Episode 3
Concept Results
Approach for Concept work developed ATM Process structure, documents with different perspectives
Comprehensive, structured concept documents produced Detailed concept descriptions produced with new detail for
Network Management Operations 4D Trajectory Operations Airport Operations
Lessons Learnt
3
Episode 3
Concept Documentation
Supporting validation activities Concept descriptions for exercises
ATM Process Model
Detailed Operational Descriptions
DODs
Operational Scenarios
Storyboards
Support implementation of SESAR Target Concept Production of specifications
Need comprehensive coverage Sufficient level of detail Future OSED production
4
Episode 3
Ex DOD
D3
Ex DODEx DODEx DOD
D3
5
Episode 3
Concept Detail Added
Network Management Operations Military involvement in FUA planning detailed Need for additional actor identified Performance criteria formulated for support to CDM processes Need for tools identified and early proposals for scope of tools
4D Trajectory Operations Update and revision process detailed SBT to RBT agreement detailed Consistent terminology for planning, ATC and airport operations implemented Actors roles and responsibilities detailed, MSP actor role refined Operability of controller role in en route and TMA operations assessed as OK
Airport Operations Scenarios for airport operations developed (execution and planning) Airport Operations Plan characterised Performance criteria formulated for airport management tool Need for additional actor identified
6
Episode 3
Concept Lessons Learnt
Concept Authority Someone needed with the authority (SESAR) to make concept
decisions
A Framework is required to structure the concept Checks for gaps and overlaps EP3 used the ATM Process Model
Need different document types for different users DODs, Scenarios, Storyboards, Use Cases