    Sl No. Bridge Name Page no1 Repairing Estimate Bridge no : 213/1 2 - 5

    2 Quantity Calculation Bridge no : 213/1 6 - 8

    3 Repairing Estimate Bridge no : 223/4 9 - 12

    4 Quantity Calculation Bridge no : 223/4 13 - 15

    5 Repairing Estimate Bridge no : 228/1 16 - 19

    6 Quantity Calculation Bridge no : 228/1 20 - 22

    7 Repairing Estimate Bridge no : 229/1 23 - 268 Quantity Calculation Bridge no : 229/1 27 - 29

    9 Repairing Estimate Bridge no : 234/1 30 - 33

    10 Quantity Calculation Bridge no : 234/1 34 - 36

    11 Repairing Estimate Bridge no : 235/3 37 - 40

    12 Quantity Calculation Bridge no : 235/3 41 - 43

    13 Repairing Estimate Bridge no : 237/1 44 - 48

    14 Quantity Calculation Bridge no : 237/1 49 - 51

    15 Repairing Estimate Bridge no : 240/1 52 - 55

    16 Quantity Calculation Bridge no : 240/1 56 - 57

    17 Repairing Estimate Bridge no : 245/3 58 - 61

    18 Quantity Calculation Bridge no : 245/3 62 - 64

    19 Repairing Estimate Bridge no : 250/4 65 - 6820 Quantity Calculation Bridge no : 250/4 69 - 71

    21 Repairing Estimate Bridge no : 251/1 72 - 75

    22 Quantity Calculation Bridge no : 251/1 76 - 78

    23 Repairing Estimate Bridge no : 252/1 79 - 82

    24 Quantity Calculation Bridge no : 252/1 83 - 85

    25 Repairing Estimate Bridge no : 255/1 86 - 89

    26 Quantity Calculation Bridge no : 255/1 90 - 92

    27 Repairing Estimate Bridge no : 255/2 93 - 96

    28 Quantity Calculation Bridge no : 255/2 97 - 99

    29 Repairing Estimate Bridge no : 259/1 100 - 103

    30 Quantity Calculation Bridge no : 259/1 104 - 105

    31 Repairing Estimate Bridge no : 259/2 106 - 10932 Quantity Calculation Bridge no : 259/2 110 - 112

    33 Repairing Estimate Bridge no : 259/3 113 - 116

    34 Quantity Calculation Bridge no : 259/3 117 - 119

    35 Repairing Estimate Bridge no : 260/1 120 - 123

    36 Quantity Calculation Bridge no : 260/1 124 - 126

    37 Repairing Estimate Bridge no : 260/2 127 - 130

    38 Quantity Calculation Bridge no : 260/2 131 - 132

    39 Repairing Estimate Bridge no : 260/4 133 - 136

    40 Quantity Calculation Bridge no : 260/4 137 - 139

    41 Repairing Estimate Bridge no : 260/5 140 - 143

    42 Quantity Calculation Bridge no : 260/5 144 - 146

    43 Repairing Estimate Bridge no : 260/6 147 - 150

    44 Quantity Calculation Bridge no : 260/6 151 - 153

    45 Repairing Estimate Bridge no : 264/1 154 - 157

    46 Quantity Calculation Bridge no : 264/1 158 - 160

    47 Repairing Estimate Bridge no : 264/2 161 - 164

    48 Quantity Calculation Bridge no : 264/2 165 - 167

    49 Repairing Estimate Bridge no : 265/1 168 - 171

    50 Quantity Calculation Bridge no : 265/1 172 - 174

    51 Repairing Estimate Bridge no : 266/1 175- 178

    52 Quantity Calculation Bridge no : 266/1 179 - 181

    Index (Repairing)

  • 8/12/2019 Esstt Bridge

    2/510

    Sl No Bridge Name Page No1 Abstract 1 - 4

    2 Cost Estimate Bridge No : 209/1 5 - 9

    3 Quantity Calculation Bridge No : 209/1 10 - 11

    4 Cost Estimate Bridge No : 213/1 12 - 15

    5 Quantity Calculation Bridge No : 213/1 16 - 18

    6 Cost Estimate Bridge No : 223/4 19 - 22

    7 Quantity Calculation Bridge No : 223/4 23 - 258 Cost Estimate Bridge No : 226/1 26 - 29

    9 Quantity Calculation Bridge No : 226/1 30 - 31

    10 Cost Estimate Bridge No : 228/1 32 - 35

    11 Quantity Calculation Bridge No : 228/1 36 - 38

    12 Cost Estimate Bridge No : 229/1 39 - 42

    13 Quantity Calculation Bridge No : 229/1 43 - 45

    14 Cost Estimate Bridge No : 232/1 46 - 50

    15 Quantity Calculation Bridge No : 232/1 51 - 52

    16 Cost Estimate Bridge No : 234/1 53 - 56

    17 Quantity Calculation Bridge No : 234/1 57 - 59

    18 Cost Estimate Bridge No : 235/3 60 - 63

    19 Quantity Calculation Bridge No : 235/3 64 - 6620 Cost Estimate Bridge No : 237/1 67 - 70

    21 Quantity Calculation Bridge No : 237/1 71 - 73

    22 Cost Estimate Bridge No : 240/1 74 - 77

    23 Quantity Calculation Bridge No : 240/1 78 - 80

    24 Cost Estimate Bridge No : 241/1 81 - 85

    25 Quantity Calculation Bridge No : 241/1 86 - 87

    26 Cost Estimate Bridge No : 245/3 88 - 91

    27 Quantity Calculation Bridge No : 245/3 92 - 94

    28 Cost Estimate Bridge No : 250/4 95 - 98

    29 Quantity Calculation Bridge No : 250/4 99 - 101

    30 Cost Estimate Bridge No : 251/1 102 - 105

    31 Quantity Calculation Bridge No : 251/1 106 - 10832 Cost Estimate Bridge No : 252/1 109 - 112

    33 Quantity Calculation Bridge No : 252/1 113 - 115

    34 Cost Estimate Bridge No : 255/1 116 - 119

    35 Quantity Calculation Bridge No : 255/1 120 - 122

    36 Cost Estimate Bridge No : 255/2 123 - 126

    37 Quantity Calculation Bridge No : 255/2 127 - 129

    38 Cost Estimate Bridge No : 259/1 130 - 133

    39 Quantity Calculation Bridge No : 259/1 134 - 136

    40 Cost Estimate Bridge No : 259/2 137 - 140

    41 Quantity Calculation Bridge No : 259/2 141 - 143

    42 Cost Estimate Bridge No : 259/3 144 - 147

    43 Quantity Calculation Bridge No : 259/3 148 - 150

    44 Cost Estimate Bridge No : 260/1 151 - 154

    45 Quantity Calculation Bridge No : 260/1 155 -157

    46 Cost Estimate Bridge No : 260/2 158 - 161

    47 Quantity Calculation Bridge No : 260/2 162 - 164

    48 Cost Estimate Bridge No : 260/4 165 - 168

    49 Quantity Calculation Bridge No : 260/4 169 - 171

    50 Cost Estimate Bridge No : 260/5 172 - 175

    51 Quantity Calculation Bridge No : 260/5 176 - 178

    52 Cost Estimate Bridge No : 260/6 179 - 182

    53 Quantity Calculation Bridge No : 260/6 183 - 185

    Index (Bridge Estimate)

  • 8/12/2019 Esstt Bridge

    3/510

    Sl No Bridge Name Page No54 Cost Estimate Bridge No : 264/1 186 - 189

    55 Quantity Calculation Bridge No : 264/1 190 - 192

    56 Cost Estimate Bridge No : 264/2 193 - 196

    57 Quantity Calculation Bridge No : 264/2 197 - 199

    58 Cost Estimate Bridge No : 265/1 200 - 203

    59 Quantity Calculation Bridge No : 265/1 204 - 206

    60 Cost Estimate Bridge No : 266/1 207 - 210

    61 Quantity Calculation Bridge No : 266/1 211 - 213

    62 Annexure-I 214

  • 8/12/2019 Esstt Bridge

    4/510

  • 8/12/2019 Esstt Bridge

    5/510

  • 8/12/2019 Esstt Bridge

    6/510

    Sl No. Bridge Name Page No.

    1 Abstract of Cost for ROB 1

    2 Cost Estimate for ROB No. 222/1 2

    3 Cost Estimate for ROB No. 227/1 3

    4 Cost Estimate for ROB No. 238/2 4

    5 Cost Estimate for ROB No. 243/1 5

    Index

  • 8/12/2019 Esstt Bridge

    7/510

    Sl

    no Chainage

    Bridge

    NumberFoundation Substructure Superstructure

    Protection

    workTotal Amount

    1 208415 209/1 83715247 7631471 46683197 4479733 142509648

    2 212964 213/1 3843254 4361152 4996144 1661894 14862444

    3 222595 223/4 7490574 5663192 7657806 1376013 22187585

    4 225454 226/1 244385207 23916554 84373397 10811927 363487085

    5 227462 228/1 6465518 11477347 7688495 1441941 27073301

    6 228087 229/1 5996341 10441881 7360981 1592802 25392005

    7 231240 232/1 65021408 5311920 17303325 12290131 99926784

    8 233214 234/1 4931416 8773643 5345836 1353616 20404511

    9 234859 235/3 6536365 5794902 7660685 1220261 21212213

    10 236259 237/1 4360989 3019475 4131320 738296 12250080

    11 239322 240/1 4056387 6086571 5259062 1068934 16470954

    12 240272 241/1 384107664 30270892 99342251 12883592 526604399

    13 244803 245/3 3568408 3266608 5381863 853013 13069892

    14 249990 250/4 4674659 3966948 5451262 954638 15047507

    15 250350 251/1 5410407 3043138 5871868 989581 15314994

    16 251630 252/1 3146003 2186448 4660377 729730 10722558

    17 254000 255/1 3314720 5161212 4822344 773338 14071614

    18 254750 255/2 5242120 2220405 5654614 1009724 14126863

    19 258170 259/1 3174818 1290626 4556071 601683 9623198

    20 258380 259/2 2966473 1955483 4704570 694720 10321246

    21 258590 259/3 11491302 7172930 10273280 1866128 30803640

    22 259015 260/1 7056378 3516355 8207648 1303642 20084023

    23 259230 260/2 6602668 8643895 6165614 1251493 22663670

    24 259580 260/4 4445961 2586142 5632670 864840 13529613

    25 259685 260/5 4191425 2674023 5652421 901225 13419094

    26 259870 260/6 4841176 2464563 5332024 821020 13458783

    Name of Work: 4 Lane Connectivity from Nagaon to Itanagar in Arunachal Pradesh under SARDP NE

    Work (Phase A). 4 Laning of NH 52 from the end of Biswanath Chariali by-pass (Km 208.00) to Gohpur (km

    265.5) (Total Length = 57.50 km) in Sonitpur district in the state of Assam Ref : Based on SOR 2013-2014

    for Roads and Bridge Works,PWD,Assam.

    Abstract of Bridge

  • 8/12/2019 Esstt Bridge

    8/510

    27 263570 264/1 5804558 2469928 4822344 773345 13870175

    28 263955 264/2 2897694 1501263 4610317 644714 9653988

    29 264876 265/1 3087778 2298645 4796887 754574 10937884

    30 265310 266/1 7542217 3229441 5819061 1009840 17600559

    Total- 1,560,700,310

    Executive Engineer, PWD

    Nagaon NH Division,

    Nagaon

  • 8/12/2019 Esstt Bridge

    9/510

    Sl no ChainageBridge

    NumberDismentaling Foundation Substructure Superstructure Ruppes

    1 212964 213/1 104,715 613,447 455,953 1,382,460 2,556,575

    2 222595 223/4 183,138 1,191,778 649,760 2,084,142 4,108,818

    3 227462 228/1 233,329 1,395,824 1,335,324 1,696,710 4,661,187

    4 228087 229/1 217,058 1,395,876 1,188,107 1,690,820 4,491,861

    5 233214 234/1 145,782 647,749 556,737 1,494,203 2,844,471

    6 234859 235/3 187,388 1,187,123 676,088 2,086,432 4,137,031

    7 236259 237/1 85,263470,188

    413,807 1,169,230 2,138,488

    8 239322 240/1 156,977 614,217 565,880 1,385,178 2,722,252

    9 244803 245/3 100,342 647,685 365,057 1,482,814 2,595,898

    10 249990 250/4 112,938 995,378 393,973 1,500,684 3,002,973

    11 250350 251/1 93,668 1,392,045 416,105 2,087,088 3,988,906

    12 251630 252/1 76,611 899,480 286,231 1,377,954 2,640,276

    13 254000 255/1 81,241 900,118 331,915 1,382,054 2,695,328

    14 254750 255/2 95,960 952,754 395,253 1,689,338 3,133,305

    15 258170 259/1 87,078 581,501 139,117 1,367,871 2,175,567

    16 258380 259/2 71,386 610,877 230,832 1,368,238 2,281,333

    17 258590 259/3 234,904 2,592,675 1,015,141 2,813,056 6,655,776

    18259015 260/1 137,139 1,310,164 423,335 2,311,053 4,181,691

    19 259230 260/2 154,825 1,395,824 1,016,838 1,719,776 4,287,263

    20 259580 260/4 88,803 935,252 304,129 1,694,206 3,022,390

    21 259685 260/5 90,435 946,506 324,676 1,704,987 3,066,604

    22 259870 260/6 87,206 675,398 326,470 1,489,713 2,578,787

    Widening & Rehabiliation

  • 8/12/2019 Esstt Bridge

    10/510

    23 263570 264/1 81,385 613,630 332,993 1,380,474 2,408,482

    24 263955 264/2 72,267 578,710 191,444 1,366,111 2,208,532

    25 264876 265/1 77,095 615,637 286,714 1,374,327 2,353,773

    26 265310 266/1 79,820 946,740 502,306 1,704,302 3,233,168

    84,170,735

    Executive Engineer, PWD

    Nagaon NH Division,

    Nagaon

    Total-

  • 8/12/2019 Esstt Bridge

    11/510

    Sl. No. Description of Items

    1 ROB No. 222/1 Rs. 41119979.45

    2 ROB No. 227/1 Rs. 39259966.47

    3 ROB No. 238/2 Rs. 39259966.47

    4 ROB No. 243/1 Rs. 39259966.47

    Total Rs. 158899879.00

    Name of work : 4 Lane Connectivity from Nagaon to Itanagar in Arunachal Pradesh

    under SARDP NE Work (Phase A). 4 Laning of NH 52 from the end of Biswanath

    Chariali by-pass (Km 208.00) to Gohpur (Total Length = 57.50 km) in Sonitpur

    district in the state of Assam

    Abstract of Cost for ROB

    Amount (Rs.)

    Executive Engineer, PWD

    Nagaon NH Division,

    Nagaon

  • 8/12/2019 Esstt Bridge

    12/510

    Quantity UnitRate

    (in Rs.)

    Amount

    (in Rs.)

    1*6*0.14*0.15*0.01*7850=9.89kg ( base plate)

    1*6*0.14*0.15*0.01*7850=9.89kg (template)

    1*6*0.14*0.35*0.016*7850=36.93kg (vertical plate)

    Total= 56.71 kg+10% wastage=62.38 kg

    2. Fastener:

    MS bar 16mm

    1*2*6*0.70*1.578 kg/m=

    Total= 13.26 kg+10% wastage=14.56 kg

    3. MS nuts and washer:

    4*6=24 nos @ 0.125 kg=3.00 kg

    6.75 m 500.00 3375.00

    5. Welding ( base plate with verticle plate)

    1*2*14.00=25.00 cm

    Quantity for 6 sets=28*6=168.00cm

    6. Labour for cutting and errection charges

    0.18 each 160.00 28.80

    0.09 each 125.00 11.25

    0.66 each 97.00 64.021.5 sqm 180.00 270.00

    8227.47

    Rs. 822.75

    Rs. 9050.22

    Rs. 905.0217

    9955.24

    Rs. 1474.85

    Rs. 1475/m

    1. MS plates:

    62.38 Kg 55.00 3430.90

    Annexure-I

    Analysis of Rate for Hand Rail

    Providing and fixing hand rail over the crash barrier consisting of MS base plate, embedded

    fastener and nuts, MS vertical plates and pipe etc. as shown in the drawing and as per

    specifications, All the railing components as mentioned above to be hot dip gal vanished with a

    zinc coating of at least 175gm/sqm. The thickness of plates to be as shown in the drawings and

    pipe to be 65NB heavy class with a weight not less than 7.92 kg/m and conforming to IS: 1161-

    1979. Item to include all incidental works required to complete the work as directed by theEngineer- in-charge. Management shall be made for the length of the pipe only

    DETAILS OF COST FOR 6.75M

    Materials

    Executive Engineer, PWD

    Nagaon NH Division,

    Nagaon

    i. Black smith

    14.59 Kg 50.00 729.50

    3.00 Kg 50.00 150.00

    4. G.I. Pipe 65mm NB heavy duty

    168 cm 1.00 168.00

    Cost for 1.00m

    Say

    ii. Bandhani

    iii. Beldar7. Galvanishing: 1.5 sqm

    Add 10% overhead charges

    Add 10% contractor's profit

    Cost for 6.75m

  • 8/12/2019 Esstt Bridge

    13/510

  • 8/12/2019 Esstt Bridge

    14/510

    Item No. Particulars/Descrption of items UnitTotal

    Quantity

    Rate in

    Rs.Amount (Rs.)

    1 2 3 4 5 6

    Foundation

    Excavation for Structures (Earth work in excavation of foundation

    of structures as per drawing and technical specification,

    including setting out, construction of shoring and bracing,

    removal of stumps and other deleterious matter, dressing of

    sides and bottom and backfilling with approved material.

    I. Ordinary Soil

    B. Mechanical means

    (II) With dewatering

    (i) upto 3m depth Cum 2816.778 54.00 152,106.00

    Plain/Reinforced Cement concrete, in open Foundation

    complete as per Drawing and Technical Specifications

    includin steel shutterin formwork.(p) With plasticser (Master plast PL-1/SPL-2 or

    equivalent),air entraining and water reducing plasticiser

    (Masterplast PAE or equivalent) and accelerating

    plasticiser (Masterplast ACPL or equivalent) conforming

    to IS-9103-1999.

    Cum

    A.PCC Grade M15 Cum 135.166 6514.00 880,471.00

    H.RCC Grade M35

    (II) Using Batching plant Transit mixer and concrete pump Cum 191.616 9030.00 1,730,293.00

    3/12.40 Reinforcement in Foundation: Supplying, fitting and

    placing un-coated TMT bar reinforcement in foundation

    complete as per drawing and technical specifications.(A) From Primary Sources:

    TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel

    (i) TMT Corrosion Resistant Steel (CRS) reinforcement

    bar of Fe-500 N/mm2

    tonne 14.743 73279.00 1,080,384.00

    Substructure

    Plain/Reinforced cement concrete, in sub structure

    complete as per drawing and technical specification and

    steel shuttering formwork.

    (P)With plasticiser (Masterplast PL-1/SPL-2 or

    equivalent),air entraining and water reducing plasticiser

    (Masterplast PAE or equivalent) and accelerating

    plasticiser(Masterplast ACPL or equivalent) conforming to

    IS-9103-1999B. PCC Grade M20

    a) Height up to 5.0 m Cum 196.320 8120.00 1,594,119.00

    H. RCC Grade M 35

    a) Height up to 5.0 m

    Case II : With Batching plant, Transit Mixer and

    concrete Pump

    Cum 126.221 9169.00 1,157,325.00

    5/13.6 Supplying, f itting and placing TMT bar reinforcement in

    substructure complete as per drawing and technical

    specifications

    MT

    Name of Work: 4 Lane Connectivity from Nagaon to Itanagar in Arunachal Pradesh under

    SARDP NE Work (Phase A). 4 Laning of NH 52 from the end of Biswanath Chariali by-pass

    (Km 208.00) to Gohpur (km 265.5) (Total Length = 57.50 km) in Sonitpur district in the state

    of Assam Ref : Based on SOR 2013-2014 for Roads and Bridge Works,PWD,Assam.

    Esstt for existing br No.213/1,Ch-212964

    1/12.1

    2/12.8

    4/13.5

  • 8/12/2019 Esstt Bridge

    15/510

    Item No. Particulars/Descrption of items UnitTotal

    Quantity

    Rate in

    Rs.Amount (Rs.)

    1 2 3 4 5 6

    (a) From Primary Sources:

    TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel

    (i) TMT Corrosion Resistant Steel (CRS) reinforcement

    bar of Fe-500 N/mm2

    Tonne 21.948 73343.00 1,609,708.00

    Super Structure

    Furnishing and Placing Reinforced/Prestressed cement concrete

    in super-structure as per drawing and Technical Specification'including steel shuttering formwork.

    (P) With plasticiser ( Masterplast PL-1/SPL-2 or

    equivalent ), air entraining and water reducing plasticiser

    ( Masterplast PAE or equivalent) and accelerating

    plasticiser ( Masterplast ACPL or equivalent) conforming

    to IS-9103-1999.

    B.'RCC Grade M25

    Case II : Using Batching Plant, Transit Mixer and

    Concrete Pump

    ii) For T-Beam and Slab

    a) Height up to 5.0 m Cum 87.140 10591.00 922,900.00

    7/14.2 Reinforcement in Super Structure: Supplying, fitting and

    placing TMT bar reinforcement in super-structureincluding splicing complete as per drawing and technical

    specifications

    (a) From Primary Sources:

    TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel

    (i) TMT Corrosion Resistant Steel (CRS) reinforcement

    bar of Fe-500 N/mm2

    MT 6.08 77554.00 471,219.00

    8/14.18 Filler joint

    (i)'Providing & fixing 2 mm thick corrugated copper plate

    in expansion joint complete as per drawing & Technical

    Specification.

    metre 24.000 1640.00 39,360.00

    ii) 'Providing & fixing 20 mm thick compressible fibre

    board in expansion joint complete as per drawing &

    Technical Specification.

    metre 24.000 558.00 13,392.00

    (iii)'Providing and fixing in position 20 mm thick

    premoulded joint filler in expansion joint for fixed ends of

    simply supported spans not exceeding 10 m to cater for a

    horizontal movement upto 20 mm, covered with sealant

    complete as per drawing and technical specification.

    metre 24.000 317.00 7,608.00

    (iv)'Providing and filling joint sealing compound as per

    drawings and technical specifications with coarse sand

    and 6% bitumen by weight.

    metre 24.00 17.00 408.00

    9/14.4 Providing and laying Cement concrete wearing coat M-

    30 grade including reinforcement complete as per

    drawin and Technical S ecifications

    152.49 12993.00 1,981,303.00

    10/8.22 Reinforced Cement Concrete Crash Barrier(Provisionof an Reinforced cement concrete crash barrier at the

    edges of the road, approaches to bridge structures and

    medians,constructed with concrete with HYSD/TMT

    reinforcement conforming to IRC:21 and dowel bar 25mm

    dia, 450mm long at expansion joints filled with pre

    moulded asphalt fil ler board, keyed to the structure on

    which it is built and installed as per design given in the

    enclouser to MOST circular No. RW/NH-33022/1/94-DO

    III dated June 1994 as per dimension in the approved

    drowing and at locations directed by the engineer,all as

    specified.

    6/14.1

  • 8/12/2019 Esstt Bridge

    16/510

    Item No. Particulars/Descrption of items UnitTotal

    Quantity

    Rate in

    Rs.Amount (Rs.)

    1 2 3 4 5 6

    B. M 40 grade concrete metre 35.88 4170.00 149,620.00

    11/Analy

    sis Rate

    HAND RAIL

    Providing and fixing hand rail over the crash barrier

    consisting of MS base plate, embedded fastener and

    nuts, MS vertical plates and pipe etc. as shown in the

    drawing and as per specifications, All the railing

    components as mentioned above to be hot dip galvanished with a zinc coating of at least 175gm/sqm. The

    thickness of plates to be as shown in the drawings and

    pipe to be 65NB heavy class with a weight not less than

    7.92 kg/m and conforming to IS: 1161-1979. Item to

    include all incidental works required to complete the work

    as directed by the Engineer- in-charge. Management

    shall be made for the length of the pipe only. (Rate from

    Annexure-I)

    metre 35.88 1475.00 52,923.00

    12/14.7 Construction of RCC railing of M30 Grade in-situ with 20

    mm nominal size aggregate, true to line and grade,

    tolurence of vertical RCC post not to exceed 1 in 500,

    centre to centre spacing between vertical post not to

    exceed 2000 mm, leaving adequat space between

    vertical posts for expansion, complete as per approved

    drawings and technical specifications.

    metre 17.94 2044.00 36,670.00

    13/14.11 Reinforced cement concrete approach slab including

    reinforcement and formwork complete as per drawing

    and Technical specification

    a) With TATA make TMT CRS (Fe-500) grade rebar Cum 28.80 12025.00 346,320.00

    14/14.10 PCC M15 grade levelling course below approach slab

    complete as per drawing and technical specification

    Cum, 14.40 5498.00 79,172.00

    15/14.9 Drainage Spouts complete as per drawing and Technical

    specification.

    Each 2.00 10197.00 20,394.00

    16/14.16 Painting on concrete surface (Providing and applying 2

    coats of water based cement paint to unplastered

    concrete surface after cleaning the surface of dirt, dust,oil, grease, efflorescence and applying paint @ of 1 litre

    for 2 Sq.m.)

    (B) For RCC Railing RM 53.82 160.00 8,612.00

    17/13.9 Back filling behind Abutment ,Wing wall and Return Wall

    complete as per drawing and technical specification.

    Cum

    (A) Granular material Cum 548.26 1524.00 835,543.00

    18/13.8 Providing weep holes in brick mansonry/plain/reinforced

    concrete abutment, wing wall/return wall with 100 mm dia

    AC pipe, extending through the full width of the structure

    with slope of IV:20H towards drawing foce, complete as

    per drawing and technical specification

    Each 40.00 204.00 8,160.00

  • 8/12/2019 Esstt Bridge

    17/510

    Item No. Particulars/Descrption of items UnitTotal

    Quantity

    Rate in

    Rs.Amount (Rs.)

    1 2 3 4 5 6

    19/8.47 Providing Sparkle Solar Road Studs, manufactured by

    Tata B.P. Solar India Ltd. Of size (125mmx125mm),

    90mm height (from

    bottom of shank to the top of stud) with detachable

    battery, m6LEDs-three on each side for Bi-directional

    studs/3 LEDs on one side for unidirectional studs, ultra

    bright LED in amber and red colour, weight per stud700+25 gms, flash rate of 50-65 times per

    minute completely water resistant and weather proof with

    replacement warranty and free maintenance fro one year

    from the date of installation of stud on road-(installation

    should be made using adhesives and procedures

    recommended by manufacturer under the supervision of

    their competent technician).

    a) Bi-directional Stud Each 3500.00

    b) Uni-directional Stud Each 4 3400.00 13,600.00

    20/8.51 Providing relfective pavement marker with Micro

    prismatic lens in both direction having thermoplastic body

    adhering to the specification and guidelines of

    MoSRT&H's fixed to the road surface using the adhesives

    and the procedures recommended by the manufacturers

    with three months replacement warranty and free

    maintenance.

    Each 30.00 298.00 8,940.00

    Protection work

    21/15.10 Curtain wall complete as per drawing and Technical

    specification

    A. Stone masonry in cement mortar (1:3) Cum 4333.00 0.00

    B. Cement concrete Grade M15 Cum 100.14 7046.00 705,587.00

    22/15.11 Flexible Apron :Construction of flexible apron 1 m thick

    comprising of loose stone boulders weighing not less

    than 40 kg beyond curtain wall.

    Cum 303.66 1485.00 450,936.00

    23/15.9 Dry rubble Flooring, Construcytion of dry rubbl flooring at

    cross drainage works for relatively less important works

    Cum 301.00 1679.00 505,371.00

    14,862,444.00

    Executive Engineer, PWD

    Nagaon NH Division,

    Nagaon

    Total-

  • 8/12/2019 Esstt Bridge

    18/510

    Item No. Particulars/Descrption of items UnitTotal

    Quantity

    Rate in

    Rs.Amount (Rs.)

    1 2 3 4 5 6

  • 8/12/2019 Esstt Bridge

    19/510

    Item No. Particulars/Descrption of items UnitTotal

    Quantity

    Rate in

    Rs.Amount (Rs.)

    1 2 3 4 5 6

  • 8/12/2019 Esstt Bridge

    20/510

    Item No. Particulars/Descrption of items UnitTotal

    Quantity

    Rate in

    Rs.Amount (Rs.)

    1 2 3 4 5 6

  • 8/12/2019 Esstt Bridge

    21/510

    3,843,254.00

  • 8/12/2019 Esstt Bridge

    22/510

    4,361,152.00

  • 8/12/2019 Esstt Bridge

    23/510

  • 8/12/2019 Esstt Bridge

    24/510

    4,996,144.00

    1,661,894.00

  • 8/12/2019 Esstt Bridge

    25/510

  • 8/12/2019 Esstt Bridge

    26/510

  • 8/12/2019 Esstt Bridge

    27/510

  • 8/12/2019 Esstt Bridge

    28/510

    Sl.

    No.

    Item No. Unit Qty for 2-

    Lane

    2 2.65 12 6.3 m3 400.68

    2 4.35 10.34 12 1079.50

    2 0.3 1.5 12 10.80

    2 0.3 1.5 10.34 9.31

    2 33.74+9.942

    0.45 11.9 233.91

    15 0.45 9.94 67.10

    33.74 6 0.75 151.83

    33.74 3 0.75 75.92

    33.74 2.5 1.85 156.05

    33.74 2 1.5 101.22

    4 6.08+1.82

    16.83 2 530.48

    2816.78

    PCC M-15 12 9.94 0.15 m3

    17.89c/wall 1 16.94 16.94

    Apron 15 9.94 0.15 22.37

    2 33.74+9.942

    0.15 11.9 77.97

    135.17

    RCC M35(open

    foundation)9.94 12 1.2 m

    3 143.14

    2 0.25 1.5 12 m3 9.00

    2 0.25 1.5 9.44 m3 7.08

    m/wall 2 1.2 3 4.5m

    3 32.40

    191.62

    Reinforcement in foundation

    25 mm dia 2 47 11.92 kg 4322.84

    25 mm dia 47 10.86 kg 1969.21

    20 mm dia 66 13.2 kg 2151.11

    20 mm dia 66 13.2 kg 2151.11

    12 mm dia 10 43.88 kg 390.04

    12 mm dia 292 2 kg 519.11

    m/wall 100 32.4 3240.00

    kg 14743.43

    MT 14.74

    Substructure (M35)

    Dirt wall - 2 0.82 12 0.25 m3 4.92

    Abutment cap - 2 0.7 12 0.225 m3 3.78

    Abutment- 2 0.7+1.22

    4.666 12 m3 106.38

    M/wall 20.2+0.45

    23 5.7111 11.14

    126.22

    Total =

    Total=

    Total =

    Quantity Calculation fo Br. No.213/1,Ch-212964

    Total=

    Earth work in or

    foundation of structures

    as per drawings &

    technical specification

    including setting out.

    1

    2

    3 12.8

    12.8

    12.1

    Total=

    Total =

    4

    5 13.5

    12.40

  • 8/12/2019 Esstt Bridge

    29/510

    Substructure (M20) PCC

    Wing wall- 1 196.32 m3 196.32

    Dirt wall - 12 mm dia 2 6 25.5 kg 272.00

    12 mm dia 2 0.95 2 86 kg 290.49

    Abutment cap - 12 mm dia 2 10 12.45 kg 221.33

    12 mm dia 2 1.85 80 kg 263.11

    Abutment- 28 mm dia 2 7.02 2 95 kg 12909.87

    12 mm dia 2 32 25.9 kg 1473.42

    12 mm dia 2 32 95 1 kg 5404.44

    m/wall 11.13 100 kg 1113.00

    kg 21947.67

    Tonne 21.95

    8 14.1 1 87.14 m3 87.14

    9 14.2 1 6.076 MT 6.08

    10 14.18 2 12 Nos. 24.00

    11 8.22 2 17.94 m 35.88

    12 14.7 2 8.97 m 17.94

    13 14.16 3 17.94 m2 53.82

    14 14.4 17.94 8.5 m3 152.49

    15 14.9 1 2 Nos. 2.00

    Reinforcement in Super Structure:

    Supplying, fitting and placing TMT bar

    reinforcement in super-structure

    including splicing complete as per

    drawin and technical s ecification

    Furnished and placing

    reinforcement/Prestressed cement

    concrete in Superstructureas per

    drawing and Technical Specifications.

    Supplying, fitting and placing TMT bar

    Reinforcement in substructurecomplete

    as per drawing and technical specifications

    Total =

    Total =

    Drainage Spoutscomplete as per

    drawing and Technical specification.

    Providing and laying Cement concrete

    Wearing coatM-30 grade including

    reinforcement complete as per drawing

    and Technical S ecifications

    Paintingon concrete surface

    (Providing and applying 2 coats of

    water based cement paint to

    unplastered For RCC Railing

    Construction of RCC Railingof M30

    Grade in-situ with 20 mm nominal size

    aggregate, true to line and grade,

    tolurence of vertical RCC post not to

    exceed 1 in 500, centre to centre

    spacing between vertical post not toexceed 2000 mm.

    Reinforced Cement Concrete Crash

    Barrier (Provision of an Reinforced

    cement concrete crash barrier at the

    edges of the road,approaches to

    bridge structures and medians,

    constructed with M-20 grade concrete.

    Filler jointProviding & fixing 20 mm

    thick compressible fibre board in

    expansion joint complete as perdrawing & Technical Specification.

    7 13.6

    13.56

  • 8/12/2019 Esstt Bridge

    30/510

  • 8/12/2019 Esstt Bridge

    31/510

    Qty for 4-

    Lane

    5633.56

    270.33

    383.23

    29486.86

    29.49

    252.44

  • 8/12/2019 Esstt Bridge

    32/510

    392.64

    43895.33

    43.90

    174.28

    12.15

    48.00

    71.76

    35.88

    107.64

    304.98

    4

  • 8/12/2019 Esstt Bridge

    33/510

    1096.51

    57.60

    28.80

    80

    60

    8

    607.32

    601.99

    200.28

    71.76

    er, PWD

    vision,

  • 8/12/2019 Esstt Bridge

    34/510

    Item

    No.Particulars/Descrption of items Unit

    Total

    Quantity

    Rate in

    Rs.Amount (Rs.)

    1 2 3 4 5 6

    Dismantling of Structures (Dismantling of existingstructures like culverts, bridges, retaining walls and other

    structure comprising of masonry, cement concrete, wood

    work, steel work, including T&P and scaffolding wherever

    necessary, sorting the dismantled material,disposal of

    unserviceable material and stacking the serviceable

    material with all lift and lead of 1000 metres)

    II) By Mechanical Means

    (a) Cement concrete grade M-15 & M-20

    Wing wall- 115.34 356.00 41,062.00

    (b) Prestressed/ Reinforced cement grade M-20 & above. 111.09 573.00 63,653.00

    Foundation

    Excavation for Structures (Earth work in excavation of

    foundation of structures as per drawing and technicalspecification, including setting out, construction of

    shoring and bracing, removal of stumps and other

    deleterious matter, dressing of sides and bottom and

    backfilling with approved material.

    I.Ordinary Soil

    B.Mechanical means

    (ii) With dewatering

    (i) upto 3m depth

    Plain/Reinforced Cement concrete, in open Foundation

    complete as per Drawing and Technical Specifications

    including steel shuttering formwork.

    (P) With plasticser (Master plast PL-1/SPL-2 or

    equivalent),air entraining and water reducing plasticiser(Masterplast PAE or equivalent) and accelerating

    plasticiser (Masterplast ACPL or equivalent) conforming to

    IS-9103-1999.

    A.PCC Grade M15 Cum 5.22 6514.00 33,994.00

    H.RCC Grade M35

    (II) Using Batching plant Transit mixer and concrete pump Cum 34.79 9030.00 314,154.00

    Supplying, fitting and placing uncoated HYSD

    reinforcement in foundation complete as per drawing and

    Technical S ecification(a) From Primary Sources:

    TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel

    (i) TMT Corrosion Resistant Steel (CRS) reinforcement bar

    of Fe-500 N/mm2

    tonne 3.48 73279.00 254,938.00

    Substructure5/13.5 Plain/Reinforced Cement concrete, in Substructure

    complete as per Drawing and Technical Specifications

    (P)With plasticiser (Masterplast PL-1/SPL-2 or

    equivalent),air entraining and water reducing plasticiser

    (Masterplast PAE or equivalent) and accelerating

    plasticiser(Masterplast ACPL or equivalent) conforming to

    IS-9103-1999

    H. RCC Grade M 35

    a) Height up to 5.0 m

    4/12.40

    Cum 191.86 54.00

    Name of Work: 4 Lane Connectivity from Nagaon to Itanagar in Arunachal Pradesh under

    SARDP NE Work (Phase A). 4 Laning of NH 52 from the end of Biswanath Chariali by-pass

    (Km 208.00) to Gohpur (km 265.5) (Total Length = 57.50 km) in Sonitpur district in the state

    of Assam Ref : Based on SOR 2013-2014 for Roads and Bridge Works,PWD,Assam.

    Esstt for Repairing of existing br No.213/1,Ch-212964

    2/12.1

    3/12.8

    10,361.00

    1/2.4

  • 8/12/2019 Esstt Bridge

    35/510

    Item

    No.Particulars/Descrption of items Unit

    Total

    Quantity

    Rate in

    Rs.Amount (Rs.)

    1 2 3 4 5 6

    Case II : With Batching plant, Transit Mixer and concrete

    Pump.

    Cum 27.63 9169.00 253,306.00

    Supplying, fitt ing and placing TMT bar reinforcement in

    substructure complete as per drawing and technical

    specifications

    MT

    (a) From Primary Sources:

    TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel

    (i) TMT Corrosion Resistant Steel (CRS) reinforcement bar

    of Fe-500 N/mm2

    Tonne 2.76 73343.00 202,647.00

    Super Structure

    Furnishing and Placing Reinforced/Prestressed cement

    concrete in super-structure as per drawing and Technical

    Specification' including steel shuttering formwork.

    (P) With plasticiser ( Masterplast PL-1/SPL-2 or equivalent

    ), air entraining and water reducing plasticiser (

    Masterplast PAE or equivalent) and accelerating

    plasticiser ( Masterplast ACPL or

    equivalent) conforming to IS-9103-1999.

    B. RCC GRADE M 25

    Case II : Using Batching Plant, Transit Mixer andConcrete Pump

    ii) For T-Beam and Slab

    a) Height up to 5.0 m Cum 26.98 10591.00 285,724.00

    Reinforcement in Super Structure: Supplying, fitting and

    placing TMT bar reinforcement in super-structure including

    splicing complete as per drawing and technical

    specifications

    (a) From Primary Sources:

    TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel

    (i) TMT Corrosion Resistant Steel (CRS) reinforcement bar

    of Fe-500 N/mm2

    tonne 2.16 77554.00 167,381.00

    Filler joint

    (i)'Providing & fixing 2 mm thick corrugated copper plate in

    expansion joint complete as per drawing & Technical

    Specification.

    metre 24.00 1640.00 39,360.00

    ii) 'Providing & fixing 20 mm thick compressible fibre board

    in expansion joint complete as per drawing & Technical

    Specification.

    metre 24.00 558.00 13,392.00

    (iii)'Providing and fixing in position 20 mm thick

    premoulded joint fil ler in expansion joint for fixed ends of

    simply supported spans not exceeding 10 m to cater for a

    horizontal movement upto 20 mm, covered with sealant

    complete as per drawing and technical specification.

    metre 24.00 317.00 7,608.00

    v rov ng an ng o n sea ng compoun as per

    drawings and technical specifications with coarse sandand 6% bitumen by weight.

    metre 24.00 17.00 408.00

    8/14.2

    6/13.6

    7/14.1

    9/14.18

  • 8/12/2019 Esstt Bridge

    36/510

    Item

    No.Particulars/Descrption of items Unit

    Total

    Quantity

    Rate in

    Rs.Amount (Rs.)

    1 2 3 4 5 6

    Reinforced Cement Concrete Crash Barrier (Provision

    of an Reinforced cement concrete crash barrier at the

    edges of the road, approaches to bridge structures and

    medians,constructed with concrete with HYSD/TMT

    reinforcement conforming to IRC:21 and dowel bar 25mm

    dia, 450mm long at expansion joints filled with pre

    moulded asphalt filler board, keyed to the structure on

    which it is built and installed as per design given in the

    enclouser to MOST circular No. RW/NH-33022/1/94-DO III

    dated June 1994 as per dimension in the approved

    drowing and at locations directed by the engineer,al l as

    specified.B. M 40 grade concrete metre 35.88 4170.00 149,620.00

    11/14.7 Construction ofRCC railing of M30 Grade in-situ with 20

    mm nominal size aggregate, true to line and grade,

    tolurence of vertical RCC post not to exceed 1 in 500,

    centre to centre spacing between vertical post not to

    exceed 2000 mm, leaving adequat space between vertical

    posts for expansion, complete as per approved drawings

    and technical specifications.

    metre 17.94 2044.00 36,670.00

    Reinforced cement concrete approach slab includingreinforcement and formwork complete as per drawing and

    Technical specification

    a) With TATA make TMT CRS (Fe-500) grade rebar Cum 27.60 12025.00 331,890.00

    13/14.1

    0

    PCC M15 grade levelling course below approach slab

    com lete as er drawin and technical s ecification.

    Cum 27.60 5498.00 151,745.00

    14/14.9 Drainage Spouts complete as per drawing and Technical

    specification.

    Each 2.00 10197.00 20,394.00

    15/13.8 Providing weep holes in brick mansonry/plain/reinforced

    concrete abutment, wing wall/return wall with 100 mm dia

    AC pipe, extending through the full width of the structure

    with slope of IV:20H towards drawing foce, complete as

    per drawing and technical specification

    Each 24.00 204.00 4,896.00

    Providing Sparkle Solar Road Studs, manufactured by

    Tata B.P. Solar India Ltd. Of size (125mmx125mm), 90mm

    height (from

    bottom of shank to the top of stud) with detachable battery,

    m6LEDs-three on each side for Bi-directional studs/3

    LEDs on one side for unidirectional studs, ultra bright LED

    in amber and red colour, weight per stud 700+25 gms,

    flash rate of 50-65 times per

    minute completely water resistant and weather proof with

    replacement warranty and free maintenance fro one year

    from the date of installation of stud on road-(installation

    should be made using adhesives and procedures

    recommended by manufacturer under the supervision of

    their com etent technician .a) Bi-directional Stud

    b) Uni-directional Stud Each 4.00 3400.00 13,600.00

    17/8.51 Providing relfective pavement marker with Micro

    prismatic lens in both direction having thermoplastic body

    adhering to the specification and guidelines of MoSRT&H's

    fixed to the road surface using the adhesives and the

    procedures recommended by the manufacturers with three

    months replacement warranty and free maintenance.

    Each 10.00 298.00 2,980.00

    10/8.22

    12/14.11

    16/8.47

  • 8/12/2019 Esstt Bridge

    37/510

  • 8/12/2019 Esstt Bridge

    38/510

  • 8/12/2019 Esstt Bridge

    39/510

  • 8/12/2019 Esstt Bridge

    40/510

  • 8/12/2019 Esstt Bridge

    41/510

  • 8/12/2019 Esstt Bridge

    42/510

    Sl.N

    o.

    Item

    No.

    Unit Qty for

    2-Lane

    2 57.67 Cm 115.34

    2 0.275 0.25 0.9 10 Cm 1.24

    2 2 0.2 0.175 14.915 Cm 2.09

    2 0.5 0.2 17.94 Cm 3.59

    1 0.82 9.4 3.95 Cm 30.45

    2 0.82 0.25 3.95 Cm 1.62

    2 0.7+1.0

    2

    3.95 4.891 Cm 32.84

    9.94 3.95 1 Cm 39.26

    Cm 111.09

    9.95 3.5 1.65 m3 57.46

    m3

    191.86

    9.94 3.5 0.15 m3 5.22

    5.22

    9.94 3.5 1 34.79

    34.79

    34.79 100 kg 3479.00

    kg 3479.00

    Total= Tonne 3.5

    26.7+1.0

    23.15 4.891 m

    3 26.19

    2 0.25 3.5 0.82 m3 1.435

    m3 27.63

    27.63 100 Kg 2763.00

    Kg 2763.00

    Tonne 2.76Superstructure RCC (M25)-

    1 3.5 9.4 0.82 m3 26.978

    m3 26.978

    26.978 80 Kg 2158.24

    Kg 2158.24

    Tonne 2.16

    10 14.9 1 2.00 Nos. 2.00

    2 12.00 Nos. 24.00

    2 12.00 Nos. 24.00

    2 12.00 Nos. 24.00

    2 12.00 Nos. 24.00

    12 14.10 2 11.5 4 0.3 m3 27.60

    2

    2.4

    12.1

    Repairing Quantity Calculation fo Br. No.213/1,Ch-212964

    Post -

    Rail-

    Kerb-

    Dismantling (M20):(ii) (A) Cement concrete grade M-15 & M-20

    Wing Wall-

    (B) Prestressed/ Reinforced cement grade M-20 & above.

    1

    4.8 4

    Earth work in or foundation of

    structures as per drawings &

    technical specification including

    setting out.(Upto 3m)-

    Total=

    134.40m32 3.5

    Slab-

    Dirt wall-

    Abut/Pier-

    Raft-

    Total=

    14.18 Filler jointProviding & fixing 20mm thick compressible fibre board

    in expansion joint complete as per

    drawing & Technical Specification.

    PCC M15 grade levelling course

    below approach slab complete as

    per drawing and technical

    specification

    Reinforcement in foundation-

    PCC M15-

    RCC M35 (open

    foundation)-

    Total=

    Reinforcement in Superstructure-

    Total=

    Total=

    Total=

    Total=

    Total=

    Total=

    Reinforcement in Substructure-

    3 12.8

    4 12.8

    5 12.4

    9 14.2

    Substructure(M35)-6 13.5

    7 13.6

    8 14.1

    Drainage Spoutscomplete as perdrawing and Technical specification.

    Total=

    11

    Total=

  • 8/12/2019 Esstt Bridge

    43/510

    Sl.N

    o.

    Item

    No.

    Unit Qty for

    2-Lane

    13 14.11 2 11.5 4 0.3 m3 27.60

    14 14.7 1 17.94 m 17.94

    15 8.22 2 17.94 m 35.88

    16 16.1 7.5 9.94 74.55

    17 16.17 2.00 8.5 metre 17.00

    18 16.2 8.5 9.94 metre 84.49

    19 13.8 2 12 Nos. 24.00

    20 8.47 4 Nos. 4.00

    21 8.51 10 Nos. 10.00

    0.82 2 0.25 sqm 0.41

    2 0.7+1.02

    4.891 sqm 8.31

    1.8 9.94 sqm 17.89

    26.62

    Construction of RCC Railingof M30

    Grade in-situ with 20 mm nominal

    size aggregate, true to line and

    grade, tolurence of vertical RCC

    post not to exceed 1 in 500, centre

    to centre spacing between vertical

    post not to exceed 2000 mm.

    Reinforced Cement Concrete Crash

    Barrier (Provision of an Reinforced

    cement concrete crash barrier at the

    edges of the road,approaches to

    bridge structures and medians,

    constructed with M-20 grade

    concrete.

    Removal of existing cementconcrete wearing coatincluding its

    disposal complete as per Technical

    specification without causing any

    detrimental effect to any part of the

    bridge structure and removal of

    dismantled material with all lifts and

    lead upto 1000.(Thickness 75mm.)

    Replacement of Expansion Joints

    complete as per drawings.

    Removal of existing asphaltic

    wearing coatcomprising of 50 mm

    thick asphaltic concrete laid over 12

    mm thick mastic asphalt includingdisposal with all lift and lead upto

    1000m.

    Providing weep holesin brick

    mansonry/plain/reinforced concrete

    abutment, wing wall/return wall with

    100 mm dia AC pipe,

    16.28

    Providing 'Sparkle Solar Road

    Studds,manufactured by Tata

    B.P.Solar India Ltd. Of size

    (125mmx125mm),90mm height

    (frombottom of shank to the top of

    stud)with detachable battery.RPM: Providingrelfective

    pavement marker with Microprismatic lens in both direction

    having thermoplastic body adhering

    to the s ecification.

    Reinforced cement concrete

    approachslabincluding

    reinforcement and formwork

    complete as per drawing and

    Technical specification.

    Total=

    Supplying and applying Epoxy

    based bonding agentMasterbond

    EP of Choksey Chemicals or

    euivalent @ 0.50 Lit pe sqm after

    totally saturating the cleaned

    concrete surface.

    22

  • 8/12/2019 Esstt Bridge

    44/510

    Sl.N

    o.

    Item

    No.

    Unit Qty for

    2-Lane

    23 16.53 59.321

    0.6

    Each 99

    Executive Engineer, PWD

    Nagaon NH Division,

    Nagaon

    Providing, placing and fixing in

    position Chemical rebar fastners

    (of M/s Hilti or M/s Sika or approved

    equivalent conforming to Europian

    standard CSTB/ETA and Civil Aid

    standard) of vaious diameters in

    Piers.

  • 8/12/2019 Esstt Bridge

    45/510

  • 8/12/2019 Esstt Bridge

    46/510

  • 8/12/2019 Esstt Bridge

    47/510

  • 8/12/2019 Esstt Bridge

    48/510

    Item

    No.Particulars/Descrption of items Unit

    Total

    Quantit

    Rate in

    Rs.Amount (Rs.)

    1 2 3 4 5 6

    Dismantling of Structures (Dismantling of existing

    structures like culverts, bridges, retaining walls and other

    structure comprising of masonry, cement concrete, wood

    work, steel work, including T&P and scaffolding wherever

    necessary, sorting the dismantled material,disposal of

    unserviceable material and stacking the serviceable

    material with all lift and lead of 1000 metresII) By Mechanical Means

    (a) Cement concrete grade M-15 & M-20

    Wing wall- 197.12 356.00 70,175.00

    (b) Prestressed/ Reinforced cement grade M-20 & 197.14 573.00 112,963.00

    FoundationExcavation for Structures (Earth work in excavation of

    foundation of structures as per drawing and technicalspecification, including setting out, construction of shoring and

    bracing, removal of stumps and other deleterious matter,

    dressing of sides and bottom and backfilling with approved

    material.

    I.Ordinary Soil

    B.Mechanical means

    (II) With dewatering

    (i) upto 3m depth Cum 317.72 54.00 17,157.00

    Plain/Reinforced Cement concrete, in open Foundation

    complete as per Drawing and Technical Specifications

    including steel shuttering formwork.

    (p) With plasticser (Master plast PL-1/SPL-2 or

    equivalent),air entraining and water reducing plasticiser

    (Masterplast PAE or equivalent) and accelerating

    plasticiser (Masterplast ACPL or equivalent) conforming

    to IS-9103-1999.

    Cum

    A.PCC Grade M15 Cum 10.16 6514.00 66,209.00

    H.RCC Grade M35

    (II) Using Batching plant Transit mixer and concrete

    pump

    Cum 67.76 9030.00 611,873.00

    Reinforcement in Foundation: Supplying, fitting and placing un-

    coated TMT bar reinforcement in foundation complete as per

    drawing and technical specifications

    (a) From Primary Sources:

    TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel

    (i) TMT Corrosion Resistant Steel (CRS) reinforcement

    bar of Fe-500 N/mm2

    tonne 6.78 73279.00 496,539.00

    Substructure

    Plain/Reinforced Cement concrete, in Substructure

    complete as per Drawing and Technical Specifications

    (P)With plasticiser (Masterplast PL-1/SPL-2 or

    equivalent),air entraining and water reducing plasticiser

    (Masterplast PAE or equivalent) and accelerating

    plasticiser(Masterplast ACPL or equivalent) conforming

    to IS-9103-1999

    H. RCC Grade M 35

    a) Height up to 5.0 m

    Name of Work: 4 Lane Connectivity from Nagaon to Itanagar in Arunachal Pradesh under

    SARDP NE Work (Phase A). 4 Laning of NH 52 from the end of Biswanath Chariali by-pass

    (Km 208.00) to Gohpur (km 265.5) (Total Length = 57.50 km) in Sonitpur district in the state

    of Assam Ref : Based on SOR 2013-2014 for Roads and Bridge Works,PWD,Assam.

    Esstt for Repairing of existing br No.223/4,Ch-222595

    5/13.5

    1/2.4

    2/12.1

    3/12.8

    4/12.40

  • 8/12/2019 Esstt Bridge

    49/510

    Item

    No.Particulars/Descrption of items Unit

    Total

    Quantit

    Rate in

    Rs.Amount (Rs.)

    1 2 3 4 5 6

    Case II : W ith Batching plant, Transit Mixer and

    concrete Pump.

    Cum 39.37 9169.00 361,008.00

    Supplying, fitting and placing TMT bar reinforcement in

    substructure complete as per drawing and technical

    specifications

    MT

    (a) From Primary Sources:

    TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel

    (i) TMT Corrosion Resistant Steel (CRS) reinforcement

    bar of Fe-500 N/mm2

    Tonne 3.94 73343.00 288,752.00

    Super Structure

    Furnished and placing reinforcement/Prestressed

    cement concrete in superstructure as per drawing and

    Technical Specifications.

    (P) With plasticiser ( Masterplast PL-1/SPL-2 or

    equivalent ), air entraining and water reducing plasticiser

    ( Masterplast PAE or equivalent) and accelerating

    plasticiser ( Masterplast ACPL or

    equivalent) conforming to IS-9103-1999.

    B.RCC GRADE M 25

    Case II : Using Batching Plant, Transit Mixer andConcrete Pump

    ii) For T-Beam and Slab

    a) Height up to 5.0 m Cum 53.96 10591.00 571,448.00

    Reinforcement in Super Structure: Supplying, fitting and

    placing TMT bar reinforcement in super-structure

    including splicing complete as per drawing and technical

    specifications

    (a) From Primary Sources:

    TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel

    (i) TMT Corrosion Resistant Steel (CRS) reinforcement

    bar of Fe-500 N/mm2

    tonne 4.32 77554.00 334,761.00

    Filler joint

    (i)'Providing & fixing 2 mm thick corrugated copper plate

    in expansion joint complete as per drawing & Technical

    Specification.

    metre 36.00 1640.00 59,040.00

    ii) 'Providing & fixing 20 mm thick compressible fibre

    board in expansion joint complete as per drawing &

    Technical Specification.

    metre 36.00 558.00 20,088.00

    (iii)'Providing and fixing in position 20 mm thick

    premoulded joint filler in expansion joint for fixed ends of

    simply supported spans not exceeding 10 m to cater for

    a horizontal movement upto 20 mm, covered with

    sealant complete as per drawing and technical

    specification.

    metre 36.00 317.00 11,412.00

    (iv)'Providing and filling joint sealing compound as per

    drawings and technical specifications with coarse sand

    and 6% bitumen by weight.

    metre 36.00 17.00 612.00

    8/14.2

    6/13.6

    7/14.1

    9/14.18

  • 8/12/2019 Esstt Bridge

    50/510

    Item

    No.Particulars/Descrption of items Unit

    Total

    Quantit

    Rate in

    Rs.Amount (Rs.)

    1 2 3 4 5 6

    Reinforced Cement Concrete Crash Barrier(Provision

    of an Reinforced cement concrete crash barrier at the

    edges of the road, approaches to bridge structures and

    medians,constructed with concrete with HYSD/TMT

    reinforcement conforming to IRC:21 and dowel bar

    25mm dia, 450mm long at expansion joints filled with pre

    moulded asphalt fil ler board, keyed to the structure on

    which it is built and installed as per design given in the

    enclouser to MOST circular No. RW/NH-33022/1/94-DO

    III dated June 1994 as per dimension in the approved

    drowing and at locations directed by the engineer,all as

    specified.B. M 40 grade concrete metre 54.72 4170.00 228,183.00

    11/14.7 Construction ofRCC railing of M30 Grade in-situ with 20

    mm nominal size aggregate, true to line and grade,

    tolurence of vertical RCC post not to exceed 1 in 500,

    centre to centre spacing between vertical post not to

    exceed 2000 mm, leaving adequat space between

    vertical posts for expansion, complete as per approved

    drawings and technical specifications.

    metre 27.36 2044.00 55,924.00

    Reinforced cement concrete approach slab includingreinforcement and formwork complete as per drawing

    and Technical specification

    a) With TATA make TMT CRS (Fe-500) grade rebar Cum 27.60 12025.00 331,890.0013/14.10 PCC M15 grade levelling course below approach slab

    complete as per drawing and technical specification

    Cum 27.60 5498.00 151,745.00

    14/14.9 Drainage Spouts complete as per drawing and

    Technical specification

    Each 4.00 10197.00 40,788.00

    15/13.8 Providing weep holes in brick mansonry/plain/reinforced

    concrete abutment, wing wall/return wall with 100 mm dia

    AC pipe, extending through the full width of the structure

    with slope of IV:20H towards drawing foce, complete as

    per drawing and technical specification

    Each 56.00 204.00 11,424.00

    ProvidingSparkle Solar Road Studs, manufactured by

    Tata B.P. Solar India Ltd. Of size (125mmx125mm),

    90mm height (from

    bottom of shank to the top of stud) with detachable

    battery, m6LEDs-three on each side for Bi-directional

    studs/3 LEDs on one side for unidirectional studs, ultra

    bright LED in amber and red colour, weight per stud

    700+25 gms, flash rate of 50-65 times per

    minute completely water resistant and weather proof with

    replacement warranty and free maintenance fro one year

    from the date of installation of stud on road-(installation

    should be made using adhesives and procedures

    recommended by manufacturer under the supervision oftheir com etent technician .a) Bi-directional Stud Each 3500.00

    b) Uni-directional Stud Each 4.00 3400.00 13,600.0017/8.51 Providing relfective pavement marker with Micro

    prismatic lens in both direction having thermoplastic body

    adhering to the specification and guidelines of

    MoSRT&H's fixed to the road surface using the

    adhesives and the procedures recommended by the

    manufacturers with three months replacement warranty

    and free maintenance.

    Each 18.00 298.00 5,364.00

    10/8.22

    12/14.11

    16/8.47

  • 8/12/2019 Esstt Bridge

    51/510

    Item

    No.Particulars/Descrption of items Unit

    Total

    Quantit

    Rate in

    Rs.Amount (Rs.)

    1 2 3 4 5 618/16.1 Removal of existing cement concrete wearing coat

    including its disposal complete as per Technical

    specification without causing any detrimental effect to

    any part of the bridge structure and removal of

    dismantled material with all lifts and lead upto

    1000.(Thickness 75mm.)

    Sqm 145.20 78.00 11,326.00

    19/16.17 Replacement of Expansion Jointscomplete as per drawings. metre 25.50 3628.00 92,514.00

    20/16.2 Removal of existing asphaltic wearing coatcomprising

    of 50 mm thick asphaltic concrete laid over 12 mm thick

    mastic asphalt including disposal with all lift and lead

    upto 1000m.

    Sqm 164.56 59.00 9,710.00

    Providing, placing and fixing in position Chemical rebar

    fastners(of M/s Hilti or M/s Sika or approved equivalent

    conforming to Europian standard CSTB/ETA and Civil

    Aid standard) of vaious diameters in Piers.

    Each

    (a)12 mm dia re-bar fastners 25% of 171 Each 42.74 500.00 21,368.00(b)16 mm dia re-bar fastners 25% of 171 Each 42.74 700.00 29,915.00(C) 20 mm dia re-bar fastners 25% of 171 Each 42.74 750.00 32,052.00

    (d)25 mm dia re-bar fastners 25% of 171 Each 42.74 800.00 34,188.00

    4,108,818.00

    22/16.53

    21/16.28

    Total-

    Executive Engineer, PWD

    Nagaon NH Division,Nagaon

    (A)'Supplying and applying Epoxy based bonding agent

    Masterbond EP of Choksey Chemicals or euivalent @

    0.50 Lit pe sqm after totally saturating the cleaned

    Sqm27.34 614.00 16,790.00

  • 8/12/2019 Esstt Bridge

    52/510

    Sl.

    No.

    Item

    No.

    Unit Qty for 2-

    Lane1 2.4

    2 98.56 Cm 197.12

    2 0.275 0.25 0.9 15 Cm 1.86

    2 2 0.2 0.175 23.235 Cm 3.25

    2 0.5 0.2 27.36 Cm 5.472 0.82 9.4 3.95 Cm 60.89

    2 0.82 0.25 3.95 Cm 1.62

    2 0.7+1.0

    2

    3.95 4.461 Cm 29.96

    1 1 3.95 4.461 Cm 17.62

    19.36 3.95 1 Cm 76.47

    Cm 197.14

    2 12.1 19.36 3.5 2.16 m3 146.36

    2 3.5 6.12 4.0 m3 171.36

    m3

    317.72

    3 12.8 19.36 3.5 0.15 m3 10.16

    10.16

    4 12.8 19.36 1 3.5 67.76

    67.76

    5 12.40 100 67.76 kg 6776.00

    kg 6776.00

    Total= Tonne 6.78

    6 13.5 Substructure(M35)-

    20.7+1.0

    23.15 4.461 m

    3 23.89

    1 1.0 4.46 3.15 m3 14.05

    2 0.25 3.5 0.82 m3 1.435

    m3 39.37

    7 13.6 100 39.37 Kg 3937.00

    Kg 3937.00

    Tonne 3.94

    8 14.1 Superstructure RCC (M25)-

    2 3.5 9.4 0.82 m3 53.956

    m

    3 53.956

    9 14.2 53.96 80 Kg 4316.48

    Kg 4316.48

    Tonne 4.32

    10 14.9 2.00 2.00 Nos. 4.00

    3 12.00 Nos. 36.00

    3 12.00 Nos. 36.00

    3 12.00 Nos. 36.00

    3 12.00 Nos. 36.00

    Total=

    Total=

    Reinforcement in Superstructure-

    Total=

    Repairing Quantity Calculation for Br. No.223/4,Ch-222595

    Post -

    Rail-

    Kerb-

    Slab-

    Dirt wall-

    Raft-

    Dismantling (M20):(ii) (A) Cement concrete grade M-15 & M-20.

    Wing Wall-

    (B) Prestressed/ Reinforced cement grade M-20 & above.

    Abut/Pier-

    Total=

    Earth work in or foundation of structures

    as per drawings & technical

    specification including setting out.(Upto

    3m)-

    Total=

    PCC M15-

    Total=

    RCC M35 (open foundation)-

    Total=

    Reinforcement in foundation-

    Total=

    Total=

    Reinforcement in Substructure-

    Total=

    Total=

    11 14.18 Filler jointProviding & fixing 20 mmthick compressible fibre board in

    expansion joint complete as per drawing

    & Technical Specification.

    Drainage Spoutscomplete as per

    drawing and Technical specification.

  • 8/12/2019 Esstt Bridge

    53/510

    Sl.

    No.

    Item

    No.

    Unit Qty for 2-

    Lane12 14.10 2 11.5 4 0.3 m

    3 27.60

    13 14.11 2 11.5 4 0.3 m3 27.60

    14 14.7 1 27.36 m 27.36

    15 8.22 2 27.36 m 54.72

    16 16.1 7.5 19.36 145.20

    17 16.17 3 8.5 25.50

    18 16.2 8.5 19.36 metre 164.56

    19 13.8 2 28 Nos. 56.00

    20 8.47 4 Nos. 4.00

    21 8.51 18 Nos. 18.00

    0.8 2 0.25 sqm 0.40

    2 0.7+1.02

    4.461 sqm 7.58

    19.36 1 sqm 19.36

    27.34

    Providing 'Sparkle Solar Road

    Studs,manufactured by Tata B.P.Solar

    India Ltd. Of size (125mmx125mm)

    ,90mm height (frombottom of shank to

    the top of stud)with detachable battery.

    PCC M15 grade levelling coursebelow

    approach slab complete as per drawing

    and technical specification

    Reinforced cement concreteapproach

    slabincluding reinforcement and

    formwork complete as per drawing and

    Technical specification.Construction of RCC Railingof M30

    Grade in-situ with 20 mm nominal size

    aggregate, true to line and grade,

    tolurence of vertical RCC post not to

    exceed 1 in 500, centre to centre

    spacing between vertical post not to

    exceed 2000 mm.

    Reinforced Cement Concrete Crash

    Barrier (Provision of an Reinforced

    cement concrete crash barrier at the

    edges of the road,approaches to bridge

    structures and medians, constructed

    with M-20 grade concrete.

    Removal of existing cement concrete

    wearing coatincluding its disposalcomplete as per Technical specification

    without causing any detrimental effect to

    any part of the bridge structure and

    removal of dismantled material with all

    lifts and lead upto 1000.(Thickness

    75mm.)Replacement of Expansion Joints

    complete as per drawings.

    Removal of existing asphaltic wearing

    coatcomprising of 50 mm thick

    asphaltic concrete laid over 12 mm thick

    mastic asphalt including disposal with

    all lift and lead upto 1000m.

    Providing weep holesin brick

    mansonry/plain/reinforced concrete

    abutment, wing wall/return wall with 100

    mm dia AC pipe,

    RPM: Providingrelfective pavement

    marker with Micro prismatic lens in both

    direction having thermoplastic body

    adhering to the specification.22 16.28 Supplying and applying Epoxy basedbonding agentMasterbond EP of

    Choksey Chemicals or euivalent @

    0.50 Lit pe sqm after totally saturating

    the cleaned concrete surface.Total-

  • 8/12/2019 Esstt Bridge

    54/510

    Sl.

    No.

    Item

    No.

    Unit Qty for 2-

    Lane23 16.53 102.564

    0.6

    Each 171

    Executive Engineer, PWD

    Nagaon NH Division,

    Nagaon

    Providing, placing and fixing in position

    Chemical rebar fastners(of M/s Hilti or

    M/s Sika or approved equivalent

    conforming to Europian standard

    CSTB/ETA and Civil Aid standard) of

    vaious diameters in Piers.

  • 8/12/2019 Esstt Bridge

    55/510

  • 8/12/2019 Esstt Bridge

    56/510

    Item

    No.Particulars/Descrption of items Unit

    Total

    Quantity

    Rate in

    Rs.Amount (Rs.)

    1 2 3 4 5 6

    (i) TMT Corrosion Resistant Steel (CRS)

    reinforcement bar of Fe-500 N/mm2

    Tonne 31.64 73343.00 2,320,393.00

    Super StructureFurnishing and Placing Reinforced/Prestressed cement

    concrete in super-structure as per drawing and Technical

    Specification' including steel shuttering formwork.

    (P) With plasticiser ( Masterplast PL-1/SPL-2 orequivalent ), air entraining and water reducing

    plasticiser ( Masterplast PAE or equivalent) and

    accelerating plasticiser ( Masterplast ACPL or

    equivalent) conforming

    to IS-9103-1999.

    B.'RCC Grade M25

    Case II : Using Batching Plant, Transit Mixer and

    Concrete Pump

    ii) For T-Beam and Slab

    a) Height up to 5.0 m Cum 174.280 10591.00 1,845,800.007/14.2 Reinforcement in Super Structure: Supplying,

    fitting and placing TMT bar reinforcement in super-

    structure including splicing complete as per

    drawing and technical specifications(a) From Primary Sources:

    TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel

    (i) TMT Corrosion Resistant Steel (CRS)

    reinforcement bar of Fe-500 N/mm2

    MT 12.15 77554.00 942,437.00

    8/14.18 Filler joint

    (i)'Providing & fixing 2 mm thick corrugated copper

    plate in expansion joint complete as per drawing &

    Technical Specification.

    metre 24.000 1640.00 39,360.00

    ii) 'Providing & fixing 20 mm thick compressible

    fibre board in expansion joint complete as per

    drawing & Technical Specification.

    metre 24.000 558.00 13,392.00

    (i ii )'Providing and fixing in position 20 mm thick

    premoulded joint fil ler in expansion joint for fixedends of simply supported spans not exceeding 10

    m to cater for a horizontal movement upto 20 mm,

    covered with sealant complete as per drawing and

    technical specification.

    metre 24.000 317.00 7,608.00

    (iv)'Providing and filling joint sealing compound as

    per drawings and technical specifications with

    coarse sand and 6% bitumen by weight.

    metre 24.00 17.00 408.00

    9/14.4 Providing and laying Cement concrete wearing

    coat M-30 grade including reinforcement complete

    as per drawing and Technical Specifications

    232.56 12993.00 3,021,653.00

    10/8.22 Reinforced Cement Concrete Crash

    Barrier(Provision of an Reinforced cement

    concrete crash barrier at the edges of the road,approaches to bridge structures and medians,

    constructed with concrete with HYSD/TMT

    reinforcement conforming to IRC:21 and dowel bar

    25mm dia,450mm long at expension joints fi lled

    with free moulded asphalt filler board, keyed to the

    structure on which it is built and installed as per

    design given in the enclouser to MOST circuler No.

    RW/NH - 33022/1/94-DO III dated June 1994 as

    per dimension in the approved drawing and at

    locations directed by the engineer, all as specified.

    6/14.1

  • 8/12/2019 Esstt Bridge

    57/510

    Item

    No.Particulars/Descrption of items Unit

    Total

    Quantity

    Rate in

    Rs.Amount (Rs.)

    1 2 3 4 5 6

    B. M 40 grade concrete metre 54.72 4170.00 228,183.00

    11/Analy

    sis Rate

    HAND RAIL

    Providing and fixing hand rail over the crash barrier

    consisting of MS base plate, embedded fastener

    and nuts, MS vertical plates and pipe etc. as

    shown in the drawing and as per specifications, All

    the railing components as mentioned above to be

    hot dip gal vanished with a zinc coating of at least175gm/sqm. The thickness of plates to be as

    shown in the drawings and pipe to be 65NB heavy

    class with a weight not less than 7.92 kg/m and

    conforming to IS: 1161-1979. Item to include all

    incidental works required to complete the work as

    directed by the Engineer- in-charge. Management

    shall be made for the length of the pipe only. (Rate

    from Annexure-I)

    metre 54.72 1475.00 80,712.00

    12/14.7 Construction of RCC railing of M30 Grade in-situ

    with 20 mm nominal size aggregate, true to line

    and grade, tolurence of vertical RCC post not to

    exceed 1 in 500, centre to centre spacing between

    vertical post not to exceed 2000 mm, leavingadequat space between vertical posts for

    expansion, complete as per approved drawings

    and technical s ecifications.

    metre 27.36 2044.00 55,924.00

    13/14.11 Reinforced cement concrete approach slab

    including reinforcement and formwork complete as

    per drawing and Technical specification

    a) With TATA make TMT CRS (Fe-500) grade

    rebar

    Cum 28.80 12025.00 346,320.00

    14/14.10 PCC M15 grade levelling course below approach

    slab complete as per drawing and technical

    specification

    Cum, 14.40 5498.00 79,172.00

    15/14.9 Drainage Spouts complete as per drawing and

    Technical specification.

    Each 8.00 10197.00 81,576.00

    16/14.16 Painting on concrete surface (Providing and

    applying 2 coats of water based cement paint to

    unplastered concrete surface after cleaning the

    surface of dirt, dust, oil, grease, efflorescence and

    applying paint @ of 1 litre for 2 Sq.m.)

    (B) For RCC Railing RM 82.08 160.00 13,133.00

    17/13.9 Back filling behind Abutment ,Wing wall and

    Return Wall complete as per drawing and technical

    specification.

    Cum

    (A) Granular material Cum 506.98 1524.00 772,632.00

    18/13.8 Providing weep holes in brick

    mansonry/plain/reinforced concrete abutment,

    wing wall/return wall with 100 mm dia AC pipe,

    extending through the full width of the structure

    with slope of IV:20H towards drawing foce,

    complete as per drawing and technicalspecification

    Each 40.00 204.00 8,160.00

  • 8/12/2019 Esstt Bridge

    58/510

    Item

    No.Particulars/Descrption of items Unit

    Total

    Quantity

    Rate in

    Rs.Amount (Rs.)

    1 2 3 4 5 6

    19/8.4 Retro reflectorised Traffic sign:

    Providing and erecting of Retro-Reflectrorised

    cautionary, mandatory & informatory sign as per

    IRC: 67 made of high intensity encapsulated lens

    type reflective sheeting vide clause 801.3, fixed

    over aluminium sheeting, 2 mm thick f ixed on an

    angle iron of 25x25x4mm supported on a mild steel

    angle iron post 75mm x 75mm x 6mm firmly f ixedto the ground by means of properly design

    foundation with M-15 grade Cement concrete

    45cm x 45cm x 60cm, 60cm below ground level as

    per approved drawing and sign. ( All the Steel work

    must be Tata/Sail/or any other approved brand)

    (V) 80cmm x 45 cm rectangular Each 17.28 5200.00 89,856.00

    20/8.47 Providing Sparkle Solar Road Studs,

    manufactured by Tata B.P. Solar India Ltd. Of size

    (125mmx125mm), 90mm height (from

    bottom of shank to the top of stud) with detachable

    battery, m6LEDs-three on each side for Bi-

    directional studs/3 LEDs on one side for

    unidirectional studs, ultra bright LED in amber andred colour, weight per stud 700+25 gms, flash rate

    of 50-65 times per

    minute completely water resistant and weather

    proof with replacement warranty and free

    maintenance fro one year from the date of

    installation of stud on road-(installation should be

    made using adhesives and procedures

    recommended by manufacturer under the

    su ervision of their com etent technician .a) Bi-directional Stud Each 3500.00

    b) Uni-directional Stud Each 4.00 3400.00 13,600.0020/8.51 Providing relfective pavement marker with Micro

    prismatic lens in both direction having

    thermoplastic body adhering to the specification

    and guidelines of MoSRT&H's fixed to the road

    surface using the adhesives and the procedures

    recommended by the manufacturers with three

    months replacement warranty and free

    maintenance.

    Each 60.00 298.00 17,880.00

    Protection work

    21/15.10 Curtain wall complete as per drawing and

    Technical specification

    A. Stone masonry in cement mortar (1:3) Cum 4333.00 0.00

    B. Cement concrete Grade M15 Cum 90.70 7046.00 639,073.00

    22/15.11 Flexible Apron :Construction of flexible apron 1 m

    thick comprising of loose stone boulders weighing

    not less than 40 kg beyond curtain wall.

    Cum 206.28 1485.00 306,326.00

    23/15.9 Dry rubble Flooring, Construcytion of dry rubbl

    flooring at cross drainage works for relatively less

    important works

    Cum 256.47 1679.00 430,614.00

    22,187,585.00Total-

    Executive Engineer, PWD

    Nagaon NH Division,

    Nagaon

  • 8/12/2019 Esstt Bridge

    59/510

    7,490,574.00

  • 8/12/2019 Esstt Bridge

    60/510

    5,663,192.00

  • 8/12/2019 Esstt Bridge

    61/510

  • 8/12/2019 Esstt Bridge

    62/510

    7,657,806.00

    1,376,013.00

  • 8/12/2019 Esstt Bridge

    63/510

    Sl.

    No.

    Item

    No.

    Unit Qty for 2-

    Lane

    2 3.5 5.5 12 m3 462.00

    2 19.36 1.25 12 580.80

    2 0.3 1.5 12 10.80

    2 0.3 1.5 19.36 17.42

    2 30.56+19.362

    0.45 5.6 215.61

    15 0.45 19.36 130.68

    30.56 6 0.75 137.52

    30.56 3 0.75 68.76

    30.56 2.5 1.85 141.34

    30.56 2 1.5 91.68

    4 6.08+1.82

    7.92 2 249.64

    2106.25

    PCC M-15 = 12 18.86 0.15 m3 33.95

    c/wall 1 15.7 m3 15.70

    1 156.75 m3 156.75

    15 19.36 0.15 43.56

    2 30.56+19.362

    0.15 5.6 41.93

    291.89

    RCC M35(open

    foundation)19.36 1.4 12 m

    3 325.25

    2 0.25 1.5 12 m3 9.00

    2 0.25 1.5 18.86 m3 14.15

    m/wall 2 1.2 4.5 3 m3 32.40

    380.79Reinforcement in foundation =

    25 mm dia 33.00 120 kg 15277.78

    20 mm dia 26.8 120 kg 7940.74

    12 mm dia 10 64.52 kg 573.51

    12 mm dia 2 430 kg 764.44

    m/wall 100 32.4 kg 3240.00

    kg 27796.47

    Total= Tonne 27.80

    Substructure (M35) RCC

    Dirt wall = 2 0.82 12 0.25 m3 4.92

    Abutment cap = 2 0.7 12 0.225 m3 3.78

    Abutment = 2 0.7+1.42

    4.461 12 m3 112.42

    Pier cap 1 0.225 12 m3 2.70

    Pier 1 12 4.461 m3 53.53

    M/wall 20.2+0.45

    24.5 5.881 m

    3 17.20

    194.55

    6 13.5 Substructure (M20) PCC

    Wing wall 1 191.99 m3 191.99

    Quantity Calculation fo Br. No.223/4 , Ch-222595

    Total=

    Total=

    Earth work or

    foundation of

    structures as per

    drawings & technical

    specification including

    setting out

    12.11

    12.82

    12.83

    12.404

    13.55

    Approach base

    Floor apron

    Total =

    Total =

    Total=

  • 8/12/2019 Esstt Bridge

    64/510

    Reinforcement in substucture-

    Dirt wall = 12 mm dia 2 6 26.55 kg 283.20

    12 mm dia 2 0.95 2 86 kg 290.49

    Abutment cap = 12 mm dia 2 10 13.5 kg 240.00

    12 mm dia 2 1.85 86 kg 282.84

    Pier Cap 12 mm dia 1 10 13.5 kg 120.00

    12 mm dia 1 1.85 86 kg 141.42

    Abutment 28 mm dia 2 2 110 6.512 kg 13866.54

    12 mm dia 2 27.3 30 kg 1456.00

    12 mm dia 2 30 110 1 kg 5866.67

    Pier 28 mm dia 2 80 6.512 kg 5042.38

    12 mm dia 1 27.3 30 kg 728.00

    12 mm dia 1 30 60 1 kg 1600.00

    m/wall 17.2 100 kg 1720.00

    kg 31637.54

    Tonne 31.64

    8 14.1 2 87.14 m3 174.28

    9 14.2 2 6.076 MT 12.15

    10 14.18 2 12 Nos. 24.00

    11 13.14 Elastomeric bearing = Cucm 0.00

    12 8.22 2 27.36 m 54.72

    13 14.7 1 27.36 27.36

    14 14.16 3 27.36 m2 82.08

    15 14.4 27.36 8.5 232.56

    Total=

    Total=

    Furnished and placing

    reinforcement/Prestressed cement

    concrete in SuperstructureM25as per

    drawing and Technical Specifications.

    Reinforcement in Super Structure:

    Supplying, fitting and placing TMT bar

    reinforcement in super-structure

    including splicing complete as per

    drawing and technical specification

    Reinforced Cement Concrete Crash

    Barrier (Provision of an Reinforced

    cement concrete crash barrier at the

    edges of the road,approaches to bridge

    structures and medians, constructed with

    M-20 grade concrete.

    Providing and laying Cement concrete

    Wearing coatM-30 grade including

    reinforcement complete as per drawing

    and Technical Specifications.

    Construction of RCC Railingof M30

    Grade in-situ with 20 mm nominal size

    aggregate, true to line and grade,

    tolurence of vertical RCC post not toexceed 1 in 500, centre to centre spacing

    between vertical post not to exceed 2000

    mm.Paintingon concrete surface (Providing

    and applying 2 coats of water based

    cement paint to unplastered For RCC

    Railing

    13.67

    Filler jointProviding & fixing 20 mm

    thick compressible fibre board inexpansion joint complete as per drawing

    & Technical Specification.

  • 8/12/2019 Esstt Bridge

    65/510

    16 14.9 2 4 Nos. 8.00

    17 13.9 2 12 4.00 5.281 m3 506.98

    18 14.11 2 0.3 12.00 4 m3 28.80

    19 14.10 2 0.15 12.00 4 m3 14.40

    20 13.8 2 20 Nos. 40.00

    21 8.4 17.28 m2 17.28

    22 8.51 60 Nos. 60.00

    23 8.47 4 Nos. 4.00

    24 15.11 206.28 206.28

    25 15.9 256.47 m3

    256.47

    26 15.10 90.7 m3 90.70

    27 AnalysisRate

    2 27.36 m 54.72

    Drainage Spoutscomplete as per

    drawing and Technical specification.

    Back fillingbehind Abutment ,Wing wall

    and Return Wall complete as per

    drawing and technical specification with

    Granular Material. (A) Granular material .

    Executive Engineer, PWD

    Nagaon NH Division,

    Nagaon

    Providing 'Sparkle Solar Road

    Studs,manufactured by Tata B.P. Solar

    India Ltd. Of siz(125mmx125mm),90mm

    height(frombottom of shank to the top of

    stud)with detachable battery.

    Stone apronFlexible Apron

    :Construction of flexible apron 1 m thick

    comprising of loose stone boulders

    weighing not less than 40 kg beyond

    curtain wall.

    Flore apron:Dry rubble Flooring,Construcytion of dry rubbl flooring at

    cross drainage works for relatively less

    important works

    Curtain wallcomplete as per drawing

    and Technical specification

    HAND RAIL

    Providing and fixing hand rail over the

    crash barrier consisting of MS base

    plate, embedded fastener and nuts, MS

    vertical plates and pipe etc.

    Reinforced cement concreteapproach

    slabincluding reinforcement and

    formwork complete as per drawing and

    Technical specification.

    PCC M15 grade levelling coursebelowapproach slab complete as per drawing

    and technical specification

    Providing weep holesin brick

    mansonry/plain/reinforced concrete

    abutment, wing wall/return wall with 100

    mm dia AC pipe,

    Sign board :Retro reflectorised Traffic

    sign: Providing and erecting of Retro-

    Reflectrorised cautionary, mandatory &

    informatory sign as per IRC: 67 made of

    high intensity encapsulated lens type

    reflective sheeting vide clause 801.3

    Providingrelfective pavement marker

    with Micro prismatic lens in both direction

    having thermoplastic body adhering to

    the specification.

  • 8/12/2019 Esstt Bridge

    66/510

    380.134 41.52 15783.15

    490.875 33.00 16198.88

  • 8/12/2019 Esstt Bridge

    67/510

    Item No. Particulars/Descrption of items UnitTotal

    Quantity

    Rate in

    Rs.Amount (Rs.)

    1 2 3 4 5 6

    Dismantling of Structures (Dismantling of existingstructures like culverts, bridges, retaining walls and other

    structure comprising of masonry, cement concrete, wood

    work, steel work, including T&P and scaffolding wherever

    necessary, sorting the dismantled material,disposal of

    unserviceable material and stacking the serviceable

    material with all lift and lead of 1000 metres)

    II) By Mechanical Means

    (a) Cement concrete grade M-15 & M-20

    Wing wall- Cm 315.52 356.00 112,326.00

    (b) Prestressed/ Reinforced cement grade M-20 & above. Cm 211.17 573.00 121,003.00

    FoundationExcavation for Structures (Earth work in excavation of foundation

    of structures as per drawing and technical specification,

    including setting out, construction of shoring and bracing,

    removal of stumps and other deleterious matter, dressing of

    sides and bottom and backfilling with approved material.

    I.Ordinary Soil

    B.Mechanical means

    (II) With dewatering

    (i) upto 3m depth Cum 386.49 54.00 20,871.00

    Plain/Reinforced Cement concrete, in open Foundation

    complete as per Drawing and Technical Specifications

    including steel shuttering formwork.

    (p) With plasticser (Master plast PL-1/SPL-2 or

    equivalent),air entraining and water reducing plasticiser

    (Masterplast PAE or equivalent) and acceleratingplasticiser (Masterplast ACPL or equivalent) conforming to

    IS-9103-1999.

    A.PCC Grade M15 Cum 8.57 6514.00 55,851.00

    H.RCC Grade M35

    (II) Using Batching plant Transit mixer and concrete pump Cum 80.64 9030.00 728,180.00

    Reinforcement in Foundation: Supplying, fitting and placing un-

    coated TMT bar reinforcement in foundation complete as per

    drawing and technical specifications

    (a) From Primary Sources:

    TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel

    (i) TMT Corrosion Resistant Steel (CRS) reinforcement

    bar of Fe-500 N/mm2

    tonne 8.06 73279.00 590,922.00

    Substructure

    5/13.5 Plain/Reinforced Cement concrete, in Substructure

    complete as per Drawing and Technical Specifications

    (P)With plasticiser (Masterplast PL-1/SPL-2 or

    equivalent),air entraining and water reducing plasticiser

    (Masterplast PAE or equivalent) and accelerating

    plasticiser(Masterplast ACPL or equivalent) conforming to

    IS-9103-1999

    H. RCC Grade M 35

    a) Height up to 5.0 m

    1/2.4

    2/12.1

    Name of Work: 4 Lane Connectivity from Nagaon to Itanagar in Arunachal Pradesh under

    SARDP NE Work (Phase A). 4 Laning of NH 52 from the end of Biswanath Chariali by-pass

    (Km 208.00) to Gohpur (km 265.5) (Total Length = 57.50 km) in Sonitpur district in the state

    of Assam Ref : Based on SOR 2013-2014 for Roads and Bridge Works,PWD,Assam.

    Esstt for Repairing of existing br No.228/1,Ch-227462

    3/12.8

    4/12.40

  • 8/12/2019 Esstt Bridge

    68/510

    Item No. Particulars/Descrption of items UnitTotal

    Quantity

    Rate in

    Rs.Amount (Rs.)

    1 2 3 4 5 6

    Case II : With Batching plant, Transit Mixer and concrete

    Pump.

    Cum 80.91 9169.00 741,905.00

    Supplying, fitt ing and placing TMT bar reinforcement in

    substructure complete as per drawing and technical

    specifications

    MT

    (a) From Primary Sources:

    TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel

    (i) TMT Corrosion Resistant Steel (CRS) reinforcement

    bar of Fe-500 N/mm2

    Tonne 8.1 73343.00 593,419.00

    Super Structure

    Furnished and placing reinforcement/Prestressed cement

    concrete in superstructure as per drawing and Technical

    Specifications.

    (P) With plasticiser ( Masterplast PL-1/SPL-2 or

    equivalent ), air entraining and water reducing plasticiser (

    Masterplast PAE or equivalent) and accelerating

    plasticiser ( Masterplast ACPL or

    equivalent) conforming to IS-9103-1999.

    B. RCC GRADE M 25

    Case II : Using Batching Plant, Transit Mixer and

    Concrete Pumpii) For T-Beam and Slab

    a) Height up to 5.0 m Cum 33.67 10591.00 356,599.00

    Reinforcement in Super Structure: Supplying, fitting and

    placing TMT bar reinforcement in super-structure

    including splicing complete as per drawing and technical

    specifications

    (a) From Primary Sources:

    TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel

    (i) TMT Corrosion Resistant Steel (CRS) reinforcement

    bar of Fe-500 N/mm2

    tonne 2.7 77554.00 208,900.00

    Filler joint

    (i)'Providing & fixing 2 mm thick corrugated copper plate in

    expansion joint complete as per drawing & TechnicalSpecification.

    metre 36.00 1640.00 59,040.00

    ii) 'Providing & fixing 20 mm thick compressible fibre

    board in expansion joint complete as per drawing &

    Technical Specification.

    metre 36.00 558.00 20,088.00

    (iii)'Providing and fixing in position 20 mm thick

    premoulded joint fil ler in expansion joint for fixed ends of

    simply supported spans not exceeding 10 m to cater for a

    horizontal movement upto 20 mm, covered with sealant

    complete as per drawing and technical specification.

    metre 36.00 317.00 11,412.00

    (iv)'Providing and filling joint sealing compound as per

    drawings and technical specifications with coarse sand

    and 6% bitumen by weight.

    metre 36.00 17.00 612.00

    Reinforced Cement Concrete Crash Barrier(Provisionof an Reinforced cement concrete crash barrier at the

    edges of the road, approaches to bridge structures and

    medians, constructed with concrete with HYSD/TMT

    reinforcement conforming to IRC:21 and dowel bar 25mm

    dia,450mm long at expension joints filled with free

    moulded asphalt filler board, keyed to the structure on

    which it is built and installed as per design given in the

    enclouser to MOST circuler No. RW/NH - 33022/1/94-DO

    III dated June 1994 as per dimension in the approved

    drawing and at locations directed by the engineer, all asB. M 40 grade concrete metre 46.72 4170.00 194,823.00

    9/14.18

    10/8.22

    6/13.6

    7/14.1

    8/14.2

  • 8/12/2019 Esstt Bridge

    69/510

    Item No. Particulars/Descrption of items UnitTotal

    Quantity

    Rate in

    Rs.Amount (Rs.)

    1 2 3 4 5 6

    11/14.7 Construction ofRCC railing of M30 Grade in-situ with 20

    mm nominal size aggregate, true to line and grade,

    tolurence of vertical RCC post not to exceed 1 in 500,

    centre to centre spacing between vertical post not to

    exceed 2000 mm, leaving adequat space between vertical

    posts for expansion, complete as per approved drawings

    and technical specifications.

    metre 23.36 2044.00 47,748.00

    Reinforced cement concrete approach slab including

    reinforcement and formwork complete as per drawing and

    Technical specification

    a) With TATA make TMT CRS (Fe-500) grade rebar Cum 27.60 12025.00 331,890.00

    13/14.10 PCC M15 grade levelling course below approach slab

    complete as per drawing and technical specification

    Cum 27.60 5498.00 151,745.00

    14/14.9 Drainage Spouts complete as per drawing and Technical

    specification

    Each 4.00 10197.00 40,788.00

    15/13.8 Providing weep holes in brick mansonry/plain/reinforced

    concrete abutment, wing wall/return wall with 100 mm dia

    AC pipe, extending through the full width of the structure

    with slope of IV:20H towards drawing foce, complete as

    per drawing and technical specification

    Each 40.00 204.00 8,160.00

    Providing Sparkle Solar Road Studs, manufactured byTata B.P. Solar India Ltd. Of size (125mmx125mm),

    90mm height (from

    bottom of shank to the top of stud) with detachable

    battery, m6LEDs-three on each side for Bi-directional

    studs/3 LEDs on one side for unidirectional studs, ultra

    bright LED in amber and red colour, weight per stud

    700+25 gms, flash rate of 50-65 times per

    minute completely water resistant and weather proof with

    replacement warranty and free maintenance fro one year

    from the date of installation of stud on road-(installation

    should be made using adhesives and procedures

    recommended by manufacturer under the supervision of

    their competent technician).a) Bi-directional Stud Each 3500.00

    b) Uni-directional Stud Each 4.00 3400.00 13,600.00

    17/8.51 Providing relfective pavement marker with Micro

    prismatic lens in both direction having thermoplastic body

    adhering to the specification and guidelines of

    MoSRT&H's fixed to the road surface using the adhesives

    and the procedures recommended by the manufacturers

    with three months replacement warranty and free

    maintenance.

    Each 15.00 298.00 4,470.00

    18/16.1 Removal of existing cement concrete wearing coat

    including its disposal complete as per Technical

    specification without causing any detrimental effect to any

    part of the bridge structure and removal of dismantled

    material with all lifts and lead upto 1000.(Thickness75mm.)

    Sqm 115.20 78.00 8,986.00

    19/16.17 Replacement of Expansion Jointscomplete as per drawings. metre 25.50 3628.00 92,514.00

    20/16.2 Removal of existing asphaltic wearing coatcomprising

    of 50 mm thick asphaltic concrete laid over 12 mm thick

    mastic asphalt including disposal with all lift and lead upto

    1000m.

    Sqm 130.56 59.00 7,704.00

    (A)'Supplying and applying Epoxy based bonding agent

    Masterbond EP of Choksey Chemicals or euivalent @

    0.50 Lit pe sqm after totally saturating the cleaned

    Sqm46.48 614.00 28,538.00

    12/14.11

    16/8.47

    21/16.28

  • 8/12/2019 Esstt Bridge

    70/510

    Item No. Particulars/Descrption of items UnitTotal

    Quantity

    Rate in

    R


Recommended