ESMD Space Grant Educational Projects
ESMD SG Student Manager-Teresa Parham (Acting)ESMD SG Faculty Manager-Rich Smith (Acting)
ESMD Space Grant Projects Specialist- Susan Sawyer
• 34 applicants: Representing 18 SGC; 56% MSI
• 10 selected (AL, CA, GA, DC, MS, NC, NM, OH, UT, VA)- 50% MSI
• Tenure at Centers: June 2- July 2; KSC July 14-17
• All 10 will attend a SG Regional and give presentation
• Objectives:
• Confirmation of existing internships & senior design project
• Locating related published research for SD projects
• KSC will pay stipends; each center will handle logistics
(badging, info on housing, computers, etc.)
• Reviewing senior design courses developed by AU & MTU
2008 ESMD SG Faculty Cohorts
ESMD Senior Design Course Development
Auburn University: Dr. Dan Beale & Dr. David HarrisConcepts for Lunar Regolith excavation equipment and propose solutions in the form of completed designs and prototypes. NASA POC - Robert Muller of KSC
Michigan Technological University: Dr. John GershensonHigh-risk, low cost development projects like those common to the Small Space Craft Program. While this will be based on a particular project, the curriculum will not be tied to only that project. NASA POC is Dr. Butler Hine of ARC
Working with ESMD 2008 Summer Faculty
Presenting in Atlanta at National Conference
Workshop in DC 2009 (day before? after?)
• Summer Internship• Total of applications received – 103• Applications that met minimum requirements – 84• Mar 14 SG will make offers to students• Mar 20 need to know if the students accept or decline
• Fall Internships• Application deadline – May 1, 2008• Process flowchart instructions on the KSC Education
website• Let us know if you will not be funding students for
NASA Internship through this site
Student Intern Application for NASA
• Students submit a Systems Engineering Paper to be evaluated by NASA judges
• Judged by NASA judges– First prize: $3500 scholarship and VIP Shuttle
launch seating– Second prize: $2500 scholarship and VIP Shuttle
launch seating– Third prize: $1500 scholarship and VIP Shuttle
launch seatingDeadlines:• Paper submission March 3, 2008• 13 teams have signed up as of Feb 28• Award ceremony mid April
Systems Engineering Paper Competition
• 34 applicants: Representing 18 SGC; 56% MSI
•10 selected (AL, CA, GA, DC, MS, NC, NM, OH, UT, VA)- 50% MSI
• Tenure at Centers: June 2- July 2; KSC July 14-17
• All 10 will attend a SG Regional and give presentation
• Objectives:
• Confirmation of existing internships & senior design project
• Locating related published research for SD projects
• KSC will pay stipends; each center will handle logistics
(badging, info on housing, computers, etc.)
• Reviewing senior design courses developed by AU & MTU
2008 ESMD SG Faculty Cohorts
2007/2008 - Select from NASA project list OR submit a project
2008/2009 - Select NASA project list ONLY List is available so select projects NOW
Choose MULTIPLE projects
Point of Contacts at KSC (Teresa or Susan)
Senior Design Project
Reporting thru Mar 30 2008
Due by April 14
NASA HQ will not release 2008/2009 ESMD funds until you have completed the status report showing adequate progress
2006/2007 money may be used until Sep 30 08
2007/2008 money may be used until Sep 30 09
Mid-Term Status Reports