  • 8/2/2019 Evaluation Report IPSWAM Final

    1/44

    Embassy of the

    Kingdom of the Netherlands

    Dhaka, Bangladesh

    Bangladesh Water

    Development Board

    Dhaka, Bangladesh

    Integrated Planning for Sustainable

    Water Management (IPSWAM)

    Evaluation report

  • 8/2/2019 Evaluation Report IPSWAM Final

    2/44

    Table of Contents

    Summary

    1. Introduction

    2. Evaluation: approach and methods

    3. The IPSWAM project

    4. Achievements

    4.1. Overview

    4.2. Participatory water management in nine polders

    4.2.1.

    The participatory process

    4.2.2. Rehabilitation of infrastructure

    4.2.3. Operation and Maintenance

    4.2.4. Impact on beneficiaries and polder development

    4.3. Institutional development of BWDB

    4.3.1. Establishment of the central and zonal Planning Cells

    4.3.2. Development of guidelines for Integrated Planning for Sustainable

    Water Resources Management

    4.3.3.

    Dissemination of the IPSWAM approach in WMIP andSWAIWRPMP projects

    4.3.4. Dissemination of the IPSWAM approach in BWDB

    4.3.5. Support to the adaptation of planning and budgeting procedures

    4.3.6. Establishment of the Resource Cell for Participatory Water

    Management

    5. Conclusions

    5.1. Conclusions

    5 2 Challenges and lessons learned

  • 8/2/2019 Evaluation Report IPSWAM Final

    3/44

    List of Abbreviations

    ADP Annual Development Plan

    BWDB Bangladesh Water Development Board

    DAE Department of Agricultural Extension

    DG Director General

    DP Planning Directorate in BWDB

    DPP Development Project Proposal

    EKN Embassy of the Kingdom of the Netherlands

    FCD Flood Control and Drainage

    FCD/I Flood Control, Drainage and Irrigation

    FY Financial Year

    GoB Government of Bangladesh

    GPWM Guidelines for Participatory Water Management

    HYV High Yielding Variety

    IFAD International Fund for Agricultural Development

    IPM Integrated Pest Management

    IPSWAM Integrated Planning for Sustainable Water Management Project

    LCS Landless Contracting Society

    LIV Local Improved Variety

    NGO Non-governmental Organisation

    NWPo National Water Policy

    O&M Operation and Maintenance

    SAAO Sub-Assistant Agricultural Officers of the Department of Agricultural

    Extension

    SDE Sub-Divisional Engineer (BWDB)

    SO Section Office (BWDB)

    SWAIWRPMP Southwest Area Integrated Water Resources Planning and Management

    P j t (G B ADB EKN f d d)

  • 8/2/2019 Evaluation Report IPSWAM Final

    4/44

    Summary

    The aim of the IPSWAM project is to support the BWDB to find an operational approach to introduce

    practical and sustainable participatory and integrated water management in line with the Guidelines

    for Participatory Water Management in the subprojects for which it is responsible. To achieve this

    purpose IPSWAM has followed a two track intervention approach:

    Piloting and demonstrating a practical approach in nine polders in the Southwest and South-

    central zones of the BWDB.

    Institutional strengthening of BWDB offices concerned and dissemination of integrated and

    participatory water management practices throughout the BWDB.

    The project started in November 2003 for a period of five years. Due to cyclone damage it wasextended twice and terminated in June 2011.

    During implementation of the project all envisaged activities have been executed and most of the

    expected direct outputs were achieved. For some outputs, the achievements substantially exceed

    expected outputs, for example the numbers of BWDB staff and WMO leaders and members trained.

    Some activities that were not described in the inception report have been executed and direct results

    obtained, for example the approval for the establishment of a Resource Cell for Participatory Water

    Management in BWDB, the establishment of a participatory monitoring system and the support givento the formulation and approval of a Gender Strategy for BWDB.

    Project impact at the level of the nine polders is encouraging. A study by BARD found clear

    improvements in the level of agricultural production and non-agricultural employment. Most

    important, the incidence of extreme poverty was reportedly reduced from 45% to 16%. During visits

    of the evaluation team to two of the nine polders these findings were generally validated. It appeared

    also that full exploitation of the potential of improved water management is not yet realized, and

    f rther impro ements are therefore possible The Water Management Organisations sho a

  • 8/2/2019 Evaluation Report IPSWAM Final

    5/44

    Overall it is concluded that the project has realized considerable achievements and that its results

    achieved so-far hold considerable promise for sustained institutional change of BWDB. In the nine

    polders that were rehabilitated IPSWAM has positive effects on the lives of tens of thousands of

    people in the nine polders. It has led to some important steps in the institutional change process of theBWDB. At the same time it should be realized that such institutional change processes require a long

    term time horizon. Further work is necessary to realize a critical mass for change within the

    organization, and with that sustainability of achievements. Synergy with other similar projects in the

    water sector will strengthen the institutional impact of IPSWAM.

  • 8/2/2019 Evaluation Report IPSWAM Final

    6/44

    1. IntroductionThe Netherlands has cooperated with Bangladesh in the development of water resources almost since

    independence. After the adoption of the National Water Policy (NWPo) and the Guidelines for

    Participatory Water Resources Management (GPWM) by the Government of Bangladesh (GoB), the

    Netherlands has supported the Bangladesh Water Development Board (BWDB) with the practical

    application of the new approach. IPSWAM is the main project for this, but also other projects play a

    role, notably the Southwest Area Integrated Water Resources Planning and Management Project

    (SWAIWRPMP) and the Water Management Improvement Project (WMIP). For the Dutch

    cooperation programme in Bangladesh, the water sector will remain a priority. With IPSWAMterminated in June 2011, an evaluation of both the direct project achievements as well as an

    appreciation of its wider institutional and policy context is relevant, in order to develop a perspective

    for possible future interventions of this nature.

    In accordance with its dual objective of evaluation and developing a forward looking perspective, the

    mission drafted two reports. This report presents the evaluation of the IPSWAM project, including the

    findings and conclusions/lessons learned. The forward looking perspective for a continuation of

    support to the BWDB as a follow-up of the IPSWAM project is presented in a separate report1

    .

    The evaluation took place from 8-25 August 2011, and was executed by Dr. Bert van de Putte

    (institutional development specialist and team leader), Mr. Nityanandra Chakravorty (socio-

    economist), Mr. Abu Saleh Khan (water resources management specialist) and Ms. Syeda Rizwana

    Hasan (Gender Expert). The mission wishes to express its sincere appreciation for the cooperation that

    it received from staff of the Embassy of the Kingdom of the Netherlands (EKN) and of the BWDB as

    well as from other organisations contacted. The mission is grateful for the support provided by the

    IPSWAM j t t ff

  • 8/2/2019 Evaluation Report IPSWAM Final

    7/44

    In some cases, it was felt difficult to consider the gender aspects in isolation from the overall

    management approach. It is also difficult to comment on the adequacy of gender integration separate

    from the overall achievements of the project. Hence gender issues were discussed and assessed both

    distinctly and in combination with the general project activities and results.

    3. The IPSWAM projectThe ultimate aim of the IPSWAM project is to assist the BWDB to find an operational approach to

    introduce practical, affordable and sustainable participatory and integrated water resources

    management, based on the principles of the GPWM. The approach being developed must be suitable

    to be applied in the normal circumstances of Bangladeshi institutions. The IPSWAM project is based

    on the cumulative experiences of a series of water sector projects supported by EKN. These includethe Early Implementation Project, the Delta Development Project, the Char Development and

    Settlement Project, the System Rehabilitation Project, and the Small Scale Water Resources

    Development Sector Project.

    The first formulation of the project was done in the second half of the 1990s. The project documentthat was finally approved was formulated in 2001. Implementation started in November 2003 for a

    period of five years (until November 2008). The total budget of the project is composed of a

    contribution of the Government of Netherlands (11.36 million) and a contribution of the Governmentof Bangladesh of 2,525 lakh Taka

    2.

    To achieve its objective the project executed interventions in two interrelated components:

    Piloting and demonstrating a practical and pragmatic approach to participatory water

    management through development of water management in nine medium sized3

    polders in the

    South West and South Central zones of Bangladesh. The polders are located in the tidal area,

    with problems of salinity and siltation. Their infrastructure (mainly the perimeter embankment

    d t t f d i ) ft i l t d f ti l K h t i ti f th

  • 8/2/2019 Evaluation Report IPSWAM Final

    8/44

    4. Project achievements4.1. OverviewThe expected outputs of the IPSWAM project are described in detail in the logical framework

    included in the inception report. Appendix C presents an overview of the expected outputs and the

    achievements of the project. This is summarised in the following table.

    Table 4.1: Summary of envisaged outputs and achievementsActivities/outputs in logical framework Project achievements

    IPSWAM Planning Team established at

    DP-III

    IPSWAM Planning Team established and fully staffed (BWDB staff and TA

    staff)

    Planning Cells established at CE offices of

    SC and SW Zones

    Planning Cells in the two zones established, BWDB staff assigned to

    Planning Cells about half of envisaged numbers. All TA staff appointed.

    Planning staff trained Needs assessment and training plan made. Substantially more BWDB staff

    trained than originally envisaged: all planning staff trained and in addition all

    professional staff of BWDB have received training in various related

    subjects.

    Distribution of responsibilities between

    BWDB-HQ and Zonal/local offices defined

    Institutional analysis study completed, findings are used as an input for the

    on-going restructuring of BWDB.

    Approaches developed for local level

    institutional development and multi-

    disciplinary participatory planning

    Approach developed, including supporting information and training material.

    External relationships defined and

    formalised in MoUs with Line Ministries

    BWDB has concluded MoUs with different relevant departments (LGED,Dept of Cooperatives, Dept. of Agricultural Extension, Dept of Fisheries.

    Guidelines and procedures for participatory

    water management introduced by BWDB.

    Guidelines for the approach have been formally adopted by BWDB.

  • 8/2/2019 Evaluation Report IPSWAM Final

    9/44

    4.2. Participatory water management in nine polders4.2.1.The participatory processIn the initial years of the project (2004/2005) a process for participatory water resources management

    was developed, taking into consideration experiences of (mainly) CDSP and of the SSWRDSP

    (LGED) for medium sized Flood Control and Drainage (FCD) projects This six step participatory

    process is as follows:

    Figure 4.1: The participatory planning and implementation process

    1.Identification/ Selectionof projects

    2.Participatory, Multi-disciplinary data

    collection/ analysis

    and option

    development

    3.Formation of WaterManagement

    Organisations (WMO)

    4.Plan formulation andfinalisation, including:

    Infrastructure

    Rehabilitation Plan

    Sustainable

    Environmental

    Management Plan

    Agreement on O&M

    ibiliti

  • 8/2/2019 Evaluation Report IPSWAM Final

    10/44

    On specific aspects of the participatory process the mission observes the following:

    The definition of participatory water management requires involvement in all six stages of

    projects/ schemes (see page 2 of the Guidelines for IPSWAM), the field visits revealed the

    absence of an effective platform for response and redress. The project approach includes stakeholders participation in the stages ofidentification,

    planning, implementation and O & M as described in the GPWM (see page 9 of that

    document). Local stakeholders are not yet effectively participating in decision making with

    regard to the following aspects:

    Detailed planning and design (as described in the GPWM page 13)

    Contracting of works to contractors (transparency of financial plans to be vetted by the

    WMGs/WMAs)

    In these stages local stakeholders are discussing (but not deciding) issues.

    The provisions in the Operation and Maintenance Agreement (between WMA and BWDB) on

    removing interruptions in the canal/ rivers in the polder area have remained largely unutilized (see

    page 56 of the Guidelines for IPSWAM). Many resource persons stated that the lease of water bodies

    for fish cultivation purposes impeded the free flow of water for drainage or irrigation. Also, the

    commitment to allow use of acquired lands, sides of embankments, public canals/wetlands for

    realizing the cost of operation and maintenance by WMGs (see page 57 of the Guidelines for

    IPSWAM) has remained unfulfilled. At all group discussions these issues were mentioned as requiringaction from the relevant authorities.

    4.2.2.Rehabilitation of infrastructureIn the IPSWAM project the rehabilitation of infrastructure follows a bottom up approach with the

    WMOs defining their respective water management problems in the different blocks in a polder during

    village level meetings. On the basis of the consolidation/prioritisation of problems expressed by the

    WMA d th d i t id d b th IPSWAM/BWDB ffi th BWDB D i III

  • 8/2/2019 Evaluation Report IPSWAM Final

    11/44

    IPSWAM has contributed to the modification of the design of gates and the hoisting system to make

    them more easily operable and ensuring less O&M expenditure in future. The Mechanical Design

    Circle of BWDB has pointed out that as a measure to reduce the O&M expenditure of gates they

    should have sand blasting done before the painting work is done and the gates of coastal regionsshould be made of skin plates of 12mm instead of 8mm as presently done.

    Quality control of the construction of the water management structures was done by SO & SDE of

    BWDB. The WMA had a quality control sub-committee of 7 members specially trained by IPSWAM

    for this purpose. Sub-committee members were often almost continuously present on the construction

    sites. In case of observed deviations of contracted work, the sub-committee informed the BWDB

    office concerned and IPSWAM quality control staff. This ensured that work was done as per design.

    The earthwork done by the LCS was also checked by BWDB and the quality control sub-committee ofthe WMA. The BWDB assisted the LCS in the earthwork by setting demonstration pilot segments of

    the work assigned and certifying them if they met the design standards before the full work was taken

    up. This ensured that the LCS had a reference work to refer to do the rest of the job. The final bill was

    processed and paid with the involvement of four parties: the BWDB field office, all members of the

    WMA quality control sub-committee, IPSWAM office and the WMA. Thus all work of rehabilitation

    had a tight system of quality control.

    Participatory planning requires substantial flexibility in work procedures in order to adjust to the needsof water users and cope with changing situations. In the IPSWAM polders, both changes in the

    quantity of work and in engineering design and some new items of work have been included in the

    rehabilitation plans. The WMGs & WMAs have been instrumental in the planning process. Overall, as

    a consequence of participation by WMO, some additional 18.63 km re-excavation of canal, 1.70 km

    retired embankment, 12 irrigation inlets, 0.70 km protective work and some changes in the location of

    structures have been included in the plan. Detailed examples of adaptations of plans as a result of

    participation of WMAs are:

    1. In polder 43/2D a proposed 4-Vent Regulator was changed into two 2-Vent Regulators

    iti d t t diff t l t th t f WMG

  • 8/2/2019 Evaluation Report IPSWAM Final

    12/44

    The monitoring report reveals that the condition of the infrastructure and water management in a

    particular polder is heavily dependent on institutional capacity of the WMAs/WMGs (mainly its

    internal coherence and level of activity) and good relations with the local BWDB engineer.

    Physical Verification of Polder 22

    The WMA & WMGs in polder 22 appreciated the IPSWAM project implementation and expressed

    their willingness to assume responsibility for the routine project O&M as per the MoU with BWDB.

    Members of the WMA stated clearly that water management had improved, and specifically had

    become more predictable. They pointed out some areas where attention should be given to make the

    polder water management even more effective:

    Some parts of the peripheral embankment needed to be raised to prevent water from entering

    during high tide. Some khals needed to be re-excavated.

    Irrigation management was wanting in some places and because of that 4 more inlet structures

    are required to be constructed.

    Availability of drinking water still remains a major issue for the people in the polder.

    Compartmentalization of the polder for more precise water management through water

    structures is still complete.

    Physical Verification of Polder 30This is a larger polder than Polder 22 and thus the complexities are more. The WMA & WMGs

    pointed out that the IPSWAM project implementations have raised their expectations on water as a

    vital resource for development and as a consequence new requirements have come up. They raised

    some issues that require attention to further improve water management in the polder:

    Some gates (at Milemara) on the western side of the project are not functioning adequately

    due to siltation of the outlet canal.

    Due to siltation of external rivers some additional gates are required to remove water logging

    t ifi l

  • 8/2/2019 Evaluation Report IPSWAM Final

    13/44

    WMOs in IPSWAM polders until December 2009 is Tk. 5,100,000. The contribution of WMOs in

    O&M is mainly in the form of voluntary labour, though they do occasionally collect cash contributions

    for contracting LCS and for procurement of small maintenance items (grease, paint).

    It is observed that in the two polders the maintenance required from the side of BWDB is not yet as

    agreed, notably with regard to the emergency maintenance after the two cyclones that hit the area.

    BWDB O&M Directorate indicated that shortage of funding for maintenance meant that not all

    requirements could be fulfilled. The following table presents demands for maintenance funding (from

    all zones and the allocation for O&M.

    Table 4.3: O&M demands and allocations in BWDB

    Fiscal Year Demand (Tk Cr.) Expenditure (Tk Cr.) Percentage (%)200102 250.76 57.19 22.80

    200203 235.18 82.19 34.95

    200304 257.89 100.00 38.78

    200405 276.90 125.90 45.47

    200506 341.00 135.00 39.50

    200607 350.00 150.00 42.86

    200708 400.00 281.46 70.36

    200809 529.00 305.00 57.66

    200910 846.00 402.00 47.52201011 1799.00 305.10 16.96

    201112 3000.00* 317.00* 10.57Source: data provided by Chief Engineer O&M and O&M Directorate.

    *2011-12 expected figure

    Other resource persons indicate that the amount of funding per se is not the main constraint for O&M,

    but rather the inefficient allocation and utilisation of funds. There are no transparent criteria for the

    allocation of O&M funds that are consistently applied. Interference by external stakeholders (local

    lit liti i ) hi t d t

  • 8/2/2019 Evaluation Report IPSWAM Final

    14/44

    So approximately 92% of the sample beneficiaries have been experienced some degree of positive

    impact by IPSWAM interventions.

    Key findings of the study are summarised in the following table.

    Table 4.4: Summary of quantifiable impact dataItem Polder 22 Polder 43/2

    Increase of flood free area 26% 23%

    Increase of total paddy production 21% 34%

    Increased cropping intensity 17% 13%

    Increase of average savings per household From Tk. 280 to Tk. 1349 From Tk. 5 to Tk. 2272

    Incidence of extreme poverty Decreased from 45% to 16%

    Increase of average income (adjusted for inflation) 33% 22%Source: BARD Impact study, 2008

    Other main findings from the BARD study are reproduced in the following box.

    Box 4.1: Overview of main impact findings BARD study.Livelihood strategiesThe opportunities for livelihood strategies were found to have increased in the study area after the IPSWAM interventions.

    Despite Sidr, housing conditions, especially the number of houses with tin roof and tin/wooden wall increased, whichimplies improvement in housing conditions over the last five years.

    The number of sanitary/water sealed latrines increased by over 25% in the Khulna and Patuakhali polder areas respectively

    due to increase of health awareness and changes in living standards.

    AgricultureCompared with the situation before IPSWAM, the total cultivable area of respondents in Khulna and Patuakhali polder areas

    under F0 (flood-free) remarkably increased.

    the cropping intensity in all the sample polder areas increased in the post-IPSWAM period compared to the pre-IPSWAM

    i d

  • 8/2/2019 Evaluation Report IPSWAM Final

    15/44

    polder-22 and 10 farmers in polder-30, the present T. aman crop was found to be the major added

    benefit as a result of improved drainage. They also reported to grow maize, sunflower and sesame in

    rabi season with the limited water for irrigation from nearby canals by retaining water with the help of

    IPSWAM structures which was not possible without project. In addition, qualitative changes arereported concerning employment, diversity of livelihood opportunities, organisational strengthening of

    WMO and stronger relationship with GoB developmental services.

    The areas visited are mainly paddy growing. Due to salinity, paddy could not be grown on most of the

    land in both polders before the IPSWAM interventions. After rehabilitation of the FCD systems, T

    aman paddy (HYV) occupied the well-drained land which constitutes around 20% of polder net area

    for cultivation. T. aman paddy (LIV) occupied the remaining 80% of the net area where drainage is

    impeded because LIV aman can withstand shallow depth of water on land. Following T. aman(HYV/LIV), Rabi crops (vegetables, pulse, gourd, sesame, sunflower and maize) are grown. But no

    Rabi crop is possible outside the polder because of salinity. The diversity of the cropping pattern has

    increased with the project. Homestead gardening with vegetables, spices and fruits round the year has

    also developed.

    The Upazila Agricultural Officer estimates that the intensity of cropping has increased from 170% to

    194% in polder 30 and to 198% in polder 22. The change is noteworthy because in areas outside the

    project polders, this official recons there is no increase as such and paddy cultivation is gradually

    decreasing due to intrusion of salinity, being replaced by brackish water shrimp cultivation. HYV

    paddy yield is reported to be about 3.5 ton/ha with project while it is less than 2 ton/ha without project.

    Yield of LIV is about 15% to 20% lower than HYV yield levels. Although lower in yield, LIV is

    better in quality than HYV aman. So, farmers prefer LIV practice in areas with low drainage

    efficiency. Yield of Rabi crops are reported to be 30% to 50% higher with project than the yield under

    without project situation.

    Limitations are that polder 22 still experiences water logging in 25% of its net area. This prevents the

    f f l i T (HYV) i i L l i l i d d i ld f T

  • 8/2/2019 Evaluation Report IPSWAM Final

    16/44

    Institutional development of Water Management Organisations

    In the nine polders included in the IPSWAM project, altogether 242 Water Management Groups

    (WMG) are set-up. The WMGs and the WMAs were found vibrant and alive. Key data on WMGs areshown in the following table.

    Training of WMG leaders and members to strengthen the functioning of the WMG and promote the

    empowerment of its members, was an essential part of the approach followed by IPSWAM. Altogether23,504 persons were trained in different subjects related to WMO formation, functioning and

    management (see Appendix D). Training covered the following topics:

    Establishment and management of LCS

    Establishment and management of WMOs

    Leadership training (for men and women).

    Financial management and auditing of WMO

    Agricultural production

    C i

  • 8/2/2019 Evaluation Report IPSWAM Final

    17/44

    BWDB has its Extension Overseers at field level to train and demonstrate appropriate agricultural and

    water management techniques to WMG members in polders. One Extension Overseers covers in

    principle some 2000 ha, but not all positions are filled. The number of Extension Overseers is limited.

    Water management in FCD systems has not been structurally addressed by BWDB. In the nine FCD

    schemes rehabilitated under IPSWAM production opportunities have changed, economic and

    technological conditions are evolving, and other land use practices are developing. Water management

    functions are performed by WMGs according to their level of knowledge, but improving the

    knowledge of improved water management of WMG may contribute to make better use of the

    opportunities that an improved water management infrastructure offers.

    The roles of the Local Service Providers (LSPs) are not specified in the guidelines. The LSPs were

    found reluctant to engage in the project area (among others because of constraints of resources) and

    maximize the benefits for the WMOs through systematic engagements. There is no in-built

    coordination mechanism in the guidelines that could hold them accountable for delivering service. As

    areas of livestock, poultry, homestead agriculture etc. have special potential for womens economicuplifting, a gender focused plan in these sectors and integration of the same with the water

    management project is felt necessary as a more sustained approach (as opposed to earth work) to

    remove disparity and alleviate poverty.

    The role of women in the WMOs

    All groups had womens representation and active participation. In the two polders visited, it wasobserved that participation of women in the discussion and planning of projects was facilitated through

    the WMGs and the WMAs as envisaged in the GPWM. Women were found enthusiastic in

    committing for more work and earning more. Their roles and contributions to the process generally

    received positive appreciation from the community.

    Th h k d b h h h LCS dd i h i l d f

  • 8/2/2019 Evaluation Report IPSWAM Final

    18/44

    Despite the limitations that still prevail in the participation process, the involvement of the localstakeholders including women in the discussions, broad planning and implementation have certainlyled to some improvements in the water management scenarios in as much as problems are identified

    accurately, community expected and accepted solutions are suggested and some improvements havebeen noted in the O&M. Such successes are limited in nature and are often inadequate against the

    magnitude of the peculiar, dynamic and complex water management problems of the polder areas.

    4.3. Institutional development of BWDBInstitutional development of BWDB includes the following main activities:

    Establishment of the central and zonal Planning Cells in BWDB

    Dissemination of the IPSWAM approach in BWDB Development and dissemination of guidelines and strategy documents

    Support to the adaptation of planning and budgeting procedures

    Support to the establishment of a Cell for Participatory Water Resources Management

    4.3.1.Establishment of the central and zonal Planning CellsTo implement the project it was envisaged that a central planning team would be established in DP-III

    and two zonal planning cells in the South-western and South-central zone respectively. The envisagedpositions of BWDB staff and TA staff in the central planning team are as follows:

    Table 4.6: IPSWAM planning team in DP-III

    IPSWAM/BWDB Technical Assistants1 Executive Engineer

    1 Hydraulic Engineer/SDE

    1 Civil Engineer SDE

    1 Environmentalist

    1 S i l i

    1 Community Organisation Expert

    1 Training Expert

    1 Gender and Development Expert

    1 Environmental Expert

    1 I i i l S i li

  • 8/2/2019 Evaluation Report IPSWAM Final

    19/44

    subjects. The training provided to the planning cells at central and zonal level is presented in

    Appendix D.

    When the project entered its extension phases (after 2008), all positions of the central planning cellwere maintained, but the staff assigned to these positions was new. The experienced and trained staff

    present during IPSWAM implementation was transferred, often to other Planning Directorates of

    BWDB. At the time of the mission, at zonal level the Deputy Chiefs Agronomist and their related staff

    are still posted in the IPSWAM planning cells. The Executive Engineers from the zonal planning cells

    are assigned to other BWDB projects, and their responsibilities have now been added to the

    responsibilities of the local Executive Engineers in this office. TA staff of both the central and zonal

    planning cells was put on other assignments, some in the water sector, others outside.

    4.3.2.Development of guidelinesThe experiences with participatory planning culminated in guidelines drafted for BWDB

    7. These

    guidelines describe in detail the six-step model for participatory subproject development, including the

    responsibilities of different BWDB offices, and provide models for by-laws of WMG, WMA and for

    the O&M agreement to be concluded between WMAs and BWDB. The guidelines have shown to

    work in practice and in addition have the advantage of simplicity.

    The guidelines were reviewed at a workshop on February 17, 2008 and finally approved by the

    BWDB on September 29, 2008. In his foreword the then DG explicitly states: This guideline will beused by BWDB throughout the country for medium sized Flood Control Drainage (FCD) Projects. It is

    expected that other Development Agencies will also use the guidelines for efficient and sustainable

    management of water resources. The guidelines have been printed and disseminated widely amongBWDB staff and among development partners of the BWDB. Training and dissemination workshops

    have been organised to explain the guidelines. Training material was prepared for BWDB staff and

    other stakeholders in the water sector (see section 4.3.4).

  • 8/2/2019 Evaluation Report IPSWAM Final

    20/44

    Despite the clear and unequivocal statement by the DG BWDB that the guidelines should be used

    throughout the BWDB and by its development partners, and the considerable effort made for

    dissemination, use of the guidelines as they are formalised is as yet limited. This is in part due to the

    fact that the envisaged interrelationship between IPSWAM (development of the approach) and WMIP(scaling up of the use of the approach) has not materialised. This has various reasons that are discussed

    in section 4.3.3.

    The variations that are developed by the different projects supported by external funding may not

    deviate from the principles of participation, but the different terminology and demarcation of

    responsibilities may easily lead to confusion.

    4.3.3.Dissemination of the IPSWAM approachDissemination of the approach developed by IPSWAM in the BWDB was expected to follow a

    differentiated route. This included direct general dissemination through training, exposure sessions

    and distribution of information material by IPSWAM itself, and focused scaling-up of the

    participatory approach through projects supported by development partners. Originally this included

    mainly WMIP, in a later stage also the SWAIWRPMP project.

    Water Management Improvement ProjectIPSWAM was conceptualised as the pathfinder for WMIP. WMIP was initially formulated in 1998,

    reformulated in 2003 and subsequently substantially altered in 2004 by the Planning Commission.

    WMIP is funded by the Worldbank, EKN and GoB. After lengthy negotiations the project started

    towards the end of 2007. The WMIP project formulation was based on the same principles as

    IPSWAM, and WMIP is comitted to participatory water management. The set-up of the zonal

    planning cells is modelled on the organisational structure developed for the IPSWAM project. Other

    support provided to WMIP includes staff training, exchange visits and training and extension material

    for participatory water management. The following box presents a summary of the support IPSWAM

    h id d WMIP

  • 8/2/2019 Evaluation Report IPSWAM Final

    21/44

    In March 2011 the project was restructured, and its objectives substantially reduced, from originally

    200 subprojects to 67 subprojects8. A considerable part of the budget has been reallocated to the Flood

    Damage Rehabilitation component, where the participatory element is essentially absent. As part ofthe recent restructuring of WMIP the participatory development cycle for subprojects was reduced

    from 48 (the IPSWAM average) to 30 months. Available information suggests that the participatory

    process is rushed, to the detriment of the quality of beneficiary participation. The problems in

    implementation have led the Embassy of the Kingdom of the Netherlands to suspend its contribution

    to the project.

    Because it is a precondition for WMIP that it can only rehabilitate polders where WMOs have been

    established, WMIP now plans rehabilitation works in some of the nine polders rehabilitated byIPSWAM. Because the approach to participatory processes of WMIP in practice is very different from

    the approach practiced by IPSWAM this is undesirable. It is also against the agreement with the

    WMAs that they have to take care of a large part of the maintenance by themselves and thereby

    undermines the credibility of both the IPSWAM project and the BWDB. This jeopardises the local

    level institutional strengthening that has been achieved by the IPSWAM project.

    Overall, the situation is that the expected synergy between IPSWAM and WMIP, whereby IPSWAM

    would develop a practical approach for participatory water management at subproject level and this

    approach would be disseminated throughout BWDB through the WMIP project, has not materialised.

    Southwest Area Integrated Water Resources Planning and Management Project

    (SWAIWRPMP)

    The Project aims to enhance economic growth and reduce poverty in the concerned FCD/I areas, and

    provide a model for rejuvenating the poorly performing FCD/I systems that will be replicated

    throughout the country. The Project objective is to enhance and sustain the productivity of the selected

    i i FCD/I ff i f l f d hi h i id f A i i i

  • 8/2/2019 Evaluation Report IPSWAM Final

    22/44

    During the visit of the evaluation team to one of the WMGs of the SWAIWRPMP project, it appeared

    that these WMGs are more focused on the development of economic activities than on water

    management issues.

    The model for participatory subproject development closely follows the six steps formalised by the

    BWDB, but uses different terminology.

    4.3.4.Dissemination of the IPSWAM approach in BWDBDissemination of the IPSWAM approach and methods, including the guidelines mentioned above, in

    the BWDB was a continuous activity during project implementation with increasing emphasis towards

    the end of the project. It was done mainly through training, exposure visits and the dissemination ofinformation material. IPSWAM launched a substantial training programme for BWDB staff (both of

    central office and field offices) in a series of modules. Appendix D, table D.2 presents an overview of

    the training provided to BWDB staff. In some training courses also officials from other organisations

    participated as is indicated.

    An evaluation of the training programme was done in September 2008. The conclusions of this

    internal evaluation are:

    Overall training has been given to more BWDB staff than envisaged in the Training Plan.

    Participants rated the training as follows:

    Table 4.8: Participants satisfaction with training provided

    Rating Percentage

    Excellent 23

    Good 68

    Fair 8

    Poor 0

  • 8/2/2019 Evaluation Report IPSWAM Final

    23/44

    funds, priorities must be set. There are no clear criteria for prioritisation of maintenance needs,

    and it is suggested that political influence may interfere.

    The development budget amounts to approx Tk 2,680 crore. (Tk 26.8 billion). The budgeting

    of the development funds is based on the DPP, a project planning and budgeting format thatmust be approved by the BWDB, the Ministry and the Planning Commission. In the DPP,

    budget items are listed in great detail. Approval of the DPP is a lengthy process, and may take

    several years for larger projects and subprojects. After approval of the DPP the project is

    included in the Annual Development Plan (ADP). In the period that approval is pending, no

    action may be undertaken. In numerous cases the situation on the ground has substantially

    changed when the DPP is finally approved, and the planned to be adjusted. Getting approval

    of changes to the DPP is again a lengthy and cumbersome process.

    It is obvious that the rigid and lengthy DPP/ADP process is a major obstacle to effective participatory

    planning and implementation, and not suitable for water resources management in the coastal area

    where morphological changes occur regularly, mainly due to siltation. Because most of the funding

    was provided by an external donor, IPSWAM has managed sufficient flexibility to allow meaningful

    participation in the development of the nine subprojects. To adopt a participatory model for all its

    projects, also those funded from the GoB development budget, the planning and budgeting procedures

    need to be adjusted.

    The IPSWAM project proposed to engage in a discussion with the relevant authorities to adapt these

    regulation to allow for meaningful participation in the planning phase. This was supported by BWDB

    management, but the MoWR considered that this would not obtain the approval of the Planning

    Commission, and therefore discouraged to pursue this issue.

    4.3.6.Other institutional achievementsEstablishment of the Resources Cell for Participatory Water Management

    h i i i i d d h bli h f ll f i i

  • 8/2/2019 Evaluation Report IPSWAM Final

    24/44

    5. Conclusions and lessons learned5.1. ConclusionsIn this chapter conclusions will be drawn for the two main components of the project mentioned in

    chapter 3 (page 2):

    Piloting and demonstrating a practical and pragmatic approach to participatory subproject

    development through rehabilitation and development of water management in nine polders in

    the South West and South Central zones of Bangladesh.

    Institutional strengthening of BWDB offices concerned and dissemination of integrated andparticipatory water management practices throughout the BWDB.

    Participatory subproject development

    A) IPSWAM has developed a participatory approach for subproject development that isworkable and that, if applied properly, results in effective and positive engagement of

    Water Management Organisations.

    The approach developed by IPSWAM has shown to work in practice. It results in WMO playing an

    effective and positive role in decision making for water management, and a stronger feeling of

    ownership and responsibility for the infrastructure. Involvement of WMOs in planning has resulted in

    adaptation to the plans, and hence a more appropriate water management infrastructure. Close quality

    control by WMO has improved the quality of the works. Their engagement in the decision making

    process and transparency of decision making contributes also to a realistic attitude of water users.

    They realise that financial resources for improvement of infrastructure and O&M are scarce and are

  • 8/2/2019 Evaluation Report IPSWAM Final

    25/44

    by IPSWAM was widely seen as an important contribution to the strengthening of the WMO and their

    effective functioning.

    WMO increasingly establish relationships with local providers of development services (DAE, Dept ofFisheries, Dept. of Cooperatives, NGOs) to seek support to improve the exploitation of better water

    management

    E) Women effectively participate in decision making in the WMO, but for economicempowerment too much emphasis was put on their participation in earthwork.

    The WMGs and the WMAs had womens representation and active participation. Their roles in and

    potential to contribute to the process generally received positive appreciation from the community hithard by poverty and employment. The quota system in the WMOs and the LCS worked well, but very

    few women held the posts of office bearers in the WMOs and the potential of earth work as a tool for

    economic empowerment was considered to be limited and also cumbersome in nature. The various

    skill development trainings have increased the confidence level in women and created ground for

    income diversification. Women were found enthusiastic in committing for diverse work and earning

    more to address their strategic needs. There is need to develop and execute plans for income

    diversification, utilization of the cooperative fund and reserving some posts of office quotas for

    women against the posts of office bearers in the WMOs.

    Institutional development

    F) BWDB has made important steps in formally accepting the Guidelines for IntegratedPlanning for Sustainable Water Resources Management and obtaining approval for the

    establishment of the Resource Cell for Participatory Water Management.

    The Guidelines for Integrated Planning for Sustainable Water Resources Management have been

  • 8/2/2019 Evaluation Report IPSWAM Final

    26/44

    H) Implementation of the Gender Strategy in BWDB has had only limited progressThe Action Plan annexed to the Gender Strategy (2006-2011) has remained largely unfulfilled so farBWDB central office is concerned. The number of women employees in the project was also minimal

    and does not correspond to the commitments of the Gender Strategy (2006-2011, see page 18)

    I) BWDB has not yet fulfilled its responsibilities for O&M as specified in the agreementswith the WMA in the nine subprojects.

    In the nine IPSWAM subprojects agreements have been concluded between the WMA and BWDB.

    Many WMA have assumed their responsibilities for maintenance as defined in that agreement, in anumber of cases even exceeded it. BWDB, however, has not yet taken up its responsibility, i.e. the

    necessary emergency maintenance11

    after the cyclones that hit the subprojects. This may compromise

    the motivation of WMA to continue to take their responsibilities for operation and maintenance in

    these subprojects.

    Overall conclusion

    The overall conclusion of the evaluation is that IPSWAM has by and large realised its outputs, and

    achieved considerable results, certainly in the nine polders that were rehabilitated. Also in the

    institutional change process in BWDB IPSWAM has made important steps. It has fulfilled its role as a

    pathfinder, but the envisaged wider dissemination of participatory approaches mainly through theWMIP project has not yet materialised to the extent expected, mainly because of problems in the

    operationalisation of WMIP.

    IPSWAM is a very promising project, Continuation of support to the dissemination of participatory

    approaches in BWDB and their internalisation will be of substantial benefit to the people who depend

  • 8/2/2019 Evaluation Report IPSWAM Final

    27/44

    E) IPSWAM created scope for the community to assert local authority in water management.The decentralization model of IPSWAM (if continued, institutionalized and given legal

    coverage) has the force of converting the long prevailing centralised and top-down mode of

    water management towards an inclusive oneF) IPSWAM has initiated a process of community harmonization and social empowerment

    (including such different aspects as capital generation, increased economic activities,

    community unity and solidarity, knowledge and skill development, participation in the

    electoral process). The involvement of women has been socially empowering

    Institutional development of BWDBG) Institutional change in BWDB is a long term process. It requires a change of attitudes. Within

    BWDB there are traditional engineers and more progressive staff, including engineers. Theseare often, but not exclusively younger, staff. To bring about institutional change the

    progressive staff in the BWDB need support.

    H) Rigid procedures pose a real constraint for participatory planning and implementation in

    practice. These procedures originate partly from the BWDB itself, but mainly from the

    National level.

    I) The plethora of different practical approaches for participatory water resources management

    developed by foreign funded projects is confusing and may well be one of the constraints for

    effective adoption of participatory practices by BWDB. Active alignment of approaches by

    BWDB in cooperation with its development partners is required to enhance effective

    introduction of participatory water management in BWDB.

  • 8/2/2019 Evaluation Report IPSWAM Final

    28/44

    Appendix A: Terms of Reference including annotation agreed during briefing meeting

    Terms of Reference (TOR)for the Evaluation of

    the Integrated Planning for Sustainable Water Management (IPSWAM) project

    Background

    The Bangladesh Water Development Board (BWDB) has implemented the Integrated Planning forSustainable Water Management (IPSWAM) project in nine polders of the coastal area in thePatuakhali and Khulna districts. The objective of the project was to put into practice the principlesfor water management formulated by the Government of Bangladesh (GoB) in the National WaterPolicy (NWPo) and the Guidelines for Participatory Water Management (GPWM). The specificobjective of the project was to strengthen the capacity of water sector organisations, includinglocal level water management organisations (WMO), the central and decentralised offices of theBWDB and Local Government Institutions to responsibly assume their roles as specified in theNWPo and GPWM.

    The IPSWAM project consisted of three components: Technical Assistance (Pir 38) supported by aDutch Grant of EUR 7.236.180; Financial Assistance (Pir 39) supported by a Dutch Grant of BDT

    318.496.863; and iii) financial contribution by GoB amounting BDT 213,892,000. However, theamount of the contract with Euroconsult Mott MacDonald stands at EUR6.619.767. In addition, aprovision of an amount of EUR 204.200 was made available for conducting annual as well as mid-term review missions. The original intended project implementation period was five years from

    November 2003 to November 2008. However, the project areas were hit by two consecutivecyclones (Sidr in 2007 and Aila in 2009) and the project implementation period was extended up to30 June 2011 through two amendments to the Administration Arrangement signed between GONand GoB.

    The first and second annual reviews took place in 2005 and 2006. The mid-term review and the

  • 8/2/2019 Evaluation Report IPSWAM Final

    29/44

    Was the policy/institutional environment conducive/supportive for project implementation? What is the perception of the beneficiaries of the relevance of the project? Has the project

    contributed to poverty alleviation?

    Has the infrastructural rehabilitation been done properly? What is the perception of the institutional environment12 of the relevance of the project? Has the BWDB internalised project outputs, both formally and in practice? Has the BWDB taken the necessary steps to ensure that the project accomplishments are

    sustained upon completion of the project period? Have adequate actions been taken to integrate project accomplishments into the ongoing

    Water Management Improvement Project (WMIP) and Southwest Area Integrated WaterResources Management Project? Whether proper sharing of experiences between theseprojects has taken place?

    Is the participatory water management (PWM) approach feasible and sustainable13

    ? Whathave been the impeding and facilitating factors affecting the performance of the WMOs?

    How were gender and womens rights issues addressed under IPSWAM? And what were theresults reached? How have governance issues been addressed?

    Are there examples of WMOs that have become a grass root level vehicle for otherdevelopment activities or function as civil society peer pressure groups? How can WMOactivities benefit from and/or compliment the efficiency of the ongoing initiatives e.g. by the

    GoB/WB, SDC etc. on strengthening of local government institutions (including the use ofsocial accountability mechanisms)?

    What collective and successful initiatives have been undertaken by the WMOs regarding seed

    production and/or distribution, fertilizer dealership, crop processing & storage, cropmarketing, value chain development, etc., and what was the impact of these collectiveactivities?14

    Outputs

    The Mission will prepare an evaluation report that describes the main findings, conclusions and

    recommendations + attachments. In this report, the mission will answer the questions as

    formulated in its Terms of Reference. As for the conclusions, the mission will:

  • 8/2/2019 Evaluation Report IPSWAM Final

    30/44

    Duration

    The total duration of the evaluation study will be about 3 weeks.

    Work plan

    The Mission will carry out consultations with national and local level stakeholders, present a draft

    report and prepare the final report. In addition, during a short field visit to representative polders,

    the team will have working sessions with relevant local governance institutions (local government,

    field level institutions) and representatives of the project beneficiaries and relevant stakeholders.

    The Mission will prepare a work plan in consultation with the Netherlands Embassy and the BWDB.

    The proposed mission activity time frame (tentative) is as follows:

    Activities Location Time frame

    Discussion with EKN, BWDB and TATeam

    EKN Day 1

    Consultation with stakeholders at Dhakaand Report/Data collection

    Various offices e.g. WB, ADB,BWDB, LGED, DoC, DAE, BARD,IWM, IWMI, World Fish, IRRI,BRAC etc.

    Day 2

    Field visit Patuakhali & Khulna IPSWAMpolders

    Day 3-8

    Consultation with stakeholders at locallevel incl. LGI, WMO members especiallywomen, NGOs, local administration, lineagencies etc.

    As applicable Day 3-8

    Continue consultation with stakeholdersat Dhaka and Data analysis

    Various offices e.g. WB, ADB,BWDB, LGED, DoC, DAE, BARD,IWM, IWMI, World Fish, IRRI,

    Day 9

  • 8/2/2019 Evaluation Report IPSWAM Final

    31/44

    Annual Review reports Mid-Term review report IPSWAM Guidelines All Technical Reports, Technical Notes and Training Records prepared by the TA Team

    Project Appraisal Document (PAD) of WMIP WMIP restructuring proposal 2011 BWDB Gender Strategy 2006 Report on the Impact Assessment of IPSWAM project conducted by BARD in 2009 Report on the Evaluation of the Small Scale-II project by the Inter-Ministerial Committee

    headed by the Planning Commission The World Bank Issue Note 2010 on restructuring of WMIP Any ongoing reviews on IPSWAM project activities All other relevant documents upon request by the evaluation team/GON/GoB

  • 8/2/2019 Evaluation Report IPSWAM Final

    32/44

    Appendix B: Mission programme

    Date Organisation/Activity Persons met

    8 August Briefng EKNPlanning mission programme

    Mr. Jaap van der Velden, First Secretary Water a.iMr. Khaled Khaleduzzaman, Programme officer water

    Mr. Masoud, Proejct Director IPSWAM

    Mr. Alamgir Chowdhury, Deputy Team Leaders IPSWAM

    9 August Briefing Ipswam project office

    BWDB O&M Department

    Mr. Alamgir Chowdhury, Deputy Team Leader IPSWAM

    Mr. Md. Korban Ali, Chief Engineer O&M

    Mr. Mozzafer Ahmed, Director O&M

    10 August Asian Development Bank

    World Bank

    International Fund for

    Agricultural Development

    BRAC

    BWDB

    Mr. Zahir Uddin Ahmad Team Leader Water Resources

    Management

    Mr. S.A.M. Rafiquzzaman, Consultant Agriculture and RuralDevelopment.

    Mr. Md. Akhtaruzzaman, Consultant Social Development.

    Mr. Md. Rafiqul Islam, Consultant Civil Engineering

    Mr. Mahboul Islam Khan, IFAD Representative

    Dr. Manoranjan K. Mondal, Programme Head Agriculture and

    Food Security Program

    Mr. Andrew Jenkins, Donor Liaison Office (former Team Leader

    IPSWAM).

    Mr. Mozzamel Hossain, Superintending EngineerDesign Circle V

    Mr. Mozaffer Ahmed, Superintending Engineer

    Design Circle III

    Mr. Abdul Hye Baki, Superintending Engineer

    Design Circle II

    11 August BWDB Mollah Ruhul Alam, Chief Planning

    Mr. Md. Aminul Islam, Project Director WMIP

    Mr. Md. Jahangir, Chief Engineer

    Directorate of Mechanical Equipment

  • 8/2/2019 Evaluation Report IPSWAM Final

    33/44

    20 August Internal team discussion and

    reporting

    21 August Internal team discussion

    Debriefing EKN on evaluation

    part

    Mr. Carel Richter, Head of Development Cooperation, EKN

    Mr. Jaap van der Velden, Water specialist a.i. EKNMr Khaled Khaleduzzaman, Programme Officer Water, EKN

    Mr. Harry Moreel, Controller EKN

    Mrs. Tapoti Das, Genders specialist EKN

    22 August Discussion at EKN Mr. A Hennekens, Ambassador

    Mr. Carel Richter, Head of Development Cooperation, EKN

    Mr. Jaap van der Velden, Water specialist a.i. EKN

    Mr. Harry Moreel, Controller EKN

    23 August Internal team discussion

    Reporting

    Mr. Hero Heering, Team leader IPSWAM

    24 August Debriefing on recommendations Mr. Carel Richter, Head of Development Cooperation, EKNMr. Jaap van der Velden, Water specialist a.i. EKN

    Mr Khaled Khaleduzzaman, Programme Officer Water, EKN

    Mr. Harry Moreel, Controller EKN

    25 August Debriefing at BWDB Engr. Md. Habibur Rahman, Director General BWDB

    Engr. Md. A. Wadud Bhuiyan, ADG Planning BWDB

    Mr. Mollah Ruhul Alam, Chief Planning BWDB

    Mr Khaled Khaleduzzaman, Programme Officer Water, EKN

  • 8/2/2019 Evaluation Report IPSWAM Final

    34/44

    34

    Appendix C: Summary of envisaged results and outputs and actual achievements

    Programme Summary Indicators AchievementsA. Overall ObjectiveStrengthened capacity of water sector

    organisations (WMOs, BWDB and

    LGI) to assume their roles defined in

    the NWPo and GPWM

    B. Programme results

    1. Enhanced planning capacity of

    DP-I, DP-II, DP-III, project

    office WSIP and two Zonal

    BWDB offices to work according

    to the NWPo and the GPWM

    1.1 Quality of studies and plans

    1.1.1. All staff of BWDB, including DP-I, DP-II, DP-III, Zonal offices and WMIP trained in

    IPSWAM approach and related subjects.

    1.1.2. Training provided on other subjects (GIS, Good Governance and many others).

    1.1.3 Quality of studies and p lans done under the IPSWAM project is adequate. Quality of studies and

    plans for other interventions could not be assessed.

    2. GPWM further operationalised 2.1 Operational guidelines and procedures introduced in

    BWDB, LGI and WMO

    2.1 Operational guidelines formulated and adopted by BWDB. Training BWDB on guidelines is

    part of training on IPSWAM approach. WMO trained, and some staff of LGI.

    3. Nine selected sub-projects in

    proper working order

    (institutional and technical)

    3.1 WMOs effective and infrastructure operational 3.1.1 WMG and WMAs generally effective, with regular meetings and developing other activities

    3.1.2 Infrastructure was rehabilitated and schemes generally operational, but damaged by cyclones;

    repairs provisional, some infrastructures not yet to design standards. Additional water

    management infrastructures desirable to continue improving water management.

    C. Programme outputs

    1. IPSWAM Planning Team

    established at DP-III

    1.1

    Staff appointed by BWDB

    1.2TA staff appointed

    1.3Gender balance of BWDB and TA staff incrementally

    improved.

    1.1 All BWDB staff was appointed as indicated in section 6.2.1. For specific training and planning

    additional staff from DP-III was assigned for shorter periods

    1.2 TA staff appointed as planned

    1.3 Gender balance of BWDB sufficiently adjusted. Gender balance TA staff as envisaged.

    2. Planning Cells established at CE

    offices of SC and SW Zones

    2.1 Planning Cells formally established by administrative

    order

    2.2 Staff appointed (BWDB and TA).

    2.3 Gender balance of zonal planning cell staff incrementally

    improved

    2.1 Planning Cells established

    2.2.1 BWDB professional staff about half envisaged numbers; number of Extension Overseers higher

    than envisaged (9 vs. 2 in proj. Document).

    2.2.2 TA staff assigned as envisaged.

    2.3 Gender balance of BWDB adjusted. Gender balance TA staff as envisaged

    3. Planning staff trained 3.1 Training needs assessment study completed: report

    available

    3.2 Training plan made, for subjects mentioned in section

    6.2.3

    3.3

    Training modules and materials designed3.4 Courses specified in training plan executed: number of

    courses and tours executed compared to plan

    3.5 Number of staff of other Planning Directorates trained

    3.1 Report Training Needs Assessment available

    3.2 Training Plan made

    3.3 Relevant training modules and materials prepared; included in the training toolkit

    3.4 Number of courses executed in excess of plans

    3.5 All staff of Planning Directorates trained. In addition different training modules delivered to allBWDB professional field staff.

  • 8/2/2019 Evaluation Report IPSWAM Final

    35/44

    35

    4 Distribution of responsibilities

    between BWDB-HQ and

    Zonal/local offices defined

    4.1 Institutional analysis study completed: report available

    4.2 Functions defined for Zonal and field level BWDB st aff

    and formalised;

    4.3 Functions defined and formalised for BWDB HQ

    planning staff

    4.1 Institutional analysis study completed and accepted by BWDB. The study was an input in the

    on-going restructuring of BWDB. The institutional analysis was also an input for WMIP.

    4.2 Functions defined, but because of on-going restructuring not yet formalised.

    4.3 Functions defined, but because of on-going restructuring not yet formalised.

    5 Approaches developed for:

    o Local level institutional

    developmento Multi-disciplinary

    participatory planning

    5.1 Concept documents prepared

    5.2 Quality of conceptual papers prepared

    5.3

    Training material prepared/adjusted

    5.1 Concept document included in the documentation on IPSWAM approach

    5.2 Documentation of good quality/ accessible

    5.3.1 Training modules and materials for polder level t raining prepared, includes handouts and manualand 2 DVDs. A modulewas developed for Training of Trainers.

    5.3.2 The number of people trained exceeds the envisaged numbers

    6 External relationships defined

    and formalised in MoUs with

    Line Ministries

    6.1 Roles of BWDB, LGI and WMO and Line Minist ries

    defined

    6.2 Mechanisms for transfer/share of management

    responsibilities defined

    6.3 Mechanisms for transfer of ownership of small projects

    defined

    6.4 MoUs prepared and formalised

    6.1 Roles defined in the institutional analysis study and the guidelines.

    6.2 Mechanisms defined in the BWDB approved water management agreement. The model for this

    agreement is also used by WMIP and SWAIWRPMP.

    6.3 Mechanism for management transfer developed, transfer of ownership pending.

    6.4 MoUs concluded between BWDB and DAE, DoC, DoF, LGED

    7 Guidelines and procedures

    introduced by BWDB for:

    7.1 Guidelines prepared and formalised by BWDB for

    Selection of sub-projects for rehabilitation.

    Environmental assessment process PRA procedure including gender and poverty

    analysis

    Establishment of different level WMOs including

    the levels of involvement of men, women and

    specific professional categories in WMOs.

    Role of WMOs in the design p rocess

    Establishment of LCS and EMG and contracting

    work to LCS and EMG.

    Implementation Agreements between BWDB and

    WMA/WMF.

    Formulating operation plans WMOs.

    Bylaws for WMAs.

    Annual maintenance plans for sub-projects.

    Registration of WMAs and WMFs.

    7.1 Guidelines for Integrated Planning for Sustainable Water Resources Management prepared and

    adopted by BWDB, including model for bye laws, water management agreements, water

    management plans, PRA.7.2 Training modules and materials for polder level training of stakeholders prepared.

    7.3 Role of WMO in design process not realised.

    7.4 100% of earthwork contracted to LCS.

    7.5 All 242 WMG are registered under Cooperative Act. WMA and WMF do not satisfy

    requirements for registration (no membership of persons) and are not registered under the

    Cooperative Act.

  • 8/2/2019 Evaluation Report IPSWAM Final

    36/44

    36

    8 Adequately functioning water

    management organisations in 9

    selected sub-projects

    8.1 Number of water management groups and water

    management associations established at sub-project level

    8.2 Numbers of group leaders trained

    8.3 Frequency of WMO meeting and their activities

    8.4 Contribution of beneficiaries in rehabilitation and

    maintenance

    8.5 Management transfer agreements concluded for 9 sub-

    projects

    8.6

    Effective participation of women and of landless and

    non-farming categories in WMO meetings and

    committees/leadership.

    8.1 242 WMG and 16 WMA operational in 9 polders

    8.2 Leadership related training delivered to 4984 participants (men and women)

    8.3 201 meeting for 242 WMGs and 24 meetings for 16 WMA in May 2011.

    8.4 WMG and WMA contribution to maintenance exceeds their obligations in all polders

    8.5 All management transfers concluded.

    8.6 Women, landless and non-farming groups members of WMG. Landless benefit through LCS.

    9 Rehabilitation and O&M plans

    prepared for the 9 selected sub-

    projects with full participation of

    WMOs

    9.1 Plans available, number and quality of project plans

    9.2 Involvement of water users in project planning and

    approval

    9.3 Satisfaction of each of the user groups and categories

    (men, women, farmer categories, fishermen etc).

    9.4 Water management organisations prepare the annual

    maintenance plan with assistance from BWDB field

    offices

    9.5 Plans approved by WMOs.

    9.6 Effective resource mobilisation by BWDB and WMOs

    for O&M plan implementation

    9.1 Rehabilitation and O&M Plans made and of good technical quality

    9.2 WMA effectively participated in planning

    9.2 WMA participated effectively in plan formulation and satisfied with plans

    9.3 WMA prepare annual maintenance plans, active participation BWDB DP-III staff. Involvement

    section officers limited.

    9.4 O&M plans approved in plenary meetings of WMA.

    9.5 Resources from BWDB for O&M not yet mobilised; contribution WMA mainly labour, for cash

    needs funds collected from members.

    10

    Nine selected sub-projects in

    proper rehabilitated

    10.1

    Designs made, Works tendered, Project system ele ments

    rehabilitated

    10.2Nine selected sub-projects in working order

    10.3Satisfaction of different categories of water users with

    project operation.

    10.4Measurable impact on socio-economic position of the

    beneficiaries; increase of revenue in the project area

    from agricultural and non-agricultural sources.

    10.1 Designs made in accordance with plans, works tendered and implemented; not all khals

    excavated, priorities set jointly with WMAs.

    10.2 Nine subprojects in working order, damage to infrastructure provisionally repaired by WMA,

    final repairs done by BWDB, except 2 breaches (repairs provisional, work not yet to design

    specifications). Gates in Pathuakhali not yet installed (6 subprojects). In all subprojects the

    hoisting mechanism is still missing.

    10.3 Water users satisfied with project operation, indicated higher expectation for further

    improvements water management..

    10.4 Initial benefits of improved water management observed. Further development possible.

    11 Achievements not included in original Logical Framework 11.1 Contribution to ob taining approval for the Cell for Participatory Water Resources Management

    11.2 Setting-up of a participatory M&E system of subprojects.

    11.3Project contributed to formulation of BWDB gender strategy.

    11.4Training of WMAs in 3 polders of 4 th Fisheries project and in 1 GoB funded project.

    11.51,300 toolkits distributed to BWDB offices throughout the country.

    11.6

    Exchange visits for staff of other pro jects (WMIP, SWAIWRPMP, LGED).

  • 8/2/2019 Evaluation Report IPSWAM Final

    37/44

    Appendix D: Data on Training

    Table D.1: Overview of polder level training

    Training Participants numberLCS Orientation LCS Members 280

    LCS Training LCS Members 429

    LCS Training LCS Members 360

    WMO Management WMO Members 381

    WMO Management WMO Members 132

    WMO Management WMO Members 373

    WMO Management WMO Members 210

    LCS Training LCS Members 960LCS Training LCS Members 580

    Women Leaders Experience Sharing WMO Women Leaders; 1 day WS/polder 573

    Joint Exposure Visits WMO leaders 47

    WMO Management WMO Members 200

    WMO Management WMO Members 318

    Operation & Maintenance WMO Leaders 200

    Women Leaders Experience Sharing WMO Women Leaders; 1 day WS/polder 140

    Gender and Leadership Development Training WMO leaders 1000

    WMO Management WMO Members 384

    Gender and Leadership Development Training WMO Leaders 854

    Agriculture Production and Cooperative Management WMO Members 460

    LCS Training LCS Members 5496

    Operation and Maintenance WMO Leaders 752

    Women Leaders Experience Sharing WMO Women Leaders 201

    WMA Organisational Development WMA Members 123

    Quality Control WMA Members 192

    Agriculture Production and Cooperative Management WMO Members 1842

  • 8/2/2019 Evaluation Report IPSWAM Final

    38/44

    Table D.2: Overview of training of BWDB staff

    Training Participants number1 Zonal Team Orientation Central/Zonal Teams 282 Development of WMOs Central/Zonal Teams 28

    5 GIS/GPS Orientation Planning Team 19

    6 Gender Orientation Planning Team/DP-III/ Other BWDB 31

    7 Facilitators Training Central/Zonal Teams/DP-III/Field Divisions 21

    8 Organisational Management for WMOs and Zonal Teams Central/Zonal Teams/DP-III/Field Divisions 17

    9 GIS ArcView Central/Zonal Teams/Other BWDB 11

    10 Sustainable Environment Management Planning Central/Zonal Teams 69

    16 Office Management for Support Staff IPSWAM & DP-III Support Staff 28

    17 Project Management IPSWAM, DP-III, BWDB Planning Professionals 21

    20 Multi-disciplinary Planning, Evaluation and Monitoring IPSWAM, DP-III, BWDB Planning Professionals 15

    23 Project Management BWDB Planning Professionals 21

    25 Leadership Development ToT BWDB/Zonal Teams 48

    26 GPS Dhaka/Zonal Teams 19

    27 WMIP Experience Sharing BWDB WMIP staff 2231 Experience Sharing with Water Sector Projects Project Team Members 18

    32 Seminar on IPSWAM Methodology, DWM-BWDB DWM & IPSWAM Staff 32

    34 Participatory Monitoring IPSWAM/BWDB Staff 43

    36 Study Tour Philippines IPSWAM/BWDB 10

    38 Workshop to finalise BWDB Gender Strategy and AP GoB, RNE, BWDB Staff 145

    40 Experience Sharing: Quality Control and WMO role Senior staff from water sector projects 29

    41 Sustainable Water Management and Good Governance BWDB Young Professionals 20

  • 8/2/2019 Evaluation Report IPSWAM Final

    39/44

    Table D.3: Training modules and training material included in toolkit

    Title of training / training

    material

    Duration Type Expected Participants

    Training of Trainers (ToT) 8 Days Module description BWDB Officials

    IPSWAM and Union Parishad

    Orientation

    1 Day Module description UP Representatives and Local

    leaders

    Organisational Management 3 Days Module description WMG

    TOT on Gender and Leadership 4 Days Module description Trainers; BWDB Officials

    Gender and Leadership Development 4 Days Module description WMG

    Organizational Development 3 Days Module description WMA

    TOT on Agricultural and Cooperative

    Management

    4 Days Module description Trainers; BWDB & DAE

    OfficialsAgricultural and Cooperatives

    Management Training

    4 Days Module description WMG

    LCS Training 1 Day Module description LCS

    Constructions Monitoring and Quality

    Control

    2 Days Module description Monitoring Quality Control

    Committee

    Operation and Maintenance 3 Days Module description WMA

    Participatory Monitoring 1 Day Module description Monitoring Committee

    TOT Module for Training Resource

    Group

    4 Days Module description WMOs- Training Resource Group

    Organizational Management - Handouts WMO

    Gender and Leadership Development - Handouts WMO

    Organizational Development - Handouts WMO

    Agricultural production and

    Cooperatives Management

    - Handouts WMO

    Constructions Monitoring and Quality

    Control

    - Handouts WMO

  • 8/2/2019 Evaluation Report IPSWAM Final

    40/44

    40

    Appendix E: Rehabilitation works in the nine polders

    Source: IPSWAM.

  • 8/2/2019 Evaluation Report IPSWAM Final

    41/44

    Appendix F: Review of the Socioeconomic Impact Assessment Report on IPSWAM Project

    Prepared by Bangladesh Academy for Rural Development (BARD)

    General1. The Integrated Planning for Sustainable Water Management (IPSWAM) Project started by the

    end of 2003. The project plan incorporated the experiences of earlier water sector schemes like EIP,

    DDP, SRP, CPP, CDSP and SSWRDSP. At the end of the project period IPSWAM had completed the

    rehabilitation of 9 Polders in June 2009, following a participatory approach to planning,

    implementation and O&M for the nine FCD/I schemes. These polders are exposed to cyclones, storm

    surges and salinity, drawing scarce resources for FCD/I system rehabilitation, and in 2007 and 2009

    cyclones damaged the infrastructures. Drawing participation from beneficiaries at all stages of scheme

    development was a great challenge because stakeholders trust is hard to obtain in these disaster-pronepolders.

    2. The IPSWAM program included the vital elements of peoples existence like livelihood andphysical and social environment in its basement. Physical development of water infrastructures was

    made instrumental to achieve social and economic welfare objectives like poverty reduction and

    creation of sustainable livelihood opportunities for the poorer sections of the communities. It some

    locations in the polders farmers tried cultivation of new varieties and new crops to enhance their

    income. Others choose for livestock, fisheries, agro-based trade and small scale enterprises.

    3. The National Water Policy (1999) and the Guidelines for Participation in Water Management

    (2000) laid the foundation on which the participatory water management issues developed in

    IPSWAM. It was intended to be the path-finder in the pursuit of achieving really participatory andsustainable water management systems in the country.

    4. BARD was assigned the task to assess the impact of the project to and it prepared a

  • 8/2/2019 Evaluation Report IPSWAM Final

    42/44

    d. Land-use patterns have changed due to the favourable agro-hydrological regime with project.

    Better drainage and irrigation water availability in the critical period by water retention in

    khals with the help of rehabilitated structures have promoted agricultural yields and larger

    cropped areas in both polders. Limited fish cum paddy has also been practiced as a pattern in

    both the polders.

    e. Kharif-1 crop was unknown in polder-22 before IPSWAM started. T aus and HYV aus have

    entered the area during Kharif-1 season. In Kharif-2, HYV aman has now a much wider

    coverage than before the project. Triple cropping (T ausT aman-pulses/oilseed/spices/vegetables) is increasing in 43/2E polder. Cropping intensity has

    increased by 17% in polder-22 and by 18% in polder 43/2E.

    f. For polder-22 : the yield/ac has increased by 14% and 17% for T aman and HYV aman

    respectively while for spices it is 250% higher compared to pre-IPSWAM situation. The yieldof vegetables has decreased and prawn has remained the same.

    g. For polder-43/2: the yield has increased by around 32% for T aus, HYV aus and T aman each

    while yields of oilseed, pulses and spices also increase in case.

    h. Insect/pest attack is reported to be the major cause of crop damage in both the polders.

    Environmental impact

    i.

    While no standard environmental impact assessment has been presented, households report ageneral notion of environmental improvement with project.

    Socioeconomic impactsj. Employment: Earthwork by Landless Contracting Societies (LCS) for IPSWAM rehabilitation

    work, mainly by female members has facilitated employment for the poor. Increased crop area

    due to better drainage has created employment for agricultural wage labour in the crop seasons

    k. A higher level of economic activities in IPSWAM polders has created opportunities for

  • 8/2/2019 Evaluation Report IPSWAM Final

    43/44

    etc. These networks chase opportunities for the WMO members to negotiate their positions

    and potentials with interested clients for mutual economic gains. As groups, they have greater

    strength and skill and bargaining capacity with local government organisations.

    q.

    Improved skill: A lot of training and demonstration was imparted to the WMO members by

    the IPSWAM project. Besides learning the O&M skills for WM structures, training on gender

    aspects, livelihood improvement, livestock development, fisheries development, crisis coping,

    disaster preparedness, collective decision making, marketing of agricultural produces, storage

    of perishable crops etc have enriched their capability to improve their lives.

  • 8/2/2019 Evaluation Report IPSWAM Final

    44/44

    44

    Appendix G: Steps in the participatory subproject development of different exterannly supported development projects under BWDBStep

    No.

    BWDB/IPSWAM SW Project WIMP15

    CDSP

    Chapter1 Step2 Steps WMO formation171 Identification/

    selectionProject Orientation Meetingat District Level

    Pre-Identification/Identification

    Process ofparticipatory water

    management

    Preparatory stage Information campaign

    2 Investigation Consultation meeting /Workshop at Union Level

    Assessment ofSchemes

    Identification of watermanagement issues

    and scope forimprovement

    Identification of water management issues and scopefor improved water management

    Workshops with key persons on demarcation of area

    3 Mobilisat ion Clearance from the UnionCouncil

    Screening Concept of participatory water management andinstitutional structure, election of committee members

    Plan for WMG formation

    4 Plan Finalisation DLIAPEC Approval Mobilisati on Workshop with stakeholders Mass meetings (men and women separately)5 Rehabilitation Project Confirmation Planning Structure of the

    organisation and

    elections

    Decide structure of organisation and its functions andprocedure of election

    Induction orientation session on tasks andresponsibilities of WMG, election of 12 member

    committee

    6 Operation and

    Maintenance

    Preparation of Beneficiaries

    List

    Design Formation of election commission Regular meetings, preparation of byelaws, training of

    members and leaders, registration with DoC

    7 Formation of WMGFoundation Committee

    Implementation Preparation for election of committee members Assumes responsibi lity for operation of structures,strengthen liaison with LGI, mobilising savings

    8 Clustering of Villages Management Plan Election and declaration of results WMG involved in activities of other implementingagencies, WMA formation

    9 Members Enrolment

    (Continuation)

    Operation and

    Maintenance

    Capacity development

    of the watermanagementorganisation

    Identification of required capacity building

    10 WMG Formation (Ad-hoc) Evaluation and

    ManagementTransfer

    Storage of information

    11 WMG Bye-Law drafting

    Committee (BDC) formed

    Training Needs Assessment

    12 Training to BDC members

    on Bye-Law drafting

    Identification of training

    13 Election Committee formed Process of

    management transfer

    Preparation of handing over contract

    14 Draft Bye- Law Prepared Handing over of subproject

    15 Voter List Mitigation plan and implementation

    16 Election / WMG Formed Taking over responsibi lity of water management

    17 Bye-Lay approved inGeneral Meeting

    Monitoring andevaluation of WMO

    Monitoring of the organisation

    18 Application Submission date

    to DoC for Registration

    Identification of problems and required solutions

    19 Date of Registration by DoC Monitoring of organisation and election

    20 Target date for O & MSigning between WMG &SMO

    Monitoring capacity development of organisation

    21 WMG Proceeds to O & Mwith monitoring

    Handing over responsibility of water managementproject

    15 For the Mid-Term Review/Restructuring Mission (May 2011) the TA Team proposed a simplified model for the participatory process. This simplification does not reduce the number of steps, but rather the activities included ineach step. The original and simplified models are presented in Annex 2 of the Aide Memoire of the Mission.16 From the CDSP Guidelines for Participatory Water Management 200417 Fom Technical Report no. 9, 2011


Recommended