+ All Categories
Home > Documents > European Region Air Navigation & Planning Group (EANPG)

European Region Air Navigation & Planning Group (EANPG)

Date post: 08-Feb-2016
Category:
Upload: byron
View: 28 times
Download: 1 times
Share this document with a friend
Description:
PIRG/RASG GCM-2013/PPT-2 EANPG Agenda item 2. European Region Air Navigation & Planning Group (EANPG). Chairman: Phil Roberts (UK CAA). PIRG-RASG Global Coordination Meeting, Montreal 19 March 2013. EUR. NAM. NAT. MID. PAC. CAR. AFI. PAC. SAM. ASIA. EANG Key Points (1). - PowerPoint PPT Presentation
Popular Tags:
6
Page 1 European Region Air Navigation & Planning Group (EANPG) Chairman: Phil Roberts (UK CAA) PIRG-RASG Global Coordination Meeting, Montreal 19 March 2013 PIRG/RASG GCM-2013/PPT-2 EANPG Agenda item 2
Transcript
Page 1: European Region  Air  Navigation & Planning Group  (EANPG)

Page 1

European Region Air Navigation & Planning Group

(EANPG)

Chairman: Phil Roberts (UK CAA)

PIRG-RASG Global Coordination Meeting, Montreal 19 March 2013

PIRG/RASG GCM-2013/PPT-2 EANPGAgenda item 2

Page 2: European Region  Air  Navigation & Planning Group  (EANPG)

Page 2PIRG-RASG Global Coordination Meeting, Montreal 19 March 2013

52 States meeting once year in plenary session. COG to continue business between plenary sessions.

In order to pursue the best possible coordination and to avoid duplication of efforts, 11 international institutions and organizations recognized by the ICAO Council, are invited to participate as observers on a regular basis: e.g. EC, EASA, IFALPA, IATA, IFATCA, etc.

Arrangements in place to co-ordinate work of RASG EUR and EANPG.

EANG Key Points (1)

EURNAT

AFIMID

ASIA

PAC

PAC

NAM

CAR

SAM

Page 3: European Region  Air  Navigation & Planning Group  (EANPG)

Page 3PIRG-RASG Global Coordination Meeting, Montreal 19 March 2013

Introduction and ongoing safety monitoring of RVSM in western part of Region and more recently EURASIA RVSM.

Creation of Performance Scheme material. Rapid response to Volcanic Ash situation in 2010 in revising

and coordinating changes to NAT and EUR contingency plans.

Technical proposals for amendments to Annex material and SARPs.

Inter/intra-regional co-ordination to optimize network interactions.

Introduced ICARD system.

EANPG Key Points (2)

Page 4: European Region  Air  Navigation & Planning Group  (EANPG)

Page 4PIRG-RASG Global Coordination Meeting, Montreal 19 March 2013

Developing a methodology for dealing with ASBU implementation.

Ensuring effective co-ordination between the EC/ Eurocontrol /ECAC member states and the rest of the EUR Region. Optimize relationships with HQ.

Ensuring effective co-ordination with adjacent/neighboring Regions, in particular NAT SPG.

Developing an effective relationship with the RASG EUR. Tackling those issues that cause States to be included in

the Deficiencies List. Developing procedures to update VA contingency plans.

EANPG: Priorities

Page 5: European Region  Air  Navigation & Planning Group  (EANPG)

Page 5PIRG-RASG Global Coordination Meeting, Montreal 19 March 2013

To introduce a workable Performance Scheme within the Region.

To align/update the Regional Air Navigation Plan with the GANP/GASP.

To assist States in eradicating Deficiencies. To improve the levels of safety associated with ongoing

RVSM operation throughout the Region. To improve the delivery of language training to minimize

the risk caused by confusion in communication. Ensure the right resources are in place to support States

in the delivery of ASBUs.

EANPG: Targets

Page 6: European Region  Air  Navigation & Planning Group  (EANPG)

Page 6PIRG-RASG Global Coordination Meeting, Montreal 19 March 2013


Recommended