VACUUM EJECTORVACUUM EJECTOR
DHI UDHI RTOModerator KBK Proses
8/13/2019 Equipment of Vacuum Ejector
2/34
STEAM JET EJECTOR
8/13/2019 Equipment of Vacuum Ejector
3/34
STEAM JET EJECTOR
8/13/2019 Equipment of Vacuum Ejector
4/34
LIQUID RING PUMP OPERATION
8/13/2019 Equipment of Vacuum Ejector
5/34
LIQUID RING
8/13/2019 Equipment of Vacuum Ejector
6/34
LIQUID RING PUMP PRESSURE RANGE
8/13/2019 Equipment of Vacuum Ejector
7/34
ADVANTAGES OF EJECTOR OVER OTHER TYPES OF VACUUM PUMPS
8/13/2019 Equipment of Vacuum Ejector
8/34
TWO STAGE CONDENSING WITH DIRECT CONTACT INTERCONDENSER
8/13/2019 Equipment of Vacuum Ejector
9/34
EJECTOR OPERATION
8/13/2019 Equipment of Vacuum Ejector
10/34
LOBE TYPE POSITIVE DISPLACEMENT VACUUM PUMP
8/13/2019 Equipment of Vacuum Ejector
11/34
EJECTOR CHARACTERISTICS
8/13/2019 Equipment of Vacuum Ejector
12/34
MOLLIER CHARTSATURATED STEAM MOTIVE AND VAPOR SUCTION FLUID
8/13/2019 Equipment of Vacuum Ejector
13/34
8/13/2019 Equipment of Vacuum Ejector
14/34
EJECTOR PERFORMANCE CURVE
8/13/2019 Equipment of Vacuum Ejector
15/34
EJECTOR PERFORMANCE CURVE
EFFECT OF NOZZLE POSITION ON PERFORMANCE CURVE
8/13/2019 Equipment of Vacuum Ejector
16/34
EFFECT OF NOZZLE POSITION ON PERFORMANCE CURVE
CONTROL BY THROTTLING INLET VAPOR LINE
8/13/2019 Equipment of Vacuum Ejector
17/34
CONTROL BY THROTTLING INLET VAPOR LINE
CONTROL BY ADDITIONAL LOAD GAS THROTTLING
8/13/2019 Equipment of Vacuum Ejector
18/34
CONTROL BY ADDITIONAL LOAD GAS THROTTLING
CONTROL BY RECYCLING INTERSTAGE FLOW BACK TO SUCTION
8/13/2019 Equipment of Vacuum Ejector
19/34
CONTROL BY RECYCLING INTERSTAGE FLOW BACK TO SUCTION
EJECTOR APPLICATION INFORMATION
8/13/2019 Equipment of Vacuum Ejector
20/34
EJECTOR APPLICATION INFORMATION
SINGLE STAGE ~ 50 75 mmHg Abs
8/13/2019 Equipment of Vacuum Ejector
21/34
SINGLE STAGE ~ 50 75 mmHg Abs
TWO STAGE ~ 10 100 mmHg Abs
8/13/2019 Equipment of Vacuum Ejector
22/34
TWO STAGE ~ 10 100 mmHg Abs
LIQUID RING VACUUM PUMP
8/13/2019 Equipment of Vacuum Ejector
23/34
LIQUID RING VACUUM PUMP
THREE STAGE ~ 1 25 mmHg Abs
8/13/2019 Equipment of Vacuum Ejector
24/34
THREE STAGE 1 25 mmHg Abs
FOUR STAGE ~ 150 Microns 4 mmHg Abs
8/13/2019 Equipment of Vacuum Ejector
25/34
FOUR STAGE 150 Microns 4 mmHg Abs(1 Micron = 1/1000 mm)
EJECTOR PERFORMANCE CURVE
8/13/2019 Equipment of Vacuum Ejector
26/34
SHOWING THE EFFECT OF CHANGES IN MOL WT
8/13/2019 Equipment of Vacuum Ejector
27/34
8/13/2019 Equipment of Vacuum Ejector
28/34
CORRECTION TO STEAM RATE FOR PERCENT NONCONDENSIBLES
8/13/2019 Equipment of Vacuum Ejector
29/34
STEAM JET EJECTOR CONSUMPTION CHART
8/13/2019 Equipment of Vacuum Ejector
30/34
CONDENSATE REMOVAL UTILIZING A PUMP
8/13/2019 Equipment of Vacuum Ejector
31/34
CONDENSATE REMOVAL USING HOT WELL AND ELEVATED CONDENSERS
8/13/2019 Equipment of Vacuum Ejector
32/34
DESIGN PARAMETERS