+ All Categories
Home > Documents > Episode 3: Concept detailing

Episode 3: Concept detailing

Date post: 11-Jan-2016
Category:
Upload: binah
View: 38 times
Download: 1 times
Share this document with a friend
Description:
Episode 3: Concept detailing. Episode 3 - CAATS II Final Dissemination Event. Episode 3. Brussels, 13 & 14 Oct 2009. Concept Results. Approach for Concept work developed ATM Process structure, documents with different perspectives Comprehensive, structured concept documents produced - PowerPoint PPT Presentation
6
1 Episode 3 Episode 3: Concept detailing Episode 3 - CAATS II Final Dissemination Event Episode 3 Brussels, 13 & 14 Oct 2009
Transcript
Page 1: Episode 3: Concept detailing

1

Episode 3

Episode 3: Concept detailing

Ep

isod

e 3

- C

AA

TS

II Fin

al D

isse

min

ati

on E

vent

Episode 3

Brussels, 13 & 14 Oct 2009

Page 2: Episode 3: Concept detailing

2

Episode 3

Concept Results

Approach for Concept work developed ATM Process structure, documents with different perspectives

Comprehensive, structured concept documents produced Detailed concept descriptions produced with new detail for

Network Management Operations 4D Trajectory Operations Airport Operations

Lessons Learnt

Page 3: Episode 3: Concept detailing

3

Episode 3

Concept Documentation

Supporting validation activities Concept descriptions for exercises

ATM Process Model

Detailed Operational Descriptions

DODs

Operational Scenarios

Storyboards

Support implementation of SESAR Target Concept Production of specifications

Need comprehensive coverage Sufficient level of detail Future OSED production

Page 4: Episode 3: Concept detailing

4

Episode 3

Ex DOD

D3

Ex DODEx DODEx DOD

D3

Page 5: Episode 3: Concept detailing

5

Episode 3

Concept Detail Added

Network Management Operations Military involvement in FUA planning detailed Need for additional actor identified Performance criteria formulated for support to CDM processes Need for tools identified and early proposals for scope of tools

4D Trajectory Operations Update and revision process detailed SBT to RBT agreement detailed Consistent terminology for planning, ATC and airport operations implemented Actors roles and responsibilities detailed, MSP actor role refined Operability of controller role in en route and TMA operations assessed as OK

Airport Operations Scenarios for airport operations developed (execution and planning) Airport Operations Plan characterised Performance criteria formulated for airport management tool Need for additional actor identified

Page 6: Episode 3: Concept detailing

6

Episode 3

Concept Lessons Learnt

Concept Authority Someone needed with the authority (SESAR) to make concept

decisions

A Framework is required to structure the concept Checks for gaps and overlaps EP3 used the ATM Process Model

Need different document types for different users DODs, Scenarios, Storyboards, Use Cases


Recommended