European synergy
Geographical cluster
8/8/2019 European Synergy Geogr Cluster
2/15
Agenda
1. Virtualization
2. Disaster recovery
3. Redundancy
4. Globalization
8/8/2019 European Synergy Geogr Cluster
3/15
Point 0 - 6 Sigma for IT?
Define
businessneed andperformanalyses
DMAIC
Will be IT able to act like
Measurecurrentperformance
of IT andperform ataskdefinition
Analyze
relationships and findcommonpoints
Improve
situationbyimplementation
Control
anddevelopimprovements
making improvement with methodology?
8/8/2019 European Synergy Geogr Cluster
4/15
Progress Diagramfinished phases
businessneeds aredefined oncorporate level local roles areagreed andclarified
common points
defined cooperationareas defined availability andconditions checkdone on site
control itemsestablished follow upperformed
Measurement AnalysesDefinitions
8/8/2019 European Synergy Geogr Cluster
5/15
Step-by-step 1.
1. Virtualization
2. Disaster recovery
3. Redundancy
4. Globalization
8/8/2019 European Synergy Geogr Cluster
6/15
Virtualizationcurrent status
currently exists lot of hardware forservers
difficult to manage, expensiveservice, zero flexibility
in case of failure, complete installationneeded and data restore timeconsuming performance isolated for separate use
8/8/2019 European Synergy Geogr Cluster
7/15
Virtualizationstarting step
Introduc
e
virtual
center
WHY?hardware independent
installations server installation fullytransferable starting of virtual server is aquestion of seconds or minutescompared to restore of physical
server taking hours load distributed inside virtualcenter
8/8/2019 European Synergy Geogr Cluster
8/15
Virtualizationnext steps
create virtual images of server farm lower the time of outage when problem occures created environment for safe testing installation of hardware independent servers
performance is distributed according need
server in virtual environment is transferable increased availability
Virtual image
01Virtual image01Virtual image
01Virtual image
01Virtual image
01Virtual image
01
8/8/2019 European Synergy Geogr Cluster
9/15
Step-by-step 2.
1. Virtualization
2. Disaster recovery
3. Redundancy
4. Globalization
8/8/2019 European Synergy Geogr Cluster
10/15
Disaster recoveryhow to make profit from virtualization
possibility to create any serverduring very short time possibility to send image todifferent location and toreconstruct server there
changes could be applied andare reversible after starting server is enoughto actualize data from tape all activities are transparent forusers
need to reconstruct anyenvironment is only backup tapeand available hardware
Virtual image
8/8/2019 European Synergy Geogr Cluster
11/15
Step-by-step 3.
1. Virtualization
2. Disaster recovery
3. Redundancy
4. Globalization
8/8/2019 European Synergy Geogr Cluster
12/15
Redundancyvirtual helpers
virtualization creates border not dividing but putting together every sourceneeded by use of virtual image and offers functionality restricted only byphysical hardware could be used not only in case of failure, but also as additional resourceto grant that business is not endangered by any means
Virtual image
Running invirtual
8/8/2019 European Synergy Geogr Cluster
13/15
Step-by-step 4.
1. Virtualization
2. Disaster recovery
3. Redundancy
4. Globalization
Gl b li i
8/8/2019 European Synergy Geogr Cluster
14/15
Virtual image
Globalizationcorporate profit
perform activities will make possible to let born any server on
virtually any location when sharing data will be also implemented,because of independency of virtual server on dedicated hardware
Ti l
8/8/2019 European Synergy Geogr Cluster
15/15
Time scaleimplementation schedule
2007 2008 2009 2010
1. Virtualization
2. Disaster recovery
3. Redundancy
4. Globalization