    Building Plan Grid system and storey Data Definitions will be displayed after selecting Nobutton.

    Set the grid line and spacing between two grid lines. Set the storey heightdata using Edit storey Data command.

  • 8/14/2019 ETABS G+4.doc

    5/69

    Note: You can change Grid spacing by choosing Custom Grid spacing, forcolumn arying spacing then clic! Edit Grid you can also change any storeyheight by choosing Custom Storey Data, then clic! on Edit Storey Data.

    Go to "ain menu Edit Storey data Edit Storey.

  • 8/14/2019 ETABS G+4.doc

    6/69

  • 8/14/2019 ETABS G+4.doc

    7/69

  • 8/14/2019 ETABS G+4.doc

    8/69

  • 8/14/2019 ETABS G+4.doc

    9/69

  • 8/14/2019 ETABS G+4.doc

    10/69

    STEP 3: (Define Material Properties)

    #rom "ain menu Define "aterial $roperty %dd new material "aterial Name &"'(Concrete cubic comp. strength fc! &'()ending *einforcement yield strength fy &+-

    Shear *einforcement yield strength fy &+-! !.

  • 8/14/2019 ETABS G+4.doc

    11/69

  • 8/14/2019 ETABS G+4.doc

    12/69

    STEP 4: (Define Frame section)

  • 8/14/2019 ETABS G+4.doc

    13/69

  • 8/14/2019 ETABS G+4.doc

    14/69

  • 8/14/2019 ETABS G+4.doc

    15/69

    )ar si5e &4- dCorner bar &4- d

    *einforcement to be designed !!.

    Define )eam:

    #rom "ain menu Define #rame section %dd rectangular "aterial

    name &"'( /select0 Section Name&)4'(26(("'(Dimensions:Depth /'0 &6((mm3idth /40 &'((mm

  • 8/14/2019 ETABS G+4.doc

    16/69

    Select Beam

    Define Slab:

    #rom "ain menu define 3all7Slab 7Dec! section %dd New slab

  • 8/14/2019 ETABS G+4.doc

    17/69

    Section name & S"aterial name & "'(.

    "embrane"embrane &4- mm )ending &4-mm

    Select "embrane ! !.

  • 8/14/2019 ETABS G+4.doc

    18/69

    STEP 5: (Drawing Columns !eams an" Sla#s)Drawing Columns:

    #rom "ain menu Draw Draw line ob8ects Create column in region

    $roperty & C1((2'(("'( Select or Clic! on the column 8oints in $lan iew /9eft window0 with similar

    storey; option.

  • 8/14/2019 ETABS G+4.doc

    19/69

  • 8/14/2019 ETABS G+4.doc

    20/69

  • 8/14/2019 ETABS G+4.doc

    21/69

    Drawing Slab:

    #rom "ain menu Draw Draw area ob8ects Create areas at clic! /Draw

    areas0 /$lan0 $roperty &S Clic! on the periphery of column 8oints and

    press enter /3ith similar storey option0.

  • 8/14/2019 ETABS G+4.doc

    22/69

  • 8/14/2019 ETABS G+4.doc

    23/69

  • 8/14/2019 ETABS G+4.doc

    24/69

    STEP $:(%ssigning Support Con"ition)

    Set )ase floor $lan iew in left window Set Column points /with mouse0

    #rom "ain menu %ssign >oint7$oint *estraints /supports0 Select

    #i2ed !.

  • 8/14/2019 ETABS G+4.doc

    25/69

  • 8/14/2019 ETABS G+4.doc

    26/69

    ?o iew Support assigned

    #rom top ?ool bar Set )uilding iew option

    &isi#le in 'iew

    Supports !.

    Go to Eleation iew and iew . #or other iews clic! arrow at top of

    tool bar.

    STEP : (Defining oa"s)

    .Graity 9oads /Dead 9oad @ 9ie 9oad0

    #rom "ain menu Define Static 9oad Cases

    9oad & S

  • 8/14/2019 ETABS G+4.doc

    27/69

  • 8/14/2019 ETABS G+4.doc

    28/69

    %ssigning the 9oads:

    %ctiate left window and set to $lan iew %ctiate or select similar storeyoption /at bottom0 and select all slabs

    #rom "ain menu %ssign

    Shell 7 %rea loads Aniform

    9oad case name &S

  • 8/14/2019 ETABS G+4.doc

    29/69

  • 8/14/2019 ETABS G+4.doc

    30/69

  • 8/14/2019 ETABS G+4.doc

    31/69

    %ssigning 3all loads:= wall load & .61Bn7m /#irst to fourth floor0Ground floor &+.44+Bn7m.?errace floor&+.-(Bn7m.

  • 8/14/2019 ETABS G+4.doc

    32/69

    oint7$oint loads 9oad case name &Dead. Anits Bn.m.

    *eplace e2isting loads

    #orces Global &( Bn !.

  • 8/14/2019 ETABS G+4.doc

    33/69

  • 8/14/2019 ETABS G+4.doc

    34/69

  • 8/14/2019 ETABS G+4.doc

    35/69

  • 8/14/2019 ETABS G+4.doc

    36/69

  • 8/14/2019 ETABS G+4.doc

    37/69

    4. 3ind 9oads :

  • 8/14/2019 ETABS G+4.doc

    38/69

    Coefficient Cp= - (Change if required) Ok.

    ?o see wind load selection

    Set )uilding iew option

    %rea section

    9ine section !.

    3*EarthFua!e %nalysis

  • 8/14/2019 ETABS G+4.doc

    39/69

  • 8/14/2019 ETABS G+4.doc

    40/69

    Define "ass Source%s per

  • 8/14/2019 ETABS G+4.doc

    41/69

    Define EarthFua!e 9oad /Static "ethod0

    #rom "ain menu Define Static 9oad cases 9oad &EMH?ype & Mua!eDefault "ultiplier &(

    %uto 9ateral load &

  • 8/14/2019 ETABS G+4.doc

    42/69

    %ssigning Diaphragms

    Set all storey option and select all slabs #rom "ain menu %ssign

    Shell area Diaphragms D !.

    ?o iew the Diaphragm

    Go to Set )uilding iew ob8ects

    Diaphragm

  • 8/14/2019 ETABS G+4.doc

    43/69

  • 8/14/2019 ETABS G+4.doc

    44/69

  • 8/14/2019 ETABS G+4.doc

    45/69

  • 8/14/2019 ETABS G+4.doc

    46/69

  • 8/14/2019 ETABS G+4.doc

    47/69

  • 8/14/2019 ETABS G+4.doc

    48/69

  • 8/14/2019 ETABS G+4.doc

    49/69

  • 8/14/2019 ETABS G+4.doc

    50/69

  • 8/14/2019 ETABS G+4.doc

    51/69

  • 8/14/2019 ETABS G+4.doc

    52/69

  • 8/14/2019 ETABS G+4.doc

    53/69

  • 8/14/2019 ETABS G+4.doc

    54/69

  • 8/14/2019 ETABS G+4.doc

    55/69

  • 8/14/2019 ETABS G+4.doc

    56/69

  • 8/14/2019 ETABS G+4.doc

    57/69

  • 8/14/2019 ETABS G+4.doc

    58/69

  • 8/14/2019 ETABS G+4.doc

    59/69

  • 8/14/2019 ETABS G+4.doc

    60/69

  • 8/14/2019 ETABS G+4.doc

    61/69

  • 8/14/2019 ETABS G+4.doc

    62/69

  • 8/14/2019 ETABS G+4.doc

    63/69

  • 8/14/2019 ETABS G+4.doc

    64/69

  • 8/14/2019 ETABS G+4.doc

    65/69

  • 8/14/2019 ETABS G+4.doc

    66/69

  • 8/14/2019 ETABS G+4.doc

    67/69

  • 8/14/2019 ETABS G+4.doc

    68/69

  • 8/14/2019 ETABS G+4.doc

    69/69


Recommended