04/11/02 02:15:20
FLT PLN/110/FIN 2-10
FD04
MORIN
BLOOMFIELD
FRICK
WALHEIM
OCHOA
ROSS
SMITH
EVA 1 (6:25)< >
ONUFRIENKO
WALZ
BURSCH
10.2DPRS
♦ ♦ ♦ ♦ ♦
REPLANNED
♦
STS
ISS
STS
09 10 11 12 13 14 15 16 17 18 19 20GMT 04/11/02 12 13 14 15 16 17 18 19 20 21 22 23 003/00
MET Day 002
CDR
CABLE
CWC#3
INIT
CWC#4
INIT
CWC#3
TERM
CWC#4
TERM
CWC
XFER
CWC
XFER
DSO493
INHIB
PAD SRMS & P/TV
SUPPORTSRMS & P/TVSUPPORT
SRMS & P/TVSUPPORT
SRMS &P/TV
SUPPORTMEALP/TV 22 OPSPMC
A/G
POSTSLEEP
POSTSLEEP
PLT SRMS & P/TV SUPPORTSRMS & P/TV SUPPORT MEAL
OSVS*
OSVS*
P/TV23S/U
POST SLEEPGRPL
S0 S0 INSTALLUNBERTH S0
UNGRPL
MS1/EV2 C/L DPRSSEMU P/B
EMU
PURGE
EGRESS/SETUP INST FWD MTS W/TQ MT INST PORT
AVIONICSINST STBD AVIONICSINSTTUSCBL
EVA PREPPOST SLEEP
MS2 DSO493
APFR INSTINSTTUSCBL
POSTSLEEP
SSRMS
RCFG
INST FWD MTS W/TQ MT INST PORTAVIONICS
GRPL
S0 S0 INSTALLUNBERTH S0
UNGRPL
INST STBD AVIONICSCAL
MS3/EV4STAT
BPSSTAT
MAGR
EXERCISEEVA PREP PCS SPTLCAACT
LCA
DEACT
LCA MATEPOST SLEEP
MS4/EV3A/L14.7REPR
EVA PREP IVAPOST SLEEP
MS5/EV1 ASSTEV2
ASSTEV2
C/L DPRSS DEPLOY AFTTRAYEMU P/B
EMU
PURGE
EGRESS/SETUP
DEPLOYAFT TRAY
INSTCID7
INSTCID8
INST FWD MTSINSTTUSCBL
EVA PREPPOST SLEEP
ISS CDR POST SLEEP
POST
SLEEP
DPC КУРС КАБЕЛБОСМОТР
КУРСКАБЕЛБОСМОТР
ER1
PWRDN
♣
PAO
EVENT
COM*
⊕ EXERCISE VELO+RED MIDDAY-MEAL СОЖ-MNTPREP
WORK
FE-1 POST SLEEP
POST
SLEEP
DPC EVA PREPA/L14.7REPR
IVA EVA 1 SUPPORT MIDDAY-MEAL IWISXFER
♦ PLSTAT
PLAN
REVW
FE-2 POST SLEEPCAL
GRPL
S0 UNBERTH S0 S0 INSTALL
UNGRPL
SSRMS
RCFG
MEAL INST FWD MTS W/TQ MT INST STBD AVIONICS INST PORTAVIONICS
INSTTUSCBL
DAY/NIGHTORBIT 41 42 43 44 45 46 47 48
DAILY ORBIT 14 15 1 2 3 4 5 6
TDRS47171
RS GNDORB ATT BIAS -XLV +ZVVISS ATT BIAS +ZLV +XVV
NOTES♣PAO PREP ⊕PAO EVENT1 ♦HAM-PASS-SETUP
HAM PASS*PWRDN*PWRUP
*VERIFY CONFIG 2B2-10
FD04
MORIN
BLOOMFIELD
FRICK
WALHEIM
OCHOA
ROSS
SMITH
EVA 1 (6:25)< >
ONUFRIENKO
WALZ
BURSCH
10.2DPRS
♦ ♦ ♦ ♦ ♦
REPLANNED
♦
STS
ISS
STS
09 10 11 12 13 14 15 16 17 18 19 20GMT 04/11/02 12 13 14 15 16 17 18 19 20 21 22 23 003/00
MET Day 002
CDR
CABLE
CWC#3
INIT
CWC#4
INIT
CWC#3
TERM
CWC#4
TERM
CWC
XFER
CWC
XFER
DSO493
INHIB
PAD SRMS & P/TV
SUPPORTSRMS & P/TVSUPPORT
SRMS & P/TVSUPPORT
SRMS &P/TV
SUPPORTMEALP/TV 22 OPSPMC
A/G
POSTSLEEP
POSTSLEEP
PLT SRMS & P/TV SUPPORTSRMS & P/TV SUPPORT MEAL
OSVS*
OSVS*
P/TV23S/U
POST SLEEPGRPL
S0 S0 INSTALLUNBERTH S0
UNGRPL
MS1/EV2 C/L DPRSSEMU P/B
EMU
PURGE
EGRESS/SETUP INST FWD MTS W/TQ MT INST PORT
AVIONICSINST STBD AVIONICSINSTTUSCBL
EVA PREPPOST SLEEP
MS2 DSO493
APFR INSTINSTTUSCBL
POSTSLEEP
SSRMS
RCFG
INST FWD MTS W/TQ MT INST PORTAVIONICS
GRPL
S0 S0 INSTALLUNBERTH S0
UNGRPL
INST STBD AVIONICSCAL
MS3/EV4STAT
BPSSTAT
MAGR
EXERCISEEVA PREP PCS SPTLCAACT
LCA
DEACT
LCA MATEPOST SLEEP
MS4/EV3A/L14.7REPR
EVA PREP IVAPOST SLEEP
MS5/EV1 ASSTEV2
ASSTEV2
C/L DPRSS DEPLOY AFTTRAYEMU P/B
EMU
PURGE
EGRESS/SETUP
DEPLOYAFT TRAY
INSTCID7
INSTCID8
INST FWD MTSINSTTUSCBL
EVA PREPPOST SLEEP
ISS CDR POST SLEEP
POST
SLEEP
DPC КУРС КАБЕЛБОСМОТР
КУРСКАБЕЛБОСМОТР
ER1
PWRDN
♣
PAO
EVENT
COM*
⊕ EXERCISE VELO+RED MIDDAY-MEAL СОЖ-MNTPREP
WORK
FE-1 POST SLEEP
POST
SLEEP
DPC EVA PREPA/L14.7REPR
IVA EVA 1 SUPPORT MIDDAY-MEAL IWISXFER
♦ PLSTAT
PLAN
REVW
FE-2 POST SLEEPCAL
GRPL
S0 UNBERTH S0 S0 INSTALL
UNGRPL
SSRMS
RCFG
MEAL INST FWD MTS W/TQ MT INST STBD AVIONICS INST PORTAVIONICS
INSTTUSCBL
DAY/NIGHTORBIT 41 42 43 44 45 46 47 48
DAILY ORBIT 14 15 1 2 3 4 5 6
TDRS47171
RS GNDORB ATT BIAS -XLV +ZVVISS ATT BIAS +ZLV +XVV
NOTES♣PAO PREP ⊕PAO EVENT1 ♦HAM-PASS-SETUP
HAM PASS*PWRDN*PWRUP
*VERIFY CONFIG 2B
04/11/02 02:15:20
FLT PLN/110/FIN 2-11
FD04
REPLANNEDSTS-110/8A JOINT MISSION STP
ISS
12 13 14 15 16 17 18 19 20 21 22 23 003/00MET Day 002 09 10 11 12 13 14 15 16 17 18 19 20
GMT 04/11/02SYS
ISS EVA-COMM-CNFGC&T-VIDEO-CNFGA/L-10.2 PSI OP-INITIATCS-RFCA STPT-CHNGDPCEVA1 INHIBIT PADC&DH-S0 ACT 1553-C/OLCA-ACT5.1C(ISS)/4.1(STS)PPS-PCU WARNING-ENADDCU-RT FDIR-INHISS-RAP DPRS-INH/ENAEPS-EVA-SAFINGA/L-10.2 PSI OP-TERM
LCA-S0 TRUSS-MATE ACS-MP PPL-INCORPACS-ATT-CCDB-INCLCA-DEACTC&DH-HK1 TLM-SWAPACS-MM-PREP & ACTS0-ACT
SBD
ISS EVA-COMM-CNFGC&T-VIDEO-CNFG
A/L-10.2 PSI OP-INITIATCS-RFCA STPT-CHNGDPC
EVA1 INHIBIT PADC&DH-S0 ACT 1553-C/O
LCA-ACT5.1C(ISS)/4.1(STS)
PPS-PCU WARNING-ENADDCU-RT FDIR-INH
ISS-RAP DPRS-INH/ENAEPS-EVA-SAFING
A/L-10.2 PSI OP-TERMA/L-10.2 PSI OP-TERM
LCA-S0 TRUSS-MATEACS-MP PPL-INCORPACS-ATT-CCDB-INC
LCA-DEACTC&DH-HK1 TLM-SWAPACS-MM-PREP & ACT
S0-ACTMAIL SYNC
KU
MAIL SYNC MAIL SYNC
PAO EVENTRS
PAO EVENT
PCG-STES-007-PWRADVASC-GROWTH-TERMEXPRS1-PWR/THERMBTR-OPERATIONDM-HEALTH-&-STATUSEXPRS4-PWR/THERMPLSS-POWER1SAMS-ICU/D1-OPSPCG-STES-010-PWRCPCG-H1-CRYSTAL-GRTHCPO/PRO-EXPRS1-CMDADVASC-VIDEOADVASC-LOG-DATA-DUMPADVASC-ENV-DATA-DUMP
PL
PCG-STES-ADVASC-GR
EXPRS1-PWR/THERMBTR-OPERADM-HEALTHEXPRS4-PWPLSS-POWESAMS-ICU/PCG-STES-CPCG-H1-C
CPO/PRO-EXPRS1-CMDADVASC-VIDEO
ADVASC-LOG-DATA-DUMPADVASC-ENV-DATA-DUMP
DPCEVA1 INHIBIT PADC&T-COMM CNFG-VERIFYMCC-H FCT H/O (1/2)
MCC
DPCEVA1 INHIBIT PAD
C&T-COMM CNFG-VERIFYMCC-H FCT H/O (1/2)
ISS ATT BIAS +ZLV +XVV
RS GNDDAY/NIGHTORBIT
DAILY ORBIT 14 15 1 2 3 4 5 6TDRS KU AVAIL
NOTES*VERIFY CONFIG 2B
2-11
FD04
REPLANNEDSTS-110/8A JOINT MISSION STP
ISS
12 13 14 15 16 17 18 19 20 21 22 23 003/00MET Day 002 09 10 11 12 13 14 15 16 17 18 19 20
GMT 04/11/02SYS
ISS EVA-COMM-CNFGC&T-VIDEO-CNFGA/L-10.2 PSI OP-INITIATCS-RFCA STPT-CHNGDPCEVA1 INHIBIT PADC&DH-S0 ACT 1553-C/OLCA-ACT5.1C(ISS)/4.1(STS)PPS-PCU WARNING-ENADDCU-RT FDIR-INHISS-RAP DPRS-INH/ENAEPS-EVA-SAFINGA/L-10.2 PSI OP-TERM
LCA-S0 TRUSS-MATE ACS-MP PPL-INCORPACS-ATT-CCDB-INCLCA-DEACTC&DH-HK1 TLM-SWAPACS-MM-PREP & ACTS0-ACT
SBD
ISS EVA-COMM-CNFGC&T-VIDEO-CNFG
A/L-10.2 PSI OP-INITIATCS-RFCA STPT-CHNGDPC
EVA1 INHIBIT PADC&DH-S0 ACT 1553-C/O
LCA-ACT5.1C(ISS)/4.1(STS)
PPS-PCU WARNING-ENADDCU-RT FDIR-INH
ISS-RAP DPRS-INH/ENAEPS-EVA-SAFING
A/L-10.2 PSI OP-TERMA/L-10.2 PSI OP-TERM
LCA-S0 TRUSS-MATEACS-MP PPL-INCORPACS-ATT-CCDB-INC
LCA-DEACTC&DH-HK1 TLM-SWAPACS-MM-PREP & ACT
S0-ACTMAIL SYNC
KU
MAIL SYNC MAIL SYNC
PAO EVENTRS
PAO EVENT
PCG-STES-007-PWRADVASC-GROWTH-TERMEXPRS1-PWR/THERMBTR-OPERATIONDM-HEALTH-&-STATUSEXPRS4-PWR/THERMPLSS-POWER1SAMS-ICU/D1-OPSPCG-STES-010-PWRCPCG-H1-CRYSTAL-GRTHCPO/PRO-EXPRS1-CMDADVASC-VIDEOADVASC-LOG-DATA-DUMPADVASC-ENV-DATA-DUMP
PL
PCG-STES-ADVASC-GR
EXPRS1-PWR/THERMBTR-OPERADM-HEALTHEXPRS4-PWPLSS-POWESAMS-ICU/PCG-STES-CPCG-H1-C
CPO/PRO-EXPRS1-CMDADVASC-VIDEO
ADVASC-LOG-DATA-DUMPADVASC-ENV-DATA-DUMP
DPCEVA1 INHIBIT PADC&T-COMM CNFG-VERIFYMCC-H FCT H/O (1/2)
MCC
DPCEVA1 INHIBIT PAD
C&T-COMM CNFG-VERIFYMCC-H FCT H/O (1/2)
ISS ATT BIAS +ZLV +XVV
RS GNDDAY/NIGHTORBIT
DAILY ORBIT 14 15 1 2 3 4 5 6TDRS KU AVAIL
NOTES*VERIFY CONFIG 2B
04/11/02 02:15:20
FLT PLN/110/FIN 2-12
FD04
MORIN
BLOOMFIELD
FRICK
WALHEIM
OCHOA
ROSS
SMITH
ONUFRIENKO
WALZ
BURSCH
♦ ♦ ♦ ♦
SVS TESTING >
REPLANNED
STS
ISS
STS
21 22 23 04/12 01 02 03 04 05 06 07 08GMT 04/11/02 003/00 01 02 03 04 05 06 07 08 09 10 11 12
MET Day 003
CDR EXERCISE PMCOCA
PRE SLEEP PRE SLEEP SLEEP
COMM*
PLTSRMS &P/TV
SUPPORTEXERCISE
ILLUM
ONR
MS
PARK
PRE SLEEP SLEEP
MS1/EV2
C/L
RPRSS
C/U&
INGRS♣ POST EVA W/H20 PRE SLEEP SLEEP
MS2
CABLE
PRE SLEEP SLEEPSSRMSRCFG
MS3/EV4
BSA-I
EMU
SWAP
PCS SPT POST EVAW/H20 PRE SLEEP
REBA*
SLEEP
MS4/EV3
BSA-I
EMU-I
EMU
SWAP
IVA POST EVAW/H20 PRE SLEEP SLEEP
MS5/EV1
C/L
RPRSS
C/U&
INGRS⊕ POST EVA W/H20 PRE SLEEP SLEEP
ISS CDRPREP
WORK
TVISCOM*
PLANREVW DPC PRE SLEEP SLEEP
FE-1PLAN
REVW
IRED DPC PRE SLEEP SLEEP
FE-2 SSRMSRCFG
PREPWORK
PLANREVW DPC PRE SLEEP SLEEP
DAY/NIGHTORBIT 49 50 51 52 53 54 55 56
DAILY ORBIT 7 8 9 10 11 12 13 14
TDRS47171
RS GNDORB ATT BIAS -XLV +ZVVISS ATT BIAS +ZLV +XVV
NOTES♣INST TUS CBL⊕INST TUS CBL
*DECONFIG*PARK POS
*INIT
*VERIFY CONFIG 3B 2-12
FD04
MORIN
BLOOMFIELD
FRICK
WALHEIM
OCHOA
ROSS
SMITH
ONUFRIENKO
WALZ
BURSCH
♦ ♦ ♦ ♦
SVS TESTING >
REPLANNED
STS
ISS
STS
21 22 23 04/12 01 02 03 04 05 06 07 08GMT 04/11/02 003/00 01 02 03 04 05 06 07 08 09 10 11 12
MET Day 003
CDR EXERCISE PMCOCA
PRE SLEEP PRE SLEEP SLEEP
COMM*
PLTSRMS &P/TV
SUPPORTEXERCISE
ILLUM
ONR
MS
PARK
PRE SLEEP SLEEP
MS1/EV2
C/L
RPRSS
C/U&
INGRS♣ POST EVA W/H20 PRE SLEEP SLEEP
MS2
CABLE
PRE SLEEP SLEEPSSRMSRCFG
MS3/EV4
BSA-I
EMU
SWAP
PCS SPT POST EVAW/H20 PRE SLEEP
REBA*
SLEEP
MS4/EV3
BSA-I
EMU-I
EMU
SWAP
IVA POST EVAW/H20 PRE SLEEP SLEEP
MS5/EV1
C/L
RPRSS
C/U&
INGRS⊕ POST EVA W/H20 PRE SLEEP SLEEP
ISS CDRPREP
WORK
TVISCOM*
PLANREVW DPC PRE SLEEP SLEEP
FE-1PLAN
REVW
IRED DPC PRE SLEEP SLEEP
FE-2 SSRMSRCFG
PREPWORK
PLANREVW DPC PRE SLEEP SLEEP
DAY/NIGHTORBIT 49 50 51 52 53 54 55 56
DAILY ORBIT 7 8 9 10 11 12 13 14
TDRS47171
RS GNDORB ATT BIAS -XLV +ZVVISS ATT BIAS +ZLV +XVV
NOTES♣INST TUS CBL⊕INST TUS CBL
*DECONFIG*PARK POS
*INIT
*VERIFY CONFIG 3B
04/11/02 02:15:20
FLT PLN/110/FIN 2-13
FD04
REPLANNEDSTS-110/8A JOINT MISSION STP
ISS
003/00 01 02 03 04 05 06 07 08 09 10 11 12MET Day 003 21 22 23 04/12 01 02 03 04 05 06 07 08
GMT 04/11/02SYS
S0-ACTS&M-SSAS HTR-VFYMT-IMCA PWR-C/OC&DH-ERB-DUMPISS EVA-COMM-DECNFGMT-TUS-C/OPPS-PCU WARNING-INHC&DH-S0 ACT 1553-C/OMT-LDU-DISENGAGEVDS-EVSU INIT-A/CDDCU-LA2A LA4A-BDTC&DH-S0 PPL-LOADMT-TD-C/OC&DH-HK1 TLM-SWAPMSS-PWRDWNSBD-KEY-CHG
SBD
S0-ACTS&M-SSAS HTR-VFY
MT-IMCA PWR-C/OC&DH-ERB-DUMP
ISS EVA-COMM-DECNFGMT-TUS-C/O
PPS-PCU WARNING-INHC&DH-S0 ACT 1553-C/OMT-LDU-DISENGAGEVDS-EVSU INIT-A/CDDCU-LA2A LA4A-BDT
C&DH-S0 PPL-LOADMT-TD-C/O
C&DH-HK1 TLM-SWAPMSS-PWRDWN
SBD-KEY-CHGMAIL SYNC
KU
MAIL SYNC MAIL SYNC
RS
PCG-STES-007-PWRADVASC-GROWTH-TERMBTR-OPERATIONDM-HEALTH-&-STATUSEXPRS4-PWR/THERMPLSS-POWER1SAMS-ICU/D1-OPSPCG-STES-010-PWRCPCG-H1-CRYSTAL-GRTH
PL
PCG-STES-ADVASC-GRBTR-OPERADM-HEALTHEXPRS4-PWPLSS-POWESAMS-ICU/PCG-STES-CPCG-H1-C
C&T-COMM CNFG-VERIFYMCC-H FCT H/O (2/3)MCC-H FCT H/O (3/1)
MCC
C&T-COMM CNFG-VERIFYMCC-H FCT H/O (2/3)
MCC-H FCT H/O (3/1
ISS ATT BIAS +ZLV +XVV
RS GNDDAY/NIGHTORBIT
DAILY ORBIT 7 8 9 10 11 12 13 14TDRS KU AVAIL
NOTES*VERIFY CONFIG 3B
2-13
FD04
REPLANNEDSTS-110/8A JOINT MISSION STP
ISS
003/00 01 02 03 04 05 06 07 08 09 10 11 12MET Day 003 21 22 23 04/12 01 02 03 04 05 06 07 08
GMT 04/11/02SYS
S0-ACTS&M-SSAS HTR-VFYMT-IMCA PWR-C/OC&DH-ERB-DUMPISS EVA-COMM-DECNFGMT-TUS-C/OPPS-PCU WARNING-INHC&DH-S0 ACT 1553-C/OMT-LDU-DISENGAGEVDS-EVSU INIT-A/CDDCU-LA2A LA4A-BDTC&DH-S0 PPL-LOADMT-TD-C/OC&DH-HK1 TLM-SWAPMSS-PWRDWNSBD-KEY-CHG
SBD
S0-ACTS&M-SSAS HTR-VFY
MT-IMCA PWR-C/OC&DH-ERB-DUMP
ISS EVA-COMM-DECNFGMT-TUS-C/O
PPS-PCU WARNING-INHC&DH-S0 ACT 1553-C/OMT-LDU-DISENGAGEVDS-EVSU INIT-A/CDDCU-LA2A LA4A-BDT
C&DH-S0 PPL-LOADMT-TD-C/O
C&DH-HK1 TLM-SWAPMSS-PWRDWN
SBD-KEY-CHGMAIL SYNC
KU
MAIL SYNC MAIL SYNC
RS
PCG-STES-007-PWRADVASC-GROWTH-TERMBTR-OPERATIONDM-HEALTH-&-STATUSEXPRS4-PWR/THERMPLSS-POWER1SAMS-ICU/D1-OPSPCG-STES-010-PWRCPCG-H1-CRYSTAL-GRTH
PL
PCG-STES-ADVASC-GRBTR-OPERADM-HEALTHEXPRS4-PWPLSS-POWESAMS-ICU/PCG-STES-CPCG-H1-C
C&T-COMM CNFG-VERIFYMCC-H FCT H/O (2/3)MCC-H FCT H/O (3/1)
MCC
C&T-COMM CNFG-VERIFYMCC-H FCT H/O (2/3)
MCC-H FCT H/O (3/1
ISS ATT BIAS +ZLV +XVV
RS GNDDAY/NIGHTORBIT
DAILY ORBIT 7 8 9 10 11 12 13 14TDRS KU AVAIL
NOTES*VERIFY CONFIG 3B
04/11/02 02:11:10
FLT PLN/110/FIN 3-26
FD4 EZ ACTIVITIES OCAC FILTER INSPECT TEPC(STATUS CK) (ORB OPS, CREW SYS) Step A6 REBOOT PGSCs L17 Check MCIU Filter Screen ILLUMINATOR OPS (PHOTO/TV, CUE CARDS) Camr B & C - OFF
04
BLOOMFIELD FRICK OCHOA
β 21 deg only
Box C1-7<AZ<50-60<EL<73
Box C2-28<AZ<-5-40<EL<42
Box D1-60<AZ<5-80<EL<-7
Box D2-20<AZ<70 30<EL<50
UPLINK
UPLINKTFL 192INH C&W
REPLANNED
S0 GRAPPLE (ROBOTICS, S0 TRUSS OPERATIONS)
STS-110 (FD )
09:00
10:00
11:00
12:00
GMT
Date04/11
12:00
13:00
14:00
15:00
16:00
MET
Day 002E W
TDRS
~
~
DORB
14
15
1
ORB
41
42
43
STS ATT~
~
BIAS -XLV +ZVV
CDR
RECONNECT RWS 1,2 BNC to BNC CABLES AT HATCH
SALIVA COLLECTION (ORB OPS, DSO 493)
EVA INHIBIT PAD (EVA, FS TIMELINES)
P/TV22 SO INSTALL (OPS) (PHOTO/TV, SCENES)
~
06 UHF MODE - OFF PRIVATE MEDICAL CONFERENCE DISCONNECT DTV AUDIO CABLE
√
POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)
POST-SLEEP ACTIVITY (ORB OPS, CREW SYS) DTV AUDIO - CREW DISCRETION
PLT
OSVS POWERUP (PDRS OPS, OSVS OPS)
POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)
GALLEY MORNING CONFIG (ORB OPS, ECLS)
S0 GRAPPLE (ROBOTICS, S0 TRUSS OPERATIONS)
S0 INSTALL (ROBOTICS, S0 TRUSS OPERATIONS)
~
S0 UNBERTH (ROBOTICS, S0 TRUSS OPERATIONS)
MS2
SALIVA COLLECTION (ORB OPS, DSO 493)
POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)
S0 INSTALL (ROBOTICS, S0 TRUSS OPERATIONS)
~
S0 UNBERTH (ROBOTICS, S0 TRUSS OPERATIONS)
HAND CONTROLLER CALIBRATION (RBT GEN, RWS CHECKOUT)
MCC Notes
3-26
FD4 EZ ACTIVITIES OCAC FILTER INSPECT TEPC(STATUS CK) (ORB OPS, CREW SYS) Step A6 REBOOT PGSCs L17 Check MCIU Filter Screen ILLUMINATOR OPS (PHOTO/TV, CUE CARDS) Camr B & C - OFF
04
BLOOMFIELD FRICK OCHOA
β 21 deg only
Box C1-7<AZ<50-60<EL<73
Box C2-28<AZ<-5-40<EL<42
Box D1-60<AZ<5-80<EL<-7
Box D2-20<AZ<70 30<EL<50
UPLINK
UPLINKTFL 192INH C&W
REPLANNED
S0 GRAPPLE (ROBOTICS, S0 TRUSS OPERATIONS)
STS-110 (FD )
09:00
10:00
11:00
12:00
GMT
Date04/11
12:00
13:00
14:00
15:00
16:00
MET
Day 002E W
TDRS
DORB
14
15
1
ORB
41
42
43
STS ATT~
~
BIAS -XLV +ZVV
CDR
RECONNECT RWS 1,2 BNC to BNC CABLES AT HATCH
SALIVA COLLECTION (ORB OPS, DSO 493)
EVA INHIBIT PAD (EVA, FS TIMELINES)
P/TV22 SO INSTALL (OPS) (PHOTO/TV, SCENES)
~
06 UHF MODE - OFF PRIVATE MEDICAL CONFERENCE DISCONNECT DTV AUDIO CABLE
√
POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)
POST-SLEEP ACTIVITY (ORB OPS, CREW SYS) DTV AUDIO - CREW DISCRETION
PLT
OSVS POWERUP (PDRS OPS, OSVS OPS)
POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)
GALLEY MORNING CONFIG (ORB OPS, ECLS)
S0 GRAPPLE (ROBOTICS, S0 TRUSS OPERATIONS)
S0 INSTALL (ROBOTICS, S0 TRUSS OPERATIONS)
~
S0 UNBERTH (ROBOTICS, S0 TRUSS OPERATIONS)
MS2
SALIVA COLLECTION (ORB OPS, DSO 493)
POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)
S0 INSTALL (ROBOTICS, S0 TRUSS OPERATIONS)
~
S0 UNBERTH (ROBOTICS, S0 TRUSS OPERATIONS)
HAND CONTROLLER CALIBRATION (RBT GEN, RWS CHECKOUT)
MCC Notes
04/11/02 02:11:10
FLT PLN/110/FIN 3-27
04
WALHEIM MORIN ROSS SMITH
MAGR ONORBIT S/U (ORB OPS, GPS) Steps 4-11MDDK ASCENT STATUS CKS (ASSY OPS, CUE CARD) Step 1
< Do not don helmet if arrival at lab approach greater than 20 min away
< Do not don helmet if arrival at lab approach greater than 20 min away
< Do not don helmet if arrival at lab approach greater than 20 min away
REPLANNEDSTS-110 (FD )
09:00
10:00
11:00
12:00
GMT
Date04/11
12:00
13:00
14:00
15:00
16:00
MET
Day 002E W
TDRS
~
~
DORB
14
15
1
ORB
41
42
43
STS ATT~
~
BIAS -XLV +ZVV
MS1
EVA PREP (ISS EVA SYSTEMS, EVA PREP)
~
POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)
MS3
BPS DATA DOWNLOAD & STATUS CHECK (ASSY OPS, CUE CARD)
EXERCISE
EVA PREP (ISS EVA SYSTEMS, EVA PREP)
MATE S0 TRUSS TO LCA (ASSY OPS, S&M) Steps 1-9
POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)
MS4
EVA PREP (ISS EVA SYSTEMS, EVA PREP)
~
POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)
MS5
EVA PREP (ISS EVA SYSTEMS, EVA PREP)
~
POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)
Notes
3-27
04
WALHEIM MORIN ROSS SMITH
MAGR ONORBIT S/U (ORB OPS, GPS) Steps 4-11MDDK ASCENT STATUS CKS (ASSY OPS, CUE CARD) Step 1
< Do not don helmet if arrival at lab approach greater than 20 min away
< Do not don helmet if arrival at lab approach greater than 20 min away
< Do not don helmet if arrival at lab approach greater than 20 min away
REPLANNEDSTS-110 (FD )
09:00
10:00
11:00
12:00
GMT
Date04/11
12:00
13:00
14:00
15:00
16:00
MET
Day 002E W
TDRS
DORB
14
15
1
ORB
41
42
43
STS ATT~
~
BIAS -XLV +ZVV
MS1
EVA PREP (ISS EVA SYSTEMS, EVA PREP)
~
POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)
MS3
BPS DATA DOWNLOAD & STATUS CHECK (ASSY OPS, CUE CARD)
EXERCISE
EVA PREP (ISS EVA SYSTEMS, EVA PREP)
MATE S0 TRUSS TO LCA (ASSY OPS, S&M) Steps 1-9
POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)
MS4
EVA PREP (ISS EVA SYSTEMS, EVA PREP)
~
POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)
MS5
EVA PREP (ISS EVA SYSTEMS, EVA PREP)
~
POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)
Notes
04/11/02 02:11:10
FLT PLN/110/FIN 3-28
04
BLOOMFIELD FRICK OCHOA
♦
β 21 deg only
Box C1-7<AZ<50-60<EL<73
Box C2-28<AZ<-5-40<EL<42
Box D1-60<AZ<5-80<EL<-7
UPLINK
Box D2-20<AZ<75 30<EL<55
♦
UPLINKTFL 199ENA C&W
REPLANNED
TRANSITION TO EVA C/L
STS-110 (FD )
13:00
14:00
15:00
16:00
GMT
Date04/11
16:00
17:00
18:00
19:00
20:00
MET
Day 002E W
TDRS
~
~
DORB
1
2
3
4
ORB
43
44
45
46
STS ATT~
~
BIAS -XLV +ZVV
CDR
SHUTTLE/ISS H2O CNTR FILL (CWC #3) (ORB OPS, ECLS) Ag biocide only. No samples req'd Est fill time 55 min Prior to fill inform MCC of bar code and S/N
RMS EVA1 SUPPORT
MEAL
P/TV22 SO INSTALL (OPS) (PHOTO/TV, SCENES)
~
PLT
RMS EVA1 SUPPORT
~
OSVS POWERDOWN (PDRS OPS, OSVS OPS)P/TV23 EVA (SETUP) (PHOTO/TV, SCENES)
S0 INSTALL (ROBOTICS, S0 TRUSS OPERATIONS)
~
S0 UNGRAPPLE (ROBOTICS, S0 TRUSS OPERATIONS)
MS2
INITIAL APFR INSTALL
SSRMS RECONFIG FOR EVA1 SUPPORT (ROBOTICS, EVA1)
INSTALL FWD MTS STRUTS W/ TORQUE MULTIPLIER
~
S0 INSTALL (ROBOTICS, S0 TRUSS OPERATIONS)
~
S0 UNGRAPPLE (ROBOTICS, S0 TRUSS OPERATIONS)
MCC Notes
3-28
04
BLOOMFIELD FRICK OCHOA
♦
β 21 deg only
Box C1-7<AZ<50-60<EL<73
Box C2-28<AZ<-5-40<EL<42
Box D1-60<AZ<5-80<EL<-7
UPLINK
Box D2-20<AZ<75 30<EL<55
♦
UPLINKTFL 199ENA C&W
REPLANNED
TRANSITION TO EVA C/L
STS-110 (FD )
13:00
14:00
15:00
16:00
GMT
Date04/11
16:00
17:00
18:00
19:00
20:00
MET
Day 002E W
TDRS
DORB
1
2
3
4
ORB
43
44
45
46
STS ATT~
~
BIAS -XLV +ZVV
CDR
SHUTTLE/ISS H2O CNTR FILL (CWC #3) (ORB OPS, ECLS) Ag biocide only. No samples req'd Est fill time 55 min Prior to fill inform MCC of bar code and S/N
RMS EVA1 SUPPORT
MEAL
P/TV22 SO INSTALL (OPS) (PHOTO/TV, SCENES)
~
PLT
RMS EVA1 SUPPORT
~
OSVS POWERDOWN (PDRS OPS, OSVS OPS)P/TV23 EVA (SETUP) (PHOTO/TV, SCENES)
S0 INSTALL (ROBOTICS, S0 TRUSS OPERATIONS)
~
S0 UNGRAPPLE (ROBOTICS, S0 TRUSS OPERATIONS)
MS2
INITIAL APFR INSTALL
SSRMS RECONFIG FOR EVA1 SUPPORT (ROBOTICS, EVA1)
INSTALL FWD MTS STRUTS W/ TORQUE MULTIPLIER
~
S0 INSTALL (ROBOTICS, S0 TRUSS OPERATIONS)
~
S0 UNGRAPPLE (ROBOTICS, S0 TRUSS OPERATIONS)
MCC Notes
04/11/02 02:11:10
FLT PLN/110/FIN 3-29
04
WALHEIM MORIN ROSS SMITH
< Start depress to 5 psi no earlier than 1st stage capture
< Depress below 5 psi no earlier than thruster reenable
< Start depress to 5 psi no earlier than 1st stage capture
< Depress below 5 psi no earlier than thruster reenable
REPLANNED
TRANSITION TO EVA C/L
STS-110 (FD )
13:00
14:00
15:00
16:00
GMT
Date04/11
16:00
17:00
18:00
19:00
20:00
MET
Day 002E W
TDRS
~
~
DORB
1
2
3
4
ORB
43
44
45
46
STS ATT~
~
BIAS -XLV +ZVV
MS1
CREWLOCK DEPRESS (ISS EVA SYSTEMS, C/L DEP/REP CC)
EMU PREBREATHE (ISS EVA SYSTEMS, EVA PREP)
EMU PURGE (ISS EVA SYSTEMS, EVA PREP)
EVA1 EGRESS/SETUP
INSTALL FWD MTS STRUTS W/ TORQUE MULTIPLIER
~
EVA PREP (ISS EVA SYSTEMS, EVA PREP)
~
MS3
MDDK ASCENT STATUS CKS (ASSY OPS, CUE CARD) Step 1
IVA SUPPORT EVA1
~
MATE S0 TRUSS TO LCA (ASSY OPS, S&M) Steps 26
MATE S0 TRUSS TO LCA (ASSY OPS, S&M) Steps 10-25
MS4
AIRLOCK REPRESS
EVA PREP (ISS EVA SYSTEMS, EVA PREP)
~
IVA SUPPORT EVA1
~
MS5
CREWLOCK DEPRESS (ISS EVA SYSTEMS, C/L DEP/REP CC)
EMU PREBREATHE (ISS EVA SYSTEMS, EVA PREP)
EMU PURGE (ISS EVA SYSTEMS, EVA PREP)
EVA1 EGRESS/SETUP
INSTALL FWD MTS STRUTS
~
EVA PREP (ISS EVA SYSTEMS, EVA PREP)
~
Notes
3-29
04
WALHEIM MORIN ROSS SMITH
< Start depress to 5 psi no earlier than 1st stage capture
< Depress below 5 psi no earlier than thruster reenable
< Start depress to 5 psi no earlier than 1st stage capture
< Depress below 5 psi no earlier than thruster reenable
REPLANNED
TRANSITION TO EVA C/L
STS-110 (FD )
13:00
14:00
15:00
16:00
GMT
Date04/11
16:00
17:00
18:00
19:00
20:00
MET
Day 002E W
TDRS
DORB
1
2
3
4
ORB
43
44
45
46
STS ATT~
~
BIAS -XLV +ZVV
MS1
CREWLOCK DEPRESS (ISS EVA SYSTEMS, C/L DEP/REP CC)
EMU PREBREATHE (ISS EVA SYSTEMS, EVA PREP)
EMU PURGE (ISS EVA SYSTEMS, EVA PREP)
EVA1 EGRESS/SETUP
INSTALL FWD MTS STRUTS W/ TORQUE MULTIPLIER
~
EVA PREP (ISS EVA SYSTEMS, EVA PREP)
~
MS3
MDDK ASCENT STATUS CKS (ASSY OPS, CUE CARD) Step 1
IVA SUPPORT EVA1
~
MATE S0 TRUSS TO LCA (ASSY OPS, S&M) Steps 26
MATE S0 TRUSS TO LCA (ASSY OPS, S&M) Steps 10-25
MS4
AIRLOCK REPRESS
EVA PREP (ISS EVA SYSTEMS, EVA PREP)
~
IVA SUPPORT EVA1
~
MS5
CREWLOCK DEPRESS (ISS EVA SYSTEMS, C/L DEP/REP CC)
EMU PREBREATHE (ISS EVA SYSTEMS, EVA PREP)
EMU PURGE (ISS EVA SYSTEMS, EVA PREP)
EVA1 EGRESS/SETUP
INSTALL FWD MTS STRUTS
~
EVA PREP (ISS EVA SYSTEMS, EVA PREP)
~
Notes
04/11/02 02:11:10
FLT PLN/110/FIN 3-30
04
BLOOMFIELD FRICK OCHOA
♦
♦
REPLANNED
♦
STS-110 (FD )
17:00
18:00
19:00
20:00
GMT
Date04/11
20:00
21:00
22:00
23:00
00:00
MET
Day 002E W
TDRS
~
~
~
DORB
4
5
6
ORB
46
47
48
STS ATT~
~
BIAS -XLV +ZVV
CDR
SHUTTLE/ISS H2O CNTR FILL (CWC #4) (ORB OPS, ECLS) Ag biocide only, No samples req'd Est fill time 55 min Prior to fill inform MCC of bar code and S/N
SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS) Terminate CWC fill
SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS) Terminate CWC fillCWC TRANSFER Transfer 1 CWC to ISS.
CWC TRANSFER Transfer 1 CWC to ISS.
RMS EVA1 SUPPORT
RMS EVA1 SUPPORT
RMS EVA1 SUPPORT
PLT
RMS EVA1 SUPPORT
~
RMS EVA1 SUPPORT
~
MEAL
MS2
INSTALL TUS 1 ZNTH CBL
INSTALL FWD MTS STRUTS W/ TORQUE MULTIPLIER
~
INSTALL LAB FWD PORT AVIONICS UMBILICALS
INSTALL STBD AVIONICS
MCC Notes
3-30
04
BLOOMFIELD FRICK OCHOA
♦
♦
REPLANNED
♦
STS-110 (FD )
17:00
18:00
19:00
20:00
GMT
Date04/11
20:00
21:00
22:00
23:00
00:00
MET
Day 002E W
TDRS
DORB
4
5
6
ORB
46
47
48
STS ATT~
~
BIAS -XLV +ZVV
CDR
SHUTTLE/ISS H2O CNTR FILL (CWC #4) (ORB OPS, ECLS) Ag biocide only, No samples req'd Est fill time 55 min Prior to fill inform MCC of bar code and S/N
SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS) Terminate CWC fill
SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS) Terminate CWC fillCWC TRANSFER Transfer 1 CWC to ISS.
CWC TRANSFER Transfer 1 CWC to ISS.
RMS EVA1 SUPPORT
RMS EVA1 SUPPORT
RMS EVA1 SUPPORT
PLT
RMS EVA1 SUPPORT
~
RMS EVA1 SUPPORT
~
MEAL
MS2
INSTALL TUS 1 ZNTH CBL
INSTALL FWD MTS STRUTS W/ TORQUE MULTIPLIER
~
INSTALL LAB FWD PORT AVIONICS UMBILICALS
INSTALL STBD AVIONICS
MCC Notes
04/11/02 02:11:10
FLT PLN/110/FIN 3-31
04
WALHEIM MORIN ROSS SMITH
REPLANNEDSTS-110 (FD )
17:00
18:00
19:00
20:00
GMT
Date04/11
20:00
21:00
22:00
23:00
00:00
MET
Day 002E W
TDRS
~
~
~
DORB
4
5
6
ORB
46
47
48
STS ATT~
~
BIAS -XLV +ZVV
MS1
INSTALL FWD MTS STRUTS W/ TORQUE MULTIPLIER
~
INSTALL LAB FWD PORT AVIONICS UMBILICALS
INSTALL FWD STBD AVIONICS
INSTALL TUS 1 ZNTH CBL
~
MS3
IVA SUPPORT EVA1
~
~
MS4
IVA SUPPORT EVA1
~
~
MS5
ASSIST W/ PORT AVIONICS
ASSIST W/STBD AVIONICS
DEPLOY AFT LAB TRAY
DEPLOY AFT LAB TRAY
INSTALL CID 7
INSTALL CID 8
INSTALL FWD MTS STRUTS~
INSTALL TUS 1 ZNTH CBL
~
Notes
3-31
04
WALHEIM MORIN ROSS SMITH
REPLANNEDSTS-110 (FD )
17:00
18:00
19:00
20:00
GMT
Date04/11
20:00
21:00
22:00
23:00
00:00
MET
Day 002E W
TDRS
DORB
4
5
6
ORB
46
47
48
STS ATT~
~
BIAS -XLV +ZVV
MS1
INSTALL FWD MTS STRUTS W/ TORQUE MULTIPLIER
~
INSTALL LAB FWD PORT AVIONICS UMBILICALS
INSTALL FWD STBD AVIONICS
INSTALL TUS 1 ZNTH CBL
~
MS3
IVA SUPPORT EVA1
~
~
MS4
IVA SUPPORT EVA1
~
~
MS5
ASSIST W/ PORT AVIONICS
ASSIST W/STBD AVIONICS
DEPLOY AFT LAB TRAY
DEPLOY AFT LAB TRAY
INSTALL CID 7
INSTALL CID 8
INSTALL FWD MTS STRUTS~
INSTALL TUS 1 ZNTH CBL
~
Notes
04/11/02 02:11:10
FLT PLN/110/FIN 3-32
OVERNIGHT CONFIG A
A OVERNIGHT CONFIG COLOR PRINTER - ON PAPER IN COLOR PRINTER FLOPPY DISK IN PROSHARE KFX LAUNCHED OCA ROUTER - ON PROSHARE - ON TV POWER CONTROL - cmd
CHECK APPLICATIONS CLOSED OUTLOOK
04
BLOOMFIELD FRICK OCHOA
SVSTESTING
EVA COMM DECONFIG (EVA, EVA PREP)
♦
β 21 deg only
Box C1-7<AZ<50-60<EL<73
Box C2-28<AZ<-5-40<EL<42
Box D1-60<AZ<5-80<EL<-7
UPLINK
♦
REPLANNEDSTS-110 (FD )
21:00
22:00
23:00
00:00
GMT
Date04/11
00:00
01:00
02:00
03:00
04:00
MET
Day 003E W
TDRS
~
~
~
DORB
7
8
9
ORB
49
50
51
STS ATT~
~
BIAS -XLV +ZVV
CDR
EXERCISE
VIDEO CONFERENCING (PMC) (ORB OPS, PGSC)
PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)
PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)
PLT
RMS EVA1 SUPPORT
~
EXERCISE
ILLUMINATOR OPS (PHOTO/TV, CUE CARDS) Camr B & C
WATER DUMP OVERNIGHT PARK Ref MSG 041
PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)
GALLEY OVERNIGHT CONFIG (ORB OPS, ECLS)
MS2
DISCONNECT RWS 1,2 BNC to BNC CABLES AT HATCH
PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)
SSRMS RECONFIG FOR EVA2 SUPPORT (ROBOTICS, EVA1)
MCC Notes
OCA-PMC
3-32
OVERNIGHT CONFIG A
A OVERNIGHT CONFIG COLOR PRINTER - ON PAPER IN COLOR PRINTER FLOPPY DISK IN PROSHARE KFX LAUNCHED OCA ROUTER - ON PROSHARE - ON TV POWER CONTROL - cmd
CHECK APPLICATIONS CLOSED OUTLOOK
04
BLOOMFIELD FRICK OCHOA
SVSTESTING
EVA COMM DECONFIG (EVA, EVA PREP)
♦
β 21 deg only
Box C1-7<AZ<50-60<EL<73
Box C2-28<AZ<-5-40<EL<42
Box D1-60<AZ<5-80<EL<-7
UPLINK
♦
REPLANNEDSTS-110 (FD )
21:00
22:00
23:00
00:00
GMT
Date04/11
00:00
01:00
02:00
03:00
04:00
MET
Day 003E W
TDRS
DORB
7
8
9
ORB
49
50
51
STS ATT~
~
BIAS -XLV +ZVV
CDR
EXERCISE
VIDEO CONFERENCING (PMC) (ORB OPS, PGSC)
PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)
PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)
PLT
RMS EVA1 SUPPORT
~
EXERCISE
ILLUMINATOR OPS (PHOTO/TV, CUE CARDS) Camr B & C
WATER DUMP OVERNIGHT PARK Ref MSG 041
PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)
GALLEY OVERNIGHT CONFIG (ORB OPS, ECLS)
MS2
DISCONNECT RWS 1,2 BNC to BNC CABLES AT HATCH
PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)
SSRMS RECONFIG FOR EVA2 SUPPORT (ROBOTICS, EVA1)
MCC Notes
OCA-PMC
04/11/02 02:11:10
FLT PLN/110/FIN 3-33
04
WALHEIM MORIN ROSS SMITH
8A BSA BATT RCHG INIT (ISS EVA SYSTEMS, EMU MAINT/RCHG) EVA1 HL & PGT BATTS
8A BSA BATT RCHG INIT (ISS EVA SYSTEMS, EMU MAINT/RCHG) EVA1 HL & PGT BATTS
REPLANNED
PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)
√ Condensate CWC Inform MCC
√ HUM SEP for H2OAccumulation
STS-110 (FD )
21:00
22:00
23:00
00:00
GMT
Date04/11
00:00
01:00
02:00
03:00
04:00
MET
Day 003E W
TDRS
~
~
~
DORB
7
8
9
ORB
49
50
51
STS ATT~
~
BIAS -XLV +ZVV
MS1
PRE-REPRESS CREWLOCK REPRESS (ISS EVA SYSTEMS, C/L DPRS/RPRS CC)
CLEANUP AND INGRESSINSTALL TUS 1 ZNTH CBL
~
POST EVA (ISS EVA SYSTEMS, POST EVA) PERFORM ALL STEPS EXCEPT METOX REGEN Use PWR S/N 1005
PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)
MS3
8A ISS TO STS EMU SWAP (EVA, A/L CONFIG) Post EVA1 steps
IVA SUPPORT EVA1
~
POST EVA (ISS EVA SYSTEMS, POST EVA) PERFORM ALL STEPS EXCEPT METOX REGEN Use PWR S/N 1005
PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)
REBA BATT RECHARGE (INIT) (EVA, EMU MAINT/RECHARGE) Smith & Walheim
MS4
IN-SUIT EMU BATT RECHRG/CHRG VERIF (EVA, EMU MAINT/RECHARGE) Init Smith & Walheim
8A ISS TO STS EMU SWAP (EVA, A/L CONFIG) Post EVA1 steps
IVA SUPPORT EVA1
~
POST EVA (ISS EVA SYSTEMS, POST EVA) PERFORM ALL STEPS EXCEPT METOX REGEN Use PWR S/N 1005
PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)
MS5
PRE-REPRESS CREWLOCK REPRESS (ISS EVA SYSTEMS, C/L DPRS/RPRS CC)
CLEANUP AND INGRESSINSTALL TUS 1 ZNTH CBL
~
POST EVA (ISS EVA SYSTEMS, POST EVA) PERFORM ALL STEPS EXCEPT METOX REGEN Use PWR S/N 1005
Notes
3-33
04
WALHEIM MORIN ROSS SMITH
8A BSA BATT RCHG INIT (ISS EVA SYSTEMS, EMU MAINT/RCHG) EVA1 HL & PGT BATTS
8A BSA BATT RCHG INIT (ISS EVA SYSTEMS, EMU MAINT/RCHG) EVA1 HL & PGT BATTS
REPLANNED
PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)
√ Condensate CWC Inform MCC
√ HUM SEP for H2OAccumulation
STS-110 (FD )
21:00
22:00
23:00
00:00
GMT
Date04/11
00:00
01:00
02:00
03:00
04:00
MET
Day 003E W
TDRS
DORB
7
8
9
ORB
49
50
51
STS ATT~
~
BIAS -XLV +ZVV
MS1
PRE-REPRESS CREWLOCK REPRESS (ISS EVA SYSTEMS, C/L DPRS/RPRS CC)
CLEANUP AND INGRESSINSTALL TUS 1 ZNTH CBL
~
POST EVA (ISS EVA SYSTEMS, POST EVA) PERFORM ALL STEPS EXCEPT METOX REGEN Use PWR S/N 1005
PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)
MS3
8A ISS TO STS EMU SWAP (EVA, A/L CONFIG) Post EVA1 steps
IVA SUPPORT EVA1
~
POST EVA (ISS EVA SYSTEMS, POST EVA) PERFORM ALL STEPS EXCEPT METOX REGEN Use PWR S/N 1005
PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)
REBA BATT RECHARGE (INIT) (EVA, EMU MAINT/RECHARGE) Smith & Walheim
MS4
IN-SUIT EMU BATT RECHRG/CHRG VERIF (EVA, EMU MAINT/RECHARGE) Init Smith & Walheim
8A ISS TO STS EMU SWAP (EVA, A/L CONFIG) Post EVA1 steps
IVA SUPPORT EVA1
~
POST EVA (ISS EVA SYSTEMS, POST EVA) PERFORM ALL STEPS EXCEPT METOX REGEN Use PWR S/N 1005
PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)
MS5
PRE-REPRESS CREWLOCK REPRESS (ISS EVA SYSTEMS, C/L DPRS/RPRS CC)
CLEANUP AND INGRESSINSTALL TUS 1 ZNTH CBL
~
POST EVA (ISS EVA SYSTEMS, POST EVA) PERFORM ALL STEPS EXCEPT METOX REGEN Use PWR S/N 1005
Notes