+ All Categories
Home > Documents > EUCOS - FMInetfam.fmi.fi/OBS09/dibbern.pdfEUCOS The EUMETNET Composite Observing System Status and...

EUCOS - FMInetfam.fmi.fi/OBS09/dibbern.pdfEUCOS The EUMETNET Composite Observing System Status and...

Date post: 30-Jan-2021
Category:
Upload: others
View: 1 times
Download: 0 times
Share this document with a friend
46
10 March 2008 Jochen Dibbern, EUCOS Program 1 EUCOS The EUMETNET Composite Observing System Status and new programmatic objectives 2009-2011 Jochen Dibbern EUCOS Programme Manager COST Action ES0702 Workshop, Oslo, 18 March 2009
Transcript
  • 10 March 2008 Jochen Dibbern, EUCOS Programme Manager, Deutscher Wetterdienst1

    EUCOSThe EUMETNET Composite Observing System

    Status and new programmatic objectives 2009-2011

    Jochen Dibbern EUCOS Programme Manager

    COST Action ES0702 Workshop, Oslo, 18 March 2009

    www.free-stockphotos.com

  • Jochen Dibbern, EUCOS Programme Manager, Deutscher Wetterdienst 2

    Content

    • EUCOS programme and objectives• The current EUCOS network• EUCOS Information System and Quality Monitoring• EUCOS objectives for 2009-2011• EUCOS interest in EG-CLIMET activities

  • Jochen Dibbern, EUCOS Programme Manager, Deutscher Wetterdienst 3

    EUCOS OPERATIONAL PROGRAMME

    E-AMDARE-ASAP

    (including OWS „M“ and Ekofisk“)

    E-SURFMAR(surface marine buoys and VOS)

    E-WINPROFTerritorial Segment

    (upper air and RBSN stations)

    Operations Monitoring

    Studies Programme

    Possible Future

    Observation Targeting

    Programme Components

    Fully integrated programmes

    since 2009

    Collaborative components

    Managed byEUCOS team

    Evolving needs

    EUCOS governance (1)

    E-GVAP

  • Jochen Dibbern, EUCOS Programme Manager, Deutscher Wetterdienst 4

    EUCOS governance (2)EUMETNET

    Council EUMETNET CO

    EUMETNETProgramme Board

    (PB-OBS)

    EUCOSProgramme Team

    EUCOS AdvisoryGroup

    EUCOS ScientificAdvisory Team

    External Relations(GMES, GEO, EUMETSAT,

    ECMWF, WMO)

    National EUCOS contacts

  • Jochen Dibbern, EUCOS Programme Manager, Deutscher Wetterdienst 5

    EUCOS objectives

    EUCOS: EUCOS: Serving the Regional Scale NWP Serving the Regional Scale NWP

    requirement for observations over the requirement for observations over the European regionEuropean region

    Contributes to

    Medium and extended range weather prediction over the Globe

    Provides a framework for

    Very short range and nowcasting over national territories

    Climate,Climate prediction

    Warnings and InfoServices

  • Jochen Dibbern, EUCOS Programme Manager, Deutscher Wetterdienst 6

    EUCOS area (10N-90N, 70W-40E)

  • Jochen Dibbern, EUCOS Programme Manager, Deutscher Wetterdienst 7

    The current EUCOS networkThe network comprises

    • All European ships of the Automated Ship Aerological Programme - ASAP (10 E-ASAP integrated, 6 national)

    • All European measurements from commercial aircrafts (AMDAR)• European wind profiler and weather radar wind profiles• Ocean weather ship „M“ and Ekofisk oil platform• Selected moored buoys and all European drifting buoys• European Voluntary Observing Ships• Selected European radiosonde stations• Selected European synoptic weather stations

    The EUCOS Team is responsible for providing statistics summarising the performance of each component of the network

  • Jochen Dibbern, EUCOS Programme Manager, Deutscher Wetterdienst 8

    E-ASAP: The oceanic upper-air segment

    ResponsibleMember: DWD

  • Jochen Dibbern, EUCOS Programme Manager, Deutscher Wetterdienst 9

    E-ASAP network coverage 2008

  • Jochen Dibbern, EUCOS Programme Manager, Deutscher Wetterdienst 10

    E-SURMAR: the oceanic surface segment

    Responsible Member: Météo France

  • Jochen Dibbern, EUCOS Programme Manager, Deutscher Wetterdienst

    Drifting buoys tracks

    January 2009

    Iridium SVP-B

    Argos SVP-B

    SVP-BW

    (moored buoys)

  • Jochen Dibbern, EUCOS Programme Manager, Deutscher Wetterdienst

    0

    500

    1000

    1500

    2000

    2500

    3000

    janv-0

    2

    mai-0

    2

    sept-

    02

    janv-0

    3

    mai-0

    3

    sept-

    03

    janv-0

    4

    mai-0

    4

    sept-

    04

    janv-0

    5

    mai-0

    5

    sept-

    05

    janv-0

    6

    mai-0

    6

    sept-

    06

    janv-0

    7

    mai-0

    7

    sept-

    07

    janv-0

    8

    mai-0

    8

    sept-

    08

    janv-0

    9

    Num

    ber o

    f dai

    ly o

    bs.

    Total

    < 100 min

    < 50 min

    0

    20

    40

    60

    80

    100

    120

    Jan-02 Jan-03 Jan-04 Jan-05 Jan-06 Jan-07 Jan-08 Jan-09

    Nb

    of b

    uoys

    Others

    Upgrades

    SVP-BW

    SVP-B

    Iridium SVP-B

    FGGE-W

    FGGE

    Drifting Buoys - Data Availability

    E-SURFMAR

    E-SURFMAR

    EGOS

    EGOS

    Number of operating buoys : 250% increase over 6 years

    Volume of data : 330% increase over 6 years

  • Jochen Dibbern, EUCOS Programme Manager, Deutscher Wetterdienst

    EUMETNET automated VOS - Data availability in the EUCOS areaAverage number of observations per day

    0

    200

    400

    600

    800

    1000

    janv-0

    2ma

    i-02

    sept-0

    2jan

    v-03ma

    i-03

    sept-0

    3jan

    v-04ma

    i-04

    sept-0

    4jan

    v-05ma

    i-05

    sept-0

    5jan

    v-06ma

    i-06

    sept-0

    6jan

    v-07ma

    i-07

    sept-0

    7jan

    v-08ma

    i-08

    sept-0

    8

    Num

    ber o

    f dail

    y obs

    erva

    tions

    Total

    < 100 min

    < 50 min

    EUMETNET manned VOS - Data availability in the EUCOS areaAverage number of observations per day

    0

    200

    400

    600

    800

    1000

    janv-0

    2ma

    i-02

    sept-

    02

    janv-0

    3ma

    i-03

    sept-

    03

    janv-0

    4ma

    i-04

    sept-

    04

    janv-0

    5ma

    i-05

    sept-

    05

    janv-0

    6ma

    i-06

    sept-

    06

    janv-0

    7ma

    i-07

    sept-

    07

    janv-0

    8ma

    i-08

    sept-

    08

    Num

    ber o

    f dai

    ly o

    bser

    vatio

    ns

    Total

    < 100 min

    < 50 min

    VOS Observations

    Conventional VOS Automated VOS (AWS)

    E-SURFMAR

    E-SURFMAR

    Data AvailabilityAverage number of daily reports

    from the EUCOS area

    Target : 250 obs/day

    Target : 1000 obs/day

  • Jochen Dibbern, EUCOS Programme Manager, Deutscher Wetterdienst 14

    E-AMDAR: the aeronautical segment

    Responsible Member: SMHI

  • Jochen Dibbern, EUCOS Programme Manager, Deutscher Wetterdienst 15

    E-AMDAR network growthE-AMDAR Network Development

    Period January 2000 to December 2008

    0

    50

    100

    150

    200

    250

    300

    350

    400

    450

    500

    2000Q

    1Q

    2Q

    3Q

    42001Q

    1Q

    2Q

    3Q

    42002Q

    1Q

    2Q

    3Q

    42003Q

    1Q

    2Q

    3Q

    42004Q

    1Q

    2Q

    3Q

    42005Q

    1Q

    2Q

    3Q

    42006Q

    1Q

    2Q

    3Q

    42007Q

    1Q

    2Q

    3Q

    42008Q

    1Q

    2Q

    3Q

    4

    Rep

    ortin

    g ai

    rcra

    ft (d

    aily

    ave

    rage

    )

    0

    5000

    10000

    15000

    20000

    25000

    30000

    35000

    40000

    45000

    50000

    Obs

    erva

    tion

    tota

    ls (d

    aily

    ave

    rage

    )

  • Jochen Dibbern, EUCOS Programme Manager, Deutscher Wetterdienst 16

    E-AMDAR – Network coverage

  • Jochen Dibbern, EUCOS Programme Manager, Deutscher Wetterdienst 17

    WINPROF: The European wind profiler network

    Responsible Member: Met Office

  • Jochen Dibbern, EUCOS Programme Manager, Deutscher Wetterdienst 18

    Wind Profiler UK AssimilationWind Profiler Sites Assimilated in UK Met Office Model

    0

    5

    10

    15

    20

    25

    30

    35

    Jan-0

    3

    Mar-

    03

    May-0

    3

    Jul-03

    Sep-0

    3

    Nov-0

    3

    Jan-0

    4

    Mar-

    04

    May-0

    4

    Jul-04

    Sep-0

    4

    Nov-0

    4

    Jan-0

    5

    Mar-

    05

    May-0

    5

    Jul-05

    Sep-0

    5

    Nov-0

    5

    Jan-0

    6

    Mar-

    06

    May-0

    6

    Jul-06

    Sep-0

    6

    Nov-0

    6

    Jan-0

    7

    Mar-

    07

    May-0

    7

    Jul-07

    Sep-0

    7

    Nov-0

    7

    Jan-0

    8

    Mar-

    08

    Month

    To

    tal

    nu

    mb

    er

    of

    sit

    es

    Sites Assimilated

    Total sites Reporting

  • Jochen Dibbern, EUCOS Programme Manager, Deutscher Wetterdienst 19

    WRWP UK AssimilationWeather Radar Wind sites being Assimilated in UK Met Office Model

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    Jan-0

    3

    Mar-

    03

    May-0

    3

    Jul-03

    Sep-0

    3

    Nov-0

    3

    Jan-0

    4

    Mar-

    04

    May-0

    4

    Jul-04

    Sep-0

    4

    Nov-0

    4

    Jan-0

    5

    Mar-

    05

    May-0

    5

    Jul-05

    Sep-0

    5

    Nov-0

    5

    Jan-0

    6

    Mar-

    06

    May-0

    6

    Jul-06

    Sep-0

    6

    Nov-0

    6

    Jan-0

    7

    Mar-

    07

    May-0

    7

    Jul-07

    Sep-0

    7

    Nov-0

    7

    Jan-0

    8

    Mar-

    08

    Month

    To

    tal

    Sit

    es

    Sites Assimilated

    Total sites

  • Jochen Dibbern, EUCOS Programme Manager, Deutscher Wetterdienst 20

    EUCOS territorial segment

    EUCOS Operations Manager / Quality Monitoring Coordinator

  • Jochen Dibbern, EUCOS Programme Manager, Deutscher Wetterdienst 21

    EUCOS radiosonde station network

  • Jochen Dibbern, EUCOS Programme Manager, Deutscher Wetterdienst 22

    EUCOS surface land stations and RA-VI RSBN

  • Jochen Dibbern, EUCOS Programme Manager, Deutscher Wetterdienst 23

    EUCOS quality monitoring service

    • Agreed performance standards for all networks;• Web based Information Service www.eucos.net and Quality Monitoring Portal;• Quarterly network performance summary.

    EUMETNET data hubs• CWINDE (WINPROF): Wind profiler and wind profiles from weather radar data• OPERA: composite of weather radar data• E-ADAS (E-AMDAR): data from commercial aircraft• E-GVAP: water vapour measurements from GPS data

    • Plans for a centralized data hub as a DCPC in VGIC under development

    EUCOS quality monitoring

    http://www.eucos.net/

  • Jochen Dibbern, EUCOS Programme Manager, Deutscher Wetterdienst 24

    EUCOS Information System ( www.eucos.net )

    http://www.eucos.net/

  • Jochen Dibbern, EUCOS Programme Manager, Deutscher Wetterdienst 25

    EUCOS Quality Monitoring Portal

  • Jochen Dibbern, EUCOS Programme Manager, Deutscher Wetterdienst 26

    EUCOS network performance 2008 (1)Q4 2008 Network

    Target: 95% Target: 90% Target: 95% 95% 97% 99%

    Target: 95% New target: 75% Target: 95% Target: 97% Target: 95% 91% 75% 94% 96% 91%

    New target: 75% Target: 95% Target: 90% Target: 75% 1288 obs 76% 91% 89% 81%700 obs

    (equals 54%)Ocean platforms Target: 95% New target: 75% Target: 95% Target: 95% Target: 90% Average 93% 94% 97% 97% 94%

    LDWR 93% 98% 99% 99% 97%Ekofisk 93% 87% 94% 95% 90%

    Quarterly target:** Target: 90% Target: 95% 3 Mio. obs HH+50: 95% 97%4,070,580

    (equals 136%) --- ---

    Surface stations

    ASAP units

    Timeliness HH+100 (Radiosond es: TEMP CD) Achieving 100 hPa

    ---

    Radiosonde stations

    Data availabilityTimeliness HH+50

    (Rad iosond es: T EMP AB) Achieving 50 hPa

    ---

    Quarterly target: *

    E-AMDAR

    target achieved10% below target

    Subset of the complete monitoring table

  • Jochen Dibbern, EUCOS Programme Manager, Deutscher Wetterdienst 27

    EUCOS network performance 2008 (2)Comparing observations against NWP model output of COSMO-EU

    2008 NetworkTemperature

    RMSEWind Mean

    Vector Specific Humidity

    Error dq/q*O-B-

    Geopotential Pressure

    RMSETarget: 1 K Target: 2.5 m/s Target: 10% Target: 1 hPa

    1.71 K 2.72 m/s 8.63% 0.80 hPa

    Target: 1 K Target: 2.5 m/s Target: 10% Target: 65 m1.11 K 4.15 m/s 11.96% 21.56 m

    Target: 1 K Target: 2.5 m/s Target: 10% Target: 65 m1.10 K 4.31 m/s 12.22% 18.89 m

    Ocean platforms Target: 1 K Target: 2.5 m/s Target: 10% Target: 65 mAverage 1.03 K 3.78 m/s 13.21% 24.15 m

    LDWR 1.07 K 3.90 m/s 13.25% 23.80 mEkofisk 0.99 K 3.67 m/s 13.16% 24.50 m

    Target: 1.5 K Target: 2.5 m/s Target: 10%1.07 K 4.25 m/s not provided yet

    Target: 1 K Target: 2.5 m/s Target: 10% Target: 1 hPa0.97 K 3.34 m/s 7.79% 0.77 hPa

    Target: 1 hPa1.06 hPa

    VOS ships Target: 2 K Target: 5.0 m/s Target: 15% Target: 1 hPaAutomated 1.10 K 3.18 m/s 7.10% 0.74 hPaConventional 1.42 K 4.98 m/s 9.79% 1.44 hPa

    ---

    ---

    ---

    ---

    ASAP units

    Surface stations

    Radiosonde stations

    ---

    ---Moored buoys

    Drifting buoys

    ---

    ---

    ---E-AMDAR

    ---

    ------

    EUCOS target achievedwithin WMO target

    below WMO target

  • Jochen Dibbern, EUCOS Programme Manager, Deutscher Wetterdienst 28

    EUCOS objectives 2009-2011• OSE on EUCOS upper-air network redesign, to be conducted

    during 2009 by ECMWF, OMSZ and HIRLAM Group;• Evaluation of the EURORISK PREVIEW Data Targeting System

    Trial (2009/2010);• E-AMDAR humidity sensor trial and first phase of an operational

    programme (2009/2010);• Develop specification for a new EUMETNET programme with a

    centralised data hub and quality monitoring function (E-VCOMP);

    • Second combined EUMETSAT/EUMETNET study to evaluate the impact of METOP on the ground based observing network;

    • Collaboration with E-GVAP II on future integration into EUCOS;

  • Jochen Dibbern, EUCOS Programme Manager, Deutscher Wetterdienst 29

    Upper-air network redesign OSEScenario no 1: Baseline: All current satellite observations used in NWP (radiances, cloud-drift winds, scatt winds) + GUAN radiosonde network + GSN + hourly buoys (no ship data);Scenario no 2: Control run:All currently available data in the EUCOS area.Scenario no 3a: Experiment with horizontal spacing of 100 km for profiles.Baseline + terrestrial RaSo stations with 100 km horizontal spacing, thereby excluding RaSo stations if 3 hourly AMDAR measurements are available at those locations + AMDAR data, SHIP, BUOY, ASAP, WRWP, WP dataScenario no 3b:The same as for 3a but keeping 0 UTC radiosonde ascents at those sites which are excluded in scenario 3a because of the vicinity to an airportScenario no 4:Experiment with horizontal spacing of 250 km for profiles from radiosondes and aircraft.Scenario no 5:Experiment with horizontal spacing of 500 km for profiles from radiosondes and aircraft.

  • Jochen Dibbern, EUCOS Programme Manager, Deutscher Wetterdienst 30

    DTS – status December 2008• DTS-website can be found on ECMWF’s homepage:

    www.ecmwf.int/research/EU_projects/PREVIEW/DTS/index.html

    • During the 2008 trial phase 628 high impact cases were proposed and 548 accepted by the lead user;

    • 21 countries participated by making extra observations;88% of requested radiosonde ascents from land stations had been deployed; 54% of requested ASAP soundings; in 181 cases E-AMDAR data were requested;

    • The DTS is described in the latest issue of the “ECMWF newsletter”;

    http://www.ecmwf.int/research/EU_projects/PREVIEW/DTS/index.html

  • Jochen Dibbern, EUCOS Programme Manager, Deutscher Wetterdienst 31

    DTS - outlook

    • The trial period ended at 19 December 2008;

    • EUCOS looks for: • a continuation of the DTS (just the technical part) during 2009

    – a MoU has been negotiated with ECMWF;• A basic evaluation of the trial (e.g. cataloging of cases) – will

    be done by UK Met Office (first quarter 2009);• A systematic evaluation of the impact of additional data on

    NWP – preferably by data denial studies carried out by E-SAT members during 2009, results are expected for early 2010;

  • Jochen Dibbern, EUCOS Programme Manager, Deutscher Wetterdienst 32

    EUCOS interest in EG-CLIMET activities• Previous COST actions were taken over as EUMETNET programmes

    (examples WINPROF, E-GVAP);• As a result of the current discussion on the EUMETNET strategy the

    remit of EUCOS might be extended to local scale NWP and climate requirements;

    • EUCOS is interested in the planned testbed observing system experiments and long term trials to judge cost efficiency of new observing systems;

    • EUCOS could promote through its Science Advisory Team the close cooperation with NWP centres to make optimal use of observing data in assimilation techniques;

    • EUCOS is interested in EG-CLIMET network design recommendations.

  • Jochen Dibbern, EUCOS Programme Manager, Deutscher Wetterdienst 33

    Thank you for your attention !

  • Jochen Dibbern, EUCOS Programme Manager, Deutscher Wetterdienst 34

    PREVIEW Data Targeting System (DTS)The aim of data targeting is to make additional observations when and where they will be most beneficial to subsequent forecasts. The locations, "sensitive areas", could vary from day to day and the supplementary observations will be most valuable if they help reduce uncertainty in cases of potential high-impact weather

    A pre-operational Data Targeting System (DTS) has been developed to assess the feasibility of operational adaptive control of the observing system and as a facility to aid research projects using data targeting Met Office lead, partnering with ECMWF.

    50% / 50% funding from EUCOS and EC under the framework of PREVIEW (www.preview-risk.com)

    The DTS web tool has been developed at ECMWF and runs at ECMWF.

    http://www.preview-risk.com/

  • Jochen Dibbern, EUCOS Programme Manager, Deutscher Wetterdienst 35

    Data Targeting – user needsBetter observational response ahead of potentially high-impact weather events

    • System to better exploit existing observing systems – currently have rigid schedules

    • Observational assets to be more adaptive in real time

    Potentially improve forecast products • Reduce forecast uncertainties when ensemble products show differing

    predictions• Aid accurate prediction of high impact weather events over Europe• Aid early warning - 24 to 72 hours forecasts• Aid crisis support within regions impacted by severe events

  • Jochen Dibbern, EUCOS Programme Manager, Deutscher Wetterdienst 36

    PREVIEW Data Targeting System (DTS)The DTS will provide an interactive web-based facility to request additional observations from the operational observing network.

    Registered users of the DTS will be able to

    • identify potential high-impact weather events, in particular cases with large uncertainty

    • request sensitive area calculations for a given case: predictions of regions where additional observations are likely to have most impact in reducing the forecast uncertainty

    • identify which additional observations to request

    • issue requests for additional targeted observations

  • Jochen Dibbern, EUCOS Programme Manager, Deutscher Wetterdienst 37

    PREVIEW Data Targeting System (DTS)

    09:00 UTC 10:00 UTC 10:30 UTC 12:00 UTC 13:30 UTC 14:00 UTC

    ForecastProducts

    DTS

    Suggestcases

    Final Caseselection

    Request for calculations

    Sensitive Area

    Calculations from

    ECMWF & UKMO

    DTS

    View & comment on

    proposed observations

    ObservationAvailability

    Propose observations

    1. Case selection 3. Observation selection2. SACs

    View & comment on

    cases

    Final obsselection

    Requestfor

    observations&

    Notificationto providers

    User Lead User

  • Jochen Dibbern, EUCOS Programme Manager, Deutscher Wetterdienst 38

    DTS – forecast products display

  • Jochen Dibbern, EUCOS Programme Manager, Deutscher Wetterdienst 39

    PREVIEW Data Targeting System (DTS)

    09:00 UTC 10:00 UTC

    ForecastProducts

    DTS

    Suggestcases

    1. Case selection

    View & comment on

    cases

    User Lead User

  • Jochen Dibbern, EUCOS Programme Manager, Deutscher Wetterdienst 40

    DTS – case proposals

    online form:

    1. Selecting the VT

    2. Selecting the VA

    3. Choose the TT

    4. Add justification

    5. To Submit

  • Jochen Dibbern, EUCOS Programme Manager, Deutscher Wetterdienst 41

    PREVIEW Data Targeting System (DTS)

    09:00 UTC 10:00 UTC 10:30 UTC 12:00 UTC

    ForecastProducts

    DTS

    Suggestcases

    Final Caseselection

    Request for calculations

    Sensitive Area

    Calculations from

    ECMWF & UKMO

    1. Case selection 2. SACs

    View & comment on

    cases

    User Lead User

  • Jochen Dibbern, EUCOS Programme Manager, Deutscher Wetterdienst 42

    DTS – example of an ECMWF sensitive area calculation

  • Jochen Dibbern, EUCOS Programme Manager, Deutscher Wetterdienst 43

    PREVIEW Data Targeting System (DTS)

    09:00 UTC 10:00 UTC 10:30 UTC 12:00 UTC 13:30 UTC 14:00 UTC

    ForecastProducts

    DTS

    Suggestcases

    Final Caseselection

    Request for calculations

    Sensitive Area

    Calculations from

    ECMWF & UKMO

    DTS

    View & comment on

    proposed observations

    ObservationAvailability

    Propose observations

    1. Case selection 3. Observation selection2. SACs

    View & comment on

    cases

    User Lead User

  • Jochen Dibbern, EUCOS Programme Manager, Deutscher Wetterdienst 44

    DTS – observation selection

    online form:

    observation proposal

  • Jochen Dibbern, EUCOS Programme Manager, Deutscher Wetterdienst 45

    PREVIEW Data Targeting System (DTS)

    09:00 UTC 10:00 UTC 10:30 UTC 12:00 UTC 13:30 UTC 14:00 UTC

    ForecastProducts

    DTS

    Suggestcases

    Final Caseselection

    Request for calculations

    Sensitive Area

    Calculations from

    ECMWF & UKMO

    DTS

    View & comment on

    proposed observations

    ObservationAvailability

    Propose observations

    1. Case selection 3. Observation selection2. SACs

    View & comment on

    cases

    Final obsselection

    Requestfor

    observations&

    Notificationto providers

    User Lead User

  • Jochen Dibbern, EUCOS Programme Manager, Deutscher Wetterdienst 46

    Radiosondes

    E-AMDARE-ASAP

    DTS – additional obs from:

    Folie 1ContentFolie 3EUCOS governance (2)EUCOS objectivesEUCOS area (10N-90N, 70W-40E)The current EUCOS networkE-ASAP: The oceanic upper-air segmentFolie 9E-SURMAR: the oceanic surface segmentDrifting buoys tracksDrifting Buoys - Data AvailabilityVOS ObservationsE-AMDAR: the aeronautical segment E-AMDAR network growthE-AMDAR – Network coverageWINPROF: The European wind profiler networkFolie 18Folie 19EUCOS territorial segmentEUCOS radiosonde station networkEUCOS surface land stations and RA-VI RSBNEUCOS quality monitoring serviceEUCOS Information System ( www.eucos.net )EUCOS Quality Monitoring PortalEUCOS network performance 2008 (1)EUCOS network performance 2008 (2)EUCOS objectives 2009-2011Upper-air network redesign OSEDTS – status December 2008DTS - outlookEUCOS interest in EG-CLIMET activitiesThank you for your attention !Folie 34Data Targeting – user needsPREVIEW Data Targeting System (DTS)Slide 37DTS – forecast products displaySlide 39DTS – case proposals online form: 1. Selecting the VT 2. Selecting the VA 3. Choose the TT 4. Add justification 5. To Submit Slide 41DTS – example of an ECMWF sensitive area calculation Slide 43DTS – observation selection online form: observation proposal Slide 45DTS – additional obs from:


Recommended