of 23
8/11/2019 ESTIMATE DEMO-2
1/23
S.No. Description/Item of work B H/D Qty.
1
Col's foundation F1 15 1.50 1.50 1.50 50.63 Cum.
Plinth Beam:-H-Beam 5 8.75 0.30 0.10 1.31 "
Verandah beam 1 4.50 0.30 0.10 0.14 "
V-Beam
3 11.20 0.30 0.10 1.01 "
Total 53.08 Cum
2 Sand filling under floor
Bed room 1 4.50 3.60 0.15 2.43 Cum
Toilet 1 2.40 1.80 0.15 0.65 Cum
Utility 1 3.60 1.80 0.15 0.97 Cum
Kitchen 1 3.60 2.80 0.15 1.51 Cum
Dining 1 3.60 6.45 0.15 3.48 Cum
Stair hall 1 3.60 1.00 0.15 0.54 Cum
D/Room 1 4.50 3.90 0.15 2.63 Cum
Verandah+Porch 1 4.50 2.65 0.15 1.79 Cum
Total 14.01 Cum
3
(i)
Footing 15 2 (1.40+1.40) 0.30 57.15 Sqm
15 2(0.40+0.40)
0.15 3.60 "column neck to PL 15 2 (0.23+0.30) 0.50 7.95 "
Total 68.70 Sqm.
(ii)
Slab 2 10.55 13.80 291.18 Sqm.
TOTAL 291.18 Sqm.
(iii) Columns, pillars, posts and struts
Square Cols.:-
Cols. Size(0.230x0.30) 30 2 0.23+0.30 0.53 3.00 95.40 Sqm.
Total 95.40 Sqm.
(iv)
H-Beam
Side 8 2 4.50 0.45 32.40 Sqm.
Soffits 8 1 4.50 0.30 10.80 "
Side 8 2 3.60 0.45 25.92 "
Soffits 8 1 3.60 0.3 8.64 "
Detail of MeasurementsName of work:- Proposed House of
Nos. L
Excavation in foundation, trenches etc.
Providing formwork with steel plates 3.15 mm thick
Foundation, footing bases of columns etc:-
Flat Surfaces such as soffits of suspended floors:-
Beams, cantilevers, girders and lintels etc.:-
8/11/2019 ESTIMATE DEMO-2
2/23
V-Bean:-
Side 6 2 11.20 0.45 60.48 Sqm.
Soffits 6 1 11.20 0.30 20.16 "
Lintels:-
Dw= 4Nos.(1.00x2.10)+0.46
Side 4 2 1.76 0.15 2.11 "
Soffits 4 1 1.46 0.23 1.34 "
D1 = 4Nos.(1.00x2.10)
Side 4 2 1.30 0.15 1.56 "
Soffits 4 1 1.00 0.23 0.92 "
D2 =1 Nos.(0.90x2.10)
Side 1 2 1.2 0.15 0.36 "
Soffits 1 1 0.9 0.23 0.21 "
D3 =3 Nos.(0.80x2.10)
Side 3 2 1.1 0.15 0.99 "
Soffits 3 1 0.8 0.23 0.55 "
D4=2Nos.(0.80x2.10)+0.45
Side 2 2 1.55 0.15 0.93
Soffits 2 1 1.25 0.23 0.58
W= 1Nos.(1.80x4.50)
Side 1 2 2.10 0.15 0.63 "
Soffits 1 1 1.80 0.23 0.41 "
W1= 5No.(1.80x1.35)+0.45
Side 5 2 2.55 0.15 3.83 "
Soffits 5 1 2.25 0.23 2.59 "
W2 = 1 No.(1.35x1.35)+0.45
Side 1 2 2.1 0.15 0.63 "
Soffits 1 1 1.8 0.23 0.41 "
W3 = 1 No.(1.35x1.05)+0.45
Side 1 2 2.1 0.15 0.63 "
Soffits 1 1 1.8 0.23 0.41 "
W4 = 1
No.(0.90x1.050)+0.45
Side 1 2 1.65 0.15 0.50 "
Soffits 1 1 1.35 0.23 0.31 "
W5 = 3 No.(0.90x1.35)+0.45
Side 3 2 1.65 0.15 1.49 "
Soffits 3 1 1.35 0.23 0.93 "
W6= 3 Nos.(0.75x1.05)+0.45
Side 3 2 1.50 0.15 1.35 "
Soffits 3 1 1.2 0.23 0.83 "
W7= 1 Nos.(1.50x1.45)
8/11/2019 ESTIMATE DEMO-2
3/23
Side 1 2 1.80 0.15 0.54 "
Soffits 1 1 1.5 0.23 0.35 "
Total 183.78 Sqm.
(v)
1 4 1.00 1.30 5.20 Sqm.
Steps 1 36 1.00 0.15 5.40 "Sides 1 36 1/2 0.17 0.15 0.46 "
Total 11.06 Sqm.
(vi)
F/S & B/S 4 1 8.75 35.00 Rmt.
L/S & R/S 2 1 23.20 46.40 "
Total 81.40 Rmt.
4
Under floors
Bed room 1 4.50 3.60 0.10 1.62 Cum.
Toilet 1 2.40 1.80 0.10 0.43 "
Utility 1 3.60 1.80 0.10 0.65 "
Kitchen 1 3.60 2.80 0.10 1.01 "
Dining 1 3.60 6.45 0.10 2.32 "
Stair hall 1 3.60 1.00 0.10 0.36 "
D/Room 1 4.50 3.90 0.10 1.76 "
Verandah+Porch 1 4.50 2.65 0.10 1.19 "
Total 9.34 Cum.
5Col's foundation 15 1.50 1.50 0.15 5.06 Cum.
Plinth Beam:-
H-Beam 5 8.75 0.30 0.45 5.91 "
Verandah beam 1 4.50 0.30 0.45 0.61 "
V-Beam
3 11.20 0.30 0.45 4.54 "
Total 16.11 Cum.
6
(i)
Footing 15 1.50 1.5 0.25 8.44 Cum.Trapazoidal 15 0.3 0.35 0.32 "
Pedestal 15 1.20 1.20 0.20 4.32 "
Up to PL 15 0.23 0.3 0.90 0.93 "
Plinth Beam:-
H-Beam 5 8.75 0.30 0.45 5.91 "
Verandah beam 1 4.50 0.30 0.45 0.61 "
V-Beam
3 11.20 0.30 0.45 4.54 "
P/L CC 1:4:8 in Foundation and plinth :-
P/L in position C.C.1:2:4 cement concrete :-
Foundation, footing bases of columns and the like and mass
length of parallel
P/L Cement concrete 1:6:12 in Foundation and plinth :-
Stair case (except spiral stair case) excluding landing :-
Edge of slab and breaks in floor and walls:-
8/11/2019 ESTIMATE DEMO-2
4/23
Total 25.06 Cum.
(ii)
GROUND FLOOR
Bed room 1 4.50 3.60 0.12 1.94 Cum.
Toilet 1 2.40 1.80 0.12 0.52 "
Utility 1 3.60 1.80 0.12 0.78 "Kitchen 1 3.60 2.80 0.12 1.21 "
Dining 1 3.60 6.45 0.12 2.79 "
Stair Hall 1 3.60 1.00 0.12 0.43 "
D/Room 1 4.50 3.90 0.12 2.11 "
Verandah+ Porch 1 4.50 2.65 0.12 1.43 "
Mumty 1 3.11 2.20 0.12 0.82 "
FIRST FLOOR
Master Bed Room 1 4.50 3.60 0.12 1.94 "
Dressing Area 1 1.80 1.20 0.12 0.26 "
Pooja 1 1.40 1.80 0.12 0.30 "
Toilet-I 1 1.80 2.25 0.12 0.49 "
Toilet-II 1 2.10 1.80 0.12 0.45 "
Bed room 1 4.50 3.90 0.12 2.11 "
Bed/Living 1 3.60 3.75 0.12 1.62 "
Stair Hall 1 3.60 3.50 0.12 1.51 "
Terrace 1 4.60 2.05 0.12 1.13 "
Chhajja F/S & B/S 2 1 8.75 0.60 0.12 1.26 "
L/S & R/S 2 1 (11.20+12.00 23.20 0.60 0.12 3.34 "
H-Beam "
2 5 8.75 0.23 0.30 6.04 "
Verandah beam 2 1 4.50 0.23 0.30 0.62 "V-Beam "
2 3 11.20 0.23 0.30 4.64 "
Lintle:-
D = 4Nos.(1.00x2.10)+0.46 4 1.76 0.23 0.5 0.81 "
D1 = 4Nos.(1.00x2.10) 4 1.30 0.23 0.5 0.60 "
D2 =1 Nos.(0.90x2.10) 1 1.2 0.23 0.5 0.14 "
D3 =3 Nos.(0.80x2.10) 3 1.1 0.23 0.5 0.38 "
D4=2Nos.(0.80x2.10)+0.45 2 1.55 0.23 0.5 0.36 "
W= 1Nos.(1.80x4.50) 1 2.10 0.23 0.5 0.24 "
W1= 5No.(1.80x1.35)+0.45 5 2.55 0.23 0.5 1.47 "
W2 = 1 No.(1.35x1.35)+0.45 1 2.1 0.23 0.5 0.24 "
W3 = 1 No.(1.35x1.05)+0.45 1 2.1 0.23 0.5 0.24 "
W4 = 1
No.(0.90x1.050)+0.45
1 1.65 0.23 0.5 0.19 "
W5 = 3 No.(0.90x1.35)+0.45 3 1.65 0.23 0.5 0.57 "
Suspended floors, roofs landings and
8/11/2019 ESTIMATE DEMO-2
5/23
W6= 3 Nos.(0.75x1.05)+0.45 3 1.50 0.23 0.5 0.52 "
W7= 1 Nos.(1.50x1.45) 1 1.80 0.23 0.5 0.21 "
Total 43.69 Cum.
(iii) Columns, pillars, posts and struts
Square Cols.:-
Cols. Size(0.23x0.30) 30 0.23 0.30 3.00 6.21 Cum.
Total 6.21 Cum.
(iv)
1 4 1.00 0.15 1.30 0.78 Sqm.
Steps 1 36 1/2 1.00 0.17 0.15 0.46 "
Total 1.24 Sqm.
7
As per Qty. of RCC work:-
i Foundation footing 25.06ii Suspended floor 43.69
iii Columns pillar post 6.21
iv Stair case 1.24
76.20
Total @73.5 Kg/Cum. 5601 Kgs.
8
Qty as per form work of flat surface 291.18
As per Qty. of Form work of Column 95.40
Qty. of beams 183.78
Stair case 11.06
Total 581.42 Sqm.
9
i In super structure:-
Ground Floor
Bed room 1 1 0.23 2.7 10.06 Cum.
D/Room 1 1 0.23 2.7 5.22 "
Kitchen wall 1 0.23 2.7 6.21 "
Toilet 2 0.23 2.7 2.24 "
Dining 1 0.23 2.7 6.24 "Stair Case 1 1 1 0.23 2.7 0.62 "
Verandha/porch 2 0.23 2.7 1.86 "
First Floor "
Master Bed Room 1 1 0.23 2.7 5.59 "
Dressing Area 1 1 0.23 2.7 1.86 "
Pooja 1 0.23 2.7 1.12 "
Toilet-I 1 0.23 2.7 2.52 "
Toilet-II 1 0.23 2.7 1.12 "
1.8
(3.6+6.45)
1.5
2(4.50)
1.80+1.201.8
(1.80+2.25)
1.8
(3.60+3.60+2.80)
Stair case (except spiral stair case) excluding landing :-
Providing tor steel reinforcement for reinforced cement concrete
Providing in RCC work smooth finishing of the exposed
Brick work in common burnt clay Building bricks in CM
2(4.50+3.60)
2(4.50+3.90)
8/11/2019 ESTIMATE DEMO-2
6/23
Bed room 1 0.23 2.7 10.43 "
Bed/Living 1 0.23 2.7 6.80 "
Terrace 1 0.23 2.7 1.27 "
Stair Case 1 0.23 2.7 3.40 "
Total 32.45 "
Deduction:-
D = 4Nos.(1.00x2.10)+0.46 4 1.46 0.23 2.1 2.82 "
D1 = 4Nos.(1.00x2.10) 4 1.00 0.23 2.1 1.93 "
D2 =1 Nos.(0.90x2.10) 1 0.90 0.23 2.1 0.43 "
D3 =1 Nos.(0.80x2.10) 1 0.80 0.23 2.1 0.39 "
D4=1Nos.(0.80x2.10)+0.45 1 1.25 0.23 2.1 0.60 "
W= 1Nos.(1.80x4.50) 1 1.80 0.23 4.5 1.86 "
W1= 5No.(1.80x1.35)+0.45 5 1.35 0.23 1.35 2.10 "
W2 = 1 No.(1.35x1.35)+0.45 1 1.35 0.23 1.35 0.42 "
W3 = 1 No.(1.35x1.05)+0.45 1 1.35 0.23 1.05 0.33 "
W4 = 1
No.(0.90x1.050)+0.45
1 0.90 0.23 1.05 0.22 "
W5 = 3 No.(0.90x1.35)+0.45 3 0.90 0.23 1.35 0.84 "
W6= 3 Nos.(0.75x1.05)+0.45 3 1.20 0.23 1.05 0.87 "
W7= 1 Nos.(1.50x1.45) 1 1.50 0.23 1.45 0.50 "
Total 13.31 "
Net Total Qty. 32.45-13.31 = 19.14 Cum.
10
Wall between toilet & pooja 1 1.80 0.12 2.7 0.56 Cum.
S/wToilet and Master bed
room+Toilet and dressing
area
1 4.05 0.12 2.7 1.26 "
S/W of M.Bed Room and
balcony1 3.80 0.12 2.7 1.18 "
Total 3.00 "
Deductions:- "
D3 =2 Nos.(0.80x2.10) 2 0.80 0.12 2.1 0.39 "
D4=1Nos.(0.80x2.10)+0.45 1 1.25 0.12 2.1
0.30 "
W2 = 1 No.(1.35x1.35)+0.45 1 1.35 0.12 1.35 0.21 "
Total 0.90 "
Net Total Qty. 2.10 Cum
11
D
Half Brick masonry using 2nd class common burnt
3.00-2.10 =
P/F 40 mm thick 2nd class Deodar wood frame:-
1.98+3.50
2(4.50+3.90)
3.60+3.60+3.75
2.05
8/11/2019 ESTIMATE DEMO-2
7/23
H- Member 4 1 1.46 0.08 0.125 0.058 Cum
V- Member 4 2 2.1 0.08 0.125 0.168 "
D1
H- Member 4 1 1.00 0.08 0.100 0.032 "
V- Member 4 2 2.1 0.08 0.100 0.134 "
D2
H- Member 1 1 0.90 0.08 0.125 0.009 "V- Member 1 2 2.1 0.08 0.125 0.042 "
D3
H- Member 3 1 0.8 0.08 0.125 0.024 "
V- Member 3 2 2.1 0.08 0.125 0.126 "
D4
H- Member 2 1 1.25 0.08 0.125 0.025 "
V- Member 2 2 2.1 0.08 0.125 0.084 "
W
H- Member 1 3 2.25 0.08 0.125 0.068 "
V- Member 1 4 1.35 0.08 0.125 0.054 "
W1
H- Member 5 3 1.35 0.08 0.125 0.203 "
V- Member 5 4 1.35 0.08 0.125 0.270 "
W2
H- Member 1 3 1.75 0.08 0.125 0.053 "
V- Member 1 4 1.35 0.08 0.125 0.054 "
W3
H- Member 1 3 1.75 0.08 0.125 0.053 "
V- Member 1 4 1.05 0.08 0.125 0.042 "
W4
H- Member 1 3 1.35 0.08 0.125 0.041 "V- Member 1 2 1.05 0.08 0.125 0.021 "
W5
H- Member 3 2 1.35 0.08 0.125 0.081 "
V- Member 3 2 1.35 0.08 0.125 0.081 "
W6
H- Member 3 2 1.20 0.08 0.125 0.072 "
V- Member 3 2 1.05 0.08 0.125 0.063 "
W7 (main door)
H- Member 1 1 1.5 0.08 0.125 0.015 "
V- Member 1 2 4.5 0.08 0.125 0.090 "
Total 1.961 Cum.
12
Door
D 4 1 1.46 2.10 12.264 Sqm.
D1 4 1 1.00 2.10 8.400 "
D2 1 1 0.90 2.10 1.890 "
D3 3 1 0.80 2.10 5.040 "
D4 2 1 0.80 2.10 3.360 "
P/F 40 mm thick 2nd class Deodar wood paneled, glazed or
8/11/2019 ESTIMATE DEMO-2
8/23
W 1 1 1.80 4.50 8.100 "
W1 5 1 2.25 1.35 15.188 "
W2 1 1 1.80 1.35 2.430 "
W3 1 1 1.80 1.05 1.890 "
W4 1 1 1.35 1.05 1.418 "
W5 3 1 1.35 1.35 5.468 "
W6 3 1 1.20 1.05 3.780 "W7 1 1 0.60 4.50 2.700 "
Total 60.000 Sqm.
13 P/F M.S sliding door
(i) 250x16 mm size
For main Door
D 4 1 4 Nos.
D1 4 1 4 "
D2 1 1 1 "
D3 3 1 3 "
D4 2 1 2 "
W7 1 1 1 "
Total 15 Nos.
14 P/F M.S tower bolts :-
(i) 200X10 mm
For Doors
D 4 2 8 Nos.
D1 4 2 8 "
D2 1 2 2 "
D3 3 2 6 "
D4 2 24
"W7 1 2 2 "
Total 30 Nos.
(ii) 150X10 mm
For Windows
W 1 8 8 Nos.
W1 5 8 40 "
W2 1 8 8 "
W3 1 8 8 "
W4 1 4 4 "
W5 3 2 6 "
W6 3 2 6 "
Total 80 Nos.
15
(i) 100mm
For Doors
D 4 2 8 Nos.
D1 4 2 8 "
Providing and fixing M.S. handles :-
8/11/2019 ESTIMATE DEMO-2
9/23
D2 1 2 2 "
D3 3 2 6 "
D4 2 2 4 "
W7 1 2 2 "
Total 18 Nos.
(ii) 75mmFor Windows
W 1 4 4 Nos.
W1 5 4 20 "
W2 1 4 4 "
W3 1 4 4 "
W4 1 2 2 "
W5 3 1 3 "
W6 3 1 3 "
Total 40 Nos.
16
GROUND FLOOR
Bed room 1 4.50 3.60 16.20 Sqm.
Utility 1 3.60 1.80 6.48 "
Kitchen 1 3.60 2.80 10.08 "
Dining 1 3.60 6.45 23.22 "
Stair Hall 1 3.60 1.00 3.60 "
D/Room 1 4.50 3.90 17.55 "
Verandah+ Porch 1 4.50 2.65 11.93 "
Mumty 1 3.11 2.20 6.84 "
FIRST FLOOR
Master Bed Room 1 4.50 3.60 16.20 "
Dressing Area 1 1.80 1.20 2.16 "
Pooja 1 1.40 1.80 2.52 "
Bed room 1 4.50 3.90 17.55 "
Bed/Living 1 3.60 3.75 13.50 "
Stair Hall 1 3.60 3.50 12.60 "
Terrace 1 4.60 2.05 9.43 "
Chhajja F/S & B/S 2 1 8.75 0.60 10.50 "
L/S & R/S 2 1 (11.20+12.00 23.20 0.60 27.84 "
TOTAL 180.00 Sqm.
17
Ground Floor
Toilet 1 2.40 1.80 4.32 Sqm.
First Floor
Toilet-I 1 1.80 2.25 4.05 "
Toilet-II 1 2.10 1.80 3.78 "
Total 12.15 Sqm.
Providing and laying flooring in C.C. 1:2:4:-
P/L 300x300 pattern finish ceramic (non slippary) tiles in
flooring, treads of steps
8/11/2019 ESTIMATE DEMO-2
10/23
18 P/F glazed tiles pattern finish 200X300mm size:-
Toilet 1 2 (2.40+1.80) 2.10 17.64 Sqm.
Toilet-I 1 2 (1.80+2.25) 2.10 17.01 "
Toilet-II 1 2 (2.10+1.80) 2.10 16.38 "
Total 51.03 Sqm.
Deduction:-
D2 3 0.8 2.10 5.04 Sqm.
Net Qty. 45.99 Sqm.
19
Outer Side
Qty as per item of Brick
work
(19.14/0.23)x2 166.44 Sqm.
Total 166.44 Sqm.
20
83.22 Sqm.
21
GROUND FLOOR
Bed room 1 4.50 3.60 16.20 Sqm.
Toilet 1 2.40 1.80 4.32 "
Utility 1 3.60 1.80 6.48 "
Kitchen 1 3.60 2.80 10.08 "Dining 1 3.60 6.45 23.22 "
Stair Hall 1 3.60 1.00 3.60 "
D/Room 1 4.50 3.90 17.55 "
Verandah+ Porch 1 4.50 2.65 11.93 "
Mumty 1 3.11 2.20 6.84 "
FIRST FLOOR
Master Bed Room 1 4.50 3.60 16.20 "
Dressing Area 1 1.80 1.20 2.16 "
Pooja 1 1.40 1.80 2.52 "
Toilet-I 1 1.80 2.25 4.05 "
Toilet-II 1 2.10 1.80 3.78 "Bed room 1 4.50 3.90 17.55 "
Bed/Living 1 3.60 3.75 13.50 "
Stair Hall 1 3.60 3.50 12.60 "
Terrace 1 4.60 2.05 9.43 "
Chhajja F/S & B/S 2 1 8.75 0.60 10.50 "
L/S & R/S 2 1 (11.20+12.00 23.20 0.60 27.84 "
TOTAL 220.35 Sqm.
15 mm cement Plastering in CM 1:6:-
Distempering (Two Coats) with oil bound distemper on
Qty. same as per 50% item of plastering
Distempering (Two Coats) with dry distemper on undecorated
8/11/2019 ESTIMATE DEMO-2
11/23
22
83.22 Sqm.
23
D 4 1.46 2.10 2.66 12.26 Sqm.
D1 4 1.00 2.10 2.66 8.40 "
D2 1 0.90 2.10 2.66 1.89 "D3 3 0.80 2.10 2.66 5.04 "
D4 2 0.80 2.10 2.66 3.36 "
W 1 1.80 4.50 2.66 8.10 "
W1 5 2.25 1.35 2.66 15.19 "
W2 1 1.80 1.35 2.66 2.43 "
W3 1 1.80 1.05 2.66 1.89 "
W4 1 1.35 1.05 2.66 1.42 "
W5 3 1.35 1.35 2.66 5.47 "
W6 3 1.20 1.05 2.66 3.78 "
W7 1 0.60 4.50 2.66 2.70 "
Total 71.93 Sqm.
24
D 4 1.46 2.10 2.66 12.26 Sqm.
D1 4 1.00 2.10 2.66 8.40 "
D2 1 0.90 2.10 2.66 1.89 "
D3 3 0.80 2.10 2.66 5.04 "
D4 2 0.80 2.10 2.66 3.36 "
W 1 1.80 4.50 2.66 8.10 "
W1 5 2.25 1.35 2.66 15.19 "
W2 1 1.80 1.35 2.662.43 "
W3 1 1.80 1.05 2.66 1.89 "
W4 1 1.35 1.05 2.66 1.42 "
W5 3 1.35 1.35 2.66 5.47 "
W6 3 1.20 1.05 2.66 3.78 "
W7 1 0.60 4.50 2.66 2.70 "
Total 71.93 Sqm.
Qty. same as per 50% item of plastering
Applying priming coat with ready mixed paint of approved quality
Painting two coats (excluding priming coat) with enamel paint of
Finishing walls with water proofing
8/11/2019 ESTIMATE DEMO-2
12/23
8/11/2019 ESTIMATE DEMO-2
13/23
8/11/2019 ESTIMATE DEMO-2
14/23
0.4 0.4 6.35
0.4 0.4 0.8
0.23 0.3 0.53 F1 3.10 3.25
0.23 0.3
8/11/2019 ESTIMATE DEMO-2
15/23
8/11/2019 ESTIMATE DEMO-2
16/23
0.069 1.44
1.228414
8/11/2019 ESTIMATE DEMO-2
17/23
8/11/2019 ESTIMATE DEMO-2
18/23
5638.8
2
4.5 3.6 8.1 16.2
10
10.051
9
3
1.8
4.05
1.8
8/11/2019 ESTIMATE DEMO-2
19/23
16.8
10.95
2.05
5.48
8/11/2019 ESTIMATE DEMO-2
20/23
8/11/2019 ESTIMATE DEMO-2
21/23
8/11/2019 ESTIMATE DEMO-2
22/23
8/11/2019 ESTIMATE DEMO-2
23/23
2.4 1.8 4.2
1.8 2.25 4.05
2.1 1.8 3.9
10.5