Technology Enabled Equipment Marco Laurini and Marco Jannuzzi
Laurini Officine Meccaniche11th November 2015
Laurini
Pipe Laying System
Laurini Awards at the bi-annual
IPLOCA* New Technologies & Innovation Award
sponsored by B.P.
* International Pipe Line and Offshore Contractors Association
2005:
Sideboom
kit for
hydraulic
excavator
2007:
Multipurpos
e tractor
Muletrax.
2011:
Seam
Aligner
Clamp.
2009:
Pipelayer
model PL105
2013:
Hammer, Pipe-
lifting Kit,
Muletrax for
40ft container
• What are customers looking for in
pipe-laying operations ?
• What are the limitations of traditional
sidebooms ?
• How can we overcome them ?
Laurini
Pipe Laying System
After 30 yrs of experience on jobsites, a lot of thinking
out-of-the-box was needed to design a machine that will
revolutionarize the pipeline industry:
The Laurini Pipe Laying System
Laurini
Pipe Laying System
Laurini
Pipe Laying System
The LLS …
• Will NOT tip-over
• Occupies less Right-of-Way
• No periodic inspections
• Requires a smaller initial investment
• Is transported easily to the next project
• Useable in both Highly Regulated and Less Reg’d Countries
• Pipe-laying operation can be “automated” !
Laurini
Pipe Laying System
The LLS …
• Will NOT tip-over … 100% risk-free and safe operation
We have put one track on the right-of-way,
and one inside the trench … the machine
will NOT tip-over … 100% safety !
Laurini
Pipe Laying System
The LLS …
• Occupies as little as possible the Right-of-Way … less costs
The Laurini Laying System occupies at least 3 meters
LESS Right-of-Way than a traditional sideboom … -50%
6m 3m
3m x 100 km equals
to 30 hectares LESS
to prepare, maintain,
restored … LESS $$$
Laurini
Pipe Laying System
The LLS …
• Does not need periodic inspections by authorities, less
paperwork and bureaucracy … less costs
The Laurini Laying System is not a sideboom or a
crane. It does not use cables to carry suspended
loads. No need for special inspections or certifications
Laurini
Pipe Laying System
The LLS …
• Requires a smaller initial investment ... less costs
No counterweight, smaller installed HP, operating
weight of 30 t (vs. 50 t)… means a smaller initial
investment compared to a traditional sideboom
Laurini
Pipe Laying System
The LLS …
• Is transported easily to the next project … less costs
The Laurini Laying System can be disassembled and its
components will fit a 40 ft open top container. Road
transport costs can be reduced by 70% and ocean
freight by 90%. No more lost or stolen components.
Laurini
Pipe Laying System
The LLS …
• Can be used both in Highly Regulation Countries and
Less Regulation Countries… single fleet
The engine of the Laurini Laying System is a «module».
Tier4 and Tier2-3 engines can be interchanged to allow
machine operate in Less Regulation Countries and
Highly Regulation Countries. One machine and two
engines will cost less than two machines.
Separate Engine
compartment is
dimensioned to house
either T3 or T4 engines
Hydraulic pumps
compartment is
connected to the
engine by a
cardanic joint
Laurini
Pipe Laying System
The LLS …
• Allows “automatisation” of pipe-laying operations
The Laurini Laying System will require fewer
machines that can now be coordinated by new
technologies