EURISOL DS: European Isotope Separation On-Line Radioactive Ion Beam Facility Design Study G. Fortuna, Debrecen june 05
Transcript
Page 1: EURISOL DS: European Isotope Separation On-Line Radioactive Ion Beam Facility Design Study G. Fortuna, Debrecen june 05.

EURISOL DS:

European Isotope Separation On-Line Radioactive Ion Beam

Facility

Design Study

G. Fortuna, Debrecen june 05

Page 2: EURISOL DS: European Isotope Separation On-Line Radioactive Ion Beam Facility Design Study G. Fortuna, Debrecen june 05.

Design Study

G. Fortuna, Debrecen june 05

THE GOAL:

Producing an engineering oriented study

of the EURISOL Facility and developing prototypes

of the most critical parts of the facility itself.

“Starting point: EURISOL RTD Recommendations”

Page 3: EURISOL DS: European Isotope Separation On-Line Radioactive Ion Beam Facility Design Study G. Fortuna, Debrecen june 05.

IDENTITY CARDIDENTITY CARD

EC CONTRIBUTION:EC CONTRIBUTION: ((k€)k€) 9161.99161.9 - FTE 113,25 (p*y)- FTE 113,25 (p*y)

TASKS:TASKS: 1+11 1+11 (MANAGEMENT + FOUR TOPIC AREAS)

PARTICIPANTS:PARTICIPANTS: 20 20 (15 countries involved)(15 countries involved)GANIL (F), CNRS/IN2P3 (F), INFN (I), CERN (UE), UCL (B), CEA (F), NIPNE (RO), JYU (FI), LMU (G), FZJ (G), FI (LT), UW (PL), SAS (SK), U- LIVERPOOL (UK), GSI (G), USDC (E), CCLRC (UK), PSI (CH), IPUL (LV), SU MSL (SE)

PROJECT ESTIMATED TOTAL EFFORTS:PROJECT ESTIMATED TOTAL EFFORTS: ((k€)k€) 32.284,3 32.284,3 - FTE 490,45 - FTE 490,45 ( p*y)( p*y)

DURATION OF THE PROJECT:DURATION OF THE PROJECT: 48 MONTHS48 MONTHS

STARTING DATE:STARTING DATE: FEBRUARY 1st, 2005 FEBRUARY 1st, 2005

COORDINATING INSTITUTION:COORDINATING INSTITUTION: GANIL (F)GANIL (F)

CONTRIBUTORS: 20 (12 countries involved from Europe, Asia and North America)U-FRANKFURT (G), BUDKER (RU) ,VNIIFT (RU), PNPI (RU), ORNL (USA), ANL (USA), KAERI (SKR), TRIUMF (CA),JAERI (JP), SOREQ (IL), U-MAINZ (G), VINCA (YU), KVI (NL), U-SURREY (UK), U-YORK (UK), U-PAISLEY (UK), U-UPPSALA (SE), NSCL (USA), FNAL (USA), HUG (CH)

Design Study

G. Fortuna, Debrecen june 05

Page 4: EURISOL DS: European Isotope Separation On-Line Radioactive Ion Beam Facility Design Study G. Fortuna, Debrecen june 05.

FEBRUARY, 1st 2005FEBRUARY, 1st 2005PROJECT STARTING DATEPROJECT STARTING DATE

FEBRUARY, 2-3, 2005FEBRUARY, 2-3, 2005 KICK-OFF MEETINGSKICK-OFF MEETINGS

FEBRUARY, 25th, 2005FEBRUARY, 25th, 2005 END OF NEGOTIATION PHASE, CONTRACT IN PREPARATIONEND OF NEGOTIATION PHASE, CONTRACT IN PREPARATION

MARCH, 22nd, MARCH, 22nd, 20052005CONTRACT SIGNATURE BY GANIL AND ECCONTRACT SIGNATURE BY GANIL AND EC

APRIL, 22nd, 2005APRIL, 22nd, 2005ALL PARTICIPANTS ACCESSED TO THE CONTRACTALL PARTICIPANTS ACCESSED TO THE CONTRACT

MAY, 9th, 2005MAY, 9th, 2005PRE-FINANCING PAID TO PARTICIPANTSPRE-FINANCING PAID TO PARTICIPANTS

MAY, 27th, 2005MAY, 27th, 2005IAP’S MEMBERS APPOINTMENT:IAP’S MEMBERS APPOINTMENT:ACCELERATORSACCELERATORS: Dr. S. Brandenburg from KVIDr. S. Brandenburg from KVITARGETS:TARGETS: Dr.P. Schmorr from TRIUMFDr.P. Schmorr from TRIUMF

PHYSICSPHYSICS:: Dr. W. Nazarewicz from ORNLDr. W. Nazarewicz from ORNL

JUNE, 6th, 2005JUNE, 6th, 2005AGREEMENT REACHED ON EURISOL DS CONSORTIUM AGREEMENTAGREEMENT REACHED ON EURISOL DS CONSORTIUM AGREEMENT

JULY, 29th, 2005JULY, 29th, 2005DEADLINE FOR CONSORTIUM AGREEMENT SIGNATUREDEADLINE FOR CONSORTIUM AGREEMENT SIGNATURE

Design Study

G. Fortuna, Debrecen june 05

EURISOL DS MILESTONES OF FIRST SEMESTER 2005EURISOL DS MILESTONES OF FIRST SEMESTER 2005

Page 5: EURISOL DS: European Isotope Separation On-Line Radioactive Ion Beam Facility Design Study G. Fortuna, Debrecen june 05.

STEERING COMMITTEESTEERING COMMITTEE

1 representative of each Participant+ Management Board and Chairs of

NUPECC, ESGARD, EURONS (all ex-officio)1 meeting/year

MANAGEMENT BOARDMANAGEMENT BOARD

Project Leader + 3 Members

MANAGEMENT SUPPORT MANAGEMENT SUPPORT TEAMTEAM

1. Administrative Office2. Scientific liaison Office3. Technical coordinator

COORDINATION BOARDCOORDINATION BOARD

Management Board+ Task Leaders

+ Coordinators of HIPPI JRA and BENE Network

(ex-officio) 2-3 Meetings/year

INTERNATIONAL ADVISORY INTERNATIONAL ADVISORY PANELPANEL

3 Members – 1 Meeting/year

ANNUAL PARTICIPANT ANNUAL PARTICIPANT MEETINGMEETING

1 Meeting/year

Ta

sk 2

Ta

sk n

Ta

sk 1

MANAGEMENT STRUCTUREDesign Study

G. Fortuna, Debrecen june 05

REVIEW COMMITTEE

3 Members

P

roje

ct

P

roje

ct

p

ub

licati

on

sp

ub

licati

on

s

Page 6: EURISOL DS: European Isotope Separation On-Line Radioactive Ion Beam Facility Design Study G. Fortuna, Debrecen june 05.

Design Study

G. Fortuna, Debrecen june 05

USE AND DISSEMINATION OF KNOWLEDGE

IN ORDER TO COMPLY WITH CONTRACT PROVISIONS AND TO SAFEGUARD CONTRACTOR RIGHTS A REVIEW COMMITTEE HAS BEEN SET UP

COMPOSITION: The RC, appointed by the SC, is composed of 3 members, two proposed by the SC Chair and the third, chosen among the MB Members, designated by the Project Leader.

ROLE OF THE RC: According to the EC contract provisions, the RC shall ensure, on behalf of Contractors (SC), the consent to the publication of data produced during the implementation of the Project activities.

In particular the RC: a) shall review all planned publications ensuring the quality of

the content (journal publications, proceedings, technical notes);

b) shall identify the knowledge that could be subject to protection measures by decision of the SC.

A specific procedure for the submission and the approval of planned publications has been drafted by the MB.

Page 7: EURISOL DS: European Isotope Separation On-Line Radioactive Ion Beam Facility Design Study G. Fortuna, Debrecen june 05.

Design Study

G. Fortuna, Debrecen june 05

EURISOL DS INTERNATIONAL ADVISORY PANEL

MAY 27th, 2005: IAP’S MEMBERS APPOINTMENT

TOPICS AREAS: ACCELERATORS: Dr. S. Brandenburg Dr. S. Brandenburg from KVIfrom KVI

TARGETS: Dr. P. Schmorr from TRIUMFDr. P. Schmorr from TRIUMF

PHYSICS: Dr. W. Nazarewicz from ORNLDr. W. Nazarewicz from ORNL

Page 8: EURISOL DS: European Isotope Separation On-Line Radioactive Ion Beam Facility Design Study G. Fortuna, Debrecen june 05.

Design Study

G. Fortuna, Debrecen june 05

CO-OPERATION WITH OTHER PROJECTSCO-OPERATION WITH OTHER PROJECTS

1)1) CARE: HIPPI JRA AND BENE NETWORKCARE: HIPPI JRA AND BENE NETWORK2)2) EURONSEURONS3)…3)…

CONFERENCE CONTRIBUTIONSCONFERENCE CONTRIBUTIONS

1)1) HPSL conference, Naperville (Illinois), May 22-24 2005 HPSL conference, Naperville (Illinois), May 22-24 2005 2)2) IHEP conference, Lisbon, July 21-27 2005.IHEP conference, Lisbon, July 21-27 2005.

OTHER OTHER EURISOL DS FACTS EURISOL DS FACTS

Page 9: EURISOL DS: European Isotope Separation On-Line Radioactive Ion Beam Facility Design Study G. Fortuna, Debrecen june 05.

Design Study

G. Fortuna, Debrecen june 05

TASK ACTIVITIES UNDERGOINGTASK ACTIVITIES UNDERGOINGAS AGREED IN THE MB MEETING OF APRIL 18thAS AGREED IN THE MB MEETING OF APRIL 18th

T2- Multi-MW Target:T2- Multi-MW Target: 1)1) Neutron Converter: CERN will take care of the liquid converter while CEA Neutron Converter: CERN will take care of the liquid converter while CEA will focus on solid converter.will focus on solid converter.2)2) Neutronics simulations and cylindrical converter: the neutron energy Neutronics simulations and cylindrical converter: the neutron energy

spectrumspectrum presents two radial picks out of the range of interest. Remedies are under presents two radial picks out of the range of interest. Remedies are under

consideration.consideration. (BeO reflector, natural Uranium, new geometry).(BeO reflector, natural Uranium, new geometry).3)3) Proton versus deuteron neutronics (optimum energy for deuterons).Proton versus deuteron neutronics (optimum energy for deuterons).4)4) CW versus pulsed driver (isotopic separation, target life time, multi-target CW versus pulsed driver (isotopic separation, target life time, multi-target

capability).capability).

T3- Direct Target:T3- Direct Target: 1)1) 50–Hz versus CW driver operation50–Hz versus CW driver operation: : thermal shocksthermal shocks2)2) Use of thin UCx discs (same rate of fission products with 1/10 of current and Use of thin UCx discs (same rate of fission products with 1/10 of current and

grammes instead of Kilogrammes of UCx material).grammes instead of Kilogrammes of UCx material).

T4- Fission Target: T4- Fission Target: 1)1) Work is concentrated on 1+ ion sources (Nitschke and EBIS), target and Work is concentrated on 1+ ion sources (Nitschke and EBIS), target and container container geometry.geometry.

2)2) Test on low and high density target UCx material and target life time.Test on low and high density target UCx material and target life time.3)3) Influence of slicing on high-density UCx target.Influence of slicing on high-density UCx target.

Page 10: EURISOL DS: European Isotope Separation On-Line Radioactive Ion Beam Facility Design Study G. Fortuna, Debrecen june 05.

Design Study

G. Fortuna, Debrecen june 05

TASK ACTIVITIES UNDERGOING ASTASK ACTIVITIES UNDERGOING AS AGREED IN THE MB MEETING OF APRIL 18thAGREED IN THE MB MEETING OF APRIL 18th

T6-Heavy Ion Accelerator:T6-Heavy Ion Accelerator: 1)1) The impact of beta beams on the post-accelerator layout.The impact of beta beams on the post-accelerator layout.2)2) Analysis of the S/C RFQs beam performances. Analysis of the S/C RFQs beam performances. 3)3) Starting of N/C RFQ test.Starting of N/C RFQ test.4)4) Investigation of the optimum 100 MeV *A post accelerator layout (which Investigation of the optimum 100 MeV *A post accelerator layout (which

solution for energies higher then 30 MeV *A ? )solution for energies higher then 30 MeV *A ? )

T7-Proton Accelerator Design:T7-Proton Accelerator Design: 1)1) Issues under investigation: CW versus pulsed operation, max. energy for Issues under investigation: CW versus pulsed operation, max. energy for

deuteron, heavy ion capability.deuteron, heavy ion capability.2)2) Investigation of a new injector with proton and deuteron capabilities based on Investigation of a new injector with proton and deuteron capabilities based on

a 176 MHz N/C RFQ and SC Linac up to 40 MeV.a 176 MHz N/C RFQ and SC Linac up to 40 MeV.3)3) Beam dynamics studies and cost implication of such novel scheme for the Beam dynamics studies and cost implication of such novel scheme for the

driver.driver.

T8-SC Cavity Development: T8-SC Cavity Development:

1)1) Work will concentrate on the intermediate-energy part of the Work will concentrate on the intermediate-energy part of the acceleratoraccelerator

2)2) The cryomodule to be constructed will be compatible with both HWR and The cryomodule to be constructed will be compatible with both HWR and Spoke cavities.Spoke cavities.

3)3) The same RF amplifier and RF coupler will be used for both HWR and The same RF amplifier and RF coupler will be used for both HWR and Spoke cavities.Spoke cavities.

4)4) Multi-cell cavities will be replaced with Spoke cavities to improve Multi-cell cavities will be replaced with Spoke cavities to improve reliability against vibrationsreliability against vibrations

5) Comparison of HWR and spoke cavities in terms of performance and cost 5) Comparison of HWR and spoke cavities in terms of performance and cost implication.implication.

Page 11: EURISOL DS: European Isotope Separation On-Line Radioactive Ion Beam Facility Design Study G. Fortuna, Debrecen june 05.

Design Study

G. Fortuna, Debrecen june 05

TASK ACTIVITIES UNDERGOING ASTASK ACTIVITIES UNDERGOING AS AGREED IN THE MB MEETING OF APRIL 18thAGREED IN THE MB MEETING OF APRIL 18th

T5-Safety & Radioprotection:T5-Safety & Radioprotection: 1)1) Work is started regarding code validation, cryogenic trap and gas purification Work is started regarding code validation, cryogenic trap and gas purification

systems.systems.2)2) Close contacts with SAFERIB JRA (EURONS). Close contacts with SAFERIB JRA (EURONS).

T9-Beam Preparation: T9-Beam Preparation: 1)1) Work is concentrated on the conceptual design of the high resolution Work is concentrated on the conceptual design of the high resolution

separator and the charge breeder.separator and the charge breeder.2)2) Activity is started on the 60-GHz ion source.Activity is started on the 60-GHz ion source.

T10-Physics and Instrumentation:T10-Physics and Instrumentation:1)1) The kick-off meeting is fixed for 24th June 2005 in Liverpool.The kick-off meeting is fixed for 24th June 2005 in Liverpool.2)2) A general meeting of this Task is planned at ECT* in Trento in the second half A general meeting of this Task is planned at ECT* in Trento in the second half

of January 2006.of January 2006.3)3) Pulsed versus CW Post Accelerator operation modes and energy tunability: Pulsed versus CW Post Accelerator operation modes and energy tunability:

the point of view of users.the point of view of users.

T11-Beam Intensity Calculations:T11-Beam Intensity Calculations: 1)1) Planning of the eight Subtasks has been defined. As highest priority Subtask Planning of the eight Subtasks has been defined. As highest priority Subtask

1 should clarify the benefit of the Heavy Ion Driver capability in terms of very 1 should clarify the benefit of the Heavy Ion Driver capability in terms of very neutron rich isotope yields.neutron rich isotope yields.

Page 12: EURISOL DS: European Isotope Separation On-Line Radioactive Ion Beam Facility Design Study G. Fortuna, Debrecen june 05.

Design Study

G. Fortuna, Debrecen june 05

TASK ACTIVITIES UNDERGOING ASTASK ACTIVITIES UNDERGOING AS AGREED IN THE MB MEETING OF APRIL 18thAGREED IN THE MB MEETING OF APRIL 18th

T12- Beta Beam Aspects:T12- Beta Beam Aspects: 1)1) T6 and T12 teams have agreed the following:T6 and T12 teams have agreed the following:

a) T6 team will analyze the impact of beta beams on Eurisol Post Accelerator a) T6 team will analyze the impact of beta beams on Eurisol Post Accelerator performances and Costs. performances and Costs. b) T12 team will look in a Post Accelerator fully dedicated to beta acceleration.b) T12 team will look in a Post Accelerator fully dedicated to beta acceleration.c) T12 team will study a possible dedicated cyclotron/FFAG option for beta c) T12 team will study a possible dedicated cyclotron/FFAG option for beta beam facility.beam facility.d) T12 team will explore the concept of multiple charge state acceleration for d) T12 team will explore the concept of multiple charge state acceleration for neon beam.neon beam.e) Ne19 option is under consideration ( Intensity 20 times higher than Ne18, e) Ne19 option is under consideration ( Intensity 20 times higher than Ne18, impact of the life time of 17.22s on cooling time )impact of the life time of 17.22s on cooling time )

Page 13: EURISOL DS: European Isotope Separation On-Line Radioactive Ion Beam Facility Design Study G. Fortuna, Debrecen june 05.

FEBRUARY, 1st 2005FEBRUARY, 1st 2005PROJECT STARTING DATEPROJECT STARTING DATE

FEBRUARY, 2nd-3rd, 2005FEBRUARY, 2nd-3rd, 2005 KICK-OFF MEETINGSKICK-OFF MEETINGS

APRIL, 18th, 2005APRIL, 18th, 2005 FIRST MANAGEMENT BOARD MEETINGFIRST MANAGEMENT BOARD MEETINGJULY, 8th, JULY, 8th, 20052005

FIRST CB AND SECOND MB MEETINGSFIRST CB AND SECOND MB MEETINGS

OCTOBER, 3rd, 2005OCTOBER, 3rd, 2005THIRD MANAGEMENT BOARD MEETINGTHIRD MANAGEMENT BOARD MEETING

NOVEMBER 28th – DECEMBER 1st, 2005NOVEMBER 28th – DECEMBER 1st, 2005EURISOL DS WEEK ( OPEN MEETING, SC, CB, MB AND IAP EURISOL DS WEEK ( OPEN MEETING, SC, CB, MB AND IAP MEETINGS)MEETINGS)

Design Study

G. Fortuna, Debrecen june 05

EURISOL DS MANAGEMENT MEETINGS IN 2005EURISOL DS MANAGEMENT MEETINGS IN 2005

Page 14: EURISOL DS: European Isotope Separation On-Line Radioactive Ion Beam Facility Design Study G. Fortuna, Debrecen june 05.

Design Study

G. Fortuna, Venice March 05

PROJECT DELIVERABLES/PROGRESSPROJECT DELIVERABLES/PROGRESS TOWARD THE OBJECTIVES/TOPIC POINTSTOWARD THE OBJECTIVES/TOPIC POINTS

Page 15: EURISOL DS: European Isotope Separation On-Line Radioactive Ion Beam Facility Design Study G. Fortuna, Debrecen june 05.

Design Study

G. Fortuna, Venice March 05

EURISOL DS FUTUREEURISOL DS FUTUREESFRI ROAD MAP/ESF STRATEGIC PLANESFRI ROAD MAP/ESF STRATEGIC PLAN

Page 16: EURISOL DS: European Isotope Separation On-Line Radioactive Ion Beam Facility Design Study G. Fortuna, Debrecen june 05.

0

CONTRACT SIGNATURE TIMETABLE

CONTRACT

SENT TO GANIL

10 35

CONTRACT

RETURN TO EC

CONTRACT

SIGNED BY EC

DAYS

ACCESS TO THE CONTRACT BY PARTICIPANTS ( 45 DAYS)

75

PRE-FINANCING PAYMENT TO GANIL

(45 DAYS)

95

BANK TRASFER TO THE PARTICIPANT

Design Study

Page 17: EURISOL DS: European Isotope Separation On-Line Radioactive Ion Beam Facility Design Study G. Fortuna, Debrecen june 05.

Design Study

G. Fortuna, Venice March 05

PROJECT ACTIVITIESPROJECT ACTIVITIES

Page 18: EURISOL DS: European Isotope Separation On-Line Radioactive Ion Beam Facility Design Study G. Fortuna, Debrecen june 05.

4 TOPIC AREAS

EURISOL DS MANAGEMENT (GANIL/INFN-LNL/CNRS-IN2P3/CERN)

1 Targets and ion sources (Synergies with neutron spallation sources and neutrino facilities)

– Multi-MW target station : liquid- mercury converter (CERN) – Direct target : Several target-ion source systems (CERN) – Fission target : UCx target optimization (INFN-LNL)

2 Accelerators (Synergies with HIPPI (CARE))– Proton accelerator design: the driver (INFN-LNL): – Heavy ion accelerator design: the post accelerator (GANIL)– SC cavity development: cavity prototypes and multipurpose cryomodule

(CNRS-IN2P3/IPNO)

3 Physics, beams and safety (Synergies with EURONS)– Physics and instrumentation: conceptual design of novel instruments (U-

LIVERPOOL)– Beam intensity calculations: yield optimization of RIB species (GSI)– Safety and radioprotection: radiation fields, activation, shielding, handling,

storage, conformity to legislation (CEA)

4 Beta-Beams Aspects (Synergies with BENE (CARE), EURONS)– Beam preparation : breeders, 60 GHz ECR source (JYV) – Beta-beam aspects: conceptual design report of the Beta-Beam facility. It

includes preliminary studies on modifications of CERN accelerators in case the facility is sited at CERN ( CERN)

Design Study

G. Fortuna, Venice March 05

Page 19: EURISOL DS: European Isotope Separation On-Line Radioactive Ion Beam Facility Design Study G. Fortuna, Debrecen june 05.

Design Study

G. Fortuna, Venice March 05

TASK LEADERS PER COUNTRY

3

33

1

11

France

I taly

Switzerland

Finland

United Kingdom

Germany

Page 20: EURISOL DS: European Isotope Separation On-Line Radioactive Ion Beam Facility Design Study G. Fortuna, Debrecen june 05.

Design Study

G. Fortuna, Venice March 05

4 4

9

13 13

8

5

3

9

15

9 9

0

2

4

6

8

10

12

14

16

Man

agem

ent

Mul

ti M

W T

arge

t Sta

tion

Direct

Tar

get

Fiss

ion

Targ

et

Safet

y& R

adio

prot

ectio

n

Heavy

Ion

Accel

erat

or D

esig

n

Proto

n Acc

eler

ator

Des

ign

SC Cav

ity D

evel

opm

ent

Beam

Pre

para

tion

Physi

cs a

nd In

stru

men

tatio

n

Beam

Inte

nsity

Cal

cula

tions

Beta

Beam

s Asp

ects

Participants and Contributors per task

Page 21: EURISOL DS: European Isotope Separation On-Line Radioactive Ion Beam Facility Design Study G. Fortuna, Debrecen june 05.

Design Study

G. Fortuna, Venice March 05

566.4

828.0 890.0 887.0

697.5784.0

356.0

1,257.0

750.0

500.0636.0

1,010.0

0.0

200.0

400.0

600.0

800.0

1,000.0

1,200.0

1,400.0

EC CONTRI BUTI ON PER TASK (kEuro)

Page 22: EURISOL DS: European Isotope Separation On-Line Radioactive Ion Beam Facility Design Study G. Fortuna, Debrecen june 05.

Design Study

G. Fortuna, Venice March 05

3.004,9

1.428,5

1.181,5

1.827,0

578,5

103,5239,0 237,5

28,5 74,5 81,5 161,562,5 52,5 100,5

0,0

500,0

1.000,0

1.500,0

2.000,0

2.500,0

3.000,0

3.500,0EC contribution per Country (kEuro)

Page 23: EURISOL DS: European Isotope Separation On-Line Radioactive Ion Beam Facility Design Study G. Fortuna, Debrecen june 05.

11

8

6

9

3

1

2

4

1

3 3

2

1

2 2

0

2

4

6

8

10

12 No. OF TASKS PER COUNTRY Design Study

Page 24: EURISOL DS: European Isotope Separation On-Line Radioactive Ion Beam Facility Design Study G. Fortuna, Debrecen june 05.

1.303,8

1.182,0

786,0 790,8

120,068,4

302,4370,8

108,0156,0

264,0212,4

18,0

168,0

34,8

0,0

200,0

400,0

600,0

800,0

1.000,0

1.200,0

1.400,0

FTE PER COUNTRY (PERSON MONTHS)Design Study

Page 25: EURISOL DS: European Isotope Separation On-Line Radioactive Ion Beam Facility Design Study G. Fortuna, Debrecen june 05.

Design Study

G. Fortuna, Venice March 05

ORGANIZATIONORGANIZATION

Page 26: EURISOL DS: European Isotope Separation On-Line Radioactive Ion Beam Facility Design Study G. Fortuna, Debrecen june 05.

STEERING COMMITTEE

It is the governing body of the DESIGN STUDY determining the political and strategic orientation of the project: - activity planning, allocation of the resources, management

appointment, inclusion and withdrawal of contractors.

VOTING RULES: quorum 2/3 of members - usually majority 3/4 of votes

- simple majority for Chair, MB and IAP appointment - unanimous vote for inclusion or withdrawal of contractors

Design Study

G. Fortuna, Venice March 05

Page 27: EURISOL DS: European Isotope Separation On-Line Radioactive Ion Beam Facility Design Study G. Fortuna, Debrecen june 05.

Design Study

G. Fortuna, Venice March 05

Without voting rights

With voting rightsINSTITUTION REPRESENTATIVE

1 GANIL Prof. Dominique GOUTTE2 CNRS/IN2P3 Prof. Sydney GALES3 INFN Dr. Gabriele PUGLIERIN4 CERN Dr. Enrico CHIAVERI5 UCL Dr. Marc LOISELET6 CEA Dr. N. ALAMANOS 7 NIPNE Prof. Nicolae Victor ZAMFIR8 JYU Prof. Juha AYSTO9 LMU Prof. Dietrich HABS10 FZJ Dr. Heiner BRUECHER11 FI Dr. Arturas PLUKIS 12 UW Prof. Jerzy JASTRZEBSKI

13 SAS Prof. Emil BETAK 14 U-LIVERPOOL Prof. Paul NOLAN 15 GSI Prof. Klaus SUEMMERER16 USDC Prof. Jose BENLLIURE 17 CCLRC Prof. David WARNER18 PSI Prof. Heinz GAEGGELER19 IPUL Prof. Janis FREIBERGS 20 SU MSL Prof. Anders KALLBERG

Members of EURISOL DS Steering CommitteeChaired by Juha Aysto

NUPECC CHAIRMAN Prof. Mushin HARAKEHESGARD CHAIRMAN Prof. Roy ALEKSANEURONS CHAIRMAN Prof. Alex MUELLER

MANAGEMENT BOARD

Page 28: EURISOL DS: European Isotope Separation On-Line Radioactive Ion Beam Facility Design Study G. Fortuna, Debrecen june 05.

Design Study

G. Fortuna, Venice March 05

3

1

3

1 1 1

2

1 1 1 1 1 1 1 1

0

0.5

1

1.5

2

2.5

3

3.5Fr

ance Italy

Ger

man

yCer

n (E

Cr)Sw

itzer

land

Spa

in

Unite

d Kin

gdom

Finl

and

Lith

uani

aPol

and

Roman

iaLa

tvia

Belgi

umSlo

vaki

aSw

eden

Country of Origin of Participating Institutions SC-Members

Page 29: EURISOL DS: European Isotope Separation On-Line Radioactive Ion Beam Facility Design Study G. Fortuna, Debrecen june 05.

MANAGEMENT BOARD (It is chaired by the Project Leader)

- Ensuring communication between consortium and EC- Taking care of all legal, contractual, financial and administrative activities- Overseeing of all technical and scientific activities - Monitoring and ensuring the Global coherence of the

project- Ensuring the respect for contract obligations and results- Securing protection, use ,dissemination of the results- Task leaders appointment- Analysing and reporting on site options and on the funding mechanism of the EURISOL facility.

- VOTING RULES: unanimous consent basis

Design Study

G. Fortuna, Venice March 05

Page 30: EURISOL DS: European Isotope Separation On-Line Radioactive Ion Beam Facility Design Study G. Fortuna, Debrecen june 05.

The Management BoardChaired by the Project Leader

Graziano Fortuna: (T1,T4,T7,T8), Project Leader Yorick Blumenfeld ( T5,T6,T11) Peter Butler ( T9, T10 ) Mats Lindroos (T2, T3, T12)

Technical Coordinator ( without voting rights)

Management Support Team

Administrative Office: R. Battistella, V. Vandevoorde Scientific liaison Office: A. Andrighetto, M. Comunian

Technical Coordinator: J. Cornell

Design Study

G. Fortuna, Venice March 05

Page 31: EURISOL DS: European Isotope Separation On-Line Radioactive Ion Beam Facility Design Study G. Fortuna, Debrecen june 05.

COORDINATION BOARD (It is chaired by the Project Leader)

1. to present reports on the progress of the individual task

2. to make proposal concerning or modifying programme to be conducted

3. to make proposal concerning the allocation or the re-allocation of specific task among the contractors

4. to draft the project reports5. to identify contractor presenting financial or

technical risks6. to resolve technical problems or any difficulty arising

in connection with the task implementation7. to foster the connectivity among the individual task8. to evaluate and favour possible synergies with other

projects

VOTING RULES: quorum 2/3 of members majority 3/4 of votes

Design Study

G. Fortuna, Venice March 05

Page 32: EURISOL DS: European Isotope Separation On-Line Radioactive Ion Beam Facility Design Study G. Fortuna, Debrecen june 05.

Design Study

G. Fortuna, Venice March 05

TASK REPRESENTATIVE

1 Project Leader G. Fortuna1 MB Member Y. Blumenfeld1 MB Member P. Butler1 MB Member M. Lindroos2 Multi MW Target Station Y. Kadi3 Direct Target J. Lettry4 Fission Target L. Tecchio5 Safety & Radioprotection D. Ridikas6 Heavy Ion Accelerator Design M-H. Moscatello7 Proton accelerator Design A. Facco8 SC Cavity Development S. Bousson9 Beam Preparation A. Jokinen

10 Physics and Instrumentation R. Page11 Beam Intensity Calculations K.H. Schmidt12 Beta Beams Aspects M. Benedikt

Without voting rights

Technical Coordinator J. Cornell

HIPPY (CARE) Dr. Roland GAROBY

BENE (CARE)Dr. Vittorio PALLADINO

With voting rights

List of members of Coordination Board

Page 33: EURISOL DS: European Isotope Separation On-Line Radioactive Ion Beam Facility Design Study G. Fortuna, Debrecen june 05.

Design Study

G. Fortuna, Venice March 05

CB MEMBERS PER COUNTRY

4

35

1

11

France

I taly

Switzerland (CERN)

Finland

United Kingdom

Germany

Page 34: EURISOL DS: European Isotope Separation On-Line Radioactive Ion Beam Facility Design Study G. Fortuna, Debrecen june 05.

INTERNATIONAL ADVISORY PANEL(appointed by the SC at the kick-off meeting)

– It is composed of three Int. Experts covering the domains of RIB Science, accelerators and high power production targets

– It is in charge with critical assessment of the technical and scientific aspects of the Project

– It may be consulted, any time, by the SC and MB on specific scientific and organizational aspects.

Members elected by SC:P.Schmor (Triumf), K. Hubner (Cern),

W. Nazarewicz (Ornl)

Design Study

G. Fortuna, Venice March 05

Page 35: EURISOL DS: European Isotope Separation On-Line Radioactive Ion Beam Facility Design Study G. Fortuna, Debrecen june 05.

Design Study

G. Fortuna, Venice March 05

KICK-OFF MEETINGS OUTPUTS

Page 36: EURISOL DS: European Isotope Separation On-Line Radioactive Ion Beam Facility Design Study G. Fortuna, Debrecen june 05.

CB kick-off meeting(Orsay 3 Feb. 05) summary and recommendations

1. Annex1 fully compatible with the content of the proposal

2. Concern about the delay between project starting date ( Feb. 1st,o5) and date of EU funds availability (July 05); difficulties are anticipated by some contractors because lack of resources

3. Need to fix reference parameters of the various parts of the facility. A set of such parameters will be collected by the TC and discussed at the next CB meeting of July 8th, 05

4. Synergies with HIPPI and BENE already exist, HIPPI and EURISOL activities on proton linacs are fully complementary ; the impact of the project Linac4 on EURISOL short and long term strategy in terms of design solutions: pulsed versus CW machines and consequences on the high power target lifetime

Design Study

G. Fortuna, Venice March 05

Page 37: EURISOL DS: European Isotope Separation On-Line Radioactive Ion Beam Facility Design Study G. Fortuna, Debrecen june 05.

SC-kick-off meeting (Orsay 4th Feb. 05)summary and recommendations

1. The need of a standing IAP was deeply debated. The consensus was reached on the basis of a Panel mission focussed on technical and scientific matters.

2. Synergies with HIPPI, BENE, EURONS and EUROTRANS were discussed. It was recommended to cultivate all the possible contacts, exchange of information, collaboration in specific WP, invitation to meetings of common interest.

3. The impact of pulsed machines on target lifetime was discussed. The subject is of extreme importance in case of driver sharing among different users ( RIB, Beta beams, neutrino factories…) Quantitative exploration to which extent a RIB target could withstand high power pulsed beam operation is needed.

4. Investigating the use of the Beta beam rings to push the RIB energies well over 100 MeV*A for secondary fragmentation. Some reference parameters should be fixed for the next SC meeting.

5. Implementation of an electronic data management to facilitate the flow of information within and outside the EURISOL community ( EDMS-CERN type suggested)

Design Study

G. Fortuna, Venice March 05

Page 38: EURISOL DS: European Isotope Separation On-Line Radioactive Ion Beam Facility Design Study G. Fortuna, Debrecen june 05.

MB kick-off meeting (Orsay Feb. 4th, 05) Summary and actions

– EURISOL web-site: implemented in the next 3 months;

– Publications: written note on the policy to be followed complying with EC rules;

– Site options: all bodies are very sensitive to this matter. According to the work plan,the MB should produce a report on site options, in a period of 6 months, starting from month 24.

– It is suggested that a draft paper containing the guidelines to face the site options problem should be presented to the next SC meeting;

– VII FP: Is there room for a new application in the contest of ESFRI roadmap? This should be decided according to the NuPECC strategy.

Design Study

G. Fortuna, Venice March 05

Page 39: EURISOL DS: European Isotope Separation On-Line Radioactive Ion Beam Facility Design Study G. Fortuna, Debrecen june 05.

Design Study

G. Fortuna, Venice March 05

CONCLUSIONS

Page 40: EURISOL DS: European Isotope Separation On-Line Radioactive Ion Beam Facility Design Study G. Fortuna, Debrecen june 05.

1. Signature of the contract (April 05, Ganil /EC)

2. Access to the contract by participants ( June 05, Ganil- Participants)

3. Signature of the Consortium Agreement (April/May 05, Participants)

Tentative dates of the 2005 official

meetings

- April, 18th : MB meeting - July, 8th : CB Meeting - October MB meeting (to be fixed) - Nov, 28th –Dec 1st : EURISOL Ds week

During the week the following meetings will take place:( *)

a) Annual participants meeting b) CB meeting c) IAP meeting d) Steering Committee meeting f) MB meeting

( *)Aim of the EURISOL week:

Review and monitor the activities of the year, check the overall project planning, extend the discussion and the confrontation on the achieved results to all community, approve the general lines (technical, scientific and financial matters) of the yearly reports, discuss and approve the activities planning for the incoming year taking into account the suggestion given by the community.

Design Study

G. Fortuna, Venice March 05