ESKOM 2010 PROJECT Johnny Dladla Managing Director, 2010 Special Project Power Indaba Conference, 19 - 21 May 2009 Power Indaba Conference, 19 - 21 May 2009
Transcript
Page 1: ESKOM 2010 PROJECT - Metering.com Dladla.pdf · ESKOM 2010 PROJECT Johnny Dladla ... • Event occurs in winter • Venue: • 9 Host cities, 10 stadia • Event’s key installations

ESKOM 2010 PROJECT

Johnny DladlaManaging Director, 2010 Special Project

Power Indaba Conference, 19 - 21 May 2009

Power Indaba Conference, 19 - 21 May 2009

Page 2: ESKOM 2010 PROJECT - Metering.com Dladla.pdf · ESKOM 2010 PROJECT Johnny Dladla ... • Event occurs in winter • Venue: • 9 Host cities, 10 stadia • Event’s key installations

Eskom 2010 PMO

The Winning Bid

Port Elizabeth Pretoria Rustenburg Johannesburg Durban Bloemfontein Nelspruit Polokwane

Page 3: ESKOM 2010 PROJECT - Metering.com Dladla.pdf · ESKOM 2010 PROJECT Johnny Dladla ... • Event occurs in winter • Venue: • 9 Host cities, 10 stadia • Event’s key installations

The Challenge to Eskom

• The Electricity challenge is that:

• The Key installations for the 2010WC lie within the host cities and are supplied by the municipalities.

GenerationDivision

Transmission Division DistributionDivision

Host cities& Key 2010Installations

System Operations

In Eskoms area of control

Within Municipal

area of control

Page 4: ESKOM 2010 PROJECT - Metering.com Dladla.pdf · ESKOM 2010 PROJECT Johnny Dladla ... • Event occurs in winter • Venue: • 9 Host cities, 10 stadia • Event’s key installations

-4

-2

0

2

4

6

8

10

12

14

16

18

20

•03 •05 •07 •09 •11 •13 •15

• % net capacity reserve margin

• Eskom base case

• 10% demand savings

• 5% demand savings

2010 Soccer World Cup

Reality Strikes – Reserve Margin

Page 5: ESKOM 2010 PROJECT - Metering.com Dladla.pdf · ESKOM 2010 PROJECT Johnny Dladla ... • Event occurs in winter • Venue: • 9 Host cities, 10 stadia • Event’s key installations

Defining the Challenge

Hosting a successful World Cup in a period where Security of Supply is tight

• Dates:• 2009FCC: 14-28 June 2009• 2010FWC: 11 June - 11 July 2010• Event occurs in winter

• Venue: • 9 Host cities, 10 stadia• Event’s key installations in municipal boundaries

Page 6: ESKOM 2010 PROJECT - Metering.com Dladla.pdf · ESKOM 2010 PROJECT Johnny Dladla ... • Event occurs in winter • Venue: • 9 Host cities, 10 stadia • Event’s key installations

The Journey to 2010

Intelligence gathering Planning

Testing

The event

Hosting

Learning

Understanding

Knowing

Curiosity

Managing

Page 7: ESKOM 2010 PROJECT - Metering.com Dladla.pdf · ESKOM 2010 PROJECT Johnny Dladla ... • Event occurs in winter • Venue: • 9 Host cities, 10 stadia • Event’s key installations

ESKOM 2010 PROJECT

Our Mandate…

“Ensure a reliable electricity delivery and treatment of risks to enable a successful 2009 Confederations Cup & 2010 FIFA World Cup, South Africa.”

Page 8: ESKOM 2010 PROJECT - Metering.com Dladla.pdf · ESKOM 2010 PROJECT Johnny Dladla ... • Event occurs in winter • Venue: • 9 Host cities, 10 stadia • Event’s key installations

Eskom 2010MW Project: Target Market

Global 2010WC Community: The Media, 2010 WC visitors & viewers around the globe

SA 2010WC Community:• Government (National, Provincial,

Local)• SALGA• Regulators• Host cities and Municipalities• FIFA and Local Organizing

committee• Foreign Embassies• Information and Communication

Technology (ICT) service providers

• SAPP• Travel and Tourism

Host Cities

Page 9: ESKOM 2010 PROJECT - Metering.com Dladla.pdf · ESKOM 2010 PROJECT Johnny Dladla ... • Event occurs in winter • Venue: • 9 Host cities, 10 stadia • Event’s key installations

Addressing the Challenge

National Project Office:

Finance and Business Support

Project Management

Marketing &Communications

RiskManagement:

Technical and Capacity

Marketing & communication incl. stakeholder engagement

Greening 2010

2010 Demand Side Management

National

Regional

SAPP

Audit: Corporate & Technical

Information technology and Telecommunication

Security and Business Continuity

Project Platforms –Each with its own platform deliverable

A dedicated 2010 Project Team

To ensure reliable electricity supply

Page 10: ESKOM 2010 PROJECT - Metering.com Dladla.pdf · ESKOM 2010 PROJECT Johnny Dladla ... • Event occurs in winter • Venue: • 9 Host cities, 10 stadia • Event’s key installations

Eskom: The road to 2010

Phase 1: Apr 2007 – Mar 2008 • Project Initiated

• Dedicated 2010 project team established

• Benchmark studies on previous mega international sporting events conducted

• Planning focussed on delivery of a reliable electricity supply chain for 2010 World Cup, network strengthening & capacity enhancement projects

• Collaboration with municipalities (AMEU)

• Broad engagement with world cup community in SA

A combination of technical delivery

and focussed stakeholder engagement

Page 11: ESKOM 2010 PROJECT - Metering.com Dladla.pdf · ESKOM 2010 PROJECT Johnny Dladla ... • Event occurs in winter • Venue: • 9 Host cities, 10 stadia • Event’s key installations

Eskom: The road to 2010

Phase 2: Apr 2008 – Mar 2009 • Regional joint, Eskom & Municipal, task

teams established

• Track, Audit rollout of project plans across the supply chain

• Risk treatment plans developed & implemented

• Situational (real time) response & command/operations centre planning

• Internal campaigns launched to mobilise, prepare, empower and inspire Eskom employees

A combination of technical delivery

and focussed stakeholder engagement

Page 12: ESKOM 2010 PROJECT - Metering.com Dladla.pdf · ESKOM 2010 PROJECT Johnny Dladla ... • Event occurs in winter • Venue: • 9 Host cities, 10 stadia • Event’s key installations

Eskom: The road to 2010Phase 3: Apr 2009 – Mar 2010 • April 2009 - SAPP contributions pledged

• Command/Operational centres operational

• Focus on refining preparations & conducting simulation exercises to test readiness

• Review, simulate, enhance Operational, Emergency and Disaster management plans

• Host a successful 2009 Confederations Cup & continue collaborative efforts ensure reliable electricity supplies

A combination of technical delivery

and focussed stakeholder engagement

Page 13: ESKOM 2010 PROJECT - Metering.com Dladla.pdf · ESKOM 2010 PROJECT Johnny Dladla ... • Event occurs in winter • Venue: • 9 Host cities, 10 stadia • Event’s key installations

Eskom: The road to 2010

Phase 4: Apr 2010 – Aug 2010 • All infrastructure projects rolled out

• Final preparations complete, electricity supply chain ready

• Host a successful 2010 FIFA World Cup South Africa

A combination of technical delivery

and focussed stakeholder engagement

Page 14: ESKOM 2010 PROJECT - Metering.com Dladla.pdf · ESKOM 2010 PROJECT Johnny Dladla ... • Event occurs in winter • Venue: • 9 Host cities, 10 stadia • Event’s key installations

Eskom Internal Campaign

Page 15: ESKOM 2010 PROJECT - Metering.com Dladla.pdf · ESKOM 2010 PROJECT Johnny Dladla ... • Event occurs in winter • Venue: • 9 Host cities, 10 stadia • Event’s key installations

Eskom 2010 Project

Together we will : “Ensure a reliable electricity delivery, Eskom

preparedness, and treatment of risks to enable a successful 2009 FIFA Confederations Cup and

2010 FIFA World Cup – South Africa”

Page 16: ESKOM 2010 PROJECT - Metering.com Dladla.pdf · ESKOM 2010 PROJECT Johnny Dladla ... • Event occurs in winter • Venue: • 9 Host cities, 10 stadia • Event’s key installations

Eskom Internal campaign

Page 17: ESKOM 2010 PROJECT - Metering.com Dladla.pdf · ESKOM 2010 PROJECT Johnny Dladla ... • Event occurs in winter • Venue: • 9 Host cities, 10 stadia • Event’s key installations

PARTNERING WITH THE SADC REGION

Page 18: ESKOM 2010 PROJECT - Metering.com Dladla.pdf · ESKOM 2010 PROJECT Johnny Dladla ... • Event occurs in winter • Venue: • 9 Host cities, 10 stadia • Event’s key installations

As a key member of “team South Africa”,

Eskom aligns with and supports major events

and campaigns that positively propel the

socio-economic aspirations of the country

and continent.

Unlocking African potential

Page 19: ESKOM 2010 PROJECT - Metering.com Dladla.pdf · ESKOM 2010 PROJECT Johnny Dladla ... • Event occurs in winter • Venue: • 9 Host cities, 10 stadia • Event’s key installations

SADC Commitments to 2010

Page 20: ESKOM 2010 PROJECT - Metering.com Dladla.pdf · ESKOM 2010 PROJECT Johnny Dladla ... • Event occurs in winter • Venue: • 9 Host cities, 10 stadia • Event’s key installations

SA AspirationsTo host a successful 2010 FIFA World Cup in South Africa

Power Indaba Conference, 19 - 21 May 2009


Recommended