Description:
ERU WATSAN MODULE 15 Description and Equipment. Contents. Introduction Types of ERU Watsan Mod.15: Aim Watsan Mod. 15: Capabilities Watsan Mod. 15: Team Composition Watsan Mod. 15: Equipment. Introduction. - PowerPoint PPT Presentation
30
ERU WATSAN MODULE 15 Description and Equipment
Transcript
Page 1: ERU WATSAN MODULE 15 Description and Equipment

ERU WATSAN MODULE 15 Description and Equipment

Page 2: ERU WATSAN MODULE 15 Description and Equipment

WATSAN MODULE 15 ERU Description and Equipment2

WATSAN M15 ERUWATSAN M15 ERU

Contents

• Introduction

• Types of ERU

• Watsan Mod.15: Aim

• Watsan Mod. 15: Capabilities

• Watsan Mod. 15: Team Composition

• Watsan Mod. 15: Equipment

Page 3: ERU WATSAN MODULE 15 Description and Equipment

WATSAN MODULE 15 ERU Description and Equipment3

WATSAN M15 ERUWATSAN M15 ERU

In 1996, the International Federation of Red Cross and Red Crescent Societies (IFRC) set up the emergency response units (ERUs), which have responded to the needs of the vulnerable in major disasters.

ERUs are part of IFRC disaster response tools. They provide specific support or direct service when local facilities are either destroyed, overwhelmed by needs, or do not exist.

Using a standardized modular system of equipment and pre-trained teams of National Society technical specialists ERUs can be deployed within 48 to 72 hours.

Introduction

Page 4: ERU WATSAN MODULE 15 Description and Equipment

WATSAN MODULE 15 ERU Description and Equipment4

WATSAN M15 ERUWATSAN M15 ERU

Basic Health Care Referral Hospital (field hospital) Water and Sanitation. Specialized Water Module 15 Water and Sanitation. Mass Water Module 40 Water and Sanitation. Mass Sanitation Module 20 Telecommunications Logistics Relief

Types of ERUs

Page 5: ERU WATSAN MODULE 15 Description and Equipment

WATSAN MODULE 15 ERU Description and Equipment5

WATSAN M15 ERUWATSAN M15 ERU

To supply safe water in emergency situations to health care facilities and the population up to a maximum of 15.000 people when the local facilities are nor sufficient or have been destroyed. The unit can also provide basic sanitation.

Watsan Mod. 15

Aim

Page 6: ERU WATSAN MODULE 15 Description and Equipment

WATSAN MODULE 15 ERU Description and Equipment6

WATSAN M15 ERUWATSAN M15 ERU

• To provide water treatment and distribution up to 225,000 litres a day for a population of 15,000 people, with a storage capacity of a maximum

of 200,000 litres a day. • This unit can also provide basic sanitation for up to 5,000 people. • The module is designed for response to scattered populations, with a

flexible approach due to a number of smaller treatment units, which can be split and set up as stand-alone units in different locations.

• Availability of local water sources is required.• Integrated in the Water and Sanitation Module 15 is distribution and trucking capacity, for transport of treated water to dispersed populations, capacity of up to 75,000 litres a day, with possibility to set up nine different storage and distribution points (preconditions are availability of flatbed trucks, fuel, road access).

Approximate weight: 20 MT, volume: 75m3.

Watsan Mod. 15

Capabilities

Page 7: ERU WATSAN MODULE 15 Description and Equipment

WATSAN MODULE 15 ERU Description and Equipment7

WATSAN M15 ERUWATSAN M15 ERU

Page 8: ERU WATSAN MODULE 15 Description and Equipment

WATSAN MODULE 15 ERU Description and Equipment8

WATSAN M15 ERUWATSAN M15 ERU

Watsan Mod. 15

Team composition

Maximum capacity:

ERU SRC1 Team Leader

1 Technician (Sanitation)1 Technician (Quality control)1 Engineer1 Logistician5 Technician (electricity, plumbing, etc)

RC National Society

10 people similar characteristics

Page 9: ERU WATSAN MODULE 15 Description and Equipment

WATSAN MODULE 15 ERU Description and Equipment9

WATSAN M15 ERUWATSAN M15 ERU

• 5 lines of specialized water production: up to 45.000 litres/day and chemicals for 3 months (1 WTP/Line).

• 1-5 lines of mass water production: up to 600.000 litres/day and chemicals for 1 month.

• 50 latrines to be built immediately. Capacity to build more latrines.

• Equipment for the living area for expatriates and local staff.

• Laboratory.

• Workshop.

• Vehicles for 10 people.

• Communication equipment

Watsan Mod. 15

Deployment capability

Page 10: ERU WATSAN MODULE 15 Description and Equipment

WATSAN MODULE 15 ERU Description and Equipment10

WATSAN M15 ERUWATSAN M15 ERU

Unit Name

Module

Submodule

Set or Kit

Watsan Mod. 15

Equipment

• Modular• Standardized • Packed• Code (Tracking number)

SP/ERU/WATSAN/EQU/CAP/01A

Page 11: ERU WATSAN MODULE 15 Description and Equipment

WATSAN MODULE 15 ERU Description and Equipment11

WATSAN M15 ERUWATSAN M15 ERU

Watsan Mod. 15

Equipment:

Watsan Mod. 15

Equipment

MODULE CODE

Technical EQU

Sanitation SAN

Logistics LOG

Personal PFK

Telecommunications COM

Page 12: ERU WATSAN MODULE 15 Description and Equipment

WATSAN MODULE 15 ERU Description and Equipment12

WATSAN M15 ERUWATSAN M15 ERU

Watsan Mod. 15

Equipment

Watsan equipment. Floods Pakistan Jul-Aug 2007

Page 13: ERU WATSAN MODULE 15 Description and Equipment

WATSAN MODULE 15 ERU Description and Equipment13

WATSAN M15 ERUWATSAN M15 ERU

Watsan Mod. 15

Equipment

TECHNICAL EQUIPMENT MODULETECHNICAL EQUIPMENT MODULE

SUBMODULE CODE

Captation CAP

Mobile Water Plant MWP

Distribution DIS

Canalization CAN

Pipeline PIP

Dosage DOS

Laboratory LAB

Chemicals CHE

Administration OFA

Tools Automobile ATO

Tools Plumbing GTO

Page 14: ERU WATSAN MODULE 15 Description and Equipment

WATSAN MODULE 15 ERU Description and Equipment14

WATSAN M15 ERUWATSAN M15 ERU

Watsan Mod. 15

Equipment

SP/ERU/WATSAN/EQU/CAP/01A

SP/ERU/WATSAN/EQU/CAP/02A

SP/ERU/WATSAN/EQU/CAP/03A

SP/ERU/WATSAN/EQU/MWP/01

SP/ERU/WATSAN/EQU/CHE/01

WATER PRODUCTION LINEWATER PRODUCTION LINE

5

5

5

5

5

TOTAL ERUTOTAL ERU

Page 15: ERU WATSAN MODULE 15 Description and Equipment

WATSAN MODULE 15 ERU Description and Equipment15

WATSAN M15 ERUWATSAN M15 ERU

Watsan Mod. 15

Equipment

SP/ERU/WATSAN/EQU/DIS/01A

SP/ERU/WATSAN/EQU/CAN/01A

SP/ERU/WATSAN/EQU/CAN/01

SP/ERU/WATSAN/EQU/DIS/02A

SP/ERU/WATSAN/EQU/DIS/03A

WATER DISTRIBUTION LINEWATER DISTRIBUTION LINE

1

1

5

5

1

TOTAL ERUTOTAL ERU

Page 16: ERU WATSAN MODULE 15 Description and Equipment

WATSAN MODULE 15 ERU Description and Equipment16

WATSAN M15 ERUWATSAN M15 ERU

Watsan Mod. 15

Equipment

SP/ERU/WATSAN/EQU/ATO/01

SP/ERU/WATSAN/EQU/GTO/01

TOOLSTOOLS

SP/ERU/WATSAN/EQU/OFA/01

ADMINISTRATIONADMINISTRATION

SP/ERU/WATSAN/EQU/LAB/01

LABORATORYLABORATORY

SP/ERU/WATSAN/EQU/PIP/01

PIPELINEPIPELINE

1

1

1

1

1

TOTAL ERUTOTAL ERU

Page 17: ERU WATSAN MODULE 15 Description and Equipment

WATSAN MODULE 15 ERU Description and Equipment17

WATSAN M15 ERUWATSAN M15 ERU

5SP/ERU/WATSAN/EQU/CAP/01

A,B,C,D,ETrunks: onion tank 30 m3

5SP/ERU/WATSAN/EQU/CAP/02

A,B,C,D,ETrunks: Lombardini water pump

5SP/ERU/WATSAN/EQU/CAP/03

A,B,C,D,EPallets: onion tank 10 m3

5SP/ERU/WATSAN/EQU/DIS/01

A,B,C,D,ETrunks: bladder tank 10 m3

5SP/ERU/WATSAN/EQU/DIS/02

A,B,C,D,ETrunks: screaned bladder tanks 5 m3

1 SP/ERU/WATSAN/EQU/DIS/03 Trunk: Honda water pump

Watsan Mod. 15

Equipment

Page 18: ERU WATSAN MODULE 15 Description and Equipment

WATSAN MODULE 15 ERU Description and Equipment18

WATSAN M15 ERUWATSAN M15 ERU

1 SP/ERU/WATSAN/EQU/CAN 01 Trunk: 5 Pressure groups

1SP/ERU/WATSAN/EQU/CAN 01 A

Palet: 100m PVC pipe roll

4SP/ERU/WATSAN/EQU/PIP 01 02 03 04

Trunks: Various PVC parts

1SP/ERU/WATSAN/EQU/ATO O1

Trunk: Vehicle mechanic tools

1 SP/ERU/WATSAN/EQU/GTO 01 Trunk: Plumbing and various tools

5SP/ERU/WATSAN/EQU/CHE 01,02,03,04,05

Boxes: Chemicals

1 SP/ERU/WATSAN/EQU/LAB 01 Trunk: Laboratory kit

1 SP/ERU/WATSAN/EQU/DOS 01 Trunk: Dosage pumps

Watsan Mod. 15

Equipment

Page 19: ERU WATSAN MODULE 15 Description and Equipment

WATSAN MODULE 15 ERU Description and Equipment19

WATSAN M15 ERUWATSAN M15 ERU

Watsan Mod. 15

Equipment

SP/ERU/WATSAN/EQU/CHE/01

Chemicals: 24 kg. Calcium Hypoclorite HTH and 25 kg. Alumnium Sulphate

Page 20: ERU WATSAN MODULE 15 Description and Equipment

WATSAN MODULE 15 ERU Description and Equipment20

WATSAN M15 ERUWATSAN M15 ERU

SP/ERU/WATSAN/EQU/CAP/02A

Watsan Mod. 15

Equipment

Page 21: ERU WATSAN MODULE 15 Description and Equipment

WATSAN MODULE 15 ERU Description and Equipment21

WATSAN M15 ERUWATSAN M15 ERU

SP/ERU/WATSAN/EQU/PIP/01

Watsan Mod. 15

Equipment

Page 22: ERU WATSAN MODULE 15 Description and Equipment

WATSAN MODULE 15 ERU Description and Equipment22

WATSAN M15 ERUWATSAN M15 ERU

SATINATION MODULESATINATION MODULE

SUBMODULE CODE

General GEN

Excavation EXC

Pulveration PUL

Watsan Mod. 15

Equipment

Page 23: ERU WATSAN MODULE 15 Description and Equipment

WATSAN MODULE 15 ERU Description and Equipment23

WATSAN M15 ERUWATSAN M15 ERU

SP/ERU/WATSAN/SAN/GEQ/01

SP/ERU/WATSAN/SAN/GEQ/05

SP/ERU/WATSAN/SAN/GEQ/02

SP/ERU/WATSAN/SAN/GEQ/03

SP/ERU/WATSAN/SAN/GEQ/04

GENERALGENERAL

SP/ERU/WATSAN/SAN/EXC/01

SP/ERU/WATSAN/SAN/PUL/01

EXCAVATIONEXCAVATION

PULVERISATIONPULVERISATION

Watsan Mod. 15

Equipment

Page 24: ERU WATSAN MODULE 15 Description and Equipment

WATSAN MODULE 15 ERU Description and Equipment24

WATSAN M15 ERUWATSAN M15 ERU

1 SP/ERU/WATSAN/SAN/EXC/01 Trunk: Manual tools

1 SP/ERU/WATSAN/SAN/PUL/01Trunk: Sprayers, insecticides, protection clothes

1 SP/ERU/WATSAN/SAN/GEQ/01Trunk: Plastic containers, soap, buckets, etc

1 SP/ERU/WATSAN/SAN/GEQ/02 Pallet: 6 Monarflex plastic rolls 240 m2/roll

1 SP/ERU/WATSAN/SAN/GEQ/03 Pallet: 50 Monarflex squatting slabs

1 SP/ERU/WATSAN/SAN/GEQ/04 Pallet: 2 Wheelbarrows 85 l.

1 SP/ERU/WATSAN/SAN/GEQ/05 Pallet: 1 Wheelbarrow 85l.

Watsan Mod. 15

Equipment

Page 25: ERU WATSAN MODULE 15 Description and Equipment

WATSAN MODULE 15 ERU Description and Equipment25

WATSAN M15 ERUWATSAN M15 ERU

Watsan Mod. 15

Equipment

SP/ERU/WATSAN/SAN/EXC/01

Page 26: ERU WATSAN MODULE 15 Description and Equipment

WATSAN MODULE 15 ERU Description and Equipment26

WATSAN M15 ERUWATSAN M15 ERU

LOGISTICS MODULELOGISTICS MODULE

SUBMODULE CODE

Generator GEN

Lighting LIG

Hand forklift TRANS

Watsan Mod. 15

Equipment

Page 27: ERU WATSAN MODULE 15 Description and Equipment

WATSAN MODULE 15 ERU Description and Equipment27

WATSAN M15 ERUWATSAN M15 ERU

SP/ERU/WATSAN/LOG/GEN/01

SP/ERU/WATSAN/LOG/TRANS/01

SP/ERU/WATSAN/LOG/LIG/01

HAND FORKLIFTHAND FORKLIFT

GENERATORGENERATOR

LIGHTINGLIGHTING

Watsan Mod. 15

Equipment

Page 28: ERU WATSAN MODULE 15 Description and Equipment

WATSAN MODULE 15 ERU Description and Equipment28

WATSAN M15 ERUWATSAN M15 ERU

1 SP/ERU/WATSAN/LOG/GEN/01 Trunk: Generator and parts

1SP/ERU/WATSAN/LOG/LIG/01

Trunk: Lighting equipment

1 SP/ERU/WATSAN/LOG/TRAN/01 Hand forklift

Watsan Mod. 15

Equipment

Page 29: ERU WATSAN MODULE 15 Description and Equipment

WATSAN MODULE 15 ERU Description and Equipment29

WATSAN M15 ERUWATSAN M15 ERU

Watsan Mod. 15

Equipment

Hand forklift. Floods Pakistan Jul-Aug 2007

Page 30: ERU WATSAN MODULE 15 Description and Equipment

WATSAN MODULE 15 ERU Description and Equipment30

WATSAN M15 ERUWATSAN M15 ERU

Thank you……….Thank you……….