1100-FT-121 1 of 137 DATE : SIGMA ENGINEERING WORKS L.L.C ESTIMATES Est No : 250061 Client : Emerson Process Management Project : Enq Ref No : Scope of Work ; Custody transfer metering skid (013-FT-400) Design pressure = 18 bar Description MOC Nos Unit Wt Proc Wt Material (AED) Kg Kg Kg Rate Amount Custody transfer metering skid--Ref: Drg.no.101230810-3-003 Rev.0 (Qty.01No) Skid size; 8.5mtr long x 2.6mtr width x 3mtr height I. Material Cost : - STEEL PIPING Pipe 8 inch x Sch.40 x 12mtr long A106GR.B 1 723.72 723.7 956.76 225 /mtr 2,700 Pipe 4 inch x Sch.40 x 12mtr long A106GR.B 3 723.72 2171.2 956.76 100 /mtr 3,600 Pipe 1.5 inch x Sch.80 x 12mtr long A106GR.B 1 64.92 64.9 64.92 55 /mtr 660 Pipe 3/4 inch x Sch.80 x 12mtr long A106GR.B 1 26.4 26.4 26.4 50 /mtr 600 Pipe 1/2 inch x Sch.80 x 12mtr long A106GR.B 1 19.44 19.4 19.44 40 /mtr 480 Elbow 8 inch x Sch.40 x 90 Degree, LR SA234GR.WPB 5 37 185.0 185.0 500 /Each 2,500 Elbow 1.5 inch x Sch.80 x 90 Degree SA234GR.WPB 2 0.36 0.7 0.7 30 /Each 60 Eq. Tee 8 inch x Sch.40 SA234GR.WPB 5 49.35 246.8 246.8 400 /Each 2,000 Reducer 8 inch x 4 inch x Sch.40 SA234GR.WPB 4 10.7 42.8 42.8 150 /Each 600 WN Type Flange 8 inch x Sch.40 x 150# ASTM A105N 30 24 720.0 720.0 160 /Each 4,800 Blind Type Flange 8 inch x 150# ASTM A105N 2 32 64.0 64.0 390 /Each 780 WN Type Flange 4 inch x Sch.40 x 150# ASTM A105N 4 7 28.0 28.0 70 /Each 280 ASTM A105N 8 1.8 14.4 14.4 60 /Each 480 ASTM A105N 4 0.8 3.2 3.2 45 /Each 180 ASTM A105N 4 0.6 2.4 2.4 40 /Each 160 ASTM A105 4 1.0 4.0 4.0 80 /Each 320 ASTM A105 4 0.5 2.0 2.0 20 /Each 80 U Clamps for 8 inch pipes A36/EQ. 16 2.96 47.3 47.3 90 /Each 1,440 U Clamps for 6 inch pipes A36/EQ. 16 3.47 55.5 55.5 60 /Each 960 Stud bolts + Nuts M24 x 115mm long 24 1.9 45.0 45.0 6 /Each 144 Stud bolts + Nuts M20 x 115mm long 360 1.1 389.3 389.3 6 /Each 2,160 10 inch @110/each, 6 inch @60/each, 1.5 in 2,260 STEEL FRAME WORK UC254 x 254 x 73kg/mtr x 50mtr long S275JR 1 3650 3650 4015 3.2 /kg 12,848 Lifting lug 50 mm thk x 200 x 350mm S355K2G3 6 27.48 165 181.34 5 /kg 907 S275JR 3 63.60 191 209.88 3.2 /kg 672 S275JR 2 112.80 226 248.16 3.2 /kg 794 S275JR 10 112.80 1128 1240.80 3.2 /kg 3,971 S275JR 1 884.00 884 972.40 6.8 /kg 6,612 Grating clip; 4nos/sq.mtr S275JR 100 0.10 10 11.00 6 /no 600 A106GR.B 4 20.34 81 89.50 28 /mtr 672 Additional cost for Spares (10% extra) 3,000 Consumables 10% 8,030 5% on Material 8,296 8,929 LS #REF! Total cost for Materials 65,350 Total cost for Materials with 10% Margin 71,885 II. Fabrication Cost : - Inch Dia --8 inch x Sch.40--10hrs/Joint 600 Hrs Rate 42/hr 25200 Inch Dia --1.5 inch x Sch.80--3 hrs/Joi 60 Hrs Rate 42/hr 2520 Inch Dia --3/4 inch x Sch.80--2 hrs/Joi 20 Hrs Rate 42/hr 840 Pipe havdling Hrs (20% of the total fab 132 Hrs Rate 42/hr 5544 Fabrication cost (marking, cutting) 400 Hrs For marking, cuting 42 Per hrs 16800 Fab. cost of support structurals (set u 700 Hrs For setup & welding 42 Per hrs 29400 Sl No Finish Wt Rate Basis 150# 150# 150# Half coupling 3/4" x 3000# x NPT threaded, male Half coupling 1/2" x 3000# x NPT threaded, FF A193GR.B7/ A194GR.2H A193GR.B7/ A194GR.2H Gaskets ,10" --2nos, 6"-24nos, 1.5"- 6nos SS316L Spiral wound Supports for meters and valves UPN 100 x 10.6 kg/mtr x 6mtr long Supports for platform UPN 160 x 18.8 kg/mtr x 6mtr long Supports for mid platform UPN 160 x 18.8 kg/mtr x 6mtr long Platform gratings-- Load bar size 25 x 5mm, load bar pitch 30mm, cross bar pitch 100mm, serrated, 6mm twisted square, 40kg/mtr x 2600mm width x 8500mm long Handrail pipe 1 1/4 inch x Sch.40 x 6mtr long
Transcript
Page 1: est

1100-FT-121 1 of 79

DATE : 4/3/2011

SIGMA ENGINEERING WORKS L.L.CESTIMATES

Est No : 250061Client : Emerson Process ManagementProject : Enq Ref No : Scope of Work ; Custody transfer metering skid (013-FT-400) Design pressure = 18 bar

Description MOC Nos Proc Wt Material (AED) Remarks

Kg Kg Kg Rate Amount

Custody transfer metering skid--Ref: Drg.no.101230810-3-003 Rev.0 (Qty.01No)

Skid size; 8.5mtr long x 2.6mtr width x 3mtr height

I. Material Cost : -

STEEL PIPING

Pipe 8 inch x Sch.40 x 12mtr long A106GR.B 1 723.72 723.7 956.76 225 /mtr 2,700

Pipe 4 inch x Sch.40 x 12mtr long A106GR.B 3 723.72 2171.2 956.76 100 /mtr 3,600

Pipe 1.5 inch x Sch.80 x 12mtr long A106GR.B 1 64.92 64.9 64.92 55 /mtr 660

Pipe 3/4 inch x Sch.80 x 12mtr long A106GR.B 1 26.4 26.4 26.4 50 /mtr 600

Pipe 1/2 inch x Sch.80 x 12mtr long A106GR.B 1 19.44 19.4 19.44 40 /mtr 480

Elbow 8 inch x Sch.40 x 90 Degree, LR SA234GR.WPB 5 37 185.0 185.0 500 /Each 2,500

Elbow 1.5 inch x Sch.80 x 90 Degree SA234GR.WPB 2 0.36 0.7 0.7 30 /Each 60

Eq. Tee 8 inch x Sch.40 SA234GR.WPB 5 49.35 246.8 246.8 400 /Each 2,000

Reducer 8 inch x 4 inch x Sch.40 SA234GR.WPB 4 10.7 42.8 42.8 150 /Each 600

WN Type Flange 8 inch x Sch.40 x 150# ASTM A105N 30 24 720.0 720.0 160 /Each 4,800

Blind Type Flange 8 inch x 150# ASTM A105N 2 32 64.0 64.0 390 /Each 780

WN Type Flange 4 inch x Sch.40 x 150# ASTM A105N 4 7 28.0 28.0 70 /Each 280

WN Type Flange 1.5 inch x Sch.80 x 150# ASTM A105N 8 1.8 14.4 14.4 60 /Each 480

WN Type Flange 3/4 inch x Sch.80 x 150# ASTM A105N 4 0.8 3.2 3.2 45 /Each 180

WN Type Flange 1/2 inch x Sch.80 x 150# ASTM A105N 4 0.6 2.4 2.4 40 /Each 160

ASTM A105 4 1.0 4.0 4.0 80 /Each 320

ASTM A105 4 0.5 2.0 2.0 20 /Each 80

U Clamps for 8 inch pipes A36/EQ. 16 2.96 47.3 47.3 90 /Each 1,440

U Clamps for 6 inch pipes A36/EQ. 16 3.47 55.5 55.5 60 /Each 960

Stud bolts + Nuts M24 x 115mm long 24 1.9 45.0 45.0 6 /Each 144

Stud bolts + Nuts M20 x 115mm long 360 1.1 389.3 389.3 6 /Each 2,160

Gaskets ,10" --2nos, 6"-24nos, 1.5"-6nos 10 inch @110/each, 6 inch @60/each, 1.5 inc 2,260

STEEL FRAME WORK

UC254 x 254 x 73kg/mtr x 50mtr long S275JR 1 3650 3650 4015 3.2 /kg 12,848

Lifting lug 50 mm thk x 200 x 350mm S355K2G3 6 27.47 165 181.33 5 /kg 907

S275JR 3 63.60 191 209.88 3.2 /kg 672

S275JR 2 112.80 226 248.16 3.2 /kg 794

S275JR 10 112.80 1128 1240.80 3.2 /kg 3,971

S275JR 1 884.00 884 972.40 6.8 /kg 6,612

Grating clip; 4nos/sq.mtr S275JR 100 0.10 10 11.00 6 /no 600

A106GR.B 4 20.34 81 89.50 28 /mtr 672

Additional cost for Spares (10% extra) 3,000

Consumables 10% 8,030 5% on Material 8,296 8,929 LS #REF!

Total cost for Materials 65,350 Total cost for Materials with 10% Margin 71,885

II. Fabrication Cost : -Inch Dia --8 inch x Sch.40--10hrs/Joint x 60J 600 Hrs Rate 42/hr 25200Inch Dia --1.5 inch x Sch.80--3 hrs/Joint x 20 60 Hrs Rate 42/hr 2520Inch Dia --3/4 inch x Sch.80--2 hrs/Joint x 10 20 Hrs Rate 42/hr 840Pipe havdling Hrs (20% of the total fab.hrs) 132 Hrs Rate 42/hr 5544Fabrication cost (marking, cutting) 400 Hrs For marking, cuting 42 Per hrs 16800Fab. cost of support structurals (set up & w 700 Hrs For setup & welding 42 Per hrs 29400

Sl No

Unit Wt

Finish Wt

Rate Basis

Half coupling 3/4" x 3000# x NPT threaded, male

Half coupling 1/2" x 3000# x NPT threaded, FF

A193GR.B7/A194GR.2HA193GR.B7/A194GR.2H

SS316L Spiral wound

Supports for meters and valves UPN 100 x 10.6 kg/mtr x 6mtr long

Supports for platform UPN 160 x 18.8 kg/mtr x 6mtr long

Supports for mid platform UPN 160 x 18.8 kg/mtr x 6mtr long

Platform gratings-- Load bar size 25 x 5mm, load bar pitch 30mm, cross bar pitch 100mm, serrated, 6mm twisted square, 40kg/mtr x 2600mm width x 8500mm long

Handrail pipe 1 1/4 inch x Sch.40 x 6mtr long

Page 2: est

1100-FT-121 2 of 79

Description MOC Nos Proc Wt Material (AED) Remarks

Kg Kg Kg Rate Amount

Sl No

Unit Wt

Finish Wt

Rate Basis

80304III. NDT : -

Radiography test 100% 8"-60 Joints@175/joint, 4"-8 Joints@85/joint, 1. 12,680 MPI on lifting lugs 100% 500 Visual Examination 100% 50 hrs 42 /Hrs 2,100 MPI (wherever RT is not possible) 100% 0 Visits 450 1,200

Blasting & Painting 150 sq.mtr 80 /sq.mtr 12,000 Transport for Painting - 100 MT -

Collection of Free Issue materials from site Delivery to Sigma shop is in Emerson scope MT -

QA/QC Inspection 96 42 /Hrs 4,015 - 125 MT 1,800

Design and Preparartion of Fab Drawings LS 4,000 Packing for Transport LS 3,000 Documentation LS 900 Commercial Loading 1% of Total Value LS

Total Cost for NDT and other works 42,195 IV SKID ASSEMBLING & TESTING

Grating and handrail assembling 4 man, 4day, 8hrs 42 /Hrs 5,376 Skid assembling for hydro testing 3 man, 4day, 8hrs 42 /Hrs 4,032 Hydrotesting at shop 2 man, 2 days,8 hrs 32 Hrs 42 /Hrs 1,344 Installation of all free issue instruments & valves (8nos 10 inch dia valves & meters) 42 /Hrs 6048Trial Testing (Air testing) 3man, 2day,8hrs 42 /Hrs 2016

V Final packing and loading 3man, 2 day, 8 hrs 2,016 Total Cost for assembling and testing 20,832

Total Price = Fab + NDT + Assembling and testing ### 39,108 US $Total Selling Price 215216

Rate in US $ = 58722

Transport upto site (up to JAFZ)

Page 3: est

Skid-27 3 of 79

DATE : 4/3/2011

SIGMA ENGINEERING WORKS L.L.CESTIMATES

Est No : 250061Client : Emerson Process ManagementProject : Enq Ref No : Scope of Work ; Custody transfer metering skid (013-FT-400) Design pressure = 18 bar

Description MOC Nos Proc Wt Material (AED) Remarks

Kg Kg Kg Rate Amount

Custody transfer metering skid--Ref: Drg.no.101230810-3-003 Rev.0 (Qty.01No)

Skid size; 8.5mtr long x 2.6mtr width x 3mtr height

I. Material Cost : -

STEEL PIPING

Pipe 8 inch x Sch.40 x 12mtr long A106GR.B 3 723.72 2171.2 956.76 225 /mtr 8,100

Pipe 1.5 inch x Sch.80 x 12mtr long A106GR.B 1 64.92 64.9 64.92 55 /mtr 660

Pipe 3/4 inch x Sch.80 x 12mtr long A106GR.B 1 26.4 26.4 26.4 50 /mtr 600

Pipe 1/2 inch x Sch.80 x 12mtr long A106GR.B 1 19.44 19.4 19.44 40 /mtr 480

Elbow 8 inch x Sch.40 x 90 Degree, LR SA234GR.WPB 5 37 185.0 185.0 500 /Each 2,500

Elbow 1.5 inch x Sch.80 x 90 Degree SA234GR.WPB 2 0.36 0.7 0.7 30 /Each 60

Eq. Tee 8 inch x Sch.40 SA234GR.WPB 5 49.35 246.8 246.8 400 /Each 2,000

Reducer 8 inch x 4 inch x Sch.40 SA234GR.WPB 4 10.7 42.8 42.8 150 /Each 600

WN Type Flange 8 inch x Sch.40 x 150# ASTM A105N 30 24 720.0 720.0 160 /Each 4,800

Blind Type Flange 8 inch x 150# ASTM A105N 2 32 64.0 64.0 390 /Each 780

WN Type Flange 4 inch x Sch.40 x 150# ASTM A105N 4 7 28.0 28.0 70 /Each 280

WN Type Flange 1.5 inch x Sch.80 x 150# ASTM A105N 8 1.8 14.4 14.4 60 /Each 480

WN Type Flange 3/4 inch x Sch.80 x 150# ASTM A105N 4 0.8 3.2 3.2 45 /Each 180

WN Type Flange 1/2 inch x Sch.80 x 150# ASTM A105N 4 0.6 2.4 2.4 40 /Each 160

ASTM A105 4 1.0 4.0 4.0 80 /Each 320

ASTM A105 4 0.5 2.0 2.0 20 /Each 80

U Clamps for 8 inch pipes A36/EQ. 16 2.96 47.3 47.3 90 /Each 1,440

U Clamps for 6 inch pipes A36/EQ. 16 3.47 55.5 55.5 60 /Each 960

Stud bolts + Nuts M24 x 115mm long 24 1.9 45.0 45.0 6 /Each 144

Stud bolts + Nuts M20 x 115mm long 360 1.1 389.3 389.3 6 /Each 2,160

Gaskets ,10" --2nos, 6"-24nos, 1.5"-6nos 10 inch @110/each, 6 inch @60/each, 1.5 inc 2,260

STEEL FRAME WORK

UC254 x 254 x 73kg/mtr x 50mtr long S275JR 1 3650 3650 4015 3.2 /kg 12,848

Lifting lug 50 mm thk x 200 x 350mm S355K2G3 6 27.47 165 181.33 5 /kg 907

S275JR 3 63.60 191 209.88 3.2 /kg 672

S275JR 2 112.80 226 248.16 3.2 /kg 794

S275JR 10 112.80 1128 1240.80 3.2 /kg 3,971

S275JR 1 884.00 884 972.40 6.8 /kg 6,612

Grating clip; 4nos/sq.mtr S275JR 100 0.10 10 11.00 6 /no 600

A106GR.B 4 20.34 81 89.50 28 /mtr 672

Additional cost for Spares (10% extra) 3,000

Consumables 10% 8,030 5% on Material 8,296 8,929 LS #REF!

Total cost for Materials 67,150 Total cost for Materials with 10% Margin 73,865

II. Fabrication Cost : -Inch Dia --8 inch x Sch.40--10hrs/Joint x 60J 600 Hrs Rate 42/hr 25200Inch Dia --1.5 inch x Sch.80--3 hrs/Joint x 20 60 Hrs Rate 42/hr 2520Inch Dia --3/4 inch x Sch.80--2 hrs/Joint x 10 20 Hrs Rate 42/hr 840Pipe havdling Hrs (20% of the total fab.hrs) 132 Hrs Rate 42/hr 5544Fabrication cost (marking, cutting) 400 Hrs For marking, cuting 42 Per hrs 16800Fab. cost of support structurals (set up & w 700 Hrs For setup & welding 42 Per hrs 29400

80304

Sl No

Unit Wt

Finish Wt

Rate Basis

Half coupling 3/4" x 3000# x NPT threaded, male

Half coupling 1/2" x 3000# x NPT threaded, FF

A193GR.B7/A194GR.2HA193GR.B7/A194GR.2H

SS316L Spiral wound

Supports for meters and valves UPN 100 x 10.6 kg/mtr x 6mtr long

Supports for platform UPN 160 x 18.8 kg/mtr x 6mtr long

Supports for mid platform UPN 160 x 18.8 kg/mtr x 6mtr long

Platform gratings-- Load bar size 25 x 5mm, load bar pitch 30mm, cross bar pitch 100mm, serrated, 6mm twisted square, 40kg/mtr x 2600mm width x 8500mm long

Handrail pipe 1 1/4 inch x Sch.40 x 6mtr long

Page 4: est

Skid-27 4 of 79

Description MOC Nos Proc Wt Material (AED) Remarks

Kg Kg Kg Rate Amount

Sl No

Unit Wt

Finish Wt

Rate Basis

III. NDT : -Radiography test 100% 8"-60 Joints@175/joint, 4"-8 Joints@85/joint, 1. 12,680 MPI on lifting lugs 100% 500 Visual Examination 100% 50 hrs 42 /Hrs 2,100 MPI (wherever RT is not possible) 100% 0 Visits 450 1,200

Blasting & Painting 150 sq.mtr 80 /sq.mtr 12,000 Transport for Painting - 100 MT -

Collection of Free Issue materials from site Delivery to Sigma shop is in Emerson scope MT -

QA/QC Inspection 96 42 /Hrs 4,015 - 125 MT 1,800

Design and Preparartion of Fab Drawings LS 4,000 Packing for Transport LS 3,000 Documentation LS 900 Commercial Loading 1% of Total Value LS

Total Cost for NDT and other works 42,195 IV SKID ASSEMBLING & TESTING

Grating and handrail assembling 4 man, 4day, 8hrs 42 /Hrs 5,376 Skid assembling for hydro testing 3 man, 4day, 8hrs 42 /Hrs 4,032 Hydrotesting at shop 2 man, 2 days,8 hrs 32 Hrs 42 /Hrs 1,344 Installation of all free issue instruments & valves (8nos 10 inch dia valves & meters) 42 /Hrs 6048Trial Testing (Air testing) 3man, 2day,8hrs 42 /Hrs 2016

V Final packing and loading 3man, 2 day, 8 hrs 2,016 Total Cost for assembling and testing 20,832

Total Price = Fab + NDT + Assembling and testing ### 39,108 US $Total Selling Price 217196

Rate in US $ = 59262Electrical and Instrumentation work = US $ 9564 with 25% margin = US $ 12,000

Transport upto site (up to JAFZ)

Page 5: est

Skid-26 5 of 79

DATE : 4/3/2011

SIGMA ENGINEERING WORKS L.L.CESTIMATES

Est No : 250061Client : Emerson Process ManagementProject : Enq Ref No : Scope of Work ; Custody transfer metering skid (013-FT-400) Design pressure = 18 bar

Description MOC Nos Proc Wt Material (AED) Remarks

Kg Kg Kg Rate Amount

Custody transfer metering skid--Ref: Drg.no.101230810-3-003 Rev.0 (Qty.01No)

Skid size; 8.5mtr long x 2.6mtr width x 3mtr height

I. Material Cost : -

STEEL PIPING

Pipe 8 inch x Sch.40 x 12mtr long A106GR.B 3 723.72 2171.2 956.76 225 /mtr 8,100

Pipe 1.5 inch x Sch.80 x 12mtr long A106GR.B 1 64.92 64.9 64.92 55 /mtr 660

Pipe 3/4 inch x Sch.80 x 12mtr long A106GR.B 1 26.4 26.4 26.4 50 /mtr 600

Pipe 1/2 inch x Sch.80 x 12mtr long A106GR.B 1 19.44 19.4 19.44 40 /mtr 480

Elbow 8 inch x Sch.40 x 90 Degree, LR SA234GR.WPB 5 37 185.0 185.0 500 /Each 2,500

Elbow 1.5 inch x Sch.80 x 90 Degree SA234GR.WPB 2 0.36 0.7 0.7 30 /Each 60

Eq. Tee 8 inch x Sch.40 SA234GR.WPB 5 49.35 246.8 246.8 400 /Each 2,000

Reducer 8 inch x 4 inch x Sch.40 SA234GR.WPB 4 10.7 42.8 42.8 150 /Each 600

WN Type Flange 8 inch x Sch.40 x 150# ASTM A105N 30 24 720.0 720.0 160 /Each 4,800

Blind Type Flange 8 inch x 150# ASTM A105N 2 32 64.0 64.0 390 /Each 780

WN Type Flange 4 inch x Sch.40 x 150# ASTM A105N 4 7 28.0 28.0 70 /Each 280

WN Type Flange 1.5 inch x Sch.80 x 150# ASTM A105N 8 1.8 14.4 14.4 60 /Each 480

WN Type Flange 3/4 inch x Sch.80 x 150# ASTM A105N 4 0.8 3.2 3.2 45 /Each 180

WN Type Flange 1/2 inch x Sch.80 x 150# ASTM A105N 4 0.6 2.4 2.4 40 /Each 160

ASTM A105 4 1.0 4.0 4.0 80 /Each 320

ASTM A105 4 0.5 2.0 2.0 20 /Each 80

U Clamps for 8 inch pipes A36/EQ. 16 2.96 47.3 47.3 90 /Each 1,440

U Clamps for 6 inch pipes A36/EQ. 16 3.47 55.5 55.5 60 /Each 960

Stud bolts + Nuts M24 x 115mm long 24 1.9 45.0 45.0 8 /Each 192

Stud bolts + Nuts M20 x 115mm long 360 1.1 389.3 389.3 6 /Each 2,160

Gaskets ,10" --2nos, 6"-24nos, 1.5"-6nos 10 inch @110/each, 6 inch @60/each, 1.5 inc 2,260

STEEL FRAME WORK

UC254 x 254 x 73kg/mtr x 50mtr long S275JR 1 3650 3650 4015 3.2 /kg 12,848

Lifting lug 50 mm thk x 200 x 350mm S355K2G3 6 27.47 165 181.33 5 /kg 907

S275JR 3 63.60 191 209.88 3.2 /kg 672

S275JR 2 112.80 226 248.16 3.2 /kg 794

S275JR 10 112.80 1128 1240.80 3.2 /kg 3,971

S275JR 1 884.00 884 972.40 6.8 /kg 6,612

Grating clip; 4nos/sq.mtr S275JR 100 0.10 10 11.00 6 /no 600

A106GR.B 4 20.34 81 89.50 28 /mtr 672

Additional cost for Spares (10% extra) 3,000

Consumables 10% 7,770 5% on Material 8,296 8,929 LS #REF!

Total cost for Materials 73,631 Total cost for Materials with 10% Margin 80,994

II. Fabrication Cost : -Inch Dia --8 inch x Sch.40--10hrs/Joint x 60J 600 Hrs Rate 42/hr 25200Inch Dia --1.5 inch x Sch.80--3 hrs/Joint x 20 60 Hrs Rate 42/hr 2520Inch Dia --3/4 inch x Sch.80--2 hrs/Joint x 10 20 Hrs Rate 42/hr 840Pipe havdling Hrs (20% of the total fab.hrs) 132 Hrs Rate 42/hr 2940Fabrication cost (marking, cutting) 400 Hrs For marking, cuting 42 Per hrs 16800Fab. cost of support structurals (set up & w 700 Hrs For setup & welding 42 Per hrs 29400

77700

Sl No

Unit Wt

Finish Wt

Rate Basis

Half coupling 3/4" x 3000# x NPT threaded, male

Half coupling 1/2" x 3000# x NPT threaded, FF

A193GR.B7/A194GR.2HA193GR.B7/A194GR.2H

SS316L Spiral wound

Supports for meters and valves UPN 100 x 10.6 kg/mtr x 6mtr long

Supports for platform UPN 160 x 18.8 kg/mtr x 6mtr long

Supports for mid platform UPN 160 x 18.8 kg/mtr x 6mtr long

Platform gratings-- Load bar size 25 x 5mm, load bar pitch 30mm, cross bar pitch 100mm, serrated, 6mm twisted square, 40kg/mtr x 2600mm width x 8500mm long

Handrail pipe 1 1/4 inch x Sch.40 x 6mtr long

Page 6: est

Skid-26 6 of 79

Description MOC Nos Proc Wt Material (AED) Remarks

Kg Kg Kg Rate Amount

Sl No

Unit Wt

Finish Wt

Rate Basis

III. NDT : -Radiography test 100% 8"-60 Joints@175/joint, 4"-8 Joints@85/joint, 1. 12,680 MPI on lifting lugs 100% 500 Visual Examination 100% 50 hrs 42 /Hrs 2,100 MPI (wherever RT is not possible) 100% 0 Visits 450 1,200

Blasting & Painting 150 sq.mtr 80 /sq.mtr 12,000 Transport for Painting - 100 MT -

Collection of Free Issue materials from site Delivery to Sigma shop is in Emerson scope MT -

QA/QC Inspection 96 42 /Hrs 4,015 - 125 MT 1,800

Design and Preparartion of Fab Drawings LS 4,000 Packing for Transport LS 3,000 Documentation LS 900 Commercial Loading 1% of Total Value LS

Total Cost for NDT and other works 42,195 IV SKID ASSEMBLING & TESTING

Grating and handrail assembling 4 man, 4day, 8hrs 42 /Hrs 5,376 Skid assembling for hydro testing 3 man, 4day, 8hrs 42 /Hrs 4,032 Hydrotesting at shop 2 man, 2 days,8 hrs 32 Hrs 42 /Hrs 1,344 Installation of all free issue instruments & valves (8nos 10 inch dia valves & meters) 42 /Hrs 6048Trial Testing (Air testing) 3man, 2day,8hrs 42 /Hrs 2016

V Final packing and loading 3man, 2 day, 8 hrs 2,016 Total Cost for assembling and testing 20,832

Total Price = Fab + NDT + Assembling and testing ### 38,398 US $Total Selling Price 221721

Rate in US $ = 60,497 Electrical and Instrumentation work = US $ 9564 with 25% margin = US $ 12,000

Transport upto site (up to JAFZ)

Page 7: est

Skid-25 7 of 79

DATE : 4/3/2011

SIGMA ENGINEERING WORKS L.L.CESTIMATES

Est No : 250061Client : Emerson Process ManagementProject : Enq Ref No : Scope of Work ; Custody transfer metering skid (013-FT-400) Design pressure = 18 bar

Description MOC Nos Proc Wt Material (AED) Remarks

Kg Kg Kg Rate Amount

Custody transfer metering skid--Ref: Drg.no.101230810-3-003 Rev.0 (Qty.01No)

Skid size; 8.5mtr long x 2.6mtr width x 3mtr height

I. Material Cost : -

STEEL PIPING

Pipe 8 inch x Sch.40 x 12mtr long A106GR.B 3 723.72 2171.2 956.76 225 /mtr 8,100

Pipe 1.5 inch x Sch.80 x 12mtr long A106GR.B 1 64.92 64.9 64.92 55 /mtr 660

Pipe 3/4 inch x Sch.80 x 12mtr long A106GR.B 1 26.4 26.4 26.4 50 /mtr 600

Pipe 1/2 inch x Sch.80 x 12mtr long A106GR.B 1 19.44 19.4 19.44 40 /mtr 480

Elbow 8 inch x Sch.40 x 90 Degree, LR SA234GR.WPB 5 37 185.0 185.0 500 /Each 2,500

Elbow 1.5 inch x Sch.80 x 90 Degree SA234GR.WPB 2 0.36 0.7 0.7 30 /Each 60

Eq. Tee 8 inch x Sch.40 SA234GR.WPB 5 49.35 246.8 246.8 400 /Each 2,000

Reducer 8 inch x 4 inch x Sch.40 SA234GR.WPB 4 10.7 42.8 42.8 150 /Each 600

WN Type Flange 8 inch x Sch.40 x 150# ASTM A105N 30 24 720.0 720.0 160 /Each 4,800

Blind Type Flange 8 inch x 150# ASTM A105N 2 32 64.0 64.0 390 /Each 780

WN Type Flange 4 inch x Sch.40 x 150# ASTM A105N 4 7 28.0 28.0 70 /Each 280

WN Type Flange 1.5 inch x Sch.80 x 150# ASTM A105N 8 1.8 14.4 14.4 60 /Each 480

WN Type Flange 3/4 inch x Sch.80 x 150# ASTM A105N 4 0.8 3.2 3.2 45 /Each 180

WN Type Flange 1/2 inch x Sch.80 x 150# ASTM A105N 4 0.6 2.4 2.4 40 /Each 160

ASTM A105 4 1.0 4.0 4.0 80 /Each 320

ASTM A105 4 0.5 2.0 2.0 20 /Each 80

U Clamps for 8 inch pipes A36/EQ. 16 2.96 47.3 47.3 90 /Each 1,440

U Clamps for 6 inch pipes A36/EQ. 16 3.47 55.5 55.5 60 /Each 960

Stud bolts + Nuts M24 x 115mm long 24 1.9 45.0 45.0 6 /Each 144

Stud bolts + Nuts M20 x 115mm long 360 1.1 389.3 389.3 6 /Each 2,160

Gaskets ,10" --2nos, 6"-24nos, 1.5"-6nos 10 inch @110/each, 6 inch @60/each, 1.5 inc 2,260

STEEL FRAME WORK

UC254 x 254 x 73kg/mtr x 50mtr long S275JR 1 3650 3650 4015 3.2 /kg 12,848

Lifting lug 50 mm thk x 200 x 350mm S355K2G3 6 27.47 165 181.33 5 /kg 907

S275JR 3 63.60 191 209.88 3.2 /kg 672

S275JR 2 112.80 226 248.16 3.2 /kg 794

S275JR 10 112.80 1128 1240.80 3.2 /kg 3,971

S275JR 1 884.00 884 972.40 6.8 /kg 6,612

Grating clip; 4nos/sq.mtr S275JR 100 0.10 10 11.00 6 /no 600

A106GR.B 4 20.34 81 89.50 28 /mtr 672

Additional cost for Spares (10% extra) 3,000

Consumables 10% 8,030 5% on Material 8,296 8,929 LS #REF!

Total cost for Materials 67,150 Total cost for Materials with 10% Margin 73,865

II. Fabrication Cost : -Inch Dia --8 inch x Sch.40--10hrs/Joint x 60J 600 Hrs Rate 42/hr 25200Inch Dia --1.5 inch x Sch.80--3 hrs/Joint x 20 60 Hrs Rate 42/hr 2520Inch Dia --3/4 inch x Sch.80--2 hrs/Joint x 10 20 Hrs Rate 42/hr 840Pipe havdling Hrs (20% of the total fab.hrs) 132 Hrs Rate 42/hr 5544Fabrication cost (marking, cutting) 400 Hrs For marking, cuting 42 Per hrs 16800Fab. cost of support structurals (set up & w 700 Hrs For setup & welding 42 Per hrs 29400

80304

Sl No

Unit Wt

Finish Wt

Rate Basis

Half coupling 3/4" x 3000# x NPT threaded, male

Half coupling 1/2" x 3000# x NPT threaded, FF

A193GR.B7/A194GR.2HA193GR.B7/A194GR.2H

SS316L Spiral wound

Supports for meters and valves UPN 100 x 10.6 kg/mtr x 6mtr long

Supports for platform UPN 160 x 18.8 kg/mtr x 6mtr long

Supports for mid platform UPN 160 x 18.8 kg/mtr x 6mtr long

Platform gratings-- Load bar size 25 x 5mm, load bar pitch 30mm, cross bar pitch 100mm, serrated, 6mm twisted square, 40kg/mtr x 2600mm width x 8500mm long

Handrail pipe 1 1/4 inch x Sch.40 x 6mtr long

Page 8: est

Skid-25 8 of 79

Description MOC Nos Proc Wt Material (AED) Remarks

Kg Kg Kg Rate Amount

Sl No

Unit Wt

Finish Wt

Rate Basis

III. NDT : -Radiography test 100% 8"-60 Joints@175/joint, 4"-8 Joints@85/joint, 1. 12,680 MPI on lifting lugs 100% 500 Visual Examination 100% 50 hrs 42 /Hrs 2,100 MPI (wherever RT is not possible) 100% 0 Visits 450 1,200

Blasting & Painting 150 sq.mtr 80 /sq.mtr 12,000 Transport for Painting - 100 MT -

Collection of Free Issue materials from site Delivery to Sigma shop is in Emerson scope MT -

QA/QC Inspection 96 42 /Hrs 4,015 - 125 MT 1,800

Design and Preparartion of Fab Drawings LS 4,000 Packing for Transport LS 3,000 Documentation LS 900 Commercial Loading 1% of Total Value LS

Total Cost for NDT and other works 42,195 IV SKID ASSEMBLING & TESTING

Grating and handrail assembling 4 man, 4day, 8hrs 42 /Hrs 5,376 Skid assembling for hydro testing 3 man, 4day, 8hrs 42 /Hrs 4,032 Hydrotesting at shop 2 man, 2 days,8 hrs 32 Hrs 42 /Hrs 1,344 Installation of all free issue instruments & valves (8nos 10 inch dia valves & meters) 42 /Hrs 6048Trial Testing (Air testing) 3man, 2day,8hrs 42 /Hrs 2016

V Final packing and loading 3man, 2 day, 8 hrs 2,016 Total Cost for assembling and testing 20,832

Total Price = Fab + NDT + Assembling and testing ### 39,108 US $Total Selling Price 217196

Rate in US $ = 59262Electrical and Instrumentation work = US $ 9564 with 25% margin = US $ 12,000

Transport upto site (up to JAFZ)

Page 9: est

Skid-24 9 of 79

DATE : 4/3/2011

SIGMA ENGINEERING WORKS L.L.CESTIMATES

Est No : 250061Client : Emerson Process ManagementProject : Enq Ref No : Scope of Work ; Custody transfer metering skid (013-FT-400) Design pressure = 18 bar

Description MOC Nos Proc Wt Material (AED) Remarks

Kg Kg Kg Rate Amount

Custody transfer metering skid--Ref: Drg.no.101230810-3-003 Rev.0 (Qty.01No)

Skid size; 8.5mtr long x 2.6mtr width x 3mtr height

I. Material Cost : -

STEEL PIPING

Pipe 8 inch x Sch.40 x 12mtr long A106GR.B 3 723.72 2171.2 956.76 225 /mtr 8,100

Pipe 1.5 inch x Sch.80 x 12mtr long A106GR.B 1 64.92 64.9 64.92 55 /mtr 660

Pipe 3/4 inch x Sch.80 x 12mtr long A106GR.B 1 26.4 26.4 26.4 50 /mtr 600

Pipe 1/2 inch x Sch.80 x 12mtr long A106GR.B 1 19.44 19.4 19.44 40 /mtr 480

Elbow 8 inch x Sch.40 x 90 Degree, LR SA234GR.WPB 5 37 185.0 185.0 500 /Each 2,500

Elbow 1.5 inch x Sch.80 x 90 Degree SA234GR.WPB 2 0.36 0.7 0.7 30 /Each 60

Eq. Tee 8 inch x Sch.40 SA234GR.WPB 5 49.35 246.8 246.8 400 /Each 2,000

Reducer 8 inch x 4 inch x Sch.40 SA234GR.WPB 4 10.7 42.8 42.8 150 /Each 600

WN Type Flange 8 inch x Sch.40 x 150# ASTM A105N 30 24 720.0 720.0 160 /Each 4,800

Blind Type Flange 8 inch x 150# ASTM A105N 2 32 64.0 64.0 390 /Each 780

WN Type Flange 4 inch x Sch.40 x 150# ASTM A105N 4 7 28.0 28.0 70 /Each 280

WN Type Flange 1.5 inch x Sch.80 x 150# ASTM A105N 8 1.8 14.4 14.4 60 /Each 480

WN Type Flange 3/4 inch x Sch.80 x 150# ASTM A105N 4 0.8 3.2 3.2 45 /Each 180

WN Type Flange 1/2 inch x Sch.80 x 150# ASTM A105N 4 0.6 2.4 2.4 40 /Each 160

ASTM A105 4 1.0 4.0 4.0 80 /Each 320

ASTM A105 4 0.5 2.0 2.0 20 /Each 80

U Clamps for 8 inch pipes A36/EQ. 16 2.96 47.3 47.3 90 /Each 1,440

U Clamps for 6 inch pipes A36/EQ. 16 3.47 55.5 55.5 60 /Each 960

Stud bolts + Nuts M24 x 115mm long 24 1.9 45.0 45.0 8 /Each 192

Stud bolts + Nuts M20 x 115mm long 360 1.1 389.3 389.3 6 /Each 2,160

Gaskets ,10" --2nos, 6"-24nos, 1.5"-6nos 10 inch @110/each, 6 inch @60/each, 1.5 inc 2,260

STEEL FRAME WORK

UC254 x 254 x 73kg/mtr x 50mtr long S275JR 1 3650 3650 4015 3.2 /kg 12,848

Lifting lug 50 mm thk x 200 x 350mm S355K2G3 6 27.47 165 181.33 5 /kg 907

S275JR 3 63.60 191 209.88 3.2 /kg 672

S275JR 2 112.80 226 248.16 3.2 /kg 794

S275JR 10 112.80 1128 1240.80 3.2 /kg 3,971

S275JR 1 884.00 884 972.40 6.8 /kg 6,612

Grating clip; 4nos/sq.mtr S275JR 100 0.10 10 11.00 6 /no 600

A106GR.B 4 20.34 81 89.50 28 /mtr 672

Additional cost for Spares (10% extra) 3,000

Consumables 10% 8,030 5% on Material 8,296 8,929 LS #REF!

Total cost for Materials 67,198 Total cost for Materials with 10% Margin 73,917

II. Fabrication Cost : -Inch Dia --8 inch x Sch.40--10hrs/Joint x 60J 600 Hrs Rate 42/hr 25200Inch Dia --1.5 inch x Sch.80--3 hrs/Joint x 20 60 Hrs Rate 42/hr 2520Inch Dia --3/4 inch x Sch.80--2 hrs/Joint x 10 20 Hrs Rate 42/hr 840Pipe havdling Hrs (20% of the total fab.hrs) 132 Hrs Rate 42/hr 5544Fabrication cost (marking, cutting) 400 Hrs For marking, cuting 42 Per hrs 16800Fab. cost of support structurals (set up & w 700 Hrs For setup & welding 42 Per hrs 29400

80304

Sl No

Unit Wt

Finish Wt

Rate Basis

Half coupling 3/4" x 3000# x NPT threaded, male

Half coupling 1/2" x 3000# x NPT threaded, FF

A193GR.B7/A194GR.2HA193GR.B7/A194GR.2H

SS316L Spiral wound

Supports for meters and valves UPN 100 x 10.6 kg/mtr x 6mtr long

Supports for platform UPN 160 x 18.8 kg/mtr x 6mtr long

Supports for mid platform UPN 160 x 18.8 kg/mtr x 6mtr long

Platform gratings-- Load bar size 25 x 5mm, load bar pitch 30mm, cross bar pitch 100mm, serrated, 6mm twisted square, 40kg/mtr x 2600mm width x 8500mm long

Handrail pipe 1 1/4 inch x Sch.40 x 6mtr long

Page 10: est

Skid-24 10 of 79

Description MOC Nos Proc Wt Material (AED) Remarks

Kg Kg Kg Rate Amount

Sl No

Unit Wt

Finish Wt

Rate Basis

III. NDT : -Radiography test 100% 8"-60 Joints@175/joint, 4"-8 Joints@85/joint, 1. 12,680 MPI on lifting lugs 100% 500 Visual Examination 100% 50 hrs 50 /Hrs 2,500 MPI (wherever RT is not possible) 100% 0 Visits 450 1,200

Blasting & Painting 150 sq.mtr 80 /sq.mtr 12,000 Transport for Painting - 100 MT -

Collection of Free Issue materials from site Delivery to Sigma shop is in Emerson scope MT -

QA/QC Inspection 96 42 /Hrs 4,015 - 125 MT 1,800

Design and Preparartion of Fab Drawings LS 4,000 Packing for Transport LS 3,000 Documentation LS 900 Commercial Loading 1% of Total Value LS

Total Cost for NDT and other works 42,595 IV SKID ASSEMBLING & TESTING

Grating and handrail assembling 4 man, 4day, 8hrs 42 /Hrs 5,376 Skid assembling for hydro testing 3 man, 4day, 8hrs 42 /Hrs 4,032 Hydrotesting at shop 2 man, 2 days,8 hrs 32 Hrs 42 /Hrs 1,344 Installation of all free issue instruments & valves (8nos 10 inch dia valves & meters) 42 /Hrs 6048Trial Testing (Air testing) 3man, 2day,8hrs 42 /Hrs 2016

V Final packing and loading 3man, 2 day, 8 hrs 2,016 Total Cost for assembling and testing 20,832

Total Price = Fab + NDT + Assembling and testing ### 39,217 US $Total Selling Price 217649

Rate in US $ = 59386Electrical and Instrumentation work = US $ 9564 with 25% margin = US $ 12,000

Transport upto site (up to JAFZ)

Page 11: est

SIGMA ENGINEERING WORKS L.L.CESTIMATES

Est No : 250061Client : Emerson Process ManagementProject : Enq Ref No : Scope of Work ; Custody transfer metering skid (013-FT-400) Design pressure = 18 bar

Sl No Description MOC Nos Unit Wt

Kg Kg

Custody transfer metering skid--Ref: Drg.no.101230810-3-003 Rev.0 (Qty.01No)Skid size; 12.5mtr long x 2.6mtr width x 3.6mtr height

I. Material Cost : -STEEL PIPINGPipe 20 inch x Sch.40 x 12mtr long A106GR.B 1 2201.04 2201.0Pipe 10 inch x Sch.40 x 12mtr long A106GR.B 4 723.72 2894.9Pipe 1.5 inch x Sch.80 x 12mtr long A106GR.B 1 64.92 64.9Pipe 3/4 inch x Sch.80 x 12mtr long A106GR.B 1 26.4 26.4Pipe 1/2 inch x Sch.80 x 12mtr long A106GR.B 1 19.44 19.4

SA234GR.WPB 2 142.4 284.8

SA234GR.WPB 5 37 185.0Elbow 1.5 inch x Sch.80 x 90 DegreeSA234GR.WPB 2 0.6 1.2Eq. Tee 20 inch x Sch.40 SA234GR.WPB 7 168 1176.0Eq. Tee 10 inch x Sch.40 SA234GR.WPB 7 49.35 345.5Reducer 10 inch x 8 inch x Sch.40 SA234GR.WPB 6 10.7 64.2Reducer 20 inch x 10 inch x Sch.40 SA234GR.WPB 7 99 693.0

ASTM A105N 2 77 154.0Blind Type Flange 20 inch x 150# ASTM A105N 2 123 246.0

ASTM A105N 40 24 960.0

ASTM A105N 6 18 108.0

ASTM A105N 8 1.8 14.4

ASTM A105N 4 0.8 3.2

ASTM A105N 4 0.6 2.4

ASTM A105 4 1.0 4.0

ASTM A105 4 0.5 2.0U Clamps for 20 inch pipes A36/EQ. 24 2.96 71.0U Clamps for 10 inch pipes A36/EQ. 48 3.47 166.4

Stud bolts + Nuts M30 x 170mm long 48 1.9 90.1

Finish Wt

Elbow 20 inch x Sch.40 x 90 Degree, LR

Elbow 10 inch x Sch.40 x 90 Degree, LR

WN Type Flange 20 inch x Sch.40 x 150#

WN Type Flange 10 inch x Sch.40 x 150#

WN Type Flange 8 inch x Sch.40 x 150#

WN Type Flange 1.5 inch x Sch.80 x 300#

WN Type Flange 3/4 inch x Sch.80 x 300#

WN Type Flange 1/2 inch x Sch.80 x 300#

Half coupling 3/4" x 3000# x NPT threaded, male

Half coupling 1/2" x 3000# x NPT threaded, FF

A193GR.B7/

A194GR.2H

Page 12: est

Stud bolts + Nuts M24 x 130mm long 432 1.1 467.2

20 inch @1500/each, 10 inch @110/each, 8 inch STEEL FRAME WORK

S275JR 1 4380 4380S355K2G3 12 27.47 330

S275JR 6 63.60 382

S275JR 6 112.80 677

S275JR 12 112.80 1354

S275JR 1 1300.00 1300Grating clip; 4nos/sq.mtr S275JR 200 0.10 20

A106GR.B 8 20.34 163

Consumables 10%5% on Material 13,753

Total cost for MaterialsTotal cost for Materials with 10% Margin

II. Fabrication Cost : -Inch Dia --20 inch x Sch.40--18hrs/Join 432 Hrs Rate 42/hrInch Dia --10 inch x Sch.40--8 hrs/Joint 720 Hrs Rate 42/hrInch Dia --8 inch x Sch.40--6 hrs/Joint x 36 Hrs Rate 42/hrInch Dia --1.5 inch x Sch.80--3 hrs/Join 60 Hrs Rate 42/hrInch Dia --3/4 inch x Sch.XXS--2 hrs/Joi 20 Hrs Rate 42/hrPipe havdling Hrs (20% of the total fab 242 Hrs Rate 42/hrFabrication cost (marking, cutting) 700 Hrs For marking, cuting Fab. cost of support structurals (set u 800 Hrs For setup & welding

III. NDT : -Radiography test 100%MPI on lifting lugs 100%Visual Examination 100% 60 hrsMPI (wherever RT is not possible) 100% 0 Visits Blasting & Painting 200 sq.mtrTransport for Painting - Collection of Free Issue materials fromDelivery to Sigma shop is in Emerson scopeQA/QC Inspection 149

- Design and Preparartion of Fab DrawingsPacking for TransportDocumentationCommercial Loading 1% of Total Value

Total Cost for NDT and other works

A193GR.B7/

A194GR.2H

Gaskets ,20" --2nos, 10"-34nos, 8"-8nos, 1.5"-6nos

SS316L Spiral wound

long350mm

Supports for meters and valves UPN 100 x 10.6 kg/mtr x 6mtr long

Supports for platform UPN 160 x 18.8 kg/mtr x 6mtr long

Supports for mid platform UPN 160 x 18.8 kg/mtr x 6mtr long

Platform gratings-- Load bar size 25 x 5mm, load bar pitch 30mm, cross bar pitch 100mm, serrated, 6mm twisted square, 40kg/mtr x 2600mm width x 12500mm long

Handrail pipe 1 1/4 inch x Sch.40 x 6mtr long

Additional cost for Spares (10% extra)

20"-2 Joints@175/joint, 10"-90 Joints@85/joint, 1.5" --20 Joints

Transport upto site (up to JAFZ)

Page 13: est

IV SKID ASSEMBLING & TESTINGGrating and handrail assembling 4 man, 8day, 8hrsSkid assembling for hydro testing 3 man, 8day, 8hrsHydrotesting at shop 4 man, 2 days,8 hrs 64 HrsInstallation of all free issue instruments & valves (20nos 10 inch dia valves & meters)Trial Testing (Air testing) 4man, 2day,8hrs

V Final packing and loading 4man, 2 day, 8 hrsTotal Cost for assembling and testing

Total Price = Fab + NDT + Assembling and testingTotal Selling Price

Page 14: est

DATE : 4/3/2011

SIGMA ENGINEERING WORKS L.L.CESTIMATES

Design pressure = 18 bar

Material (AED)

Kg Rate Amount

Custody transfer metering skid--Ref: Drg.no.101230810-3-003 Rev.0 (Qty.01No)

956.76 2600 /mtr 31,200 1021.2 325 /mtr 15,600 64.92 55 /mtr 660 26.4 50 /mtr 600

19.44 40 /mtr 480

284.8 4000 /Each 8,000

185.0 500 /Each 2,500 1.2 60 /Each 120

1176.0 7000 /Each 49,000 345.5 750 /Each 5,250 64.2 200 /Each 1,200

693.0 5000 /Each 35,000

154.0 860 /Each 1,720 246.0 1500 /Each 3,000

960.0 215 /Each 8,600

108.0 160 /Each 960

14.4 60 /Each 480

3.2 45 /Each 180

2.4 40 /Each 160

4.0 160 /Each 640

2.0 40 /Each 160 71.0 240 /Each 5,760

166.4 110 /Each 5,280

90.1 15 /Each 720

Proc Wt Remark

sRate Basis

Page 15: est

467.2 6 /Each 2,592

20 inch @1500/each, 10 inch @110/each, 8 inch 7,620

4818 3.2 /kg 15,418 362.67 5 /kg 1,813

419.76 3.2 /kg 1,343

744.48 3.2 /kg 2,382

1488.96 3.2 /kg 4,765

1430.00 6.8 /kg 9,724 22.00 6 /no 1,200

178.99 28 /mtr 1,344

3,000 12,644

14,614 LS #REF!Total cost for Materials ###

Total cost for Materials with 10% Margin ###

Rate 42/hr 18144Rate 42/hr 30240Rate 42/hr 1512Rate 42/hr 2520Rate 42/hr 840Rate 42/hr 10180.8

For marking, cuting 42 Per hrs 29400 For setup & welding 42 Per hrs 33600

126437

10,050 500

42 /Hrs 2,520 450 2,000

80 /sq.mtr 16,000 100 MT -

Delivery to Sigma shop is in Emerson scope MT - 42 /Hrs 6,246

125 MT 4,000 LS 4,000 LS 3,000 LS 900 LS

Total Cost for NDT and other works 49,216

20"-2 Joints@175/joint, 10"-90 Joints@85/joint, 1.5" --20 Joints

Page 16: est

42 /Hrs 10,752 42 /Hrs 8,064

Hrs 42 /Hrs 2,688 Installation of all free issue instruments & valves (20nos 10 inch dia valves & meters) 42 /Hrs 12096

42 /Hrs 2688 2,688

Total Cost for assembling and testing 38,976 Total Price = Fab + NDT + Assembling and testing ### ###

Total Selling Price 479855

Page 17: est

Skid-23 17 of 79

DATE : 4/3/2011

SIGMA ENGINEERING WORKS L.L.CESTIMATES

Est No : 250061Client : Emerson Process ManagementProject : Enq Ref No : Scope of Work ; Custody transfer metering skid (013-FT-400) Design pressure = 18 bar

Description MOC Nos Proc Wt Material (AED) Remarks

Kg Kg Kg Rate Amount

Custody transfer metering skid--Ref: Drg.no.101230810-3-003 Rev.0 (Qty.01No)

Skid size; 12.5mtr long x 2.6mtr width x 3.6mtr height

I. Material Cost : -

STEEL PIPING

Pipe 20 inch x Sch.40 x 12mtr long A106GR.B 1 2201 2201.0 956.76 2600 /mtr 31,200

Pipe 10 inch x Sch.40 x 12mtr long A106GR.B 4 723.72 2894.9 1021.2 325 /mtr 15,600

Pipe 1.5 inch x Sch.80 x 12mtr long A106GR.B 1 64.92 64.9 64.92 55 /mtr 660

Pipe 3/4 inch x Sch.80 x 12mtr long A106GR.B 1 26.4 26.4 26.4 50 /mtr 600

Pipe 1/2 inch x Sch.80 x 12mtr long A106GR.B 1 19.44 19.4 19.44 40 /mtr 480

Elbow 20 inch x Sch.40 x 90 Degree, LR SA234GR.WPB 2 142.4 284.8 284.8 4000 /Each 8,000

Elbow 10 inch x Sch.40 x 90 Degree, LR SA234GR.WPB 5 37 185.0 185.0 500 /Each 2,500

Elbow 1.5 inch x Sch.80 x 90 Degree SA234GR.WPB 2 0.6 1.2 1.2 60 /Each 120

Eq. Tee 20 inch x Sch.40 SA234GR.WPB 7 168 1176.0 1176.0 7000 /Each 49,000

Eq. Tee 10 inch x Sch.40 SA234GR.WPB 7 49.35 345.5 345.5 750 /Each 5,250

Reducer 10 inch x 8 inch x Sch.40 SA234GR.WPB 6 10.7 64.2 64.2 200 /Each 1,200

Reducer 20 inch x 10 inch x Sch.40 SA234GR.WPB 7 99 693.0 693.0 5000 /Each 35,000

WN Type Flange 20 inch x Sch.40 x 150# ASTM A105N 2 77 154.0 154.0 860 /Each 1,720

Blind Type Flange 20 inch x 150# ASTM A105N 2 123 246.0 246.0 1500 /Each 3,000

WN Type Flange 10 inch x Sch.40 x 150# ASTM A105N 40 24 960.0 960.0 215 /Each 8,600

WN Type Flange 8 inch x Sch.40 x 150# ASTM A105N 6 18 108.0 108.0 160 /Each 960

WN Type Flange 1.5 inch x Sch.80 x 300# ASTM A105N 8 1.8 14.4 14.4 60 /Each 480

WN Type Flange 3/4 inch x Sch.80 x 300# ASTM A105N 4 0.8 3.2 3.2 45 /Each 180

WN Type Flange 1/2 inch x Sch.80 x 300# ASTM A105N 4 0.6 2.4 2.4 40 /Each 160

ASTM A105 4 1.0 4.0 4.0 160 /Each 640

ASTM A105 4 0.5 2.0 2.0 40 /Each 160

U Clamps for 20 inch pipes A36/EQ. 24 2.96 71.0 71.0 240 /Each 5,760

U Clamps for 10 inch pipes A36/EQ. 48 3.47 166.4 166.4 110 /Each 5,280

Stud bolts + Nuts M30 x 170mm long 48 1.9 90.1 90.1 15 /Each 720

Stud bolts + Nuts M24 x 130mm long 432 1.1 467.2 467.2 6 /Each 2,592

20 inch @1500/each, 10 inch @110/each, 8 in 7,620

STEEL FRAME WORK

UC254 x 254 x 73kg/mtr x 60mtr long S275JR 1 4380 4380 4818 3.2 /kg 15,418

Lifting lug 50 mm thk x 200 x 350mm S355K2G3 12 27.47 330 362.67 5 /kg 1,813

S275JR 6 63.60 382 419.76 3.2 /kg 1,343

S275JR 6 112.80 677 744.48 3.2 /kg 2,382

S275JR 12 112.80 1354 1488.96 3.2 /kg 4,765

S275JR 1 ### 1300 1430.00 6.8 /kg 9,724

Grating clip; 4nos/sq.mtr S275JR 200 0.10 20 22.00 6 /no 1,200

A106GR.B 8 20.34 163 178.99 28 /mtr 1,344

Additional cost for Spares (10% extra) 3,000

Consumables 10% 12,644 5% on Material 13,753 14,614 LS #REF!

Total cost for Materials 241,115 Total cost for Materials with 10% Margin 265,226

II. Fabrication Cost : -

Sl No

Unit Wt

Finish Wt

Rate Basis

Half coupling 3/4" x 3000# x NPT threaded, male

Half coupling 1/2" x 3000# x NPT threaded, FF

A193GR.B7/A194GR.2HA193GR.B7/A194GR.2H

Gaskets ,20" --2nos, 10"-34nos, 8"-8nos, 1.5"-6nos

SS316L Spiral wound

Supports for meters and valves UPN 100 x 10.6 kg/mtr x 6mtr long

Supports for platform UPN 160 x 18.8 kg/mtr x 6mtr long

Supports for mid platform UPN 160 x 18.8 kg/mtr x 6mtr long

Platform gratings-- Load bar size 25 x 5mm, load bar pitch 30mm, cross bar pitch 100mm, serrated, 6mm twisted square, 40kg/mtr x 2600mm width x 12500mm long

Handrail pipe 1 1/4 inch x Sch.40 x 6mtr long

Page 18: est

Skid-23 18 of 79

Description MOC Nos Proc Wt Material (AED) Remarks

Kg Kg Kg Rate Amount

Sl No

Unit Wt

Finish Wt

Rate Basis

Inch Dia --20 inch x Sch.40--18hrs/Joint x 34 432 Hrs Rate 42/hr 18144Inch Dia --10 inch x Sch.40--8 hrs/Joint x 90 720 Hrs Rate 42/hr 30240Inch Dia --8 inch x Sch.40--6 hrs/Joint x 6 Jo 36 Hrs Rate 42/hr 1512Inch Dia --1.5 inch x Sch.80--3 hrs/Joint x 20 60 Hrs Rate 42/hr 2520Inch Dia --3/4 inch x Sch.XXS--2 hrs/Joint x 20 Hrs Rate 42/hr 840Pipe havdling Hrs (20% of the total fab.hrs) 242 Hrs Rate 42/hr 10180.8Fabrication cost (marking, cutting) 700 Hrs For marking, cuting 42 Per hrs 29400Fab. cost of support structurals (set up & w 800 Hrs For setup & welding 42 Per hrs 33600

126437III. NDT : -

Radiography test 100% 10,050 MPI on lifting lugs 100% 500 Visual Examination 100% 60 hrs 42 /Hrs 2,520 MPI (wherever RT is not possible) 100% 0 Visits 450 2,000

Blasting & Painting 200 sq.mtr 80 /sq.mtr 16,000 Transport for Painting - 100 MT -

Collection of Free Issue materials from site Delivery to Sigma shop is in Emerson scope MT -

QA/QC Inspection 149 42 /Hrs 6,246 - 125 MT 4,000

Design and Preparartion of Fab Drawings LS 4,000 Packing for Transport LS 3,000 Documentation LS 900 Commercial Loading 1% of Total Value LS

Total Cost for NDT and other works 49,216 IV SKID ASSEMBLING & TESTING

Grating and handrail assembling 4 man, 8day, 8hrs 42 /Hrs 10,752 Skid assembling for hydro testing 3 man, 8day, 8hrs 42 /Hrs 8,064 Hydrotesting at shop 4 man, 2 days,8 hrs 64 Hrs 42 /Hrs 2,688 Installation of all free issue instruments & valves (20nos 10 inch dia valves & meters) 42 /Hrs 12096Trial Testing (Air testing) 4man, 2day,8hrs 42 /Hrs 2688

V Final packing and loading 4man, 2 day, 8 hrs 2,688 Total Cost for assembling and testing 38,976

Total Price = Fab + NDT + Assembling and testing 214,629 58,562 US $Total Selling Price 479855

Rate in US $ = 130929Electrical and Instrumentation work = US $ 9564 with 25% margin = US $ 12,000

20"-2 Joints@175/joint, 10"-90 Joints@85/joint, 1.5" --20 Joints

Transport upto site (up to JAFZ)

Page 19: est

Skid-22 19 of 79

DATE : 4/3/2011

SIGMA ENGINEERING WORKS L.L.CESTIMATES

Est No : 250061Client : Emerson Process ManagementProject : Enq Ref No : Scope of Work ; Custody transfer metering skid (013-FT-400) Design pressure = 18 bar

Description MOC Nos Proc Wt Material (AED) Remarks

Kg Kg Kg Rate Amount

Custody transfer metering skid--Ref: Drg.no.101230810-3-003 Rev.0 (Qty.01No)

Skid size; 8.5mtr long x 2.6mtr width x 3mtr height

I. Material Cost : -

STEEL PIPING

Pipe 10 inch x Sch.40 x 12mtr long A106GR.B 1 723.72 723.7 956.76 325 /mtr 3,900

Pipe 6 inch x Sch.40 x 12mtr long A106GR.B 3 339.12 1017.4 1021.2 150 /mtr 5,400

Pipe 1.5 inch x Sch.80 x 12mtr long A106GR.B 1 64.92 64.9 64.92 55 /mtr 660

Pipe 3/4 inch x Sch.80 x 12mtr long A106GR.B 1 26.4 26.4 26.4 50 /mtr 600

Pipe 1/2 inch x Sch.80 x 12mtr long A106GR.B 1 19.44 19.4 19.44 40 /mtr 480

Elbow 10 inch x Sch.40 x 90 Degree, LR SA234GR.WPB 2 54 108.0 108.0 500 /Each 1,000

Elbow 6 inch x Sch.40 x 90 Degree, LR SA234GR.WPB 3 20.3 60.9 60.9 180 /Each 540

Elbow 1.5 inch x Sch.80 x 90 Degree SA234GR.WPB 2 0.36 0.7 0.7 30 /Each 60

Eq. Tee 12 inch x Sch.40 SA234GR.WPB 2 65 130.0 130.0 1200 /Each 2,400

Eq. Tee 6 inch x Sch.40 SA234GR.WPB 2 33 66.0 66.0 200 /Each 400

Reducer 10 inch x 6 inch x Sch.40 SA234GR.WPB 5 15 75.0 75.0 200 /Each 1,000

Reducer 6 inch x 4 inch x Sch.40 SA234GR.WPB 4 6.5 26.0 26.0 90 /Each 360

WN Type Flange 10 inch x Sch.40 x 300# ASTM A105N 2 41 82.0 82.0 370 /Each 740

Blind Type Flange 10 inch x 300# ASTM A105N 2 58 116.0 116.0 700 /Each 1,400

WN Type Flange 6 inch x Sch.40 x 300# ASTM A105N 24 19 456.0 456.0 170 /Each 4,080

WN Type Flange 4 inch x Sch.40 x 300# ASTM A105N 4 11 44.0 44.0 100 /Each 400

WN Type Flange 1.5 inch x Sch.80 x 300# ASTM A105N 8 3.5 28.0 28.0 60 /Each 480

WN Type Flange 3/4 inch x Sch.80 x 300# ASTM A105N 4 1.8 7.2 7.2 30 /Each 120

WN Type Flange 1/2 inch x Sch.80 x 300# ASTM A105N 4 1.5 6.0 6.0 25 /Each 100

ASTM A105 4 1.0 4.0 4.0 80 /Each 320

ASTM A105 4 0.5 2.0 2.0 20 /Each 80

U Clamps for 10 inch pipes A36/EQ. 16 2.96 47.3 47.3 110 /Each 1,760

U Clamps for 6 inch pipes A36/EQ. 16 3.47 55.5 55.5 60 /Each 960

Stud bolts + Nuts M24 x 140mm long 24 0.7 17.3 17.3 8 /Each 192

Stud bolts + Nuts M20 x 120mm long 240 0.1 34.1 34.1 6 /Each 1,440

Gaskets ,10" --2nos, 6"-30nos, 1.5"-6nos 10 inch @110/each, 6 inch @60/each, 1.5 inc 2,260

STEEL FRAME WORK

UC254 x 254 x 73kg/mtr x 50mtr long S275JR 1 3650 3650 4015 3.2 /kg 12,848

Lifting lug 50 mm thk x 200 x 350mm S355K2G3 6 27.47 165 181.33 5 /kg 907

S275JR 3 63.60 191 209.88 3.2 /kg 672

S275JR 2 112.80 226 248.16 3.2 /kg 794

S275JR 10 112.80 1128 1240.80 3.2 /kg 3,971

S275JR 1 884.00 884 972.40 6.8 /kg 6,612

Grating clip; 4nos/sq.mtr S275JR 100 0.10 10 11.00 6 /no 600

A106GR.B 4 20.34 81 89.50 28 /mtr 672

Additional cost for Spares (10% extra) 3,000

Consumables 10% 5,771 5% on Material 7,811 8,445 LS #REF!

Total cost for Materials 66,978 Total cost for Materials with 10% Margin 73,676

II. Fabrication Cost : -Inch Dia --10 inch x Sch40--10hrs/Joint x 2Jo 20 Hrs Rate 42/hr 840

Sl No

Unit Wt

Finish Wt

Rate Basis

Half coupling 3/4" x 3000# x NPT threaded, male

Half coupling 1/2" x 3000# x NPT threaded, FF

A193GR.B7/A194GR.2HA193GR.B7/A194GR.2H

SS316L Spiral wound

Supports for meters and valves UPN 100 x 10.6 kg/mtr x 6mtr long

Supports for platform UPN 160 x 18.8 kg/mtr x 6mtr long

Supports for mid platform UPN 160 x 18.8 kg/mtr x 6mtr long

Platform gratings-- Load bar size 25 x 5mm, load bar pitch 30mm, cross bar pitch 100mm, serrated, 6mm twisted square, 40kg/mtr x 2600mm width x 8500mm long

Handrail pipe 1 1/4 inch x Sch.40 x 6mtr long

Page 20: est

Skid-22 20 of 79

Description MOC Nos Proc Wt Material (AED) Remarks

Kg Kg Kg Rate Amount

Sl No

Unit Wt

Finish Wt

Rate Basis

Inch Dia --6 inch x Sch.40--5 hrs/Joint x 45 J 225 Hrs Rate 42/hr 9450Inch Dia --1.5 inch x Sch.40--2.5 hrs/Joint x 50 Hrs Rate 42/hr 2100Inch Dia --3/4 inch x Sch.40--2 hrs/Joint x 10 20 Hrs Rate 42/hr 840Pipe havdling Hrs (20% of the total fab.hrs) 59 Hrs Rate 42/hr 2478Fabrication cost (marking, cutting) 400 Hrs For marking, cuting 42 Per hrs 16800Fab. cost of support structurals (set up & w 600 Hrs For setup & welding 42 Per hrs 25200

57708III. NDT : -

Radiography test 100% 10"-2 Joints@175/joint, 6"-45 Joints@85/joint, 1 5,675 MPI on lifting lugs 100% 500 Visual Examination 100% 50 hrs 42 /Hrs 2,100 MPI (wherever RT is not possible) 100% 0 Visits 450 1,200

Blasting & Painting 150 sq.mtr 80 /sq.mtr 12,000 Transport for Painting - 100 MT -

Collection of Free Issue materials from site Delivery to Sigma shop is in Emerson scope MT -

QA/QC Inspection 69 42 /Hrs 2,885 - 125 MT 1,800

Design and Preparartion of Fab Drawings LS 4,000 Packing for Transport LS 3,000 Documentation LS 900 Commercial Loading 1% of Total Value LS

Total Cost for NDT and other works 34,060 IV SKID ASSEMBLING & TESTING

Grating and handrail assembling 4 man, 4day, 8hrs 42 /Hrs 5,376 Skid assembling for hydro testing 3 man, 4day, 8hrs 42 /Hrs 4,032 Hydrotesting at shop 2 man, 2 days,8 hrs 32 Hrs 42 /Hrs 1,344 Installation of all free issue instruments & valves (8nos 10 inch dia valves & meters) 42 /Hrs 6048Trial Testing (Air testing) 3man, 2day,8hrs 42 /Hrs 2016

V Final packing and loading 3man, 2 day, 8 hrs 2,016 Total Cost for assembling and testing 20,832

Total Price = Fab + NDT + Assembling and testing ### 30,723 US $Total Selling Price 186276

Rate in US $ = 50826Electrical and Instrumentation work = US $ 9564 with 25% margin = US $ 12,000

Transport upto site (up to JAFZ)

Page 21: est

Skid-21 21 of 79

DATE : 4/3/2011

SIGMA ENGINEERING WORKS L.L.CESTIMATES

Est No : 250061Client : Emerson Process ManagementProject : Enq Ref No : Scope of Work ; Custody transfer metering skid (013-FT-400) Design pressure = 18 bar

Description MOC Nos Proc Wt Material (AED) Remarks

Kg Kg Kg Rate Amount

Custody transfer metering skid--Ref: Drg.no.101230810-3-003 Rev.0 (Qty.01No)

Skid size; 8.5mtr long x 2.6mtr width x 3mtr height

I. Material Cost : -

STEEL PIPING

Pipe 8 inch x Sch.40 x 12mtr long A106GR.B 1 723.72 723.7 956.76 225 /mtr 2,700

Pipe 6 inch x Sch.40 x 12mtr long A106GR.B 3 339.12 1017.4 1021.2 150 /mtr 5,400

Pipe 1.5 inch x Sch.80 x 12mtr long A106GR.B 1 64.92 64.9 64.92 55 /mtr 660

Pipe 3/4 inch x Sch.80 x 12mtr long A106GR.B 1 26.4 26.4 26.4 50 /mtr 600

Pipe 1/2 inch x Sch.80 x 12mtr long A106GR.B 1 19.44 19.4 19.44 40 /mtr 480

Elbow 8 inch x Sch.40 x 90 Degree, LR SA234GR.WPB 2 37 74.0 74.0 500 /Each 1,000

Elbow 6 inch x Sch.40 x 90 Degree, LR SA234GR.WPB 3 10.2 30.6 30.6 180 /Each 540

Elbow 1.5 inch x Sch.80 x 90 Degree SA234GR.WPB 2 0.36 0.7 0.7 30 /Each 60

Eq. Tee 8 inch x Sch.40 SA234GR.WPB 3 49.35 148.1 148.1 500 /Each 1,500

Eq. Tee 6 inch x Sch.40 SA234GR.WPB 3 16.48 49.4 49.4 200 /Each 600

Reducer 8 inch x 6 inch x Sch.40 SA234GR.WPB 5 10.7 53.5 53.5 150 /Each 750

Reducer 6 inch x 4 inch x Sch.40 SA234GR.WPB 4 3.9 15.6 15.6 60 /Each 240

WN Type Flange 8 inch x Sch.40 x 150# ASTM A105N 2 24 48.0 48.0 160 /Each 320

Blind Type Flange 8 inch x 150# ASTM A105N 2 32 64.0 64.0 390 /Each 780

WN Type Flange 6 inch x Sch.40 x 150# ASTM A105N 26 10.8 280.8 280.8 102 /Each 2,652

WN Type Flange 4 inch x Sch.40 x 150# ASTM A105N 4 7 28.0 28.0 70 /Each 280

WN Type Flange 1.5 inch x Sch.80 x 150# ASTM A105N 8 1.8 14.4 14.4 60 /Each 480

WN Type Flange 3/4 inch x Sch.80 x 150# ASTM A105N 4 0.8 3.2 3.2 45 /Each 180

WN Type Flange 1/2 inch x Sch.80 x 150# ASTM A105N 4 0.6 2.4 2.4 40 /Each 160

ASTM A105 4 1.0 4.0 4.0 80 /Each 320

ASTM A105 4 0.5 2.0 2.0 20 /Each 80

U Clamps for 8 inch pipes A36/EQ. 16 2.96 47.3 47.3 90 /Each 1,440

U Clamps for 6 inch pipes A36/EQ. 16 3.47 55.5 55.5 60 /Each 960

Stud bolts + Nuts M24 x 115mm long 24 1.9 45.0 45.0 6 /Each 144

Stud bolts + Nuts M20 x 115mm long 360 1.1 389.3 389.3 6 /Each 2,160

Gaskets ,10" --2nos, 6"-24nos, 1.5"-6nos 10 inch @110/each, 6 inch @60/each, 1.5 inc 2,260

STEEL FRAME WORK

UC254 x 254 x 73kg/mtr x 50mtr long S275JR 1 3650 3650 4015 3.2 /kg 12,848

Lifting lug 50 mm thk x 200 x 350mm S355K2G3 6 27.47 165 181.33 5 /kg 907

S275JR 3 63.60 191 209.88 3.2 /kg 672

S275JR 2 112.80 226 248.16 3.2 /kg 794

S275JR 10 112.80 1128 1240.80 3.2 /kg 3,971

S275JR 1 884.00 884 972.40 6.8 /kg 6,612

Grating clip; 4nos/sq.mtr S275JR 100 0.10 10 11.00 6 /no 600

A106GR.B 4 20.34 81 89.50 28 /mtr 672

Additional cost for Spares (10% extra) 3,000

Consumables 10% 7,610 5% on Material 7,801 8,435 LS #REF!

Total cost for Materials 64,432 Total cost for Materials with 10% Margin 70,875

II. Fabrication Cost : -Inch Dia --10 inch x Sch.40--10hrs/Joint x 20 200 Hrs Rate 42/hr 8400

Sl No

Unit Wt

Finish Wt

Rate Basis

DS Korea Flange

Half coupling 3/4" x 3000# x NPT threaded, male

Half coupling 1/2" x 3000# x NPT threaded, FF

A193GR.B7/A194GR.2HA193GR.B7/A194GR.2H

SS316L Spiral wound

Supports for meters and valves UPN 100 x 10.6 kg/mtr x 6mtr long

Supports for platform UPN 160 x 18.8 kg/mtr x 6mtr long

Supports for mid platform UPN 160 x 18.8 kg/mtr x 6mtr long

Platform gratings-- Load bar size 25 x 5mm, load bar pitch 30mm, cross bar pitch 100mm, serrated, 6mm twisted square, 40kg/mtr x 2600mm width x 8500mm long

Handrail pipe 1 1/4 inch x Sch.40 x 6mtr long

Page 22: est

Skid-21 22 of 79

Description MOC Nos Proc Wt Material (AED) Remarks

Kg Kg Kg Rate Amount

Sl No

Unit Wt

Finish Wt

Rate Basis

Inch Dia --6 inch x Sch.40--8 hrs/Joint x 50 J 400 Hrs Rate 42/hr 16800Inch Dia --1.5 inch x Sch.80--3 hrs/Joint x 20 60 Hrs Rate 42/hr 2520Inch Dia --3/4 inch x Sch.80--2 hrs/Joint x 10 20 Hrs Rate 42/hr 840Pipe havdling Hrs (20% of the total fab.hrs) 132 Hrs Rate 42/hr 5544Fabrication cost (marking, cutting) 400 Hrs For marking, cuting 42 Per hrs 16800Fab. cost of support structurals (set up & w 600 Hrs For setup & welding 42 Per hrs 25200

76104III. NDT : -

Radiography test 100% 10"-2 Joints@175/joint, 6"-45 Joints@85/joint, 1 5,675 MPI on lifting lugs 100% 500 Visual Examination 100% 50 hrs 42 /Hrs 2,100 MPI (wherever RT is not possible) 100% 0 Visits 450 1,200

Blasting & Painting 150 sq.mtr 80 /sq.mtr 12,000 Transport for Painting - 100 MT -

Collection of Free Issue materials from site Delivery to Sigma shop is in Emerson scope MT -

QA/QC Inspection 91 42 /Hrs 3,805 - 125 MT 1,800

Design and Preparartion of Fab Drawings LS 4,000 Packing for Transport LS 3,000 Documentation LS 900 Commercial Loading 1% of Total Value LS

Total Cost for NDT and other works 34,980 IV SKID ASSEMBLING & TESTING

Grating and handrail assembling 4 man, 4day, 8hrs 42 /Hrs 5,376 Skid assembling for hydro testing 3 man, 4day, 8hrs 42 /Hrs 4,032 Hydrotesting at shop 2 man, 2 days,8 hrs 32 Hrs 42 /Hrs 1,344 Installation of all free issue instruments & valves (8nos 10 inch dia valves & meters) 42 /Hrs 6048Trial Testing (Air testing) 3man, 2day,8hrs 42 /Hrs 2016

V Final packing and loading 3man, 2 day, 8 hrs 2,016 Total Cost for assembling and testing 20,832

Total Price = Fab + NDT + Assembling and testing ### 35,994 US $Total Selling Price 202791

Rate in US $ = 55332Electrical and Instrumentation work = US $ 9564 with 25% margin = US $ 12,000

Transport upto site (up to JAFZ)

Page 23: est

Skid-20 23 of 79

DATE : 4/3/2011

SIGMA ENGINEERING WORKS L.L.CESTIMATES

Est No : 250061Client : Emerson Process ManagementProject : Enq Ref No : Scope of Work ; Custody transfer metering skid (013-FT-400) Design pressure = 18 bar

Description MOC Nos Proc Wt Material (AED) Remarks

Kg Kg Kg Rate Amount

Custody transfer metering skid--Ref: Drg.no.101230810-3-003 Rev.0 (Qty.01No)

Skid size; 8.5mtr long x 2.6mtr width x 3mtr height

I. Material Cost : -

STEEL PIPING

Pipe 8 inch x Sch.40 x 12mtr long A106GR.B 1 723.72 723.7 956.76 225 /mtr 2,700

Pipe 6 inch x Sch.40 x 12mtr long A106GR.B 3 339.12 1017.4 1021.2 150 /mtr 5,400

Pipe 1.5 inch x Sch.80 x 12mtr long A106GR.B 1 64.92 64.9 64.92 55 /mtr 660

Pipe 3/4 inch x Sch.80 x 12mtr long A106GR.B 1 26.4 26.4 26.4 50 /mtr 600

Pipe 1/2 inch x Sch.80 x 12mtr long A106GR.B 1 19.44 19.4 19.44 40 /mtr 480

Elbow 8 inch x Sch.40 x 90 Degree, LR SA234GR.WPB 2 37 74.0 74.0 500 /Each 1,000

Elbow 6 inch x Sch.40 x 90 Degree, LR SA234GR.WPB 3 10.2 30.6 30.6 180 /Each 540

Elbow 1.5 inch x Sch.80 x 90 Degree SA234GR.WPB 2 0.36 0.7 0.7 30 /Each 60

Eq. Tee 8 inch x Sch.40 SA234GR.WPB 3 49.35 148.1 148.1 470 /Each 1,410

Eq. Tee 6 inch x Sch.40 SA234GR.WPB 3 16.48 49.4 49.4 200 /Each 600

Reducer 8 inch x 6 inch x Sch.40 SA234GR.WPB 5 10.7 53.5 53.5 150 /Each 750

Reducer 6 inch x 4 inch x Sch.40 SA234GR.WPB 4 3.9 15.6 15.6 60 /Each 240

WN Type Flange 8 inch x Sch.40 x 150# ASTM A105N 2 24 48.0 48.0 160 /Each 320

Blind Type Flange 8 inch x 150# ASTM A105N 2 32 64.0 64.0 390 /Each 780

WN Type Flange 6 inch x Sch.40 x 150# ASTM A105N 26 10.8 280.8 280.8 102 /Each 2,652

WN Type Flange 4 inch x Sch.40 x 150# ASTM A105N 4 7 28.0 28.0 70 /Each 280

WN Type Flange 1.5 inch x Sch.80 x 150# ASTM A105N 8 1.8 14.4 14.4 60 /Each 480

WN Type Flange 3/4 inch x Sch.80 x 150# ASTM A105N 4 0.8 3.2 3.2 45 /Each 180

WN Type Flange 1/2 inch x Sch.80 x 150# ASTM A105N 4 0.6 2.4 2.4 40 /Each 160

ASTM A105 4 1.0 4.0 4.0 80 /Each 320

ASTM A105 4 0.5 2.0 2.0 20 /Each 80

U Clamps for 8 inch pipes A36/EQ. 16 2.96 47.3 47.3 90 /Each 1,440

U Clamps for 6 inch pipes A36/EQ. 16 3.47 55.5 55.5 60 /Each 960

Stud bolts + Nuts M24 x 115mm long 24 1.9 45.0 45.0 6 /Each 144

Stud bolts + Nuts M20 x 115mm long 360 1.1 389.3 389.3 6 /Each 2,160

Gaskets ,10" --2nos, 6"-24nos, 1.5"-6nos 10 inch @110/each, 6 inch @60/each, 1.5 inc 2,260

STEEL FRAME WORK

UC254 x 254 x 73kg/mtr x 50mtr long S275JR 1 3650 3650 4015 3.2 /kg 12,848

Lifting lug 50 mm thk x 200 x 350mm S355K2G3 6 27.47 165 181.33 5 /kg 907

S275JR 3 63.60 191 209.88 3.2 /kg 672

S275JR 2 112.80 226 248.16 3.2 /kg 794

S275JR 10 112.80 1128 1240.80 3.2 /kg 3,971

S275JR 1 884.00 884 972.40 6.8 /kg 6,612

Grating clip; 4nos/sq.mtr S275JR 100 0.10 10 11.00 6 /no 600

A106GR.B 4 20.34 81 89.50 28 /mtr 672

Additional cost for Spares (10% extra) 3,000

Consumables 10% 7,610 5% on Material 7,801 8,435 LS #REF!

Total cost for Materials 64,342 Total cost for Materials with 10% Margin 70,776

II. Fabrication Cost : -Inch Dia --10 inch x Sch.40--10hrs/Joint x 20 200 Hrs Rate 42/hr 8400

Sl No

Unit Wt

Finish Wt

Rate Basis

DS Korea Flange

Half coupling 3/4" x 3000# x NPT threaded, male

Half coupling 1/2" x 3000# x NPT threaded, FF

A193GR.B7/A194GR.2HA193GR.B7/A194GR.2H

SS316L Spiral wound

Supports for meters and valves UPN 100 x 10.6 kg/mtr x 6mtr long

Supports for platform UPN 160 x 18.8 kg/mtr x 6mtr long

Supports for mid platform UPN 160 x 18.8 kg/mtr x 6mtr long

Platform gratings-- Load bar size 25 x 5mm, load bar pitch 30mm, cross bar pitch 100mm, serrated, 6mm twisted square, 40kg/mtr x 2600mm width x 8500mm long

Handrail pipe 1 1/4 inch x Sch.40 x 6mtr long

Page 24: est

Skid-20 24 of 79

Description MOC Nos Proc Wt Material (AED) Remarks

Kg Kg Kg Rate Amount

Sl No

Unit Wt

Finish Wt

Rate Basis

Inch Dia --6 inch x Sch.40--8 hrs/Joint x 50 J 400 Hrs Rate 42/hr 16800Inch Dia --1.5 inch x Sch.80--3 hrs/Joint x 20 60 Hrs Rate 42/hr 2520Inch Dia --3/4 inch x Sch.80--2 hrs/Joint x 10 20 Hrs Rate 42/hr 840Pipe havdling Hrs (20% of the total fab.hrs) 132 Hrs Rate 42/hr 5544Fabrication cost (marking, cutting) 400 Hrs For marking, cuting 42 Per hrs 16800Fab. cost of support structurals (set up & w 600 Hrs For setup & welding 42 Per hrs 25200

76104III. NDT : -

Radiography test 100% 10"-2 Joints@175/joint, 6"-45 Joints@85/joint, 1 5,675 MPI on lifting lugs 100% 500 Visual Examination 100% 50 hrs 42 /Hrs 2,100 MPI (wherever RT is not possible) 100% 0 Visits 450 1,200

Blasting & Painting 150 sq.mtr 80 /sq.mtr 12,000 Transport for Painting - 100 MT -

Collection of Free Issue materials from site Delivery to Sigma shop is in Emerson scope MT -

QA/QC Inspection 91 42 /Hrs 3,805 - 125 MT 1,800

Design and Preparartion of Fab Drawings LS 4,000 Packing for Transport LS 3,000 Documentation LS 900 Commercial Loading 1% of Total Value LS

Total Cost for NDT and other works 34,980 IV SKID ASSEMBLING & TESTING

Grating and handrail assembling 4 man, 4day, 8hrs 42 /Hrs 5,376 Skid assembling for hydro testing 3 man, 4day, 8hrs 42 /Hrs 4,032 Hydrotesting at shop 2 man, 2 days,8 hrs 32 Hrs 42 /Hrs 1,344 Installation of all free issue instruments & valves (8nos 10 inch dia valves & meters) 42 /Hrs 6048Trial Testing (Air testing) 3man, 2day,8hrs 42 /Hrs 2016

V Final packing and loading 3man, 2 day, 8 hrs 2,016 Total Cost for assembling and testing 20,832

Total Price = Fab + NDT + Assembling and testing ### 35,994 US $Total Selling Price 202692

Rate in US $ = 55305Electrical and Instrumentation work = US $ 9564 with 25% margin = US $ 12,000

Transport upto site (up to JAFZ)

Page 25: est

Skid-19 25 of 79

DATE : 4/3/2011

SIGMA ENGINEERING WORKS L.L.CESTIMATES

Est No : 250061Client : Emerson Process ManagementProject : Enq Ref No : Scope of Work ; Custody transfer metering skid (013-FT-400) Design pressure = 18 bar

Description MOC Nos Proc Wt Material (AED) Remarks

Kg Kg Kg Rate Amount

Custody transfer metering skid--Ref: Drg.no.101230810-3-003 Rev.0 (Qty.01No)

Skid size; 10mtr long x 2.6mtr width x 3mtr height

I. Material Cost : -

STEEL PIPING

Pipe 10 inch x Sch.40 x 12mtr long A106GR.B 1 723.72 723.7 956.76 325 /mtr 3,900

Pipe 6 inch x Sch.40 x 12mtr long A106GR.B 3 339.12 1017.4 1021.2 150 /mtr 5,400

Pipe 1.5 inch x Sch.80 x 12mtr long A106GR.B 1 64.92 64.9 64.92 55 /mtr 660

Pipe 3/4 inch x Sch.80 x 12mtr long A106GR.B 1 26.4 26.4 26.4 50 /mtr 600

Pipe 1/2 inch x Sch.80 x 12mtr long A106GR.B 1 19.44 19.4 19.44 40 /mtr 480

Elbow 10 inch x Sch.40 x 90 Degree, LR SA234GR.WPB 2 37 74.0 74.0 500 /Each 1,000

Elbow 6 inch x Sch.40 x 90 Degree, LR SA234GR.WPB 3 10.2 30.6 30.6 180 /Each 540

Elbow 1.5 inch x Sch.80 x 90 Degree SA234GR.WPB 2 0.36 0.7 0.7 30 /Each 60

Eq. Tee 10 inch x Sch.40 SA234GR.WPB 3 49.35 148.1 148.1 650 /Each 1,950

Eq. Tee 6 inch x Sch.40 SA234GR.WPB 3 16.48 49.4 49.4 200 /Each 600

Reducer 10 inch x 6 inch x Sch.40 SA234GR.WPB 5 10.7 53.5 53.5 150 /Each 750

Reducer 6 inch x 4 inch x Sch.40 SA234GR.WPB 4 3.9 15.6 15.6 60 /Each 240

WN Type Flange 10 inch x Sch.40 x 150# ASTM A105N 2 24 48.0 48.0 215 /Each 430

Blind Type Flange 10 inch x 150# ASTM A105N 2 32 64.0 64.0 390 /Each 780

WN Type Flange 6 inch x Sch.40 x 150# ASTM A105N 26 10.8 280.8 280.8 102 /Each 2,652

WN Type Flange 4 inch x Sch.40 x 150# ASTM A105N 4 7 28.0 28.0 70 /Each 280

WN Type Flange 1.5 inch x Sch.80 x 150# ASTM A105N 8 1.8 14.4 14.4 60 /Each 480

WN Type Flange 3/4 inch x Sch.80 x 150# ASTM A105N 4 0.8 3.2 3.2 45 /Each 180

WN Type Flange 1/2 inch x Sch.80 x 150# ASTM A105N 4 0.6 2.4 2.4 40 /Each 160

ASTM A105 4 1.0 4.0 4.0 80 /Each 320

ASTM A105 4 0.5 2.0 2.0 20 /Each 80

U Clamps for 10 inch pipes A36/EQ. 16 2.96 47.3 47.3 110 /Each 1,760

U Clamps for 6 inch pipes A36/EQ. 16 3.47 55.5 55.5 60 /Each 960

Stud bolts + Nuts M24 x 115mm long 24 1.9 45.0 45.0 6 /Each 144

Stud bolts + Nuts M20 x 115mm long 360 1.1 389.3 389.3 6 /Each 2,160

Gaskets ,10" --2nos, 6"-24nos, 1.5"-6nos 10 inch @110/each, 6 inch @60/each, 1.5 inc 2,260

STEEL FRAME WORK

UC254 x 254 x 73kg/mtr x 50mtr long S275JR 1 3650 3650 4015 3.2 /kg 12,848

Lifting lug 50 mm thk x 200 x 350mm S355K2G3 6 27.47 165 181.33 5 /kg 907

S275JR 3 63.60 191 209.88 3.2 /kg 672

S275JR 2 112.80 226 248.16 3.2 /kg 794

S275JR 10 112.80 1128 1240.80 3.2 /kg 3,971

S275JR 1 ### 1040 1144.00 6.8 /kg 7,779

Grating clip; 4nos/sq.mtr S275JR 100 0.10 10 11.00 6 /no 600

A106GR.B 4 20.34 81 89.50 28 /mtr 672

Additional cost for Spares (10% extra) 3,000

Consumables 10% 7,610 5% on Material 7,957 8,606 LS #REF!

Total cost for Materials 67,679 Total cost for Materials with 10% Margin 74,446

II. Fabrication Cost : -Inch Dia --10 inch x Sch.40--10hrs/Joint x 20 200 Hrs Rate 42/hr 8400

Sl No

Unit Wt

Finish Wt

Rate Basis

DS Korea Flange

Half coupling 3/4" x 3000# x NPT threaded, male

Half coupling 1/2" x 3000# x NPT threaded, FF

A193GR.B7/A194GR.2HA193GR.B7/A194GR.2H

SS316L Spiral wound

Supports for meters and valves UPN 100 x 10.6 kg/mtr x 6mtr long

Supports for platform UPN 160 x 18.8 kg/mtr x 6mtr long

Supports for mid platform UPN 160 x 18.8 kg/mtr x 6mtr long

Platform gratings-- Load bar size 25 x 5mm, load bar pitch 30mm, cross bar pitch 100mm, serrated, 6mm twisted square, 40kg/mtr x 2600mm width x 10000mm long

Handrail pipe 1 1/4 inch x Sch.40 x 6mtr long

Page 26: est

Skid-19 26 of 79

Description MOC Nos Proc Wt Material (AED) Remarks

Kg Kg Kg Rate Amount

Sl No

Unit Wt

Finish Wt

Rate Basis

Inch Dia --6 inch x Sch.40--8 hrs/Joint x 50 J 400 Hrs Rate 42/hr 16800Inch Dia --1.5 inch x Sch.80--3 hrs/Joint x 20 60 Hrs Rate 42/hr 2520Inch Dia --3/4 inch x Sch.80--2 hrs/Joint x 10 20 Hrs Rate 42/hr 840Pipe havdling Hrs (20% of the total fab.hrs) 132 Hrs Rate 42/hr 5544Fabrication cost (marking, cutting) 400 Hrs For marking, cuting 42 Per hrs 16800Fab. cost of support structurals (set up & w 600 Hrs For setup & welding 42 Per hrs 25200

76104III. NDT : -

Radiography test 100% 10"-2 Joints@175/joint, 6"-45 Joints@85/joint, 1 5,675 MPI on lifting lugs 100% 500 Visual Examination 100% 50 hrs 42 /Hrs 2,100 MPI (wherever RT is not possible) 100% 0 Visits 450 1,200

Blasting & Painting 200 sq.mtr 80 /sq.mtr 16,000 Transport for Painting - 100 MT -

Collection of Free Issue materials from site Delivery to Sigma shop is in Emerson scope MT -

QA/QC Inspection 91 42 /Hrs 3,805 - 125 MT 1,800

Design and Preparartion of Fab Drawings LS 4,000 Packing for Transport LS 3,000 Documentation LS 900 Commercial Loading 1% of Total Value LS

Total Cost for NDT and other works 38,980 IV SKID ASSEMBLING & TESTING

Grating and handrail assembling 4 man, 4day, 8hrs 42 /Hrs 5,376 Skid assembling for hydro testing 3 man, 4day, 8hrs 42 /Hrs 4,032 Hydrotesting at shop 2 man, 2 days,8 hrs 32 Hrs 42 /Hrs 1,344 Installation of all free issue instruments & valves (8nos 10 inch dia valves & meters) 42 /Hrs 6048Trial Testing (Air testing) 3man, 2day,8hrs 42 /Hrs 2016

V Final packing and loading 3man, 2 day, 8 hrs 2,016 Total Cost for assembling and testing 20,832

Total Price = Fab + NDT + Assembling and testing ### 37,085 US $Total Selling Price 210363

Rate in US $ = 57398Electrical and Instrumentation work = US $ 9564 with 25% margin = US $ 12,000

Transport upto site (up to JAFZ)

Page 27: est

Skid-18 27 of 79

DATE : 4/3/2011

SIGMA ENGINEERING WORKS L.L.CESTIMATES

Est No : 250061Client : Emerson Process ManagementProject : Enq Ref No : Scope of Work ; Custody transfer metering skid (013-FT-400) Design pressure = 18 bar

Description MOC Nos Proc Wt Material (AED) Remarks

Kg Kg Kg Rate Amount

Custody transfer metering skid--Ref: Drg.no.101230810-3-003 Rev.0 (Qty.01No)

Skid size; 8.5mtr long x 2.6mtr width x 3mtr height

I. Material Cost : -

STEEL PIPING

Pipe 14 inch x Sch.40 x 12mtr long A106GR.B 1 1134.6 1134.6 956.76 530 /mtr 6,360

Pipe 10 inch x Sch.40 x 12mtr long A106GR.B 3 723.72 2171.2 1021.2 325 /mtr 11,700

Pipe 1.5 inch x Sch.80 x 12mtr long A106GR.B 1 64.92 64.9 64.92 55 /mtr 660

Pipe 3/4 inch x Sch.80 x 12mtr long A106GR.B 1 26.4 26.4 26.4 50 /mtr 600

Pipe 1/2 inch x Sch.80 x 12mtr long A106GR.B 1 19.44 19.4 19.44 40 /mtr 480

Elbow 14 inch x Sch.40 x 90 Degree, LR SA234GR.WPB 2 68 136.0 136.0 1800 /Each 3,600

Elbow 10 inch x Sch.40 x 90 Degree, LR SA234GR.WPB 3 20.3 60.9 60.9 500 /Each 1,500

Elbow 1.5 inch x Sch.80 x 90 Degree SA234GR.WPB 2 0.36 0.7 0.7 30 /Each 60

Eq. Tee 14 inch x Sch.40 SA234GR.WPB 2 93 186.0 186.0 1800 /Each 3,600

Eq. Tee 10 inch x Sch.40 SA234GR.WPB 2 33 66.0 66.0 650 /Each 1,300

Reducer 14 inch x 10 inch x Sch.40 SA234GR.WPB 5 27 135.0 135.0 920 /Each 4,600

Reducer 10 inch x 8 inch x Sch.40 SA234GR.WPB 4 6.5 26.0 26.0 150 /Each 600

WN Type Flange 14 inch x Sch.40 x 150# ASTM A105N 2 47 94.0 94.0 470 /Each 940

Blind Type Flange 14 inch x 150# ASTM A105N 2 59 118.0 118.0 700 /Each 1,400

WN Type Flange 10 inch x Sch.40 x 150# ASTM A105N 24 24 576.0 576.0 215 /Each 5,160

WN Type Flange 1.5 inch x Sch.80 x 300# ASTM A105N 8 1.8 14.4 14.4 60 /Each 480

WN Type Flange 3/4 inch x Sch.80 x 300# ASTM A105N 4 0.8 3.2 3.2 30 /Each 120

WN Type Flange 1/2 inch x Sch.80 x 300# ASTM A105N 4 0.6 2.4 2.4 25 /Each 100

ASTM A105 4 1.0 4.0 4.0 80 /Each 320

ASTM A105 4 0.5 2.0 2.0 20 /Each 80

U Clamps for 14 inch pipes A36/EQ. 16 2.96 47.3 47.3 190 /Each 3,040

U Clamps for 10 inch pipes A36/EQ. 16 3.47 55.5 55.5 110 /Each 1,760

Stud bolts + Nuts M24 x 140mm long 24 0.7 17.3 17.3 8 /Each 192

Stud bolts + Nuts M20 x 120mm long 240 0.1 34.1 34.1 6 /Each 1,440

Gaskets ,10" --2nos, 6"-30nos, 1.5"-6nos 10 inch @110/each, 6 inch @60/each, 1.5 inc 2,260

STEEL FRAME WORK

UC254 x 254 x 73kg/mtr x 60mtr long S275JR 1 4380 4380 4818 3.2 /kg 15,418

Lifting lug 50 mm thk x 200 x 350mm S355K2G3 6 27.47 165 181.33 5 /kg 907

S275JR 3 63.60 191 209.88 3.2 /kg 672

S275JR 2 112.80 226 248.16 3.2 /kg 794

S275JR 10 112.80 1128 1240.80 3.2 /kg 3,971

S275JR 1 884.00 884 972.40 6.8 /kg 6,612

Grating clip; 4nos/sq.mtr S275JR 100 0.10 10 11.00 6 /no 600

A106GR.B 4 20.34 81 89.50 28 /mtr 672

Additional cost for Spares (10% extra) 3,000

Consumables 10% 6,438 5% on Material 8,754 9,461 LS #REF!

Total cost for Materials 91,435 Total cost for Materials with 10% Margin ###

II. Fabrication Cost : -Inch Dia --14 inch x Sch40--12hrs/Joint x 2Jo 24 Hrs Rate 42/hr 1008Inch Dia --10 inch x Sch.40--6 hrs/Joint x 45 270 Hrs Rate 42/hr 11340

Sl No

Unit Wt

Finish Wt

Rate Basis

DS Korea Flange

Half coupling 3/4" x 3000# x NPT threaded, male

Half coupling 1/2" x 3000# x NPT threaded, FF

A193GR.B7/A194GR.2HA193GR.B7/A194GR.2H

SS316L Spiral wound

Supports for meters and valves UPN 100 x 10.6 kg/mtr x 6mtr long

Supports for platform UPN 160 x 18.8 kg/mtr x 6mtr long

Supports for mid platform UPN 160 x 18.8 kg/mtr x 6mtr long

Platform gratings-- Load bar size 25 x 5mm, load bar pitch 30mm, cross bar pitch 100mm, serrated, 6mm twisted square, 40kg/mtr x 2600mm width x 8500mm long

Handrail pipe 1 1/4 inch x Sch.40 x 6mtr long

Page 28: est

Skid-18 28 of 79

Description MOC Nos Proc Wt Material (AED) Remarks

Kg Kg Kg Rate Amount

Sl No

Unit Wt

Finish Wt

Rate Basis

Inch Dia --1.5 inch x Sch.40--2.5 hrs/Joint x 50 Hrs Rate 42/hr 2100Inch Dia --3/4 inch x Sch.40--2 hrs/Joint x 10 20 Hrs Rate 42/hr 840Pipe havdling Hrs (20% of the total fab.hrs) 69 Hrs Rate 42/hr 2889.6Fabrication cost (marking, cutting) 500 Hrs For marking, cuting 42 Per hrs 21000Fab. cost of support structurals (set up & w 600 Hrs For setup & welding 42 Per hrs 25200

64378III. NDT : -

Radiography test 100% 14"-2 Joints@250/joint, 6"-45 Joints@85/joint, 1 5,825 MPI on lifting lugs 100% 500 Visual Examination 100% 50 hrs 42 /Hrs 2,100 MPI (wherever RT is not possible) 100% 0 Visits 450 1,200

Blasting & Painting 150 sq.mtr 80 /sq.mtr 12,000 Transport for Painting - 100 MT -

Collection of Free Issue materials from site Delivery to Sigma shop is in Emerson scope MT -

QA/QC Inspection 77 42 /Hrs 3,219 - 125 MT 1,800

Design and Preparartion of Fab Drawings LS 4,000 Packing for Transport LS 3,000 Documentation LS 900 Commercial Loading 1% of Total Value LS

Total Cost for NDT and other works 34,544 IV SKID ASSEMBLING & TESTING

Grating and handrail assembling 4 man, 4day, 8hrs 42 /Hrs 5,376 Skid assembling for hydro testing 3 man, 4day, 8hrs 42 /Hrs 4,032 Hydrotesting at shop 2 man, 2 days,8 hrs 32 Hrs 42 /Hrs 1,344 Installation of all free issue instruments & valves (8nos 10 inch dia valves & meters) 42 /Hrs 6048Trial Testing (Air testing) 3man, 2day,8hrs 42 /Hrs 2016

V Final packing and loading 3man, 2 day, 8 hrs 2,016 Total Cost for assembling and testing 20,832

Total Price = Fab + NDT + Assembling and testing ### 32,675 US $Total Selling Price 220332

Rate in US $ = 60118Electrical and Instrumentation work = US $ 9564 with 25% margin = US $ 12,000

Transport upto site (up to JAFZ)

Page 29: est

Skid-17 29 of 79

DATE : 4/3/2011

SIGMA ENGINEERING WORKS L.L.CESTIMATES

Est No : 250061Client : Emerson Process ManagementProject : Enq Ref No : Scope of Work ; Custody transfer metering skid (013-FT-400) Design pressure = 18 bar

Description MOC Nos Proc Wt Material (AED) Remarks

Kg Kg Kg Rate Amount

Custody transfer metering skid--Ref: Drg.no.101230810-3-003 Rev.0 (Qty.01No)

Skid size; 8.5mtr long x 2.6mtr width x 3mtr height

I. Material Cost : -

STEEL PIPING

Pipe 10 inch x Sch.40 x 12mtr long A106GR.B 1 723.72 723.7 956.76 325 /mtr 3,900

Pipe 6 inch x Sch.40 x 12mtr long A106GR.B 2 339.12 678.2 1021.2 140 /mtr 3,360

Pipe 1.5 inch x Sch.80 x 12mtr long A106GR.B 1 64.92 64.9 64.92 55 /mtr 660

Pipe 3/4 inch x Sch.80 x 12mtr long A106GR.B 1 26.4 26.4 26.4 50 /mtr 600

Pipe 1/2 inch x Sch.80 x 12mtr long A106GR.B 1 19.44 19.4 19.44 40 /mtr 480

Elbow 10 inch x Sch.40 x 90 Degree, LR SA234GR.WPB 2 37 74.0 74.0 500 /Each 1,000

Elbow 6 inch x Sch.40 x 90 Degree, LR SA234GR.WPB 3 10.2 30.6 30.6 180 /Each 540

Elbow 1.5 inch x Sch.80 x 90 Degree SA234GR.WPB 2 0.36 0.7 0.7 30 /Each 60

Eq. Tee 10 inch x Sch.40 SA234GR.WPB 2 49.35 98.7 98.7 650 /Each 1,300

Eq. Tee 6 inch x Sch.40 SA234GR.WPB 2 16.48 33.0 33.0 200 /Each 400

Reducer 10 inch x 6 inch x Sch.40 SA234GR.WPB 5 10.7 53.5 53.5 150 /Each 750

Reducer 6 inch x 4 inch x Sch.40 SA234GR.WPB 4 3.9 15.6 15.6 60 /Each 240

WN Type Flange 10 inch x Sch.40 x 150# ASTM A105N 2 24 48.0 48.0 215 /Each 430

Blind Type Flange 10 inch x 150# ASTM A105N 2 32 64.0 64.0 385 /Each 770

WN Type Flange 6 inch x Sch.40 x 150# ASTM A105N 24 10.8 259.2 259.2 102 /Each 2,448

WN Type Flange 4 inch x Sch.40 x 150# ASTM A105N 4 7 28.0 28.0 70 /Each 280

WN Type Flange 1.5 inch x Sch.80 x 150# ASTM A105N 8 1.8 14.4 14.4 60 /Each 480

WN Type Flange 3/4 inch x Sch.80 x 150# ASTM A105N 4 0.8 3.2 3.2 45 /Each 180

WN Type Flange 1/2 inch x Sch.80 x 150# ASTM A105N 4 0.6 2.4 2.4 40 /Each 160

ASTM A105 4 1.0 4.0 4.0 80 /Each 320

ASTM A105 4 0.5 2.0 2.0 20 /Each 80

U Clamps for 10 inch pipes A36/EQ. 16 2.96 47.3 47.3 110 /Each 1,760

U Clamps for 6 inch pipes A36/EQ. 16 3.47 55.5 55.5 60 /Each 960

Stud bolts + Nuts M24 x 115mm long 24 1.9 45.0 45.0 6 /Each 144

Stud bolts + Nuts M20 x 115mm long 360 1.1 389.3 389.3 6 /Each 2,160

Gaskets ,10" --2nos, 6"-30nos, 1.5"-6nos 10 inch @110/each, 6 inch @60/each, 1.5 inc 2,260

STEEL FRAME WORK

UC254 x 254 x 73kg/mtr x 50mtr long S275JR 1 3650 3650 4015 3.2 /kg 12,848

Lifting lug 50 mm thk x 200 x 350mm S355K2G3 6 27.47 165 181.33 5 /kg 907

S275JR 3 63.60 191 209.88 3.2 /kg 672

S275JR 2 112.80 226 248.16 3.2 /kg 794

S275JR 10 112.80 1128 1240.80 3.2 /kg 3,971

S275JR 1 884.00 884 972.40 6.8 /kg 6,612

Grating clip; 4nos/sq.mtr S275JR 100 0.10 10 11.00 6 /no 600

A106GR.B 4 20.34 81 89.50 28 /mtr 672

Additional cost for Spares (10% extra) 3,000

Consumables 10% 6,502 5% on Material 7,714 8,347 LS #REF!

Total cost for Materials 62,299 Total cost for Materials with 10% Margin 68,529

II. Fabrication Cost : -Inch Dia --10 inch x Sch.40--10hrs/Joint x 2J 20 Hrs Rate 42/hr 840

Sl No

Unit Wt

Finish Wt

Rate Basis

DS Korea Flange

Half coupling 3/4" x 3000# x NPT threaded, male

Half coupling 1/2" x 3000# x NPT threaded, FF

A193GR.B7/A194GR.2HA193GR.B7/A194GR.2H

SS316L Spiral wound

Supports for meters and valves UPN 100 x 10.6 kg/mtr x 6mtr long

Supports for platform UPN 160 x 18.8 kg/mtr x 6mtr long

Supports for mid platform UPN 160 x 18.8 kg/mtr x 6mtr long

Platform gratings-- Load bar size 25 x 5mm, load bar pitch 30mm, cross bar pitch 100mm, serrated, 6mm twisted square, 40kg/mtr x 2600mm width x 8500mm long

Handrail pipe 1 1/4 inch x Sch.40 x 6mtr long

Page 30: est

Skid-17 30 of 79

Description MOC Nos Proc Wt Material (AED) Remarks

Kg Kg Kg Rate Amount

Sl No

Unit Wt

Finish Wt

Rate Basis

Inch Dia --6 inch x Sch.40--8 hrs/Joint x 45 J 360 Hrs Rate 42/hr 15120Inch Dia --1.5 inch x Sch.80--3 hrs/Joint x 20 60 Hrs Rate 42/hr 2520Inch Dia --3/4 inch x Sch.80--2 hrs/Joint x 10 20 Hrs Rate 42/hr 840Pipe havdling Hrs (20% of the total fab.hrs) 88 Hrs Rate 42/hr 3696Fabrication cost (marking, cutting) 400 Hrs For marking, cuting 42 Per hrs 16800Fab. cost of support structurals (set up & w 600 Hrs For setup & welding 42 Per hrs 25200

65016III. NDT : -

Radiography test 100% 10"-2 Joints@175/joint, 6"-45 Joints@85/joint, 1 5,675 MPI on lifting lugs 100% 500 Visual Examination 100% 50 hrs 42 /Hrs 2,100 MPI (wherever RT is not possible) 100% 0 Visits 450 1,200

Blasting & Painting 150 sq.mtr 80 /sq.mtr 12,000 Transport for Painting - 100 MT -

Collection of Free Issue materials from site Delivery to Sigma shop is in Emerson scope MT -

QA/QC Inspection 77 42 /Hrs 3,251 - 125 MT 1,800

Design and Preparartion of Fab Drawings LS 4,000 Packing for Transport LS 3,000 Documentation LS 900 Commercial Loading 1% of Total Value LS

Total Cost for NDT and other works 34,426 IV SKID ASSEMBLING & TESTING

Grating and handrail assembling 4 man, 4day, 8hrs 42 /Hrs 5,376 Skid assembling for hydro testing 3 man, 4day, 8hrs 42 /Hrs 4,032 Hydrotesting at shop 2 man, 2 days,8 hrs 32 Hrs 42 /Hrs 1,344 Installation of all free issue instruments & valves (8nos 10 inch dia valves & meters) 42 /Hrs 6048Trial Testing (Air testing) 3man, 2day,8hrs 42 /Hrs 2016

V Final packing and loading 3man, 2 day, 8 hrs 2,016 Total Cost for assembling and testing 20,832

Total Price = Fab + NDT + Assembling and testing ### 32,817 US $Total Selling Price 188803

Rate in US $ = 51515Electrical and Instrumentation work = US $ 9564 with 25% margin = US $ 12,000

Transport upto site (up to JAFZ)

Page 31: est

Skid-16 31 of 79

DATE : 4/3/2011

SIGMA ENGINEERING WORKS L.L.CESTIMATES

Est No : 250061Client : Emerson Process ManagementProject : Enq Ref No : Scope of Work ; Custody transfer metering skid (013-FT-400) Design pressure = 18 bar

Description MOC Nos Proc Wt Material (AED) Remarks

Kg Kg Kg Rate Amount

Custody transfer metering skid--Ref: Drg.no.101230810-3-003 Rev.0 (Qty.01No)

Skid size; 8.5mtr long x 2.6mtr width x 3mtr height

I. Material Cost : -

STEEL PIPING

Pipe 10 inch x Sch.40 x 12mtr long A106GR.B 1 723.72 723.7 956.76 325 /mtr 3,900

Pipe 6 inch x Sch.40 x 12mtr long A106GR.B 2 339.12 678.2 1021.2 140 /mtr 3,360

Pipe 1.5 inch x Sch.80 x 12mtr long A106GR.B 1 64.92 64.9 64.92 55 /mtr 660

Pipe 3/4 inch x Sch.80 x 12mtr long A106GR.B 1 26.4 26.4 26.4 50 /mtr 600

Pipe 1/2 inch x Sch.80 x 12mtr long A106GR.B 1 19.44 19.4 19.44 40 /mtr 480

Elbow 10 inch x Sch.40 x 90 Degree, LR SA234GR.WPB 2 37 74.0 74.0 500 /Each 1,000

Elbow 6 inch x Sch.40 x 90 Degree, LR SA234GR.WPB 3 10.2 30.6 30.6 180 /Each 540

Elbow 1.5 inch x Sch.80 x 90 Degree SA234GR.WPB 2 0.36 0.7 0.7 30 /Each 60

Eq. Tee 10 inch x Sch.40 SA234GR.WPB 2 49.35 98.7 98.7 650 /Each 1,300

Eq. Tee 6 inch x Sch.40 SA234GR.WPB 2 16.48 33.0 33.0 200 /Each 400

Reducer 10 inch x 6 inch x Sch.40 SA234GR.WPB 5 10.7 53.5 53.5 150 /Each 750

Reducer 6 inch x 4 inch x Sch.40 SA234GR.WPB 4 3.9 15.6 15.6 60 /Each 240

WN Type Flange 10 inch x Sch.40 x 150# ASTM A105N 2 24 48.0 48.0 215 /Each 430

Blind Type Flange 10 inch x 150# ASTM A105N 2 32 64.0 64.0 385 /Each 770

WN Type Flange 6 inch x Sch.40 x 150# ASTM A105N 24 10.8 259.2 259.2 102 /Each 2,448

WN Type Flange 4 inch x Sch.40 x 150# ASTM A105N 4 7 28.0 28.0 70 /Each 280

WN Type Flange 1.5 inch x Sch.80 x 150# ASTM A105N 8 1.8 14.4 14.4 60 /Each 480

WN Type Flange 3/4 inch x Sch.80 x 150# ASTM A105N 4 0.8 3.2 3.2 45 /Each 180

WN Type Flange 1/2 inch x Sch.80 x 150# ASTM A105N 4 0.6 2.4 2.4 40 /Each 160

ASTM A105 4 1.0 4.0 4.0 80 /Each 320

ASTM A105 4 0.5 2.0 2.0 20 /Each 80

U Clamps for 10 inch pipes A36/EQ. 16 2.96 47.3 47.3 110 /Each 1,760

U Clamps for 6 inch pipes A36/EQ. 16 3.47 55.5 55.5 60 /Each 960

Stud bolts + Nuts M24 x 115mm long 24 1.9 45.0 45.0 8 /Each 192

Stud bolts + Nuts M20 x 115mm long 360 1.1 389.3 389.3 6 /Each 2,160

Gaskets ,10" --2nos, 6"-30nos, 1.5"-6nos 10 inch @110/each, 6 inch @60/each, 1.5 inc 2,260

STEEL FRAME WORK

UC254 x 254 x 73kg/mtr x 50mtr long S275JR 1 3650 3650 4015 3.2 /kg 12,848

Lifting lug 50 mm thk x 200 x 350mm S355K2G3 6 27.47 165 181.33 5 /kg 907

S275JR 3 63.60 191 209.88 3.2 /kg 672

S275JR 2 112.80 226 248.16 3.2 /kg 794

S275JR 10 112.80 1128 1240.80 3.2 /kg 3,971

S275JR 1 884.00 884 972.40 6.8 /kg 6,612

Grating clip; 4nos/sq.mtr S275JR 100 0.10 10 11.00 6 /no 600

A106GR.B 4 20.34 81 89.50 28 /mtr 672

Additional cost for Spares (10% extra) 3,000

Consumables 10% 6,502 5% on Material 7,714 8,347 LS

Total cost for Materials 62,347 Total cost for Materials with 10% Margin 68,582

II. Fabrication Cost : -Inch Dia --10 inch x Sch.40--10hrs/Joint x 2J 20 Hrs Rate 42/hr 840

Sl No

Unit Wt

Finish Wt

Rate Basis

DS Korea Flange

Half coupling 3/4" x 3000# x NPT threaded, male

Half coupling 1/2" x 3000# x NPT threaded, FF

A193GR.B7/A194GR.2HA193GR.B7/A194GR.2H

SS304L Spiral wound

Supports for meters and valves UPN 100 x 10.6 kg/mtr x 6mtr long

Supports for platform UPN 160 x 18.8 kg/mtr x 6mtr long

Supports for mid platform UPN 160 x 18.8 kg/mtr x 6mtr long

Platform gratings-- Load bar size 25 x 5mm, load bar pitch 30mm, cross bar pitch 100mm, serrated, 6mm twisted square, 40kg/mtr x 2600mm width x 8500mm long

Handrail pipe 1 1/4 inch x Sch.40 x 6mtr long

Page 32: est

Skid-16 32 of 79

Description MOC Nos Proc Wt Material (AED) Remarks

Kg Kg Kg Rate Amount

Sl No

Unit Wt

Finish Wt

Rate Basis

Inch Dia --6 inch x Sch.40--8 hrs/Joint x 45 J 360 Hrs Rate 42/hr 15120Inch Dia --1.5 inch x Sch.80--3 hrs/Joint x 20 60 Hrs Rate 42/hr 2520Inch Dia --3/4 inch x Sch.80--2 hrs/Joint x 10 20 Hrs Rate 42/hr 840Pipe havdling Hrs (20% of the total fab.hrs) 88 Hrs Rate 42/hr 3696Fabrication cost (marking, cutting) 400 Hrs For marking, cuting 42 Per hrs 16800Fab. cost of support structurals (set up & w 600 Hrs For setup & welding 42 Per hrs 25200

65016III. NDT : -

Radiography test 100% 10"-2 Joints@175/joint, 6"-45 Joints@85/joint, 1 5,675 MPI on lifting lugs 100% 500 Visual Examination 100% 50 hrs 42 /Hrs 2,100 MPI (wherever RT is not possible) 100% 0 Visits 450 1,200

Blasting & Painting 150 sq.mtr 80 /sq.mtr 12,000 Transport for Painting - 100 MT -

Collection of Free Issue materials from site Delivery to Sigma shop is in Emerson scope MT -

QA/QC Inspection 77 42 /Hrs 3,251 - 125 MT 1,800

Design and Preparartion of Fab Drawings LS 4,000 Packing for Transport LS 3,000 Documentation LS 900 Commercial Loading 1% of Total Value LS

Total Cost for NDT and other works 34,426 IV SKID ASSEMBLING & TESTING

Grating and handrail assembling 4 man, 4day, 8hrs 42 /Hrs 5,376 Skid assembling for hydro testing 3 man, 4day, 8hrs 42 /Hrs 4,032 Hydrotesting at shop 2 man, 2 days,8 hrs 32 Hrs 42 /Hrs 1,344 Installation of all free issue instruments & valves (8nos 10 inch dia valves & meters) 42 /Hrs 6048Trial Testing (Air testing) 3man, 2day,8hrs 42 /Hrs 2016

V Final packing and loading 3man, 2 day, 8 hrs 2,016 Total Cost for assembling and testing 20,832

Total Price = Fab + NDT + Assembling and testing ### 32,817 US $Total Selling Price 188855

Rate in US $ = 51529Electrical and Instrumentation work = US $ 9564 with 25% margin = US $ 12,000

Transport upto site (up to JAFZ)

Page 33: est

Skid-15 33 of 79

DATE : 4/3/2011

SIGMA ENGINEERING WORKS L.L.CESTIMATES

Est No : 250061Client : Emerson Process ManagementProject : Enq Ref No : Scope of Work ; Custody transfer metering skid (013-FT-400) Design pressure = 18 bar

Description MOC Nos Proc Wt Material (AED) Remarks

Kg Kg Kg Rate Amount

Custody transfer metering skid--Ref: Drg.no.101230810-3-003 Rev.0 (Qty.01No)

Skid size; 10mtr long x 2.6mtr width x 3mtr height

I. Material Cost : -

STEEL PIPING

Pipe 16 inch x Sch.40 x 12mtr long A106GR.B 1 1479.6 1479.6 956.76 750 /mtr 9,000

Pipe 10 inch x Sch.40 x 12mtr long A106GR.B 3 723.72 2171.2 1021.2 325 /mtr 11,700

Pipe 1.5 inch x Sch.80 x 12mtr long A106GR.B 1 64.92 64.9 64.92 55 /mtr 660

Pipe 3/4 inch x Sch.80 x 12mtr long A106GR.B 1 26.4 26.4 26.4 50 /mtr 600

Pipe 1/2 inch x Sch.80 x 12mtr long A106GR.B 1 19.44 19.4 19.44 40 /mtr 480

Elbow 16 inch x Sch.40 x 90 Degree, LR SA234GR.WPB 2 89.2 178.4 178.4 1800 /Each 3,600

Elbow 10 inch x Sch.40 x 90 Degree, LR SA234GR.WPB 3 37 111.0 111.0 500 /Each 1,500

Elbow 1.5 inch x Sch.80 x 90 Degree SA234GR.WPB 2 0.36 0.7 0.7 30 /Each 60

Eq. Tee 16 inch x Sch.40 SA234GR.WPB 3 115 345.0 345.0 1800 /Each 5,400

Eq. Tee 10 inch x Sch.40 SA234GR.WPB 3 49.35 148.1 148.1 650 /Each 1,950

Reducer 16 inch x 10 inch x Sch.40 SA234GR.WPB 5 33 165.0 165.0 1000 /Each 5,000

Reducer 10 inch x 8 inch x Sch.40 SA234GR.WPB 4 10.7 42.8 42.8 60 /Each 240

WN Type Flange 16 inch x Sch.40 x 150# ASTM A105N 2 58 116.0 116.0 600 /Each 1,200

WN Type Flange 10 inch x Sch.40 x 150# ASTM A105N 28 24 672.0 672.0 215 /Each 6,020

Blind Type Flange 16 inch x 150# ASTM A105N 2 77 154.0 154.0 900 /Each 1,800

WN Type Flange 8 inch x Sch.40 x 150# ASTM A105N 4 18 72.0 72.0 160 /Each 640

WN Type Flange 1.5 inch x Sch.80 x 150# ASTM A105N 8 1.8 14.4 14.4 60 /Each 480

WN Type Flange 3/4 inch x Sch.80 x 150# ASTM A105N 4 0.8 3.2 3.2 45 /Each 180

WN Type Flange 1/2 inch x Sch.80 x 150# ASTM A105N 4 0.6 2.4 2.4 40 /Each 160

ASTM A105 4 1.0 4.0 4.0 80 /Each 320

ASTM A105 4 0.5 2.0 2.0 20 /Each 80

U Clamps for 16 inch pipes A36/EQ. 16 2.96 47.3 47.3 210 /Each 3,360

U Clamps for 10 inch pipes A36/EQ. 16 3.47 55.5 55.5 110 /Each 1,760

Stud bolts + Nuts M24 x 115mm long 24 1.9 45.0 45.0 6 /Each 144

Stud bolts + Nuts M20 x 115mm long 360 1.1 389.3 389.3 6 /Each 2,160

Gaskets ,10" --2nos, 6"-30nos, 1.5"-6nos 10 inch @110/each, 6 inch @60/each, 1.5 inc 2,260

STEEL FRAME WORK

UC254 x 254 x 73kg/mtr x 50mtr long S275JR 1 3650 3650 4015 3.2 /kg 12,848

Lifting lug 50 mm thk x 200 x 350mm S355K2G3 6 27.47 165 181.33 5 /kg 907

S275JR 3 63.60 191 209.88 3.2 /kg 672

S275JR 2 112.80 226 248.16 3.2 /kg 794

S275JR 10 112.80 1128 1240.80 3.2 /kg 3,971

S275JR 1 ### 1040 1144.00 6.8 /kg 7,779

Grating clip; 4nos/sq.mtr S275JR 100 0.10 10 11.00 6 /no 600

A106GR.B 4 20.34 81 89.50 28 /mtr 672

Additional cost for Spares (10% extra) 3,000

Consumables 10% 8,635 5% on Material 9,169 9,819 LS #REF!

Total cost for Materials ###Total cost for Materials with 10% Margin ###

II. Fabrication Cost : -Inch Dia --16 inch x Sch.40--14hrs/Joint x 20 280 Hrs Rate 42/hr 11760

Sl No

Unit Wt

Finish Wt

Rate Basis

DS Korea Flange

Half coupling 3/4" x 3000# x NPT threaded, male

Half coupling 1/2" x 3000# x NPT threaded, FF

A193GR.B7/A194GR.2HA193GR.B7/A194GR.2H

SS316L Spiral wound

Supports for meters and valves UPN 100 x 10.6 kg/mtr x 6mtr long

Supports for platform UPN 160 x 18.8 kg/mtr x 6mtr long

Supports for mid platform UPN 160 x 18.8 kg/mtr x 6mtr long

Platform gratings-- Load bar size 25 x 5mm, load bar pitch 30mm, cross bar pitch 100mm, serrated, 6mm twisted square, 40kg/mtr x 2600mm width x 10000mm long

Handrail pipe 1 1/4 inch x Sch.40 x 6mtr long

Page 34: est

Skid-15 34 of 79

Description MOC Nos Proc Wt Material (AED) Remarks

Kg Kg Kg Rate Amount

Sl No

Unit Wt

Finish Wt

Rate Basis

Inch Dia --10 inch x Sch.40--8 hrs/Joint x 50 400 Hrs Rate 42/hr 16800Inch Dia --8 inch x Sch.40--6 hrs/Joint x 8 Jo 48 Hrs Rate 42/hr 2016Inch Dia --1.5 inch x Sch.80--3 hrs/Joint x 20 60 Hrs Rate 42/hr 2520Inch Dia --3/4 inch x Sch.80--2 hrs/Joint x 10 20 Hrs Rate 42/hr 840Pipe havdling Hrs (20% of the total fab.hrs) 148 Hrs Rate 42/hr 6216Fabrication cost (marking, cutting) 400 Hrs For marking, cuting 42 Per hrs 16800Fab. cost of support structurals (set up & w 700 Hrs For setup & welding 42 Per hrs 29400

86352III. NDT : -

Radiography test 100% 10"-2 Joints@175/joint, 6"-45 Joints@85/joint, 1 16,750 MPI on lifting lugs 100% 500 Visual Examination 100% 50 hrs 42 /Hrs 2,100 MPI (wherever RT is not possible) 100% 0 Visits 450 1,200

Blasting & Painting 200 sq.mtr 80 /sq.mtr 16,000 Transport for Painting - 100 MT -

Collection of Free Issue materials from site Delivery to Sigma shop is in Emerson scope MT -

QA/QC Inspection 100 42 /Hrs 4,217 - 125 MT 4,000

Design and Preparartion of Fab Drawings LS 4,000 Packing for Transport LS 3,000 Documentation LS 900 Commercial Loading 1% of Total Value LS

Total Cost for NDT and other works 52,667 IV SKID ASSEMBLING & TESTING

Grating and handrail assembling 4 man, 4day, 8hrs 42 /Hrs 5,376 Skid assembling for hydro testing 3 man, 4day, 8hrs 42 /Hrs 4,032 Hydrotesting at shop 2 man, 2 days,8 hrs 32 Hrs 42 /Hrs 1,344 Installation of all free issue instruments & valves (8nos 10 inch dia valves & meters) 42 /Hrs 6048Trial Testing (Air testing) 3man, 2day,8hrs 42 /Hrs 2016

V Final packing and loading 3man, 2 day, 8 hrs 2,016 Total Cost for assembling and testing 20,832

Total Price = Fab + NDT + Assembling and testing ### 43,615 US $Total Selling Price 270545

Rate in US $ = 73819Electrical and Instrumentation work = US $ 9564 with 25% margin = US $ 12,000

Transport upto site (up to JAFZ)

Page 35: est

Skid-14 35 of 79

DATE : 4/3/2011

SIGMA ENGINEERING WORKS L.L.CESTIMATES

Est No : 250061Client : Emerson Process ManagementProject : Enq Ref No : Scope of Work ; Custody transfer metering skid (013-FT-400) Design pressure = 18 bar

Description MOC Nos Proc Wt Material (AED) Remarks

Kg Kg Kg Rate Amount

Custody transfer metering skid--Ref: Drg.no.101230810-3-003 Rev.0 (Qty.01No)

Skid size; 12.5mtr long x 3.6mtr width x 3.6mtr height

I. Material Cost : -

STEEL PIPING

Pipe 24 inch x Sch.40 x 12mtr long A106GR.B 1 3064.9 3064.9 956.76 4000 /mtr 48,000

Pipe 10 inch x Sch.40 x 12mtr long A106GR.B 5 723.72 3618.6 1021.2 325 /mtr 19,500

Pipe 1.5 inch x Sch.80 x 12mtr long A106GR.B 1 64.92 64.9 64.92 55 /mtr 660

Pipe 3/4 inch x Sch.80 x 12mtr long A106GR.B 1 26.4 26.4 26.4 50 /mtr 600

Pipe 1/2 inch x Sch.80 x 12mtr long A106GR.B 1 19.44 19.4 19.44 40 /mtr 480

Elbow 24 inch x Sch.40 x 90 Degree, LR SA234GR.WPB 2 202 404.0 404.0 7000 /Each 14,000

Elbow 10 inch x Sch.40 x 90 Degree, LR SA234GR.WPB 5 37 185.0 185.0 500 /Each 2,500

Elbow 1.5 inch x Sch.80 x 90 Degree SA234GR.WPB 2 0.6 1.2 1.2 60 /Each 120

Eq. Tee 24 inch x Sch.40 SA234GR.WPB 7 225 1575.0 1575.0 ### /Each 71,400

Eq. Tee 10 inch x Sch.40 SA234GR.WPB 7 36 252.0 252.0 750 /Each 5,250

Reducer 10 inch x 8 inch x Sch.40 SA234GR.WPB 8 10.7 85.6 85.6 200 /Each 1,600

Reducer 24 inch x 10 inch x Sch.40 SA234GR.WPB 10 105 1050.0 1050.0 6500 /Each 65,000

WN Type Flange 24 inch x Sch.40 x 150# ASTM A105N 2 118 236.0 236.0 1250 /Each 2,500

Blind Type Flange 24 inch x 150# ASTM A105N 2 186 372.0 372.0 2250 /Each 4,500

WN Type Flange 10 inch x Sch.40 x 150# ASTM A105N 38 24 912.0 912.0 215 /Each 8,170

WN Type Flange 8 inch x Sch.40 x 150# ASTM A105N 6 18 108.0 108.0 160 /Each 960

WN Type Flange 1.5 inch x Sch.80 x 300# ASTM A105N 8 1.8 14.4 14.4 60 /Each 480

WN Type Flange 3/4 inch x Sch.80 x 300# ASTM A105N 4 0.8 3.2 3.2 45 /Each 180

WN Type Flange 1/2 inch x Sch.80 x 300# ASTM A105N 4 0.6 2.4 2.4 40 /Each 160

ASTM A105 4 1.0 4.0 4.0 160 /Each 640

ASTM A105 4 0.5 2.0 2.0 40 /Each 160

U Clamps for 24 inch pipes A36/EQ. 24 2.96 71.0 71.0 360 /Each 8,640

U Clamps for 10 inch pipes A36/EQ. 48 3.47 166.4 166.4 110 /Each 5,280

Stud bolts + Nuts M33 x 190mm long 48 1.9 90.1 90.1 20 /Each 960

Stud bolts + Nuts M24 x 130mm long 432 1.1 467.2 467.2 6 /Each 2,592

24 inch @1500/each, 10 inch @110/each, 8 in 8,500

STEEL FRAME WORK

UC254 x 254 x 73kg/mtr x 90mtr long S275JR 1 6570 6570 7227 3.2 /kg 23,126

Lifting lug 50 mm thk x 200 x 350mm S355K2G3 12 27.47 330 362.67 5 /kg 1,813

S275JR 6 63.60 382 419.76 3.2 /kg 1,343

S275JR 6 112.80 677 744.48 3.2 /kg 2,382

S275JR 12 112.80 1354 1488.96 3.2 /kg 4,765

S275JR 1 ### 1800 1980.00 6.8 /kg 13,464

Grating clip; 4nos/sq.mtr S275JR 200 0.10 20 22.00 6 /no 1,200

A106GR.B 8 20.34 163 178.99 28 /mtr 1,344

Additional cost for Spares (10% extra) 3,000

Consumables 10% 11,515 5% on Material 17,407 18,536 LS #REF!

Total cost for Materials 336,785 Total cost for Materials with 10% Margin 370,463

II. Fabrication Cost : -Inch Dia --24 inch x Sch.40--24hrs/Joint x 2J 48 Hrs Rate 42/hr 2016

Sl No

Unit Wt

Finish Wt

Rate Basis

DS Korea Flange

Half coupling 3/4" x 3000# x NPT threaded, male

Half coupling 1/2" x 3000# x NPT threaded, FF

A193GR.B7/A194GR.2HA193GR.B7/A194GR.2H

Gaskets, 24" --2nos, 10"-42nos, 8"-8nos, 1.5"-6nos

SS316L Spiral wound

Supports for meters and valves UPN 100 x 10.6 kg/mtr x 6mtr long

Supports for platform UPN 160 x 18.8 kg/mtr x 6mtr long

Supports for mid platform UPN 160 x 18.8 kg/mtr x 6mtr long

Platform gratings-- Load bar size 25 x 5mm, load bar pitch 30mm, cross bar pitch 100mm, serrated, 6mm twisted square, 40kg/mtr x 3600mm width x 12500mm long

Handrail pipe 1 1/4 inch x Sch.40 x 6mtr long

Page 36: est

Skid-14 36 of 79

Description MOC Nos Proc Wt Material (AED) Remarks

Kg Kg Kg Rate Amount

Sl No

Unit Wt

Finish Wt

Rate Basis

Inch Dia --10 inch x Sch.40--7 hrs/Joint x 90 630 Hrs Rate 42/hr 26460Inch Dia --8 inch x Sch.40--6 hrs/Joint x 6 Jo 36 Hrs Rate 42/hr 1512Inch Dia --1.5 inch x Sch.80--3 hrs/Joint x 20 60 Hrs Rate 42/hr 2520Inch Dia --3/4 inch x Sch.XXS--2 hrs/Joint x 20 Hrs Rate 42/hr 840Pipe havdling Hrs (20% of the total fab.hrs) 148 Hrs Rate 42/hr 6199.2Fabrication cost (marking, cutting) 800 Hrs For marking, cuting 42 Per hrs 33600Fab. cost of support structurals (set up & w 1000 Hrs For setup & welding 42 Per hrs 42000

115147III. NDT : -

Radiography test 100% 9,850 MPI on lifting lugs 100% 500 Visual Examination 100% 60 hrs 42 /Hrs 2,520 MPI (wherever RT is not possible) 100% 0 Visits 450 2,000

Blasting & Painting 300 sq.mtr 80 /sq.mtr 24,000 Transport for Painting - 100 MT -

Collection of Free Issue materials from site Delivery to Sigma shop is in Emerson scope MT -

QA/QC Inspection 135 42 /Hrs 5,682 - 125 MT 4,000

Design and Preparartion of Fab Drawings LS 4,000 Packing for Transport LS 3,000 Documentation LS 900 Commercial Loading 1% of Total Value LS

Total Cost for NDT and other works 56,452 IV SKID ASSEMBLING & TESTING

Grating and handrail assembling 4 man, 8day, 8hrs 42 /Hrs 10,752 Skid assembling for hydro testing 3 man, 8day, 8hrs 42 /Hrs 8,064 Hydrotesting at shop 4 man, 2 days,8 hrs 64 Hrs 42 /Hrs 2,688 Installation of all free issue instruments & valves (20nos 10 inch dia valves & meters) 42 /Hrs 12096Trial Testing (Air testing) 4man, 2day,8hrs 42 /Hrs 2688

V Final packing and loading 4man, 2 day, 8 hrs 2,688 Total Cost for assembling and testing 38,976

Total Price = Fab + NDT + Assembling and testing 210,575 57,456 US $Total Selling Price 581038

Rate in US $ = 158537Electrical and Instrumentation work = US $ 9564 with 25% margin = US $ 12,000

24"-2 Joints@350/joint, 10"-90 Joints@85/joint, 1.5" --20 Joints

Transport upto site (up to JAFZ)

Page 37: est

Skid-13 37 of 79

DATE : 4/3/2011

SIGMA ENGINEERING WORKS L.L.CESTIMATES

Est No : 250061Client : Emerson Process ManagementProject : Enq Ref No : Scope of Work ; Custody transfer metering skid (013-FT-400) Design pressure = 18 bar

Description MOC Nos Proc Wt Material (AED) Remarks

Kg Kg Kg Rate Amount

Custody transfer metering skid--Ref: Drg.no.101230810-3-003 Rev.0 (Qty.01No)

Skid size; 12.5mtr long x 3.6mtr width x 3.6mtr height

I. Material Cost : -

STEEL PIPING

Pipe 24 inch x Sch.40 x 12mtr long A106GR.B 1 3064.9 3064.9 956.76 4000 /mtr 48,000

Pipe 10 inch x Sch.40 x 12mtr long A106GR.B 5 723.72 3618.6 1021.2 325 /mtr 19,500

Pipe 1.5 inch x Sch.80 x 12mtr long A106GR.B 1 64.92 64.9 64.92 55 /mtr 660

Pipe 3/4 inch x Sch.80 x 12mtr long A106GR.B 1 26.4 26.4 26.4 50 /mtr 600

Pipe 1/2 inch x Sch.80 x 12mtr long A106GR.B 1 19.44 19.4 19.44 40 /mtr 480

Elbow 24 inch x Sch.40 x 90 Degree, LR SA234GR.WPB 2 202 404.0 404.0 7000 /Each 14,000

Elbow 10 inch x Sch.40 x 90 Degree, LR SA234GR.WPB 5 37 185.0 185.0 500 /Each 2,500

Elbow 1.5 inch x Sch.80 x 90 Degree SA234GR.WPB 2 0.6 1.2 1.2 60 /Each 120

Eq. Tee 24 inch x Sch.40 SA234GR.WPB 7 225 1575.0 1575.0 ### /Each 71,400

Eq. Tee 10 inch x Sch.40 SA234GR.WPB 7 36 252.0 252.0 750 /Each 5,250

Reducer 10 inch x 8 inch x Sch.40 SA234GR.WPB 8 10.7 85.6 85.6 200 /Each 1,600

Reducer 24 inch x 10 inch x Sch.40 SA234GR.WPB 10 105 1050.0 1050.0 6500 /Each 65,000

WN Type Flange 24 inch x Sch.40 x 150# ASTM A105N 2 118 236.0 236.0 1250 /Each 2,500

Blind Type Flange 24 inch x 150# ASTM A105N 2 186 372.0 372.0 2240 /Each 4,480

WN Type Flange 10 inch x Sch.40 x 150# ASTM A105N 38 24 912.0 912.0 215 /Each 8,170

WN Type Flange 8 inch x Sch.40 x 150# ASTM A105N 6 18 108.0 108.0 154 /Each 924

WN Type Flange 1.5 inch x Sch.80 x 300# ASTM A105N 8 1.8 14.4 14.4 60 /Each 480

WN Type Flange 3/4 inch x Sch.80 x 300# ASTM A105N 4 0.8 3.2 3.2 45 /Each 180

WN Type Flange 1/2 inch x Sch.80 x 300# ASTM A105N 4 0.6 2.4 2.4 40 /Each 160

ASTM A105 4 1.0 4.0 4.0 160 /Each 640

ASTM A105 4 0.5 2.0 2.0 40 /Each 160

U Clamps for 24 inch pipes A36/EQ. 24 2.96 71.0 71.0 360 /Each 8,640

U Clamps for 10 inch pipes A36/EQ. 48 3.47 166.4 166.4 110 /Each 5,280

Stud bolts + Nuts M33 x 190mm long 48 1.9 90.1 90.1 20 /Each 960

Stud bolts + Nuts M24 x 130mm long 432 1.1 467.2 467.2 6 /Each 2,592

24 inch @1500/each, 10 inch @110/each, 8 in 8,500

STEEL FRAME WORK

UC254 x 254 x 73kg/mtr x 90mtr long S275JR 1 6570 6570 7227 3.2 /kg 23,126

Lifting lug 50 mm thk x 200 x 350mm S355K2G3 12 27.47 330 362.67 5 /kg 1,813

S275JR 6 63.60 382 419.76 3.2 /kg 1,343

S275JR 6 112.80 677 744.48 3.2 /kg 2,382

S275JR 12 112.80 1354 1488.96 3.2 /kg 4,765

S275JR 1 ### 1800 1980.00 6.8 /kg 13,464

Grating clip; 4nos/sq.mtr S275JR 200 0.10 20 22.00 6 /no 1,200

A106GR.B 8 20.34 163 178.99 28 /mtr 1,344

Additional cost for Spares (10% extra) 3,000

Consumables 10% 11,515 5% on Material 17,407 18,536 LS #REF!

Total cost for Materials 336,729 Total cost for Materials with 10% Margin 370,402

II. Fabrication Cost : -

Sl No

Unit Wt

Finish Wt

Rate Basis

DS Korea Flange

Half coupling 3/4" x 3000# x NPT threaded, male

Half coupling 1/2" x 3000# x NPT threaded, FF

A193GR.B7/A194GR.2HA193GR.B7/A194GR.2H

Gaskets, 24" --2nos, 10"-42nos, 8"-8nos, 1.5"-6nos

SS316L Spiral wound

Supports for meters and valves UPN 100 x 10.6 kg/mtr x 6mtr long

Supports for platform UPN 160 x 18.8 kg/mtr x 6mtr long

Supports for mid platform UPN 160 x 18.8 kg/mtr x 6mtr long

Platform gratings-- Load bar size 35 x 5mm, load bar pitch 30mm, cross bar pitch 100mm, serrated, 6mm twisted square, 40kg/mtr x 3600mm width x 12500mm long

Handrail pipe 1 1/4 inch x Sch.40 x 6mtr long

Page 38: est

Skid-13 38 of 79

Description MOC Nos Proc Wt Material (AED) Remarks

Kg Kg Kg Rate Amount

Sl No

Unit Wt

Finish Wt

Rate Basis

Inch Dia --24 inch x Sch.40--24hrs/Joint x 2J 48 Hrs Rate 42/hr 2016Inch Dia --10 inch x Sch.40--7 hrs/Joint x 90 630 Hrs Rate 42/hr 26460Inch Dia --8 inch x Sch.40--6 hrs/Joint x 6 Jo 36 Hrs Rate 42/hr 1512Inch Dia --1.5 inch x Sch.80--3 hrs/Joint x 20 60 Hrs Rate 42/hr 2520Inch Dia --3/4 inch x Sch.XXS--2 hrs/Joint x 20 Hrs Rate 42/hr 840Pipe havdling Hrs (20% of the total fab.hrs) 148 Hrs Rate 42/hr 6199.2Fabrication cost (marking, cutting) 800 Hrs For marking, cuting 42 Per hrs 33600Fab. cost of support structurals (set up & w 1000 Hrs For setup & welding 42 Per hrs 42000

115147III. NDT : -

Radiography test 100% 9,850 MPI on lifting lugs 100% 500 Visual Examination 100% 60 hrs 42 /Hrs 2,520 MPI (wherever RT is not possible) 100% 0 Visits 450 2,000

Blasting & Painting 300 sq.mtr 80 /sq.mtr 24,000 Transport for Painting - 100 MT -

Collection of Free Issue materials from site Delivery to Sigma shop is in Emerson scope MT -

QA/QC Inspection 135 42 /Hrs 5,682 - 125 MT 4,000

Design and Preparartion of Fab Drawings LS 4,000 Packing for Transport LS 3,000 Documentation LS 900 Commercial Loading 1% of Total Value LS

Total Cost for NDT and other works 56,452 IV SKID ASSEMBLING & TESTING

Grating and handrail assembling 4 man, 8day, 8hrs 42 /Hrs 10,752 Skid assembling for hydro testing 3 man, 8day, 8hrs 42 /Hrs 8,064 Hydrotesting at shop 4 man, 2 days,8 hrs 64 Hrs 42 /Hrs 2,688 Installation of all free issue instruments & valves (20nos 10 inch dia valves & meters) 42 /Hrs 12096Trial Testing (Air testing) 4man, 2day,8hrs 42 /Hrs 2688

V Final packing and loading 4man, 2 day, 8 hrs 2,688 Total Cost for assembling and testing 38,976

Total Price = Fab + NDT + Assembling and testing 210,575 57,456 US $Total Selling Price 580977

Rate in US $ = 158520Electrical and Instrumentation work = US $ 9564 with 25% margin = US $ 12,000

24"-2 Joints@350/joint, 10"-90 Joints@85/joint, 1.5" --20 Joints

Transport upto site (up to JAFZ)

Page 39: est

SIGMA ENGINEERING WORKS L.L.CESTIMATES

Est No : 250061Client : Emerson Process ManagementProject : Enq Ref No : Scope of Work ; Custody transfer metering skid (013-FT-400) Design pressure = 18 bar

Sl No Description MOC Nos Unit Wt

Kg Kg Kg

Custody transfer metering skid--Ref: Drg.no.101230810-3-003 Rev.0 (Qty.01No)Skid size; 12.5mtr long x 2.6mtr width x 3.6mtr height

I. Material Cost : -STEEL PIPINGPipe 10 inch x Sch.40 x 12mtr long A106GR.B 1 723.72 723.7 956.76Pipe 6 inch x Sch.40 x 12mtr long A106GR.B 3 339.12 1017.4 1021.2Pipe 1.5 inch x Sch.80 x 12mtr long A106GR.B 1 64.92 64.9 64.92Pipe 3/4 inch x Sch.80 x 12mtr long A106GR.B 1 26.4 26.4 26.4Pipe 1/2 inch x Sch.80 x 12mtr long A106GR.B 1 19.44 19.4 19.44

SA234GR.WPB 2 142.4 284.8 284.8

SA234GR.WPB 5 37 185.0 185.0

SA234GR.WPB 2 0.6 1.2 1.2Eq. Tee 10 inch x Sch.40 SA234GR.WPB 7 168 1176.0 1176.0Eq. Tee 6 inch x Sch.40 SA234GR.WPB 7 49.35 345.5 345.5Reducer 6 inch x 4 inch x Sch.40 SA234GR.WPB 8 10.7 85.6 85.6Reducer 10 inch x 6 inch x Sch.40 SA234GR.WPB 10 99 990.0 990.0

ASTM A105N 2 77 154.0 154.0Blind Type Flange 10 inch x 150# ASTM A105N 2 123 246.0 246.0

ASTM A105N 38 24 912.0 912.0

ASTM A105N 6 18 108.0 108.0

ASTM A105N 8 1.8 14.4 14.4

ASTM A105N 4 0.8 3.2 3.2

ASTM A105N 4 0.6 2.4 2.4

ASTM A105 4 1.0 4.0 4.0

ASTM A105 4 0.5 2.0 2.0U Clamps for 10 inch pipes A36/EQ. 24 2.96 71.0 71.0U Clamps for 6 inch pipes A36/EQ. 48 3.47 166.4 166.4

Finish Wt

Proc Wt

Elbow 10 inch x Sch.40 x 90 Degree, LR

Elbow 6 inch x Sch.40 x 90 Degree, LR

Elbow 1.5 inch x Sch.80 x 90 Degree

WN Type Flange 10 inch x Sch.40 x 150#

WN Type Flange 6 inch x Sch.40 x 150#

WN Type Flange 6 inch x Sch.40 x 150#

WN Type Flange 1.5 inch x Sch.80 x 150#

WN Type Flange 3/4 inch x Sch.80 x 300#

WN Type Flange 1/2 inch x Sch.80 x 300#

Half coupling 3/4" x 3000# x NPT threaded, male

Half coupling 1/2" x 3000# x NPT threaded, FF

Page 40: est

48 1.9 90.1 90.1

432 1.1 467.2 467.2

20 inch @1500/each, 10 inch @120/each, 8 inch STEEL FRAME WORK

S275JR 1 4380 4380 4818

S355K2G3 12 27.47 330 362.67

S275JR 6 63.60 382 419.76

S275JR 6 112.80 677 744.48

S275JR 12 112.80 1354 1488.96

S275JR 1 1300.00 1300 1430.00Grating clip; 4nos/sq.mtr S275JR 200 0.10 20 22.00

A106GR.B 8 20.34 163 178.99

Consumables 10%5% on Material 14,024 14,884

Total cost for MaterialsTotal cost for Materials with 10% Margin

II. Fabrication Cost : -Inch Dia --20 inch x Sch.40--18hrs/Join 36 Hrs Rate 42/hrInch Dia --10 inch x Sch.40--8 hrs/Join 720 Hrs Rate 42/hrInch Dia --8 inch x Sch.40--6 hrs/Joint 36 Hrs Rate 42/hrInch Dia --1.5 inch x Sch.80--3 hrs/Joi 60 Hrs Rate 42/hrInch Dia --3/4 inch x Sch.XXS--2 hrs/Jo 20 Hrs Rate 42/hrPipe havdling Hrs (20% of the total fa 163 Hrs Rate 42/hrFabrication cost (marking, cutting) 600 Hrs For marking, cuting Fab. cost of support structurals (set 800 Hrs For setup & welding

III. NDT : -Radiography test 100%MPI on lifting lugs 100%Visual Examination 100% 60 hrsMPI (wherever RT is not possible) 100% 0 Visits Blasting & Painting 200 sq.mtrTransport for Painting - Collection of Free Issue materials fro Delivery to Sigma shop is in Emerson scopeQA/QC Inspection 120

-

Stud bolts + Nuts M30 x 170mm long

A193GR.B7/

A194GR.2H

Stud bolts + Nuts M24 x 130mm long

A193GR.B7/

A194GR.2H

Gaskets ,20" --2nos, 10"-34nos, 8"-8nos, 1.5"-6nos

SS316L Spiral wound

UC254 x 254 x 73kg/mtr x 60mtr long

Lifting lug 50 mm thk x 200 x 350mm

Supports for meters and valves UPN 100 x 10.6 kg/mtr x 6mtr long

Supports for platform UPN 160 x 18.8 kg/mtr x 6mtr long

Supports for mid platform UPN 160 x 18.8 kg/mtr x 6mtr long

Platform gratings-- Load bar size 35 x 5mm, load bar pitch 30mm, cross bar pitch 100mm, serrated, 6mm twisted square, 40kg/mtr x 2600mm width x 12500mm long

Handrail pipe 1 1/4 inch x Sch.40 x 6mtr long

Additional cost for Spares (10% extra)

20"-2 Joints@175/joint, 10"-90 Joints@85/joint, 1.5" --20 Joints

Transport upto site (up to JAFZ)

Page 41: est

Design and Preparartion of Fab DrawingsPacking for TransportDocumentationCommercial Loading 1% of Total Value

Total Cost for NDT and other worksIV SKID ASSEMBLING & TESTING

Grating and handrail assembling 4 man, 8day, 8hrsSkid assembling for hydro testing 3 man, 8day, 8hrsHydrotesting at shop 4 man, 2 days,8 hrs 64 HrsInstallation of all free issue instruments & valves (20nos 10 inch dia valves & meters)Trial Testing (Air testing) 4man, 2day,8hrs

V Final packing and loading 4man, 2 day, 8 hrsTotal Cost for assembling and testing

Total Price = Fab + NDT + Assembling and testingTotal Selling Price

Rate in US $ =Electrical and Instrumentation work = US $ 9564 with 25% margin = US $ 12,000

Page 42: est

DATE : 4/3/2011

SIGMA ENGINEERING WORKS L.L.CESTIMATES

Material (AED)

Rate Amount

Custody transfer metering skid--Ref: Drg.no.101230810-3-003 Rev.0 (Qty.01No)

2600 /mtr 31,200 325 /mtr 11,700

55 /mtr 660 50 /mtr 600 40 /mtr 480

4000 /Each 8,000

500 /Each 2,500

60 /Each 120 7000 /Each 49,000

750 /Each 5,250 200 /Each 1,600

5000 /Each 50,000

860 /Each 1,720 1500 /Each 3,000

220 /Each 8,360

154 /Each 924

60 /Each 480

45 /Each 180

40 /Each 160

160 /Each 640

40 /Each 160 250 /Each 6,000 110 /Each 5,280

Remarks

Rate Basis

DS Korea Flange

Page 43: est

15 /Each 720

6 /Each 2,592

20 inch @1500/each, 10 inch @120/each, 8 inch 7,960

3.2 /kg 15,418

5 /kg 1,813

3.2 /kg 1,343

3.2 /kg 2,382

3.2 /kg 4,765

6.8 /kg 9,724 6 /no 1,200

28 /mtr 1,344

3,000 10,228

LS #REF!Total cost for Materials ###

Total cost for Materials with 10% Margin ###

151230240

15122520

8406854.4

42 Per hrs 2520042 Per hrs 33600

102278

10,050 500

42 /Hrs 2,520 450 2,000

80 /sq.mtr 16,000 100 MT -

MT - 42 /Hrs 5,038

125 MT 4,000

20"-2 Joints@175/joint, 10"-90 Joints@85/joint, 1.5" --20 Joints

Page 44: est

LS 4,000 LS 3,000 LS 900 LS

Total Cost for NDT and other works 48,008

42 /Hrs 10,752 42 /Hrs 8,064 42 /Hrs 2,688 42 /Hrs 1209642 /Hrs 2688

2,688 Total Cost for assembling and testing 38,976

Total Price = Fab + NDT + Assembling and testing ### ###Total Selling Price 464816

Rate in US $ = 126826US $ 9564 with 25% margin = US $ 12,000

Page 45: est

Skid-12 45 of 79

DATE : 4/3/2011

SIGMA ENGINEERING WORKS L.L.CESTIMATES

Est No : 250061Client : Emerson Process ManagementProject : Enq Ref No : Scope of Work ; Custody transfer metering skid (013-FT-400) Design pressure = 18 bar

Description MOC Nos Proc Wt Material (AED) Remarks

Kg Kg Kg Rate Amount

Custody transfer metering skid--Ref: Drg.no.101230810-3-003 Rev.0 (Qty.01No)

Skid size; 12.5mtr long x 2.6mtr width x 3.6mtr height

I. Material Cost : -

STEEL PIPING

Pipe 20 inch x Sch.40 x 12mtr long A106GR.B 1 2201 2201.0 956.76 2600 /mtr 31,200

Pipe 10 inch x Sch.40 x 12mtr long A106GR.B 4 723.72 2894.9 1021.2 325 /mtr 15,600

Pipe 1.5 inch x Sch.80 x 12mtr long A106GR.B 1 64.92 64.9 64.92 55 /mtr 660

Pipe 3/4 inch x Sch.80 x 12mtr long A106GR.B 1 26.4 26.4 26.4 50 /mtr 600

Pipe 1/2 inch x Sch.80 x 12mtr long A106GR.B 1 19.44 19.4 19.44 40 /mtr 480

Elbow 20 inch x Sch.40 x 90 Degree, LR SA234GR.WPB 2 142.4 284.8 284.8 4000 /Each 8,000

Elbow 10 inch x Sch.40 x 90 Degree, LR SA234GR.WPB 5 37 185.0 185.0 500 /Each 2,500

Elbow 1.5 inch x Sch.80 x 90 Degree SA234GR.WPB 2 0.6 1.2 1.2 60 /Each 120

Eq. Tee 20 inch x Sch.40 SA234GR.WPB 7 168 1176.0 1176.0 7000 /Each 49,000

Eq. Tee 10 inch x Sch.40 SA234GR.WPB 7 49.35 345.5 345.5 750 /Each 5,250

Reducer 10 inch x 8 inch x Sch.40 SA234GR.WPB 8 10.7 85.6 85.6 200 /Each 1,600

Reducer 20 inch x 10 inch x Sch.40 SA234GR.WPB 10 99 990.0 990.0 5000 /Each 50,000

WN Type Flange 20 inch x Sch.40 x 150# ASTM A105N 2 77 154.0 154.0 860 /Each 1,720

Blind Type Flange 20 inch x 150# ASTM A105N 2 123 246.0 246.0 1500 /Each 3,000

WN Type Flange 10 inch x Sch.40 x 150# ASTM A105N 38 24 912.0 912.0 220 /Each 8,360

WN Type Flange 8 inch x Sch.40 x 150# ASTM A105N 6 18 108.0 108.0 154 /Each 924

WN Type Flange 1.5 inch x Sch.80 x 300# ASTM A105N 8 1.8 14.4 14.4 60 /Each 480

WN Type Flange 3/4 inch x Sch.80 x 300# ASTM A105N 4 0.8 3.2 3.2 45 /Each 180

WN Type Flange 1/2 inch x Sch.80 x 300# ASTM A105N 4 0.6 2.4 2.4 40 /Each 160

ASTM A105 4 1.0 4.0 4.0 160 /Each 640

ASTM A105 4 0.5 2.0 2.0 40 /Each 160

U Clamps for 20 inch pipes A36/EQ. 24 2.96 71.0 71.0 250 /Each 6,000

U Clamps for 10 inch pipes A36/EQ. 48 3.47 166.4 166.4 110 /Each 5,280

Stud bolts + Nuts M30 x 170mm long 48 1.9 90.1 90.1 15 /Each 720

Stud bolts + Nuts M24 x 130mm long 432 1.1 467.2 467.2 6 /Each 2,592

20 inch @1500/each, 10 inch @120/each, 8 in 7,960

STEEL FRAME WORK

UC254 x 254 x 73kg/mtr x 60mtr long S275JR 1 4380 4380 4818 3.2 /kg 15,418

Lifting lug 50 mm thk x 200 x 350mm S355K2G3 12 27.47 330 362.67 5 /kg 1,813

S275JR 6 63.60 382 419.76 3.2 /kg 1,343

S275JR 6 112.80 677 744.48 3.2 /kg 2,382

S275JR 12 112.80 1354 1488.96 3.2 /kg 4,765

S275JR 1 ### 1300 1430.00 6.8 /kg 9,724

Grating clip; 4nos/sq.mtr S275JR 200 0.10 20 22.00 6 /no 1,200

A106GR.B 8 20.34 163 178.99 28 /mtr 1,344

Additional cost for Spares (10% extra) 3,000

Consumables 10% 10,228 5% on Material 14,024 14,884 LS #REF!

Total cost for Materials 254,403 Total cost for Materials with 10% Margin 279,843

II. Fabrication Cost : -Inch Dia --20 inch x Sch.40--18hrs/Joint x 2J 36 Hrs Rate 42/hr 1512

Sl No

Unit Wt

Finish Wt

Rate Basis

DS Korea Flange

Half coupling 3/4" x 3000# x NPT threaded, male

Half coupling 1/2" x 3000# x NPT threaded, FF

A193GR.B7/A194GR.2HA193GR.B7/A194GR.2H

Gaskets ,20" --2nos, 10"-34nos, 8"-8nos, 1.5"-6nos

SS316L Spiral wound

Supports for meters and valves UPN 100 x 10.6 kg/mtr x 6mtr long

Supports for platform UPN 160 x 18.8 kg/mtr x 6mtr long

Supports for mid platform UPN 160 x 18.8 kg/mtr x 6mtr long

Platform gratings-- Load bar size 35 x 5mm, load bar pitch 30mm, cross bar pitch 100mm, serrated, 6mm twisted square, 40kg/mtr x 2600mm width x 12500mm long

Handrail pipe 1 1/4 inch x Sch.40 x 6mtr long

Page 46: est

Skid-12 46 of 79

Description MOC Nos Proc Wt Material (AED) Remarks

Kg Kg Kg Rate Amount

Sl No

Unit Wt

Finish Wt

Rate Basis

Inch Dia --10 inch x Sch.40--8 hrs/Joint x 90 720 Hrs Rate 42/hr 30240Inch Dia --8 inch x Sch.40--6 hrs/Joint x 6 Jo 36 Hrs Rate 42/hr 1512Inch Dia --1.5 inch x Sch.80--3 hrs/Joint x 20 60 Hrs Rate 42/hr 2520Inch Dia --3/4 inch x Sch.XXS--2 hrs/Joint x 20 Hrs Rate 42/hr 840Pipe havdling Hrs (20% of the total fab.hrs) 163 Hrs Rate 42/hr 6854.4Fabrication cost (marking, cutting) 600 Hrs For marking, cuting 42 Per hrs 25200Fab. cost of support structurals (set up & w 800 Hrs For setup & welding 42 Per hrs 33600

102278III. NDT : -

Radiography test 100% 10,050 MPI on lifting lugs 100% 500 Visual Examination 100% 60 hrs 42 /Hrs 2,520 MPI (wherever RT is not possible) 100% 0 Visits 450 2,000

Blasting & Painting 200 sq.mtr 80 /sq.mtr 16,000 Transport for Painting - 100 MT -

Collection of Free Issue materials from site Delivery to Sigma shop is in Emerson scope MT -

QA/QC Inspection 120 42 /Hrs 5,038 - 125 MT 4,000

Design and Preparartion of Fab Drawings LS 4,000 Packing for Transport LS 3,000 Documentation LS 900 Commercial Loading 1% of Total Value LS

Total Cost for NDT and other works 48,008 IV SKID ASSEMBLING & TESTING

Grating and handrail assembling 4 man, 8day, 8hrs 42 /Hrs 10,752 Skid assembling for hydro testing 3 man, 8day, 8hrs 42 /Hrs 8,064 Hydrotesting at shop 4 man, 2 days,8 hrs 64 Hrs 42 /Hrs 2,688 Installation of all free issue instruments & valves (20nos 10 inch dia valves & meters) 42 /Hrs 12096Trial Testing (Air testing) 4man, 2day,8hrs 42 /Hrs 2688

V Final packing and loading 4man, 2 day, 8 hrs 2,688 Total Cost for assembling and testing 38,976

Total Price = Fab + NDT + Assembling and testing 189,263 51,641 US $Total Selling Price 469106

Rate in US $ = 127996Electrical and Instrumentation work = US $ 9564 with 25% margin = US $ 12,000

20"-2 Joints@175/joint, 10"-90 Joints@85/joint, 1.5" --20 Joints

Transport upto site (up to JAFZ)

Page 47: est

Skid-11 47 of 79

DATE : 4/3/2011

SIGMA ENGINEERING WORKS L.L.CESTIMATES

Est No : 250061Client : Emerson Process ManagementProject : Enq Ref No : Scope of Work ; Custody transfer metering skid (013-FT-400) Design pressure = 18 bar

Description MOC Nos Proc Wt Material (AED) Remarks

Kg Kg Kg Rate Amount

Custody transfer metering skid--Ref: Drg.no.101230810-3-003 Rev.0 (Qty.01No)

Skid size; 8.5mtr long x 2.6mtr width x 3mtr height

I. Material Cost : -

STEEL PIPING

Pipe 12 inch x Sch.40 x 12mtr long A106GR.B 1 956.76 956.8 956.76 440 /mtr 5,280

Pipe 8 inch x Sch.40 x 12mtr long A106GR.B 3 510.6 1531.8 1021.2 225 /mtr 8,100

Pipe 1.5 inch x Sch.80 x 12mtr long A106GR.B 1 64.92 64.9 64.92 55 /mtr 660

Pipe 3/4 inch x Sch.80 x 12mtr long A106GR.B 1 26.4 26.4 26.4 50 /mtr 600

Pipe 1/2 inch x Sch.80 x 12mtr long A106GR.B 1 19.44 19.4 19.44 40 /mtr 480

Elbow 12 inch x Sch.40 x 90 Degree, LR SA234GR.WPB 2 54 108.0 108.0 800 /Each 1,600

Elbow 8 inch x Sch.40 x 90 Degree, LR SA234GR.WPB 3 20.3 60.9 60.9 200 /Each 600

Elbow 1.5 inch x Sch.80 x 90 Degree SA234GR.WPB 2 0.36 0.7 0.7 30 /Each 60

Eq. Tee 12 inch x Sch.40 SA234GR.WPB 3 65 195.0 195.0 1200 /Each 3,600

Eq. Tee 8 inch x Sch.40 SA234GR.WPB 3 33 99.0 99.0 400 /Each 1,200

Reducer 12 inch x 8 inch x Sch.40 SA234GR.WPB 5 15 75.0 75.0 300 /Each 1,500

Reducer 8 inch x 4 inch x Sch.40 SA234GR.WPB 4 6.5 26.0 26.0 90 /Each 360

WN Type Flange 12 inch x Sch.40 x 150# ASTM A105N 2 37 74.0 74.0 360 /Each 720

Blind Type Flange 12 inch x 150# ASTM A105N 2 40 80.0 80.0 480 /Each 960

WN Type Flange 8 inch x Sch.40 x 150# ASTM A105N 24 18 432.0 432.0 160 /Each 3,840

WN Type Flange 4 inch x Sch.40 x 150# ASTM A105N 4 7 28.0 28.0 70 /Each 280

WN Type Flange 1.5 inch x Sch.80 x 300# ASTM A105N 8 1.8 14.4 14.4 60 /Each 480

WN Type Flange 3/4 inch x Sch.80 x 300# ASTM A105N 4 0.8 3.2 3.2 30 /Each 120

WN Type Flange 1/2 inch x Sch.80 x 300# ASTM A105N 4 0.6 2.4 2.4 25 /Each 100

ASTM A105 4 1.0 4.0 4.0 80 /Each 320

ASTM A105 4 0.5 2.0 2.0 20 /Each 80

U Clamps for 12 inch pipes A36/EQ. 16 2.96 47.3 47.3 150 /Each 2,400

U Clamps for 8 inch pipes A36/EQ. 16 3.47 55.5 55.5 90 /Each 1,440

Stud bolts + Nuts M24 x 140mm long 24 0.7 17.3 17.3 8 /Each 192

Stud bolts + Nuts M20 x 120mm long 240 0.1 34.1 34.1 6 /Each 1,440

Gaskets ,12" --2nos, 8"-30nos, 1.5"-6nos 12 inch @120/each, 8 inch @80/each, 1.5 inc 2,880

STEEL FRAME WORK

UC254 x 254 x 73kg/mtr x 50mtr long S275JR 1 3650 3650 4015 3.2 /kg 12,848

Lifting lug 50 mm thk x 200 x 350mm S355K2G3 6 27.47 165 181.33 5 /kg 907

S275JR 3 63.60 191 209.88 3.2 /kg 672

S275JR 2 112.80 226 248.16 3.2 /kg 794

S275JR 10 112.80 1128 1240.80 3.2 /kg 3,971

S275JR 1 860.00 860 946.00 6.8 /kg 6,433

Grating clip; 4nos/sq.mtr S275JR 100 0.10 10 11.00 6 /no 600

A106GR.B 4 20.34 81 89.50 28 /mtr 672

Additional cost for Spares (10% extra) 3,000

Consumables 10% 6,018 5% on Material 7,780 8,411 LS #REF!

Total cost for Materials 75,206 Total cost for Materials with 10% Margin 82,726

II. Fabrication Cost : -Inch Dia --12 inch x Sch40--12hrs/Joint x 2Jo 24 Hrs Rate 42/hr 1008

Sl No

Unit Wt

Finish Wt

Rate Basis

DS Korea Flange

Half coupling 3/4" x 3000# x NPT threaded, male

Half coupling 1/2" x 3000# x NPT threaded, FF

A193GR.B7/A194GR.2HA193GR.B7/A194GR.2H

SS316L Spiral wound

Supports for meters and valves UPN 100 x 10.6 kg/mtr x 6mtr long

Supports for platform UPN 160 x 18.8 kg/mtr x 6mtr long

Supports for mid platform UPN 160 x 18.8 kg/mtr x 6mtr long

Platform gratings-- Load bar size 25 x 5mm, load bar pitch 30mm, cross bar pitch 100mm, serrated, 6mm twisted square, 40kg/mtr x 2500mm width x 8600mm long

Handrail pipe 1 1/4 inch x Sch.40 x 6mtr long

Page 48: est

Skid-11 48 of 79

Description MOC Nos Proc Wt Material (AED) Remarks

Kg Kg Kg Rate Amount

Sl No

Unit Wt

Finish Wt

Rate Basis

Inch Dia --8 inch x Sch.40--6 hrs/Joint x 45 J 270 Hrs Rate 42/hr 11340Inch Dia --1.5 inch x Sch.40--2.5 hrs/Joint x 50 Hrs Rate 42/hr 2100Inch Dia --3/4 inch x Sch.40--2 hrs/Joint x 10 20 Hrs Rate 42/hr 840Pipe havdling Hrs (20% of the total fab.hrs) 69 Hrs Rate 42/hr 2889.6Fabrication cost (marking, cutting) 400 Hrs For marking, cuting 42 Per hrs 16800Fab. cost of support structurals (set up & w 600 Hrs For setup & welding 42 Per hrs 25200

60178III. NDT : -

Radiography test 100% 16"-2 Joints@175/joint, 8"-45 Joints@85/joint, 1 5,675 MPI on lifting lugs 100% 500 Visual Examination 100% 50 hrs 42 /Hrs 2,100 MPI (wherever RT is not possible) 100% 0 Visits 450 1,200

Blasting & Painting 150 sq.mtr 80 /sq.mtr 12,000 Transport for Painting - 100 MT -

Collection of Free Issue materials from site Delivery to Sigma shop is in Emerson scope MT -

QA/QC Inspection 72 42 /Hrs 3,009 - 125 MT 1,800

Design and Preparartion of Fab Drawings LS 4,000 Packing for Transport LS 3,000 Documentation LS 900 Commercial Loading 1% of Total Value LS

Total Cost for NDT and other works 34,184 IV SKID ASSEMBLING & TESTING

Grating and handrail assembling 4 man, 4day, 8hrs 42 /Hrs 5,376 Skid assembling for hydro testing 3 man, 4day, 8hrs 42 /Hrs 4,032 Hydrotesting at shop 2 man, 2 days,8 hrs 32 Hrs 42 /Hrs 1,344 Installation of all free issue instruments & valves (8nos 10 inch dia valves & meters) 42 /Hrs 6048Trial Testing (Air testing) 3man, 2day,8hrs 42 /Hrs 2016

V Final packing and loading 3man, 2 day, 8 hrs 2,016 Total Cost for assembling and testing 20,832

Total Price = Fab + NDT + Assembling and testing ### 31,431 US $Total Selling Price 197920

Rate in US $ = 54003Electrical and Instrumentation work = US $ 9564 with 25% margin = US $ 12,000

Transport upto site (up to JAFZ)

Page 49: est

Skid-10 49 of 79

DATE : 4/3/2011

SIGMA ENGINEERING WORKS L.L.CESTIMATES

Est No : 250061Client : Emerson Process ManagementProject : Enq Ref No : Scope of Work ; Custody transfer metering skid (013-FT-400) Design pressure = 18 bar

Description MOC Nos Proc Wt Material (AED) Remarks

Kg Kg Kg Rate Amount

Custody transfer metering skid--Ref: Drg.no.101230810-3-003 Rev.0 (Qty.01No)

Skid size; 8.5mtr long x 2.6mtr width x 3mtr height

I. Material Cost : -

STEEL PIPING

Pipe 12 inch x Sch.40 x 12mtr long A106GR.B 1 956.76 956.8 956.76 430 /mtr 5,160

Pipe 8 inch x Sch.40 x 12mtr long A106GR.B 3 510.6 1531.8 1021.2 225 /mtr 8,100

Pipe 1.5 inch x Sch.80 x 12mtr long A106GR.B 1 64.92 64.9 64.92 55 /mtr 660

Pipe 3/4 inch x Sch.80 x 12mtr long A106GR.B 1 26.4 26.4 26.4 50 /mtr 600

Pipe 1/2 inch x Sch.80 x 12mtr long A106GR.B 1 19.44 19.4 19.44 40 /mtr 480

Elbow 12 inch x Sch.40 x 90 Degree, LR SA234GR.WPB 2 54 108.0 108.0 800 /Each 1,600

Elbow 8 inch x Sch.40 x 90 Degree, LR SA234GR.WPB 3 20.3 60.9 60.9 200 /Each 600

Elbow 1.5 inch x Sch.80 x 90 Degree SA234GR.WPB 2 0.36 0.7 0.7 30 /Each 60

Eq. Tee 12 inch x Sch.40 SA234GR.WPB 3 65 195.0 195.0 1200 /Each 3,600

Eq. Tee 8 inch x Sch.40 SA234GR.WPB 3 33 99.0 99.0 400 /Each 1,200

Reducer 12 inch x 8 inch x Sch.40 SA234GR.WPB 5 15 75.0 75.0 300 /Each 1,500

Reducer 8 inch x 4 inch x Sch.40 SA234GR.WPB 4 6.5 26.0 26.0 90 /Each 360

WN Type Flange 12 inch x Sch.40 x 150# ASTM A105N 2 37 74.0 74.0 360 /Each 720

Blind Type Flange 12 inch x 150# ASTM A105N 2 40 80.0 80.0 480 /Each 960

WN Type Flange 8 inch x Sch.40 x 150# ASTM A105N 24 18 432.0 432.0 160 /Each 3,840

WN Type Flange 4 inch x Sch.40 x 150# ASTM A105N 4 7 28.0 28.0 70 /Each 280

WN Type Flange 1.5 inch x Sch.80 x 300# ASTM A105N 8 1.8 14.4 14.4 60 /Each 480

WN Type Flange 3/4 inch x Sch.80 x 300# ASTM A105N 4 0.8 3.2 3.2 30 /Each 120

WN Type Flange 1/2 inch x Sch.80 x 300# ASTM A105N 4 0.6 2.4 2.4 25 /Each 100

ASTM A105 4 1.0 4.0 4.0 80 /Each 320

ASTM A105 4 0.5 2.0 2.0 20 /Each 80

U Clamps for 12 inch pipes A36/EQ. 16 2.96 47.3 47.3 150 /Each 2,400

U Clamps for 8 inch pipes A36/EQ. 16 3.47 55.5 55.5 90 /Each 1,440

Stud bolts + Nuts M24 x 140mm long 24 0.7 17.3 17.3 8 /Each 192

Stud bolts + Nuts M20 x 120mm long 240 0.1 34.1 34.1 6 /Each 1,440

Gaskets ,12" --2nos, 8"-30nos, 1.5"-6nos 12 inch @120/each, 8 inch @80/each, 1.5 inc 2,880

STEEL FRAME WORK

UC254 x 254 x 73kg/mtr x 50mtr long S275JR 1 3650 3650 4015 3.2 /kg 12,848

Lifting lug 50 mm thk x 200 x 350mm S355K2G3 6 27.47 165 181.33 5 /kg 907

S275JR 3 63.60 191 209.88 3.2 /kg 672

S275JR 2 112.80 226 248.16 3.2 /kg 794

S275JR 10 112.80 1128 1240.80 3.2 /kg 3,971

S275JR 1 884.00 884 972.40 6.8 /kg 6,612

Grating clip; 4nos/sq.mtr S275JR 100 0.10 10 11.00 6 /no 600

A106GR.B 4 20.34 81 89.50 28 /mtr 672

Additional cost for Spares (10% extra) 3,000

Consumables 10% 6,023 5% on Material 7,804 8,438 LS #REF!

Total cost for Materials 75,270 Total cost for Materials with 10% Margin 82,797

II. Fabrication Cost : -Inch Dia --12 inch x Sch40--12hrs/Joint x 2Jo 24 Hrs Rate 42/hr 1008

Sl No

Unit Wt

Finish Wt

Rate Basis

DS Korea Flange

Half coupling 3/4" x 3000# x NPT threaded, male

Half coupling 1/2" x 3000# x NPT threaded, FF

A193GR.B7/A194GR.2HA193GR.B7/A194GR.2H

SS316L Spiral wound

Supports for meters and valves UPN 100 x 10.6 kg/mtr x 6mtr long

Supports for platform UPN 160 x 18.8 kg/mtr x 6mtr long

Supports for mid platform UPN 160 x 18.8 kg/mtr x 6mtr long

Platform gratings-- Load bar size 25 x 5mm, load bar pitch 30mm, cross bar pitch 100mm, serrated, 6mm twisted square, 40kg/mtr x 2600mm width x 8500mm long

Handrail pipe 1 1/4 inch x Sch.40 x 6mtr long

Page 50: est

Skid-10 50 of 79

Description MOC Nos Proc Wt Material (AED) Remarks

Kg Kg Kg Rate Amount

Sl No

Unit Wt

Finish Wt

Rate Basis

Inch Dia --8 inch x Sch.40--6 hrs/Joint x 45 J 270 Hrs Rate 42/hr 11340Inch Dia --1.5 inch x Sch.40--2.5 hrs/Joint x 50 Hrs Rate 42/hr 2100Inch Dia --3/4 inch x Sch.40--2 hrs/Joint x 10 20 Hrs Rate 42/hr 840Pipe havdling Hrs (20% of the total fab.hrs) 69 Hrs Rate 42/hr 2940Fabrication cost (marking, cutting) 400 Hrs For marking, cuting 42 Per hrs 16800Fab. cost of support structurals (set up & w 600 Hrs For setup & welding 42 Per hrs 25200

60228III. NDT : -

Radiography test 100% 16"-2 Joints@175/joint, 8"-45 Joints@85/joint, 1 5,675 MPI on lifting lugs 100% 500 Visual Examination 100% 50 hrs 42 /Hrs 2,100 MPI (wherever RT is not possible) 100% 0 Visits 450 1,200

Blasting & Painting 150 sq.mtr 80 /sq.mtr 12,000 Transport for Painting - 100 MT -

Collection of Free Issue materials from site Delivery to Sigma shop is in Emerson scope MT -

QA/QC Inspection 72 42 /Hrs 3,009 - 125 MT 1,800

Design and Preparartion of Fab Drawings LS 4,000 Packing for Transport LS 3,000 Documentation LS 900 Commercial Loading 1% of Total Value LS

Total Cost for NDT and other works 34,184 IV SKID ASSEMBLING & TESTING

Grating and handrail assembling 4 man, 4day, 8hrs 42 /Hrs 5,376 Skid assembling for hydro testing 3 man, 4day, 8hrs 42 /Hrs 4,032 Hydrotesting at shop 2 man, 2 days,8 hrs 32 Hrs 42 /Hrs 1,344 Installation of all free issue instruments & valves (8nos 10 inch dia valves & meters) 42 /Hrs 6048Trial Testing (Air testing) 3man, 2day,8hrs 42 /Hrs 2016

V Final packing and loading 3man, 2 day, 8 hrs 2,016 Total Cost for assembling and testing 20,832

Total Price = Fab + NDT + Assembling and testing ### 31,444 US $Total Selling Price 198041

Rate in US $ = 54036Electrical and Instrumentation work = US $ 9564 with 25% margin = US $ 12,000

Transport upto site (up to JAFZ)

Page 51: est

Skid-9 51 of 79

DATE : 4/3/2011

SIGMA ENGINEERING WORKS L.L.CESTIMATES

Est No : 250061Client : Emerson Process ManagementProject : Enq Ref No : Scope of Work ; Custody transfer metering skid (013-FT-400) Design pressure = 18 bar

Description MOC Nos Proc Wt Material (AED) Remarks

Kg Kg Kg Rate Amount

Custody transfer metering skid--Ref: Drg.no.101230810-3-003 Rev.0 (Qty.01No)

Skid size; 12.5mtr long x 3.6mtr width x 3.6mtr height

I. Material Cost : -

STEEL PIPING

Pipe 28 inch x 25.4mm thk x 12mtr long A106GR.B 1 5352 5352.0 956.76 5300 /mtr 63,600

Pipe 10 inch x Sch.80 x 12mtr long A106GR.B 5 1152.1 5760.6 1021.2 500 /mtr 30,000

Pipe 1.5 inch x Sch.80 x 12mtr long A106GR.B 1 64.92 64.9 64.92 55 /mtr 660

Pipe 3/4 inch x Sch.80 x 12mtr long A106GR.B 1 26.4 26.4 26.4 50 /mtr 600

Pipe 1/2 inch x Sch.80 x 12mtr long A106GR.B 1 19.44 19.4 19.44 40 /mtr 480

SA234GR.WPB 2 478 956.0 956.0 ### /Each 30,000

Elbow 10 inch x Sch.80 x 90 Degree, LR SA234GR.WPB 5 57.11 285.6 285.6 900 /Each 4,500

Elbow 1.5 inch x Sch.80 x 90 Degree SA234GR.WPB 2 0.6 1.2 1.2 60 /Each 120

Eq. Tee 28 inch x Sch.80 SA234GR.WPB 7 526 3682.0 3682.0 ### /Each 140,000

Eq. Tee 10 inch x Sch.80 SA234GR.WPB 7 58.57 410.0 410.0 1200 /Each 8,400

Reducer 10 inch x 8 inch x Sch.80 SA234GR.WPB 8 17 136.0 136.0 350 /Each 2,800

Reducer 28 inch x 10 inch x Sch.80 SA234GR.WPB 10 341 3410.0 3410.0 ### /Each 140,000

WN Type Flange 28 inch x Sch.80 x 300# ASTM A105N 2 340 680.0 680.0 3500 /Each 7,000

Blind Type Flange 28 inch x 300# ASTM A105N 2 615 1230.0 1230.0 7380 /Each 14,760

WN Type Flange 10 inch x Sch.80 x 300# ASTM A105N 46 41 1886.0 1886.0 370 /Each 17,020

WN Type Flange 8 inch x Sch.80 x 300# ASTM A105N 8 30 240.0 240.0 275 /Each 2,200

WN Type Flange 1.5 inch x Sch.80 x 300# ASTM A105N 8 1.8 14.4 14.4 60 /Each 480

WN Type Flange 3/4 inch x Sch.80 x 300# ASTM A105N 4 0.8 3.2 3.2 45 /Each 180

WN Type Flange 1/2 inch x Sch.80 x 300# ASTM A105N 4 0.6 2.4 2.4 40 /Each 160

ASTM A105 4 1.0 4.0 4.0 160 /Each 640

ASTM A105 4 0.5 2.0 2.0 40 /Each 160

U Clamps for 28 inch pipes A36/EQ. 24 2.96 71.0 71.0 400 /Each 9,600

U Clamps for 10 inch pipes A36/EQ. 48 3.47 166.4 166.4 110 /Each 5,280

Stud bolts + Nuts M50 x 350mm long 56 1.9 105.1 105.1 70 /Each 3,920

Stud bolts + Nuts M27 x 160mm long 736 1.1 796.0 796.0 10 /Each 7,360

28 inch @2500/each, 10 inch @110/each, 8 in 10,940

STEEL FRAME WORK

UC254 x 254 x 73kg/mtr x 90mtr long S275JR 1 6570 6570 7227 3.2 /kg 23,126

Lifting lug 50 mm thk x 200 x 350mm S355K2G3 12 27.47 330 362.67 5 /kg 1,813

S275JR 6 63.60 382 419.76 3.2 /kg 1,343

S275JR 6 112.80 677 744.48 3.2 /kg 2,382

S275JR 12 112.80 1354 1488.96 3.2 /kg 4,765

S275JR 1 ### 1800 1980.00 6.8 /kg 13,464

Grating clip; 4nos/sq.mtr S275JR 200 0.10 20 22.00 6 /no 1,200

A106GR.B 8 20.34 163 178.99 28 /mtr 1,344

Additional cost for Spares (10% extra) 3,000

Consumables 10% 16,523 5% on Material 25,486 26,616 LS #REF!

Total cost for Materials 569,821 Total cost for Materials with 10% Margin 626,803

II. Fabrication Cost : -

Sl No

Unit Wt

Finish Wt

Rate Basis

Elbow 28 inch x 25.4mm thk x 90 Degree, LR

DS Korea Flange

Half coupling 3/4" x 6000# x NPT threaded, male

Half coupling 1/2" x 6000# x NPT threaded, FF

A193GR.B7/A194GR.2HA193GR.B7/A194GR.2H

Gaskets ,28" --2nos, 10"-46nos, 8"-8nos, 1.5"-6nos

SS316L Spiral wound

Supports for meters and valves UPN 100 x 10.6 kg/mtr x 6mtr long

Supports for platform UPN 160 x 18.8 kg/mtr x 6mtr long

Supports for mid platform UPN 160 x 18.8 kg/mtr x 6mtr long

Platform gratings-- Load bar size 25 x 5mm, load bar pitch 30mm, cross bar pitch 100mm, serrated, 6mm twisted square, 40kg/mtr x 3600mm width x 12500mm long

Handrail pipe 1 1/4 inch x Sch.40 x 6mtr long

Page 52: est

Skid-9 52 of 79

Description MOC Nos Proc Wt Material (AED) Remarks

Kg Kg Kg Rate Amount

Sl No

Unit Wt

Finish Wt

Rate Basis

Inch Dia --28 inch x 25.4mm thk--50hrs/Joint 120 Hrs Rate 42/hr 5040Inch Dia --10 inch x Sch.80--10 hrs/Joint x 1 1000 Hrs Rate 42/hr 42000Inch Dia --8 inch x Sch.80--8 hrs/Joint x 8 Jo 64 Hrs Rate 42/hr 2688Inch Dia --1.5 inch x Sch.80--3 hrs/Joint x 20 60 Hrs Rate 42/hr 2520Inch Dia --3/4 inch x Sch.XXS--2 hrs/Joint x 20 Hrs Rate 42/hr 840Pipe havdling Hrs (20% of the total fab.hrs) 236 Hrs Rate 42/hr 2940Fabrication cost (marking, cutting) 1200 Hrs For marking, cuting 42 Per hrs 50400Fab. cost of support structurals (set up & w 1400 Hrs For setup & welding 42 Per hrs 58800

165228III. NDT : -

Radiography test 100% 22,600 MPI on lifting lugs 100% 500 Visual Examination 100% 100 hrs 42 /Hrs 4,200 MPI (wherever RT is not possible) 100% 0 Visits 450 2,500

Blasting & Painting 300 sq.mtr 80 /sq.mtr 24,000 Transport for Painting - 100 MT -

Collection of Free Issue materials from site Delivery to Sigma shop is in Emerson scope MT -

QA/QC Inspection 202 42 /Hrs 8,476 - 125 MT 4,000

Design and Preparartion of Fab Drawings LS 4,000 Packing for Transport LS 3,000 Documentation LS 900 Commercial Loading 1% of Total Value LS

Total Cost for NDT and other works 74,176 IV SKID ASSEMBLING & TESTING

Grating and handrail assembling 4 man, 8day, 8hrs 42 /Hrs 10,752 Skid assembling for hydro testing 3 man, 8day, 8hrs 42 /Hrs 8,064 Hydrotesting at shop 4 man, 2 days,8 hrs 64 Hrs 42 /Hrs 2,688 Installation of all free issue instruments & valves (20nos 10 inch dia valves & meters) 42 /Hrs 12096Trial Testing (Air testing) 4man, 2day,8hrs 42 /Hrs 2688

V Final packing and loading 4man, 3 day, 8 hrs 4,032 Total Cost for assembling and testing 40,320

Total Price = Fab + NDT + Assembling and testing 279,724 76,323 US $Total Selling Price 906526

Rate in US $ = 247347Electrical and Instrumentation work = US $ 9564 with 25% margin = US $ 12,000

28"-28 Joints@175/joint, 10"-100 Joints@85/joint, 1.5" --20 Joints

Transport upto site (up to JAFZ)

Page 53: est

Skid-8 53 of 79

DATE : 4/3/2011

SIGMA ENGINEERING WORKS L.L.CESTIMATES

Est No : 250061Client : Emerson Process ManagementProject : Enq Ref No : Scope of Work ; Custody transfer metering skid (013-FT-400) Design pressure = 18 bar

Description MOC Nos Proc Wt Material (AED) Remarks

Kg Kg Kg Rate Amount

Custody transfer metering skid--Ref: Drg.no.101230810-3-003 Rev.0 (Qty.01No)

Skid size; 12.5mtr long x 3.6mtr width x 3.6mtr height

I. Material Cost : -

STEEL PIPING

Pipe 28 inch x 25.4mm thk x 12mtr long A106GR.B 1 5352 5352.0 956.76 5300 /mtr 63,600

Pipe 10 inch x Sch.80 x 12mtr long A106GR.B 5 1152.1 5760.6 1021.2 500 /mtr 30,000

Pipe 1.5 inch x Sch.80 x 12mtr long A106GR.B 1 64.92 64.9 64.92 55 /mtr 660

Pipe 3/4 inch x Sch.80 x 12mtr long A106GR.B 1 26.4 26.4 26.4 50 /mtr 600

Pipe 1/2 inch x Sch.80 x 12mtr long A106GR.B 1 19.44 19.4 19.44 40 /mtr 480

SA234GR.WPB 2 478 956.0 956.0 ### /Each 30,000

Elbow 10 inch x Sch.80 x 90 Degree, LR SA234GR.WPB 5 57.11 285.6 285.6 900 /Each 4,500

Elbow 1.5 inch x Sch.80 x 90 Degree SA234GR.WPB 2 0.6 1.2 1.2 60 /Each 120

Eq. Tee 28 inch x Sch.80 SA234GR.WPB 7 526 3682.0 3682.0 ### /Each 140,000

Eq. Tee 10 inch x Sch.80 SA234GR.WPB 7 58.57 410.0 410.0 1200 /Each 8,400

Reducer 10 inch x 8 inch x Sch.80 SA234GR.WPB 8 17 136.0 136.0 350 /Each 2,800

Reducer 28 inch x 10 inch x Sch.80 SA234GR.WPB 10 341 3410.0 3410.0 ### /Each 140,000

WN Type Flange 28 inch x Sch.80 x 300# ASTM A105N 2 340 680.0 680.0 3500 /Each 7,000

Blind Type Flange 28 inch x 300# ASTM A105N 2 615 1230.0 1230.0 7380 /Each 14,760

WN Type Flange 10 inch x Sch.80 x 300# ASTM A105N 46 41 1886.0 1886.0 370 /Each 17,020

WN Type Flange 8 inch x Sch.80 x 300# ASTM A105N 8 30 240.0 240.0 275 /Each 2,200

WN Type Flange 1.5 inch x Sch.80 x 300# ASTM A105N 8 1.8 14.4 14.4 60 /Each 480

WN Type Flange 3/4 inch x Sch.80 x 300# ASTM A105N 4 0.8 3.2 3.2 45 /Each 180

WN Type Flange 1/2 inch x Sch.80 x 300# ASTM A105N 4 0.6 2.4 2.4 40 /Each 160

ASTM A105 4 1.0 4.0 4.0 160 /Each 640

ASTM A105 4 0.5 2.0 2.0 40 /Each 160

U Clamps for 28 inch pipes A36/EQ. 24 2.96 71.0 71.0 400 /Each 9,600

U Clamps for 10 inch pipes A36/EQ. 48 3.47 166.4 166.4 110 /Each 5,280

Stud bolts + Nuts M50 x 350mm long 56 1.9 105.1 105.1 70 /Each 3,920

Stud bolts + Nuts M27 x 160mm long 736 1.1 796.0 796.0 10 /Each 7,360

28 inch @2500/each, 10 inch @110/each, 8 in 10,940

STEEL FRAME WORK

UC254 x 254 x 73kg/mtr x 90mtr long S275JR 1 6570 6570 7227 3.2 /kg 23,126

Lifting lug 50 mm thk x 200 x 350mm S355K2G3 12 27.47 330 362.67 5 /kg 1,813

S275JR 6 63.60 382 419.76 3.2 /kg 1,343

S275JR 6 112.80 677 744.48 3.2 /kg 2,382

S275JR 12 112.80 1354 1488.96 3.2 /kg 4,765

S275JR 1 ### 1800 1980.00 6.8 /kg 13,464

Grating clip; 4nos/sq.mtr S275JR 200 0.10 20 22.00 6 /no 1,200

A106GR.B 8 20.34 163 178.99 28 /mtr 1,344

Additional cost for Spares (10% extra) 3,000

Consumables 10% 16,523 5% on Material 25,486 26,616 LS #REF!

Total cost for Materials 569,821 Total cost for Materials with 10% Margin 626,803

II. Fabrication Cost : -

Sl No

Unit Wt

Finish Wt

Rate Basis

Elbow 28 inch x 25.4mm thk x 90 Degree, LR

DS Korea Flange

Half coupling 3/4" x 6000# x NPT threaded, male

Half coupling 1/2" x 6000# x NPT threaded, FF

A193GR.B7/A194GR.2HA193GR.B7/A194GR.2H

Gaskets ,28" --2nos, 10"-46nos, 8"-8nos, 1.5"-6nos

SS316L Spiral wound

Supports for meters and valves UPN 100 x 10.6 kg/mtr x 6mtr long

Supports for platform UPN 160 x 18.8 kg/mtr x 6mtr long

Supports for mid platform UPN 160 x 18.8 kg/mtr x 6mtr long

Platform gratings-- Load bar size 35 x 5mm, load bar pitch 30mm, cross bar pitch 100mm, serrated, 6mm twisted square, 40kg/mtr x 3600mm width x 12500mm long

Handrail pipe 1 1/4 inch x Sch.40 x 6mtr long

Page 54: est

Skid-8 54 of 79

Description MOC Nos Proc Wt Material (AED) Remarks

Kg Kg Kg Rate Amount

Sl No

Unit Wt

Finish Wt

Rate Basis

Inch Dia --28 inch x 25.4mm thk--50hrs/Joint 120 Hrs Rate 42/hr 5040Inch Dia --10 inch x Sch.80--10 hrs/Joint x 1 1000 Hrs Rate 42/hr 42000Inch Dia --8 inch x Sch.80--8 hrs/Joint x 8 Jo 64 Hrs Rate 42/hr 2688Inch Dia --1.5 inch x Sch.80--3 hrs/Joint x 20 60 Hrs Rate 42/hr 2520Inch Dia --3/4 inch x Sch.XXS--2 hrs/Joint x 20 Hrs Rate 42/hr 840Pipe havdling Hrs (20% of the total fab.hrs) 236 Hrs Rate 42/hr 2940Fabrication cost (marking, cutting) 1200 Hrs For marking, cuting 42 Per hrs 50400Fab. cost of support structurals (set up & w 1400 Hrs For setup & welding 42 Per hrs 58800

165228III. NDT : -

Radiography test 100% 22,600 MPI on lifting lugs 100% 500 Visual Examination 100% 100 hrs 42 /Hrs 4,200 MPI (wherever RT is not possible) 100% 0 Visits 450 2,500

Blasting & Painting 300 sq.mtr 80 /sq.mtr 24,000 Transport for Painting - 100 MT -

Collection of Free Issue materials from site Delivery to Sigma shop is in Emerson scope MT -

QA/QC Inspection 202 42 /Hrs 8,476 - 125 MT 4,000

Design and Preparartion of Fab Drawings LS 4,000 Packing for Transport LS 3,000 Documentation LS 900 Commercial Loading 1% of Total Value LS

Total Cost for NDT and other works 74,176 IV SKID ASSEMBLING & TESTING

Grating and handrail assembling 4 man, 8day, 8hrs 42 /Hrs 10,752 Skid assembling for hydro testing 3 man, 8day, 8hrs 42 /Hrs 8,064 Hydrotesting at shop 4 man, 2 days,8 hrs 64 Hrs 42 /Hrs 2,688 Installation of all free issue instruments & valves (20nos 10 inch dia valves & meters) 42 /Hrs 12096Trial Testing (Air testing) 4man, 2day,8hrs 42 /Hrs 2688

V Final packing and loading 4man, 3 day, 8 hrs 4,032 Total Cost for assembling and testing 40,320

Total Price = Fab + NDT + Assembling and testing 279,724 76,323 US $Total Selling Price 906526

Rate in US $ = 247347Electrical and Instrumentation work = US $ 9564 with 25% margin = US $ 12,000

28"-28 Joints@175/joint, 10"-100 Joints@85/joint, 1.5" --20 Joints

Transport upto site (up to JAFZ)

Page 55: est

Skid-7 55 of 79

DATE : 4/3/2011

SIGMA ENGINEERING WORKS L.L.CESTIMATES

Est No : 250061Client : Emerson Process ManagementProject : Enq Ref No : Scope of Work ; Custody transfer metering skid (013-FT-400) Design pressure = 18 bar

Description MOC Nos Proc Wt Material (AED) Remarks

Kg Kg Kg Rate Amount

Custody transfer metering skid--Ref: Drg.no.101230810-3-003 Rev.0 (Qty.01No)

Skid size; 8.5mtr long x 2.6mtr width x 3mtr height

I. Material Cost : -

STEEL PIPING

Pipe 10 inch x Sch.40 x 12mtr long A106GR.B 1 723.72 723.7 956.76 325 /mtr 3,900

Pipe 6 inch x Sch.40 x 12mtr long A106GR.B 3 339.12 1017.4 1021.2 150 /mtr 5,400

Pipe 1.5 inch x Sch.80 x 12mtr long A106GR.B 1 64.92 64.9 64.92 55 /mtr 660

Pipe 3/4 inch x Sch.80 x 12mtr long A106GR.B 1 26.4 26.4 26.4 50 /mtr 600

Pipe 1/2 inch x Sch.80 x 12mtr long A106GR.B 1 19.44 19.4 19.44 40 /mtr 480

Elbow 10 inch x Sch.40 x 90 Degree, LR SA234GR.WPB 2 37 74.0 74.0 500 /Each 1,000

Elbow 6 inch x Sch.40 x 90 Degree, LR SA234GR.WPB 3 10.2 30.6 30.6 180 /Each 540

Elbow 1.5 inch x Sch.80 x 90 Degree SA234GR.WPB 2 0.36 0.7 0.7 30 /Each 60

Eq. Tee 10 inch x Sch.40 SA234GR.WPB 2 49.35 98.7 98.7 650 /Each 1,300

Eq. Tee 6 inch x Sch.40 SA234GR.WPB 2 16.48 33.0 33.0 200 /Each 400

Reducer 10 inch x 6 inch x Sch.40 SA234GR.WPB 5 10.7 53.5 53.5 150 /Each 750

Reducer 6 inch x 4 inch x Sch.40 SA234GR.WPB 4 3.9 15.6 15.6 60 /Each 240

WN Type Flange 10 inch x Sch.40 x 150# ASTM A105N 2 24 48.0 48.0 215 /Each 430

Blind Type Flange 10 inch x 150# ASTM A105N 2 32 64.0 64.0 390 /Each 780

WN Type Flange 6 inch x Sch.40 x 150# ASTM A105N 24 10.8 259.2 259.2 100 /Each 2,400

WN Type Flange 4 inch x Sch.40 x 150# ASTM A105N 4 7 28.0 28.0 70 /Each 280

WN Type Flange 1.5 inch x Sch.80 x 150# ASTM A105N 8 1.8 14.4 14.4 50 /Each 400

WN Type Flange 3/4 inch x Sch.80 x 150# ASTM A105N 4 0.8 3.2 3.2 45 /Each 180

WN Type Flange 1/2 inch x Sch.80 x 150# ASTM A105N 4 0.6 2.4 2.4 40 /Each 160

ASTM A105 4 1.0 4.0 4.0 80 /Each 320

ASTM A105 4 0.5 2.0 2.0 20 /Each 80

U Clamps for 10 inch pipes A36/EQ. 16 2.96 47.3 47.3 110 /Each 1,760

U Clamps for 6 inch pipes A36/EQ. 16 3.47 55.5 55.5 60 /Each 960

Stud bolts + Nuts M24 x 115mm long 24 1.9 45.0 45.0 6 /Each 144

Stud bolts + Nuts M20 x 115mm long 360 1.1 389.3 389.3 6 /Each 2,160

Gaskets ,10" --2nos, 6"-30nos, 1.5"-6nos 10 inch @110/each, 6 inch @80/each, 1.5 inc 2,860

STEEL FRAME WORK

UC254 x 254 x 73kg/mtr x 50mtr long S275JR 1 3650 3650 4015 3.2 /kg 12,848

Lifting lug 50 mm thk x 200 x 350mm S355K2G3 6 27.47 165 181.33 5 /kg 907

S275JR 3 63.60 191 209.88 3.2 /kg 672

S275JR 2 112.80 226 248.16 3.2 /kg 794

S275JR 10 112.80 1128 1240.80 3.2 /kg 3,971

S275JR 1 884.00 884 972.40 6.8 /kg 6,612

Grating clip; 4nos/sq.mtr S275JR 100 0.10 10 11.00 6 /no 600

A106GR.B 4 20.34 81 89.50 28 /mtr 672

Additional cost for Spares (10% extra) 3,000

Consumables 10% 6,502 5% on Material 7,714 8,347 LS #REF!

Total cost for Materials 64,821 Total cost for Materials with 10% Margin 71,303

II. Fabrication Cost : -Inch Dia --10 inch x Sch.40--10hrs/Joint x 2J 20 Hrs Rate 42/hr 840

Sl No

Unit Wt

Finish Wt

Rate Basis

DS Korea Flange

Half coupling 3/4" x 3000# x NPT threaded, male

Half coupling 1/2" x 3000# x NPT threaded, FF

A193GR.B7/A194GR.2HA193GR.B7/A194GR.2H

SS316L Spiral wound

Supports for meters and valves UPN 100 x 10.6 kg/mtr x 6mtr long

Supports for platform UPN 160 x 18.8 kg/mtr x 6mtr long

Supports for mid platform UPN 160 x 18.8 kg/mtr x 6mtr long

Platform gratings-- Load bar size 25 x 5mm, load bar pitch 30mm, cross bar pitch 100mm, serrated, 6mm twisted square, 40kg/mtr x 2600mm width x 8500mm long

Handrail pipe 1 1/4 inch x Sch.40 x 6mtr long

Page 56: est

Skid-7 56 of 79

Description MOC Nos Proc Wt Material (AED) Remarks

Kg Kg Kg Rate Amount

Sl No

Unit Wt

Finish Wt

Rate Basis

Inch Dia --6 inch x Sch.40--8 hrs/Joint x 45 J 360 Hrs Rate 42/hr 15120Inch Dia --1.5 inch x Sch.80--3 hrs/Joint x 20 60 Hrs Rate 42/hr 2520Inch Dia --3/4 inch x Sch.80--2 hrs/Joint x 10 20 Hrs Rate 42/hr 840Pipe havdling Hrs (20% of the total fab.hrs) 88 Hrs Rate 42/hr 3696Fabrication cost (marking, cutting) 400 Hrs For marking, cuting 42 Per hrs 16800Fab. cost of support structurals (set up & w 600 Hrs For setup & welding 42 Per hrs 25200

65016III. NDT : -

Radiography test 100% 10"-2 Joints@175/joint, 6"-45 Joints@85/joint, 1 5,675 MPI on lifting lugs 100% 500 Visual Examination 100% 50 hrs 42 /Hrs 2,100 MPI (wherever RT is not possible) 100% 0 Visits 450 1,200

Blasting & Painting 150 sq.mtr 80 /sq.mtr 12,000 Transport for Painting - 100 MT -

Collection of Free Issue materials from site Delivery to Sigma shop is in Emerson scope MT -

QA/QC Inspection 77 42 /Hrs 3,251 - 125 MT 4,000

Design and Preparartion of Fab Drawings LS 4,000 Packing for Transport LS 3,000 Documentation LS 900 Commercial Loading 1% of Total Value LS

Total Cost for NDT and other works 36,626 IV SKID ASSEMBLING & TESTING

Grating and handrail assembling 4 man, 4day, 8hrs 42 /Hrs 5,376 Skid assembling for hydro testing 3 man, 4day, 8hrs 42 /Hrs 4,032 Hydrotesting at shop 2 man, 2 days,8 hrs 32 Hrs 42 /Hrs 1,344 Installation of all free issue instruments & valves (8nos 10 inch dia valves & meters) 42 /Hrs 6048Trial Testing (Air testing) 3man, 2day,8hrs 42 /Hrs 2016

V Final packing and loading 3man, 2 day, 8 hrs 2,016 Total Cost for assembling and testing 20,832

Total Price = Fab + NDT + Assembling and testing ### 33,417 US $Total Selling Price 193777

Rate in US $ = 52872Electrical and Instrumentation work = US $ 9564 with 25% margin = US $ 12,000

Transport upto site (up to JAFZ)

Page 57: est

Skid-6 57 of 79

DATE : 4/3/2011

SIGMA ENGINEERING WORKS L.L.CESTIMATES

Est No : 250061Client : Emerson Process ManagementProject : Enq Ref No : Scope of Work ; Custody transfer metering skid (013-FT-400) Design pressure = 18 bar

Description MOC Nos Proc Wt Material (AED) Remarks

Kg Kg Kg Rate Amount

Custody transfer metering skid--Ref: Drg.no.101230810-3-003 Rev.0 (Qty.01No)

Skid size; 8.5mtr long x 2.6mtr width x 3mtr height

I. Material Cost : -

STEEL PIPING

Pipe 6 inch x Sch.40 x 12mtr long A106GR.B 1 339.12 339.1 956.76 140 /mtr 1,680

Pipe 4 inch x Sch.40 x 12mtr long A106GR.B 3 192.84 578.5 1021.2 90 /mtr 3,240

Pipe 1.5 inch x Sch.80 x 12mtr long A106GR.B 1 64.92 64.9 64.92 55 /mtr 660

Pipe 3/4 inch x Sch.80 x 12mtr long A106GR.B 1 26.4 26.4 26.4 50 /mtr 600

Pipe 1/2 inch x Sch.80 x 12mtr long A106GR.B 1 19.44 19.4 19.44 40 /mtr 480

Elbow 6 inch x Sch.40 x 90 Degree, LR SA234GR.WPB 2 10.2 20.4 20.4 800 /Each 1,600

Elbow 4 inch x Sch.40 x 90 Degree, LR SA234GR.WPB 3 3.9 11.7 11.7 200 /Each 600

Elbow 1.5 inch x Sch.80 x 90 Degree SA234GR.WPB 2 0.36 0.7 0.7 30 /Each 60

Eq. Tee 6 inch x Sch.40 SA234GR.WPB 2 16.48 33.0 33.0 250 /Each 500

Eq. Tee 4 inch x Sch.40 SA234GR.WPB 2 6 12.0 12.0 200 /Each 400

Reducer 6 inch x 4 inch x Sch.40 SA234GR.WPB 5 3.9 19.5 19.5 300 /Each 1,500

Reducer 4 inch x 3 inch x Sch.40 SA234GR.WPB 4 1.6 6.4 6.4 90 /Each 360

WN Type Flange 6 inch x Sch.40 x 150# ASTM A105N 2 10.8 21.6 21.6 102 /Each 204

Blind Type Flange 6 inch x 150# ASTM A105N 2 12 24.0 24.0 150 /Each 300

WN Type Flange 4 inch x Sch.40 x 150# ASTM A105N 24 7 168.0 168.0 70 /Each 1,680

WN Type Flange 3 inch x Sch.40 x 150# ASTM A105N 4 4.5 18.0 18.0 60 /Each 240

WN Type Flange 1.5 inch x Sch.80 x 300# ASTM A105N 8 1.8 14.4 14.4 40 /Each 320

WN Type Flange 3/4 inch x Sch.80 x 300# ASTM A105N 4 0.8 3.2 3.2 30 /Each 120

WN Type Flange 1/2 inch x Sch.80 x 300# ASTM A105N 4 0.6 2.4 2.4 25 /Each 100

ASTM A105 4 1.0 4.0 4.0 80 /Each 320

ASTM A105 4 0.5 2.0 2.0 20 /Each 80

U Clamps for 6 inch pipes A36/EQ. 16 2.96 47.3 47.3 60 /Each 960

U Clamps for 4 inch pipes A36/EQ. 16 3.47 55.5 55.5 60 /Each 960

Stud bolts + Nuts M20 x 115mm long 24 0.3 6.8 6.8 6 /Each 144

Stud bolts + Nuts M16 x 100mm long 240 0.2 37.9 37.9 4 /Each 960

Gaskets ,6" --2nos, 4"-30nos, 1.5"-6nos 6 inch @110/each, 4 inch @60/each, 1.5 inch 2,260

STEEL FRAME WORK

UC254 x 254 x 73kg/mtr x 50mtr long S275JR 1 3650 3650 4015 3.2 /kg 12,848

Lifting lug 50 mm thk x 200 x 350mm S355K2G3 6 27.47 165 181.33 5 /kg 907

S275JR 3 63.60 191 209.88 3.2 /kg 672

S275JR 2 112.80 226 248.16 3.2 /kg 794

S275JR 10 112.80 1128 1240.80 3.2 /kg 3,971

S275JR 1 884.00 884 972.40 6.8 /kg 6,612

Grating clip; 4nos/sq.mtr S275JR 100 0.10 10 11.00 6 /no 600

A106GR.B 4 20.34 81 89.50 28 /mtr 672

Additional cost for Spares (10% extra) 3,000

Consumables 10% 5,257 5% on Material 6,954 7,588 LS #REF!

Total cost for Materials 55,660 Total cost for Materials with 10% Margin 61,226

II. Fabrication Cost : -Inch Dia --6 inch x Sch40--4hrs/Joint x 2Join 8 Hrs Rate 42/hr 336

Sl No

Unit Wt

Finish Wt

Rate Basis

DS Korea Flange

Half coupling 3/4" x 3000# x NPT threaded, male

Half coupling 1/2" x 3000# x NPT threaded, FF

A193GR.B7/A194GR.2HA193GR.B7/A194GR.2H

SS316L Spiral wound

Supports for meters and valves UPN 100 x 10.6 kg/mtr x 6mtr long

Supports for platform UPN 160 x 18.8 kg/mtr x 6mtr long

Supports for mid platform UPN 160 x 18.8 kg/mtr x 6mtr long

Platform gratings-- Load bar size 25 x 5mm, load bar pitch 30mm, cross bar pitch 100mm, serrated, 6mm twisted square, 40kg/mtr x 2600mm width x 8500mm long

Handrail pipe 1 1/4 inch x Sch.40 x 6mtr long

Page 58: est

Skid-6 58 of 79

Description MOC Nos Proc Wt Material (AED) Remarks

Kg Kg Kg Rate Amount

Sl No

Unit Wt

Finish Wt

Rate Basis

Inch Dia --4 inch x Sch.40--3 hrs/Joint x 45 J 135 Hrs Rate 42/hr 5670Inch Dia --1.5 inch x Sch.40--2.5 hrs/Joint x 50 Hrs Rate 42/hr 2100Inch Dia --3/4 inch x Sch.40--2 hrs/Joint x 10 20 Hrs Rate 42/hr 840Pipe havdling Hrs (20% of the total fab.hrs) 39 Hrs Rate 42/hr 1621.2Fabrication cost (marking, cutting) 400 Hrs For marking, cuting 42 Per hrs 16800Fab. cost of support structurals (set up & w 600 Hrs For setup & welding 42 Per hrs 25200

52567III. NDT : -

Radiography test 100% 6"-2 Joints@175/joint, 4"-45 Joints@85/joint, 1. 5,675 MPI on lifting lugs 100% 500 Visual Examination 100% 50 hrs 42 /Hrs 2,100 MPI (wherever RT is not possible) 100% 450 1,200

Blasting & Painting 150 sq.mtr 80 /sq.mtr 12,000 Transport for Painting - 100 MT -

Collection of Free Issue materials from site Delivery to Sigma shop is in Emerson scope MT -

QA/QC Inspection 63 50 /Hrs 3,129 - 125 MT 1,800

Design and Preparartion of Fab Drawings LS 4,000 Packing for Transport LS 3,000 Documentation LS 900 Commercial Loading 1% of Total Value LS

Total Cost for NDT and other works 34,304 IV SKID ASSEMBLING & TESTING

Grating and handrail assembling 4 man, 4day, 8hrs 42 /Hrs 5,376 Skid assembling for hydro testing 3 man, 4day, 8hrs 42 /Hrs 4,032 Hydrotesting at shop 2 man, 2 days,8 hrs 32 Hrs 42 /Hrs 1,344 Installation of all free issue instruments & valves (8nos 10 inch dia valves & meters) 42 /Hrs 6048Trial Testing (Air testing) 3man, 2day,8hrs 42 /Hrs 2016

V Final packing and loading 3man, 2 day, 8 hrs 2,016 Total Cost for assembling and testing 20,832

Total Price = Fab + NDT + Assembling and testing ### 29,387 US $Total Selling Price 168929

Rate in US $ = 46093Electrical and Instrumentation work = US $ 9564 with 25% margin = US $ 12,000

Transport upto site (up to JAFZ)

Page 59: est

Skid-5 59 of 79

DATE : 4/3/2011

SIGMA ENGINEERING WORKS L.L.CESTIMATES

Est No : 250061Client : Emerson Process ManagementProject : Enq Ref No : Scope of Work ; Custody transfer metering skid (013-FT-400) Design pressure = 18 bar

Description MOC Nos Proc Wt Material (AED) Remarks

Kg Kg Kg Rate Amount

Custody transfer metering skid--Ref: Drg.no.101230810-3-003 Rev.0 (Qty.01No)

Skid size; 8.5mtr long x 2.6mtr width x 3mtr height

I. Material Cost : -

STEEL PIPING

Pipe 10 inch x Sch.80 x 12mtr long A106GR.B 1 1152.1 1152.1 956.76 490 /mtr 5,880

Pipe 6 inch x Sch.80 x 12mtr long A106GR.B 3 510.72 1532.2 1021.2 200 /mtr 7,200

Pipe 1.5 inch x Sch.80 x 12mtr long A106GR.B 1 64.92 64.9 64.92 55 /mtr 660

Pipe 3/4 inch x Sch.80 x 12mtr long A106GR.B 1 26.4 26.4 26.4 50 /mtr 600

Pipe 1/2 inch x Sch.80 x 12mtr long A106GR.B 1 19.44 19.4 19.44 40 /mtr 480

Elbow 10 inch x Sch.80 x 90 Degree, LR SA234GR.WPB 2 57.11 114.2 114.2 1150 /Each 2,300

Elbow 6 inch x Sch.80 x 90 Degree, LR SA234GR.WPB 3 15.35 46.1 46.1 320 /Each 960

Elbow 1.5 inch x Sch.XXS x 90 Degree SA234GR.WPB 2 0.36 0.7 0.7 60 /Each 120

Eq. Tee 10 inch x Sch.80 SA234GR.WPB 2 58.57 117.1 117.1 1350 /Each 2,700

Eq. Tee 6 inch x Sch.80 SA234GR.WPB 2 19.3 38.6 38.6 350 /Each 700

Reducer 10 inch x 6 inch x Sch.80 SA234GR.WPB 5 17 85.0 85.0 200 /Each 1,000

Reducer 6 inch x 4 inch x Sch.80 SA234GR.WPB 4 5.95 23.8 23.8 90 /Each 360

WN Type Flange 10 inch x Sch.80 x 900# ASTM A105N 2 118 236.0 236.0 1210 /Each 2,420 DS Korea Flange

Blind Type Flange 10 inch x 900# ASTM A105N 2 130 260.0 260.0 1560 /Each 3,120

WN Type Flange 6 inch x Sch.80 x 900# ASTM A105N 24 51 1224.0 1224.0 460 /Each 11,040

WN Type Flange 4 inch x Sch.80 x 900# ASTM A105N 4 23 92.0 92.0 232 /Each 928

WN Type Flange 1.5 inch x Sch.80 x 900# ASTM A105N 8 1.8 14.4 14.4 60 /Each 480

WN Type Flange 3/4 inch x Sch.80 x 900# ASTM A105N 4 0.8 3.2 3.2 45 /Each 180

WN Type Flange 1/2 inch x Sch.80 x 900# ASTM A105N 4 0.6 2.4 2.4 40 /Each 160

ASTM A105 4 1.0 4.0 4.0 160 /Each 640

ASTM A105 4 0.5 2.0 2.0 40 /Each 160

U Clamps for 10 inch pipes A36/EQ. 16 2.96 47.3 47.3 110 /Each 1,760

U Clamps for 6 inch pipes A36/EQ. 16 3.47 55.5 55.5 60 /Each 960

Stud bolts + Nuts M36 x 235mm long 24 1.9 45.0 45.0 25 /Each 600

Stud bolts + Nuts M30 x 195mm long 360 1.1 389.3 389.3 15 /Each 5,400

Gaskets ,10" --2nos, 6"-30nos, 1.5"-6nos 10 inch @110/each, 6 inch @80/each, 1.5 inc 2,860

STEEL FRAME WORK

UC254 x 254 x 73kg/mtr x 50mtr long S275JR 1 3650 3650 4015 3.2 /kg 12,848

Lifting lug 50 mm thk x 200 x 350mm S355K2G3 6 27.47 165 181.33 5 /kg 907

S275JR 3 63.60 191 209.88 3.2 /kg 672

S275JR 2 112.80 226 248.16 3.2 /kg 794

S275JR 10 112.80 1128 1240.80 3.2 /kg 3,971

S275JR 1 884.00 884 972.40 6.8 /kg 6,612

Grating clip; 4nos/sq.mtr S275JR 100 0.10 10 11.00 6 /no 600

A106GR.B 4 20.34 81 89.50 28 /mtr 672

Additional cost for Spares (10% extra) 3,000

Consumables 10% 7,846 5% on Material 9,246 9,879 LS #REF!

Total cost for Materials 91,589 Total cost for Materials with 10% Margin ###

II. Fabrication Cost : -Inch Dia --10 inch x Sch.80--12hrs/Joint x 2J 120 Hrs Rate 42/hr 5040

Sl No

Unit Wt

Finish Wt

Rate Basis

Half coupling 3/4" x 6000# x NPT threaded, male

Half coupling 1/2" x 6000# x NPT threaded, FF

A193GR.B7/A194GR.2HA193GR.B7/A194GR.2H

SS316L Spiral wound

Supports for meters and valves UPN 100 x 10.6 kg/mtr x 6mtr long

Supports for platform UPN 160 x 18.8 kg/mtr x 6mtr long

Supports for mid platform UPN 160 x 18.8 kg/mtr x 6mtr long

Platform gratings-- Load bar size 25 x 5mm, load bar pitch 30mm, cross bar pitch 100mm, serrated, 6mm twisted square, 40kg/mtr x 2600mm width x 8500mm long

Handrail pipe 1 1/4 inch x Sch.40 x 6mtr long

Page 60: est

Skid-5 60 of 79

Description MOC Nos Proc Wt Material (AED) Remarks

Kg Kg Kg Rate Amount

Sl No

Unit Wt

Finish Wt

Rate Basis

Inch Dia --6 inch x Sch.80--8 hrs/Joint x 45 J 360 Hrs Rate 42/hr 15120Inch Dia --1.5 inch x Sch.80--3 hrs/Joint x 20 60 Hrs Rate 42/hr 2520Inch Dia --3/4 inch x Sch.XXS--2 hrs/Joint x 20 Hrs Rate 42/hr 840Pipe havdling Hrs (20% of the total fab.hrs) 108 Hrs Rate 42/hr 4536Fabrication cost (marking, cutting) 400 Hrs For marking, cuting 42 Per hrs 16800Fab. cost of support structurals (set up & w 800 Hrs For setup & welding 42 Per hrs 33600

78456III. NDT : -

Radiography test 100% 10"-2 Joints@175/joint, 6"-45 Joints@85/joint, 1 5,675 MPI on lifting lugs 100% 500 Visual Examination 100% 50 hrs 42 /Hrs 2,100 MPI (wherever RT is not possible) 100% 0 Visits 450 1,200

Blasting & Painting 150 sq.mtr 80 /sq.mtr 12,000 Transport for Painting - 100 MT -

Collection of Free Issue materials from site Delivery to Sigma shop is in Emerson scope MT -

QA/QC Inspection 93 42 /Hrs 3,923 - 125 MT 4,000

Design and Preparartion of Fab Drawings LS 4,000 Packing for Transport LS 3,000 Documentation LS 900 Commercial Loading 1% of Total Value LS

Total Cost for NDT and other works 37,298 IV SKID ASSEMBLING & TESTING

Grating and handrail assembling 4 man, 4day, 8hrs 42 /Hrs 5,376 Skid assembling for hydro testing 3 man, 4day, 8hrs 42 /Hrs 4,032 Hydrotesting at shop 2 man, 2 days,8 hrs 32 Hrs 42 /Hrs 1,344 Installation of all free issue instruments & valves (8nos 10 inch dia valves & meters) 42 /Hrs 6048Trial Testing (Air testing) 3man, 2day,8hrs 42 /Hrs 2016

V Final packing and loading 3man, 2 day, 8 hrs 2,016 Total Cost for assembling and testing 20,832

Total Price = Fab + NDT + Assembling and testing ### 37,268 US $Total Selling Price 237334

Rate in US $ = 64757Electrical and Instrumentation work = US $ 9564 with 25% margin = US $ 12,000

Transport upto site (up to JAFZ)

Page 61: est

Skid-4 61 of 79

DATE : 4/3/2011

SIGMA ENGINEERING WORKS L.L.CESTIMATES

Est No : 250061Client : Emerson Process ManagementProject : Enq Ref No : Scope of Work ; Custody transfer metering skid (013-FT-400) Design pressure = 18 bar

Description MOC Nos Proc Wt Material (AED) Remarks

Kg Kg Kg Rate Amount

Custody transfer metering skid--Ref: Drg.no.101230810-3-003 Rev.0 (Qty.01No)

Skid size; 8.5mtr long x 2.6mtr width x 3mtr height

I. Material Cost : -

STEEL PIPING

Pipe 10 inch x Sch.XXS x 12mtr long A106GR.B 1 1861.8 1861.8 956.76 900 /mtr 10,800

Pipe 6 inch x Sch.XXS x 12mtr long A106GR.B 3 950.64 2851.9 1021.2 460 /mtr 16,560

Pipe 1.5 inch x Sch.XXS x 12mtr long A106GR.B 1 114.72 114.7 64.92 55 /mtr 660

Pipe 3/4 inch x Sch.XXS x 12mtr long A106GR.B 1 43.68 43.7 26.4 50 /mtr 600

Pipe 1/2 inch x Sch.XXS x 12mtr long A106GR.B 1 30.6 30.6 19.44 40 /mtr 480

Elbow 10 inch x Sch.XXS x 90 Degree, LR SA234GR.WPB 2 97 194.0 194.0 2500 /Each 5,000

Elbow 6 inch x Sch.XXS x 90 Degree, LR SA234GR.WPB 3 30 90.0 90.0 600 /Each 1,800

Elbow 1.5 inch x Sch.XXS x 90 Degree SA234GR.WPB 2 0.36 0.7 0.7 60 /Each 120

Eq. Tee 10 inch x Sch.XXS SA234GR.WPB 2 98 196.0 196.0 2100 /Each 4,200

Eq. Tee 6 inch x Sch.XXS SA234GR.WPB 2 39 78.0 78.0 800 /Each 1,600

Reducer 10 inch x 6 inch x Sch.XXS SA234GR.WPB 5 29 145.0 145.0 600 /Each 3,000

Reducer 6 inch x 4 inch x Sch.XXS SA234GR.WPB 4 11.08 44.3 44.3 300 /Each 1,200

ASTM A105N 2 118 236.0 236.0 1210 /Each 2,420 DS Korea Flange

Blind Type Flange 10 inch x 900# ASTM A105N 2 130 260.0 260.0 1560 /Each 3,120

WN Type Flange 6 inch x Sch.XXS x 900# ASTM A105N 24 50 1200.0 1200.0 500 /Each 12,000

WN Type Flange 4 inch x Sch.XXS x 900# ASTM A105N 4 23 92.0 92.0 232 /Each 928

ASTM A105N 8 1.8 14.4 14.4 60 /Each 480

ASTM A105N 4 0.8 3.2 3.2 40 /Each 160

ASTM A105N 4 0.6 2.4 2.4 40 /Each 160

ASTM A105 4 1.0 4.0 4.0 160 /Each 640

ASTM A105 4 0.5 2.0 2.0 40 /Each 160

U Clamps for 10 inch pipes A36/EQ. 16 2.96 47.3 47.3 110 /Each 1,760

U Clamps for 6 inch pipes A36/EQ. 16 3.47 55.5 55.5 60 /Each 960

Stud bolts + Nuts M36 x 235mm long 24 1.9 45.0 45.0 25 /Each 600

Stud bolts + Nuts M30 x 195mm long 360 1.1 389.3 389.3 15 /Each 5,400

Gaskets ,10" --2nos, 6"-30nos, 1.5"-6nos 10 inch @110/each, 6 inch @80/each, 1.5 inc 2,860

STEEL FRAME WORK

UC254 x 254 x 73kg/mtr x 50mtr long S275JR 1 3650 3650 4015 3.2 /kg 12,848

Lifting lug 50 mm thk x 200 x 350mm S355K2G3 6 27.47 165 181.33 5 /kg 907

S275JR 3 63.60 191 209.88 3.2 /kg 672

S275JR 2 112.80 226 248.16 3.2 /kg 794

S275JR 10 112.80 1128 1240.80 3.2 /kg 3,971

S275JR 1 884.00 884 972.40 6.8 /kg 6,612

Grating clip; 4nos/sq.mtr S275JR 100 0.10 10 11.00 6 /no 600

A106GR.B 4 20.34 81 89.50 28 /mtr 672

Additional cost for Spares (10% extra) 3,000

Consumables 10% 8,400 5% on Material 9,623 10,178 LS #REF!

Total cost for Materials ###Total cost for Materials with 10% Margin ###

II. Fabrication Cost : -Inch Dia --10 inch x Sch.XXS--14hrs/Joint x 2 140 Hrs Rate 42/hr 5880

Sl No

Unit Wt

Finish Wt

Rate Basis

WN Type Flange 10 inch x Sch.XXS x 900#

WN Type Flange 1.5 inch x Sch.XXS x 900#WN Type Flange 3/4 inch x Sch.XXS x 900#WN Type Flange 1/2 inch x Sch.XXS x 900#Half coupling 3/4" x 6000# x NPT threaded, male

Half coupling 1/2" x 6000# x NPT threaded, FF

A193GR.B7/A194GR.2HA193GR.B7/A194GR.2H

SS316L Spiral wound

Supports for meters and valves UPN 100 x 10.6 kg/mtr x 6mtr long

Supports for platform UPN 160 x 18.8 kg/mtr x 6mtr long

Supports for mid platform UPN 160 x 18.8 kg/mtr x 6mtr long

Platform gratings-- Load bar size 25 x 5mm, load bar pitch 30mm, cross bar pitch 100mm, serrated, 6mm twisted square, 40kg/mtr x 2600mm width x 8500mm long

Handrail pipe 1 1/4 inch x Sch.40 x 6mtr long

Page 62: est

Skid-4 62 of 79

Description MOC Nos Proc Wt Material (AED) Remarks

Kg Kg Kg Rate Amount

Sl No

Unit Wt

Finish Wt

Rate Basis

Inch Dia --6 inch x Sch.XXS--10 hrs/Joint x 4 450 Hrs Rate 42/hr 18900Inch Dia --1.5 inch x Sch.XXS--3 hrs/Joint x 60 Hrs Rate 42/hr 2520Inch Dia --3/4 inch x Sch.XXS--2 hrs/Joint x 20 Hrs Rate 42/hr 840Pipe havdling Hrs (20% of the total fab.hrs) 130 Hrs Rate 42/hr 5460Fabrication cost (marking, cutting) 400 Hrs For marking, cuting 42 Per hrs 16800Fab. cost of support structurals (set up & w 800 Hrs For setup & welding 42 Per hrs 33600

84000III. NDT : -

Radiography test 100% 10"-2 Joints@175/joint, 6"-45 Joints@85/joint, 1 5,675 MPI on lifting lugs 100% 500 Visual Examination 100% 50 hrs 42 /Hrs 2,100 MPI (wherever RT is not possible) 100% 0 Visits 450 1,200

Blasting & Painting 150 sq.mtr 80 /sq.mtr 12,000 Transport for Painting - 100 MT -

Collection of Free Issue materials from site Delivery to Sigma shop is in Emerson scope MT -

QA/QC Inspection 100 50 /Hrs 5,000 - 125 MT 1,800

Design and Preparartion of Fab Drawings LS 4,000 Packing for Transport LS 3,000 Documentation LS 900 Commercial Loading 1% of Total Value LS

Total Cost for NDT and other works 36,175 IV SKID ASSEMBLING & TESTING

Grating and handrail assembling 4 man, 4day, 8hrs 42 /Hrs 5,376 Skid assembling for hydro testing 3 man, 4day, 8hrs 42 /Hrs 4,032 Hydrotesting at shop 2 man, 2 days,8 hrs 32 Hrs 42 /Hrs 1,344 Installation of all free issue instruments & valves (8nos 10 inch dia valves & meters) 42 /Hrs 6048Trial Testing (Air testing) 3man, 2day,8hrs 42 /Hrs 2016

V Final packing and loading 3man, 2 day, 8 hrs 2,016 Total Cost for assembling and testing 20,832

Total Price = Fab + NDT + Assembling and testing ### 38,474 US $Total Selling Price 268765

Rate in US $ = 73333Electrical and Instrumentation work = US $ 9564 with 25% margin = US $ 12,000

Transport upto site (up to JAFZ)

Page 63: est

Skid-3 63 of 79

DATE : 4/3/2011

SIGMA ENGINEERING WORKS L.L.CESTIMATES

Est No : 250061Client : Emerson Process ManagementProject : Enq Ref No : Scope of Work ; Custody transfer metering skid (013-FT-400) Design pressure = 18 bar

Description MOC Nos Proc Wt Material (AED) Remarks

Kg Kg Kg Rate Amount

Custody transfer metering skid--Ref: Drg.no.101230810-3-003 Rev.0 (Qty.01No)

Skid size; 10mtr long x 2.6mtr width x 3mtr height

I. Material Cost : -

STEEL PIPING

Pipe 16 inch x Sch.40 x 12mtr long A106GR.B 1 1476 1476.0 956.76 750 /mtr 9,000

Pipe 10 inch x Sch.40 x 12mtr long A106GR.B 3 723.72 2171.2 1021.2 325 /mtr 11,700

Pipe 1.5 inch x Sch.80 x 12mtr long A106GR.B 1 64.92 64.9 64.92 55 /mtr 660

Pipe 3/4 inch x Sch.80 x 12mtr long A106GR.B 1 26.4 26.4 26.4 50 /mtr 600

Pipe 1/2 inch x Sch.80 x 12mtr long A106GR.B 1 19.44 19.4 19.44 40 /mtr 480

Elbow 16 inch x Sch.40 x 90 Degree, LR SA234GR.WPB 2 54 108.0 108.0 1800 /Each 3,600

Elbow 10 inch x Sch.40 x 90 Degree, LR SA234GR.WPB 3 20.3 60.9 60.9 500 /Each 1,500

Elbow 1.5 inch x Sch.80 x 90 Degree SA234GR.WPB 2 0.36 0.7 0.7 30 /Each 60

Eq. Tee 16 inch x Sch.40 SA234GR.WPB 2 65 130.0 130.0 1800 /Each 3,600

Eq. Tee 10 inch x Sch.40 SA234GR.WPB 2 33 66.0 66.0 650 /Each 1,300

Reducer 16 inch x 10 inch x Sch.40 SA234GR.WPB 5 15 75.0 75.0 920 /Each 4,600

Reducer 10 inch x 8 inch x Sch.40 SA234GR.WPB 4 6.5 26.0 26.0 150 /Each 600

WN Type Flange 16 inch x Sch.40 x 150# ASTM A105N 2 37 74.0 74.0 600 /Each 1,200 DS Korea Flange

Blind Type Flange 16 inch x 150# ASTM A105N 2 40 80.0 80.0 480 /Each 960

WN Type Flange 10 inch x Sch.40 x 150# ASTM A105N 24 18 432.0 432.0 210 /Each 5,040

WN Type Flange 1.5 inch x Sch.80 x 300# ASTM A105N 8 1.8 14.4 14.4 60 /Each 480

WN Type Flange 3/4 inch x Sch.80 x 300# ASTM A105N 4 0.8 3.2 3.2 30 /Each 120

WN Type Flange 1/2 inch x Sch.80 x 300# ASTM A105N 4 0.6 2.4 2.4 25 /Each 100

ASTM A105 4 1.0 4.0 4.0 80 /Each 320

ASTM A105 4 0.5 2.0 2.0 20 /Each 80

U Clamps for 16 inch pipes A36/EQ. 16 2.96 47.3 47.3 210 /Each 3,360

U Clamps for 10 inch pipes A36/EQ. 16 3.47 55.5 55.5 110 /Each 1,760

Stud bolts + Nuts M24 x 140mm long 24 0.7 17.3 17.3 8 /Each 192

Stud bolts + Nuts M20 x 120mm long 240 0.1 34.1 34.1 6 /Each 1,440

Gaskets ,10" --2nos, 6"-30nos, 1.5"-6nos 10 inch @110/each, 6 inch @80/each, 1.5 inc 2,860

STEEL FRAME WORK

UC254 x 254 x 73kg/mtr x 60mtr long S275JR 1 4380 4380 4818 3.2 /kg 15,418

Lifting lug 50 mm thk x 200 x 350mm S355K2G3 6 27.47 165 181.33 5 /kg 907

S275JR 3 63.60 191 209.88 3.2 /kg 672

S275JR 2 112.80 226 248.16 3.2 /kg 794

S275JR 10 112.80 1128 1240.80 3.2 /kg 3,971

S275JR 1 ### 1040 1144.00 6.8 /kg 7,779

Grating clip; 4nos/sq.mtr S275JR 100 0.10 10 11.00 6 /no 600

A106GR.B 4 20.34 81 89.50 28 /mtr 672

Additional cost for Spares (10% extra) 800

Consumables 10% 5,817 5% on Material 8,564 9,286 LS #REF!

Total cost for Materials 93,041 Total cost for Materials with 10% Margin ###

II. Fabrication Cost : -Inch Dia --10 inch x Sch40--10hrs/Joint x 2Jo 20 Hrs Rate 42/hr 840Inch Dia --6 inch x Sch.40--5 hrs/Joint x 45 J 225 Hrs Rate 42/hr 9450

Sl No

Unit Wt

Finish Wt

Rate Basis

Half coupling 3/4" x 3000# x NPT threaded, male

Half coupling 1/2" x 3000# x NPT threaded, FF

A193GR.B7/A194GR.2HA193GR.B7/A194GR.2H

SS316L Spiral wound

Supports for meters and valves UPN 100 x 10.6 kg/mtr x 6mtr long

Supports for platform UPN 160 x 18.8 kg/mtr x 6mtr long

Supports for mid platform UPN 160 x 18.8 kg/mtr x 6mtr long

Platform gratings-- Load bar size 25 x 5mm, load bar pitch 30mm, cross bar pitch 100mm, serrated, 6mm twisted square, 40kg/mtr x 2600mm width x 10,000mm long

Handrail pipe 1 1/4 inch x Sch.40 x 6mtr long

Page 64: est

Skid-3 64 of 79

Description MOC Nos Proc Wt Material (AED) Remarks

Kg Kg Kg Rate Amount

Sl No

Unit Wt

Finish Wt

Rate Basis

Inch Dia --1.5 inch x Sch.40--2.5 hrs/Joint x 50 Hrs Rate 42/hr 2100Inch Dia --3/4 inch x Sch.40--2 hrs/Joint x 10 20 Hrs Rate 42/hr 840Pipe havdling Hrs (20% of the total fab.hrs) 59 Hrs Rate 42/hr 2940Fabrication cost (marking, cutting) 400 Hrs For marking, cuting 42 Per hrs 16800Fab. cost of support structurals (set up & w 600 Hrs For setup & welding 42 Per hrs 25200

58170III. NDT : -

Radiography test 100% 10"-2 Joints@175/joint, 6"-45 Joints@85/joint, 1 5,675 MPI on lifting lugs 100% 500 Visual Examination 100% 50 hrs 42 /Hrs 2,100 MPI (wherever RT is not possible) 100% 0 Visits 450 1,200

Blasting & Painting 180 sq.mtr 80 /sq.mtr 14,400 Transport for Painting - 100 MT -

Collection of Free Issue materials from site Delivery to Sigma shop is in Emerson scope MT -

QA/QC Inspection 69 42 /Hrs 2,885 - 125 MT 1,800

Design and Preparartion of Fab Drawings LS 4,000 Packing for Transport LS 3,000 Documentation LS 900 Commercial Loading 1% of Total Value LS

Total Cost for NDT and other works 36,460 IV SKID ASSEMBLING & TESTING

Grating and handrail assembling 4 man, 4day, 8hrs 42 /Hrs 5,376 Skid assembling for hydro testing 3 man, 4day, 8hrs 42 /Hrs 4,032 Hydrotesting at shop 2 man, 2 days,8 hrs 32 Hrs 42 /Hrs 1,344 Installation of all free issue instruments & valves (8nos 10 inch dia valves & meters) 42 /Hrs 6048Trial Testing (Air testing) 3man, 2day,8hrs 42 /Hrs 2016

V Final packing and loading 3man, 2 day, 8 hrs 2,016 Total Cost for assembling and testing 20,832

Total Price = Fab + NDT + Assembling and testing ### 31,504 US $Total Selling Price 217807

Rate in US $ = 59429Electrical and Instrumentation work = US $ 9564 with 25% margin = US $ 12,000

Transport upto site (up to JAFZ)

Page 65: est

Skid-2 65 of 79

DATE : 4/3/2011

SIGMA ENGINEERING WORKS L.L.CESTIMATES

Est No : 250061Client : Emerson Process ManagementProject : Enq Ref No : Scope of Work ; Custody transfer metering skid (013-FT-400) Design pressure = 18 bar

Description MOC Nos Proc Wt Material (AED) Remarks

Kg Kg Kg Rate Amount

Custody transfer metering skid--Ref: Drg.no.101230810-3-003 Rev.0 (Qty.01No)

Skid size; 8.5mtr long x 2.6mtr width x 3mtr height

I. Material Cost : -

STEEL PIPING

Pipe 10 inch x Sch.40 x 12mtr long A106GR.B 1 723.72 723.7 956.76 325 /mtr 3,900

Pipe 6 inch x Sch.40 x 12mtr long A106GR.B 3 339.12 1017.4 1021.2 140 /mtr 5,040

Pipe 1.5 inch x Sch.80 x 12mtr long A106GR.B 1 64.92 64.9 64.92 55 /mtr 660

Pipe 3/4 inch x Sch.80 x 12mtr long A106GR.B 1 26.4 26.4 26.4 50 /mtr 600

Pipe 1/2 inch x Sch.80 x 12mtr long A106GR.B 1 19.44 19.4 19.44 40 /mtr 480

Elbow 10 inch x Sch.40 x 90 Degree, LR SA234GR.WPB 2 54 108.0 108.0 500 /Each 1,000

Elbow 6 inch x Sch.40 x 90 Degree, LR SA234GR.WPB 3 20.3 60.9 60.9 180 /Each 540

Elbow 1.5 inch x Sch.80 x 90 Degree SA234GR.WPB 2 0.36 0.7 0.7 30 /Each 60

Eq. Tee 12 inch x Sch.40 SA234GR.WPB 2 65 130.0 130.0 1360 /Each 2,720

Eq. Tee 6 inch x Sch.40 SA234GR.WPB 2 33 66.0 66.0 200 /Each 400

Reducer 10 inch x 6 inch x Sch.40 SA234GR.WPB 5 15 75.0 75.0 200 /Each 1,000

Reducer 6 inch x 4 inch x Sch.40 SA234GR.WPB 4 6.5 26.0 26.0 90 /Each 360

WN Type Flange 10 inch x Sch.40 x 300# ASTM A105N 2 41 82.0 82.0 363 /Each 726 DS Korea Flange

Blind Type Flange 10 inch x 300# ASTM A105N 2 58 116.0 116.0 700 /Each 1,400

WN Type Flange 6 inch x Sch.40 x 300# ASTM A105N 24 19 456.0 456.0 170 /Each 4,080

WN Type Flange 4 inch x Sch.40 x 300# ASTM A105N 4 11 44.0 44.0 100 /Each 400

WN Type Flange 1.5 inch x Sch.80 x 300# ASTM A105N 8 3.5 28.0 28.0 60 /Each 480

WN Type Flange 3/4 inch x Sch.80 x 300# ASTM A105N 4 1.8 7.2 7.2 30 /Each 120

WN Type Flange 1/2 inch x Sch.80 x 300# ASTM A105N 4 1.5 6.0 6.0 25 /Each 100

ASTM A105 4 1.0 4.0 4.0 80 /Each 320

ASTM A105 4 0.5 2.0 2.0 20 /Each 80

U Clamps for 12 inch pipes A36/EQ. 16 2.96 47.3 47.3 150 /Each 2,400

U Clamps for 8 inch pipes A36/EQ. 16 3.47 55.5 55.5 90 /Each 1,440

Stud bolts + Nuts M24 x 140mm long 24 0.7 17.3 17.3 8 /Each 192

Stud bolts + Nuts M20 x 120mm long 240 0.1 34.1 34.1 6 /Each 1,440

Gaskets ,10" --2nos, 6"-30nos, 1.5"-6nos 10 inch @110/each, 6 inch @80/each, 1.5 inc 2,860

STEEL FRAME WORK

UC254 x 254 x 73kg/mtr x 50mtr long S275JR 1 3650 3650 4015 3.2 /kg 12,848

Lifting lug 50 mm thk x 200 x 350mm S355K2G3 6 27.47 165 181.33 5 /kg 907

S275JR 3 63.60 191 209.88 3.2 /kg 672

S275JR 2 112.80 226 248.16 3.2 /kg 794

S275JR 10 112.80 1128 1240.80 3.2 /kg 3,971

S275JR 1 884.00 884 972.40 6.8 /kg 6,612

Grating clip; 4nos/sq.mtr S275JR 100 0.10 10 11.00 6 /no 600

A106GR.B 4 20.34 81 89.50 28 /mtr 672

Additional cost for Spares (10% extra) 800

Consumables 10% 5,771 5% on Material 7,811 8,445 LS

Total cost for Materials 66,444 Total cost for Materials with 10% Margin 73,088

II. Fabrication Cost : -Inch Dia --10 inch x Sch40--10hrs/Joint x 2Jo 20 Hrs Rate 42/hr 840

Sl No

Unit Wt

Finish Wt

Rate Basis

Half coupling 3/4" x 3000# x NPT threaded, male

Half coupling 1/2" x 3000# x NPT threaded, FF

A193GR.B7/A194GR.2HA193GR.B7/A194GR.2H

SS316L Spiral wound

Supports for meters and valves UPN 100 x 10.6 kg/mtr x 6mtr long

Supports for platform UPN 160 x 18.8 kg/mtr x 6mtr long

Supports for mid platform UPN 160 x 18.8 kg/mtr x 6mtr long

Platform gratings-- Load bar size 25 x 5mm, load bar pitch 30mm, cross bar pitch 100mm, serrated, 6mm twisted square, 40kg/mtr x 2600mm width x 8500mm long

Handrail pipe 1 1/4 inch x Sch.40 x 6mtr long

Page 66: est

Skid-2 66 of 79

Description MOC Nos Proc Wt Material (AED) Remarks

Kg Kg Kg Rate Amount

Sl No

Unit Wt

Finish Wt

Rate Basis

Inch Dia --6 inch x Sch.40--5 hrs/Joint x 45 J 225 Hrs Rate 42/hr 9450Inch Dia --1.5 inch x Sch.40--2.5 hrs/Joint x 50 Hrs Rate 42/hr 2100Inch Dia --3/4 inch x Sch.40--2 hrs/Joint x 10 20 Hrs Rate 42/hr 840Pipe havdling Hrs (20% of the total fab.hrs) 59 Hrs Rate 42/hr 2478Fabrication cost (marking, cutting) 400 Hrs For marking, cuting 42 Per hrs 16800Fab. cost of support structurals (set up & w 600 Hrs For setup & welding 42 Per hrs 25200

57708III. NDT : -

Radiography test 100% 10"-2 Joints@175/joint, 6"-45 Joints@85/joint, 1 5,675 MPI on lifting lugs 100% 500 Visual Examination 100% 50 hrs 42 /Hrs 2,100 MPI (wherever RT is not possible) 100% 0 Visits 450 1,200

Blasting & Painting 150 sq.mtr 80 /sq.mtr 12,000 Transport for Painting - 100 MT -

Collection of Free Issue materials from site Delivery to Sigma shop is in Emerson scope MT -

QA/QC Inspection 69 42 /Hrs 2,885 - 125 MT 1,800

Design and Preparartion of Fab Drawings LS 4,000 Packing for Transport LS 3,000 Documentation LS 900 Commercial Loading 1% of Total Value LS

Total Cost for NDT and other works 34,060 IV SKID ASSEMBLING & TESTING

Grating and handrail assembling 4 man, 4day, 8hrs 42 /Hrs 5,376 Skid assembling for hydro testing 3 man, 4day, 8hrs 42 /Hrs 4,032 Hydrotesting at shop 2 man, 2 days,8 hrs 32 Hrs 42 /Hrs 1,344 Installation of all free issue instruments & valves (8nos 10 inch dia valves & meters) 42 /Hrs 6048Trial Testing (Air testing) 3man, 2day,8hrs 42 /Hrs 2016

V Final packing and loading 3man, 2 day, 8 hrs 2,016 Total Cost for assembling and testing 20,832

Total Price = Fab + NDT + Assembling and testing ### 30,723 US $Total Selling Price 185689

Rate in US $ = 50665Electrical and Instrumentation work = US $ 9564 with 25% margin = US $ 12,000

Transport upto site (up to JAFZ)

Page 67: est

SIGMA ENGINEERING WORKS L.L.CESTIMATES

Est No : 250061Client : Emerson Process ManagementProject : Enq Ref No : Scope of Work ; Custody transfer metering skid (013-FT-400) Design pressure = 18 bar

Description MOC Nos Unit Wt

Kg Kg

Custody transfer metering skid--Ref: Drg.no.101230810-3-003 Rev.0 (Qty.01No)Skid size; 8.5mtr long x 2.6mtr width x 3mtr height

I. Material Cost : -STEEL PIPINGPipe 10 inch x Sch.40 x 12mtr long A106GR.B 1 723.72 723.7Pipe 6 inch x Sch.40 x 12mtr long A106GR.B 3 339.12 1017.4Pipe 1.5 inch x Sch.80 x 12mtr long A106GR.B 1 64.92 64.9Pipe 3/4 inch x Sch.80 x 12mtr long A106GR.B 1 26.4 26.4Pipe 1/2 inch x Sch.80 x 12mtr long A106GR.B 1 19.44 19.4Elbow 10 inch x Sch.40 x 90 Degree, LR SA234GR.WPB 2 54 108.0Elbow 6 inch x Sch.40 x 90 Degree, LR SA234GR.WPB 3 20.3 60.9Elbow 1.5 inch x Sch.80 x 90 Degree SA234GR.WPB 2 0.36 0.7Eq. Tee 10 inch x Sch.40 SA234GR.WPB 2 65 130.0Eq. Tee 6 inch x Sch.40 SA234GR.WPB 2 33 66.0Reducer 10 inch x 6 inch x Sch.40 SA234GR.WPB 5 15 75.0Reducer 6 inch x 4 inch x Sch.40 SA234GR.WPB 4 6.5 26.0WN Type Flange 10 inch x Sch.40 x 150# ASTM A105N 2 37 74.0Blind Type Flange 10 inch x 150# ASTM A105N 2 40 80.0WN Type Flange 6 inch x Sch.40 x 150# ASTM A105N 24 18 432.0WN Type Flange 4 inch x Sch.40 x 150# ASTM A105N 4 7 28.0WN Type Flange 1.5 inch x Sch.80 x 300# ASTM A105N 8 1.8 14.4WN Type Flange 3/4 inch x Sch.80 x 300# ASTM A105N 4 0.8 3.2WN Type Flange 1/2 inch x Sch.80 x 300# ASTM A105N 4 0.6 2.4

ASTM A105 4 1.0 4.0

ASTM A105 4 0.5 2.0U Clamps for 12 inch pipes A36/EQ. 16 2.96 47.3U Clamps for 8 inch pipes A36/EQ. 16 3.47 55.5

Stud bolts + Nuts M24 x 140mm long 24 0.7 17.3

Stud bolts + Nuts M20 x 120mm long 240 0.1 34.1

Gaskets ,12" --2nos, 8"-30nos, 1.5"-6nos 12 inch @120/each, 8 inch @100/each, 1.5 inch STEEL FRAME WORKUC254 x 254 x 73kg/mtr x 50mtr long S275JR 1 3650 3650Lifting lug 50 mm thk x 200 x 350mm S355K2G3 6 27.47 165

S275JR 3 63.60 191

Sl No

Finish Wt

Half coupling 3/4" x 3000# x NPT threaded, male

Half coupling 1/2" x 3000# x NPT threaded, FF

A193GR.B7/A194GR.2H

A193GR.B7/A194GR.2H

SS316L Spiral wound

Supports for meters and valves UPN 100 x 10.6 kg/mtr x 6mtr long

Page 68: est

S275JR 2 112.80 226

S275JR 10 112.80 1128

S275JR 1 884.00 884Grating clip; 4nos/sq.mtr S275JR 100 0.10 10

A106GR.B 4 20.34 81Additional cost for Spares (10% extra)Consumables 10%

5% on Material 7,706 Total cost for Materials

Total cost for Materials with 10% MarginII. Fabrication Cost : -

Inch Dia --12 inch x Sch40--12hrs/Joint x 2J 24 Hrs Rate 42/hrInch Dia --8 inch x Sch.40--6 hrs/Joint x 45 270 Hrs Rate 42/hrInch Dia --1.5 inch x Sch.40--2.5 hrs/Joint x 50 Hrs Rate 42/hrInch Dia --3/4 inch x Sch.40--2 hrs/Joint x 1 20 Hrs Rate 42/hrPipe havdling Hrs (20% of the total fab.hrs) 69 Hrs Rate 42/hrFabrication cost (marking, cutting) 400 Hrs For marking, cuting Fab. cost of support structurals (set up & w 600 Hrs For setup & welding

III. NDT : -Radiography test 100% 16"-2 Joints@175/joint, 8"-45 Joints@85/joint, 1.5" MPI on lifting lugs 100%Visual Examination 100% 50 hrsMPI (wherever RT is not possible) 100% 0 Visits Blasting & Painting 150 sq.mtrTransport for Painting - Collection of Free Issue materials from site Delivery to Sigma shop is in Emerson scopeQA/QC Inspection 72

- Design and Preparartion of Fab DrawingsPacking for TransportDocumentationCommercial Loading 1% of Total Value

Total Cost for NDT and other worksIV SKID ASSEMBLING & TESTING

Grating and handrail assembling 4 man, 4day, 8hrsSkid assembling for hydro testing 3 man, 4day, 8hrsHydrotesting at shop 2 man, 2 days,8 hrs 32 HrsInstallation of all free issue instruments & valves (8nos 10 inch dia valves & meters)Trial Testing (Air testing) 3man, 2day,8hrs

V Final packing and loading 3man, 2 day, 8 hrsTotal Cost for assembling and testing

Total Price = Fab + NDT + Assembling and testingTotal Selling Price

Supports for platform UPN 160 x 18.8 kg/mtr x 6mtr long

Supports for mid platform UPN 160 x 18.8 kg/mtr x 6mtr long

Platform gratings-- Load bar size 25 x 5mm, load bar pitch 30mm, cross bar pitch 100mm, serrated, 6mm twisted square, 40kg/mtr x 2600mm width x 8500mm long

Handrail pipe 1 1/4 inch x Sch.40 x 6mtr long

Transport upto site (up to JAFZ)

Page 69: est

DATE : 4/3/2011

SIGMA ENGINEERING WORKS L.L.CESTIMATES

Design pressure = 18 bar

Material (AED)

Kg Rate Amount

Custody transfer metering skid--Ref: Drg.no.101230810-3-003 Rev.0 (Qty.01No)

956.76 325 /mtr 3,900 1021.2 140 /mtr 5,040 64.92 55 /mtr 660 26.4 50 /mtr 600

19.44 40 /mtr 480 108.0 450 /Each 900 60.9 115 /Each 345 0.7 20 /Each 40

130.0 650 /Each 1,300 66.0 210 /Each 420 75.0 245 /Each 1,225 26.0 65 /Each 260 74.0 325 /Each 650 80.0 357.5 /Each 715

432.0 115 /Each 2,760 28.0 95 /Each 380 14.4 34 /Each 272 3.2 30 /Each 120 2.4 25 /Each 100

4.0 60 /Each 240

2.0 40 /Each 160 47.3 150 /Each 2,400 55.5 90 /Each 1,440

17.3 8 /Each 192

34.1 6 /Each 1,440

12 inch @120/each, 8 inch @100/each, 1.5 inch 3,480

4015 3.2 /kg 12,848 181.33 5 /kg 907

209.88 3.2 /kg 672

Proc Wt Remark

sRate Basis

Page 70: est

248.16 3.2 /kg 794

1240.80 3.2 /kg 3,971

972.40 6.8 /kg 6,612 11.00 6 /no 600

89.50 28 /mtr 672 800 6,018

8,340 LS #REF!Total cost for Materials 63,412

Total cost for Materials with 10% Margin 69,753

Rate 42/hr 1008Rate 42/hr 11340Rate 42/hr 2100Rate 42/hr 840Rate 42/hr 2889.6

For marking, cuting 42 Per hrs 16800 For setup & welding 42 Per hrs 25200

60178

16"-2 Joints@175/joint, 8"-45 Joints@85/joint, 1.5" 5,675 500

42 /Hrs 2,100 450 1,200

80 /sq.mtr 12,000 100 MT -

MT - 42 /Hrs 3,009

125 MT 1,800 LS 4,000 LS 3,000 LS 900 LS

Total Cost for NDT and other works 34,184

42 /Hrs 5,376 42 /Hrs 4,032

Hrs 42 /Hrs 1,344 42 /Hrs 604842 /Hrs 2016

2,016 Total Cost for assembling and testing 20,832

Total Price = Fab + NDT + Assembling and testing ### ###Total Selling Price 184947

Rate in US $ = 50463 ###

Page 71: est

Skid-1 71 of 79

DATE : 4/3/2011

SIGMA ENGINEERING WORKS L.L.CESTIMATES

Est No : 250061Client : Emerson Process ManagementProject : Enq Ref No : Scope of Work ; Custody transfer metering skid (013-FT-400) Design pressure = 18 bar

Description MOC Nos Proc Wt Material (AED) Remarks

Kg Kg Kg Rate Amount

Custody transfer metering skid--Ref: Drg.no.101230810-3-003 Rev.0 (Qty.01No)

Skid size; 8.5mtr long x 2.6mtr width x 3mtr height

I. Material Cost : -

STEEL PIPING

Pipe 12 inch x Sch.40 x 12mtr long A106GR.B 1 956.76 956.8 956.76 425 /mtr 5,100

Pipe 8 inch x Sch.40 x 12mtr long A106GR.B 3 510.6 1531.8 1021.2 225 /mtr 8,100

Pipe 1.5 inch x Sch.80 x 12mtr long A106GR.B 1 64.92 64.9 64.92 55 /mtr 660

Pipe 3/4 inch x Sch.80 x 12mtr long A106GR.B 1 26.4 26.4 26.4 50 /mtr 600

Pipe 1/2 inch x Sch.80 x 12mtr long A106GR.B 1 19.44 19.4 19.44 40 /mtr 480

Elbow 12 inch x Sch.40 x 90 Degree, LR SA234GR.WPB 2 54 108.0 108.0 650 /Each 1,300

Elbow 8 inch x Sch.40 x 90 Degree, LR SA234GR.WPB 3 20.3 60.9 60.9 225 /Each 675

Elbow 1.5 inch x Sch.80 x 90 Degree SA234GR.WPB 2 0.36 0.7 0.7 17 /Each 34

Eq. Tee 12 inch x Sch.40 SA234GR.WPB 2 65 130.0 130.0 1450 /Each 2,900

Eq. Tee 8 inch x Sch.40 SA234GR.WPB 2 33 66.0 66.0 450 /Each 900

Reducer 12 inch x 8 inch x Sch.40 SA234GR.WPB 5 15 75.0 75.0 450 /Each 2,250

Reducer 8 inch x 4 inch x Sch.40 SA234GR.WPB 4 6.5 26.0 26.0 145 /Each 580

WN Type Flange 12 inch x Sch.40 x 150# ASTM A105N 2 37 74.0 74.0 550 /Each 1,100

Blind Type Flange 12 inch x 150# ASTM A105N 2 40 80.0 80.0 605 /Each 1,210

WN Type Flange 8 inch x Sch.40 x 150# ASTM A105N 24 18 432.0 432.0 225 /Each 5,400 DS Korea Flange

WN Type Flange 4 inch x Sch.40 x 150# ASTM A105N 4 7 28.0 28.0 95 /Each 380

WN Type Flange 1.5 inch x Sch.80 x 300# ASTM A105N 8 1.8 14.4 14.4 52 /Each 416

WN Type Flange 3/4 inch x Sch.80 x 300# ASTM A105N 4 0.8 3.2 3.2 38 /Each 152

WN Type Flange 1/2 inch x Sch.80 x 300# ASTM A105N 4 0.6 2.4 2.4 35 /Each 140

ASTM A105 4 1.0 4.0 4.0 20 /Each 80

ASTM A105 4 0.5 2.0 2.0 10 /Each 40

U Clamps for 12 inch pipes A36/EQ. 16 2.96 47.3 47.3 150 /Each 2,400

U Clamps for 8 inch pipes A36/EQ. 16 3.47 55.5 55.5 90 /Each 1,440

Stud bolts + Nuts M24 x 140mm long 24 0.7 17.3 17.3 8 /Each 192

Stud bolts + Nuts M20 x 120mm long 240 0.1 34.1 34.1 6 /Each 1,440

Gaskets ,12" --2nos, 8"-30nos, 1.5"-6nos 12 inch @120/each, 8 inch @100/each, 1.5 in 3,480

STEEL FRAME WORK

UC254 x 254 x 73kg/mtr x 50mtr long S275JR 1 3650 3650 4015 3.2 /kg 12,848

Lifting lug 50 mm thk x 200 x 350mm S355K2G3 6 27.47 165 181.33 5 /kg 907

S275JR 3 63.60 191 209.88 3.2 /kg 672

S275JR 2 112.80 226 248.16 3.2 /kg 794

S275JR 10 112.80 1128 1240.80 3.2 /kg 3,971

S275JR 1 884.00 884 972.40 7 /kg 6,807

Grating clip; 4nos/sq.mtr S275JR 100 0.10 10 11.00 6 /no 600

A106GR.B 4 20.34 81 89.50 28 /mtr 672

Additional cost for Spares (10% extra) 800

Consumables 10% 6,018 5% on Material 7,706 8,340 LS #REF!

Total cost for Materials 75,537 Total cost for Materials with 10% Margin 83,090

II. Fabrication Cost : -Inch Dia --12 inch x Sch40--12hrs/Joint x 2Jo 24 Hrs Rate 42/hr 1008

Sl No

Unit Wt

Finish Wt

Rate Basis

Half coupling 3/4" x 3000# x NPT threaded, male

Half coupling 1/2" x 3000# x NPT threaded, FF

A193GR.B7/A194GR.2HA193GR.B7/A194GR.2H

SS316L Spiral wound

Supports for meters and valves UPN 100 x 10.6 kg/mtr x 6mtr long

Supports for platform UPN 160 x 18.8 kg/mtr x 6mtr long

Supports for mid platform UPN 160 x 18.8 kg/mtr x 6mtr long

Platform gratings-- Load bar size 25 x 5mm, load bar pitch 30mm, cross bar pitch 100mm, serrated, 6mm twisted square, 40kg/mtr x 2600mm width x 8500mm long

Handrail pipe 1 1/4 inch x Sch.40 x 6mtr long

Page 72: est

Skid-1 72 of 79

Description MOC Nos Proc Wt Material (AED) Remarks

Kg Kg Kg Rate Amount

Sl No

Unit Wt

Finish Wt

Rate Basis

Inch Dia --8 inch x Sch.40--6 hrs/Joint x 45 J 270 Hrs Rate 42/hr 11340Inch Dia --1.5 inch x Sch.40--2.5 hrs/Joint x 50 Hrs Rate 42/hr 2100Inch Dia --3/4 inch x Sch.40--2 hrs/Joint x 10 20 Hrs Rate 42/hr 840Pipe havdling Hrs (20% of the total fab.hrs) 69 Hrs Rate 42/hr 2889.6Fabrication cost (marking, cutting) 400 Hrs For marking, cuting 42 Per hrs 16800Fab. cost of support structurals (set up & w 600 Hrs For setup & welding 42 Per hrs 25200

60178III. NDT : -

Radiography test 100% 16"-2 Joints@175/joint, 8"-45 Joints@85/joint, 1 5,675 MPI on lifting lugs 100% 500 Visual Examination 100% 50 hrs 42 /Hrs 2,100 MPI (wherever RT is not possible) 100% 0 Visits 450 1,200

Blasting & Painting 150 sq.mtr 80 /sq.mtr 12,000 Transport for Painting - 100 MT -

Collection of Free Issue materials from site Delivery to Sigma shop is in Emerson scope MT -

QA/QC Inspection 72 42 /Hrs 3,009 - 125 MT 1,800

Design and Preparartion of Fab Drawings LS 4,000 Packing for Transport LS 3,000 Documentation LS 900 Commercial Loading 1% of Total Value LS

Total Cost for NDT and other works 34,184 IV SKID ASSEMBLING & TESTING

Grating and handrail assembling 4 man, 4day, 8hrs 42 /Hrs 5,376 Skid assembling for hydro testing 3 man, 4day, 8hrs 42 /Hrs 4,032 Hydrotesting at shop 2 man, 2 days,8 hrs 32 Hrs 42 /Hrs 1,344 Installation of all free issue instruments & valves (8nos 10 inch dia valves & meters) 42 /Hrs 6048Trial Testing (Air testing) 3man, 2day,8hrs 42 /Hrs 2016

V Final packing and loading 3man, 2 day, 8 hrs 2,016 Total Cost for assembling and testing 20,832

Total Price = Fab + NDT + Assembling and testing ### 31,431 US $Total Selling Price 198284

Rate in US $ = 54102 ###Electrical and Instrumentation work = US $ 9564 with 25% margin = US $ 12,000

Transport upto site (up to JAFZ)

Page 73: est

OFFER (R2) 73 of 79

CLIENT: EMERSON PROCESS MANAGEMENT SEW WO.NO: 250061CLIENT REF: Project IRP-2

JOB DESCRIPTION: QTY. PRICE A) Material procurement,fabrication,assembling, Testing and delivery of various custody transfer unidirectional metering skid for IRP-2 ProjectCustody transfer metering Skid (Tag.no.013-FT-400); Size 8.5mtr lg x 2.6mtr width x 3mtr h 1 69400Custody transfer metering Skid (Tag.no.029-FT-209); Size 8.5mtr lg x 2.6mtr width x 3mtr h 1 66200Custody transfer metering Skid (Tag.no.311-FT-400); Size 10mtr lg x 2.6mtr width x 3mtr ht 1 75500Custody transfer metering Skid (Tag.no.312-FT-001); Size 8.5mtr lg x 2.6mtr width x 3mtr h 1 104100Custody transfer metering Skid (Tag.no.312-FT-002); Size 8.5mtr lg x 2.6mtr width x 3mtr h 1 98100Custody transfer metering Skid (Tag.no.323-FT-400); Size 8.5mtr lg x 2.6mtr width x 3mtr h 1 60300Custody transfer metering Skid (Tag.no.323-FT-401); Size 8.5mtr lg x 2.6mtr width x 3mtr h 1 69500Custody transfer metering Skid (Tag.no.410-FT-400); Size 12.5mtr lg x 3.6mtr width x 3.6mt 1 322500Custody transfer metering Skid (Tag.no.410-FT-401); Size 12.5mtr lg x 3.6mtr width x 3.6mt 1 322500Custody transfer metering Skid (Tag.no.410-FT-203); Size 8.5mtr lg x 2.6mtr width x 3mtr h 1 69900Custody transfer metering Skid (Tag.no.410-FT-206); Size 8.5mtr lg x 2.6mtr width x 3mtr h 1 69900Custody transfer metering Skid (Tag.no.410-FT-209); Size 12.5mtr lg x 2.6mtr width x 3.6mt 1 170000Custody transfer metering Skid (Tag.no.751-FT-300); Size 12.5mtr lg x 3.6mtr width x 3.6mt 1 197300Custody transfer metering Skid (Tag.no.751-FT-301); Size 12.5mtr lg x 3.6mtr width x 3.6mt 1 197300Custody transfer metering Skid (Tag.no.751-FT-001); Size 10mtr lg x 2.6mtr width x 3mtr ht 1 89000Custody transfer metering Skid (Tag.no.751-FT-011); Size 8.5mtr lg x 2.6mtr width x 3mtr h 1 68300Custody transfer metering Skid (Tag.no.751-FT-021); Size 8.5mtr lg x 2.6mtr width x 3mtr h 1 68300Custody transfer metering Skid (Tag.no.751-FT-041); Size 8.5mtr lg x 2.6mtr width x 3mtr h 1 77900Custody transfer metering Skid (Tag.no.751-FT-031); Size 10mtr lg x 2.6mtr width x 3mtr ht 1 72850Custody transfer metering Skid (Tag.no.800-FT-400); Size 8.5mtr lg x 2.6mtr width x 3mtr h 1 72850Custody transfer metering Skid (Tag.no.900-FT-001); Size 8.5mtr lg x 2.6mtr width x 3mtr h 1 72850Custody transfer metering Skid (Tag.no.900-FT-002); Size 8.5mtr lg x 2.6mtr width x 3mtr h 1 66200Custody transfer metering Skid (Tag.no.800-FT-401); Size 12.5mtr lg x 2.6mtr width x 3.6mt 1 174600Custody transfer metering Skid (Tag.no.326-FT-400); Size 8.5mtr lg x 2.6mtr width x 3mtr h 1 75100Custody transfer metering Skid (Tag.no.326-FT-401); Size 8.5mtr lg x 2.6mtr width x 3mtr h 1 75100Custody transfer metering Skid (Tag.no.326-FT-402); Size 8.5mtr lg x 2.6mtr width x 3mtr h 1 75100Custody transfer metering Skid (Tag.no.326-FT-403); Size 8.5mtr lg x 2.6mtr width x 3mtr h 1 75100

Truck Loading Metering Skid (Tag no. 1000-FT-401A); Size 5.05mtr lg x 1mtr width x 1.8mtr 1 14800Truck Loading Metering Skid (Tag no. 1000-FT-401B); Size 5.05mtr lg x 1mtr width x 1.8mtr 1 16960Truck Loading Metering Skid (Tag no. 1000-FT-401C); Size 5.05mtr lg x 1mtr width x 1.8mtr 1 16960Truck Loading Metering Skid (Tag no. 1000-FT-401D); Size 5.05mtr lg x 1mtr width x 1.8mtr 1 16960Truck Loading Metering Skid (Tag no. 1000-FT-401E); Size 5.05mtr lg x 1mtr width x 1.8mtr 1 16960Truck Loading Metering Skid (Tag no. 1000-FT-401F); Size 5.05mtr lg x 1mtr width x 1.8mtr 1 16960Truck Loading Metering Skid (Tag no. 1000-FT-402A); Size 5.05mtr lg x 1mtr width x 1.8mtr 1 16960Truck Loading Metering Skid (Tag no. 1000-FT-402B); Size 5.05mtr lg x 1mtr width x 1.8mtr 1 16960Truck Loading Metering Skid (Tag no. 1000-FT-402C); Size 5.05mtr lg x 1mtr width x 1.8mtr 1 16960Truck Loading Metering Skid (Tag no. 1000-FT-402D); Size 5.05mtr lg x 1mtr width x 1.8mtr 1 16960Truck Loading Metering Skid (Tag no. 1000-FT-402E); Size 5.05mtr lg x 1mtr width x 1.8mtr 1 16960Truck Loading Metering Skid (Tag no. 1000-FT-402F); Size 5.05mtr lg x 1mtr width x 1.8mtr 1 16960Truck Loading Metering Skid (Tag no. 1000-FT-403A); Size 5.05mtr lg x 1mtr width x 1.8mtr 1 16960Truck Loading Metering Skid (Tag no. 1000-FT-403B); Size 5.05mtr lg x 1mtr width x 1.8mtr 1 16960Truck Loading Metering Skid (Tag no. 1000-FT-403C); Size 5.05mtr lg x 1mtr width x 1.8mtr 1 16960Truck Loading Metering Skid (Tag no. 1000-FT-403D); Size 5.05mtr lg x 1mtr width x 1.8mtr 1 16960Truck Loading Metering Skid (Tag no. 1000-FT-404A); Size 5.05mtr lg x 1mtr width x 1.8mtr 1 16960Truck Loading Metering Skid (Tag no. 1000-FT-404B); Size 5.05mtr lg x 1mtr width x 1.8mtr 1 16960Truck Loading Metering Skid (Tag no. 020-FT-500A); Size 5.05mtr lg x 1mtr width x 1.8mtr h 1 16960Truck Loading Metering Skid (Tag no. 020-FT-500B); Size 5.05mtr lg x 1mtr width x 1.8mtr h 1 16960

B) Electrical & Instrumentation work

Page 74: est

OFFER (R2) 74 of 79

Custody transfer metering Skid (Tag.no.013-FT-400) 1 23600Custody transfer metering Skid (Tag.no.029-FT-209) 1 23600Custody transfer metering Skid (Tag.no.311-FT-400) 1 23600Custody transfer metering Skid (Tag.no.312-FT-001) 1 23600Custody transfer metering Skid (Tag.no.312-FT-002) 1 23600Custody transfer metering Skid (Tag.no.323-FT-400) 1 23600Custody transfer metering Skid (Tag.no.323-FT-401) 1 23600Custody transfer metering Skid (Tag.no.410-FT-400) 1 38950Custody transfer metering Skid (Tag.no.410-FT-401) 1 38950Custody transfer metering Skid (Tag.no.410-FT-203) 1 23600Custody transfer metering Skid (Tag.no.410-FT-206) 1 23600Custody transfer metering Skid (Tag.no.410-FT-209) 1 32200Custody transfer metering Skid (Tag.no.751-FT-300) 1 38950Custody transfer metering Skid (Tag.no.751-FT-301) 1 38950Custody transfer metering Skid (Tag.no.751-FT-001) 1 23600Custody transfer metering Skid (Tag.no.751-FT-011) 1 23600Custody transfer metering Skid (Tag.no.751-FT-021) 1 23600Custody transfer metering Skid (Tag.no.751-FT-041) 1 23600Custody transfer metering Skid (Tag.no.751-FT-031) 1 23600Custody transfer metering Skid (Tag.no.800-FT-400) 1 23600Custody transfer metering Skid (Tag.no.900-FT-001) 1 23600Custody transfer metering Skid (Tag.no.900-FT-002) 1 23600Custody transfer metering Skid (Tag.no.800-FT-401) 1 32200Custody transfer metering Skid (Tag.no.326-FT-400) 1 23600Custody transfer metering Skid (Tag.no.326-FT-401) 1 23600Custody transfer metering Skid (Tag.no.326-FT-402) 1 23600Custody transfer metering Skid (Tag.no.326-FT-403) 1 23600

Truck Loading Metering Skid (Tag no. 1000-FT-401A) 1 16100Truck Loading Metering Skid (Tag no. 1000-FT-401B) 1 16100Truck Loading Metering Skid (Tag no. 1000-FT-401C) 1 16100Truck Loading Metering Skid (Tag no. 1000-FT-401D) 1 16100Truck Loading Metering Skid (Tag no. 1000-FT-401E) 1 16100Truck Loading Metering Skid (Tag no. 1000-FT-401F) 1 16100Truck Loading Metering Skid (Tag no. 1000-FT-402A) 1 16100Truck Loading Metering Skid (Tag no. 1000-FT-402B) 1 16100Truck Loading Metering Skid (Tag no. 1000-FT-402C) 1 16100Truck Loading Metering Skid (Tag no. 1000-FT-402D) 1 16100Truck Loading Metering Skid (Tag no. 1000-FT-402E) 1 16100Truck Loading Metering Skid (Tag no. 1000-FT-402F) 1 16100Truck Loading Metering Skid (Tag no. 1000-FT-403A) 1 16100Truck Loading Metering Skid (Tag no. 1000-FT-403B) 1 16100Truck Loading Metering Skid (Tag no. 1000-FT-403C) 1 16100Truck Loading Metering Skid (Tag no. 1000-FT-403D) 1 16100Truck Loading Metering Skid (Tag no. 1000-FT-404A) 1 16100Truck Loading Metering Skid (Tag no. 1000-FT-404B) 1 16100Truck Loading Metering Skid (Tag no. 020-FT-500A) 1 16100Truck Loading Metering Skid (Tag no. 020-FT-500B) 1 16100

Total cost in US $ = 4330590

Scope of work : Assumptions/Considerations:-01) Pipe work fabrication and welding shall be as per code ASME B31.302) Desingn of the Skid structural is included in our scope.We shall submit detailed fabrication drawings for your approval proir to start of fabrication.03) Following materials shall be supplied by us with any origin as available in the local market.Pipes --Material ASTM A106GR.B smls

Page 75: est

OFFER (R2) 75 of 79

Flanges --WNRF typ--Material ASTM A105NElbows, Reducers and Tees -- ASTM A234GR.WPBSkid structural -- S275JR/EQ.U Clamps -- A36/EQ.Bolts and Nuts -- A193GR.B7/ A194GR.2H, Gaskets -- CAF04) MTC shall be submitted with 3.1 Certification for the materials which is included in our scope of supply.05) We have not considered any type of Valves, Meters, Filters, etc. from our scope of supply.06) Fllowing documents shall be submitted for your review and approval prior to start of fabrication.Welding procedureProcedure Qualification RecordNDT Procedures07) Following documents shall be submitted for your review with in 4-6 weeks after the placement of order.Painting procedure.Manufacturing record book indexProduction scheduleLeak test procedureHydro test procedure08) We have considered the main pipe line Schedule for the Skids based on your design pressure.09) Main Skid frame size and Lifting lug locations shall be confirmed after the completion of our design calculations. 10) Electrical and instrumentation work is included in our scope and the scope of work shall be as per follows.a) Supply of materials as per the following reference attachments (Material Take off/MTO list attached separately). EF/280/411.A/MTO/1 Supply.EF/280/411.A/MTO/2 Supply.EF/280/411.A/MTO/3 Supply.EF/280/411.A/MTO/4 Supply.b) Supply of SS Cable trays, cables, Nickel Plated glands and its installation work.c) Supply of Junction box (JB) as per the attached MTOs.d) Cable laying between instruments and JB, dressing, glanding & termination.e) Installation of instruments as per your hook up drawingf) Supply and installation of instrument shades for field instruments.g) Supply of instrument tube fittings as per hook up drawings.h) Cable insulation test and continuity testi) Install all lables and ferrulesj) Manpower assistance in FAT11) NDT shall be as per follows.a) 100% Visual inspection on weld joints. b) 100% radiography test on all butt weld joints.c) 100% MPI test on lifting lugs weld joints.d) 100% MPI on butt weld joints wherever RT is not possible.12) We have not considered any PWHT in our scope.13) Hydrotest shall be done by us in our shop with 1.5 times of design pressure. Required gaskets, Fastners and Blind flanges shall be provided by us for hydro testing. 14) After satisfactory completion of the inspection of hydrotest, we shall dismandle the same for blasting and painting.15) Pipe spools external surfaces and Skid structural area shall be blasted to SA 2 1/2 & painted as per follows.Primer coat -- One layer of Inorganic zinc silicate primer, minimum thickness 75 microns.Intermediate -- One layer of Modified epoxy polyamide 50 microns.Finishing coat --Aliphatic polyurethane 50 micron thickness--Colours RAL 7038, light gray.16) Assembly of the Skid with all free issued eqipments & instruments is in our scope.17) Air leak test of the full skid after the completion of all assembly is in our scope.18) Assistance for FAT shall be provided by us after the completion of electrical and instrumentation work.19) Dismandling of the required components, Proper packing of the Metering Skid shall be done by us as per follows.a) Tagged with metal tags and tied with G.I wires.b) Flanged end blanked by using flange end protectors/wooden blinds.20) Our quoted price is strictly based on the above assumptions/ considerations basis. If any major

Page 76: est

OFFER (R2) 76 of 79

changes/deviation comes on this, our quoted price shall be revised accordingly.21) Delivery with in your UAE site is in our scope.22) We shall submit all QA/QC related documents after the completion of final inspection and testing.Exclusions:1) Any process Design.2) NDT other than mentioned above.3) Arrangement of any third party inspection agency.4) Supply of any valves, gauges and any other instruments/equipments.5) Any heat treatment/insulation work.6) Any site installation/erection work.Delivery: With in 50-54 weeks from the date of receipt of PO.

Page 77: est

OFFER-04-03-2011 77 of 79

CLIENT: EMERSON PROCESS MANAGEMENT SEW WO.NO: 250,061 CLIENT REF: Project IRP-2

JOB DESCRIPTION: QTY. PRICE A) Material procurement,fabrication,assembling, Testing and delivery of various custody transfer unidirectional metering skid for IRP-2 Project

Custody transfer metering Skid (Tag.no.013-FT-400); Size 8.5mtr lg x 2.6mtr width x 3mtr h 1 55,800 Custody transfer metering Skid (Tag.no.013-FT-101); Size 8.5mtr lg x 2.6mtr width x 3mtr h 1 53,200 Custody transfer metering Skid (Tag.no.029-FT-209); Size 8.5mtr lg x 2.6mtr width x 3mtr h 1 53,200 Custody transfer metering Skid (Tag.no.311-FT-400); Size 10mtr lg x 2.6mtr width x 3mtr ht 1 62,500 Custody transfer metering Skid (Tag.no.312-FT-001); Size 8.5mtr lg x 2.6mtr width x 3mtr h 1 77,100 Custody transfer metering Skid (Tag.no.312-FT-002); Size 8.5mtr lg x 2.6mtr width x 3mtr h 1 68,300 Custody transfer metering Skid (Tag.no.323-FT-400); Size 8.5mtr lg x 2.6mtr width x 3mtr h 1 48,300 Custody transfer metering Skid (Tag.no.410-FT-400); Size 12.5mtr lg x 3.6mtr width x 3.6mt 1 55,500 Custody transfer metering Skid (Tag.no.410-FT-401); Size 12.5mtr lg x 3.6mtr width x 3.6mt 1 259,900 Custody transfer metering Skid (Tag.no.410-FT-203); Size 8.5mtr lg x 2.6mtr width x 3mtr h 1 259,900 Custody transfer metering Skid (Tag.no.410-FT-206); Size 8.5mtr lg x 2.6mtr width x 3mtr h 1 56,700 Custody transfer metering Skid (Tag.no.410-FT-209); Size 12.5mtr lg x 2.6mtr width x 3.6mt 1 56,700 Custody transfer metering Skid (Tag.no.410-FT-211); Size 8.5mtr lg x 2.6mtr width x 3mtr h 1 134,000

Custody transfer metering Skid (Tag.no.751-FT-300); Size 12.5mtr lg x 3.6mtr width x 3.6mt 1 166,600 Custody transfer metering Skid (Tag.no.751-FT-301); Size 12.5mtr lg x 3.6mtr width x 3.6mt 1 166,600 Custody transfer metering Skid (Tag.no.751-FT-001); Size 10mtr lg x 2.6mtr width x 3mtr ht 1 77,600 Custody transfer metering Skid (Tag.no.751-FT-011); Size 8.5mtr lg x 2.6mtr width x 3mtr h 1 55,200 Custody transfer metering Skid (Tag.no.751-FT-021); Size 8.5mtr lg x 2.6mtr width x 3mtr h 1 54,200 Custody transfer metering Skid (Tag.no.751-FT-031); Size 10mtr lg x 2.6mtr width x 3mtr ht 1 60,300 Custody transfer metering Skid (Tag.no.751-FT-041); Size 8.5mtr lg x 2.6mtr width x 3mtr h 1 63,200

Custody transfer metering Skid (Tag.no.800-FT-400); Size 8.5mtr lg x 2.6mtr width x 3mtr h 1 58,200 Custody transfer metering Skid (Tag.no.800-FT-401); Size 12.5mtr lg x 2.6mtr width x 3.6mt 1 137,500

Custody transfer metering Skid (Tag.no.900-FT-001); Size 8.5mtr lg x 2.6mtr width x 3mtr h 1 58,200 Custody transfer metering Skid (Tag.no.900-FT-002); Size 8.5mtr lg x 2.6mtr width x 3mtr h 1 53,400

Custody transfer metering Skid (Tag.no.326-FT-400); Size 8.5mtr lg x 2.6mtr width x 3mtr h 1 62,400 Custody transfer metering Skid (Tag.no.326-FT-401); Size 8.5mtr lg x 2.6mtr width x 3mtr h 1 62,400 Custody transfer metering Skid (Tag.no.326-FT-402); Size 8.5mtr lg x 2.6mtr width x 3mtr h 1 62,400 Custody transfer metering Skid (Tag.no.326-FT-403); Size 8.5mtr lg x 2.6mtr width x 3mtr h 1 62,400 Custody transfer metering Skid (Tag.no.1100-FT-121); Size 8.5mtr lg x 2.6mtr width x 3mtr 1 58,000

2,499,700 B) Electrical & Instrumentation workCustody transfer metering Skid (Tag.no.013-FT-400) 1 23,100 Custody transfer metering Skid (Tag.no.013-FT-101) 1 23,100 Custody transfer metering Skid (Tag.no.029-FT-209) 1 23,100 Custody transfer metering Skid (Tag.no.311-FT-400) 1 23,100 Custody transfer metering Skid (Tag.no.312-FT-001) 1 17,400 Custody transfer metering Skid (Tag.no.312-FT-002) 1 17,400 Custody transfer metering Skid (Tag.no.323-FT-400) 1 23,100 Custody transfer metering Skid (Tag.no.410-FT-400) 1 23,100 Custody transfer metering Skid (Tag.no.410-FT-401) 1 31,500 Custody transfer metering Skid (Tag.no.410-FT-203) 1 23,100 Custody transfer metering Skid (Tag.no.410-FT-206) 1 23,100 Custody transfer metering Skid (Tag.no.410-FT-209) 1 23,100 Custody transfer metering Skid (Tag.no.410-FT-211) 1 23,100

Page 78: est

OFFER-04-03-2011 78 of 79

Custody transfer metering Skid (Tag.no.751-FT-300) 1 23,100 Custody transfer metering Skid (Tag.no.751-FT-301) 1 31,500 Custody transfer metering Skid (Tag.no.751-FT-001) 1 23,100 Custody transfer metering Skid (Tag.no.751-FT-011) 1 23,100 Custody transfer metering Skid (Tag.no.751-FT-021) 1 23,100 Custody transfer metering Skid (Tag.no.751-FT-041) 1 23,100 Custody transfer metering Skid (Tag.no.751-FT-031) 1 23,100 Custody transfer metering Skid (Tag.no.800-FT-400) 1 23,100 Custody transfer metering Skid (Tag.no.900-FT-001) 1 23,100 Custody transfer metering Skid (Tag.no.900-FT-002) 1 23,100 Custody transfer metering Skid (Tag.no.800-FT-401) 1 23,100 Custody transfer metering Skid (Tag.no.326-FT-400) 1 23,100 Custody transfer metering Skid (Tag.no.326-FT-401) 1 23,100 Custody transfer metering Skid (Tag.no.326-FT-402) 1 23,100 Custody transfer metering Skid (Tag.no.326-FT-403) 1 23,100 Custody transfer metering Skid (Tag.no.1100-FT-121) 1 23,100

675,300

Total cost in US $ = 3,175,000

Scope of work : Assumptions/Considerations:-01) Pipe work fabrication and welding shall be as per code ASME B31.302) Desingn of the Skid structure including the skid base and pipe supports and anchor point location is included inour scope.03) Detailed engineering with MTO, drawings to fabricate the structure and piping is in our scope.04) Following materials shall be supplied by us with any origin as available in the local market.Pipes --Material ASTM A106GR.B smls, Sch.STDFlanges --WNRF typ--Material ASTM A105NElbows, Reducers and Tees -- ASTM A234GR.WPBSkid structural -- S275JR/EQ.U Clamps -- A36/EQ.Bolts and Nuts -- A193GR.B7/ A194GR.2H, Gaskets -- CAF05) MTC shall be submitted with 3.1 Certification for the materials which is included in our scope of supply.06) We have not considered any type of Valves, Meters, Filters, etc. from our scope of supply.07) Fllowing documents shall be submitted for your review and approval prior to start of fabrication.Welding procedureProcedure Qualification RecordNDT Procedures08) Following documents shall be submitted for your review with in 4-6 weeks after the placement of order.Painting procedure.Manufacturing record book indexProduction scheduleLeak test procedureHydro test procedure09) We have considered the main pipe line Schedule for the Skids based on your design pressure.10) Main Skid frame size and Lifting lug locations shall be confirmed after the completion of our design calculations. 11) Electrical and instrumentation work is included in our scope and the scope of work shall be as per follows.Our offer is based on the following documents;PID With HC4 Option IRP2-101230810-3-003.Rev.0 GSEC, Typical Skid GA-1 TK4926-1, Typical Skid GA-2 TK4927-1& Technical piping specifications for piping system-AMD-PU-003-5595-001-Rev-02.Instrument tubing & fitting of SS-316- Make Sawagelok or Parker.We have not considered any electrical lighting for the skid.We have considered following in our scope of work.cable trays & accessories-stainless steel material.Instrumentataion /Electrical cables & accessories.Instrument tubes & fittings.Sun shades for electrical instruments.Cable glands, junction boxes, instrumentation bulk materials for instruments.

Page 79: est

OFFER-04-03-2011 79 of 79

cabling will be secured with UV resistant cable ties & sufficient free cable at termination end.All the Tagged instruments/valves shall be supplied by Emerson.We have not considered any fire or gas detection system.rand can be provided upon request with an additional commercial impact.All tubing/tube fitting considered seamless SS316L material.12) NDT shall be as per follows.a) 100% Visual inspection on weld joints. b) 100% radiography test on all butt weld joints.c) 100% MPI test on lifting lugs weld joints.d) 100% MPI on butt weld joints wherever RT is not possible.13) We have not considered any PWHT in our scope.14) Hydrotest shall be done by us in our shop with 1.5 times of design pressure. Required gaskets, Fastners and Blind flanges shall be provided by us for hydro testing. 15) After satisfactory completion of the inspection of hydrotest, we shall dismandle the same for blasting and painting.16) Pipe spools external surfaces and Skid structural area shall be blasted to SA 2 1/2 & painted as per follows.Primer coat -- One layer of Inorganic zinc silicate primer, minimum thickness 75 microns.Intermediate -- One layer of Modified epoxy polyamide 50 microns.Finishing coat --Aliphatic polyurethane 50 micron thickness--Colours RAL 7038, light gray.17) Assembly of the Skid with all free issued eqipments & instruments is in our scope.18) Air leak test of the full skid after the completion of all assembly is in our scope.19) Assistance for FAT shall be provided by us after the completion of electrical and instrumentation work.20) Dismandling of the required components, Proper packing of the Metering Skid shall be done by us as per follows.a) Tagged with metal tags and tied with G.I wires.b) Flanged end blanked by using flange end protectors/wooden blinds.21) Our quoted price is strictly based on the above assumptions/ considerations basis. If any major changes/deviation comes on this, our quoted price shall be revised accordingly.22) Delivery with in your UAE site is in our scope.23) We shall submit all QA/QC related documents after the completion of final inspection and testing.24) Material will be procured as available in local market with authentic origin as we did not received any approvedvendor list from the client.Exclusions:1) Any process Design.2) NDT other than mentioned above.3) Arrangement of any third party inspection agency.4) Supply of any valves, gauges and any other instruments/equipments.5) Any heat treatment/insulation work.6) Any site installation/erection work.Delivery: With in 50-54 weeks from the date of receipt of PO.