Plan Name Number of KPIs
Achieved
Number of KPIs Not
Achieved
Annual targets & No
target in Q1
Achievement Rate
(%) (not considering
Annual Target)
Develop and Sustain our Spatial, Natural and Built
Environment
19 0 1 100.00
Developing a Prosperous, Diverse Economy and
Employment Creation
72 14 3 83.72
Creating a Quality Living Environment 13 12 23 52.00
Fostering a Socially Equitable Environment 34 8 4 80.95
Creating a Platform for Growth, Empowerment and Skills
Development
41 3 2 93.18
Embracing our Cultural Diversity, Arts & Heritage 20 5 1 80.00
Good Governance and Responsive Local Government 22 6 13 78.57
Good Governance and Responsive Local Government 59 9 0 86.76
Financially Accountable and Sustainable City 29 10 9 74.36
309 67 56 82.18Overal Achievement 432 71.53
Plan 7B Sipho Nzuza 68 86.76
Plan 8 Dr Krish Kumar 48 60.42
Plan 6 Dr Musa Gumede 26 76.92
Plan 7A Sipho Cele 41 53.66
Plan 4 Dr Musa Gumede 46 73.91
Plan 5 Dumisile Nene 46 89.13
Plan 2 Phillip Sithole 89 80.90
Plan 3 Sipho Nzuza / Philemon Mashoko 48 27.08
Plan Number Plan Owner Total number of
KPIs
Achievement Rate (%)
(considering Annual Target)
Plan 1 Phillip Sithole 20 95.00
eThekwini Municipality
Service Delivery and Budget Implementation Plan
SDBIP REPORT AS AT 30 SEPTEMBER 2017SUMMARY OF
Programme Programme
Driver
Project Project
Manager
Sub Project Sub Project
Owner
Unit Of
Measure
Annual Target as at
2017/2018
Quarter 1
Target as at 30
September
2017/2018
Quarter 1
Actual as at 30
September
2017/2018
Indicator Reason For Variance Steps Taken to improve
Performance
Means Of
Verification/Evidence
Comment
Lihle Phewa 1.1.1. Spatial Development
Framework review for 18/19
Helene Epstein % Review the Spatial
Development Framework
for the 18/19 Financial
Year by 30 June 2018 in
compliance with
SPLUMA
0 0 A The project is reported as an annual target
Lihle Phewa 1.1.2. Preparation of Local
Area Plans
Helene Epstein 1.1.2.1. Vulamehlo
Local Area Plan &
Scheme Phase 2
Marcus
Govender
% Draft LAP and FAP
prepared by 30 June
2018
25 25J
Development Framework
Report, Pre-inception
meeting minutes (evidence
available with project
manager)
1.1.3.1.
Nsimbini/Golokodo
Formalisation Phase 2
Ndumiso
Zondo
% Draft Scheme Report
prepared by 30 June
2018
25 25J
Land Use framework report,
Minutes and attendance
register, minutes of the PSC
meeting, Invoice
Evidence sent to PME
1.1.3.2.
Waterfall/Inanda Rd
FAP and Scheme
Francis
Ngcobo
% Draft Functional Area
Plan prepared by 30 June
2018
25 25J
Attendance register for
Stakeholder Engagement,
Emails,Final Conceptual
framework report
Evidence sent to PME
1.1.3.3. Mpumalanga
Northern FAP and Draft
Scheme incl. MR385
Corridor Precinct Plan
Francis
Ngcobo
% Draft Conceptual
Framework Plan
prepared by 30 June
2018
25 59J
The consultants were
requested to undertake
multiple phases in
paralell due to
budgetary constraints.
Attendance register, Minutes
for stakeholder needs
assessment, Draft status quo
report,, Attedance register
and minutes for the
PSC,Emails, final Status Quo
Report, Stakeholder
Workshop attendance
register and minutes
Evidence sent to PME
1.1.4.1. Central &
Scheme Review
Justin Rajan % Central Scheme Report
prepared by 30 June
2018
25 25J
Attendance registers, working
Central Scheme Document
and inception report.
Evidence availble at my office and Sindis office.
1.1.4.2. Student
Accomodation Precinct
Shikar Singh % Student Accomodation
Precinct Plan prepared by
30 June 2018
25 25J
Final situational analysis and
status quo report, minutes
and attendance register
Evidence to be obtained in Sindi's office
Plan 1 :Develop and Sustain our Spatial, Natural and Built Environment
Plan Owner: Philip Sithole
1.1. Develop
and Implement a
sustainable and
integrated
spatial planning
system
Lihle Phewa 1.1.3. Preparation of
Functional Area Plans
Helene Epstein
Lihle Phewa 1.1.4. Undertake Special
Projects
Claire Norton
Programme Programme
Driver
Project Project
Manager
Sub Project Sub Project
Owner
Unit Of
Measure
Annual Target as at
2017/2018
Quarter 1
Target as at 30
September
2017/2018
Quarter 1
Actual as at 30
September
2017/2018
Indicator Reason For Variance Steps Taken to improve
Performance
Means Of
Verification/Evidence
Comment
Chumisa
Thengwa
1.2.1. D'MOSS (Durban
Metropolitan Open Space
System) and Finescale
Systematic Conversation
Planning (SCP)
Richard Boon 1.2.1.1. Publish and
maintain D'MOSS and
the finescale Systematic
Conservation Plan.
Cameron
Mclean
% 1. Update the
Municipality's Systematic
Conservation
Assessment (SCA). 2.
Subject to Council
approval, publish a new
version of D'MOSS as
part of the town planning
schemes. 3. Publish or
review, as necessary, the
Municipality's Biodversity
Sector Plan. 4.
Incorporate D'MOSS and
the SCA into the
hierarchy of municipal
plans as required.
25 25J
Reports, comments, emails,
minutes, presentations,
advertisements, attendance
sheets (evidence uploaded
on EPMA)
1. Reviewed the World Bank’s report on the valuation of
Durban’s natural assets, and met with the lead author (Jane
Turpie, Anchor Environmental) to initiate inclusion of
ecosystem services into the next iteration of the Systematic
Conservation Assessment. 2. ECOD authority granted on 20-
07-2017 to advertise. Proposal advertised on 17 & 18-
082017 with expiry date on 02-10-2017. Public meetings
conducted between 28 & 31-08-2017. Meeting held with the
eThekwini Amakosi Forum on 15-09-2017. A number of
enquiries and objections have been dealt with in order to
minimise objections and appeals against the process. 3.
Held a meeting to discuss next steps for the Biodiversity
Strategy. The Biodiversity Strategy prepared in 16/17
identified compliance and enforcement as key to achieving
municipal biodiversity objectives. The development of an
Enforcement Strategy aligns well with this goal and will be
one of the aspects of the strategy that will be explored in the
17/18 financial year. A project team has developed a project
plan for the development of an Enforcement Strategy. 4.
Provided comment for the status quo of the Ward 105 FAP,
LAP, and draft scheme. Met with the environmental
consultant to discuss comments and agree on a way
forward. Provided comments for the Central Densification
Strategy. Provided comments for the Mpumalanga North
FAP and attended a project steering committee meeting to
workshop the way forward.
1.2.2.1. Fire and
Invasive Species
Control Programme.
Bongani
Zungu
% Fire and Invasive Species
Control: Construction of
new Ecology Base at
Assagay
10 10J
CSA 2752-Assagay EMC-
Site Plan 2017; Meeting
munites with Architecture
(including e-mail
communication) and Report
to ECOD to request the listing
of the project on Capex
Budget (evidence uploaded
on EPMA)
An update meeting with Architecture confirmed that project
was making progress. A report was drafted for ECOD as
the project, although previously approved, did not appear on
this year's CAPEX budget.
1.2.2.2. Community
Reforestation
Programmes
Errol
Douwes
% Community Reforestation
Programmes:
Reforestation Hub;
Infrastructure upgrades
20 20J
Meeting minutes,
appointment letter, report to
BAC (evidence uploaded on
EPMA)
Work on Centre of Excellence is on track, and vehicle
acquisition is in progress
Chumisa
Thengwa
1.2.3. Land Acquisition and
rezoning to secure critical
environmental assets
Richard Boon 1.2.3.1. Acquire land
identified for possible
acquisition
Bhekizizwe
Mdletshe
% Select sites for acquisition
and obtain authority and
purchase land. 100% of
budget spent by the end
of the financial year.
25 25J
Minutes of meetings, office
memo, table showing
2017/2018 selected
properties, report to Council
(evidence uploaded on
EPMA)
Properties have been selected and prioritised for acquisition
in the 2017/2018 financial year. A report to obtain Council
authority has been drafted and will be tabled at the ECOD
meeting in October 2017. Requests for valuations have
been sent to the Real Estates Department; some of the
valuations will be done by private valuers. The
Environmental Acquisition Liaison meeting was held in
August 2017 to discuss budget and 2017/2018 acquisition
projects.
Chumisa
Thengwa
1.2.4. Regular state of
biodiversity reporting
Richard Boon 1.2.4.1. Produce an
annual State of
Biodiversity report
Natasha
Govender
% Produce the State of
Biodiversity report, submit
to the Economic
Development & Planning
committee for noting and
present at the Biodiversity
forum by 30 June 2018
40 40J
Data collection database;
word documents of 1) Advert,
2) Terms of Reference, and
3) Draft write up initiation
(evidence uploaded on
EPMA)
1. Data has been collected from internal (Restoration
Ecology and Biodiversity Planning Branches) and external
(Natural Resources Division, SANBI, the Energy Office, and
eThekwini Economic Development) sources. 2. - The
template for the report has been created and the write-up
has been initiated. 3. The advert and terms of reference has
been drafted. A PQ number has been requested.
1.2. Ensure the
long term
sustainability of
the natural
resource base
Chumisa
Thengwa
1.2.2. Large scale
programmes for
implementation of biodiversity
and climate protection, and
for green job creation
Errol Douwes
Programme Programme
Driver
Project Project
Manager
Sub Project Sub Project
Owner
Unit Of
Measure
Annual Target as at
2017/2018
Quarter 1
Target as at 30
September
2017/2018
Quarter 1
Actual as at 30
September
2017/2018
Indicator Reason For Variance Steps Taken to improve
Performance
Means Of
Verification/Evidence
Comment
1.2.5.1. Strategic
Environmental
Assessment (SEA)
Joanne
douwes
% 1) Implement the SEA; 2)
Integrate critical outputs
from the SEA into the
major review of the
Spatial Development
Framework in 2018.
25 25J
The previous Section 36
contract with the University of
KwaZulu Natal was cancelled
due to a breach on the
agreement. As a result of
this, non-award was declared
for the stakeholder
engagement contract that
was undergoing procurement.
Letters of non-award have
been issued to all tenderers.
A new procurement process
has commenced for a service
provider to undertake the
Strategic Environmental
Assessment for eThekwini
Municipality.(evidence
uploaded on EPMA)
1.2.5.2. Durban's 100
Resilient Cities
Programme
Joanne
douwes
% 1) Finalise Council
approval of Durban's
Resilience Strategy; 2)
Begin implementation of
Durban's Resilience
Srategy through relevant
engagement with
stakeholders to
implement work plans
proposed for the
Resilience Building
Options in the Resilience
Strategy; 3) Develop a
monitoring and
evalulation plan to track
progress on the
implementation of the
Resilience Strategy; 4)
Continue implementation
of 100RC pilot projects
where relevant
(Resilience Framework
pilot project, Biodiversity
Skills pilot); 5)
Consolidate learnings
from 100RC pilot projects
that have concluded (e.g.
Take Back our Rivers
pilot)
25 25J
Durban's Resilience Strategy
was approved by Council in
August 2017. The 100RC
Multi-stakeholder Reference
group for RBO 1:
Collaborative informal
settlements action was
convened to understand the
current work being done by
the various stakeholders in
relation to each of Durban's
Resilience strategy outcomes
and to understand what role
Durban's 100RC Team can
play to support this work.
Durban’s Resilience Strategy
was circulated to local
Durban stakeholders in
September 2017. The 100RC
pilot projects- the Resilience
Framework pilot project and
Biodiversity Skills pilot
continue to make steady
progress.(evidence uploaded
on EPMA)
1.2. Ensure the
long term
sustainability of
the natural
resource base
Chumisa
Thengwa
1.2.5. Influence city planning
to address environmental
sustainability and resilience
Joanne
douwes
Programme Programme
Driver
Project Project
Manager
Sub Project Sub Project
Owner
Unit Of
Measure
Annual Target as at
2017/2018
Quarter 1
Target as at 30
September
2017/2018
Quarter 1
Actual as at 30
September
2017/2018
Indicator Reason For Variance Steps Taken to improve
Performance
Means Of
Verification/Evidence
Comment
Sbu Ndebele 1.3.1. Meet scorecard
stipulated processing time
frames for applications
Richard
Holgate
% 99% applications
submitted are on target in
terms of National Building
Regulations (30 days for
applications less than
500m2 and 60 days for
applications greater than
500m2)
99 100J
1. Plan Tracker register and
report 2. application form and
receipt. 3 Decision record.
decision notice 4 Resub
confirmation 5 Approval
stamp 6 consolidated stats
(evidence uploaded on
EPMA)
Sbu Ndebele 1.3.2. Enhance signage
opportunities on Council
owned assets and provide
support to Citywide
Programs (a) Clean My City
Campaign (b) UMZ
Ntombi Maema % Two advertising tenders
to be finalised (100%)
25 25J
BSC Report (evidence
uploaded on EPMA)
Sbu Ndebele 1.3.3. Inspect 100% of
identified completed buildings
in compliance with the
approved plans are initiated
for valuation and rating
purposes within 30 days from
date of entry on the
valuations register.
Daniels
Pentasaib
% Inspect 100% of identified
completed buildings and
initiate the process for the
valuation of buildings for
rating purposes within 30
working days from date
eligible for valuation.
100 100J
Collated monthly reports ,
Valuations register and
occupation certificates
Evidence is too large to be uploaded. It will be obtained in
Project Manager's Office
Sbu Ndebele 1.3.4. Provide an
Enforcement and
Prosecution response to
Citywide Programs (a)
Clean My City Campaign
(b) UMZ
Abdull
Domingo
% A full statement or spot
summons submitted to
Metro Police within 21
days for 100% of all
prosecuted cases
100 100J
Stats _BPM - Fines
Processing System (Metro
Police)
The evidence is too large to be uploaded. It will be
obtained in Steven/Abdull's office
Chumisa
Thengwa
1.4.1. Implementation of the
Durban Adaptation Charter
(DAC).
Sean
O'donoghue
% Implement DAC work
programme with local &
international partners
25 25J
Lusaka Learning Exchange
visit planning,CKZNCCC
Engagement (evidence
uploaded on EPMA)
Chumisa
Thengwa
1.4.2. Facilitate the
implementation of the Durban
Climate Change
Strategy(DCCS)
Sean
O'donoghue
% Develop sector based
implementation plans for
the DCCS
25 25J
Minutes for Sector Plan
Development, Council
Approval for the
Development for
Implementation Plan - C40
(evidence uploaded on
EPMA)
1.3. Manage
and regulate the
built
environment
1.4. Develop
and implement a
Municipal
Climate
Protection
Programme
Programme Programme Driver Project Project Manager Sub Project Sub Project
Owner
Unit Of
Measure
Annual Target as at
2017/2018
Quarter 1
Target as at
30
September
2017/2018
Quarter 1
Actual as at
30
September
2017/2018
Indicator
Ajiv Maharaj 2.1.1. Providing a strategic economic
framework
Ajiv Maharaj 2.1.1.1. Review Economic Growth
and Job-Creation Strategy for
2018_19
Ajiv Maharaj % Revised Economic Growth
and Job-Creation Strategy
25 25 J
2.1.2.1. Produce Quarterly EDGE
Publications
Tshegang
Chipeya
% 4 Publications (100%) 25 25 J
2.1.2.2. Organize Quarterly EDGE
Seminars/ events
Tshegang
Chipeya
% 4 Seminars (100%) 25 25 J
2.1.2.3. State of the Economy Report
Presentation
Tshegang
Chipeya
% Electronic Report 0 0 A
Ajiv Maharaj 2.1.3. Ease of Doing Business Mimi Ndokweni 2.1.3.1. Study on the ease of doing
business
Mimi Ndokweni % Report 0 0 J
Ajiv Maharaj 2.1.4. Industrial revitalisation Nuthan Maharaj 2.1.4.1. Industrial Revitalisation
Study
Nuthan Maharaj % Report 10 10 J
Ajiv Maharaj 2.2.1. Facilitation of Innovation
Programme
Aurelia Albert 2.2.1.1. Facilitation of Innovation
Programme
Aurelia Albert % Close-out report 0 0 A
2.3.1.1. Proactive and reactive
alternate and standard advertising in
existing framework
Farah Dawood % Minimum 20% of Annual
Budget invested in
alternative investment
marketing channels by year
end
25 25 J
2.3.1.2. Diplomatic Community
Investment Promotion Campaign in
Cape Town, plus existing network
Farah Dawood % Host an event/s in
continuation of the existing
investment promotion
campaign active to the
Diplomactic community
25 25 J
Plan 2 :Developing a Prosperous, Diverse Economy and Employment Creation
Plan Owner: Philip Sithole
2.1. Provide Economic
Intelligence and a Strategic
Economic Framework
Ajiv Maharaj 2.1.2. Provide economic intelligence Tshegang
Chipeya
2.2. Innovation
Programme
2.3. Investment Promotion
and facilitation Russell Curtis 2.3.1. Investment Promotion and
Marketing
Farah Dawood
Programme Programme Driver Project Project Manager Sub Project Sub Project
Owner
Unit Of
Measure
Annual Target as at
2017/2018
Quarter 1
Target as at
30
September
2017/2018
Quarter 1
Actual as at
30
September
2017/2018
Indicator
2.3.1.3. Maintenance of web platform
plus active campaigning of the
refreshed brand thereon
Farah Dawood % To continue the exisiting
online campaign of
promoting Durban as an
investment Destination
worldwide and promote the
services of the investment
Promotion Office in Durban
25 25 J
2.3.2.1. Implement Investment
Promotion Strategy plus
Implementation Plan
Joseph Mazibuko % Implement two projects
from the investment
Promotion Strategy
25 25 J
2.3.2.2. Prepare and conduct an
outbound FDI mission to Europe or
USA
Kajal Singh % To implement the FDI
business engagement by
June 2018
25 25 J
2.3.2.3. To conduct an FDI investor
survey for Businesses located
within selected Priority sectors
Kajal Singh % An FDI Database 25 10 L
2.3.3.1. BR&E Program extension in
current targeted areas
Sibusiso
Makhathini
% Extended Program in
current area with Business
structure engaged/formed
& Council line Depts.
locked in by year end
25 25 J
2.3.3.2. Continued activation of the
existing Business Investor
Engagement Strategy and Action
Plan
Sibusiso
Makhathini
% To implement the Action
Plan in respected of
selected key investors by
year-end
25 25 J
2.3.3.3. Identify, explore and project-
package two new FDI opportunities
in ICT or existing clusters
Sibusiso
Makhathini
% To identify two new FDI
opportunities and project-
manage them for actioning
by departmental project
managers by year-end
25 25 J
2.3. Investment Promotion
and facilitation Russell Curtis 2.3.1. Investment Promotion and
Marketing
Farah Dawood
Russell Curtis 2.3.2. Foreign Direct Investment
Strategic Action Plan
Joseph Mazibuko
Russell Curtis 2.3.3. Local existing Investor Support Sibusiso
Makhathini
Programme Programme Driver Project Project Manager Sub Project Sub Project
Owner
Unit Of
Measure
Annual Target as at
2017/2018
Quarter 1
Target as at
30
September
2017/2018
Quarter 1
Actual as at
30
September
2017/2018
Indicator
Philip Sithole 2.4.1. Point Waterfront Afika Ndima % 100% achievement of
projects as outlined in the
Project Plans
15 0 L
Philip Sithole 2.4.2. Warwick Junction Themba
Masimula
% 100% achievement of
projects as outlined in the
Project Plans
25 25 J
2.4.3.1. Cornubia Retail Facility Steven Angelos % 100% achievement of
projects as outlined in the
Project Plans
50 34 L
2.4.3.2. Flanders Drive Upgrade Steven Angelos % 100% achievement of
projects as outlined in the
Project Plans
100 90 L
Philip Sithole 2.4.4. Dube TradePort Steven Angelos % 100% achievement of
projects as outlined in the
Project Plans
25 25 J
Philip Sithole 2.4.5. Southern Densification Corridor
(Kind Edward, Montclair, Umlazi)
Zakhi Mkhize % 100% achievement of
projects as outlined in the
Project Plans
25 0 L
Philip Sithole 2.4.6. Keystone Phase Two Zakhi Mkhize % 100% achievement of
projects as outlined in the
Project Plans
25 0 L
Soobs Moonsamy 2.5.1. Facilitate Revitalization of the
Inner City
Afika Ndima 2.5.1.1. Beachfront upgrade Afika Ndima % Implementation of projects 10 0 L
Soobs Moonsamy 2.5.2. Inner-City LAP, Regeneration
Strategy & Implementation Plan
Zakhi Mkhize 2.5.2.1. Pixley ka Seme, Anton
Lembede and Mahatma Gandhi
Rejuvenation
Zakhi Mkhize % Draft Inner-City
Regeneration Strategy
25 0 L
Takalani Rathiyaya 2.6.1. Automotive Sector
Development Support
Ravesha
Govender
2.6.1.1. Automotive Sector
Development Programmes
Ravesha
Govender
% Facilitate the
Implementation of
Automative Sector
Development Programmes
25 25 J
2.4. Catalytic Projects
Philip Sithole 2.4.3. Cornubia Steven Angelos
2.5. Urban Renewal
2.6. Stimulate key sectors
that promote economic
growth and create jobs
through providing support
for prioritised sectors
Programme Programme Driver Project Project Manager Sub Project Sub Project
Owner
Unit Of
Measure
Annual Target as at
2017/2018
Quarter 1
Target as at
30
September
2017/2018
Quarter 1
Actual as at
30
September
2017/2018
Indicator
Takalani Rathiyaya 2.6.2. Chemical Sector Development
Support
Ravesha
Govender
2.6.2.1. Durban Chemical Sector
Development Programmes
Ravesha
Govender
% Facilitate the
Implementation of the
Chemicals Sector
Development Programmes
25 25 J
Takalani Rathiyaya 2.6.3. Maritime Sector Development
Support
Nomalanga
Sokhela
2.6.3.1. eThekwini Maritime Sector
Development Programmes
Nomalanga
Sokhela
% Facilitate the
Implementation of the
Maritime Sector
Development Programmes
25 25 J
Takalani Rathiyaya 2.6.4. Furniture Sector Development
Support
Anu Pather 2.6.4.1. Furniture Sector
Development Programmes
Anu Pather % Facilitate the
implementation of the
Furniture Sector
Development Programmes
25 25 J
Takalani Rathiyaya 2.6.5. Clothing and Textile Sector
Development Support
Anu Pather 2.6.5.1. Clothing and Textile Sector
Development Programmes
Anu Pather % Facilitate the
Implementation of the
Clothing and Textile Sector
Development Programmes
25 25 J
2.6.6.1. Edamame Soya Bean
Programmes
Phakamile
Mbonambi
% Facilitate the
Implementation of the
Edamane Soya Bean
Initiative Development
Programmes
25 25 J
2.6.6.2. Agri-Park Sivani Pather % Implementation of project
plan
25 25 J
Takalani Rathiyaya 2.6.7. Business Process Outsourcing
Initiative
Simanga
Magwenyane
2.6.7.1. Business Process
Outsourcing Initiative
Simanga
Magwenyane
% Facilitate the Finalisation
and Implementation of the
BPO Development
programmes
25 25 J
2.6.8.1. SmartXchange ICT
Incubator
Simanga
Magwenyane
% Facilitate the
Implementation of the ICT
Business Incubation
Programmes
25 25 J
2.6.8.2. ICT FORUM Simanga
Magwenyane
% Facilitate the Convening of
the ICT Forum
25 25 J
2.6. Stimulate key sectors
that promote economic
growth and create jobs
through providing support
for prioritised sectors
Takalani Rathiyaya 2.6.6. Agri Processing Sector
Development Support
Phakamile
Mbonambi
Takalani Rathiyaya 2.6.8. ICT Sector Initiatives Simanga
Magwenyane
Programme Programme Driver Project Project Manager Sub Project Sub Project
Owner
Unit Of
Measure
Annual Target as at
2017/2018
Quarter 1
Target as at
30
September
2017/2018
Quarter 1
Actual as at
30
September
2017/2018
Indicator
Takalani Rathiyaya 2.6.9. Durban Leisure, Entertainment
and Tourism Sector Development
Gary Cullen 2.6.9.1. Durban Leisure,
Entertainment and Tourism Sector
Development Programmes
Gary Cullen % Facilitate the Development
of the Durban Leisure,
Entertainment and Tourism
Sector Development
Programmes
25 25 J
2.6.10.1. Durban Green Corridor Gary Cullen % Facilitate the
Implementation of the
Durban Green Corridor Eco-
Tourism Programmes
25 25 J
2.6.10.2. Waste Materials Recovery
Industry Development Programmes
Phakamile
Mbonambi
% Facilitate the
Implementation of the
Waste Materials Recovery
Industry Development
Programmes
25 25 J
Takalani Rathiyaya 2.6.11. Sector Advisory Programme Shivani Naicker % Facilitate the roll out of a
industrial census for the
eThekwini region
20 20 J
2.7.1.1. Develop a programme to
ensure the integration of women into
the economy (Women Empowerment
Programme)
Nonku Mthembu % 100% 40 40 J
2.7.1.2. Access to information
Empowerment Workshops
Nelisa Mshengu % 100% 40 40 J
2.7.1.3. BEE Workshops Nonhle Memela % 100% 20 20 J
2.7.1.4. Support to enterprise Nonku Mthembu % 100% 30 35 J
Philip Sithole 2.7.2. Fashion Development Program Thulani Nzama 2.7.2.1. Durban Fashion Fair Sindi Shangase % Implementation of
Programmes
60 70 J
Philip Sithole 2.7.3. Creative Arts Development
Program
Thulani Nzama 2.7.3.1. Arts and Craft Sector
Development
Sindi Shangase % 100% 25 25 J
2.6. Stimulate key sectors
that promote economic
growth and create jobs
through providing support
for prioritised sectors
Takalani Rathiyaya 2.6.10. Green Economy Sector
Development Support
Gary Cullen
2.7. Facilitating Industry
Skills and Economic
Inclusion
Philip Sithole 2.7.1. Implementation of
Empowerment initiatives
Thulani Nzama
Programme Programme Driver Project Project Manager Sub Project Sub Project
Owner
Unit Of
Measure
Annual Target as at
2017/2018
Quarter 1
Target as at
30
September
2017/2018
Quarter 1
Actual as at
30
September
2017/2018
Indicator
Philip Sithole 2.7.4. Construction Development
Program
Thulani Nzama 2.7.4.1. Construction Development
Program
Nonhle Memela % Implementation of
Development Programmes
45 45 J
2.7.5.1. Tourism Enterprise
Development
Nelisa Mshengu % 100% 20 20 J
2.7.5.2. Rural and eco-tourism
product development (Hazelmere
Dam; Valley of 1000 Hills;
Umgababa)
Nelisa Mshengu % 100% 25 25 J
2.7.5.3. Developing cultural and
heritage tourism (e.g. Inanda
Heritage Route)
Nelisa Mshengu % 100% 25 25 J
2.7.5.4. Promoting SMMEs through
tourism
Nelisa Mshengu % 100% 25 25 J
Philip Sithole 2.8.1. Provide support to the informal
economy
Michael Hlangu 2.8.1.1. Provide infrastructure
support and development to informal
trade
Michael Hlangu % 100% 25 25 J
2.9.1.1. Development of Sales Hall Sipho Jwara % Completion of internal
redecoration and
replacement of ammonia
coils
15 3 L
2.9.1.2. Development of Distribution
Facilities
Kumeras Naidoo % Completion of Traders Hall
Upgrade
50 50 J
2.9.1.3. Gatehouse Shelter Sipho Jwara % Extended roof cover over
the gatehouse at the
entrance of the Market
complete
20 20 J
2.9.1.4. Ripening Holding Facility Kumeras Naidoo % Completion of Ripening
Holding Facility
15 10 L
Philip Sithole 2.9.2. Providing a platform to enable
the Sale of Fresh Produce
Jason Moonsamy Days Total number of trading
days achieved
77 77 J
2.7. Facilitating Industry
Skills and Economic
Inclusion
Philip Sithole 2.7.5. Tourism Development
Program
Thulani Nzama
2.8. Managing the Informal
Economy
2.9. Managing the Bulk
Fresh Produce market Philip Sithole 2.9.1. Enhancement of Facility Andre Young
Programme Programme Driver Project Project Manager Sub Project Sub Project
Owner
Unit Of
Measure
Annual Target as at
2017/2018
Quarter 1
Target as at
30
September
2017/2018
Quarter 1
Actual as at
30
September
2017/2018
Indicator
David Lievaart 2.10.1. Expanded Public Works
Programme
Sbu Chamane 2.10.1.1. The number of work
opportunities (i.e. 230 person days-
FTES) created through the municipal
capital and operating budget per line
dept. this year.
Sbu Chamane Number 8208 work opportunities
created
1000 1259 J
2.11.1.1. Enterprise Development
and Business Linkages
Nonhle Memela % 100% 30 30 J
2.11.1.2. Strategic Partnerships Nonhle Memela % 100% 30 30 J
2.11.2.1. Durban Business Fair and
Regional Business Fairs
Nonku Mthembu % 100% 20 20 J
2.11.2.2. Rural and Township Retail
Development (Retail centres and
spaza shops)
Nelisa Mshengu % 100% 25 25 J
2.11.2.3. Access to finance Nonhle Memela % 100% 20 20 J
2.11.2.4. Sister Cities Programme Sindi Shangase % 100% 30 30 J
2.11.2.5. Ink Construction Incubation
Program
Nonhle Memela % 100% 35 35 J
2.11.2.6. Cooperative Development
Programme
Nonhle Memela % 100% 20 20 J
2.11.2.7. Construction Indaba
2017/18
Nonhle Memela % 100% 20 20 J
Antoinette Monty 2.12.1. Marketing & Communications Mbalenhle
Gumede
2.12.1.1. 1. Marketing Strategy
2.Communications Plan
Mbalenhle
Gumede
% Implementation of Annual
Projects as outlined in the
individual Performance
Plans
30 30 J
Antoinette Monty 2.12.2. Market Access and Audience
Development
Antoinette Monty 2.12.2.1. Durban FilmMart Mbalenhle
Gumede
% Implementation of Annual
Projects as outlined in the
individual Performance
Plans
25 25 J
Thulani Nzama
2.10. Socio-Economic
Development through the
creation of sustainable jobs
within various sectors.
2.11. Enterprise and sector
Development Philip Sithole 2.11.1. Facilitate strategic
partnerships (including public-private
partnerships) to support Enterprise
Development
Thulani Nzama
Philip Sithole 2.11.2. Provision of Support Services
to Small Enterprises and
Cooperatives
2.12. Special Purpose
Vehicle to support, market
and promote the local film
and digital media industry.
Programme Programme Driver Project Project Manager Sub Project Sub Project
Owner
Unit Of
Measure
Annual Target as at
2017/2018
Quarter 1
Target as at
30
September
2017/2018
Quarter 1
Actual as at
30
September
2017/2018
Indicator
Antoinette Monty 2.12.3. Development Programmes Fezile Peko 2.12.3.1. 1.Development Grant
Programmes; 2. Micro Budget
Programmes
Sibongiseni
Shangase
% Implementation of Annual
Projects as outlined in the
individual Performance
Plans
30 30 J
Antoinette Monty 2.12.4. Strategic Projects Antoinette Monty 2.12.4.1. 1.Location Development
2.Sector Strategy
Fezile Peko % Implementation of Annual
Projects as outlined in the
individual Performance
Plans
25 25 J
2.13.1.1. Brand and destination
positioning through Events and MICE
sponsored by the City
Zandile Mthembu % Reports detailing the
impact of the specific
events
25 0 L
2.13.1.2. Manage 100 site
inspectioins for verification of
product quality as a tourist offering
Roshni Mehta % Site Inspection Reports 25 25 J
2.13.1.3. Conduct 4 socio economic
impact assessments
Roshni Mehta % Four Socio-economic
impact assessment reports
25 25 J
2.13.1.4. Brochure Distribution Sibusiso
Mngoma
% Distribution Reports 25 25 J
2.13.1.5. Conference Support Sibusiso
Mngoma
% Reports detailing the
support rendered to
Conferences
25 25 J
2.13.1.6. Cruise Industry support Sibusiso
Mngoma
% Report detailing the nature
of support to the Cruise
Industry
0 0 A
2.13.1.7. Domestic Trade and
Consumer travel shows
Sibusiso
Mngoma
% Reports outllining details of
Trade and Consumer
Travel Shows Attended
25 25 J
2.13.1.8. Enhance the perception of
Durban as a tourism destination
online/web presence globally
Siphokazi
Mxinwa
% Report detailing number of
visits/hits, etc. on the
Durban website and
number of information
quieries.
25 0 L
2.13.1.9. Radio, TV and print
communications nationally & globally
(SABC Radio, TV, Print media and
CNBC)
Mayasree
Moodley
% Report listing the nature
and number of
communications through
the various media
resources.
30 30 J
Philip Sithole
2.12. Special Purpose
Vehicle to support, market
and promote the local film
and digital media industry.
2.13. Tourism Marketing
Philip Sithole 2.13.1. Expansion of the Tourism
Sector
Programme Programme Driver Project Project Manager Sub Project Sub Project
Owner
Unit Of
Measure
Annual Target as at
2017/2018
Quarter 1
Target as at
30
September
2017/2018
Quarter 1
Actual as at
30
September
2017/2018
Indicator
2.13.1.10. Broaden the Destination
footprint through the entire European
region
Meryl Mbuli % Report Outlining the
marketing material and list
of sources in which it was
advertised
25 25 J
2.13.1.11. Strategically position the
city of Durban as a "must visit
tourism destination" in America
Ntombenhle
Dlamini
% Report Outlining the nature
and number of marketing
initiatives in American
media
25 25 J
2.13.1.12. Strategically position the
city of Durban as a "must-see
tourism destination" in Asia
Ntombenhle
Dlamini
% Report on the leveraging of
Sports Partnerships in the
City
50 50 J
2.13.2.1. Australia Trade &
Consumer Mission
Melusi Khumalo % Reports describing the
participation in the
Australian Trade and
Consumer Mission
25 25 J
2.13.2.2. Destination Profiling in key
Africa Countries
Melusi Khumalo % Report outlining the number
of marketing initatives in
key African countries
25 25 J
2.13.2.3. Strategic Domestic
Marketing in key regions i.e Gauteng
Melusi Khumalo % Report detailing marketing
initiatives in Gauteng
25 25 J
Lennard Baars 2.14.1. Town Centre Renewals Vuyolwethu Jayiya % 75% implementation of
Town Cente Projects as per
unit Sub-Projects Plan
10 0 L
Lennard Baars 2.14.2. Tourism Nodes & Corridor Nkululeko Mkhize % 75% implementation of
Tourism Nodes and
Corridors Development
Projects as per Department
Sub Project Plan
20 0 L
Philip Sithole
Philip Sithole 2.13.2. Marketing of eThekwini as a
Tourism Destination
Philip Sithole
2.14. Promoting investment
in priority nodes and
corridors
2.13. Tourism Marketing
Philip Sithole 2.13.1. Expansion of the Tourism
Sector
Programme Programme Driver Project Project Manager Sub Project Sub Project
Owner
Unit Of
Measure
Annual Target as at
2017/2018
Quarter 1
Target as at
30
September
2017/2018
Quarter 1
Actual as at
30
September
2017/2018
Indicator
Lennard Baars 2.15.1. Neighbourhood Development
(NDPG)
Peter Gilmore % 75% Implementation of
NDPG funded projects as
per Department Sub-
project plan
10 10 J
Lennard Baars 2.15.2. Rural Development Nkululeko Mkhize % Magabheni, 100%
completion of Government
Mall, Mbululu 100%
completion
10 10 J
2.15. Ensuring Township
Development
Programme Programme Driver Project Project Manager Sub Project Sub Project
Owner
Reason For Variance Steps Taken to improve
Performance
Means Of Verification/Evidence Comment PME Comment
Ajiv Maharaj 2.1.1. Providing a strategic economic
framework
Ajiv Maharaj 2.1.1.1. Review Economic Growth
and Job-Creation Strategy for
2018_19
Ajiv Maharaj Report outlining preparatory notes for
update of the Strategy
2.1.2.1. Produce Quarterly EDGE
Publications
Tshegang Chipeya SOE EDGE Publication and Project Plan 25
2.1.2.2. Organize Quarterly EDGE
Seminars/ events
Tshegang Chipeya Attendance Reg, Invite, Programme,
Motivation to CM Signed.
Achieved.
2.1.2.3. State of the Economy Report
Presentation
Tshegang Chipeya Annual
Ajiv Maharaj 2.1.3. Ease of Doing Business Mimi Ndokweni 2.1.3.1. Study on the ease of doing
business
Mimi Ndokweni This is an Annual Target Not applicable on this
Quarter (Q1)
Ajiv Maharaj 2.1.4. Industrial revitalisation Nuthan Maharaj 2.1.4.1. Industrial Revitalisation Study Nuthan Maharaj 2 Reports attached
Ajiv Maharaj 2.2.1. Facilitation of Innovation
Programme
Aurelia Albert 2.2.1.1. Facilitation of Innovation
Programme
Aurelia Albert This is an Annual target
2.3.1.1. Proactive and reactive
alternate and standard advertising in
existing framework
Farah Dawood
2.3.1.2. Diplomatic Community
Investment Promotion Campaign in
Cape Town, plus existing network
Farah Dawood
2.3.1.3. Maintenance of web platform
plus active campaigning of the
refreshed brand thereon
Farah Dawood
2.3.2.1. Implement Investment
Promotion Strategy plus
Implementation Plan
Joseph Mazibuko
2.3.2.2. Prepare and conduct an
outbound FDI mission to Europe or
USA
Kajal Singh
2.3.2.3. To conduct an FDI investor
survey for Businesses located within
selected Priority sectors
Kajal Singh PM Kajal Singh returned to
her substantive post in July
2017 to Planning
department.
Project to be deleted at
MTAs
PM Kajal Singh returned to
her substantive post in
July 2017 to Planning
department.
2.3.3.1. BR&E Program extension in
current targeted areas
Sibusiso
Makhathini
2.3.3.2. Continued activation of the
existing Business Investor
Engagement Strategy and Action
Plan
Sibusiso
Makhathini
2.3.3.3. Identify, explore and project-
package two new FDI opportunities
in ICT or existing clusters
Sibusiso
Makhathini
Plan 2 :Developing a Prosperous, Diverse Economy and Employment Creation
Plan Owner: Philip Sithole
2.1. Provide Economic
Intelligence and a Strategic
Economic Framework
Ajiv Maharaj 2.1.2. Provide economic intelligence Tshegang
Chipeya
2.2. Innovation Programme
2.3. Investment Promotion
and facilitation Russell Curtis 2.3.1. Investment Promotion and
Marketing
Farah Dawood
Russell Curtis 2.3.2. Foreign Direct Investment
Strategic Action Plan
Joseph Mazibuko
Russell Curtis 2.3.3. Local existing Investor Support Sibusiso
Makhathini
2.4. Catalytic Projects
Philip Sithole 2.4.1. Point Waterfront Afika Ndima No reporting done this
Quarter
Philip Sithole 2.4.2. Warwick Junction Themba
Masimula
draft report to ECOD and Draft MOA
2.4.3.1. Cornubia Retail Facility Steven Angelos Project on track as per
contract. Target too
ambitious
Set more realistic targets
based on contract
timeframes
Minutes of Site Meeting Project on track, target
was too ambitious
2.4.3.2. Flanders Drive Upgrade Steven Angelos Delays experienced by
contractor on site for various
reasons
Issues outside the control
of the PM
Minutes of last site meeting Delays experienced by
contractor on site for
various reasons
Philip Sithole 2.4.4. Dube TradePort Steven Angelos Presentation showing progress of
Aerotropolis Masterplan
Ongoing facilitation on a
number of issues relating
to this programme
Philip Sithole 2.4.5. Southern Densification Corridor
(Kind Edward, Montclair, Umlazi)
Zakhi Mkhize No reporting done this
Quarter
Philip Sithole 2.4.6. Keystone Phase Two Zakhi Mkhize No reporting done this
Quarter
Soobs Moonsamy 2.5.1. Facilitate Revitalization of the
Inner City
Afika Ndima 2.5.1.1. Beachfront upgrade Afika Ndima No reporting done this
Quarter
Soobs Moonsamy 2.5.2. Inner-City LAP, Regeneration
Strategy & Implementation Plan
Zakhi Mkhize 2.5.2.1. Pixley ka Seme, Anton
Lembede and Mahatma Gandhi
Rejuvenation
Zakhi Mkhize No reporting done this
Quarter
Takalani Rathiyaya 2.6.1. Automotive Sector
Development Support
Ravesha
Govender
2.6.1.1. Automotive Sector
Development Programmes
Ravesha
Govender
Means of verification uploaded
Takalani Rathiyaya 2.6.2. Chemical Sector Development
Support
Ravesha
Govender
2.6.2.1. Durban Chemical Sector
Development Programmes
Ravesha
Govender
Means of verification uploaded
Takalani Rathiyaya 2.6.3. Maritime Sector Development
Support
Nomalanga
Sokhela
2.6.3.1. eThekwini Maritime Sector
Development Programmes
Nomalanga
Sokhela
Board Pack (agenda, minutes, reports,
financials, attendance register, projects
progress reports, clairwood land use
assessement,
Project on schedule
2.4. Catalytic Projects
Philip Sithole 2.4.3. Cornubia Steven Angelos
2.5. Urban Renewal
2.6. Stimulate key sectors
that promote economic
growth and create jobs
through providing support
for prioritised sectors
Takalani Rathiyaya 2.6.4. Furniture Sector Development
Support
Anu Pather 2.6.4.1. Furniture Sector
Development Programmes
Anu Pather Draft Bp; Quarterly reports; Business Plan
for Cluster; EXCO Agenda and Minutes;
Monthly Reports; PSC Minutes; Board
Meeting; SAFI workshop; Financials; Expo
and AGM Planning; Contract; Furniture
workshop Presentation; BEEE
Presentation; Press release; Meeting
Notes; SAFI SETA Roadshows; Invitation
SAFI AGM and Industry Event; Training
Recruitment Advert; TR Session; GIZ
Funding Proposal;BI SAFI Presentation;
DTI Furn Design Competition; TOE; Draft
MOA; Adjudication Sheet;
on track
Takalani Rathiyaya 2.6.5. Clothing and Textile Sector
Development Support
Anu Pather 2.6.5.1. Clothing and Textile Sector
Development Programmes
Anu Pather Meeting Minutes; Draft Addendum; Memo
Addendum; Letter of Addendum;
Chairperson's Nominations; Invitation to
Magic Trade Platform; Invitation to
Participate Egypt; News Briefs; AGM Pics;
CMT tour Pics; Exco Invite;
Financials(AFS); Quarterly Report;
Innovation session Invite; Ethekwini
Tranche invoice; Cluster Invoice;
Management Accounts; Newsletter; Exco
Minutes; Invitation Origin africa; C&T
Industrial Hub Presentation; Project plan;
Export study Proposal; Correspondance;
Feasibility-Hubs; KZNCTC Activity Plan;
on track
2.6.6.1. Edamame Soya Bean
Programmes
Phakamile
Mbonambi
Please provide
evidence
2.6.6.2. Agri-Park Sivani Pather Uploaded
Takalani Rathiyaya 2.6.7. Business Process Outsourcing
Initiative
Simanga
Magwenyane
2.6.7.1. Business Process
Outsourcing Initiative
Simanga
Magwenyane
Implementation plan, email
correspondance and Quarter report
Achieved
2.6.8.1. SmartXchange ICT Incubator Simanga
Magwenyane
Monthly financials, Quarter report Achieved
2.6.8.2. ICT FORUM Simanga
Magwenyane
Value chain study Achieved
Takalani Rathiyaya 2.6.9. Durban Leisure, Entertainment
and Tourism Sector Development
Gary Cullen 2.6.9.1. Durban Leisure,
Entertainment and Tourism Sector
Development Programmes
Gary Cullen
2.6.10.1. Durban Green Corridor Gary Cullen Report, POE supplied on disk Please advise where
can the evidence be
obtained from
2.6.10.2. Waste Materials Recovery
Industry Development Programmes
Phakamile
Mbonambi
Please provide
evidence
Takalani Rathiyaya 2.6.11. Sector Advisory Programme Shivani Naicker Evidence uploaded
2.6. Stimulate key sectors
that promote economic
growth and create jobs
through providing support
for prioritised sectors
Takalani Rathiyaya 2.6.6. Agri Processing Sector
Development Support
Phakamile
Mbonambi
Takalani Rathiyaya 2.6.8. ICT Sector Initiatives Simanga
Magwenyane
Takalani Rathiyaya 2.6.10. Green Economy Sector
Development Support
Gary Cullen
2.7.1.1. Develop a programme to
ensure the integration of women into
the economy (Women Empowerment
Programme)
Nonku Mthembu PR & Marketing plan and Media buying
proposal + concept document, invite,
delegation list & programme +
implementation plan + workshop
programme & attendance register + invite,
programme + attendance register
The Women Economic
Engagement took place
during the ESSENCE
Festival hence the
marketing and creative
were integrated into the
Festival's program and
planning
2.7.1.2. Access to information
Empowerment Workshops
Nelisa Mshengu 1. Schedule of Empowerment Workshop
for Q1; 2. Attendance Registers.
2.7.1.3. BEE Workshops Nonhle Memela Registers Please advise where
can the evidence be
obtained from
2.7.1.4. Support to enterprise Nonku Mthembu 2 Enterprise & Supplier
Development workshops
were done in this quarter
instead of 1. The supplier
development workshop was
scheduledfor Q2
Invites, programmes & attendance
registers + training schedule
Philip Sithole 2.7.2. Fashion Development Program Thulani Nzama 2.7.2.1. Durban Fashion Fair Sindi Shangase Essence Festival was
moved to the first quarter
Marketing and Pr Reports, Production
Report, Fashion Show schedule, Designer
Manual, Mentorship Reports, Mentorship
Registers, DFF Sales Report
Philip Sithole 2.7.3. Creative Arts Development
Program
Thulani Nzama 2.7.3.1. Arts and Craft Sector
Development
Sindi Shangase Product Development Trining Report,
attendance registers, Decorex
Johannesburg Report
Philip Sithole 2.7.4. Construction Development
Program
Thulani Nzama 2.7.4.1. Construction Development
Program
Nonhle Memela Please provide
evidence
2.7.5.1. Tourism Enterprise
Development
Nelisa Mshengu 1. TOR for Tourism Sector Transformation
through Enterprise & Supplier
Development; 2. Report on Participation of
township tour operators on the Soweto
Trade Show.
2.7.5.2. Rural and eco-tourism
product development (Hazelmere
Dam; Valley of 1000 Hills;
Umgababa)
Nelisa Mshengu TOR for Rural and Eco-Tourism Product
Development
2.7.5.3. Developing cultural and
heritage tourism (e.g. Inanda
Heritage Route)
Nelisa Mshengu
2.7.5.4. Promoting SMMEs through
tourism
Nelisa Mshengu
Philip Sithole 2.8.1. Provide support to the informal
economy
Michael Hlangu 2.8.1.1. Provide infrastructure
support and development to informal
trade
Michael Hlangu
2.9.1.1. Development of Sales Hall Sipho Jwara Due to challenges with the
implementing department,
this project will commence in
the new financial year
2018/2019
The project is not going
commence this year -
therefore there is nothing
to improve this year
Please provide
evidence of the work
done
2.9.1.2. Development of Distribution
Facilities
Kumeras Naidoo Project is in progress and target for
quarter 1 was achieved.
2.9.1.3. Gatehouse Shelter Sipho Jwara target achieved
2.7. Facilitating Industry
Skills and Economic
Inclusion
Philip Sithole 2.7.1. Implementation of
Empowerment initiatives
Thulani Nzama
Philip Sithole 2.7.5. Tourism Development
Program
Thulani Nzama
2.8. Managing the Informal
Economy
2.9. Managing the Bulk
Fresh Produce market Philip Sithole 2.9.1. Enhancement of Facility Andre Young
2.9.1.4. Ripening Holding Facility Kumeras Naidoo Delays in appointing a
consultant by implementing
department due to SCM
challenges.
Implementing department
to expedite the
appointment of the panel
consultant in order to
expedite the project
programme. Implementing
department to also
provide an action plan in
this regard.
Please provide
evidence
Philip Sithole 2.9.2. Providing a platform to enable
the Sale of Fresh Produce
Jason Moonsamy Daily Agents Sales Payments
David Lievaart 2.10.1. Expanded Public Works
Programme
Sbu Chamane 2.10.1.1. The number of work
opportunities (i.e. 230 person days-
FTES) created through the municipal
capital and operating budget per line
dept. this year.
Sbu Chamane Over achieved More FTEs will be
reported when data is
recieved and captured on
time
Over achieved Please provide a
reason for over
achieving
2.11.1.1. Enterprise Development
and Business Linkages
Nonhle Memela Please provide
evidence
2.11.1.2. Strategic Partnerships Nonhle Memela Please provide
evidence
2.11.2.1. Durban Business Fair and
Regional Business Fairs
Nonku Mthembu Project plan, marketing plan, progress
reports, exhibitors and conference
delegates lists,
2.11.2.2. Rural and Township Retail
Development (Retail centres and
spaza shops)
Nelisa Mshengu Report on the Cornubia Agribusiness
Project. 2. Cornubia Retail Centre
Progress Report.
2.11.2.3. Access to finance Nonhle Memela Please provide
evidence
2.11.2.4. Sister Cities Programme Sindi Shangase fashion show schedule, list of exhibitors,
international pavilion stand design
2.11.2.5. Ink Construction Incubation
Program
Nonhle Memela Please provide
evidence
2.11.2.6. Cooperative Development
Programme
Nonhle Memela Please provide
evidence
2.11.2.7. Construction Indaba
2017/18
Nonhle Memela Please provide
evidence
Antoinette Monty 2.12.1. Marketing & Communications Mbalenhle
Gumede
2.12.1.1. 1. Marketing Strategy
2.Communications Plan
Mbalenhle
Gumede
Available on hard copy for submission All on par
Antoinette Monty 2.12.2. Market Access and Audience
Development
Antoinette Monty 2.12.2.1. Durban FilmMart Mbalenhle
Gumede
Available on hard copy for submission All on par
Antoinette Monty 2.12.3. Development Programmes Fezile Peko 2.12.3.1. 1.Development Grant
Programmes; 2. Micro Budget
Programmes
Sibongiseni
Shangase
Available on file 11th Floor Rennie House
Antoinette Monty 2.12.4. Strategic Projects Antoinette Monty 2.12.4.1. 1.Location Development
2.Sector Strategy
Fezile Peko Available on file 11th Floor Rennie House
2.13.1.1. Brand and destination
positioning through Events and MICE
sponsored by the City
Zandile Mthembu No reporting done this
Quarter
2.13.1.2. Manage 100 site
inspectioins for verification of product
quality as a tourist offering
Roshni Mehta step one projecgt plan, step 2 walk
through survey, step 3 certificates, step 4
database of products
Thulani Nzama
2.9. Managing the Bulk
Fresh Produce market Philip Sithole 2.9.1. Enhancement of Facility Andre Young
2.10. Socio-Economic
Development through the
creation of sustainable jobs
within various sectors.
Philip Sithole
2.11. Enterprise and sector
Development Philip Sithole 2.11.1. Facilitate strategic
partnerships (including public-private
partnerships) to support Enterprise
Development
Thulani Nzama
Philip Sithole 2.11.2. Provision of Support Services
to Small Enterprises and
Cooperatives
2.12. Special Purpose
Vehicle to support, market
and promote the local film
and digital media industry.
2.13. Tourism Marketing
Philip Sithole 2.13.1. Expansion of the Tourism
Sector
2.13.1.3. Conduct 4 socio economic
impact assessments
Roshni Mehta step 1 accomodation stats analysis, step 2
easter season stats analysis of previous
season, step 3 presenation and
dissemination to management minutes
and emails
2.13.1.4. Brochure Distribution Sibusiso Mngoma Evidence uploaded Project achieved
2.13.1.5. Conference Support Sibusiso Mngoma Evidence uploaded Project achieved
2.13.1.6. Cruise Industry support Sibusiso Mngoma Annual Target
2.13.1.7. Domestic Trade and
Consumer travel shows
Sibusiso Mngoma Evidence uploaded Project Achieved
2.13.1.8. Enhance the perception of
Durban as a tourism destination
online/web presence globally
Siphokazi Mxinwa No reporting done this
Quarter
2.13.1.9. Radio, TV and print
communications nationally & globally
(SABC Radio, TV, Print media and
CNBC)
Mayasree Moodley Durban Fun Season - Kaya Fm; Radio
2000 media partnership. VDJ Media Radio
2000 - OB's. Essence Festival Durban -
CNBC Africa; Independent newspapers.
First Quarter Report
2.13.1.10. Broaden the Destination
footprint through the entire European
region
Meryl Mbuli WTM London
2.13.1.11. Strategically position the
city of Durban as a "must visit
tourism destination" in America
Ntombenhle
Dlamini
Emails, Motivation and Report (report is
available at 90 Florida Road.)
report is available at 90
Florida Road.
2.13.1.12. Strategically position the
city of Durban as a "must-see
tourism destination" in Asia
Ntombenhle
Dlamini
Emails & Report
2.13.2.1. Australia Trade &
Consumer Mission
Melusi Khumalo Durban Tourism Participation at the
Australia Roadshow Report, Participation
Confirmations.
2.13.2.2. Destination Profiling in key
Africa Countries
Melusi Khumalo SADC & Africa Trade & Media Hosting
Invitations/ Itenerary/Report
Achieved
2.13.2.3. Strategic Domestic
Marketing in key regions i.e Gauteng
Melusi Khumalo Durban Summer Launch Initiative Report/
Gauteng Activations Reports. Summer
Guide Brochure Hard Copie available at
Durban Tourism Office 90 Florida Road
Durban.
Achieved
Philip Sithole
Philip Sithole 2.13.2. Marketing of eThekwini as a
Tourism Destination
Philip Sithole
2.13. Tourism Marketing
Philip Sithole 2.13.1. Expansion of the Tourism
Sector
Lennard Baars 2.14.1. Town Centre Renewals Vuyolwethu Jayiya No reporting done this
Quarter
Lennard Baars 2.14.2. Tourism Nodes & Corridor Nkululeko Mkhize No reporting done this
Quarter
Lennard Baars 2.15.1. Neighbourhood Development
(NDPG)
Peter Gilmore
Lennard Baars 2.15.2. Rural Development Nkululeko Mkhize Two documents attached. Achieved
2.14. Promoting investment
in priority nodes and
corridors
2.15. Ensuring Township
Development
Programme Programme
Driver
Project Project Manager Sub Project Sub Project Owner Unit Of Measure Annual Target as
at 2017/2018
Quarter 1
Target as at
30 September
2017/2018
Quarter 1
Actual as at
30 September
2017/2018
Indicator Reason For Variance Steps Taken to improve
Performance
Means Of
Verification/Evidence
Comment PME Comments
3.1. New
Integrated
Housing
Development.
Beryl
Mphakathi
3.1.1. Upgrading
informal
settlements,
relocations and
greenfield
projects.
Bheki Shabane 3.1.1.1. The number of subsidized
HOUSES constructed/ built.
Bheki Shabane Number 4 688 1875 642L
Poor performance by
contractors which
lead to some of them
being terminated.
Hence there are
delays on SCM
process in regard to
appointment of new
contractors e.g.
Cornubia. Slow
progress on
installation of services
resulted in a delay on
building of top
structures e.g.
Ntuzuma D
Phase2&3, Umlazi
etc.
Turnkey panel is now in
place so SCM processes will
now be fast tracked. Some
projects will now be handed
over to Housing Engineering
in order to fast track the
installation of services.
D3 certificates available
from: Bheki Shabane DH-
Projects- 3rd Floor Shell
Hse (tel: 311-3489);
PEARL NDWALANE Snr
Manager South (tel: 311-
3025) Shell Hse 3rd Floor;
Oscar Kunene- Snr
Manger North (tel: 311-
2474) 17 Doveside Place,
Phoenix; Nontobeko
Mhlongo - Snr Manager
West (tel: 311-3448) 90
Qashana Khuzwayo(ex
Shepstone) Rd, New
Germany. Lindi Dlamini/
Phumlani Dlamini
Beryl
Mphakathi
3.1.2. Provision
of Services for
informal
settlement
upgrading &
relocations
Lorato Kegakilwe-
Piki
3.1.2.1. The number of households
benefitting from serviced sites handed
over for subsidised housing units
Ashley Roopnarian Number 3 599 1440 291L
Delayed contract
commencement due
to the lack of an
agreed relocation
plan, 1 contractor in
financial difficulties
and delayed services
relocations by line
departments.
Better planning regarding
services relocations and
household relocations,
curtailed scope of works for
the contractor in financial
difficulties and a tender is
currently out to complete the
scope of works that was
curtailed.
PM records available from
Doug Jooste 6th Floor City
Engineers (tel:311-6375)
Beryl
Mphakathi
3.1.3. Access to
Land for Housing
Dumisile Malambe 3.1.3.1. Hectares of land acquired for
Housing
Dumisile Malambe Number 300 120 0L
No funding was
provided for land
acquisitions in the
budget.
Have motivated fro R100mn
in the adjustment budget.
Awaiting approval by Exco.
Mkomazi Sibisi - Snr
Manager AdminShell Hse
Ground Floor (tel: 311-
3102) & Dumi Makhete -
Manager : land Shell Hse
3rd floor (Tel:311-3433)
Beryl
Mphakathi
3.1.4.
Occupation of
new fully
subsidised
houses
Mkhomazi Sibisi 3.1.4.1. Number of new fully subsidized
housing units allocated
Dumezweni Ngema Number 4 988 1995 821L
Number of houses
allocated are based
on keys received,
some houses, due to
threat of invasion at
Umlazi, were
relocated without
approvals which is
now in progress.
These allocations are
not included here and
will be included next
month.
The department is working
on backlogs to improve
stats, and fast tracking
approvals.
Evidence available from
Mkhomazi Sibisi - Snr
Manager Admin Shell Hse
Ground Floor (tel: 311-
3102) & Gugu Ngema
Shell Hse 1st floor (311-
3023)
How is the department
working on backlogs?
What measures or tasks
have been put in place to
ensure that stats improve
and the target is met?
3.2.1.1. CRU's - upgrading,
refurbishment, of new family units (at
existing hostels).
Walter Ngubane Number 60 family units
upgraded/
refurbished.
0 0 N/A
3.2.1.2. Construction of new family units
(at existing hostels).
Walter Ngubane Number 30 new family uits
constructed.
0 0 N/A
Plan 3 :Creating a Quality Living Environment
Plan Owner: Sipho Nzuza
3.2. Rental
Housing
Strategy
Beryl
Mphakathi
3.2.1.
CRU/Hostel
management
Yunus Sacoor
Programme Programme
Driver
Project Project Manager Sub Project Sub Project Owner Unit Of Measure Annual Target as
at 2017/2018
Quarter 1
Target as at
30 September
2017/2018
Quarter 1
Actual as at
30 September
2017/2018
Indicator Reason For Variance Steps Taken to improve
Performance
Means Of
Verification/Evidence
Comment PME Comments
3.2.2.1. Sale of rental and BNG housing Dumezweni Ngema Number 4 500 1800 610L
Double registrations,
Outstanding Sectional
Title for flats. Opening
of the Township
Register. Outstanding
high balances.
Outstanding
Regularisation of
illegals. Levy
clearance certificate
administration fee. A
standard levy
certificate fee has
been agreed with all
management and
payment before
releasing levy
clearance certificate.
Poor responses from
beneficiaries when
invited to come and
sign sales
documents. Expired
Projects and projects
not on DOHS
business Plan.
Province is attending to the
appointment of consultants
to open sectional title
registers. Title Deed
STEERCOM hasbeen
established coprising of
Deeds Office,COGTA,
PROVINCE,
CONVEYANCER, and
SURVEYOR GENERAL to
resolve the issue. Despite
application of indiplume rule
there arestill balances to be
paid and purchasers are
unable to pay these
balances. Extension of the
cut off date for the
regularisation of illegals is
being reviewed for
extension from 1 of July
1997 to 2010. Beneficiaries
will be signed up prio to
relocation to the units. In the
process of renewal of
projects contracts and align
Ethekwini Business Plan
with KZN DOHS Business
Plan.
Evidence available from
Mkomazi Sibisi - Snr
Manager Admin (tel: 311-
3102) & Sipho Ngema -
Manager Conveyancing
(tel: 311-3437) Shell Hse
2nd floor (Dayalan
Govender)
3.2.2.2. Upgrade and refurbishment of
pre-1994 housing units.
Visvanathan
Moodley
Number 160 housing units 64 166J
Over achieved. From
the financial year
2015/16 to date there
is/was a backlog of
2727 units to be
signed off by Province
of which, 1658 were
signed off in 2015/16
financial year, 749
were signed off in
2016/17 year and
Province is currently
busy signing off the
balance. The unit is
considered completed
after Province’s
signature.
Evidence available from
Vis Moodley - Project
Executive (tel: 311-3436)
Shell Hse 2nd floor.
3.2. Rental
Housing
Strategy
Beryl
Mphakathi
3.2.2. Rental
stock
rationalisation
strategy
Mkhomazi Sibisi
Programme Programme
Driver
Project Project Manager Sub Project Sub Project Owner Unit Of Measure Annual Target as
at 2017/2018
Quarter 1
Target as at
30 September
2017/2018
Quarter 1
Actual as at
30 September
2017/2018
Indicator Reason For Variance Steps Taken to improve
Performance
Means Of
Verification/Evidence
Comment PME Comments
3.3.1.1. Number of title deeds submitted
to the deeds registrar for registration for
subsidized housing
Dumezweni Ngema Number 400 160 449J
Over achieved. Title
Deeds STEERCOM
was established
comprising Deeds
Office, COGTA,
CONVEYANCER, and
SURVEYOR
GENERAL to facilitate
the Township
Establishment
process.
Mkomazi Sibisi - Snr
Manager Admin (tel: 311-
3102) & Sipho Ngema -
Manager Conveyancing
(tel: 311-3437) Shell Hse
2nd floor (Dayalan
Govender)
3.3.1.2. Number of Title Deeds issued to
owners for subsidised housing
Dumezweni Ngema Number 1250 500 259L
Due to poor response
from beneficiaries
when invited to collect
title deeds.
A rollout programme to
issue titrle deeds has been
prepared to encourage
collection of title deeds
Mkomazi Sibisi - Snr
Manager AdminShell Hse
Ground Floor (tel: 311-
3102) & Sipho Ngema
Manager 2nd Floor Shell
House. 3113473. (Dayalan
Govender)
3.3. Title Deeds
strategy Beryl
Mphakathi
3.3.1. Issuing of
Title Deeds
Mkhomazi Sibisi
Programme Programme
Driver
Project Project Manager Sub Project Sub Project Owner Unit Of Measure Annual Target as
at 2017/2018
Quarter 1
Target as at
30 September
2017/2018
Quarter 1
Actual as at
30 September
2017/2018
Indicator Reason For Variance Steps Taken to improve
Performance
Means Of
Verification/Evidence
Comment PME Comments
Beryl
Mphakathi
3.4.1. The
number of
households
benefitting from
Incremental
Services to
Informal
Settlements –
Roads and
Footpaths access
with Stormwater
controls.
Douglas Jooste Number 5000 0 0 N/A
Adrian Peters 3.5.1. Address
Service
Backlogs:
Strategy office
Ken Breetzke 3.5.1.1. Built Environment Performance
Plan produced in accordance with
National Treasury guidelines and
timeframes
Ken Breetzke % 100 0 0 N/A
3.6.1.1. The number of consumer units
provided with access to AT LEAST a
FREE basic level of potable WATER
either by means of an individual h.h.
yard supply (ground tank or metered
flow limiter connected to a yard tap) or,
for informal settlements, by a standpipe
within 200m.
Bongani Mngoma Number 10000 2500 1800L
Funding has run out.
The application for
further funding is at
an advanced stage.
The application for further
funding is at an advanced
stage.
Evidence uploaded in
system.
3.6.1.2. The number of consumer units
provided with access to AT LEAST a
FREE basic level of SANITATION by
means of a UD toilet, an existing VIP or,
for informal settlements, by means of a
toilet/ablution block within 200m.
Vusumuzi
Mkhwanazi
Number 15 000 3750 1800L
Funding has run out.
The application for
further funding is at
an advanced stage.
The application for further
funding is at an advanced
stage.
Evidence uploaded in
system.
Philemon
Mashoko
3.6.2. Demand
management
Simon Scruton 3.6.2.1. The % of non-revenue water
loss.
Devashan Govender % 39 40 24.77J
The reason for the
Variance is due to the
high Sales Figure
from RMS over the
first quarter as
compared to the
historic Sales Figures.
Evidence uploaded in
system.
3.7.1.1. The number of connections
energised and captured on Ellipse, for
provision of prepaid electricity to
residential dwellings
Jay Kalichuran Number 30 000 6000 2515L
Delays in supplier of
meters from Supplier
Top management are
engaging with suppliers.
Delivery of meters has
commenced
Connections recorded on
Ellipse
Informal settlements being
electrified. Spatial info not
readily available for deign
of networks
3.7.1.2. The number of connections
energised and captured on Ellipse, for
provision of conventional electricity to
residential dwellings
Jay Kalichuran Number 800 200 217J
Connections
dependent upon
customers meeting
requirements
Connections recorded on
Ellipse
Connections dependent
upon customers meeting
requirements
3.7.1.3. Cumulative number of
consumer units collecting FREE BASIC
ELECTRICITY
Leshan Moodliar Number 1 101 705 275426 310861J
FBE Reports / Excel
Calculation Spreadsheet
Please provide reasons for
variance.
3.4. Provision
of Incremental
Services to
Informal
Settlements -
Roads,
Footpaths,
Stormwater
control.
3.5. Address
Infrastructure
backlogs:
Strategy office
3.6. Address
Infrastructure
backlogs:
Water
Philemon
Mashoko
3.6.1. Address
Service
Backlogs: Water
Ednick Msweli
3.7. Address
Infrastructure
backlogs:
Electricity
Philemon
Mashoko
3.7.1. Address
Service
Backlogs:
Electricity
Jay Kalichuran
Programme Programme
Driver
Project Project Manager Sub Project Sub Project Owner Unit Of Measure Annual Target as
at 2017/2018
Quarter 1
Target as at
30 September
2017/2018
Quarter 1
Actual as at
30 September
2017/2018
Indicator Reason For Variance Steps Taken to improve
Performance
Means Of
Verification/Evidence
Comment PME Comments
3.8.1.1. The % of households wiith
access to a basic level of Solid Waste
Removal once a week.
Thandeka
Gwamanda
% 100 100 100J
Evidence uploaded in
system.
3.8.1.2. The % of municipal landfills in
compliance with the Environmental
Conservation Act.
John Parkin % 100 100 89.18L
The non compliance
is mainly related to
the poor water quality
and shortage of cover
material
More protection to the
monitoring boreholes will be
provided; daily cover
material will be increase to a
minimum of 150mm to
cover the waste filling by the
end of each working day.
3.9.1.1. The number of properties below
the eThekwini defined level of service
provided with STORM WATER solutions
.
Randeer
Kasserchun
Number 440 80 120J
Overachievement due
to previous and
current years storm
damage.
Evidence uploaded in
system.
3.9.1.2. The number of km of
SIDEWALK constructed.
David Thomas KM 25 2 2J
Evidence uploaded in
system.
3.9.1.3. The km of unsurfaced ROAD
converted to surfaced
David Thomas KM 10 0 0 N/A
Thami
Manyathi
3.10.1. Address
Service
Backlogs: ETA
Carlos Esteves 3.10.1.1. The number of PUBLIC
TRANSPORT RANKS constructed
Japhet Mkhabela Number 2 0 0 A
3.8. Address
Infrastructure
backlogs: CSW
Philemon
Mashoko
3.8.1. Address
Service
Backlogs: CSW
Raymond
Rampersad
3.9. Address
Infrastructure
backlogs:
Engineering
Gregory
Evans
3.9.1. Address
Service
Backlogs:
Engineering
Gregory Evans
3.10. Address
Infrastructure
backlogs: ETA
Programme Programme
Driver
Project Project Manager Sub Project Sub Project Owner Unit Of Measure Annual Target as
at 2017/2018
Quarter 1
Target as at
30 September
2017/2018
Quarter 1
Actual as at
30 September
2017/2018
Indicator Reason For Variance Steps Taken to improve
Performance
Means Of
Verification/Evidence
Comment PME Comments
3.11.1.1. Infrastructure Asset
Management Plan Water & Sanitation
Bhavna Soni % 100 0 0 A3.11.1.2. Infrastructure Asset
Management Plan Electricity
Maxwell Mthembu % 100 0 38 A Chapters 2, 3 and 4
submitted to the IMS
department.
This is an annual target.
Actual reported here is
progress made in the first
quarter.
3.11.1.3. Infrastructure Asset
Management Plan Level 2 -Roads
Provision
David Thomas % 100 0 0 A
3.11.1.4. Infrastructure Asset
Management Plan CSCM
Randeer
Kasserchun
% 100 0 0 A
3.11.1.5. Infrastructure Asset
Management Plan Solid Waste
John Parkin % 100 0 0 A The asset maangement
plan comprises of eight
section. Section one to four
has been completed. In
terms of the percentage
the plan is 43% complete.
3.11.1.6. Infrastructure Asset
Management Plans- ETA
Thami Manyathi % 100 0 0 A3.11.1.7. Infrastructure Asset
Management Plan Architecture
Nina Saunders % 100 0 0 A3.11.1.8. Infrastructure Asset
Management Plan Parks & Leisure
Thembinkosi
Ngcobo
% 100 0 0 A
3.11.1.9. Integrated Infrastructure Asset
Management Plan Bridges & Retaining
Walls
David Thomas % 100 0 0 A
3.11.1.10. Infrastructure Asset
Management Plan Information Services
Robert Dlamini % 100 0 0 A
3.11.1.11. Infrastructure Asset
Management Plan-Fleet
Malcolm Joshua % 100 0 0 A3.11.1.12. Infrastructure Asset
Management Plan uShaka
Stella Khumalo % 100 0 0 A
3.11.1.13. Infrastructure Asset
Management Plan ICC
Lindiwe Rakharebe % 100 0 0 A
3.11.1.14. Infrastructure Asset
Management Plan Moses Mabhida
Stadium
Vusi Mazibuko % 100 0 0 A
3.11.1.15. Integrated Infrastructure
Asset Management Plan for the City
David Lievaart % 100 0 0 A
Adrian Peters 3.11.2. Asset
Management
Policy
David Lievaart % Revised policies
approved by
Council
0 0 A
3.12.1.1. Public Transport Services. No.
of passengers (People with dissabilities)
using accessible scheduled public
transport services.
Japhet Mkhabela Number 50000 15000 19004J
The target was over-
achieved - service has
gained momentum,
and is attracting more
passengers with
dissabilities.
Records from the
monitoring firm
3.11.
Infrastructure
Asset
Management
Adrian Peters 3.11.1. Establish
an Asset
Management
Plan
David Lievaart
3.12.
Implement an
effective public
transport plan
for the
Municipality
Thami
Manyathi
3.12.1. Improve
public transport
Carlos Esteves
Programme Programme
Driver
Project Project Manager Sub Project Sub Project Owner Unit Of Measure Annual Target as
at 2017/2018
Quarter 1
Target as at
30 September
2017/2018
Quarter 1
Actual as at
30 September
2017/2018
Indicator Reason For Variance Steps Taken to improve
Performance
Means Of
Verification/Evidence
Comment PME Comments
3.12.1.2. Public Transport Services -
No of passengers using scheduled
public transport services
Japhet Mkhabela Number 31000000 10850000 7555197L
The target was under-
achieved - the service
has not fully
recovered since last
year's service
disruption
Measures have been put in
place to ensure that no more
disruptions are experinced.
The controls put in place
include:
Contract between
municipality & Operator-
Tansnat
municipality and the
Operator
appointed to stabilise
operations;
for revenue collection and
payment of bus services;
Records from the
monitoring firm
3.12.1.3. Road Safety Awareness
Campaign
Siphindile Ngidi Number 40 Programmes 10 12J
Overachievement is
due to dedication and
excellent performance
by the staff this
quarter.
Attached report with visual
evidence.
3.12.1.4. Construction of IRPTN on C3B
(12+to 14+)
Japhet Mkhabela % 100 100 100J
The target was
achieved
Completion Certificate
3.12.1.5. Construction of IRPTN on C3B
(9+to 12+)
Japhet Mkhabela % 100 97 100J
The final stages if the
work included the
laying of asphalt
which is an expensive
item. Asphalt can only
be laid in good clear
weather and is
dependent on the
availability of supply
from the asphalt
supplier. These
factors are taken into
account when
planning and
programming works.
During the period in
question, due to good
weather and
continuous supply of
asphalt, a better than
expected productivity
was achieved
resulting in the target
being exceeded.
Completion Certificate
3.12.1.6. Construction of ROW from
Bridge City to MR577
Japhet Mkhabela % 100 100 0L
No reporting done.
3.12.1.7. Construction of ROW Along
MR577 from M25 to the
Inanda/Malandela Intersection
Japhet Mkhabela % 100 95 100J
The target was
achieved
Completion Certificate
3.12.1.8. Construction of IRPTN corridor
along MR577 from Inanda/Malandela
Intersection to the Umgeni Viaduct
Japhet Mkhabela % 100 85 0L
No reporting done.
3.12.1.9. Traffic calming residential
streets
Eugene Naidoo Number 59 0 0 N/A
3.12.
Implement an
effective public
transport plan
for the
Municipality
Thami
Manyathi
3.12.1. Improve
public transport
Carlos Esteves
Programme Programme
Driver
Project Project
Manager
Sub Project Sub Project
Owner
Unit Of
Measure
Annual Target as
at 2017/2018
Quarter 1
Target as at
30 September
2017/2018
Quarter 1
Actual as at 30
September
2017/2018
Indicator Reason For Variance Steps Taken to
improve
Performance
Means Of
Verification/Evidence
Comment
4.1.1.1. Increase police
visibility at identified
crime hot spot areas
Ashley Dove % 100%
implementation
30 30J
Information too large to upload.
Evidence available in Room
211.
4.1.1.2. Monitoring and
evaluating the pilot
project on domestic
violence
Derrick Sawoni % 100%
implementation
10 0L
There is no project ongoing
in this regard, thus there
cannot be scoring
This is a completed
project of years ago
4.1.2.1. Implementation
of incident management
system
Director Edwards % 100%
implementation
10 10J
Information too large to upload.
Evidence available in Room
211.
4.1.2.2. Increase
enforcement on NRTA for
roadworthiness of
vehicles
Rajen Chin % 100%
implementation
25 25J
Information too large to upload.
Evidence available in Room
211.
4.1.3.1. Increase
enforcement on trucks
infringing bylaws
Director Edwards % 100%
implementation
25 25J
Information too large to upload.
Evidence available in Room
211.
4.1.3.2. Increase
enforcement in terms of
nuisance and general
bylaws in Central
business districts
Kay Naidoo % 100%
implementation
20 20J
Information too large to upload.
Evidence available in Room
211.
Martin Xaba 4.2.1. Plan and
execute activities
relating to social
policing to support
social crime
prevention in line with
Ward Safety Plans
Nomusa
Shembe
Number 60 15 15J
File is too large to upload.
Reports available in file - /Mafi
Mthiyane
Martin Xaba 4.2.2. Plan and
execute programs
relating to Social
policing to support
drug and substance
abuse in line with the
moral regeneration
plan
Nomusa
Shembe
Number 78 18 22J
Manager to provide reason
for over achievement
File is too large to upload.
Reports available in file - /Mafi
Mthiyane
Martin Xaba 4.2.3. Plan and
execute activities
relating to social
policing to support
Crime Prevention
Through
Environmental Design
Nomusa
Shembe
Number 52 13 19J
Manager to provide
reason for over
achievement
File is too large to upload.
Reports available in file - /Mafi
Mthiyane
Martin Xaba 4.2.4. Facilitate
implementation of
social development
plan
Nomusa
Shembe
% 50 13 13J
File is too large to upload.
Reports available in file -
Nomusa Shembe
Plan 4 : Fostering a Socially Equitable Environment
Plan Owner: Martin Xaba
Steven
Middleton
4.1.1. Develop and
execute Crime
Prevention Plan
Steven
Middleton
Steven
Middleton
Steven
Middleton
4.1.3. Implement the
Integrated Law
Enforcement Strategy
Steven
Middleton
4.2. Implement the
Social, Situational and
Environmental Crime
Prevention strategies
and urban safety
management of the
built environment
throughout EMA
Steven
Middleton
4.1.2. Plan and
implement the traffic
management plan
4.1. Compliance with
SAPS Amendment Act
1998 with regard to
mandated functions of
Crime Prevention,
Traffic Management
and Bylaw Enforcement
Programme Programme
Driver
Project Project
Manager
Sub Project Sub Project
Owner
Unit Of
Measure
Annual Target as
at 2017/2018
Quarter 1
Target as at
30 September
2017/2018
Quarter 1
Actual as at 30
September
2017/2018
Indicator Reason For Variance Steps Taken to
improve
Performance
Means Of
Verification/Evidence
Comment
Martin Xaba 4.2.5. Plan and
execute activities
relating to community
involvement in safety
through review and
establishment of Ward
Safety Plans
Nomusa
Shembe
Number 60 10 10J
File is too large to upload.
Reports available in file - /Mafi
Mthiyane
Vincent
Ngubane
4.3.1. Review and
implementation of
revised Disaster
Contingency Plan for
Floods
Wilfred
Mkhwanazi
% 100% 25 25J
Uploaded on the system
Vincent
Ngubane
4.3.2. Educating
communities on the
services provided by
the emergency call
centre [031] 3610000
Brenda Ndlovu % 100% 25 25J
Target achieved
within the required
time frames
Q1 Project completed
successfully
Vincent
Ngubane
4.3.3. Installation of
License Plate
Recognition Cameras
within the 4 regions.
(Central/North/South/
West)
Mervyn
Govender
% 100% 20 20J
Meeting, Meeting Register & Co-
ordinates uploaded
Quarter 1 target
achieved, evidence
uploaded
Vincent
Ngubane
4.3.4. Community
Awareness program
focusing on disaster
awareness and
disaster risk
avoidance
Wilfred
Mkhwanazi
% 100% 25 25J
Uploaded on the system
Pakade Mchunu 4.4.1. Maintain a
response fleet
replacement
programme to ensure
fleet age and condition
adequately supports
delivery of emergency
services across the
EMA region
Lance Ravidutt % 100% 15 0L
Tender CF/02/17 advertised
in 2016/17 recommended
for non-award, City Fleet to
go back out to open tender
under enquiry numbers
CF/76/17 & CF/77/17
Targets and project
plan to be amended
Q3 & Q4
Tender Specifications,
Correspondence (uploaded)
Pakade Mchunu 4.4.2. Maintain a high
value equipment
replacement
programme to ensure
age and condition of
equipment adequately
supports delivery of
emergency services
across the EMA region
Lance Ravidutt % 100% 20 60J
Late award of S5123
initiated in 2016/17 has
resulted in re-prioritisation
of requests against the
remaining capital budget
and skewed results when
compared against the
2017/18 project plan
Targets and project
plan to be amended
Q3 & Q4
Letter of Award &
Correspondence (uploaded) /
Smaller orders processed via
QMS (available from Sheri
Mackay)
4.2. Implement the
Social, Situational and
Environmental Crime
Prevention strategies
and urban safety
management of the
built environment
throughout EMA
4.3. Promoting safety of
communities within the
EMA in support of
emergency and
essential services
4.4. To reduce the
incidence and severity
of fire and other
emergencies
Programme Programme
Driver
Project Project
Manager
Sub Project Sub Project
Owner
Unit Of
Measure
Annual Target as
at 2017/2018
Quarter 1
Target as at
30 September
2017/2018
Quarter 1
Actual as at 30
September
2017/2018
Indicator Reason For Variance Steps Taken to
improve
Performance
Means Of
Verification/Evidence
Comment
Pakade Mchunu 4.4.3. Host
educational school
visits to Fire and
Emergency service
Headquarters
Pakade Mchunu Number 70 25 32J
Originals available from
Regional Secretaries, scanned
copies uploaded
Pakade Mchunu 4.4.4. Conduct Fire
safety Education for
identified risk groups
and communities
within the EMA
Alexander
Gloster
Number 200 40 42J
Source documentation available
from Alex Gloster (spreadsheet
uploaded)
Pakade Mchunu 4.4.5. Conduct a
comprehensive Fire
Safety Inspection of all
high risk occupancies
at least once in every
12 month period
Soobramoney
Pillay
Number 1200 343 344J
Additional location
identified and inspected
Pakade Mchunu 4.4.6. eThekwini Fire
training Centre (Phase
3)
Lance Ravidutt % 80% 8 0L
Phase 3 delayed in order to
have work initiated during
phase 2 completed.
Mechanical engineering
consultant placed on notice
in this regard. Elements of
work to be carried out in
phase 3 contingent upon
completion of work started
in phase 2.
Remedial work
undertaken,
awaiting works
completion, cost
estimate to be
revised
Correspondence (uploaded)
Pakade Mchunu 4.4.7. Construction of
Permanent Verulam
Fire
Lance Ravidutt % 75% 18 0L
BAC approval attained
20/02/2017, letter of award
signed 19/09/2017
Delays beyond
control of Line and
Architectural
Services (see
correspondence
uploaded), Targets
and project plan to
be amended Q3 &
Q4
Correspondence, Letter of
Award (uploaded)
Pakade Mchunu 4.4.8. Scheduled fire
station refurbishment
and renovation to
enhance and maintain
condition of existing
infrastructure (Brigade
Head Quarters)
Lance Ravidutt % 100% 38 8L
Site handover meeting held
19/07/2017 (BAC approval
27/02/2017, signed letter of
award 05/06/2017)
Delays beyond
control of Line and
Architectural
Services, Targets
and project plan to
be amended Q3 &
Q4
Site Meeting Minutes,
Contractor Report, Progress
Photos, Cashflow Reports
(uploaded)
4.4. To reduce the
incidence and severity
of fire and other
emergencies
Programme Programme
Driver
Project Project
Manager
Sub Project Sub Project
Owner
Unit Of
Measure
Annual Target as
at 2017/2018
Quarter 1
Target as at
30 September
2017/2018
Quarter 1
Actual as at 30
September
2017/2018
Indicator Reason For Variance Steps Taken to
improve
Performance
Means Of
Verification/Evidence
Comment
Pakade Mchunu 4.4.9. Project
Packaging for
Demolition and
Reconstruction of
Hammarsdale Fire
Station
Lance Ravidutt % 100% 35 0L
Appointment of professional
team for preparation of
engineering drawings and
BoQ pending finalisation of
panel
Appointment of new
panel beyond
control of Line,
request received to
submit new format
requisition
03/10/2017
(uploaded)
Concept Design, Cost Estimate
(part of 16/17 POE)
Dumisani
Bhengu
4.5.1. Plan and
execute protection
services for
councillors and
employees
Mandla Madlala % 100% 25 25J
Duty Lists, Threat Assessment
Reports iro Councillors,
Register
Dumisani
Bhengu
4.5.2. 75%
Implementation of the
Municipal Land
Invasion Policy for all
reports received
Mandla Madlala % 75% 75 75J
Compliants Register,
Dumisani
Bhengu
4.5.3. Conduct daily
inspections to ensure
that 90% of sites are
compliant with
contractual obligations
Mandla Madlala % 90% 90 98.4J
The overachievement
occurred due to the
department compelling the
Services Providers to
adhere to their contractual
obligations and if there are
any deviations, there will be
a financial penalty levied to
them, which resulted in
Service Providers
complying.
Site Visit Sheets, Electronic
Stats
Overachieved
4.6.1.1. Area asset
management plan
approved by the Head
Charmaine Blose Number 17 17 17J
Asset Plans - To be viewed at
Unit Head's Office Room 208
4.6.1.2. Area
procurement plan
approved by the Head
Charmaine Blose Number 17 17 17J
Procurement Plans -
4.6.1.3. 3Es financial
management
Charmaine Blose % 100% budget
performance in line
with budget
allocation
100 100J
Monthly Expenditure Control
Certificate - To be viewed at
Unit Head's Office Room 208
Nomakhosi
Gxagxisa
4.7.1. Conduct
community health
literacy campaigns in
each local service
area
Zinhle Buthelezi Number 17 Health literacy
campaigns
0 0 A
4.4. To reduce the
incidence and severity
of fire and other
emergencies
4.5. Ensure the safety
and security of
municipal councillors,
officials and municipal
assets
4.6. Accountable,
efficient and effective
administration
Nomakhosi
Gxagxisa
4.6.1. Strengthening
administrative systems
to improve
governance within the
health unit
Charmaine
Blose
4.7. Mass mobilisation
for better health
4.8. Provide services of
high quality in line with
set norms and
standards
Programme Programme
Driver
Project Project
Manager
Sub Project Sub Project
Owner
Unit Of
Measure
Annual Target as
at 2017/2018
Quarter 1
Target as at
30 September
2017/2018
Quarter 1
Actual as at 30
September
2017/2018
Indicator Reason For Variance Steps Taken to
improve
Performance
Means Of
Verification/Evidence
Comment
Nomakhosi
Gxagxisa
4.8.1. Improve the
quality and operational
efficiency of health
services through clinic
and environmental
health supervision that
is compliant to health
unit policy
Zinhle Buthelezi % 100% (monthly
reports for each
health facility,
environmental
office and support
sections)
100 100J
Monthly Supervision Reports -
To be viewed at Unit Head's
Office Room 208
4.9.1.1. Monitoring of
HCRW generator
Busi Grootboom % 50% of non
compliant HCRW
generators brought
to compliance
and/or legal action
instituted
0 0 A Unit data base collated from
individual area data bases.
4.9.1.2. Water quality
monitoring
Zinhle Buthelezi Number 17 water quality
monitoring plans
including
interrogation of
water quality data
as submitted by
water service
providers.
17 17J
Water Monitoring Plans - To be
viewed at Unit Head's Office
Room 208
4.9.1.3. Food safety
compliance monitoring
Neil Larratt Number 17 Audits plans for
food manufactures
and evidence
17 17J
Project not under achieved,
target incorrectly captured
Improved co-
ordination between
SD's.
1.Develop and submit KPI,
Project plan developed, defiub-
districts developed,3.Revise
preliminary audit and audit
tools.4. Training provided in the
W4 SD, 5. Audit of Star meats
N5 conducted, 6. Audit of ABI
Coca Cola N5 completred, 7.
Training of EHP's in N3/4/5. 8
Conducted Audit of Shoprite
Checkers N3, 9 Collated data
base of Food manufactures for
all SD's, 10 Conducted audit of
Power Super Spar Kwa
Mashu.All evidence available in
the Food Safety Section
17 is an annual target,
Q1 target needs to be
revised.1. Overall plan
developed. However
each SD's has
developed their own
individual plans. have
Nomakhosi
Gxagxisa
4.9.1. Improve
compliance monitoring
of environmental
programmes in
accordance with
Environmental Health
Norms and Standards
Neil Larratt
4.8. Provide services of
high quality in line with
set norms and
standards
4.9. Enhance
Environmental Health
Service Delivery
Programme Programme
Driver
Project Project
Manager
Sub Project Sub Project
Owner
Unit Of
Measure
Annual Target as
at 2017/2018
Quarter 1
Target as at
30 September
2017/2018
Quarter 1
Actual as at 30
September
2017/2018
Indicator Reason For Variance Steps Taken to
improve
Performance
Means Of
Verification/Evidence
Comment
4.9.1.4. Compliance
auditing against the Air
Emission Licenses
Neil Larratt % 10% field audits
completed
0 0 A N/A N/A 1. Development of project plan.
2 Selection of facilities for
compliance audit. 3 Proposed
audit dates for facilities. 4
Develop and finalise
compliance guidelines for onsite
audits.5. Develop and finalise
process flow for AEL
compliance monitoring 6.
Developed and finalised
standard operating proceedures
for air quality compliance
insepections.7 5 planning
meetings conducted to finalise
process 8. Complied and
finalised technical indicator
definitions for SDBIP projects
Project well on track.
However certain
facilities have been
damaged during the
storm events of 10/10
and certain inspection
dates may need to be
adjusted.
4.9.1.5. Schedule Trade
Permitting
Rosemary Van
Heerden
Number 1 database report
and legal action
taken against 1
1 1J
Scheduled Trade data bases for
sub-districts collated into one
unit data base. EHSM's to verify
data base
4.9.1.6. Address
environmental health
aspects of urban decay
Ayo Olowolagba Number 4 reports on project
based interventions
in CBDs o
0 0 A 4 CBD Reports - To be viewed
at Unit Head's Office Room 208
Nomakhosi
Gxagxisa
4.10.1. 90% of
quarterly cohort
patients on ARV with
viral suppression
Dr Ngomane % 90 90 90J
NHLS Report - To be viewed at
Unit Head's Office Room 208
Nomakhosi
Gxagxisa
4.10.2. Improve TB
programme
performance through
increasing patients
converting from
sputum smear positive
to negative
Ayo Olowolagba % 90 90 87.2L
Source data unreliable -
due to system migration
Major cleanup of
the data and
verification thereof
Source data unreliable
- due to system
migration
Nomakhosi
Gxagxisa
4.10.3. HIV
counselling and
testing
Dr Ngomane Number 600 000 150000 139380L
Due to system integration of
the Tier Dotnet System and
the Electronic TB Data
System
Major cleanup of
the data and
verification thereof
HTS Report - To be viewed at
Unit Head's Office Room 208
Nomakhosi
Gxagxisa
4.11.1. Increase
percentage of
pregnant women
visiting clinic in the
first half of pregnancy
Busi Grootboom % 75% 75 75J
DHIS Stats - To be viewed at
Unit Head's Office Room 208
Nomakhosi
Gxagxisa
4.11.2. Improve
adequacy of cervical
smears to reach 75%
adequacy of smears
taken in the fourth
quarter
Dr Ngomane % Quarterly
improvements to
reach 75% by the
fourth quarter
64 75J
Overachieved - Improved
awareness campaigns and
clinical care
DHIS Stats - To be viewed at
Unit Head's Office Room 208
Nomakhosi
Gxagxisa
4.9.1. Improve
compliance monitoring
of environmental
programmes in
accordance with
Environmental Health
Norms and Standards
Neil Larratt
4.10. Reduce burden of
HIV and AIDS and TB
4.11. Strengthen
maternal, child and
women's health and
provision of non-
communicable health
care services
4.9. Enhance
Environmental Health
Service Delivery
Programme Programme
Driver
Project Project
Manager
Sub Project Sub Project
Owner
Unit Of
Measure
Annual Target as
at 2017/2018
Quarter 1
Target as at
30 September
2017/2018
Quarter 1
Actual as at 30
September
2017/2018
Indicator Reason For Variance Steps Taken to
improve
Performance
Means Of
Verification/Evidence
Comment
Nomakhosi
Gxagxisa
4.11.3. Implementation
of youth and
adolescent friendly
services in 20
municipal clinics
Dr Ngomane Number 20 5 7J
Overachievied Under targeted - will
revisit targets in the
MTA
Self Assesment Progress
Reports - 4 - West, 3 - South -
To be viewed at Unit Head's
Office Room 208
Nomakhosi
Gxagxisa
4.11.4. Conduct
community based
screening campaign
for non communicable
diseases
Nomakhosi
Gxagxisa
Number 1 campaign plan by
September 2017
and implementati
1 1J
Campaign Plan place - To be
viewed at Unit Head's Office
Room 208
Nomakhosi
Gxagxisa
4.12.1. Interrogate
vector, environmental
and clinical data
collecting tools for
Public Health planning
Ayo Olowolagba Number 3 Reports on the
existing data
collection tools
0 0J
4.11. Strengthen
maternal, child and
women's health and
provision of non-
communicable health
care services
4.12. Strengthen
disease surveillance
and vector control
services
Capture Type Target Type PME Comments
Quarterly Increasing
Quarterly Increasing
Quarterly Increasing
Quarterly Increasing
Quarterly Increasing
Quarterly Increasing
Quarterly Increasing
Quarterly Increasing Please provide
reasons for
variance
Quarterly Increasing Please provide
reasons for
variance
Quarterly Increasing
Plan 4 : Fostering a Socially Equitable Environment
Plan Owner: Martin Xaba
Capture Type Target Type PME Comments
Quarterly Increasing
Quarterly Increasing
Quarterly Increasing
Quarterly Increasing
Quarterly Increasing
Quarterly Increasing
Quarterly Increasing
Capture Type Target Type PME Comments
Quarterly Increasing
Quarterly Increasing
Quarterly Increasing
Quarterly Increasing
Quarterly Increasing
Quarterly Increasing
Capture Type Target Type PME Comments
Quarterly Increasing
Quarterly Increasing
Quarterly Variable
Increasing
Quarterly Variable
Increasing
Quarterly Variable
Quarterly Variable
Quarterly Variable
Annual Increasing
Capture Type Target Type PME Comments
Quarterly Increasing
Annual Variable
Quarterly Variable
Quarterly Variable The project is
achieved on target,
there is no need for
the "Reason of
variance" and
"Steps taken to
improve
performance" .
Clarify the
statement on the
"comment" column
and kindly advise
what the trget
should be. This can
omnly be amended
during MTA's.
Capture Type Target Type PME Comments
Annual Variable
Quarterly Variable
Annual Variable
Quarterly Variable
Increasing
Quarterly Increasing
Quarterly Increasing
Quarterly Variable
Increasing
Quarterly Increasing
Capture Type Target Type PME Comments
Quarterly Increasing Please provide
"Reasons for
Variance". The
reason provided is
insufficient.
Quarterly Variable
Increasing
Quarterly Variable
Programme Project Sub Project Unit Of
Measure
Annual Target as
at 2017/2018
Quarter 1
Target as at
30
September
2017/2018
Quarter 1
Actual as at
30
September
2017/2018
Indicator Reason For
Variance
Steps Taken to
improve Performance
PME COMMENT Comment
5.1.1. Implement and maintain
programmes to provide access to
Learner ships, Skills programmes,
Apprentice-ships & Scarce Skills for
the unemployed members of the
community
Number 18 8 8J
6 maintained and 2 new
established
5.1.2. Implement foundation of
technical skills programmes for
employees in Plumbing ,Bricklaying
and Painting.
Number 3 new programmes 3 3J
5.1.3. Implement worker skills
development, learning and
development programmes as per the
Workplace Skills Plan
% 100 100 100J
The courses in the WSP
has been scheduled for the
year.
5.1.4. Maintain programmes to
provide access to In-service Training,
Internships and Work Experience
Number 3 3 3J
5.2. Address the numeracy
and literacy skills gap for
employees.
5.2.1. Facilitate the provision of
Learning and Development
Programmes in order to improve the
numeracy and literacy skills levels of
employees such as Matric ,Sign
Language , Basic Communication in
IsiZulu and foundation for Learner
ship Water reticulation
Number 4 programmes 4 4J
5.3.1. Facilitate and co-ordinate the
WSP and ATR in the municipality
% 100 % = Annual
Workplace Skills
Plan & Annual Trai
30 30J
meetings and roadshows
with line departments
5.3.2. Develop quality assurance
framework for learning and
development programmes
% 100 % = Draft
Framework
Developed
10 10J
inception meetings and
task team set up
5.3.3. Develop Learning and
Development Policy of the
municipality.
% 100 % = Draft
Learning and
Development
Policy
10 10J
inception meetings and
task team set up
5.4.1. Coordinate capacity building
initiatives for community based
initiatives .
Number 5 skills needs-
based initiatives
supported
1 1J
5.5.1. Implement ward committee
governance capacity enhancement
programme.
Number 1 Ward committee
Governance
programme
implemented
1 1J
5.6.1. Participate in exhibition and
community based expos
Number 1 exhibition and 4
community based
career expose
1 1J
5.7.1.1. Attraction and Retention
Strategy (Social Business)
% 100 25 25J
1. Birthday Message
Survey completed
2.Publish LinkedIn article in
Metro paper-06/10/2017
3.Share Point - HR
Calendar fully functional
on live environment
5.7.1.2. Communications and Marketing
Strategy
% 100 25 25J
1. HR Matters and FAQS
refer attached 2. Hosted
HR Forum with Pinky
Kunene
Plan 5 :Supporting organisation design ,human capital development and Management
Plan Owner: Dumisile Nene
5.3. Facilitate Workplace
Skills Planning and
Development
5.4. Provide community
building support to
community.
5.1. Providing occupationally
directed learning and
development opportunities in
the workplace
5.5. Increasing public sector
capacity for improved service
delivery and supporting the
building of a developmental
state
5.6. Building career and
vocational guidance
5.7. Providing Human Capital
Empowerment 5.7.1. Human Capital Metrics
Programme Project Sub Project Unit Of
Measure
Annual Target as
at 2017/2018
Quarter 1
Target as at
30
September
2017/2018
Quarter 1
Actual as at
30
September
2017/2018
Indicator Reason For
Variance
Steps Taken to
improve Performance
PME COMMENT Comment
5.7.1.3. Employee Induction % 100 25 25J
Supplied 25 staff
handbooks for general staff
induction to HR
ServicesNo Executives
appointed during July 2017
5.7.1.4. Employee Engagement
(Siyalalela)
% 100 15 15J
Completed summary of
Head HR Siyalalela held on
27 June 2017 (Summary
done in July 2017)
5.7.1.5. Employment Engagement
HRMD
% 100 10 10J
This section was for the
Assessment centres under
HCM
5.7.2.1. Talent Identification,
Development & Succession Planning
% 100 25 25J
449 staff trained in PM; 166
trained on eperfomance;
Five onsite
trainings/workshops
5.7.2.2. Talent Management
Committees
% 100 20 20J
TMC Calender developed
and sent to all Unit heads,
Deputy Heads HR & Senior
Managers HR. TMCs
Prepared for Cancelled :
Econ Planning City
Engineering Rescheduled
for
5.7.2.3. Coaching and Mentoring Phase
2 (Year 3)
% 100 40 40J
Four Coaching and
Mentoring Sessions Held
5.7.2.4. Attraction and Retention
Strategy (Year 3)
% 100 25 25J
HR Siyalalela;VOCE
Survey Prepared and
released on intranet;
Inaugaral Bursary
Committee scheduled and
held , Intergrated TM/PM
project with HRIS on Track;
TM reDraft policy submitted
to Acting Dep Head Policy
& Dev and Head HR ; PM
policy circulated to all unit
heads for
consultation.Invitatation to
Atraction and Retention
workshop.
5.7.3.1. Intergrate DRL Systems (Year
3)
% 100 25 25J
TM and PM and Integrate
Skills Development, Pilot
Area (Health and Tourism
(pilot)), Configuration and
User Acceptance Testing,
Feedback, communication,
training and change
Management on Employee
Engagement Surveys,
minutes of meetings,
change Request, report
specs,
5.7.3.2. Roll out of Self Service &
Computer Labs
% 100 30 30J
Evidence is available on
disc provided by
Dumezweni Moyo.
5.7. Providing Human Capital
Empowerment 5.7.1. Human Capital Metrics
5.7.2. Talent Management
5.7.3. Human Resource Management
Information System
Programme Project Sub Project Unit Of
Measure
Annual Target as
at 2017/2018
Quarter 1
Target as at
30
September
2017/2018
Quarter 1
Actual as at
30
September
2017/2018
Indicator Reason For
Variance
Steps Taken to
improve Performance
PME COMMENT Comment
5.7.3.3. Enhance and Maintain RL
Systems
% 100 25 25J
E-Recruitment alligned to
new adopted recruitment
policy to include
automation,Reviewded E-
recruitment RTF process
and process flow maps
5.7.3.4. Time and Attendance & Bio
Metric Readers
% 100 20 20J
Time and Attendance &
Biometric Readers, update
on bio reader in terms of
sites identified.finalise Bio
Metric Roll out 5 year
plan/Strategy in place and
presented to Project
Steercom.
5.8.1.1. New EE Plan % 100 25 10L
Longer strategic
processes to
complete the
project
Project plan in place.
Communication and
consultations with the
relevant stakeholders
Project plan in place.
Communication and
consultations with the
relevant stakeholders
Target not met
5.8.1.2. EE Awareness Programme % 100 25 25J
Target met
5.8.1.3. Diversity Training % 100 25 25J
Target met
5.8.1.4. PWD and Women
Empowerment
% 100 25 25J
Target met
5.8.1.5. EE Communication Plan % 100 25 25J
Target met
5.8.1.6. EE (DOL) Compliance % 100 25 10L
Longer strategic
processes to
complete the
project
Project plan in place.
Communication and
consultations with the
relevant stakeholders
Project plan in place.
Communication and
consultations with the
relevant stakeholders
Target not met
5.9.1. Measure productivity and
develop standards of performance
Number Implement 42
projects to
measure
productivity and
10 10J
File is too large to upload,
evidence is available at
Embassy 15th Floor
5.9.2. Improve business processes Number Implement 16
projects to improve
business processe
4 4J
File is too big to upload,
evidence is available at
15th floor Embassy
Building
5.9.3. Eliminate wastage of resources Number Implement 1
project to eliminate
wastage
0 0J
This is an annual report.
We report in quarter 4
5.7. Providing Human Capital
Empowerment
5.9. Advise on Ways To
Improve Productivity
Throughout The Municipality.
5.10. Drive organisational
change and effecieny
interventions
5.7.3. Human Resource Management
Information System
5.8. Organisational
Transformation (Employment
Equity)
5.8.1. Employment Equity
Programme Project Sub Project Unit Of
Measure
Annual Target as
at 2017/2018
Quarter 1
Target as at
30
September
2017/2018
Quarter 1
Actual as at
30
September
2017/2018
Indicator Reason For
Variance
Steps Taken to
improve Performance
PME COMMENT Comment
5.10.1. Organisational Transformation
and Efficiency Projects
Number Implement 3
projects
0 0 A This is an annual project. It
will be reported in quarter 4
5.10.2. Monitor transformation and
efficiency projects including incentive
bonus schemes
Number implemented 3
projects
0 0 A This is an annual report. It
will be reported in quarter 4
5.10.3. Undertake office automation
projects
Number Implements 26
projects
7 7J
File is too big to be
uploaded. Evidence will be
available at 15th floor,
Embassy building
5.10.4. Undertake organisational
architecture ,capacity building and
strategic change interventions .
Number Implement 4
change
management
interventions
1 1J
File is too big to be
uploaded. Evidence will be
available at 15th floor,
Embassy Building
5.10.5. Undertake cost saving in
terms of National Treasury Circular
No 82.
Number IMPLEMENT 1
COST SAVING
PROJECTS
0 0J
This is an annual project. It
will be reported in quarter 4
5.11.1. Implementation of a Municipal-
wide Wellness Programme.
Number 100 25 41J
Overachieved due to
higher demand for health
screening during heart
health awareness week
Overachieved due to
higher demand for health
screening during heart
health awareness week
5.11.2. Peer Educator Training
Programme
Number 80 0 0J
Annual Target Annual target
5.11.3. HIV Counselling and Testing
(HCT) Progam
Number 100 25 30J
30 HIV counselling and
testing programmes were
completed to
accommodate additional
requests from clients unit's
for onsite HIV testing
30 HIV counselling and
testing programmes were
completed to
accommodate additional
requests from clients unit's
for onsite HIV testing
5.10. Drive organisational
change and effecieny
interventions
5.11. Reduce new HIV/AIDs
infections in the workplace
5.12. Compliance with
Occupational Health and
Safety Legislation
Programme Project Sub Project Unit Of
Measure
Annual Target as
at 2017/2018
Quarter 1
Target as at
30
September
2017/2018
Quarter 1
Actual as at
30
September
2017/2018
Indicator Reason For
Variance
Steps Taken to
improve Performance
PME COMMENT Comment
5.12.1. Occupational Health Medical
Surveillance
Number 11000 2750 3208J
Target was exceeded due
to the high number of
preplacement medicals for
firefighters completed this
quarter
Target was exceeded due
to the high number of
preplacement medicals for
firefighters completed this
quarter
5.12.2. Occupational Hygiene
Baseline assessments
Number 155 38 42J
42 surveys were
completed in this quarter
due to accommodation of
urgent, unplanned
requirements for
ventilation survey.
42 surveys were completed
in this quarter due to
accommodation of urgent,
unplanned requirements
for ventilation survey.
5.12.3. Health and Safety Inspections
programme
Number 736 184 286J
Over achieved-
undertaken other activities
that were not part of the
initial plan
Over achieved- undertaken
other activities that were
not part of the initial plan
5.12.4. Health and Safety Audits
programme
Number 370 92.5 95J
Line management has
requested workshops to
be audited afterincidents
had occurred. This was to
ascertain the level of
compliance with Council
Health and Safety
Management system
Line management has
requested workshops to be
audited afterincidents had
occurred. This was to
ascertain the level of
compliance with Council
Health and Safety
Management system
5.12.5. Health and Safety training of
contractors programme.
Number 200 50 37L
There were no
expected Local
Based Contractors
in this quater
Train more of small local
contractors in
Construction Safety
The recent promulgation
of Construction Regulation
2014 guidelines turned
our focus on the
implementation of the
guidelines in order to
ensure complaince there
were less number of
construction projects that
were introduced for this
quarter
The recent promulgation of
Construction Regulation
2014 guidelines turned our
focus on the
implementation of the
guidelines in order to
ensure complaince there
were less number of
construction projects that
were introduced for this
quarter
5.12. Compliance with
Occupational Health and
Safety Legislation
Programme Programme
Driver
Project Project
Manager
Unit Of
Measure
Annual Target
as at 2017/2018
Quarter 1
Target as at
30
September
2017/2018
Quarter 1
Actual as at
30
September
2017/2018
Indicator Reason For Variance Steps Taken to improve
Performance
Means Of
Verification/Evidence
Comment PME Comment
Thembinkosi
Ngcobo
6.1.1. Provide citizens
with a diverse range of
opportunities for learning
and enrichment
Amanda
Zungu
Number 773
programmes /
activities
234 579J Due to the diverse nature of the work
undertaken by the Unit, various
sections are drawn into partnerships by
other depts (in addition to existing
projects). Additionally, since this project
speaks to offering diverse opportunities
to our citizens, our mandate is to
deliver on the servcies that our citizens
request.
Reports; Photos; emails;
booking forms;
invitations; PR
(EVIDENCE WITH
ALLISON RUITERS)
LIBRARIES: 41 programmes / activities; LHM - 90 programmes / activities;
NSM - 393 programmes / activities; PLC - 54 programmes / activities; DAG -
1 programmes / activities
Thembinkosi
Ngcobo
6.1.2. Establish and
maintain local, national
and international
relationships to promote
Global Citizenship.
Allison
Ruiters
Number 26 relationships
established and
/ or maintained
8 9J
Reports; Photos; emails;
presentations;
programmes (EVIDENCE
WITH ALLISON
RUITERS
Buffalo City Visit; High Performance Conference; FBIP Field
Trip; BIMF / FBIP Forum & Workshop; ESSA Conference;
Moshito International Music Conference and Exhibition; IERM
Conference; ICOFOM 40th Symposium;International
association of impact assessment Congress. 16-18 August
2017
Sandra
Khathi
6.2.1. Create and
facilitate sports
development
opportunities linked to 20
sports codes
Teddi
Adams
Number 20 codes 5 5J
Concept Documents,
Quarterly reports with
photos, results and
attandance
registars.(POE forwarded
to PME)
Sandra
Khathi
6.2.2. Undertake
programmes that provide
recreational opportunities
for mass participation for
all citizens
Ravi
Subramone
y
Number 5 activities 2 2J
Concept Documents,
Quarterly reports with
photos, results and
attandance registars.
(POE forwarded to PME)
Sibusiso
Mkhwanazi
6.3.1. Develop and
Review Management and
Master Plans for
Conservation sites
Livhuwani
Keneth
Mabila
Number 4 activities 1 1J
DECLARATION REPORT
(evidence available with
project manager)
Roosfontein Nature Reserve has been declared in compliance with
Protected Areas Act Sections 23 and 28. Now in need of funds for fencing
and development of the infrastructure as there are challenges of illegal
removal of medicinal plants and land invasion. Daily operations and
maintenance such as patrols and removal alien plants are conducted.
Sibusiso
Mkhwanazi
6.3.2. Develop and
manage an Urban
Forestry Programme in
line with the City's
Greening Strategy
Sherelle
Whitaker
Number 4 activities 1 1J
DOCUMENTS (evidence
uploaded on EPMA)
Parks District 2 undertook tree planting at the following sites: - 1. Dube
Village playlot, 2. Newtown C playlot, 3. Glebe playlot, 4. Piesang playlot, 5.
Newtown C sportsfield, 6. Glebe sportsfield. A total of 40 indigenous trees
were planted as follows: - Syzygium cordatum X 8,
Sibusiso
Mkhwanazi
6.3.3. Engagement with
relevant stakeholders on
issues of sustainable land
practices
Slindile
Ndlovu
Number 8 activities 2 2J
REPORT;
PROGRAMMES
(evidence uploaded on
EPMA)
All processes have been done and waiting for SCM to award tender to
provide t/shirts and water bottles that would be distributed during the Road-
shows as per the programme of events and activities which were due to
start in September 2017. Programs would be displayed to take full
recognition and respect for all different cultures which forms Ethekwini
population. Parks, Leisure and Cemeteries supported the South African
National Cemeteries Association (SACA) and South African Local
Government Association (SALGA) Pan African Cemeteries Conference on
27 – 30 August 2017 held at the ICC, Durban. The discussions were around
the challenges that are faced in the provision of sustainable services for the
disposal of the dead which extends beyond national boundaries. The
Conference encouraged and promoted the participation of various
stakeholders to contribute and commit to solutions which addresses the
issue for the sustainable management and the provision of interment
services and provide a platform for governmental authorities and various
stakeholders network and develop a common approach to address the
challenges arising from the scarcity of natural resources as a result of
growing population demands.
Sibusiso
Mkhwanazi
6.3.4. Conducting
fundamental research,
and disseminating this to
the broader scientific
community.
Allison
Ruiters
Number 6 papers
submitted to
peer-reviewed
scientific
journals; 3
survey report; 1
edition of the
Durban Natural
Science
Museum
Novitates
0 0 N/A Reporting for this project starts in Q2
6.4. Create
Empowerment
Opportunities in
Arts, Culture and
Heritage
6.1. Cultivating a
sense of
citizenship
Plan 6 : A vibrant and creative city - the foundation for sustainibility and social cohesion
Plan Owner: Martin Xaba
6.2. Promoting
healthy and active
citizens
6.3. Ensure
effective
management of
environmental
goods and
ecosystem
services
Programme Programme
Driver
Project Project
Manager
Unit Of
Measure
Annual Target
as at 2017/2018
Quarter 1
Target as at
30
September
2017/2018
Quarter 1
Actual as at
30
September
2017/2018
Indicator Reason For Variance Steps Taken to improve
Performance
Means Of
Verification/Evidence
Comment PME Comment
Thembinkosi
Ngcobo
6.4.1. Facilitation of
interactive programmes to
support economic
empowerment
Tebogo
Mzizi
Number 16 activities in
this financial
year
4 3L
Planned activity with community - Arts & Craft
exhibition could not proceed due to community
groups not being redy for exhibition - this has
now been planned for Dec 2017
See Action / Business Plan for
activity in Dec 2017
Reports (EVIDENCE
WITH ALLISON
RUITERS)
3 activities
Thembinkosi
Ngcobo
6.4.2. Implement
programmes to create
opportunities in arts
culture, parks and
heritage
Tebogo
Mzizi
Number 31 programmes 7 7J
Reports; Photos; emails;
PR; (EVIDENCE WITH
ALLISON RUITERS)
Parks, Leisure and Cemeteries department has drafted a precinct
management plan for introduction of a roll out programme to create
linkages within the PRC unit to encourage the development of integrated
programmes relating to Arts and Culture, Libraries, Sports and recreation
this concept was presented at the recent IERM Conference held on 11- 13
September in Johannesburg. The department has is also preparing precinct
plans for the development of the integrated approach to our Green
infrastructure in terms of creating opportunities in the Arts Culture and
Heritage in our city. Gospel ID Activations July - Sept; Gospel Icon
Discovery - FINAL, 17 September 2017; Celebrate Heritage, 16 Sept 2017;
Artists Promotion, Jul - Sept 2017; Libraries - training for DUT sudents;
ICOM led CIDOC Training in Lubbock Texas from 14-23
Thembinkosi
Ngcobo
6.4.3. Development of
community / agricultural
fish ponds and plant
nurseries
Sibusiso
Mkhwanazi
Number 24 activities 6 6J
REPORT (evidence
uploaded on EPMA)
19-21 July 2017 - New Germany Nature Reserve conducted plant
propagation training for Ubuhle Bomdabu Traditional Healers. The training
consisted of asexual propagation (soft tip, hardwood, leaf cutting), potting
plants into different bag sizes, pricking out of plants from seed beds into
trays and sexual propagation (collection, cleaning and sowing of seeds) and
different types of growth media mixture used including fertilizer, compost,
umgeni sand and pine bark, plant identification.22-23 August - Silverglen
Nursery conducted plant propagation training for Life Makes Happiness and
Uzalo Project. 30-31 August Qhubulwazi Youth Organization attended
training at Silverglen Nature reserve on asexual propagation (soft tip,
hardwood and leaf cutting), potting plants into different bag sizes, pricking
out of plants from seed beds into trays, sexual propagation (collection,
cleaning and sowing of seeds), different types of growth media mixture used
including fertilizer, compost, umgeni sand and pine bark, vegetative
propagation (teaching groups how to grow plants using different parts of the
plant tip, semi hardwood, and leaf cuttings). 06 September – Parks Natural
Resources Agriculture Division hosted a workshop at the Botanic Gardens
Visitors’ Centre on agro-ecology discussing strategic activities and issues
related to implementation of agricultural projects. 11-13 September - four
(4) officials from Parks, Leisure and Cemeteries attended the Institute of
Environment and Recreation Management (IERM) held in Johannesburg,
Wanderers Club on the 11th to 13th September 2017. IERM is a logical
association for Managers responsible for management processes involving
Eco Tourism, Environmental Education, Environmental Planning,
Horticulture, Landscape Design, Nature Conservation, Recreation, and
Urban Greening. They advocate internationally recognized, environment and
recreation management practices that are sustainable in a regional context.
Two (2) delegates from Parks Depart
Ernest Shozi 6.5.1. Develop and
evaluate new plans to
support the creative
industry
Themba
Mchunu
Number 4 plans
developed /
evaluated
1 1J
Concept / Report
(EVIDENCE WITH
ALLISON RUITERS)
Poetry meets Jazz Concept
Ernest Shozi 6.5.2. Development of
master plan for cultural
precincts Phase 2:
Rivertown Cultural
Precinct
Themba
Mchunu
% Meet milestones
for 2017/18 as
per project plan
70 70J
Emails; revised cash
flow; update report; BAC
report; minutes;
attendance register
(EVIDENCE WITH
ALLISON RUITERS)
The Section 24 Report was approved on 11 September 2017.
Awaiting Letter of Award from SCM to start construction.
6.4. Create
Empowerment
Opportunities in
Arts, Culture and
Heritage
6.5. Create and
promote an
environment that
encourages
economic activity
for arts and
culture
Programme Programme
Driver
Project Project
Manager
Unit Of
Measure
Annual Target
as at 2017/2018
Quarter 1
Target as at
30
September
2017/2018
Quarter 1
Actual as at
30
September
2017/2018
Indicator Reason For Variance Steps Taken to improve
Performance
Means Of
Verification/Evidence
Comment PME Comment
Thembinkosi
Ngcobo
6.6.1. 1 Inanda Pool
:Stage 5
Zakithi Jali % Meet milestones
for annual
project plans.
75 39L
Work stoppages by Local Black Forum,
members of the community and rains.
Various meeting(s) were held
with relevant stakeholders
including ward local forum to
try and resolve the matter
Minutes and photos
submitted to PME
Project is at 39% as per the minutes dated 20th September 2017.
Construction on site is in progress , site meetings are held,
Thembinkosi
Ngcobo
6.6.2. Tshelimnyama
Library Stage 4
Zakithi Jali % Meet milestones
for annual
project plans.
70 40L
Awaiting for the letter of award for construction
from SCM monitoring.
Implementing department is in
contact with SCM.
Implementation manual
from City Architecture
(evidence submitted to
PME)
The percentage achieved this far is 40 % from stage 1 to 4 of the project
lifecycle as per the Implementation Manual from City Architecture.This
however excludes construction stage which is listed as stage 5
Thembinkosi
Ngcobo
6.6.3. Intshanga
Sportsfield Stage 3
Zakithi Jali % Meet milestones
for annual
project plans.
60 60J
Legal opinion attached The percentage achieved this far is from stage 1 to 3 of the project lifecycle
as per the Implementation Manual from City Architecture. This however
excludes construction stage which is listed as stage 5; construction process
has not started. The unit and legal are currently working on MOU for sharing
of facilities. Looking at the stage this project is in, it is critical to temporarily
remove it from SDBIP
Thembinkosi
Ngcobo
6.6.4. Waterloo
Sportsfield Stage 3
Zakithi Jali % Meet milestones
for annual
project plans.
75 100J
The project started in 16/17 financial year, was
suppose to end in June 16/17 financial year.
The project delayed due to work stoppages and
was compoleted in August 17/18
Practical Completion
Certificate attached
completed
Thembinkosi
Ngcobo
6.6.5. Umgababa Beach :
Stage 5
Zakithi Jali % Meet milestones
for annual
project plans.
75 77J
Minutes attached Achieved 77% which is more than the target Please provide reason for
overachieving
Thembinkosi
Ngcobo
6.6.6. Mobeni
Crematorium stage 1
Zakithi Jali % Meet milestones
for annual
project plans.
40 40J
Evidence submitted to
PME
The project is in procurement monitoring. The percentage achieved this far
is from stage 1 to 4 of the project lifecycle as per the Implementation
Manual from City Architecture. This however excludes construction stage
which is listed as stage 5
Thembinkosi
Ngcobo
6.6.7. Amaoti Library
stage 3
Zakithi Jali % Meet milestones
for annual
project plans.
60 4.11L
Construction commencement site handover
was held in June 2017, Contractor advised they
are 2 weeks behind on their program.
Site meetings were held, the
contractor have noted that as
of last weekend 19 August
2017 they have started to work
on 3 Saturdays a month and
Sundays in specific cases in
order to get back on track
Minutes and pictures
attached
Contruction in progress.Construction commencement site handover was
held in June 2017, Achieved this far is 4.11%. The unit will change project
tagert during MTA period to be inline with the contruction only. This will
exclude other stage listed on the implementation manual from City
Engineers.
Thembinkosi
Ngcobo
6.6.8. Whetstone Library
stage 4
Zakithi Jali % Meet milestones
for annual
project plans.
70 8L
Minutes attached Contruction in progress.Construction commencement site handover was
held in 29 August 2017, Achieved this far is 8%. The unit will change project
tagert during MTA period to be inline with the contruction only. This will
exclude other stage listed on the implementation manual from City
Engineers.
Please provide reason for
not achieving and steps
taken to improve
Thembinkosi
Ngcobo
6.6.9. Execute new
Museum of Education
Project Plan
Sinothi
Thabethe
% Meet milestones
for annual
project plans.
10 10J
Research documents and
plans (evidence uploaded
on EPMA)
Thembinkosi
Ngcobo
6.6.10. Executing Phase
2 for Cato Manor Museum
Sinothi
Thabethe
% Meet milestones
for annual
project plans.
10 10J
Research Narration
Documents and
Exhibition Plans
(evidence uploaded on
EPMA)
Thembinkosi
Ngcobo
6.6.11. Plan and execute
National Liberation
Heritage Route
Sinothi
Thabethe
% 100%
(Identification of
10 suitable
Durban
Liberation
Heritage Route
sites)
30 30J
3 Liberation Heritage
Route Sites from Inanda
(evidence uploaded on
EPMA)
6.6. Strategic
Social
infrastructure and
legacy projects
Programme Programme
Driver
Project Project
Manager
Unit Of
Measure
Annual Target
as at 2017/2018
Quarter 1
Target as at
30
September
2017/2018
Quarter 1
Actual as at
30
September
2017/2018
Indicator Reason For Variance Steps Taken to improve
Performance
Means Of
Verification/Evidence
Comment PME Comment
Thembinkosi
Ngcobo
6.6.12. Plan and execute
eThekwini Living Legends
Sinothi
Thabethe
% Meet milestones
for annual
project plans.
15 15J
Report (EVIDENCE
WITH ALLISON
RUITERS)
Bertha Mkhize Annual Lecture - Theo Bophela (Living Legend)
6.7. Preservation
and Management
of Heritage Assets
Ernest Shozi 6.7.1. Developing
collections management
mechanisms to address
the preservation and
management of heritage
assets
Allison
Ruiters
Number 26 mechanisms
/ plans
developed,
reviewed,
implemented;
reported on
5 5 JEPCPD foresty standard;
proposal form; tender
documents;
implementation plan;
research documents
(EVIDENCE WITH
ALLISON RUITERS)
PLC: The parks department is in the process of reviewing the EPCPD’S
Current URBAN forestry standard as attached to evaluate this manual and
programme in terms of the PLC standard for street tree planting and
precinct planting. The process is still underway; Research conducted on
heritage grave sites. LHM: Reviewed Heritage Assets Implementation plan;
Collections Management system tender documents; DAG: Digitisation
proposal form
6.6. Strategic
Social
infrastructure and
legacy projects
Programme Programme
Driver
Project Project Manager Sub Project Sub Project Owner Unit Of Measure Annual Target as
at 2017/2018
Quarter 1
Weight as at
2017/2018
Quarter 1
Target as at
30 September
2017/2018
Quarter 1
Actual as at 30
September
2017/2018
Indicator Reason For Variance Steps Taken to
improve Performance
Means Of
Verification/Evidence
Comment PME Comment
Eric Apelgren 71.1.1. Implement co-operative
international relations programmes that
mobilises financial and knowledge
exchange that supports capacity of staff
and office bearers to deliver on the
Integrated Development Plan.
Thabile
Mngomezulu
Number 40 projects
Implemented
20 10 12J
Evidence electronic and can be
obtain from Project manager
Please provide
reasons for over
achievement.
Eric Apelgren 71.1.2. Implement co-operative
Africa/NEPAD programmes that
mobilises financial and knowledge
exchange that supports capacity of staff
and office bearers to deliver on the
Integrated Development Plan.
Bongiwe Mkhize Number 39 Projects
Implemented
20 10 10J
Reports and Programmes
and photos.
Eric Apelgren 71.1.3. Implement an integrated
intergovernmental relations programme
that mobilises resources, policy
alignment and knowledge exchange that
benefits all stakeholders.
Theo Scott Number 33 Projects
Implemented
20 8 10J
evidence available at 12
floor Rennie house ext.
12112
Our work depends on other
departments. it is demand driven
by dept.
Please provide
reasons for over
achievement.
Eric Apelgren 71.1.4. Facilitate implementaion of
initiatives arising from Aerotropolis, Port
and N3 Freight Route Development
Projects between eThekwini
Municipality, State Owned Enterprises
and Spheres of Government.
Hlengiwe Twala Number 11 project
implemented
20 3 4 A ATTENDANCE
REGISTERS, AGENDA'S
Evidence available on the 12th
Floor - Hlengiwe Zondi's Office.
We need to be shown hoiw to
attach evidence.
Please provide
reasons for over
achievement.
Eric Apelgren 71.1.5. Implement stakeholder relations
and integration of all Clusters with all
IGR Structures, Inter-municipal projects,
SALGA and government communicators
at all levels.
Sthembiso
Mshengu
Number 7 projects
implemented
20 2 2J
Preparing for the South
African Cities Network
stakeholder sysmposium to
be held in Dbn End of
October. Attended a
meeting in Jorburg in
September 2017.
Preparing for the South African
Cities Network stakeholder
sysmposium to be held in Dbn
End of October. Attended a
meeting in Jorburg in September
2017.
Please provide
evidence.
71.2.1.1. Linking the Sizakala and
Presidential Hotlines to the Central
Platform for Call Centres operated by
the IT Department.
Phindile Mdletshe % 100 This project will be
removed during
MTAs.
71.2.1.2. Implementation of the
approved municipal wide complaints
management system.
Phindile Mdletshe % 100%
implementation of
the revised
complaints mana
This project will be
removed during
MTAs.
71.2.1.3. Roll-out of the EMTV
Programme at specific Sizakala
Centres.
Mavuso Tshabalala Number Roll out of the
Programme,
including taped
broadca
This project will be
removed during
MTAs.
Ntsiki Magwaza 71.2.2. Implementation of a Municipal-
wide customer satisfaction programme
Phindile Mdletshe % 100% percent
Implementation of
the programme
This project will be
removed during
MTAs.
71.2.3.1. Provide integrated services
at Sizakala Centres.
Victus Jama % 100%
implementation as
per the project
plans.
This project will be
removed during
MTAs.
Mavuso
Tshabalala
71.1. Promote co-operative
international and inter-
governmental relations
Plan 71 :Good Governance and Responsive Local Government
Plan Owner: Sipho Cele
71.2. Implement a Customer
Relations Management
Strategy and Customer Care
Policy
Ntsiki Magwaza 71.2.1. Implementation of the customer
relations management strategy.
Mavuso
Tshabalala
Ntsiki Magwaza 71.2.3. Determine and implement a
capital programme to upgrade existing
centres and provide for new centres in
areas where needed.
Programme Programme
Driver
Project Project Manager Sub Project Sub Project Owner Unit Of Measure Annual Target as
at 2017/2018
Quarter 1
Weight as at
2017/2018
Quarter 1
Target as at
30 September
2017/2018
Quarter 1
Actual as at 30
September
2017/2018
Indicator Reason For Variance Steps Taken to
improve Performance
Means Of
Verification/Evidence
Comment PME Comment
71.2.3.2. Additions/alterations at 3
centres and plannning of 1 new
centre.
Reshma Naidoo Number Additions/
alterations at 3
centres and
planning of 1 centre
completed
This project will be
removed during
MTAs.
71.3.1.1. Allocate and distribute
Sundry Grant as directed by council.
Xoliswa Mashiane Number 70 grant distribution
to qualifying
organisations
50 0 0 A
71.3.1.2. Allocate Adhoc Grant upon
request as per policy
Xoliswa Mashiane Number 6 organisations 50 0 0J
Vincent Cebekhulu 71.3.2. Capacitate Community Based
Structures
Xoliswa Mashiane 71.3.2.1. Provide GIA workshops to
applicants (successful or
unsuccessful)
Xoliswa Mashiane Number 6 Workshops 100 0 0J
71.3.3.1. Launch and Adopt
Vulnerable Groups Policy
Xoliswa Mashiane Number Vulnerable Groups
Policy launched
and adopted
0 0 A
71.3.3.2. Launch and Adopt Youth
Policy
Xoliswa Mashiane Number Youth Policy
launched and
adopted
0 0 A
71.3.3.3. Develop Traditional
Leadership Policy
Xoliswa Mashiane Number Traditionbal
Leadership Policy
developed
0 0 A
71.3.3.4. Review Community
Participation Policy
Xoliswa Mashiane Number Community
Participation Policy
reviewed
0 0 A
71.3.3.5. Develop Draft Poverty
Aleviation Policy
Xoliswa Mashiane Number Draft Poverty
Alleviation Policy
Developed
0 0 A
Vincent Cebekhulu 71.3.4. Faciliate empowerment
programmes for Traditional structures
Prisca Ntombela 71.3.4.1. Awareness programmes for
17 traditional councils
Vitor Mkhize Number 12 Awareness
programmes
3 0L
Vincent Cebekhulu 71.3.5. Facilitate implementation of
Community Based Planning
Prisca Ntombela 71.3.5.1. Review and provide
community feedback sessions on
ward development plans
Lungisile Mpetshwa Number Consultation on 71
wards plans
0 0 A Delayed by planning,
consultation with
stakeholders and
obtaining necessary
approvals
To be priotized in the
next 2 quarters
71.3.6.1. Hold Masakhane
Roadshows
Thamsanqa Ntuli Number 48 Masakhane
roadshows held
12 2L
The delays have been
caused by planning,
obtaining necessary
authority, and
consultation with the
Mayoral Parlour
To be priotized in the
next 2 quarters
Please provide
evidence
71.3.6.2. Support Mayoral izimbizo on
IDP and budget roadshows
Thamsanqa Ntuli Number 8 Mayoral Imbizo
Held
0 0 A Still consulting with the
Mayoral Parlour
Mavuso
Tshabalala
Vincent Cebekhulu 71.3.6. Create platforms for stakeholder
engagements
Prisca Ntombela
Vincent Cebekhulu 71.3.1. Facilitate Grant in Aid distribution Xoliswa Mashiane
71.2. Implement a Customer
Relations Management
Strategy and Customer Care
Policy
Ntsiki Magwaza 71.2.3. Determine and implement a
capital programme to upgrade existing
centres and provide for new centres in
areas where needed.
71.3. Create integrated
mechanisms, processes and
procedures for citizen
participation
Vincent Cebekhulu 71.3.3. Facilitate reviews of Community
Participation Unit Policies
Xoliswa Mashiane
Programme Programme
Driver
Project Project Manager Sub Project Sub Project Owner Unit Of Measure Annual Target as
at 2017/2018
Quarter 1
Weight as at
2017/2018
Quarter 1
Target as at
30 September
2017/2018
Quarter 1
Actual as at 30
September
2017/2018
Indicator Reason For Variance Steps Taken to
improve Performance
Means Of
Verification/Evidence
Comment PME Comment
71.3.6.3. Provide support to ward
based intervention programmes
Prisca Ntombela Number Provide support to
50 ward based
programmes
0 15 A Additional Requests
received from other
wards
Please provide
evidence
71.3.6.4. (a) Facilitate Participation of
Stakeholders in the Budget and IDP
Roadshows
Lungisile Mpetshwa Number 6 different
stakeholders
0 0 A To be undertaken in the quarter
4
71.3.6.5. Facilitate engagement of
traditional leaders in government
programmes
Prisca Ntombela Number 12 Engagements of
traditional leaders
3 4J
Additional Requests
received from
Amakhosi
Please provide
evidence
71.3.6.6. Facilitate voter education
programme
Prisca Ntombela Number 4 0 0 A Still consulting with the
ECI
71.3.7.1. Increase Soup kitchen sites Themba Mdluli Number 18 additional soup
kitchens
50 0 0 A Report and proposed new
sites
Still at the planning stage
71.3.7.2. Identify and Support
Community gardens
Themba Mdluli Number 12 Community
gardens
50 3 2L
Planning, consultation
and the seasonal
nature of the project
delayed the
implimentation
The shortfall to be
addressed in the next
quarter
Invitations, agenda and
registers
71.3.7.3. Identify and Support One
Home One gardens
Themba Mdluli Number 12 One Home One
Garden
3 0L
Planning, consultation
and the seasonal
nature of the project
delayed the
implimentation
The shortfall to be
addressed in the next
quarter
Registers and list of sites
71.3.8.1. Facilitate and Support for
Vulnerable Groups(Children, Elderly
& Disability) Projects
Themba Mdluli Number 60 Projects 15 20J
Registers, invitations and
programme of the day
Please provide
reasons for over
achievement.
71.3.8.2. Undertake Children
Empowerment Programmes for
Vulnerable Groups(Children, Elderly
& Disability)
Themba Mdluli Number 24 Programmes 6 6J
Registers and programme
of the day
Please indicate
where evidence can
be obtained.
71.3.9.1. Facilitate and Support
Gender
Themba Mdluli Number 20 Projects 5 8J
Addtional requests
were received from
wards and provincial
departments
Attendance registers,
invitations and
programmes
Please indicate
where evidence can
be obtained.
71.3.9.2. Undertake Gender
Empowerment Programmes
Themba Mdluli Number 8 Programmes 2 2J
Registers, invitations and
programmes
Please indicate
where evidence can
be obtained.
Vincent Cebekhulu 71.3.6. Create platforms for stakeholder
engagements
Prisca Ntombela
71.3.7. Facilitate implementation of
Poverty Alleviation Programme
Themba Mdluli
Vincent Cebekhulu 71.3.9. Facilitate and Support Gender
Programmes
Themba Mdluli
71.3. Create integrated
mechanisms, processes and
procedures for citizen
participation
Vincent Cebekhulu 71.3.8. Facilitate and Support
Vulnerable groups Programmes
Themba Mdluli
Vincent Cebekhulu
Programme Programme
Driver
Project Project Manager Sub Project Sub Project Owner Unit Of Measure Annual Target as
at 2017/2018
Quarter 1
Weight as at
2017/2018
Quarter 1
Target as at
30 September
2017/2018
Quarter 1
Actual as at 30
September
2017/2018
Indicator Reason For Variance Steps Taken to
improve Performance
Means Of
Verification/Evidence
Comment PME Comment
71.3.10.1. Facilitate and Support
Youth Development Projects
Themba Mdluli Number 20 Projects 5 7J
Addtional requests
were received from
wards and provincial
departments
Registers, invitations and
programme of the day
Please indicate
where evidence can
be obtained.
71.3.10.2. Undertake Youth
Empowerment Programmes
Themba Mdluli Number 8 Programmes 2 4J
Addtional requests
were received from
wards and provincial
departments
Registers, invitations and
programme of the day
Please indicate
where evidence can
be obtained.
Ntombifuthi
Christophora
Mthethwa
71.4.1. Implement the annual
communication and marketing plan
Mandla Nsele % 100%
implementation of
plan
33.33000183 30 30J
News articles, Advertorials,
Communication materials
Please indicate
where evidence can
be obtained.
Ntombifuthi
Christophora
Mthethwa
71.4.2. Maintain existing communication
tools
Mandla Nsele Number Maintain 11 tools 33.33000183 11 11J
Weekly bulletin, Metro
ezasegagasini,Newsflash,
Info Info, Radio slots,
Internet, Intranet,
Facebook, Twitter,
Linkedin and Youtube
Please indicate
where evidence can
be obtained.
Ntombifuthi
Christophora
Mthethwa
71.4.3. Implement Municipal media
relations plan
Mandla Nsele % 100%
implementation of
identified tools
33.34000015 30 30J
Media releases, Media
Statements, Media
briefings and Media
engagements
Please indicate
where evidence can
be obtained.
Adele Seheri 71.5.1. Provide operational support to
ward committees
Belinda Mhlongo % 100%
implementation of
the project plan
25 25J
Schedule of Ward
Committee meetings and
Attendance registers from
the engagements with
Ward Committee
memebers.
The ward committee sechedule
of meetings for July to
December 2017 has been
developed, and Ward
Committee members are
attending accordingly. In this
quarter 2 engagements were
held with Ward Committee
members, one in July 2017 ina
form of a Quarterly meeting
where their roles were clarified,
and also they raised challenges
which were addressed. Towards
the end of September 2017
anothe engagement was held
where 4 Muicipal Units, namely,
Water&Sanitation, DSW,
Human Settlement and
Engineering were giving
information to Ward Committee
members on their core
functions, programmes and
service standards they had as
Units. This was part of
capacitating Ward Committees
with better understanding of the
Municipal Departments.
71.4. Effectively communicate
the programmes and policies of
the eThekwini Municipality to
the full range of audiences,
both internally and externally.
71.5. Establish and implement
projects, programs and
services in accordance with
Good Governance objectives
and the Unit's Business Plan
so as to enhance efficiency,
accountability,accessibility and
the interface between Council,
the Administration and the Cit
Vincent Cebekhulu 71.3.10. Facilitate and Support Youth
Development Programmes
Themba Mdluli
71.3. Create integrated
mechanisms, processes and
procedures for citizen
participation
Programme Programme
Driver
Project Project Manager Sub Project Sub Project Owner Unit Of Measure Annual Target as
at 2017/2018
Quarter 1
Weight as at
2017/2018
Quarter 1
Target as at
30 September
2017/2018
Quarter 1
Actual as at 30
September
2017/2018
Indicator Reason For Variance Steps Taken to
improve Performance
Means Of
Verification/Evidence
Comment PME Comment
Adele Seheri 71.5.2. Provide training to Ward
Committee Secretariat
Maria Ndlovu % 100%
implementation of
the project plan
30 87J
Target over-achieved
because of some of the
Secretaries' personal
choice to attend on the
given dates
Portfolio of Evidence file
available in the office of
Senior Manager:
Secretariat
The target has been over-
achieved because Ward
Committee Secretaries attended
as per their availability on the
dates communicated to the
target audience. The
Secretaries have developed
inter-communication channel to
share information coming from
the Municipality, hence, they get
to know about information even
if not directly related to some of
them at a given time. I tshould
be noted that there is no harm in
getting them to attend since
training conducted is similar
accross the Secretaries.
Adele Seheri 71.5.3. Municipal wide Records
Management
Betty Moyo % Implemented as per
Action Plan
33.33000183 25 25J
Martin Xaba 71.6.1. Coordinate the Mayor's statutory
obligations in terms of preparation,
implementation and monitoring of the
IDP and the budget.
Martin Xaba % To monitor
performance of the
Municipal Manager
and members of
EXCO. Public
Participation
sessions in relation
to the annual
budget, IDP and
SDBIP
100 0L
Please provide
reason for non
achievement.
Martin Xaba 71.6.2. Coordinate the strategic
sessions with the administratrtion and
monitoring of the implementation of the
strategy
Martin Xaba % Legotla 1:IDP
,SDBIP and Budget
issues Legotla 2:
Mid Term Reviews
of performance
20 25 0L
Please provide
reason for non
achievement.
Martin Xaba 71.6.3. Coordinate the Mayor's
interaction with strategic interests
groups, including Gender and
vulnerable groups.
Funeka Thabethe % 100%
Implementation of
the annual unit plan
20 25 25J
The 25% target has been
achieved within the first quarter
of the financial year 2017/2018
financial year
Martin Xaba 71.6.4. Coordinate the Mayor's
interaction with strategic interests
groups, including Youth
Mndeni Mkhize % 100%
implementation of
the annual unit
plan.
20 25 25J
1. Matric Exam
Preparation Workshop
2.Life After Graduation
Seminar
3. Health and Fitness
Training Campaign
4. Heritage vs Women's
Day Celebration
5. Youth Leadership
Course
Achieved target
Martin Xaba 71.6.5. Coordinate civic and ceremonial
functions of the Mayor.
Sharm Maharaj % Developent and
100% Implentation
of the events
calender.
20 25 25J
Documentty evidnece for
two projects uploaded
2 of 8 events completed
71.5. Establish and implement
projects, programs and
services in accordance with
Good Governance objectives
and the Unit's Business Plan
so as to enhance efficiency,
accountability,accessibility and
the interface between Council,
the Administration and the Cit
71.6. Provide strategic
management and coordination
support to the political oversight
role of the Mayor
Programme Programme Driver Project Project Manager Sub Project Sub Project Owner Unit Of Measure Annual Target as
at 2017/2018
Quarter 1
Weight as at
2017/2018
Quarter 1
Target as at
30 September
2017/2018
Quarter 1
Actual as at
30 September
2017/2018
Indicator Reason For Variance Steps Taken to improve
Performance
Means Of
Verification/Evidence
Comment PME Coment
Mbuso Ngcobo 72.1.1. Provide effective forensic
investigations
Dumisani Cele Number 264 cases resolved
during the year
20 60 44L
Lots of reports had
been sent back for
quality assusrance
Shortfall will be made up in
the 2nd quarter
Mbuso Ngcobo 72.1.2. Promotion of human rights and
good governance principles within the
eThekwini Municipal area
Tholakele Ngubane % 80%
implementation of
the projects in the
Human Rights and
Good Governance
Programme
20 25 25.02J
Implementation of the
integrity management plan
Reasons for over
achievement.
Xoliswa Hlongwane 72.2.1. Undertake Internal Audits as
approved by the Audit committee
Xoliswa Hlongwane % 90% of audits per
approved plan
completed
33.33000183 15 20J
Evidence available on
request at 6th floor
Shellhouse
Achievement above target
due to audit carried forward
from 2016/17.
Reasons for over
achievement.
Xoliswa Hlongwane 72.2.2. To monitor the implementation of
the recommendations by management
Xoliswa Hlongwane % Agreed
management action
monitored by
updating the audit
log once a quarter
33.33000183 100 100J
Please provide evidence
Xoliswa Hlongwane 72.2.3. To ensure quality internal audit
services by measuring the audit
committee's satisfaction
Xoliswa Hlongwane Number Satisfaction Rate of
3
33.34000015 0 0J
Xoliswa Hlongwane 72.2.4. Undertake Advisory and
Consulting assurance engagements of
Infrastructure Asset management
systems; programmes and projects City
Wide
Xoliswa Hlongwane % 90% of audits
(Infrastructure
Assets
managements
systems,
programmes and
projects City Wide
) per approved
plan completed
15 6L
Priority was given to ad
hoc requests thus
resulting in delays on
the planned coverage
for 2016/17
Catch-up plan is in place for
implementation.
Please provide evidence
72.3.1.1. HR Nandakumaran
Naidoo
% Dashboards
complete
25 25 25J
72.3.1.2. JDE Nandakumaran
Naidoo
% Dashboards
complete/
Additional reports
complete
25 25 25J
72.3.1.3. Revenue Reporting Nandakumaran
Naidoo
% Dashboards
complete/
Additional reports
complete
25 25J
72.3.1.4. Customer Services Nandakumaran
Naidoo
% Data mart complete 25 25J
Robert Dlamini 72.3.2. Document Management System Ugenderan
Gangadaran
72.3.2.1. Upgrade to Sharepoint Londiwe Bophela % Rollout
Sharepoint/migrate
from Interwover to
Shar
25 25J
72.3.3.1. MILE Londiwe Bophela % Additional changes
requests
25 25 25J
72.3.3.2. Durban Tourism Londiwe Bophela % Additional changes
requests
25 25 25J
72.3.4.1. Direct Debit Shivani Naicker % System
implemented
30 25 25J
72.3.4.2. IRCAM rewrite Shivani Naicker % System
implemented
25 25J
72.3.4.3. Real Estate - Objections and
Appeals
Shivani Naicker % System
implemented
25 25J
72.3.4.4. Credit applications Shivani Naicker % System
implemented
25 25J
72.3.4.5. Over the Counter eService
Registration
Shivani Naicker % Needs analysis 25 25J
to be removed in
maintenance period
to be removed in
maintenance period
Please provide evidence
72.3.5.1. DAA - Building Inspectorate Ugenderan
Gangadaran
% System
implemented
25 25J
72.3.5.2. DAA - Self Service Ugenderan
Gangadaran
% System
implemented
25 25J
72.3.5.3. Real Estate - Land Acquistion Ugenderan
Gangadaran
% System
implemented
25 25J
72.3.5.4. DAA - Public Sector Housing Ugenderan
Gangadaran
% System
implemented
25 25J
Robert Dlamini 72.3.6. Performance Management
Solution
Ugenderan
Gangadaran
72.3.6.1. Design of integrated solution
with core ERP
Clinton Naidoo % 25 25J
Robert Dlamini 72.4.1. Radio Communication
Infrastructure - Highsite Accommodation
Enhancement
Cleopas Nkwanyana Number 6 Test Instruments 16.67000008 0 0J
Robert Dlamini 72.4.2. Telephony Immanuel Pillay Number 500 IP Telephones
Installed
16.67000008 0 557J
Overacheived, phones
where required
urgently and stock was
available
Phones deployed
spreadsheet
Overacheived, phones
where required urgently and
stock was available
Robert Dlamini 72.4.3. Switches and Routers for
Expansion of the Network
Immanuel Pillay Number Core Upgrade 16.67000008 30 26L
Equipment needed to
be run in and tested
Implementation plan has
been expediated
Project Plan
Robert Dlamini 72.4.4. Fibre and Wide area Network Immanuel Pillay Number 12 sites installed 16.67000008 2 7J
Overacheived -
permissions to instal
were not delayed
Project Plan for Fibre Overacheived - permissions
to instal were not delayed
72.4.5.1. Telephony for Call Centre Rajiv Singh % Procurement Projects done during
previous year - not
current
Projects done during
previous year - not current
Projects done during
previous year - not current
Projects done during
previous year - not current
This project done during
previous year, to be
removed during MTAs.
72.4.5.2. Sitches - Access Layer
Replacement - 12
Rajiv Singh % Deployment Projects done during
previous year - not
current
Projects done during
previous year - not current
Projects done during
previous year - not current
Projects done during
previous year - not current
This project done during
previous year, to be
removed during MTAs.
Plan 72 :Good Governance and Responsive Local Government
Plan Owner: Sipho Nzuza
72.1. Create a clean and
accountable organisation
72.2. Mobilise integrated risk
assurance to strengthen
administrative governance in
pursuit of efficient, effective
service delivery with economy
of scales to realise Batho Pele
principles.
72.3. Provision of an
automated solution
development
Robert Dlamini 72.3.1. Data Warehousing, Business
Intelligence & App Integration
Ugenderan
Gangadaran
Robert Dlamini 72.3.3. Internet/Intranet Development Ugenderan
Gangadaran
Robert Dlamini 72.3.4. E-Government Web Based
Applications
Shivani Naicker
Robert Dlamini 72.3.5. Business Process Management Ugenderan
Gangadaran
72.4. Network,
Telecommunications and
Electronic Services
Robert Dlamini 72.4.5. Ethekwini Water Services Network
& Telephony
Rajiv Singh
Programme Programme Driver Project Project Manager Sub Project Sub Project Owner Unit Of Measure Annual Target as
at 2017/2018
Quarter 1
Weight as at
2017/2018
Quarter 1
Target as at
30 September
2017/2018
Quarter 1
Actual as at
30 September
2017/2018
Indicator Reason For Variance Steps Taken to improve
Performance
Means Of
Verification/Evidence
Comment PME Coment
72.4.5.3. Additional Switches Rajiv Singh % Deployment Projects done during
previous year - not
current
Projects done during
previous year - not current
Projects done during
previous year - not current
Projects done during
previous year - not current
This project done during
previous year, to be
removed during MTAs.
72.4.5.5. Radio / Pager / Network /
Bandwidth
Rajiv Singh % Procurement Projects done during
previous year - not
current
Projects done during
previous year - not current
Projects done during
previous year - not current
Projects done during
previous year - not current
This project done during
previous year, to be
removed during MTAs.
Robert Dlamini 72.4.6. Fibre, Wireless and Wide Area
Network
Immanuel Pillay Number 250 Public Wi-Fi
Sites Deployed
0 0J
72.5.1.1. Corporate Replacements Nomazwi Mhloma % Budget Spend 50 20 0L
Please provide reason
for non achievement
72.5.1.2. Corporate - NEW Nomazwi Mhloma % Budget Spend 20 0L
Please provide reason
for non achievement
72.5.2.1. Stabilise ICT ops: APO01 -
Manage ICT Management Framework
Nomazwi Mhloma % Process
documented
100 0 100J
Please provide evidence
72.5.2.2. Stabilise ICT ops: APO08 -
Manage Relationships (ITIL Phase 4)
Nomazwi Mhloma % Process
documented
20 20J
Please provide evidence
72.5.2.3. Stabilise ICT ops: APO12 -
Manage Risk
Siyabonga Mngadi % Process
documented
20 50J
Documentation available
from Siyabonga
Please provide evidence
and reasons for over
achievement.
72.5.3.1. Antivirus/Patch Management Nomazwi Mhloma % 100% License
Renewal and
Maintenance
50 0 100J
72.5.3.2. Microsoft Enterprise License Nomazwi Mhloma % Procurement of
Microsoft EA
Licenses
0 0J
72.6.1.1. Upgrade CA-IDM to latest
release
Roney Moodley % Software
implemented and
licenses procured
40 40J
planning done Please provide evidence
and please indicate
where evidence can be
obtained.
72.6.1.2. Procure and implement servers,
storage & backup solution
Roney Moodley % Outlook and AD
Security to be on
supported Hardwar
30 30J
planning done Please provide evidence
and please indicate
where evidence can be
obtained.
Robert Dlamini 72.6.2. SDS: Datacente Mechanical and
Eletcrical Equipment
Roney Moodley 72.6.2.1. Datacente Mechanical and
Eletcrical Equipment
Roney Moodley % Datacentre
equipment
procured
100 25 25J
planning done Please provide evidence
and please indicate
where evidence can be
obtained.
72.6.3.1. SAN disc storage for
mainframe
Roney Moodley % Procure and
implement SAN
disk storage for
mainframe
25 30 30J
feasibility done Please provide evidence
and please indicate
where evidence can be
obtained.
72.6.3.2. VM / OS and VM management
tools
Roney Moodley % Upgrade VM stack
to support
Microsoft Azure
25 30 30J
planning complete Please provide evidence
and please indicate
where evidence can be
obtained.
72.6.3.3. VM Server for Open Systems Roney Moodley % Procure VM stack
for testing of Apps
25 30 30J
planning complete Please provide evidence
and please indicate
where evidence can be
obtained.
72.6.3.4. Back up Robot and Tape Drives Roney Moodley % Procure and
implement
25 30 30J
planning complete Please provide evidence
and please indicate
where evidence can be
obtained.
72.6.4.1. New Production Environment Rajiv Singh % 100% Deployment Projects done during
previous year - not
current
Projects done during
previous year - not current
Projects done during
previous year - not current
Projects done during
previous year - not current
This project done during
previous year, to be
removed during MTAs.
72.6.4.2. Additional Storage Rajiv Singh % 100% Deployment Projects done during
previous year - not
current
Projects done during
previous year - not current
Projects done during
previous year - not current
Projects done during
previous year - not current
This project done during
previous year, to be
removed during MTAs.
72.7.1.1. Risk Management Seminar Phumi Madlala Number 1 0 0J
Due to be done in second
quarter
72.7.1.2. Risk Induction of leadership Phumi Madlala Number 1 0 0J
Due to be done in second
quarter
72.7.1.3. Participate in staff Induction
sessions
Phumi Madlala Number 8 2 2J
Available at 15th floor -
Embassy Building with
Bonga Mhlongo
DMTP Manco Training
Risk Champion Quartely
Meeting - Substituted in lieu
of schheduled induction
from HR
72.7.1.4. BCM Training and awareness Phumi Madlala Number 12 3 5J
Available at 15th floor -
Embassy Building with
Bonga Mhlongo
Development Planning &
Engineering 2 Units not
planned for this quarter
were available for training
and awareness as well as
assistance to commence
with BCM implementation.
Xoliswa Hlongwane 72.7.2. Systems enhancements Phumi Madlala 72.7.2.1. Cura enhancements and
Training
Phumi Madlala Number 12 100 3 2L
Discussions with
service provider on
amendments to
objectives took longer
than expected
Ability to amend Objectives'
column still being discussed
with service provider.
Engagements currently in
progress, and agreement will
be reached during 2nd
quarter.
Available at 15th Floor
Embassy Building with
Bonga Mhlongo
Discussions with service
provider on amendments to
objectives took longer than
expected
72.4. Network,
Telecommunications and
Electronic Services
Robert Dlamini 72.4.5. Ethekwini Water Services Network
& Telephony
Rajiv Singh
72.5. Managing ICT
Customers and desktop
infrastructure
Nomazwi Mhloma 72.5.1. Infrastructure management tools Nomazwi Mhloma
Nomazwi Mhloma 72.5.2. Enterprise Architecture (CGICT)
72.6. Provision of a secure
and robust server and data
centre infrastructure
Robert Dlamini 72.6.1. IT Security & Access
Management
Roney Moodley
Robert Dlamini 72.6.3. SDS: Server and SAN storage for
Production and DR
Nomazwi Mhloma
Nomazwi Mhloma 72.5.3. Software Licences Nomazwi Mhloma
Roney Moodley
Robert Dlamini 72.6.4. Ethekwini Water Services
Infrastructure
Rajiv Singh
72.7. To develop, co-ordinate,
implement and monitor the
Enterprise Risk Management,
Business Continuity (BCM)
and Project Risk Management
programs within the
municipality
Xoliswa Hlongwane 72.7.1. Training and awareness Phumi Madlala
Programme Programme Driver Project Project Manager Sub Project Sub Project Owner Unit Of Measure Annual Target as
at 2017/2018
Quarter 1
Weight as at
2017/2018
Quarter 1
Target as at
30 September
2017/2018
Quarter 1
Actual as at
30 September
2017/2018
Indicator Reason For Variance Steps Taken to improve
Performance
Means Of
Verification/Evidence
Comment PME Coment
Xoliswa Hlongwane 72.7.3. Risk assessment Phumi Madlala 72.7.3.1. Risk Maturity Assessments Phumi Madlala Number 2 0 0J
Due to be done in second
quarter
Xoliswa Hlongwane 72.7.4. Business Continuity program Phumi Madlala 72.7.4.1. Business continuity support,
advisory, and implementation
Phumi Madlala Number 12 3 6J
Available at 15th floor
Embassy Building with
Bonga Mhlongo
Development Planning
Engineering - Two
additional Units that were
not targeted for
implementation this quarter
expressed readiness to
commence BCM
implementation and were
supported.
72.7.5.1. Strategic and Operational risk
registers and quarterly reviews
Phumi Madlala Number 38 10 29J
Available at 15th floor
Embassy building with
Bonga Mhlongo
Ecod & HSEETA Cluster
Operational risk
assessments were able to
be completed timeously
than previous years
72.7.5.2. Practitioner reports Phumi Madlala Number 24 6 13J
Available at 15th floor
Embassy Building with
bonga Mhlongo
CM Report - AC - 29
SeptCRO Report - AC - 29
Sept BCM Report - AC -
29 Additional Reports were
prepared by practitioners to
risk governance structures.
72.7.5.3. Risk Reports and presentations
to operations
Phumi Madlala Number 36 8 13J
Available at 15th floor
Embassy Building with
Bonga Mhlongo
September combined risk-
moved to 2nd of
October.More monthly risk
presentations to support are
done by practitioners to
Operations than budgeted.
Review will be done at mid-
term to adjust linked
practical results.
Sibusiso Shezi 72.8.1. % of Business License
Applications finalised within 60 day
Qondeni Liqwa % 100% of all
Business Licenece
Applications
finalised within 60
days
100 100 100J
n/a n/a Please see the attached
evidence
We received more
applications than the
licenses issued.
Linda Mbonambi 72.9.1. Joint Government Inanda
Ntuzuma Kwa-Mashu business plan
Linda Mbonambi % Full Implementation 12.5 25 25J
Linda Mbonambi 72.9.2. Improved Environment
Programme
Linda Mbonambi % Full Implementation 12.5 25 25J
Linda Mbonambi 72.9.3. Enhanced Income Programme Linda Mbonambi % Full implementation 12.5 25 25J
The evidence can be
collected from Linda
Mbonambi's office since it
does not allow to be
uploaded on the system.
Linda Mbonambi 72.9.4. Infrastructure Investment
Programme
Linda Mbonambi % Full implementation 12.5 25 25J
Linda Mbonambi 72.9.5. Profiling of bad buildings Hoosen Moola Number 12 12.5 3 3J
Profile documents available
on file
Unit is underresourced Please indicate where
evidence can be
obtained
Linda Mbonambi 72.9.6. Facilitate the serving of
contravention notices on building owners
Hoosen Moola Number 36 12.5 9 14J
copies of Notices available
on File
Unit is under resourced Please indicate where
evidence can be
obtained, and reasons
for over achievement
Linda Mbonambi 72.9.7. Close down buildings and
rehabilitation of buildings
Hoosen Moola Number 4 12.5 1 1J
Profile document with
closure on file/ also onsite
verification
Unit is under resourced Please indicate where
evidence can be
obtained
Linda Mbonambi 72.9.8. Undertake integrated joint
operations on identified problem buildings
Hoosen Moola Number 10 12.5 3 3J
Documents relating to joint
operations on file
Unit is under resourced Please indicate where
evidence can be
obtained
Linda Mbonambi 72.9.9. Support the establishment of
Urban Improvement Precincts (UIP’s)
Linda Mbonambi % 80 20 20L
The support and
establishment of Urban
Improvement Precincts
(UIP's) follows the same
process of signing of the
Service Level Agreements.
The support for UIP's
needs the Service Level
Agreements in place first
before the UIP's can be
established. The evidence
for support and establish
the UIP's is the same as
the one for facilitate the
development and signing of
Service Level Agreements
(SLA's).
Please provide reasons
for non achievement
and indicate where
evidence can be
obtained.
Xoliswa Hlongwane 72.7.5. Strategic and operational risk
Assessments and reviews
Phumi Madlala
72.8. Review Business
License regulatory framework
and processes
72.9. Coordinate and
Implement ABM projects
72.7. To develop, co-ordinate,
implement and monitor the
Enterprise Risk Management,
Business Continuity (BCM)
and Project Risk Management
programs within the
municipality
Programme Programme Driver Project Project Manager Sub Project Sub Project Owner Unit Of Measure Annual Target as
at 2017/2018
Quarter 1
Weight as at
2017/2018
Quarter 1
Target as at
30 September
2017/2018
Quarter 1
Actual as at
30 September
2017/2018
Indicator Reason For Variance Steps Taken to improve
Performance
Means Of
Verification/Evidence
Comment PME Coment
Linda Mbonambi 72.9.10. Facilitate Urban Management
processes and innovations
Linda Mbonambi % 90 20 15L
The full intention is to
improve the quality of life of
all stakeholders, thus
contributing to the city’s
investment quality and
creating employment.
To uplift and sustain the
area identified as the urban
management zone which
includes:
ZONE 1 – Central & CBD
ZONE 2 – Warwick &
Albert Park
ZONE 3 – Point &
Addington
ZONE 4 – Back of Beach
ZONE 5 – Sport Precinct
ZONE 6 – Umngeni
Corridor
Provide a clean and safe
environment.
Contribute to sustainable
urban management through
facilitating the integration
and management of
municipal services.
Ensure that the assets are
maintained especially in
Please provide reasons for
under achievement.
Please provide reasons
for non achievement
and indicate where
evidence can be
obtained.
Linda Mbonambi 72.9.11. Facilitate and control the call
logging system on all faults identified.
Linda Mbonambi % 100 25 20L
South Durban Basin
1. A total of 1222 calls
logged.
2. A total of 599 calls
closed.
Please provide reasons for
under achievement.
Please provide reasons
for non achievement
and indicate where
evidence can be
obtained.
Linda Mbonambi 72.9.12. Inspections on all sites where
faults have been identified and close the
calls when the issues have been resolved.
Linda Mbonambi % 85 20 20J
South Durban Basin
A total of 182 site
inspections in
SDB/Chatsworth
Please provide reasons
for non achievement
and indicate where
evidence can be
obtained.
Linda Mbonambi 72.9.13. Facilitate the development of
Service Level Agreements with various
Units to ensure efficiency and
accountability within the Units.
Nompumelelo Ntuli % 80 20 20J
The signing of Service
Level Agreements (SLA's)
is a process and it relies on
other Units
/Departments.The
workshop with the relevant
Heads of
Units/departments was held
on the 20th September
2017. The purpose of the
workshop was to facilitate
the development and
signing of SLA's.There are
also planned workshops
that are aimed to finalise the
signing of SLA's.
Please provide reasons
for non achievement
and indicate where
evidence can be
obtained.
Linda Mbonambi 72.9.14. Establish Urban Management
Forums in all ABM areas where
Departments meet to plan, report and
resolve service delivery issues together
Linda Mbonambi % 80 20 20J
The evidence of
minutes/reports are
obtainable at number 77
Monty naicker from
Nompumelelo Ntuli since
the document was not able
to be uploaded.
Please provide reasons
for non achievement.
Linda Mbonambi 72.9.15. Facilitate and co-ordinate the City
Manager’s Executive Operations meeting
Linda Mbonambi % 100 25 25J
The evidence can be
collected from the Project
Manager's responsible
Thobile Ngcobo at number
77 Monty Naicker, Durban
Central.
Please provide reasons
for non achievement.
72.9. Coordinate and
Implement ABM projects
Programme Programme Driver Project Project
Manager
Sub Project Sub Project
Owner
Unit Of
Measure
Annual Target as at
2017/2018
Quarter 1 Target
as at 30
September
2017/2018
Quarter 1
Actual as at 30
September
2017/2018
Indicator Reason For Variance Steps Taken to
improve
Performance
Means Of Verification/Evidence Comments PME Comments Review of evidance findings Evidance per project plan
Sandile Mnguni 8.1.1. Co-ordinate and
compile an Operating
Budget which is
sustainable and
affordable to the rate
payer/consumer
Kay Naidoo % Completion by 31
March
10 10 J Documents available at 5th floor
FMB, Budget Office
Detailed timetable of the budget
and allied processes completed
and report done. Budget circulars
issued. Staff estimates and
executive packages base
calculations done being checked.
New budget model near
completion.
Set a meeting,print project plans
Sandile Mnguni 8.1.2. Co-ordinate and
compile a 3 year Capital
Budget which is
affordable and in line with
the financial
model/strategy
Zama Cele % Produce budget in line
with finance
model/strategy
10 10 J Documents available at 5th floor
FMB, Budget Office
Commences at in the second
quarter. Circulars prepared.New
capital budget model completed
and final testing being completed.
Set a meeting,print project plans
Sandile Mnguni 8.2.1. Provide support on
city's strategic budgeting
process
Kay Naidoo % Completion by 31
March
10 10 J Documents available at 5th floor
FMB, Budget Office
Commences at the end of the
quarter. Circulars giving direction
to the budget process including
prioritising and capturing issued
Set a meeting,print project plans
Sandile Mnguni 8.2.2. Alignment of
operating budget to the
IDP
Kay Naidoo % Operating budget
aligned to the IDP
10 10 J Evidence available at 5th floor
FMB, Budget Office
New capital budget model with
IDP categories automated
completed and being tested.
Set a meeting,print project plans
Sandile Mnguni 8.3.1. Refine financial
model and update
projections
Kay Naidoo 8.3.1.1. Long Term
Financial Plan
Kay Naidoo % Review and update
Financial Model
15 15 J Evidence available at 5th floor
FMB, Budget Office
New budget model for operating
and capital budgets finalised on
E1 and testing being completed.
Set a meeting,print project plans
8.3.2.1. Accounting
Policy
Yogeeta
Rayan
% Revised policies
approved by Council
0 0 A annual target
8.3.2.2. Borrowing
Framework Policy and
Guidelines
Sibonelo
Mbele
% Revised policies
approved by Council
0 0 A review of the policy will be initiated
shortly in line with budget and will
be tabled before June 2018
8.3.2.3. Budget Policy Kay Naidoo % Revised policies
approved by Council
0 0 N/A Commences in the second quarter annual target
8.3.2.4. Credit Control
and Debt Collection
Policy
Nokulunga
Nzuke
% Draft Policy and the
F&P Committee
Report submitted to
Legal
10 10 J Evidance received we have recieved CREDIT
CONTROL AND DEBT
COLLECTION POLICY 2017/2018
but this does not correspond with
what we have on the project plan for
this sub project therefor I would to
request evidance of meetings and
invite request as per project plan.
8.3.2.5. Review free
basic services (FBS)
package in terms of
affordability and
sustainability
Khanyisile
Gama
% Full review of FBS
package and decisions
taken regarding the
appropriateness of the
threshold levels of the
lifeline tariffs and, if
necessary, policies
amended accordingly
10 10 J With Khanyi 1st Floor FMB Set a meeting,print project plans
8.3.2.6. Investment
Framework Policy and
Guidelines
Sibonelo
Mbele
% 100% 0 0 A review of the policy will be initiated
shortly in line with budget and will
be tabled before June 2018
annual target
8.3.2.7. Rates Policy Nokulunga
Nzuke
% Draft Policy and the
F&P Committee
Report submitted to
Legal
10 10 J Evidance received we have recieved RATE POLICY
2017/2018 but this does not
correspond with what we have on
the project plan for this sub project
therefor I would to request invite
request as per project plan.
8.3.2.8. Tariff Policy Nokulunga
Nzuke
% Draft Policy and the
F&P Committee
Report submitted to
Legal
10 10 J Please provide evidence Set a meeting,print project plans
8.3.3.1. Salaries &
Wages as a % of
operating expenditure
Yogeeta
Rayan
% 30 30 27.89 L This target is normally an annual
target and the 30% is a National
Treasury benchmark. The ratio is
slightly below the benchmark/target
due to time taken to fill vacancies.
The ratio is expected to increase as
posts are filled during the year
EVIDANCE PROVIDED Favourable Please provide reason for
variance
Set a meeting,print project plans
8.3.3.2. Repairs &
Maintenance as a % of
opex
Yogeeta
Rayan
% 7 7 5.34 L This target is normally and annual
target. Whilst the actual is below
the target at this stage, historically
the target is always exceeded by
year end. The actual will increase
as spending on repairs and
maintenance increases in the
ensuing months.
EVIDANCE PROVIDED Unfavourable. Target anticipated
to be achieved by year end.
Please provide reason for
variance
Set a meeting,print project plans
8.3.3.3. Debt-Equity
Ratio
Yogeeta
Rayan
% 1:1 (100) 0 0.21:1 J This target is normally an annual
target and is favourable. This ratio
will increase once the R1 billion
loan to fund capital expenditure is
taken.
EVIDANCE PROVIDED Favourable Please provide reason for
variance
Set a meeting,print project plans
8.4.
Implementation of
Municipal
Property Rates
Act
Vincent Cebekhulu 8.4.1. Compile
Supplementary Valuation
Roll
Clive
Munien
Number Issue 1 supplementary
roll in May.
0 0 A Annual target
8.5.1.1. % Collection
Rate Bulk Electricity
Philile
Madonsela
% 95 95 96.09 J
Overcollected Monthly reports
Please provide reason for
virianceand means of
verification
8.5.1.2. % Collection
Rate Electricity
Philile
Madonsela
% 95 95 114.71 J
Overcollected Monthly reports
Please provide reason for
virianceand steps taken to
improve performance, as well
as means of verification
Plan 8 :Financially Accountable and Sustainable City
Plan Owner: Krish Kumar
8.1. Compile and
annually update
the City's Medium
Term Income and
Expenditure
Framework
8.2. Budget
according to IDP
priorities
8.3. Budget for
sustainability
Sandile Mnguni 8.3.2. Review Budget
Related Policies
Sandile
Mnguni
Sandile Mnguni 8.3.3. Monitoring of key
ratios
Sandile
Mnguni
8.5. Reduce
Council Debts
Peet Duplessis 8.5.1. Collection of
outstanding debts
Peet
Duplessis
Programme Programme Driver Project Project
Manager
Sub Project Sub Project
Owner
Unit Of
Measure
Annual Target as at
2017/2018
Quarter 1 Target
as at 30
September
2017/2018
Quarter 1
Actual as at 30
September
2017/2018
Indicator Reason For Variance Steps Taken to
improve
Performance
Means Of Verification/Evidence Comments PME Comments Review of evidance findings Evidance per project plan
8.5.1.3. % Collection
Rate Water
Philile
Madonsela
% 95 95 73.48 L
Collected less than expected due to
limited disconnections
Improve debt
collection and
enforce
disconnections
Monthly reports
Please provide reason for
virianceand steps taken to
improve performance, as well
as means of verification
8.5.1.4. % Collection
Rate Rates
Philile
Madonsela
% 95 95 67.39 L
Collected less than expected due to
annual rates raised in July and due in
Oct. 2017
Annual rates due
in October and
that should
increase
collections
Monthly reports
Please proviode reason for
virianceand steps taken to
improve performance, as well
as means of verification
8.6. Secure
property and
property rights
necessary for
capital projects
Vincent Cebekhulu 8.6.1. Ensure capital
provision spend for Real
Estate Blocksum in
respect of property
acquisitions
Clive
Munien
% 100% spend of capital
provisions (reflects %
spend of the capital
blocksum)
5 4.17 L delay in processing of payments Discuss the
delays with the
finance
department to
speed up
payment
Refer to email dated 10 October
2017 from the departmental
accountant (attached).
They is no project plan for this
project and they have provided
spreed sheet that consist of
calculantions .and elmail
explaination " the percentage of 4.17
reflected is based on a budget of
R3.6m"
8.7. Revenue
Completeness:Re
venue
Management
System
Peet Duplessis 8.7.1. Percentage of
contracts that should be
billed versus contracts
actually billed
Khanyisile
Gama
% 100 100 99 L Some contracts were missed Daily balancing
has been
implemented
working together
with the
production team
to monitor and
resolve issues as
they occur.
With Khanyi 1st Floor FMB *Please elaborate on reason
for varience and also on
steps taken to improve
perfomance
8.8. Seek to
maximise returns
on investment
opportunities
Sibonelo Mbele 8.8.1. Investment
optimization
Sibonelo
Mbele
8.8.1.1. External vs.
internal funding exercise
Sibonelo
Mbele
% Investment return to be
in line with average
NCD rate
100 100 J EVIDANCE PROVIDED Set a meeting,print project plans
Vincent Cebekhulu 8.9.1. Grow property
sales income (year to
date)
Fathima
Khan
R 24000000 6000000 0 L No report done
Vincent Cebekhulu 8.9.2. Grow property
lease income (year to
date)
Vincent
Cebekhulu
R 103000000 11000000 0 L No report done
Sibonelo Mbele 8.10.1. Review
Investment Policy
Sibonelo
Mbele
% Revised policy 0 0 A review of the policy will be initiated
shortly in line with budget and will
be tabled before June 2018
Sibonelo Mbele 8.10.2. Review borrowing
for implementation of
capital programme
Sibonelo
Mbele
% Benchmark against
prevailing bond rates
100 100 J EVIDANCE PROVIDED Set a meeting,print project plans
8.11. Asset &
Liability Insurance
Cover
Sibonelo Mbele 8.11.1. Self Insurance
Fund settlements
Thulani
Ntuli
% Timeous settlement of
all claims
100 100 J JDE E1 Insurance Report Please advise if the provided
evidance of JDE claims report is for
1st proposal or final policy. The
evidance is not fully provided .to set
a meeting requesting missing
evidance
1. 1st Proposal & JDE Claims Report.
2. Minutes/ Correspondence & JDE Claims
Report.
3.Amended polilies
4.Final policy & JDE Claims Report.
8.12. Deadline
Monitoring
Similo Mbongwe 8.12.1. Maintain and
update deadline
monitoring system
Patrick
Chami
% Achievement of all
statutory deadlines for
Treasury Cluster
100 100 J Deadline Monitoring System's
(DLMS) Report for September
2017
Evidance in order but the evidance
provided contain completed
deadlines from DLMS for September
only why?
1. Report on Pending and completed deadlines
from DLMS
Sandile Mnguni 8.13.1. Submit financial
statements in compliance
with MFMA for the
previous financial year
Yogeeta
Rayan
8.13.1.1. Submission of
eThekwini's AFS
2016/2017
Yogeeta
Rayan
% 31-Aug 0 0 A annual target Set a meeting,print project plans
Sandile Mnguni 8.13.2. Maintain accurate
and updated asset
register
Zama Cele % Compliant register 0 0.99 J Updates are done during the AFS
process, awaiting Auditor
General's comments.
Please provide reason for
variance and means of
verification
8.14. Payment of
all creditors and
verification of
SCM procedures
Sandile Mnguni 8.14.1. Manage Systems
and procedures to ensure
all creditors paid within
legislated or contractual
deadlines
Tommy
Hunt
8.14.1.1. Verification of
SCM compliance
Tommy
Hunt
% All creditors paid within
the legislated time
frames or per their
payment terms
100 59 L July 2017 % was only 37% due to
financial year end, payment
documents continue to be delivered
late to Accounts Payable, payment
documents delivered to AP which
do not comply with the SCM policy
are not processed for payment until
regularised.
Finance circular
has been issued
setting out the
required time
frames for
business units to
approve
documents and
deliver to AP.
E1 Report Evidance in oder.List of payments
made for the first quarter.
1 .Payment Documents
8.15. Cash
Control and
Management
Peet Duplessis 8.15.1. Effective cash
management
Peet
Duplessis
8.15.1.1. Banking and
reconciliation of cash on
a daily basis
Khanyisile
Gama
% All Council revenue
accounted for
100 100 J Krish Naidoo 3rd Floor FMB Set a meeting,print project plans
Andre Petersen 8.16.1. Contracts
Management
Andre
Petersen
8.16.1.1. Procurement
Scheduling
Andre
Petersen
Number Reporting on
procurements plans for
the Top 150 capital
projects
3 3 J Evidence uploaded Evidance in oder No project plan for this project
8.16.2.1. Letters of
awards
Andre
Petersen
% All letters of award
issued within 30
calander days from the
date of finalisation of
award.
80 80 J Documents can be verified as they
are available in my office (Nicolette
Napier's Office).
Set a meeting,print project plans
8.16.2.2. Monitoring of
reports in bid committee
process
Andre
Petersen
Number Monthly tracking
reports on all bid
committee repor
3 3 J July Report, August Report and
September Report
Evidance in oder No project plan for this sub project
8.16.2.3. Review of SCM
Policy
Andre
Petersen
% Amended Policy
approved & in place by
30 June 2018
0 0 A No work has commenced on the
SCM Policy yet: currently at 0%.
8.17. Municipal
Energy Efficiency,
Saving & Strategy
Sibonelo Mbele 8.17.1. Implementation of
the Durban Energy Office
programmes
Magashen
Naidoo
% 80% implementation of
programmes
20 17 L Progress report for the
Development of an Energy
Management System not fully
acheived as there are some steps
that are not yed done. However the
final report on Q4 will be achieved.
Draft EIA report for the Erection of
the Wind Turbine has not been
compiled, but Q4 target will be
achieved.
Energy Office to
formalise due
tades in advance
for better
communication.
For wind turbine,
bad weather
impacts will be
taken into
account going
forward.
evidance uploaded Please provide means of
verification
evidance is provided but some
reports are for 2016.
1. Progress report
2. Draft EIA report
8.18. Risk
Management
Similo Mbongwe 8.18.1. Monitoring of top
10 risks for the Cluster:
Advise and assist units
within the cluster on risk
management issues and
report back to Risk
Management component
on progress.Monitoring
implementation of action
plans on the Risk
Register for the current
year
Vikash
Deeplal
Number Produce a quarterly
risk report to manage
all top 10 cluster risks
and keep them within
acceptable levels
1 1 J Available on the 7th Floor, FMB Set a meeting,print project plans
Similo Mbongwe 8.19.1. Performing bank
reconciliations for all
accounts on a monthly
basis and resolving any
non reconciling items
timeously
Vikash
Deeplal
Number Performance of 12 sets
of Bank Reconciliations
(monthly) by the 10th
working day after
month end
3 3 J Evidence Available on the 7th
Floor, FMB
Set a meeting,print project plans
8.5. Reduce
Council Debts
Peet Duplessis 8.5.1. Collection of
outstanding debts
Peet
Duplessis
8.9. Maximise
revenue from
Council properties
8.10. Investment
Management
8.13. Completion
of Financial
Statements
8.16. Effective,
efficient and
economical SCM
Andre Petersen 8.16.2. Continuous
Improvement
Andre
Petersen
8.19.
Reconciliations
and Pay Admin
Programme Programme Driver Project Project
Manager
Sub Project Sub Project
Owner
Unit Of
Measure
Annual Target as at
2017/2018
Quarter 1 Target
as at 30
September
2017/2018
Quarter 1
Actual as at 30
September
2017/2018
Indicator Reason For Variance Steps Taken to
improve
Performance
Means Of Verification/Evidence Comments PME Comments Review of evidance findings Evidance per project plan
Similo Mbongwe 8.19.2. Performing
payroll administration
duties: Processing salary
payments and any other
related third party
payment transactions on
time.
Vikash
Deeplal
Number Perform 12 sets of
Payroll Reconciliations
(monthly) together with
the processing of all
Salary and Statutory
Payments in line with
policies/ legislation
3 3 J Available on the 7th Floor, FMB Set a meeting,print project plans
8.20. Effective
and efficient
processes
Similo Mbongwe 8.20.1. Review of
Standards operating
procedures for Treasury
Cluster
Patrick
Chami
Number 4 departments
reviewed in the year
1 1 J Review of the SCM Store
Department's procedure manuals
has been completed for the
Quarter. Number of documents
and large files can be viewed by
contacting Financial Officer: Sindi
Buthelezi on X11952
Set a meeting,print project plans
Similo Mbongwe 8.20.2. Undertaking of
Special Projects within
Treasury Cluster - to
improve service delivery
to other units
Patrick
Chami
Number 2 special projects to be
completed within
agreed timeframes
0 0 N/A
Malcolm Joshua 8.21.1. Improve
effectiveness of
operations
Malcolm
Joshua
8.21.1.1. Standardization
of vehicle fleet
Malcolm
Joshua
% 80% of vehicles
purchased in
accordance with the
vehicle replacement
programme
80 100 J All vehicles purchased are in
accordance with the vehicle
replacement programme
Vehicle Standardisation Report
and council resolution.
elaborate on reason for
varience on what resulted to
over achievement of the target
evidance reccieved.since they is
nothing to compare to will take it as
it is
nothing
8.21.2.1. Optimal
availability of fleet
vehicles (excluding
buses)
Malcolm
Joshua
% 90% availability of fleet
vehicles (excluding
buses)
90 90 J Reports on vehicles off the roads
for July, August and September.
evidance reccieved.since they is
nothing to compare to will take it as
it is
nothing
8.21.2.2. Optimal
availability of bus fleet
Malcolm
Joshua
% 90% availability of bus
fleet.
90 95 J Achieved due to effort employed at
monitoring and managing the
turnaround time for buses at the
workshops. Meetings are being
held every Friday with the bus
manufacturers
Report for buses off the road for
July, August and September.
evidance reccieved.since they is
nothing to compare to will take it as
it is
nothing
Malcolm Joshua 8.21.3. Ensure that the
mechanical workshop
facilities are equipped to
manage the technological
advancements in the
automotive industry
Malcolm
Joshua
8.21.3.1. Improvement of
workshops in terms of
optimal utilisation and
service delivery
Malcolm
Joshua
% Upgrade workshop
tools and equipment
aligned to OEM
Standards
25 80 J The project started in 2016 and
almost complete.
Official purchase order what enabled the unit to
overachieve this target ?
evidance reccieved.since they is
nothing to compare to will take it as
it is
nothing
8.21. Efficient
Fleet
Management
Malcolm Joshua 8.21.2. Maximising
vehicle availability to
enhance service delivery
capabilities of the
municipalities
Malcolm
Joshua
8.19.
Reconciliations
and Pay Admin