7/27/2019 ERECTION - PT& DM Projection Dated 09.08.12
1/14
Page 1 of
SL.NO.
I PREVIOUSQTY
IN THIS BILL
QTY
CUMULATIVE
QTY
PREVIOUS
AMOUNT
aug'12(projectio
n)
1.00.00 Pre-Treatment Plant
1.01.00 Nos 2 402,625.00 805250.00 1.60 0.40 2.00 644200.00 161050.00
1.02.00 Nos 2 25,000.00 50000.00 2.00 0.00 2.00 50000.00 0.00
1.03.00 Nos 1 400,000.00 400000.00 1.00 0.00 1.00 400000.00 0.00
1.04.00 Nos 3 270,000.00 810000.00 2.70 0.00 2.70 729000.00 0.00
1.05.00 Nos 2 15,000.00 30000.00 2.00 0.00 2.00 30000.00 0.001.06.00 Nos 2 12,500.00 25000.00 2.00 0.00 2.00 25000.00 0.00
1.07.00 Nos 3 8,000.00 24000.00 3.00 0.00 3.00 24000.00 0.00
1.08.00 Nos. 2 15,000.00 30000.00 2.00 0.00 2.00 30000.00 0.00
1.09.00 Nos 2 15,000.00 30000.00 2.00 0.00 2.00 30000.00 0.00
1.10.00 Nos. 2 10,000.00 20000.00 0.00 2.00 2.00 0.00 20000.00
1.11.00 Nos. 2 17,500.00 35000.00 0.00 2.00 2.00 0.00 35000.00
1.12.00 Nos 6 5,000.00 30000.00 6.00 0.00 6.00 30000.00 0.00
1.13.00 Nos 6 18,000.00 108000.00 6.00 0.00 6.00 108000.00 0.00
1.14.00 Nos 6 15,000.00 90000.00 0.00 6.00 6.00 0.00 90000.00
1.15.00 Nos 8 500.00 4000.00 0.00 0.00 0.00 0.00 0.001.16.00 VALVES :
1.16.01 Lot 1 20,000.00 20000.00 1.00 0.00 1.00 20000.00 0.00
1.16.02 Lot 1 10,000.00 10000.00 1.00 0.00 1.00 10000.00 0.00
1.16.03 Lot 1 25,000.00 25000.00 1.00 0.00 1.00 25000.00 0.00
1.16.04.01 Nos 2 10,000.00 20000.00 0.00 0.00 0.00 0.00 0.00
1.16.05 Lot 1 10,000.00 10000.00 0.00 1.00 1.00 0.00 10000.00
1.16.06 Lot 1 5,000.00 5000.00 1.00 0.00 1.00 5000.00 0.00
1.16.07.01 Nos 6 1,000.00 6000.00 1.00 5.00 6.00 1000.00 5000.00
1.16.08 Lot 1 10,000.00 10000.00 1.00 0.00 1.00 10000.00 0.00
PACKAGE: Clubbed Water System Packages for 2X363.3 MW CCPP for OTPC,TRIPURA
CLIENT : NTPC-BHEL POWER PROJECTS PRIVATE LIMITED
Knife Gate Valve (Manual)
Butterfly Valve (Manual)
Butterfly Valve (Motor) 350 NB
Diaphragm Valve (Manual)
Globe Valve
Plug Valve - 80 NB
Check Valve
Clariflocculator Mechanism with Telescopic Device
Flash Mixer Agitator Assembly
Thickener Mechanism
Centrifuge
Gate Valve (Manual)
Sludge Transfer PumpFiltrate Water Tr. Pump
Thickened Sludge Tr. Pump
Alum Dosing Tank Agitator Assembly
Lime Dosing Tank Agitator Assembly
Alum Dosing Pump
Lime Dosing Pump
Polyelectrolyte Dosing Tank (MSRL)
Polyelectrolyte Dosing Tank Agitator Assembly
Poly Dosing Pumps
Alum Dosing Tank
ERECTION BBU - CLUBBED WATER SYSTEM - Aug'12
Total Lumpsum, Exworks Price for Erection of Main Equipment
PO NO.: NBPPL/CMP/PALT/WSP/P-1040/10 Dated-08.04.2010
MBE PROJECT NO.: W016
EXECUTED AMOUNItem/DescriptionUnit Qty.
UNIT RATE
(RS.)Erection
EXECUTED QUANTITY
Erection of Plant & Equipment
7/27/2019 ERECTION - PT& DM Projection Dated 09.08.12
2/14
Page 2 of
SL.NO.
I PREVIOUSQTY
IN THIS BILL
QTY
CUMULATIVE
QTY
PREVIOUS
AMOUNT
aug'12(projectio
n)
PACKAGE: Clubbed Water System Packages for 2X363.3 MW CCPP for OTPC,TRIPURA
CLIENT : NTPC-BHEL POWER PROJECTS PRIVATE LIMITED
ERECTION BBU - CLUBBED WATER SYSTEM - Aug'12
Total Lumpsum, Exworks Price for Erection of Main Equipment
PO NO.: NBPPL/CMP/PALT/WSP/P-1040/10 Dated-08.04.2010
MBE PROJECT NO.: W016
EXECUTED AMOUNItem/DescriptionUnit Qty.
UNIT RATE
(RS.)Erection
EXECUTED QUANTITY
Erection of Plant & Equipment
1.17.00 PIPE
1.17.01 Lot 1 100,000.00 100000.00 0.00 0.50 0.50 0.00 50000.00
1.17.02 Lot 1 5,500.00 5500.00 0.00 0.00 0.00 0.00 0.00
2.00.00 Lot 1 900,000.00 900000.00 0.00 0.00 0.00 0.00 0.00
3.00.00 Lot 1 900,000.00 900000.00 0.00 0.00 0.00 0.00 0.00
4.00.00 Effluent Treatment Plant4.01.00 Nos 22 9,000.00 198000.00 2.00 2.00 4.00 18000.00 18000.00
4.02.00 Nos 2 10,000.00 20000.00 0.00 2.00 2.00 0.00 20000.00
4.03.00 Set 1 75,000.00 75000.00 1.00 0.00 1.00 75000.00 0.00
4.04.00 Nos 1 7,500.00 7500.00 0.00 0.00 0.00 0.00 0.00
4.05.00 Nos 1 7,500.00 7500.00 0.00 0.00 0.00 0.00 0.00
4.06.00 No 1 12,000.00 12000.00 1.00 0.00 1.00 12000.00 0.00
4.07.00 No 1 2,500.00 2500.00 0.00 1.00 1.00 0.00 2500.00
4.08.00 No 1 2,500.00 2500.00 0.00 1.00 1.00 0.00 2500.00
4.09.00 Sets 2 11,000.00 22000.00 0.00 0.00 0.00 0.00 0.00
4.10.00 Sets 2 15,000.00 30000.00 0.00 0.00 0.00 0.00 0.004.11.00 Sets 2 9,000.00 18000.00 0.00 2.00 2.00 0.00 18000.00
4.12.00 nos 1 1,000.00 1000.00 0.00 1.00 1.00 0.00 1000.00
4.13.00 PIPE
4.13.01 Lot 1 22,000.00 22000.00 0.00 0.50 0.50 0.00 11000.00
4.13.02 Lot 1 2,500.00 2500.00 0.00 0.00 0.00 0.00 0.00
4.14.00 VALVE 0.00
4.14.01 Lot 1 18,000.00 18000.00 0.00 0.00 0.00 0.00 0.00
4.14.02 Lot 1 25,000.00 25000.00 0.00 0.00 0.00 0.00 0.00
4.14.03 Lot 1 40,000.00 40000.00 0.00 0.00 0.00 0.00 0.00
4.14.04 Lot 1 150,000.00 150000.00 0.00 0.00 0.00 0.00 0.00
PVC Pipe
Gate Valve (Manual)
Check Valve
Butterfly Valve
Diaphragm Valve (Manual)
MS Pipe
Treated Water Transfer Pumps
Flash mixer,flocculator& lamella clarifier
Agitator for flocculator(lamella clarifier)
Agitator for flash(lamella clarifier)
TPI with all accessories
Acid dosing tank
NaOH dosing tank
Polyelectrolyte dosing tank
Polyelectrolyte dosing tank agitator assemblyPolyelectrolyte dosing pump
Agitator for NaOH dosing tank
Vertical Centrifugal Pumps
MS Pipe
PVC Pipe
RW & CW Chlorination with all accessories.
CW Treatment System with all accessories.
7/27/2019 ERECTION - PT& DM Projection Dated 09.08.12
3/14
Page 3 of
SL.NO.
I PREVIOUSQTY
IN THIS BILL
QTY
CUMULATIVE
QTY
PREVIOUS
AMOUNT
aug'12(projectio
n)
PACKAGE: Clubbed Water System Packages for 2X363.3 MW CCPP for OTPC,TRIPURA
CLIENT : NTPC-BHEL POWER PROJECTS PRIVATE LIMITED
ERECTION BBU - CLUBBED WATER SYSTEM - Aug'12
Total Lumpsum, Exworks Price for Erection of Main Equipment
PO NO.: NBPPL/CMP/PALT/WSP/P-1040/10 Dated-08.04.2010
MBE PROJECT NO.: W016
EXECUTED AMOUNItem/DescriptionUnit Qty.
UNIT RATE
(RS.)Erection
EXECUTED QUANTITY
Erection of Plant & Equipment
5.00.00 SEWAGE TREATMENT PLANT 0.00
5.01.00 Nos 10 7,500.00 75000.00 0.00 0.00 0.00 0.00 0.00
5.02.00 Nos 2 8,000.00 16000.00 0.00 0.00 0.00 0.00 0.00
5.03.00 No 1 10,000.00 10000.00 0.00 0.00 0.00 0.00 0.00
5.04.00 No 1 3,750.00 3750.00 0.00 0.00 0.00 0.00 0.00
5.05.00 No 1 3,000.00 3000.00 0.00 0.00 0.00 0.00 0.005.06.00 Nos 2 4,000.00 8000.00 0.00 0.00 0.00 0.00 0.00
5.07.00 Polymer Dosing System (HDPE Dosing Tank + Agitator + Dosing Pump) 0.00
5.07.01 No 1 3,000.00 3000.00 0.00 0.00 0.00 0.00 0.00
5.07.02 No 1 4,000.00 4000.00 0.00 0.00 0.00 0.00 0.00
5.07.03 No 2 4,000.00 8000.00 0.00 0.00 0.00 0.00 0.00
5.08.00 Alum Dosing System (MSEP Dosing Tank + Agitator + Dosing Pump) 0.00
5.08.01 No 1 3,000.00 3000.00 0.00 0.00 0.00 0.00 0.00
5.08.02 No 1 4,000.00 4000.00 0.00 0.00 0.00 0.00 0.00
5.08.03 No 2 4,000.00 8000.00 0.00 0.00 0.00 0.00 0.00
5.09.00 NaOCL Dosing System (MSEP Dosing Tank + Dosing Pump) 0.005.09.01 No 1 2,000.00 2000.00 0.00 0.00 0.00 0.00 0.00
5.09.02 No 2 4,000.00 8000.00 0.00 0.00 0.00 0.00 0.00
5.10.00 PIPE
5.10.01 Lot 1 15,000.00 15000.00 0.00 0.00 0.00 0.00 0.00
5.10.02 Lot 1 2,000.00 2000.00 0.00 0.00 0.00 0.00 0.00
5.11.00 VALVES
5.11.01 Lot 1 20,000.00 20000.00 0.00 0.00 0.00 0.00 0.00
5.11.02 Lot 1 4,000.00 4000.00 0.00 0.00 0.00 0.00 0.00
5.11.03 Lot 1 5,000.00 5000.00 0.00 0.00 0.00 0.00 0.00
6.00.00 Lot 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00Mandatory Spares
Dosing Pump
MS Pipe
PVC Pipe
Gate Valve (Manual)
Check Valve
Butterfly Valve
Agitator for Poly Dosing Tank
Poly Dosing Pump
MSRL Dosing Tank
Agitator for Alum Dosing Tank
Alum Dosing Pump
MSRL Dosing Tank
HDPE Dosing Tank
Sewage Lift Pump
Air Blower
Tube Settler + Flocculator(MSEP)
Agitator for Flocculation Tank
MS Clear Water TankClear Water Disposal Pump
7/27/2019 ERECTION - PT& DM Projection Dated 09.08.12
4/14
Page 4 o
SL.NO.
I PREVIOUSQTY
IN THIS BILL
QTY
CUMULATIVE
QTY
PREVIOUS
AMOUNT
aug'12(projectio
n)
PACKAGE: Clubbed Water System Packages for 2X363.3 MW CCPP for OTPC,TRIPURA
CLIENT : NTPC-BHEL POWER PROJECTS PRIVATE LIMITED
ERECTION BBU - CLUBBED WATER SYSTEM - Aug'12
Total Lumpsum, Exworks Price for Erection of Main Equipment
PO NO.: NBPPL/CMP/PALT/WSP/P-1040/10 Dated-08.04.2010
MBE PROJECT NO.: W016
EXECUTED AMOUNItem/DescriptionUnit Qty.
UNIT RATE
(RS.)Erection
EXECUTED QUANTITY
Erection of Plant & Equipment
7.00.00 ELECTRICAL & INSTRUMENTATION
7.01.00 Instrumentation for PT
7.01.01 Nos 13 1,000.00 13000.00 0.00 0.00 0.00 0.00 0.00
7.01.02 Nos 20 600.00 12000.00 0.00 0.00 0.00 0.00 0.00
7.01.03 Nos 17 500.00 8500.00 0.00 0.00 0.00 0.00 0.00
7.01.04 Nos 2 500.00 1000.00 0.00 0.00 0.00 0.00 0.007.01.05 nos 18 500.00 9000.00 0.00 0.00 0.00 0.00 0.00
7.02.00 Instrumentation for ETP
7.02.01 Nos 15 1,400.00 21000.00 0.00 0.00 0.00 0.00 0.00
7.02.02 Nos 5 1,200.00 6000.00 0.00 0.00 0.00 0.00 0.00
7.02.03 Nos 20 1,000.00 20000.00 0.00 0.00 0.00 0.00 0.00
7.02.04 Nos 10 1,000.00 10000.00 0.00 0.00 0.00 0.00 0.00
7.02.05 No 1 500.00 500.00 0.00 0.00 0.00 0.00 0.00
7.02.06 No 1 500.00 500.00 0.00 0.00 0.00 0.00 0.00
7.02.07 No 1 9,000.00 9000.00 0.00 0.00 0.00 0.00 0.00
7.02.08 No 1 9,000.00 9000.00 0.00 0.00 0.00 0.00 0.007.03.00 Instrumentation for STP
7.03.01 Nos 7 1,500.00 10500.00 0.00 0.00 0.00 0.00 0.00
7.03.02 Nos 3 1,000.00 3000.00 0.00 0.00 0.00 0.00 0.00
7.03.03 Nos 18 500.00 9000.00 0.00 0.00 0.00 0.00 0.00
5500000.00 2276200.00 444050.00
PH Analyser
RCA Analyser
Level Switch
Level Switch
Level Gauge
Pressure Switch
Flow TransmitterPressure Gauge
Level Gauge
Pressure Gauge
TOTAL
Level Switch
Level Gauge
Pressure Gauge
Pressure Switch
Flow Indicator
Temprature Indicator
7/27/2019 ERECTION - PT& DM Projection Dated 09.08.12
5/14
Page 5 o
CUMULATIVE
AMOUNT
805250.00
50000.00
400000.00
729000.00
30000.0025000.00
24000.00
30000.00
30000.00
20000.00
35000.00
30000.00
108000.00
90000.00
0.00
20000.00
10000.00
25000.00
0.00
10000.00
5000.00
6000.00
10000.00
(Rs.)
7/27/2019 ERECTION - PT& DM Projection Dated 09.08.12
6/14
Page 6 o
CUMULATIVE
AMOUNT
(Rs.)
50000.00
0.00
0.00
0.00
36000.00
20000.00
75000.00
0.00
0.00
12000.00
2500.00
2500.00
0.00
0.0018000.00
1000.00
11000.00
0.00
0.00
0.00
0.00
0.00
7/27/2019 ERECTION - PT& DM Projection Dated 09.08.12
7/14
Page 7
CUMULATIVE
AMOUNT
(Rs.)
0.00
0.00
0.00
0.00
0.000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7/27/2019 ERECTION - PT& DM Projection Dated 09.08.12
8/14
Page 8
CUMULATIVE
AMOUNT
(Rs.)
0.00
0.00
0.00
0.000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2720250.00
7/27/2019 ERECTION - PT& DM Projection Dated 09.08.12
9/14
Page 9 o
Unit QTYUNIT RATE
(RS.)Erection
PREVIOUS
QTY
IN THIS BILL
QTY
CUMULATIVE
QTY
PREVIOUS
AMOUNT
aug'12(project
ion)
A. VESSEL & PIPING
1 Dual Media Filter Nos 3 114,000.00 342,000.00 3.00 0.00 3.00 342000.00 0.00
2 Activated Carbon Filter Nos 3 110,000.00 330,000.00 3.00 0.00 3.00 330000.00 0.00
3 Strong Acid Cation Exchanger Nos 3 85,000.00 255,000.00 3.00 0.00 3.00 255000.00 0.00
4 Strong Base Anion Exchanger Nos 3 85,000.00 255,000.00 3.00 0.00 3.00 255000.00 0.00
5 Mixed Bed Exchanger Nos 3 85,000.00 255,000.00 3.00 0.00 3.00 255000.00 0.00
6 AC Filter for Alkali Solution Nos 1 45,000.00 45,000.00 1.00 0.00 1.00 45000.00 0.00
7 Degasser Tower Nos 3 50,000.00 150,000.00 3.00 0.00 3.00 150000.00 0.00
8 Degassed Water Storage Tank Nos 3 50,000.00 150,000.00 3.00 0.00 3.00 150000.00 0.00
9 Bulk Acid Storage tank Nos 1 100,000.00 100,000.00 1.00 0.00 1.00 100000.00 0.00
10 Bulk Caustic Storage Tank Nos 1 100,000.00 100,000.00 1.00 0.00 1.00 100000.00 0.00
11 UF Feed Tank Nos 3 45,000.00 135,000.00 3.00 0.00 3.00 135000.00 0.00
12 Caustic Dilution Tank Nos 2 27,500.00 55,000.00 2.00 0.00 2.00 55000.00 0.00
13 Acid measuring Tank Nos 2 25,000.00 50,000.00 2.00 0.00 2.00 50000.00 0.00
14 Alkali Preperation tank Nos 2 25,000.00 50,000.00 2.00 0.00 2.00 50000.00 0.0015 Hot Water Tank Nos 1 75,500.00 75,500.00 1.00 0.00 1.00 75500.00 0.00
16 Filtered Water Tank Nos 1 35,000.00 35,000.00 0.00 1.00 1.00 0.00 35000.00
17 Pipeline for Dual Media Filter Lot 1 60,000.00 60,000.00 1.00 0.00 1.00 60000.00 0.00
18 Pipeline for Activated Carbon Filter Lot 1 60,000.00 60,000.00 1.00 0.00 1.00 60000.00 0.00
19 Pipeline for Cation Exchanger Lot 1 75,000.00 75,000.00 1.00 0.00 1.00 75000.00 0.00
20 Pipeline for Anion Exchanger Lot 1 65,000.00 65,000.00 1.00 0.00 1.00 65000.00 0.00
21 Pipeline for Mixed Bed Exchanger Lot 1 65,000.00 65,000.00 1.00 0.00 1.00 65000.00 0.00
22 Pipeline for Degasser Lot 1 60,000.00 60,000.00 1.00 0.00 1.00 60000.00 0.00
23 Pipeline for Acid & Alkali transfer Lot 1 55,000.00 55,000.00 1.00 0.00 1.00 55000.00 0.00
24 Pipeline for DM Plant to UF Feed Tank & DM Storage Tank Lot 1 35,000.00 35,000.00 0.00 0.00 0.00 0.00 0.0025 Pipeline for DM Plant to UF Feed Tank & DM Storage Tank Lot 1 35,000.00 35,000.00 0.00 0.00 0.00 0.00 0.00
EXECUTED AMOUN
Billing Schedule: DM Plant - ERECTION
PROJECT : 726.6 MW Combined Cycle Power Project
PACKAGE : DEMINERALISION PLANT FOR 2 X 363.3 MW CCCP, Palatana, Tripura
P.O. No. : NBPPL/CMP/PALT/DMP/P-1037/10 dated 08.04.2010
Client :NTPC-BHEL POWER PROJECTS PRIVATE LTD
Total Lumpsum, Exworks Price for Supply of Main Equipment Including Mandatory Spares, Commissioning spares, Maintanance Tools & Tackles etc for the
per Scope of Supply
SL. NO. DESCRIPTION
AS PER BBU EXECUTED QUANTITY
7/27/2019 ERECTION - PT& DM Projection Dated 09.08.12
10/14
Page 10 of
Unit QTYUNIT RATE
(RS.)Erection
PREVIOUS
QTY
IN THIS BILL
QTY
CUMULATIVE
QTY
PREVIOUS
AMOUNT
aug'12(project
ion)
EXECUTED AMOUN
Billing Schedule: DM Plant - ERECTION
PROJECT : 726.6 MW Combined Cycle Power Project
PACKAGE : DEMINERALISION PLANT FOR 2 X 363.3 MW CCCP, Palatana, Tripura
P.O. No. : NBPPL/CMP/PALT/DMP/P-1037/10 dated 08.04.2010
Client :NTPC-BHEL POWER PROJECTS PRIVATE LTD
Total Lumpsum, Exworks Price for Supply of Main Equipment Including Mandatory Spares, Commissioning spares, Maintanance Tools & Tackles etc for the
per Scope of Supply
SL. NO. DESCRIPTION
AS PER BBU EXECUTED QUANTITY
B. PUMP & BLOWERS 0.00
1 Air Blower for Dual Media Filter with Motors Nos 2 29,000.00 58,000.00 2.00 0.00 2.00 58000.00 0.00
2 Air Blower for Mixed Bed with Motors Nos 2 29,000.00 58,000.00 2.00 0.00 2.00 58000.00 0.00
3 Air Blower for Degasser with Motors Nos 6 27,500.00 165,000.00 6.00 0.00 6.00 165000.00 0.00
4 Degassed Water Transfer Pump with Motors Nos 6 21,000.00 126,000.00 1.80 0.00 1.80 37800.00 0.00
5 Acid Unloading Pump with Motors Nos 2 10,000.00 20,000.00 2.00 0.00 2.00 20000.00 0.00
6 Caustic Unloading Pump with Motors Nos 2 10,000.00 20,000.00 2.00 0.00 2.00 20000.00 0.00
7 Effluent disposal Pump with Motors Nos 2 20,000.00 40,000.00 1.00 0.00 1.00 20000.00 0.00
8 Regeneration Pump with Motors Nos 2 10,000.00 20,000.00 0.00 0.00 0.00 0.00 0.00
9 Alkali transfer Pump with Motors Nos 2 10,000.00 20,000.00 2.00 0.00 2.00 20000.00 0.00
C. INSTRUMENT 0.00
1 Pressure Gauge Nos 75 400.00 30,000.00 29.00 0.00 29.00 11600.00 0.00
2 Differential Pressure Indicator Nos 7 2,000.00 14,000.00 0.00 0.00 0.00 0.00 0.00
3 Differential Pressure Switch Nos 7 2,500.00 17,500.00 6.00 0.00 6.00 15000.00 0.00
4 Flow Indicator Nos 23 1,000.00 23,000.00 15.00 0.00 15.00 15000.00 0.005 Flow Transmitter with Orifice Nos 9 9,000.00 81,000.00 0.00 0.00 0.00 0.00 0.00
6 Conductivity Transmitter Nos 6 4,000.00 24,000.00 0.00 0.00 0.00 0.00 0.00
7 pH Transmitter Nos 4 4,000.00 16,000.00 0.00 0.00 0.00 0.00 0.00
8 3-channel Sodium Analyzer Nos 1 25,000.00 25,000.00 0.00 0.00 0.00 0.00 0.00
9 3-channel Silica Analyzer Nos 1 25,000.00 25,000.00 0.00 0.00 0.00 0.00 0.00
10 1-channel Silica Analyzer Nos 1 25,000.00 25,000.00 0.00 0.00 0.00 0.00 0.00
11 Conductivity Comparator Nos 3 11,000.00 33,000.00 0.00 0.00 0.00 0.00 0.00
12 Level Indicator Nos 20 1,000.00 20,000.00 6.00 0.00 6.00 6000.00 0.00
13 Level Switch Nos 20 600.00 12,000.00 0.00 0.00 0.00 0.00 0.00
7/27/2019 ERECTION - PT& DM Projection Dated 09.08.12
11/14
Page 11 of 14
Unit QTYUNIT RATE
(RS.)Erection
PREVIOUS
QTY
IN THIS BILL
QTY
CUMULATIVE
QTY
PREVIOUS
AMOUNT
aug'12(project
ion)
EXECUTED AMOUN
Billing Schedule: DM Plant - ERECTION
PROJECT : 726.6 MW Combined Cycle Power Project
PACKAGE : DEMINERALISION PLANT FOR 2 X 363.3 MW CCCP, Palatana, Tripura
P.O. No. : NBPPL/CMP/PALT/DMP/P-1037/10 dated 08.04.2010
Client :NTPC-BHEL POWER PROJECTS PRIVATE LTD
Total Lumpsum, Exworks Price for Supply of Main Equipment Including Mandatory Spares, Commissioning spares, Maintanance Tools & Tackles etc for the
per Scope of Supply
SL. NO. DESCRIPTION
AS PER BBU EXECUTED QUANTITY
D. VALVES 0.00
1 Butterfly Valve Lot 3 40,000.00 120,000.00 2.00 0.00 2.00 80000.00 0.00
2 Diaphragm Valve Lot 3 40,000.00 120,000.00 2.00 0.00 2.00 80000.00 0.00
F. RESIN FOR EXCHANGER 0.00
1 Cation Resin Lot 1 60,000.00 60,000.00 1.00 0.00 1.00 59800.00 0.00
2 Anion Resin Lot 1 60,000.00 60,000.00 1.00 0.00 1.00 59800.00 0.00F. ULTRAFILTRATION SYSTEM 0.00
1 Ultrafiltration Skid Nos 3 35,000.00 105,000.00 0.00 0.00 0.00 0.00 0.00
2 Chemical preparation & dosing tank Nos 6 4,000.00 24,000.00 6.00 0.00 6.00 24000.00 0.00
3 Chemical preparation tank for CIP Nos 1 5,000.00 5,000.00 0.00 0.00 0.00 0.00 0.00
4 UF Feed Pump Nos 6 8,000.00 48,000.00 6.00 0.00 6.00 48000.00 0.00
5 UF Backwash Pump Nos 2 9,000.00 18,000.00 0.00 0.00 0.00 0.00 0.00
6 UF Fast Flush Pump Nos 2 7,000.00 14,000.00 0.00 0.00 0.00 0.00 0.00
7 Chemical Dosing Pump Nos 6 5,000.00 30,000.00 0.00 0.00 0.00 0.00 0.00
8 CIP Pump Nos 2 12,500.00 25,000.00 0.00 0.00 0.00 0.00 0.00
9 Micron Strainer Nos 3 2,000.00 6,000.00 0.00 0.00 0.00 0.00 0.00
G. Mandatory Spares 0.00
1 Mandatory Spares Lot 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total 4,400,000.00 3585500.00 35000.00
FOR MBECL FORNBPP
7/27/2019 ERECTION - PT& DM Projection Dated 09.08.12
12/14
Page 12 of 14
CUMULATIVE
AMOUNT
342000.00
330000.00
255000.00
255000.00
255000.00
45000.00150000.00
150000.00
100000.00
100000.00
135000.00
55000.00
50000.00
50000.00
75500.00
35000.00
60000.00
60000.00
75000.00
65000.00
65000.00
60000.00
55000.00
0.00
0.00
T(Rs.)
system as
FOR MBECL FORNBPPL
7/27/2019 ERECTION - PT& DM Projection Dated 09.08.12
13/14
Page 13 of 14
CUMULATIVE
AMOUNT
T(Rs.)
system as
58000.00
58000.00
165000.00
37800.00
20000.00
20000.0020000.00
0.00
20000.00
11600.00
0.00
15000.00
15000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6000.00
0.00
FOR MBECL FORNBPPL
7/27/2019 ERECTION - PT& DM Projection Dated 09.08.12
14/14
Page 14 of 14
CUMULATIVE
AMOUNT
T(Rs.)
system as
80000.00
80000.00
59800.00
59800.00
0.00
24000.00
0.00
48000.00
0.00
0.00
0.00
0.00
0.00
0.00
3620500.00
FOR MBECL FORNBPPL