12
ERM Dolphyn Project Large Scale Offshore Hydrogen Production
Transcript

www.erm.com

Case 1 - ERM Dolphyn Concept:

a) Semi-submersible base

b) Spar structure

Gas Network

Gas Storage

H2 Gas Pipeline to shore

Offshore Onshore

Overview of Concepts

Case 2 - desalination and electrolysis

performed on separate offshore

platform and pipeline export

Gas Network

Gas Storage

H2 Gas Pipeline to shore

Offshore Onshore

Electric cable to Electrolysis

Platform

Case 3 - Onshore hydrogen production,

using electrical cables to bring power

back to shore with all electrolysis

performed on land

Gas Network

Gas Storage

Offshore Onshore

Electric cable to onshore

hydrogen generation

electrolysis unit

H2

Electric Switchgear

Platform

(DC output)

www.erm.com

Results

Case 1, Dolphyn single spa

Case 1, Dolphyn semi-sub

Case 2, centralised H2 production

Case 3, onshore H2 production

www.erm.com

Result: Semi-Sub Dolphyn Concept Selected

www.erm.com

FEED Development – 45 Studies/Documents

Document Number Document Title

0500255-1b-ERM-PM-S01 Master Document Register

0500255-1b-ODE-CE-N01 Basis for Cost Estimate

0500255-1b-ODE-CE-R17 Manning (Maintenance Assessment) for OPEX

0500255-1b-ODE-CE-R18 MTO Development/Report

0500255-1b-ODE-CE-R19 Cost Estimate Report

0500255-1b-ODE-EE-D01 Single Line Diagram

0500255-1b-ODE-EE-N01 Load List

0500255-1b-ODE-EE-N02 Electrical Equipment List

0500255-1b-ODE-EE-N03 Electrical Equipment Data Sheets

0500255-1b-ODE-EE-R01 Electrical Design Criteria

0500255-1b-ODE-PE-D0* Process Flow Diagrams - various

0500255-1b-ODE-PE-D0* Process & Instrumentation Diagrams - various

0500255-1b-ODE-PE-N0* Data Sheets - various

0500255-1b-ODE-PE-N04 Gas Quality Technical Note

0500255-1b-ODE-PE-N05 Process Calculations

0500255-1b-ODE-PE-N06 Sloshing Study

0500255-1b-ODE-PE-N07 Turndown Efficiency Analysis

0500255-1b-ODE-PE-N08 Export Pipeline Technical Note

0500255-1b-ODE-PE-R01 Desalination Technology Assessment Report

0500255-1b-ODE-PE-R02 Process Design Basis

0500255-1b-ODE-PE-R03 Sparing and Modularisation Analysis (RAM)

0500255-1b-ODE-PE-R04 Material Selection Report (H2 System)

0500255-1b-ODE-PE-R05 Cause & Effects

0500255-1b-ODE-PE-S01 Equipment List

0500255-1b-ODE-PE-S02 Line List

0500255-1b-ODE-PE-S03 Heat and Material Balance (H&MB)

0500255-1b-ODE-PM-D01 Project (FEED) Schedule

0500255-1b-ODE-PM-R01 Project Inception Report

0500255-1b-ODE-PM-R02 Overall Study Report

0500255-1b-ODE-PM-R03 Risk Review

0500255-1b-ODE-PM-S02 Project Action Tracker

0500255-1b-ODE-TQ-Q0* Technical Queries - various

0500255-1b-ODE-TS-N01 HAZID SAMs

0500255-1b-ODE-TS-N02 HAZOP SAMs

0500255-1b-ODE-TS-R01 HAZID / HAZOP / Safety Review ToR

0500255-1b-ODE-TS-R02 HAZID / HAZOP / Safety Review Report

0500255-1b-ODE-TS-R03 SAMS Actions Administration Report

0500255-1b-ODE-TS-S01 SAMS Actions

0500255-1b-TE -AM-D01 Mooring System Layout Drawing

0500255-1b-TE -AM-R01 Mooring Motion Analysis Report

0500255-1b-TE -EE-R01 Integration/interface/battery limits report

0500255-1b-TE -EE-R02 Electricity Evacuation Report

0500255-1b-TE -SS-D01 General Arrangement Plan

0500255-1b-TE -SS-D02 Layout Drawing

0500255-1b-TE -SS-R01 Weight Estimate Report

0500255-1b-TE -SS-R02 Hydrostatic Properties Report

0500255-1b-TE -WT-R01 WRA/EYA Report

www.erm.com

Key Engineering Drawings

www.erm.com

Key Engineering Drawings

www.erm.com

Construction Process

Procurement of long lead items (Sub-

structure, turbine and electrolyser)

Construction of sub-structure (Fene

Shipyard, Northern Spain or UK alternative)

Addition of MHI Wind Turbine and sail to UK (Dundee Port, Deepwater

Berth)

Installation of deck and topside equipment,

commissioning and testing

Install moorings and pipeline at location

Sail to location, hook-up, commission and

operate

1 2 5 3 4 6

www.erm.com

Development Plan

Dolphyn Hydrogen

Project:

Size of Development

Operational

from

Location Cost

(CAPEX)

(£m)

Hydrogen

Production

Rate

(Tonnes/yr)

Hydrogen

Production

Rate (TWh/y)

2MW - prototype (single

operating unit)

2024 Orkney or

Aberdeen

16m 180 0.006

10MW – pre-commercial

facility (single

operating unit)

2027 Aberdeen 40m 900 0.03

100 MW- first

commercial offshore

hydrogen wind farm (10

x 10MW turbines)

2032 Northern

North Sea

~ 300m 9,000 0.30

4GW – first full scale 20

x 20 array hydrogen

wind farm (400 x 10MW

turbines)

2034 Northern

North Sea

~ 12 billion 360,000 12.0

www.erm.com

North Sea Potential

www.erm.com

Dolphyn at a glance ...

Production of green

hydrogen at scale

Replace 50% of UK

gas by 2060

Lowest, Competitive

Energy Price Solution

4 GW field heating

1.5m UK homes

by 2034

Supply to gas grid,

industry, power and

transport

Brings together

leading oil and gas

and offshore wind

industries

Sufficient wind

resource for

eventually providing

all UK heat

2 MW prototype by

2023 (180 te H2/yr)

The business of sustainability

Thank you Kevin Kinsella

Partner, Hydrogen Lead

[email protected]