Erie BoulevardErie BoulevardApril 21, 2009April 21, 2009
8/14/2019 Erie Boulevard
2/37
22
Meeting PurposePresent Project Design
8/14/2019 Erie Boulevard
3/37
33
Project Description
Federally Funded TransportationProject
Project Funding - $14 million Total 80% Federal 15% State
5% City
8/14/2019 Erie Boulevard
4/37
44
Project LocationProject Location
Reconstruction of Erie Boulevard from I-890 to Union Street
Project Begins I 890
Project EndsUnion Street
8/14/2019 Erie Boulevard
5/37
55
Why are we doing this
and what needs to beimproved?
8/14/2019 Erie Boulevard
6/37
66
x s ng oa wayConditions
NarrowPaintedMedianFour Travel Lanes
Approximately 110 Feet
DiagonalParking and
Back-outSpace
High Speeds
Difficult Left Turns
Difficult Pedestrian Crossings
Random U-Turns
Accidents
8/14/2019 Erie Boulevard
7/3777
The existing condition is
not an acceptabledesign solution.
8/14/2019 Erie Boulevard
8/3788
The Image of Erie
Boulevard
Th i f
8/14/2019 Erie Boulevard
9/3799
The image of aprogressive successful
city?
8/14/2019 Erie Boulevard
10/371010
Albany, NY
Add photo
8/14/2019 Erie Boulevard
11/37
8/14/2019 Erie Boulevard
12/371212
Oneonta, NY
8/14/2019 Erie Boulevard
13/371313
Hudson, NY
8/14/2019 Erie Boulevard
14/371414
State Street,
Schenectady
8/14/2019 Erie Boulevard
15/371515
State Street,
Schenectady
8/14/2019 Erie Boulevard
16/371616
State Street,
Schenectady
8/14/2019 Erie Boulevard
17/371717
State Street,
Schenectady
8/14/2019 Erie Boulevard
18/371818
Revitalization of
Downtown Schenectady
I-890
State Street
Lower State Street
Erie Boulevard
8/14/2019 Erie Boulevard
19/371919
Erie Boulevard Looking
South
8/14/2019 Erie Boulevard
20/372020
Lower State Street
Looking West
8/14/2019 Erie Boulevard
21/372121
Where are we in the
design process?
8/14/2019 Erie Boulevard
22/372222
Design Process
Preliminary Design Phase 2006 to2009
Public Information Meeting Nov. 29,2007
Meet with individuals and
organizationsEvaluation of alternatives 2008 to
Present
Final Design
8/14/2019 Erie Boulevard
23/37
8/14/2019 Erie Boulevard
24/37
2424
Key Issues from the
Public InvolvementOn-street parking and strategicparking locations
Service access to businessesTurnarounds and access to businessService road on east side
Left turns at State StreetBike LanesRoundabouts are undesirable
8/14/2019 Erie Boulevard
25/37
2525
What is the basis of the
design?
8/14/2019 Erie Boulevard
26/37
2626
Project Objectives1. Improve traffic operations2. Provide for safe and efficient vehicular
travel3. Improve access and linkages
4. Reduce vehicular speeds5. Improve pedestrian and bicycle access6. Maximize on-street parking
7. Make consistent with downtownredevelopment plans
Design Alternatives that
8/14/2019 Erie Boulevard
27/37
2727
Design Alternatives thatMeet the Project
ObjectivesAlternative A Conventional
Intersection at South Ferry Street
and Service RoadAlternative B Roundabout
Intersection at South Ferry Street
and Service Road
8/14/2019 Erie Boulevard
28/37
2828
Preferred Design
AlternativeAlternative A ConventionalIntersection at South Ferry Street
and Service Road
8/14/2019 Erie Boulevard
29/37
2929
Key Elements of the
Project DesignComparable on-street parking with
buffer
Wide conventional intersection with turnlanes
Service Road for access to the rear ofbuildings
Bike lanes
Pedestrian improvements at LibertyStreet
Off-Peak left turns onto State Street
8/14/2019 Erie Boulevard
30/37
3030
Proposed Project DesignI-890 to State Street
Realigned conventional
Intersection with signal
Curbed Median with StreetTrees
Service Road with Access to
Intersection
Turnaround at I890
Parallel Parking - West Side
Diagonal Parking East side
Turnaround at Erie Street
I-890
State St.
8/14/2019 Erie Boulevard
31/37
3131
Proposed Project DesignI-890 to State Street
Requires acquisition of
book store
One-way streetnorthbound
Requires acquisition of old
body shop
Parallel Parking in front of
Computer store Allows U-turns except for
trucks
Service access to Olenders
8/14/2019 Erie Boulevard
32/37
3232
Proposed Project DesignState Street to Union Street
Realigned intersection for better
traffic flow and shorter
pedestrian crossings
Entrances from sidewalk to new
Train Station
Extend sidewalk beneath RR
bridge
Preserve Union Street entrance
to Stockade
Left Turns during Non-
Peak Hours
8/14/2019 Erie Boulevard
33/37
3333
Enhanced ConventionalIntersection
Public SpaceTextured Pavement within
Intersection
CrosswalksPedestrian Refuge
8/14/2019 Erie Boulevard
34/37
3434
Typical On-Street Parking
Bike Lanes on both sides
Textured pavement buffer
strip
Parallel parking on west side
Diagonal parking on east
side
Preserves all but 5 parking spaces
Next Steps
8/14/2019 Erie Boulevard
35/37
3535
Next Steps
Written comments may besubmitted until May 5, 2009
to:
Erie Boulevard Project
Clough Harbour & AssociatesIII Winners Circle, P.O. Box 5269
Albany, NY 12077-0269
8/14/2019 Erie Boulevard
36/37
8/14/2019 Erie Boulevard
37/37
Proposed Project DesignState Street to Union Street