Date post: | 31-Mar-2015 |
Category: |
Documents |
Upload: | jailyn-forland |
View: | 219 times |
Download: | 1 times |
EUROCHIP 3
WP1Status of the project
17 September 2010Sofia, Bulgaria
EUROCHIP-3 PLANEUROCHIP-3 PLAN
Ahti AnttilaAdherence to cervical screening in 5 Eastern EU countries
Renée OtterPopulation-based CR indicators: dissemination and promotion
Piret Veerus Cancer rehabilitation indicators
Andrea Micheli Cutting costs of cancer control
4 MAIN WORK PACKAGES4 MAIN WORK PACKAGES
+ 3 HORIZONTAL WORK PACKAGES+ 3 HORIZONTAL WORK PACKAGEScoordination (A. Micheli), coordination (A. Micheli),
evaluation (Z. Valerianova), evaluation (Z. Valerianova), dissemination (A. Costa)dissemination (A. Costa)
Steering CommitteeSteering Committee
Working TeamWorking Team WP-Coordination
EUROCHIP-3EUROCHIP-3: ORGANISATION CHANGES: ORGANISATION CHANGES
WP-Evaluation
WPScreenin
g
WPRegistratio
n
WPRehabilitatio
n
WPCosts
DGSDGS
DGSDGS
NGSNGS
WP-Dissemination
Panel of ExpertsPanel of Experts
NGSNGS
NGSNGS
NGSNGS
WP: Work packageNGS: National Group of SpecialistsDGS: Domain Group of Specialists (European coverage)
DGSDGS
DGSDGS
NGSNGS
WP1 deliverables
• Administration and management • Preparation of material for the EUROCHIP
website dissemination• Interim reports to the EC at month 18• Final report sent to EC at month 38• Specific reports to be prepared for the European
Commission and/or for the Network of Competent Authorities on specific issues discussed in the EUROCHIP forum
INIT
IAL
INIT
IAL
PROJECT
PROJECT
Date Place Aims
26/09/2008 Tallinn EUROCHIP-3 WP-4 and WP-6 activity coordination
31/10/2008 Milan EUROCHIP-3 Steering Committee meeting
20/01/2009 Sofia EUROCHIP-3 WP-4 activity discussion
10/03/2009 Amsterdam EUROCHIP-3 WP-5 activity discussion
19/03/2009 Bruxelles “European Partnership Action Against Cancer”29/05/2009 Costantia EUROCHIP-3 WP-4 dissemination
06/08/2009 Phone call EUROCHIP-3 WP-2 activity coordination
29/09/2009 Bruxelles “European Partnership Action Against Cancer”26/10/2009 Phone call Discussion on Cernobbio’s meeting with WP-2
08-11/11/09 Cernobbio 3rd International Cancer Control Congress
08/11/2009 Cernobbio EUROCHIP-3 WP-4 and WP-2 coordination
11/11/2009 Cernobbio EUROCHIP-3 WP-6 activity discussion
08/12/2009 Bruxelles “European Partnership Action Against Cancer”
28/01/2010 Luxembourg “European Partnership Action Against Cancer”16/03/2010 Rome EUROCHIP-3 WP-7 activity discussion
INTERIM
INTERIM
REPORT
REPORTWP1 activities
WP2 deliverables
• Dissemination throughout EUROCHIP website
• Monograph and/or series of papers in scientific journals on EUROCHIP3 result
• News flash can be disseminated in 5 Eastern European MS for WP4 activities
• Panel of Experts meeting to disseminate EUROCHIP3 results to the EUROCHIP network
INIT
IAL
INIT
IAL
PROJECT
PROJECT
In short, we propose
• Two or three Cancer World articles• Five media packs tailored to each
country• One media training day for everyone• A guide to working with the media in
cervical cancer screening• Advice and help with specific
dissemination projects
AFTER THE
AFTER THE
INTERIM
INTERIM
REPORT
REPORT
Press packs
• Aim to inform journalists and stimulate them to pose relevant questions to the relevant people
• Present key information, graphs and images
• Published electronically in the local language/languages
Media training day
A hands-on training day for WP4 participants
• Which media for which target audiences?
• Getting their attention: writing press releases, finding news ‘hooks’, organising press events
• Clarifying key messages targeted at the audience
• Delivering the message: conducting press, radio and TV interviews
• Building long-term relationships
CLUJ IN
CLUJ IN
JANUARY
JANUARY
WP4 deliverables
• Publication of EUROCHIP-2 study results
• Study protocol on adherence to cervical screening in 5 Eastern EU MS
• Result of studies on adherence to cervical screening in 5 Eastern EU MS
• WP4 to be strictly connected with WP2 on dissemination
INIT
IAL
INIT
IAL
PROJECT
PROJECT
TUMORI ISSUE
TUMORI ISSUE
SUMMARY - BULGARIA
• National campaign (related with EUROCHIP-3 adherence study) not yet started
• Without this campaign study should be rewiewed
• We suggest
• To prepare an alternative protocol for 15th August
• To share it with EUROCHIP (Ahti/Milan group) but also with your Bulgarian partners because probably this will have organizational and economic implications (about EUROCHIP funds)
• If the campaign will not start before 15th September the EUROCHIP study will follow the new protocol
WARSAW
WARSAW
MEETIN
G
MEETIN
G
NEW PROTOCOL
NEW PROTOCOL
SUMMARY - LATVIA
• Study designed to reach doctors
• Today after meeting discussion with Paolo on destination of 17600 euro available in EUROCHIP
• Data collection closure for April 2011
• Analysis closure for August 2011
WARSAW
WARSAW
MEETIN
G
MEETIN
G
SUMMARY - ESTONIA
• Study started
• All questionnaire sent
• Up to now 26% of respondent
• Project in time for reporting results to EUROCHIP and to ESO
AMENDMENT
AMENDMENT
REQUESTED
REQUESTED
SUMMARY - LITHUANIA
• Study designed aimed to evaluate the role of centralized invitation system
• Is realistic that deadline of analysis is september 2011? YES
• Discussion after meeting with Paolo on the destination of 17600 euro availble in EUROCHIP
WARSAW
WARSAW
MEETIN
G
MEETIN
G
SUMMARY - ROMANIA
• To evaluate the possibility to perform a study
• Ahti will call Florian
AMENDMENT
AMENDMENT
REQUESTED
REQUESTED
DECIDED TO
DECIDED TO
CONTINUE
CONTINUE
WP5 deliverables
• Continuation of CR promotion in countries without CRs
• EUROCHIP qualitative questionnaire
• Report on cancer registry indicators in various countries
• WP5 to be strictly connected with WP2 on dissemination
INIT
IAL
INIT
IAL
PROJECT
PROJECT
Description of WP5• Continuation of population-based CR promotion
o in countries of the EU without PBCRs (Lux, Greece)o Promotion to make the PBCRs national wide in those countries
were only some regions are covered (France, Italy, Spain, Germany..)
• Inventory (Questionnaire) among the PBCRs ono available or collectable (also time delay) EUROCHIP indicatorso whether they are find to be usefulo The linkage possibilities between which databanks (mortality,
hospital discharge…)o Promote the outcomes on different subjects: primary prevention,
screening, clinical items (delay of treatment, treatment according to GLs..)
DURING
DURING
SCSC
Description of WP5
• GreeceA training programme was formed by Mrs Margery Duin, with specific aim to assist in the development of a Cancer Registry (CR) in Greece.
• LuxembourgWP-5 members are in contact with the Ministry of Health in Luxembourg to provide support in the decision making processes necessary for the activation of a National Population based Cancer Registry in Luxembourg
• Qualitative questionnaireQuestionnaire developed in collaboration with ENCR and the EUROCOURSE project. It should be sent to European CRs after interim reports
INTERIM
INTERIM
REPORT
REPORT
EUROCHIP-1 (2000-2002)
Organized more than 20 meetings with participation of more than 120 cancer specialists
a)During these meetings a preliminary list of 158 cancer indicators was progressively discussed up to produce a list of 31 cancer indicators
b)Now some of these indicators are in the ECHI list and should be collected in the same way in all EU countries
c) EUROCHIP-1 cancer indicator list did not include any indicator on cancer rehabilitation
WP6 BackgroundIN
ITIA
L
INIT
IAL
PROJECT
PROJECT
PRIORITY INDICATORS
INCLUSION PRIORITY INDICATOR
PREVALENCE YES HIGH DEFINED
% OF RELAPSE NO
FUNDING FOR REHAB YES HIGH TBD
STRATEGY ON REHAB YES HIGH TBS
GUIDELINE FOR REHAB YES HIGH TBS
FOLLOW-UP NO
NGO DEVOTED TO REHAB
CHANGED MEDIUM TBS
HOMECARE YES HIGH TBS
TRAINING YES HIGH TBD
COUNSELLING CHANGED MEDIUM TBS
RETURN TO WORK NO
QoL YES HIGH TBDTBD: TO BE DEFINED – TBS: TO BE SPECIFIED
WARSAW
WARSAW
MEETIN
G
MEETIN
G
WP7 Deliverables
• List of cancer control items where innovation intervention to reduce costs is possible (for a childhood cancer and female breast cancer).
• Definition of cancer managing actions to cut costs while maintaining outcomes reductions.
• WP7 to be strictly connected with WP2 on dissemination.
INIT
IAL
INIT
IAL
PROJECT
PROJECT