Home > Documents > ESTABLISHING MANEUVER WORK INDICATORS IN THE PICK-UP TRAINS FORMING PROCESS USING THE SIMULTANEOUS...

ESTABLISHING MANEUVER WORK INDICATORS IN THE PICK-UP TRAINS FORMING PROCESS USING THE SIMULTANEOUS...

Date post: 28-Mar-2015
Category:
Upload: jasper-beam
View: 215 times
Download: 0 times
Share this document with a friend
Popular Tags:
86
ESTABLISHING MANEUVER WORK INDICATORS IN THE PICK-UP TRAINS FORMING PROCESS USING THE SIMULTANEOUS METHOD I.Belošević, M.Ivić, M.Marković, S.Vesković, N.Pavlović, S.Milinković, M.Kosijer University of Belgrade, Serbia 19 th International Symposium EURO –ŽEL 2011 ‘’Recent challenges for European railways’’ 8th – 9 th June Žilina,Slovak Republic
Transcript

ESTABLISHING MANEUVER WORK INDICATORS IN THE PICK-UP TRAINS

FORMING PROCESS USING THE SIMULTANEOUS METHOD

I.Belošević, M.Ivić, M.Marković, S.Vesković, N.Pavlović, S.Milinković, M.KosijerUniversity of Belgrade, Serbia

19th International Symposium

EURO –ŽEL 2011

‘’Recent challenges for European railways’’

8th – 9 th June Žilina,Slovak Republic

What are pick - up trains?

• Serve on line sections between two technical freight yards on the principle “leave, pick-up or exchange” wagons in intermediate stations

• Technical freight yards prepare compositions in order to minimaze shunting work in intermediate stations

INTRODUCTION PROBLEM STATEMENT

SIMULATION MODEL

CONCLUSIONS

TRAIN

INTERMEDIATE STATION

B C D

TECHNICAL FREIGHT YARD

TECHNICAL FREIGHT YARD

INTRODUCTION PROBLEM STATEMENT

SIMULATION MODEL

CONCLUSIONS

TRAIN

INTERMEDIATE STATION

B C D

TECHNICAL FREIGHT YARD

What are pick - up trains?

• Serve on line sections between two technical freight yards on the principle “leave, pick-up or exchange” wagons in intermediate stations

• Technical freight yards prepare compositions in order to minimaze shunting work in intermediate stations

TECHNICAL FREIGHT YARD

INTRODUCTION PROBLEM STATEMENT

SIMULATION MODEL

CONCLUSIONS

TRAIN

INTERMEDIATE STATION

B C D

TECHNICAL FREIGHT YARD

What are pick - up trains?

• Serve on line sections between two technical freight yards on the principle “leave, pick-up or exchange” wagons in intermediate stations

• Technical freight yards prepare compositions in order to minimaze shunting work in intermediate stations

TECHNICAL FREIGHT YARD

INTRODUCTION PROBLEM STATEMENT

SIMULATION MODEL

CONCLUSIONS

TRAIN

INTERMEDIATE STATION

B C D

TECHNICAL FREIGHT YARD

What are pick - up trains?

• Serve on line sections between two technical freight yards on the principle “leave, pick-up or exchange” wagons in intermediate stations

• Technical freight yards prepare compositions in order to minimaze shunting work in intermediate stations

TECHNICAL FREIGHT YARD

INTRODUCTION PROBLEM STATEMENT

SIMULATION MODEL

CONCLUSIONS

TRAIN

INTERMEDIATE STATION

B C D

TECHNICAL FREIGHT YARD

What are pick - up trains?

• Serve on line sections between two technical freight yards on the principle “leave, pick-up or exchange” wagons in intermediate stations

• Technical freight yards prepare compositions in order to minimaze shunting work in intermediate stations

TECHNICAL FREIGHT YARD

INTRODUCTION PROBLEM STATEMENT

SIMULATION MODEL

CONCLUSIONS

TRAIN

INTERMEDIATE STATION

B C D

TECHNICAL FREIGHT YARD

What are pick - up trains?

• Serve on line sections between two technical freight yards on the principle “leave, pick-up or exchange” wagons in intermediate stations

• Technical freight yards prepare compositions in order to minimaze shunting work in intermediate stations

TECHNICAL FREIGHT YARD

INTRODUCTION PROBLEM STATEMENT

SIMULATION MODEL

CONCLUSIONS

TRAIN

INTERMEDIATE STATION

B C D

TECHNICAL FREIGHT YARD

What are pick - up trains?

• Serve on line sections between two technical freight yards on the principle “leave, pick-up or exchange” wagons in intermediate stations

• Technical freight yards prepare compositions in order to minimaze shunting work in intermediate stations

TECHNICAL FREIGHT YARD

INTRODUCTION PROBLEM STATEMENT

SIMULATION MODEL

CONCLUSIONS

TRAIN

INTERMEDIATE STATION

B C D

TECHNICAL FREIGHT YARD

What are pick - up trains?

TECHNICAL FREIGHT YARD

• Serve on line sections between two technical freight yards on the principle “leave, pick-up or exchange” wagons in intermediate stations

• Technical freight yards prepare compositions in order to minimaze shunting work in intermediate stations

INTRODUCTION PROBLEM STATEMENT

SIMULATION MODEL

CONCLUSIONS

TRAIN

INTERMEDIATE STATION

B C D

TECHNICAL FREIGHT YARD

What are pick - up trains?

TECHNICAL FREIGHT YARD

• Serve on line sections between two technical freight yards on the principle “leave, pick-up or exchange” wagons in intermediate stations

• Technical freight yards prepare compositions in order to minimaze shunting work in intermediate stations

INTRODUCTION PROBLEM STATEMENT

SIMULATION MODEL

CONCLUSIONS

TRAIN

INTERMEDIATE STATION

B C D

TECHNICAL FREIGHT YARD

What are pick - up trains?

• Serve on line sections between two technical freight yards on the principle “leave, pick-up or exchange” wagons in intermediate stations

• Technical freight yards prepare compositions in order to minimaze shunting work in intermediate stations

TECHNICAL FREIGHT YARD

INTRODUCTION PROBLEM STATEMENT

SIMULATION MODEL

CONCLUSIONS

Principal of Simultaneous method

Marshalling Yard

RECEIVING YARD CLASSIFICATION YARD

RECEIVING YARD

6 4 7 2 4 1

6 5 3 1 4 8 7

8 9 3 7 1 6 2

5 8 5 3 2

Pushing onto the hump

lok.

RECEIVING YARD

6 4 7 2 4 1

6 5 3 1 4 8 7

8 9 3 7 1 6 2

5 8 5 3 2

lok.

Pushing onto the hump

RECEIVING YARD

6 4 7 2 4 1

6 5 3 1 4 8 7

8 9 3 71

62

5 8 5 3 2

lok.

Pushing onto the hump

CLASSIFICATION YARD7 1 6 2

1st, 3rd, 5th, 7th, 9th

2nd, 6th

4th

8th

Sorting tracks for final forming of trains

Sorting tracks for wagons accumulation by intermediate station

- The First Phase -

Gravity shunting

CLASSIFICATION YARD3 7 1

6

2

Gravity shunting

1st, 3rd, 5th, 7th, 9th

2nd, 6th

4th

8th

Sorting tracks for final forming of trains

Sorting tracks for wagons accumulation by intermediate station

- The First Phase -

CLASSIFICATION YARD8 9

3

7

1 6 2

lok.

Gravity shunting

1st, 3rd, 5th, 7th, 9th

2nd, 6th

4th

8th

Sorting tracks for final forming of trains

Sorting tracks for wagons accumulation by intermediate station

- The First Phase -

CLASSIFICATION YARD

8

9

3 7 1

6 2

lok.

Gravity shunting

1st, 3rd, 5th, 7th, 9th

2nd, 6th

4th

8th

Sorting tracks for final forming of trains

Sorting tracks for wagons accumulation by intermediate station

- The First Phase -

CLASSIFICATION YARD1 4 8 7

9 3 7 1

6 2

8Gravity shunting

1st, 3rd, 5th, 7th, 9th

2nd, 6th

4th

8th

Sorting tracks for final forming of trains

Sorting tracks for wagons accumulation by intermediate station

- The First Phase -

6 5 3

1

4

7

lok.

8

9 3 7 1

6 2

8Gravity shunting

CLASSIFICATION YARD

1st, 3rd, 5th, 7th, 9th

2nd, 6th

4th

8th

Sorting tracks for final forming of trains

Sorting tracks for wagons accumulation by intermediate station

- The First Phase -

6

53

1

lok.

4

8

9 3 7 1

6 2

8

7

Gravity shunting

CLASSIFICATION YARD

1st, 3rd, 5th, 7th, 9th

2nd, 6th

4th

8th

Sorting tracks for final forming of trains

Sorting tracks for wagons accumulation by intermediate station

- The First Phase -

4

9 3 7 15 3 1 7

6 6 2

8 8Gravity shunting

CLASSIFICATION YARD

1st, 3rd, 5th, 7th, 9th

2nd, 6th

4th

8th

Sorting tracks for final forming of trains

Sorting tracks for wagons accumulation by intermediate station

- The First Phase -

CLASSIFICATION YARD

4

9 3 7 15 3 1 7

6 6 2

8 8

7 2 4 1

Gravity shunting

1st, 3rd, 5th, 7th, 9th

2nd, 6th

4th

8th

Sorting tracks for final forming of trains

Sorting tracks for wagons accumulation by intermediate station

- The First Phase -

CLASSIFICATION YARD

4

9 3 7 15 3 1 7

6 6 2

8 8

76 4

24

1

lok.

Gravity shunting

1st, 3rd, 5th, 7th, 9th

2nd, 6th

4th

8th

Sorting tracks for final forming of trains

Sorting tracks for wagons accumulation by intermediate station

- The First Phase -

4

9 3 7 15 3 1 7

6 6 2

8 8

lok.

64

7 2

4

1

Gravity shunting

CLASSIFICATION YARD

1st, 3rd, 5th, 7th, 9th

2nd, 6th

4th

8th

Sorting tracks for final forming of trains

Sorting tracks for wagons accumulation by intermediate station

- The First Phase -

9 3 7 15 3 1 7

6 6 2

8 8

7 1

6 2

4 4 4

Gravity shunting

CLASSIFICATION YARD

1st, 3rd, 5th, 7th, 9th

2nd, 6th

4th

8th

Sorting tracks for final forming of trains

Sorting tracks for wagons accumulation by intermediate station

- The First Phase -

9 3 7 15 3 1 7

6 6 2

8 8

7 1

6 2

4 4 4

5 8 5 3 2

Gravity shunting

CLASSIFICATION YARD

1st, 3rd, 5th, 7th, 9th

2nd, 6th

4th

8th

Sorting tracks for final forming of trains

Sorting tracks for wagons accumulation by intermediate station

- The First Phase -

9 3 7 15 3 1 7

6 6 2

8 8

7 1

6 2

4 4 4

5 8

53

2

lok.

Gravity shunting

CLASSIFICATION YARD

1st, 3rd, 5th, 7th, 9th

2nd, 6th

4th

8th

Sorting tracks for final forming of trains

Sorting tracks for wagons accumulation by intermediate station

- The First Phase -

9 3 7 15 3 1 7

6 6 2

8 8

7 1

6 2

4 4 4

lok.

5

8

5 3

2

Gravity shunting

CLASSIFICATION YARD

1st, 3rd, 5th, 7th, 9th

2nd, 6th

4th

8th

Sorting tracks for final forming of trains

Sorting tracks for wagons accumulation by intermediate station

- The First Phase -

9 3 7 15 3 1 7

6 6 2

7 1

4 4 4

lok.

5 5 3

2 6 2

8 8 8Gravity shunting

CLASSIFICATION YARD

1st, 3rd, 5th, 7th, 9th

2nd, 6th

4th

8th

Sorting tracks for final forming of trains

Sorting tracks for wagons accumulation by intermediate station

- The First Phase -

32

CLASSIFICATION YARD

9 3 7 15 3 1 7

6 6 2

7 1

4 4 4

5 5 3

2 6 2

8 8 8

lok.

1st, 3rd, 5th, 7th, 9th

2nd, 6th

4th

8th

Sorting tracks for final forming of trains

Sorting tracks for wagons accumulation by intermediate station

- The First Phase -

33

CLASSIFICATION YARD

9 3 7 15 3 1 7

6 6 2

7 1

4 4 4

5 5 3

2 6 2

8 8 8

lok.

1st, 3rd, 5th, 7th, 9th

2nd, 6th

4th

8th

Sorting tracks for final forming of trains

Sorting tracks for wagons accumulation by intermediate station

- The First Phase -

34

CLASSIFICATION YARD

9 3 7 15 3 1 7

6 6 2

1

4 4 4

2 6 2

8 8 8

75 5 3lok.

Shunting onto the hump

1st, 3rd, 5th, 7th, 9th

2nd, 6th

4th

8th

Sorting tracks for final forming of trains

Sorting tracks for wagons accumulation by intermediate station

- The First Phase -

35

CLASSIFICATION YARD

9 3 7 15 3 1 7

6 6 2

4 4 4

2 6 2

8 8 8

71

55

3

lok.

1st, 3rd, 5th, 7th, 9th

2nd, 6th

4th

8th

Sorting tracks for final forming of trains

Sorting tracks for wagons accumulation by intermediate station

Shunting onto the hump

- The First Phase -

36

CLASSIFICATION YARD

93

71

53

17

6 6 2

4 4 4

2 6 2

8 8 8

7 15 5 3

Shunting onto the hump

1st, 3rd, 5th, 7th, 9th

2nd, 6th

4th

8th

Sorting tracks for final forming of trains

Sorting tracks for wagons accumulation by intermediate station

- The First Phase -

37

CLASSIFICATION YARD

6 6 2

4 4 4

2 6 2

8 8 8

9 3 7 1

Shunting onto the hump

1st, 3rd, 5th, 7th, 9th

2nd, 6th

4th

8th

Sorting tracks for final forming of trains

Sorting tracks for wagons accumulation by intermediate station

- The First Phase -

38

CLASSIFICATION YARD

4 4 4

8 8 8

5 3 1 7

37

9

1

6 6 22 6 2 2nd, 6th, 3rd, 7th

4th, 5th

8th, 9th

Sorting tracks for final forming of trains

Sorting tracks for wagons accumulation by intermediate station

- The Second Phase -

Gravity shunting

39

CLASSIFICATION YARD

4 4 4

8 8 8

1

53

1

1

75 5 3lok.

7 3 7

9

6 6 22 6 2

Sorting tracks for final forming of trains

Sorting tracks for wagons accumulation by intermediate station

Gravity shunting

2nd, 6th, 3rd, 7th

4th, 5th

8th, 9th

- The Second Phase -

40

CLASSIFICATION YARD

4 4 4

8 8 8

7

5 5 5

3 7 3

1

1

1

lok.

9

3 7 6 6 22 6 2

Sorting tracks for final forming of trains

Sorting tracks for wagons accumulation by intermediate station

Gravity shunting

2nd, 6th, 3rd, 7th

4th, 5th

8th, 9th

- The Second Phase -

41

CLASSIFICATION YARD

4 4 4

8 8 89

lok.

5 5 5

3 7 3 7 3 7 6 6 22 6 2

Sorting tracks for final forming of trains

Sorting tracks for wagons accumulation by intermediate station 2nd, 6th, 3rd, 7th

4th, 5th

8th, 9th

- The Second Phase -

1

1

1

42

CLASSIFICATION YARD

4 4 4

8 8 89

5 5 5

lok.

3 7 3 7 3 7 6 6 22 6 2

Sorting tracks for final forming of trains

Sorting tracks for wagons accumulation by intermediate station 2nd, 6th, 3rd, 7th

4th, 5th

8th, 9th

- The Second Phase -

1

1

1

43

CLASSIFICATION YARD

4 4 4

8 8 89

5 5 5lok.

3 7 3 7 3 7 6 6 22 6 2

Sorting tracks for final forming of trains

Sorting tracks for wagons accumulation by intermediate station 2nd, 6th, 3rd, 7th

4th, 5th

8th, 9th

- The Second Phase -

1

1

1

44

CLASSIFICATION YARD

4 4 4

8 8 89

5 5 5

lok. 3 7 3 7 3 7 6 6 22 6 2

Sorting tracks for final forming of trains

Sorting tracks for wagons accumulation by intermediate station

Shunting onto the hump

2nd, 6th, 3rd, 7th

4th, 5th

8th, 9th

- The Second Phase -

1

1

1

45

CLASSIFICATION YARD

4 4 4

8 8 8

6 6 22 6 27

9

3 7

5 5 5

lok.

37

3

Sorting tracks for final forming of trains

Sorting tracks for wagons accumulation by intermediate station

Shunting onto the hump

2nd, 6th, 3rd, 7th

4th, 5th

8th, 9th

- The Second Phase -

1

1

1

46

CLASSIFICATION YARD

4 4 4

8 8 89

5 5 5

66

2

26

2

7 3 77 3

Sorting tracks for final forming of trains

Sorting tracks for wagons accumulation by intermediate station

Shunting onto the hump

2nd, 6th, 3rd, 7th

4th, 5th

8th, 9th

- The Second Phase -

1

1

1

47

CLASSIFICATION YARD

4 4 4

8 8 89

5 5 5

6 6 2

Sorting tracks for final forming of trains

Sorting tracks for wagons accumulation by intermediate station 2nd, 6th, 3rd, 7th

4th, 5th

8th, 9th

- The Second Phase -

Shunting onto the hump

1

1

1

48

CLASSIFICATION YARD

4 4 4

8 8 89

5 5 5

2

66

2 6 2

8th, 9th

Sorting tracks for final forming of trains

Sorting tracks for wagons accumulation by intermediate station

- The Third Phase -

4th, 5th , 6th , 7th

Gravity shunting

1

1

1

49

CLASSIFICATION YARD

4 4 4

8 8 89

5 5 5

6

6 6

2

22

7 3 7

Sorting tracks for final forming of trains

Sorting tracks for wagons accumulation by intermediate station

8th, 9th

- The Third Phase -

4th, 5th , 6th , 7th

Gravity shunting

1

1

1

50

CLASSIFICATION YARD

4 4 4

8 8 89

5 5 5

3

6 6 6

7

3 7 3lok.

7

Sorting tracks for final forming of trains

Sorting tracks for wagons accumulation by intermediate station

8th, 9th

- The Third Phase -

4th, 5th , 6th , 7th

Gravity shunting

1

1

1

2

2

2

51

CLASSIFICATION YARD

4 4 4

8 8 89

5 5 56 6 6

3

3

lok.

7 7 7

Sorting tracks for final forming of trains

Sorting tracks for wagons accumulation by intermediate station

8th, 9th

- The Third Phase -

4th, 5th , 6th , 7th

Gravity shunting

1

1

1

2

2

23

52

CLASSIFICATION YARD

4 4 4

8 8 89

5 5 56 6 6

lok.

7 7 7

Sorting tracks for final forming of trains

Sorting tracks for wagons accumulation by intermediate station

8th, 9th

- The Third Phase -

4th, 5th , 6th , 7th

1

1

1

2

2

2

3

3

3

53

CLASSIFICATION YARD

4 4 4

8 8 89

5 5 56 6 67 7 7

lok.

Sorting tracks for final forming of trains

Sorting tracks for wagons accumulation by intermediate station

8th, 9th

- The Third Phase -

4th, 5th , 6th , 7th

1

1

1

2

2

2

3

3

3

54

CLASSIFICATION YARD

4 4 4

8 8 89

5 5 56 6 67 7 7lok.

Sorting tracks for final forming of trains

Sorting tracks for wagons accumulation by intermediate station

8th, 9th

- The Third Phase -

4th, 5th , 6th , 7th

1

1

1

2

2

2

3

3

3

55

CLASSIFICATION YARD

4 4 4

8 8 89

5 5 56 6 6lok. 7 7 7

Sorting tracks for final forming of trains

Sorting tracks for wagons accumulation by intermediate station

8th, 9th

- The Third Phase -

4th, 5th , 6th , 7th

Shunting onto the hump

1

1

1

2

2

2

3

3

3

56

CLASSIFICATION YARD

4 4 4

8 8 89

5 5 56 6 6

lok.

77

7

Sorting tracks for final forming of trains

Sorting tracks for wagons accumulation by intermediate station

8th, 9th

- The Third Phase -

4th, 5th , 6th , 7th

Shunting onto the hump

1

1

1

2

2

2

3

3

3

57

CLASSIFICATION YARD

4 4 4

8 8 89

5 5 5

66

6

lok. 7 7 7

Sorting tracks for final forming of trains

Sorting tracks for wagons accumulation by intermediate station

8th, 9th

- The Third Phase -

4th, 5th , 6th , 7th

Shunting onto the hump

1

1

1

2

2

2

3

3

3

58

CLASSIFICATION YARD44

4 8 8 89

5 5 56

Sorting tracks for final forming of trains

Sorting tracks for wagons accumulation by intermediate station

8th, 9th

- The Third Phase -

4th, 5th , 6th , 7th

Shunting onto the hump

1

1

1

2

2

2

3

3

3

59

CLASSIFICATION YARD

8 8 89

4 4 4

Sorting tracks for final forming of trains

Sorting tracks for wagons accumulation by intermediate station

8th, 9th

- The Third Phase -

4th, 5th , 6th , 7th

Shunting onto the hump

1

1

1

2

2

2

3

3

3

60

CLASSIFICATION YARD

8 8 89

4

4

4

5 5 5

8th, 9th

Sorting tracks for final forming of trains

Sorting tracks for wagons accumulation by intermediate station

- The Forth Phase -

Gravity shunting

1

1

1

2

2

2

3

3

3

61

CLASSIFICATION YARD

8 8 89

5

5

5

6 6 6

Sorting tracks for final forming of trains

Sorting tracks for wagons accumulation by intermediate station

Gravity shunting 8th, 9th

- The Forth Phase -

1

1

1

2

2

2

3

3

3

4

4

4

62

CLASSIFICATION YARD

8 8 89

6

6

6

7 7 7

Sorting tracks for final forming of trains

Sorting tracks for wagons accumulation by intermediate station

Gravity shunting 8th, 9th

- The Forth Phase -

5

5

5

1

1

1

2

2

2

3

3

3

4

4

4

63

CLASSIFICATION YARD

8 8 89

7

7

7

lok.

Sorting tracks for final forming of trains

Sorting tracks for wagons accumulation by intermediate station

Gravity shunting 8th, 9th

- The Forth Phase -

5

5

5

6

6

6

1

1

1

2

2

2

3

3

3

4

4

4

64

CLASSIFICATION YARD

8 8 89

lok.

Sorting tracks for final forming of trains

Sorting tracks for wagons accumulation by intermediate station

Gravity shunting 8th, 9th

- The Forth Phase -

5

5

5

6

6

6

7

7

7

1

1

1

2

2

2

3

3

3

4

4

4

65

CLASSIFICATION YARD

8 8 89

lok.

Sorting tracks for final forming of trains

Sorting tracks for wagons accumulation by intermediate station

8th, 9th

- The Forth Phase -

5

5

5

6

6

6

7

7

7

1

1

1

2

2

2

3

3

3

4

4

4

66

CLASSIFICATION YARD

8 8 89lok.

Sorting tracks for final forming of trains

Sorting tracks for wagons accumulation by intermediate station

8th, 9th

- The Forth Phase -

5

5

5

6

6

6

7

7

7

1

1

1

2

2

2

3

3

3

4

4

4

67

CLASSIFICATION YARD

8 8 89lok.

Sorting tracks for final forming of trains

Sorting tracks for wagons accumulation by intermediate station

8th, 9th

- The Forth Phase -

5

5

5

6

6

6

7

7

7

1

1

1

2

2

2

3

3

3

4

4

4

68

CLASSIFICATION YARD

8 8 89lok.

Sorting tracks for final forming of trains

Sorting tracks for wagons accumulation by intermediate station

8th, 9th

- The Forth Phase -

Shunting onto the hump

5

5

5

6

6

6

7

7

7

1

1

1

2

2

2

3

3

3

4

4

4

69

CLASSIFICATION YARD

8 8 89lok.

Sorting tracks for final forming of trains

Sorting tracks for wagons accumulation by intermediate station

Shunting onto the hump 8th, 9th

- The Forth Phase -

5

5

5

6

6

6

7

7

7

1

1

1

2

2

2

3

3

3

4

4

4

70

CLASSIFICATION YARD

8 8 8

9lok.

Sorting tracks for final forming of trains

Sorting tracks for wagons accumulation by intermediate station

Shunting onto the hump 8th, 9th

- The Forth Phase -

5

5

5

6

6

6

7

7

7

1

1

1

2

2

2

3

3

3

4

4

4

71

CLASSIFICATION YARD8 8 8

Sorting tracks for final forming of trains

Sorting tracks for wagons accumulation by intermediate station

Shunting onto the hump 8th, 9th

- The Forth Phase -

5

5

5

6

6

6

7

7

7

1

1

1

2

2

2

3

3

3

4

4

4

72

CLASSIFICATION YARD9lok.

8

8

8

Sorting tracks for final forming of trains

Sorting tracks for wagons accumulation by intermediate station

- The Fifth Phase -

Gravity shunting

5

5

5

6

6

6

7

7

7

1

1

1

2

2

2

3

3

3

4

4

4

73

CLASSIFICATION YARDlok.

9

Sorting tracks for final forming of trains

Sorting tracks for wagons accumulation by intermediate station

Gravity shunting

- The Fifth Phase -

5

5

5

6

6

6

7

7

7

8

8

8

1

1

1

2

2

2

3

3

3

4

4

4

74

CLASSIFICATION YARD

5

5

5

6

6

6

lok.

7

7

7

8

8

8

9

Sorting tracks for final forming of trains

Sorting tracks for wagons accumulation by intermediate station

- The Fifth Phase -

1

1

1

2

2

2

3

3

3

4

4

4

Short description of Simultaneous method

• Advantages – Forming more then one trains at the same time– Faster forming process with minimal shunting

• Disadvantages– Requires appropriate adjustment of the timetable and

more qualified shunting staff– Begins at the moment when the sufficient number of

wagons is gathered for all trains

INTRODUCTION PROBLEM STATEMENT

SIMULATION MODEL

CONCLUSIONS

• The relationship between – the number of intermediate stations (m) and – required number of sorting tracks (k) ( for accumulation

without additional sorting)

where

12max km

2log

)1log( ;1

2log

)1log(

2log

)1log( ;

2log

)1log(

maxmax

maxmax

N

mm

Nmm

kstvstv

stvstv

INTRODUCTION PROBLEM STATEMENT

SIMULATION MODEL

CONCLUSIONS

Mathematical description

Track number in-line (ki)

Intermediate station numbers in-line for all the sections for which pick-up trains

are formed (mis)

General rule for wagon accumulation by intermediate stations

1 2 3 4 5

1 3 5 7 9 11 13 15 17... 2 6 10 14 18 ... 4 12 ... 8 ... 16 ...

m1,s = 20+ 2*(j-1) m2,s = 21+ 4*(j-1) m3,s = 22+ 8*(j-1) m4,s = 23+ 16*(j-1) m5,s = 24+ 32*(j-1)

i = 1, ..., k j = 1, ..., N

s = 1, ..., stvmmax

ki 12 ik ... mi,s = 2i-1(1+ 2*(j-1)) mi,s stvmmax

General rule for wagon’s accumulation

INTRODUCTION PROBLEM STATEMENT

SIMULATION MODEL

CONCLUSIONS

INTRODUCTION PROBLEM STATEMENT

SIMULATION MODEL

CONCLUSIONS

Objectives

INTRODUCTION PROBLEM STATEMENT

SIMULATION MODEL

CONCLUSIONS

Simulation steps

Input parameters:•5 tracks for accumulation process•5 tracks for forming process•30; 35; 40; 45 and 50 wagons per train•5; 7; 9; 10; 13 and 16 intermediate stations

Data from the analysis of technology and train operations of Belgrade marshaling yard

INTRODUCTION PROBLEM STATEMENT

SIMULATION MODEL

CONCLUSIONS

Example: Case of Belgrade marshaling yard

Formation process– Uniform lengths

40 wagons per train

0 50 100 150 200

5

6

7

9

10

13

14

16

stat

ions

wagons

track 5

track 4

track 3

track 2

track 1

Accumulation process– Different lengths– Unacceptable from the point of

exploitation and construction

INTRODUCTION PROBLEM STATEMENT

SIMULATION MODEL

CONCLUSIONS

Simulation results

Trac

k le

ngth

s

in function of number of wagons per train

0.00

50.00

100.00

150.00

200.00

250.00

30 35 40 45 50wagons per train

Tfor

5

6

7

9

10

13

14

16

stat

ions

INTRODUCTION PROBLEM STATEMENT

SIMULATION MODEL

CONCLUSIONS

Simulation results

Dur

ation

of t

rain

s fo

rmati

on

in function of number of stations and number of wagons per train

INTRODUCTION PROBLEM STATEMENT

SIMULATION MODEL

CONCLUSIONS

Simulation results

Wag

ons

hand

ling

perf

orm

ance

30

40

50

56

79

10131416

0

100

200

300

400

500

600

WH

P

wagons per trainstations

in function of number of stations and number of wagons per train

INTRODUCTION PROBLEM STATEMENT

SIMULATION MODEL

CONCLUSIONS

Simulation results

Num

ber o

f dis

plac

emen

ts

(cou

plin

g an

d un

coup

ling)

30

40

50

567910131416

0

50

100

150

200

250

300

350

TND

stations

wagons per train

INTRODUCTION PROBLEM STATEMENT

SIMULATION MODEL

CONCLUSIONS