ESPACIO FOTOGRAFIA (Opcional)
PresentationAnalysts / Investors
Visit to South America
March 2007
2
Disclaimer
The views expressed here contain information derived from publicly available sources that have not been independently verified. No representation or warranty is made as to the accuracy, completeness or reliability of the information. Any forward looking information in this presentation has been prepared on the basis of a number of assumptions which may prove to be incorrect. This presentation should not be relied upon as a recommendation or forecast by BHP Billiton or Minera Escondida Limitada.
Nothing in this release should be construed as either an offer to sell or a solicitation of an offer to buy or sell shares in any jurisdiction.
3
Presentation Content
• General Overview• Production• Water & Energy• Key Financials
4
Escondida’s Strategy Builds on its Strengths to Maximize Long Term Value
Strong Cash Flow
Strong Cash Strong Cash FlowFlow
Low Cost ProducerLow Cost Low Cost ProducerProducer
Strong Credit Ratings
Strong Strong Credit Credit RatingsRatings
Stable CountryStable Stable
CountryCountry
Unequalled Resource
Unequalled Unequalled ResourceResource
High Quality ConcentrateHigh Quality High Quality ConcentrateConcentrate
Strong SponsorsStrong Strong
SponsorsSponsors
Ability to Manage
Expansions
Ability to Ability to Manage Manage
ExpansionsExpansions
Diversified Sales BaseDiversified Diversified Sales BaseSales Base
World’s Largest
Copper Mine
WorldWorld’’s s Largest Largest
Copper MineCopper Mine
5
Escondida Vision• Be the leading copper mine in the world, creating value and
sustainability through superior performance in the industry in safety, production, and unit costs.
• Achievement reached by:
– Working as a team to create a business of excellence– Consistently meeting our operating commitments in a planned, stable
and sustainable way, with Zero Harm to people, the environment, andthe community
– Being an excellent business partner for our communities, contractors, suppliers, and other interested parties
– Becoming the prefered mining employer in Chile – with employeeswho enjoy their work and are recognized for their efforts
– Successfully developing new projects and discovering new deposits
6
Key Strategic Objectives FY08 – F12
• Improving and strengthening sustainable development (Zero Harm): Health, Safety, Environment and Community
• Develop a High-Performance Organization with competent, highly productive, innovative employees committed to obtaining outstanding results
• Manage the Company through Business Excellence, with operational discipline and with focus on costs and quality.
• Optimize usage of resources, aggressively develop new projects and discover new ore bodies.
7
Northern Chile’s Atacama Desert,160 km south east of Antofagasta.
Taltal
Inca d e Oro
El Salvador
Chañaral
ARG
ENTI
NA
Coloso
Antofagasta
Mejillones
ZaldivarMonturaqui
Escondida
Calama
Chuquicamata
CH
ILE
Tocopilla
Potrerillo s
BOLI
VIA
World’s Premium Copper Region
Cerro ColoradoQuebrada BlancaCollahuasi
El AbraChuquicamata
Radomiro Tomic
Michilla Lince
Mantos Blancos
El Tesoro
EscondidaZaldivar
El Sa lvadorManto VerdeLa Candelaria
El IndioAndacollo
Los Pelambres
El Soldado Andina
Los Bronces El Teniente
Lomas Bayas
Spence
•Spence
ESPACIO FOTOGRAFIA (Opcional)
Escondida Norte Pit
Oxide Leach Pads
Escondida Pit
Laguna Seca Concentrator
Zaldivar Pit
Hamburgo Tailings Dam
Los Colorados Concentrator
2 kmN
Zaldivar Leach Pads
Sulphide LeachPads
9
Coloso Filter & Port Facilities
10
Development since the beginning
MEL MEL MEL MEL MEL MEL
ESCONDIDA NORTE
SulphideLeach
Start-up
FY1990
Phase I
FY1992
Phase II
FY1993
Phase III
FY1996
Phase 3.5
Oxide
FY1998
Phase IV
FY2002
370 831636 741 1159Prod.Payable (kt) 316
FY2005 FY2006
1283
11
710 721 726 730
1,1651,479
1,640
2,142
2,574 2,6813,090
3,7033,877
4,083
4,723
5,379
0
1,000
2,000
3,000
4,000
5,000
6,000
1991
1992
1993
1994199
5199
6199
7199819
9920
00200
1200
2200
320
04200
5200
6
Fiscal Years
US
$ (0
00´s
)Capital Investments
12
Leading Copper Minesites
Copper production (Contained Cu ‘000 tonnes)
World’s Largest Copper Mine
Source: Brook H unt, Copper Costs: Mines & Proj ects 2006 editi on
Radomiro Tomic
Cerro Verde
Los Pelambres
Antamina
Norilsk
El Teniente
Morenci
Collahuasi
PT Freeport Indonesia
KGHM Polish Copper
Chuquicamata
Escondida
0.0 250.0 500.0 750.0 1000.0 1250.0 1500.0
MEL Copper Production CY 2006: 1,255,559 Contained Cu tonnes
13
2007 Production League Ranked on C1 Cash Cost by Minesite (Pro – Rata Costing)
Source: Brook H unt, Copper Costs: Mines & Proj ects 2006 editi on
Pro-rata Costing i n which cost at each s tage are allocated to each metal pro-rata to its contribution to net revenue ( e.g a metal that contributes 30% of net revenue is allocated 30% of shared cost)
Esco
ndid
a M
ines
ite
0.0
50.0
100.0
150.0
200.0
0 5000 10000 15000 20000 25000 30000
Cumulative Product ion (Mlbs)
US
c/lb
14
Diversified Customer BaseSales by Destination - 2006
Copper Concentrate
Japan 21%
China 16%Chile 15%
South Korea 9%Ge rmany 5%
Others 15%
India 18%
Copper Cathode
USA 13%
Traders 16%
Netherlands 7%
Mexico 6%France 9%China 7%
Korea 5%Italy 5%
Japan 4%Others 10%
Chile 11%
Canada 6%
89%
11%
15
Sponsored By World’s Premier Metals & Mining Houses
BHP Billiton Limited
100%
BHP Escondida Inc 57.5%
Rio Tinto Plc 100%
Rio Tinto Escondida Limited
30%
Mitsubishi Corporation 70%
Mitsubishi Materials Corp 10%
Nippon Mining & Metals Co Ltd 20%
Japan EscondidaCorporation
10%
International FinanceCorporation
2.5%
Minera EscondidaLimitada
Owners Council
16
MEL Organization
Vicepresidencia
HSE
Hugo Rojas
PresidenteBert Nacken
Manager Business Excellence
Luis Kessra
Vicepresidencia
Minería
Patricio Barros
Vicepresidencia
Procesos
Marcelo Villouta
Vicepresidencia SS
Operacionales
Pedro Damjanic
Vicepresidencia
RRHH
Jorge Muñoz
Vicepresidencia
Finanzas
Alfredo Atucha
Vicepresidencia
Desarrollo
Andres Hevia
Manager AACC
Pedro Correa
Manager Legal
Alejandro Canut de Bon
PresidentSub-committee Operations
PresidentSub-committee Capital Expenditure
VP FinanceSub-com Contracts &Contractors
VP ProcessSub-committee Maintenance
VP RR.HH.Sub-committee Human Resources
PresidentSub-committee Social Responsibility
VP MinaSub-committee Air Quality
VP SS.OO.Sub-committee Energy
VP DesarrolloSub-committee Water
LeaderSub-Committee Name
17
Human Resources
Permanent Contractors 3.317
Capital Projects
Total Contractors
Note: As of January, 2007
2.90252.7189980Total MEL
68455892763Professional /Mgrs.
152131417Technical & Admin.
2.0641.99668Operators
22Expatriates
Total MELSantiagoMinaColosoAntofagasta
1.618
4.935
18
Total Recordable Injuries Frequency Rate (TRIFR)Escondida & Contractors (3 & 12 month rolling)
1
5
1
2 2 2 2
1
2
1 1
2
3
3
2
31
1
2
1
2
2
1
2 2
1 3
1
1
2
3 3
1
3
2
1
1
0
1
2
3
4
5
6
7
8
9
Mar-05
Apr-05
May-05
Jun-0
5Ju
l-05
Ago-05
Sep-05
Oct-05
Nov-0 5
Dic-05
Ene-06
Feb-06
Mar-06
Abr-0
6May
-06Ju
n-06
Jul-0
6Ago
-06Sep
-06Oct-
06No
v-06
Dic-06
Ene-07
Feb-
07
Num
ber o
f inj
urie
s by
cat
egor
y .
0
0,5
1
1,5
2
2,5
3
3,5
4
4,5
Number of Fatalities Number of LTI Number of Medical Treatment TRIFR 12 Month Rolling TRIFR 3 Month Rolling
19
Community Engagement Approach
ApproachPriorities (1,2)
Area
Open and constructive relationships with s takeholders including NGO's and local and
national author ities
1Art and Culture initiatives for low income groups, partnerships, and
dialogue with authorities.
2Corporate Affairs Santiago
Short and Medium term, regional development
strategy, specific community support in Coloso& Peine.
Support to company employees on voluntary social
initiatives
1Partnership, neighborhood
relationships and cooperation with stakeholders
(Antofagasta, Coloso, Peine)
2Social project with high and sustainable impact in the II
Region.
Corporate AffairsAntofagasta
Long term, politically neutral, beyond the operation's life time. Antofagasta and II
Region
2Execution of social projects with high and sustainable community
impact (Antofagasta – II Region)
1Education, Health, Social development, Indigenous
Affairs, and youth.
MineraEscondida Foundation
Reputation Social Capital Development
20
Main Community Projects - FY07Corporate Affairs
• 2010 No Slums; Antofagasta Region.Alliance with Ministry of Housing and “A Roof for Chile” NGO, with the purpose to provide a permanent housing for 1048 families currently living in slums in cities of the Antofagasta II Region.
• Programme for Professionals Towards a Globalized Chile.Scholarship program to provide international postgraduates studies for 150 Chilean young professionals, with working experience and who come mainly from lower and middle-income sectors, and accomplish academic merits and personal profiles.
• “Santiago a Mil”, Street Theater Festival at Santiago and Antofagasta.Leverage at the national level the company commitment with low income groups access to high level art and culture expressions.
• Escondida Ladies CommitteeScholarships Program for lower income students, financed with different collecting fund initiatives.
• Voluntary Initiatives of Escondida’s Employees14 social projects presented by Escondida's employees in areas of training and equipment for social organizations were selected by the Social Responsibility Fund for the year 2007. More than 1500 workers involve in voluntary work.
21
Main Community Projects - FY07
Minera Escondida Foundation
• Playgrounds (3) and Nursery Houses (12) construction at Antofagasta and Calama.Alliance with National and Local Government and National Council of Playground Facilities for 528 Childs from lower income families. This project is being supported by the President Mrs. Bachelet.
• Fund For Indigenous Organizations12 projects were financed for indigenous communities from the villages of Río Grande, Camar, Toconao, Taira, Ayllu de Cucuter, Calama, and San Pedro de Atacama. These initiatives are oriented to capacity development in project management, associatively and community relations.
Industrial and Mining Training Center
• School For Industrial DutiesProgram oriented to improve the qualification levels of the labor force under a development skills methodology in order to accomplish the mining industry labor force requirements.
22
Escondida Mine Pit
23
FINAL (Main Pit) Dimensions
Distance EW 3.5 km
Dis
tanc
eNS
4.8
km
Deep 840 m (Initial Bench 3255, Final Bench 2415)
DIMENSIONES PIT FINAL (KMS)
EW 3.5
NS 4.8
H 0.84
24
FINAL (Escondida Norte) Dimensions
Distance EW 2.7 km
Dis
tanc
eNS
2.6
km
Deep 795 m (Initial Bench 3410, Final Bench 2615)
DIMENSIONES PIT FINAL (KMS)
EW 2.7NS 2.6H 0.795
25
Resources as at end June 2006
(*)Sol. Cu
Resources as at end June 2006 EscondidaOre Type Cut-off Tonnes TCu Tonnes TCu Tonnes TCu Tonnes TCu
millions % millions % millions % millions %Sulphide Variable 556 1.18 987 0.97 575 0.82 2,119 0.98
Sulphide leach Variable 635 0.51 1,435 0.48 2,731 0.47 4,801 0.48Oxide 0.2 69 0.67 15 0.55 9 0.56 93 0.64
1,261 0.81 2,437 0.68 3,315 0.53 7,013 0.63Escondida NorteOre Type Cut-off Tonnes TCu Tonnes TCu Tonnes TCu Tonnes TCu
millions % millions % millions % millions %Sulphide Variable 149 1.55 330 1.33 139 1.05 619 1.32
Sulphide leach Variable 70 0.61 702 0.57 1,431 0.51 2,203 0.53Oxide 0.2 5 1.20 20 1.14 7 1.17 32 1.16
224 1.25 1,052 0.82 1,577 0.56 2,853 0.71Total ResourcesOre Type Cut-off Tonnes TCu Tonnes TCu Tonnes TCu Tonnes TCu
millions % millions % millions % millions %Sulphide Variable 705 1.26 1,318 1.06 715 0.86 2,738 1.06
Sulphide leach Variable 705 0.52 2,136 0.51 4,162 0.48 7,004 0.50Oxide 0.2 74 0.71 35 0.88 16 0.82 125 0.77
1,485 0.88 3,489 0.72 4,893 0.54 9,866 0.65
Total
Total
Total
Measured (A) Indicated (B) Inferred (C) Total (A+B+C)
•Resources are based on information compiled by J C amacho(CP), who is a member of the Aus tralian Ins titute of Mining and Metallurgy. Mr Camacho was employed by Minera Escondida Limitada. He has sufficient experience with the estimation, assessment, evaluation and economic extraction of large scale copper mining oper ations and projec ts. T his experience is r elevant to the style of mineralizati on and type of deposit under consider ation and to the acti vity which he is undertaki ng, and as such he qualifies as a Competent Person as defi ned in the 1999 Edition of the 'Australasi an C ode for Reporting of Exploration Results, Mineral Resources and Ore Reserves'.'
26
Reserves as at end June 2006
(*) Sol. Cu
Ore Reserves As at June 2006 EscondidaOre Type Cut-off Tonnes TCu Tonnes TCu Tonnes TCu
millions % millions % millions %Sulphide Variable 555 1,18 846 1,00 1.401 1,07
Sulphide leach Variable 592 0,51 994 0,51 1.586 0,51Oxide 0.2 69 0,67 (*) 15 0,55 (*) 85 0,65 (*)
1.217 0,82 1.856 0,73 3.072 0,77Escondida NorteOre Type Cut-off Tonnes TCu Tonnes TCu Tonnes TCu
millions % millions % millions %Sulphide Variable 149 1,55 321 1,34 470 1,41
Sulphide leach Variable 59 0,55 549 0,61 608 0,60Oxide 0.2 5 1,20 (*) 20 1,14 (*) 25 1,15 (*)
213 1,27 890 0,89 1.103 0,96Total ReservesOre Type Cut-off Tonnes TCu Tonnes TCu Tonnes TCu
millions % millions % millions %Sulphide Variable 704 1,26 1.167 1,09 1.872 1,16
Sulphide leach Variable 651 0,51 1.543 0,55 2.194 0,53Oxide 0.2 74 0,71 (*) 35 0,88 (*) 109 0,76 (*)
1.430 0,89 2.745 0,78 4.175 0,82
Total
Total
Total
Proved (G) Probable (H) Total (G+H)
•Ore reser ves ar e based on i nfor mati on compiled by P Fehlandt (CP), who is a member of the Aus tralian Institute of Mining and Metallurg y. Mr Fehlandt is empl oyed by Minera Escondida Limitada. H e has sufficient experience with the esti mation, assessment, evaluation and economic extraction of large scale copper mining operations and proj ects. This experience is relevant to the style of mi neralizati on and type of deposit under consideration and to the acti vity which he is undertaki ng, and as such he qualifies as a Competent Person as defi ned in the 1999 Edition of the 'Austral asian Code for Reporting of Explorati on R esults, Mineral Resources and Ore Reserves'.'
27
Escondida Mining Fleet - Dec 2006
•• Electric Rope Shovels – Total 17- Shovel (73 yd Dipper) 5- Shovel (67 yd Dipper) 2- Shovel (55 yd Dipper) 9- Shovel (30 yd Dipper) 1
• Haul Trucks – Total 122- Trucks (240 mt) 73- Trucks (380 mt) 49
• Front End Loaders – Total 5- (23 yd Bucket)
• Drills – Total 18- 49R R2 R3s (10), DMM2s (2), DM45 (3), CM780 (1) & 250XPs (2)
• Auxiliary Equipment – Total 70
28
MEL Future Growth Options
MEL is developing studies in three areas:
• Improve the performance of actual facilities through optimization and small expansions such as pre-crushing and additional grinding capacity,
• Increase throughput by adding new facilities, such as a new/additional concentrator to the two existing ones.
• Increase/maintain throughput over time by bringing in new potential ore sources by exploration.
Exploration:
• MEL initiated a brown fields exploration program in 2005 with the objective of investigation the ore potential of its current tenements (4,000 sq. kmsapprox) around its operations.
29
Presentation Content
• General Overview• Production• Key Financial Numbers• Water & Energy
30
General Diagram
Main Pit Pit Escondida Norte
Oxide
SX Sulphide
Oxide
Waste SulphideMix Ore
Concentrator Plants
Stock Sulphide
Stock Mix Ore
Stock Óxide
CopperCathodes
Copper Concentrate Puerto Coloso
Puerto Antofagasta
Dumping
Crusher
Crusher
Crusher
31
Copper Production – 000s of tons of copper Payable
810 817702
591730
8961,008
505
56151
145151
137
151
152
116
87
831
1,167
831 866967
847741
867
1,0471,159
1,283
592
0
200
400
600
800
1000
1200
1400
1998 1999 2000 2001 2002 2003 2004 2005 2006 YTD Dec06
Fiscal Years
'000s
Tonn
es of
Pro
ducti
on o
f Cu
Paya
ble
Concentrate Cathodes Total
32
Mine earth movement – ‘000s TPD (ex-Pit)
681 725835
901814
9061026 1009
834
678
0
200
400
600
800
1000
1200
1998 1999 2000 2001 2002 2003 2004 2005 2006 YTD Dec06
Fiscal Years
'000s
Ton
nes
per D
ay
33
Copper Production in Concentrate& Head Grade
Material Milled, Headgrade and Copper Production
0
200
400
600
800
1.000
1.200
1.400
FY91 FY92 FY93 FY94 FY95 FY96 FY97 FY98 FY99 FY00 FY01 FY02 FY03 FY04 FY05 FY06 YTDDec-06
0,00%
0,50%
1,00%
1,50%
2,00%
2,50%
3,00%
3,50%
Tonnes milled (00 000t) Production (Cu Contained) (kt) Headgrade (%)
34
Los Colorados ConcentratorPlant
35
Concentrator Plants
PebblesOre
Flotation Rougher
ThickenerTailings
Tailings
SAG Mills
Ball Mills
Remill
RecoveryWater
Flotación CleanerScavenger Thickener
Tailings
Recovery WaterConcentrator
to Coloso
2° Cleaner FlotationConcentrator
Thickener
WaterWater
Agua
36
Los Colorados Production – ‘000s TPD milled
116 125 125 118 107 115 108119 122103
0
20
40
60
80
100
120
140
1998 1999 2000 2001 2002 2003 2004 2005 2006 YTDDec06
Fiscal Years
'000s
Ton
nes p
er D
ay
37
Laguna Seca Concentrator Plant
38
Laguna Seca Production – ‘000s TPD milled
114
51,5
97,7118109
0
20
40
60
80
100
120
140
2002 2003 2004 2005 2006 YTD Dec06Fiscal Years
'000s
Tonn
es p
er D
ay
ESPACIO FOTOGRAFIA (Opcional)
Coloso Filter and Port Facilities
40
Coloso Port – Concentrate Shipped (000s of tons)
2,145 2,105 1,813 1,6822,056
2,617
1,465
2,9943,425
2,073
0
500
1000
1500
2000
2500
3000
3500
4000
1998 1999 2000 2001 2002 2003 2004 2005 2006 YTD Dec06
Fiscal Years
'000s
Ton
nes S
hippe
d
41
Escondida SX-EW Oxide Plant
42
Flowsheet (Oxide & Sulphide Leach)
Primary
Crusher
Stockpile
SecundaryCrushing
TertiaryCrushing
WaterAcidSilo
Agglomeration
LeachingAcid
Water
PLS
Raffinate
Mine
Raffinate
Electrowining
ES
LoadedOrganic
StrippedOrganic
SolventExtraction (SX)
E.R E.PPower
CaopperCathodes
PLS
Electrowining
Power
Copper Cathodes
Leaching
Acid
Water
PLS
Raffinate
RaffinateE
S
Str ippedOrganic
LoadedOrganic
SolventExtraction
E.RE.P
Mine
PLS
InterPlantPipeline
17 km
ILS
ILS
Air
43
Production – ‘000s Tonnes of Cathodes
151 145 151137
151 152
116
5156
36
0
20
40
60
80
100
120
140
160
1999 2000 2001 2002 2003 2004 2005 2006 YTDDec06
'000s
Tonn
es
Oxide S.Leach
44
Sulphide Leach Cu production in FY07
Sulphide Leach Cu Production in Tonnes
0
5000
10000
15000
20000
25000
30000
35000
40000
Jul-06 Aug-06 Sep-06 Oct-06 Nov-06 Dec-06
Month
Cop
per P
rodu
ctio
n cu
mm
ulat
ive
45
Key Challenges
• Safety (MEL and Contractors), • Labor Relationship• Increase the availability of mine equipment (trucks)• Productivity ( increase productivity, contractor management) • Supply of new Tyres• Supply of new mine equipment • Water • Energy
46
Presentation Content
• General Overview• Production• Water & Energy• Key Financial Numbers
47
WATER STRATEGY
Five focus areas
1. Base Case: desalination expansion. 2. “Water Market” as supply option.3. Optimization of current water resources4. Water Recovery Projects & Studies.5. Water Exploration
48
SING Generation in the near future (2006 - 2010)
2007 2008 2009
COAL
1,200 MW
GAS
2,100 MW
300 MWDiesel-F.O.
Installed
Generation
3,600 MW
Dual-Diesel
800 MWmax
SING Demand
1,650 MW
2,120 MW
Without Gas
1000 --
2000 --
3000 --
Power MW
2006
1750
MW
1850
MW
1950
MW
2100
MW
2010
COAL
1,550 MW
GAS
2,100 MW
300 MWD-F.O.
BHPBilliton
New Coal
Plant
Gas or Diesel
generation needs
49
Natural Gas Restriction (2004 – 2007).
NATURAL GAS RESTRICTIONS
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
May
-04
Ago-
04
Nov-
04
Feb-
05
May
-05
Ago-
05
Nov-0
5
Feb-
06
May
-06
Ago-
06
Nov-
06
Feb-
07
%DEMAND % RESTRICTIONS
•Natural Gas Price (Aver.): Mar. ’04: 2.32 USD/MMBTUFeb. ’07: 5.55 USD/MMBTU
Source: CDEC SING
50
BHP Billiton’s Strategy – Short & Long Term.
Interim Solution (2007-2010): Running pre-feasibility studies for different alternatives:
• Self generation (Local Diesel Generators)• On Shore LNG Terminal (Regasification On Shore & Floating Storage)• Off Shore LNG Terminal (FSRU - Floating Storage Regasification Unit)
Long-term Power Supply (2010-2026):Subscribe Power Purchase Agreements with power generation companies based in coal fired generation.
The agreements involve the construction and operation of a coal fired thermoelectric plant of at least 400 MW connected to the SING.
Considering the gas fired power generation installed in the SING and the uncertainty in the natural gas supply, BHP Billiton defined a strategy to ensure electricity supply at the lowest possible cost:
51
Presentation Content
• General Overview• Production • Water & Energy• Key Financial Numbers
52
Net Profit
1,111
1,896
4,560
2,456
1.51
3.09
1.15
2.80
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
FY04 FY05 FY06 YTD Dec 060.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
Net Profit Copper Price
$Million
10471159
1283
592
0
200
400
600
800
1000
1200
1400
FY 2004 FY 2005 FY 2006 Dec 06 YTD
Payable Pro duction
53
Profit & Loss FY 04 FY 05 FY 06 YTD Dec 06
Gross Revenue 2.726 3.935 8.069 4.150
Refining / Treatment / Shipping (378) (508) (912) (418)
Net Return on Sales 2.349 3.427 7.158 3.732
Cost of Sales (691) (809) (947) (555)
Gross Profit 1.657 2.618 6.211 3.177
EBITDA 1.610 2.546 5.903 3.193
Depreciation & Amortization (206) (194) (252) (120)
EBIT 1.404 2.352 5.651 3.074
Interest (66) (63) (47) (52)
Tax (227) (392) (1.045) (565)
NPAT 1.111 1.896 4.560 2.456
54
C1, C2 & C3 Cost ComponentsCost C1
+ Cash Cost- Deferred Stripping inventory increase+ Inventory movements (Concentrate + Cathodes)+ Treatment & Refining Charges+ Concentrate Shipment Charges+ Cathode Shipment Charges- Gold and Silver revenue
Cost C2+ Total C1 Costs+ Depreciation+ Deferred Stripping amortization.+ Amortizations
Cost C3+ Total C2 Costs+ Interest Expenses+ Interest Income+ Exploration Costs+ Other Expenses / Income
55
C1 Costs
0.5650.609
0.4250.479
0.5920.680
0.00
0.10
0.20
0.30
0.40
0.50
0.60
0.70
0.80
FY04 FY05 FY06 YTD Dec 06
cUS$
/lb C
u
C1
56
Business Excellence Benefit
19,726
32,442
45,633
25,20041,116
51,847
26,647
73,639
42,90521,490
74,951
119,272
0
30,000
60,000
90,000
120,000
150,000
FY04 FY05 FY06 YTD Dec 06
Revenue Cost
000' US$
57
Cash Flow before Funding & Dividends $m
3,447
2,982
1,280
1,080
206
652 713
173
0
500
1,000
1,500
2,000
2,500
3,000
3,500
4,000
FY04 FY05 FY06 YTD Dec 06
Cash FlowCapex
US$Millions
58
Taxes Paid
0
500
1,000
1,500
2,000
2,500
Mill
ion
US$
First Category WHT Dividends Royalty TOTAL
TOTAL 0 3 129 71 138 155 253 331 119 165 182 84 39 118 617 861 2,411
Royalty 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 266
WHT Dividends 0 0 82 35 48 44 141 188 87 115 114 66 20 30 303 329 1,148
First Category 0 3 46 36 91 111 112 143 32 50 68 17 19 88 314 532 997
1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006
US$5.676m.Taxes paid since Escondida
start up
59
Debt Maturity Profile
$455m & $125m Export Credit Agency Debt
$440m OutstandingSyndicated Bank Debt
$40m OutstandingChile Bond
31 Dec 06External Debt Instruments
$ 0
$ 50
$ 100
$ 150
$ 200$ 250
$ 300
$ 350
$ 400
FY06 FY07 FY08 FY09 FY10
Capital MarketsECA DebtBank Debt
Maturity Profile as at 31 Dec 2006 ($Millions)
60
THANKS