REPUBLIC OF ZAMBIA
ESTIMATES OF REVENUE AND
EXPENDITURE
(Output Based Budget)
For the Year
1st January 2015 to 31st December 2015
HEAD 80:
MINISTRY OF
EDUCATION, SCIENCE,
VOCATIONAL TRAINING
AND EARLY EDUCATION
TABLE OF CONTENTS
1. MANDATE……………………………………………………………………………………………………………………….1
2. STRATEGIC OBJECTIVES……………………………………………………………………………………………………1
3. OUTPUT MATRIX………………………………………………………………………………………………………………2
3.1. Early Childhood Education Programme……………………………………………………………………..4
3.2. Primary Education Programme………………………………………………………………………………….4
3.3. Secondary Education Programme………………………………………………………………………………5
3.4. Tertiary/Higher Education Programme……………………………………………………………………….5
3.5. Youth and Adult Literacy Programme…………………………………………..…………………………….5
3.6. Skills Development Programme………………………………………………………………………………….5
3.7. Science, Technology and Innovation Programme……………………………………………………….5
3.8. Management and Support Services Programme………………………………………………………..6
4. BUDGET SUMMARY…………………………………………………………………………………………….…………….7
4.1. Figure I: 2015 Budget by Source of Financing……………………………………….…….…….………10
4.2. 2015 Budget Allocation by Economic Classification…………………………………………………..10
4.3. Figure II: 2015 Budget Allocation by Programme……………………………………………………….11
5. PROGRAMME DETAIL……………………………………………………………………………………………………….13
5.1. Early Childhood Education Programme…………………………………………………………………..…13
5.2. Primary Education Programme………………………………………………………………………………….14
5.3. Secondary Education Programme……………………………………………………………………………..15
5.4. Tertiary/Higher Education Programme………………………………………………………………………16
5.5. Youth and Adult Literacy Programme………………………………………………………………………...18
5.6. Skills Development Programme………………………………………………………………………………….19
5.7. Science, Technology and Innovation Programme……………………………………………………....21
5.8. Management and Support Services Programme…………………………………………………………23
6. HEAD TOTAL………………………………………………………………………………………………………………………24
OUTPUT BASED ANNUAL BUDGET
Page 1
HEAD 80: MINISTRY OF EDUCATION, SCIENCE, VOCATIONAL
TRAINING AND EARLY EDUCATION
MANDATE:
Formulation and implementation of education and science policies; setting and
enforcement of standards and regulations; licensing, supervision and provision of
education and skills development; and promotion of science, technology and
innovation.
STRATEGIC OBJECTIVES:
1. To increase access to, and promote the efficient and equitable provision of,
quality early childhood, primary and secondary education;
2. To increase access to, and promote the efficient and equitable provision of,
quality and labour-market relevant technical, vocational and entrepreneurial
skills;
3. To increase equitable access to, and participation in the provision of, quality
university education;
4. To increase youth and adult literacy levels; and
5. To enhance research and development and strengthen the commercialisation,
transfer and diffusion of technology and innovation.
OUTPUT BASED ANNUAL BUDGET
Page 2
OUTPUT MATRIX:
2015
TARGET ACTUAL TARGET ACTUAL* TARGET
5501: a) Proportion of Grade 1 entrants with
ECE experience
15% 14.8% 19% - 25%
b) Number of ECE centres constructed - - 20 - 60
c) Number of Existing Buildings converted
to ECE Centres
- 100 171 - 1,140
5502: a) - - Eng: 37% - Eng: 42%
- - Math: 40% - Math: 45%
b) Average Amount of School Grant per
Child in Primary Schools
- - - - K26.94
c) Pupil/Teacher Ratio (Grades 1-7) 48:1 48:1 46:1 - 45:1
d) Number of New Classrooms
Constructed
200 200 150 - 500
e) Number of Teacher Houses
Constructed
200 200 150 - 200
5503: a) Grade 9 Completion Rate - 61.5% 63.5% - 66%
b) Grade 12 Completion Rate - 31% 34% - 36%
c) Gender-Parity at Grade 10-12 - 84% 85% - 90%
d) Average Amount of School Grant per
Child in Secondary Schools
- - - - K144.22
e) - - Eng: 37% - Eng: 39%
- - Math: 30% - Math: 32%
- - Scie: 35% - Scie: 37%
f) Number of Schools Operational of
those Under Construction
31 31 42 42 83
h) Number of Basic Schools Upgraded - - 220 - 220
Primary Education
Proportion of Learners attaining at least
Division III in English, Environmental
Science and Mathematics
Secondary
Education
KEY OUTPUT(S)
OUTPUT INDICATOR(S)PROGRAMME
Early Chi ldhood
Education
2013 2014
Proportion of Grade 5 Pupils with
Competence in Reading and
Mathematics
OUTPUT BASED ANNUAL BUDGET
Page 3
2015
TARGET ACTUAL TARGET ACTUAL* TARGET
5504: a) Number of School Leavers Entering
Tertiary/Higher Education
38,000 35,234 42,500 - 43,000
b) Number of New Bed Spaces Created in
Existing Universities & Colleges
- - 2,880 - 9,600
-
5505: a) Number of Literacy Centres established - - 100 - 800
b) Number of Learners Enrolled in Literacy
Centres
- - 118,000 - 125,000
5506: a) Number of Learners in TEVET
Institutions
34,000 - 36,000 - 40,000
b) Completion Rate in TEVET Programmes 65% - 70% - 80%
c) Number of Lecturers Trained in
Pedagogical Skills - TVTC
360 423 460 - 536
d) Number of New Trades Training
Institutes (TTIs) constructed
2 - 3 2 3
5507: a) Number of Scientists Trained at MSc
Level
17 21 24 21 30
b) Number of Scientists Trained at PhD
Level
16 7 8 7 14
c) Number of R&D Products Produced 6 2 6 1 6
d) Number of Technologies
Commercialised
2 1 2 - 2
e) Proportion of Female Scientists Trained
at MSc and PhD Levels
20% 25% 25% 25% 50%
f) Number of R&D Institutions
Constructed
- - - - 2
h) Number of R&D institutions
Rehabilitated
2 2 1 1 1
i) Number of Research and Development
Units Equiped
1 - 1 1 1
Science, Technology
and Innovation
Ski l ls Development
Tertiary/Higher
Education
KEY OUTPUT(S)
OUTPUT INDICATOR(S)2013 2014
Youth and Adult
Literacy
PROGRAMME
OUTPUT BASED ANNUAL BUDGET
Page 4
The 2015 Ministry budget focuses on the implementation of eight (8) key programmes.
The implementation of each of these programmes is expected to result into the
attainment of respective outputs as outlined below:
1. Early Childhood Education
Funds allocated to early childhood education will, among other outputs, result
in an increase in the proportion of children that enter grade one having early
childhood education experience to 25% and more early childhood centres
established countrywide.
2. Primary Education
The focus of the budget is to increase access to, and quality of, primary
education. The envisaged results include increase in primary school education
infrastructure, improvement in teacher/pupil ratio as well as the performance
of learners in primary school.
2015
TARGET ACTUAL TARGET ACTUAL* TARGET
5508: a) Prportion of Reduction in Audit
Queries
- - 60% - 75%
b) Number of New Teaching Posts Filled 5,000 5,000 - - 5,000
c) Strategic Plan in place - - - - 1
d) Number of Policies Developed and
Launched
- - - - 5
Ex ec u t ive Au t h o r it y : Minister of Education, Science, Vocational Training and Early Education
Co n t r o llin g Offic er : Permanent Secretary (Ministry of Education, Science, Vocational Training and Early Education)
2014
*Outputs produced by 30th June 2014
Management and
Support Services
PROGRAMME
KEY OUTPUT(S)
OUTPUT INDICATOR(S)2013
OUTPUT BASED ANNUAL BUDGET
Page 5
3. Secondary Education
The focus is to ensure that a number of the Secondary schools under
construction are operational, improve the grant support for vulnerable learners,
raise the gender parity rate of learners as well as improve student performance
in subjects such as science and mathematics.
4. Tertiary/Higher Education
The budget focuses on increasing access of learners to tertiary and higher
education, increasing the proportion of female learners studying science
courses and further development of infrastructure.
5. Youth and Adult Literacy
The major focus is increasing youth and adult literacy centres countrywide as
well as the number of learners enrolled in the centres.
6. Skills Development
The expected outputs include increasing the number of school leavers at grade
12 that access Technical Education, Vocational and Entrepreneurship Training
(TEVET), improving pedagogical training for instructors, and constructing more
Trades Training Institutes.
7. Science Technology and Innovation
The focus of the budget is to increase the number of scientists trained at
Master’s and Doctorate degree levels, increase the number of commercialised
technologies that are generated by research and improve infrastructure for
research and development institutions.
OUTPUT BASED ANNUAL BUDGET
Page 6
8. Management and Support Services
This programme will ensure that human resource, logistical and other support
services are provided which will lead to the efficient and effective delivery of
educational services. Among other key expected outputs, the programme will
ensure that current audit queries are significantly reduced in terms of number
of cases as well as value of resources involved. The other expected outputs are
the recruitment of five thousand (5,000) teachers and the launching of policies
on Education, Early Childhood Education, Youth and Adult Literacy and Science,
Technology and Innovation.
OUTPUT BASED ANNUAL BUDGET
Page 7
BUDGET SUMMARY:
2015
APPROVED EXPENDITURE APPROVED RELEASES* ESTIMATE
5501: - - - - 46,587,001 001: 2,920,202
002: 743,747
003: 457,825
004: 150,000
006: 42,315,226
5502: - - - - 5,318,203,379 001: 5,024,489,276
002: 5,002,152
003: 72,516,849
004 2,000,000
005: 584,075
006: 213,611,027
5503 - - - - 2,111,692,224 001: 1,244,946,457
002: 8,379,285
003: 40,000,000
004 4,315,271
005: 451,923
006: 813,599,287
5504: - - - - 1,183,502,640 001: 514,041,467
002: 19,267,543
003: 193,630
006: 650,000,000
2013 BUDGET 2014 BUDGETPROGRAMME/SUB-PROGRAMME
Primary Education Provision (17)
Teacher Education and Specialized Services (19)
Curriculum and Materials Development (21)
Infrastructure Development
Secondary Education Provision (25)
Teacher Education and Specialized Services (27)
Curriculum and Materials Development (29)
Secondary Education
Educational Standards, Assessment and Evaluation (23)
Educational Standards, Assessment and Evaluation (31)
Open and Distance Learning
Infrastructure Development
Tertiary/Higher Education Provisions
Early Childhood Education Provision (9)
Teacher Education and Specialized Services (11)
Curriculum and Materials Development (13)
Educational Standards, Assessment and Evaluation (15)
Infrastructure Development
Open and Distance Learning
Infrastructure Development
Primary Education
Early Childhood Education
Tertiary/Higher Education
Teacher Education and Specialised Services (33)
Open and Distance Learning
OUTPUT BASED ANNUAL BUDGET
Page 8
(1) Pool Fund (Japan/Ireland) Grant 1,316,700
Various Donors Grant 3,000,000
(3) Various Donors Grant 14,136,000
2015
APPROVED EXPENDITURE APPROVED RELEASES* ESTIMATE
5505: - - - - 1,402,354 001: 1,402,354
5506: - - - - 153,335,054 001: 73,578,161
002 145,223
003: 79,611,670
5507: - - - - 78,374,135 001: 55,100,760
002: 4,329,930
003: 5,215,598
004: 4,821,968
006: 8,905,879
5508: - - - - 522,057,658 001: 1,151,368
002: 7,994,546
003: 292,713,357
004: 97,129,758
005: 68,876,354
007: 54,192,276
HEAD TOTAL - - - - 9,415,154,444
* Budget Releases as at 30th June 2014
Financial Management (1)
Human Resource Management and Administration
Planning, Policy Coordination and Information
Management (3)
Provinical Education Administration -PEOs (5)
District Education Administration -DEBs (7)
Executive Office Management
PROGRAMME/SUB-PROGRAMME2013 BUDGET 2014 BUDGET
Science, Technology and Innovation
Skills Development Provision (35)
Management and Support Services
Skills Development
Adult and Youth Literacy
Innovation Promotion
Infrastructure Development
Youth and Adult Literacy Provision
Infrastructure Development
Science, Technology and Innovation Coordination
Scientific Research and Development
Technology Commercialization
Open and Distance Learning
OUTPUT BASED ANNUAL BUDGET
Page 9
(5) Various Donors Grant 1,000,000
(7) Various Donors Grant 4,000,000
(9) Various Donors Grant 500,000
(11) Various Donors Grant 500,000
(13) Various Donors Grant 350,000
(15) Various Donors Grant 150,000
(17) Pool Fund (Japan/Ireland) Grant 26,334,000
Various Donors Grant 25,000,000
(19) Pool Fund (Japan/Ireland) Grant 1,755,600
Various Donors Grant 1,500,000
(21) Various Donors Grant 53,000,000
Pool Fund (Japan/Ireland) Grant 18,556,000
(23) Various Donors Grant 2,000,000
(25) Various Donors Grant 12,000,000
Pool Fund (Japan/Ireland) Grant 438,900
(27) Various Donors Grant 1,500,000
(29) Various Donors Grant 40,000,000
(31) Various Donors Grant 4,000,000
(33) Various Donors Grant 1,500,000
Pool Fund (Japan/Ireland) Grant 6,000,000
(35) Various Donors Grant 3,500,000
OUTPUT BASED ANNUAL BUDGET
Page 10
The 2015 budget for the Ministry of Education, Science, Vocational Training and Early
Education (MESVTEE) is estimated at K9.4 billion, reflecting an increase of about
13.3% from the 2014 allocation. Of this amount, K9.2 billion (or 98% of the Ministry’s
budget) is projected to be financed by the Government of Zambia, while K222 million
(or 2% of the Ministry’s budget) is budget support to the sector of education from
various cooperating partners which include DFID, JICA, Irish Aid and GPE.
2015 Budget Allocation by Economic Classification
Item 2015 Budget (K)
1. Personnel Emoluments 6,420,714,241
2. General Operations 330,083,520
3. Grants and Other Payments 826,902,960
4. Capital Expenditures 1,837,453,723
Total 9,415,154,444
Of the K9.4 billion Ministerial budget, K6.4 billion is allocated towards the payment of
emoluments to existing and new education staff in 2015, while K1.8 billion is projected
to be invested into the development of various infrastructural projects in the sector,
as well as the acquisition of learning and research equipment. The balance of K1.2
Government of Zambia
98%
Cooperating Partners2%
FIGURE I: 2015 BUDGET FINANCING
OUTPUT BASED ANNUAL BUDGET
Page 11
million is for the procurement of educational materials and other school requisites,
including the general operations of the Ministry and its grant-aided institutions such
as public universities, colleges and trades training institutes.
The Budget Summary above reveals that 56.5% of the Ministry’s budget is allocated
to the primary education programme, in view of the fact that primary school enrolment
is projected to reach 3.2 million children in 2015. A further 22.4% is allocated to
educate an estimated 800,000 pupils at secondary level in 2015.
The Early Childhood Education (ECE) programme has a relatively small allocation,
reflecting the nascent state of Government-provided ECE, but the allocation is
expected to rise over the medium term as ECE infrastructure is developed.
Early Childhood Education 0.5%
Primary Education56.5%
Secondary Eduction22.4%
Tertiary/Higher Education
12.6%
Adult & Youth Literacy0.01%
Skills Development1.6%
Science, Technology & Innovation
0.8%
Management & Support Services
5.5%
FIGURE II: 2015 BUDGET ALLOCATION BY PROGRAMME
OUTPUT BASED ANNUAL BUDGET
Page 12
The skills development and tertiary/higher education programmes have been allocated
14.2% of the budget while the science, technology and innovation programme has
been allocated 0.8%. The allocation to the management and support services
programme has been kept at less than 6% of the Ministry’s budget so as to maximize
the resources allocated to frontline services.
OUTPUT BASED ANNUAL BUDGET
Page 13
PROGRAMME DETAIL:
The Early Childhood Education (ECE) programme budget is almost exclusively related
to capital expenditure to be incurred on building and converting the infrastructure
needed to deliver Government-provided early childhood education to pre-primary
school children. This is aimed at supplementing the work done by private sector
providers of early childhood education. In 2015, in each province, the Ministry will
construct 6 ECE centres and convert 5 existing community buildings into ECE centres.
2015
Approved Expenditure Approved Releases* Estimate
1. Current Expenditures - - - - 2,171,774
-
2,171,774
2. Transfers, Subsidies & Other Payments - - - - 2,100,000
2,100,000
3. Capital Expenditures - - - - 42,315,226
42,315,226
Programme Total 46,587,001
* Budget Releases as at 30th June 2014
Economic Classification
01: Personnel Emoluments
02: Goods and Services
01: Early Childhood School Infrastructure
Programme 5501: Early Childhood Education
Purpose:
2013 Budget 2014 Budget
01: Early Childhood School Grants
To secure quantitative and qualitative improvement in the delivery of Early Childhood Education (ECE), through guidelines
and standards, and increasing the proportion of 3 to 6 year old children who have equitable access to ECE.
OUTPUT BASED ANNUAL BUDGET
Page 14
In order to effectively provide free and compulsory education to over 3 million primary
school children, the Ministry has allocated K5.3 billion (56.5% of the Ministry’s total
budget). Due to the labour-intensive nature of providing primary education, 91.1% of
the programme’s budget is committed to paying teachers’ emoluments.
The development of new primary school infrastructure has been allocated K 213.6
million to construct 500 new classrooms and 200 teacher houses. To enhance the
cognitive ability of vulnerable children and encourage their school attendance, K32
million has been allocated to the School Feeding Programme in 2015. A further K95
million has been allocated as operational grants for various primary schools, translating
to an average expenditure per pupil of K26.94.
2015
Approved Expenditure Approved Releases* Estimate
1. Current Expenditures - - - - 4,967,558,816
4,846,121,739
121,437,077
2. Transfers, Subsidies & Other Payments - - - - 137,033,537
95,000,000
32,033,537
10,000,000
3. Capital Expenditures - - - - 213,611,027
213,611,027
Programme Total 5,318,203,379
* Budget Releases as at 30th June 2014
Programme 5502: Primary Education
Purpose:
Economic Classification2013 Budget 2014 Budget
02: School Feeding Programme
03: School Requisites for Free Primary Education
01: Primary School Grants
To provide free and compulsory education to all learners from Grade 1 to 7, and to enhance the quality of education through
teaching a comprehensive, diversified and integrated primary education curriculum.
01: Personnel Emoluments
02: Goods and Services
01: Primary School Infrastructure
OUTPUT BASED ANNUAL BUDGET
Page 15
The secondary education programme has been allocated a total of K2.1 billion (22.4%
of the total education sector budget) for operations and infrastructure development.
Expenditure on secondary school teacher salaries accounts for 56% of the programme’s
budget while the next biggest element of the programme’s budget is for secondary
school infrastructure amounting K813.6 million.
There are 118 new secondary schools being constructed, out of which 83 will be
completed in 2015. Further, 220 basic schools will be upgraded into secondary schools
in 2015. In addition, K42.1 million has been allocated for grants to secondary schools
which translates to K144.22 per pupil. Support towards the education of orphans and
vulnerable children also continues in 2015 with an allocation of K19.7 million.
2015
Approved Expenditure Approved Releases* Estimate
1. Current Expenditures 1,236,276,666
1,183,130,187
53,146,479
2. Transfers, Subsidies & Other Payments - - - - 61,816,270
01: Secondary School Grants 42,114,011
02: Bursaries for Orphans and Vulnerable Children 19,702,259
3. Capital Expenditures - - - - 813,599,287
01: Secondary Schools Infrastructure 813,599,287
Programme Total 2,111,692,224
* Budget Releases as at 30th June 2014
Programme 5503: Secondary Education
Purpose:
Economic Classification2013 Budget 2014 Budget
01: Personnel Emoluments
02: Goods and Services
To provide a quality and effective two tier (academic and skills development) secondary education system, raise standards
and improve transition rates.
OUTPUT BASED ANNUAL BUDGET
Page 16
2015
Approved Expenditure Approved Releases* Estimate
1. Current Expenditures - - - - 54,149,818
45,956,026
8,193,792
2. Transfers, Subsidies & Other Payments - - - - 447,852,822
156,606,429
63,787,433
20,633,858
71,624,417
37,607,880
49,055,197
22,001,746
8,793,267
984,075
984,075
984,075
11,267,381
1,062,801
984,075
984,075
492,038
3. Capital Expenditures - - - - 650,000,000
650,000,000
4. Liabi l i ties - - - - 31,500,000
31,500,000
Programme Total - - - - 1,183,502,640
* Budget Releases as at 30th June 2014
To increase equitable access to, and participation in the provision of, quality university and college education.
12: Grants to Colleges of Education
Purpose:
Economic Classi fication2013 Budget 2014 Budget
01: Personnel Emoluments
02: Goods and Services
Programme 5504: Tertiary/Higer Education
09: Chalimbana University
10: Kwame Nkhrumah University
11: Mukuba University
02: Copperbelt University
03: Mulungushi University
01: University of Zambia
05: Student Tuition and Accomodation - CBU
04: Student Tuition and Accomodation - UNZA
08: Students Bursary Award - Abroad
01: Univeristy Infrastructure
01: Dismantling of University Arrears
06: Students Loan and Bursary Award - UNZA
07: Students Loan and Bursary Award - CBU
13: Higher Education Loans and Scholarships Board
14: Higher Education Authority
15: National Qualification Authority
16: Higher Education Staff Development - New Universities
OUTPUT BASED ANNUAL BUDGET
Page 17
In 2015, K650 million (54.9% of the programme’s budget) has been allocated to
continue the construction of Paul Mushindo, Robert Kapasa Makasa, Mukuba, Kwame
Nkrumah, Chalimbana and Palabana universities. Additional student accommodation
will also be built at University of Zambia, Copperbelt University, Mulungushi University
and Evelyn Hone College.
Operational grants for university and college education have been allocated K447.9
million which translates to 37.8% of the programme’s budget. This amount includes
K189.1 million to fund bursaries for deserving university students. K31.5 million has
also been allocated towards the continuation of dismantling of arrears owed by various
public universities and K45.9 million is for emoluments for lecturers at teacher training
colleges.
OUTPUT BASED ANNUAL BUDGET
Page 18
In 2015, Government has allocated K1.4 million for the Youth and Adult Literacy
Programme. Of this amount, K200,804 is a grant to the Zambia College of Distance
Education, which is responsible for the design and development of self-instructional
materials for non-conversional learners; and K1.2 million has been allocated to cater
for the programme requisites and staff emoluments under the programme.
2015
Approved Expenditure Approved Releases* Estimate
1. Current Expenditures - - - - 1,201,550
330,444
871,106
2. Transfers, Subsidies & Other Payments - - - - 200,804
200,804
Programme Total 1,402,354
* Budget Releases as at 30th June 2014
To provide functional literacy education to the illiterate youth and adult population.
Economic Classification2013 Budget 2014 Budget
01: Zambia College of Distance Education (ZACODE)
Programme 5505: Youth and Adult Literacy
Purpose:
01: Personnel Emoluments
02: Goods and Services
OUTPUT BASED ANNUAL BUDGET
Page 19
2015
Approved Expenditure Approved Releases* Estimate
1. Current Expenditures - - - - 15,239,252
9,264,654
5,974,598
2. Transfers, Subsidies & Other Payments - - - - 51,484,132
1,033,279
984,075
2,657,003
1,279,298
688,853
639,649
1,082,483
836,464
718,375
974,234
1,623,724
984,075
1,180,890
1,082,483
836,464
1,574,520
1,180,890
984,075
1,082,483
1,180,890
984,075
To increase equitable access to, and participation in the provision of, labour-market relevant skills.
07: Kabwe Trades Training Institute
08: Kaoma Trades Training Institute
09: Kasiya Secretarial College
10: Kitwe Vocational Training Centre
11: Livingstone Institute of Business and Engineering Studies
12: Luanshya Technical and Business College
01: Chipata Trades Training Institute
02: Choma Trades Training Institute
03: Evelyn Hone College
04: Gemstone Processing & Lapidary Training Centre
05: Industrial Training Centre
01: Personnel Emoluments
02: Goods and Services
Programme 5506: Skills Development
Purpose:
Economic Classi fication
06: In-Service Training and Education Centre
13: Lukashya Trades Training Institute
14: Lusaka Business and Technical College
15: Lusaka Vocational Training Centre
16: Mansa Trades Training Institute
17: Mongu Trades Training Institute
18: Mwinilunga Trades Training Institute
2013 Budget 2014 Budget
19: Nkumbi International College
20: Solwezi Trades Training Institute
21: Technical and Vocational Teachers College
OUTPUT BASED ANNUAL BUDGET
Page 20
In 2015, Government has allocated K79.6 million (51.9% of the programme’s budget)
towards the construction of 9 trades training institutes across the country of which 3
will be completed in 2015 in Isoka, Kalabo and Mwense districts. The remainder of the
budget will go towards operational grants for the existing trades training institutes,
staff emoluments and other requisites.
2015
Approved Expenditure Approved Releases* Estimate
8,364,638
880,747
836,464
984,075
492,038
2,657,003
590,445
590,445
10,000,000
2,500,000
3. Capital Expenditures - - - - 86,611,670
79,611,670
4,000,000
3,000,000
Programme Total - - - - 153,335,054 *Budget Releases as at 30th June 2014
TEVET Infrastructure
Training Equipment - TEVET
30: TEVET Bursaries
31: Administration and Management of TEVET Examinations
Motor Vehicles
22: TEVETA
23: Thornpark Construction Training Centre
24: Ukwimi Trades Training Institute
Economic Classification2013 Budget 2014 Budget
25: Zambia Institute of Business Studies and Industrial Practice
26: Zambia Institute of Management
27: Northern Technical College
28: Isoka Trades Training Institute
29: Kalabo Trades Training Institute
OUTPUT BASED ANNUAL BUDGET
Page 21
In 2015, Government has provided K41.5 million as operational grants for various
science and technology institutions, of which K21.9 million (52.7%) is for the National
Institute for Scientific and Industrial Research (NISIR), which is responsible for
managing the interface between the scientific community and the needs of the
industry. A further K4.3 million has be earmarked to cater for costs of training young
scientists at the Masters (MSc) and Doctorate (PhD) levels.
2015
Approved Expenditure Approved Releases* Estimate
1. Current Expenditures - - - - 3,811,187
1,575,861
2,235,326
2. Transfers, Subsidies & Other Payments - - - - 41,492,146
1,771,335
21,850,008
3,444,263
4,821,968
5,215,598
4,329,930
59,045
3. Capital Expenditures - - - - 28,475,905
8,905,879
19,000,000
570,026
4. Liabi l i ties - - - - 4,594,896
4,594,896
Programme Total 78,374,135
* Budget Releases as at 30th June 2014
01: Personnel Emoluments
02: Goods and Services
01: National Biosafety Authority
02: National Institute for Scientific and Industrial Research
03: National Remote Sensing Centre
Programme 5507: Science, Technology and Innovation
Purpose:
Economic Classification2013 Budget 2014 Budget
To enhance research and development and strengthen the commercialisation, transfer and diffusion of technology and
innovation.
04: National Science and Technology Council
05: National Technology Business Centre
06: Support to Strategic Research and Scholarships
07: International Obligations
01: Research and Development Infrastructure
02: Research and Development Equipment
01: Institutional Arrears - NISIR
03: Motor Vehicles
OUTPUT BASED ANNUAL BUDGET
Page 22
Capital expenditure under this programme has been allocated K28.5 million and
includes the procurement of research and development equipment at K19 million and
the commencing of the construction of a National Science Centre in Chongwe, a
Fisheries Research Centre in Samfya and a Mineral Research Centre in Solwezi.
OUTPUT BASED ANNUAL BUDGET
Page 23
In order to attain the strategic objectives of the Ministry, the Management and Support
Services programme will undertake, in a cost effective manner, all necessary tasks to
Management and Support Services
2015
Approved Expenditure Approved Releases* Estimate
1. Current Expenditures - - - - 430,959,357
334,335,330
154,650,000
96,624,026
2. Transfers, Subsidies & Other Payments - - - - 84,923,248
790,445
8,000,461
2,389,778
15,529,966
32,577,527
15,495,601
4,278,250
434,073
393,866
426,218
202,586
437,037
3,452,313
270,128
245,000
3. Capital Expenditures - - - - 2,840,608
2,840,608
4. Liabi l i ties - - - - 3,334,446
3,334,446
Programme Total 522,057,658
* Budget Releases as at 30th June 2014
Purpose : To facilitate, support and coordinate the effective delivery of the Ministry's mandated functions.
01: Motor vehicles
01: Dismantling of Arrears
Programme 5508:
Economic Classi fication2013 Budget 2014 Budget
05: Administration & Marking of Examinations - ECZ
11: Education Broadcasting Services
09: Grants to Libraries
10: Zambia Library Services
12: Teaching Council of Zambia
14: Hubert Young Hostels
15: International Organisations and Professional Bodies
o/w Net Recruitment
03: Zambia Education Publishing House (ZEPH)
04: Examination Council of Zambia (ECZ)
13: Schools Thermal Power
01: Personnel Emoluments
06: Science Centres
07: Grants to Mission Schools
08: Mission Schools Secretariat
02: Goods and Services
01: UNESCO
02: Zambia Education Programme Implementation Unit
OUTPUT BASED ANNUAL BUDGET
Page 24
support the effective delivery of the core education, training and scientific research
and development functions that the Ministry is mandated to deliver.
About 5.5% of the Ministry’s budget is allocated to this support programme, reflecting
the need to direct most of the Ministry’s resources to the core service delivery
programmes. 64% of the programme’s budget is for the payment of personnel
emoluments which includes K154.7 million for the net recruitment of 5,000 teachers
under the Primary and Secondary education programmes.
HEAD TOTAL 9,415,154,444
ANNEX I
2015
PROVINCE DISTRICT BUDGET (K)
New All Provinces -
New All Provinces -
New All Provinces -
New All Provinces -
New All Provinces -
New All Provinces -
New All Provinces
New Selected Districts
PEOs offices
in Choma &
Chinsali
New All Provinces -
New All Provinces -
New Lusaka Chilanga 449,100
New Lusaka Chirundu 299,400
New Lusaka Chongwe 299,400
New Lusaka Kafue 449,100
New Lusaka Luangwa 299,400
New Lusaka Lusaka 898,200
New Lusaka Rufunsa 299,400
New Lusaka Shibuyunji 449,100
OUTPUT LOCATION TABLE (INFRASTRUCTURE PROJECTS)
Upgrading of Basic Schools
into Secondary Schools
213,611,027
Construction of DEBS and PEOs (Choma and Chinsali) Offices
Rehabilitation of School Furniture
Construction of School Toilet Blocks
PROGRAMME/PROJECT DESCRIPTION STATUS
LOCATION
Construction of 5 ECE centres in each province42,315,226
Construction of Pit Latrines
School Desks (Procurement and Installation)
Construction of Pit Latrines
Early Childhood Education
Infrastructure
Primary Education
Infrastructure
Construction of classrooms using community mode
Boreholes (Drilling and Equiping with Pumps)
Boreholes (Drilling and Equiping with Pumps)
Mount Makulu; Bayuni; Lusaka West
Chinyungu;Mpanshya;
Kaunga; Kapocche
Silver Rest; Ndeke
Shikoswe; Nakatete; Gotagota
Woodlands "A"; Northmead; Nelson Mandela, Matero Boys Primary; Lusaka Girls Primary
Kamwala South
Mwembezhi
Ng'ombe ilede; Hachipilika
1
2015
PROVINCE DISTRICT BUDGET (K)
PROGRAMME/PROJECT DESCRIPTION STATUS
LOCATION
Construction of 5 ECE centres in each province42,315,226 Early Childhood Education
InfrastructureNew Copperbelt Kitwe 449,100
New Copperbelt Luanshya 299,400
New Copperbelt Lufwanyama 299,400
New Copperbelt Chililabombwe 299,400
New Copperbelt Chingola 299,400
New Copperbelt Mufulira 299,400
New Copperbelt Kalulushi 299,400
New Copperbelt Masaiti 299,400
New Copperbelt Mpongwe 299,400
New Copperbelt Ndola 449,100
New Central Mumbwa 299,400
New Central Kapiri Mposhi 299,400
New Central Kabwe 299,400
New Central Chibombo 299,400
New Central Serenje 299,400
New Central Itezh Tezhi 299,400
New Central Mkushi 299,400
New Central Chisamba 299,400
New Central Ngabwe 299,400
New Central Chitambo 299,400
Upgrading of Basic Schools
into Secondary Schools
Ipafu Primary; Nchanga
Kaputi; Momboshi
Mine Sec. ; Broadway
Kitwe Primary;Lima ; Kamatipa
Mikomfwa; Nkulumashiba
Mulilo Primary; St. Marys'
Kamenza Primary; Fitobaula
Chinyongola; Chiyuni
Kalukanya; Buyantashi
Mumba chala; Ngabwe
Mpelembe;Babonde
Twalubuka; Kankoshi
Lisomono; Fiwale
Kaindu;Kalilwe
Kanyenda; Chintinfu
Kamba; Kayele:Kanini
Mulilima; Kabamba
Lukanda; Lukomba
Mbila; Shibuwaboombo
Masansa;Mkushi Boma
2
2015
PROVINCE DISTRICT BUDGET (K)
PROGRAMME/PROJECT DESCRIPTION STATUS
LOCATION
Construction of 5 ECE centres in each province42,315,226 Early Childhood Education
InfrastructureNew Northern Chilubi 299,400
New Northern Kaputa 449,100
New Northern Kasama 299,400
New Northern Luwingu 449,100
New Northern Mbala 299,400
New Northern Mporokoso 299,400
New Northern Mpulungu 299,400
New Northern Mungwi 449,100
New Northern Nsama 449,100
New Western Kalabo 149,700
New Western Kaoma 299,400
New Western Limulunga 149,700
New Western Luampa 149,700
New Western Lukulu 149,700
New Western Mongu 449,100
New Western Nkeyema 149,700
New Western Sesheke 299,400
New Western Mwandi 149,700
New Western Mulobezi 149,700
New Western Shangombo 299,400
Upgrading of Basic Schools
into Secondary Schools
Mukanga; Mukupa Kaoma
Kavumbu; Vyamba
Katima; Kalobolelwa
Sitaka
Kanyonyo; Imwiko; Mandanga
Luwingu Basic; Mapulanga; Shimumbi
Kaka;Mambwe
Chaba; Matipa
Kalaba; Kasepa;Kasongole
Chishimba; Lua-Lua
Lipumpu
Nawinda
Shangombo; Natukoma
Munkuye
Sihole
Chisali; Makasa, Nseluka
Kapinda; Munwa; Nsumbu
Mulamatila; Luana
Nangula
Mbanyutu
3
2015
PROVINCE DISTRICT BUDGET (K)
PROGRAMME/PROJECT DESCRIPTION STATUS
LOCATION
Construction of 5 ECE centres in each province42,315,226 Early Childhood Education
InfrastructureNew Western Sioma 149,700
New Western Senanga 149,700
New Western Mitete 149,700
New Western Nalolo 149,700
New Western Sikongo 149,700
New Eastern Chipata 748,500
New Eastern Chadiza 299,400
New Eastern Katete 299,400
New Eastern Petauke 299,400
New Eastern Nyimba 149,700
New Eastern Sinda 299,400
New Eastern Vubwi 299,400
New Eastern Lundazi 449,100
New Eastern Mambwe 299,400
New Luapula Mansa 449,100
New Luapula Lunga 449,100
New Luapula Mwense 299,400
New Luapula Samfya 299,400
New Luapula Chembe 149,700
New Luapula Nchelenge 449,100
New Luapula Chipili 299,400
Upgrading of Basic Schools
into Secondary Schools
Chitamba; Mutende; Matanda
Itala; Bwalya Mponda
Matunga; Chimtende
Seya; Mtandaza
Chigwe; Mbozi
Chasela;Kazembe; Chikomeni
Jumbe; Msoro
Nyengo
Maguya; Chikungu; Chipangali; Lutembe; Chiziye
Liangati; Sibukali
Muyondoti
Zumaile; Lutwazi; Maila
Nyimba East;
Maombe
Mwala Chanjowe; Zemba
Mutomena
Kashiba; Mukumbwa
Chisokone; Miponda
Kundamfumu
Munsa; Mweru
Kalundu; Chululuongo
4
2015
PROVINCE DISTRICT BUDGET (K)
PROGRAMME/PROJECT DESCRIPTION STATUS
LOCATION
Construction of 5 ECE centres in each province42,315,226 Early Childhood Education
InfrastructureNew Luapula Mwansabombwe 299,400
New Luapula Milenge 299,400
New Luapula Kawambwa 299,400
New Luapula Chienge 299,400
New North Western Solwezi 598,800
New North Western Za,mbezi 449,100
New North Western Ikeleng'i 299,400
New North Western Kabompo 299,400
New North Western Kasempa 299,400
New North Western Mwinilunga 299,400
New North Western Chavuma 299,400
New North Western Mufumbwe 299,400
New North Western Manyinga 299,400
New Southern Siavonga 149,700
New Southern Chikankata 149,700
New Southern Mazabuka 299,400
New Southern Monze 299,400
New Southern Kalomo 299,400
New Southern Choma 598,800
New Southern Pemba 149,700
Upgrading of Basic Schools
into Secondary Schools
Kanaji Chilanda; Pokola
Kamakeche; Nkenyauna
Kakoma; Katemwa
Kashinakaji; Chifuwe North
Keemba; Manungu;
Siachitema; Choonga
Swan Primary; Singani west; Mangunza; St. Mulumba
Kanchomba
Chaanga
Kafwanka; Chibende
Kawambwa Central; Kanengo
Lunchinda; Pondwa
Kazembe;Chinyanta
Moses Luneta; Nathanda
Kamezekezeke; Kalende
Nansenga
Neganenga; Kawama
Mukumbi; Mwajimambwe; Solwezi Primary; Kabisapi
Mwange; Mapachi; Dipalata
Ikeleng'i; Lwakela
5
2015
PROVINCE DISTRICT BUDGET (K)
PROGRAMME/PROJECT DESCRIPTION STATUS
LOCATION
Construction of 5 ECE centres in each province42,315,226 Early Childhood Education
InfrastructureNew Southern Namwala 149,700
New Southern Zimba 149,700
New Southern Gwembe 149,700
New Southern Livingstone 299,400
New Southern Kazungula 299,400
New Southern Sinazongwe 449,100
New Muchinga Shiwang'andu 299,400
New Muchinga Chinsali 748,500
New Muchinga Mpika 748,500
New Muchinga Chama 598,800
New Muchinga Isoka 449,100
New Muchinga Nakonde 748,500
New Muchinga Mafinga 299,400
On-going Eastern Nyimba
On-going Eastern Nyimba
On-going Eastern Nyimba
On-going Eastern Petauke
On-going Eastern Petauke
On-going Eastern Petauke
On-going Eastern Petauke
On-going Eastern Sinda
780,216,187 Continued Construction of
118 Secondary Schools
Upgrading of Basic Schools
into Secondary Schools
Mulakupikwa Day; Mishishi day; Mulilansolo Sec; Chinsali Day; Kalwala Day
Shemu Day; Kaombe day; Nteko Day; Katozi Day; Nakonde Day
Chanama day; Thendele Day
Construction of Mumbi Boarding Secondary School
Mpika day; Kabale Day; Mununga Day; Malambwa; Chiundaponde Day
Construction of Chikowa Day Secondary School
Construction of Mutumbata Day Secondary School
Construction of Nyampande Boarding Secondary School
Construction of Sinda Day Secondary School
Construction of Chiware Boarding Secondary School
Construction of Vizimumba Day Secondary School
Construction of Kacholola Boarding Secondary School
Muchila
Luyaba
Sinafala
Mulwani; Nalituwe
Mukuni; Simango
Maamba GRZ; Nkandabwe; Maamba Special
Shiwang'andu Day; Kabanda Day
Kambombo; Katangalika; Chitheba; Chikwa Day
Sansamwenje; Kapililonga Day; Kampumbu Day
6
2015
PROVINCE DISTRICT BUDGET (K)
PROGRAMME/PROJECT DESCRIPTION STATUS
LOCATION
Construction of 5 ECE centres in each province42,315,226 Early Childhood Education
InfrastructureOn-going Eastern Katete
On-going Eastern Chipata
On-going Eastern Chipata
On-going Eastern Chipata
Re-tender Eastern Chipata
Re-tender Eastern Chipata
On-going Eastern Vubwi
On-going Eastern Lundazi
On-going Muchinga Chama
On-going Muchinga Mafinga
On-going Muchinga Nakonde
On-going Muchinga Chama
On-going Muchinga Isoka
On-going Muchinga Mpika
On-going Muchinga Mpika
On-going Muchinga Mpika
On-going Muchinga Mpika
On-going Muchinga Mpika
On-going Muchinga Shiwang'andu
780,216,187 Continued Construction of
118 Secondary Schools
Construction of Chibale Boarding Secondary School
Construction of Michael Sata Boarding Secondary School
Construction of Katibunga Boarding Secondary School
Construction of Kampamba Day Secondary School
Construction of Chewe Shimfwamba Day SecondaRY School
Construction of John Mubanga Day Secondary School
Construction of Kopa Day Secondary School
Construction of Chasefu BoardingSecondary School
Construction of Chiparamba Girls' Technical Secondary School
Construction of Matumbo Day Secondary School
Construction of Chikando Day Secdondary School
Chiparamba Day Secondary School
Chipangali Day Secondary School
Construction of Vubwi Boarding Secondary School
Construction of Chama South Boarding Secondary School
Construcytion of Kapoche Day Secondary School
Construction of Kasenengwa Boarding Secondary School
Construction of Muyombe Boarding Secondary School
Constructionof Nakonde Day Secondary School
7
2015
PROVINCE DISTRICT BUDGET (K)
PROGRAMME/PROJECT DESCRIPTION STATUS
LOCATION
Construction of 5 ECE centres in each province42,315,226 Early Childhood Education
InfrastructureOn-going Northern Kasama
On-going Northern Mungwi
On-going Northern Kasama
On-going Northern Luwingu
On-going Northern Luwingu
On-going Northern Chilubi
On-going Northern Mporokoso
On-going Northern Mporokoso
On-going Northern Nsama
On-going Northern Kaputa
On-going Northern Mbala
On-going Northern Mpulungu
On-going Luapula Milenge
On-going Luapula Mwense
On-going Luapula Mwense
On-going Luapula Chienge
On-going Luapula Mwansabombwe
On-going Luapula Mansa
780,216,187 Continued Construction of
118 Secondary Schools
Construction of Musa Day Secondary School
Construction of Ntumpa Boarding Secondary School
Construction of Lupososhi Boarding Secondary School
Construction of Katuta Boarding Secondary School
Construction of Chilubi Boarding Secondary School
Construction of Lunte Girls' Technical Secondary School
Construction of Bweupe Boarding Secondary School
Construction of Kaputa Boarding Secondary School
Construction of Menje Boarding Secondary School
Construction of Mungwi Girls' Technical School
Construction of Ponde Day Secondary School
Construction of Kashita Day Secondary School
Construction of Kalanga Day Secondary School
Construction of Mpulungu Boarding Secondary School
Construction of Milenge Boarding Secondary School
Construction of Lukwesa Boarding Secondary School
Construction of Nsama Boarding Secondar School
Construction of Luapula Girls' Technical Secondary School
8
2015
PROVINCE DISTRICT BUDGET (K)
PROGRAMME/PROJECT DESCRIPTION STATUS
LOCATION
Construction of 5 ECE centres in each province42,315,226 Early Childhood Education
InfrastructureOn-going Luapula Mwansabombwe
On-going Luapula Chembe
On-going Luapula Kawambwa
On-going Luapula Chiengi
On-going Luapula Chipili
On-going Luapula Nchelenge
On-going Luapula Samfya
On-going Copperbelt Mufulira
On-going Copperbelt Kalulushi
On-going Copperbelt Lufwanyama
On-going Copperbelt Masaiti
On-going Copperbelt Lufwanyama
On-going Copperbelt Mpongwe
On-going Copperbelt Masaiti
On-going Copperbelt Kitwe
On-going Copperbelt Masaiti
On-going Copperbelt Luanshya
On-going North-Western Solwezi
On-going North-Western Ikeleng'e
On-going North-Western Mwinilunga
780,216,187 Continued Construction of
118 Secondary Schools
Construction of Mwansabombwe Day Secondary School
Construction of Chembe Boarding Secondary School
Construction of Pambashe Boarding Secondary School
Construction of Mushindamo Boarding Secondary School
Construction of Ikeleng'e Boarding Secondary School
Construction of Kanyama Boarding Secondary School
Construction of Kalungwishi Boarding Secondary School
Construction of Mwenda Boarding Secondary School
Construction of Kapale Boarding Secondary School
Construction of Kasaba Day Secondary School
Construction of Fisenge Day Secondary School
Construction of Chati South Boardign Secondary School
Construction of Lumpuma Boardign Secondary School
Construction of Luansobe Boardign Secondary School
Construction of Lufwanyama Boardign Secondary School
Construction of Mpongwe South Boarding Secondary School
Construction of Masaiti Boardign Secondary School
Construction of Kamfinsa Day Secondary School
Construction of Mulundu Day Secondary School
Construction of Masangano Boarding Secondary School
9
2015
PROVINCE DISTRICT BUDGET (K)
PROGRAMME/PROJECT DESCRIPTION STATUS
LOCATION
Construction of 5 ECE centres in each province42,315,226 Early Childhood Education
InfrastructureOn-going North-Western Kasempa
On-going North-Western Mufumbwe
On-going North-Western Kabompo
On-going North-Western Zambezi
On-going North-Western Chavuma
On-going Central Kapiri Mposhi
On-going Central Kapiri Mposhi
On-going Central Kapiri Mposhi
On-going Central Luano
On-going Central Serenje
On-going Central Serenje
On-going Central Serenje
On-going Central Serenje
On-going Central Serenje
On-going Central Kabwe
On-going Central Chisamba
On-going Central Chibombo
On-going Central Chibombo
On-going Central Mumbwa
On-going Central Itezhi-tezhi
On-going Lusaka Chilanga
780,216,187 Continued Construction of
118 Secondary Schools
Construction of Kapiri Day Secondary School
Construction of Chipepo Boarding Secondary School
Construction of Chibale Day Secondary School
Construction of Justine Mkando Boarding Secondary School
Construction of Muchinda Boarding Secondary School
Construction of Kanona Day Secondary School
Construction of Makululu Day Secondary School
Construction of Chisamba Boarding Secondary School
Construction of Moomba Boarding Secondary School
Construction of Mumbwa Day Secondary School
Construction of Kafushi Boarding Secondary School
Construction of Chavuma Boarding Secondary School
Construction of Kapiri Girls' Technical Secondary School
Construction of Itezhi-tezhi Boarding Secondary School
Construction of Mwembeshi Boarding Secondary School
Construction of Mkushi South Boarding Secondary School
Construction of Mufumbwe Boarding Secondary School
Construction of Mako Day Secondary School
Construction of Kayombo Boarding Secondary School
Construction of Liyovu Boarding Secondary School
Construction of Mailo Boarding Secondary School
10
2015
PROVINCE DISTRICT BUDGET (K)
PROGRAMME/PROJECT DESCRIPTION STATUS
LOCATION
Construction of 5 ECE centres in each province42,315,226 Early Childhood Education
InfrastructureOn-going Lusaka Chilanga
On-going Lusaka Kafue
On-going Lusaka Chongwe
On-going Lusaka Chongwe
On-going Lusaka Lusaka
On-going Lusaka Lusaka
On-going Lusaka Lusaka
On-going Lusaka Luangwa
On-going Lusaka Lusaka
On-going Lusaka Lusaka
On-going Lusaka Lusaka
On-going Southern Mazabuka
On-going Southern Monze
On-going Southern Choma
On-going Southern Gwembe
On-going Southern Pemba
On-going Southern Sinazongwe
On-going Southern Sinazongwe
On-going Southern Livingstone
On-going Southern Kazungula
On-going Southern Namwala
780,216,187 Continued Construction of
118 Secondary Schools
Construction of Magoye Boarding Secondary School
Construction of Munali Centre of Execellence Boarding Secondary School
Construction of Faith Babtist Boarding Secondary School
Construction of Margret Mwachiyeya Boarding Secondary School
Construction of Rufunsa Girls' Technical Secondary School
Construction of Twin Palm Day Secondary School
Construction of Nyumba Yanga Day Secondary School
Construction of Lilayi Day Secondary School
Construction of Luangwa (Feira) Day Secondary School
Construction of Kabanana Day Secondary School
Construction of Kazungula Boarding Secondary School
Construction of Niko Girls' Technical Secondary School
Construction of Munyumbwe Boarding Secondary School
Construction of Ndondi Boarding Secondary School
Construction of Sinazongwe Day Secondary School
Construction of Lusaka West Boarding Secondary School
Construction of Chikupi Day Secondary School
Construction of Kaumba Boarding Secondary School
Construction of Batoka Boarding Secondary School
Construction of Maamba Day Secondary School
Construction of Shungu Namutitima Day Secondary School
11
2015
PROVINCE DISTRICT BUDGET (K)
PROGRAMME/PROJECT DESCRIPTION STATUS
LOCATION
Construction of 5 ECE centres in each province42,315,226 Early Childhood Education
InfrastructureOn-going Western Mulobezi
On-going Western Mwandi
On-going Western Sioma
On-going Western Nalolo
On-going Western Mongu
On-going Western Limulunga
On-going Western Kaoma
On-going Western Lukulu
On-going Western Mitete
On-going Western Kalabo
On-going Western Sikongo
Continued construction of Paul Mushindo University On-going Muchinga Chinsali
Continued Construction of Robert Kapasa Makasa University On-going Muchinga Chinsali
Continued Construction of Mukuba University On-going Copperbelt Kitwe
Continued Construction of Kwame Nkrumah University On-going Central Kabwe
Continued Construction of Chalimbana University On-going Lusaka Chongwe
Continued Construction of Palabana University On-going Lusaka Chongwe
Continued Construction of King Lewanika University On-going Western Mongu
Continued Construction of Luapula University On-going Luapula Mansa
Feasibility Studies for the Construction of a Public University New Southern Choma
Feasibility Studies for the Construction of a Public University New Eastern Chipata
780,216,187 Continued Construction of
118 Secondary Schools
650,000,000 Tertiary Education
Infrastructure
Construction of Nalolo Boarding Secondary School
Construction of Nangweshi Boarding Secondary School
Construction of Mulobezi Day Secondary School
Construction of Mwandi Boarding Secondary School
Construction of Libonda Boarding Secondary School
Construction of Nakanyaa Girls' Technical Secondary School
Construction of Limulunga Day Secondary School
Construction of Mayukwayukwa Boarding Secondary School
Construction of Lukulu Boarding Secondary School
Construction of Mitete Boarding Secondary School
Construction of Sikongo Boarding Secondary School
12
2015
PROVINCE DISTRICT BUDGET (K)
PROGRAMME/PROJECT DESCRIPTION STATUS
LOCATION
Construction of 5 ECE centres in each province42,315,226 Early Childhood Education
InfrastructureFeasibility Studies for the Construction of a Public University New North-Western Solwezi
Feasibility Studies for the Construction of a Public University New Northern Kasama
Construction of Hostels at University of Zambia (UNZA) New Lusaka Lusaka
Construction of Hostels at Mulungushi University New Central Kabwe
Construction of Hostels at Copperbelt University (CBU) New Copperbelt Kitwe
Construction of Hostels at Evelyn Hone College New Lusaka Lusaka
Construction of Laboratories at Mufulira College of Education New Copperbelt Mufulira
Construction of Laboratories at David Livingstone College of Education New Southern Livingstone
New Eastern Katete 750,000
New N/Western Solwezi 750,000
New Western Nalolo 750,000
On-going Western Kalabo 2,400,000
On-going Northern Isoka 2,500,000
On-going Lusaka Lusaka 1,000,000
On-going Copperbelt Luanshya 4,750,000
On-going Eastern Lundazi 3,750,000
On-going Luapula Mwense 3,900,000
On-going Eastern Chipata 3,100,000
On-going Copperbelt Ndola 1,250,000
On-going Lusaka Lusaka 11,800,000
New Eastern Petauke 5,875,000
650,000,000
Construction of Nalolo College University
Tertiary Education
Infrastructure
Continued construction of Kalabo Trades
Continued construction of Isoka Trades
Continued Rehabilitation of ZASTI
Continued Construction of Luanshya Merger Hostels
Continued Construction of Lundazi Trades
Continued Construction of Mwese Trades
Continued Rehabilitation of Nortec Hostels
Continued construction of TEVETA Exaination Centre
Continued Construction of Hostels at Chipata Trades
Construction of Hostel at Ukwimi Trades
Construction of Katete College University
Construction of Solwezi College University
Skills Development
Infastructure
13
2015
PROVINCE DISTRICT BUDGET (K)
PROGRAMME/PROJECT DESCRIPTION STATUS
LOCATION
Construction of 5 ECE centres in each province42,315,226 Early Childhood Education
InfrastructureNew Luapula Milenge 3,875,000
New Northern Mporokoso 4,950,000
New Southern Choma 3,500,000
New Western Kaoma 3,500,000
New Central Mumbwa 4,950,000
New Western Sesheke 4,950,000
New N/Western Zambezi 4,200,000
New Lusaka Luangwa 450,000
New Southern Kazungula 450,000
New Lusaka Lusaka 2,700,670
New Lusaka Lusaka 899,000
New Northern Kasama 1,700,000
New N/Western Mwinilunga 456,000
New N/Western Solwezi 456,000
New Luapula Samfya 1,980,000
New N/Western Solwezi 2,000,000
New Lusaka Lusaka 1,000,000
New Lusaka Lusaka 1,000,000
New Lusaka Lusaka 1,000,000
New Lusaka Lusaka 1,000,000
New Lusaka Lusaka 925,879
1,808,043,089
Science, Technology and
Innovation InfrastructureConstruction of Fisheries Reseach Centre
Construction of Solwezi Trades Training Institute
Construction of Student Hostels Kaoma Trades
Construction of Mumbwa Trades
Construction of Sesheke Trades
Construction of Chitokoloki Trades
Construction of Luangwa Trades
Construction of Hostel at Milengi Trades
TOTAL
Construction of the National Science Centre
Construction of Mporokoso Trades
NTBC Incubation Facilities
Construction of Mineral Research Centre
Establishment of Science Complex
Establishment of Science Centre for Climate Change
Rehabilitation of NISIR Laboratories
Construction of Kazungula Trades
Construction of Library at Evelyn Hone College
Rehabilitation of Maxwel House
Rehabilitation of Lukashya Trades Training Institute
Construction of Mwinilunga Trades Training Institute
Construction of Student Hostels at Choma Trades
Skills Development
Infastructure
14