BREAKWATER AND MARINE BREAKWATER AND MARINE DOCK CONSTRUCTIONDOCK CONSTRUCTION
EQUIPMENTEQUIPMENT
CATALOGUE 2007CATALOGUE 2007
BREAKWATER & DOCK CONSTRUCTION EQUIPMENT
CONCRETE BLOCK EXTRACTION CLAMP TECHNICAL DATA
MULTI BLOCK SIZE EXTRACTION CLAMP
Three finger clamp operated through gravity blocking system. Using hoist and two wire ropes, one to close and lift the load and the other to open
and lift unloaded.
Clamp mass: 9,5 Ton
Block mass : Multi-size 30 & 45 Ton.
Drive system : Two wire ropes & hoist.
Standard : EN - 13155
Clamps for other block sizes on request.
C/ Marqué s de San Esteban Nº9 4º33206 Gijón – Asturias – Españ a
Tfno: 0034 984199692 Fax: 0034 984199992www.natec-ingenieros.com [email protected]
BLOCK HANDLING CLAMP FOR STORAGE PARK
MULTI BLOCK SIZE HANDLING CLAMP FOR
SIZES 30 & 60 Ton
Four shoe clamp operated through gravity blocking system. Ideal for handling concrete
blocks after short cure periods in block production facilities. Single rope wire lifting system with
pneumatic or hydraulic anchoring system in open position. Two wire rope system available.
Clamp mass: 6,5 Ton
Block mass : Multi-size 30 & 60 Ton.
Drive system : Single wire rope with anchor system. Two wire rope system available.
Standard : EN - 13155
Clamps for other block sizes on request.
C/ Marqué s de San Esteban Nº9 4º33206 Gijón – Asturias – Españ a
Tfno: 0034 984199692 Fax: 0034 984199992www.natec-ingenieros.com [email protected]
BREAKWATER & DOCK CONSTRUCTION EQUIPMENT
TECHNICAL DATA
HANDLING CLAMP FOR 145 Ton BLOCKS
Four shoe clamp operated through gravity blocking system. Ideal for handling concrete
blocks after short cure periods in block production facilities. Single rope wire lifting system with
pneumatic or hydraulic anchoring system in open position. Two wire rope system available.
Clamp mass: 12 Ton.
Block mass : 145 Ton.
Drive system : Single wire rope with anchor system. Two wire rope system available
Stasndard : EN - 13155
Clamps for other block sizes on request.
C/ Marqué s de San Esteban Nº9 4º33206 Gijón – Asturias – Españ a
Tfno: 0034 984199692 Fax: 0034 984199992www.natec-ingenieros.com [email protected]
BREAKWATER & DOCK CONSTRUCTION EQUIPMENT
TECHNICAL DATABLOCK HANDLING CLAMP FOR STORAGE PARK
MULTI BLOCK SIZE HANDLING CLAMP FORSIZES 145 & 200 Ton
Four shoe clamp operated through gravity blocking system. Ideal for handling concrete
blocks after short cure periods in block production facilities. Single rope wire lifting system with
pneumatic or hydraulic anchoring system in open position. Two wire rope system available.
Clamp mass: 17 Ton
Block mass : Multi-size 145 & 200 Ton.
Drive system : Single wire rope with anchor system. Two wire rope system available
Standard : EN - 13155
Clamps for other block sizes on request.
C/ Marqué s de San Esteban Nº9 4º33206 Gijón – Asturias – Españ a
Tfno: 0034 984199692 Fax: 0034 984199992www.natec-ingenieros.com [email protected]
BREAKWATER & DOCK CONSTRUCTION EQUIPMENT
TECHNICAL DATABLOCK HANDLING CLAMP FOR STORAGE PARK
MULTIPLE BLOCK HANDLING CLAMP FOR 4 BLOCKS x 10 TON
Clamp operated through gravity blocking system for 4 blocks x 10 Tons simultaneously. Single
rope wire lifting system with pneumatic or hydraulic anchoring system in open position.
Hydraulic blocking system available.
Clamp mass: 4,9 Ton
Block mass : 4 x 10 Ton.
Drive system : Single wire rope with anchor system. Hydraulic system available
Standard : EN - 13155
Clamps for other block sizes on request.
C/ Marqué s de San Esteban Nº9 4º33206 Gijón – Asturias – Españ a
Tfno: 0034 984199692 Fax: 0034 984199992www.natec-ingenieros.com [email protected]
BREAKWATER & DOCK CONSTRUCTION EQUIPMENT
TECHNICAL DATABLOCK HANDLING CLAMP FOR STORAGE PARK
BLOCK POSITIONING CLAMP
Two finger clamp with gravity blocking system for positioning and extraction of blocks in breakwater sea dikes. Two wire rope handling system, one to close and lift the load and the other to open and
lift unloaded.
Clamp mass: 9,3 Ton
Block mass : 145 Ton.
Drive system : Two wire rope handling system.
Standard : EN – 13155
Clamps for other block sizes on request.
C/ Marqué s de San Esteban Nº9 4º33206 Gijón – Asturias – Españ a
Tfno: 0034 984199692 Fax: 0034 984199992www.natec-ingenieros.com [email protected]
BREAKWATER & DOCK CONSTRUCTION EQUIPMENT
TECHNICAL DATABLOCK POSITIONING CLAMP IN BREAKWATER
CLAMPS FOR DEMOULDING AND MOULD HANDLING
DEMOULDING CLAMP FOR SEVERAL BLOCK SIZES : 30 & 60 Ton . TWO BLOCKS
PER MOULD.
Hydraulic demoulding clamp for twin moulds, containing 2 blocks of 30 or 60 Ton per block. Same clamp usable for the two block sizes.
Clamp also for mould handling.
Clamp mass: 2,9 Ton
Block mass : 2 x 30 Ton & 2x 60 Ton.
Drive system : Hydraulic from Crane or On-board hydraulic unit.
Standard : EN – 13155
Clamps for other block sizes on request.
C/ Marqué s de San Esteban Nº9 4º33206 Gijón – Asturias – Españ a
Tfno: 0034 984199692 Fax: 0034 984199992www.natec-ingenieros.com [email protected]
BREAKWATER & DOCK CONSTRUCTION EQUIPMENT
TECHNICAL DATA
DEMOULDING CLAMP FOR SEVERAL BLOCK SIZES : 145 & 200 Ton. ONE BLOCK
PER MOULD.
Hydraulic demoulding clamp for single moulds, containing 1 block of 145 or 200 Ton per block.
Same clamp usable for the two block sizes. Clamp also for mould handling.
Clamp mass : 11 Ton
Block mass : 145 Ton & 200 Ton.
Drive system : Hydraulic from Crane or On-board hydraulic unit.
Standard : EN – 13155
Clamps for other block sizes on request.
C/ Marqué s de San Esteban Nº9 4º33206 Gijón – Asturias – Españ a
Tfno: 0034 984199692 Fax: 0034 984199992www.natec-ingenieros.com [email protected]
BREAKWATER & DOCK CONSTRUCTION EQUIPMENT
TECHNICAL DATACLAMPS FOR DEMOULDING AND MOULD HANDLING
DEMOULDING CLAMP FOR CLUSTER MOULDS. FOUR BLOCKS PER MOULD.
15 TON BLOCKS
Hydraulic demoulding clamp for cluster moulds, containing 4 blocks of 15 Ton per block.
Clamp also for mould handling.
Clamp mass: 4,8 Ton
Block mass : 4 x 15 Ton
Drive system: Hydraulic from Crane or On-board hydraulic unit
Standard : EN – 13155
Clamps for other block sizes on request.
C/ Marqué s de San Esteban Nº9 4º33206 Gijón – Asturias – Españ a
Tfno: 0034 984199692 Fax: 0034 984199992www.natec-ingenieros.com [email protected]
BREAKWATER & DOCK CONSTRUCTION EQUIPMENT
TECHNICAL DATACLAMPS FOR DEMOULDING AND MOULD HANDLING
DEMOULDING CLAMP FOR TWEEN BLOCKS SIZE 150 Ton . TWO BLCOKS PER MOULD.
Hydraulic demoulding clamp for twin moulds, containing 2 blocks of 150 Ton per block.
Clamp also for mould handling.
Clamp mass: 10,9 Ton
Block mass : 2 x 150 Ton
Drive system : Hydraulic from Crane or On-board hydraulic unit
Standard : EN – 13155
Clamps for other block sizes on request.
C/ Marqué s de San Esteban Nº9 4º33206 Gijón – Asturias – Españ a
Tfno: 0034 984199692 Fax: 0034 984199992www.natec-ingenieros.com [email protected]
BREAKWATER & DOCK CONSTRUCTION EQUIPMENT
TECHNICAL DATACLAMPS FOR DEMOULDING AND MOULD HANDLING
MECHANICAL FORK GRAB FOR ROCKDISPLACEMENT
MECHANICAL FORK GRAB FOR ROCK DISPLACEMENT. 5 m³ CAPACITY
Operation system using hoist and two wire ropes, one to close and lift the load, and the other to open and lift unloaded. 5 m³ capacity for large
size rocks and heavy duty.
Fork Grab mass: 17,1 Ton
Capacity : 5 m³
Drive system : Two wire ropes & hoist.
Standard : EN – 13155
Ask for other sizes or capacities.
C/ Marqué s de San Esteban Nº9 4º33206 Gijón – Asturias – Españ a
Tfno: 0034 984199692 Fax: 0034 984199992www.natec-ingenieros.com [email protected]
BREAKWATER & DOCK CONSTRUCTION EQUIPMENT
TECHNICAL DATA
MOULDS FOR CONCRETE CUBIC BLOCKS
MOULDS FOR VERTICAL DEMOULDING :
Ø Mould cluster for blocks : 4 x 15 ton.
Mould mass : 4,7 Ton
ØMould cluster for blocks : 2 x 60 ton.
Mould mass : 7,6 Ton
ØMould cluster for blocks : 2 x 150 ton.
Mould mass : 16,5 Ton
Other block sizes on request.
C/ Marqué s de San Esteban Nº9 4º33206 Gijón – Asturias – Españ a
Tfno: 0034 984199692 Fax: 0034 984199992www.natec-ingenieros.com [email protected]
BREAKWATER & DOCK CONSTRUCTION EQUIPMENT
TECHNICAL DATA
C/ Marqué s de San Esteban Nº9 - 4º33206 Gijón – Asturias – Españ a
Tfn: 0034 984199692 Fax: 0034 [email protected]