Date post: | 19-Jan-2015 |
Category: |
Technology |
Upload: | anne-marie-van-gerwen |
View: | 696 times |
Download: | 2 times |
Europeana PlansAnne Marie van Gerwen
Manager Marketing Europeana
Europeana Strategic Plan 2011-2015: 4 strategic tracks
become THE trusted source for cultural heritage
AGGREGATE
Semantic enrichment30 million objects
Improved data quality
FACILITATESupport cultural heritage sector through knowledge transfer, innovation & advocay
Licensing Frameworks
Improved APIs, API based application development
Linked Open Data
Make heritage available wherever they are whenever they want it
DISTRIBUTE
Improve the portalDifferent ways of Content distribution
Improve the mobile UX
cultivate new way for users to participate in their cultural heritage
ENGAGEImproved exhibition platform
Europeana as UGC platform:-Storytelling-Europeana 1914-1918•Europeana Remix
Improved contextualisation
Improve mobile UX, interactivity and contextualization
Interactivity, social use and self-publication
Europeana Development Priorities Q3 2011
October November December
Map search and display Hierarchical object display (EDM-display)Search and display 3D content (CARARE)
Portal design modifications
Improved and multiple media objects display and download (EDM-display) Improved ranking (ASSETS)
UIM: CRM Integration&Harvesting (REPOX)
OAI-server for collection harvesting by partners (REPOX config, website setup) Query suggestions (ASSETS)
UIM: Link checking&Image caching plug-in UIM: Data enrichment modules
UIM/EDM skeleton workflow completion
Wikipedia citation/Cite item UIM: MINT adaptation
UIM: Link checking&Image caching, embedding provenance and license metadata in previews
UIM: MINT adaptation
Europeana Development Priorities Q1 2012
January February March
Improved ranking (ASSETS) Improved facets Content subscription (ASSETS)
Query suggestions (ASSETS)
Improved autosuggestions Personalisation (ASSETS)
Browse persons (Wikipedia enriched search) Improved mobile Improved embed object widget
Improved mobile interaction design study Improved mobile
UIM workflow improvements
UIM workflow improvements UIM workflow improvements
GLAM-Wikimedia Upload System
Europeana Development Priorities Q2 2012
April May June
Linked Open Data in full production User created galleries
Improved and semantic tagging
Improved Search API incl. Automated API sign-up Improved search widget Geotagging
Improved mobileLanguage sensitive QR-codes
for Europeana items
UIM workflow improvements UIM workflow improvementsUIM workflow
improvements
GLAM-Wikimedia Upload SystemGLAM-Wikimedia Upload
SystemGLAM-Wikimedia
Upload System
Thanks
For further questions: [email protected]
Background information:
www.europeana.eu
Version1.europeana.eu
remix.europeana.eu
Europeana Strategic Plan: http://www.slideshare.net/Europeana/europeana-strategic-plan-20112015