    Erection All Risk Insurance

  • 7/29/2019 Errection All Risk-2

    2/22

    Project Insurance

    Insured Parties

    Principal Employer

    Manufacturer

    Contractor Sub-contractor& Insurer

    Any one or more of the following

  • 7/29/2019 Errection All Risk-2

    3/22

    Erection All Risk

    Basic concept

    Comprehensive cover against all the risk

    involved in the

    Storage

    Erection

    Testing and

    Commissioning

    of machinery & plant pertaining to various

    Industries

  • 7/29/2019 Errection All Risk-2

    4/22

    Erection All Risk

    CoverSudden and unforeseen loss or damage due to

    Fire, lightning, explosion, aircraft damage

    Riot, strike, malicious act

    Flood, inundation, storm, cyclone and allied perils

    Landslide, subsidence and rockslide Burglary and theft

    Faults in erection

    Human errors, negligence, lack of skill

    Short circuiting, arcing, excess voltage

    Collapse, damage due to foreign objects, impact damages

    Earthquake (optional)

    Terrorism (optional)

    Any other sudden, unforeseen damages not explicitly

    excluded

  • 7/29/2019 Errection All Risk-2

    5/22

    Erection All Risk

    Interest

    Joint interest:

    The policy can be taken jointly by the owner / principal

    covering the interests of all other parties

    Interest of Financial institution:

    Insured must specify clearly if interest of Financial Institution

    or Bank is required to be covered

  • 7/29/2019 Errection All Risk-2

    6/22

    Erection All Risk

    Period of cover

    Erection period according to the contract

    requirement

    Testing period - Normally 1 month but maybe more than a month

    depending on actual

    requirement

    Maintenance periodbegins from the day testing

    of the plant is declared

    completed upto the period

    based on requirement

  • 7/29/2019 Errection All Risk-2

    7/22

    Erection All Risk

    Insured Period

    Taken into use

    Works Testing Maintenance

    EAR Operational

    Commencement

    of Works

    Provisional Acceptance

    Certificate

    Final Acceptance

  • 7/29/2019 Errection All Risk-2

    8/22

    Erection All Risk

    Sum insured

    Completely erected value of the property

    inclusive of

    Freights

    Customs duty

    Erection cost

  • 7/29/2019 Errection All Risk-2

    9/22

    Erection All Risk

    Exclusion

    Types:

    General Market Exclusions

    Trade Risks

    Risks more exactly the Subject matter

    of Other Insurance

  • 7/29/2019 Errection All Risk-2

    10/22

    Erection All Risk

    General Market Exclusions War Invasion Riot Strike Civil Commotion etc

    Nuclear Reaction Nuclear Radiation or Radioactive

    Contamination

    Insureds Contribution Deductible

    Wilful Act or Wilful Negligence of the Insured

    Cessation of Work

  • 7/29/2019 Errection All Risk-2

    11/22

    Erection All Risk

    Trade risk

    Defective Material or Bad workmanship

    Wear Tear Corrosion Oxidation Deterioration

    Normal Maintenance or Making Good

    Disappearance or Shortage (Inventory Losses)

    Risks more exactly the Subject matter of Other Insurance

    Design Defects

    Loss of files, drawings, cash, cheques etc,.

    Consequential Loss

  • 7/29/2019 Errection All Risk-2

    12/22

    Erection All Risk

    Add-on covers

    Third party liability

    Cross liability

    Cost of removal of debris,

    Express freight,overtime charges,

    Air freight,

    Custom duty

    Escalation

    Owners surrounding property

    Storage risk at Fabricators Premises

  • 7/29/2019 Errection All Risk-2

    13/22

    Project Insurance

    IMPORTANT ADD-ONS:

    Third-party exposure to nearbystructures by excavation and

    foundation work and to traffic

    Third Party Liability

  • 7/29/2019 Errection All Risk-2

    14/22

    Project Insurance

    Add-on covers

    The cost of debris removalfollowing an accident to the

    Extent that it is necessary

    Before repairs may be put

    In hand

    Removal of Debris

  • 7/29/2019 Errection All Risk-2

    15/22

    Project Insurance

    Add-on covers

    The integration of an oldhotel into the new project

    represented a high exposure

    of the Principals existing property

    Surrounding Property

  • 7/29/2019 Errection All Risk-2

    16/22

    Project Insurance

    For early completion of the project:

    Refund of Premium

    Subject to :

    Period of insurance >= 18 months

    Notice for early completion in advance

    Claim experience < 60%

    Policy period not exceeding the contract period

    Minimum period for refund 3 months

  • 7/29/2019 Errection All Risk-2

    17/22

    Project Insurance

    Elimination & minimisation of risks

    Risk Management

    First Step:

    To identify the risk

    Evaluate risks inherent of the contract

    Second Step:

    Implement a loss prevention and

    safety programme to minimise these

    Inherent risks

    Third Step:

    The risk would be assigned to various

    parties involved by contractual

    agreement

  • 7/29/2019 Errection All Risk-2

    18/22

    Erection All Risk

    Physical Hazards

    Pre-erection and storage:

    Fire

    Theft

    Water Damage

    AOG Perils

    Material Handling Equipments

    Improper Storage

    Acts of god

  • 7/29/2019 Errection All Risk-2

    19/22

    Erection All Risk

    Physical Hazards

    Construction & erection:

    Working at Heights

    Heavy Lifts

    Handling of Over Dimensioned Items & Electrical

    Equipments

    Civil Construction Requirements

    Fire & AOG Perils Theft

  • 7/29/2019 Errection All Risk-2

    20/22

    Erection All Risk

    Physical Hazards

    Testing & commissioning:

    Failure of Controls & Safety Device

    Chemical Leakages

    Controls & Instrument Failure

    Failure of Material under Pressure

    Human Error & Negligence

    MBD & Explosion.

    Mfging. Faults

    ErectionErrors

  • 7/29/2019 Errection All Risk-2

    21/22

    Erection All Risk

    Claim procedure

    Designated Surveyors

    Contact Details of Surveyors

    Surveyors response within 24 hours

    Interim report

    Final report

    Settlement based on the survey report

    Risk Engineers assistance as and when

    required

  • 7/29/2019 Errection All Risk-2

    22/22

    Erection All Risk

    Basis of settlement

    Partial loss:

    The cost of repairs necessary to restore the items to their

    condition immediately before the occurrence of the damage

    less salvage, OR

    Total loss:

    The actual value of the items immediately before the

    occurrence of the loss less salvage;

    However, only to the extent the costs claimed has to be borne

    by the Insured and to the extent they are included in the

    Sum Insured