+ All Categories
Home > Documents > ESTB Test Beam Upgrades Hadrons Shorter bunch length Carsten Hast March 17 th 2011.

ESTB Test Beam Upgrades Hadrons Shorter bunch length Carsten Hast March 17 th 2011.

Date post: 19-Dec-2015
Category:
View: 213 times
Download: 0 times
Share this document with a friend
6
ESTB Test Beam Upgrades Hadrons Shorter bunch length Carsten Hast March 17 th 2011
Transcript

ESTB Test Beam Upgrades

Hadrons

Shorter bunch length

Carsten HastMarch 17th 2011

C.Hast, ESTB Workshop SLAC, March 2011 2

Secondary Hadron Beam Properties

Beam Properties at Detector Plane

x=1mm y=1.4mm

E/E=1.3%

Divide by 4 for 250 pC

C.Hast, ESTB Workshop SLAC, March 2011 3

ESTB Stage II: Hadron Production

• Add Be target, beam dump, analyzing magnet, momentum slit, and quadrupole doublets to produce a secondary hadron beam

• Production angle = 1.35O and Acceptance = 10 sr

• Move Collimator (BSY)

• Design, build and install Be-target (BSY)

• Design, build and install insertable dump / collimator (BSY)

• Retrieve and install bend magnet (for momentum selection) (ESA)

• Retrieve and install 4 quadrupoles (BSY/ESA)

• Design, build and install collimator (ESA)

• Additional vacuum system (ESA)

• Many any other odds and ends

4C.Hast, ESTB Workshop SLAC, March 2011

ESTB Stage II: Components

Serious effort!

Needs to be driven by user demand!

C.Hast, ESTB Workshop SLAC, March 2011 5

Shorter Bunch Length for ESTB

• Interest for shorter bunches (CLIC, accelerator R&D, etc)

• LCLS ultra-short bunch length: 10 mm and shorter

• In A-line, bunch length increases to 280 mm due to strong bends (24o) and large (optics) R56

• With existing optics: 20-30 mm bunch length is possible if one manages to reduce R56 by a factor 3-4 and keep sE=0.02% Lew, Ted and Jury are looking into that

• Possible to preserve short bunches in ESA with adequate $ support by interested parties …

Summary

• Production of Hadrons is possible for late 2012 if – Demanded by users – Funding is made available

• Short bunch length might be possible– Currently under study– Funding needs to be found

6C.Hast, ESTB Workshop SLAC, March 2011

Production of Hadrons would add

desirable capabilities to ESTB


Recommended