Sl No. Bridge Name Page no1 Repairing Estimate Bridge no : 213/1 2 - 5
2 Quantity Calculation Bridge no : 213/1 6 - 8
3 Repairing Estimate Bridge no : 223/4 9 - 12
4 Quantity Calculation Bridge no : 223/4 13 - 15
5 Repairing Estimate Bridge no : 228/1 16 - 19
6 Quantity Calculation Bridge no : 228/1 20 - 22
7 Repairing Estimate Bridge no : 229/1 23 - 268 Quantity Calculation Bridge no : 229/1 27 - 29
9 Repairing Estimate Bridge no : 234/1 30 - 33
10 Quantity Calculation Bridge no : 234/1 34 - 36
11 Repairing Estimate Bridge no : 235/3 37 - 40
12 Quantity Calculation Bridge no : 235/3 41 - 43
13 Repairing Estimate Bridge no : 237/1 44 - 48
14 Quantity Calculation Bridge no : 237/1 49 - 51
15 Repairing Estimate Bridge no : 240/1 52 - 55
16 Quantity Calculation Bridge no : 240/1 56 - 57
17 Repairing Estimate Bridge no : 245/3 58 - 61
18 Quantity Calculation Bridge no : 245/3 62 - 64
19 Repairing Estimate Bridge no : 250/4 65 - 6820 Quantity Calculation Bridge no : 250/4 69 - 71
21 Repairing Estimate Bridge no : 251/1 72 - 75
22 Quantity Calculation Bridge no : 251/1 76 - 78
23 Repairing Estimate Bridge no : 252/1 79 - 82
24 Quantity Calculation Bridge no : 252/1 83 - 85
25 Repairing Estimate Bridge no : 255/1 86 - 89
26 Quantity Calculation Bridge no : 255/1 90 - 92
27 Repairing Estimate Bridge no : 255/2 93 - 96
28 Quantity Calculation Bridge no : 255/2 97 - 99
29 Repairing Estimate Bridge no : 259/1 100 - 103
30 Quantity Calculation Bridge no : 259/1 104 - 105
31 Repairing Estimate Bridge no : 259/2 106 - 10932 Quantity Calculation Bridge no : 259/2 110 - 112
33 Repairing Estimate Bridge no : 259/3 113 - 116
34 Quantity Calculation Bridge no : 259/3 117 - 119
35 Repairing Estimate Bridge no : 260/1 120 - 123
36 Quantity Calculation Bridge no : 260/1 124 - 126
37 Repairing Estimate Bridge no : 260/2 127 - 130
38 Quantity Calculation Bridge no : 260/2 131 - 132
39 Repairing Estimate Bridge no : 260/4 133 - 136
40 Quantity Calculation Bridge no : 260/4 137 - 139
41 Repairing Estimate Bridge no : 260/5 140 - 143
42 Quantity Calculation Bridge no : 260/5 144 - 146
43 Repairing Estimate Bridge no : 260/6 147 - 150
44 Quantity Calculation Bridge no : 260/6 151 - 153
45 Repairing Estimate Bridge no : 264/1 154 - 157
46 Quantity Calculation Bridge no : 264/1 158 - 160
47 Repairing Estimate Bridge no : 264/2 161 - 164
48 Quantity Calculation Bridge no : 264/2 165 - 167
49 Repairing Estimate Bridge no : 265/1 168 - 171
50 Quantity Calculation Bridge no : 265/1 172 - 174
51 Repairing Estimate Bridge no : 266/1 175- 178
52 Quantity Calculation Bridge no : 266/1 179 - 181
Index (Repairing)
8/12/2019 Esstt Bridge
2/510
Sl No Bridge Name Page No1 Abstract 1 - 4
2 Cost Estimate Bridge No : 209/1 5 - 9
3 Quantity Calculation Bridge No : 209/1 10 - 11
4 Cost Estimate Bridge No : 213/1 12 - 15
5 Quantity Calculation Bridge No : 213/1 16 - 18
6 Cost Estimate Bridge No : 223/4 19 - 22
7 Quantity Calculation Bridge No : 223/4 23 - 258 Cost Estimate Bridge No : 226/1 26 - 29
9 Quantity Calculation Bridge No : 226/1 30 - 31
10 Cost Estimate Bridge No : 228/1 32 - 35
11 Quantity Calculation Bridge No : 228/1 36 - 38
12 Cost Estimate Bridge No : 229/1 39 - 42
13 Quantity Calculation Bridge No : 229/1 43 - 45
14 Cost Estimate Bridge No : 232/1 46 - 50
15 Quantity Calculation Bridge No : 232/1 51 - 52
16 Cost Estimate Bridge No : 234/1 53 - 56
17 Quantity Calculation Bridge No : 234/1 57 - 59
18 Cost Estimate Bridge No : 235/3 60 - 63
19 Quantity Calculation Bridge No : 235/3 64 - 6620 Cost Estimate Bridge No : 237/1 67 - 70
21 Quantity Calculation Bridge No : 237/1 71 - 73
22 Cost Estimate Bridge No : 240/1 74 - 77
23 Quantity Calculation Bridge No : 240/1 78 - 80
24 Cost Estimate Bridge No : 241/1 81 - 85
25 Quantity Calculation Bridge No : 241/1 86 - 87
26 Cost Estimate Bridge No : 245/3 88 - 91
27 Quantity Calculation Bridge No : 245/3 92 - 94
28 Cost Estimate Bridge No : 250/4 95 - 98
29 Quantity Calculation Bridge No : 250/4 99 - 101
30 Cost Estimate Bridge No : 251/1 102 - 105
31 Quantity Calculation Bridge No : 251/1 106 - 10832 Cost Estimate Bridge No : 252/1 109 - 112
33 Quantity Calculation Bridge No : 252/1 113 - 115
34 Cost Estimate Bridge No : 255/1 116 - 119
35 Quantity Calculation Bridge No : 255/1 120 - 122
36 Cost Estimate Bridge No : 255/2 123 - 126
37 Quantity Calculation Bridge No : 255/2 127 - 129
38 Cost Estimate Bridge No : 259/1 130 - 133
39 Quantity Calculation Bridge No : 259/1 134 - 136
40 Cost Estimate Bridge No : 259/2 137 - 140
41 Quantity Calculation Bridge No : 259/2 141 - 143
42 Cost Estimate Bridge No : 259/3 144 - 147
43 Quantity Calculation Bridge No : 259/3 148 - 150
44 Cost Estimate Bridge No : 260/1 151 - 154
45 Quantity Calculation Bridge No : 260/1 155 -157
46 Cost Estimate Bridge No : 260/2 158 - 161
47 Quantity Calculation Bridge No : 260/2 162 - 164
48 Cost Estimate Bridge No : 260/4 165 - 168
49 Quantity Calculation Bridge No : 260/4 169 - 171
50 Cost Estimate Bridge No : 260/5 172 - 175
51 Quantity Calculation Bridge No : 260/5 176 - 178
52 Cost Estimate Bridge No : 260/6 179 - 182
53 Quantity Calculation Bridge No : 260/6 183 - 185
Index (Bridge Estimate)
8/12/2019 Esstt Bridge
3/510
Sl No Bridge Name Page No54 Cost Estimate Bridge No : 264/1 186 - 189
55 Quantity Calculation Bridge No : 264/1 190 - 192
56 Cost Estimate Bridge No : 264/2 193 - 196
57 Quantity Calculation Bridge No : 264/2 197 - 199
58 Cost Estimate Bridge No : 265/1 200 - 203
59 Quantity Calculation Bridge No : 265/1 204 - 206
60 Cost Estimate Bridge No : 266/1 207 - 210
61 Quantity Calculation Bridge No : 266/1 211 - 213
62 Annexure-I 214
8/12/2019 Esstt Bridge
4/510
8/12/2019 Esstt Bridge
5/510
8/12/2019 Esstt Bridge
6/510
Sl No. Bridge Name Page No.
1 Abstract of Cost for ROB 1
2 Cost Estimate for ROB No. 222/1 2
3 Cost Estimate for ROB No. 227/1 3
4 Cost Estimate for ROB No. 238/2 4
5 Cost Estimate for ROB No. 243/1 5
Index
8/12/2019 Esstt Bridge
7/510
Sl
no Chainage
Bridge
NumberFoundation Substructure Superstructure
Protection
workTotal Amount
1 208415 209/1 83715247 7631471 46683197 4479733 142509648
2 212964 213/1 3843254 4361152 4996144 1661894 14862444
3 222595 223/4 7490574 5663192 7657806 1376013 22187585
4 225454 226/1 244385207 23916554 84373397 10811927 363487085
5 227462 228/1 6465518 11477347 7688495 1441941 27073301
6 228087 229/1 5996341 10441881 7360981 1592802 25392005
7 231240 232/1 65021408 5311920 17303325 12290131 99926784
8 233214 234/1 4931416 8773643 5345836 1353616 20404511
9 234859 235/3 6536365 5794902 7660685 1220261 21212213
10 236259 237/1 4360989 3019475 4131320 738296 12250080
11 239322 240/1 4056387 6086571 5259062 1068934 16470954
12 240272 241/1 384107664 30270892 99342251 12883592 526604399
13 244803 245/3 3568408 3266608 5381863 853013 13069892
14 249990 250/4 4674659 3966948 5451262 954638 15047507
15 250350 251/1 5410407 3043138 5871868 989581 15314994
16 251630 252/1 3146003 2186448 4660377 729730 10722558
17 254000 255/1 3314720 5161212 4822344 773338 14071614
18 254750 255/2 5242120 2220405 5654614 1009724 14126863
19 258170 259/1 3174818 1290626 4556071 601683 9623198
20 258380 259/2 2966473 1955483 4704570 694720 10321246
21 258590 259/3 11491302 7172930 10273280 1866128 30803640
22 259015 260/1 7056378 3516355 8207648 1303642 20084023
23 259230 260/2 6602668 8643895 6165614 1251493 22663670
24 259580 260/4 4445961 2586142 5632670 864840 13529613
25 259685 260/5 4191425 2674023 5652421 901225 13419094
26 259870 260/6 4841176 2464563 5332024 821020 13458783
Name of Work: 4 Lane Connectivity from Nagaon to Itanagar in Arunachal Pradesh under SARDP NE
Work (Phase A). 4 Laning of NH 52 from the end of Biswanath Chariali by-pass (Km 208.00) to Gohpur (km
265.5) (Total Length = 57.50 km) in Sonitpur district in the state of Assam Ref : Based on SOR 2013-2014
for Roads and Bridge Works,PWD,Assam.
Abstract of Bridge
8/12/2019 Esstt Bridge
8/510
27 263570 264/1 5804558 2469928 4822344 773345 13870175
28 263955 264/2 2897694 1501263 4610317 644714 9653988
29 264876 265/1 3087778 2298645 4796887 754574 10937884
30 265310 266/1 7542217 3229441 5819061 1009840 17600559
Total- 1,560,700,310
Executive Engineer, PWD
Nagaon NH Division,
Nagaon
8/12/2019 Esstt Bridge
9/510
Sl no ChainageBridge
NumberDismentaling Foundation Substructure Superstructure Ruppes
1 212964 213/1 104,715 613,447 455,953 1,382,460 2,556,575
2 222595 223/4 183,138 1,191,778 649,760 2,084,142 4,108,818
3 227462 228/1 233,329 1,395,824 1,335,324 1,696,710 4,661,187
4 228087 229/1 217,058 1,395,876 1,188,107 1,690,820 4,491,861
5 233214 234/1 145,782 647,749 556,737 1,494,203 2,844,471
6 234859 235/3 187,388 1,187,123 676,088 2,086,432 4,137,031
7 236259 237/1 85,263470,188
413,807 1,169,230 2,138,488
8 239322 240/1 156,977 614,217 565,880 1,385,178 2,722,252
9 244803 245/3 100,342 647,685 365,057 1,482,814 2,595,898
10 249990 250/4 112,938 995,378 393,973 1,500,684 3,002,973
11 250350 251/1 93,668 1,392,045 416,105 2,087,088 3,988,906
12 251630 252/1 76,611 899,480 286,231 1,377,954 2,640,276
13 254000 255/1 81,241 900,118 331,915 1,382,054 2,695,328
14 254750 255/2 95,960 952,754 395,253 1,689,338 3,133,305
15 258170 259/1 87,078 581,501 139,117 1,367,871 2,175,567
16 258380 259/2 71,386 610,877 230,832 1,368,238 2,281,333
17 258590 259/3 234,904 2,592,675 1,015,141 2,813,056 6,655,776
18259015 260/1 137,139 1,310,164 423,335 2,311,053 4,181,691
19 259230 260/2 154,825 1,395,824 1,016,838 1,719,776 4,287,263
20 259580 260/4 88,803 935,252 304,129 1,694,206 3,022,390
21 259685 260/5 90,435 946,506 324,676 1,704,987 3,066,604
22 259870 260/6 87,206 675,398 326,470 1,489,713 2,578,787
Widening & Rehabiliation
8/12/2019 Esstt Bridge
10/510
23 263570 264/1 81,385 613,630 332,993 1,380,474 2,408,482
24 263955 264/2 72,267 578,710 191,444 1,366,111 2,208,532
25 264876 265/1 77,095 615,637 286,714 1,374,327 2,353,773
26 265310 266/1 79,820 946,740 502,306 1,704,302 3,233,168
84,170,735
Executive Engineer, PWD
Nagaon NH Division,
Nagaon
Total-
8/12/2019 Esstt Bridge
11/510
Sl. No. Description of Items
1 ROB No. 222/1 Rs. 41119979.45
2 ROB No. 227/1 Rs. 39259966.47
3 ROB No. 238/2 Rs. 39259966.47
4 ROB No. 243/1 Rs. 39259966.47
Total Rs. 158899879.00
Name of work : 4 Lane Connectivity from Nagaon to Itanagar in Arunachal Pradesh
under SARDP NE Work (Phase A). 4 Laning of NH 52 from the end of Biswanath
Chariali by-pass (Km 208.00) to Gohpur (Total Length = 57.50 km) in Sonitpur
district in the state of Assam
Abstract of Cost for ROB
Amount (Rs.)
Executive Engineer, PWD
Nagaon NH Division,
Nagaon
8/12/2019 Esstt Bridge
12/510
Quantity UnitRate
(in Rs.)
Amount
(in Rs.)
1*6*0.14*0.15*0.01*7850=9.89kg ( base plate)
1*6*0.14*0.15*0.01*7850=9.89kg (template)
1*6*0.14*0.35*0.016*7850=36.93kg (vertical plate)
Total= 56.71 kg+10% wastage=62.38 kg
2. Fastener:
MS bar 16mm
1*2*6*0.70*1.578 kg/m=
Total= 13.26 kg+10% wastage=14.56 kg
3. MS nuts and washer:
4*6=24 nos @ 0.125 kg=3.00 kg
6.75 m 500.00 3375.00
5. Welding ( base plate with verticle plate)
1*2*14.00=25.00 cm
Quantity for 6 sets=28*6=168.00cm
6. Labour for cutting and errection charges
0.18 each 160.00 28.80
0.09 each 125.00 11.25
0.66 each 97.00 64.021.5 sqm 180.00 270.00
8227.47
Rs. 822.75
Rs. 9050.22
Rs. 905.0217
9955.24
Rs. 1474.85
Rs. 1475/m
1. MS plates:
62.38 Kg 55.00 3430.90
Annexure-I
Analysis of Rate for Hand Rail
Providing and fixing hand rail over the crash barrier consisting of MS base plate, embedded
fastener and nuts, MS vertical plates and pipe etc. as shown in the drawing and as per
specifications, All the railing components as mentioned above to be hot dip gal vanished with a
zinc coating of at least 175gm/sqm. The thickness of plates to be as shown in the drawings and
pipe to be 65NB heavy class with a weight not less than 7.92 kg/m and conforming to IS: 1161-
1979. Item to include all incidental works required to complete the work as directed by theEngineer- in-charge. Management shall be made for the length of the pipe only
DETAILS OF COST FOR 6.75M
Materials
Executive Engineer, PWD
Nagaon NH Division,
Nagaon
i. Black smith
14.59 Kg 50.00 729.50
3.00 Kg 50.00 150.00
4. G.I. Pipe 65mm NB heavy duty
168 cm 1.00 168.00
Cost for 1.00m
Say
ii. Bandhani
iii. Beldar7. Galvanishing: 1.5 sqm
Add 10% overhead charges
Add 10% contractor's profit
Cost for 6.75m
8/12/2019 Esstt Bridge
13/510
8/12/2019 Esstt Bridge
14/510
Item No. Particulars/Descrption of items UnitTotal
Quantity
Rate in
Rs.Amount (Rs.)
1 2 3 4 5 6
Foundation
Excavation for Structures (Earth work in excavation of foundation
of structures as per drawing and technical specification,
including setting out, construction of shoring and bracing,
removal of stumps and other deleterious matter, dressing of
sides and bottom and backfilling with approved material.
I. Ordinary Soil
B. Mechanical means
(II) With dewatering
(i) upto 3m depth Cum 2816.778 54.00 152,106.00
Plain/Reinforced Cement concrete, in open Foundation
complete as per Drawing and Technical Specifications
includin steel shutterin formwork.(p) With plasticser (Master plast PL-1/SPL-2 or
equivalent),air entraining and water reducing plasticiser
(Masterplast PAE or equivalent) and accelerating
plasticiser (Masterplast ACPL or equivalent) conforming
to IS-9103-1999.
Cum
A.PCC Grade M15 Cum 135.166 6514.00 880,471.00
H.RCC Grade M35
(II) Using Batching plant Transit mixer and concrete pump Cum 191.616 9030.00 1,730,293.00
3/12.40 Reinforcement in Foundation: Supplying, fitting and
placing un-coated TMT bar reinforcement in foundation
complete as per drawing and technical specifications.(A) From Primary Sources:
TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel
(i) TMT Corrosion Resistant Steel (CRS) reinforcement
bar of Fe-500 N/mm2
tonne 14.743 73279.00 1,080,384.00
Substructure
Plain/Reinforced cement concrete, in sub structure
complete as per drawing and technical specification and
steel shuttering formwork.
(P)With plasticiser (Masterplast PL-1/SPL-2 or
equivalent),air entraining and water reducing plasticiser
(Masterplast PAE or equivalent) and accelerating
plasticiser(Masterplast ACPL or equivalent) conforming to
IS-9103-1999B. PCC Grade M20
a) Height up to 5.0 m Cum 196.320 8120.00 1,594,119.00
H. RCC Grade M 35
a) Height up to 5.0 m
Case II : With Batching plant, Transit Mixer and
concrete Pump
Cum 126.221 9169.00 1,157,325.00
5/13.6 Supplying, f itting and placing TMT bar reinforcement in
substructure complete as per drawing and technical
specifications
MT
Name of Work: 4 Lane Connectivity from Nagaon to Itanagar in Arunachal Pradesh under
SARDP NE Work (Phase A). 4 Laning of NH 52 from the end of Biswanath Chariali by-pass
(Km 208.00) to Gohpur (km 265.5) (Total Length = 57.50 km) in Sonitpur district in the state
of Assam Ref : Based on SOR 2013-2014 for Roads and Bridge Works,PWD,Assam.
Esstt for existing br No.213/1,Ch-212964
1/12.1
2/12.8
4/13.5
8/12/2019 Esstt Bridge
15/510
Item No. Particulars/Descrption of items UnitTotal
Quantity
Rate in
Rs.Amount (Rs.)
1 2 3 4 5 6
(a) From Primary Sources:
TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel
(i) TMT Corrosion Resistant Steel (CRS) reinforcement
bar of Fe-500 N/mm2
Tonne 21.948 73343.00 1,609,708.00
Super Structure
Furnishing and Placing Reinforced/Prestressed cement concrete
in super-structure as per drawing and Technical Specification'including steel shuttering formwork.
(P) With plasticiser ( Masterplast PL-1/SPL-2 or
equivalent ), air entraining and water reducing plasticiser
( Masterplast PAE or equivalent) and accelerating
plasticiser ( Masterplast ACPL or equivalent) conforming
to IS-9103-1999.
B.'RCC Grade M25
Case II : Using Batching Plant, Transit Mixer and
Concrete Pump
ii) For T-Beam and Slab
a) Height up to 5.0 m Cum 87.140 10591.00 922,900.00
7/14.2 Reinforcement in Super Structure: Supplying, fitting and
placing TMT bar reinforcement in super-structureincluding splicing complete as per drawing and technical
specifications
(a) From Primary Sources:
TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel
(i) TMT Corrosion Resistant Steel (CRS) reinforcement
bar of Fe-500 N/mm2
MT 6.08 77554.00 471,219.00
8/14.18 Filler joint
(i)'Providing & fixing 2 mm thick corrugated copper plate
in expansion joint complete as per drawing & Technical
Specification.
metre 24.000 1640.00 39,360.00
ii) 'Providing & fixing 20 mm thick compressible fibre
board in expansion joint complete as per drawing &
Technical Specification.
metre 24.000 558.00 13,392.00
(iii)'Providing and fixing in position 20 mm thick
premoulded joint filler in expansion joint for fixed ends of
simply supported spans not exceeding 10 m to cater for a
horizontal movement upto 20 mm, covered with sealant
complete as per drawing and technical specification.
metre 24.000 317.00 7,608.00
(iv)'Providing and filling joint sealing compound as per
drawings and technical specifications with coarse sand
and 6% bitumen by weight.
metre 24.00 17.00 408.00
9/14.4 Providing and laying Cement concrete wearing coat M-
30 grade including reinforcement complete as per
drawin and Technical S ecifications
152.49 12993.00 1,981,303.00
10/8.22 Reinforced Cement Concrete Crash Barrier(Provisionof an Reinforced cement concrete crash barrier at the
edges of the road, approaches to bridge structures and
medians,constructed with concrete with HYSD/TMT
reinforcement conforming to IRC:21 and dowel bar 25mm
dia, 450mm long at expansion joints filled with pre
moulded asphalt fil ler board, keyed to the structure on
which it is built and installed as per design given in the
enclouser to MOST circular No. RW/NH-33022/1/94-DO
III dated June 1994 as per dimension in the approved
drowing and at locations directed by the engineer,all as
specified.
6/14.1
8/12/2019 Esstt Bridge
16/510
Item No. Particulars/Descrption of items UnitTotal
Quantity
Rate in
Rs.Amount (Rs.)
1 2 3 4 5 6
B. M 40 grade concrete metre 35.88 4170.00 149,620.00
11/Analy
sis Rate
HAND RAIL
Providing and fixing hand rail over the crash barrier
consisting of MS base plate, embedded fastener and
nuts, MS vertical plates and pipe etc. as shown in the
drawing and as per specifications, All the railing
components as mentioned above to be hot dip galvanished with a zinc coating of at least 175gm/sqm. The
thickness of plates to be as shown in the drawings and
pipe to be 65NB heavy class with a weight not less than
7.92 kg/m and conforming to IS: 1161-1979. Item to
include all incidental works required to complete the work
as directed by the Engineer- in-charge. Management
shall be made for the length of the pipe only. (Rate from
Annexure-I)
metre 35.88 1475.00 52,923.00
12/14.7 Construction of RCC railing of M30 Grade in-situ with 20
mm nominal size aggregate, true to line and grade,
tolurence of vertical RCC post not to exceed 1 in 500,
centre to centre spacing between vertical post not to
exceed 2000 mm, leaving adequat space between
vertical posts for expansion, complete as per approved
drawings and technical specifications.
metre 17.94 2044.00 36,670.00
13/14.11 Reinforced cement concrete approach slab including
reinforcement and formwork complete as per drawing
and Technical specification
a) With TATA make TMT CRS (Fe-500) grade rebar Cum 28.80 12025.00 346,320.00
14/14.10 PCC M15 grade levelling course below approach slab
complete as per drawing and technical specification
Cum, 14.40 5498.00 79,172.00
15/14.9 Drainage Spouts complete as per drawing and Technical
specification.
Each 2.00 10197.00 20,394.00
16/14.16 Painting on concrete surface (Providing and applying 2
coats of water based cement paint to unplastered
concrete surface after cleaning the surface of dirt, dust,oil, grease, efflorescence and applying paint @ of 1 litre
for 2 Sq.m.)
(B) For RCC Railing RM 53.82 160.00 8,612.00
17/13.9 Back filling behind Abutment ,Wing wall and Return Wall
complete as per drawing and technical specification.
Cum
(A) Granular material Cum 548.26 1524.00 835,543.00
18/13.8 Providing weep holes in brick mansonry/plain/reinforced
concrete abutment, wing wall/return wall with 100 mm dia
AC pipe, extending through the full width of the structure
with slope of IV:20H towards drawing foce, complete as
per drawing and technical specification
Each 40.00 204.00 8,160.00
8/12/2019 Esstt Bridge
17/510
Item No. Particulars/Descrption of items UnitTotal
Quantity
Rate in
Rs.Amount (Rs.)
1 2 3 4 5 6
19/8.47 Providing Sparkle Solar Road Studs, manufactured by
Tata B.P. Solar India Ltd. Of size (125mmx125mm),
90mm height (from
bottom of shank to the top of stud) with detachable
battery, m6LEDs-three on each side for Bi-directional
studs/3 LEDs on one side for unidirectional studs, ultra
bright LED in amber and red colour, weight per stud700+25 gms, flash rate of 50-65 times per
minute completely water resistant and weather proof with
replacement warranty and free maintenance fro one year
from the date of installation of stud on road-(installation
should be made using adhesives and procedures
recommended by manufacturer under the supervision of
their competent technician).
a) Bi-directional Stud Each 3500.00
b) Uni-directional Stud Each 4 3400.00 13,600.00
20/8.51 Providing relfective pavement marker with Micro
prismatic lens in both direction having thermoplastic body
adhering to the specification and guidelines of
MoSRT&H's fixed to the road surface using the adhesives
and the procedures recommended by the manufacturers
with three months replacement warranty and free
maintenance.
Each 30.00 298.00 8,940.00
Protection work
21/15.10 Curtain wall complete as per drawing and Technical
specification
A. Stone masonry in cement mortar (1:3) Cum 4333.00 0.00
B. Cement concrete Grade M15 Cum 100.14 7046.00 705,587.00
22/15.11 Flexible Apron :Construction of flexible apron 1 m thick
comprising of loose stone boulders weighing not less
than 40 kg beyond curtain wall.
Cum 303.66 1485.00 450,936.00
23/15.9 Dry rubble Flooring, Construcytion of dry rubbl flooring at
cross drainage works for relatively less important works
Cum 301.00 1679.00 505,371.00
14,862,444.00
Executive Engineer, PWD
Nagaon NH Division,
Nagaon
Total-
8/12/2019 Esstt Bridge
18/510
Item No. Particulars/Descrption of items UnitTotal
Quantity
Rate in
Rs.Amount (Rs.)
1 2 3 4 5 6
8/12/2019 Esstt Bridge
19/510
Item No. Particulars/Descrption of items UnitTotal
Quantity
Rate in
Rs.Amount (Rs.)
1 2 3 4 5 6
8/12/2019 Esstt Bridge
20/510
Item No. Particulars/Descrption of items UnitTotal
Quantity
Rate in
Rs.Amount (Rs.)
1 2 3 4 5 6
8/12/2019 Esstt Bridge
21/510
3,843,254.00
8/12/2019 Esstt Bridge
22/510
4,361,152.00
8/12/2019 Esstt Bridge
23/510
8/12/2019 Esstt Bridge
24/510
4,996,144.00
1,661,894.00
8/12/2019 Esstt Bridge
25/510
8/12/2019 Esstt Bridge
26/510
8/12/2019 Esstt Bridge
27/510
8/12/2019 Esstt Bridge
28/510
Sl.
No.
Item No. Unit Qty for 2-
Lane
2 2.65 12 6.3 m3 400.68
2 4.35 10.34 12 1079.50
2 0.3 1.5 12 10.80
2 0.3 1.5 10.34 9.31
2 33.74+9.942
0.45 11.9 233.91
15 0.45 9.94 67.10
33.74 6 0.75 151.83
33.74 3 0.75 75.92
33.74 2.5 1.85 156.05
33.74 2 1.5 101.22
4 6.08+1.82
16.83 2 530.48
2816.78
PCC M-15 12 9.94 0.15 m3
17.89c/wall 1 16.94 16.94
Apron 15 9.94 0.15 22.37
2 33.74+9.942
0.15 11.9 77.97
135.17
RCC M35(open
foundation)9.94 12 1.2 m
3 143.14
2 0.25 1.5 12 m3 9.00
2 0.25 1.5 9.44 m3 7.08
m/wall 2 1.2 3 4.5m
3 32.40
191.62
Reinforcement in foundation
25 mm dia 2 47 11.92 kg 4322.84
25 mm dia 47 10.86 kg 1969.21
20 mm dia 66 13.2 kg 2151.11
20 mm dia 66 13.2 kg 2151.11
12 mm dia 10 43.88 kg 390.04
12 mm dia 292 2 kg 519.11
m/wall 100 32.4 3240.00
kg 14743.43
MT 14.74
Substructure (M35)
Dirt wall - 2 0.82 12 0.25 m3 4.92
Abutment cap - 2 0.7 12 0.225 m3 3.78
Abutment- 2 0.7+1.22
4.666 12 m3 106.38
M/wall 20.2+0.45
23 5.7111 11.14
126.22
Total =
Total=
Total =
Quantity Calculation fo Br. No.213/1,Ch-212964
Total=
Earth work in or
foundation of structures
as per drawings &
technical specification
including setting out.
1
2
3 12.8
12.8
12.1
Total=
Total =
4
5 13.5
12.40
8/12/2019 Esstt Bridge
29/510
Substructure (M20) PCC
Wing wall- 1 196.32 m3 196.32
Dirt wall - 12 mm dia 2 6 25.5 kg 272.00
12 mm dia 2 0.95 2 86 kg 290.49
Abutment cap - 12 mm dia 2 10 12.45 kg 221.33
12 mm dia 2 1.85 80 kg 263.11
Abutment- 28 mm dia 2 7.02 2 95 kg 12909.87
12 mm dia 2 32 25.9 kg 1473.42
12 mm dia 2 32 95 1 kg 5404.44
m/wall 11.13 100 kg 1113.00
kg 21947.67
Tonne 21.95
8 14.1 1 87.14 m3 87.14
9 14.2 1 6.076 MT 6.08
10 14.18 2 12 Nos. 24.00
11 8.22 2 17.94 m 35.88
12 14.7 2 8.97 m 17.94
13 14.16 3 17.94 m2 53.82
14 14.4 17.94 8.5 m3 152.49
15 14.9 1 2 Nos. 2.00
Reinforcement in Super Structure:
Supplying, fitting and placing TMT bar
reinforcement in super-structure
including splicing complete as per
drawin and technical s ecification
Furnished and placing
reinforcement/Prestressed cement
concrete in Superstructureas per
drawing and Technical Specifications.
Supplying, fitting and placing TMT bar
Reinforcement in substructurecomplete
as per drawing and technical specifications
Total =
Total =
Drainage Spoutscomplete as per
drawing and Technical specification.
Providing and laying Cement concrete
Wearing coatM-30 grade including
reinforcement complete as per drawing
and Technical S ecifications
Paintingon concrete surface
(Providing and applying 2 coats of
water based cement paint to
unplastered For RCC Railing
Construction of RCC Railingof M30
Grade in-situ with 20 mm nominal size
aggregate, true to line and grade,
tolurence of vertical RCC post not to
exceed 1 in 500, centre to centre
spacing between vertical post not toexceed 2000 mm.
Reinforced Cement Concrete Crash
Barrier (Provision of an Reinforced
cement concrete crash barrier at the
edges of the road,approaches to
bridge structures and medians,
constructed with M-20 grade concrete.
Filler jointProviding & fixing 20 mm
thick compressible fibre board in
expansion joint complete as perdrawing & Technical Specification.
7 13.6
13.56
8/12/2019 Esstt Bridge
30/510
8/12/2019 Esstt Bridge
31/510
Qty for 4-
Lane
5633.56
270.33
383.23
29486.86
29.49
252.44
8/12/2019 Esstt Bridge
32/510
392.64
43895.33
43.90
174.28
12.15
48.00
71.76
35.88
107.64
304.98
4
8/12/2019 Esstt Bridge
33/510
1096.51
57.60
28.80
80
60
8
607.32
601.99
200.28
71.76
er, PWD
vision,
8/12/2019 Esstt Bridge
34/510
Item
No.Particulars/Descrption of items Unit
Total
Quantity
Rate in
Rs.Amount (Rs.)
1 2 3 4 5 6
Dismantling of Structures (Dismantling of existingstructures like culverts, bridges, retaining walls and other
structure comprising of masonry, cement concrete, wood
work, steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material,disposal of
unserviceable material and stacking the serviceable
material with all lift and lead of 1000 metres)
II) By Mechanical Means
(a) Cement concrete grade M-15 & M-20
Wing wall- 115.34 356.00 41,062.00
(b) Prestressed/ Reinforced cement grade M-20 & above. 111.09 573.00 63,653.00
Foundation
Excavation for Structures (Earth work in excavation of
foundation of structures as per drawing and technicalspecification, including setting out, construction of
shoring and bracing, removal of stumps and other
deleterious matter, dressing of sides and bottom and
backfilling with approved material.
I.Ordinary Soil
B.Mechanical means
(ii) With dewatering
(i) upto 3m depth
Plain/Reinforced Cement concrete, in open Foundation
complete as per Drawing and Technical Specifications
including steel shuttering formwork.
(P) With plasticser (Master plast PL-1/SPL-2 or
equivalent),air entraining and water reducing plasticiser(Masterplast PAE or equivalent) and accelerating
plasticiser (Masterplast ACPL or equivalent) conforming to
IS-9103-1999.
A.PCC Grade M15 Cum 5.22 6514.00 33,994.00
H.RCC Grade M35
(II) Using Batching plant Transit mixer and concrete pump Cum 34.79 9030.00 314,154.00
Supplying, fitting and placing uncoated HYSD
reinforcement in foundation complete as per drawing and
Technical S ecification(a) From Primary Sources:
TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel
(i) TMT Corrosion Resistant Steel (CRS) reinforcement bar
of Fe-500 N/mm2
tonne 3.48 73279.00 254,938.00
Substructure5/13.5 Plain/Reinforced Cement concrete, in Substructure
complete as per Drawing and Technical Specifications
(P)With plasticiser (Masterplast PL-1/SPL-2 or
equivalent),air entraining and water reducing plasticiser
(Masterplast PAE or equivalent) and accelerating
plasticiser(Masterplast ACPL or equivalent) conforming to
IS-9103-1999
H. RCC Grade M 35
a) Height up to 5.0 m
4/12.40
Cum 191.86 54.00
Name of Work: 4 Lane Connectivity from Nagaon to Itanagar in Arunachal Pradesh under
SARDP NE Work (Phase A). 4 Laning of NH 52 from the end of Biswanath Chariali by-pass
(Km 208.00) to Gohpur (km 265.5) (Total Length = 57.50 km) in Sonitpur district in the state
of Assam Ref : Based on SOR 2013-2014 for Roads and Bridge Works,PWD,Assam.
Esstt for Repairing of existing br No.213/1,Ch-212964
2/12.1
3/12.8
10,361.00
1/2.4
8/12/2019 Esstt Bridge
35/510
Item
No.Particulars/Descrption of items Unit
Total
Quantity
Rate in
Rs.Amount (Rs.)
1 2 3 4 5 6
Case II : With Batching plant, Transit Mixer and concrete
Pump.
Cum 27.63 9169.00 253,306.00
Supplying, fitt ing and placing TMT bar reinforcement in
substructure complete as per drawing and technical
specifications
MT
(a) From Primary Sources:
TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel
(i) TMT Corrosion Resistant Steel (CRS) reinforcement bar
of Fe-500 N/mm2
Tonne 2.76 73343.00 202,647.00
Super Structure
Furnishing and Placing Reinforced/Prestressed cement
concrete in super-structure as per drawing and Technical
Specification' including steel shuttering formwork.
(P) With plasticiser ( Masterplast PL-1/SPL-2 or equivalent
), air entraining and water reducing plasticiser (
Masterplast PAE or equivalent) and accelerating
plasticiser ( Masterplast ACPL or
equivalent) conforming to IS-9103-1999.
B. RCC GRADE M 25
Case II : Using Batching Plant, Transit Mixer andConcrete Pump
ii) For T-Beam and Slab
a) Height up to 5.0 m Cum 26.98 10591.00 285,724.00
Reinforcement in Super Structure: Supplying, fitting and
placing TMT bar reinforcement in super-structure including
splicing complete as per drawing and technical
specifications
(a) From Primary Sources:
TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel
(i) TMT Corrosion Resistant Steel (CRS) reinforcement bar
of Fe-500 N/mm2
tonne 2.16 77554.00 167,381.00
Filler joint
(i)'Providing & fixing 2 mm thick corrugated copper plate in
expansion joint complete as per drawing & Technical
Specification.
metre 24.00 1640.00 39,360.00
ii) 'Providing & fixing 20 mm thick compressible fibre board
in expansion joint complete as per drawing & Technical
Specification.
metre 24.00 558.00 13,392.00
(iii)'Providing and fixing in position 20 mm thick
premoulded joint fil ler in expansion joint for fixed ends of
simply supported spans not exceeding 10 m to cater for a
horizontal movement upto 20 mm, covered with sealant
complete as per drawing and technical specification.
metre 24.00 317.00 7,608.00
v rov ng an ng o n sea ng compoun as per
drawings and technical specifications with coarse sandand 6% bitumen by weight.
metre 24.00 17.00 408.00
8/14.2
6/13.6
7/14.1
9/14.18
8/12/2019 Esstt Bridge
36/510
Item
No.Particulars/Descrption of items Unit
Total
Quantity
Rate in
Rs.Amount (Rs.)
1 2 3 4 5 6
Reinforced Cement Concrete Crash Barrier (Provision
of an Reinforced cement concrete crash barrier at the
edges of the road, approaches to bridge structures and
medians,constructed with concrete with HYSD/TMT
reinforcement conforming to IRC:21 and dowel bar 25mm
dia, 450mm long at expansion joints filled with pre
moulded asphalt filler board, keyed to the structure on
which it is built and installed as per design given in the
enclouser to MOST circular No. RW/NH-33022/1/94-DO III
dated June 1994 as per dimension in the approved
drowing and at locations directed by the engineer,al l as
specified.B. M 40 grade concrete metre 35.88 4170.00 149,620.00
11/14.7 Construction ofRCC railing of M30 Grade in-situ with 20
mm nominal size aggregate, true to line and grade,
tolurence of vertical RCC post not to exceed 1 in 500,
centre to centre spacing between vertical post not to
exceed 2000 mm, leaving adequat space between vertical
posts for expansion, complete as per approved drawings
and technical specifications.
metre 17.94 2044.00 36,670.00
Reinforced cement concrete approach slab includingreinforcement and formwork complete as per drawing and
Technical specification
a) With TATA make TMT CRS (Fe-500) grade rebar Cum 27.60 12025.00 331,890.00
13/14.1
0
PCC M15 grade levelling course below approach slab
com lete as er drawin and technical s ecification.
Cum 27.60 5498.00 151,745.00
14/14.9 Drainage Spouts complete as per drawing and Technical
specification.
Each 2.00 10197.00 20,394.00
15/13.8 Providing weep holes in brick mansonry/plain/reinforced
concrete abutment, wing wall/return wall with 100 mm dia
AC pipe, extending through the full width of the structure
with slope of IV:20H towards drawing foce, complete as
per drawing and technical specification
Each 24.00 204.00 4,896.00
Providing Sparkle Solar Road Studs, manufactured by
Tata B.P. Solar India Ltd. Of size (125mmx125mm), 90mm
height (from
bottom of shank to the top of stud) with detachable battery,
m6LEDs-three on each side for Bi-directional studs/3
LEDs on one side for unidirectional studs, ultra bright LED
in amber and red colour, weight per stud 700+25 gms,
flash rate of 50-65 times per
minute completely water resistant and weather proof with
replacement warranty and free maintenance fro one year
from the date of installation of stud on road-(installation
should be made using adhesives and procedures
recommended by manufacturer under the supervision of
their com etent technician .a) Bi-directional Stud
b) Uni-directional Stud Each 4.00 3400.00 13,600.00
17/8.51 Providing relfective pavement marker with Micro
prismatic lens in both direction having thermoplastic body
adhering to the specification and guidelines of MoSRT&H's
fixed to the road surface using the adhesives and the
procedures recommended by the manufacturers with three
months replacement warranty and free maintenance.
Each 10.00 298.00 2,980.00
10/8.22
12/14.11
16/8.47
8/12/2019 Esstt Bridge
37/510
8/12/2019 Esstt Bridge
38/510
8/12/2019 Esstt Bridge
39/510
8/12/2019 Esstt Bridge
40/510
8/12/2019 Esstt Bridge
41/510
8/12/2019 Esstt Bridge
42/510
Sl.N
o.
Item
No.
Unit Qty for
2-Lane
2 57.67 Cm 115.34
2 0.275 0.25 0.9 10 Cm 1.24
2 2 0.2 0.175 14.915 Cm 2.09
2 0.5 0.2 17.94 Cm 3.59
1 0.82 9.4 3.95 Cm 30.45
2 0.82 0.25 3.95 Cm 1.62
2 0.7+1.0
2
3.95 4.891 Cm 32.84
9.94 3.95 1 Cm 39.26
Cm 111.09
9.95 3.5 1.65 m3 57.46
m3
191.86
9.94 3.5 0.15 m3 5.22
5.22
9.94 3.5 1 34.79
34.79
34.79 100 kg 3479.00
kg 3479.00
Total= Tonne 3.5
26.7+1.0
23.15 4.891 m
3 26.19
2 0.25 3.5 0.82 m3 1.435
m3 27.63
27.63 100 Kg 2763.00
Kg 2763.00
Tonne 2.76Superstructure RCC (M25)-
1 3.5 9.4 0.82 m3 26.978
m3 26.978
26.978 80 Kg 2158.24
Kg 2158.24
Tonne 2.16
10 14.9 1 2.00 Nos. 2.00
2 12.00 Nos. 24.00
2 12.00 Nos. 24.00
2 12.00 Nos. 24.00
2 12.00 Nos. 24.00
12 14.10 2 11.5 4 0.3 m3 27.60
2
2.4
12.1
Repairing Quantity Calculation fo Br. No.213/1,Ch-212964
Post -
Rail-
Kerb-
Dismantling (M20):(ii) (A) Cement concrete grade M-15 & M-20
Wing Wall-
(B) Prestressed/ Reinforced cement grade M-20 & above.
1
4.8 4
Earth work in or foundation of
structures as per drawings &
technical specification including
setting out.(Upto 3m)-
Total=
134.40m32 3.5
Slab-
Dirt wall-
Abut/Pier-
Raft-
Total=
14.18 Filler jointProviding & fixing 20mm thick compressible fibre board
in expansion joint complete as per
drawing & Technical Specification.
PCC M15 grade levelling course
below approach slab complete as
per drawing and technical
specification
Reinforcement in foundation-
PCC M15-
RCC M35 (open
foundation)-
Total=
Reinforcement in Superstructure-
Total=
Total=
Total=
Total=
Total=
Total=
Reinforcement in Substructure-
3 12.8
4 12.8
5 12.4
9 14.2
Substructure(M35)-6 13.5
7 13.6
8 14.1
Drainage Spoutscomplete as perdrawing and Technical specification.
Total=
11
Total=
8/12/2019 Esstt Bridge
43/510
Sl.N
o.
Item
No.
Unit Qty for
2-Lane
13 14.11 2 11.5 4 0.3 m3 27.60
14 14.7 1 17.94 m 17.94
15 8.22 2 17.94 m 35.88
16 16.1 7.5 9.94 74.55
17 16.17 2.00 8.5 metre 17.00
18 16.2 8.5 9.94 metre 84.49
19 13.8 2 12 Nos. 24.00
20 8.47 4 Nos. 4.00
21 8.51 10 Nos. 10.00
0.82 2 0.25 sqm 0.41
2 0.7+1.02
4.891 sqm 8.31
1.8 9.94 sqm 17.89
26.62
Construction of RCC Railingof M30
Grade in-situ with 20 mm nominal
size aggregate, true to line and
grade, tolurence of vertical RCC
post not to exceed 1 in 500, centre
to centre spacing between vertical
post not to exceed 2000 mm.
Reinforced Cement Concrete Crash
Barrier (Provision of an Reinforced
cement concrete crash barrier at the
edges of the road,approaches to
bridge structures and medians,
constructed with M-20 grade
concrete.
Removal of existing cementconcrete wearing coatincluding its
disposal complete as per Technical
specification without causing any
detrimental effect to any part of the
bridge structure and removal of
dismantled material with all lifts and
lead upto 1000.(Thickness 75mm.)
Replacement of Expansion Joints
complete as per drawings.
Removal of existing asphaltic
wearing coatcomprising of 50 mm
thick asphaltic concrete laid over 12
mm thick mastic asphalt includingdisposal with all lift and lead upto
1000m.
Providing weep holesin brick
mansonry/plain/reinforced concrete
abutment, wing wall/return wall with
100 mm dia AC pipe,
16.28
Providing 'Sparkle Solar Road
Studds,manufactured by Tata
B.P.Solar India Ltd. Of size
(125mmx125mm),90mm height
(frombottom of shank to the top of
stud)with detachable battery.RPM: Providingrelfective
pavement marker with Microprismatic lens in both direction
having thermoplastic body adhering
to the s ecification.
Reinforced cement concrete
approachslabincluding
reinforcement and formwork
complete as per drawing and
Technical specification.
Total=
Supplying and applying Epoxy
based bonding agentMasterbond
EP of Choksey Chemicals or
euivalent @ 0.50 Lit pe sqm after
totally saturating the cleaned
concrete surface.
22
8/12/2019 Esstt Bridge
44/510
Sl.N
o.
Item
No.
Unit Qty for
2-Lane
23 16.53 59.321
0.6
Each 99
Executive Engineer, PWD
Nagaon NH Division,
Nagaon
Providing, placing and fixing in
position Chemical rebar fastners
(of M/s Hilti or M/s Sika or approved
equivalent conforming to Europian
standard CSTB/ETA and Civil Aid
standard) of vaious diameters in
Piers.
8/12/2019 Esstt Bridge
45/510
8/12/2019 Esstt Bridge
46/510
8/12/2019 Esstt Bridge
47/510
8/12/2019 Esstt Bridge
48/510
Item
No.Particulars/Descrption of items Unit
Total
Quantit
Rate in
Rs.Amount (Rs.)
1 2 3 4 5 6
Dismantling of Structures (Dismantling of existing
structures like culverts, bridges, retaining walls and other
structure comprising of masonry, cement concrete, wood
work, steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material,disposal of
unserviceable material and stacking the serviceable
material with all lift and lead of 1000 metresII) By Mechanical Means
(a) Cement concrete grade M-15 & M-20
Wing wall- 197.12 356.00 70,175.00
(b) Prestressed/ Reinforced cement grade M-20 & 197.14 573.00 112,963.00
FoundationExcavation for Structures (Earth work in excavation of
foundation of structures as per drawing and technicalspecification, including setting out, construction of shoring and
bracing, removal of stumps and other deleterious matter,
dressing of sides and bottom and backfilling with approved
material.
I.Ordinary Soil
B.Mechanical means
(II) With dewatering
(i) upto 3m depth Cum 317.72 54.00 17,157.00
Plain/Reinforced Cement concrete, in open Foundation
complete as per Drawing and Technical Specifications
including steel shuttering formwork.
(p) With plasticser (Master plast PL-1/SPL-2 or
equivalent),air entraining and water reducing plasticiser
(Masterplast PAE or equivalent) and accelerating
plasticiser (Masterplast ACPL or equivalent) conforming
to IS-9103-1999.
Cum
A.PCC Grade M15 Cum 10.16 6514.00 66,209.00
H.RCC Grade M35
(II) Using Batching plant Transit mixer and concrete
pump
Cum 67.76 9030.00 611,873.00
Reinforcement in Foundation: Supplying, fitting and placing un-
coated TMT bar reinforcement in foundation complete as per
drawing and technical specifications
(a) From Primary Sources:
TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel
(i) TMT Corrosion Resistant Steel (CRS) reinforcement
bar of Fe-500 N/mm2
tonne 6.78 73279.00 496,539.00
Substructure
Plain/Reinforced Cement concrete, in Substructure
complete as per Drawing and Technical Specifications
(P)With plasticiser (Masterplast PL-1/SPL-2 or
equivalent),air entraining and water reducing plasticiser
(Masterplast PAE or equivalent) and accelerating
plasticiser(Masterplast ACPL or equivalent) conforming
to IS-9103-1999
H. RCC Grade M 35
a) Height up to 5.0 m
Name of Work: 4 Lane Connectivity from Nagaon to Itanagar in Arunachal Pradesh under
SARDP NE Work (Phase A). 4 Laning of NH 52 from the end of Biswanath Chariali by-pass
(Km 208.00) to Gohpur (km 265.5) (Total Length = 57.50 km) in Sonitpur district in the state
of Assam Ref : Based on SOR 2013-2014 for Roads and Bridge Works,PWD,Assam.
Esstt for Repairing of existing br No.223/4,Ch-222595
5/13.5
1/2.4
2/12.1
3/12.8
4/12.40
8/12/2019 Esstt Bridge
49/510
Item
No.Particulars/Descrption of items Unit
Total
Quantit
Rate in
Rs.Amount (Rs.)
1 2 3 4 5 6
Case II : W ith Batching plant, Transit Mixer and
concrete Pump.
Cum 39.37 9169.00 361,008.00
Supplying, fitting and placing TMT bar reinforcement in
substructure complete as per drawing and technical
specifications
MT
(a) From Primary Sources:
TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel
(i) TMT Corrosion Resistant Steel (CRS) reinforcement
bar of Fe-500 N/mm2
Tonne 3.94 73343.00 288,752.00
Super Structure
Furnished and placing reinforcement/Prestressed
cement concrete in superstructure as per drawing and
Technical Specifications.
(P) With plasticiser ( Masterplast PL-1/SPL-2 or
equivalent ), air entraining and water reducing plasticiser
( Masterplast PAE or equivalent) and accelerating
plasticiser ( Masterplast ACPL or
equivalent) conforming to IS-9103-1999.
B.RCC GRADE M 25
Case II : Using Batching Plant, Transit Mixer andConcrete Pump
ii) For T-Beam and Slab
a) Height up to 5.0 m Cum 53.96 10591.00 571,448.00
Reinforcement in Super Structure: Supplying, fitting and
placing TMT bar reinforcement in super-structure
including splicing complete as per drawing and technical
specifications
(a) From Primary Sources:
TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel
(i) TMT Corrosion Resistant Steel (CRS) reinforcement
bar of Fe-500 N/mm2
tonne 4.32 77554.00 334,761.00
Filler joint
(i)'Providing & fixing 2 mm thick corrugated copper plate
in expansion joint complete as per drawing & Technical
Specification.
metre 36.00 1640.00 59,040.00
ii) 'Providing & fixing 20 mm thick compressible fibre
board in expansion joint complete as per drawing &
Technical Specification.
metre 36.00 558.00 20,088.00
(iii)'Providing and fixing in position 20 mm thick
premoulded joint filler in expansion joint for fixed ends of
simply supported spans not exceeding 10 m to cater for
a horizontal movement upto 20 mm, covered with
sealant complete as per drawing and technical
specification.
metre 36.00 317.00 11,412.00
(iv)'Providing and filling joint sealing compound as per
drawings and technical specifications with coarse sand
and 6% bitumen by weight.
metre 36.00 17.00 612.00
8/14.2
6/13.6
7/14.1
9/14.18
8/12/2019 Esstt Bridge
50/510
Item
No.Particulars/Descrption of items Unit
Total
Quantit
Rate in
Rs.Amount (Rs.)
1 2 3 4 5 6
Reinforced Cement Concrete Crash Barrier(Provision
of an Reinforced cement concrete crash barrier at the
edges of the road, approaches to bridge structures and
medians,constructed with concrete with HYSD/TMT
reinforcement conforming to IRC:21 and dowel bar
25mm dia, 450mm long at expansion joints filled with pre
moulded asphalt fil ler board, keyed to the structure on
which it is built and installed as per design given in the
enclouser to MOST circular No. RW/NH-33022/1/94-DO
III dated June 1994 as per dimension in the approved
drowing and at locations directed by the engineer,all as
specified.B. M 40 grade concrete metre 54.72 4170.00 228,183.00
11/14.7 Construction ofRCC railing of M30 Grade in-situ with 20
mm nominal size aggregate, true to line and grade,
tolurence of vertical RCC post not to exceed 1 in 500,
centre to centre spacing between vertical post not to
exceed 2000 mm, leaving adequat space between
vertical posts for expansion, complete as per approved
drawings and technical specifications.
metre 27.36 2044.00 55,924.00
Reinforced cement concrete approach slab includingreinforcement and formwork complete as per drawing
and Technical specification
a) With TATA make TMT CRS (Fe-500) grade rebar Cum 27.60 12025.00 331,890.0013/14.10 PCC M15 grade levelling course below approach slab
complete as per drawing and technical specification
Cum 27.60 5498.00 151,745.00
14/14.9 Drainage Spouts complete as per drawing and
Technical specification
Each 4.00 10197.00 40,788.00
15/13.8 Providing weep holes in brick mansonry/plain/reinforced
concrete abutment, wing wall/return wall with 100 mm dia
AC pipe, extending through the full width of the structure
with slope of IV:20H towards drawing foce, complete as
per drawing and technical specification
Each 56.00 204.00 11,424.00
ProvidingSparkle Solar Road Studs, manufactured by
Tata B.P. Solar India Ltd. Of size (125mmx125mm),
90mm height (from
bottom of shank to the top of stud) with detachable
battery, m6LEDs-three on each side for Bi-directional
studs/3 LEDs on one side for unidirectional studs, ultra
bright LED in amber and red colour, weight per stud
700+25 gms, flash rate of 50-65 times per
minute completely water resistant and weather proof with
replacement warranty and free maintenance fro one year
from the date of installation of stud on road-(installation
should be made using adhesives and procedures
recommended by manufacturer under the supervision oftheir com etent technician .a) Bi-directional Stud Each 3500.00
b) Uni-directional Stud Each 4.00 3400.00 13,600.0017/8.51 Providing relfective pavement marker with Micro
prismatic lens in both direction having thermoplastic body
adhering to the specification and guidelines of
MoSRT&H's fixed to the road surface using the
adhesives and the procedures recommended by the
manufacturers with three months replacement warranty
and free maintenance.
Each 18.00 298.00 5,364.00
10/8.22
12/14.11
16/8.47
8/12/2019 Esstt Bridge
51/510
Item
No.Particulars/Descrption of items Unit
Total
Quantit
Rate in
Rs.Amount (Rs.)
1 2 3 4 5 618/16.1 Removal of existing cement concrete wearing coat
including its disposal complete as per Technical
specification without causing any detrimental effect to
any part of the bridge structure and removal of
dismantled material with all lifts and lead upto
1000.(Thickness 75mm.)
Sqm 145.20 78.00 11,326.00
19/16.17 Replacement of Expansion Jointscomplete as per drawings. metre 25.50 3628.00 92,514.00
20/16.2 Removal of existing asphaltic wearing coatcomprising
of 50 mm thick asphaltic concrete laid over 12 mm thick
mastic asphalt including disposal with all lift and lead
upto 1000m.
Sqm 164.56 59.00 9,710.00
Providing, placing and fixing in position Chemical rebar
fastners(of M/s Hilti or M/s Sika or approved equivalent
conforming to Europian standard CSTB/ETA and Civil
Aid standard) of vaious diameters in Piers.
Each
(a)12 mm dia re-bar fastners 25% of 171 Each 42.74 500.00 21,368.00(b)16 mm dia re-bar fastners 25% of 171 Each 42.74 700.00 29,915.00(C) 20 mm dia re-bar fastners 25% of 171 Each 42.74 750.00 32,052.00
(d)25 mm dia re-bar fastners 25% of 171 Each 42.74 800.00 34,188.00
4,108,818.00
22/16.53
21/16.28
Total-
Executive Engineer, PWD
Nagaon NH Division,Nagaon
(A)'Supplying and applying Epoxy based bonding agent
Masterbond EP of Choksey Chemicals or euivalent @
0.50 Lit pe sqm after totally saturating the cleaned
Sqm27.34 614.00 16,790.00
8/12/2019 Esstt Bridge
52/510
Sl.
No.
Item
No.
Unit Qty for 2-
Lane1 2.4
2 98.56 Cm 197.12
2 0.275 0.25 0.9 15 Cm 1.86
2 2 0.2 0.175 23.235 Cm 3.25
2 0.5 0.2 27.36 Cm 5.472 0.82 9.4 3.95 Cm 60.89
2 0.82 0.25 3.95 Cm 1.62
2 0.7+1.0
2
3.95 4.461 Cm 29.96
1 1 3.95 4.461 Cm 17.62
19.36 3.95 1 Cm 76.47
Cm 197.14
2 12.1 19.36 3.5 2.16 m3 146.36
2 3.5 6.12 4.0 m3 171.36
m3
317.72
3 12.8 19.36 3.5 0.15 m3 10.16
10.16
4 12.8 19.36 1 3.5 67.76
67.76
5 12.40 100 67.76 kg 6776.00
kg 6776.00
Total= Tonne 6.78
6 13.5 Substructure(M35)-
20.7+1.0
23.15 4.461 m
3 23.89
1 1.0 4.46 3.15 m3 14.05
2 0.25 3.5 0.82 m3 1.435
m3 39.37
7 13.6 100 39.37 Kg 3937.00
Kg 3937.00
Tonne 3.94
8 14.1 Superstructure RCC (M25)-
2 3.5 9.4 0.82 m3 53.956
m
3 53.956
9 14.2 53.96 80 Kg 4316.48
Kg 4316.48
Tonne 4.32
10 14.9 2.00 2.00 Nos. 4.00
3 12.00 Nos. 36.00
3 12.00 Nos. 36.00
3 12.00 Nos. 36.00
3 12.00 Nos. 36.00
Total=
Total=
Reinforcement in Superstructure-
Total=
Repairing Quantity Calculation for Br. No.223/4,Ch-222595
Post -
Rail-
Kerb-
Slab-
Dirt wall-
Raft-
Dismantling (M20):(ii) (A) Cement concrete grade M-15 & M-20.
Wing Wall-
(B) Prestressed/ Reinforced cement grade M-20 & above.
Abut/Pier-
Total=
Earth work in or foundation of structures
as per drawings & technical
specification including setting out.(Upto
3m)-
Total=
PCC M15-
Total=
RCC M35 (open foundation)-
Total=
Reinforcement in foundation-
Total=
Total=
Reinforcement in Substructure-
Total=
Total=
11 14.18 Filler jointProviding & fixing 20 mmthick compressible fibre board in
expansion joint complete as per drawing
& Technical Specification.
Drainage Spoutscomplete as per
drawing and Technical specification.
8/12/2019 Esstt Bridge
53/510
Sl.
No.
Item
No.
Unit Qty for 2-
Lane12 14.10 2 11.5 4 0.3 m
3 27.60
13 14.11 2 11.5 4 0.3 m3 27.60
14 14.7 1 27.36 m 27.36
15 8.22 2 27.36 m 54.72
16 16.1 7.5 19.36 145.20
17 16.17 3 8.5 25.50
18 16.2 8.5 19.36 metre 164.56
19 13.8 2 28 Nos. 56.00
20 8.47 4 Nos. 4.00
21 8.51 18 Nos. 18.00
0.8 2 0.25 sqm 0.40
2 0.7+1.02
4.461 sqm 7.58
19.36 1 sqm 19.36
27.34
Providing 'Sparkle Solar Road
Studs,manufactured by Tata B.P.Solar
India Ltd. Of size (125mmx125mm)
,90mm height (frombottom of shank to
the top of stud)with detachable battery.
PCC M15 grade levelling coursebelow
approach slab complete as per drawing
and technical specification
Reinforced cement concreteapproach
slabincluding reinforcement and
formwork complete as per drawing and
Technical specification.Construction of RCC Railingof M30
Grade in-situ with 20 mm nominal size
aggregate, true to line and grade,
tolurence of vertical RCC post not to
exceed 1 in 500, centre to centre
spacing between vertical post not to
exceed 2000 mm.
Reinforced Cement Concrete Crash
Barrier (Provision of an Reinforced
cement concrete crash barrier at the
edges of the road,approaches to bridge
structures and medians, constructed
with M-20 grade concrete.
Removal of existing cement concrete
wearing coatincluding its disposalcomplete as per Technical specification
without causing any detrimental effect to
any part of the bridge structure and
removal of dismantled material with all
lifts and lead upto 1000.(Thickness
75mm.)Replacement of Expansion Joints
complete as per drawings.
Removal of existing asphaltic wearing
coatcomprising of 50 mm thick
asphaltic concrete laid over 12 mm thick
mastic asphalt including disposal with
all lift and lead upto 1000m.
Providing weep holesin brick
mansonry/plain/reinforced concrete
abutment, wing wall/return wall with 100
mm dia AC pipe,
RPM: Providingrelfective pavement
marker with Micro prismatic lens in both
direction having thermoplastic body
adhering to the specification.22 16.28 Supplying and applying Epoxy basedbonding agentMasterbond EP of
Choksey Chemicals or euivalent @
0.50 Lit pe sqm after totally saturating
the cleaned concrete surface.Total-
8/12/2019 Esstt Bridge
54/510
Sl.
No.
Item
No.
Unit Qty for 2-
Lane23 16.53 102.564
0.6
Each 171
Executive Engineer, PWD
Nagaon NH Division,
Nagaon
Providing, placing and fixing in position
Chemical rebar fastners(of M/s Hilti or
M/s Sika or approved equivalent
conforming to Europian standard
CSTB/ETA and Civil Aid standard) of
vaious diameters in Piers.
8/12/2019 Esstt Bridge
55/510
8/12/2019 Esstt Bridge
56/510
Item
No.Particulars/Descrption of items Unit
Total
Quantity
Rate in
Rs.Amount (Rs.)
1 2 3 4 5 6
(i) TMT Corrosion Resistant Steel (CRS)
reinforcement bar of Fe-500 N/mm2
Tonne 31.64 73343.00 2,320,393.00
Super StructureFurnishing and Placing Reinforced/Prestressed cement
concrete in super-structure as per drawing and Technical
Specification' including steel shuttering formwork.
(P) With plasticiser ( Masterplast PL-1/SPL-2 orequivalent ), air entraining and water reducing
plasticiser ( Masterplast PAE or equivalent) and
accelerating plasticiser ( Masterplast ACPL or
equivalent) conforming
to IS-9103-1999.
B.'RCC Grade M25
Case II : Using Batching Plant, Transit Mixer and
Concrete Pump
ii) For T-Beam and Slab
a) Height up to 5.0 m Cum 174.280 10591.00 1,845,800.007/14.2 Reinforcement in Super Structure: Supplying,
fitting and placing TMT bar reinforcement in super-
structure including splicing complete as per
drawing and technical specifications(a) From Primary Sources:
TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel
(i) TMT Corrosion Resistant Steel (CRS)
reinforcement bar of Fe-500 N/mm2
MT 12.15 77554.00 942,437.00
8/14.18 Filler joint
(i)'Providing & fixing 2 mm thick corrugated copper
plate in expansion joint complete as per drawing &
Technical Specification.
metre 24.000 1640.00 39,360.00
ii) 'Providing & fixing 20 mm thick compressible
fibre board in expansion joint complete as per
drawing & Technical Specification.
metre 24.000 558.00 13,392.00
(i ii )'Providing and fixing in position 20 mm thick
premoulded joint fil ler in expansion joint for fixedends of simply supported spans not exceeding 10
m to cater for a horizontal movement upto 20 mm,
covered with sealant complete as per drawing and
technical specification.
metre 24.000 317.00 7,608.00
(iv)'Providing and filling joint sealing compound as
per drawings and technical specifications with
coarse sand and 6% bitumen by weight.
metre 24.00 17.00 408.00
9/14.4 Providing and laying Cement concrete wearing
coat M-30 grade including reinforcement complete
as per drawing and Technical Specifications
232.56 12993.00 3,021,653.00
10/8.22 Reinforced Cement Concrete Crash
Barrier(Provision of an Reinforced cement
concrete crash barrier at the edges of the road,approaches to bridge structures and medians,
constructed with concrete with HYSD/TMT
reinforcement conforming to IRC:21 and dowel bar
25mm dia,450mm long at expension joints fi lled
with free moulded asphalt filler board, keyed to the
structure on which it is built and installed as per
design given in the enclouser to MOST circuler No.
RW/NH - 33022/1/94-DO III dated June 1994 as
per dimension in the approved drawing and at
locations directed by the engineer, all as specified.
6/14.1
8/12/2019 Esstt Bridge
57/510
Item
No.Particulars/Descrption of items Unit
Total
Quantity
Rate in
Rs.Amount (Rs.)
1 2 3 4 5 6
B. M 40 grade concrete metre 54.72 4170.00 228,183.00
11/Analy
sis Rate
HAND RAIL
Providing and fixing hand rail over the crash barrier
consisting of MS base plate, embedded fastener
and nuts, MS vertical plates and pipe etc. as
shown in the drawing and as per specifications, All
the railing components as mentioned above to be
hot dip gal vanished with a zinc coating of at least175gm/sqm. The thickness of plates to be as
shown in the drawings and pipe to be 65NB heavy
class with a weight not less than 7.92 kg/m and
conforming to IS: 1161-1979. Item to include all
incidental works required to complete the work as
directed by the Engineer- in-charge. Management
shall be made for the length of the pipe only. (Rate
from Annexure-I)
metre 54.72 1475.00 80,712.00
12/14.7 Construction of RCC railing of M30 Grade in-situ
with 20 mm nominal size aggregate, true to line
and grade, tolurence of vertical RCC post not to
exceed 1 in 500, centre to centre spacing between
vertical post not to exceed 2000 mm, leavingadequat space between vertical posts for
expansion, complete as per approved drawings
and technical s ecifications.
metre 27.36 2044.00 55,924.00
13/14.11 Reinforced cement concrete approach slab
including reinforcement and formwork complete as
per drawing and Technical specification
a) With TATA make TMT CRS (Fe-500) grade
rebar
Cum 28.80 12025.00 346,320.00
14/14.10 PCC M15 grade levelling course below approach
slab complete as per drawing and technical
specification
Cum, 14.40 5498.00 79,172.00
15/14.9 Drainage Spouts complete as per drawing and
Technical specification.
Each 8.00 10197.00 81,576.00
16/14.16 Painting on concrete surface (Providing and
applying 2 coats of water based cement paint to
unplastered concrete surface after cleaning the
surface of dirt, dust, oil, grease, efflorescence and
applying paint @ of 1 litre for 2 Sq.m.)
(B) For RCC Railing RM 82.08 160.00 13,133.00
17/13.9 Back filling behind Abutment ,Wing wall and
Return Wall complete as per drawing and technical
specification.
Cum
(A) Granular material Cum 506.98 1524.00 772,632.00
18/13.8 Providing weep holes in brick
mansonry/plain/reinforced concrete abutment,
wing wall/return wall with 100 mm dia AC pipe,
extending through the full width of the structure
with slope of IV:20H towards drawing foce,
complete as per drawing and technicalspecification
Each 40.00 204.00 8,160.00
8/12/2019 Esstt Bridge
58/510
Item
No.Particulars/Descrption of items Unit
Total
Quantity
Rate in
Rs.Amount (Rs.)
1 2 3 4 5 6
19/8.4 Retro reflectorised Traffic sign:
Providing and erecting of Retro-Reflectrorised
cautionary, mandatory & informatory sign as per
IRC: 67 made of high intensity encapsulated lens
type reflective sheeting vide clause 801.3, fixed
over aluminium sheeting, 2 mm thick f ixed on an
angle iron of 25x25x4mm supported on a mild steel
angle iron post 75mm x 75mm x 6mm firmly f ixedto the ground by means of properly design
foundation with M-15 grade Cement concrete
45cm x 45cm x 60cm, 60cm below ground level as
per approved drawing and sign. ( All the Steel work
must be Tata/Sail/or any other approved brand)
(V) 80cmm x 45 cm rectangular Each 17.28 5200.00 89,856.00
20/8.47 Providing Sparkle Solar Road Studs,
manufactured by Tata B.P. Solar India Ltd. Of size
(125mmx125mm), 90mm height (from
bottom of shank to the top of stud) with detachable
battery, m6LEDs-three on each side for Bi-
directional studs/3 LEDs on one side for
unidirectional studs, ultra bright LED in amber andred colour, weight per stud 700+25 gms, flash rate
of 50-65 times per
minute completely water resistant and weather
proof with replacement warranty and free
maintenance fro one year from the date of
installation of stud on road-(installation should be
made using adhesives and procedures
recommended by manufacturer under the
su ervision of their com etent technician .a) Bi-directional Stud Each 3500.00
b) Uni-directional Stud Each 4.00 3400.00 13,600.0020/8.51 Providing relfective pavement marker with Micro
prismatic lens in both direction having
thermoplastic body adhering to the specification
and guidelines of MoSRT&H's fixed to the road
surface using the adhesives and the procedures
recommended by the manufacturers with three
months replacement warranty and free
maintenance.
Each 60.00 298.00 17,880.00
Protection work
21/15.10 Curtain wall complete as per drawing and
Technical specification
A. Stone masonry in cement mortar (1:3) Cum 4333.00 0.00
B. Cement concrete Grade M15 Cum 90.70 7046.00 639,073.00
22/15.11 Flexible Apron :Construction of flexible apron 1 m
thick comprising of loose stone boulders weighing
not less than 40 kg beyond curtain wall.
Cum 206.28 1485.00 306,326.00
23/15.9 Dry rubble Flooring, Construcytion of dry rubbl
flooring at cross drainage works for relatively less
important works
Cum 256.47 1679.00 430,614.00
22,187,585.00Total-
Executive Engineer, PWD
Nagaon NH Division,
Nagaon
8/12/2019 Esstt Bridge
59/510
7,490,574.00
8/12/2019 Esstt Bridge
60/510
5,663,192.00
8/12/2019 Esstt Bridge
61/510
8/12/2019 Esstt Bridge
62/510
7,657,806.00
1,376,013.00
8/12/2019 Esstt Bridge
63/510
Sl.
No.
Item
No.
Unit Qty for 2-
Lane
2 3.5 5.5 12 m3 462.00
2 19.36 1.25 12 580.80
2 0.3 1.5 12 10.80
2 0.3 1.5 19.36 17.42
2 30.56+19.362
0.45 5.6 215.61
15 0.45 19.36 130.68
30.56 6 0.75 137.52
30.56 3 0.75 68.76
30.56 2.5 1.85 141.34
30.56 2 1.5 91.68
4 6.08+1.82
7.92 2 249.64
2106.25
PCC M-15 = 12 18.86 0.15 m3 33.95
c/wall 1 15.7 m3 15.70
1 156.75 m3 156.75
15 19.36 0.15 43.56
2 30.56+19.362
0.15 5.6 41.93
291.89
RCC M35(open
foundation)19.36 1.4 12 m
3 325.25
2 0.25 1.5 12 m3 9.00
2 0.25 1.5 18.86 m3 14.15
m/wall 2 1.2 4.5 3 m3 32.40
380.79Reinforcement in foundation =
25 mm dia 33.00 120 kg 15277.78
20 mm dia 26.8 120 kg 7940.74
12 mm dia 10 64.52 kg 573.51
12 mm dia 2 430 kg 764.44
m/wall 100 32.4 kg 3240.00
kg 27796.47
Total= Tonne 27.80
Substructure (M35) RCC
Dirt wall = 2 0.82 12 0.25 m3 4.92
Abutment cap = 2 0.7 12 0.225 m3 3.78
Abutment = 2 0.7+1.42
4.461 12 m3 112.42
Pier cap 1 0.225 12 m3 2.70
Pier 1 12 4.461 m3 53.53
M/wall 20.2+0.45
24.5 5.881 m
3 17.20
194.55
6 13.5 Substructure (M20) PCC
Wing wall 1 191.99 m3 191.99
Quantity Calculation fo Br. No.223/4 , Ch-222595
Total=
Total=
Earth work or
foundation of
structures as per
drawings & technical
specification including
setting out
12.11
12.82
12.83
12.404
13.55
Approach base
Floor apron
Total =
Total =
Total=
8/12/2019 Esstt Bridge
64/510
Reinforcement in substucture-
Dirt wall = 12 mm dia 2 6 26.55 kg 283.20
12 mm dia 2 0.95 2 86 kg 290.49
Abutment cap = 12 mm dia 2 10 13.5 kg 240.00
12 mm dia 2 1.85 86 kg 282.84
Pier Cap 12 mm dia 1 10 13.5 kg 120.00
12 mm dia 1 1.85 86 kg 141.42
Abutment 28 mm dia 2 2 110 6.512 kg 13866.54
12 mm dia 2 27.3 30 kg 1456.00
12 mm dia 2 30 110 1 kg 5866.67
Pier 28 mm dia 2 80 6.512 kg 5042.38
12 mm dia 1 27.3 30 kg 728.00
12 mm dia 1 30 60 1 kg 1600.00
m/wall 17.2 100 kg 1720.00
kg 31637.54
Tonne 31.64
8 14.1 2 87.14 m3 174.28
9 14.2 2 6.076 MT 12.15
10 14.18 2 12 Nos. 24.00
11 13.14 Elastomeric bearing = Cucm 0.00
12 8.22 2 27.36 m 54.72
13 14.7 1 27.36 27.36
14 14.16 3 27.36 m2 82.08
15 14.4 27.36 8.5 232.56
Total=
Total=
Furnished and placing
reinforcement/Prestressed cement
concrete in SuperstructureM25as per
drawing and Technical Specifications.
Reinforcement in Super Structure:
Supplying, fitting and placing TMT bar
reinforcement in super-structure
including splicing complete as per
drawing and technical specification
Reinforced Cement Concrete Crash
Barrier (Provision of an Reinforced
cement concrete crash barrier at the
edges of the road,approaches to bridge
structures and medians, constructed with
M-20 grade concrete.
Providing and laying Cement concrete
Wearing coatM-30 grade including
reinforcement complete as per drawing
and Technical Specifications.
Construction of RCC Railingof M30
Grade in-situ with 20 mm nominal size
aggregate, true to line and grade,
tolurence of vertical RCC post not toexceed 1 in 500, centre to centre spacing
between vertical post not to exceed 2000
mm.Paintingon concrete surface (Providing
and applying 2 coats of water based
cement paint to unplastered For RCC
Railing
13.67
Filler jointProviding & fixing 20 mm
thick compressible fibre board inexpansion joint complete as per drawing
& Technical Specification.
8/12/2019 Esstt Bridge
65/510
16 14.9 2 4 Nos. 8.00
17 13.9 2 12 4.00 5.281 m3 506.98
18 14.11 2 0.3 12.00 4 m3 28.80
19 14.10 2 0.15 12.00 4 m3 14.40
20 13.8 2 20 Nos. 40.00
21 8.4 17.28 m2 17.28
22 8.51 60 Nos. 60.00
23 8.47 4 Nos. 4.00
24 15.11 206.28 206.28
25 15.9 256.47 m3
256.47
26 15.10 90.7 m3 90.70
27 AnalysisRate
2 27.36 m 54.72
Drainage Spoutscomplete as per
drawing and Technical specification.
Back fillingbehind Abutment ,Wing wall
and Return Wall complete as per
drawing and technical specification with
Granular Material. (A) Granular material .
Executive Engineer, PWD
Nagaon NH Division,
Nagaon
Providing 'Sparkle Solar Road
Studs,manufactured by Tata B.P. Solar
India Ltd. Of siz(125mmx125mm),90mm
height(frombottom of shank to the top of
stud)with detachable battery.
Stone apronFlexible Apron
:Construction of flexible apron 1 m thick
comprising of loose stone boulders
weighing not less than 40 kg beyond
curtain wall.
Flore apron:Dry rubble Flooring,Construcytion of dry rubbl flooring at
cross drainage works for relatively less
important works
Curtain wallcomplete as per drawing
and Technical specification
HAND RAIL
Providing and fixing hand rail over the
crash barrier consisting of MS base
plate, embedded fastener and nuts, MS
vertical plates and pipe etc.
Reinforced cement concreteapproach
slabincluding reinforcement and
formwork complete as per drawing and
Technical specification.
PCC M15 grade levelling coursebelowapproach slab complete as per drawing
and technical specification
Providing weep holesin brick
mansonry/plain/reinforced concrete
abutment, wing wall/return wall with 100
mm dia AC pipe,
Sign board :Retro reflectorised Traffic
sign: Providing and erecting of Retro-
Reflectrorised cautionary, mandatory &
informatory sign as per IRC: 67 made of
high intensity encapsulated lens type
reflective sheeting vide clause 801.3
Providingrelfective pavement marker
with Micro prismatic lens in both direction
having thermoplastic body adhering to
the specification.
8/12/2019 Esstt Bridge
66/510
380.134 41.52 15783.15
490.875 33.00 16198.88
8/12/2019 Esstt Bridge
67/510
Item No. Particulars/Descrption of items UnitTotal
Quantity
Rate in
Rs.Amount (Rs.)
1 2 3 4 5 6
Dismantling of Structures (Dismantling of existingstructures like culverts, bridges, retaining walls and other
structure comprising of masonry, cement concrete, wood
work, steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material,disposal of
unserviceable material and stacking the serviceable
material with all lift and lead of 1000 metres)
II) By Mechanical Means
(a) Cement concrete grade M-15 & M-20
Wing wall- Cm 315.52 356.00 112,326.00
(b) Prestressed/ Reinforced cement grade M-20 & above. Cm 211.17 573.00 121,003.00
FoundationExcavation for Structures (Earth work in excavation of foundation
of structures as per drawing and technical specification,
including setting out, construction of shoring and bracing,
removal of stumps and other deleterious matter, dressing of
sides and bottom and backfilling with approved material.
I.Ordinary Soil
B.Mechanical means
(II) With dewatering
(i) upto 3m depth Cum 386.49 54.00 20,871.00
Plain/Reinforced Cement concrete, in open Foundation
complete as per Drawing and Technical Specifications
including steel shuttering formwork.
(p) With plasticser (Master plast PL-1/SPL-2 or
equivalent),air entraining and water reducing plasticiser
(Masterplast PAE or equivalent) and acceleratingplasticiser (Masterplast ACPL or equivalent) conforming to
IS-9103-1999.
A.PCC Grade M15 Cum 8.57 6514.00 55,851.00
H.RCC Grade M35
(II) Using Batching plant Transit mixer and concrete pump Cum 80.64 9030.00 728,180.00
Reinforcement in Foundation: Supplying, fitting and placing un-
coated TMT bar reinforcement in foundation complete as per
drawing and technical specifications
(a) From Primary Sources:
TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel
(i) TMT Corrosion Resistant Steel (CRS) reinforcement
bar of Fe-500 N/mm2
tonne 8.06 73279.00 590,922.00
Substructure
5/13.5 Plain/Reinforced Cement concrete, in Substructure
complete as per Drawing and Technical Specifications
(P)With plasticiser (Masterplast PL-1/SPL-2 or
equivalent),air entraining and water reducing plasticiser
(Masterplast PAE or equivalent) and accelerating
plasticiser(Masterplast ACPL or equivalent) conforming to
IS-9103-1999
H. RCC Grade M 35
a) Height up to 5.0 m
1/2.4
2/12.1
Name of Work: 4 Lane Connectivity from Nagaon to Itanagar in Arunachal Pradesh under
SARDP NE Work (Phase A). 4 Laning of NH 52 from the end of Biswanath Chariali by-pass
(Km 208.00) to Gohpur (km 265.5) (Total Length = 57.50 km) in Sonitpur district in the state
of Assam Ref : Based on SOR 2013-2014 for Roads and Bridge Works,PWD,Assam.
Esstt for Repairing of existing br No.228/1,Ch-227462
3/12.8
4/12.40
8/12/2019 Esstt Bridge
68/510
Item No. Particulars/Descrption of items UnitTotal
Quantity
Rate in
Rs.Amount (Rs.)
1 2 3 4 5 6
Case II : With Batching plant, Transit Mixer and concrete
Pump.
Cum 80.91 9169.00 741,905.00
Supplying, fitt ing and placing TMT bar reinforcement in
substructure complete as per drawing and technical
specifications
MT
(a) From Primary Sources:
TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel
(i) TMT Corrosion Resistant Steel (CRS) reinforcement
bar of Fe-500 N/mm2
Tonne 8.1 73343.00 593,419.00
Super Structure
Furnished and placing reinforcement/Prestressed cement
concrete in superstructure as per drawing and Technical
Specifications.
(P) With plasticiser ( Masterplast PL-1/SPL-2 or
equivalent ), air entraining and water reducing plasticiser (
Masterplast PAE or equivalent) and accelerating
plasticiser ( Masterplast ACPL or
equivalent) conforming to IS-9103-1999.
B. RCC GRADE M 25
Case II : Using Batching Plant, Transit Mixer and
Concrete Pumpii) For T-Beam and Slab
a) Height up to 5.0 m Cum 33.67 10591.00 356,599.00
Reinforcement in Super Structure: Supplying, fitting and
placing TMT bar reinforcement in super-structure
including splicing complete as per drawing and technical
specifications
(a) From Primary Sources:
TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel
(i) TMT Corrosion Resistant Steel (CRS) reinforcement
bar of Fe-500 N/mm2
tonne 2.7 77554.00 208,900.00
Filler joint
(i)'Providing & fixing 2 mm thick corrugated copper plate in
expansion joint complete as per drawing & TechnicalSpecification.
metre 36.00 1640.00 59,040.00
ii) 'Providing & fixing 20 mm thick compressible fibre
board in expansion joint complete as per drawing &
Technical Specification.
metre 36.00 558.00 20,088.00
(iii)'Providing and fixing in position 20 mm thick
premoulded joint fil ler in expansion joint for fixed ends of
simply supported spans not exceeding 10 m to cater for a
horizontal movement upto 20 mm, covered with sealant
complete as per drawing and technical specification.
metre 36.00 317.00 11,412.00
(iv)'Providing and filling joint sealing compound as per
drawings and technical specifications with coarse sand
and 6% bitumen by weight.
metre 36.00 17.00 612.00
Reinforced Cement Concrete Crash Barrier(Provisionof an Reinforced cement concrete crash barrier at the
edges of the road, approaches to bridge structures and
medians, constructed with concrete with HYSD/TMT
reinforcement conforming to IRC:21 and dowel bar 25mm
dia,450mm long at expension joints filled with free
moulded asphalt filler board, keyed to the structure on
which it is built and installed as per design given in the
enclouser to MOST circuler No. RW/NH - 33022/1/94-DO
III dated June 1994 as per dimension in the approved
drawing and at locations directed by the engineer, all asB. M 40 grade concrete metre 46.72 4170.00 194,823.00
9/14.18
10/8.22
6/13.6
7/14.1
8/14.2
8/12/2019 Esstt Bridge
69/510
Item No. Particulars/Descrption of items UnitTotal
Quantity
Rate in
Rs.Amount (Rs.)
1 2 3 4 5 6
11/14.7 Construction ofRCC railing of M30 Grade in-situ with 20
mm nominal size aggregate, true to line and grade,
tolurence of vertical RCC post not to exceed 1 in 500,
centre to centre spacing between vertical post not to
exceed 2000 mm, leaving adequat space between vertical
posts for expansion, complete as per approved drawings
and technical specifications.
metre 23.36 2044.00 47,748.00
Reinforced cement concrete approach slab including
reinforcement and formwork complete as per drawing and
Technical specification
a) With TATA make TMT CRS (Fe-500) grade rebar Cum 27.60 12025.00 331,890.00
13/14.10 PCC M15 grade levelling course below approach slab
complete as per drawing and technical specification
Cum 27.60 5498.00 151,745.00
14/14.9 Drainage Spouts complete as per drawing and Technical
specification
Each 4.00 10197.00 40,788.00
15/13.8 Providing weep holes in brick mansonry/plain/reinforced
concrete abutment, wing wall/return wall with 100 mm dia
AC pipe, extending through the full width of the structure
with slope of IV:20H towards drawing foce, complete as
per drawing and technical specification
Each 40.00 204.00 8,160.00
Providing Sparkle Solar Road Studs, manufactured byTata B.P. Solar India Ltd. Of size (125mmx125mm),
90mm height (from
bottom of shank to the top of stud) with detachable
battery, m6LEDs-three on each side for Bi-directional
studs/3 LEDs on one side for unidirectional studs, ultra
bright LED in amber and red colour, weight per stud
700+25 gms, flash rate of 50-65 times per
minute completely water resistant and weather proof with
replacement warranty and free maintenance fro one year
from the date of installation of stud on road-(installation
should be made using adhesives and procedures
recommended by manufacturer under the supervision of
their competent technician).a) Bi-directional Stud Each 3500.00
b) Uni-directional Stud Each 4.00 3400.00 13,600.00
17/8.51 Providing relfective pavement marker with Micro
prismatic lens in both direction having thermoplastic body
adhering to the specification and guidelines of
MoSRT&H's fixed to the road surface using the adhesives
and the procedures recommended by the manufacturers
with three months replacement warranty and free
maintenance.
Each 15.00 298.00 4,470.00
18/16.1 Removal of existing cement concrete wearing coat
including its disposal complete as per Technical
specification without causing any detrimental effect to any
part of the bridge structure and removal of dismantled
material with all lifts and lead upto 1000.(Thickness75mm.)
Sqm 115.20 78.00 8,986.00
19/16.17 Replacement of Expansion Jointscomplete as per drawings. metre 25.50 3628.00 92,514.00
20/16.2 Removal of existing asphaltic wearing coatcomprising
of 50 mm thick asphaltic concrete laid over 12 mm thick
mastic asphalt including disposal with all lift and lead upto
1000m.
Sqm 130.56 59.00 7,704.00
(A)'Supplying and applying Epoxy based bonding agent
Masterbond EP of Choksey Chemicals or euivalent @
0.50 Lit pe sqm after totally saturating the cleaned
Sqm46.48 614.00 28,538.00
12/14.11
16/8.47
21/16.28
8/12/2019 Esstt Bridge
70/510
Item No. Particulars/Descrption of items UnitTotal
Quantity
Rate in