+ All Categories
Home > Documents > Equipment Quotation

Equipment Quotation

Date post: 03-Apr-2018
Category:
Upload: danudear-daniel
View: 230 times
Download: 0 times
Share this document with a friend

of 34

Transcript
  • 7/28/2019 Equipment Quotation

    1/34

    Investment Cost 42,035.15 43,412.42 17,054.44

    Production cost 122,121.60 123,132.80 ########

    at full capacity

    operation ( Year 4)

    Cumulated cash

    flow ( year 11) 162,590.00 145,348.23 ########

    Net profit ( Year 4) 18,696.23 17,684.99 19,031.89

    NPV 69,973.79 71,019.32 43,677.59IRR 33.91% 34.12% 49.12%

    Pay back period Four years Four years Four years

    Break even at full

    capacity operation

    ( Year 4) 38% 42% 28%

    ScenarioIIIItems Scenario I Scenario II

  • 7/28/2019 Equipment Quotation

    2/34

    Sr.No Discribtionqty

    price

    in USD

    price

    in Birr

    1

    Steel structure(KBK) design for

    loading frame, engine and rear

    axle to the line

    1 set 7,608.8 84,457.94

    2

    Structure(KBK) design for

    loading frame, engine and rear

    axle to the line

    1 set 5,735.3 63,661.76

    3Hanger design for loading

    frame on the line

    1 set 841.2 9,337.06

    4Hanger design for loading

    engine on the line1 set 114.7 1,273.24

    5Hanger design for loading rear

    axle on the line1 set 382.4 4,244.12

    6Metal rack design for moving

    frame3set 4,588.2 50,929.41

    7Metal rack design for moving

    body and cargo box5set 9,558.8 106,102.94

    8

    loading body and cargo box tothe line and loading chassis off

    1set 23,132.4 256,769.12

    9Hanger design for loading body

    on the line1set 382.4 4,244.12

    10Hanger design for loading body

    on the line1set 535.3 5,941.76

    11Hanger design for loading

    frame off the line1set 420.6 4,668.53

    12 shower room 1set 17,205.9 190,985.29

    15 Motor hoist (loading body,cargo box and chassis)

    1set 1,500.0 16,650.00

    16 Motor hoist(loading frame) 1set 1,341.2 14,887.06

    17Motor hoist(loading rear axle

    and engine)1set 1,164.7 12,928.24

    18 2-pole lifter 1set 2,470.6 27,423.53

    19-

    1set 2,823.5 31,341.18

  • 7/28/2019 Equipment Quotation

    3/34

    20

    wheel alignment survey

    meter(with wheel steering angle

    survey meter)

    1set 21,176.5 235,058.82

    21Refrigerant filling-up

    machine(repair level)1set 4,376.5 48,578.82

    22 lamp survey meter 1set 14,117.6 156,705.88

    23 side slide survey meter 1set 6,882.4 76,394.12

    24brake and axle weight survey

    meter1set 14,470.6 160,623.53

    25 speed survey meter 1set 7,588.2 84,229.41

    26 exhaust survey meter 1set 4,058.8 45,052.94

    27 horn classis survey meter 1set 441.2 4,897.06

    28 survey control system 1set 35,294.1 391,764.71

    29 Torque tool 1set 14,117.6 156,705.88

    30 Air-powered assembly tool 2 set 14,117.6 156,705.8832 manual lifter 5set 5,294.1 58,764.71

    33 packing and other charge 8,000.0 88,800.00

    Total 229,741.2 2,550,127.06

    Sea and inland transport and

    duties ( 25%)57,435 637,532

    Grand Total 287,176 3,187,659

    Production 2

    Production 4 Production 5

    70,592.07 ###### $140,817.82 140,817.82 ########

    59,436.14 ###### $120,523.28 120,523.28 ########

    11,155.93 ###### $20,294.54 20,294.54 20,294.54

    15.8 14.24 $14.41 14.41 14.41

    379.20 379.20 $379.20 379.20 379.20

    10,776.73 ###### $19,915.34 19,915.34 19,915.3415.27 13.89 $14.14 14.14 14.14

    0 0 $0.00 0 0

    1,020.87 ###### $883.45 734.35 572.58

    9,755.86 ###### $19,031.89 19,180.98 19,342.75

    13.82 12.94 $13.52 13.62 13.74

    0 0 $0.00 0 0

  • 7/28/2019 Equipment Quotation

    4/34

    0 0 $0.00 0 0

    0 0 $0.00 0 0

    9,755.86 ###### $19,031.89 19,180.98 19,342.75

    0 0 $0.00 0 0

    9,755.86 ###### $19,031.89 19,180.98 19,342.75

    0.00 0.00 $0.00 5,754.30 5,802.83

    9,755.86 ###### $19,031.89 13,426.69 13,539.93

    13.82 12.94 $13.52 9.53 9.62

    0 0 $0.00 0 0

    9,755.86 ###### $19,031.89 13,426.69 13,539.93

    193.41 274.83 $377.30 266.18 268.42

    65.92 48.37 $39.90 21.97 18.14

    63.08 60.98 $64.77 45.82 45.66

    Netprofit+

    interest

    to

    invest

    ment

    23.87 29.01 $34.99 25.41 25.2

    1.868483

  • 7/28/2019 Equipment Quotation

    5/34

  • 7/28/2019 Equipment Quotation

    6/34

    ######## ######## ######## ######## ########

    ######## ######## ######## ######## ########

    20,294.54 20,294.54 20,294.54 20,294.54 20,294.54

    14.41 14.41 14.41 14.41 14.41

    277.2 277.2 277.2 277.2 277.2

    20,017.34 20,017.34 20,017.34 20,017.34 20,017.3414.22 14.22 14.22 14.22 14.22

    0 0 0 0 0

    397.06 206.63 0 0 0

    19,620.27 19,810.71 20,017.34 20,017.34 20,017.34

    13.93 14.07 14.22 14.22 14.22

    0 0 0 0 0

  • 7/28/2019 Equipment Quotation

    7/34

    0 0 0 0 0

    0 0 0 0 0

    19,620.27 19,810.71 20,017.34 20,017.34 20,017.34

    0 0 0 0 0

    19,620.27 19,810.71 20,017.34 20,017.34 20,017.34

    5,886.08 5,943.21 6,005.20 6,005.20 6,005.20

    13,734.19 13,867.50 14,012.14 14,012.14 14,012.14

    9.75 9.85 9.95 9.95 9.95

    0 0 0 0 0

    13,734.19 13,867.50 14,012.14 14,012.14 14,012.14

    272.27 274.92 277.78 277.78 277.78

    15.54 13.56 12.05 10.75 9.71

    45.72 45.54 45.34 45.34 45.34

    25.3 25.04 24.76 24.76 24.76

  • 7/28/2019 Equipment Quotation

    8/34

    Items Station wagon Pick up

    FOB price of imported components 138,971 116,400

    Sea and inland transport

    and duties

    Finishing , auxiliary materials and other over 48,601 41,455

    Total 210,605 179,640

    Cost of imported components 161,999 138,184

    Paint, battery and tyer 5,592 5,592

    Utility 985 985

    Labour 2,444 2,444

    Other costs 4,951 4,951

    175,972 152,157

    13,973 13,973

    7.94 9.18

    14327 11860

    164760.5 13639049428.15 40917

    Items Station wagon Pick up

    Cost of imported components 150,434 124,530

    Sea and inland transport and duties 30,087 24,906

    Labour cost 32,550 32,550

    Lubricants 650 650

    Tyre, Battery , Paint and utility 10,515 10,515

    Total Unit Assembling Cost 224,235 193,151

    Profit Margin ( 25%) 56,059 48,288Recommended Selling Price per unit 280,294 241,439

    73,802 68,621

    33 36

    ############

    Items Station wagon Pick up

    23,028 21,784

  • 7/28/2019 Equipment Quotation

    9/34

    Cost of imported components ( including sea a 180,520 149,436

    Lubricants 650 650

    Tyre, Battery and Paint and utility 10,515 10,515

    Total 191,685 160,601

    41,979,059 52,837,729

    94,816,788

    Items Station wagon Pick up

    Cost of imported components 158,600 131,290

    Sea and inland transport and duties 31,720 26,258

    Lubricants 650 650

    Tyre, Battery , Paint and utility 10,515 10,515

    Total Unit Assembling Cost 201,485 168,713

    44,125,186 55,506,656

    99,631,842

  • 7/28/2019 Equipment Quotation

    10/34

    14250 156892.5

    14327 150434195564

    214188.65 177307

    2402245335

    2233613550

    ###########

    176007

    195563.55

    45,130

    73,802

  • 7/28/2019 Equipment Quotation

    11/34

    Production Production Production Production

    Raw materials 54,917.13 84,918.16 111,359.74 111,359.74

    Factory supplies 0 0 0 0Utilities 266.3 411.78 540 540

    Energy 0 0 0 0

    Spare parts consumed 146.83 227.05 297.74 297.74

    Repair, maintenance, materi 157.2 243.08 318.77 318.77

    Royalties 0 0 0 0

    Labour 8,796.53 13,602.04 17,837.40 17,837.40

    Labour overhead costs (taxe 1,495.41 2,312.35 3,032.36 3,032.36

    Factory overhead costs 0 0 0 0

    FACTORY COSTS 65,779.40 101,714.44 133,386.01 133,386.01

    Administrative overhead cos 369.86 571.92 750 750OPERATING COSTS 66,149.26 102,286.36 134,136.01 134,136.01

    Depreciation 1,236.24 1,236.24 1,236.24 1,236.24

    Financial costs 1,635.05 1,635.05 1,414.96 1,176.16

    TOTAL PRODUCTION COSTS 69,020.55 105,157.65 136,787.20 136,548.41

    Direct marketing costs 246.58 381.28 1500 1500

    Marketing overhead costs 0 0 0 0

    COSTS OF PRODUCTS 69,267.12 105,538.92 137,287.20 137,048.41

    Foreign share (%) 0 0 0 0

    Variable share (%) 95.85 97.28 98.07 98.24

    8,851.27

    5,822.36 8851270

    5822360 16152

    10625

  • 7/28/2019 Equipment Quotation

    12/34

    Production Production Production Production Production Production 11

    111,359.74 111,359.74 111,359.74 111,359.74 111,359.74 111,359.74

    0 0 0 0 0 0540 540 540 540 540 540

    0 0 0 0 0 0

    297.74 297.74 297.74 297.74 297.74 297.74

    318.77 318.77 318.77 318.77 318.77 318.77

    0 0 0 0 0 0

    17,837.40 17,837.40 17,837.40 17,837.40 17,837.40 17,837.40

    3,032.36 3,032.36 3,032.36 3,032.36 3,032.36 3,032.36

    0 0 0 0 0 0

    133,386.01 133,386.01 133,386.01 133,386.01 133,386.01 133,386.01

    750 750 750 750 750 750134,136.01 134,136.01 134,136.01 134,136.01 134,136.01 134,136.01

    1,236.24 956.59 956.59 956.59 956.59 956.59

    917.07 635.95 330.94 0 0 0

    136,289.31 135,728.54 135,423.53 135,092.59 135,092.59 135,092.59

    500 500 500 500 500 500

    0 0 0 0 0 0

    136,789.31 136,228.54 135,923.53 135,592.59 135,592.59 135,592.59

    0 0 0 0 0 0

    98.43 98.83 99.05 99.29 99.29 99.29

  • 7/28/2019 Equipment Quotation

    13/34

    Items tation wago Pick up

    Cost of imported components ( including sea

    and inland transport and duties)190,320 157,548

    Lubricants 650 650

    Tyre, Battery and Paint and utility 10,515 10,515

    Labour cost 33,600 28,800

    Otheres 16,152 8,800

    Total Unit Assembling Cost 251,237 206,313

    Profit Margin ( 20%) 50,247 41,263

    Recommended Selling Price per unit 301,484 247,576

    60,917

    24

    Items tation wago Pick up

    Cost of imported components ( including sea

    and inland transport and duties)190,320 157,548

    Lubricants 650 650

    Tyre, Battery and Paint and utility 10,515 10,515

    Labour cost 33,600 33,600

    Otheres 16,152 16,152Total Unit Assembling Cost 251,237 218,465

    Profit Margin ( 20%) 50,247 43,693

    Recommended Selling Price per unit 301,484 262,158

    60,917

    24

  • 7/28/2019 Equipment Quotation

    14/34

    14327 11860

    158599.9 131290.2

    190320 157548

    247415.8

    57,096

  • 7/28/2019 Equipment Quotation

    15/34

    Sr.N Activities Labour Cost

    1 Engine and engin parts mounti 1,200

    2 Fuel system and air filter as 550

    3 Muffer system assembelly 450

    4 Clutch system 8505 Transmition system 500

    6 Fron axle and rear axle 400

    7 Propeller shaft system 200

    8 Defferential 450

    9 Fram system 350

    10 Suspantion system 450

    11 Whell system 200

    12 Steering system 1,000

    13 Braking system 900

    14 Electronic parts 1,50015 Instrumental panales 500

    16 Name plate in car tooles asse 250

    17 Door wireing harnes system 450

    18 Lamp system 250

    19 Body suspention system 400

    20 Body floor system ( 1,250

    21 Wire and wire shild 350

    22 Front well system ( with upho 1,100

    23 Side window system 850

    24 Sun roof and rach system 550

    25 Safty belt system 15026 Fron door lock and front door 350

    27 Rear door lock and rear door 350

    28 Tail door system 150

    29 Seat system 250

    30 All hock and lock 150

    31 Sound system 150

    32 A/C system 250

    33 Side wall 350

    34 Engin hood 600

    35 Painting 1,500 2170036 Otheres 2,500

    37 Over head 10,850

    Total 32,55017,837,400

  • 7/28/2019 Equipment Quotation

    16/34

    S/N

    Basic requirement

    qty

    1

    KBK

    Steel structure(KBK)

    design for loading frame,

    engine and rear axle to

    the line

    KBK

    Meet requirement of KBK

    structure

    11

    set

    2

    KBK

    Structure(KBK) design for

    loading frame, engine and

    rear axle to the line

    5001000

    Meet the requirement of

    500kg and 1000kg motor

    hoist ring chain usage

    11

    set

    3 Hanger design for loading

    frame on the line

    Meet the requirement

    11

    set

    4

    Hanger design for loading

    engine on the line

    Meet the requirement

    11

    set

    5 Hanger design for loading

    rear axle on the line

    Meet the requirement

    11

    set

    6

    Metal rack design formoving frame

    Front and rear supportis separated, each one

    could move separately.

    33set

    7

    Metal rack design for

    moving body and cargo box

    55set

    8

    Steel structure design

    for loading body and

    cargo box to the line and

    loading chassis off the

    line

    2000

    Meet the requirement of

    200kg motor hoist usague

    11set

    9 Hanger design for loadingbody on the line

    Meet the requirement

    11set

    10 Hanger design for loading

    body on the line

    Meet the

    requirement11set

    11 Hanger design for loading

    frame off the line

    Meet the requirement11set

    12 shower room 11set

    Price List of equipments and tools

    1.Equipments list

    Job content

  • 7/28/2019 Equipment Quotation

    17/34

    13 air compressore and pipes 11set

    14 paint room

    could coating paint

    and bake paint

    11set

    S/N

    Model Qty

    1

    Motor hoist (loading

    body, cargo box and

    chassis)

    2000kg 1

    2

    Motor hoist(loading

    frame)1000kg 1

    Motor hoist(loading rearaxle and engine) 500kg 1

    3

    2-pole lifter 4000kg 1

    4

    4-pole lifter(test wheel

    alignment)4000kg 1

    5

    wheel alignment survey

    meter(with wheel steering

    angle survey meter)

    1

    6

    Refrigerant filling-up

    machine(repair level) 1

    7 lamp survey meter 1

    8

    side slide survey meter 1

    9

    brake survey meter 1

    10

    axle weight survey meter 1

    11

    speed survey meter 1

    12 exhaust survey meter 1

    13

    horn classis survey meter 1

    Sub total

    2Tools and racks listName

  • 7/28/2019 Equipment Quotation

    18/34

    14 survey control system 1

    15 vehicle Fault Diagnosis

    meterX431 1

    16 Torque tool 1

    17

    18 Air-powered assembly tool 1

    19 fuel filling-up machine 1

    20 fork lifter 3 tone 121 manual lifter 2 tone 5

    S/N

    1 2

    1 Equipments list $130,726.47

    2

    Tools and racks list $166,235.29

    3 packing and other charge $8,000.00

    Total $304,961.76

    Sun-totla

    All the charge in total

    Remark

    1FOB

    The price is base on FOB Tianjin in USD2

    The above-mentioned price is valid within 30 days from the date of quoting(Decem

    explaining right subject to Great Wall Company.

    310%

    Install,debug and training charge and requirements shall to be negotiated separat

    total value.

    3packing and other charge

    Name

    packing chargeinstall,debug and training charge

  • 7/28/2019 Equipment Quotation

    19/34

    unit pricein USD

    $7,608.82

    $5,735.29

    $841.18

    $114.71

    $382.35

    $4,588.24

    $9,558.82

    $23,132.35

    $382.35

    $535.29

    $420.59

    $17,205.88

  • 7/28/2019 Equipment Quotation

    20/34

    $21,985.29

    $38,235.29

    $130,726.47

    Remark

    $1,500.00MD2-

    6wirerope

    $1,341.18PKring

    chain

    $1,164.71 PK

    ringchain

    $2,470.59

    $2,823.53 with

    wheel spinner

    $21,176.47

    $4,376.47

    $14,117.65

    $6,882.35

    $14,470.59

    $0.00

    $7,588.24

    $4,058.82

    $441.18

    one

    unit

    equipment

  • 7/28/2019 Equipment Quotation

    21/34

    $35,294.12

    could be

    cancelled if

    not cannect

    to the web

    $0.00

    suggest to

    buy fromafter sales

    dept as

    precision

    instrument

    $14,117.65

    $5,294.12

    $7,058.82

    $0.00suggested buy

    in local

    $16,764.71$5,294.12

    $166,235.29

    price inUSD Remark

    $8,000.00

    er 19th, 2008), and the

    ely, it is about 10% of

    to be negotiatedseparately

  • 7/28/2019 Equipment Quotation

    22/34

    Particulars Cost % share

    Raw materials 94,816.8 77.86

    Utilities 540.0 0.44

    Spare parts 407.7 0.33

    Repair and maintenance 203.9 0.17

    Working Premiss rental 900.0 0.74

    Labour 17,837.4 14.65

    Labour overhead costs 3,567.5 2.93

    Administrative overhead costs 750.0 0.62

    Marketing and distribution cost 1,500.0 1.23

    Depreciation 379.2 0.31

    Financial costs 883.5 0.73

    TOTAL PRODUCTION CO 121,785.9 100

    5,044.26 12,010.18

    4,380.86 ########

    1,211.30 3,832.96 3,832.96

    3,066.60 8,943.58 8,943.58

    4,277.90 ######## ########

    Equity Loan

  • 7/28/2019 Equipment Quotation

    23/34

    17,054.44

    Total

  • 7/28/2019 Equipment Quotation

    24/34

    Producti

    Raw mate ########

    Factory 0

    Utilitie 266.3

    Energy 0

    Spare pa 201.08

    Investment

    cost Repair, 100.54

    Civil works, structures and buil 250 Royaltie 4,438.36

    Plant machinery and equipment 3,187.66 Labour 8,796.53

    Vehicles 600 Labour o 1,759.31

    Office furniture and equipment - Factory 0Initial working capital* 12,776.54 FACTORY ########

    Pre production cost** 240.24 Administ 369.86

    TOTAL INVESTMENT CO 17,054.44 OPERATIN ########

    Deprecia 379.20

    Financia 1,020.87

    4,277.90 TOTAL PR ########

    Direct m 739.73

    Marketin 0

    COSTS OF ########

    Foreign 0Variable 97.84

    Items

  • 7/28/2019 Equipment Quotation

    25/34

    Producti Production Producti Producti Producti Producti Producti Producti Productio

    ######## 94,816.79 ######## ######## ######## ######## ######## ######## ########

    0 0 0 0 0 0 0 0 0

    411.78 540 540 540 540 540 540 540 540

    0 0 0 0 0 0 0 0 0

    310.93 407.74 407.74 407.74 407.74 407.74 407.74 407.74 407.74

    155.46 203.87 203.87 203.87 203.87 203.87 203.87 203.87 203.87

    6,863.01 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

    ######## 17,837.40 ######## ######## ######## ######## ######## ######## ########

    2,720.41 3,567.48 3,567.48 3,567.48 3,567.48 3,567.48 3,567.48 3,567.48 3,567.48

    0 0 0 0 0 0 0 0 0######## 126,373.28 ######## ######## ######## ######## ######## ######## ########

    571.92 750 750 750 750 750 750 750 750

    ######## 127,123.28 ######## ######## ######## ######## ######## ######## ########

    379.20 379.20 379.20 379.20 277.2 277.2 277.2 277.2 277.2

    1,020.87 883.45 734.35 572.58 397.06 206.63 0 0 0

    ######## 128,385.93 ######## ######## ######## ######## ######## ######## ########

    1,143.84 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

    0 0 0 0 0 0 0 0 0

    ######## 129,885.93 ######## ######## ######## ######## ######## ######## ########

    0 0 0 0 0 0 0 0 098.59 99.03 99.14 99.27 99.48 99.63 99.78 99.78 99.78

  • 7/28/2019 Equipment Quotation

    26/34

    n 11

  • 7/28/2019 Equipment Quotation

    27/34

    Total in Starting Construc Producti ProductiDisbursement ######## ######## 2,826.36 8,943.58 0

    Repayment ######## 0 0.00 0.00 4,160.01

    Debt balance 0.00 ######## ######## ######## ########

    Capitalized interest 1,720.47 0 1,720.47 0 0

    Interest payable ######## 0 0 2,626.91 2,626.91

  • 7/28/2019 Equipment Quotation

    28/34

  • 7/28/2019 Equipment Quotation

    29/34

    Producti Producti Producti Producti Produ Production Scrap Production0 0 0 0 0 0 0 0

    4,513.61 4,897.27 5,313.53 5,765.19 #### 0 0 0

    ######## ######## ######## 6,255.23 0.00 0 0 0

    0 0 0 0 0 0 0 0

    2,273.31 1,889.65 1,473.39 1,021.73 532 0 0 0

    Year isbursementCapitaliz

    ed

    interest

    Repayment

    1 20,240.78 1,720.47 0.00

    2 8,943.58 0 0.00

    3 0 0 4,160.01

    4 0 0 4,513.61

    5 0 0 4,897.27

  • 7/28/2019 Equipment Quotation

    30/34

  • 7/28/2019 Equipment Quotation

    31/34

    Production 110

    0

    0

    0

    0

    ebt balancInterestpayable

    21,961.25 0

    30,904.83 2,626.91

    26,744.82 2,626.91

    22,231.21 2,273.31

    17,333.95 1,889.65

  • 7/28/2019 Equipment Quotation

    32/34

    12,020.41 1,473.39

    6,255.23 1,021.73

    0.00 531.69

    0 0

    0 0

    0 00.00 ########

    Production Producti Producti Producti Producti Producti Producti Producti Producti

    0 0 0 0 0 0 0 0 0

    1,616.66 1,754.07 1,903.17 2,064.94 2,240.46 2,430.89 0 0 0

    10,393.53 8,639.45 6,736.29 4,671.35 2,430.89 0 0 0 00 0 0 0 0 0 0 0 0

    0 0 0 0 0 0 0 0 0

    1,020.87 883.45 734.35 572.58 397.06 206.63 0 0 0

  • 7/28/2019 Equipment Quotation

    33/34

  • 7/28/2019 Equipment Quotation

    34/34

    Scrap

    0

    0

    00

    0

    0

    Year Disbursemen

    Capitaliz

    ed

    interest

    Repayment Debt balanc

    Interes

    t

    payable

    1 2,826.36 240.24 0 3,066.60 0

    2 8,943.58 0 0 12,010.18 #######3 0 0 1,616.66 10,393.53 #######

    4 0 0 1,754.07 8,639.45 883.45

    5 0 0 1,903.17 6,736.29 734.35

    6 0 0 2,064.94 4,671.35 572.58

    7 0 0 2,240.46 2,430.89 397.06

    8 0 0 2,430.89 0 206.63

    9 0 0 0 0 0

    10 0 0 0 0 0

    11 0 0 0 0 0

    Total 11,769.94 240.24 12,010.18 0 #######


Recommended