+ All Categories
Home > Documents > EPS Edge Protection- Anchor Check

EPS Edge Protection- Anchor Check

Date post: 28-Sep-2015
Category:
Upload: bogdim2003
View: 5 times
Download: 0 times
Share this document with a friend
Description:
Ancor check
Popular Tags:
3
Tour 25 Harrow, M Tel. 0 F H1 = F T BRIEF EPS Edge Anchor: M Post & Sl Post heigh Slab brac Loading c Horizonta Moment d Tension fo Design Lo reen Group Cecil Road Middlesex, HA3 5Q 02084247998 0.3kN 1425 = 7.125kN : e Protection S M16 - R-DCA W lab Bracket d ht ket bottom pla considered in l load at the to due to horizont orce in Ancho oad of M16 - R QY Proje Secti Calc. 60 A Ov e to F M H1 System used w Wedge Ancho details: ate diameter n accordance op of the post tal force at the r due to mome R-DCA Wedge ect on EPS by MM Da e rturning mo F H1 , M H1 =0.4 2 with EPS Slab or e with: BS EN e bottom ent e Anchor Observato Edge Protect ate 4/23/2015 ment due 2 8kNm Bracket h = 1.425 m d = 120 mm N 13374:2013 FH1 = 0.3 kN MH1 = FH1 * h T = MH1 /(d / NRd = 17.35 NRd > T “Anchors pu ory House ion – Anchor c Chk'd by m m N h = 0.428 kNm / 2) = 7.125 kN 5 kN ullout strength check Date EPS Slab B m N PA h is sufficient” Job Ref. Sheet no App'd by Bracket ASS TNB 396 ./rev. 1 Date EPS Po ost
Transcript
  • Tour25

    Harrow, MTel. 0

    FH1 =

    FT

    BRIEFEPS EdgeAnchor: M

    Post & SlPost heighSlab brac Loading cHorizontaMoment dTension foDesign Lo

    reen Group Cecil Road

    Middlesex, HA3 5Q02084247998

    0.3kN

    1425

    = 7.125kN

    : e Protection S

    M16 - R-DCA W

    lab Bracket dht ket bottom pla

    considered inl load at the to

    due to horizontorce in Anchooad of M16 - R

    QY

    Proje

    Secti

    Calc.

    60

    AOveto F

    MH1

    System used wWedge Ancho

    details:

    ate diameter

    n accordanceop of the post tal force at ther due to momeR-DCA Wedge

    ect

    on EPS

    by MM

    Da

    erturning m oFH1, MH1=0.42

    with EPS Slab or

    e with: BS EN

    e bottoment e Anchor

    Observato

    Edge Protectate 4/23/2015

    m ent due28kNm

    Bracket

    h = 1.425 md = 120 mm

    N 13374:2013FH1 = 0.3 kNMH1 = FH1 * hT = MH1 /(d /NRd = 17.35

    NRd > T Anchors pu

    ory House

    ion Anchor cChk'd by

    m m

    N h = 0.428 kNm/ 2) = 7.125 kN

    5 kN

    ullout strength

    check Date

    EPS Slab B

    m N

    PAh is sufficient

    Job Ref.

    Sheet no

    App'd by

    Bracket

    ASS

    TNB 396 ./rev.

    1 Date

    EPS Po

    ost

  • Tour25

    Harrow, MTel. 0

    reen Group Cecil Road

    Middlesex, HA3 5Q02084247998

    QY

    Proje

    Secti

    Calc.

    ect

    on EPS

    by MM

    Da

    Observato

    Edge Protectate 4/23/2015

    ory House

    ion Anchor cChk'd by

    check Date

    Job Ref.

    Sheet no

    App'd by

    TNB 396 ./rev.

    2 Date

  • Tour25

    Harrow, MTel. 0

    reen Group Cecil Road

    Middlesex, HA3 5Q02084247998

    QY

    Proje

    Secti

    Calc.

    ect

    on EPS

    by MM

    Da

    Observato

    Edge Protectate 4/23/2015

    ory House

    ion Anchor cChk'd by

    check Date

    Job Ref.

    Sheet no

    App'd by

    TNB 396 ./rev.

    3 Date


Recommended