ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
CONSTRUCTION OF ACADEMIC BLOCK, ADMINISTRATION BLOCK,
MAIN GATE, GUARD, UGWT & EXTERNAL DEVELOPMENT WORKS
TENDER DOCUMENTS (VOL-III)
BILL OF QUANTITIES
August, 2020
MASTER SUMMARY
EA Consulting
(Pvt) Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
MASTER SUMMARY
S.No Description Amount
(Rs.)
1 Academic Block (2 Units)
2 Admin Block
3 Main Gate, Guard & UGWT
4 External Development
GRAND TOTAL
ACADEMIC BLOCK
EA Consulting
(Pvt) Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Academic Block)
S.NO: Amount
1 Civil Works
2 Electrical Works
3 ELV Works
4 Plumbing Works
5 HVAC Works
TOTAL CARRIED TO MASTER SUMMARY
GRAND SUMMARY
CIVIL WORKS
EA Consulting
(Pvt) LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Academic Block)
Civil Works
S.NO: Amount
A SCHEDULE ITEMS
1
2
3
4
5
6
7
8
9
10
11 ROOF FINISHES & WATER PROOFING
12 EXTERNAL FINISHES (BUILDING)
13 EXTERNAL FINISHES OTHER THAN BUILDING (NON COVERED AREA)
B NON-SCHEDULE ITEMS
1
2
3
4
5
6
7
8
9
10
11 ROOF FINISHES & WATER PROOFING
12 EXTERNAL FINISHES (BUILDING)
13 EXTERNAL FINISHES OTHER THAN BUILDING (NON COVERED AREA)
1
2
Total of Non-Schedule Items - B
TOTAL AMOUNT OF O1 No BUILDING (A+B)
TOTAL AMOUNT OF 02 Nos BUILDING CARRIED TO
GRAND SUMMARY
MASONRY WORKS
SUB STRUCTURE
SUPER STRUCTURE
MASONRY WORKS
THERMAL & MOISTURE PROTECTION (NOT APPLICABLE)
METAL WORKS
WOOD WORKS
EARTH WORKS
FLOOR FINISHES
WALL FINISHES
CEILING FINISHES
CEILING FINISHES
Total of Schedule Items
Add ____% Premium on Civil Works of PWD-2012
Total of Schedule Items with Premium - A
THERMAL & MOISTURE PROTECTION (NOT APPLICABLE)
METAL WORKS
WOOD WORKS
FLOOR FINISHES
WALL FINISHES
SUPER STRUCTURE
Civil SUMMARY
Description
EARTH WORKS
SUB STRUCTURE
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Academic Block
Building Works (Structure)
1 2 4 5 6 7 = 4 x 6
1
1.1 Code -103,
Item # 2 From ± 0'-0" to -5' - 0" 71875 Cft 100 Cft 613.14
Item # 2+28 From -5' - 0" to -8' - 0" 17580 Cft 100 Cft 690.49
1.2 Code -104
Item #4
44750 Cft 100 Cft 261.80
1.3 Code -117
Item #1
6000 Cft 100 Cft 3,251.34
Description
PWD
Schedule 2012
Ref.No
S.No Amount
(Pak Rs.)
Rate
(Pak Rs.) Unit QTY
3
A-SCHEDULE ITEMS
EARTH WORKS
Excavation for foundation trenches and drains in gravelly
soil and back filling the excavated material in foundation
trenches, plinth or under floor including breaking clods,
watering, consolidation by ramming in layers not
exceeding 9 inches (229 mm) in depth to full
compaction, dressing and disposal of surplus excavated
stuff as directed lead upto one chain (30.5 R.m) and lift
upto 5 feet (1.52 m).
All items under this head (Structure work) to be
carried out as per relevant Section of PWD &
technical specifications (Volume-II), Drawings,
BSI/ASTM Standards, complete in all respect and to
the entire satisfaction of the Engineer.
Due to pitch roof second pera of clause No 1.9 of
General conditions of PWD schedule of rates-2012
will be applicable for the height of the higher side.
Filling bajri available at site in foundation plinth or under
floor, etc. including dressing, watering, consolidation by
ramming in layers not exceeding 9 inches (229 mm) in
depth to full compaction, complete within a lead of one
chain (30.5 R.m) and lift of 5 feet (1.52 R.m). etc.
complete, including all lifts etc. complete in all respects
as per drawing, standard , specifications and as directed
by the Engineer.
Providing and laying soling stones 6 inches to 9 inches
(152 mm to 229 mm) size under floors/foundations &
where required etc. including packing with sprawls and
chips and consolidating etc. complete in all respects as
per drawing, standard , specifications and as directed
by the Engineer.
Amount Carried to Civil Summary
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Academic Block
Building Works (Structure)
Description
PWD
Schedule 2012
Ref.No
S.No Amount
(Pak Rs.)
Rate
(Pak Rs.) Unit QTY
32
2.1 Code -106
Item # 1110235 Cft 100 Cft 14,411.43
2.2 Code -106
Item # 12 2845 Cft 100 Cft 15,840.97
2.3 Code -114
Item # 1+134+137 24200 Cft 100 Cft 21,685.85
2.4 Code -114
Item # 4+135+138 2410 Cft 100 Cft 26,704.50
2.5 Code -114
Foundation for any type
(Cylindrical Strength 3000 Psi)
Providing and laying reinforced cement concrete with
using crushed graded boulders 3/4" inch (19 mm) and
down gauge having a minimum works cube crushing
strength of 4500 Ibs. per sq. inch (31.04 N/mm2 at 28
days) with a mix not leaner than 1:1:2 in columns of
square or rectangular shape of regular section including
form work and its removal, compacting and curing etc.
but excluding the cost of reinforcement, in foundation
basement and plinth. etc. complete in all respects as
per drawing, standard , specifications and as directed
by the Engineer.
Columns upto plinth
(Cylindrical Strength 3750 Psi)
Providing and laying reinforced cement concrete with
using crushed graded boulders 3/4" inch (19 mm) and
down gauge having a minimum works cube crushing
strength of 3750 Ibs. per sq. inch (23.24 N /mm 2 at 28
days) with a mix not leaner than 1:1-1/2:3 in plinth
beams of required shape and design including form work
and its removal, compacting and curing etc. but
excluding the cost of reinforcement, foundation
basement and plinth etc. complete in all respects as per
drawing, standard , specifications and as directed by
the Engineer.
For Cast in situ / mass concrete or where required
(Cylindrical 1500 Psi)
REINFORCED CONCRETE WORKS
Providing and laying reinforced cement concrete with
using crushed graded boulders 3/4" inch (19 mm) and
down gauge having a minimum works cube crushing
strength of 3750 Ibs. per sq. inch (23.24 N/mm2 at 28
days) with a mix not leaner than 1:1-1/2:3 in columns
footing of required shape including form work and its
removal, compacting, leveling and curing etc. complete
but excluding the cost of reinforcement, in foundation
basement and plinth etc. complete in all respects as per
drawing, standard , specifications and as directed by
the Engineer.
SUB STRUCTURE
CONCRETE WORKS
Providing and laying in situ 1:4:8 (1 cement 4 sand and 8
coarse aggregate) cement concrete using crushed
graded boulders 3/4" inch (19 mm) and down gauge in
foundation, basement and plinth including form work,
compacting, curing and removal of form work etc.
complete, foundation and basement up to 5 feet (1.52
m) depth and plinth up to 4 feet (1.2 m) height from
ground level etc. complete in all respects as per drawing,
standard , specifications and as directed by the
Engineer.Below plinth beam,situ,walls,tanks, over stone soling or
where required (Cylindrical 1000 Psi)
Providing and laying in situ 1:3:6 (1 cement 3 sand and 6
coarse aggregate) cement concrete using crushed
graded boulders 3/4" inch (19 mm) and down gauge in
foundation, basement and plinth including form work,
compacting, curing and removal of form work, etc.
complete, foundation and basement up to 5 feet (1.52
m) depth and plinth up to 4 feet (1.2 m) height from
ground level etc. complete in all respects as per drawing,
standard , specifications and as directed by the
Engineer.
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Academic Block
Building Works (Structure)
Description
PWD
Schedule 2012
Ref.No
S.No Amount
(Pak Rs.)
Rate
(Pak Rs.) Unit QTY
3Item # 8+134+137 2910 Cft 100 Cft 22,344.09
2.6 Code -114
Item # 166
69190 Kg Kg 123.02
2.7 Code -108
Item # 12
35435 Sft 100 Sft 648.08
2.8
14100 Sft Sft
3
3.1 Code -114
Item #
24+135+138 2260 Cft 100 Cft 30,389.36
Item #
24+135+138+92 3255 Cft 100 Cft 31,338.56 Item #
24+135+138+92+
93 615 Cft 100 Cft 32,090.01
Plinth Beams i/c nibs / projections
(Cylindrical Strength 3000 Psi)
(+12'-0" to +33'-0")
First Floor
B-NON-SCHEDULE ITEMS
SUB STRUCTURE
SUPER STRUCTURE
REINFORCED CONCRETE WORKS
Providing and laying hard grade ribbed deformed
(minimum yield point 60,000 psi or 414 Mpa)
reinforcement bars with & including the cost of
straightening, cutting, bending, binding, wastage, and
such overlaps as are not shown in the drawings, placing
in position on cement concrete 1:2:4 precast or Ms.
chairs, tying with binding wire, cost of chairs and wires
etc. in all kinds of RCC work in foundation, basement,
plinth and ground floor of building including septic tanks
and under ground tanks and in projections for future
extension.etc. complete in all respects as per drawing,
standard , specifications and as directed by the
Engineer.
(Bars to be cut and placed in position at any level
according to the Bar bending schedule prepared by the Providing a coat of bitumen emulsion at 10 Lbs. per % sft.
(0.49 Kg/sm) on walls and floor in ground floor etc.
complete in all respects as per drawing, standard ,
specifications and as directed by the Engineer.
Amount Carried to Civil Summary
Providing and laying reinforced cement concrete with
using crushed graded boulders 3/4" inch (19 mm) and
down gauge having a minimum works cube crushing
strength of 4500 Ibs. per sq. inch (31.04 N/mm2 at 28
days) with a mix not leaner than 1:1:2 in columns of
square or rectangular shape of regular section including
form work and its removal, compacting and curing etc.
but excluding the cost of reinforcement, in the ground
floor etc. complete in all respects as per drawing,
standard , specifications and as directed by the
Engineer.
TERMITE PROOFING
Providing and applying Termite control treatment of sub
grade soil, excavated surfaces and fill material with
HEPTACHLOR emulsifiable to 0.5% with clean water or
AGENDA 25 EC containing FIPRONIL or BIFLEX with
Bifenthrin or DURSBIN or TENEKIL PLUS or MIRAGE ALI AKBER
GROUP or approved equivalent as per manufacturer's
specifications and instructions. etc., complete in all
respects as per drawing, standard , specifications and as
directed by the Engineer.
(Note: Plinth Area will be measured one time for
payment where is the number of applications will be
three times on all horizontal & vertical surfaces of the
excavation for termite proofing)
Amount Carried to Civil Summary
Columns (Cylindrical Strength 3750 Psi)
Ground Floor
(±0'-0" to +12'-0")
(+12'-0" to +24'-0")
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Academic Block
Building Works (Structure)
Description
PWD
Schedule 2012
Ref.No
S.No Amount
(Pak Rs.)
Rate
(Pak Rs.) Unit QTY
3
Item #
24+135+138+92+
93x2 620 Cft 100 Cft 32,841.46 Item #
24+135+138+92+
93x3 5210 Cft 100 Cft 33,592.91
3.2 Code -114
Item #
38+134+137 2560 Cft 100 Cft 24,839.57
Item #
38+134+137+92 3120 Cft 100 Cft 25,788.77 Item #
38+134+137+92
+93 885 Cft 100 Cft 26,540.22
Item #
38+134+137+92
+93x2 1120 Cft 100 Cft 27,291.67 Item #
38+134+137+92
+93x3 3440 Cft 100 Cft 28,043.12
3.3 Code -114
Item # 38+136 1605 Cft 100 Cft 20,668.60
Item # 38+136+92 1870 Cft 100 Cft 21,617.80
Item #
38+136+92+93x2 575 Cft 100 Cft 22,369.25
Item #
38+136+92+93x2 225 Cft 100 Cft 23,120.70
Item #
38+136+92+93x3 1130 Cft 100 Cft 23,872.15
(+24-0" to +40'-0")
(+33-0" to +60'-0")
Second Floor
Providing and laying reinforced cement concrete with
using crushed graded boulders 3/4" inch (19 mm) and
down gauge having a minimum works cube crushing
strength of 3750 Ibs. per sq. inch (23.24 N /mm 2 at 28
days) with a mix not leaner than 1:1-1/2:3 in straight
beams lintels cantilever beams of required shape or
section including form work and its removal, compacting
and curing etc. but excluding the cost of reinforcement,
in basement and ground floor etc. complete in all
respects as per drawing, standard , specifications and as
directed by the Engineer.
Beams and projections
(Cylindrical Strength 3000 Psi)
Second Floor
(+24-0" to +40'-0")
(+33-0" to +60'-0")
Providing and laying reinforced cement concrete with
using crushed graded boulders 3/4" inch (19 mm) and
down gauge having a minimum works cube crushing
strength of 3000 Ibs. per sq. inch (20.68 N /mm 2 at 28
days) with a mix not leaner than 1:2:4 in straight beams
lintels cantilever beams of required shape or section
including form work and its removal, compacting and
curing etc. but excluding the cost of reinforcement, in
basement and ground floor etc. complete in all respects
as per drawing, standard , specifications and as directed
by the Engineer.
(±0'-0" to +12'-0")
(+12'-0" to +24'-0")
Ground Floor
First Floor
(+12'-0" to +33'-0")
Second Floor
(+24-0" to +40'-0")
(+33-0" to +60'-0")
Bracing beams / lintels / nibs / sills / bands /around
opening (Cylindrical Strength 2500 Psi)
Ground Floor
(±0'-0" to +12'-0")
First Floor
(+12'-0" to +24'-0")
(+12'-0" to +33'-0")
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Academic Block
Building Works (Structure)
Description
PWD
Schedule 2012
Ref.No
S.No Amount
(Pak Rs.)
Rate
(Pak Rs.) Unit QTY
33.4 Code -114
Item #
56+134+137 3675 Cft 100 Cft 24,314.96
Item #
56+134+137+92 3410 Cft 100 Cft 25,264.16
Item #
56+134+137+92
+93 0 Cft 100 Cft 26,015.61
Item #
56+134+137+92
+93x2 1165 Cft 100 Cft 26,767.06
Item #
56+134+137+92
+93x3 2155 Cft 100 Cft 27,518.51
3.5 Code -114
Item #
57+134+137 2320 Cft 100 Cft 23,691.64
Item #
57+134+137+92 1540 Cft 100 Cft 24,640.84 Item #
57+134+137+92
+93 915 Cft 100 Cft 25,392.29
Item #
57+134+137+92
+93x2 0 Cft 100 Cft 26,143.74
Item #
57+134+137+92
+93x3 5010 Cft 100 Cft 26,895.19
Providing and laying reinforced cement concrete with
using crushed graded boulders 3/4" inch (19 mm) and
down gauge having a minimum works cube crushing
strength of 3750 Ibs. per sq. inch (23.24 N /mm 2 at 28
days) with a mix not leaner than 1:1-1/2:3 in ordinary
slab more than 6 inches (152 mm) thick including form
work and its removal compacting and curing etc.
complete but excluding the cost of reinforcement, in
basement plinth and ground floor etc. complete in all
respects as per drawing, standard , specifications and as
directed by the Engineer.
Slab i/c projections (straight & sloping )
(Cylindrical Strength 3000 Psi)
(±0'-0" to +12'-0")
(+12'-0" to +24'-0")
(+12'-0" to +33'-0")
Providing and laying reinforced cement concrete with
using crushed graded boulders 3/4" inch (19 mm) and
down gauge having a minimum works cube crushing
strength of 3750 Ibs. per sq. inch (23.24 N /mm 2 at 28
days) with a mix not leaner than 1:1-1/2:3 in ordinary
slab 5 inches (127 mm) to 6 inches (152mm) thick
including form work and its removal compacting and
curing etc. complete but excluding the cost of
reinforcement, in basement plinth and ground floor etc.
complete in all respects as per drawing, standard ,
specifications and as directed by the Engineer.
(±0'-0" to +12'-0")
(+12'-0" to +24'-0")
(+12'-0" to +33'-0")
Ground Floor
First Floor
First Floor
(+33-0" to +60'-0")
Second Floor
(+24-0" to +40'-0")
Slab i/c projections (straight & sloping )
(Cylindrical Strength 3000 Psi)
(+33-0" to +60'-0")
Second Floor
(+24-0" to +40'-0")
Ground Floor
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Academic Block
Building Works (Structure)
Description
PWD
Schedule 2012
Ref.No
S.No Amount
(Pak Rs.)
Rate
(Pak Rs.) Unit QTY
33.6 Code -114
Item #
50+134+137 545 Cft 100 Cft 30,160.60
Item #
50+134+137+92 745 Cft 100 Cft 31,109.80 Item #
50+134+137+92
+93 205 Cft 100 Cft 31,861.25
Item #
50+134+137+92
+93x2 0 Cft 100 Cft 32,612.70 Item #
50+134+137+92
+93x3 0 Cft 100 Cft 33,364.15
3.7 Code -114
Item #
114+135+138
+127x2260 Cft 100 Cft 34,550.73
3.8 Code -114
OH Water Tank Bottom Slab
(Cylindrical Strength 3750 Psi)
Providing and laying reinforced cement concrete with
using crushed graded boulders 3/4" inch (19 mm) and
down gauge having a minimum works cube crushing
strength of 3750 Ibs. per sq. inch (23.24 N /mm 2 at 28
days) with a mix not leaner than 1:1-1/2:3 in straight
stairs and landing of required section including form work
and its removal, compacting and curing etc. complete
but excluding the cost of reinforcement, in basement
plinth and ground floor.etc. complete in all respects as
per drawing, standard , specifications and as directed
by the Engineer.
Stair Case / steps /seats (Steps, Landing
& Waist slab) (Cylindrical Strength 3000 Psi)
(+12'-0" to +24'-0")
(+12'-0" to +33'-0")
(+24-0" to +40'-0")
(+33-0" to +60'-0")
First Floor
Ground Floor
(±0'-0" to +12'-0")
Providing and laying reinforced cement concrete with
using crushed graded boulders 3/4" inch (19 mm) and
down gauge having a minimum works cube crushing
strength of 4500 Ibs. per sq. inch (31.04 N/mm2 at 28
days) with a mix not leaner than 1:1:2 in straight walls in
over head water tank bins, bunkers, intze tanks and silo
up to a height of 30 feet (9 m) above ground including
form works and its removal, compacting and curing etc.
complete but excluding the cost of reinforcement etc.
complete in all respects as per drawing, standard ,
specifications and as directed by the Engineer.
Providing and laying reinforced cement concrete with
using crushed graded boulders 3/4" inch (19 mm) and
down gauge having a minimum works cube crushing
strength of 4500 Ibs. per sq. inch (31.04 N/mm2 at 28
days) with a mix not leaner than 1:1:2 in a square of
rectangular bottom slab of over head water tank up to a
height of 30 feet (9 m) above ground including form
works and its removal, compacting and curing etc.
complete but excluding the cost of reinforcement .etc.
complete in all respects as per drawing, standard ,
specifications and as directed by the Engineer.
Second Floor
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Academic Block
Building Works (Structure)
Description
PWD
Schedule 2012
Ref.No
S.No Amount
(Pak Rs.)
Rate
(Pak Rs.) Unit QTY
3Item #
112+135+138
+127x2 390 Cft 100 Cft 35,126.50
3.9 Code -114
Item #
118+135+138
+127x2 245 Cft 100 Cft 32,154.29
3.10 Code -114
Item # 166 47650 Kg Kg 123.02
Item # 166+174 56715 Kg Kg 124.47
Item #
166+174+174 12990 Kg Kg 125.92
Item #
166+174+174+174 12590 Kg Kg 127.37 Item #
166+174+174+174
+174 74750 Kg Kg 128.82
Amount Carried to Civil Summary
Second Floor
(+24-0" to +40'-0")
(+33-0" to +60'-0")
Providing and laying hard grade ribbed deformed
(minimum yield point 60,000 psi or 414 Mpa)
reinforcement bars with & including the cost of
straightening, cutting, bending, binding, wastage, and
such overlaps as are not shown in the drawings, placing
in position on cement concrete 1:2:4 precast or Ms.
chairs, tying with binding wire, cost of chairs and wires
etc. in all kinds of RCC work in foundation, basement,
plinth and ground floor of building including septic tanks
and under ground tanks and in projections for future
extension.etc. complete in all respects as per drawing,
standard , specifications and as directed by the
Engineer.
(Bars to be cut and placed in position at any level
according to the Bar bending schedule prepared by the
contractor and approved by the Engineer).
(±0'-0" to +12'-0")
(+12'-0" to +24'-0")
(+12'-0" to +33'-0")
Ground Floor
OH Water Tank Top Slab
(Cylindrical Strength 3750 Psi)
Providing and laying reinforced cement concrete with
using crushed graded boulders 3/4" inch (19 mm) and
down gauge having a minimum works cube crushing
strength of 4500 Ibs. per sq. inch (31.04 N/mm2 at 28
days) with a mix not leaner than 1:1:2 in roof slab of over
head water tank up to a height of 30 feet (9 m) above
ground including form works and its removal,
compacting and curing etc. complete but excluding the
cost of reinforcement.etc. complete in all respects as per
drawing, standard , specifications and as directed by
the Engineer.
First Floor
OH Water Tank Walls
(Cylindrical Strength 3750 Psi)
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Academic Block
Building Works (Architectural)
1 2 3 4 5 6 7 = 4 x 6
A-SCHEDULE ITEMS
All items under this head (Architectural work) to be carried out
as per relevant Section of PWD & technical specifications
(Volume-II), Drawings, BSI/ASTM Standards, complete in all
respect and to the entire satisfaction of the Engineer.
Due to pitch roof second pear of clause No 1.9 of General
conditions of PWD schedule of rates-2012 will be applicable for
the height of the higher side.
4 DPC & MASONRY WORKS
Damp Proof Course (DPC)
4.1 Code -108
Item # 3
Page # 47
+
Code -109
Item # 123
Page # 64
Providing and laying 2 inches (51 mm) thick damp proof
course with cement concrete 1:2:4 cast in situ using graded
crushed boulders (insted of Screened bajri) of 3/4 inch (19 mm)
and down gauge mixed with any approved water proofing
agent including compacting, curing form work and its removal
etc. complete, but excluding the cost of water proofing agent
.etc., complete in all respects as per specifications & relevant
drawings and all works to the satisfaction of the Engineer.
2" thick DPC 20000.Sft 100 Sft 2,812.71
4.2 Code -108
Item # 5
Page # 47
Extra for using water proofing agent pudlo in item Nos. 4.1
(quantity to be used as per manufacturer's
specification/2.50Kg per 100Sft).etc., complete in all respects
as per specifications & relevant drawings and all works to the
satisfaction of the Engineer. 50.Kg Kg 86.10
Solid Block Masonry
4.3 Code-110
&
Code-109
Providing and laying 1:3:6 machine made standard size
6"x8"x12" cement concrete solid block masonry more than 6
inches (152 mm) thick using graded crushed boulders (instead
Screened bajri) 3/4 inch (19 mm) and down gauge set in
cement mortar 1:6 including scaffolding, raking out joints and
curing etc. complete in ground floor superstructure etc,
complete in all respects as per drawing, standard ,
specifications and direction of the Engineer.
Ground FloorCode-110
Item #
34+92+100+
Code-109
Item # 120 Lev ± 0'-0" to +12'-0" 3800.Cft 100 Cft 16040.34
First Floor Code-110
Item #
34+70+92+100+
Code-109
Item # 120 Lev + 12'-0" to + 24'-0" 6000.Cft 100 Cft 16864.Cft
Code-110
Item # 34+70+71+
92+100+
Code-109
Item # 120 Lev + 12'-0" to + 33'-0" 1100.Cft 100 Cft 17,544
Second Floor Code-110
Item #
34+70+2x71+
92+100+
Code-109
Item # 120 Lev + 24'-0" to + 40'-0" 2200.Cft 100 Cft 18,223.07
Amount
(Pak Rs.)
Rate
(Pak Rs.) S.No
PWD Schedule
2012 Ref.NoDescription Qty Unit
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Academic Block
Building Works (Architectural)
1 2 3 4 5 6 7 = 4 x 6
Amount
(Pak Rs.)
Rate
(Pak Rs.) S.No
PWD Schedule
2012 Ref.NoDescription Qty Unit
Code-110
Item #
34+70+3x71+
92+100+
Code-109
Item # 120 Lev + 33'-0" to + 60'-0" 3500.Cft 100 Cft 18,902.55
Code-110
Item #
34+70+4x71+
92+100+
Code-109
Item # 120 + 33'-0" to + 60'-0" 5500.Cft 100 Cft 19,582.03
4.4
Code-110
&
Code-109
Providing and laying 1:3:6 machine made standard size
6"x8"x12" cement concrete solid block 4 to 6 inches (102mm to
152 mm) thick using graded crushed boulders (insted Screened
bajri) 3/4 inch (19 mm) and down gauge set in cement mortar
1:6 including scaffolding, raking out joints and curing etc.
complete in all respects as per specifications & relevant
drawings and all works to the satisfaction of the Engineer.
Ground FloorCode-110
Item #
44+92+100+
Code-109
Item # 120 Lev ± 0'-0" to +12'-0" 7300.Cft 100 Cft 16,897.84
First Floor
Code-110
Item # 44+70+92+
100+
Code-109
Item # 120 + 12'-0" to + 24'-0" 10300.Cft 100 Cft 17,721.61
Code-110
Item # 34+70+71+
92+100+
Code-109
Item # 120 + 24'-0" to + 36'-0" 1100.Cft 100 Cft 17,543.59
Second FloorCode-110
Item #
34+70+2x71+
92+100+
Code-109
Item # 120 + 12'-0" to + 33'-0" 1800.Cft 100 Cft 18,223
Code-110
Item #
34+70+3x71+
92+100+
Code-109
Item # 120 + 24'-0" to + 40'-0" 5300.Cft 100 Cft 18,902.55
Code-110
Item #
34+70+4x71+
92+100+
Code-109
Item # 120 + 33'-0" to + 60'-0" 4200.Cft 100 Cft 19,582
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Academic Block
Building Works (Architectural)
1 2 3 4 5 6 7 = 4 x 6
Amount
(Pak Rs.)
Rate
(Pak Rs.) S.No
PWD Schedule
2012 Ref.NoDescription Qty Unit
4.5 Code-110
Page #
72, 80 & 81
Providing and laying 1:3:6 machine made standard size
6"x8"x12" cement concrete solid block masonry more than 6
inches (152 mm) thick in steps, stairs of approved design using
graded curshed boulders (instead of screened bajri) 3/4 inch
(19 mm) and down gauge set in cement mortar 1:4 including
scaffolding, raking out joints and curing etc. complete in
ground floor superstructure etc., complete in all respects as
per specifications & relevant drawings and all works to the
satisfaction of the Engineer.Code-110
Item
#2+68+74+92
code-109
Item# 120 FOR BLOCK MASONRY STEPS 2400.Cft 100 Cft 17,915.71
4.6Code-112
Item #144
Providing and laying wall ties of mild steel flats of approved
section and design placed at horizontal and vertical spacing
in cavity wall of any description in any floor at any height.2100 Kg Kg 181.84
5 THERMAL & MOISTURE PROTECTION
6 METAL WORKS
6.1 Code -119
Item # 43
Page # 240
Providing and fixing M.S. moulded steel door frame of 4" x 2-
1/2" (102 mm x 64 mm) manufactured from mild steel sheet of
18 gauge (1.41 mm) conforming to BSS. 1245 having a single
rebate size 1-1/2" x 1/2" (38 mm x 13 mm) with provision of 3
Nos. M.S. plate, section 1-1/2" x 1/4" (38 mm x 6 mm), (2 Nos. 6
inch long welded with frame at not less than 10 points and 1
No., 12 inch long welded with frame at not less than 20 points),
with holes and threads for fixing steel hinges, fitted with one
locking box of same sheet (point welded inside the frame), 6
Nos. 6 inches long flat iron fixing lugs, of 1-1/4" x 3/16" section,
treated with special red oxide primer coat all around including
cutting holes and filling the cavity with cement concrete 1:2:4
etc. in any floor at any height. etc., complete in all respects as
per specifications & relevant drawings and all works to the
satisfaction of the Engineer. 960.Rft Rft 157.12
6.2 Code -119
Item # 44
Page # 240
Providing and fixing M.S. moulded steel door frames of 5.73" x 2-
1/2" (146 mm x 63 mm) manufactured from mild steel sheet of
18 gauge (1.41 mm) conforming to B.S.S. 1245 having a double
rebate size 1-1/2" x 1/2" (38 mm x 12 mm) provision of 3 Nos.
M.S. plate, section 1-1/2" x 1/4" (38 mm x 6 mm) (2 Nos. 6 inch
long welded with frame at not less than 10 points and 1 Nos.
12 inch long welded with frame at not less than 20 points), with
holes and threads for fixing steel hings, fitted with one locking
box of same sheet (point welded inside the frame), 6 Nos. 6
inches long flat iron fixing lugs of 1-1/4" x 3/16" section, treated
with special red oxide primer coat all around including cutting
holes and filling the cavity with cement concrete 1:2:4 etc. in
any floor at any height complete as directed by the Engineer-
in-Charge 240.Rft Rft 185.34
6.3
Code -122
Item #159
Page # 333
Painting Iron work with synthetic enamel paint of approved
make and shade two coats over and including the cost of one
priming coat at any height in any floor etc., complete in all
respects as per specifications & relevant drawings and all
works to the satisfaction of the Engineer.1500.Sft 100 Sft 2,776.62
TOTAL CARRIED TO CIVIL SUMMARY
TOTAL CARRIED TO CIVIL SUMMARY
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Academic Block
Building Works (Architectural)
1 2 3 4 5 6 7 = 4 x 6
Amount
(Pak Rs.)
Rate
(Pak Rs.) S.No
PWD Schedule
2012 Ref.NoDescription Qty Unit
6.4
Code -119
Item #102
Page # 251
Providing and fixing fully glazed Bronze anodized or powder
coated aluminium Sliding / fixed & openable /Top hung
windows & ventilators as per British standard manufactured by
Lucky, Alcop, Krudson, Pakistan cable and A.C.P. (fixing
through their approved fabricators) deluxe model box section
95mm x 30mm and 2mm thick including the cost of aluminium
netting ,fittings, with all accessories cutting hole etc. and
making good damages to walls etc. complete as required in
any floor as per direction of engineer-in-charge, but excluding
the cost of glass pans.4300.Sft Sft 568.07
6.5
Code -119
Item #120
Page # 254
Providing and fixing Tinted glass panes 5mm thick to M.S. Box
pipe / Aluminium doors, windows and ventilators etc including
the cost of labour but excluding the cost of M.S. square pipe
beading, rubber packing and screw in any floor at any height.
(For Doors, Windows & Fixed Glazing or where instructed)8800.Sft Sft 106.11
6.6
Code -119
Item #119
Page # 254
Providing and fixing plain glass panes 5mm thick to M.S. Box
pipe / Aluminium doors, windows and ventilators etc. including
the cost of labour but excluding the cost of M.S. square pipe
beading, rubber packing and screw in any floor at any height.
(For vision panel of door shutters)150.Sft Sft 88.91
7 WOOD WORKS
Door, windows & partitions Frame
7.1 Code-120
Item # 02
Providing and fixing best quality deodar frames for doors.
windows, ventilators, clerestory windows, shelves, partitions,
trellis work, etc., as required . Complete in all respect as per
drawings, specification and as directed by the Engineer.200.Cft Cft 4,595.14
Architrave / Beading
7.2 Code-120 Providing and fixing best quality deodar wood projected
beading upto one Sq. inch (6.45 Sqm.) in sections and required
design fixed around the panels of doors, windows etc., of any
description , complete in all respect as per drawings,
specification and as directed by the Engineer. 2100 Rft Rft 35.66
7.3 Code-122
Item # 189
Page # 336
Applying French or spirit polishing, two coat of approved make
on wood work at any height in any floor.2600 Sft 100 Sft 1,878.96
8 INTERNAL FLOOR FINISHES
8.1 Code-117 Providing and laying 1:5:10 cement concrete bed under floors
using graded stone ballast 3/4 & down instead of 2 inches (51
mm) and down gauge with levelling, ramming, watering and
curing etc. complete.
(under Mosaic & Porcelain tiles).Item # 3
Page# 190 Ground Floor (± 0'-0") 3200.Cft 100 Cft 9,442.42
Item # 3 +25
Page# 190 &192 First Floor (+12'-0" & +19'-0" ) 1700.Cft 100 Cft 9,684.38
Item # 3 +25+26
Page# 190 &192 Second Floor (+24'-0" & Up to 34'-0") 1900.Cft 100 Cft 9,879.51
TOTAL CARRIED TO CIVIL SUMMARY
TOTAL CARRIED TO CIVIL SUMMARY
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Academic Block
Building Works (Architectural)
1 2 3 4 5 6 7 = 4 x 6
Amount
(Pak Rs.)
Rate
(Pak Rs.) S.No
PWD Schedule
2012 Ref.NoDescription Qty Unit
Mosaic Tiles
8.2 Code-117 Providing and laying terrazzo floor 1-1/2 inches (38 mm) thick
consisting of 1/2 inch (13 mm) thicktopping 1:2 (one grey
cement 2 approved marble chips No. 0 to 4) in ground floor
over a base of 1:2:4 (one cement, two sand and four screened
graded bajri) cement concrete 1 inch (25 mm) thick laid in
panels or pattern including form work, curing, cutting, rubbing
and polishing etc. complete.
Item # 12+17
Page# 191 Ground Floor (± 0'-0") 10400 Sft 100 Sft 6,163.94
Item # 12+17+25
Page# 191+192 First Floor (+12'-0" & +19'-0" ) 7800 Sft 100 Sft 6,405.90
Item #
12+17+25+26
Page# 191+192 Second Floor (+24'-0" & Up to 34'-0") 9000 Sft 100 Sft 6,601.03
8.3 Code-117 Providing and laying terrazzo floor 1-1/2 inches (38 mm) thick
consisting of 1/2 inch (13 mm) thicktopping 1:2 (one grey
cement 2 approved marble chips No. 0 to 4) in ground floor
over a base of 1:2:4 (one cement, two sand and four screened
graded bajri) cement concrete 1 inch (25 mm) thick laid in
panels or pattern including form work, curing, cutting, rubbing
and polishing etc. complete.
Item # 12
Page# 191 Ground Floor 2600 Sft 100 Sft 5,287.04
Item # 12+25
Page# 191+192 First Floor 2000 Sft 100 Sft 5,529.00
Item # 12+25+26
Page# 191+192 Second Floor 2500 Sft 100 Sft 5,724.13
9.6
Code-117
Item # 159
Page # 209
Providing and laying light colour, glazed/non skid vitrified
porcelean tiles (Polished) not exceeding 1600 Sqcm each,
(Pak made) on walls and floors, in any floor, laid with dry bond
(stile bond) over a base of 1" thick cement mortar (1:3)
including jointing to tiles with joint filler of approved quality as
per direction of the Engineer incharge. 1400 Sft 100 Sft 2572.28
9 INTERNAL WALL FINISHES
Internal Wall Plaster
9.1 Code-122 1/2" (13 mm) thick cement plaster 1:6 on wall columns etc. in
basement, plinth, mezzanine and ground floor including
making edges, corners, grooves as specified and curing etc.,
complete in all respects as per specifications & relevant
drawings and all works to the satisfaction of the Engineer.
Ground Floor
Item # 6
Page # 320 Lev ± 0'-0" to +12'-0" 33000 Sft 100 Sft 1,730.74
First FloorItem # 6+87
Page # 320
& 327 Lev ± 12'-0" to +24'-0" 37500 Sft 100 Sft 1,884.61
Item # 6+87+90
Page # 320, 327
& 328 Lev ± 24'-0" to +36'-0" 3000 Sft 100Sft 2,015.07
Second Floor
Item # 6+87+90
Page # 320, 327
& 328Lev ± 12'-0" to +33'-0" 3100 Sft 100Sft 2,015.07
TOTAL CARRIED TO CIVIL SUMMARY
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Academic Block
Building Works (Architectural)
1 2 3 4 5 6 7 = 4 x 6
Amount
(Pak Rs.)
Rate
(Pak Rs.) S.No
PWD Schedule
2012 Ref.NoDescription Qty Unit
Item #
6+87+90+90
Page # 320, 327
& 328 Lev ± 24'-0" to +40'-0" 16500 Sft 100Sft 2,145.53
Item #
6+87+90+90+90
Page # 320, 327
& 328 Lev ± 33'-0" to +60'-0" 10500 Sft 100 Sft 2,275.99
Dado & Skirting
9.2 Code-118
Item # 55 + 58
Page# 219
Providing and fixing marble mosaic tile 12" X 6" X 3/4" (305 mm
X 152 X 19 mm) with chips No. 0 to 4 in dado and skirting of
approved design in light shade over 1/2 inch (13 mm) thick
base of cement mortar 1:3 in ground floor setting of tiles in
slurry of grey cement over mortar base including filling of joints
and washing the tiles with cement slurry of matching colour
curing, grinding, rubbing and polishing etc. complete.
Code-118
Item # 55 + 58
Page# 219 Ground Floor (± 0'-0") 1100 Sft 100 Sft 14274.5
Code-118
Item # 55 + 58+60
Page# 219First Floor (+12'-0" & +19'-0" ) 1100 Sft 100 Sft 14,567.19
Code-118
Item # 55 +
58+60+61
Page# 219 Second Floor (+24'-0" & Up to 34'-0") 1000 Sft 100 Sft 14,813.05
9.3 Code-122
Item # 151
Page # 333
Distempering with vinyl distemper (ICI) Deluxe Paintex of
approved make and shade in two coats over and including
the cost of one priming coat of lime wash including sand
papering, dusting, and filling the holes, cracks and inequalities,
if any, at any height in any floor. 103500 Sft 100 Sft 1,053.54
Puddlo Plaster
9.4 Code-122 3/4'' (19 mm) thick cement plaster (Plain) 1:4 on walls and
columns etc. in basement, plinth, mezzanine and ground floor
including making edges, corners, grooves as specified and
curing etc,complete in all respects as per specifications &
relevant drawings and all works to the satisfaction of the
Engineer.Item # 8+88 O.H.W.T Plaster 1000 Sft 100 Sft 2572.28
9.5 Code-122 Providing and mixing water proofing agent pudlo in cement
mortar of any description in any floor etc., complete in all
respects as per specifications/2.50Kg per 100Sft). & relevant
drawings and all works to the satisfaction of the Engineer.
Item # 30 O.H.W.T 25 Kg Kg 86.15
9.6
Code-117
Item # 159
Page # 209
Providing and laying light colour, glazed/non skid vitrified
porcelean tiles (Polished) not exceeding 1600 Sqcm each,
(Pak made) on walls and floors, in any floor, laid with dry bond
(stile bond) over a base of 1" thick cement mortar (1:3)
including jointing to tiles with joint filler of approved quality as
per direction of the Engineer incharge. 4600 Sft 100 Sft 2572.28
TOTAL CARRIED TO CIVIL SUMMARY
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Academic Block
Building Works (Architectural)
1 2 3 4 5 6 7 = 4 x 6
Amount
(Pak Rs.)
Rate
(Pak Rs.) S.No
PWD Schedule
2012 Ref.NoDescription Qty Unit
10 INTERNAL CEILING FINISHES
Internal Ceiling Plaster
10.1 Code-122 1/2" (13 mm) thick cement plaster 1:6 on ceilings cantilever
soffits others etc. in basement, plinth, mezzanine and ground
floor including making edges, corners, grooves as specified
and curing etc., complete in all respects as per specifications
& relevant drawings and all works to the satisfaction of the
Engineer.Item # 6
Page # 320 Ground Floor 13000 Sft 100 Sft 1,730.74
Item # 6+87
Page # 320 &327 First Floor 9700 Sft 100 Sft 1,884.61
Item # 6+87+90
Page # 320, 327
&328 Second Floor 10300 Sft 100 Sft 2,015.07
10.2 Code-122
Item # 151
Distempering with vinyl distemper (ICI) Deluxe Paintex of
approved make and shade in two coats over and including
the cost of one priming coat of lime wash including sand
papering, dusting, and filling the holes, cracks and inequalities,
if any, at any height in any floor. 33000 Sft 100 Sft 1,053.54
10.3 Code-124
Item # 182
Page# 361
Providing and fixing Gypsum board 2' x 2'x 12mm tiles ceiling
including Aluminum T & L angle 1" x 1" i.c hanger clips jointing
clips and G.I Wire etc. complete as required in any floor.700 Sft Sft 71.69
11 ROOF FINISHES & WATER PROOFING
11.1 Code-117
Item #7+60+61
Page# 190 &196
Providing and laying floor of 3 inches (76 mm) thick 1:2:4
reinforced cement concrete using graded crushed bolders
instead of screened bajri 3/4" (19 mm) and down gauge in
ground floor including form work, consolidation, finishing and
curing etc. complete but excluding the cost of reinforcement.
Item #7+25+26
Page# 192 First Floor (+27'-0") 1500 Sft 100 Sft 4,726.58
Item #7+25+26
Page# 192 Second Floor 6500 Sft 100 Sft 4,726.58
Item
#7+25+26+26
Page# 192 Third Floor 10200 Sft 100 Sft 4,921.71
11.2
Code-108
Item #27
Page# 50
Water proofing of roof slab using Bituflex @ 10 Kg per % sft in
three coats, i/c cleaning /scraping the extra mortar etc. from
the roof surface,and washing the surface with water and filling
the depressions using Bituflex: sand mortar (1.2).Applyingone
one primer coal, over moist surface using a mix of 50 %Bituflex
and 50 % water blirded the surface with saul any floor in any
light. 18200 Sft 100 Sft 685.80
TOTAL CARRIED TO CIVIL SUMMARY
TOTAL CARRIED TO CIVIL SUMMARY
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Academic Block
Building Works (Architectural)
1 2 3 4 5 6 7 = 4 x 6
Amount
(Pak Rs.)
Rate
(Pak Rs.) S.No
PWD Schedule
2012 Ref.NoDescription Qty Unit
12 EXTERNAL WALL FINISHES (BUILDING)
12.1 Code-122 3/4'' (19 mm) thick cement plaster (Plain) 1:4 on walls and
columns etc. in basement, plinth, mezzanine and ground floor
including making edges, corners, grooves as specified and
curing etc., complete in all respects as per specifications &
relevant drawings and all works to the satisfaction of the
Engineer.Item # 8
Page # 320 Ground Floor 15000 Sft 100 Sft 2,367.12
Item # 8+88
Page # 320 & 327 First Floor 13000 Sft 100 Sft 2,572.28
Item # 8+88+91
Page # 320, 327
& 328 Second Floor 15500 Sft 100 Sft 2,746.22
Item #
8+88+91+91
Page # 320, 327
& 328 Second Floor 13000 Sft 100 Sft 2,920.16
12.2 Code-122
Item # 83
Page # 327
Extra for providing horizontal or vertical joints or grooves 3/8" x
1/4" (9.5 mm x 6.4 mm) size of approved design over item No.
12.1 3500 Sft 100 Sft 518.48
12.3 Code-122
Item # 172
Painting three coats with weather shield paint deluxe (ICI)
make of approved shade on plaster surface (External) and
including the cost of cleaning the surface, sand papering etc.
complete at any height in any floor etc., complete in all
respects as per specifications & relevant drawings and all
works to the satisfaction of the Engineer. 56500 Sft 100 Sft 1,406.88
13 EXTERNAL FINISHES OTHER THAN BUILDING
(NON COVERED AREA)
13.1 Code-122 3/4'' (19 mm) thick cement plaster (Plain) 1:4 on walls and
columns etc. in basement, plinth, mezzanine and ground floor
including making edges, corners, grooves as specified and
curing etc., complete in all respects as per specifications &
relevant drawings and all works to the satisfaction of the
Engineer.Item # 8+37
Page # 322 Ground Floor 6000 Sft 100 Sft 3,100.23
13.2 Code -108
Item # 5
Page # 47
Extra for using water proofing agent pudlo in item No. 13.1
(quantity to be used as per manufacturer's
specification/2.50Kg per 100Sft).etc., complete in all respects
as per specifications & relevant drawings and all works to the
satisfaction of the Engineer. 150 Kg Kg 86.15
13.3 Code-122
Item # 172
Page # 334
Painting three coats with weather shield paint deluxe (ICI)
make of approved shade on plaster surface (External) and
including the cost of cleaning the surface, sand papering etc.
complete at any height in any floor etc., complete in all
respects as per specifications & relevant drawings and all
works to the satisfaction of the Engineer. 1800 Sft 100 Sft 1,406.88
TOTAL CARRIED TO CIVIL SUMMARY
TOTAL CARRIED TO CIVIL SUMMARY
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Academic Block
Building Works (Architectural)
1 2 3 4 5 6 7 = 4 x 6
Amount
(Pak Rs.)
Rate
(Pak Rs.) S.No
PWD Schedule
2012 Ref.NoDescription Qty Unit
4 DPC & MASONRY WORKS
38mm thick Diamond jumbolon-Board.
4.1 N.S.I Providing & laying in position 1-1/2"(38mm) thick Diamond
jumbolon-Board from Diamond Foam or approved equivalent
having density 35kg/cum, for cavity wall with rebated edge
as per manufacturer's specifications, as shown in the drawing
etc, complete in all respects as per drawings, specification
and as directed by the Engineer. 0 Sft Sft
5 THERMAL & MOISTURE PROTECTION
5.1 N.S.I Providing and applying three coats of 2 component flexible
polymer modified cementitious waterproof coating AQUAFIN-
2C /BASF-Master seal-550/ SIKA top seal -107 or approved
equivalent over RCC slabs and walls of any wet area e.g.
Baths, Kitchens, Balcony's etc, at any height in any floor as per
manufacturer's specifications & recommendations complete in
all respects as per drawings, relevant specifications and as
directed by the Engineer. 1600 Sft Sft
6 METAL WORKS
MS Screen
6.1 N.S.I Providing, fabricating, welding & fixing in position decorative
MS screen comprising of MS tube 100mm x 100mm x 2.5mm
main outer frame fixed with 100mm x 100mm x 6mm thick MS
angle, design pattern with MS tube100mm x 50mm x 2.5mm as
shown on drawing including all required hard ware &
arrangement for fixing. providing & applying epoxy paint not
less than 300 micron of approved colour & shades as per
manufacturer's specification etc, complete in all respect as
per drawing, standard, specifications and direction of the
Engineer.
NOTE: The contractor shall submit shop drawings (without any
additional cost) for approval prior to start of work. 0.Each Each
6.2 N.S.I Providing, fabricating, welding & fixing in position decorative
MS screen comprising of MS tube 75mm x 50mm x 2.5mm
main outer frame fixed with 75mm x 50mm x 6mm thick MS
angle, design pattern with MS tube75mm x 50mm x 2.5mm as
shown on drawing including all required hard ware &
arrangement for fixing. providing & applying epoxy paint not
less than 300 micron of approved colour & shades as per
manufacturer's specification etc, complete in all respect as
per drawing, standard, specifications and direction of the
Engineer.
NOTE: The contractor shall submit shop drawings (without any
additional cost) for approval prior to start of work. 0.Each Each
M.S Staircase Railing
6.3 N.S.I Providing, fabricating, welding & fixing in position MS Staircase
railing comprising of 50mm dia x 16 Swg MS pipe hand rail,
25mm dia x 16 Swg dia balustrade welded to handrail as
shown in the drawing including all required accessories &
hardware such as base plate, cap, nuts & bolts etc. fixing
arrangement (Drilling & grouting)etc including three coat of
approved colour enamel paint over one coat od primer (Paint
will be paid in seaprate item, refer BOQ Item) complete in all
respects as per drawing, standard, specifications and
direction of the Engineer. 400 Rft Rft
TOTAL CARRIED TO CIVIL SUMMARY
TOTAL CARRIED TO CIVIL SUMMARY
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Academic Block
Building Works (Architectural)
1 2 3 4 5 6 7 = 4 x 6
Amount
(Pak Rs.)
Rate
(Pak Rs.) S.No
PWD Schedule
2012 Ref.NoDescription Qty Unit
MS Hand Rail
6.4 N.S.I Providing, fabricating, welding & fixing in position MS hand
railing comprising of 50mm dia x 16 Swg MS pipe hand rail,
25mm dia x 16 Swg dia balustrade welded to handrail as
shown in the drawing including all required accessories &
hardware such as base plate, cap, nuts & bolts etc. fixing
arrangement (Drilling & grouting)etc including three coat of
approved colour enamel paint over one coat od primer (Paint
will be paid in seaprate item, refer BOQ Item) complete in all
respects as per drawing, standard, specifications and
direction of the Engineer. 300 Rft Rft
Monkey Ladder
6.5 N.S.I Providing, fabricating, welding, bolting & fixing in position MS
Access/Monkey ladder comprising MS Flat steel 2" x 3/8" thick (
Vertical member) weld with 8" x 8" x 3/8" thick steel plate bolt
to Rcc slab, 8" x 3" x 3/8" thick steel plate weld to vertical flat
and bolted to wall, 3/4" dia solid steel bar welded to flat @ 12"
C/C, as shown on drawing, three coat of approved colour
enamel paint over one coat od primer (Paint will be paid in
seaprate schedule item, refer BOQ Item) etc, including
required hard ware complete in all respect as per drawing,
standard, specifications and direction of the Engineer.
The contractor shall submit shop drawings (without any
additional cost) for approval prior to start of work. 100 Kg Kg
6.6 N.S.I Providing and fixing Anti-Oxidation Aluminum Spacer Bar for
Double Glazing Glass up to 10mm wide including slicon
sealant bead to door, fixed glazing, windows, ventilators or
where required etc. including the cost of rubber gasket
packing and screw etc., in any floor at any height. 100.Rft Rft
Sky Light
6.7 N.S.I Providing, fabricating and fixing double glazed waterproof
Roof Skylight comprising of coloured anodized premium
quality heavy duty Aluminium section for framing (consider
Curtain wall section for pricing) of Pakistan Cable or
equivalent approved manufacturers, 12mm thick clear
tempered & laminated glass in inner face, 12 mm air-
gap/spacer & 12mm thick clear tempered glass in outer face
(12mm+12mm air-gap+12mm) including all required
accessories & hardware such as Neoprene Gaskets, slicon
sealant etc , Skylight to be fixed on top of roof at any height
over Rcc or masonry wall. Complete in all respects as per
drawings, specification and as directed by the Engineer.
(Contractor to submit the shop drawing/detail design without
any cost for approval before start of work) 0.Sft Sft
TOTAL CARRIED TO CIVIL SUMMARY
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Academic Block
Building Works (Architectural)
1 2 3 4 5 6 7 = 4 x 6
Amount
(Pak Rs.)
Rate
(Pak Rs.) S.No
PWD Schedule
2012 Ref.NoDescription Qty Unit
7 WOOD WORKS
Door Shutter
7.1 N.S.I Providing, Making & fixing in position 1-1/2" (38mm) thick solid
core approved colour Formica finish flush door shutters with &
without vision panel. Comprising of 6mm thick lamination sheet
(manufacturer pressed lamination sheet over lasani board) on
either side, over all around best quality Partal or approved
wood frame 50mm wide horizontal, vertical & cross /diagonal
& 150mm wide lock rail in full length, hollow area except
framing to be filled with the approved rough wood, 1-1/2" x
1/2" thick Golden teak wood edge lipping all around. The door
shutter mechanically pressed by standard manufacturers
under power driven hydraulic press as approved by the
Engineer, with and without vision glass panel (vision glass panel
will be paid separately, in BOQ item # ....) including with and
without vision glass panel, nails, glue or any required
hardware's and applying solignum for termite treatment, at
any height & any floor etc., complete in all respects as per
drawing, standard , specifications and direction of the
Engineer.
(Note: Cost of Ironmongery such as Hinges, Tower bolts,
Locks, Handles, kick & push plate etc. paid in Separate item.)1800 Sft Sft
7.2 Providing and fixing Tinted glass panes 6mm thick to wooden
door, fixed glazing, windows, ventilators or where required etc.
including the cost of wooden trim, rubber gasket packing and
screw etc., in any floor at any height. 500.Sft Sft
7.3 N.S.I Providing, Making & fixing in position Solid Phenolic Core frame
less door shutter of approved colour & thickness, equivalent
approved manufacturer, including door hardware's such as
corner fasteners, Auto return Hinges, Latch, indicator door
Locks, Stay, Handle, etc., in any floor & any heifght as shown in
drawings, complete in all respect as per drawing,
specifications and entire satisfaction of the Engineer0.Sft Sft
7.4 N.S.I Providing, fabricating and fixing Aluminum frame door
comprising of 17mm thick water proof laminated board
(lamination should be on both side of board) , premium quality
aluminum sections Frame of Pakistan Cable/ Krudson or
equivalent approved manufacturers fixed on Rcc & masonry
surface , fitted in Neoprene Gaskets including all required
Hardware (all hardware should be in stainless steel ) hinges,
handles, latch,locks, stays etc. Including silicon sealant to all
external junction between structure and door to give
water/wind proof seal . complete in all respect as per drawing,
standard specifications and direction of the
Engineer.(Contractor to submit the shop drawing for approval
before start of work) 280.Sft Sft
7.5 N.S.I Providing and fixing in position as per drawings & joinery
schedule all of "New ISE" Hong Kong, New Star Japan or
approved equivalent make as per relevant drawings,
contractor to submit the sample / shop drawings for approval
prior to execution etc, complete in all respects as per drawing,
standard , specifications and direction of the Engineer.
S.S Door hinges 4" long 488.Each Each
SS Dead Lock complete set 37.Each Each
SS Pull Handle 12 inch long 60.Each Each
SS Pull Handle 36 inch long 28.Each Each
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Academic Block
Building Works (Architectural)
1 2 3 4 5 6 7 = 4 x 6
Amount
(Pak Rs.)
Rate
(Pak Rs.) S.No
PWD Schedule
2012 Ref.NoDescription Qty Unit
Motorized Door Lock complete set (Lock body, Cylender
& Liver handle) for rooms 48.Each Each
SS Tower Bolt 8" long 122.Each Each
SS Door stopper 122.Each Each
Stainless Steel Kick plate 3mm thick 100 Sft Sft
Floor Spring/Hinges 4.Each Each
Coat & Head Hook 10.Each Each
Wooden Cabinets
7.6 N.S.I Providing making and fixing in position floor mounted lower
cabinets (Pantry etc.) as per drawing at any height / floor,
made of 3/4" thick coloured laminated (both face) Lasani
board shutter free from formaldehyde including all around
OAK wood lipping kitchen cabinet, 3" x 1-1/2" thick Partal
wood frame, complete with all accessories i.e. imported
hinges, locks, magnetic catchers, best quality handles etc.,
including any termite treatment, providing & applying 03 coats
of approved colour shade lacquer polish by Jaffar Brothers or
similar approved as per manufacturer's instruction &
specification including all required hardware's for fixing
etc,complete in all respects as per specifications & relevant
drawings and all works to the satisfaction of the Engineer.
(Front face will be measured for payments) 50.Sft Sft
7.7 N.S.I Providing making and fixing in position wall mounted cabinets
for (Kitchen/Pantry etc.) as per drawing at any height / floor,
made of 3/4" thick colored laminated (both side) Lasani board
shutter free from formaldehyde including all around Deodar
wood lipping 3/8" thick, 3" x 1-1/2" thick Partal wood frame,
6mm one side laminated Lasani board back complete with all
accessories i.e. imported hinges, locks, magnetic catchers,
best quality handles etc., including any termite treatment,
providing & applying 03 coats of approved colour shade
lacquer polish by Jaffar Brothers or similar approved
equivalent as per manufacturer's instruction & specification
including all required hardware's for fixing etc., complete in all
respects as per specifications & relevant drawings and all
works to the satisfaction of the Engineer. (Front face will be
measured for payments) 50.Sft Sft
TOTAL CARRIED TO CIVIL SUMMARY
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Academic Block
Building Works (Architectural)
1 2 3 4 5 6 7 = 4 x 6
Amount
(Pak Rs.)
Rate
(Pak Rs.) S.No
PWD Schedule
2012 Ref.NoDescription Qty Unit
8 INTERNAL FLOOR FINISHES
8.1 N.S.I Providing and laying light colour, glazed/non skid vitrified
porcelean tiles 12" x 24" (imported but not made od china/Pak
made) on floors, in any floor, laid with dry bond (stile bond)
over a base of 1" thick cement mortar (1:3) including jointing to
tiles with joint filler of approved quality as per direction of the
Engineer in charge..complete in all respects as per
specifications & relevant drawings and all works to the
satisfaction of the Engineer.
Base price of tile 1800/Sqm.0.Sft Sft
8.2 N.S.I Providing, laying and fixing Per-Polished (Boticena) Marble
Counter Top of approved thickness as per drawing & finishing
schedule activities include 40mm thick RCC slab, 1:4 C.S
mortar with Dry Bond, fixing in wall, cutting/chiseling in RCC /
CC members etc, jointing, grouting, chamfering edging/half D
gola arround the counter top, finishing, maintaining proper
level with curing etc. where required complete in all respects
as per specifications and as directed by the Engineer.125.Sft Sft
8.3 N.S.I Providing & Laying Natural stone 24" x12" & 12" x12", 1" & 1-1/2"
thick rough finished approved local stone on entrance steps &
floor (straight, curved, arches etc.) with cement sand mortar
1:2 and in any pattern in as per direction of the engineer-in-
charge including the cost of curing, making the stone surface
rough flat etc. complete in all respects as per specifications &
relevant drawings and all works to the satisfaction of the
Engineer. (at any height any floor)5000.Sft Sft
9 INTERNAL WALL FINISHES
9.1 N.S.I Providing and laying light colour, glazed/non skid vitrified
porcelean tiles 12" x 24" (Polished), (imported but not made od
china/Pak made) on walls, in any floor, laid with dry bond
(stile bond) over a base of 1" thick cement mortar (1:3)
including jointing to tiles with joint filler of approved quality as
per direction of the Engineer in charge..complete in all
respects as per specifications & relevant drawings and all
works to the satisfaction of the Engineer.
Base price of tile 1800/Sqm. 0.Sft Sft
Entrance Steps Riser, Dado & Skirting
9.2 N.S.I Providing & Laying Natural stone 24" & 12" x6" x 1/2" thick rough
finished approved local stone on riser, wall/ Dado/ Skirting
/coping with cement sand mortar 1:2 in ground floor setting of
stone tiles in slurry of grey cement over mortar base including
filling of joints with cement slurry of matching colour curing etc.
complete. 850.Sft Sft
10 INTERNAL CEILING FINISHES
Gypsum board false ceiling
10.1 N.S.I Providing, fabricating and fixing Gypsum board (4'-0" x 8'-0" x
1/2" (12mm) thick false ceiling including adjustable metal
framing suspension system, MS flashgap and required hard
wares jointing tap etc, all cutting for light fixtures & other
design feature with providing & applying three coat of matte
enamel paint of approved make & color shade iover one
coat of primer coat, filling putty etc complete in all respects as
per drawings, relevant specifications and as directed by the
Engineer. (Rates for False Ceiling shall include Bulkheads, Light
Pelmets etc.)350.Sft Sft
TOTAL CARRIED TO CIVIL SUMMARY
TOTAL CARRIED TO CIVIL SUMMARY
TOTAL CARRIED TO CIVIL SUMMARY
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Academic Block
Building Works (Architectural)
1 2 3 4 5 6 7 = 4 x 6
Amount
(Pak Rs.)
Rate
(Pak Rs.) S.No
PWD Schedule
2012 Ref.NoDescription Qty Unit
11 ROOF FINISHES & WATER PROOFING
N.S.I Providing & laying complete roof treatment at any floor and
any height as shown in the drawing, details consisting of
following items complete in all respects as per drawing,
standards, specifications and direction of the Engineer.
11.1 N.S.I Providing and laying 1" thick average levelling CC screed over
Rcc slab for achieving leveled surface with (1:4) cement sand
mortar, complete in all respect and as per drawing &
specification and to the entire satisfaction of the Engineer. 18200.Sft Sft
11.2 N.S.I Providing and laying in position Water proofing membrane Hi
Grip Elastomer SUNTAN PP4000 4mm thick from Pak Hy-Oils
limited or approved equivalent over above leveled surface
including primer coating, overlapping (horizontal & vertical)
complete as per manufacturer's specifications, instruction & as
shown in the drawing etc, complete in all respects as per
drawings, specification and as directed by the Engineer.0.Sft Sft
11.3 N.S.I Providing & laying in position 1-1/2"(40mm) thick Diamond
jumbolon-Board from Diamond Foam or approved equivalent
having density 35kg/cum, over above Water Proofing
membrane with rebated edge as per manufacturer's
specifications, instruction & as shown in the drawing etc,
complete in all respects as per drawings, specification and as
directed by the Engineer. 18200.Sft Sft
11.4 N.S.I Providing and laying BRC mesh 4" x 4" x 10 swg from Al -
Burhan (Pvt) Ltd or approved equivalent including cutting,
binding with steel binding wire etc. complete in all respects as
per drawings, specifications and as directed by the Engineer.
18200.Sft Sft
12 EXTERNAL WALL FINISHES (BUILDING)
Fair Faced Plaster
12.1 N.S.I Providing and applying Ressi Plastorend-110 (6mm thick) with
sealer Silblock of approved grey & beige colour over rough
cast cement sand plaster on external walls, columns or where
required including chamfered edges, round off corner,
scaffolding, curing etc. at any height & any floor etc.,
complete in all respects as per drawing, specifications and or
as directed by the consultant / Engineer. (excluding cost of
rough cast plaster)i) Grey colour 0.Sft Sft
ii) Beige colour 0.Sft Sft
12.2 N.S.I Providing & Laying free fom natural stone wall claddin random
stone 1" & 1-1/2" thick rough finished approved local stone on
wall (straight, curved, arches etc.) with cement sand mortar
1:2 and in any pattern in as per direction of the engineer-in-
charge including the cost of curing, making the stone surface
smooth etc. complete in all respects as per specifications &
relevant drawings and all works to the satisfaction of the
Engineer. (at any height any floor)2800.Sft Sft
TOTAL CARRIED TO CIVIL SUMMARY
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Academic Block
Building Works (Architectural)
1 2 3 4 5 6 7 = 4 x 6
Amount
(Pak Rs.)
Rate
(Pak Rs.) S.No
PWD Schedule
2012 Ref.NoDescription Qty Unit
LOGO
12.3 N.S.I Providing, making, finishing and fixing in position of university
LOGO, IMAGE & LETTERING. 8'-3" dia LOGO made of 12 swg MS
Sheet with the university symbolic image & letter "UNIVERSITY
OF BALTISTAN SKARDU" (In English & Urdu), fixed to walls 3"
projected with 1" dia & 6" long steel Hilti/rowel bolts including
three coats of approved colour enamel paint over a one coat
of red oxide primer paint etc. complete in all respects as per
specifications & relevant drawings and all works to the
satisfaction of the Engineer.0.Each Each
12.4 N.S.I Providing, making and finishing lettering "ACADEMIC BLOCK
"on External wall with 2" Embossed cement, sand Plaster 1:2
(1cement & 2 sand) as per drawing dimension includes three
coats of plastic emulsion paint and preparation of surface with
filling manufactured by ICI, all nails, screws, glues etc.
complete in all respects as per specifications & relevant
drawings and all works to the satisfaction of the Engineer.0.Each Each
13 EXTERNAL FINISHES OTHER THAN BUILDING
(NON COVERED AREA)
13.1 N.S.I Providing & Laying free fom natural stone wall claddin random
stone 1" & 1-1/2" thick rough finished approved local stone on
wall (straight, curved, arches etc.) with cement sand mortar
1:2 and in any pattern in as per direction of the engineer-in-
charge including the cost of curing, making the stone surface
smooth etc. complete in all respects as per specifications &
relevant drawings and all works to the satisfaction of the
Engineer. (at any height any floor)6000 Sft Sft
TOTAL CARRIED TO CIVIL SUMMARY
TOTAL CARRIED TO CIVIL SUMMARY
ELECTRICAL WORKS
EA Consulting
(Pvt) LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Academic Block
Electrical Works
S.NO: AMOUNT
A SCHEDULE ITEMS
1
2
3
4
5
6
B NON-SCHEDULE ITEMS
1
2
3
4
5
6
7
8
TOTAL AMOUNT OF 02 NO. BUILDINGS
CARRIED TO GRAND SUMMARY
LIGHTNING PROTECTION SYSTEM (LPS)
Total of Non-Schedule Items - B
TOTAL AMOUNT OF 01 NO. BUILDING (A+B)
EARTHING SYSTEM
Total of Schedule Items
Add ____% Premium on Electrical Works of PWD-2004
Total of Schedule Items with Premium - A
CONDUITS & PIPES
L.V DISTRIBUTION BOARDS
LOW VOLTAGE CABLES AND WIRES
WIRING ACCESSORIES
LIGHTING FIXTURES
UPS SYSTEM
Electrical SUMMARY
DESCRIPTION
PVC CONDUIT & DUCT
"CLIPSAL" ACCESSORIES ON RECESSED METAL BOARD
3 WIRE IN PVC RECESSED CONDUIT
CEILING FANS
WALL BRACKET FANS
PLASTIC BODY EXHAUST FANS
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Academic Block
Electrical Works
1 2 3 4 5 6 7 = 4 X 6
SCHEDULE ITEMS
1 2-67 PVC CONDUIT & DUCT
a) 2-67-10 Supply & fixing 50mm (2") dia PVC conduit with all
especial such as bends, sockets, Junction etc
recessed in the in the wall or floor as required.
10 P/Meter 213.65
Amount Carried to Electrical Summary
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Academic Block
Electrical Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
2 2-74 "CLIPSAL" ACCESSORIES ON RECESSED METAL BOARD
a) 2-74-01 Providing & fixing 10 Amps Polycarbonate flame
retardant S.P switch with fancy required gang plate
fixed on die fabricated, powder coated metal board
recessed in wall or column including connection as
required. (E31-36/1/2A Clipsal make)
32 Each. 138.22
b) 2-74-04 Providing & fixing 10 Amps Polycarbonate flame
retardant 2-Pin switch socket unit ( Universal) with
fancy gang plate fixed on die fabricated, powder
coated metal board recessed in wall or column
including connection as required.(E15U Clipsal make)
150 Each. 396.44
c) 2-74-06 Providing & fixing 15 Amps Polycarbonate flame
retardant 3-Pin switch socket unit with fancy gang
plate fixed on die fabricated, powder coated metal
board recessed in wall or column including
connection as required. (Clipsal make)
47 Each. 514.58
d) 2-74-11 Providing & fixing Polycarbonate flame retardant, 400
watts fan dimmer with plate fixed on die fabricated,
powder coated, metal board recessed in the wall or
column including connection as required. (E32V400F
Clipsal make)
13 Each. 943.58
Amount Carried to Electrical Summary
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Academic Block
Electrical Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
3 2-40 3 WIRE IN PVC RECESSED CONDUIT
a) 2-40-02 Wiring for sub-main with 3x 2.5 mm², PVC insulated
wire 300/500 volts grade, single core, stranded copper
conductor wire in 20 mm (3/4")dia PVC conduit
recessed in the wall, column and roof etc as required.
(DB to switch board including wiring between switch
on the same circuit)
720 Meter 141.27
b) 2-40-01 Wiring for sub-main with 3x 1.5 mm², PVC insulated
wire 300/500 volts grade, single core, stranded copper
conductor wire in 20 mm (3/4")dia PVC conduit
recessed in the wall, column and roof etc as required.
(Light point from switch board to point)
4,080 Meter 125.29
c) 2-40-01 Wiring for sub-main with 3x 1.5 mm², PVC insulated
wire 300/500 volts grade, single core, stranded copper
conductor wire in 20 mm (3/4")dia PVC conduit
recessed in the wall, column and roof etc as required.
(Light point to point)
1,160 Meter 125.29
d) 2-40-02 Wiring for sub-main with 3x 2.5 mm², PVC insulated
wire 300/500 volts grade, single core, stranded copper
conductor wire in 20 mm (3/4")dia PVC conduit
recessed in the wall, column and roof etc as required.
(DB to 5/10A outlet)
640 Meter 141.27
e) 2-40-02 Wiring for sub-main with 3x 2.5 mm², PVC insulated
wire 300/500 volts grade, single core, stranded copper
conductor wire in 20 mm (3/4")dia PVC conduit
recessed in the wall, column and roof etc as required.
(Outlet to 5/10A outlet)
945 Meter 141.27
f) 2-40-03 Wiring for sub-main with 3x 4 mm², PVC insulated wire
300/500 volts grade, single core, stranded copper
conductor wire in 20 mm (3/4")dia PVC conduit
recessed in the wall, column and roof etc as required.
(DB to 13A outlet)
740 Meter 185.94
g) 2-40-03 Wiring for sub-main with 3x 4 mm², PVC insulated wire
300/500 volts grade, single core, stranded copper
conductor wire in 20 mm (3/4")dia PVC conduit
recessed in the wall, column and roof etc as required.
(Outlet to 13A outlet)
855 Meter 185.94
h) 2-40-03 Wiring for sub-main with 3x 4 mm², PVC insulated wire
300/500 volts grade, single core, stranded copper
conductor wire in 20 mm (3/4")dia PVC conduit
recessed in the wall, column and roof etc as required.
(DB to 15A outlet)
1,300 Meter 185.94
Amount Carried to Electrical Summary
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Academic Block
Electrical Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
4 2-106 CEILING FANS
a) 2-106-03 Providing & installing 140 Cm (56") sweep ceiling fan
with blades, canopy, strandard length of down rod
including connection with 14.0076" flexable wire
complete as required. (without regulator) Millat/Pak/
Asia/ Younas/Climax/ Royal.
167 Each. 2,088.00
Amount Carried to Electrical Summary
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Academic Block
Electrical Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
5 2-107 WALL BRACKET FANS
a) 2-107-03 Providing & installing 45 Cm (18") sweep wall bracket
fan complete with blades, regulator & pulling cord
switch, fitted on wall or column with GI clip including
connection as required. Millat/Pak/Asia/
Younas/Climax/ Royal.
3 Each. 1,884.00
Amount Carried to Electrical Summary
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Academic Block
Electrical Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
6 2-110 PLASTIC BODY EXHAUST FANS
a) 2-110-01 Providing & installing 20 Cm (8") sweep, Plastic body
Exhaust fan complete with blades, motor, etc fixed in
existing hole including connection with 14/.0076"
flexable wire complete as required. Millat/
Pak/Asia/Younas/Climax/ Royal.
21 Each. 1,286.00
Amount Carried to Electrical Summary
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Academic Block
Electrical Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
NON-SCHEDULE ITEMS
1 CONDUITS & PIPES
a) Supply and installation of following size internal
diameter PVC / uPVC Class-D pipe / Flexible PVC
Conduit as race ways with all accessories, recessed /
surface on wall / column / under floor, as per drawings
and specifications, complete in all respect.
i 38 mm dia uPVC Pipe (Class-D) 130 Rm.
b) Supply and installation of following size UPVC Pipe
Class-D / Road Crossing Sleeves Class-D for Power
cables. Buried in ground / under roads / under floor as per
specification, including excavation for laying of pipe, bricks,
warning tape and backfilling with new and fresh sand (6" under
and 6" above pipe) etc., (whereever required), as shown on the
specifications and drawings, complete in all respect.
i 100mm dia uPVC Conduit (Class-D) 55 Rm.
ii 150mm dia uPVC Conduit (Class-D) 25 Rm.
c) Supply and installation of Pull Boxes (Floor / Wall) with
all installation accessories, as per drawings,
specifications and approved brands, complete in all
respect.
5 No.
d) Providing and Construction of Manhole Size 3'-0" x 3'-0"
x 3'-0" deep, 6"thick, concrete 1:2:4 ratio with 3' round
heavy duty cast iron cover, 100% water proof, as per
specification and as shown on the drawing, complete
in all respect. (For Electrical cables)
2 No.
e) Providing and Construction of Handhole Size 2'-0" x 2'-
0" x 3'-0" deep, 6"thick, concrete 1:2:4 ratio with 2'
round heavy duty cast iron cover, 100% water proof,
as per specification and as shown on the drawing,
complete in all respect. (For Electrical cables)
2 No.
Amount Carried to Electrical Summary
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Academic Block
Electrical Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
2 L.V. DISTRIBUTION BOARDS
a) Supply, installation, testing and commissioning of
following wall mounting / floor standing surface type
Main Distribution Board (MDB), Sub Main Distribution
Boards (SMDB's) and Distribution Board (DB's) made
with 16 SWG sheet metal, dust protected, vermin proof
housing coated with approved color having all the
necessary switching, energy analyzer etc., protections,
as per drawing and specification, complete in all
respect.
i MDB-GF (Academic) with 75 kVAR PFI Panel 1 No.
ii SMDB-GF (Academic) 1 No.
iii DB-GF-1 1 No.
iv DB-GF-2 1 No.
v HDB-GF 1 No.
vi UDB-GF 1 No.
vii DB-1F-1 1 No.
viii DB-1F-2 1 No.
ix HDB-1F 1 No.
x UDB-1F 1 No.
xi DB-2F-1 1 No.
xii DB-2F-2 1 No.
xiii HDB-2F 1 No.
xiv UDB-2F 1 No.
Amount Carried to Electrical Summary
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Academic Block
Electrical Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
3 LOW VOLTAGE CABLES AND WIRES
3.1 Supply, laying, termination, tagging, testing and
commissioning of following size copper conductor
multi core / single core, AL/PVC, AL/PVC/PVC,
unarmoured, 0.6 kV/1 kV, 450/750V or 300/500V
voltage grade copper cable in already laid PVC
conduit / cable tray / trench including all accessories
lugs, cable gland etc. as per drawings and
specification, complete in all respect.
a) 4 Core, AL/PVC/PVC Cable (600/1000V)
i 4C, 120 Sqmm AL/PVC/PVC 70 Rm.
b) 1 Core, AL/PVC Cable as ECC (450/750V)
i 1C, 70 Sqmm AL/PVC 70 Rm.
3.2 Supply, laying, termination, tagging, testing and
commissioning of following size copper conductor
multi core / single core, Cu/PVC, Cu/PVC/PVC,
unarmoured, 0.6 kV/1 kV, 450/750V or 300/500V
voltage grade copper cable in already laid PVC
conduit / cable tray / trench including all accessories
lugs, cable gland etc. as per drawings and
specification, complete in all respect.
a) 4 Core, Cu./PVC/PVC Cable (600/1000V)
i 4C, 16 Sqmm Cu/PVC/PVC 15 Rm.
ii 4C, 10 Sqmm Cu/PVC/PVC 65 Rm.
iii 4C, 6 Sqmm Cu/PVC/PVC 45 Rm.
b) 1 Core, Cu./PVC Cable as ECC (450/750V)
i 1C, 16 Sqmm Cu/PVC 15 Rm.
ii 1C, 10 Sqmm Cu/PVC 65 Rm.
iii 1C, 6 Sqmm Cu/PVC 105 Rm.
Amount Carried to Electrical Summary
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Academic Block
Electrical Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
4 WIRING ACCESSORIES
a) Supply, installation, testing and commissioning of
following 10/13/15/20A, One/Two/Three/Four gang
type switches, Dimmer Switches, Sockets including 16
SWG Sheet Steel powder coated back boxes with
earth terminal, recessed in wall, with all accessories as
per drawigs and specification, complete in all
respects.
i Two Gang Switch 10A 16 No.
ii Three Gang Switch 10A 43 No.
iii Four Gang Switch 10A 12 No.
iv Two Gang Fan Dimmer Switch 10A 77 No.
v 20A, Double Pole Switch with neon indicator 31 No.
vi 13A, 3-Pin Flat 2-Gang Switch Socket Outlet 116 No.
vii 13A, Unswitched Spur Outlet 1 No.
viii 15A, 3-Pin Switch Socket Outlet (Weatherproof type) 6 No.
ix 20A, Flux Outlet 31 No.
x 32A, 5-Pin Industrial Socket with Plug top 7 No.
b) Supply, installation, testing and commissioning of Floor
Box (imported), 14 SWG Sheet Steel with all
accessories, as per drawings, specifications and site
requirements, complete in all respect.
Note: Excluded of all Sockets and Face plates.
1 No.
Amount Carried to Electrical Summary
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Academic Block
Electrical Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
5 LIGHTING FIXTURES
a) Supply, installation, testing and commissioning of
following Light fixtures complete with starters,
Electronic ballast (unless mention otherwise), lamps,
lamp holders, drivers, mounting accessories etc., as
per drawings and specifications, complete in all
respects. Lighting fixtures sample must be submitted to
consultant for approval.
Note: Refer light fixtures drawings for complete light
fixtures details.
i Surface mounted LED Light Fixture (IP-20) with 1x40W
LED lamp
277 No.
ii Surface mounted LED Downlight Fixture (IP-20) with
1x20W LED lamp
77 No.
iii Surface mounted LED Downlight Fixture (IP-20) with
1x18W LED lamp
42 No.
iv Recessed mounted LED Downlight Fixture (IP-20) with
1x12W LED lamp
12 No.
v Wall / Surface mounted LED Bi-Directional Light Fixture
(IP-54) with 2x12W LED lamp
64 No.
vi Recessed mounted LED Ramp Light Fixture (IP-65) with
1x6W LED lamp
30 No.
vii Surface mounted LED Planter Light Fixture (IP-65) with
1x12W LED lamp
5 No.
b) Supply, installation, testing and commissioning of
following items including all connecting accessories
as per drawings, specifications, complete in all
respects.i Fan Hook M.S.Box with colour coated 167 No.
Amount Carried to Electrical Summary
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Academic Block
Electrical Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
6 UPS SYSTEM
a) Supply, installing, testing and commissioning of True
Online Double Conversion UPS rating 15 kVA Three
Phase in, Three Phase out, minimum 0.9 output power
factor with 10 minutes battery backup, batteries with
related DC cables from UPS to batteries, external By-
pass and all accessories as per specification and
drawings, complete in all respect.
- No.
b) Supply, installing, testing and commissioning of True
Online Double Conversion UPS rating 12 kVA Three
Phase in, Three Phase out, minimum 0.9 output power
factor with 10 minutes battery backup, batteries with
related DC cables from UPS to batteries, external By-
pass and all accessories as per specification and
drawings, complete in all respect.
- No.
c) Supply, installing, testing and commissioning of True
Online Double Conversion UPS rating 8 kVA Three
Phase in, Three Phase out, minimum 0.9 output power
factor with 10 minutes battery backup, batteries with
related DC cables from UPS to batteries, external By-
pass and all accessories as per specification and
drawings, complete in all respect.
- No.
Amount Carried to Electrical Summary
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Academic Block
Electrical Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
7 EARTHING SYSTEM
Supply, installation, testing and commissioning of
following items for complete earthing system including
all connecting accessories as per drawings,
specifications and as mentioned in General Notes,
complete in all respects.
a) Supply, installation, testing and commissioning of
following items for complete Power Earthing system,
including Bentonite chemical, other all required
materials and connecting accessories, boring, labor,
tools, transportation etc., as per drawings and
specifications, complete in all respects with detailed
test reports.
i Earth pit with Rod type earth electrode, 20mm dia
and 3 meter long copper rod.
1 No.
b) Supply, installation, testing and commissioning of
following size of PVC insulated Cu. Conductor cable
as earth continuity conductor (ECC) installed on
surface / in appropriate already installed raceway / in
already excavated trench / in already laid pipe, as
per specifications and drawings, complete in all
respect.
i 70 Sq.mm Cu/PVC 10 Rm.
Amount Carried to Electrical Summary
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Academic Block
Electrical Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
8 LIGHTNING PROTECTION SYSTEM (LPS)
a) Supply, installation, testing and commissioning of Early
Streamer Emission (ESE) Air Terminal mounted on 3
meter elevation mast, as per drawing, complete in all
respect and having following specifications:
1 No.
* Efficiency: 60 micro seconds
* Lightning current withstanding test (10/350µs): 100 kA
* ESE Central Rod: Nickel Plated Copper
* Metal Housing : Stainless Steel 316L
* Protection Radius : min 52 meter at 3 meter height
* Built-In Flash Counter and Remote Testing
b) Supply and installation of 3 meter high elevation mast
consisting mounting bracket for installation and fixing
of ESE Air Terminal, as per drawing, specification and
site requirement necessary for the system, complete in
all respect.
1 No.
c) Supply and installation of lightning flash counter as per
drawing, specification and site requirement necessary
for the system, complete in all respect.
1 No.
d) Supply, installation, testing and commissioning of
complete Earthing pit with Rod type earth electrode,
20mm dia and 3 meter long copper rod, including
Bentonite chemical, other all required materials and
connecting accessories, boring, labor, tools,
transportation etc., as per drawings and
specifications, complete in all respects with detailed
test reports.
1 No.
e) Supply and installation of Test Clamp and Guard Tube
2m in length, as per drawing, specification, and site
requirement necessary for the functioning of the
system, complete in all respect.
1 Job
f) Supply, laying, testing and commissioning of 1x70
Sq.mm PVC insulated Cu. conductor cable in already
installed 38mm dia uPVC Pipe down from roof on the
elevation of the building & at ground level
connecting Lightning protection pits to power
earthing pits, including all fixing accessories etc., as
per drawings, specification & site requirement
necessary for the functioning of the system, complete
in all respect.
15 Rm.
Amount Carried to Electrical Summary
ELV WORKS
EA Consulting
(Pvt) LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Academic Block
ELV Works
S.NO: AMOUNT
A SCHEDULE ITEMS
1
B NON-SCHEDULE ITEMS
1
2
3
4
5
6
7
Total of Non-Schedule Items - B
TOTAL AMOUNT OF 01 NO. BUILDING (A+B)
TOTAL AMOUNT OF 02 NO. BUILDINGS
CARRIED TO GRAND SUMMARY
ACCESS CONTROL SYSTEM
ADDRESSABLE FIRE ALARM SYSTEM
SELF CONTAINED EMERGENCY LIGHTS
CCTV SYSTEM
Total of Schedule Items
Add ____% Premium on ELV Works of PWD--2004
Total of Schedule Items with Premium - A
CONDUITS & PIPES
VOICE, DATA COMMUNICATION & CCTV CABLING SYSTEMS (Passive
Equipment Only)
PUBLIC ADDRESS / VOICE EVACUATION SYSTEM
ELV SUMMARY
DESCRIPTION
PVC CONDUIT & DUCT
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Academic Block
ELV Works
1 2 3 4 5 6 7 = 4 X 6
SCHEDULE ITEMS
1 2-67 PVC CONDUIT & DUCT
a) 2-67-10 Supply & fixing 50mm (2") dia PVC conduit with all
especial such as bends, sockets, Junction etc
recessed in the in the wall or floor as required.
640 P/Meter 213.65
Amount Carried to ELV Summary
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Academic Block
ELV Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
NON-SCHEDULE ITEMS
1 CONDUITS & PIPES
a) Supply and installation of following size internal
diameter PVC / uPVC Class-D pipe / Flexible PVC
Conduit as race ways with all accessories, recessed /
surface on wall / column / under floor, as per drawings
and specifications, complete in all respect.
i 25 mm dia Flexible PVC Conduit 25 Rm.
b) Supply and installation of following size UPVC Pipe
Class-D / Road Crossing Sleeves Class-D for
Telecommunication Cable (copper / optic fiber). Buried in
ground / under roads / under floor as per specification, including
excavation for laying of pipe, bricks, warning tape and backfilling
with new and fresh sand (6" under and 6" above pipe) etc.,
(whereever required), as shown on the specifications and
drawings, complete in all respect.
i 50mm dia uPVC Conduit (Class-D) 10 Rm.
c) Supply and installation of Pull Boxes (Floor / Wall) with
all installation accessories, as per drawings,
specifications and approved brands, complete in all
respect.
32 No.
d) Providing and Construction of Handhole Size 2'-0" x 2'-
0" x 2'-0" deep, 6"thick, concrete 1:2:4 ratio with 2'
round heavy duty cast iron cover, 100% water proof,
as per specification and as shown on the drawing,
complete in all respect. (For Electrical cables)
1 No.
Amount Carried to ELV Summary
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Academic Block
ELV Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
2
VOICE, DATA COMMUNICATION & CCTV CABLING
SYSTEMS (Passive Equipment Only)
a) Supply, installation, testing and commissioning of
following Data / Voice Cabinets, for patch panel,
Fiber panels, adapter, PDU's, Fans and space for
active switches as it may require to complete the
entire passive and active network as per the single
line diagram, drawings and specifications, complete
in all respect.
i 42U Data Rack with PDU's (800mmx1000mm) 1 No.
ii 12U Data Rack with PDU's (800mmx800mm) 2 No.
b) Supply, installation, testing and commissioning of
Single RJ-45, Cat-6 outlet for Voice with shutter type
and 16 SWG back box including tagging, as per
drawing and specification, complete in all respect.
5 No.
c) Supply, installation, testing and commissioning of
Single RJ-45, Cat-6 outlet for Data with shutter type
and 16 SWG back box including tagging, as per
drawing and specification, complete in all respect.
52 No.
d) Supply, installation, testing and commissioning of Dual
RJ-45, Cat-6 outlet for Voice & Data with shutter type
and 16 SWG back box including tagging, as per
drawing and specification, complete in all respect.
43 No.
e) Supply, installation, testing and commissioning of Dual
RJ-45, Cat-6 outlet for Data with shutter type and 16
SWG back box including tagging, as per drawing and
specification, complete in all respect.
10 No.
f) Supply, installation, testing and commissioning of
Single RJ-45, Cat-6 outlet for Camera with shutter type
and 16 SWG back box including tagging, as per
drawing and specification, complete in all respect.
13 No.
g) Supply, installation, testing and commissioning of
Single RJ-45, Cat-6 outlet for Projector with shutter type
and 16 SWG back box including tagging, as per
drawing and specification, complete in all respect.
3 No.
h) Supply, laying, termination, testing and commissioning
of CAT 6 - 4 pair cable for Single RJ-45 outlet (Data,
Voice, Camera, Projector and Access control system)
in 25mm dia PVC conduit concealed / surface from
each outlet to IDF racks, including tagging and piping
with all necessary accessories, complete in all respect.
6,400 Rm.
j) Supply, installation, testing and commissioning of 24
port shutter type Cat 6, RJ 45 UTP Patch Panel fully
loaded with tool less jacks and rear cable manager,
as per drawing and specification, complete in all
respect.
6 No.
k) Supply, installation, testing and commissioning of 24
port Single Mode Fiber Patch Panel fully loaded with
pigtails etc., and rear cable manager, as per drawing
and specification, complete in all respect.
3 No.
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Academic Block
ELV Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
l) Supply, installation, testing and commissioning of 19"
front/rear (as required) cable organizer between
patch panels and active equipment to provide patch
cable management including with all necessary
accessories, as per drawing and specification,
complete in all respect.
9 No.
m) Supply, installation, testing and commissioning of CAT-
6 UTP (RJ-45 to RJ-45) for the above Patch Panels
including with all necessary accessories, as per
drawing and specification, complete in all respect.
i CAT-6 (1m) Long Patch Cord 179 No.
ii CAT-6 (2m) Long Patch Cord 179 No.
n) Supply, laying, termination, testing and commissioning
of Cat-5e, 25 pair cable from IDF rack to remaining IDF
racks in already laid conduit / cable tray including
with all the necessary accessories as per drawing and
specifications, complete in all respect.
30 Rm.
o) Supply, laying, termination, testing and commissioning
of 8 Core Multi mode Fiber Optic Cable from IDF rack
to remaining IDF Racks in already installed cable tray /
conduit, as shown in drawings including termination
and tagging at both ends, as per standard
specifications with all termination accessories up to
entire satisfaction of IT Engineer.
30 Rm.
p) Supply, installing, testing and commissioning of
following blocks in Data racks, as per drawing and
specification, complete in all respect.
i 1x100 Pair IDC Block 1 No.
ii 1x50 Pair IDC Block 2 No.
q) Installation, testing and commissioning by
Manufacturer Authorized Agent / Dealer and handing
over complete Voice & Data System to Owner with
Providing Training voice data fuke & OTDR Testing, as
build drawing, Rack layouts and certification's
Principal, complete equipment's Manual and
Warranty Documents to Owners representative.
1 Job.
Amount Carried to ELV Summary
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Academic Block
ELV Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
3 PUBLIC ADDRESS / VOICE EVACUATION SYSTEM
a) Supply, laying, termination, testing and commissioning
of Wiring for complete PA System with 2C - 1.5 Sq.mm
shielded, twisted pair Fire Resistant Cable in 25 mm dia
PVC conduit concealed as per drawing and
specification. Complete in all respect.
390 Rm.
b) Supply, wiring and testing of PA Microphone points
with Microphone Cable in 25mm dia PVC Conduit,
recessed / surface in wall and ceiling, complete in all
respects.
1 Job.
c) Supply, installation, testing and commissioning of PA
System complete with all connecting accessories
comprising of the following equipment, as per
drawing and specification, complete in all respects.
i Remote Microphone for upto 3 Zones with frequency
response 100 Hz to 20 KHz and unidirectional electret
condenser microphone gooze neck table type with
RJ45 connector with shielded twisted pair cable with
indicators for power, failure, broadcast switch,
covered switch, as per drawing and specification,
complete in all respects.
1 No.
ii System Manager with built in Amplifier for 4 channel
and built in Modular type massage manager with
2x150W Power Amplifier module with frequency
response 40 Hz to 20 KHz and 100V output voltage
(EN54 compliant), as per drawing and specification,
complete in all respects.
1 No.
iii Power supply manager with RJ45 female connector
for connecting the system and cascade connection
with shielded twisted pair straight cable and with
indications battery check, charging circuit failure,
battery failure (EN54 compliant), as per drawing and
specification, complete in all respects.
1 No.
iv Providing & Connecting of Inter Connects Cables etc. 1 Job.
v 19' Rack Cabinet with Glass Door to accommodate
above equipment's located at Security room as per
drawing and specification, complete in all respects.
1 No.
d) Supply, installation, testing and commissioning of
following type Speakers of Architect Approved color,
as per drawing and specification, complete in all
respects.i 6W Ceiling mounted Speakers with Tapping
Transformers (1,1.5,3,4.5,6W), EN54 Compliant.
28 No.
e) Installation, testing and commissioning, Programming
by Manufacturer Authorized Agent / Dealer and
handing over complete PA System to Owner with
providing training, SOP, complete equipment's
manual and warranty documents to Owners
representative.
1 Job.
Amount Carried to ELV Summary
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Academic Block
ELV Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
4 CCTV SYSTEM
Supply, installation, testing and commissioning of
following items for CCTV System, described below
including all accessories, as per the single line
diagram and specification, complete in all respect.
a) Supply, installation, testing and commissioning of 2 MP
IP based camera with 1/2.8" CMOS 3.3 TO 12mm
varfocal lens, power adopter, wall mounted bracket,
and IP-65 housing, complete in all respect with fixing
accessories, as per drawing and specifications,
complete in all respect.
13 No.
b) Installation, testing, commissioning, programming by
Manufacturer Authorized Agent / Dealer and handing
over complete CCTV System to Owner with providing
training, SOP, complete equipment's manual and
warranty documents to owners representative.
1 Job.
Amount Carried to ELV Summary
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Academic Block
ELV Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
5 ACCESS CONTROL SYSTEM
a) Supply, installation, testing and commissioning of 2
Door Controller LAN Based with power supply, as per
drawings and specification, complete in all respect,
complete in all respect with fixing accessories, as per
drawing and specifications, complete in all respect.
- No.
b) Supply, installation, testing and commissioning of BIO
Proximity Card Reader, as per drawings and
specification, complete in all respect.
- No.
c) Supply, installation, testing and commissioning of Exit
Control Push Button, as per drawings and
specification, complete in all respect.
- No.
d) Supply, installation, testing and commissioning of
Electromagnetic Door Lock with matching power
supply, as per drawings and specification, complete
in all respect.
- No.
e) Supply, installation, testing and commissioning of
Access control Enterprise Software with enterprise level
time attendance software integrated with IP Based
CCTV System. Complete in all respect.
- No.
f) Supply, installation, testing and commissioning of Core
i7 PC for enterprise software, as per drawing and
specifications, complete in all respect.
- No.
g) Supply, installation, testing and commissioning of PVC
Card for Reader, complete with Printer and cartridge
kit, as per drawing and specifications, complete in all
respect.
- No.
h) Installation, testing, commissioning & programming by
Manufacturer Authorized Agent / Dealer and handing
over complete Access Control System to Owner with
providing training, SOP, complete equipment's
manual and warranty documents to Owner's
Representative.
- Job.
Amount Carried to ELV Summary
NOT APPLICABLE
NOT APPLICABLE
NOT APPLICABLE
NOT APPLICABLE
NOT APPLICABLE
NOT APPLICABLE
NOT APPLICABLE
NOT APPLICABLE
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Academic Block
ELV Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
6 ADDRESSABLE FIRE ALARM SYSTEM
a) Supply, laying, termination, testing and commissioning
of wiring for complete Fire Alarm System with 2C-1.5
Sq.mm shielded FP-200, twisted pair Fire Resistant
Cable (2 hrs. rated) in 25mm dia PVC conduit
concealed, (M.S conduit for surface.) etc., including
any wiring between fire alarm control panel and
other's systems control panel's etc. Complete in all
respect.
625 Rm.
b) Supply, installation, testing and commissioning of
Addressable Photoelectric Smoke Detector with base
and back box, as per drawing and specification,
complete in all respect.
59 No.
c) Supply, installation, testing and commissioning of
Addressable Manual Pull Station / Call Point with base
and back box, as per drawing and specification,
complete in all respect.
11 No.
d) Supply, installation, testing and commissioning of
Addressable Sounder with flasher / Strobe and base
and back box, as per drawing and specification,
complete in all respect.
11 No.
e) Supply, installation, testing and commissioning of 01
Loop Addressable Fire Alarm Control Panel (FACP),
including all necessary accessories, identification
tagging etc. and 3Hrs battery back up. FACP as per
drawing and specification, complete in all respect.
1 No.
f) Installation, testing and commissioning, Softwear,
Programming by Manufacturer Authorized Agent /
Dealer and handing over complete Fire Alarm system
to owner with providing training, SOP, complete
equipment's manual and warranty documents to
Owner's Representative.
1 Job.
Amount Carried to ELV Summary
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Academic Block
ELV Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
7 SELF CONTAINED EMERGENCY LIGHTS
Supply, installation, testing and commissioning of
following items for self contained emergency lights
with all fixing accessories, as per drawing and
specification, complete in all respect.
a) 3W, Emergency light with self contained Battery,
Ceiling / Surface mounted IP-20 rated, UL 924 Listed,
as per specification and drawing, complete in all
respect. (non-maintained)
52 No.
b) 3W, Emergency light with self contained Battery, Wall
mounted IP-20 rated, UL 924 Listed, as per
specification and drawing, complete in all respect.
(non-maintained)
21 No.
c) 3W, Emergency light with self contained Battery,
Ceiling / Surface mounted IP-65 rated, UL 924 Listed,
as per specification and drawing, complete in all
respect. (non-maintained)
9 No.
d) 3W, Exit light with self contained Battery, 24m viewing,
Directional Pandent, IP-65 rated, UL 924 Listed, as per
specification and drawing, complete in all respect.
(non-maintained)
33 No.
Note: Selection of Exit Light is as per Architect's
approval.
Amount Carried to ELV Summary
PLUMBING WORKS
EA Consulting
(Pvt) LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Academic Block)
Plumbing Works
S.NO: AMOUNT
A SCHEDULE ITEMS
1
2
B NON-SCHEDULE ITEMS
1
2
3
4
TOTAL AMOUNT OF 02 NO. BUILDINGS
CARRIED TO GRAND SUMMARY
TOTAL AMOUNT OF 01 NO. BUILDING (A+B)
Total of Non-Schedule Items - B
FIRE FIGHTING WORKS
Total of Schedule Items
Add ___% Premium on Plumbing Works of PWD-2012
Total of Schedule Items with Premium - A
PLUMBING FIXTURES
WATER SUPPLY WORKS
DRAINAGE WORKS
u.P.V.C PIPE (EXTERNAL) "D" CLASS
PLUMBING SUMMARY
DESCRIPTION
MAN HOLES
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Academic Block)
Plumbing Works
1 2 3 4 5 6 7 = 4 X 6
SCHEDULE ITEMS
1 MAN HOLES:
315 -17 /
Pg:82
Providing manhole type 'C' size 3 feet x 2-1/2 feet (914
mm x 762 mm) (inside dimensions) 7-1/2 feet (2.28 m)
deep as per approved design and specifications
complete for 4 inches to 12 inches (100 mm to 305 mm
) dia. Pipe 7 feet-6 inches to 12 feet (2.28 M to 3.66 m)
depth with 18 inches (457 mm) dia. (inside) cast iron
cover and frame (weight=1 cwt. 3 Qrs.) (88.90 kg.)
fixed in R.C.C. 1:2:4 slab 6 inches (150 mm) thick, 9
inches (229 mm) thick burnt brick masonry walls set in
1:4 C.M., 6 inches (150 mm) thick 1:3:6 C.C. in
foundation, 1:2:4 C.C. in benching and 1/2 inch(13
mm) thick cement plaster in 1:3 C.M., to all inside wall
surfaces, channels and benching etc. and to top
including providing and fixing cast iron foot rest at
every foot of depth and making requisite number of
main and branch channels but excluding the cost of
excavation, back filling, disposal of excavated stuff,
manhole cover and frame.
2 Nos 32,777.77
2 u.P.V.C PIPE (EXTERNAL) "D" CLASS:
306 - 21 / Pg:
57
Providing and fixing un plasticized polyvinyl chloride
pipe (P.V.C) "D" class and specials etc. including
cutting and fitting complete with and including the
cost of cutting trench up to 1-1/2 feet deep refilling,
watering, ramming, and disposal of surplus earth
within one chain and after cleaning the pipe and
cartage within 10 miles (16.09 km.) (working pressure
12 kg/cm2 ) 1-1/4 inches (32 mm) dia.
306 - 27 / Pg:
576" inches (150 mm) dia pipe 120 Rft 509.08
Amount Carried to Plumbing Summary
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2012 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Academic Block)
Plumbing Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2012 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
NON-SCHEDULE ITEMS
PLUMBING FIXTURES:
1
Providing and fixing European type water closet with
(one piece) dual flush Tank with 6.0 liters main flush
tank and 3 liters secondary flush tank, build in S/P-Trap
, Stop cock with flexible pipe as specified by architect
in Fixture schedule, per drawings, specifications and
Engineers Approval.
21 Nos
2
Providing and fixing Eastern water closet with 6 liters
main flush tank, build in S-Trap, Stop cock with Drain
pipe till flush tank as per drawings, specifications and
Engineers Approval.
8 Nos
3
Providing and fixing wash basin with mixer having flow
of 6.0 lpm or less with two (2) nos. Stop cocks, Flexible
Connection , flexible drain pipe to floor drain as
specified by architect in Fixture schedule, per
drawings, specifications and Engineers Approval.
17 Nos
4
Providing and fixing of kitchen/Pantry Sink with mixer,
waste trap, Stop cocks with flexible pipes, Flexible
drain pipe as per drawings , specifications and
engineers approval.
3 Nos
5 Providing and fixing bath toilet accessories as under:
a Toilet Paper Holder 29 Nos
b Hand Spray / Muslim shower 29 Nos
c Liquid Soap Dispenser/ Soap dish 17 Nos
d WC Cleaning Brush 29 Nos
e Robe Hooks 17 Nos
f Towel Railing 17 Nos
Sub Total of Plumbing Fixtures
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Academic Block)
Plumbing Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2012 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
WATER SUPPLY:
1 COLD & HOT WATER PIPING:
Supply, installation, testing and Commissioning of PPR
PN - 20 Cold/Hot water pipes as per DIN 8077-8078
with molded fittings PN - 25 as per DIN 16962, including
pipe supports, cutting, filling, testing/commissioning
and all accessories as indicated on the drawing, as
per specifications and Engineers approval.
i 3/4" dia 830 Rft
ii 1" dia 260 Rft
iii 1 1/4" dia 60 Rft
iv 1 1/2" dia 90 Rft
v 2" dia 260 Rft
2 ISOLATION VALVES:
Providing and fixing of PPR Coated PN-20 Gate valves
of bronze material for diameter 2" and smaller and
Cast Iron material for Diameter greater than 2" as per
specifications and Engineers approval.
i 3/4" dia 2 Nos
ii 1" dia 1 Nos
iii 1 1/4" dia 3 Nos
iv 1 1/2" dia 2 Nos
v 2" dia 3 Nos
3 PLUMBING SPECIALITIES:
Supply and installation of the following including all
fittings, fixings, accessories, etc., as indicated on the
drawing, as per Specifications and Engineers
approval.
i 1/2" dia. Bib Tap 1 Nos.
ii 1" Air Relief Valve - Nos.
4 COLD & HOT WATER PIPE INSULATION:
Supply, installation, testing and Commissioning of
20mm thick closed cell rubber foam inculation (NBR)
for cold & hot water piping, as per specifications and
Engineers approval.
i 3/4" dia 830 Rft
ii 1" dia 260 Rft
iii 1 1/4" dia 60 Rft
iv 1 1/2" dia 90 Rft
v 2" dia 260 Rft
Continued..
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Academic Block)
Plumbing Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2012 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
5 WATER COOLER:
Supply and installation of Stainless Steel Electric water
cooler of below mentioned capacity with two taps, R-
22 Refrigeration system, S.Steel Tank safety tested at
10kg/cm2 (142 p.s.i.) with recommended maximum
working pressure of 3kg/cm2 (42 p.s.i.) including all
accessories like Valves, interconnecting piping, Drain
tray and drain connection s as indicated in the
drawings, as per specifications and engineers
approval.
6 Nos
i WC - 01 to 06 ( Capacity 32 GPH )
6 3 STAGE WATER FILTER:
Supply and installation of 3 stage filter having 5
Microns Pre Filter, Active Carbon Filter and UV Water
filter having minimum flow rate of 200 Gallons per Day
to be installed with Water cooler , including valves,
piping, accessories, etc., as per specifications and
Engineers approval.
6 Nos
7 CEILING HUNG ELECTRIC HEATER:
Providing and fixing of ceiling hung Electric Hot water
heater with all accessories like Clamps, isolation
valves, Air relief valves as indicated in the drawings, as
per specifications and engineers approval.
i EH - 01 ( Capacity 50 litre) 3 Nos
ii EH - 01 ( Capacity 80 litre) 3 Nos
Continued..
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Academic Block)
Plumbing Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2012 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
8 WATER TANK CONNECTION:
Connection for water tank including with valves,
supports, excavation and Backfill, complete all in
accordance with the drawing and specifications.
i 2" Connection to RCC water tanks 2 Nos
ii Connection to overhead water tanks using Float valve 2 Nos
iii Cast Iron Medium Duty Cover For RCC water tanks 2 Nos
Sub Total of Water Supply Works
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Academic Block)
Plumbing Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2012 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
DRAINAGE WORKS:
1 SOIL, WASTE & VENT PIPING:
Providing and fixing, uPVC pipes and fittings as per BS
EN 1329 for above ground installations for Soil, Waste,
Vent pipes with Kite mark on pipes and fittings
including cleanout plug, clamps, hanger collars,
supports, specials (bend, tees, Y-tee etc.) as indicated
on the drawing, as per specifications and Engineers
approval.
i 2" dia 150 Rft
ii 3" dia 380 Rft
iii 4" dia 360 Rft
2 DRAINAGE SPECIALITIES:
Providing and fixing of Multi floor trap with multiple
dia inlet and Single outlet and cleanout plug of the
approved self cleaning design with S.Steel grating as
specified by the architect, as indicated on the
drawing, as per specifications, architectural finishing
schedule and Engineers approval.
30 Nos
Providing and fixing UPVC cowl for vent pipe of the
following dia including all accessories complete in all
respects.
i 2" dia - Nos
ii 3" dia 3 Nos
iii 4" dia 3 Nos
Continued..
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Academic Block)
Plumbing Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2012 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
3 GULLY TRAPS:
Construction of 12" x 12" gully trap with 8" P- trap and
12" x 12" cover (min Weight =45 kg) as specified and
shown on the drawing, as per specifications and
Engineers approval.
3 Nos
Sub Total of Drainage Works
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Academic Block)
Plumbing Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2012 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
FIRE FIGHTING WORKS:
1 FIRE EXTINGUISHERS:
Supply and installation of below mentioned Portable
Fire extinguishers with Wall mount brackets as
indicated on the drawings, as per specifications and
Engineers Recommendation
i 5 Kg C02 wall mounted fire extinguisher 6 Nos
ii 6 Kg Dry powder wall mounted fire extinguisher 6 Nos
Sub Total of Fire Fighting Works
HVAC WORKS
EA Consulting
(Pvt) LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Academic Block)
HVAC Works
S.NO: AMOUNT
A SCHEDULE ITEMS
B NON-SCHEDULE ITEMS
1
2
3
4
5
Total of Non-Schedule Items - B
TOTAL AMOUNT OF 02 NO. BUILDINGS
CARRIED TO GRAND SUMMARY
TOTAL AMOUNT OF 01 NO. BUILDING (A+B)
SHOP DRAWINGS
CIVIL WORKS
Total of Schedule Items
Add ____% Premium on HVAC Works of PWD-2012
Total of Schedule Items with Premium - A
DX-HEAT PUMP TYPE SPLIT A/C UNIT
HVAC FANS
CONDENSATE DRAIN PIPE & INSULATION
HVAC SUMMARY
DESCRIPTION
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Academic Block)
HVAC Works
1 2 3 4 5 6 7 = 4 X 6
SCHEDULE ITEMS
Amount Carried to HVAC Summary
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2012 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Academic Block)
HVAC Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2012 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
NON-SCHEDULE ITEMS
1 DX-HEAT PUMP TYPE SPLIT A/C UNIT:
Supply, Installation, testing, balancing &
commissioning of DX- Heat pump type Split type Air
Conditioning Units, Wall Mounted Decorative type
indoor and condensing unit, as shown on the
drawings, as specified in equipment schedule and as
per technical specifications including thermostat,
copper piping with insulation and Refrigerant Tray on
expose piping, control cable, electric wiring &
accessories, and all needed material required for
installation and to the satisfaction of Engineer
incharge.
GROUND FLOOR:
i DX - 01 ( Capacity - 1.5 TR) - Nos
ii DX - 02 & 03 ( Capacity - 2.0 TR) - Nos
iii DX - 04 to 08 ( Capacity - 2.0 TR) - Nos
FIRST FLOOR:
i DX - 01 ( Capacity - 1.0 TR) - Nos
ii DX - 02 ( Capacity - 1.0 TR) - Nos
iii DX - 03 ( Capacity - 1.0 TR) - Nos
iv DX - 04 ( Capacity - 1.0 TR) - Nos
v DX - 05 ( Capacity - 1.0 TR) - Nos
vi DX - 06 to 10 ( Capacity - 1.5 TR) - Nos
SECOND FLOOR:
i DX - 01 & 02 ( Capacity - 1.5 TR) - Nos
Amount Carried to HVAC Summary
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Academic Block)
HVAC Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2012 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
2 HVAC FANS:
Supply, installation, testing & Commissioning of HVAC
Fans, as per equipment schedule, as shown on the
drawings and as specified in technical specifications
and to the satisfaction of Engineer incharge.
GROUND FLOOR:
i EF - 01 ( 250 CFM ) 1 Nos
ii EF - 02 ( 250 CFM ) 1 Nos
iii EF - 03 ( 250 CFM ) 1 Nos
iv EF - 04 ( 250 CFM ) 1 Nos
v EF - 05 ( 250 CFM ) 1 Nos
vi EF - 06 ( 250 CFM ) 1 Nos
vii EF - 07 ( 250 CFM ) 1 Nos
viii EF - 08 ( 250 CFM ) 1 Nos
FIRST FLOOR:
i EF - 01 ( 250 CFM ) 1 Nos
ii EF - 02 ( 250 CFM ) 1 Nos
iii EF - 03 ( 250 CFM ) 1 Nos
iv EF - 04 ( 250 CFM ) 1 Nos
v EF - 05 ( 250 CFM ) 1 Nos
vi EF - 06 ( 250 CFM ) 1 Nos
vii EF - 07 ( 250 CFM ) 1 Nos
viii EF - 08 ( 250 CFM ) 1 Nos
SECOND FLOOR:
i EF - 01 ( 250 CFM ) 1 Nos
ii EF - 02 ( 250 CFM ) 1 Nos
iii EF - 03 ( 250 CFM ) 1 Nos
iv EF - 04 ( 250 CFM ) 1 Nos
v EF - 05 ( 250 CFM ) 1 Nos
vi EF - 06 ( 250 CFM ) 1 Nos
vii EF - 07 ( 250 CFM ) 1 Nos
viii EF - 08 ( 250 CFM ) 1 Nos
Amount Carried to HVAC Summary
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Academic Block)
HVAC Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2012 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
3 CONDENSATE DRAIN PIPE & INSULATION:
Providing and fixing, uPVC Class 'E' pipes and fittings
as per BS 3505 (EN 1401) with Foam insulation for
Condensate Water drain including fittings, bends,
cuttings, filling etc. as indicated on drawings, as per
specifications and Engineers approval.
i 1" dia 350 RFt
ii 1 1/4" dia 200 RFt
iii 1 1/2" dia 70 RFt
Amount Carried to HVAC Summary
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Academic Block)
HVAC Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2012 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
4 CIVIL WORKS:
Making and cutting in walls, slabs and preparation of
RCC foundation for Condensing Unit and all other
work such as Openings, Penetrations, Pipe Sleeves,
plaster finish etc as directed by Engineer Incharge,
complete in all respect.
1 Job
Amount Carried to HVAC Summary
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Academic Block)
HVAC Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2012 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
5 SHOP DRAWINGS:
Providing Shop Drawings and As Built Drawings in A1
size with Electronic Copies, as specified in technical
specifications, as advised by the Consultant,
complete in all respect.
1 Job
Amount Carried to HVAC Summary
ADMINISTRATION BLOCK
EA Consulting
(Pvt) Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Administration Block)
S.NO: Amount
1 Civil Works
2 Electrical Works
3 ELV Works
4 Plumbing Works
5 HVAC Works
TOTAL CARRIED TO MASTER SUMMARY
GRAND SUMMARY
CIVIL WORKS
EA Consulting
(Pvt) LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Administration Block)
Civil Works
S.NO: Amount
A SCHEDULE ITEMS
1
2
3
4
5
6
7
8
9
10
11 ROOF FINISHES & WATER PROOFING
12 EXTERNAL FINISHES (BUILDING)
13
B NON-SCHEDULE ITEMS
1
2
3
4
5
6
7
8
9
10
11 ROOF FINISHES & WATER PROOFING
12 EXTERNAL FINISHES (BUILDING)
13
WALL FINISHES
Civil SUMMARY
Description
EARTH WORKS
SUB STRUCTURE
SUPER STRUCTURE
MASONRY WORKS
THERMAL & MOISTURE PROTECTION (NOT APPLICABLE)
METAL WORKS
WOOD WORKS
FLOOR FINISHES
THERMAL & MOISTURE PROTECTION (NOT APPLICABLE)
CEILING FINISHES
EXTERNAL FINISHES OTHER THAN BUILDING (NON COVERED
AREA)
Total of Schedule Items
Add ____% Premium on Civil Works of PWD-2012
Total of Schedule Items with Premium - A
EARTH WORKS
SUB STRUCTURE
SUPER STRUCTURE
MASONRY WORKS
Total of Non-Schedule Items - B
TOTAL AMOUNT CARRIED TO GRAND SUMMARY (A+B)
METAL WORKS
WOOD WORKS
FLOOR FINISHES
WALL FINISHES
CEILING FINISHES
EXTERNAL FINISHES OTHER THAN BUILDING (NON COVERED
AREA)
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Administration Block
Building Works (Structure)
1 2 4 5 6 7 = 4 x 6
1
1.1 Code -103,
Item # 2 From ± 0'-0" to -5' - 0" 62800 Cft 100 Cft 613.14
Item # 2+28 From -5' - 0" to -8' - 0" 15210 Cft 100 Cft 690.49
1.2 Code -104
Item #4
38610 Cft 100 Cft 261.80
1.3 Code -117
Item #1
5625 Cft 100 Cft 3,251.34
EARTH WORKS
Excavation for foundation trenches and drains in gravelly soil
and back filling the excavated material in foundation trenches,
plinth or under floor including breaking clods, watering,
consolidation by ramming in layers not exceeding 9 inches (229
mm) in depth to full compaction, dressing and disposal of surplus
excavated stuff as directed lead upto one chain (30.5 R.m) and
lift upto 5 feet (1.52 m).
Filling bajri available at site in foundation plinth or under floor,
etc. including dressing, watering, consolidation by ramming in
layers not exceeding 9 inches (229 mm) in depth to full
compaction, complete within a lead of one chain (30.5 R.m)
and lift of 5 feet (1.52 R.m). etc. complete, including all lifts etc.
complete in all respects as per drawing, standard ,
specifications and as directed by the Engineer.
Providing and laying soling stones 6 inches to 9 inches (152 mm
to 229 mm) size under floors/foundations & where required etc.
including packing with sprawls and chips and consolidating etc.
complete in all respects as per drawing, standard ,
specifications and as directed by the Engineer.
Amount Carried to Civil Summary
Amount
(Pak Rs.)
3
A-SCHEDULE ITEMS
All items under this head (Structure work) to be carried out
as per relevant Section of PWD & technical specifications
(Volume-II), Drawings, BSI/ASTM Standards, complete in all
respect and to the entire satisfaction of the Engineer.
Due to pitch roof second pera of clause No 1.9 of General
conditions of PWD schedule of rates-2012 will be
applicable for the height of the higher side.
S.No
PWD
Schedule 2012
Ref.No
Description QTY Unit Rate
(Pak Rs.)
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Administration Block
Building Works (Structure)
Amount
(Pak Rs.)
3
S.No
PWD
Schedule 2012
Ref.No
Description QTY Unit Rate
(Pak Rs.)
2
2.1 Code -106
Item # 119340 Cft 100 Cft 14,411.43
2.2 Code -106
Item # 12 2100 Cft 100 Cft 15,840.97
2.3 Code -114
Item # 1+134+137 20265 Cft 100 Cft 21,685.85
2.4 Code -114
Item # 4+135+138 2155 Cft 100 Cft 26,704.50
2.5 Code -114
Item # 8+134+137 3550 Cft 100 Cft 22,344.09
SUB STRUCTURE
Providing and laying reinforced cement concrete with using
crushed graded boulders 3/4" inch (19 mm) and down gauge
having a minimum works cube crushing strength of 3750 Ibs. per
sq. inch (23.24 N/mm2 at 28 days) with a mix not leaner than 1:1-
1/2:3 in columns footing of required shape including form work
and its removal, compacting, leveling and curing etc. complete
but excluding the cost of reinforcement, in foundation
basement and plinth etc. complete in all respects as per
drawing, standard , specifications and as directed by the
Engineer. Foundation for any type
(Cylindrical Strength 3000 Psi)
Providing and laying reinforced cement concrete with using
crushed graded boulders 3/4" inch (19 mm) and down gauge
having a minimum works cube crushing strength of 4500 Ibs. per
sq. inch (31.04 N/mm2 at 28 days) with a mix not leaner than
1:1:2 in columns of square or rectangular shape of regular
section including form work and its removal, compacting and
curing etc. but excluding the cost of reinforcement, in
foundation basement and plinth. etc. complete in all respects
as per drawing, standard , specifications and as directed by the
Engineer.
Columns upto plinth
(Cylindrical Strength 3750 Psi)
Providing and laying reinforced cement concrete with using
crushed graded boulders 3/4" inch (19 mm) and down gauge
having a minimum works cube crushing strength of 3750 Ibs. per
sq. inch (23.24 N /mm 2 at 28 days) with a mix not leaner
than 1:1-1/2:3 in plinth beams of required shape and design
including form work and its removal, compacting and curing
etc. but excluding the cost of reinforcement, foundation
basement and plinth etc. complete in all respects as per
drawing, standard , specifications and as directed by the
Engineer. Plinth Beams i/c nibs / projections
(Cylindrical Strength 3000 Psi)
CONCRETE WORKS
Providing and laying in situ 1:4:8 (1 cement 4 sand and 8 coarse
aggregate) cement concrete using crushed graded boulders
3/4" inch (19 mm) and down gauge in foundation, basement
and plinth including form work, compacting, curing and
removal of form work etc. complete, foundation and basement
up to 5 feet (1.52 m) depth and plinth up to 4 feet (1.2 m) height
from ground level etc. complete in all respects as per drawing,
standard , specifications and as directed by the Engineer.
Below plinth beam,situ,walls,tanks, over stone soling or where
required (Cylindrical 1000 Psi)
Providing and laying in situ 1:3:6 (1 cement 3 sand and 6 coarse
aggregate) cement concrete using crushed graded boulders
3/4" inch (19 mm) and down gauge in foundation, basement
and plinth including form work, compacting, curing and
removal of form work, etc. complete, foundation and basement
up to 5 feet (1.52 m) depth and plinth up to 4 feet (1.2 m) height
from ground level etc. complete in all respects as per drawing,
standard , specifications and as directed by the Engineer.
For Cast in situ / mass concrete or where required (Cylindrical
1500 Psi)
REINFORCED CONCRETE WORKS
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Administration Block
Building Works (Structure)
Amount
(Pak Rs.)
3
S.No
PWD
Schedule 2012
Ref.No
Description QTY Unit Rate
(Pak Rs.)
2.6 Code -114
Item # 166
61205 Kg Kg 123.02
2.7 Code -108
Item # 12
32115 Sft 100 Sft 648.08
2.8
13160 Sft Sft
3
3.1 Code -114
Item #
24+135+138 2440 Cft 100 Cft 30,389.36
Item #
24+135+138+92 2940 Cft 100 Cft 31,338.56 Item #
24+135+138+92+
93 2425 Cft 100 Cft 32,090.01
TERMITE PROOFING
Providing and applying Termite control treatment of sub grade
soil, excavated surfaces and fill material with HEPTACHLOR
emulsifiable to 0.5% with clean water or AGENDA 25 EC
containing FIPRONIL or BIFLEX with Bifenthrin or DURSBIN or
TENEKIL PLUS or MIRAGE ALI AKBER GROUP or approved
equivalent as per manufacturer's specifications and instructions.
etc., complete in all respects as per drawing, standard ,
specifications and as directed by the Engineer.
(Note: Plinth Area will be measured one time for payment where
is the number of applications will be three times on all horizontal
& vertical surfaces of the excavation for termite proofing)
Amount Carried to Civil Summary
SUPER STRUCTURE
REINFORCED CONCRETE WORKS
Providing and laying reinforced cement concrete with using
crushed graded boulders 3/4" inch (19 mm) and down gauge
having a minimum works cube crushing strength of 4500 Ibs. per
sq. inch (31.04 N/mm2 at 28 days) with a mix not leaner than
1:1:2 in columns of square or rectangular shape of regular
section including form work and its removal, compacting and
curing etc. but excluding the cost of reinforcement, in the
ground floor etc. complete in all respects as per drawing,
standard , specifications and as directed by the Engineer.
Providing and laying hard grade ribbed deformed (minimum
yield point 60,000 psi or 414 Mpa) reinforcement bars with &
including the cost of straightening, cutting, bending, binding,
wastage, and such overlaps as are not shown in the drawings,
placing in position on cement concrete 1:2:4 precast or Ms.
chairs, tying with binding wire, cost of chairs and wires etc. in all
kinds of RCC work in foundation, basement, plinth and ground
floor of building including septic tanks and under ground tanks
and in projections for future extension.etc. complete in all
respects as per drawing, standard , specifications and as
directed by the Engineer.
(Bars to be cut and placed in position at any level according to
the Bar bending schedule prepared by the contractor and
Providing a coat of bitumen emulsion at 10 Lbs. per % sft. (0.49
Kg/sm) on walls and floor in ground floor etc. complete in all
respects as per drawing, standard , specifications and as
directed by the Engineer.
Amount Carried to Civil Summary
B-NON-SCHEDULE ITEMS
SUB STRUCTURE
Columns (Cylindrical Strength 3750 Psi)
Ground Floor
(±0'-0" to +12'-0")
First Floor
(+12'-0" to +28'-0")
(+28'-0" to +48'-0")
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Administration Block
Building Works (Structure)
Amount
(Pak Rs.)
3
S.No
PWD
Schedule 2012
Ref.No
Description QTY Unit Rate
(Pak Rs.)
3.2 Code -114
Item #
30+135+138 0 Cft 100 Cft 28,692.59
Item #
30+135+138+92 0 Cft 100 Cft 29,641.79 Item #
30+135+138+92
+93 0 Cft 100 Cft 30,393.24
3.3 Code -114
Item #
38+134+137 2430 Cft 100 Cft 24,839.57
Item #
38+134+137+92 1750 Cft 100 Cft 25,788.77 Item #
38+134+137+92
+93 3450 Cft 100 Cft 26,540.22
3.4 Code -114
Item # 38+136 940 Cft 100 Cft 20,668.60
Item # 38+136+92 550 Cft 100 Cft 21,617.80
Item #
38+136+92+93 970 Cft 100 Cft 22,369.25
Providing and laying reinforced cement concrete with using
crushed graded boulders 3/4" inch (19 mm) and down gauge
having a minimum works cube crushing strength of 4500 Ibs. per
sq. inch (31.04 N/mm2 at 28 days) with a mix not leaner than
1:1:2 in straight walls more than 6 inches (152 mm) thick
including form work and its removal, compacting and curing
etc. but excluding the cost of reinforcement, in foundation
basement and plinth etc. complete in all respects as per
drawing, standard , specifications and as directed by the
Engineer.
RCC Wall / Shear Wall (Cylindrical Strength 3750 Psi)
Ground Floor
(±0'-0" to +12'-0")
First Floor
(+12'-0" to +28'-0")
(+12'-0" to +28'-0")
(+28'-0" to +48'-0")
Providing and laying reinforced cement concrete with using
crushed graded boulders 3/4" inch (19 mm) and down gauge
having a minimum works cube crushing strength of 3000 Ibs. per
sq. inch (20.68 N /mm 2 at 28 days) with a mix not leaner
than 1:2:4 in straight beams lintels cantilever beams of required
shape or section including form work and its removal,
compacting and curing etc. but excluding the cost of
reinforcement, in basement and ground floor etc. complete in
all respects as per drawing, standard , specifications and as
directed by the Engineer.
Bracing beams / lintels / nibs / sills / bands /around opening
(Cylindrical Strength 2500 Psi)
Ground Floor
(±0'-0" to +12'-0")
(+28'-0" to +48'-0")
Providing and laying reinforced cement concrete with using
crushed graded boulders 3/4" inch (19 mm) and down gauge
having a minimum works cube crushing strength of 3750 Ibs. per
sq. inch (23.24 N /mm 2 at 28 days) with a mix not leaner
than 1:1-1/2:3 in straight beams lintels cantilever beams of
required shape or section including form work and its removal,
compacting and curing etc. but excluding the cost of
reinforcement, in basement and ground floor etc. complete in
all respects as per drawing, standard , specifications and as
directed by the Engineer.
Beams and projections
(Cylindrical Strength 3000 Psi)
Ground Floor
(±0'-0" to +12'-0")
First Floor
First Floor
(+12'-0" to +28'-0")
(+28'-0" to +48'-0")
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Administration Block
Building Works (Structure)
Amount
(Pak Rs.)
3
S.No
PWD
Schedule 2012
Ref.No
Description QTY Unit Rate
(Pak Rs.)
3.5 Code -114
Item #
56+134+137 3945 Cft 100 Cft 24,314.96
Item #
56+134+137+92 945 Cft 100 Cft 25,264.16 Item #
56+134+137+92
+93 4395 Cft 100 Cft 26,015.61
3.6 Code -114
Item #
57+134+137 1280 Cft 100 Cft 23,691.64
Item #
57+134+137+92 0 Cft 100 Cft 24,640.84 Item #
57+134+137+92
+93 3135 Cft 100 Cft 25,392.29
3.7 Code -114
Item #
50+134+137 575 Cft 100 Cft 30,160.60
Item #
50+134+137+92 320 Cft 100 Cft 31,109.80 Item #
50+134+137+92
+93 0 Cft 100 Cft 31,861.25
Ground Floor
(±0'-0" to +12'-0")
First Floor
(+12'-0" to +28'-0")
(+28'-0" to +48'-0")
Providing and laying reinforced cement concrete with using
crushed graded boulders 3/4" inch (19 mm) and down gauge
having a minimum works cube crushing strength of 3750 Ibs. per
sq. inch (23.24 N /mm 2 at 28 days) with a mix not leaner
than 1:1-1/2:3 in ordinary slab more than 6 inches (152 mm) thick
including form work and its removal compacting and curing etc.
complete but excluding the cost of reinforcement, in basement
plinth and ground floor etc. complete in all respects as per
drawing, standard , specifications and as directed by the
Engineer.
Providing and laying reinforced cement concrete with using
crushed graded boulders 3/4" inch (19 mm) and down gauge
having a minimum works cube crushing strength of 3750 Ibs. per
sq. inch (23.24 N /mm 2 at 28 days) with a mix not leaner
than 1:1-1/2:3 in ordinary slab 5 inches (127 mm) to 6 inches
(152mm) thick including form work and its removal compacting
and curing etc. complete but excluding the cost of
reinforcement, in basement plinth and ground floor etc.
complete in all respects as per drawing, standard ,
specifications and as directed by the Engineer.
Slab i/c projections (straight & sloping)
(Cylindrical Strength 3000 Psi)
Providing and laying reinforced cement concrete with using
crushed graded boulders 3/4" inch (19 mm) and down gauge
having a minimum works cube crushing strength of 3750 Ibs. per
sq. inch (23.24 N /mm 2 at 28 days) with a mix not leaner
than 1:1-1/2:3 in straight stairs and landing of required section
including form work and its removal, compacting and curing
etc. complete but excluding the cost of reinforcement, in
basement plinth and ground floor.etc. complete in all respects
as per drawing, standard , specifications and as directed by the
Engineer.
Stair Case / steps /seats (Steps, Landing
& Waist slab) (Cylindrical Strength 3000 Psi)
Ground Floor
(±0'-0" to +12'-0")
First Floor
(+12'-0" to +28'-0")
Slab i/c projections (straight & sloping)
(Cylindrical Strength 3000 Psi)
Ground Floor
(±0'-0" to +12'-0")
First Floor
(+12'-0" to +28'-0")
(+28'-0" to +48'-0")
(+28'-0" to +48'-0")
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Administration Block
Building Works (Structure)
Amount
(Pak Rs.)
3
S.No
PWD
Schedule 2012
Ref.No
Description QTY Unit Rate
(Pak Rs.)
3.8 Code -114
Item #
114+135+138 225 Cft 100 Cft 33,233.11
3.9 Code -114
Item #
112+135+138370 Cft 100 Cft 33,808.88
3.10 Code -114
Item #
118+135+138215 Cft 100 Cft 30,836.67
3.11 Code -114
Item # 166 39500 Kg Kg 123.02
Item # 166+174 31500 Kg Kg 124.47
Item #
166+174+174 48200 Kg Kg 125.92
Amount Carried to Civil Summary
(+28'-0" to +48'-0")
OH Water Tank Top Slab
(Cylindrical Strength 3750 Psi)
Providing and laying hard grade ribbed deformed (minimum
yield point 60,000 psi or 414 Mpa) reinforcement bars with &
including the cost of straightening, cutting, bending, binding,
wastage, and such overlaps as are not shown in the drawings,
placing in position on cement concrete 1:2:4 precast or Ms.
chairs, tying with binding wire, cost of chairs and wires etc. in all
kinds of RCC work in foundation, basement, plinth and ground
floor of building including septic tanks and under ground tanks
and in projections for future extension.etc. complete in all
respects as per drawing, standard , specifications and as
directed by the Engineer.
(Bars to be cut and placed in position at any level according to
the Bar bending schedule prepared by the contractor and
approved by the Engineer).
Ground Floor
(±0'-0" to +12'-0")
First Floor
(+12'-0" to +28'-0")
Providing and laying reinforced cement concrete with using
crushed graded boulders 3/4" inch (19 mm) and down gauge
having a minimum works cube crushing strength of 4500 Ibs. per
sq. inch (31.04 N/mm2 at 28 days) with a mix not leaner than
1:1:2 in a square of rectangular bottom slab of over head water
tank up to a height of 30 feet (9 m) above ground including
form works and its removal, compacting and curing etc.
complete but excluding the cost of reinforcement .etc.
complete in all respects as per drawing, standard ,
specifications and as directed by the Engineer.
OH Water Tank Bottom Slab
(Cylindrical Strength 3750 Psi)
Providing and laying reinforced cement concrete with using
crushed graded boulders 3/4" inch (19 mm) and down gauge
having a minimum works cube crushing strength of 4500 Ibs. per
sq. inch (31.04 N/mm2 at 28 days) with a mix not leaner than
1:1:2 in straight walls in over head water tank bins, bunkers, intze
tanks and silo up to a height of 30 feet (9 m) above ground
including form works and its removal, compacting and curing
etc. complete but excluding the cost of reinforcement etc.
complete in all respects as per drawing, standard ,
specifications and as directed by the Engineer.
OH Water Tank Walls
(Cylindrical Strength 3750 Psi)
Providing and laying reinforced cement concrete with using
crushed graded boulders 3/4" inch (19 mm) and down gauge
having a minimum works cube crushing strength of 4500 Ibs. per
sq. inch (31.04 N/mm2 at 28 days) with a mix not leaner than
1:1:2 in roof slab of over head water tank up to a height of 30
feet (9 m) above ground including form works and its removal,
compacting and curing etc. complete but excluding the cost of
reinforcement.etc. complete in all respects as per drawing,
standard , specifications and as directed by the Engineer.
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Administration Block
Building Works (Architecture)
1 2 3 4 5 6 7=4 x 6
All items under this head (Architectural work) to be
carried out as per relevant Section of PWD & technical
specifications (Volume-II), Drawings, BSI/ASTM
Standards, complete in all respect and to the entire
satisfaction of the Engineer.
Due to pitch roof second pera of clause No 1.9 of
General conditions of PWD schedule of rates-2012 will be
applicable for the height of the higher side.
4 DPC & MASONRY WORKS
Damp Proof Course (DPC)
4.1 Code -108
Item # 3
Page # 47
+
Code -109
Item # 123
Page # 64
Providing and laying 2 inches (51 mm) thick damp proof
course with cement concrete 1:2:4 cast in situ using graded
crushed boulders (instead of Screened bajri) of 3/4 inch (19
mm) and down gauge mixed with any approved water
proofing agent including compacting, curing form work and
its removal etc. complete, but excluding the cost of water
proofing agent .etc., complete in all respects as per
specifications & relevant drawings and all works to the
satisfaction of the Engineer. 1360 Sft 100 Sft 2,812.71
2" thick DPC
4.2 Code -108
Item # 5
Page # 47
Extra for using water proofing agent pudlo in item Nos. 4.1
(quantity to be used as per manufacturer's
specification/2.50Kg per 100Sft).etc., complete in all respects
as per specifications & relevant drawings and all works to the
satisfaction of the Engineer. 34 Kg Kg 86.10
Solid Block Masonry
4.3 Code-110
&
Code-109
Providing and laying 1:3:6 machine made standard size
6"x8"x12" cement concrete solid block masonry more than 6
inches (152 mm) thick using graded crushed boulders (instead
Screened bajri) 3/4 inch (19 mm) and down gauge set in
cement mortar 1:6 including scaffolding, raking out joints and
curing etc. complete in ground floor superstructure etc.,
complete in all respects as per drawing, standard ,
specifications and direction of the Engineer.
Ground Floor
Code-110
Item #
34+92+100+
Code-109
Item # 120Lev (±0'-0" up to +12'-0") 3805 Cft 100 Cft 16040.34
First Floor
Code-110
Item #
34+70+92+100+
Code-109
Item # 120Lev (+12'-0" up to +28'-0") 4740 Cft 100 Cft 16864.11
Code-110
Item #
34+70+2x71+
92+100+
Code-109
Item # 120Lev (+28'-0" up to +48'-0") 1910 Cft 100 Cft 18223.07
Amount
(Pak Rs.)
A-SCHEDULE ITEMS
S.NoPWD Schedule
2012 Ref.NoDescription Qty Unit
Rate
(Pak Rs.)
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Administration Block
Building Works (Architecture)
1 2 3 4 5 6 7=4 x 6
Amount
(Pak Rs.)
A-SCHEDULE ITEMS
S.NoPWD Schedule
2012 Ref.NoDescription Qty Unit
Rate
(Pak Rs.)
4.4 Code-110
&
Code-109
Providing and laying 1:3:6 machine made standard size
6"x8"x12" cement concrete solid block 4 to 6 inches (102mm
to 152 mm) thick using graded crushed boulders (instead
Screened bajri) 3/4 inch (19 mm) and down gauge set in
cement mortar 1:6 including scaffolding, raking out joints and
curing etc. complete in all respects as per specifications &
relevant drawings and all works to the satisfaction of the
Engineer.
Ground Floor
Code-110
Item #
44+92+100+
Code-109
Item # 120Lev (±0'-0" up to +12'-0") 5882 Cft 100 Cft 16897.84
First Floor
Code-110
Item # 44+70+92+
100+
Code-109
Item # 120 Lev (+12'-0" up to +28'-0") 7410 Cft 100 Cft 17721.61
Code-110
Item #
34+70+2x71+
92+100+
Code-109
Item # 120Lev (+28'-0" up to +48'-0") 2280 Cft 100 Cft 18223.07
4.5 Code-110
Page #
72, 80 & 81
Providing and laying 1:3:6 machine made standard size
6"x8"x12" cement concrete solid block masonry more than 6
inches (152 mm) thick in steps, stairs of approved design using
graded crushed boulders (instead of screened bajri) 3/4 inch
(19 mm) and down gauge set in cement mortar 1:4 including
scaffolding, raking out joints and curing etc. complete in
ground floor superstructure etc., complete in all respects as
per specifications & relevant drawings and all works to the
satisfaction of the Engineer.
Code-110
Item #2+68+74+92
code-109
Item# 120 FOR BLOCK MASONRY STEPS 1150 Cft 100 Cft 17915.71
4.6 Code-112
Item #144
Page # 108
Providing and laying wall ties of mild steel flats of approved
section and design placed at horizontal and vertical spacing
in cavity wall of any description in any floor at any height..850 Kg Kg 181.84
Amount Carried to Civil Summary
5 THERMAL & MOISTURE PROTECTION
Amount Carried to Civil Summary
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Administration Block
Building Works (Architecture)
1 2 3 4 5 6 7=4 x 6
Amount
(Pak Rs.)
A-SCHEDULE ITEMS
S.NoPWD Schedule
2012 Ref.NoDescription Qty Unit
Rate
(Pak Rs.)
6 METAL WORKS
6.1 Code -119
Item # 43
Page # 240
Providing and fixing M.S. molded steel door frame of 4" x 2-
1/2" (102 mm x 64 mm) manufactured from mild steel sheet of
18 gauge (1.41 mm) conforming to BSS. 1245 having a single
rebate size 1-1/2" x 1/2" (38 mm x 13 mm) with provision of 3
Nos. M.S. plate, section 1-1/2" x 1/4" (38 mm x 6 mm), (2 Nos. 6
inch long welded with frame at not less than 10 points and 1
No., 12 inch long welded with frame at not less than 20
points), with holes and threads for fixing steel hinges, fitted
with one locking box of same sheet (point welded inside the
frame), 6 Nos. 6 inches long flat iron fixing lugs, of 1-1/4" x 3/16"
section, treated with special red oxide primer coat all around
including cutting holes and filling the cavity with cement
concrete 1:2:4 etc. in any floor at any height. etc., complete
in all respects as per specifications & relevant drawings and
all works to the satisfaction of the Engineer. 645 Rft Rft 157.12
6.2 Code -119
Item # 44
Page # 240
Providing and fixing M.S. molded steel door frames of 5.73" x 2-
1/2" (146 mm x 63 mm) manufactured from mild steel sheet of
18 gauge (1.41 mm) conforming to B.S.S. 1245 having a
double rebate size 1-1/2" x 1/2" (38 mm x 12 mm) provision of 3
Nos. M.S. plate, section 1-1/2" x 1/4" (38 mm x 6 mm) (2 Nos. 6
inch long welded with frame at not less than 10 points and 1
Nos. 12 inch long welded with frame at not less than 20
points), with holes and threads for fixing steel hinges, fitted
with one locking box of same sheet (point welded inside the
frame), 6 Nos. 6 inches long flat iron fixing lugs of 1-1/4" x 3/16"
section, treated with special red oxide primer coat all around
including cutting holes and filling the cavity with cement
concrete 1:2:4 etc. in any floor at any height complete as
directed by the Engineer-in-Charge
160 Rft Rft 185.34
6.3
Code -122
Item #159
Page # 333
Painting Iron work with synthetic enamel paint of approved
make and shade two coats over and including the cost of
one priming coat at any height in any floor etc., complete in
all respects as per specifications & relevant drawings and all
works to the satisfaction of the Engineer. 825 Sft 100 Sft 2,776.62
6.4
Code -119
Item #102
Page # 251
Providing and fixing fully glazed Bronze anodized or powder
coated aluminum Sliding / fixed & openable /Top hung
windows & ventilators as per British standard manufactured by
Lucky, Alcop, Krudson, Pakistan cable and A.C.P. (fixing
through their approved fabricators) deluxe model box section
95mm x 30mm and 2mm thick including the cost of aluminum
netting ,fittings, with all accessories cutting hole etc. and
making good damages to walls etc. complete as required in
any floor as per direction of engineer-in-charge, but excluding
the cost of glass pans.2860 Sft Sft 568.07
6.5
Code -119
Item #120
Page # 254
Providing and fixing Tinted glass panes 5mm thick to M.S. Box
pipe / Aluminum doors, windows and ventilators etc.
including the cost of labour but excluding the cost of M.S.
square pipe beading, rubber packing and screw in any floor
at any height.
(For Doors, Windows & Fixed Glazing or where instructed)3255 Sft Sft 106.11
6.6
Code -119
Item #119
Page # 254
Providing and fixing plain glass panes 5mm thick to M.S. Box
pipe / Aluminum doors, windows and ventilators etc. including
the cost of labour but excluding the cost of M.S. square pipe
beading, rubber packing and screw in any floor at any height.
(For vision panel of door shutters)120 Sft Sft 88.91
Amount Carried to Civil Summary
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Administration Block
Building Works (Architecture)
1 2 3 4 5 6 7=4 x 6
Amount
(Pak Rs.)
A-SCHEDULE ITEMS
S.NoPWD Schedule
2012 Ref.NoDescription Qty Unit
Rate
(Pak Rs.)
7 WOOD WORKS
Door, windows & partitions Frame
7.1 Code-120
Item # 02
Page # 259
Providing and fixing best quality deodar frames for doors.
windows, ventilators, clerestory windows, shelves, partitions,
trellis work, etc., as required . Complete in all respect as per
drawings, specification and as directed by the Engineer. 110 Cft 100 Cft 4,595.14
Architrave / Beading
7.2 Code-120
Item # 278
Page # 288
Providing and fixing best quality deodar wood projected
beading up to one Sq. inch (6.45 Sqm.) in sections and
required design fixed around the panels of doors, windows
etc., of any description , complete in all respect as per
drawings, specification and as directed by the Engineer. 1450 Rft Rft 35.66
7.3 Code-122
Item # 189
Page # 336
Applying French or spirit polishing, two coat of approved
make on wood work at any height in any floor.645 Sft 100 Sft 1,878.96
Amount Carried to Civil Summary
8 INTERNAL FLOOR FINISHES
8.1 Code-117 Providing and laying 1:5:10 cement concrete bed under floors
using graded stone ballast 3/4 & down instead of 2 inches (51
mm) and down gauge with levelling, ramming, watering and
curing etc. complete.
(under Mosaic & Porcelain tiles).
Item # 3
Page# 190 Ground Floor 970 Cft 100 Cft 9,442.42
Item # 3+25
Page# 190 &192First Floor
740 Cft 100 Cft 9,684.38
Mosaic Tiles
8.2 Code-117 Providing and laying terrazzo floor 1-1/2 inches (38 mm) thick
consisting of 1/2 inch (13 mm) thicktopping 1:2 (one grey
cement 2 approved marble chips No. 0 to 4) in ground floor
over a base of 1:2:4 (one cement, two sand and four
screened graded bajri) cement concrete 1 inch (25 mm) thick
laid in panels or pattern including form work, curing, cutting,
rubbing and polishing etc. complete.Item # 12+17
Page# 191 Ground Floor 9075 Sft 100 Sft 6,163.94
Item # 12+17+25
Page# 191+192 First Floor 6830 Sft 100 Sft 6,405.90
8.3 Code-117 Providing and laying terrazzo floor 1-1/2 inches (38 mm) thick
consisting of 1/2 inch (13 mm) thicktopping 1:2 (one grey
cement 2 approved marble chips No. 0 to 4) in ground floor
over a base of 1:2:4 (one cement, two sand and four
screened graded bajri) cement concrete 1 inch (25 mm) thick
laid in panels or pattern including form work, curing, cutting,
rubbing and polishing etc. complete.
Item # 12
Page# 191 Ground Floor 2270 Sft 100 Sft 5,287.04
Item # 12+25
Page# 191+192 First Floor 1710 Sft 100 Sft 5,529.00
8.4
Code-117
Item # 159
Page # 209
Providing and laying light colour, glazed/non skid vitrified
porcelean tiles (Polished) not exceeding 1600 Sqcm each,
(Pak made) on walls and floors, in any floor, laid with dry bond
(stile bond) over a base of 1" thick cement mortar (1:3)
including jointing to tiles with joint filler of approved quality as
per direction of the Engineer incharge. 790 Sft 100 Sft 2,572.28
Amount Carried to Civil Summary
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Administration Block
Building Works (Architecture)
1 2 3 4 5 6 7=4 x 6
Amount
(Pak Rs.)
A-SCHEDULE ITEMS
S.NoPWD Schedule
2012 Ref.NoDescription Qty Unit
Rate
(Pak Rs.)
9 INTERNAL WALL FINISHES
Internal Wall Plaster
9.1 Code-122 1/2" (13 mm) thick cement plaster 1:6 on wall columns etc. in
basement, plinth, mezzanine and ground floor including
making edges, corners, grooves as specified and curing etc.,
complete in all respects as per specifications & relevant
drawings and all works to the satisfaction of the Engineer.
Ground Floor
Item # 6
Page # 320 Lev (±0'-0" up to +12'-0") 24780 Sft 100 Sft 1,730.74
First Floor
Item # 6+87
Page # 320
& 327 Lev (+12'-0" up to +28'-0") 25560 Sft 100 Sft 1,884.61
Item # 6+87+90
Page # 320, 327
& 328Lev (+28'-0" up to +48'-0") 15695 Sft 100 Sft 2,015.07
Dado & Skirting
9.2 Code-118
Item # 55 + 58
Page# 219
Providing and fixing marble mosaic tile 12" X 6" X 3/4" (305 mm
X 152 X 19 mm) with chips No. 0 to 4 in dado and skirting of
approved design in light shade over 1/2 inch (13 mm) thick
base of cement mortar 1:3 in ground floor setting of tiles in
slurry of grey cement over mortar base including filling of joints
and washing the tiles with cement slurry of matching colour
curing, grinding, rubbing and polishing etc. complete.
Code-118
Item # 55 + 58
Page# 219 Ground Floor 1180 Sft 100 Sft 14,274.50
Code-118
Item # 55 + 58+60
Page# 219First Floor 925 Sft 100 Sft 14,567.19
9.3 Code-122
Item # 151
Page # 333
Distempering with vinyl distemper (ICI) Deluxe Painted of
approved make and shade in two coats over and including
the cost of one priming coat of lime wash including sand
papering, dusting, and filling the holes, cracks and
inequalities, if any, at any height in any floor. 66035 Sft 100 Sft 1,053.54
Puddlo Plaster
9.4 Code-122
Page # 320
3/4'' (19 mm) thick cement plaster (Plain) 1:4 on walls and
columns etc. in basement, plinth, mezzanine and ground floor
including making edges, corners, grooves as specified and
curing etc,complete in all respects as per specifications &
relevant drawings and all works to the satisfaction of the
Engineer.Item # 8+88 O.H.W.T Plaster 740 Sft 100 Sft 2,572.28
9.5 Code-122 Providing and mixing water proofing agent pudlo in cement
mortar of any description in any floor etc., complete in all
respects as per specifications/2.50Kg per 100Sft). & relevant
drawings and all works to the satisfaction of the Engineer.
Item # 30 O.H.W.T 20 Kg Kg 86.15
9.6
Code-117
Item # 159
Page # 209
Providing and laying light colour, glazed/non skid vitrified
porcelean tiles (Polished) not exceeding 1600 Sqcm each,
(Pak made) on walls and floors, in any floor, laid with dry bond
(stile bond) over a base of 1" thick cement mortar (1:3)
including jointing to tiles with joint filler of approved quality as
per direction of the Engineer incharge. 2380 Sft 100 Sft 2,572.28
Amount Carried to Civil Summary
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Administration Block
Building Works (Architecture)
1 2 3 4 5 6 7=4 x 6
Amount
(Pak Rs.)
A-SCHEDULE ITEMS
S.NoPWD Schedule
2012 Ref.NoDescription Qty Unit
Rate
(Pak Rs.)
10 INTERNAL CEILING FINISHES
Internal Ceiling Plaster
10.1 Code-122 1/2" (13 mm) thick cement plaster 1:6 on ceilings cantilever
soffits others etc. in basement, plinth, mezzanine and ground
floor including making edges, corners, grooves as specified
and curing etc., complete in all respects as per specifications
& relevant drawings and all works to the satisfaction of the
Engineer.Ground Floor
Item # 6
Page # 320 Lev (±0'-0" up to +12'-0") 11100 Sft 100 Sft 1,730.74
First Floor
Item # 6+87
Page # 320 &327 Lev (+12'-0" up to +28'-0") 6210 Sft 100 Sft 1,884.61
Item #
6+87+90+90
Page # 320, 327
&328
Lev (+28'-0" up to +48'-0") 4815 Sft 100 Sft 2,145.53
10.2 Code-122
Item # 151
Distempering with vinyl distemper (ICI) Deluxe Painted of
approved make and shade in two coats over and including
the cost of one priming coat of lime wash including sand
papering, dusting, and filling the holes, cracks and
inequalities, if any, at any height in any floor. 22125 Sft 100 Sft 1,053.54
10.3 Code-124
Item # 182
Page# 361
Providing and fixing Gypsum board 2' x 2'x 12mm tiles ceiling
including Aluminum T & L angle 1" x 1" i.c hanger clips jointing
clips and G.I Wire etc. complete as required in any floor.3240 Sft Sft 71.69
Amount Carried to Civil Summary
11 ROOF FINISHES & WATER PROOFING
11.1 Code-117
Item #7+25+26
Page# 190 &192
Providing and laying floor of 3 inches (76 mm) thick 1:2:4
reinforced cement concrete using graded crushed bolders
instead of screened bajri 3/4" (19 mm) and down gauge in
ground floor including form work, consolidation, finishing and
curing etc. complete but excluding the cost of reinforcement.
Item #7+25+26
Page# 190 &192 Lev (+15'-0" up to +24'-0") 1110 Sft 100 Sft 4,531.45
Item #7+25+26
Page# 190 &192 Lev (+24'-0" up to +37'-0") 8000 Sft 100 Sft 4,726.58
Item #7+25+26
Page# 190 &192 Lev (+36'-0" up to +48'-0") 6375 Sft 100 Sft 4,921.71
11.2
Code-108
Item #27
Page# 50
Water proofing of roof slab using Bituflex @ 10 Kg per % sft in
three coats, i/c cleaning /scraping the extra mortar etc. from
the roof surface,and washing the surface with water and
filling the depressions using Bituflex: sand mortar
(1.2).Applyingone one primer coal, over moist surface using a
mix of 50 %Bituflex and 50 % water blirded the surface with
saul any floor in any light. 15485 Sft 100 Sft 685.80
Amount Carried to Civil Summary
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Administration Block
Building Works (Architecture)
1 2 3 4 5 6 7=4 x 6
Amount
(Pak Rs.)
A-SCHEDULE ITEMS
S.NoPWD Schedule
2012 Ref.NoDescription Qty Unit
Rate
(Pak Rs.)
12 EXTERNAL WALL FINISHES (BUILDING)
External Plaster
12.1 Code-122 3/4'' (19 mm) thick cement plaster (Plain) 1:4 on walls and
columns etc. in basement, plinth, mezzanine and ground floor
including making edges, corners, grooves as specified and
curing etc., complete in all respects as per specifications &
relevant drawings and all works to the satisfaction of the
Engineer.Ground Floor
Item # 8
Page # 320 Lev (±0'-0" up to +12'-0") 11417 Sft 100 Sft 2,367.12
First Floor
Item # 8+88
Page # 320 & 327 Lev (+12'-0" up to +24'-0") 11036 Sft 100 Sft 2,572.28
Item # 8+88+91
Page # 320, 327
& 328 Lev (+24'-0" up to +37'-0") 4820 Sft 100 Sft 2,746.22
Item #
8+88+91+91
Page # 320, 327
& 328 Lev (+36'-0" up to +48'-0") 315 Sft 100 Sft 2,920.16
12.2 Code-122
Item # 83
Page # 327
Extra for providing horizontal or vertical joints or grooves 3/8" x
1/4" (9.5 mm x 6.4 mm) size of approved design over item No.
11.1 23970 Sft 100 Sft 518.48
12.3 Code-122 Painting three coats with weather shield paint deluxe (ICI)
make of approved shade on plaster surface (External) and
including the cost of cleaning the surface, sand papering etc.
complete at any height in any floor etc., complete in all
respects as per specifications & relevant drawings and all
works to the satisfaction of the Engineer.
Item # 172 Ground Floor to Roof 24560 Sft 100 Sft 1,406.88
Amount Carried to Civil Summary
13EXTERNAL FINISHES OTHER THAN BUILDING
(NON COVERED AREA)
13.1 Code-122 3/4'' (19 mm) thick cement plaster (Plain) 1:4 on walls and
columns etc. in basement, plinth, mezzanine and ground floor
including making edges, corners, grooves as specified and
curing etc., complete in all respects as per specifications &
relevant drawings and all works to the satisfaction of the
Engineer.
Item # 8+37
Page # 322 Ground Floor 4290 Sft 100 Sft 3,100.23
13.2 Code -108
Item # 5
Page # 47
Extra for using water proofing agent pudlo in item No. 13.1
(quantity to be used as per manufacturer's
specification/2.50Kg per 100Sft).etc., complete in all respects
as per specifications & relevant drawings and all works to the
satisfaction of the Engineer. 58 Kg Kg 86.15
13.3 Code -117
Item # 32
Page # 192
Providing and laying floor of 3/4 inch (19 mm) thick white
marble tiles up to 36 Sq. inch (232 sq.cm) size fine dressed on
the surface without windings in ground floor and laid over 1
inch (25 mm) thick lime mortar 1:2 (one lime, two sand) setting
the tiles with grey cement slurry over lime mortar, jointing &
washing the tiles with white cement slurry including curing,
rubbing and polishing etc. complete, including the cost of
mortar.755 Sft 100 Sft 15,685.68
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Administration Block
Building Works (Architecture)
1 2 3 4 5 6 7=4 x 6
Amount
(Pak Rs.)
A-SCHEDULE ITEMS
S.NoPWD Schedule
2012 Ref.NoDescription Qty Unit
Rate
(Pak Rs.)
HORTICULTURE WORK
13.4 Code-126
Item # 1
Page# 392
Rough dressing of the area for lawn including picking stones,
pebbles, stubble, grass roots and other injurious matters and
breaking of clods complete including disposal of rubbish
within 3 chains (92 m). 3940 Sft 100 Sft 103.32
13.5 Code-126
Item # 6
Page# 392
Supplying and stacking approved garden soil (sweet earth)
free from salts, pebbles and grass roots etc. including all leads
and lifts. 1970 Cft 100 Cft 4,003.42
13.6 Code-126
Item # 7
Page# 392
Spreading approved garden soil (sweet earth) in uniform
thickness including mixing and breaking clods and dressing
fine for grassing including disposal of rubbish within 3 chains
(92 m) complete . 1970 Cft 100 Cft 193.38
13.7 Code-126
Item # 2
Page# 392
Supplying and stacking well decayed cowdung manure from
approved source including all leads and lifts.985 Cft 100 Cft 2,578.40
13.8 Code-126
Item # 3
Page# 392
Spreading cowdung manure and mixing the same up to any
depth in the prepared bed including breaking clods, dressing
fine for grassing, including, disposal of rubbish within 3 chains
(92 m) complete. 985 Cft 100 Cft 107.74
13.9 Code-126
Item # 11
Page# 392
Supply live (Dacca) grass in slabs with earth intact including
all lead and lifts.3940 Sft Sft 17.60
13.10 Code-126
Item # 13
Page# 392
Grassing fine by dribbling grass roots 3" apart including
watering, weeding till such time the grass is set and becomes
green and is fit for mowing 3940 Sft 100 Sft 244.19
13.11 Code-122
Item # 172
Page # 334
Painting three coats with weather shield paint deluxe (ICI)
make of approved shade on plaster surface (External) and
including the cost of cleaning the surface, sand papering etc.
complete at any height in any floor etc., complete in all
respects as per specifications & relevant drawings and all
works to the satisfaction of the Engineer. 500 Sft 100 Sft 1,406.88
Amount Carried to Civil Summary
4 DPC & MASONRY WORKS
38mm thick Diamond jumbolon-Board.
4.1 N.S.I Providing & laying in position 1-1/2"(38mm) thick Diamond
jumbolon-Board from Diamond Foam or approved equivalent
having density 35kg/cum, for cavity wall with rebated edge
as per manufacturer's specifications, as shown in the drawing
etc., complete in all respects as per drawings, specification
and as directed by the Engineer. 0 Sft Sft
Amount Carried to Civil Summary
5 THERMAL & MOISTURE PROTECTION
5.1 N.S.I Providing and applying three coats of 2 component flexible
polymer modified cementitious waterproof coating AQUAFIN-
2C /BASF-Master seal-550/ SIKA top seal -107 or approved
equivalent over RCC slabs and walls of any wet area e.g.
Baths, Kitchens, Balcony's etc, at any height in any floor as per
manufacturer's specifications & recommendations complete
in all respects as per drawings, relevant specifications and as
directed by the Engineer. 410 Sft Sft
Amount Carried to Civil Summary
B-NON SCHEDULE ITEMS
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Administration Block
Building Works (Architecture)
1 2 3 4 5 6 7=4 x 6
Amount
(Pak Rs.)
A-SCHEDULE ITEMS
S.NoPWD Schedule
2012 Ref.NoDescription Qty Unit
Rate
(Pak Rs.)
6 METAL WORKS
MS Screen
6.1 N.S.I Providing, fabricating, welding & fixing in position decorative
MS screen comprising of MS tube 100mm x 50mm x 2.5mm
main outer frame fixed with 100mm x 100mm x 6mm thick MS
angle, design pattern with MS tube100mm x 50mm x 2.5mm
as shown on drawing including all required hard ware &
arrangement for fixing. providing & applying epoxy paint not
less than 300 micron of approved colour & shades as per
manufacturer's specification etc., complete in all respect as
per drawing, standard, specifications and direction of the
Engineer.
NOTE: The contractor shall submit shop drawings (without any
additional cost) for approval prior to start of work. 0.Each Each
6.2 N.S.I Providing, fabricating, welding & fixing in position decorative
MS screen comprising of MS tube 75mm x 50mm x 2.5mm
main outer frame fixed with 75mm x 50mm x 6mm thick MS
angle, design pattern with MS tube75mm x 50mm x 2.5mm as
shown on drawing including all required hard ware &
arrangement for fixing. providing & applying epoxy paint not
less than 300 micron of approved colour & shades as per
manufacturer's specification etc., complete in all respect as
per drawing, standard, specifications and direction of the
Engineer.
NOTE: The contractor shall submit shop drawings (without any
additional cost) for approval prior to start of work. 0.Each Each
S.S Staircase Railing
6.3 N.S.I Providing, fabricating, welding & fixing in position Stainless
Steel grade 304 staircase railing comprising of 50mm dia SS
pipe hand rail, 10mm dia intermediate rail in three stages &
50mm x 6mm thick SS Flate balustrade (2 Flate makes one
balustrade) in alternate steps as shown on drawing including
all required accessories such as base plate, cap, different size
of ss Flate, nuts & bolts etc. fixing arrangement (Drilling &
grouting) etc., with SS hardware etc., complete in all respects
as per drawing, standard, specifications and direction of the
Engineer. 110 Rft Rft
6.4 MS Hand Rail
N.S.I Providing, fabricating, welding & fixing in position MS hand
railing comprising of 50mm dia x 16 Swg MS pipe hand rail,
25mm dia x 16 Swg dia balustrade welded to handrail as
shown in the drawing including all required accessories &
hardware such as base plate, cap, nuts & bolts etc. fixing
arrangement (Drilling & grouting)etc. including three coat of
approved colour enamel paint over one coat od primer
(Paint will be paid in separate item, refer BOQ Item # .....)
complete in all respects as per drawing, standard,
specifications and direction of the Engineer. 180 Rft Rft
6.5 MS Louvered Door
N.S.I Providing, fabricating, welding & fixing in position MS louver
door comprising 100mm x 50mm main tube frame, 18 Swg MS
louvers as shown on drawing, three coat of approved colour
enamel paint over one coat od primer (Paint will be paid in
separate item, refer BOQ Item # .....) etc., including required
hard ware such as hinges, hold fast, Sliding bolt/ALdrop &
china black clour waterproof Shackle Pad lock 76mm,
complete in all respect as per drawing, standard,
specifications and direction of the Engineer.
The contractor shall submit shop drawings (without any
additional cost) for approval prior to start of work. 95 Kg Kg
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Administration Block
Building Works (Architecture)
1 2 3 4 5 6 7=4 x 6
Amount
(Pak Rs.)
A-SCHEDULE ITEMS
S.NoPWD Schedule
2012 Ref.NoDescription Qty Unit
Rate
(Pak Rs.)
Monkey Ladder
6.6 N.S.I Providing, fabricating, welding, bolting & fixing in position MS
Access/Monkey ladder comprising MS Flat steel 2" x 3/8" thick
( Vertical member) weld with 8" x 8" x 3/8" thick steel plate
bolt to Rcc slab, 8" x 3" x 3/8" thick steel plate weld to vertical
flat and bolted to wall, 3/4" dia solid steel bar welded to flat
@ 12" C/C, as shown on drawing, three coat of approved
colour enamel paint over one coat od primer (Paint will be
paid in separate schedule item, refer BOQ Item # .....) etc.,
including required hard ware complete in all respect as per
drawing, standard, specifications and direction of the
Engineer.
The contractor shall submit shop drawings (without any
additional cost) for approval prior to start of work.
210 Kg Kg
6.7 Providing and fixing Anti-Oxidation Aluminum Spacer Bar for
Double Glazing Glass up to 10mm wide including slicon
sealant bead to door, fixed glazing, windows, ventilators or
where required etc. including the cost of rubber gasket
packing and screw etc., in any floor at any height.60 Rft Rft
Sky Light
6.8 N.S.I Providing, fabricating and fixing double glazed waterproof
Roof Skylight comprising of coloured anodized premium
quality heavy duty Aluminum section for framing (consider
Curtain wall section for pricing) of Pakistan Cable or
equivalent approved manufacturers, 12mm thick clear
tempered & laminated glass in inner face, 12 mm air-
gap/spacer & 12mm thick clear tempered glass in outer
face (12mm+12mm air-gap+12mm) including all required
accessories & hardware such as Neoprene Gaskets, silicon
sealant etc. , Skylight to be fixed on top of roof at any height
over Rcc or masonry wall. Complete in all respects as per
drawings, specification and as directed by the Engineer.
(Contractor to submit the shop drawing/detail design without
any cost for approval before start of work) 0 Sft Sft
6.9 N.S.I Providing and fixing Tinted glass panes 6mm thick to wooden
door, fixed glazing, windows, ventilators or where required etc.
including the cost of wooden trim, rubber gasket packing and
screw etc., in any floor at any height.670 Sft Sft
Amount Carried to Civil Summary
7 WOOD WORKS
DOOR SHUTTERS
7.1 N.S.I Providing, Making & fixing in position 1-1/2" (38mm) thick solid
core approved colour Formica finish flush door shutters with &
without vision panel. Comprising of 6mm thick lamination
sheet (manufacturer pressed lamination sheet over lasani
board) on either side, over all around best quality Partal or
approved wood frame 50mm wide horizontal, vertical & cross
/diagonal & 150mm wide lock rail in full length, hollow area
except framing to be filled with the approved rough wood, 1-
1/2" x 1/2" thick Golden teak wood edge lipping all around.
The door shutter mechanically pressed by standard
manufacturers under power driven hydraulic press as
approved by the Engineer, with and without vision glass panel
(vision glass panel will be paid separately, in BOQ item # ....)
including with and without vision glass panel, nails, glue or any
required hardware's and applying solignum for termite
treatment, at any height & any floor etc., complete in all
respects as per drawing, standard , specifications and
direction of the Engineer.
(Note: Cost of Ironmongery such as Hinges, Tower bolts, 1170 Sft
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Administration Block
Building Works (Architecture)
1 2 3 4 5 6 7=4 x 6
Amount
(Pak Rs.)
A-SCHEDULE ITEMS
S.NoPWD Schedule
2012 Ref.NoDescription Qty Unit
Rate
(Pak Rs.)
7.2 N.S.I Providing, Making & fixing in position Solid Phenolic Core
frame less door shutter of approved colour & thickness,
equivalent approved manufacturer, including door
hardware's such as corner fasteners, Auto return Hinges, Latch,
indicator door Locks, Stay, Handle, etc., in any floor & any
height as shown in drawings, complete in all respect as per
drawing, specifications and entire satisfaction of the Engineer 0 Sft Sft
7.3 N.S.I Providing, fabricating and fixing Aluminum frame door
comprising of 17mm thick water proof laminated board
(lamination should be on both side of board) , premium
quality aluminum sections Frame of Pakistan Cable/ Krudson
or equivalent approved manufacturers fixed on Rcc &
masonry surface , fitted in Neoprene Gaskets including all
required Hardware (all hardware should be in stainless steel )
hinges, handles, latch,locks, stays etc. Including silicon
sealant to all external junction between structure and door to
give water/wind proof seal . complete in all respect as per
drawing, standard specifications and direction of the
Engineer.(Contractor to submit the shop drawing for approval 150 Sft Sft
7.4 N.S.I Providing and fixing in position as per drawings & joinery
schedule all of "New ISE" Hong Kong, New Star Japan or
approved equivalent make as per relevant drawings,
contractor to submit the sample / shop drawings for approval
prior to execution etc., complete in all respects as per
drawing, standard , specifications and direction of the
Engineer.S.S Door hinges 4" long 368 Each Each
SS Dead Lock complete set 18 Each Each
SS Pull Handle 12 inch long 34 Each Each
SS Pull Handle 36 inch long 10 Each Each
Motorized Door Lock complete set (Lock body, Cylender
& Liver handle) for rooms 44 Each Each
SS Tower Bolt 24" long 8 Each Each
SS Tower Bolt 8" long 80 Each Each
SS Door stopper 71 Each Each
Stainless Steel Kick plate 3mm thick 100 Sft Sft
Coat & Head Hook 21 Each Each
7.5 Wooden Cabinets
N.S.I Providing making and fixing in position floor mounted lower
cabinets (Pantry etc.) as per drawing at any height / floor,
made of 3/4" thick coloured laminated (both face) Lasani
board shutter free from formaldehyde including all around
OAK wood lipping kitchen cabinet, 3" x 1-1/2" thick Partal
wood frame, complete with all accessories i.e. imported
hinges, locks, magnetic catchers, best quality handles etc.,
including any termite treatment, providing & applying 03
coats of approved colour shade lacquer polish by Jaffar
Brothers or similar approved as per manufacturer's instruction
& specification including all required hardware's for fixing
etc,complete in all respects as per specifications & relevant
drawings and all works to the satisfaction of the Engineer.
(Front face will be measured for payments) 40 Sft Sft
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Administration Block
Building Works (Architecture)
1 2 3 4 5 6 7=4 x 6
Amount
(Pak Rs.)
A-SCHEDULE ITEMS
S.NoPWD Schedule
2012 Ref.NoDescription Qty Unit
Rate
(Pak Rs.)
7.6 N.S.I Providing making and fixing in position wall mounted cabinets
for (Kitchen/Pantry etc.) as per drawing at any height / floor,
made of 3/4" thick colored laminated (both side) Lasani
board shutter free from formaldehyde including all around
Deodar wood lipping 3/8" thick, 3" x 1-1/2" thick Partal wood
frame, 6mm one side laminated Lasani board back complete
with all accessories i.e. imported hinges, locks, magnetic
catchers, best quality handles etc., including any termite
treatment, providing & applying 03 coats of approved colour
shade lacquer polish by Jaffar Brothers or similar approved
equivalent as per manufacturer's instruction & specification
including all required hardware's for fixing etc., complete in all
respects as per specifications & relevant drawings and all
works to the satisfaction of the Engineer. (Front face will be 40 Sft Sft
Amount Carried to Civil Summary
8 INTERNAL FLOOR FINISHES
Porcelain Tiles
8.1 N.S.I Providing and laying light colour, glazed/non skid vitrified
porcelain tiles 12" x 24" (imported but not made od china/Pak
made) on floors, in any floor, laid with dry bond (stile bond)
over a base of 1" thick cement mortar (1:3) including jointing
to tiles with joint filler of approved quality as per direction of
the Engineer in charge. Complete in all respects as per
specifications & relevant drawings and all works to the
satisfaction of the Engineer.
Base price of tile 1800/Sqm.0 Sft Sft
8.2 N.S.I Providing, laying and fixing Per-Polished (Boticena) Marble
Counter Top of approved thickness as per drawing & finishing
schedule activities include 40mm thick RCC slab, 1:4 C.S
mortar with Dry Bond, fixing in wall, cutting/chiseling in RCC /
CC members etc., jointing, grouting, chamfering edging/half
D gola around the counter top, finishing, maintaining proper
level with curing etc. where required complete in all respects
as per specifications and as directed by the Engineer. 75 Sft Sft
8.3 N.S.I Providing and laying Terrazzo tiles 13" x 12" x 1" thick for Treads
with bull nosing & 3nos horizontal V- grooves at any floor
including 1:3 screed bedding with mortar including jointing
with grouting material of approved quality & grinding,
polishing etc. (overall thickness as shown in the drawings)
complete in all respects, as per drawings, specifications and
as directed by the Engineer. 500 Sft Sft
8.4 N.S.I Providing and laying Terrazzo tiles 12" x 6" x 1/2" thick for Risers
at any floor including 1:3 screed bedding with mortar
including jointing with grouting material of approved quality &
grinding, polishing etc. (overall thickness as shown in the
drawings) complete in all respects, as per drawings,
specifications and as directed by the Engineer. 190 Sft Sft
8.5 N.S.I Providing & Laying Natural stone 24" x12" & 12" x12", 1" & 1-
1/2" thick rough finished approved local stone on entrance
steps & floor (straight, curved, arches etc.) with cement sand
mortar 1:2 and in any pattern in as per direction of the
engineer-in-charge including the cost of curing, making the
stone surface rough flat etc. complete in all respects as per
specifications & relevant drawings and all works to the
satisfaction of the Engineer. (at any height any floor) 3590 Sft Sft
Amount Carried to Civil Summary
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Administration Block
Building Works (Architecture)
1 2 3 4 5 6 7=4 x 6
Amount
(Pak Rs.)
A-SCHEDULE ITEMS
S.NoPWD Schedule
2012 Ref.NoDescription Qty Unit
Rate
(Pak Rs.)
9 INTERNAL WALL FINISHES
Porcelain Tiles
9.1 N.S.I Providing and laying light colour, glazed/non skid vitrified
porcelain tiles 12" x 24" (Polished), (imported but not made od
china/Pak made) on walls, in any floor, laid with dry bond
(stile bond) over a base of 1" thick cement mortar (1:3)
including jointing to tiles with joint filler of approved quality as
per direction of the Engineer in charge. Complete in all
respects as per specifications & relevant drawings and all
works to the satisfaction of the Engineer.
Base price of tile 1800/Sqm.0 Sft Sft
Entrance Steps Riser, Dado & Skirting
9.2 N.S.I Providing & Laying Natural stone 24" & 12" x6" x 1/2" thick
rough finished approved local stone on riser, wall/ Dado/
Skirting /coping with cement sand mortar 1:2 in ground floor
setting of stone tiles in slurry of grey cement over mortar base
including filling of joints with cement slurry of matching colour
curing etc. complete. Sft
Amount Carried to Civil Summary
10 INTERNAL CEILING FINISHES
Gypsum board false ceiling
10.1 N.S.I Providing, fabricating and fixing Gypsum board (4'-0" x 8'-0" x
1/2" (12mm) thick false ceiling including adjustable metal
framing suspension system, MS flash gap and required hard
wares jointing tap etc., all cutting for light fixtures & other
design feature with providing & applying three coat of
matte enamel paint of approved make & color shade over
one coat of primer coat, filling putty etc. complete in all
respects as per drawings, relevant specifications and as
directed by the Engineer. (Rates for False Ceiling shall include
Bulkheads, Light Pelmets etc.) 810 Sft Sft
Amount Carried to Civil Summary
11 ROOF FINISHES & WATER PROOFING
Providing & laying complete roof treatment at any floor and
any height as shown in the drawing, details consisting of
following items complete in all respects as per drawing,
standards, specifications and direction of the Engineer.
11.1 N.S.I Providing and laying 1" thick average levelling CC screed
over Rcc slab for achieving leveled surface with (1:4) cement
sand mortar, complete in all respect and as per drawing &
specification and to the entire satisfaction of the Engineer. 1290 Cft Cft
11.2 N.S.I Providing and laying in position Water proofing membrane Hi
Grip Elastomer SUNTAN PP4000 4mm thick from Pak Hy-Oils
limited or approved equivalent over above leveled surface
including primer coating, overlapping (horizontal & vertical)
complete as per manufacturer's specifications, instruction &
as shown in the drawing etc., complete in all respects as per
drawings, specification and as directed by the Engineer. 0 Sft Sft.
11.3 N.S.I Providing & laying in position 1-1/2"(40mm) thick Diamond
jumbolon-Board from Diamond Foam or approved equivalent
having density 35kg/cum, over above Water Proofing
membrane with rebated edge as per manufacturer's
specifications, instruction & as shown in the drawing etc.,
complete in all respects as per drawings, specification and as
directed by the Engineer. 15485 Sft Sft.
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Administration Block
Building Works (Architecture)
1 2 3 4 5 6 7=4 x 6
Amount
(Pak Rs.)
A-SCHEDULE ITEMS
S.NoPWD Schedule
2012 Ref.NoDescription Qty Unit
Rate
(Pak Rs.)
11.4 N.S.I Providing and laying BRC mesh 4" x 4" x 10 swg from Al -
Burhan (Pvt) Ltd or approved equivalent including cutting,
binding with steel binding wire etc. complete in all respects as
per drawings, specifications and as directed by the Engineer.15485 Sft Sft.
Amount Carried to Civil Summary
12 EXTERNAL WALL FINISHES (BUILDING)
12.1 N.S.I Providing and making screen wall 6" thick (with 2" thick
double screen) comprising of 1:2 precast reinforced cement
concrete jali 6" x 6" x 3" (Square shape Jali 3" depth with
approved wall thickness, outer size of jali) in grey colour &
required shape/Pattern including 1/4" dia steel reinforcement
mesh as per design center to center, form works and its
removal, compacting and curing etc. in any floor & any
height, complete in all respects as per specifications &
relevant drawings and all works to the satisfaction of the
Engineer. 1010 Sft Sft
12.2 N.S.I Providing & Laying free fom natural stone wall cladding
random stone 1" & 1-1/2" thick rough finished approved local
stone on wall (straight, curved, arches etc.) with cement sand
mortar 1:2 and in any pattern in as per direction of the
engineer-in-charge including the cost of curing, making the
stone surface smooth etc. complete in all respects as per
specifications & relevant drawings and all works to the
satisfaction of the Engineer. (at any height any floor)3555 Sft Sft
Fair Faced Plaster12.3 N.S.I Providing and applying Ressi Plastorend-110 (6mm thick) with
sealer Silblock of approved grey & beige colour over rough
cast cement sand plaster on external walls, columns or where
required including chamfered edges, round off corner,
scaffolding, curing etc. at any height & any floor etc.,
complete in all respects as per drawing, specifications and or
as directed by the consultant / Engineer. (excluding cost of
rough cast plaster)i) Grey colour 0 Sft Sft
ii) Beige colour 0 Sft Sft
LOGO12.4 N.S.I Providing, making, finishing and fixing in position of university
LOGO, IMAGE & LETTERING. 8'-3" dia LOGO made of 12 swg
MS Sheet with the university symbolic image & letter
"UNIVERSITY OF BALTISTAN SKARDU" (In English & Urdu), fixed to
walls 3" projected with 1" dia & 6" long steel Hilti/rowel bolts
including three coats of approved colour enamel paint over
a one coat of red oxide primer paint etc. complete in all
respects as per specifications & relevant drawings and all
works to the satisfaction of the Engineer. 0.Each Each
12.5 N.S.I Providing, making and finishing lettering "ADMIN "on External
wall with 2" Embossed cement, sand Plaster 1:2 (1 cement & 2
sand) as per drawing dimension includes three coats of
plastic emulsion paint and preparation of surface with filling
manufactured by ICI, all nails, screws, glues etc. complete in
all respects as per specifications & relevant drawings and all
works to the satisfaction of the Engineer. 0.Each Each
Amount Carried to Civil Summary
ELECTRICAL WORKS
EA Consulting
(Pvt) Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Administration Block
Electrical Works
S.NO: AMOUNT
A SCHEDULE ITEMS
1
2
3
4
5
6
B NON-SCHEDULE ITEMS
1
2
3
4
5
6
7
8
"CLIPSAL" ACCESSORIES ON RECESSED METAL BOARD
Electrical SUMMARY
DESCRIPTION
PVC CONDUIT & DUCT
CONDUITS & PIPES
3 WIRE IN PVC RECESSED CONDUIT
CEILING FANS
WALL BRACKET FANS
PLASTIC BODY EXHAUST FANS
Total of Schedule Items
Add ____% Premium on Electrical Works of PWD-2004
Total of Schedule Items with Premium - A
TOTAL AMOUNT CARRIED TO GRAND SUMMARY (A+B)
L.V DISTRIBUTION BOARDS
LOW VOLTAGE CABLES AND WIRES
WIRING ACCESSORIES
LIGHTING FIXTURES
UPS SYSTEM
EARTHING SYSTEM
LIGHTNING PROTECTION SYSTEM (LPS)
Total of Non-Schedule Items - B
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Administration Block
Electrical Works
1 2 3 4 5 6 7 = 4 X 6
SCHEDULE ITEMS
1 2-67 PVC CONDUIT & DUCT
a) 2-67-10 Supply & fixing 50mm (2") dia PVC conduit with all
especial such as bends, sockets, Junction etc
recessed in the in the wall or floor as required.
10 P/Meter 213.65
Amount Carried to Electrical Summary
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Administration Block
Electrical Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
2 2-74 "CLIPSAL" ACCESSORIES ON RECESSED METAL BOARD
a) 2-74-01 Providing & fixing 10 Amps Polycarbonate flame
retardant S.P switch with fancy required gang plate
fixed on die fabricated, powder coated metal board
recessed in wall or column including connection as
required. (E31-36/1/2A Clipsal make)
35 Each. 138.22
b) 2-74-04 Providing & fixing 10 Amps Polycarbonate flame
retardant 2-Pin switch socket unit ( Universal) with
fancy gang plate fixed on die fabricated, powder
coated metal board recessed in wall or column
including connection as required.(E15U Clipsal make)
243 Each. 396.44
c) 2-74-06 Providing & fixing 15 Amps Polycarbonate flame
retardant 3-Pin switch socket unit with fancy gang
plate fixed on die fabricated, powder coated metal
board recessed in wall or column including
connection as required. (Clipsal make)
47 Each. 514.58
d) 2-74-11 Providing & fixing Polycarbonate flame retardant, 400
watts fan dimmer with plate fixed on die fabricated,
powder coated, metal board recessed in the wall or
column including connection as required. (E32V400F
Clipsal make)
24 Each. 943.58
Amount Carried to Electrical Summary
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Administration Block
Electrical Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
3 2-40 3 WIRE IN PVC RECESSED CONDUIT
a) 2-40-02 Wiring for sub-main with 3x 2.5 mm², PVC insulated
wire 300/500 volts grade, single core, stranded copper
conductor wire in 20 mm (3/4")dia PVC conduit
recessed in the wall, column and roof etc as required.
(DB to switch board including wiring between switch
on the same circuit)
495 Meter 141.27
b) 2-40-01 Wiring for sub-main with 3x 1.5 mm², PVC insulated
wire 300/500 volts grade, single core, stranded copper
conductor wire in 20 mm (3/4")dia PVC conduit
recessed in the wall, column and roof etc as required.
(Light point from switch board to point)
2,410 Meter 125.29
c) 2-40-01 Wiring for sub-main with 3x 1.5 mm², PVC insulated
wire 300/500 volts grade, single core, stranded copper
conductor wire in 20 mm (3/4")dia PVC conduit
recessed in the wall, column and roof etc as required.
(Light point to point)
1,205 Meter 125.29
d) 2-40-02 Wiring for sub-main with 3x 2.5 mm², PVC insulated
wire 300/500 volts grade, single core, stranded copper
conductor wire in 20 mm (3/4")dia PVC conduit
recessed in the wall, column and roof etc as required.
(DB to 5/10A outlet)
775 Meter 141.27
e) 2-40-02 Wiring for sub-main with 3x 2.5 mm², PVC insulated
wire 300/500 volts grade, single core, stranded copper
conductor wire in 20 mm (3/4")dia PVC conduit
recessed in the wall, column and roof etc as required.
(Outlet to 5/10A outlet)
600 Meter 141.27
f) 2-40-03 Wiring for sub-main with 3x 4 mm², PVC insulated wire
300/500 volts grade, single core, stranded copper
conductor wire in 20 mm (3/4")dia PVC conduit
recessed in the wall, column and roof etc as required.
(DB to 13A outlet)
755 Meter 185.94
g) 2-40-03 Wiring for sub-main with 3x 4 mm², PVC insulated wire
300/500 volts grade, single core, stranded copper
conductor wire in 20 mm (3/4")dia PVC conduit
recessed in the wall, column and roof etc as required.
(Outlet to 13A outlet)
570 Meter 185.94
h) 2-40-03 Wiring for sub-main with 3x 4 mm², PVC insulated wire
300/500 volts grade, single core, stranded copper
conductor wire in 20 mm (3/4")dia PVC conduit
recessed in the wall, column and roof etc as required.
(DB to 15A outlet)
1,060 Meter 185.94
Amount Carried to Electrical Summary
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Administration Block
Electrical Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
4 2-106 CEILING FANS
a) 2-106-03 Providing & installing 140 Cm (56") sweep ceiling fan
with blades, canopy, strandard length of down rod
including connection with 14.0076" flexable wire
complete as required. (without regulator) Millat/Pak/
Asia/ Younas/Climax/ Royal.
86 Each. 2,088.00
Amount Carried to Electrical Summary
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Administration Block
Electrical Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
5 2-107 WALL BRACKET FANS
a) 2-107-03 Providing & installing 45 Cm (18") sweep wall bracket
fan complete with blades, regulator & pulling cord
switch, fitted on wall or column with GI clip including
connection as required. Millat/Pak/Asia/
Younas/Climax/ Royal.
1 Each. 1,884.00
Amount Carried to Electrical Summary
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Administration Block
Electrical Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
6 2-110 PLASTIC BODY EXHAUST FANS
a) 2-110-01 Providing & installing 20 Cm (8") sweep, Plastic body
Exhaust fan complete with blades, motor, etc fixed in
existing hole including connection with 14/.0076"
flexable wire complete as required. Millat/
Pak/Asia/Younas/Climax/ Royal.
14 Each. 1,286.00
Amount Carried to Electrical Summary
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Administration Block
Electrical Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
NON-SCHEDULE ITEMS
1 CONDUITS & PIPES
a) Supply and installation of following size internal
diameter PVC / uPVC Class-D pipe / Flexible PVC
Conduit as race ways with all accessories, recessed /
surface on wall / column / under floor, as per drawings
and specifications, complete in all respect.
i 38 mm dia uPVC Pipe (Class-D) 50 Rm.
b) Supply and installation of following size UPVC Pipe
Class-D / Road Crossing Sleeves Class-D for Power
cables. Buried in ground / under roads / under floor as per
specification, including excavation for laying of pipe, bricks,
warning tape and backfilling with new and fresh sand (6" under
and 6" above pipe) etc., (whereever required), as shown on the
specifications and drawings, complete in all respect.
i 100mm dia uPVC Conduit (Class-D) 130 Rm.
ii 150mm dia uPVC Conduit (Class-D) 15 Rm.
c) Supply and installation of Pull Boxes (Floor / Wall) with
all installation accessories, as per drawings,
specifications and approved brands, complete in all
respect.
5 No.
d) Providing and Construction of Manhole Size 3'-0" x 3'-0"
x 3'-0" deep, 6"thick, concrete 1:2:4 ratio with 3' round
heavy duty cast iron cover, 100% water proof, as per
specification and as shown on the drawing, complete
in all respect. (For Electrical cables)
2 No.
e) Providing and Construction of Handhole Size 2'-0" x 2'-
0" x 3'-0" deep, 6"thick, concrete 1:2:4 ratio with 2'
round heavy duty cast iron cover, 100% water proof,
as per specification and as shown on the drawing,
complete in all respect. (For Electrical cables)
6 No.
Amount Carried to Electrical Summary
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Administration Block
Electrical Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
2 L.V. DISTRIBUTION BOARDS
a) Supply, installation, testing and commissioning of
following wall mounting / floor standing surface type
Main Distribution Board (MDB), Sub Main Distribution
Boards (SMDB's) and Distribution Board (DB's) made
with 16 SWG sheet metal, dust protected, vermin proof
housing coated with approved color having all the
necessary switching, energy analyzer etc., protections,
as per drawing and specification, complete in all
respect.
i MDB-GF (Admin) with 50 kVAR PFI Panel 1 No.
ii SMDB-GF (Admin) 1 No.
iii DB-GF-1 1 No.
iv DB-GF-2 1 No.
v DB-GF-3 1 No.
vi HDB-GF 1 No.
vii DB-1F-1 1 No.
viii DB-1F-2 1 No.
ix HDB-1F 1 No.
x UDB-GF-1 1 No.
xi UDB-GF-2 1 No.
xii UDB-1F 1 No.
Amount Carried to Electrical Summary
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Administration Block
Electrical Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
3 LOW VOLTAGE CABLES AND WIRES
3.1 Supply, laying, termination, tagging, testing and
commissioning of following size copper conductor
multi core / single core, AL/PVC, AL/PVC/PVC,
unarmoured, 0.6 kV/1 kV, 450/750V or 300/500V
voltage grade copper cable in already laid PVC
conduit / cable tray / trench including all accessories
lugs, cable gland etc. as per drawings and
specification, complete in all respect.
a) 4 Core, AL/PVC/PVC Cable (600/1000V)
i 4C, 120 Sqmm AL/PVC/PVC 75 Rm.
b) 1 Core, AL/PVC Cable as ECC (450/750V)
i 1C, 70 Sqmm AL/PVC 75 Rm.
3.2 Supply, laying, termination, tagging, testing and
commissioning of following size copper conductor
multi core / single core, Cu/PVC, Cu/PVC/PVC,
unarmoured, 0.6 kV/1 kV, 450/750V or 300/500V
voltage grade copper cable in already laid PVC
conduit / cable tray / trench including all accessories
lugs, cable gland etc. as per drawings and
specification, complete in all respect.
a) 4 Core, Cu./PVC/PVC Cable (600/1000V)
i 4C, 35 Sqmm Cu/PVC/PVC 5 Rm.
ii 4C, 16 Sqmm Cu/PVC/PVC 10 Rm.
iii 4C, 10 Sqmm Cu/PVC/PVC 100 Rm.
iv 4C, 6 Sqmm Cu/PVC/PVC 75 Rm.
b) 1 Core, Cu./PVC Cable as ECC (450/750V)
i 1C, 16 Sqmm Cu/PVC 10 Rm.
ii 1C, 10 Sqmm Cu/PVC 100 Rm.
iii 1C, 6 Sqmm Cu/PVC 225 Rm.
Amount Carried to Electrical Summary
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Administration Block
Electrical Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
4 WIRING ACCESSORIES
a) Supply, installation, testing and commissioning of
following 10/13/15/20A, One/Two/Three/Four gang
type switches, Dimmer Switches, Sockets including 16
SWG Sheet Steel powder coated back boxes with
earth terminal, recessed in wall, with all accessories as
per drawigs and specification, complete in all
respects.
i Two Gang Switch 10A 13 No.
ii Three Gang Switch 10A 18 No.
iii Four Gang Switch 10A 10 No.
iv Two Gang Fan Dimmer Switch 10A 31 No.
v 20A, Double Pole Switch with neon indicator 6 No.
vi 13A, 3-Pin Flat 2-Gang Switch Socket Outlet 178 No.
vii 15A, 3-Pin Switch Socket Outlet (Weatherproof type) 3 No.
viii 20A, Flux Outlet 6 No.
ix 32A, 5-Pin Industrial Socket with Plug top 8 No.
b) Supply, installation, testing and commissioning of Floor
Box (imported), 14 SWG Sheet Steel with all
accessories, as per drawings, specifications and site
requirements, complete in all respect.
Note: Excluded of all Sockets and Face plates.
5 No.
Amount Carried to Electrical Summary
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Administration Block
Electrical Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
5 LIGHTING FIXTURES
a) Supply, installation, testing and commissioning of
following Light fixtures complete with starters,
Electronic ballast (unless mention otherwise), lamps,
lamp holders, drivers, mounting accessories etc., as
per drawings and specifications, complete in all
respects. Lighting fixtures sample must be submitted to
consultant for approval.
Note: Refer light fixtures drawings for complete light
fixtures details.
i Surface mounted LED Light Fixture (IP-20) with 1x40W
LED lamp
136 No.
ii Recessed mounted LED Panel Light Fixture (IP-20) with
1x40W LED lamp
55 No.
iii Surface mounted LED Downlight Fixture (IP-20) with
1x20W LED lamp
55 No.
iv Surface mounted LED Downlight Fixture (IP-20) with
1x18W LED lamp
25 No.
v Recessed mounted LED Downlight Fixture (IP-20) with
1x12W LED lamp
29 No.
vi Recessed mounted LED Spot Downlight Fixture (IP-20)
with 1x8W LED lamp
6 No.
vii Wall / Surface mounted LED Bi-Directional Light Fixture
(IP-54) with 2x12W LED lamp
40 No.
viii Recessed mounted LED Ramp Light Fixture (IP-65) with
1x6W LED lamp
24 No.
ix Surface mounted LED Planter Light Fixture (IP-65) with
1x12W LED lamp
6 No.
x Surface / Wall mounted LED Flexible Tube / Strip Light
Fixture (IP-20) with 12W/meter
65 Rm.
b) Supply, installation, testing and commissioning of
following items including all connecting accessories
as per drawings, specifications, complete in all
respects.i Fan Hook M.S.Box with colour coated 86 No.
Amount Carried to Electrical Summary
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Administration Block
Electrical Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
6 UPS SYSTEM
a) Supply, installing, testing and commissioning of True
Online Double Conversion UPS rating 15 kVA Three
Phase in, Three Phase out, minimum 0.9 output power
factor with 10 minutes battery backup, batteries with
related DC cables from UPS to batteries, external By-
pass and all accessories as per specification and
drawings, complete in all respect.
- No.
b) Supply, installing, testing and commissioning of True
Online Double Conversion UPS rating 12 kVA Three
Phase in, Three Phase out, minimum 0.9 output power
factor with 10 minutes battery backup, batteries with
related DC cables from UPS to batteries, external By-
pass and all accessories as per specification and
drawings, complete in all respect.
- No.
Amount Carried to Electrical Summary
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Administration Block
Electrical Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
7 EARTHING SYSTEM
Supply, installation, testing and commissioning of
following items for complete earthing system including
all connecting accessories as per drawings,
specifications and as mentioned in General Notes,
complete in all respects.
a) Supply, installation, testing and commissioning of
following items for complete Power Earthing system,
including Bentonite chemical, other all required
materials and connecting accessories, boring, labor,
tools, transportation etc., as per drawings and
specifications, complete in all respects with detailed
test reports.
i Earth pit with Rod type earth electrode, 20mm dia
and 3 meter long copper rod.
1 No.
b) Supply, installation, testing and commissioning of
following size of PVC insulated Cu. Conductor cable
as earth continuity conductor (ECC) installed on
surface / in appropriate already installed raceway / in
already excavated trench / in already laid pipe, as
per specifications and drawings, complete in all
respect.
i 70 Sq.mm Cu/PVC 10 Rm.
Amount Carried to Electrical Summary
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Administration Block
Electrical Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
8 LIGHTNING PROTECTION SYSTEM (LPS)
a) Supply, installation, testing and commissioning of Early
Streamer Emission (ESE) Air Terminal mounted on 3
meter elevation mast, as per drawing, complete in all
respect and having following specifications:
1 No.
* Efficiency: 60 micro seconds
* Lightning current withstanding test (10/350µs): 100 kA
* ESE Central Rod: Nickel Plated Copper
* Metal Housing : Stainless Steel 316L
* Protection Radius : min 52 meter at 3 meter height
* Built-In Flash Counter and Remote Testing
b) Supply and installation of 3 meter high elevation mast
consisting mounting bracket for installation and fixing
of ESE Air Terminal, as per drawing, specification and
site requirement necessary for the system, complete in
all respect.
1 No.
c) Supply and installation of lightning flash counter as per
drawing, specification and site requirement necessary
for the system, complete in all respect.
1 No.
d) Supply, installation, testing and commissioning of
complete Earthing pit with Rod type earth electrode,
20mm dia and 3 meter long copper rod, including
Bentonite chemical, other all required materials and
connecting accessories, boring, labor, tools,
transportation etc., as per drawings and
specifications, complete in all respects with detailed
test reports.
1 No.
e) Supply and installation of Test Clamp and Guard Tube
2m in length, as per drawing, specification, and site
requirement necessary for the functioning of the
system, complete in all respect.
1 Job
f) Supply, laying, testing and commissioning of 1x70
Sq.mm PVC insulated Cu. conductor cable in already
installed 38mm dia uPVC Pipe down from roof on the
elevation of the building & at ground level
connecting Lightning protection pits to power
earthing pits, including all fixing accessories etc., as
per drawings, specification & site requirement
necessary for the functioning of the system, complete
in all respect.
15 Rm.
Amount Carried to Electrical Summary
ELV WORKS
EA Consulting
(Pvt) Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Administration Block
ELV Works
S.NO: AMOUNT
A SCHEDULE ITEMS
1
B NON-SCHEDULE ITEMS
1
2
3
4
5
6
7
8
ELV SUMMARY
DESCRIPTION
PVC CONDUIT & DUCT
CCTV SYSTEM
Total of Schedule Items
Add ____% Premium on ELV Works of PWD--2004
Total of Schedule Items with Premium - A
CONDUITS & PIPES
VOICE, DATA COMMUNICATION & CCTV CABLING SYSTEMS (Passive
Equipment Only)
PUBLIC ADDRESS / VOICE EVACUATION SYSTEM
Total of Non-Schedule Items - B
TOTAL AMOUNT CARRIED TO GRAND SUMMARY (A+B)
ACCESS CONTROL SYSTEM
ADDRESSABLE FIRE ALARM SYSTEM
SELF CONTAINED EMERGENCY LIGHTS
CABLE TELEVISION SYSTEM (CATV)
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Administration Block
ELV Works
1 2 3 4 5 6 7 = 4 X 6
SCHEDULE ITEMS
1 2-67 PVC CONDUIT & DUCT
a) 2-67-10 Supply & fixing 50mm (2") dia PVC conduit with all
especial such as bends, sockets, Junction etc
recessed in the in the wall or floor as required.
335 P/Meter 213.65
Amount Carried to ELV Summary
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Administration Block
ELV Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
NON-SCHEDULE ITEMS
1 CONDUITS & PIPES
a) Supply and installation of following size internal
diameter PVC / uPVC Class-D pipe / Flexible PVC
Conduit as race ways with all accessories, recessed /
surface on wall / column / under floor, as per drawings
and specifications, complete in all respect.
i 25 mm dia Flexible PVC Conduit 25 Rm.
b) Supply and installation of following size UPVC Pipe
Class-D / Road Crossing Sleeves Class-D for
Telecommunication Cable (copper / optic fiber). Buried in
ground / under roads / under floor as per specification, including
excavation for laying of pipe, bricks, warning tape and backfilling
with new and fresh sand (6" under and 6" above pipe) etc.,
(whereever required), as shown on the specifications and
drawings, complete in all respect.
i 100mm dia uPVC Conduit (Class-D) 10 Rm.
c) Supply and installation of Pull Boxes (Floor / Wall) with
all installation accessories, as per drawings,
specifications and approved brands, complete in all
respect.
19 No.
d) Providing and Construction of Handhole Size 2'-0" x 2'-
0" x 2'-0" deep, 6"thick, concrete 1:2:4 ratio with 2'
round heavy duty cast iron cover, 100% water proof,
as per specification and as shown on the drawing,
complete in all respect. (For Electrical cables)
1 No.
Amount Carried to ELV Summary
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Administration Block
ELV Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
2
VOICE, DATA COMMUNICATION & CCTV CABLING
SYSTEMS (Passive Equipment Only)
a) Supply, installation, testing and commissioning of
following Data / Voice Cabinets, for patch panel,
Fiber panels, adapter, PDU's, Fans and space for
active switches as it may require to complete the
entire passive and active network as per the single
line diagram, drawings and specifications, complete
in all respect.
i 42U Data Rack with PDU's (800mmx1000mm) 3 No.
ii 12U Data Rack with PDU's (800mmx800mm) 2 No.
b) Supply, installation, testing and commissioning of
Single RJ-45, Cat-6 outlet for Voice with shutter type
and 16 SWG back box including tagging, as per
drawing and specification, complete in all respect.
7 No.
c) Supply, installation, testing and commissioning of
Single RJ-45, Cat-6 outlet for Data with shutter type
and 16 SWG back box including tagging, as per
drawing and specification, complete in all respect.
90 No.
d) Supply, installation, testing and commissioning of Dual
RJ-45, Cat-6 outlet for Voice & Data with shutter type
and 16 SWG back box including tagging, as per
drawing and specification, complete in all respect.
91 No.
e) Supply, installation, testing and commissioning of Dual
RJ-45, Cat-6 outlet for Data with shutter type and 16
SWG back box including tagging, as per drawing and
specification, complete in all respect.
1 No.
f) Supply, installation, testing and commissioning of
Single RJ-45, Cat-6 outlet for Camera with shutter type
and 16 SWG back box including tagging, as per
drawing and specification, complete in all respect.
8 No.
g) Supply, installation, testing and commissioning of
Single RJ-45, Cat-6 outlet for Projector with shutter type
and 16 SWG back box including tagging, as per
drawing and specification, complete in all respect.
3 No.
h) Supply, installation, testing and commissioning of
Single RJ-45, Cat-6 outlet for Bio Metric Machine with
shutter type and 16 SWG back box including tagging,
as per drawing and specification, complete in all
respect.
1 No.
j) Supply, laying, termination, testing and commissioning
of CAT 6 - 4 pair cable for Single RJ-45 outlet (Data,
Voice, Camera, Projector and Access control system)
in 25mm dia PVC conduit concealed / surface from
each outlet to IDF racks, including tagging and piping
with all necessary accessories, complete in all respect.
5,920 Rm.
k) Supply, installation, testing and commissioning of 24
port shutter type Cat 6, RJ 45 UTP Patch Panel fully
loaded with tool less jacks and rear cable manager,
as per drawing and specification, complete in all
respect.
11 No.
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Administration Block
ELV Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
l) Supply, installation, testing and commissioning of 24
port Single Mode Fiber Patch Panel fully loaded with
pigtails etc., and rear cable manager, as per drawing
and specification, complete in all respect.
3 No.
m) Supply, installation, testing and commissioning of 19"
front/rear (as required) cable organizer between
patch panels and active equipment to provide patch
cable management including with all necessary
accessories, as per drawing and specification,
complete in all respect.
14 No.
n) Supply, installation, testing and commissioning of CAT-
6 UTP (RJ-45 to RJ-45) for the above Patch Panels
including with all necessary accessories, as per
drawing and specification, complete in all respect.
i CAT-6 (1m) Long Patch Cord 293 No.
ii CAT-6 (2m) Long Patch Cord 293 No.
o) Supply, laying, termination, testing and commissioning
of Cat-5e, 25 pair cable from IDF rack to remaining IDF
racks in already laid conduit / cable tray including
with all the necessary accessories as per drawing and
specifications, complete in all respect.
120 Rm.
p) Supply, laying, termination, testing and commissioning
of 8 Core Multi mode Fiber Optic Cable from IDF rack
to remaining IDF Racks in already installed cable tray /
conduit, as shown in drawings including termination
and tagging at both ends, as per standard
specifications with all termination accessories up to
entire satisfaction of IT Engineer.
60 Rm.
q) Supply, installing, testing and commissioning of
following blocks in Data racks, as per drawing and
specification, complete in all respect.
i 1x100 Pair IDC Block 1 No.
ii 1x50 Pair IDC Block 2 No.
r) Supply, installation, testing and commissioning of PABX
with Analog (8+300) Nos. trunck ports E & M Ports with
Analog extensions Ports including auto attendant
multiple voice recording and all required accessories,
as per drawing and specification, complete in all
respect.
1 No.
s) Installation, testing and commissioning by
Manufacturer Authorized Agent / Dealer and handing
over complete Voice & Data System to Owner with
Providing Training voice data fuke & OTDR Testing, as
build drawing, Rack layouts and certification's
Principal, complete equipment's Manual and
Warranty Documents to Owners representative.
1 Job.
Amount Carried to ELV Summary
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Administration Block
ELV Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
3 PUBLIC ADDRESS / VOICE EVACUATION SYSTEM
a) Supply, laying, termination, testing and commissioning
of Wiring for complete PA System with 2C - 1.5 Sq.mm
shielded, twisted pair Fire Resistant Cable in 25 mm dia
PVC conduit concealed as per drawing and
specification. Complete in all respect.
255 Rm.
b) Supply, wiring and testing of PA Microphone points
with Microphone Cable in 25mm dia PVC Conduit,
recessed / surface in wall and ceiling, complete in all
respects.
1 Job.
c) Supply, installation, testing and commissioning of PA
System complete with all connecting accessories
comprising of the following equipment, as per
drawing and specification, complete in all respects.
i Remote Microphone for upto 3 Zones with frequency
response 100 Hz to 20 KHz and unidirectional electret
condenser microphone gooze neck table type with
RJ45 connector with shielded twisted pair cable with
indicators for power, failure, broadcast switch,
covered switch, as per drawing and specification,
complete in all respects.
1 No.
ii System Manager with built in Amplifier for 4 channel
and built in Modular type massage manager with
2x150W Power Amplifier module with frequency
response 40 Hz to 20 KHz and 100V output voltage
(EN54 compliant), as per drawing and specification,
complete in all respects.
1 No.
iii Power supply manager with RJ45 female connector
for connecting the system and cascade connection
with shielded twisted pair straight cable and with
indications battery check, charging circuit failure,
battery failure (EN54 compliant), as per drawing and
specification, complete in all respects.
1 No.
iv Providing & Connecting of Inter Connects Cables etc. 1 Job.
v 19' Rack Cabinet with Glass Door to accommodate
above equipment's located at Security room as per
drawing and specification, complete in all respects.
1 No.
d) Supply, installation, testing and commissioning of
following type Speakers of Architect Approved color,
as per drawing and specification, complete in all
respects.i 6W Ceiling mounted Speakers with Tapping
Transformers (1,1.5,3,4.5,6W), EN54 Compliant.
21 No.
e) Installation, testing and commissioning, Programming
by Manufacturer Authorized Agent / Dealer and
handing over complete PA System to Owner with
providing training, SOP, complete equipment's
manual and warranty documents to Owners
representative.
1 Job.
Amount Carried to ELV Summary
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Administration Block
ELV Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
4 CCTV SYSTEM
Supply, installation, testing and commissioning of
following items for CCTV System, described below
including all accessories, as per the single line
diagram and specification, complete in all respect.
a) Supply, installation, testing and commissioning of 2 MP
IP based camera with 1/2.8" CMOS 3.3 TO 12mm
varfocal lens, power adopter, wall mounted bracket,
and IP-65 housing, complete in all respect with fixing
accessories, as per drawing and specifications,
complete in all respect.
8 No.
b) Installation, testing, commissioning, programming by
Manufacturer Authorized Agent / Dealer and handing
over complete CCTV System to Owner with providing
training, SOP, complete equipment's manual and
warranty documents to owners representative.
1 Job.
Amount Carried to ELV Summary
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Administration Block
ELV Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
5 ACCESS CONTROL SYSTEM
a) Supply, installation, testing and commissioning of 2
Door Controller LAN Based with power supply, as per
drawings and specification, complete in all respect,
complete in all respect with fixing accessories, as per
drawing and specifications, complete in all respect.
- No.
b) Supply, installation, testing and commissioning of BIO
Proximity Card Reader, as per drawings and
specification, complete in all respect.
- No.
c) Supply, installation, testing and commissioning of Exit
Control Push Button, as per drawings and
specification, complete in all respect.
- No.
d) Supply, installation, testing and commissioning of
Electromagnetic Door Lock with matching power
supply, as per drawings and specification, complete
in all respect.
- No.
e) Supply, installation, testing and commissioning of
Access control Enterprise Software with enterprise level
time attendance software integrated with IP Based
CCTV System. Complete in all respect.
- No.
f) Supply, installation, testing and commissioning of Core
i7 PC for enterprise software, as per drawing and
specifications, complete in all respect.
- No.
g) Supply, installation, testing and commissioning of PVC
Card for Reader, complete with Printer and cartridge
kit, as per drawing and specifications, complete in all
respect.
- No.
h) Installation, testing, commissioning & programming by
Manufacturer Authorized Agent / Dealer and handing
over complete Access Control System to Owner with
providing training, SOP, complete equipment's
manual and warranty documents to Owner's
Representative.
- Job.
Amount Carried to ELV Summary
NOT APPLICABLE
NOT APPLICABLE
NOT APPLICABLE
NOT APPLICABLE
NOT APPLICABLE
NOT APPLICABLE
NOT APPLICABLE
NOT APPLICABLE
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Administration Block
ELV Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
6 ADDRESSABLE FIRE ALARM SYSTEM
a) Supply, laying, termination, testing and commissioning
of wiring for complete Fire Alarm System with 2C-1.5
Sq.mm shielded FP-200, twisted pair Fire Resistant
Cable (2 hrs. rated) in 25mm dia PVC conduit
concealed, (M.S conduit for surface.) etc., including
any wiring between fire alarm control panel and
other's systems control panel's etc. Complete in all
respect.
565 Rm.
b) Supply, installation, testing and commissioning of
Addressable Photoelectric Smoke Detector with base
and back box, as per drawing and specification,
complete in all respect.
68 No.
c) Supply, installation, testing and commissioning of
Addressable Photoelectric Heat Detector with base
and back box, as per drawing and specification,
complete in all respect.
4 No.
d) Supply, installation, testing and commissioning of
Addressable Manual Pull Station / Call Point with base
and back box, as per drawing and specification,
complete in all respect.
12 No.
e) Supply, installation, testing and commissioning of
Addressable Sounder with flasher / Strobe and base
and back box, as per drawing and specification,
complete in all respect.
12 No.
f) Supply, installation, testing and commissioning of 01
Loop Addressable Fire Alarm Control Panel (FACP),
including all necessary accessories, identification
tagging etc. and 3Hrs battery back up. FACP as per
drawing and specification, complete in all respect.
1 No.
g) Installation, testing and commissioning, Softwear,
Programming by Manufacturer Authorized Agent /
Dealer and handing over complete Fire Alarm system
to owner with providing training, SOP, complete
equipment's manual and warranty documents to
Owner's Representative.
1 Job.
Amount Carried to ELV Summary
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Administration Block
ELV Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
7 SELF CONTAINED EMERGENCY LIGHTS
Supply, installation, testing and commissioning of
following items for self contained emergency lights
with all fixing accessories, as per drawing and
specification, complete in all respect.
a) 3W, Emergency light with self contained Battery,
Ceiling / Surface mounted IP-20 rated, UL 924 Listed,
as per specification and drawing, complete in all
respect. (non-maintained)
46 No.
b) 3W, Emergency light with self contained Battery,
Ceiling / Surface mounted IP-65 rated, UL 924 Listed,
as per specification and drawing, complete in all
respect. (non-maintained)
6 No.
c) 3W, Exit light with self contained Battery, 24m viewing,
Directional Pandent, IP-65 rated, UL 924 Listed, as per
specification and drawing, complete in all respect.
(non-maintained)
24 No.
Note: Selection of Exit Light is as per Architect's
approval.
Amount Carried to ELV Summary
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Administration Block
ELV Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
8 CABLE TELEVISION SYSTEM (CATV)
a) Supply, installation, testing and commissioning of TV
outlet face plate with 16 SWG back box, complete in
all respects.
1 No.
b) Supply and installation of CATV 1x4 Way TVJB Splitter
Box, complete in all respects.
1 No.
c) Supply and installation of CATV RG-06 Co-axial 75
ohms shielded cable in 25mm dia PVC conduit from
box to TV outlet, complete in all respects.
25 Rm.
Amount Carried to ELV Summary
PLUMBING WORKS
EA Consulting
(Pvt) LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Administration Block)
Plumbing Works
S.NO: AMOUNT
A SCHEDULE ITEMS
1
2
B NON-SCHEDULE ITEMS
1
2
3
4
PLUMBING SUMMARY
DESCRIPTION
MAN HOLES
u.P.V.C PIPE (EXTERNAL) "D" CLASS
FIRE FIGHTING WORKS
Total of Schedule Items
Add ___% Premium on Plumbing Works of PWD-2012
Total of Schedule Items with Premium - A
PLUMBING FIXTURES
WATER SUPPLY WORKS
DRAINAGE WORKS
Total of Non-Schedule Items - B
TOTAL AMOUNT CARRIED TO GRAND SUMMARY (A+B)
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Admin Block)
Plumbing Works
1 2 3 4 5 6 7 = 4 X 6
SCHEDULE ITEMS
1 MAN HOLES:
315 -17 /
Pg:82
Providing manhole type 'C' size 3 feet x 2-1/2 feet (914
mm x 762 mm) (inside dimensions) 7-1/2 feet (2.28 m)
deep as per approved design and specifications
complete for 4 inches to 12 inches (100 mm to 305 mm
) dia. Pipe 7 feet-6 inches to 12 feet (2.28 M to 3.66 m)
depth with 18 inches (457 mm) dia. (inside) cast iron
cover and frame (weight=1 cwt. 3 Qrs.) (88.90 kg.)
fixed in R.C.C. 1:2:4 slab 6 inches (150 mm) thick, 9
inches (229 mm) thick burnt brick masonry walls set in
1:4 C.M., 6 inches (150 mm) thick 1:3:6 C.C. in
foundation, 1:2:4 C.C. in benching and 1/2 inch(13
mm) thick cement plaster in 1:3 C.M., to all inside wall
surfaces, channels and benching etc. and to top
including providing and fixing cast iron foot rest at
every foot of depth and making requisite number of
main and branch channels but excluding the cost of
excavation, back filling, disposal of excavated stuff,
manhole cover and frame.
4 Nos 32,777.77
2 u.P.V.C PIPE (EXTERNAL) "D" CLASS:
306 - 21 / Pg:
57
Providing and fixing un plasticized polyvinyl chloride
pipe (P.V.C) "D" class and specials etc. including
cutting and fitting complete with and including the
cost of cutting trench up to 1-1/2 feet deep refilling,
watering, ramming, and disposal of surplus earth
within one chain and after cleaning the pipe and
cartage within 10 miles (16.09 km.) (working pressure
12 kg/cm2 ) 1-1/4 inches (32 mm) dia.
306 - 27 / Pg:
576" inches (150 mm) dia pipe 60 Rft 509.08
Amount Carried to Plumbing Summary
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2012 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Admin Block)
Plumbing Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2012 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
NON-SCHEDULE ITEMS
PLUMBING FIXTURES:
1
Providing and fixing European type water closet with
(one piece) dual flush Tank with 6.0 liters main flush
tank and 3 liters secondary flush tank, build in S/P-Trap
, Stop cock with flexible pipe as specified by architect
in Fixture schedule, per drawings, specifications and
Engineers Approval.
13 Nos
2
Providing and fixing Eastern water closet with 6 liters
main flush tank, build in S-Trap, Stop cock with Drain
pipe till flush tank as per drawings, specifications and
Engineers Approval.
4 Nos
3
Providing and fixing wash basin with mixer having flow
of 6.0 lpm or less with two (2) nos. Stop cocks, Flexible
Connection , flexible drain pipe to floor drain as
specified by architect in Fixture schedule, per
drawings, specifications and Engineers Approval.
15 Nos
4
Providing and fixing of kitchen/Pantry Sink with mixer,
waste trap, Stop cocks with flexible pipes, Flexible
drain pipe as per drawings , specifications and
engineers approval.
4 Nos
5
Providing and fixing of Shower head with shower mixer
having maximum flow of 9.5 lpm, as specified by
architect in Fixture schedule, per drawings,
specifications and Engineers Approval.
1 Nos
6 Providing and fixing bath toilet accessories as under:
a Toilet Paper Holder 17 Nos
b Hand Spray / Muslim shower 17 Nos
c Liquid Soap Dispenser/ Soap dish 15 Nos
d WC Cleaning Brush 17 Nos
e Robe Hooks 15 Nos
f Towel Railing 15 Nos
Sub Total of Plumbing Fixtures
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Admin Block)
Plumbing Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2012 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
WATER SUPPLY:
1 COLD & HOT WATER PIPING:
Supply, installation, testing and Commissioning of PPR
PN - 20 Cold/Hot water pipes as per DIN 8077-8078
with molded fittings PN - 25 as per DIN 16962, including
pipe supports, cutting, filling, testing/commissioning
and all accessories as indicated on the drawing, as
per specifications and Engineers approval.
i 3/4" dia 570 Rft
ii 1" dia 200 Rft
iii 1 1/4" dia 30 Rft
iv 1 1/2" dia 280 Rft
v 2" dia 30 Rft
2 ISOLATION VALVES:
Providing and fixing of PPR Coated PN-20 Gate valves
of bronze material for diameter 2" and smaller and
Cast Iron material for Diameter greater than 2" as per
specifications and Engineers approval.
i 3/4" dia 1 Nos
ii 1" dia 1 Nos
iii 1 1/4" dia 1 Nos
iv 1 1/2" dia 5 Nos
v 2" dia 1 Nos
3 PLUMBING SPECIALITIES:
Supply and installation of the following including all
fittings, fixings, accessories, etc., as indicated on the
drawing, as per Specifications and Engineers
approval.
i 1/2" dia. Bib Tap 1 Nos.
ii 1" Air Relief Valve - Nos.
4 COLD & HOT WATER PIPE INSULATION:
Supply, installation, testing and Commissioning of
20mm thick closed cell rubber foam inculation (NBR)
for cold & hot water piping, as per specifications and
Engineers approval.
i 3/4" dia 570 Rft
ii 1" dia 200 Rft
iii 1 1/4" dia 30 Rft
iv 1 1/2" dia 280 Rft
v 2" dia 30 Rft
Continued..
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Admin Block)
Plumbing Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2012 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
5 WATER COOLER:
Supply and installation of Stainless Steel Electric water
cooler of below mentioned capacity with two taps, R-
22 Refrigeration system, S.Steel Tank safety tested at
10kg/cm2 (142 p.s.i.) with recommended maximum
working pressure of 3kg/cm2 (42 p.s.i.) including all
accessories like Valves, interconnecting piping, Drain
tray and drain connection s as indicated in the
drawings, as per specifications and engineers
approval.
4 Nos
i WC - 01 to 04 ( Capacity 32 GPH )
6 3 STAGE WATER FILTER:
Supply and installation of 3 stage filter having 5
Microns Pre Filter, Active Carbon Filter and UV Water
filter having minimum flow rate of 200 Gallons per Day
to be installed with Water cooler , including valves,
piping, accessories, etc., as per specifications and
Engineers approval.
4 Nos
7 CEILING HUNG ELECTRIC HEATER:
Providing and fixing of ceiling hung Electric Hot water
heater with all accessories like Clamps, isolation
valves, Air relief valves as indicated in the drawings, as
per specifications and engineers approval.
i EH - 01 ( Capacity 50 litre) 2 Nos
ii EH - 01 ( Capacity 80 litre) 2 Nos
Continued..
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Admin Block)
Plumbing Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2012 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
8 WATER TANK CONNECTION:
Connection for water tank including with valves,
supports, excavation and Backfill, complete all in
accordance with the drawing and specifications.
i 2" Connection to RCC water tanks 2 Nos
iiConnection to overhead water tanks using Float
switch2 Nos
iii Cast Iron Medium Duty Cover For RCC water tanks 2 Nos
Sub Total of Water Supply Works
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Admin Block)
Plumbing Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2012 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
DRAINAGE WORKS:
1 SOIL, WASTE & VENT PIPING:
Providing and fixing, uPVC pipes and fittings as per BS
EN 1329 for above ground installations for Soil, Waste,
Vent pipes with Kite mark on pipes and fittings
including cleanout plug, clamps, hanger collars,
supports, specials (bend, tees, Y-tee etc.) as indicated
on the drawing, as per specifications and Engineers
approval.
i 2" dia 150 Rft
ii 3" dia 380 Rft
iii 4" dia 260 Rft
2 DRAINAGE SPECIALITIES:
Providing and fixing of Multi floor trap with multiple
dia inlet and Single outlet and cleanout plug of the
approved self cleaning design with S.Steel grating as
specified by the architect, as indicated on the
drawing, as per specifications, architectural finishing
schedule and Engineers approval.
24 Nos
Providing and fixing UPVC cowl for vent pipe of the
following dia including all accessories complete in all
respects.
i 2" dia - Nos
ii 3" dia 2 Nos
iii 4" dia 2 Nos
Continued..
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Admin Block)
Plumbing Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2012 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
3 GULLY TRAPS:
Construction of 12" x 12" gully trap with 8" P- trap and
12" x 12" cover (min Weight =45 kg) as specified and
shown on the drawing, as per specifications and
Engineers approval.
5 Nos
Sub Total of Drainage Works
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Admin Block)
Plumbing Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2012 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
FIRE FIGHTING WORKS:
1 FIRE EXTINGUISHERS:
Supply and installation of below mentioned Portable
Fire extinguishers with Wall mount brackets as
indicated on the drawings, as per specifications and
Engineers Recommendation
i 5 Kg C02 wall mounted fire extinguisher 6 Nos
ii 6 Kg Dry powder wall mounted fire extinguisher 6 Nos
Sub Total of Fire Fighting Works
HVAC WORKS
EA Consulting
(Pvt) LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Administration Block)
HVAC Works
S.NO: AMOUNT
A SCHEDULE ITEMS
B NON-SCHEDULE ITEMS
1
2
3
4
5
HVAC SUMMARY
DESCRIPTION
CIVIL WORKS
Total of Schedule Items
Add ___% Premium on HVAC Works of PWD-2012
Total of Schedule Items with Premium - A
DX-HEAT PUMP TYPE SPLIT A/C UNIT
HVAC FANS
CONDENSATE DRAIN PIPE & INSULATION
Total of Non-Schedule Items - B
TOTAL AMOUNT CARRIED TO GRAND SUMMARY (A+B)
SHOP DRAWINGS
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Admin Block)
HVAC Works
1 2 3 4 5 6 7 = 4 X 6
SCHEDULE ITEMS
Amount Carried to HVAC Summary
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2012 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Admin Block)
HVAC Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2012 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
NON-SCHEDULE ITEMS
1 DX-HEAT PUMP TYPE SPLIT A/C UNIT:
Supply, Installation, testing, balancing &
commissioning of DX- Heat pump type Split type Air
Conditioning Units, Wall Mounted Decorative type
indoor and condensing unit, as shown on the
drawings, as specified in equipment schedule and as
per technical specifications including thermostat,
copper piping with insulation and Refrigerant Tray on
expose piping, control cable, electric wiring, hanger
supports & accessories, and all needed material
required for installation and to the satisfaction of
Engineer incharge.
GROUND FLOOR:
i DX - 01 ( Capacity - 1.5 TR) - Nos
ii DX - 02 ( Capacity - 1.5 TR) - Nos
iii DX - 03 ( Capacity - 1.0 TR) - Nos
iv DX - 04 ( Capacity - 1.0 TR) - Nos
FIRST FLOOR:
i DX - 01 ( Capacity - 1.5 TR) - Nos
ii DX - 02 ( Capacity - 1.0 TR) - Nos
iii DX - 03 ( Capacity - 2.0 TR) - Nos
iv DX - 04 ( Capacity - 1.0 TR) - Nos
v DX - 05 to 10 ( Capacity - 1.5 TR) - Nos
vi DX - 11 to 14 ( Capacity - 1.5 TR) - Nos
SECOND FLOOR:
i DX - 01 & 02 ( Capacity - 1.5 TR) - Nos
Amount Carried to HVAC Summary
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Admin Block)
HVAC Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2012 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
2 HVAC FANS:
Supply, installation, testing & Commissioning of HVAC
Fans, as per equipment schedule, including hanger &
supports and as per shown on the drawings and as
specified in technical specifications and to the
satisfaction of Engineer incharge.
GROUND FLOOR:
i EF - 01 ( 250 CFM ) 1 Nos
ii EF - 02 ( 250 CFM ) 1 Nos
iii EF - 03 ( 250 CFM ) 1 Nos
iv EF - 04 ( 250 CFM ) 1 Nos
v EF - 05 ( 250 CFM ) 1 Nos
vi EF - 06 ( 250 CFM ) 1 Nos
vii EF - 07 ( 250 CFM ) 1 Nos
viii EF - 08 ( 250 CFM ) 1 Nos
ix EF - 09 ( 250 CFM ) 1 Nos
FIRST FLOOR:
i EF - 01 ( 250 CFM ) 1 Nos
ii EF - 02 ( 250 CFM ) 1 Nos
iii EF - 03 ( 250 CFM ) 1 Nos
iv EF - 04 ( 250 CFM ) 1 Nos
v EF - 05 ( 250 CFM ) 1 Nos
vi EF - 06 ( 250 CFM ) 1 Nos
vii EF - 07 ( 250 CFM ) 1 Nos
viii EF - 08 ( 250 CFM ) 1 Nos
ix EF - 09 ( 250 CFM ) 1 Nos
x EF - 10 ( 250 CFM ) 1 Nos
Amount Carried to HVAC Summary
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Admin Block)
HVAC Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2012 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
3 CONDENSATE DRAIN PIPE & INSULATION:Providing and fixing, uPVC Class 'E' pipes and fittings
as per BS 3505 (EN 1401) with Foam insulation for
Condensate Water drain including fittings, bends,
cuttings, filling, hanger & supports etc. as indicated on
drawings, as per specifications and Engineers
approval.i 1" dia 490 RFt
ii 1 1/4" dia 230 RFt
iii 1 1/2" dia 70 RFt
Amount Carried to HVAC Summary
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Admin Block)
HVAC Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2012 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
4 CIVIL WORKS:
Making and cutting in walls, slabs and preparation of
RCC foundation for Condensing Unit and all other
work such as Openings, Penetrations, Pipe Sleeves,
plaster finish etc as directed by Engineer Incharge,
complete in all respect.
1 Job
Amount Carried to HVAC Summary
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Admin Block)
HVAC Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2012 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
5 SHOP DRAWINGS:
Providing Shop Drawings and As Built Drawings in A1
size with Electronic Copies, as specified in technical
specifications, as advised by the Consultant,
complete in all respect.
1 Job
Amount Carried to HVAC Summary
MAIN GATE GUARD & UGWT
EA Consulting
(Pvt) Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Main Gate Guard
& UGWT)
S.NO: Amount
1 Civil Works
2 Electrical Works
3 ELV Works
4 Plumbing Works
TOTAL CARRIED TO MASTER SUMMARY
GRAND SUMMARY
CIVIL WORKS
EA Consulting
(Pvt) LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Main Gate Guard & UGWT)
Civil Works
S.NO: Amount
A SCHEDULE ITEMS
1
2
3
4
5
6
7
8
9
10
11 ROOF FINISHES & WATER PROOFING
12 EXTERNAL FINISHES (BUILDING)
13
B NON-SCHEDULE ITEMS1
2
3
4
5
6
7
8
9
10
11 ROOF FINISHES & WATER PROOFING
12 EXTERNAL FINISHES (BUILDING)
Total of Non-Schedule Items - B
TOTAL AMOUNT CARRIED TO GRAND SUMMARY (A+B)
METAL WORKS
WOOD WORKS
FLOOR FINISHES
WALL FINISHES
CEILING FINISHES
THERMAL & MOISTURE PROTECTION (NOT APPLICABLE)
CEILING FINISHES
EXTERNAL FINISHES OTHER THAN BUILDING (NON COVERED
AREA)
Total of Schedule Items
Add ____% Premium on Civil Works of PWD-2012
Total of Schedule Items with Premium - A
EARTH WORKS
SUB STRUCTURE
SUPER STRUCTURE
MASONRY WORKS
WALL FINISHES
Civil SUMMARY
Description
EARTH WORKS
SUB STRUCTURE
SUPER STRUCTURE
MASONRY WORKS
THERMAL & MOISTURE PROTECTION (NOT APPLICABLE)
METAL WORKS
WOOD WORKS
FLOOR FINISHES
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTTIES
(Main Gate Guard & UGWT)
Building Works (Structure)
1 2 4 5 6 7 = 4 x 6
1
1.1 Code -103,
Item # 2 From ± 0'-0" to -5' - 0" 35060 Cft 100 Cft 613.14
Item # 2+28 From -5' - 0" to -8' - 0" 11370 Cft 100 Cft 690.49
Item # 2+28+28 From -5' - 0" to -8' - 0" 5270 Cft 100 Cft 767.84
Item #
2+28+28+28 From -5' - 0" to -8' - 0" 5270 Cft 100 Cft 845.19
1.2 Code -104
Item #4
7170 Cft 100 Cft 261.80
1.3 Code -117
Item #1
1115 Cft 100 Cft 3,251.34
EARTH WORKS
Excavation for foundation trenches and drains in gravelly soil
and back filling the excavated material in foundation
trenches, plinth or under floor including breaking clods,
watering, consolidation by ramming in layers not exceeding
9 inches (229 mm) in depth to full compaction, dressing and
disposal of surplus excavated stuff as directed lead upto one
chain (30.5 R.m) and lift upto 5 feet (1.52 m).
Filling bajri available at site in foundation plinth or under floor,
etc. including dressing, watering, consolidation by ramming
in layers not exceeding 9 inches (229 mm) in depth to full
compaction, complete within a lead of one chain (30.5 R.m)
and lift of 5 feet (1.52 R.m). etc. complete, including all lifts
etc. complete in all respects as per drawing, standard ,
specifications and as directed by the Engineer.
Providing and laying soling stones 6 inches to 9 inches (152
mm to 229 mm) size under floors/foundations & where
required etc. including packing with sprawls and chips and
consolidating etc. complete in all respects as per drawing,
standard , specifications and as directed by the Engineer.
Amount Carried to Civil Summary
Amount
(Pak Rs.)
3
A-SCHEDULE ITEMS
All items under this head (Structure work) to be carried
out as per relevant Section of PWD & technical
specifications (Volume-II), Drawings, BSI/ASTM
Standards, complete in all respect and to the entire
satisfaction of the Engineer.
Due to pitch roof second pera of clause No 1.9 of
General conditions of PWD schedule of rates-2012 will
be applicable for the height of the higher side.
S.No
PWD
Schedule 2012
Ref.No
Description QTY Unit Rate
(Pak Rs.)
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTTIES
(Main Gate Guard & UGWT)
Building Works (Structure)
Amount
(Pak Rs.)
3
S.No
PWD
Schedule 2012
Ref.No
Description QTY Unit Rate
(Pak Rs.)
2
2.1 Code -106
Item # 113575 Cft 100 Cft 14,411.43
2.2 Code -106
Item # 12 810 Cft 100 Cft 15,840.97
2.3 Code -114
Item # 1+134+137 11670 Cft 100 Cft 21,685.85
2.4 Code -114
Item # 4+135+138 1070 Cft 100 Cft 26,704.50
2.5 Code -114
SUB STRUCTURE
Providing and laying reinforced cement concrete with using
crushed graded boulders 3/4" inch (19 mm) and down
gauge having a minimum works cube crushing strength of
3750 Ibs. per sq. inch (23.24 N/mm2 at 28 days) with a mix
not leaner than 1:1-1/2:3 in columns footing of required
shape including form work and its removal, compacting,
leveling and curing etc. complete but excluding the cost of
reinforcement, in foundation basement and plinth etc.
complete in all respects as per drawing, standard ,
specifications and as directed by the Engineer.
Foundation for any type
(Cylindrical Strength 3000 Psi)
Providing and laying reinforced cement concrete with using
crushed graded boulders 3/4" inch (19 mm) and down
gauge having a minimum works cube crushing strength of
4500 Ibs. per sq. inch (31.04 N/mm2 at 28 days) with a mix
not leaner than 1:1:2 in columns of square or rectangular
shape of regular section including form work and its removal,
compacting and curing etc. but excluding the cost of
reinforcement, in foundation basement and plinth. etc.
complete in all respects as per drawing, standard ,
specifications and as directed by the Engineer.
Columns upto plinth
(Cylindrical Strength 3750 Psi)
Providing and laying reinforced cement concrete with using
crushed graded boulders 3/4" inch (19 mm) and down
gauge having a minimum works cube crushing strength of
3750 Ibs. per sq. inch (23.24 N /mm 2 at 28 days) with a mix
not leaner than 1:1-1/2:3 in straight walls more than 6 inches
(152 mm) thick including form work and its removal,
compacting and curing etc. but excluding the cost of
reinforcement, in foundation basement and plinth etc.
complete in all respects as per drawing, standard ,
specifications and as directed by the Engineer.
CONCRETE WORKS
Providing and laying in situ 1:4:8 (1 cement 4 sand and 8
coarse aggregate) cement concrete using crushed graded
boulders 3/4" inch (19 mm) and down gauge in foundation,
basement and plinth including form work, compacting,
curing and removal of form work etc. complete, foundation
and basement up to 5 feet (1.52 m) depth and plinth up to 4
feet (1.2 m) height from ground level etc. complete in all
respects as per drawing, standard , specifications and as
directed by the Engineer.
Below plinth beam,situ,walls,tanks, over stone soling or where
required (Cylindrical 1000 Psi)
Providing and laying in situ 1:3:6 (1 cement 3 sand and 6
coarse aggregate) cement concrete using crushed graded
boulders 3/4" inch (19 mm) and down gauge in foundation,
basement and plinth including form work, compacting,
curing and removal of form work, etc. complete, foundation
and basement up to 5 feet (1.52 m) depth and plinth up to 4
feet (1.2 m) height from ground level etc. complete in all
respects as per drawing, standard , specifications and as
directed by the Engineer.
For Cast in situ / mass concrete or where required (Cylindrical
1500 Psi)
REINFORCED CONCRETE WORKS
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTTIES
(Main Gate Guard & UGWT)
Building Works (Structure)
Amount
(Pak Rs.)
3
S.No
PWD
Schedule 2012
Ref.No
Description QTY Unit Rate
(Pak Rs.)
Item #
30+134+137 285 Cft 100 Cft 24,922.64
2.6 Code -114
Item #
64+134+137 90 Cft 100 Cft 25,033.18
2.7 Code -114
Item # 8+134+137 1000 Cft 100 Cft 22,344.09
2.8 Code -114
Item #
99+135+138 2570 Cft 100 Cft 23,123.76
2.9 Code -114
Item #
104+135+138 770 Cft 100 Cft 28,412.51
RCC Wall / Shear Wall (Cylindrical Strength 3000Psi)
UGWTank Bottom Slab
(Cylindrical Strength 3750 Psi)
Providing and laying reinforced cement concrete with using
crushed graded boulders 3/4" inch (19 mm) and down
gauge having a minimum works cube crushing strength of
4500 Ibs. per sq. inch (31.04 N/mm2 at 28 days) with a mix
not leaner than 1:1:2 in top slab of rectangular
underground water tank or septic tank including form work
and its removal, compacting and curing etc. but excluding
the cost of reinforcement, foundation basement and
plinth.etc. complete in all respects as per drawing, standard
, specifications and as directed by the Engineer.
UGWTank Top Slab
(Cylindrical Strength 3750 Psi)
Providing and laying reinforced cement concrete with using
crushed graded boulders 3/4" inch (19 mm) and down
gauge having a minimum works cube crushing strength of
3750 Ibs. per sq. inch (23.24 N /mm 2 at 28 days) with a mix
not leaner than 1:1-1/2:3in flat circular slab more than 6
inches (152 mm) thick including form work and its removal,
compacting and curing etc. complete but excluding the
cost of reinforcement, in basement plinth and ground floor
etc. complete in all respects as per drawing, standard ,
specifications and as directed by the Engineer.
Circular Slab
(Cylindrical Strength 3000 Psi)
Providing and laying reinforced cement concrete with using
crushed graded boulders 3/4" inch (19 mm) and down
gauge having a minimum works cube crushing strength of
3750 Ibs. per sq. inch (23.24 N /mm 2 at 28 days) with a mix
not leaner than 1:1-1/2:3 in plinth beams of required shape
and design including form work and its removal, compacting
and curing etc. but excluding the cost of reinforcement,
foundation basement and plinth etc. complete in all
respects as per drawing, standard , specifications and as
directed by the Engineer.
Plinth Beams i/c nibs / projections
(Cylindrical Strength 3000 Psi)
Providing and laying reinforced cement concrete with using
crushed graded boulders 3/4" inch (19 mm) and down
gauge having a minimum works cube crushing strength of
4500 Ibs. per sq. inch (31.04 N/mm2 at 28 days) with a mix
not leaner than 1:1:2 in foundation or bottom slab of
rectangular underground water tank or septic tank including
form work and its removal, compacting and curing etc. but
excluding the cost of reinforcement, tn foundation basement
and plinth.etc. complete in all respects as per drawing,
standard , specifications and as directed by the Engineer.
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTTIES
(Main Gate Guard & UGWT)
Building Works (Structure)
Amount
(Pak Rs.)
3
S.No
PWD
Schedule 2012
Ref.No
Description QTY Unit Rate
(Pak Rs.)
2.10 Code -114
Item #
101+135+138 1935 Cft 100 Cft 28,723.31
2.11 Code -114
Item #
38+135+138 175 Cft 100 Cft 28,609.52
2.12 Code -114
Item # 166
61290 Kg Kg 123.02
2.13 Code -108
Item # 12
12425 Sft 100 Sft 648.08
2.14 Code -124
Item # 93
165 Rft Rft 500.16
Providing and laying reinforced cement concrete with using
crushed graded boulders 3/4" inch (19 mm) and down
gauge having a minimum works cube crushing strength of
4500 Ibs. per sq. inch (31.04 N/mm2 at 28 days) with a mix
not leaner than 1:1:2 in walls of rectangular underground
water tank or septic tank including form work and its
removal, compacting and curing etc. but excluding the cost
of reinforcement, tn foundation basement and plinth.etc.
complete in all respects as per drawing, standard ,
specifications and as directed by the Engineer.
UGWTank Walls
(Cylindrical Strength 3750 Psi)
Providing and laying reinforced cement concrete with using
crushed graded boulders 3/4" inch (19 mm) and down
gauge having a minimum works cube crushing strength of
4500 Ibs. per sq. inch (31.04 N/mm2 at 28 days) with a mix
not leaner than 1:1-1/2:3 in straight beams lintels cantilever
beams of required shape or section including form work and
its removal, compacting and curing etc. but excluding the
cost of reinforcement, in basement and ground floor etc.
complete in all respects as per drawing, standard ,
specifications and as directed by the Engineer.
Beams (Cylindrical Strength 3750 Psi)
Providing and laying hard grade ribbed deformed (minimum
yield point 60,000 psi or 414 Mpa) reinforcement bars with &
including the cost of straightening, cutting, bending, binding,
wastage, and such overlaps as are not shown in the
drawings, placing in position on cement concrete 1:2:4
precast or Ms. chairs, tying with binding wire, cost of chairs
and wires etc. in all kinds of RCC work in foundation,
basement, plinth and ground floor of building including
septic tanks and under ground tanks and in projections for
future extension.etc. complete in all respects as per drawing,
standard , specifications and as directed by the Engineer.
(Bars to be cut and placed in position at any level
according to the Bar bending schedule prepared by the
contractor and approved by the Engineer).
Providing a coat of bitumen emulsion at 10 Lbs. per % sft.
(0.49 Kg/sm) on walls and floor in ground floor etc. complete
in all respects as per drawing, standard , specifications and
as directed by the Engineer.
Providing and fixing plain polyvinyl chloride (PVC) water
stops 12" (305 mm) wide in vertical or horizontal expansion
joints including cutting and jointing complete in all floors etc.
complete in all respects as per drawing, standard ,
specifications and as directed by the Engineer.
Amount Carried to Civil Summary
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTTIES
(Main Gate Guard & UGWT)
Building Works (Structure)
Amount
(Pak Rs.)
3
S.No
PWD
Schedule 2012
Ref.No
Description QTY Unit Rate
(Pak Rs.)
2.15
2855 Sft Sft
3
3.1 Code -114
Item #
24+135+138 575 Cft 100 Cft 30,389.36 Item #
24+135+138+92+9
3 1920 Cft 100 Cft 32,090.01 Item #
24+135+138+92+
93x2 800 Cft 100 Cft 32,841.46
Item #
24+135+138+92+
93x4 1590 Cft 100 Cft 34,344.36 Item #
24+135+138+92+
93x6 1590 Cft 100 Cft 35,847.26 Item #
24+135+138+92+
93x8 1590 Cft 100 Cft 37,350.16 Item #
24+135+138+92+
93x10 935 Cft 100 Cft 38,853.06
SUB STRUCTURE
TERMITE PROOFING
Providing and applying Termite control treatment of sub
grade soil, excavated surfaces and fill material with
HEPTACHLOR emulsifiable to 0.5% with clean water or
AGENDA 25 EC containing FIPRONIL or BIFLEX with Bifenthrin
or DURSBIN or TENEKIL PLUS or MIRAGE ALI AKBER GROUP or
approved equivalent as per manufacturer's specifications
and instructions. etc., complete in all respects as per
drawing, standard , specifications and as directed by the
Engineer.
(Note: Plinth Area will be measured one time for payment
where is the number of applications will be three times on all
horizontal & vertical surfaces of the excavation for termite
proofing)
Amount Carried to Civil Summary
SUPER STRUCTURE
B-NON-SCHEDULE ITEMS
Third Floor
Fourth Floor
Fifth Floor
Sixth Floor
REINFORCED CONCRETE WORKS
Providing and laying reinforced cement concrete with using
crushed graded boulders 3/4" inch (19 mm) and down
gauge having a minimum works cube crushing strength of
4500 Ibs. per sq. inch (31.04 N/mm2 at 28 days) with a mix
not leaner than 1:1:2 in columns of square or rectangular
shape of regular section including form work and its removal,
compacting and curing etc. but excluding the cost of
reinforcement, in the ground floor etc. complete in all
respects as per drawing, standard , specifications and as
directed by the Engineer.
Columns (Cylindrical Strength 3750 Psi)
Ground Floor
First Floor
Second Floor
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTTIES
(Main Gate Guard & UGWT)
Building Works (Structure)
Amount
(Pak Rs.)
3
S.No
PWD
Schedule 2012
Ref.No
Description QTY Unit Rate
(Pak Rs.)
3.2 Code -114
Item #
38+134+137 310 Cft 100 Cft 24,839.57
Item #
38+134+137+92+9
3 2360 Cft 100 Cft 26,540.22 Item #
38+134+137+92
+93x2 840 Cft 100 Cft 27,291.67
Item #
38+134+137+92
+93x4 1645 Cft 100 Cft 28,794.57 Item #
38+134+137+92
+93x6 1670 Cft 100 Cft 30,297.47 Item #
38+134+137+92
+93x8 370 Cft 100 Cft 31,800.37 Item #
38+134+137+92
+93x10 390 Cft 100 Cft 33,303.27
3.3 Code -114
Item #
56+134+137 365 Cft 100 Cft 24,314.96
Item #
56+134+137+92+9
3 1440 Cft 100 Cft 26,015.61
Item #
56+134+137+92
+93x2 580 Cft 100 Cft 26,767.06
Item #
56+134+137+92
+93x4 845 Cft 100 Cft 28,269.96
Item #
56+134+137+92
+93x6 215 Cft 100 Cft 29,772.86 Item #
56+134+137+92
+93x8 125 Cft 100 Cft 31,275.76
Providing and laying reinforced cement concrete with using
crushed graded boulders 3/4" inch (19 mm) and down
gauge having a minimum works cube crushing strength of
3750 Ibs. per sq. inch (23.24 N /mm 2 at 28 days) with a mix
not leaner than 1:1-1/2:3 in straight beams lintels cantilever
beams of required shape or section including form work and
its removal, compacting and curing etc. but excluding the
cost of reinforcement, in basement and ground floor etc.
complete in all respects as per drawing, standard ,
specifications and as directed by the Engineer.
Beams /Arches/ purdi / bracing / lintels / nibs / sills / coping /
parapet wall /bands/around opening and projections
(Cylindrical Strength 3000 Psi)
Fourth Floor
Fifth Floor
Sixth Floor
Providing and laying reinforced cement concrete with using
crushed graded boulders 3/4" inch (19 mm) and down
gauge having a minimum works cube crushing strength of
3750 Ibs. per sq. inch (23.24 N /mm 2 at 28 days) with a mix
not leaner than 1:1-1/2:3 in ordinary slab 5 inches (127 mm)
to 6 inches (152mm) thick including form work and its
removal compacting and curing etc. complete but
excluding the cost of reinforcement, in basement plinth and
ground floor etc. complete in all respects as per drawing,
standard , specifications and as directed by the Engineer.
Slab i/c projections (straight & sloping roof)
(Cylindrical Strength 3000 Psi)
Ground Floor
First Floor
Second Floor
Third Floor
Fourth Floor
Fifth Floor
Ground Floor
First Floor
Second Floor
Third Floor
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTTIES
(Main Gate Guard & UGWT)
Building Works (Structure)
Amount
(Pak Rs.)
3
S.No
PWD
Schedule 2012
Ref.No
Description QTY Unit Rate
(Pak Rs.)
Item #
56+134+137+92
+93x10 465 Cft 100 Cft 32,778.66
3.4 Code -114
Item #
57+134+137 0 Cft 100 Cft 23,691.64
Item #
57+134+137+92+9
3 205 Cft 100 Cft 25,392.29
Item #
57+134+137+92
+93x2 205 Cft 100 Cft 26,143.74
Item #
57+134+137+92
+93x4 205 Cft 100 Cft 27,646.64
Item #
57+134+137+92
+93x6 0 Cft 100 Cft 29,149.54
Item #
57+134+137+92
+93x8 0 Cft 100 Cft 30,652.44
Item #
57+134+137+92
+93x10 0 Cft 100 Cft 32,155.34
3.5 Code -114
Item #
50+134+137 140 Cft 100 Cft 30,160.60 Item #
50+134+137+92+9
3 140 Cft 100 Cft 31,861.25 Item #
50+134+137+92
+93x2 140 Cft 100 Cft 32,612.70
Item #
50+134+137+92
+93x4 275 Cft 100 Cft 34,115.60 Item #
50+134+137+92
+93x6 240 Cft 100 Cft 35,618.50
Sixth Floor
Providing and laying reinforced cement concrete with using
crushed graded boulders 3/4" inch (19 mm) and down
gauge having a minimum works cube crushing strength of
3750 Ibs. per sq. inch (23.24 N /mm 2 at 28 days) with a mix
not leaner than 1:1-1/2:3 in ordinary slab more than 6 inches
(152 mm) thick including form work and its removal
compacting and curing etc. complete but excluding the
cost of reinforcement, in basement plinth and ground floor
etc. complete in all respects as per drawing, standard ,
specifications and as directed by the Engineer.
Slab i/c projections
(Cylindrical Strength 3000 Psi)
Ground Floor
Fifth Floor
Sixth Floor
Providing and laying reinforced cement concrete with using
crushed graded boulders 3/4" inch (19 mm) and down
gauge having a minimum works cube crushing strength of
3750 Ibs. per sq. inch (23.24 N /mm 2 at 28 days) with a mix
not leaner than 1:1-1/2:3 in straight stairs and landing of
required section including form work and its removal,
compacting and curing etc. complete but excluding the
cost of reinforcement, in basement plinth and ground
floor.etc. complete in all respects as per drawing, standard ,
specifications and as directed by the Engineer.
Stair Case / steps /seats (Steps, Landing
& Waist slab)
(Cylindrical Strength 3000 Psi)
Ground Floor
First Floor
Second Floor
Third Floor
Fourth Floor
First Floor
Second Floor
Third Floor
Fourth Floor
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTTIES
(Main Gate Guard & UGWT)
Building Works (Structure)
Amount
(Pak Rs.)
3
S.No
PWD
Schedule 2012
Ref.No
Description QTY Unit Rate
(Pak Rs.)
Item #
50+134+137+92
+93x8 240 Cft 100 Cft 37,121.40 Item #
50+134+137+92
+93x10 0 Cft 100 Cft 38,624.30
3.6 Code -114
Item #
114+135+138
+127x9 1085 Cft 100 Cft 39,162.40
3.7 Code -114
Item #
112+135+138
+127x9 3210 Cft 100 Cft 39,738.17
3.8 Code -114
Item #
118+135+138
+127x9 830 Cft 100 Cft 36,765.96
3.9 Code -114
Item # 166 6800 Kg Kg 123.02
Item # 166+174 28190 Kg Kg 124.47
Sixth Floor
Providing and laying reinforced cement concrete with using
crushed graded boulders 3/4" inch (19 mm) and down
gauge having a minimum works cube crushing strength of
4500 Ibs. per sq. inch (31.04 N/mm2 at 28 days) with a mix
not leaner than 1:1:2 in a square of rectangular bottom slab
of over head water tank up to a height of 30 feet (9 m)
above ground including form works and its removal,
compacting and curing etc. complete but excluding the
cost of reinforcement .etc. complete in all respects as per
drawing, standard , specifications and as directed by the
Engineer.
OH Water Tank Bottom Slab
(Cylindrical Strength 3750 Psi)
Providing and laying reinforced cement concrete with using
crushed graded boulders 3/4" inch (19 mm) and down
gauge having a minimum works cube crushing strength of
4500 Ibs. per sq. inch (31.04 N/mm2 at 28 days) with a mix
not leaner than 1:1:2 in straight walls in over head water
tank bins, bunkers, intze tanks and silo up to a height of 30
feet (9 m) above ground including form works and its
removal, compacting and curing etc. complete but
excluding the cost of reinforcement etc. complete in all
respects as per drawing, standard , specifications and as
directed by the Engineer.
OH Water Tank Walls
(Cylindrical Strength 3750 Psi)
Providing and laying reinforced cement concrete with using
crushed graded boulders 3/4" inch (19 mm) and down
gauge having a minimum works cube crushing strength of
4500 Ibs. per sq. inch (31.04 N/mm2 at 28 days) with a mix
not leaner than 1:1:2 in roof slab of over head water tank up
to a height of 30 feet (9 m) above ground including form
works and its removal, compacting and curing etc.
complete but excluding the cost of reinforcement.etc.
complete in all respects as per drawing, standard ,
specifications and as directed by the Engineer.
Fifth Floor
OH Water Tank Top Slab
(Cylindrical Strength 3750 Psi)
Providing and laying hard grade ribbed deformed (minimum
yield point 60,000 psi or 414 Mpa) reinforcement bars with &
including the cost of straightening, cutting, bending, binding,
wastage, and such overlaps as are not shown in the
drawings, placing in position on cement concrete 1:2:4
precast or Ms. chairs, tying with binding wire, cost of chairs
and wires etc. in all kinds of RCC work in foundation,
basement, plinth and ground floor of building including
septic tanks and under ground tanks and in projections for
future extension.etc. complete in all respects as per drawing,
standard , specifications and as directed by the Engineer.
(Bars to be cut and placed in position at any level
according to the Bar bending schedule prepared by the
contractor and approved by the Engineer).
Ground Floor
First Floor
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTTIES
(Main Gate Guard & UGWT)
Building Works (Structure)
Amount
(Pak Rs.)
3
S.No
PWD
Schedule 2012
Ref.No
Description QTY Unit Rate
(Pak Rs.)
Item #
166+174+174 11620 Kg Kg 125.92
Item #
166+174+174+174 21985 Kg Kg 127.37
Item #
166+174+174+174
+174 43875 Kg Kg 128.82
Item #
166+174+174+174
+174 14105 Kg Kg 128.82
Item #
166+174+174+174
+174 9280 Kg Kg 128.82
Fourth Floor
Fifth Floor
Sixth Floor
Amount Carried to Civil Summary
Second Floor
Third Floor
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Main Gate, Guard &
Water Tank)
Architecture Works
1 2 3 4 5 6 7=4 x 6
All items under this head (Architectural work) to be
carried out as per relevant Section of PWD & technical
specifications (Volume-II), Drawings, BSI/ASTM
Standards, complete in all respect and to the entire
satisfaction of the Engineer.
Due to pitch roof second pera of clause No 1.9 of
General conditions of PWD schedule of rates-2012 will be
applicable for the height of the higher side.
4 DPC & MASONRY WORKS
Damp Proof Course (DPC)
4.1 Code -108
Item # 3
Page # 47
+
Code -109
Item # 123
Page # 64
Providing and laying 2 inches (51 mm) thick damp proof
course with cement concrete 1:2:4 cast in situ using graded
crushed boulders (instead of Screened bajri) of 3/4 inch (19
mm) and down gauge mixed with any approved water
proofing agent including compacting, curing form work and its
removal etc. complete, but excluding the cost of water
proofing agent .etc., complete in all respects as per
specifications & relevant drawings and all works to the
satisfaction of the Engineer.
2" thick DPC 440 Sft 100 Sft 2,812.71
4.2 Code -108
Item # 5
Page # 47
Extra for using water proofing agent pudlo in item Nos. 4.1
(quantity to be used as per manufacturer's
specification/2.50Kg per 100Sft).etc., complete in all respects
as per specifications & relevant drawings and all works to the
satisfaction of the Engineer. 11 Kg Kg 86.10
Solid Block Masonry
4.3 Code-110
&
Code-109
Providing and laying 1:3:6 machine made standard size
6"x8"x12" cement concrete solid block masonry more than 6
inches (152 mm) thick using graded crushed boulders (instead
Screened bajri) 3/4 inch (19 mm) and down gauge set in
cement mortar 1:6 including scaffolding, raking out joints and
curing etc. complete in ground floor superstructure etc,
complete in all respects as per drawing, standard ,
specifications and direction of the Engineer.
Code-110
Item # 34+92+100
Code-109
Item # 120 Ground Floor 1675 Cft 100 Cft 16040.34
Code-110
Item #
34+70+92+100
Code-109
Item # 120 First Floor 3085 Cft 100 Cft 16864.11
Code-110
Item #
34+70+92+100
+71
Code-109
Item # 120Second Floor 1520 Cft 100 Cft 17543.59
Code-110
Item #
34+70+92+100
+2x71
Code-109
Item # 120Third Floor 0 Cft 100 Cft 18223.07
Amout
(Pak Rs.)
A-SCHEDULE ITEMS
S.NoPWD Schedule
2012 Ref.NoDescription Qty Unit
Rate
(Pak Rs.)
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Main Gate, Guard &
Water Tank)
Architecture Works
1 2 3 4 5 6 7=4 x 6
Amout
(Pak Rs.)
A-SCHEDULE ITEMS
S.NoPWD Schedule
2012 Ref.NoDescription Qty Unit
Rate
(Pak Rs.)
Code-110
Item #
34+70+92+100
+3 x 71
Code-109
Item # 120Fourth Floor 2875 Cft 100 Cft 18902.55
Code-110
Item #
34+70+92+100
+4x71
Code-109
Item # 120Fifth Floor 1900 Cft 100 Cft 19582.03
Code-110
Item #
34+70+92+100
+5x71
Code-109
Item # 120Sixth Floor 270 Cft 100 Cft 20261.51
Code-110
Item #
34+70+92+100
+6x71
Code-109
Item # 120Above Sixth Floor 265 Cft 100 Cft 20940.99
4.4 Code-110
&
Code-109
Providing and laying 1:3:6 machine made standard size
6"x8"x12" cement concrete solid block 4 to 6 inches (102mm to
152 mm) thick using graded crushed boulders (instead
Screened bajri) 3/4 inch (19 mm) and down gauge set in
cement mortar 1:6 including scaffolding, raking out joints and
curing etc. complete in all respects as per specifications &
relevant drawings and all works to the satisfaction of the
Engineer.
Code-110
Item # 44+92+100+
Code-109
Item # 120 Ground Floor 885 Cft 100 Cft 16897.84
Code-110
Item # 44+70+92
+100
Code-109
Item # 120First Floor 875 Cft 100 Cft 17721.61
Code-110
Item # 44+70+92
+100+71
Code-109
Item # 120Second Floor 950 Cft 100 Cft 18401.09
Code-110
Item # 44+70+92
+100+2x71
Code-109
Item # 120Third Floor 0 Cft 100 Cft 19080.57
Code-110
Item # 44+70+92+
100+3x71
Code-109
Item # 120 Fourth Floor 2120 Cft 100 Cft 19760.05
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Main Gate, Guard &
Water Tank)
Architecture Works
1 2 3 4 5 6 7=4 x 6
Amout
(Pak Rs.)
A-SCHEDULE ITEMS
S.NoPWD Schedule
2012 Ref.NoDescription Qty Unit
Rate
(Pak Rs.)
Code-110
Item # 44+70+92+
100+4x71
Code-109
Item # 120 Fifth Floor 1800 Cft 100 Cft 20439.53
Code-110
Item # 44+70+92+
100+5x71
Code-109
Item # 120 Sixth Floor 1290 Cft 100 Cft 21119.01
Code-110
Item # 44+70+92+
100+6x71
Code-109
Item # 120 Above Sixth Floor 500 Cft 100 Cft 21798.49
4.5 Code-110
Page #
72, 80 & 81
Providing and laying 1:3:6 machine made standard size
6"x8"x12" cement concrete solid block masonry more than 6
inches (152 mm) thick in steps, stairs of approved design using
graded curshed boulders (instead of screened bajri) 3/4 inch
(19 mm) and down gauge set in cement mortar 1:4 including
scaffolding, raking out joints and curing etc. complete in
ground floor superstructure etc., complete in all respects as
per specifications & relevant drawings and all works to the
satisfaction of the Engineer.
Code-110
Item #2+68+74+92
code-109
Item# 120 FOR BLOCK MASONRY STEPS 85 Cft 100 Cft 17915.71
4.6 Code-112
Item #144
Page # 108
Providing and laying wall ties of mild steel flats of approved
section and design placed at horizontal and vertical spacing
in cavity wall of any description in any floor at any height..750 Kg Kg 181.84
Amount Carried to Civil Summary
5 THERMAL & MOISTURE PROTECTION
Amount Carried to Civil Summary
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Main Gate, Guard &
Water Tank)
Architecture Works
1 2 3 4 5 6 7=4 x 6
Amout
(Pak Rs.)
A-SCHEDULE ITEMS
S.NoPWD Schedule
2012 Ref.NoDescription Qty Unit
Rate
(Pak Rs.)
6 METAL WORKS
6.1 Code -119
Item # 43
Page # 240
Providing and fixing M.S. moulded steel door frame of 4" x 2-
1/2" (102 mm x 64 mm) manufactured from mild steel sheet of
18 gauge (1.41 mm) conforming to BSS. 1245 having a single
rebate size 1-1/2" x 1/2" (38 mm x 13 mm) with provision of 3
Nos. M.S. plate, section 1-1/2" x 1/4" (38 mm x 6 mm), (2 Nos. 6
inch long welded with frame at not less than 10 points and 1
No., 12 inch long welded with frame at not less than 20 points),
with holes and threads for fixing steel hinges, fitted with one
locking box of same sheet (point welded inside the frame), 6
Nos. 6 inches long flat iron fixing lugs, of 1-1/4" x 3/16" section,
treated with special red oxide primer coat all around including
cutting holes and filling the cavity with cement concrete 1:2:4
etc. in any floor at any height. etc., complete in all respects as
per specifications & relevant drawings and all works to the
satisfaction of the Engineer. 335 Rft Rft 157.12
6.2 Code -119
Item # 44
Page # 240
Providing and fixing M.S. moulded steel door frames of 5.73" x 2-
1/2" (146 mm x 63 mm) manufactured from mild steel sheet of
18 gauge (1.41 mm) conforming to B.S.S. 1245 having a double
rebate size 1-1/2" x 1/2" (38 mm x 12 mm) provision of 3 Nos.
M.S. plate, section 1-1/2" x 1/4" (38 mm x 6 mm) (2 Nos. 6 inch
long welded with frame at not less than 10 points and 1 Nos.
12 inch long welded with frame at not less than 20 points), with
holes and threads for fixing steel hings, fitted with one locking
box of same sheet (point welded inside the frame), 6 Nos. 6
inches long flat iron fixing lugs of 1-1/4" x 3/16" section, treated
with special red oxide primer coat all around including cutting
holes and filling the cavity with cement concrete 1:2:4 etc. in
any floor at any height complete as directed by the Engineer-
in-Charge 85 Rft Rft 185.34
6.3
Code -122
Item #159
Page # 333
Painting Iron work with synthetic enamel paint of approved
make and shade two coats over and including the cost of one
priming coat at any height in any floor etc., complete in all
respects as per specifications & relevant drawings and all
works to the satisfaction of the Engineer. 690 Sft 100 Sft 2,776.62
6.4
Code -119
Item #102
Page # 251
Providing and fixing fully glazed Bronze anodized or powder
coated aluminium Sliding / fixed & openable /Top hung
windows & ventilators as per British standard manufactured by
Lucky, Alcop, Krudson, Pakistan cable and A.C.P. (fixing
through their approved fabricators) deluxe model box section
95mm x 30mm and 2mm thick including the cost of aluminium
netting ,fittings, with all accessories cutting hole etc. and
making good damages to walls etc. complete as required in
any floor as per direction of engineer-in-charge, but excluding
the cost of glass pans. 965 Sft Sft 568.07
6.5
Code -119
Item #120
Page # 254
Providing and fixing Tinted glass panes 5mm thick to M.S. Box
pipe / Aluminium doors, windows and ventilators etc including
the cost of labour but excluding the cost of M.S. square pipe
beading, rubber packing and screw in any floor at any height.
(For Doors, Windows & Fixed Glazing or where instructed)965 Sft Sft 106.11
6.6
Code -119
Item #119
Page # 254
Providing and fixing plain glass panes 5mm thick to M.S. Box
pipe / Aluminium doors, windows and ventilators etc. including
the cost of labour but excluding the cost of M.S. square pipe
beading, rubber packing and screw in any floor at any height.
(For vision panel of door shutters)30 Sft Sft 88.91
Amount Carried to Civil Summary
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Main Gate, Guard &
Water Tank)
Architecture Works
1 2 3 4 5 6 7=4 x 6
Amout
(Pak Rs.)
A-SCHEDULE ITEMS
S.NoPWD Schedule
2012 Ref.NoDescription Qty Unit
Rate
(Pak Rs.)
7 WOOD WORKS
Door, windows & partitions Frame
7.1 Code-120
Item # 02
Page # 259
Providing and fixing best quality deodar frames for doors.
windows, ventilators, clerestory windows, shelves, partitions,
trellis work, etc., as required . Complete in all respect as per
drawings, specification and as directed by the Engineer.100 Cft 100 Cft 4,595.14
Architrave / Beading
7.2 Code-120
Item # 278
Page # 288
Providing and fixing best quality deodar wood projected
beading upto one Sq. inch (6.45 Sqm.) in sections and required
design fixed around the panels of doors, windows etc., of any
description , complete in all respect as per drawings,
specification and as directed by the Engineer. 505 Rft Rft 35.66
7.3 Code-122
Item # 189
Page # 336
Applying French or spirit polishing, two coat of approved make
on wood work at any height in any floor.350 Sft 100 Sft 1,878.96
Amount Carried to Civil Summary
8 INTERNAL FLOOR FINISHES
8.1 Code-117 Providing and laying 1:5:10 cement concrete bed under floors
using graded stone ballast 3/4 & down instead of 2 inches (51
mm) and down gauge with levelling, ramming, watering and
curing etc. complete.
(under Mosaic & Porcelain tiles).
Item # 3
Page# 190 Ground Floor 165 Cft 100 Cft 9,442.42
Item # 3+25
Page# 190 &192First Floor
18 Cft 100 Cft 9,684.38
Item # 3+25+26
Page# 190 &192Second Floor
12 Cft 100 Cft 9,879.51
Item # 3+25+2x26
Page# 190 &192Third Floor
6 Cft 100 Cft 10,074.64
Mosaic Tiles
8.2 Code-117 Providing and laying terrazzo floor 1-1/2 inches (38 mm) thick
consisting of 1/2 inch (13 mm) thicktopping 1:2 (one grey
cement 2 approved marble chips No. 0 to 4) in ground floor
over a base of 1:2:4 (one cement, two sand and four screened
graded bajri) cement concrete 1 inch (25 mm) thick laid in
panels or pattern including form work, curing, cutting, rubbing
and polishing etc. complete.
Item # 12+17
Page# 191 Ground Floor 1190 Sft 100 Sft 6,163.94
Item # 12+17+25
Page# 191+192 First Floor 175 Sft 100 Sft 6,405.90
8.3 Code-117 Providing and laying terrazzo floor 1-1/2 inches (38 mm) thick
consisting of 1/2 inch (13 mm) thicktopping 1:2 (one grey
cement 2 approved marble chips No. 0 to 4) in ground floor
over a base of 1:2:4 (one cement, two sand and four screened
graded bajri) cement concrete 1 inch (25 mm) thick laid in
panels or pattern including form work, curing, cutting, rubbing
and polishing etc. complete.Item # 12
Page# 191 Ground Floor 300 Sft 100 Sft 5,287.04
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Main Gate, Guard &
Water Tank)
Architecture Works
1 2 3 4 5 6 7=4 x 6
Amout
(Pak Rs.)
A-SCHEDULE ITEMS
S.NoPWD Schedule
2012 Ref.NoDescription Qty Unit
Rate
(Pak Rs.)
Item # 12+25
Page# 191+192 First Floor 45 Sft 100 Sft 5,529.00
8.4 Code-117
&
Code-109
Providing and laying floors of 3 inches (76 mm) thick 1:2:4
cement concrete using graded crushed boulders (instead
Screened bajri) 3/4 inch (19 mm) and down gauge in ground
floor laid in panels including form work, consolidation finishing,
curing etc. complete in all respects as per specifications &
relevant drawings and all works to the satisfaction of the
Engineer.
Code-117
Item # 7
Code-109
Item # 123 Ground Floor 770 Sft 100 Sft 4514.375
Code-117
Item # 7+25
Code-109
Item # 123 First Floor 32 Sft 100 Sft 4756.335
Code-117
Item # 7+25+26
Code-109
Item # 123 Second Floor 840 Sft 100 Sft 4951.465
Code-117
Item # 7+25+26x2
Code-109
Item # 123 Third Floor 965 Sft 100 Sft 5146.595
Code-117
Item # 7+25+3x26
Code-109
Item # 123 Fourth Floor 0 Cft 100 Sft 5341.725
Code-117
Item # 7+25+4x26
Code-109
Item # 123Fifth Floor 1300 Sft 100 Sft 5536.855
Code-117
Item # 7+25+5x26
Code-109
Item # 123Sixth Floor 1515 Sft 100 Sft 5731.985
Code-117
Item # 7+25+6x26
Code-109
Item # 123 Above Sixth Floor 370 Sft 100 Sft 5927.115
8.5
Code-117
Item # 159
Page # 209
Providing and laying light colour, glazed/non skid vitrified
porcelean tiles (Polished) not exceeding 1600 Sqcm each,
(Pak made) on walls and floors, in any floor, laid with dry bond
(stile bond) over a base of 1" thick cement mortar (1:3)
including jointing to tiles with joint filler of approved quality as
per direction of the Engineer incharge. 530 Sft 100 Sft 2572.28
Amount Carried to Civil Summary
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Main Gate, Guard &
Water Tank)
Architecture Works
1 2 3 4 5 6 7=4 x 6
Amout
(Pak Rs.)
A-SCHEDULE ITEMS
S.NoPWD Schedule
2012 Ref.NoDescription Qty Unit
Rate
(Pak Rs.)
9 INTERNAL WALL FINISHES
Internal Wall Plaster
9.1 Code-122 1/2" (13 mm) thick cement plaster 1:6 on wall columns etc. in
basement, plinth, mezzanine and ground floor including
making edges, corners, grooves as specified and curing etc.,
complete in all respects as per specifications & relevant
drawings and all works to the satisfaction of the Engineer.
Ground FloorItem # 6
Page # 320 Ground Floor 3300 Sft 100 Sft 1,730.74
Item # 6+87
Page # 320 First Floor 6285 Sft 100 Sft 1,884.61
Item # 6+87+90
Page # 320, 327
Second Floor 3900 Sft 100 Sft 2,015.07
Item # 6+87+2x90
Page # 320, 327
& 328 Third Floor 0 Cft 100 Sft 2,145.53
Item # 6+87+3x90
Page # 320, 327
& 328 Fourth Floor 8840 Sft 100 Sft 2,275.99
Item # 6+87+4x90
Page # 320, 327
& 328 Fifth Floor 5840 Sft 100 Sft 2,406.45
Item # 6+87+5x90
Page # 320, 327
& 328 Sixth Floor 1120 Sft 100 Sft 2,536.91
Item # 6+87+6x90
Page # 320, 327
& 328 Above Sixth Floor 1200 Sft 100 Sft 2,667.37
Dado & Skirting
9.2 Code-118
Item # 55 + 58
Page# 219
Providing and fixing marble mosaic tile 12" X 6" X 3/4" (305 mm
X 152 X 19 mm) with chips No. 0 to 4 in dado and skirting of
approved design in light shade over 1/2 inch (13 mm) thick
base of cement mortar 1:3 in ground floor setting of tiles in
slurry of grey cement over mortar base including filling of joints
and washing the tiles with cement slurry of matching colour
curing, grinding, rubbing and polishing etc. complete.
Code-118
Item # 55 + 58
Page# 219 Ground Floor 130 Sft 100 Sft 14,274.50
Code-118
Item # 55 + 58+60
Page# 219First Floor 85 Sft 100 Sft 14,567.19
9.3 Code-118 Providing and fixing cement tiles 6" X 6" X 3/4" (152 mm X 152
mm X 19 mm) in dado and skirting in grey colour over 1/2 inch
(13 mm) thick base in cement mortar 1:3 in ground floor setting
of tiles in slurry of grey cement over mortar base, including
filling joints and washing the tiles with cement slurry, curing,
grinding, rubbing and polishing etc. complete..Item # 62
Page # 220 Ground Floor 100 Sft 100 Sft 12,294.08
Item # 62+69
Page # 220 First Floor 12 Sft 100 Sft 12,489.21
Item # 62+69+70
Page # 220 Second Floor 120 Sft 100 Sft 12,621.90
Item # 62+69+2x70
Page # 220 Third Floor 140 Sft 100 Sft 12,754.59
Item # 62+69+3x70
Page # 220 Fourth Floor 120 Sft 100 Sft 12,887.28
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Main Gate, Guard &
Water Tank)
Architecture Works
1 2 3 4 5 6 7=4 x 6
Amout
(Pak Rs.)
A-SCHEDULE ITEMS
S.NoPWD Schedule
2012 Ref.NoDescription Qty Unit
Rate
(Pak Rs.)
Item # 62+69+4x70
Page # 220 Fifth Floor 40 Sft 100 Sft 13,019.97
Item # 62+69+5x70
Page # 220 Sixth Floor 60 Sft 100 Sft 13,152.66
9.4 Code-122
Item # 151
Page # 333
Distempering with vinyl distemper (ICI) Deluxe Paintex of
approved make and shade in two coats over and including
the cost of one priming coat of lime wash including sand
papering, dusting, and filling the holes, cracks and inequalities,
if any, at any height in any floor. 30485 Sft 100 Sft 1,053.54
Puddlo Plaster
9.5 Code-122
Page # 320
3/4'' (19 mm) thick cement plaster (Plain) 1:4 on walls and
columns etc. in basement, plinth, mezzanine and ground floor
including making edges, corners, grooves as specified and
curing etc,complete in all respects as per specifications &
relevant drawings and all works to the satisfaction of the
Engineer.Item # 8 U.G.W.T Plaster 3260 100 Sft 2367.12
Item # 8+88+
4 x 91 O.H.W.T Plaster 3850 Sft 100 Sft 3,268.04
9.6 Code-122 Providing and mixing water proofing agent pudlo in cement
mortar of any description in any floor etc., complete in all
respects as per specifications/2.50Kg per 100Sft). & relevant
drawings and all works to the satisfaction of the Engineer.
Item # 30 U.G.W.T 82 Kg 86.15
Item # 30 O.H.W.T 97 Kg 86.15
9.7
Code-117
Item # 159
Page # 209
Providing and laying light colour, glazed/non skid vitrified
porcelean tiles (Polished) not exceeding 1600 Sqcm each,
(Pak made) on walls and floors, in any floor, laid with dry bond
(stile bond) over a base of 1" thick cement mortar (1:3)
including jointing to tiles with joint filler of approved quality as
per direction of the Engineer incharge. 1420 Sft 100 Sft 2572.28
Amount Carried to Civil Summary
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Main Gate, Guard &
Water Tank)
Architecture Works
1 2 3 4 5 6 7=4 x 6
Amout
(Pak Rs.)
A-SCHEDULE ITEMS
S.NoPWD Schedule
2012 Ref.NoDescription Qty Unit
Rate
(Pak Rs.)
10 INTERNAL CEILING FINISHES
Internal Ceiling Plaster
10.1 Code-122 1/2" (13 mm) thick cement plaster 1:6 on ceilings cantilever
soffits others etc. in basement, plinth, mezzanine and ground
floor including making edges, corners, grooves as specified
and curing etc., complete in all respects as per specifications
& relevant drawings and all works to the satisfaction of the
Engineer.
Item # 6
Page # 320 Ground Floor 590 Sft 100 Sft 1,730.74
Item # 6+87
Page # 320
& 327 First Floor 2595 Sft 100 Sft 1,884.61
Item # 6+87+90
Page # 320, 327
& 328 Second Floor 1170 Sft 100 Sft 2,015.07
Item # 6+87+2x90
Page # 320, 327
& 328 Third Floor 100 Sft 2,145.53
Item # 6+87+3x90
Page # 320, 327
& 328 Fourth Floor 1160 Sft 100 Sft 2,275.99
Item # 6+87+4x90
Page # 320, 327
& 328 Fifth Floor 1430 Sft 100 Sft 2,406.45
Item # 6+87+5x90
Page # 320, 327
& 328 Sxth Floor 180 Sft 100 Sft 2,536.91
Item # 6+87+6x90
Page # 320, 327
& 328 Above Sxth Floor 375 Sft 100 Sft 2,667.37
10.2 Code-122
Item # 151
Distempering with vinyl distemper (ICI) Deluxe Paintex of
approved make and shade in two coats over and including
the cost of one priming coat of lime wash including sand
papering, dusting, and filling the holes, cracks and inequalities,
if any, at any height in any floor. 7500 Sft 100 Sft 1,053.54
Amount Carried to Civil Summary
11 ROOF FINISHES & WATER PROOFING
11.1 Code-117
Item #7+25+26
Page# 190 &192
Providing and laying floor of 3 inches (76 mm) thick 1:2:4
reinforced cement concrete using graded crushed bolders
instead of screened bajri 3/4" (19 mm) and down gauge in
ground floor including form work, consolidation, finishing and
curing etc. complete but excluding the cost of reinforcement.
Roof
Item #7+25+26
Page# 190 &192 Lev (+22'-9" upto +31'-2") 1920 Sft 100 Sft 4,531.45
Item #7+25+26
Page# 190 &192 Lev (+75'-0" upto +117'-9") 1900 Sft 100 Sft 5,897.36
11.2
Code-108
Item #27
Page# 50
Water proofing of roof slab using Bituflex @ 10 Kg per % sft in
three coats, i/c cleaning /scraping the extra mortar etc. from
the roof surface,and washing the surface with water and filling
the depressions using Bituflex: sand mortar (1.2).Applyingone
one primer coal, over moist surface using a mix of 50 %Bituflex
and 50 % water blirded the surface with saul any floor in any
light.3820 Sft 100 Sft 685.80
Amount Carried to Civil Summary
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Main Gate, Guard &
Water Tank)
Architecture Works
1 2 3 4 5 6 7=4 x 6
Amout
(Pak Rs.)
A-SCHEDULE ITEMS
S.NoPWD Schedule
2012 Ref.NoDescription Qty Unit
Rate
(Pak Rs.)
12 EXTERNAL WALL FINISHES (BUILDING)
External Plaster
12.1 Code-122 3/4'' (19 mm) thick cement plaster (Plain) 1:4 on walls and
columns etc. in basement, plinth, mezzanine and ground floor
including making edges, corners, grooves as specified and
curing etc., complete in all respects as per specifications &
relevant drawings and all works to the satisfaction of the
Engineer.
Item # 8
Page # 320 Ground Floor 4500 Sft 100 Sft 2,367.12
Item # 8+88
Page # 320 & 327 First Floor 5500 Sft 100 Sft 2,572.28
Item # 8+88+91
Page # 320, 327
& 328 Second Floor 4500 Sft 100 Sft 2,746.22
Item # 8+88+2x91
Page # 320, 327
& 328 Third Floor 4000 Sft 100 Sft 2,920.16
Item # 8+88+3x91
Page # 320, 327
& 328 Fourth Floor 4000 Sft 100 Sft 3,094.10
Item # 8+88+4x91
Page # 320, 327
& 328 Fifth Floor 4000 Sft 100 Sft 3,268.04
Item # 8+88+5x91
Page # 320, 327
& 328 Sixth Floor 4000 Sft 100 Sft 3,441.98
Item # 8+88+6x91
Page # 320, 327
& 328 Above Sixth Floor 4000 Sft 100 Sft 3,615.92
12.2 Code-122
Item # 83
Page # 327
Extra for providing horizontal or vertical joints or grooves 3/8" x
1/4" (9.5 mm x 6.4 mm) size of approved design over item No.
11.1 500 Sft 100 Sft 518.48
12.3 Code-122 Painting three coats with weather shield paint deluxe (ICI)
make of approved shade on plaster surface (External) and
including the cost of cleaning the surface, sand papering etc.
complete at any height in any floor etc., complete in all
respects as per specifications & relevant drawings and all
works to the satisfaction of the Engineer.
Item # 172
Page # 334 Ground Floor to Roof 20000 Sft 100 Sft 1,406.88
Amount Carried to Civil Summary
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Main Gate, Guard &
Water Tank)
Architecture Works
1 2 3 4 5 6 7=4 x 6
Amout
(Pak Rs.)
A-SCHEDULE ITEMS
S.NoPWD Schedule
2012 Ref.NoDescription Qty Unit
Rate
(Pak Rs.)
13
EXTERNAL FINISHES OTHER THAN BUILDING
(NON COVERED AREA)
13.1 Code-122 3/4'' (19 mm) thick cement plaster (Plain) 1:4 on walls and
columns etc. in basement, plinth, mezzanine and ground floor
including making edges, corners, grooves as specified and
curing etc., complete in all respects as per specifications &
relevant drawings and all works to the satisfaction of the
Engineer.Item # 8+37
Page # 322
Ground Floor834 Sft 100 Sft 3,100.23
13.2 Code -108
Item # 5
Page # 47
Extra for using water proofing agent pudlo in item No. 13.4
(quantity to be used as per manufacturer's
specification/2.50Kg per 100Sft).etc., complete in all respects
as per specifications & relevant drawings and all works to the
satisfaction of the Engineer.9 Kg Kg 86.15
13.3 Code -117
Item # 32
Page # 192
Providing and laying floor of 3/4 inch (19 mm) thick white
marble tiles upto 36 Sq. inch (232 sq.cm) size fine dressed on
the surface without windings in ground fioor and laid over 1
inch (25 mm) thick lime mortar 1:2 (one lime, two sand) setting
36 Sft 100 Sft 15,685.68
HORTICULTURE WORK
13.4 Code-126
Item # 1
Page# 392
Rough dressing of the area for lawn including picking stones,
pebbles, stubble, grass roots and other injurious matters and
breaking of clods complete including disposal of rubbish within
3 chains (92 m). 580 Sft 100 Sft 103.32
13.5 Code-126
Item # 6
Page# 392
Supplying and stacking approved garden soil (sweet earth)
free from salts, pebbles and grass roots etc. including all leads
and lifts. 290 Cft 100 Cft 4,003.42
13.6 Code-126
Item # 7
Page# 392
Spreading approved garden soil (sweet earth) in uniform
thickness including mixing and breaking clods and dressing fine
for grassing including disposal of rubbish within 3 chains (92 m)
complete . 290 Cft 100 Cft 193.38
13.7 Code-126
Item # 2
Page# 392
Supplying and stacking well decayed cowdung manure from
approved source including all leads and lifts.145 Cft 100 Cft 2,578.40
13.8 Code-126
Item # 3
Page# 392
Spreading cowdung manure and mixing the same upto any
depth in the prepared bed including breaking clods, dressing
fine for grassing, including, disposal of rubbish within 3 chains
(92 m) complete. 145 Cft 100 Cft 107.74
13.9 Code-126
Item # 11
Page# 392
Supply live (Dacca) grass in slabs with earth intact including all
lead and lifts.580 Sft Sft 17.60
13.10 Code-126
Item # 13
Page# 392
Grassing fine by dribbling grass roots 3" apart including
watering, weeding till such time the grass is set and becomes
green and is fit for mowing 580 Sft 100 Sft 244.19
13.11 Code-122
Item # 172
Page # 334
Painting three coats with weather shield paint deluxe (ICI)
make of approved shade on plaster surface (External) and
including the cost of cleaning the surface, sand papering etc.
complete at any height in any floor etc., complete in all
respects as per specifications & relevant drawings and all
works to the satisfaction of the Engineer.17355 Sft 100 Sft 1,406.88
Amount Carried to Civil Summary
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Main Gate, Guard &
Water Tank)
Architecture Works
1 2 3 4 5 6 7=4 x 6
Amout
(Pak Rs.)
A-SCHEDULE ITEMS
S.NoPWD Schedule
2012 Ref.NoDescription Qty Unit
Rate
(Pak Rs.)
4 DPC & MASONRY WORKS
40mm thick Master Thermoshield sheet.
4.1 N.S.I Providing & laying in position 1-1/2"(40mm) thick Master
Thermoshield sheet or approved equivalent having density
35kg/cum, complete in all respect as per drawing, standard,
specifications and direction of the Engineer.0 Sft Sft
Amount Carried to Civil Summary
5 THERMAL & MOISTURE PROTECTION
5.1 N.S.I Providing and applying three coats of 2 component flexible
polymer modified cementitious waterproof coating AQUAFIN-
2C /BASF-Master seal-550/ SIKA top seal -107 or approved
equivalent over RCC slabs and walls of any wet area e.g.
Baths, Kitchens, Balcony's etc, at any height in any floor as per
manufacturer's specifications & recommendations complete in
all respects as per drawings, relevant specifications and as
directed by the Engineer. Second Floor 150 Sft Sft
Third Floor 80 Sft Sft
Amount Carried to Civil Summary
6METAL WORKS
MS Screen
6.1 N.S.I Providing, fabricating, welding & fixing in position decorative
MS screen comprising of MS tube 75mm x 50mm x 2.5mm
main outer frame fixed with 50mm x 50mm x 6mm thick MS
angle, design pattern with MS tube100mm x 50mm x 2.5mm as
shown on drawing including all required hard ware &
arrangement for fixing. providing & applying epoxy paint not
less than 300 micron of approved colour & shades as per
manufacturer's specification etc, complete in all respect as
per drawing, standard, specifications and direction of the
Engineer.
NOTE: The contractor shall submit shop drawings (without any
additional cost) for approval prior to start of work. 0.Each Each
M.S Staircase Railing
6.2 N.S.I Providing, fabricating, welding & fixing in position MS Staircase
railing comprising of 50mm dia x 16 Swg MS pipe hand rail,
25mm dia x 16 Swg dia balustrade welded to handrail as
shown in the drawing including all required accessories &
hardware such as base plate, cap, nuts & bolts etc. fixing
arrangement (Drilling & grouting)etc including three coat of
approved colour enamel paint over one coat od primer (Paint
will be paid in seaprate item, refer BOQ Item) complete in all
respects as per drawing, standard, specifications and
direction of the Engineer. 215 Rft
6.3 MS Louvered Door/Window
N.S.I Providing, fabricating, welding & fixing in position MS louver
door comprising 100mm x 50mm main tube frame, 18 Swg MS
louvers as shown on drawing, three coat of approved colour
enamel paint over one coat od primer (Paint will be paid in
seaprate item, refer BOQ Item # .....) etc, including required
hard ware such as hinges, hold fast, Sliding bolt/ALdrop &
china black clour waterproof Shackle Pad lock 76mm,
complete in all respect as per drawing, standard,
specifications and direction of the Engineer.
The contractor shall submit shop drawings (without any
additional cost) for approval prior to start of work. 610 Kg Kg
B-NON SCHEDULE ITEMS
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Main Gate, Guard &
Water Tank)
Architecture Works
1 2 3 4 5 6 7=4 x 6
Amout
(Pak Rs.)
A-SCHEDULE ITEMS
S.NoPWD Schedule
2012 Ref.NoDescription Qty Unit
Rate
(Pak Rs.)
MS Grill Door
6.4 N.S.I Providing, fabricating, welding & fixing in position MS hallow
tube folding grill door comprising of 1-1/2" x 3" x 16 Swg hollow
tube & solid bar horizontal & vertical & 12 swg Ms sheet on
either side as shown on drawing (EA-01012-GGWT-A6-0030),
including hold fast (6 No), hinges, L-drop with lock & MS sheet
12 swg, heavy duty wheel up to 3" dia with cover, MS wheel
track with 2" x 2" x 1/4" thick " T " iron including 1:2:4 concrete
and all required fixing hardware including two coat of red
oxide paint and three coat of epoxy paint of approved color
& shades as per manufacturer's specification etc. complete in
all respects as per drawing, standard, specifications and
direction of the Engineer. 475Sft Sft
6.5 Monkey Ladder
N.S.I Providing, fabricating, welding, bolting & fixing in position MS
Access/Monkey ladder comprising MS Flat steel 2" x 3/8" thick (
Vertical member) weld with 8" x 8" x 3/8" thick steel plate bolt
to Rcc slab, 8" x 3" x 3/8" thick steel plate weld to vertical flat
and bolted to wall, 3/4" dia solid steel bar welded to flat @ 12"
C/C, as shown on drawing, three coat of approved colour
enamel paint over one coat od primer (Paint will be paid in
seaprate schedule item, refer BOQ Item # .....) etc, including
required hard ware complete in all respect as per drawing,
standard, specifications and direction of the Engineer.
The contractor shall submit shop drawings (without any
additional cost) for approval prior to start of work. 245 Kg Kg
6.6 N.S.I Providing and fixing Tinted glass panes 6mm thick to wooden
door, fixed glazing, windows, ventilators or where required etc
including the cost of wooden trim, rubber gasket packing and
screw etc, in any floor at any height. 550 Sft Sft
6.7 N.S.I Providing and fixing Anti-Oxidation Aluminum Spacer Bar for
Double Glazing Glass up to 10mm wide including slicon
sealant bead to door, fixed glazing, windows, ventilators or
where required etc. including the cost of rubber gasket
packing and screw etc., in any floor at any height.60 Rft Rft
Amount Carried to Civil Summary
7 WOOD WORKS
DOOR SHUTTERS
7.1 N.S.I Providing, Making & fixing in position 1-1/2" (38mm) thick solid
core approved colour Formica finish flush door shutters with &
without vision panel. Comprising of 6mm thick lamination sheet
(manufacturer pressed lamination sheet over lasani board) on
either side, over all around best quality Partal or approved
wood frame 50mm wide horizontal, vertical & cross /diagonal
& 150mm wide lock rail in full length, hollow area except
framing to be filled with the approved rough wood, 1-1/2" x
1/2" thick Golden teak wood edge lipping all around. The door
shutter mechanically pressed by standard manufacturers
under power driven hydraulic press as approved by the
Engineer, with and without vision glass panel (vision glass panel
will be paid seapreatly, in BOQ item # ....) including with and
without vision glass panel, nails, glue or any required
hardware's and applying solignum for termite treatment, at
any height & any floor etc., complete in all respects as per
drawing, standard , specifications and direction of the
Engineer.
(Note: Cost of Ironmongery such as Hinges, Tower bolts,
545Sft Sft
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Main Gate, Guard &
Water Tank)
Architecture Works
1 2 3 4 5 6 7=4 x 6
Amout
(Pak Rs.)
A-SCHEDULE ITEMS
S.NoPWD Schedule
2012 Ref.NoDescription Qty Unit
Rate
(Pak Rs.)
7.2 N.S.I Providing, Making & fixing in position Solid Phenolic Core frame
less door shutter of approved colour & thickness, equivalent
approved manufacturer, including door hardware's such as
corner fasteners, Auto return Hinges, Latch, indicator door
Locks, Stay, Handle, etc., in any floor & any heifght as shown in
drawings, complete in all respect as per drawing,
specifications and entire satisfaction of the Engineer0 Sft Sft
7.3 N.S.I Providing, fabricating and fixing Aluminum frame door
comprising of 17mm thick water proof laminated board
(lamination should be on both side of board) , premium quality
aluminum sections Frame of Pakistan Cable/ Krudson or
equivalent approved manufacturers fixed on Rcc & masonry
surface , fitted in Neoprene Gaskets including all required
Hardware (all hardware should be in stainless steel ) hinges,
handles, latch,locks, stays etc. Including silicon sealant to all
external junction between structure and door to give
water/wind proof seal . complete in all respect as per drawing,
standard specifications and direction of the
Engineer.(Contractor to submit the shop drawing for approval
before start of work) 75 Sft Sft
7.4 N.S.I Providing and fixing in position as per drawings & joinery
schedule all of "New ISE" Hong Kong, New Star Japan or
approved equivalent make as per relevant drawings,
contractor to submit the sample / shop drawings for approval
prior to execution etc, complete in all respects as per drawing,
standard , specifications and direction of the Engineer.
S.S Door hinges 4" long 124.Each Each
SS Dead Lock complete set 7.Each Each
SS Handle 36 inch long 4.Each Each
SS Handle 12 inch long 10.Each Each
Motorized Door Lock complete set (Lock body, Cylender
& Liver handle) for rooms
15.Each Each
SS Tower Bolt 24" long 4.Each Each
SS Tower Bolt 8" long 25.Each Each
Stainless Steel Kick plate 3mm thick 20 Sft Sft
Wooden Cabinets
7.5 N.S.I Providing making and fixing in position floor mounted lower
cabinets (Pantry etc.) as per drawing at any height / floor,
made of 3/4" thick coloured laminated (both face) Lasani
board shutter free from formaldehyde including all around
OAK wood lipping kitchen cabinet, 3" x 1-1/2" thick Partal
wood frame, complete with all accessories i.e. imported
hinges, locks, magnetic catchers, best quality handles etc.,
including any termite treatment, providing & applying 03 coats
of approved colour shade lacquer polish by Jaffar Brothers or
similar approved as per manufacturer's instruction &
specification including all required hardware's for fixing
etc,complete in all respects as per specifications & relevant
drawings and all works to the satisfaction of the Engineer.
(Front face will be measured for payments)85 Sft Sft
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Main Gate, Guard &
Water Tank)
Architecture Works
1 2 3 4 5 6 7=4 x 6
Amout
(Pak Rs.)
A-SCHEDULE ITEMS
S.NoPWD Schedule
2012 Ref.NoDescription Qty Unit
Rate
(Pak Rs.)
7.6 N.S.I Providing making and fixing in position wall mounted cabinets
for (Kitchen/Pantry etc.) as per drawing at any height / floor,
made of 3/4" thick colored laminated (both side) Lasani board
shutter free from formaldehyde including all around Deodar
wood lipping 3/8" thick, 3" x 1-1/2" thick Partal wood frame,
6mm one side laminated Lasani board back complete with all
accessories i.e. imported hinges, locks, magnetic catchers,
best quality handles etc., including any termite treatment,
providing & applying 03 coats of approved colour shade
lacquer polish by Jaffar Brothers or similar approved
equivalent as per manufacturer's instruction & specification
including all required hardware's for fixing etc., complete in all
respects as per specifications & relevant drawings and all
works to the satisfaction of the Engineer. (Front face will be
measured for payments) 85 Sft Sft
Amount Carried to Civil Summary
8 INTERNAL FLOOR FINISHES
Porcelain Tiles
8.1 N.S.I Providing and laying light colour, glazed/non skid vitrified
porcelean tiles 12" x 24" (imported but not made od china/Pak
made) on floors, in any floor, laid with dry bond (stile bond)
over a base of 1" thick cement mortar (1:3) including jointing to
tiles with joint filler of approved quality as per direction of the
Engineer in charge..complete in all respects as per
specifications & relevant drawings and all works to the
satisfaction of the Engineer.
Base price of tile 1800/Sqm. 0 Sft Sft
8.2 N.S.I Providing, laying and fixing Per-Polished (Boticena) Marble
Counter Top of approved thickness as per drawing & finishing
schedule activities include 40mm thick RCC slab, 1:4 C.S
mortar with Dry Bond, fixing in wall, cutting/chiseling in RCC /
CC members etc, jointing, grouting, chamfering edging/half D
gola arround the counter top, finishing, maintaining proper
level with curing etc. where required complete in all respects
as per specifications and as directed by the Engineer.115 Sft Sft
8.3 N.S.I Providing and laying Terrazzo tiles 13" x 12" x 1" thick for Treads
with bull nosing & 3nos horizontal V- grooves at any floor
including 1:3 screed bedding with mortar including jointing
with grouting material of approved quality & grinding,
polishing etc (overall thickness as shown in the drawings)
complete in all respects, as per drawings, specifications and as
directed by the Engineer.210 Sft Sft
8.4 N.S.I Providing and laying Terrazzo tiles 12" x 6" x 1/2" thick for Risers
at any floor including 1:3 screed bedding with mortar including
jointing with grouting material of approved quality & grinding,
polishing etc (overall thickness as shown in the drawings)
complete in all respects, as per drawings, specifications and as
directed by the Engineer.80 Sft Sft
8.5 N.S.I Providing and laying C.C tiles 13" x 12" x 1" thick for Treads with
bull nosing & 3nos horizontal V- grooves at any floor including
1:3 screed bedding with mortar including jointing with grouting
material of approved quality & grinding, polishing etc (overall
thickness as shown in the drawings) complete in all respects, as
per drawings, specifications and as directed by the Engineer.600 Sft Sft
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Main Gate, Guard &
Water Tank)
Architecture Works
1 2 3 4 5 6 7=4 x 6
Amout
(Pak Rs.)
A-SCHEDULE ITEMS
S.NoPWD Schedule
2012 Ref.NoDescription Qty Unit
Rate
(Pak Rs.)
8.6 N.S.I Providing and laying C.C tiles 12" x 6" x 1/2" thick for Risers at
any floor including 1:3 screed bedding with mortar including
jointing with grouting material of approved quality & grinding,
polishing etc (overall thickness as shown in the drawings)
complete in all respects, as per drawings, specifications and as
directed by the Engineer.260 Sft Sft
8.7 N.S.I Providing & Laying Natural stone 24" x12" & 12" x12", 1" & 1-1/2"
thick rough finished approved local stone on entrance steps &
floor (straight, curved, arches etc.) with cement sand mortar
1:2 and in any pattern in as per direction of the engineer-in-
charge including the cost of curing, making the stone surface
rough flat etc. complete in all respects as per specifications &
relevant drawings and all works to the satisfaction of the
Engineer. (at any height any floor) 380 Sft Sft
Amount Carried to Civil Summary
9 INTERNAL WALL FINISHES
Porcelain Tiles
9.1 N.S.I Providing and laying light colour, glazed/non skid vitrified
porcelean tiles 12" x 24" (Polished), (imported but not made od
china/Pak made) on walls, in any floor, laid with dry bond (stile
bond) over a base of 1" thick cement mortar (1:3) including
jointing to tiles with joint filler of approved quality as per
direction of the Engineer in charge..complete in all respects as
per specifications & relevant drawings and all works to the
satisfaction of the Engineer.
Base price of tile 1800/Sqm. 0 Sft Sft
Amount Carried to Civil Summary
10 CEILING FINISHES
Amount Carried to Civil Summary
11 ROOF FINISHES & WATER PROOFING
Providing & laying complete roof treatment at any floor and
any height as shown in the drawing, details consisting of
following items complete in all respects as per drawing,
standards, specifications and direction of the Engineer.
11.1 N.S.I Providing and laying 1" thick average levelling CC screed over
Rcc slab for achieving leveled surface with (1:4) cement sand
mortar, complete in all respect and as per drawing &
specification and to the entire satisfaction of the Engineer. 318 Cft Cft
11.2 N.S.I Providing and laying in position Water proofing membrane Hi
Grip Elastomer SUNTAN PP4000 4mm thick from Pak Hy-Oils
limited or approved equivalent over above leveled surface
including primer coating, overlapping (horizontal & vertical)
complete as per manufacturer's specifications, instruction & as
shown in the drawing etc, complete in all respects as per
drawings, specification and as directed by the Engineer.0 Sft Sft.
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Main Gate, Guard &
Water Tank)
Architecture Works
1 2 3 4 5 6 7=4 x 6
Amout
(Pak Rs.)
A-SCHEDULE ITEMS
S.NoPWD Schedule
2012 Ref.NoDescription Qty Unit
Rate
(Pak Rs.)
11.3 N.S.I Providing & laying in position 1-1/2"(40mm) thick Diamond
jumbolon-Board from Diamond Foam or approved equivalent
having density 35kg/cum, over above Water Proofing
membrane with rebated edge as per manufacturer's
specifications, instruction & as shown in the drawing etc,
complete in all respects as per drawings, specification and as
directed by the Engineer. 3820 Sft Sft.
11.4 N.S.I Providing and laying BRC mesh 4" x 4" x 10 swg from Al -
Burhan (Pvt) Ltd or approved equivalent including cutting,
binding with steel binding wire etc. complete in all respects as
per drawings, specifications and as directed by the Engineer.3820 Sft Sft.
Amount Carried to Civil Summary
12 EXTERNAL WALL FINISHES (BUILDING)
12.1 N.S.I Providing & Laying free fom natural stone wall cladding
random stone 1" & 1-1/2" thick rough finished approved local
stone on wall (straight, curved, arches etc.) with cement sand
mortar 1:2 and in any pattern in as per direction of the
engineer-in-charge including the cost of curing, making the
stone surface smooth etc. complete in all respects as per
specifications & relevant drawings and all works to the
satisfaction of the Engineer. (at any height any floor)11500 Sft Sft
Fair Faced Plaster12.2 N.S.I Providing and applying Ressi Plastorend-110 (6mm thick) with
sealer Silblock of approved grey & beige colour over rough
cast cement sand plaster on external walls, columns or where
required including chamfered edges, round off corner,
scaffolding, curing etc at any height & any floor etc, complete
in all respects as per drawing, specifications and or as directed
by the consultant / Engineer. (excluding cost of rough cast
plaster)i) Grey colour 0 Sft
ii) Beige colour 0 Sft
LOGO12.3 N.S.I Providing, making, finishing and fixing in position of university
LOGO, IMAGE & LETTERING. 10'-0" dia LOGO made of 12 swg
MS Sheet with the university symbolic image & letter
"UNIVERSITY OF BALTISTAN SKARDU" (In English & Urdu), fixed to
walls 3" projected with 1" dia & 6" long steel hilti/rawal bolts
including three coats of approved colour enamal paint over a
one coat of red oxide primer paint etc. complete in all
respects as per specifications & relevant drawings and all
works to the satisfaction of the Engineer. 0.Each Each
Amount Carried to Civil Summary
ELECTRICAL WORKS
EA Consulting
(Pvt) LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Main Gate Guard & UGWT)
Electrical Works
S.NO: AMOUNT
A SCHEDULE ITEMS
1
2
3
4
5
6
B NON-SCHEDULE ITEMS
1
2
3
4
5
6
7
8
"CLIPSAL" ACCESSORIES ON RECESSED METAL BOARD
Electrical SUMMARY
DESCRIPTION
PVC CONDUIT & DUCT
CONDUITS & PIPES
3 WIRE IN PVC RECESSED CONDUIT
CEILING FANS
WALL BRACKET FANS
PLASTIC BODY EXHAUST FANS
Total of Schedule Items
Add ____% Premium on Electrical Works of PWD-2004
Total of Schedule Items with Premium - A
TOTAL AMOUNT CARRIED TO GRAND SUMMARY (A+B)
L.V DISTRIBUTION BOARDS
LOW VOLTAGE CABLES AND WIRES
WIRING ACCESSORIES
LIGHTING FIXTURES
UPS SYSTEM
EARTHING SYSTEM
LIGHTNING PROTECTION SYSTEM (LPS)
Total of Non-Schedule Items - B
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Gate Office
Electrical Works
1 2 3 4 5 6 7 = 4 X 6
SCHEDULE ITEMS
1 2-67 PVC CONDUIT & DUCT
a) 2-67-10 Supply & fixing 50mm (2") dia PVC conduit with all
especial such as bends, sockets, Junction etc recessed
in the in the wall or floor as required.
10 P/Meter 213.65
Amount Carried to Electrical Summary
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Gate Office
Electrical Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
2 2-74 "CLIPSAL" ACCESSORIES ON RECESSED METAL BOARD
a) 2-74-01 Providing & fixing 10 Amps Polycarbonate flame
retardant S.P switch with fancy required gang plate
fixed on die fabricated, powder coated metal board
recessed in wall or column including connection as
required. (E31-36/1/2A Clipsal make)
6 Each. 138.22
b) 2-74-04 Providing & fixing 10 Amps Polycarbonate flame
retardant 2-Pin switch socket unit ( Universal) with
fancy gang plate fixed on die fabricated, powder
coated metal board recessed in wall or column
including connection as required.(E15U Clipsal make)
38 Each. 396.44
c) 2-74-06 Providing & fixing 15 Amps Polycarbonate flame
retardant 3-Pin switch socket unit with fancy gang
plate fixed on die fabricated, powder coated metal
board recessed in wall or column including
connection as required. (Clipsal make)
4 Each. 514.58
d) 2-74-11 Providing & fixing Polycarbonate flame retardant, 400
watts fan dimmer with plate fixed on die fabricated,
powder coated, metal board recessed in the wall or
column including connection as required. (E32V400F
Clipsal make)
4 Each. 943.58
Amount Carried to Electrical Summary
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Gate Office
Electrical Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
3 2-40 3 WIRE IN PVC RECESSED CONDUIT
a) 2-40-02 Wiring for sub-main with 3x 2.5 mm², PVC insulated wire
300/500 volts grade, single core, stranded copper
conductor wire in 20 mm (3/4")dia PVC conduit
recessed in the wall, column and roof etc as required.
(DB to switch board including wiring between switch
on the same circuit)
240 Meter 141.27
b) 2-40-01 Wiring for sub-main with 3x 1.5 mm², PVC insulated wire
300/500 volts grade, single core, stranded copper
conductor wire in 20 mm (3/4")dia PVC conduit
recessed in the wall, column and roof etc as required.
(Light point from switch board to point)
680 Meter 125.29
c) 2-40-01 Wiring for sub-main with 3x 1.5 mm², PVC insulated wire
300/500 volts grade, single core, stranded copper
conductor wire in 20 mm (3/4")dia PVC conduit
recessed in the wall, column and roof etc as required.
(Light point to point)
385 Meter 125.29
d) 2-40-02 Wiring for sub-main with 3x 2.5 mm², PVC insulated wire
300/500 volts grade, single core, stranded copper
conductor wire in 20 mm (3/4")dia PVC conduit
recessed in the wall, column and roof etc as required.
(DB to 5/10A outlet)
180 Meter 141.27
e) 2-40-02 Wiring for sub-main with 3x 2.5 mm², PVC insulated wire
300/500 volts grade, single core, stranded copper
conductor wire in 20 mm (3/4")dia PVC conduit
recessed in the wall, column and roof etc as required.
(Outlet to 5/10A outlet)
155 Meter 141.27
f) 2-40-03 Wiring for sub-main with 3x 4 mm², PVC insulated wire
300/500 volts grade, single core, stranded copper
conductor wire in 20 mm (3/4")dia PVC conduit
recessed in the wall, column and roof etc as required.
(DB to 13A outlet)
75 Meter 185.94
g) 2-40-03 Wiring for sub-main with 3x 4 mm², PVC insulated wire
300/500 volts grade, single core, stranded copper
conductor wire in 20 mm (3/4")dia PVC conduit
recessed in the wall, column and roof etc as required.
(Outlet to 13A outlet)
35 Meter 185.94
h) 2-40-03 Wiring for sub-main with 3x 4 mm², PVC insulated wire
300/500 volts grade, single core, stranded copper
conductor wire in 20 mm (3/4")dia PVC conduit
recessed in the wall, column and roof etc as required.
(DB to 15A outlet)
60 Meter 185.94
j) 2-40-03 Wiring for sub-main with 3x 4 mm², PVC insulated wire
300/500 volts grade, single core, stranded copper
conductor wire in 20 mm (3/4")dia PVC conduit
recessed in the wall, column and roof etc as required.
(Outlet to 15A outlet)
20 Meter 185.94
Amount Carried to Electrical Summary
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Gate Office
Electrical Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
4 2-106 CEILING FANS
a) 2-106-03 Providing & installing 140 Cm (56") sweep ceiling fan
with blades, canopy, strandard length of down rod
including connection with 14.0076" flexable wire
complete as required. (without regulator) Millat/Pak/
Asia/ Younas/Climax/ Royal.
10 Each. 2,088.00
Amount Carried to Electrical Summary
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Gate Office
Electrical Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
5 2-107 WALL BRACKET FANS
a) 2-107-03 Providing & installing 45 Cm (18") sweep wall bracket
fan complete with blades, regulator & pulling cord
switch, fitted on wall or column with GI clip including
connection as required. Millat/Pak/Asia/
Younas/Climax/ Royal.
3 Each. 1,884.00
Amount Carried to Electrical Summary
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Gate Office
Electrical Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
6 2-110 PLASTIC BODY EXHAUST FANS
a) 2-110-01 Providing & installing 20 Cm (8") sweep, Plastic body
Exhaust fan complete with blades, motor, etc fixed in
existing hole including connection with 14/.0076"
flexable wire complete as required. Millat/
Pak/Asia/Younas/Climax/ Royal.
7 Each. 1,286.00
Amount Carried to Electrical Summary
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Gate Office
Electrical Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
NON-SCHEDULE ITEMS
1 CONDUITS & PIPES
a) Supply and installation of following size internal
diameter PVC / uPVC Class-D pipe / Flexible PVC
Conduit as race ways with all accessories, recessed /
surface on wall / column / under floor, as per drawings
and specifications, complete in all respect.
i 38 mm dia uPVC Pipe (Class-D) 50 Rm.
b) Supply and installation of following size UPVC Pipe
Class-D / Road Crossing Sleeves Class-D for Power
cables. Buried in ground / under roads / under floor as per
specification, including excavation for laying of pipe, bricks,
warning tape and backfilling with new and fresh sand (6" under
and 6" above pipe) etc., (whereever required), as shown on the
specifications and drawings, complete in all respect.
i 50mm dia uPVC Conduit (Class-D) 15 Rm.
ii 150mm dia uPVC Conduit (Class-D) 15 Rm.
iii 150mm dia uPVC Conduit (Class-D Road Crossing
Sleeves)
10 Rm.
c) Supply and installation of Pull Boxes (Floor / Wall) with
all installation accessories, as per drawings,
specifications and approved brands, complete in all
respect.
2 No.
d) Supply and installation of following Cable Trench
Covers consisting of Heavy duty MS Chequered plate,
as per drawing and details. Complete in all respect
and the entire satisfaction of the engineer and
employer. (Civil works cost not included.)
i Cable Trench Covers consisting of Heavy Duty MS
Chequered Plate (Trench Size 2'-6" Wide x 3'-0" Depth)
25 Rm.
e) Providing and Construction of Manhole Size 3'-0" x 3'-0"
x 3'-0" deep, 6"thick, concrete 1:2:4 ratio with 3' round
heavy duty cast iron cover, 100% water proof, as per
specification and as shown on the drawing, complete
in all respect. (For Electrical cables)
4 No.
f) Providing and Construction of Handhole Size 2'-0" x 2'-
0" x 3'-0" deep, 6"thick, concrete 1:2:4 ratio with 2'
round heavy duty cast iron cover, 100% water proof, as
per specification and as shown on the drawing,
complete in all respect. (For Electrical cables)
2 No.
Amount Carried to Electrical Summary
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Gate Office
Electrical Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
2 L.V. DISTRIBUTION BOARDS
a) Supply, installation, testing and commissioning of
following wall mounting / floor standing surface type
Main Distribution Board (MDB), Sub Main Distribution
Boards (SMDB's) and Distribution Board (DB's) made
with 16 SWG sheet metal, dust protected, vermin proof
housing coated with approved color having all the
necessary switching, energy analyzer etc., protections,
as per drawing and specification, complete in all
respect.
i DB-GO-GF 1 No.
ii DB-S/S 1 No.
iii DB-GO-2F 1 No.
Amount Carried to Electrical Summary
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Gate Office
Electrical Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
3 LOW VOLTAGE CABLES AND WIRES
3.1 Supply, laying, termination, tagging, testing and
commissioning of following size copper conductor
multi core / single core, Cu/PVC, Cu/PVC/PVC,
unarmoured, 0.6 kV/1 kV, 450/750V or 300/500V
voltage grade copper cable in already laid PVC
conduit / cable tray / trench including all accessories
lugs, cable gland etc. as per drawings and
specification, complete in all respect.
a) 4 Core, Cu./PVC/PVC Cable (600/1000V)
i 4C, 10 Sqmm Cu/PVC/PVC 10 Rm.
b) 1 Core, Cu./PVC Cable
i 1C, 6 Sqmm Cu/PVC 80 Rm.
c) 1 Core, Cu./PVC Cable as ECC (450/750V)
i 1C, 10 Sqmm Cu/PVC 10 Rm.
ii 1C, 6 Sqmm Cu/PVC 40 Rm.
Amount Carried to Electrical Summary
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Gate Office
Electrical Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
4 WIRING ACCESSORIES
a) Supply, installation, testing and commissioning of
following 10/13/15/20A, One/Two/Three/Four gang
type switches, Dimmer Switches, Sockets including 16
SWG Sheet Steel powder coated back boxes with
earth terminal, recessed in wall, with all accessories as
per drawigs and specification, complete in all
respects.i Two Gang Switch 10A 14 No.
ii Three Gang Switch 10A 7 No.
iii Four Gang Switch 10A 8 No.
iv Two Gang Fan Dimmer Switch 10A 3 No.
v 10A, 2-Pin Switch Socket Outlet (Weatherproof type) 5 No.
vi 13A, 3-Pin Flat 2-Gang Switch Socket Outlet 13 No.
vii 15A, 3-Pin Switch Socket Outlet (Weatherproof type) 1 No.
viii 13A, Unswitched Spur Outlet 1 No.
ix 32A, 3-Pin Industrial Socket with Plug top 2 No.
Amount Carried to Electrical Summary
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Gate Office
Electrical Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
5 LIGHTING FIXTURES
a) Supply, installation, testing and commissioning of
following Light fixtures complete with starters,
Electronic ballast (unless mention otherwise), lamps,
lamp holders, drivers, mounting accessories etc., as
per drawings and specifications, complete in all
respects. Lighting fixtures sample must be submitted to
consultant for approval.
Note: Refer light fixtures drawings for complete light
fixtures details.
i Surface mounted LED Light Fixture (IP-20) with 1x40W
LED lamp
4 No.
ii Surface mounted LED Downlight Fixture (IP-20) with
1x20W LED lamp
88 No.
iii Surface mounted LED Downlight Fixture (IP-20) with
1x18W LED lamp
11 No.
iv Recessed mounted LED Downlight Fixture (IP-20) with
1x12W LED lamp
6 No.
v Wall / Surface mounted LED Bi-Directional Light Fixture
(IP-54) with 2x12W LED lamp
17 No.
vi Recessed mounted LED Ramp Light Fixture (IP-65) with
1x6W LED lamp
6 No.
vii Surface mounted LED Light Fixture (IP-54) with 1x40W
LED lamp
12 No.
viii Surface mounted LED Downlight Fixture (IP-20) with
1x25W LED lamp
17 No.
ix Suspended mounted LED Pendent Light Fixture (IP-20)
with 1x25W LED lamp
2 No.
x Wall / Surface mounted LED Wall Light Fixture (IP-20)
with 1x20W LED lamp
7 No.
xi Surface mounted LED Mini Flood Light Fixture (IP-65)
with 1x35W LED lamp
3 No.
b) Supply, installation, testing and commissioning of
following items including all connecting accessories as
per drawings, specifications, complete in all respects.
i Fan Hook M.S.Box with colour coated 10 No.
Amount Carried to Electrical Summary
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Gate Office
Electrical Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
6 UPS SYSTEM
a) Supply, installing, testing and commissioning of True
Online Double Conversion UPS rating 4 kVA Single
Phase in, Single Phase out, minimum 0.9 output power
factor with 10 minutes battery backup, batteries with
related DC cables from UPS to batteries, external By-
pass and all accessories as per specification and
drawings, complete in all respect.
- No.
Amount Carried to Electrical Summary
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Gate Office
Electrical Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
7 EARTHING SYSTEM
Supply, installation, testing and commissioning of
following items for complete earthing system including
all connecting accessories as per drawings,
specifications and as mentioned in General Notes,
complete in all respects.
a) Supply, installation, testing and commissioning of
following items for complete Power Earthing system,
including Bentonite chemical, other all required
materials and connecting accessories, boring, labor,
tools, transportation etc., as per drawings and
specifications, complete in all respects with detailed
test reports.
i Earth pit with Rod type earth electrode, 20mm dia and
3 meter long copper rod.
1 No.
b) Supply, installation, testing and commissioning of
Copper Earth Bar, 6 Way 400mm for earthing system as
per drawings and instruction of consultant, including
all mounting accessories etc., complete in all respect.
1 No.
c) Supply, installation, testing and commissioning of
following size of PVC insulated Cu. Conductor cable as
earth continuity conductor (ECC) installed on surface /
in appropriate already installed raceway / in already
excavated trench / in already laid pipe, as per
specifications and drawings, complete in all respect.
i 70 Sq.mm Cu/PVC 10 Rm.
Amount Carried to Electrical Summary
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Gate Office
Electrical Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
8 LIGHTNING PROTECTION SYSTEM (LPS)
a) Supply, installation, testing and commissioning of Early
Streamer Emission (ESE) Air Terminal mounted on 3
meter elevation mast, as per drawing, complete in all
respect and having following specifications:
1 No.
* Efficiency: 60 micro seconds
* Lightning current withstanding test (10/350µs): 100 kA
* ESE Central Rod: Nickel Plated Copper
* Metal Housing : Stainless Steel 316L
* Protection Radius : min 52 meter at 3 meter height
* Built-In Flash Counter and Remote Testing
b) Supply and installation of 3 meter high elevation mast
consisting mounting bracket for installation and fixing
of ESE Air Terminal, as per drawing, specification and
site requirement necessary for the system, complete in
all respect.
1 No.
c) Supply and installation of lightning flash counter as per
drawing, specification and site requirement necessary
for the system, complete in all respect.
1 No.
d) Supply, installation, testing and commissioning of
complete Earthing pit with Rod type earth electrode,
20mm dia and 3 meter long copper rod, including
Bentonite chemical, other all required materials and
connecting accessories, boring, labor, tools,
transportation etc., as per drawings and specifications,
complete in all respects with detailed test reports.
1 No.
e) Supply and installation of Test Clamp and Guard Tube
2m in length, as per drawing, specification, and site
requirement necessary for the functioning of the
system, complete in all respect.
1 Job
f) Supply, laying, testing and commissioning of 1x70
Sq.mm PVC insulated Cu. conductor cable in already
installed 38mm dia uPVC Pipe down from roof on the
elevation of the building & at ground level connecting
Lightning protection pits to power earthing pits,
including all fixing accessories etc., as per drawings,
specification & site requirement necessary for the
functioning of the system, complete in all respect.
30 Rm.
Amount Carried to Electrical Summary
ELV WORKS
EA Consulting
(Pvt) LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Main Gate Guard & UGWT)
ELV Works
S.NO: AMOUNT
A SCHEDULE ITEMS
1
B NON-SCHEDULE ITEMS
1
2
3
4
5
6
7
8
ELV SUMMARY
DESCRIPTION
PVC CONDUIT & DUCT
ACCESS CONTROL SYSTEM
Total of Schedule Items
Add ____% Premium on ELV Works of PWD--2004
Total of Schedule Items with Premium - A
CONDUITS & PIPES
VOICE, DATA COMMUNICATION & CCTV CABLING SYSTEMS (Passive
Equipment Only)
CCTV SYSTEM
Total of Non-Schedule Items - B
TOTAL AMOUNT CARRIED TO GRAND SUMMARY (A+B)
ADDRESSABLE FIRE ALARM SYSTEM
SELF CONTAINED EMERGENCY LIGHTS
CABLE TELEVISION SYSTEM (CATV)
PHYSICAL SECURITY SYSTEM
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANITITES
Gate Office
ELV Works
1 2 3 4 5 6 7 = 4 X 6
SCHEDULE ITEMS
1 2-67 PVC CONDUIT & DUCT
a) 2-67-10 Supply & fixing 50mm (2") dia PVC conduit with all
especial such as bends, sockets, Junction etc
recessed in the in the wall or floor as required.
60 P/Meter 213.65
Amount Carried to ELV Summary
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANITITES
Gate Office
ELV Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
NON-SCHEDULE ITEMS
1 CONDUITS & PIPES
a) Supply and installation of following size internal
diameter PVC / uPVC Class-D pipe / Flexible PVC
Conduit as race ways with all accessories, recessed /
surface on wall / column / under floor, as per drawings
and specifications, complete in all respect.
i 25 mm dia Flexible PVC Conduit 25 Rm.
b) Supply and installation of following size UPVC Pipe
Class-D / Road Crossing Sleeves Class-D for
Telecommunication Cable (copper / optic fiber). Buried in
ground / under roads / under floor as per specification, including
excavation for laying of pipe, bricks, warning tape and backfilling
with new and fresh sand (6" under and 6" above pipe) etc.,
(whereever required), as shown on the specifications and
drawings, complete in all respect.
i 50mm dia uPVC Conduit (Class-D) 115 Rm.
ii 100mm dia uPVC Conduit (Class-D) 115 Rm.
c) Supply and installation of Pull Boxes (Floor / Wall) with
all installation accessories, as per drawings,
specifications and approved brands, complete in all
respect.
10 No.
d) Providing and Construction of Handhole Size 2'-0" x 2'-
0" x 2'-0" deep, 6"thick, concrete 1:2:4 ratio with 2'
round heavy duty cast iron cover, 100% water proof,
as per specification and as shown on the drawing,
complete in all respect. (For Electrical cables)
4 No.
Amount Carried to ELV Summary
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANITITES
Gate Office
ELV Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
2
VOICE, DATA COMMUNICATION & CCTV CABLING
SYSTEMS (Passive Equipment Only)
a) Supply, installation, testing and commissioning of
following Data / Voice Cabinets, for patch panel,
Fiber panels, adapter, PDU's, Fans and space for
active switches as it may require to complete the
entire passive and active network as per the single
line diagram, drawings and specifications, complete
in all respect.
i 12U Data Rack with PDU's (800mmx800mm) 1 No.
b) Supply, installation, testing and commissioning of
Single RJ-45, Cat-6 outlet for Voice with shutter type
and 16 SWG back box including tagging, as per
drawing and specification, complete in all respect.
6 No.
c) Supply, installation, testing and commissioning of
Single RJ-45, Cat-6 outlet for Data with shutter type
and 16 SWG back box including tagging, as per
drawing and specification, complete in all respect.
7 No.
d) Supply, installation, testing and commissioning of Dual
RJ-45, Cat-6 outlet for Voice & Data with shutter type
and 16 SWG back box including tagging, as per
drawing and specification, complete in all respect.
6 No.
e) Supply, installation, testing and commissioning of
Single RJ-45, Cat-6 outlet for Camera with shutter type
and 16 SWG back box including tagging, as per
drawing and specification, complete in all respect.
7 No.
f) Supply, laying, termination, testing and commissioning
of CAT 6 - 4 pair cable for Single RJ-45 outlet (Data,
Voice, Camera and Access control system) in 25mm
dia PVC conduit concealed / surface from each
outlet to IDF racks, including tagging and piping with
all necessary accessories, complete in all respect.
650 Rm.
g) Supply, installation, testing and commissioning of 24
port shutter type Cat 6, RJ 45 UTP Patch Panel fully
loaded with tool less jacks and rear cable manager,
as per drawing and specification, complete in all
respect.
2 No.
h) Supply, installation, testing and commissioning of 24
port Single Mode Fiber Patch Panel fully loaded with
pigtails etc., and rear cable manager, as per drawing
and specification, complete in all respect.
1 No.
j) Supply, installation, testing and commissioning of 19"
front/rear (as required) cable organizer between
patch panels and active equipment to provide patch
cable management including with all necessary
accessories, as per drawing and specification,
complete in all respect.
3 No.
k) Supply, installation, testing and commissioning of CAT-
6 UTP (RJ-45 to RJ-45) for the above Patch Panels
including with all necessary accessories, as per
drawing and specification, complete in all respect.
i CAT-6 (1m) Long Patch Cord 32 No.
ii CAT-6 (2m) Long Patch Cord 32 No.
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANITITES
Gate Office
ELV Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
l) Supply, laying, termination, testing and commissioning
of Cat-5e, 25 pair cable from IDF rack to remaining IDF
racks in already laid conduit / cable tray including
with all the necessary accessories as per drawing and
specifications, complete in all respect.
10 Rm.
m) Supply, laying, termination, testing and commissioning
of 8 Core Multi mode Fiber Optic Cable from IDF rack
to remaining IDF Racks in already installed cable tray /
conduit, as shown in drawings including termination
and tagging at both ends, as per standard
specifications with all termination accessories up to
entire satisfaction of IT Engineer.
25 Rm.
n) Supply, installing, testing and commissioning of
following blocks in Data racks, as per drawing and
specification, complete in all respect.
i 1x50 Pair IDC Block 1 No.
o) Installation, testing and commissioning by
Manufacturer Authorized Agent / Dealer and handing
over complete Voice & Data System to Owner with
Providing Training voice data fuke & OTDR Testing, as
build drawing, Rack layouts and certification's
Principal, complete equipment's Manual and
Warranty Documents to Owners representative.
1 Job.
Amount Carried to ELV Summary
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANITITES
Gate Office
ELV Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
3 CCTV SYSTEM
Supply, installation, testing and commissioning of
following items for CCTV System, described below
including all accessories, as per the single line
diagram and specification, complete in all respect.
a) Supply, installation, testing and commissioning of 2 MP
IP based camera with 1/2.8" CMOS 3.3 TO 12mm
varfocal lens, power adopter, wall mounted bracket,
and IP-65 housing, complete in all respect with fixing
accessories, as per drawing and specifications,
complete in all respect.
7 No.
b) Supply, installation, tagging, testing and
commissioning of 100 Channel NVR with RAID 1+0
configuration based, built-in VMS built-in 48TB HDD for
24/7 recording with integral access slots for HDD
suspension bays & 10 client Licenes, as per drawing
and specifications, complete in all respect.
1 No.
c) Supply, installation, testing and commissioning of 32"
LED Screen, including all mounting accessories etc., as
per drawing and specifications, complete in all
respect.
2 No.
d) Supply, installation, testing and commissioning of 27U
CCTV Rack (Wall/Floor mounted), equipped with
power distribution units (PDUs) with imported power
sockets and proper ventilation system including fan
etc., as per drawing and specifications, complete in
all respect.
1 No.
e) Supply, installation, testing and commissioning of Core
i7 Work Station Dual VGA Card & Licensed windows
10, as per drawing and specifications, complete in all
respect.
1 No.
f) Supply, installation, testing and commissioning of
variable speed desktop keyboard with all fixing
accessories, as per drawing and specifications,
complete in all respect.
1 No.
g) Installation, testing, commissioning, programming by
Manufacturer Authorized Agent / Dealer and handing
over complete CCTV System to Owner with providing
training, SOP, complete equipment's manual and
warranty documents to owners representative.
1 Job.
Amount Carried to ELV Summary
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANITITES
Gate Office
ELV Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
4 ACCESS CONTROL SYSTEM
a) Supply, installation, testing and commissioning of 2
Door Controller LAN Based with power supply, as per
drawings and specification, complete in all respect,
complete in all respect with fixing accessories, as per
drawing and specifications, complete in all respect.
- No.
b) Supply, installation, testing and commissioning of BIO
Proximity Card Reader, as per drawings and
specification, complete in all respect.
- No.
c) Supply, installation, testing and commissioning of Exit
Control Push Button, as per drawings and
specification, complete in all respect.
- No.
d) Supply, installation, testing and commissioning of
Electromagnetic Door Lock with matching power
supply, as per drawings and specification, complete
in all respect.
- No.
e) Supply, installation, testing and commissioning of
Access control Enterprise Software with enterprise level
time attendance software integrated with IP Based
CCTV System. Complete in all respect.
- No.
f) Supply, installation, testing and commissioning of Core
i7 PC for enterprise software, as per drawing and
specifications, complete in all respect.
- No.
g) Supply, installation, testing and commissioning of PVC
Card for Reader, complete with Printer and cartridge
kit, as per drawing and specifications, complete in all
respect.
- No.
h) Installation, testing, commissioning & programming by
Manufacturer Authorized Agent / Dealer and handing
over complete Access Control System to Owner with
providing training, SOP, complete equipment's
manual and warranty documents to Owner's
Representative.
- Job.
Amount Carried to ELV Summary
NOT APPLICABLE
NOT APPLICABLE
NOT APPLICABLE
NOT APPLICABLE
NOT APPLICABLE
NOT APPLICABLE
NOT APPLICABLE
NOT APPLICABLE
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANITITES
Gate Office
ELV Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
5 ADDRESSABLE FIRE ALARM SYSTEM
a) Supply, laying, termination, testing and commissioning
of wiring for complete Fire Alarm System with 2C-1.5
Sq.mm shielded FP-200, twisted pair Fire Resistant
Cable (2 hrs. rated) in 25mm dia PVC conduit
concealed, (M.S conduit for surface.) etc., including
any wiring between fire alarm control panel and
other's systems control panel's etc. Complete in all
respect.
225 Rm.
b) Supply, installation, testing and commissioning of
Addressable Photoelectric Smoke Detector with base
and back box, as per drawing and specification,
complete in all respect.
12 No.
c) Supply, installation, testing and commissioning of
Addressable Photoelectric Heat Detector with base
and back box, as per drawing and specification,
complete in all respect.
4 No.
d) Supply, installation, testing and commissioning of
Addressable Manual Pull Station / Call Point with base
and back box, as per drawing and specification,
complete in all respect.
4 No.
e) Supply, installation, testing and commissioning of
Addressable Sounder with flasher / Strobe and base
and back box, as per drawing and specification,
complete in all respect.
5 No.
f) Supply, installation, testing and commissioning of
Addressable Manual Pull Station / Call Point
(Weatherproof type) with base and back box, as per
drawing and specification, complete in all respect.
1 No.
g) Supply, installation, testing and commissioning of
Addressable Sounder (Weatherproof) with flasher /
Strobe, base and back box, as per drawing and
specification, complete in all respect.
3 No.
h) Supply, installation, testing and commissioning of
Monitor Module and back box, as per drawing and
specification, complete in all respect.
2 No.
j) Providing, laying, testing and commissioning of Linier
Heat Detectors Sensor Cable (LHD) with all required
accessories. Complete in all respect.
55 Rm.
k) Providing, installation, testing and commissioning of
Addressable Module for Linier Heat Detectors Sensor
Cable (LHD), complete in all respect.
6 No.
l) Providing, installation, testing and commissioning of
EOL Terminator Box with Fire & Fault Test Key Switch for
Linier Heat Detectors Sensor Cable (LHD), complete in
all respect.
6 No.
m) Providing, installation, testing and commissioning of
Junction Box (Interposing Cable to LHDC - Stainless
Steel), complete in all respect.
6 No.
n) Providing, installation, testing and commissioning of
Junction Box (Interposing Cable to LHDC -
Polycarbonate), complete in all respect.
6 No.
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANITITES
Gate Office
ELV Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
o) Supply, installation, testing and commissioning of 01
Loop Addressable Fire Alarm Control Panel (FACP),
including all necessary accessories, identification
tagging etc. and 3Hrs battery back up. FACP as per
drawing and specification, complete in all respect.
1 No.
p) Installation, testing and commissioning, Softwear,
Programming by Manufacturer Authorized Agent /
Dealer and handing over complete Fire Alarm system
to owner with providing training, SOP, complete
equipment's manual and warranty documents to
Owner's Representative.
1 Job.
Amount Carried to ELV Summary
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANITITES
Gate Office
ELV Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
6 SELF CONTAINED EMERGENCY LIGHTS
Supply, installation, testing and commissioning of
following items for self contained emergency lights
with all fixing accessories, as per drawing and
specification, complete in all respect.
a) 3W, Emergency light with self contained Battery,
Ceiling / Surface mounted IP-20 rated, UL 924 Listed,
as per specification and drawing, complete in all
respect. (non-maintained)
10 No.
b) 3W, Emergency light with self contained Battery,
Ceiling / Surface mounted IP-65 rated, UL 924 Listed,
as per specification and drawing, complete in all
respect. (non-maintained)
4 No.
c) 3W, Emergency light with self contained Battery, Wall
mounted IP-65 rated, UL 924 Listed, as per
specification and drawing, complete in all respect.
(non-maintained)
5 No.
d) 3W, Exit light with self contained Battery, 24m viewing,
Directional Pandent, IP-65 rated, UL 924 Listed, as per
specification and drawing, complete in all respect.
(non-maintained)
5 No.
Note: Selection of Exit Light is as per Architect's
approval.
Amount Carried to ELV Summary
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANITITES
Gate Office
ELV Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
7 CABLE TELEVISION SYSTEM (CATV)
a) Supply, installation, testing and commissioning of TV
outlet face plate with 16 SWG back box, complete in
all respects.
1 No.
b) Supply and installation of CATV 1x4 Way TVJB Splitter
Box, complete in all respects.
1 No.
c) Supply and installation of CATV RG-06 Co-axial 75
ohms shielded cable in 25mm dia PVC conduit from
box to TV outlet, complete in all respects.
25 Rm.
Amount Carried to ELV Summary
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANITITES
Gate Office
ELV Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
8 PHYSICAL SECURITY SYSTEM
a) Supply, installation, testing and commissioning of
Road Blocker 3 meter length with all fixing accessories
including the cost of providing complete equipment's
manual and warranty documents to owners
representative, complete in all respects.
- No.
b) Supply, installation, testing and commissioning of Walk
Through Gate with all fixing accessories including the
cost of providing complete equipment's manual and
warranty documents to owners representative,
complete in all respects.
2 No.
c) Supply, installation, testing and commissioning of Type
Killer (4 meter length) including the cost of providing
complete equipment's manual and warranty
documents to owners representative, complete in all
respects.
- Job
d) Supply, installation, testing and commissioning of Drop
Arm Vehicle Barrier Gate with Master Intercom Data
logging printer, emergency stop button, LED and all
related accessories, complete in all respect.
2 Job
e) Supply, installation, testing and commissioning of UVSS
systems including 1 No. PC, Software and all fixing
accessories including the cost of providing complete
equipment's manual and warranty documents to
owners representative, complete in all respects.
- Job
Amount Carried to ELV Summary
NOT APPLICABLE
NOT APPLICABLE
NOT APPLICABLE
PLUMBING WORKS
EA Consulting
(Pvt) Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Main Gate Guard & UGWT)
Plumbing Works
S.NO: AMOUNT
A SCHEDULE ITEMS
1
2
B NON-SCHEDULE ITEMS
1
2
3
4
PLUMBING SUMMARY
DESCRIPTION
MAN HOLES
u.P.V.C PIPE (EXTERNAL) "D" CLASS
FIRE FIGHTING WORKS
Total of Schedule Items
Add __% Premium on Plumbing Works of PWD-2012
Total of Schedule Items with Premium - A
PLUMBING FIXTURES
WATER SUPPLY WORKS
DRAINAGE WORKS
Total of Non-Schedule Items - B
TOTAL AMOUNT CARRIED TO GRAND SUMMARY (A+B)
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Gate Office)
Plumbing Works
1 2 3 4 5 6 7 = 4 X 6
SCHEDULE ITEMS
1 MAN HOLES:
315 -17 /
Pg:82
Providing manhole type 'C' size 3 feet x 2-1/2 feet (914
mm x 762 mm) (inside dimensions) 7-1/2 feet (2.28 m)
deep as per approved design and specifications
complete for 4 inches to 12 inches (100 mm to 305 mm
) dia. Pipe 7 feet-6 inches to 12 feet (2.28 M to 3.66 m)
depth with 18 inches (457 mm) dia. (inside) cast iron
cover and frame (weight=1 cwt. 3 Qrs.) (88.90 kg.)
fixed in R.C.C. 1:2:4 slab 6 inches (150 mm) thick, 9
inches (229 mm) thick burnt brick masonry walls set in
1:4 C.M., 6 inches (150 mm) thick 1:3:6 C.C. in
foundation, 1:2:4 C.C. in benching and 1/2 inch(13
mm) thick cement plaster in 1:3 C.M., to all inside wall
surfaces, channels and benching etc. and to top
including providing and fixing cast iron foot rest at
every foot of depth and making requisite number of
main and branch channels but excluding the cost of
excavation, back filling, disposal of excavated stuff,
manhole cover and frame.
3 Nos 32,777.77
2 u.P.V.C PIPE (EXTERNAL) "D" CLASS:
306 - 21 / Pg:
57
Providing and fixing un plasticized polyvinyl chloride
pipe (P.V.C) "D" class and specials etc. including
cutting and fitting complete with and including the
cost of cutting trench up to 1-1/2 feet deep refilling,
watering, ramming, and disposal of surplus earth
within one chain and after cleaning the pipe and
cartage within 10 miles (16.09 km.) (working pressure
12 kg/cm2 ) 1-1/4 inches (32 mm) dia.
306 - 27 / Pg:
576" inches (150 mm) dia pipe 130 Rft 509.08
Amount Carried to Plumbing Summary
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2012 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Gate Office)
Plumbing Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2012 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
NON-SCHEDULE ITEMS
PLUMBING FIXTURES:
1
Providing and fixing European type water closet with
(one piece) dual flush Tank with 6.0 liters main flush
tank and 3 liters secondary flush tank, build in S/P-Trap
, Stop cock with flexible pipe as specified by architect
in Fixture schedule, per drawings, specifications and
Engineers Approval.
6 Nos
2
Providing and fixing Eastern water closet with 6 liters
main flush tank, build in S-Trap, Stop cock with Drain
pipe till flush tank as per drawings, specifications and
Engineers Approval.
2 Nos
3
Providing and fixing wash basin with mixer having flow
of 6.0 lpm or less with two (2) nos. Stop cocks, Flexible
Connection , flexible drain pipe to floor drain as
specified by architect in Fixture schedule, per
drawings, specifications and Engineers Approval.
8 Nos
4
Providing and fixing of kitchen/Pantry Sink with mixer,
waste trap, Stop cocks with flexible pipes, Flexible
drain pipe as per drawings , specifications and
engineers approval.
3 Nos
5
Providing and fixing of Shower head with shower mixer
having maximum flow of 9.5 lpm, as specified by
architect in Fixture schedule, per drawings,
specifications and Engineers Approval.
1 Nos
6 Providing and fixing bath toilet accessories as under:
a Toilet Paper Holder 8 Nos
b Hand Spray / Muslim shower 8 Nos
c Liquid Soap Dispenser/ Soap dish 8 Nos
d WC Cleaning Brush 8 Nos
e Robe Hooks 8 Nos
f Towel Railing 8 Nos
Sub Total of Plumbing Fixtures
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Gate Office)
Plumbing Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2012 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
WATER SUPPLY:
1 COLD & HOT WATER PIPING:
Supply, installation, testing and Commissioning of PPR
PN - 20 Cold/Hot water pipes as per DIN 8077-8078
with molded fittings PN - 25 as per DIN 16962, including
pipe supports, cutting, filling, testing/commissioning
and all accessories as indicated on the drawing, as
per specifications and Engineers approval.
i 3/4" dia 430 Rft
ii 1" dia 265 Rft
iii 1 1/4" dia 140 Rft
iv 1 1/2" dia 80 Rft
v 2" dia 70 Rft
2 ISOLATION VALVES:
Providing and fixing of PPR Coated PN-20 Gate valves
of bronze material for diameter 2" and smaller and
Cast Iron material for Diameter greater than 2" as per
specifications and Engineers approval.
i 3/4" dia 3 Nos
ii 1" dia 1 Nos
iii 1 1/4" dia 1 Nos
iv 1 1/2" dia 3 Nos
v 2" dia 2 Nos
3 PLUMBING SPECIALITIES:
Supply and installation of the following including all
fittings, fixings, accessories, etc., as indicated on the
drawing, as per Specifications and Engineers
approval.
i 1/2" dia. Bib Tap 2 Nos.
ii 1" Air Relief Valve - Nos.
4 COLD & HOT WATER PIPE INSULATION:
Supply, installation, testing and Commissioning of
20mm thick closed cell rubber foam inculation (NBR)
for cold & hot water piping, as per specifications and
Engineers approval.
i 3/4" dia 430 Rft
ii 1" dia 265 Rft
iii 1 1/4" dia 140 Rft
iv 1 1/2" dia 80 Rft
v 2" dia 70 Rft
Continued..
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Gate Office)
Plumbing Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2012 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
5 WATER COOLER:
Supply and installation of Stainless Steel Electric water
cooler of below mentioned capacity with two taps, R-
22 Refrigeration system, S.Steel Tank safety tested at
10kg/cm2 (142 p.s.i.) with recommended maximum
working pressure of 3kg/cm2 (42 p.s.i.) including all
accessories like Valves, interconnecting piping, Drain
tray and drain connection s as indicated in the
drawings, as per specifications and engineers
approval.
1 Nos
i WC - 01 ( Capacity 32 GPH )
6 3 STAGE WATER FILTER:
Supply and installation of 3 stage filter having 5
Microns Pre Filter, Active Carbon Filter and UV Water
filter having minimum flow rate of 200 Gallons per Day
to be installed with Water cooler , including valves,
piping, accessories, etc., as per specifications and
Engineers approval.
1 Nos
7 CEILING HUNG ELECTRIC HEATER:
Providing and fixing of ceiling hung Electric Hot water
heater with all accessories like Clamps, isolation
valves, Air relief valves as indicated in the drawings, as
per specifications and engineers approval.
i EH - 01 ( Capacity 50 litre) 4 Nos
ii EH - 01 ( Capacity 80 litre) 1 Nos
Continued..
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Gate Office)
Plumbing Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2012 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
8 WATER TANK CONNECTION:
Connection for water tank including with valves,
supports, excavation and Backfill, complete all in
accordance with the drawing and specifications.
i 2" Connection to RCC water tanks 1 Nos
iiConnection to overhead water tanks using Float
switch- Nos
iii Cast Iron Medium Duty Cover For RCC water tanks 1 Nos
Sub Total of Water Supply Works
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Gate Office)
Plumbing Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2012 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
DRAINAGE WORKS:
1 SOIL, WASTE & VENT PIPING:
Providing and fixing, uPVC pipes and fittings as per BS
EN 1329 for above ground installations for Soil, Waste,
Vent pipes with Kite mark on pipes and fittings
including cleanout plug, clamps, hanger collars,
supports, specials (bend, tees, Y-tee etc.) as indicated
on the drawing, as per specifications and Engineers
approval.
i 2" dia 70 Rft
ii 3" dia 180 Rft
iii 4" dia 110 Rft
2 DRAINAGE SPECIALITIES:
Providing and fixing of Multi floor trap with multiple
dia inlet and Single outlet and cleanout plug of the
approved self cleaning design with S.Steel grating as
specified by the architect, as indicated on the
drawing, as per specifications, architectural finishing
schedule and Engineers approval.
20 Nos
Providing and fixing UPVC cowl for vent pipe of the
following dia including all accessories complete in all
respects.
i 2" dia - Nos
ii 3" dia 2 Nos
iii 4" dia 2 Nos
Continued..
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Gate Office)
Plumbing Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2012 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
3 GULLY TRAPS:
Construction of 12" x 12" gully trap with 8" P- trap and
12" x 12" cover (min Weight =45 kg) as specified and
shown on the drawing, as per specifications and
Engineers approval.
3 Nos
Sub Total of Drainage Works
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Gate Office)
Plumbing Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2012 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
FIRE FIGHTING WORKS:
1 FIRE EXTINGUISHERS:
Supply and installation of below mentioned Portable
Fire extinguishers with Wall mount brackets as
indicated on the drawings, as per specifications and
Engineers Recommendation
i 5 Kg C02 wall mounted fire extinguisher 4 Nos
ii 6 Kg Dry powder wall mounted fire extinguisher 4 Nos
Sub Total of Fire Fighting Works
EXTERNAL DEVELOPMENT WORKS
EA Consulting
(Pvt) Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(External
Development)
S.NO: Amount
1 Academic Block (External Development Works)
2 Administration Block (External Development Works)
3 Electrical Works
4 ELV Works
5 Plumbing Works
6 Public Health (Sewerage System)
7 Public Health (Water Supply)
8 Grading Works
TOTAL CARRIED TO MASTER SUMMARY
GRAND SUMMARY
ACADEMIC BLOCK(EXT. DEVELOPMENT WORKS)
EA Consulting
(Pvt) Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Academic Block)
Civil Works
S.NO: Amount
A SCHEDULE ITEMS
4
B NON-SCHEDULE ITEMS
4
1
2
Total of Non-Schedule Items - B
TOTAL AMOUNT OF O1 No BUILDING (A+B)
TOTAL AMOUNT OF 02 Nos BUILDING CARRIED TO
GRAND SUMMARY
Total of Schedule Items
EXTERNAL WORKS (STRUCTURE) OTHER THAN BUILDING
(NON COVERED AREA)
Add __% Premium on Plumbing Works of PWD-2012
Total of Schedule Items with Premium - A
Civil SUMMARY
Description
EXTERNAL WORKS (STRUCTURE) OTHER THAN BUILDING
(NON COVERED AREA)
EA Consulting
(Pvt) Ltd.
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Academic Block)
External Works (Structure)
1 2 4 5 6 7 = 4 x 6
1
1.1 Code -103,
Item # 2 From ± 0'-0" to -5' - 0" 2450 Cft 100 Cft 613.14
Item # 2+28 From -5' - 0" to -8' - 0" 650 Cft 100 Cft 690.49
1.2 Code -104
Item #4
1735 Cft 100 Cft 261.80
1.3 Code -117
Item #1
250 Cft 100 Cft 3,251.34
2
2.1 Code -106
Item # 11325 Cft 100 Cft 14,411.43
Providing and laying in situ 1:4:8 (1 cement 4 sand and 8
coarse aggregate) cement concrete using crushed
graded boulders 3/4" inch (19 mm) and down gauge in
foundation, basement and plinth including form work,
compacting, curing and removal of form work etc.
complete, foundation and basement up to 5 feet (1.52 m)
depth and plinth up to 4 feet (1.2 m) height from ground
level etc. complete in all respects as per drawing,
standard , specifications and as directed by the Engineer.
Below plinth beam,situ,walls,tanks, over stone soling or
where required (Cylindrical 1000 Psi)
EARTH WORKS
Excavation for foundation trenches and drains in gravelly
soil and back filling the excavated material in foundation
trenches, plinth or under floor including breaking clods,
watering, consolidation by ramming in layers not
exceeding 9 inches (229 mm) in depth to full compaction,
dressing and disposal of surplus excavated stuff as
directed lead upto one chain (30.5 R.m) and lift upto 5 feet
(1.52 m).
Filling bajri available at site in foundation plinth or under
floor, etc. including dressing, watering, consolidation by
ramming in layers not exceeding 9 inches (229 mm) in
depth to full compaction, complete within a lead of one
chain (30.5 R.m) and lift of 5 feet (1.52 R.m). etc. complete,
including all lifts etc. complete in all respects as per
drawing, standard , specifications and as directed by the
Engineer.
Providing and laying soling stones 6 inches to 9 inches (152
mm to 229 mm) size under floors/foundations & where
required etc. including packing with sprawls and chips and
consolidating etc. complete in all respects as per drawing,
standard , specifications and as directed by the Engineer.
SUB STRUCTURE
CONCRETE WORKS
Amount
(Pak Rs.)
3
A-SCHEDULE ITEMS
All items under this head (Structure work) to be
carried out as per relevant Section of PWD &
technical specifications (Volume-II), Drawings,
BSI/ASTM Standards, complete in all respect and to
the entire satisfaction of the Engineer.
Due to pitch roof second pera of clause No 1.9 of
General conditions of PWD schedule of rates-2012 will
be applicable for the height of the higher side.
S.No
PWD
Schedule 2012
Ref.No
Description QTY Unit Rate
(Pak Rs.)
EA Consulting
(Pvt) Ltd.
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Academic Block)
External Works (Structure)
Amount
(Pak Rs.)
3
S.No
PWD
Schedule 2012
Ref.No
Description QTY Unit Rate
(Pak Rs.)
2.2 Code -106
Item # 12 0 Cft 100 Cft 15,840.97
2.3 Code -114
Item # 1+134+137 1035 Cft 100 Cft 21,685.85
2.4 Code -114
Item # 4+135+138 170 Cft 100 Cft 26,704.50
2.5 Code -114
Item # 8+134+137 180 Cft 100 Cft 22,344.09
Providing and laying reinforced cement concrete with
using crushed graded boulders 3/4" inch (19 mm) and
down gauge having a minimum works cube crushing
strength of 4500 Ibs. per sq. inch (31.04 N/mm2 at 28 days)
with a mix not leaner than 1:1:2 in columns of square or
rectangular shape of regular section including form work
and its removal, compacting and curing etc. but
excluding the cost of reinforcement, in foundation
basement and plinth. etc. complete in all respects as per
drawing, standard , specifications and as directed by the
Engineer.
Columns upto plinth
(Cylindrical Strength 3750 Psi)
Providing and laying reinforced cement concrete with
using crushed graded boulders 3/4" inch (19 mm) and
down gauge having a minimum works cube crushing
strength of 3750 Ibs. per sq. inch (23.24 N /mm 2 at 28
days) with a mix not leaner than 1:1-1/2:3 in plinth beams
of required shape and design including form work and its
removal, compacting and curing etc. but excluding the
cost of reinforcement, foundation basement and plinth
etc. complete in all respects as per drawing, standard ,
specifications and as directed by the Engineer.
Plinth Beams i/c nibs / projections
(Cylindrical Strength 3000 Psi)
Providing and laying in situ 1:3:6 (1 cement 3 sand and 6
coarse aggregate) cement concrete using crushed
graded boulders 3/4" inch (19 mm) and down gauge in
foundation, basement and plinth including form work,
compacting, curing and removal of form work, etc.
complete, foundation and basement up to 5 feet (1.52 m)
depth and plinth up to 4 feet (1.2 m) height from ground
level etc. complete in all respects as per drawing,
standard , specifications and as directed by the Engineer.
For Cast in situ / mass concrete or where required
(Cylindrical 1500 Psi)
Providing and laying reinforced cement concrete with
using crushed graded boulders 3/4" inch (19 mm) and
down gauge having a minimum works cube crushing
strength of 3750 Ibs. per sq. inch (23.24 N/mm2 at 28 days)
with a mix not leaner than 1:1-1/2:3 in columns footing of
required shape including form work and its removal,
compacting, leveling and curing etc. complete but
excluding the cost of reinforcement, in foundation
basement and plinth etc. complete in all respects as per
drawing, standard , specifications and as directed by the
Engineer.
Foundation for any type
(Cylindrical Strength 3000 Psi)
EA Consulting
(Pvt) Ltd.
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Academic Block)
External Works (Structure)
Amount
(Pak Rs.)
3
S.No
PWD
Schedule 2012
Ref.No
Description QTY Unit Rate
(Pak Rs.)
2.6 Code -114
Item # 99+135+138 0 Cft 100 Cft 23,123.76
2.7 Code -114
Item #
104+135+138 0 Cft 100 Cft 28,412.51
2.8 Code -114
Item #
101+135+138 0 Cft 100 Cft 28,723.31
2.9 Code -114
Item # 166
3610 Kg Kg 123.02
2.10 Code -108
Item # 12
1575 Sft 100 Sft 648.08
Providing and laying reinforced cement concrete with
using crushed graded boulders 3/4" inch (19 mm) and
down gauge having a minimum works cube crushing
strength of 4500 Ibs. per sq. inch (31.04 N/mm2 at 28 days)
with a mix not leaner than 1:1:2 in top slab of rectangular
underground water tank or septic tank including form work
and its removal, compacting and curing etc. but
excluding the cost of reinforcement, foundation basement
and plinth.etc. complete in all respects as per drawing,
standard , specifications and as directed by the Engineer.
UGWTank Top Slab
(Cylindrical Strength 3750 Psi)
Providing and laying reinforced cement concrete with
using crushed graded boulders 3/4" inch (19 mm) and
down gauge having a minimum works cube crushing
strength of 4500 Ibs. per sq. inch (31.04 N/mm2 at 28 days)
with a mix not leaner than 1:1:2 in walls of rectangular
underground water tank or septic tank including form work
and its removal, compacting and curing etc. but
excluding the cost of reinforcement, tn foundation
basement and plinth.etc. complete in all respects as per
drawing, standard , specifications and as directed by the
Engineer.
UGWTank Walls
(Cylindrical Strength 3750 Psi)
Providing and laying hard grade ribbed deformed
(minimum yield point 60,000 psi or 414 Mpa) reinforcement
bars with & including the cost of straightening, cutting,
bending, binding, wastage, and such overlaps as are not
shown in the drawings, placing in position on cement
concrete 1:2:4 precast or Ms. chairs, tying with binding wire,
cost of chairs and wires etc. in all kinds of RCC work in
foundation, basement, plinth and ground floor of building
including septic tanks and under ground tanks and in
projections for future extension.etc. complete in all
respects as per drawing, standard , specifications and as
directed by the Engineer.
(Bars to be cut and placed in position at any level
according to the Bar bending schedule prepared by the
contractor and approved by the Engineer).
Providing a coat of bitumen emulsion at 10 Lbs. per % sft.
(0.49 Kg/sm) on walls and floor in ground floor etc.
complete in all respects as per drawing, standard ,
specifications and as directed by the Engineer.
Providing and laying reinforced cement concrete with
using crushed graded boulders 3/4" inch (19 mm) and
down gauge having a minimum works cube crushing
strength of 4500 Ibs. per sq. inch (31.04 N/mm2 at 28 days)
with a mix not leaner than 1:1:2 in foundation or bottom
slab of rectangular underground water tank or septic tank
including form work and its removal, compacting and
curing etc. but excluding the cost of reinforcement, tn
foundation basement and plinth.etc. complete in all
respects as per drawing, standard , specifications and as
directed by the Engineer.
UGWTank Bottom Slab
(Cylindrical Strength 3750 Psi)
EA Consulting
(Pvt) Ltd.
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Academic Block)
External Works (Structure)
Amount
(Pak Rs.)
3
S.No
PWD
Schedule 2012
Ref.No
Description QTY Unit Rate
(Pak Rs.)
3
3.1 Code -114
Item # 24+135+138 195 Cft 100 Cft 30,389.36
Item #
24+135+138+92 195 Cft 100 Cft 31,338.56 Item #
24+135+138+92+
93 0 Cft 100 Cft 32,090.01
3.2 Code -114
Item # 30+136 170 Cft 100 Cft 20,751.67
Item # 30+136+92 170 Cft 100 Cft 21,700.87
Item #
30+136+92+93 0 Cft 100 Cft 23,111.13
Item #
30+136+92+93x2 0 Cft 100 Cft 23,769.94
Item #
30+136+92+93x3 245 Cft 100 Cft 24,428.75 (+33-0" to +60'-0")
(±0'-0" to +12'-0")
First Floor
(+12'-0" to +24'-0")
(+12'-0" to +33'-0")
Second Floor
(+24-0" to +40'-0")
First Floor
(+12'-0" to +24'-0")
(+12'-0" to +33'-0")
Providing and laying reinforced cement concrete with
using crushed graded boulders 3/4" inch (19 mm) and
down gauge having a minimum works cube crushing
strength of 3000 Ibs. per sq. inch (20.68 N/mm2 at 28 days)
with a mix not leaner than 1:2:4 in straight walls, vertical fins
etc. more than 6 inches (152m) thick including form work
and its removal, compacting and curing etc. but
excluding the cost of reinforcement, in the ground floor
etc. complete in all respects as per drawing, standard ,
specifications and as directed by the Engineer.
Fins (Cylindrical Strength 2500 Psi)
Ground Floor
SUPER STRUCTURE
REINFORCED CONCRETE WORKS
Providing and laying reinforced cement concrete with
using crushed graded boulders 3/4" inch (19 mm) and
down gauge having a minimum works cube crushing
strength of 4500 Ibs. per sq. inch (31.04 N/mm2 at 28 days)
with a mix not leaner than 1:1:2 in columns of square or
rectangular shape of regular section including form work
and its removal, compacting and curing etc. but
excluding the cost of reinforcement, in the ground floor
etc. complete in all respects as per drawing, standard ,
specifications and as directed by the Engineer.
Columns (Cylindrical Strength 3750 Psi)
Ground Floor
(±0'-0" to +12'-0")
EA Consulting
(Pvt) Ltd.
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Academic Block)
External Works (Structure)
Amount
(Pak Rs.)
3
S.No
PWD
Schedule 2012
Ref.No
Description QTY Unit Rate
(Pak Rs.)
3.3 Code -114
Item # 30+135+138 0 Cft 100 Cft 28,692.59
Item #
30+135+138+92 0 Cft 100 Cft 29,641.79 Item #
30+135+138+92
+93 0 Cft 100 Cft 30,393.24
Item #
30+135+138+92
+93x2 0 Cft 100 Cft 31,144.69 Item #
30+135+138+92
+93x3 0 Cft 100 Cft 31,896.14
3.4 Code -114
Item # 38+134+137 490 Cft 100 Cft 24,839.57
Item #
38+134+137+92 345 Cft 100 Cft 25,788.77 Item #
38+134+137+92
+93 0 Cft 100 Cft 26,540.22
Beams /Arches/ purdi / bracing / lintels / nibs / sills / coping
/ parapet wall /bands/around opening and projections
(Cylindrical Strength 3000 Psi)
Ground Floor
(±0'-0" to +12'-0")
First Floor
(+12'-0" to +24'-0")
(+12'-0" to +33'-0")
(+12'-0" to +24'-0")
(+12'-0" to +33'-0")
Second Floor
(+24-0" to +40'-0")
(+33-0" to +60'-0")
Providing and laying reinforced cement concrete with
using crushed graded boulders 3/4" inch (19 mm) and
down gauge having a minimum works cube crushing
strength of 3750 Ibs. per sq. inch (23.24 N /mm 2 at 28
days) with a mix not leaner than 1:1-1/2:3 in straight
beams lintels cantilever beams of required shape or
section including form work and its removal, compacting
and curing etc. but excluding the cost of reinforcement, in
basement and ground floor etc. complete in all respects
as per drawing, standard , specifications and as directed
by the Engineer.
Providing and laying reinforced cement concrete with
using crushed graded boulders 3/4" inch (19 mm) and
down gauge having a minimum works cube crushing
strength of 4500 Ibs. per sq. inch (31.04 N/mm2 at 28 days)
with a mix not leaner than 1:1:2 in straight walls more than
6 inches (152 mm) thick including form work and its
removal, compacting and curing etc. but excluding the
cost of reinforcement, in foundation basement and plinth
etc. complete in all respects as per drawing, standard ,
specifications and as directed by the Engineer.
RCC Wall / Shear Wall (Cylindrical Strength 3750 Psi)
Ground Floor
(±0'-0" to +12'-0")
First Floor
EA Consulting
(Pvt) Ltd.
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Academic Block)
External Works (Structure)
Amount
(Pak Rs.)
3
S.No
PWD
Schedule 2012
Ref.No
Description QTY Unit Rate
(Pak Rs.)
3.5 Code -114
Item # 56+134+137 215 Cft 100 Cft 24,314.96
Item #
56+134+137+92 320 Cft 100 Cft 25,264.16 Item #
56+134+137+92
+93 0 Cft 100 Cft 26,015.61
3.6 Code -114
Item # 57+134+137 0 Cft 100 Cft 23,691.64
Item #
57+134+137+92 0 Cft 100 Cft 24,640.84 Item #
57+134+137+92
+93 0 Cft 100 Cft 25,392.29
(+12'-0" to +24'-0")
(+12'-0" to +33'-0")
(+12'-0" to +33'-0")
Providing and laying reinforced cement concrete with
using crushed graded boulders 3/4" inch (19 mm) and
down gauge having a minimum works cube crushing
strength of 3750 Ibs. per sq. inch (23.24 N /mm 2 at 28
days) with a mix not leaner than 1:1-1/2:3 in ordinary slab
more than 6 inches (152 mm) thick including form work and
its removal compacting and curing etc. complete but
excluding the cost of reinforcement, in basement plinth
and ground floor etc. complete in all respects as per
drawing, standard , specifications and as directed by the
Engineer.
Slab i/c projections (straight & sloping )
(Cylindrical Strength 3000 Psi)
Ground Floor
(±0'-0" to +12'-0")
First Floor
Providing and laying reinforced cement concrete with
using crushed graded boulders 3/4" inch (19 mm) and
down gauge having a minimum works cube crushing
strength of 3750 Ibs. per sq. inch (23.24 N /mm 2 at 28
days) with a mix not leaner than 1:1-1/2:3 in ordinary slab
5 inches (127 mm) to 6 inches (152mm) thick including form
work and its removal compacting and curing etc.
complete but excluding the cost of reinforcement, in
basement plinth and ground floor etc. complete in all
respects as per drawing, standard , specifications and as
directed by the Engineer.
Slab i/c projections (straight & sloping )
(Cylindrical Strength 3000 Psi)
Ground Floor
(±0'-0" to +12'-0")
First Floor
(+12'-0" to +24'-0")
EA Consulting
(Pvt) Ltd.
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Academic Block)
External Works (Structure)
Amount
(Pak Rs.)
3
S.No
PWD
Schedule 2012
Ref.No
Description QTY Unit Rate
(Pak Rs.)
3.7 Code -114
Item # 166 4500 Kg Kg 123.02
Item # 166+174 4110 Kg Kg 124.47
Item #
166+174+174 0 Kg Kg 125.92
Item #
166+174+174+174 0 Kg Kg 127.37 Item #
166+174+174+174+
174 730 Kg Kg 128.82
(+12'-0" to +24'-0")
(+12'-0" to +33'-0")
Second Floor
(+24-0" to +40'-0")
(+33-0" to +60'-0")
Amount Carried to Civil Summary
Providing and laying hard grade ribbed deformed
(minimum yield point 60,000 psi or 414 Mpa) reinforcement
bars with & including the cost of straightening, cutting,
bending, binding, wastage, and such overlaps as are not
shown in the drawings, placing in position on cement
concrete 1:2:4 precast or Ms. chairs, tying with binding wire,
cost of chairs and wires etc. in all kinds of RCC work in
foundation, basement, plinth and ground floor of building
including septic tanks and under ground tanks and in
projections for future extension.etc. complete in all
respects as per drawing, standard , specifications and as
directed by the Engineer.
(Bars to be cut and placed in position at any level
according to the Bar bending schedule prepared by the
contractor and approved by the Engineer).
Ground Floor
(±0'-0" to +12'-0")
First Floor
ADMINISTRATION BLOCK(EXT. DEVELOPMENT WORKS)
EA Consulting
(Pvt) LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Administration Block)
Civil Works
S.NO: Amount
A SCHEDULE ITEMS
1
B NON-SCHEDULE ITEMS
1
Total of Non-Schedule Items - B
TOTAL AMOUNT CARRIED TO GRAND SUMMARY (A+B)
Add __% Premium on Plumbing Works of PWD-2012
Total of Schedule Items with Premium - A
Total of Schedule Items with Premium - A
EXTERNAL WORKS (STRUCTURE) OTHER THAN BUILDING
(NON COVERED AREA)
Civil SUMMARY
Description
EXTERNAL WORKS (STRUCTURE) OTHER THAN BUILDING
(NON COVERED AREA)
EA Consulting
(Pvt) Ltd.
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Administration Block)
External Works (Structure)
1 2 4 5 6 7 = 4 x 6
1
1.1 Code -103,
Item # 2 From ± 0'-0" to -5' - 0" 5440 Cft 100 Cft 613.14
Item # 2+28 From -5' - 0" to -8' - 0" 0 Cft 100 Cft 690.49
1.2 Code -104
Item #4
10880 Cft 100 Cft 261.80
1.3 Code -117
Item #1
2720 Cft 100 Cft 3,251.34
2
2.1 Code -106
Item # 11755 Cft 100 Cft 14,411.43
2.2 Code -106
Item # 12 3345 Cft 100 Cft 15,840.97
Providing and laying in situ 1:4:8 (1 cement 4 sand and 8 coarse
aggregate) cement concrete using crushed graded boulders
3/4" inch (19 mm) and down gauge in foundation, basement and
plinth including form work, compacting, curing and removal of
form work etc. complete, foundation and basement up to 5 feet
(1.52 m) depth and plinth up to 4 feet (1.2 m) height from ground
level etc. complete in all respects as per drawing, standard ,
specifications and as directed by the Engineer.
Below plinth beam,situ,walls,tanks, over stone soling or where
required (Cylindrical 1000 Psi)
Providing and laying in situ 1:3:6 (1 cement 3 sand and 6 coarse
aggregate) cement concrete using crushed graded boulders
3/4" inch (19 mm) and down gauge in foundation, basement and
plinth including form work, compacting, curing and removal of
form work, etc. complete, foundation and basement up to 5 feet
(1.52 m) depth and plinth up to 4 feet (1.2 m) height from ground
level etc. complete in all respects as per drawing, standard ,
specifications and as directed by the Engineer.
For Cast in situ / mass concrete or where required (Cylindrical
1500 Psi)
EARTH WORKS
Excavation for foundation trenches and drains in gravelly soil and
back filling the excavated material in foundation trenches, plinth
or under floor including breaking clods, watering, consolidation by
ramming in layers not exceeding 9 inches (229 mm) in depth to
full compaction, dressing and disposal of surplus excavated stuff
as directed lead upto one chain (30.5 R.m) and lift upto 5 feet
(1.52 m).
Filling bajri available at site in foundation plinth or under floor, etc.
including dressing, watering, consolidation by ramming in layers
not exceeding 9 inches (229 mm) in depth to full compaction,
complete within a lead of one chain (30.5 R.m) and lift of 5 feet
(1.52 R.m). etc. complete, including all lifts etc. complete in all
respects as per drawing, standard , specifications and as
directed by the Engineer.
Providing and laying soling stones 6 inches to 9 inches (152 mm to
229 mm) size under floors/foundations & where required etc.
including packing with sprawls and chips and consolidating etc.
complete in all respects as per drawing, standard , specifications
and as directed by the Engineer.
SUB STRUCTURE
CONCRETE WORKS
Amount
(Pak Rs.)
3
A-SCHEDULE ITEMS
All items under this head (Structure work) to be carried out
as per relevant Section of PWD & technical specifications
(Volume-II), Drawings, BSI/ASTM Standards, complete in all
respect and to the entire satisfaction of the Engineer.
Due to pitch roof second pera of clause No 1.9 of General
conditions of PWD schedule of rates-2012 will be applicable
for the height of the higher side.
S.No
PWD
Schedule 2012
Ref.No
Description QTY Unit Rate
(Pak Rs.)
EA Consulting
(Pvt) Ltd.
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Administration Block)
External Works (Structure)
Amount
(Pak Rs.)
3
S.No
PWD
Schedule 2012
Ref.No
Description QTY Unit Rate
(Pak Rs.)
2.3 Code -114
Item # 1+134+137 0 Cft 100 Cft 21,685.85
2.4 Code -114
Item # 4+135+138 0 Cft 100 Cft 26,704.50
2.5 Code -114
Item # 8+134+137 0 Cft 100 Cft 22,344.09
2.6 Code -114
Item #
99+135+138 0 Cft 100 Cft 23,123.76
2.7 Code -114
Item #
104+135+138 0 Cft 100 Cft 28,412.51
Providing and laying reinforced cement concrete with using
crushed graded boulders 3/4" inch (19 mm) and down gauge
having a minimum works cube crushing strength of 4500 Ibs. per
sq. inch (31.04 N/mm2 at 28 days) with a mix not leaner than
1:1:2 in top slab of rectangular underground water tank or septic
tank including form work and its removal, compacting and curing
etc. but excluding the cost of reinforcement, foundation
basement and plinth.etc. complete in all respects as per drawing,
standard , specifications and as directed by the Engineer.
UGWTank Top Slab
(Cylindrical Strength 3750 Psi)
Providing and laying reinforced cement concrete with using
crushed graded boulders 3/4" inch (19 mm) and down gauge
having a minimum works cube crushing strength of 4500 Ibs. per
sq. inch (31.04 N/mm2 at 28 days) with a mix not leaner than 1:1:2
in columns of square or rectangular shape of regular section
including form work and its removal, compacting and curing etc.
but excluding the cost of reinforcement, in foundation basement
and plinth. etc. complete in all respects as per drawing,
standard , specifications and as directed by the Engineer.
Columns upto plinth
(Cylindrical Strength 3750 Psi)
Providing and laying reinforced cement concrete with using
crushed graded boulders 3/4" inch (19 mm) and down gauge
having a minimum works cube crushing strength of 3750 Ibs. per
sq. inch (23.24 N /mm 2 at 28 days) with a mix not leaner than
1:1-1/2:3 in plinth beams of required shape and design including
form work and its removal, compacting and curing etc. but
excluding the cost of reinforcement, foundation basement and
plinth etc. complete in all respects as per drawing, standard ,
specifications and as directed by the Engineer.
Plinth Beams i/c nibs / projections
(Cylindrical Strength 3000 Psi)
Providing and laying reinforced cement concrete with using
crushed graded boulders 3/4" inch (19 mm) and down gauge
having a minimum works cube crushing strength of 4500 Ibs. per
sq. inch (31.04 N/mm2 at 28 days) with a mix not leaner than
1:1:2 in foundation or bottom slab of rectangular underground
water tank or septic tank including form work and its removal,
compacting and curing etc. but excluding the cost of
reinforcement, tn foundation basement and plinth.etc. complete
in all respects as per drawing, standard , specifications and as
directed by the Engineer.
UGWTank Bottom Slab
(Cylindrical Strength 3750 Psi)
Providing and laying reinforced cement concrete with using
crushed graded boulders 3/4" inch (19 mm) and down gauge
having a minimum works cube crushing strength of 3750 Ibs. per
sq. inch (23.24 N/mm2 at 28 days) with a mix not leaner than 1:1-
1/2:3 in columns footing of required shape including form work
and its removal, compacting, leveling and curing etc. complete
but excluding the cost of reinforcement, in foundation basement
and plinth etc. complete in all respects as per drawing, standard
, specifications and as directed by the Engineer.
Foundation for any type
(Cylindrical Strength 3000 Psi)
EA Consulting
(Pvt) Ltd.
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Administration Block)
External Works (Structure)
Amount
(Pak Rs.)
3
S.No
PWD
Schedule 2012
Ref.No
Description QTY Unit Rate
(Pak Rs.)
2.8 Code -114
Item #
101+135+138 0 Cft 100 Cft 28,723.31
2.9 Code -114
Item # 166
0 Kg Kg 123.02
2.10 Code -108
Item # 12
5185 Sft 100 Sft 648.08
3
3.1 Code -114
Item #
24+135+138 0 Cft 100 Cft 30,389.36
Item #
24+135+138+92 0 Cft 100 Cft 31,338.56 Item #
24+135+138+92+
93 0 Cft 100 Cft 32,090.01
First Floor
(+12'-0" to +28'-0")
(+28'-0" to +48'-0")
SUPER STRUCTURE
REINFORCED CONCRETE WORKS
Providing and laying reinforced cement concrete with using
crushed graded boulders 3/4" inch (19 mm) and down gauge
having a minimum works cube crushing strength of 4500 Ibs. per
sq. inch (31.04 N/mm2 at 28 days) with a mix not leaner than 1:1:2
in columns of square or rectangular shape of regular section
including form work and its removal, compacting and curing etc.
but excluding the cost of reinforcement, in the ground floor etc.
complete in all respects as per drawing, standard , specifications
and as directed by the Engineer.
Columns (Cylindrical Strength 3750 Psi)
Ground Floor
(±0'-0" to +12'-0")
Providing and laying reinforced cement concrete with using
crushed graded boulders 3/4" inch (19 mm) and down gauge
having a minimum works cube crushing strength of 4500 Ibs. per
sq. inch (31.04 N/mm2 at 28 days) with a mix not leaner than
1:1:2 in walls of rectangular underground water tank or septic
tank including form work and its removal, compacting and curing
etc. but excluding the cost of reinforcement, tn foundation
basement and plinth.etc. complete in all respects as per drawing,
standard , specifications and as directed by the Engineer.
UGWTank Walls
(Cylindrical Strength 3750 Psi)
Providing and laying hard grade ribbed deformed (minimum
yield point 60,000 psi or 414 Mpa) reinforcement bars with &
including the cost of straightening, cutting, bending, binding,
wastage, and such overlaps as are not shown in the drawings,
placing in position on cement concrete 1:2:4 precast or Ms. chairs,
tying with binding wire, cost of chairs and wires etc. in all kinds of
RCC work in foundation, basement, plinth and ground floor of
building including septic tanks and under ground tanks and in
projections for future extension.etc. complete in all respects as
per drawing, standard , specifications and as directed by the
Engineer.
(Bars to be cut and placed in position at any level according to
the Bar bending schedule prepared by the contractor and
approved by the Engineer).
Providing a coat of bitumen emulsion at 10 Lbs. per % sft. (0.49
Kg/sm) on walls and floor in ground floor etc. complete in all
respects as per drawing, standard , specifications and as
directed by the Engineer.
EA Consulting
(Pvt) Ltd.
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Administration Block)
External Works (Structure)
Amount
(Pak Rs.)
3
S.No
PWD
Schedule 2012
Ref.No
Description QTY Unit Rate
(Pak Rs.)
3.2 Code -114
Item # 30+136 145 Cft 100 Cft 20,751.67
Item # 30+136+92 180 Cft 100 Cft 21,700.87
Item #
30+136+92+93 95 Cft 100 Cft 22,452.32
3.3 Code -114
Item #
30+135+138 0 Cft 100 Cft 28,692.59
Item #
30+135+138+92 0 Cft 100 Cft 29,641.79 Item #
30+135+138+92
+93 0 Cft 100 Cft 30,393.24
3.4 Code -114
Item #
38+134+137 0 Cft 100 Cft 24,839.57
Item #
38+134+137+92 0 Cft 100 Cft 25,788.77 Item #
38+134+137+92
+93 0 Cft 100 Cft 26,540.22
Beams /Arches/ purdi / bracing / lintels / nibs / sills / coping /
parapet wall /bands/around opening and projections
(Cylindrical Strength 3000 Psi)
Ground Floor
(±0'-0" to +12'-0")
First Floor
(+12'-0" to +28'-0")
(+28'-0" to +48'-0")
Ground Floor
(±0'-0" to +12'-0")
First Floor
(+12'-0" to +28'-0")
(+28'-0" to +48'-0")
Providing and laying reinforced cement concrete with using
crushed graded boulders 3/4" inch (19 mm) and down gauge
having a minimum works cube crushing strength of 3750 Ibs. per
sq. inch (23.24 N /mm 2 at 28 days) with a mix not leaner than
1:1-1/2:3 in straight beams lintels cantilever beams of required
shape or section including form work and its removal,
compacting and curing etc. but excluding the cost of
reinforcement, in basement and ground floor etc. complete in all
respects as per drawing, standard , specifications and as
directed by the Engineer.
(±0'-0" to +12'-0")
First Floor
(+12'-0" to +28'-0")
(+28'-0" to +48'-0")
Providing and laying reinforced cement concrete with using
crushed graded boulders 3/4" inch (19 mm) and down gauge
having a minimum works cube crushing strength of 4500 Ibs. per
sq. inch (31.04 N/mm2 at 28 days) with a mix not leaner than 1:1:2
in straight walls more than 6 inches (152 mm) thick including form
work and its removal, compacting and curing etc. but excluding
the cost of reinforcement, in foundation basement and plinth
etc. complete in all respects as per drawing, standard ,
specifications and as directed by the Engineer.
RCC Wall / Shear Wall (Cylindrical Strength 3750 Psi)
Providing and laying reinforced cement concrete with using
crushed graded boulders 3/4" inch (19 mm) and down gauge
having a minimum works cube crushing strength of 3000 Ibs. per
sq. inch (20.68 N/mm2 at 28 days) with a mix not leaner than 1:2:4
in straight walls, vertical fins etc. more than 6 inches (152m) thick
including form work and its removal, compacting and curing etc.
but excluding the cost of reinforcement, in the ground floor etc.
complete in all respects as per drawing, standard , specifications
and as directed by the Engineer.
Fins (Cylindrical Strength 2500 Psi)
Ground Floor
EA Consulting
(Pvt) Ltd.
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(Administration Block)
External Works (Structure)
Amount
(Pak Rs.)
3
S.No
PWD
Schedule 2012
Ref.No
Description QTY Unit Rate
(Pak Rs.)
3.5 Code -114
Item #
56+134+137 0 Cft 100 Cft 24,314.96
Item #
56+134+137+92 0 Cft 100 Cft 25,264.16 Item #
56+134+137+92
+93 0 Cft 100 Cft 26,015.61
3.6 Code -114
Item #
57+134+137 0 Cft 100 Cft 23,691.64
Item #
57+134+137+92 0 Cft 100 Cft 24,640.84 Item #
57+134+137+92
+93 0 Cft 100 Cft 25,392.29
3.7 Code -114
Item # 166 430 Kg Kg 123.02
Item # 166+174 535 Kg Kg 124.47
Item #
166+174+174 285 Kg Kg 125.92
(+12'-0" to +28'-0")
(+28'-0" to +48'-0")
Amount Carried to Civil Summary
(+12'-0" to +28'-0")
(+28'-0" to +48'-0")
Providing and laying hard grade ribbed deformed (minimum
yield point 60,000 psi or 414 Mpa) reinforcement bars with &
including the cost of straightening, cutting, bending, binding,
wastage, and such overlaps as are not shown in the drawings,
placing in position on cement concrete 1:2:4 precast or Ms. chairs,
tying with binding wire, cost of chairs and wires etc. in all kinds of
RCC work in foundation, basement, plinth and ground floor of
building including septic tanks and under ground tanks and in
projections for future extension.etc. complete in all respects as
per drawing, standard , specifications and as directed by the
Engineer.
(Bars to be cut and placed in position at any level according to
the Bar bending schedule prepared by the contractor and
approved by the Engineer).
Ground Floor
(±0'-0" to +12'-0")
First Floor
(+28'-0" to +48'-0")
Providing and laying reinforced cement concrete with using
crushed graded boulders 3/4" inch (19 mm) and down gauge
having a minimum works cube crushing strength of 3750 Ibs. per
sq. inch (23.24 N /mm 2 at 28 days) with a mix not leaner than
1:1-1/2:3 in ordinary slab more than 6 inches (152 mm) thick
including form work and its removal compacting and curing etc.
complete but excluding the cost of reinforcement, in basement
plinth and ground floor etc. complete in all respects as per
drawing, standard , specifications and as directed by the
Engineer.
Slab i/c projections (straight & sloping)
(Cylindrical Strength 3000 Psi)
Ground Floor
(±0'-0" to +12'-0")
First Floor
Providing and laying reinforced cement concrete with using
crushed graded boulders 3/4" inch (19 mm) and down gauge
having a minimum works cube crushing strength of 3750 Ibs. per
sq. inch (23.24 N /mm 2 at 28 days) with a mix not leaner than
1:1-1/2:3 in ordinary slab 5 inches (127 mm) to 6 inches (152mm)
thick including form work and its removal compacting and curing
etc. complete but excluding the cost of reinforcement, in
basement plinth and ground floor etc. complete in all respects as
per drawing, standard , specifications and as directed by the
Engineer.
Slab i/c projections (straight & sloping)
(Cylindrical Strength 3000 Psi)
Ground Floor
(±0'-0" to +12'-0")
First Floor
(+12'-0" to +28'-0")
ELECTRICAL WORKS
EA Consulting
(Pvt) LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(External Development)
Electrical Works
S.NO: AMOUNT
A SCHEDULE ITEMS
B NON-SCHEDULE ITEMS
1
2
3
4
5
6
TOTAL AMOUNT CARRIED TO GRAND SUMMARY (A+B)
EARTHING SYSTEM
Total of Non-Schedule Items - B
DIESEL GENERATOR SET
Total of Schedule Items
Add ____% Premium on Electrical Works of PWD-2004
Total of Schedule Items with Premium - A
CONDUITS & PIPES
L.V DISTRIBUTION BOARDS
MV / LV CABLES AND WIRES
SUB STATION EQUIPMENTS
Electrical SUMMARY
DESCRIPTION
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Infrastructure Works
Electrical Works
1 2 3 4 5 6 7 = 4 X 6
SCHEDULE ITEMS
Amount Carried to Electrical Summary
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Infrastructure Works
Electrical Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
NON-SCHEDULE ITEMS
1 CONDUITS & PIPES
a) Supply and installation of following size UPVC Pipe
Class-D / Road Crossing Sleeves Class-D for Power
cables. Buried in ground / under roads / under floor as per
specification, including excavation for laying of pipe, bricks,
warning tape and backfilling with new and fresh sand (6" under
and 6" above pipe) etc., (whereever required), as shown on the
specifications and drawings, complete in all respect.
i 50mm dia uPVC Conduit (Class-D) 40 Rm.
ii 38mm dia uPVC Conduit (Class-D) 15 Rm.
b) Providing and Construction of Manhole Size 3'-0" x 3'-0"
x 3'-0" deep, 6"thick, concrete 1:2:4 ratio with 3' round
heavy duty cast iron cover, 100% water proof, as per
specification and as shown on the drawing, complete
in all respect. (For Electrical cables)
10 No.
c) Providing and Construction of Handhole Size 2'-0" x 2'-
0" x 3'-0" deep, 6"thick, concrete 1:2:4 ratio with 2'
round heavy duty cast iron cover, 100% water proof,
as per specification and as shown on the drawing,
complete in all respect. (For Electrical cables)
2 No.
Amount Carried to Electrical Summary
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Infrastructure Works
Electrical Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
2 L.V. DISTRIBUTION BOARDS
a) Supply, installation, testing and commissioning of
following wall mounting / floor standing surface type
Main Distribution Board (MDB), Sub Main Distribution
Boards (SMDB's) and Distribution Board (DB's) made
with 16 SWG sheet metal, dust protected, vermin proof
housing coated with approved color having all the
necessary switching, energy analyzer etc., protections,
as per drawing and specification, complete in all
respect.
i FP-01 1 No.
ii DB-PUMP 1 No.
b) Supply, installation, testing and commissioning of
following Isolators in 16 swg sheet metal steel
enclosure with neutral and earth terminal strips,
including all accessories, as per drawings and
specifications, complete in all respect.
i 100A, TPN Weatherproof type Isolator 1 No.
ii 40A, TPN Weatherproof type Isolator 1 No.
c) Supply, installation, testing and commissioning of
following Manual Change Over Switch in 16 swg sheet
metal steel enclosure with neutral and earth terminal
strips, including all accessories, as per drawings and
specifications, complete in all respect.
i 1000A, 4-Pole Manual Change Over Switch 1 No.
Amount Carried to Electrical Summary
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Infrastructure Works
Electrical Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
3 MV / LV CABLES AND WIRES
3.1 Supply, laying, termination, tagging, testing and
commissioning of following size copper conductor
multi core / single core, AL/PVC, AL/PVC/PVC,
armoured / unarmoured, 0.6 kV/1 kV, 450/750V or
300/500V voltage grade copper cable in already laid
PVC conduit / cable tray / trench including all
accessories lugs, cable gland etc. as per drawings
and specification, complete in all respect.
a) 3 Core, AL/XLPE/SWA/PVC Cable (15kV)
i 3C, 240 Sqmm AL/XLPE/SWA/PVC (15kV) 20 Rm.
ii 3C, 120 Sqmm AL/XLPE/SWA/PVC (15kV) 155 Rm.
b) 4 Core, AL/PVC/SWA/PVC Cable (600/1000V)
i 4C, 240 Sqmm AL/PVC/SWA/PVC 300 Rm.
ii 4C, 150 Sqmm AL/PVC/SWA/PVC 165 Rm.
iii 4C, 70 Sqmm AL/PVC/SWA/PVC 30 Rm.
iv 4C, 35 Sqmm AL/PVC/SWA/PVC 150 Rm.
v 4C, 16 Sqmm AL/PVC/SWA/PVC 30 Rm.
c) 1 Core, AL/PVC/SWA/PVC Cable (600/1000V)
i 1C, 150 Sqmm AL/PVC/SWA/PVC 80 Rm.
d) 1 Core, AL/PVC Cable as ECC (450/750V)
i 1C, 240 Sqmm AL/PVC 150 Rm.
ii 1C, 150 Sqmm AL/PVC 205 Rm.
iii 1C, 35 Sqmm AL/PVC 30 Rm.
iv 1C, 16 Sqmm AL/PVC 165 Rm.
3.2 Supply, laying, termination, tagging, testing and
commissioning of following size copper conductor
multi core / single core, Cu/PVC, Cu/PVC/PVC,
armoured / unarmoured, 0.6 kV/1 kV, 450/750V or
300/500V voltage grade copper cable in already laid
PVC conduit / cable tray / trench including all
accessories lugs, cable gland etc. as per drawings
and specification, complete in all respect.
a) 1 Core, Cu./PVC Cable
i 1C, 300 Sqmm CU/PVC 50 Rm.
b) 1 Core, Cu./PVC Cable as ECC (450/750V)
i 1C, 300 Sqmm CU/PVC 10 Rm.
Amount Carried to Electrical Summary
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Infrastructure Works
Electrical Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
4 SUB STATION EQUIPMENTS
All items under this head to be carried out as per
technical specifications and approval, Drawings,
relevant BSI /ASTM Standards, IEC regulation,
complete in all respect and to the entire satisfaction
of the Employer, and as mentioned in General Notes
or noted otherwise, Including providing of shop and
as built drawings. complete in all respects.
a) Supply, installation, testing and commissioning of
following indoor floor standing totally enclosed, dust
protected and vermin proof, sheet metal clad cubical
type, 3-phase 3-wire 50Hz in free standing design
including all accessories with a set of 3-phase
insulated copper bus bars of rated capacity 630
Amps, fine wiring with cleats and ferrules, earthing bar
connecting stids, manual charging handle, cable
sockets, designation labels, holding doen bolts, MV
Switchgear with incoming and outgoing disconnect
switches and other components as per SLD and
WAPDA specifications, including MV cable
terminations, as per drawing, specifications and
approvals, complete in all respect.
i MV Switchgear (630A VCB) 11kV Panel in MV Switch
Room
- No.
b) Supply and installation following Accessories / Signs as
per drawings and specifications, including all
mounting accessories, complete in all respects.
i Supply and laying of 600mm wide, 6 mm thick Rubber
mat piece to be installed all along Switchgear in
substation rooms as per requirements and
specifications, complete in all respect. (for 2 No. MV
Switchgears)
- Job
ii Danger Boards, Emergency Signs etc. - Job
c) Supply, installing, testing and commissioning of
following 11000 / 415V, 50Hz, 3 phase, 4 wire, Pad
mounted Transformer (PMU) with housing, including
MV incoming, outgoing loop to the other Transformer
and outgoing Disconnect Switches, MV HRC Fuse
Links, LV Breaker, control cables and all necessary
installation accessories etc., as per WAPDA
specifications, drawings, data sheets and approval.
Complete in all respects.
i 630 kVA Pad Mounted Transformer (PMU) - No.
d) Supply and Construction of RCC foundation (PAD),
including excavation and backfilling for respective
Transformer. Construction with class "C" concrete used
water resistance chemical, water proofing material
applied on structure surfaces are concealed below
FGL / FFL, Pad size as per base of Transformer and as
directed by the consultant, complete in all respect.
1 Job
Amount Carried to Electrical Summary
Not Applicable
Not Applicable
Not Applicable
Not Applicable
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Infrastructure Works
Electrical Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
5 DIESEL GENERATOR SET
a) Supply, installation, testing and commissioning of 300
kVA (Prime Power Rated) 3 phase, 4 wire, 400V Diesel
Generator set with Weatherproof accoustic canopy,
Electronic Governor, AMF, an advanced LCD Display
control panel (Programmable), as per specification,
including transportation up to site and safety store.
Exhaust piping, ducting, Residential silencer with
elbow, also inclusive of power cable end termination
with the approval of engineer. complete in all
respect.
- No.
b) Providing and Construction of RCC base as
foundation/pad for above Generators (as per
recommendation of manufacturer & specification),
with the approval of engineer, complete in all
respect.
1 Job.
c) Supply and Handing Over to Client Representative of
Standard Spare Parts as recommended by the
manufacturer for the operation of 1000 hours for
above D.G. Sets (List of Spares to be provided as per
specification) and as per standard engine &
alternator models provided by manufacturer.
- Lot.
d) Getting necessary Approval / NOC's for Installation of
above Generators from concerned Authorities
(Electric Inspector) etc., is the responsibility of
contractor. However all official fees/expenses shall be
paid by client.
- Job.
e) Supply, installing, testing and commissioning of
Control Cabling with appropriate sized (multicore)
cable as per manufacturer recommendation,
between Generator and emergency DB, including
terminations and all mounting accessories etc.,
complete in all respects.
- Job.
f) Supply, installing, testing and commisioning of
following sizes of Automatic Transfer Switch (ATS) with
manual bypass switch as per specifications and
drawings, complete in all respects.
i 500A ATS 4 Pole - No.
Amount Carried to Electrical Summary
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Infrastructure Works
Electrical Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
6 EARTHING SYSTEM
Supply, installation, testing and commissioning of
following items for complete earthing system including
all connecting accessories as per drawings,
specifications and as mentioned in General Notes,
complete in all respects.
a) Supply, installation, testing and commissioning of
following items for complete Power Earthing system,
including Bentonite chemical, other all required
materials and connecting accessories, boring, labor,
tools, transportation etc., as per drawings and
specifications, complete in all respects with detailed
test reports.
i Earth pit with Rod type earth electrode, 20mm dia
and 3 meter long copper rod.
7 No.
b) Supply, installation, testing and commissioning of
following size of PVC insulated Cu. Conductor cable
as earth continuity conductor (ECC) installed on
surface / in appropriate already installed raceway / in
already excavated trench / in already laid pipe, as
per specifications and drawings, complete in all
respect.
i 120 Sq.mm Cu/PVC 25 Rm.
ii 95 Sq.mm Cu/PVC 40 Rm.
iii 35 Sq.mm Cu/PVC 10 Rm.
Amount Carried to Electrical Summary
ELV WORKS
EA Consulting
(Pvt) LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(External Development)
ELV Works
S.NO: AMOUNT
A SCHEDULE ITEMS
B NON-SCHEDULE ITEMS
1
2
TOTAL AMOUNT CARRIED TO GRAND SUMMARY (A+B)
CONDUITS & PIPES
VOICE, DATA COMMUNICATION (Passive Equipment Only)
Total of Non-Schedule Items - B
ELV SUMMARY
DESCRIPTION
Total of Schedule Items
Add ____% Premium on ELV Works of PWD--2004
Total of Schedule Items with Premium - A
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Infrastructure Works
ELV Works
1 2 3 4 5 6 7 = 4 X 6
SCHEDULE ITEMS
Amount Carried to ELV Summary
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Infrastructure Works
ELV Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
NON-SCHEDULE ITEMS
1 CONDUITS & PIPES
a) Supply and installation of following size UPVC Pipe
Class-D / Road Crossing Sleeves Class-D for
Telecommunication Cable (copper / optic fiber). Buried in
ground / under roads / under floor as per specification, including
excavation for laying of pipe, bricks, warning tape and backfilling
with new and fresh sand (6" under and 6" above pipe) etc.,
(whereever required), as shown on the specifications and
drawings, complete in all respect.
i 100mm dia uPVC Conduit (Class-D) 760 Rm.
ii 100mm dia uPVC Conduit (Class-D Road Crossing
Sleeves)
40 Rm.
b) Providing and Construction of Handhole Size 2'-0" x 2'-
0" x 3'-0" deep, 6"thick, concrete 1:2:4 ratio with 2'
round heavy duty cast iron cover, 100% water proof,
as per specification and as shown on the drawing,
complete in all respect. (For Electrical cables)
16 No.
Amount Carried to ELV Summary
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
Infrastructure Works
ELV Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2004 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
2
VOICE, DATA COMMUNICATION & CCTV CABLING
SYSTEMS (Passive Equipment Only)
a) Supply, laying, termination, testing and commissioning
of Cat-5e, 25 pair Backbone cable in already laid
UPVC conduit, including with all the necessary
accessories as per drawing and specifications,
complete in all respect.
860 Rm.
b) Supply, laying, termination, testing and commissioning
of 8 Core Single mode Fiber Optic Cable in already
laid UPVC conduit, as shown in drawings including
termination and tagging at both ends, as per
standard specifications with all termination
accessories up to entire satisfaction of IT Engineer.
1,335 Rm.
c) Installation, testing and commissioning by
Manufacturer Authorized Agent / Dealer and handing
over complete Voice & Data System to Owner with
Providing Training voice data fuke & OTDR Testing, as
build drawing, Rack layouts and certification's
Principal, complete equipment's Manual and
Warranty Documents to Owners representative.
1 Job.
Amount Carried to ELV Summary
PLUMBING WORKS
EA Consulting
(Pvt) LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(External Development)
Plumbing Works
S.NO: AMOUNT
A SCHEDULE ITEMS
1
B NON-SCHEDULE ITEMS
1
Total of Non-Schedule Items - B
TOTAL AMOUNT CARRIED TO GRAND SUMMARY (A+B)
Total of Schedule Items
Add __% Premium on Plumbing Works of PWD-2012
Total of Schedule Items with Premium - A
IRRIGATION WORKS
PLUMBING SUMMARY
DESCRIPTION
u.P.V.C PIPE (EXTERNAL) "D" CLASS
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITES
(External Development)
Plumbing Works
1 2 3 4 5 6 7 = 4 X 6
SCHEDULE ITEMS
1 u.P.V.C PIPE (EXTERNAL) "D" CLASS:
Providing and fixing un plasticized polyvinyl chloride
pipe (P.V.C) "D" class and specials etc. including
cutting and fitting complete with and including the
cost of cutting trench up to 1-1/2 feet deep refilling,
watering, ramming, and disposal of surplus earth
within one chain and after cleaning the pipe and
cartage within 10 miles (16.09 km.) (working pressure
12 kg/cm2 ).
i 4" inches (100 mm) dia pipe 140 RFt 328.36
ii 3" inches (80 mm) dia pipe 320 RFt 207.10
iii 1 1/2" inches (40 mm) dia pipe 60 RFt 80.05
Amount Carried to Plumbing Summary
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2012 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITES
(External Development)
Plumbing Works
AMOUNT
(Pak Rs.) S.No
PWD
Schedule
2012 Ref.No
DESCRIPTION QTY UNITRATE
(Pak Rs.)
NON-SCHEDULE ITEMS
2 ValvesSupply & installation testing and commissioning of
PVC PN-16 Irrigation Bib Tap with quick coupling
connection to be coupled with PVC Pipe, as per
drawings, specifications and Engineers
Recommendationi 1 1/4" dia 9 Nos
3 Air Relief Valves
Supply & installation testing and commissioning of
25mm PN-20 Automatic Air Relief valve to be installed
in Irrigation Mains, as indicated on the drawings, as
per specifications and engineers approval.
1 Nos
5 Thrust block
Construction of Thrust block to be provided at critical
points, bends as per specifications and engineers
Approval
1 Nos
6 Excavation and Backfill for Pipes
Excavation and backfilling in all kinds of soils, dry or
wet, hard or soft, up to depth of 2.0 meters including
site clearing and backfilling or filling the excavated
material to specified depth to any lead within site,
complete with dewatering, breaking clods, leveling,
dressing, watering and compaction to obtain 95%
modified AASHTO density, complete as per drawing
and specifications and approval of the Engineer.
1 Job
9 Submersible Irrigation Pumps
Supply , Installation, Testing and Commissioning of
submersible pump sets for Irrigation water of below
mentioned fittings and as required for proper
operation of pumps, as indicated on the drawings, as
per specifications and Engineers Approval:-
1- Submersible Pump Set with Comprising of 1 Duty, 1
standby Pumps
(Pump Flow (each) = 60GPM @ 5.0 bars Head)
2- 63mm dia PN-16 Ductile Iron Disk type Non Return Valve
= 02 No's
3- 63mm dia Gate Valve
4- Pump Control Panel = 01 No's
5- 25mm Air Relief Valve = 01 No's
1 Set
Amount Carried to Plumbing Summary
PUBLIC HEALTH (Sewerage System)
EA Consulting
(Pvt) Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(External Development)
Sewerage System
S.NO: AMOUNT
A SCHEDULE ITEMS
1
2
3
4
B NON-SCHEDULE ITEMS
5
6
7
8
9
Total of Non-Schedule Items - B
TOTAL AMOUNT CARRIED TO GRAND SUMMARY (A+B)
SEPTIC /HOLDING TANK
Total of Schedule Items
Add ____% Premium on Sewerage System of PWD-2012
Total of Schedule Items with Premium - A
R.C.C MANHOLE COVER
M.S LADDER RUNGS FOR MANHOLE
GRANULAR BEDDING
PIPES (Upvc)
SEWERAGE SYSTEM SUMMARY
DESCRIPTION
EARTH WORK ITEMS
PLAIN CEMENT CONCRETE ITEMS
REINFORCED CONCRETE WORKS
STEEL REINFORCEMENT
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(External Development)
Sewerage System
S.NO
PWD
Schedule
2012 Ref.No
QTY UNIT RATE
(Pak Rs.)
AMOUNT
(Pak Rs.)
1 2 4 5 6 7 = 4 x 6
1 Sub Head
Code-127
1.1
For Pipe Line 33,343 100 Cft 594.03
For Manhole 4,535 100 Cft 594.03
1.2
For Pipe Line 8,083 100 Cft 671.38
For Manhole 1,015 100 Cft 671.38
1.3
For Pipe Line 2,041 100 Cft 748.73
For Manhole 272 100 Cft 748.73
2 Sub Head
Code-102
2.1 Graded material obtained from required
excavation 7,057 100 Cft 2,314.41
2.2 Backfill materia from outside Source Rate only 100 Cft 2,314.41
Item#148
P-446
From -5' - 0" to -8' - 0"
Item#148
P-446
From -8' - 0" to -11' - 0"
Supplying and filling approved quality
imported earth in depressions within a radius
of 5 miles (8 km) including breaking clods,
levelling, dressing, watering and
consolidating in 6 inches (152 mm) layers etc.
complete, including all lifts.etc. complete in
all respects as per drawing, standard ,
specifications and as directed by the
Engineer.
Item#14 P-12
Amount of Eath work Items
DESCRIPTION
3
SCHEDULE ITEMS
EARTH WORK ITEMS
EXCAVATIONS, SHORING AND DEWATERING
Excavation in all kind of soils in trenches,
manhole and channels including dressing to
required section and backfilling excavated
stuff including watering, ramming etc. in
layers as per direction of Engineer-in- Charge
and disposal of surplus earth complete: lift
upto 5 ft. (1.52 m) and lead upto 100 ft. (30.5
m) etc. complete in all respects as per
drawing, standard , specifications and as
directed by the Engineer.
Item#148
P-446
From ± 0'-0" to -5' - 0"
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(External Development)
Sewerage System
S.NO
PWD
Schedule
2012 Ref.No
QTY UNIT RATE
(Pak Rs.)
AMOUNT
(Pak Rs.) DESCRIPTION
3
Sub Head
Code-105
3.1
322 100 Cft 10,505.04
4
Sub Head
Code-114
4.1
Item#2,
P-135 1,506 100 Cft 14,922.33
Providing and laying 1:2:4 (1 cement 2 sand
and 4 coarse aggregate) cement concrete
using graded gravel (bajri) 1inch (25 mm)
and down gauge in foundation including
levelling, compacting and curing etc.
complete in all respects as per drawing,
standard , specifications and as directed by
the Engineer.
Below foundation, trenches, manhole
situ,tanks, and where required (Ratio 1:2:4)
Amount of Plain Cement Concrete Items
FOR PIPE ENCASEMENT
PLAIN CEMENT CONCRETE ITEMS
PLAIN CEMENT CONCRETE WORKS
Providing and laying 1:4:8 (1 cement 4 sand
and 8 coarse aggregate) cement concrete
using graded gavel (bajri) 1 inch (25 mm)
and down gauge in foundation including
levelling, compacting and curing etc.
complete in all respects as per drawing,
standard , specifications and as directed by
the Engineer.
Below foundation, trenches, manhole
situ,tanks, and where required (Ratio 1:4:8)
(1000 Psi)
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(External Development)
Sewerage System
S.NO
PWD
Schedule
2012 Ref.No
QTY UNIT RATE
(Pak Rs.)
AMOUNT
(Pak Rs.) DESCRIPTION
5
Sub Head
Code-114
Item#1,P-135
5.1 i
635 100 Cft 16,626.18
5.2 ii
1,488 100 Cft 16,626.18
6
Sub Head
Code-108
Item#12,
P-48
6.1 For Manhole 2,669 100 Sft 648.08
7
Sub Head
Code-124
Item#94,
P-355
7.1685 Rft 333.08
Providing and fixing plain polyvinyle chloride
(PVC) water stops 8" (203 mm) wide in vertical
or horizontal expansion joints including cutting
and jointing etc. complete in all respects as
per drawing, standard , specifications and as
directed by the Engineer.
For Any type of Tanks/Walls, manhole and
where required etc.
Amount of Reinforced Cement Concrete Items
PVC WATER STOPER BAR
REINFORCED CONCRETE WORKS
Providing and laying reinforced cement
concrete using screened graded bajri 3/4
inch (19 mm) and down gauge having a
minimum works cube crushing strength of
2250 Ibs. per sq inch (15.52 N/mm2 ) at 28
days with a mix not leaner than 1:2:4 in
required shape including form work and its
removal, compacting and curing etc.
complete but excluding the cost of
reinforcement.etc. complete in all respects as
per drawing, standard , specifications and as
directed by the Engineer.
BOTTOM SLAB
RCC MANHOLE (3'-0" Internal Diameter)
WALLS
RCC MANHOLE (3'-0" Internal Diameter)
BITUMEN COATING
Providing a coat of bitumen emulsion at 10
Lbs. per % sft. (0.49 Kg/sm).etc. complete in all
respects as per drawing, standard ,
specifications and as directed by the
Engineer.
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(External Development)
Sewerage System
S.NO
PWD
Schedule
2012 Ref.No
QTY UNIT RATE
(Pak Rs.)
AMOUNT
(Pak Rs.) DESCRIPTION
8
Sub Head
Code-114
Item#166,
P-159
8.1 8,415 Kg 123.02
STEEL REINFORCEMENT
Providing and laying hard grade ribbed
deformed (minimum yield point 60,000 psi)
reinforcement bars with & including the cost
of straightening, cutting, bending, binding,
wastage, and such overlaps as are not shown
in the drawings, placing in position on
cement concrete 1:2:4 precast or m.s. chairs,
tying with binding wire, cost of chairs and
wires etc. in all kinds of RCC work in
foundation, basement, plinth and ground
floor of building including septic tanks and
under ground tanks and in projections for
future extension . etc. complete in all respects
as per drawing, standard , specifications and
as directed by the Engineer.
(Bars to be cut and placed in position at any
level according to the Bar bending schedule
prepared by the contractor and approved
by the Engineer).
Deformed bars (Grade-60)
Amount of Steel Reinforcement Items
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(External Development)
Sewerage System
S.NO
PWD
Schedule
2012 Ref.No
QTY UNIT RATE
(Pak Rs.)
AMOUNT
(Pak Rs.) DESCRIPTION
9
9.1 i)
RCC Precast cover circular shape (24"
dia) 31 No
10
174 No
11
3,322 Cft
12
12.1 2,269 Rft
GRANULAR BEDDING
Providing, spreading, and consolidating of
granular bedding material of approved
quality including watering etc .complete in all
respect as per drawings and specification
and as directed by the Engineer Incharge.
PIPES (Upvc)
Providing, laying jointing, installing and fixing
UPVC pipes SN-4, Confirmed to
BS3505/PS3501 (cement solvent) of class "B" &
manufacturer's specification including
cutting, jointing, specials, transportation
loading unloading at the site of work
stacking, and testing as per standard with
water minimum pressure as specified etc,
complete in all respect, as per specifications
& relevant drawings and all works to the
entire satisfaction of the Engineer.
200 mm ( 8" ) dia
Providing fabricating and fixing M.S ladder
/rungs as shown in drawing complete with all
fixing arrangements (rawal bolt, etc.) as
shown in drawing enamel painting with rust
proof paint (at any height in any floor) etc.,
complete in all respects as per drawing,
standard , specifications and directed by the
Engineer.
NON-SCHEDULE ITEMS
R.C.C MANHOLE COVER
Providing and fixing R.C.C precast manhole
cover including steel reinforcement, angle
iron frame with painting & lifting hook etc.
complete in all respects as per drawing,
standard , specifications and as directed by
the Engineer.
M.S LADDER RUNGS FOR MANHOLE
EA Consulting
Pvt Ltd
ESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(External Development)
Sewerage System
S.NO
PWD
Schedule
2012 Ref.No
QTY UNIT RATE
(Pak Rs.)
AMOUNT
(Pak Rs.) DESCRIPTION
13
13.1 85,000 UK Gallon
Construction and making of RCC Septic Tank
of size (45' -0" x 30' -0" x 10'-0") depth of
approved design all works comprising of
(Excavation back filling and disposal of
surplus earth , Pcc concrete, RCC bottom &
top slab & walls, cc benching complete with
curing and finishing, providing and fixing MS
foot rest (rungs) as shown on drawings,.
Including cost of Reinforcement bars, Fair
face Steel form work, C.I cover and frame
heavy duty (weight) as shown and bitumen
coating on outer surface up to substructure
level etc, complete in all respect, as per
specifications & relevant drawings and all
works to the entire satisfaction of the
Engineer.
Amount Carried to Sewerage Summary
SEPTIC /HOLDING TANK
PUBLIC HEALTH (Water Supply)
EA Consulting
(Pvt) LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(External Development)
Water Supply
S.NO: AMOUNT
A SCHEDULE ITEMS
1
2
3
4
B NON-SCHEDULE ITEMS
5
6
7
8
9
10
11
WATER SUPPLY SUMMARY
DESCRIPTION
EARTH WORK ITEMS
PLAIN CEMENT CONCRETE ITEMS
REINFORCED CEMENT CONCRETE ITEMS
STEEL REINFORCEMENT
Valves
Total of Schedule Items
Add ____% Premium on Plumbing Works of PWD-2012
Total of Schedule Items with Premium - A
SAND BEDDING
M.S LADDER RUNGS FOR CHAMBER
HDPE PIPE
PIPES (MS)
Total of Non-Schedule Items - B
TOTAL AMOUNT CARRIED TO GRAND SUMMARY (A+B)
Pumping Machinery
ERS Survey & Test Tube Well
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(External Development)
Water Supply
S.NO
PWD
Schedule
2012 Ref.No
QTY UNIT
RATE
(Pak Rs.)
AMOUNT
(Pak Rs.)
1 2 4 5 6 7 = 4 x 6
1
Sub Head
Code-127
1.1
1.1.1 19,847 100 Cft 594.03
1.1.2 29,495 100 Cft 594.03
2
2.1 12,848 100 Cft 2,314.41
3
Chapter-105
3.1 50 100 Cft 10,505.04
3.2
Chapter-114
3.2.1 222 100 Cft 14,922.33
3.2.2 10 100 Cft 14,922.33
3.2.3 248 100 Cft 14,922.33
Excavation in all kind of soils in trenches, manhole,
chambers, underground tank and channels
including dressing to required section and
backfilling excavated stuff including watering,
ramming etc. in layers as per direction of Engineer-
in- Charge and disposal of surplus earth complete:
lift upto 5 ft. (1.52 m) and lead upto 100 ft. (30.5 m)
etc. complete in all respects as per drawing,
standard , specifications and as directed by the
Engineer.
DESCRIPTION
3
SCHEDULE ITEMS
EARTH WORK ITEMS
EXCAVATIONS, SHORING AND DEWATERING
Amount of Eath work Items
PLAIN CEMENT CONCRETE ITEMS
PLAIN CONCRETE WORKS
Providing and laying 1:4:8 (1 cement 4 sand and 8
coarse aggregate) cement concrete using graded
gavel (bajri) 1 inch (25 mm) and down gauge in
foundation including levelling, compacting and
curing etc. complete in all respects as per drawing,
standard , specifications and as directed by the
Engineer.
Item#148
P-446
From ± 0'-0" to 5' - 0"
For Pipe Line
For Chamber
Chapter-102 Supplying and filling approved quality imported
earth in depressions within a radius of 5 miles (8 km)
including breaking clods, levelling, dressing,
watering and consolidating in 6 inches (152 mm)
layers etc. complete, including all lifts.etc. complete
in all respects as per drawing, standard ,
specifications and as directed by the Engineer.
With new earth excavated from outside.
Amount of Plain Cement Concrete Items
Concrete Cylindrical strength of 1000Psi Ratio 1:4:8
Providing and laying 1:2:4 (1 cement 2 sand and 4
coarse aggregate) cement concrete using graded
gravel (bajri) 1inch (25 mm) and down gauge in
foundation including levelling, compacting and
curing etc. complete in all respects as per drawing,
standard , specifications and as directed by the
Engineer.
Item#2,
P-135
Concrete Cylindrical strength of 3000Psi for Section
under carriage way
Concrete Cylindrical strength of 3000Psi for Thurst
block
Concrete Cylindrical strength of 3000Psi for Chamber
walls
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(External Development)
Water Supply
S.NO
PWD
Schedule
2012 Ref.No
QTY UNIT
RATE
(Pak Rs.)
AMOUNT
(Pak Rs.)
1 2 4 5 6 7 = 4 x 6
DESCRIPTION
3
4
Chapter-114
Item#1,P-135
4.1174 100 Cft 16,626.18
5
Chapter-108
Item#12,
P-48
5.1 528 100 Sft 648.08
6
Chapter-114
Item#166,
P-159
6.1 392 Kg 123.02
REINFORCED CEMENT CONCRETE ITEMS
REINFORCED CONCRETE WORKS
Providing and laying reinforced cement concrete
using screened graded bajri 3/4 inch (19 mm) and
down gauge having a minimum works cube
crushing strength of 2250 Ibs. per sq inch (15.52
N/mm2 ) at 28 days with a mix not leaner than 1:2:4
in required shape including form work and its
removal, compacting and curing, but excluding
the cost of reinforcement.etc. complete in all
respects as per drawing, standard , specifications
and as directed by the Engineer.
Chambers Bottom & Top Slab (4000 Psi)
BITUMEN COATING
Providing a coat of bitumen emulsion at 10 Lbs. per
% sft. (0.49 Kg/sm).etc. complete in all respects as
per drawing, standard , specifications and as
directed by the Engineer.
Amount of Reinforced Cement Concrete Items
STEEL REINFORCEMENT
Providing and laying hard grade ribbed deformed
(minimum yield point 60,000 psi) reinforcement bars
with & including the cost of straightening, cutting,
bending, binding, wastage, and such overlaps as
are not shown in the drawings, placing in position on
cement concrete 1:2:4 precast or m.s. chairs, tying
with binding wire, cost of chairs and wires etc. in all
kinds of RCC work in foundation, basement, plinth
and ground floor of building including septic tanks
and under ground tanks and in projections for future
extension .
(Bars to be cut and placed in position at any level
according to the Bar bending schedule prepared by
the contractor and approved by the Engineer).
Deformed bars (Grade-60) (for chamber )
Amount of Steel Reinforcement Items
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(External Development)
Water Supply
S.NO
PWD
Schedule
2012 Ref.No
QTY UNIT
RATE
(Pak Rs.)
AMOUNT
(Pak Rs.)
1 2 4 5 6 7 = 4 x 6
DESCRIPTION
3
7
2,534 Cft
8
28 No
9
9.1 850 P.Rft
9.2 770 P.Rft
9.3 60 P.Rft
10
10.1
300.00 P.Rft
10.2
450.00 P.Rft
10.3
60.00 P.Rft
NON SCHEDULE ITEMS
SAND BEDDING
Providing, spreading, and consolidating of sand
bedding material of approved quality including
watering etc. complete in all respects as per
drawing, standard , specifications and as directed
by the Engineer.
M.S LADDER RUNGS FOR CHAMBER
Providing fabricating and fixing M.S ladder /rungs
as shown in drawing complete with all fixing
arrangements (rawal bolt, etc.) as shown in drawing
enamel painting with rust proof paint (at any height
in any floor) etc., complete in all respects as per
drawing, standard , specifications and directed by
the Engineer.
HDPE PIPE
Providing, Laying, jointing, commissioning, testing
and disinfection of HDPE pipes of below mentioned
diameter and pressure confirming to specified
standards, in trenches to correct alignment and
grade as indicated in the drawing and
specifications including cost of all fittings, (bend,
tee, yee of any degree & reducer flange adopter,
stub end ) and all other accessories, equipment etc
, complete in all respect, as per specifications,
relevant drawings and all works to the entire
satisfaction of the Engineer.
O.D 160 mm (6.299 inch) PN -10
O.D 125 mm (4.92 inch) PN -10
O.D 110 mm (4.33 inch) PN-10
PIPES (MS)
Manufacturing, supplying, laying, jointing, testing,
disinfection & commissioning of Black steel M.S Pipe
made out of M.S sheet confirming to API 5L grade X
42 (Spirally Welded) with ERW & Externally asphalt
coated with fiber glass 5 mm thick & internally CC
Lining 8mm thick as per American Water Works
Association (AWWA) Specification i/c jointing with
welding in trenches i/c cost of all fittings, bend, tee,
yee of any degree & reducer (if required) and
testing with water specified pressure for different dia
of pipes as below complete in all respect as per
drawings, specifications and as directed by the
Engineer/Incharge.
For Supply, Overflow, Drain out and manifold Pipe
150mm (I.D)
For Tube well Suction Pipe
150mm (I.D)
For Discharge Pipe and suction pipe
100mm (I.D)
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(External Development)
Water Supply
S.NO
PWD
Schedule
2012 Ref.No
QTY UNIT
RATE
(Pak Rs.)
AMOUNT
(Pak Rs.)
1 2 4 5 6 7 = 4 x 6
DESCRIPTION
3
11
11.1 2 Each
11.2 1 Each
11.3 2 Each
12
12.1 1 Each
13
13.1 1 Each
14
14.1
2.00 No
GATE VALVE
Providing, installing testing and commissioning of
centrifugal pumps including cost of motor of
approved quality and required H.P. i/c cost of all
fittings (Tee, Bends ,Reducer/Expander ), pipe
sleeves, puddle flange,foot valve, gate
valves(100mm dia), Non Return Valve(100mm dia),
pressure gauge, flow meter, air release valve
(double acting), flexible coupling, electrical cables
with float levels to control pump on and off ,
switches, panels with dry running protection, also i/c
cost of suction Pipes etc complete in all respect as
per drawings and specifications and as directed by
the Engineer Incharge.
Providing & Fixing of Flange End Cast Iron Sluice
Valve of Design Standard BS 5150/API 600
compliance with EN 1171/BS 5163 having Nominal
Pressure PN-16 - Class 125 S.S. Cr 13% Seat & Stem
with Nuts, Bolts, Gas kit/Rubber Packing including
Labour complete in all respect, as per specifications
& relevant drawings and all works to the entire
satisfaction of the Engineer.
PN-10 150 mm
PN-10 125 mm
PN-10 100 mm
AIR RELEASE VALVE
Supplying, installing, jointing and fixing C.I Air Valve
(Double acting) with SS ball heavy duty pattern of
approved manufacturer's specification (test
pressure ) as per standard including 50mm dia
isolating flanged gate valve, m.s flanges etc
complete in all respect, as per specifications &
relevant drawings and all works to the entire
satisfaction of the Engineer.
2" (DN-50)
WASH OUT VALVE
Providing, fixing, jointing and testing of Flanged C.I
Washout valve of approved quality, including
fittings (tee, Bend,flange adaptor),nut, bolts gasket
and washers etc. Complete in all respect as per
drawing and specifications and as directed by the
Engineer.
PN-10 (SDR -21)100 mm
PUMPING MACHINERY FOR UGWT
Pumps 190 IGPM and head of 35.0 m (1 duty / 1
stand by).
EA Consulting
Pvt LtdESTABLISHMENT OF UNIVERSITY OF BALTISTAN, SKARDU
(PACKAGE-II)
BILL OF QUANTITIES
(External Development)
Water Supply
S.NO
PWD
Schedule
2012 Ref.No
QTY UNIT
RATE
(Pak Rs.)
AMOUNT
(Pak Rs.)
1 2 4 5 6 7 = 4 x 6
DESCRIPTION
3
15
15.1
1.00 job.
15.2
1.00 job.
15.3
1.00 Job
15.4
15.4.1
15.4.1.1 1.00 No
TUBEWELL
Perform the Electric resistivity Survey of the land to
identify the availability, potentiality of ground water
and drill a test bore to meet the required flow of 190
IGPM and provide the detail report showing
subsurface lithology and yield test (quantity &
quality) results to consultant for revision in the
pumping machinery and tubewell details. etc
complete in all respect as per drawings and
specifications and as directed by the Engineer
Incharge
Construction of Tubewell i/c Boring in all types of
water bearing soils from ground level upto required
depth, and 16" bore dia including sinking and
drawing of casing pipe, providing, fixing and
installation of screen & blind uPVC pipe class "D"
including all required necessary fittings and
accessories (M.S Cone, nuts, screw, solution,
centralizers, coupling and plug or cap etc.) with
over lapping, Providing and filling Shrouding
material in between bore hole & screen pipe etc
complete in all respects as per standard
specification, drawing and entire satisfaction of the
Engineer. (The configuration of tube well will be
updated after finalization of test results or availablity
of yields)
Construction of Pump Room having size of (12'-0" x
12'-0" x 10'-6" ) for Tube well , i/c excavation,
backfilling, Stone soling, Plain Cement Concrete/
R.C.Concrete column , roof and Beam/Plith beam ,
Wooden formwork/shuttering, Reinforcement,
2coats of Bitumen coating, Damp Proof Course, Anti-
termite treatment by spraying, Block Masonry walls
and steps, Roof treatment Internal & External Plaster
and also Paints internal ,external wall surface door
and windows, M.S Doors, Windows, with all
accessories etc complete in all respect as per
drawing and specification and as directed by the
engineer.
PUMPING MACHINERY
Providing, installing, testing and commisioning of
submersible pump for Tubewell i/c fittings bends,
expenders, flanges ,gate valves (100mm), Non
Return Valve(100mm), pressure gauge, flow meter,
air release valve (double acting 50mm dia ),
electrical cables from tube wells to ugwt with float
levels to control pump on and off, panels with dry
protection , etc, required to complete in all
respects as per standard specification, drawing and
entire satisfaction of the Engineer. (The
configuration of pumping machinary will be updated
after finalization of tube well test results or availablity
of yields)
Pumps 190 IGPM and head of 160 m (1 duty).
Amount carried to water supply Summary
GRADING WORKS
SCHEDULE ITEMS
1 Clearing jungle (ordinary) by cutting, removing all shrubs,
trees, upto 6 inches (152 mm) girth, etc. and taking out their
entire roots and filling the hollows with earth complete with
dressing, consolidating and watering the filling including
stacking the serviceable materials and disposal of useless
material as directed, lead to 10 chains (305 Rm), cost of earth
included.
Sft 40,000 0.43
(PWD) 102, Sr. 1)
2 SUITABLE CUT
Cutting to a required gradient in all kinds of soil (except rock
murum and gravelly soil) and filling and excavated stuff in 6
inches (152 mm) layers in depression, where required or
disposing the same complete with levelling, dressing and
watering the filling and consolidation etc. as required, lead
upto one chain (30.5 Rm) average, and lift upto 5 feet (1.52
Rm).
To Be Used in Refill for Embankment
Cft 589,950 6.35
(PWD) 102, Sr. 6)
3 Add for additionaHift of every 3 feet (0.9 mm) or thereof in
items No.6,8 and 9. ( 3 + 3 Feet Rate 0.77 x 2)Cft 589,950 1.54
(PWD) 102, Sr. 19)
4 Add for additional lead of every one chain (30.5 R.m) or part
thereof in item Nos. 6,8,9,13,15 and 18.
(5.00 Chain x 0.77)
Cft 589,950 3.85
(PWD) 102, Sr. 21)
5 SUITABLE CUT
Cutting to a required gradient in soft, or disintegrated rock by
hammering and chiseling and jumper work including sorting
out and stacking serviceable and unserviceable materials
separately, complete with levelling and dressing as required,
lead upto one chain (30.5 Rm), average, and lift upto 5 feet
(1.52 m).
To Be Used in Refill for Embankment
Cft 31,050 14.84
(PWD) 102, Sr. 10)
6 Add for additional lift of every 3 feet (0.9 m) or part there of in
items 10 to 12. ( 3 + 3 Feet Rate 0.97 x 2)Cft 31,050 1.94
(PWD) 102, Sr. 20)
7 Add for additional lead of every one chain (30.5 R.m) or part
thereof in item Nos. 10 to 12. (5.00 Chain x 0.97)Cft 31,050 4.83
(PWD) 102, Sr. 22)
Continue
REMARKS
UNIVERSITY OF BALTISTAN SKARDU
ABSTRACT COST OF GRADING
BILL OF QUANTITIES
PACKAGE-II
SR. # Description Unit Quantities Rate Amount
(Rs)
REMARKS
UNIVERSITY OF BALTISTAN SKARDU
ABSTRACT COST OF GRADING
BILL OF QUANTITIES
PACKAGE-II
SR. # Description Unit Quantities Rate Amount
(Rs)
8Making earthen embankments with earth taken from approved
borrow pits including cost of excavation, placing earth in
layers not exceeding 9" (229 m) depth as per approved section
including dressing top and sides of the bank within a lift of 5
ft. (1.52m) and lead upto 100ft. (30.5 m) in all kinds of soil
(except gravelly, murum, wet silt, clay or mud and rock).
Cft 500 5.91
(PWD) 127, Sr. 10)
9 Carriage of Material
Carriage of Sand, Bajri, lime, murum,manure, earth, building
rubbish etc. (Upto 5 Miles)
Cft 500 13.94
(PWD) TRP 4, Sr. 2)
10 Compaction of earthen embankments to full depth and width
below sub-grade level by approved mechanical means in layers
not exceeding 9" (229 mm) in depth at optimum moisture
content including watering, mixing by mechanical means
complete (the sub-grade embankment of 3 Ft. (914 mm) or less
in height shall be compacted to at least 95% modified
A.A.S.H.O. max. dry density or their full depth and width,
embankments over 3 ft. (914 mm) in depth shall have top 3 ft.
(914 mm) compacted to not less than 95% modified
A.A.S.H.O. maximum dry density to their full depth and width
and portion below 3 ft. (914 mm) compacted not less than 85%
modified A.A.S.H.O. max. dry density to their full depth and
width) .
Cft 500 3.01
(PWD) 127, Sr. 18)
11 Disposal of surplus excavated stuff distinct from the
materials and the rubbish accumulated during construction
upto one chain lead (average) and 5 feet (1.52 m) lift, levelling
etc. complete.
Cft 441,000 3.50
(PWD) 102, Sr. 15)
12 Add for additional lead of every one chain (30.5 R.m) or part
thereof in item Nos. 6,8,9,13,15 and 18.(20 Chain x 0.77)Cft 441,000 15.40
(PWD) 102, Sr. 21)
GRADING BILL (PWD SCHEDULE ITEM)
GRADING BILL PREMIUM ON (SCHEDULE ITEM)
TOTAL CARRIED TO GRAND SUMMARY