    S.No. Description/Item of work B H/D Qty.

    1

    Col's foundation F1 15 1.50 1.50 1.50 50.63 Cum.

    Plinth Beam:-H-Beam 5 8.75 0.30 0.10 1.31 "

    Verandah beam 1 4.50 0.30 0.10 0.14 "

    V-Beam

    3 11.20 0.30 0.10 1.01 "

    Total 53.08 Cum

    2 Sand filling under floor

    Bed room 1 4.50 3.60 0.15 2.43 Cum

    Toilet 1 2.40 1.80 0.15 0.65 Cum

    Utility 1 3.60 1.80 0.15 0.97 Cum

    Kitchen 1 3.60 2.80 0.15 1.51 Cum

    Dining 1 3.60 6.45 0.15 3.48 Cum

    Stair hall 1 3.60 1.00 0.15 0.54 Cum

    D/Room 1 4.50 3.90 0.15 2.63 Cum

    Verandah+Porch 1 4.50 2.65 0.15 1.79 Cum

    Total 14.01 Cum

    3

    (i)

    Footing 15 2 (1.40+1.40) 0.30 57.15 Sqm

    15 2(0.40+0.40)

    0.15 3.60 "column neck to PL 15 2 (0.23+0.30) 0.50 7.95 "

    Total 68.70 Sqm.

    (ii)

    Slab 2 10.55 13.80 291.18 Sqm.

    TOTAL 291.18 Sqm.

    (iii) Columns, pillars, posts and struts

    Square Cols.:-

    Cols. Size(0.230x0.30) 30 2 0.23+0.30 0.53 3.00 95.40 Sqm.

    Total 95.40 Sqm.

    (iv)

    H-Beam

    Side 8 2 4.50 0.45 32.40 Sqm.

    Soffits 8 1 4.50 0.30 10.80 "

    Side 8 2 3.60 0.45 25.92 "

    Soffits 8 1 3.60 0.3 8.64 "

    Detail of MeasurementsName of work:- Proposed House of

    Nos. L

    Excavation in foundation, trenches etc.

    Providing formwork with steel plates 3.15 mm thick

    Foundation, footing bases of columns etc:-

    Flat Surfaces such as soffits of suspended floors:-

    Beams, cantilevers, girders and lintels etc.:-

  • 8/11/2019 ESTIMATE DEMO-2

    2/23

    V-Bean:-

    Side 6 2 11.20 0.45 60.48 Sqm.

    Soffits 6 1 11.20 0.30 20.16 "

    Lintels:-

    Dw= 4Nos.(1.00x2.10)+0.46

    Side 4 2 1.76 0.15 2.11 "

    Soffits 4 1 1.46 0.23 1.34 "

    D1 = 4Nos.(1.00x2.10)

    Side 4 2 1.30 0.15 1.56 "

    Soffits 4 1 1.00 0.23 0.92 "

    D2 =1 Nos.(0.90x2.10)

    Side 1 2 1.2 0.15 0.36 "

    Soffits 1 1 0.9 0.23 0.21 "

    D3 =3 Nos.(0.80x2.10)

    Side 3 2 1.1 0.15 0.99 "

    Soffits 3 1 0.8 0.23 0.55 "

    D4=2Nos.(0.80x2.10)+0.45

    Side 2 2 1.55 0.15 0.93

    Soffits 2 1 1.25 0.23 0.58

    W= 1Nos.(1.80x4.50)

    Side 1 2 2.10 0.15 0.63 "

    Soffits 1 1 1.80 0.23 0.41 "

    W1= 5No.(1.80x1.35)+0.45

    Side 5 2 2.55 0.15 3.83 "

    Soffits 5 1 2.25 0.23 2.59 "

    W2 = 1 No.(1.35x1.35)+0.45

    Side 1 2 2.1 0.15 0.63 "

    Soffits 1 1 1.8 0.23 0.41 "

    W3 = 1 No.(1.35x1.05)+0.45

    Side 1 2 2.1 0.15 0.63 "

    Soffits 1 1 1.8 0.23 0.41 "

    W4 = 1

    No.(0.90x1.050)+0.45

    Side 1 2 1.65 0.15 0.50 "

    Soffits 1 1 1.35 0.23 0.31 "

    W5 = 3 No.(0.90x1.35)+0.45

    Side 3 2 1.65 0.15 1.49 "

    Soffits 3 1 1.35 0.23 0.93 "

    W6= 3 Nos.(0.75x1.05)+0.45

    Side 3 2 1.50 0.15 1.35 "

    Soffits 3 1 1.2 0.23 0.83 "

    W7= 1 Nos.(1.50x1.45)

  • 8/11/2019 ESTIMATE DEMO-2

    3/23

    Side 1 2 1.80 0.15 0.54 "

    Soffits 1 1 1.5 0.23 0.35 "

    Total 183.78 Sqm.

    (v)

    1 4 1.00 1.30 5.20 Sqm.

    Steps 1 36 1.00 0.15 5.40 "Sides 1 36 1/2 0.17 0.15 0.46 "

    Total 11.06 Sqm.

    (vi)

    F/S & B/S 4 1 8.75 35.00 Rmt.

    L/S & R/S 2 1 23.20 46.40 "

    Total 81.40 Rmt.

    4

    Under floors

    Bed room 1 4.50 3.60 0.10 1.62 Cum.

    Toilet 1 2.40 1.80 0.10 0.43 "

    Utility 1 3.60 1.80 0.10 0.65 "

    Kitchen 1 3.60 2.80 0.10 1.01 "

    Dining 1 3.60 6.45 0.10 2.32 "

    Stair hall 1 3.60 1.00 0.10 0.36 "

    D/Room 1 4.50 3.90 0.10 1.76 "

    Verandah+Porch 1 4.50 2.65 0.10 1.19 "

    Total 9.34 Cum.

    5Col's foundation 15 1.50 1.50 0.15 5.06 Cum.

    Plinth Beam:-

    H-Beam 5 8.75 0.30 0.45 5.91 "

    Verandah beam 1 4.50 0.30 0.45 0.61 "

    V-Beam

    3 11.20 0.30 0.45 4.54 "

    Total 16.11 Cum.

    6

    (i)

    Footing 15 1.50 1.5 0.25 8.44 Cum.Trapazoidal 15 0.3 0.35 0.32 "

    Pedestal 15 1.20 1.20 0.20 4.32 "

    Up to PL 15 0.23 0.3 0.90 0.93 "

    Plinth Beam:-

    H-Beam 5 8.75 0.30 0.45 5.91 "

    Verandah beam 1 4.50 0.30 0.45 0.61 "

    V-Beam

    3 11.20 0.30 0.45 4.54 "

    P/L CC 1:4:8 in Foundation and plinth :-

    P/L in position C.C.1:2:4 cement concrete :-

    Foundation, footing bases of columns and the like and mass

    length of parallel

    P/L Cement concrete 1:6:12 in Foundation and plinth :-

    Stair case (except spiral stair case) excluding landing :-

    Edge of slab and breaks in floor and walls:-

  • 8/11/2019 ESTIMATE DEMO-2

    4/23

    Total 25.06 Cum.

    (ii)

    GROUND FLOOR

    Bed room 1 4.50 3.60 0.12 1.94 Cum.

    Toilet 1 2.40 1.80 0.12 0.52 "

    Utility 1 3.60 1.80 0.12 0.78 "Kitchen 1 3.60 2.80 0.12 1.21 "

    Dining 1 3.60 6.45 0.12 2.79 "

    Stair Hall 1 3.60 1.00 0.12 0.43 "

    D/Room 1 4.50 3.90 0.12 2.11 "

    Verandah+ Porch 1 4.50 2.65 0.12 1.43 "

    Mumty 1 3.11 2.20 0.12 0.82 "

    FIRST FLOOR

    Master Bed Room 1 4.50 3.60 0.12 1.94 "

    Dressing Area 1 1.80 1.20 0.12 0.26 "

    Pooja 1 1.40 1.80 0.12 0.30 "

    Toilet-I 1 1.80 2.25 0.12 0.49 "

    Toilet-II 1 2.10 1.80 0.12 0.45 "

    Bed room 1 4.50 3.90 0.12 2.11 "

    Bed/Living 1 3.60 3.75 0.12 1.62 "

    Stair Hall 1 3.60 3.50 0.12 1.51 "

    Terrace 1 4.60 2.05 0.12 1.13 "

    Chhajja F/S & B/S 2 1 8.75 0.60 0.12 1.26 "

    L/S & R/S 2 1 (11.20+12.00 23.20 0.60 0.12 3.34 "

    H-Beam "

    2 5 8.75 0.23 0.30 6.04 "

    Verandah beam 2 1 4.50 0.23 0.30 0.62 "V-Beam "

    2 3 11.20 0.23 0.30 4.64 "

    Lintle:-

    D = 4Nos.(1.00x2.10)+0.46 4 1.76 0.23 0.5 0.81 "

    D1 = 4Nos.(1.00x2.10) 4 1.30 0.23 0.5 0.60 "

    D2 =1 Nos.(0.90x2.10) 1 1.2 0.23 0.5 0.14 "

    D3 =3 Nos.(0.80x2.10) 3 1.1 0.23 0.5 0.38 "

    D4=2Nos.(0.80x2.10)+0.45 2 1.55 0.23 0.5 0.36 "

    W= 1Nos.(1.80x4.50) 1 2.10 0.23 0.5 0.24 "

    W1= 5No.(1.80x1.35)+0.45 5 2.55 0.23 0.5 1.47 "

    W2 = 1 No.(1.35x1.35)+0.45 1 2.1 0.23 0.5 0.24 "

    W3 = 1 No.(1.35x1.05)+0.45 1 2.1 0.23 0.5 0.24 "

    W4 = 1

    No.(0.90x1.050)+0.45

    1 1.65 0.23 0.5 0.19 "

    W5 = 3 No.(0.90x1.35)+0.45 3 1.65 0.23 0.5 0.57 "

    Suspended floors, roofs landings and

  • 8/11/2019 ESTIMATE DEMO-2

    5/23

    W6= 3 Nos.(0.75x1.05)+0.45 3 1.50 0.23 0.5 0.52 "

    W7= 1 Nos.(1.50x1.45) 1 1.80 0.23 0.5 0.21 "

    Total 43.69 Cum.

    (iii) Columns, pillars, posts and struts

    Square Cols.:-

    Cols. Size(0.23x0.30) 30 0.23 0.30 3.00 6.21 Cum.

    Total 6.21 Cum.

    (iv)

    1 4 1.00 0.15 1.30 0.78 Sqm.

    Steps 1 36 1/2 1.00 0.17 0.15 0.46 "

    Total 1.24 Sqm.

    7

    As per Qty. of RCC work:-

    i Foundation footing 25.06ii Suspended floor 43.69

    iii Columns pillar post 6.21

    iv Stair case 1.24

    76.20

    Total @73.5 Kg/Cum. 5601 Kgs.

    8

    Qty as per form work of flat surface 291.18

    As per Qty. of Form work of Column 95.40

    Qty. of beams 183.78

    Stair case 11.06

    Total 581.42 Sqm.

    9

    i In super structure:-

    Ground Floor

    Bed room 1 1 0.23 2.7 10.06 Cum.

    D/Room 1 1 0.23 2.7 5.22 "

    Kitchen wall 1 0.23 2.7 6.21 "

    Toilet 2 0.23 2.7 2.24 "

    Dining 1 0.23 2.7 6.24 "Stair Case 1 1 1 0.23 2.7 0.62 "

    Verandha/porch 2 0.23 2.7 1.86 "

    First Floor "

    Master Bed Room 1 1 0.23 2.7 5.59 "

    Dressing Area 1 1 0.23 2.7 1.86 "

    Pooja 1 0.23 2.7 1.12 "

    Toilet-I 1 0.23 2.7 2.52 "

    Toilet-II 1 0.23 2.7 1.12 "

    1.8

    (3.6+6.45)

    1.5

    2(4.50)

    1.80+1.201.8

    (1.80+2.25)

    1.8

    (3.60+3.60+2.80)

    Stair case (except spiral stair case) excluding landing :-

    Providing tor steel reinforcement for reinforced cement concrete

    Providing in RCC work smooth finishing of the exposed

    Brick work in common burnt clay Building bricks in CM

    2(4.50+3.60)

    2(4.50+3.90)

  • 8/11/2019 ESTIMATE DEMO-2

    6/23

    Bed room 1 0.23 2.7 10.43 "

    Bed/Living 1 0.23 2.7 6.80 "

    Terrace 1 0.23 2.7 1.27 "

    Stair Case 1 0.23 2.7 3.40 "

    Total 32.45 "

    Deduction:-

    D = 4Nos.(1.00x2.10)+0.46 4 1.46 0.23 2.1 2.82 "

    D1 = 4Nos.(1.00x2.10) 4 1.00 0.23 2.1 1.93 "

    D2 =1 Nos.(0.90x2.10) 1 0.90 0.23 2.1 0.43 "

    D3 =1 Nos.(0.80x2.10) 1 0.80 0.23 2.1 0.39 "

    D4=1Nos.(0.80x2.10)+0.45 1 1.25 0.23 2.1 0.60 "

    W= 1Nos.(1.80x4.50) 1 1.80 0.23 4.5 1.86 "

    W1= 5No.(1.80x1.35)+0.45 5 1.35 0.23 1.35 2.10 "

    W2 = 1 No.(1.35x1.35)+0.45 1 1.35 0.23 1.35 0.42 "

    W3 = 1 No.(1.35x1.05)+0.45 1 1.35 0.23 1.05 0.33 "

    W4 = 1

    No.(0.90x1.050)+0.45

    1 0.90 0.23 1.05 0.22 "

    W5 = 3 No.(0.90x1.35)+0.45 3 0.90 0.23 1.35 0.84 "

    W6= 3 Nos.(0.75x1.05)+0.45 3 1.20 0.23 1.05 0.87 "

    W7= 1 Nos.(1.50x1.45) 1 1.50 0.23 1.45 0.50 "

    Total 13.31 "

    Net Total Qty. 32.45-13.31 = 19.14 Cum.

    10

    Wall between toilet & pooja 1 1.80 0.12 2.7 0.56 Cum.

    S/wToilet and Master bed

    room+Toilet and dressing

    area

    1 4.05 0.12 2.7 1.26 "

    S/W of M.Bed Room and

    balcony1 3.80 0.12 2.7 1.18 "

    Total 3.00 "

    Deductions:- "

    D3 =2 Nos.(0.80x2.10) 2 0.80 0.12 2.1 0.39 "

    D4=1Nos.(0.80x2.10)+0.45 1 1.25 0.12 2.1

    0.30 "

    W2 = 1 No.(1.35x1.35)+0.45 1 1.35 0.12 1.35 0.21 "

    Total 0.90 "

    Net Total Qty. 2.10 Cum

    11

    D

    Half Brick masonry using 2nd class common burnt

    3.00-2.10 =

    P/F 40 mm thick 2nd class Deodar wood frame:-

    1.98+3.50

    2(4.50+3.90)

    3.60+3.60+3.75

    2.05

  • 8/11/2019 ESTIMATE DEMO-2

    7/23

    H- Member 4 1 1.46 0.08 0.125 0.058 Cum

    V- Member 4 2 2.1 0.08 0.125 0.168 "

    D1

    H- Member 4 1 1.00 0.08 0.100 0.032 "

    V- Member 4 2 2.1 0.08 0.100 0.134 "

    D2

    H- Member 1 1 0.90 0.08 0.125 0.009 "V- Member 1 2 2.1 0.08 0.125 0.042 "

    D3

    H- Member 3 1 0.8 0.08 0.125 0.024 "

    V- Member 3 2 2.1 0.08 0.125 0.126 "

    D4

    H- Member 2 1 1.25 0.08 0.125 0.025 "

    V- Member 2 2 2.1 0.08 0.125 0.084 "

    W

    H- Member 1 3 2.25 0.08 0.125 0.068 "

    V- Member 1 4 1.35 0.08 0.125 0.054 "

    W1

    H- Member 5 3 1.35 0.08 0.125 0.203 "

    V- Member 5 4 1.35 0.08 0.125 0.270 "

    W2

    H- Member 1 3 1.75 0.08 0.125 0.053 "

    V- Member 1 4 1.35 0.08 0.125 0.054 "

    W3

    H- Member 1 3 1.75 0.08 0.125 0.053 "

    V- Member 1 4 1.05 0.08 0.125 0.042 "

    W4

    H- Member 1 3 1.35 0.08 0.125 0.041 "V- Member 1 2 1.05 0.08 0.125 0.021 "

    W5

    H- Member 3 2 1.35 0.08 0.125 0.081 "

    V- Member 3 2 1.35 0.08 0.125 0.081 "

    W6

    H- Member 3 2 1.20 0.08 0.125 0.072 "

    V- Member 3 2 1.05 0.08 0.125 0.063 "

    W7 (main door)

    H- Member 1 1 1.5 0.08 0.125 0.015 "

    V- Member 1 2 4.5 0.08 0.125 0.090 "

    Total 1.961 Cum.

    12

    Door

    D 4 1 1.46 2.10 12.264 Sqm.

    D1 4 1 1.00 2.10 8.400 "

    D2 1 1 0.90 2.10 1.890 "

    D3 3 1 0.80 2.10 5.040 "

    D4 2 1 0.80 2.10 3.360 "

    P/F 40 mm thick 2nd class Deodar wood paneled, glazed or

  • 8/11/2019 ESTIMATE DEMO-2

    8/23

    W 1 1 1.80 4.50 8.100 "

    W1 5 1 2.25 1.35 15.188 "

    W2 1 1 1.80 1.35 2.430 "

    W3 1 1 1.80 1.05 1.890 "

    W4 1 1 1.35 1.05 1.418 "

    W5 3 1 1.35 1.35 5.468 "

    W6 3 1 1.20 1.05 3.780 "W7 1 1 0.60 4.50 2.700 "

    Total 60.000 Sqm.

    13 P/F M.S sliding door

    (i) 250x16 mm size

    For main Door

    D 4 1 4 Nos.

    D1 4 1 4 "

    D2 1 1 1 "

    D3 3 1 3 "

    D4 2 1 2 "

    W7 1 1 1 "

    Total 15 Nos.

    14 P/F M.S tower bolts :-

    (i) 200X10 mm

    For Doors

    D 4 2 8 Nos.

    D1 4 2 8 "

    D2 1 2 2 "

    D3 3 2 6 "

    D4 2 24

    "W7 1 2 2 "

    Total 30 Nos.

    (ii) 150X10 mm

    For Windows

    W 1 8 8 Nos.

    W1 5 8 40 "

    W2 1 8 8 "

    W3 1 8 8 "

    W4 1 4 4 "

    W5 3 2 6 "

    W6 3 2 6 "

    Total 80 Nos.

    15

    (i) 100mm

    For Doors

    D 4 2 8 Nos.

    D1 4 2 8 "

    Providing and fixing M.S. handles :-

  • 8/11/2019 ESTIMATE DEMO-2

    9/23

    D2 1 2 2 "

    D3 3 2 6 "

    D4 2 2 4 "

    W7 1 2 2 "

    Total 18 Nos.

    (ii) 75mmFor Windows

    W 1 4 4 Nos.

    W1 5 4 20 "

    W2 1 4 4 "

    W3 1 4 4 "

    W4 1 2 2 "

    W5 3 1 3 "

    W6 3 1 3 "

    Total 40 Nos.

    16

    GROUND FLOOR

    Bed room 1 4.50 3.60 16.20 Sqm.

    Utility 1 3.60 1.80 6.48 "

    Kitchen 1 3.60 2.80 10.08 "

    Dining 1 3.60 6.45 23.22 "

    Stair Hall 1 3.60 1.00 3.60 "

    D/Room 1 4.50 3.90 17.55 "

    Verandah+ Porch 1 4.50 2.65 11.93 "

    Mumty 1 3.11 2.20 6.84 "

    FIRST FLOOR

    Master Bed Room 1 4.50 3.60 16.20 "

    Dressing Area 1 1.80 1.20 2.16 "

    Pooja 1 1.40 1.80 2.52 "

    Bed room 1 4.50 3.90 17.55 "

    Bed/Living 1 3.60 3.75 13.50 "

    Stair Hall 1 3.60 3.50 12.60 "

    Terrace 1 4.60 2.05 9.43 "

    Chhajja F/S & B/S 2 1 8.75 0.60 10.50 "

    L/S & R/S 2 1 (11.20+12.00 23.20 0.60 27.84 "

    TOTAL 180.00 Sqm.

    17

    Ground Floor

    Toilet 1 2.40 1.80 4.32 Sqm.

    First Floor

    Toilet-I 1 1.80 2.25 4.05 "

    Toilet-II 1 2.10 1.80 3.78 "

    Total 12.15 Sqm.

    Providing and laying flooring in C.C. 1:2:4:-

    P/L 300x300 pattern finish ceramic (non slippary) tiles in

    flooring, treads of steps

  • 8/11/2019 ESTIMATE DEMO-2

    10/23

    18 P/F glazed tiles pattern finish 200X300mm size:-

    Toilet 1 2 (2.40+1.80) 2.10 17.64 Sqm.

    Toilet-I 1 2 (1.80+2.25) 2.10 17.01 "

    Toilet-II 1 2 (2.10+1.80) 2.10 16.38 "

    Total 51.03 Sqm.

    Deduction:-

    D2 3 0.8 2.10 5.04 Sqm.

    Net Qty. 45.99 Sqm.

    19

    Outer Side

    Qty as per item of Brick

    work

    (19.14/0.23)x2 166.44 Sqm.

    Total 166.44 Sqm.

    20

    83.22 Sqm.

    21

    GROUND FLOOR

    Bed room 1 4.50 3.60 16.20 Sqm.

    Toilet 1 2.40 1.80 4.32 "

    Utility 1 3.60 1.80 6.48 "

    Kitchen 1 3.60 2.80 10.08 "Dining 1 3.60 6.45 23.22 "

    Stair Hall 1 3.60 1.00 3.60 "

    D/Room 1 4.50 3.90 17.55 "

    Verandah+ Porch 1 4.50 2.65 11.93 "

    Mumty 1 3.11 2.20 6.84 "

    FIRST FLOOR

    Master Bed Room 1 4.50 3.60 16.20 "

    Dressing Area 1 1.80 1.20 2.16 "

    Pooja 1 1.40 1.80 2.52 "

    Toilet-I 1 1.80 2.25 4.05 "

    Toilet-II 1 2.10 1.80 3.78 "Bed room 1 4.50 3.90 17.55 "

    Bed/Living 1 3.60 3.75 13.50 "

    Stair Hall 1 3.60 3.50 12.60 "

    Terrace 1 4.60 2.05 9.43 "

    Chhajja F/S & B/S 2 1 8.75 0.60 10.50 "

    L/S & R/S 2 1 (11.20+12.00 23.20 0.60 27.84 "

    TOTAL 220.35 Sqm.

    15 mm cement Plastering in CM 1:6:-

    Distempering (Two Coats) with oil bound distemper on

    Qty. same as per 50% item of plastering

    Distempering (Two Coats) with dry distemper on undecorated

  • 8/11/2019 ESTIMATE DEMO-2

    11/23

    22

    83.22 Sqm.

    23

    D 4 1.46 2.10 2.66 12.26 Sqm.

    D1 4 1.00 2.10 2.66 8.40 "

    D2 1 0.90 2.10 2.66 1.89 "D3 3 0.80 2.10 2.66 5.04 "

    D4 2 0.80 2.10 2.66 3.36 "

    W 1 1.80 4.50 2.66 8.10 "

    W1 5 2.25 1.35 2.66 15.19 "

    W2 1 1.80 1.35 2.66 2.43 "

    W3 1 1.80 1.05 2.66 1.89 "

    W4 1 1.35 1.05 2.66 1.42 "

    W5 3 1.35 1.35 2.66 5.47 "

    W6 3 1.20 1.05 2.66 3.78 "

    W7 1 0.60 4.50 2.66 2.70 "

    Total 71.93 Sqm.

    24

    D 4 1.46 2.10 2.66 12.26 Sqm.

    D1 4 1.00 2.10 2.66 8.40 "

    D2 1 0.90 2.10 2.66 1.89 "

    D3 3 0.80 2.10 2.66 5.04 "

    D4 2 0.80 2.10 2.66 3.36 "

    W 1 1.80 4.50 2.66 8.10 "

    W1 5 2.25 1.35 2.66 15.19 "

    W2 1 1.80 1.35 2.662.43 "

    W3 1 1.80 1.05 2.66 1.89 "

    W4 1 1.35 1.05 2.66 1.42 "

    W5 3 1.35 1.35 2.66 5.47 "

    W6 3 1.20 1.05 2.66 3.78 "

    W7 1 0.60 4.50 2.66 2.70 "

    Total 71.93 Sqm.

    Qty. same as per 50% item of plastering

    Applying priming coat with ready mixed paint of approved quality

    Painting two coats (excluding priming coat) with enamel paint of

    Finishing walls with water proofing

  • 8/11/2019 ESTIMATE DEMO-2

    12/23

  • 8/11/2019 ESTIMATE DEMO-2

    13/23

  • 8/11/2019 ESTIMATE DEMO-2

    14/23

    0.4 0.4 6.35

    0.4 0.4 0.8

    0.23 0.3 0.53 F1 3.10 3.25

    0.23 0.3

  • 8/11/2019 ESTIMATE DEMO-2

    15/23

  • 8/11/2019 ESTIMATE DEMO-2

    16/23

    0.069 1.44

    1.228414

  • 8/11/2019 ESTIMATE DEMO-2

    17/23

  • 8/11/2019 ESTIMATE DEMO-2

    18/23

    5638.8

    2

    4.5 3.6 8.1 16.2

    10

    10.051

    9

    3

    1.8

    4.05

    1.8

  • 8/11/2019 ESTIMATE DEMO-2

    19/23

    16.8

    10.95

    2.05

    5.48

  • 8/11/2019 ESTIMATE DEMO-2

    20/23

  • 8/11/2019 ESTIMATE DEMO-2

    21/23

  • 8/11/2019 ESTIMATE DEMO-2

    22/23

  • 8/11/2019 ESTIMATE DEMO-2

    23/23

    2.4 1.8 4.2

    1.8 2.25 4.05

    2.1 1.8 3.9

    10.5


Recommended