EPA’s Energy Extraction Regulatory and Enforcement Initiative: The Storm is Here Colin G. Harris, Faegre Baker Daniels, Boulder, CO
UNCONVENTIONAL OIL AND GAS PLAYS
2
UPSTREAM
► Source: Michael W. Conder and April D. Schroer, Production Facility Design (2015)
3
MIDSTREAM
4
DRIVERS OF INCREASED REGULATION: MORE PRODUCTION
5
DRIVERS OF INCREASED REGULATION: MORE PRODUCTION
6
DRIVERS OF INCREASED REGULATION: “FRACKING” ► 2-3 Day Fracking Process Source: EPA
7
DRIVERS OF INCREASED REGULATION: MULTI-WELL PADS
8
DRIVERS OF INCREASED REGULATION: OZONE AND METHANE
9
DRIVERS OF INCREASED REGULATION: LOCATION OF OIL AND GAS DEVELOPMENT
10
DRIVERS OF REGULATION: LOCATION OF OIL AND GAS DEVELOPMENT
11
DRIVERS OF REGULATION: LOCATION OF OIL AND GAS DEVELOPMENT
12
DRIVERS OF REGULATION: LOCATION OF OIL AND GAS DEVELOPMENT
13
DRIVERS OF REGULATION: LOCATION OF OIL AND GAS DEVELOPMENT
14
DRIVERS OF REGULATION: LOCATION OF OIL AND GAS DEVELOPMENT
15
DRIVERS OF REGULATION: STONE AGE THINKING (“COMMAND AND CONTROL”)
16
“QUAD O”
17
► CAA section 111 " Emission standards for new and modified facilities
(“NSPS”) in production and transmission " 40 CFR Part 60, Subpart OOOO - - OOOOa
► Quad O (2012) " “VOCs”
► Quad Oa (2016) " VOCs/Methane
QUAD O/Oa: WELL COMPLETION
► Flowback " fracturing fluids, water, and reservoir gas or oil (or
both) surface at a high velocity and volume " Mixture may contain a high volume of VOCs and
methane " Must limit by either
► Performing a “green completion” ► Or sending to a control device (combustion
unit) 18
QUAD O/Oa: WELL PRODUCTION
► Source: Magnetrol
19
QUAD O/Oa: “FLARING”
► Source: University of North Dakota Energy & Environmental Research Center
20
QUAD O/Oa: WELL PRODUCTION
► Source: Texas DEQ
21
QUAD O/Oa: WELL PRODUCTION
► Source: Texas Environmental Research Consortium
22
QUAD O/Oa: WELL PRODUCTION
23
QUAD O/Oa: STORAGE VESSELS
► Applicability: 6 tons per year " Could be as low as 20 barrels of oil produced/1 mcf emission " tanks connected in parallel considered single tank? " Valid state permit can limit VOCs to less than 6 tons per year
► Reduce VOC emissions by 95% ► Performance testing of control devices
" Pre-certification " Field test
► Tank and vapor control system design and certification " Caution: EPA believes operators have not properly designed their
tank piping systems and air emission control devices to handle “peak flows” from separators
24
QUAD O/Oa: STORAGE VESSELS
► Source: Emerson Process Management
25
QUAD O/Oa: STORAGE VESSELS
► Photoionization Detector
► Infrared Imaging Camera " Can “see” methane leaks and volatile organic compounds " Displays real-time visual image " Does not quantify or speciate
26
QUAD O/Oa: LDAR
►
► Texas Commission on Environmental Quality
27
QUAD O/Oa: LDAR
► Prevent fugitive emissions " fugitive emission = visible using OGI or a reading of 500
ppm or greater using EPA’s Method 21 ► Prohibits fugitive emissions from cover of a tank (e.g.,
access hatches, sampling ports, pressure relief valves) ► Use optical gas imaging or Method 21 to conduct a leak
survey ► Repair leaks within 30 days ► Strategies
28
ENFORCEMENT: NOBLE ENERGY CONSENT DECREE
► EPA/State alleged that vapor control systems at well pads were undersized
► Relied on State law " Colorado’s SIP: “all air pollution equipment shall be adequately designed and
sized…to handle reasonably foreseeable fluctuations in emissions of [VOC’s]. Fluctuations in emissions that occur when the separator dumps into the tank are reasonably foreseeable.”
► Regulation through enforcement " Basin wide settlement " Applies to existing facilities
► “Next Generation” monitoring/reporting concepts applied ► “Quad O on steroids”
29
ENFORCEMENT: NOBLE ENERGY CONSENT DECREE
► Sample Develop Model Perform Design Evaluation VCS Modifications Verification
► Source: Michael W. Conder and April D. Schroer, Production Facility Design (2015) 30
ENFORCEMENT: NOBLE ENERGY CONSENT DECREE
► Multiple avenues to trigger well shut-ins ► EPA estimates $73 million total value of settlement " ≈ $13 million in in civil penalties/SEP’s/mitigation
project funding " EPA estimated ≈ $60 million in equipment
upgrades/changes ► IR camera inspection triggers ► Elaborate reporting including to public via website ► Impacts asset sales/restructuring
31
ENFORCEMENT: NOBLE ENERGY CONSENT DECREE
► Read the consent decree ► Read the End of Phase Reports This is the template EPA wants for you!
32
ENFORCEMENT: COMPLIANCE ALERT
33
ENFORCEMENT: CAA INFORMATION REQUESTS
► CAA §114 requests to numerous operators in Region 8 and 6
► Declare whether design analyses of VCS completed and provide to EPA
► Perform design analysis to verify VCS has capacity to handle peak emissions
► Provide detailed information so EPA can perform independent design analysis
► CAA §114 response strategies
34
North Dakota and EPA: Breakdown in Cooperative Federalism Over the Energy Extraction Initiative
► What is Cooperative Federalism? ► Lessons
35
Questions?
36