Date post: | 20-Jan-2016 |
Category: |
Documents |
Upload: | richard-malone |
View: | 216 times |
Download: | 2 times |
ERASMUS FOR ALLEUROPEAN FUNDED PILOT PROJECTWORK PACKAGES / DELIVERABLES
PRESENTED BY DR SHYAM PATIAR
LEONARDO DA VINCI SECTOR SKILLS ALLIANCES
TOURISM AND CATERING
SUMMARY OF DELIVERABLES
Deliverable
numberDeliverable title/description
Work package most contributing to this deliverable
Expected date
1 Project meeting 1
WP1, WP2, WP3, WP4, WP5, WP6,
WP7, WP8, WP9 & WP10
January 2013
2Training and skills need analysis
WP1January 2013 –
June 2013
3Examination and comparison of curriculum
WP2January 2013 –
June 2013
4 SSA-TC material pool WP1 & WP2January 2013 –
September 2013
5SSA-TC new curriculum / qualification
WP3July 2013 – March 2014
Deliverable
numberDeliverable title/description
Work package most contributing to this deliverable
Expected date
6 Project meeting 2 WP4 October 2013
7 SSA-TC learning content WP4October 2013 –
June 2014
8 SSA-TC handbook WP4January 2013 –
June 2014
9 SSA-TC DVD WP4January 2013 –
June 2014
10 SSA-TC pilot WP5April 2014 –
September 2014
11 SSA-TC evaluation of the pilot WP5April 2014 –
September 2014
SUMMARY OF DELIVERABLES
Deliverable
numberDeliverable title/description
Work package most contributing to this deliverable
Expected date
12 Project meeting 3 WP4, WP5 & WP6 May 2014
13SSA-TC qualification implementation
WP5 & WP6October 2013 - December 2014
14SSA-TC intellectual property rights
WP6July 2014 –
December 2014
15 SSA-TC strategy paper WP7July 2014 –
December 2014
16 Network sustainability WP8January 2013 - December 2014
17 Progress report WP8 & WP9January 2013 - December 2014
SUMMARY OF DELIVERABLES
Deliverable
numberDeliverable title/description
Work package most contributing to this deliverable
Expected date
18 Peer group evaluation WP9January 2013 - December 2014
19 External evaluation report WP9January 2013 - December 2014
20 Pilot evaluation WP9January 2013 - December 2014
21 SSA-TC website WP10January 2013 –
June 2013
22 SSA-TC newsletter I-IV WP10January 2013 - December 2014
23 SSA-TC flyers and posters WP10January 2013 - December 2014
SUMMARY OF DELIVERABLES
Deliverable
numberDeliverable title/description
Work package most contributing to this deliverable
Expected date
24Project meeting 4 – dissemination final conference
WP10 November 2014
25 SSA-TC email pool WP10January 2013 - December 2014
26 SSA-TC You Tube blog WP10January 2013 - December 2014
SUMMARY OF DELIVERABLES
Work package number
Work package title/description Start End
1Identification of training needs and skills analysis in the tourism and catering industry across Europe. Develop a website for SSA-TC project.
January 2013
June 2013
2
Examination and comparison of current curriculum and qualifications being delivered as part of Initial and Continuous Vocational Education and Training system.
January 2013
June 2013
3Design and develop the curriculum for a brand NEW qualification to meet the needs of employers across Europe.
July 2013
March 2014
4
Develop the learning content for the selected modules from the curriculum identified as an on-line learning resource along with the assessment tool.
July 2013
June 2014
5
Piloting and testing the NEW qualification developed amongst the selected partners. Evaluating the results from the pilot and making amendments where necessary
April 2014
September 2014
SUMMARY OF WORK PACKAGES
Work package number
Work package title/description Start End
6Implementation of SSA-TC NEW qualification into education programme and the final launch of the product at the final conference.
July 2014
December 2014
7Producing a strategy paper to inform the EU policy makers about the final outcomes of SSA-TC project.
July 2014
December 2014
8
Project management and sustainability cannot be over-emphasised as without good project management high quality product and sustainable network cannot be produced.
January 2013
December 2014
9Quality management and assurance will be of prime importance at each stage of the project to ensure that high quality product is produced.
January 2013
December 2014
10Project dissemination will be carried out through the website, European e-mail pool, conferences and seminars by all project partners.
January 2013
December 2014
SUMMARY OF WORK PACKAGES
WORKPLAN & WORK PACKAGESTIMETABLE & MILESTONES
ANY QUESTIONS?