  • 7/30/2019 Evalucacin de molino de bolas

    1/26

    TitleTitle

    No.1 Milling Unit Grind Optimisation

    Jan Matuwane

    27 May 2005

  • 7/30/2019 Evalucacin de molino de bolas

    2/26

    AgendaAgenda

    Introduction

    Sampling procedure

    Sample points

    Simulations

    Results and Conclusions

    Recommendations

  • 7/30/2019 Evalucacin de molino de bolas

    3/26

    ObjectiveObjective

    Improve Mill grind:

    Mill Discharge Density Optimization

    Circulating load

    Grinding Performance

    Mill power

    Ball size ratio Evaluating cyclone performance by

    using 100 &150 mm Spigots

  • 7/30/2019 Evalucacin de molino de bolas

    4/26

    Ball Mill circuit

    Mill variables

    Feed size Power consumption

    Grind

    Ball charge volume

    IntroductionIntroduction

  • 7/30/2019 Evalucacin de molino de bolas

    5/26

    SAG Mill Ball Mill

    Cyclone Feed

    U/F

    O/F

    Mill Sump

    No.1 ClusterLinear Screen

    Fresh FeedDilution

    U/F U/F

    Scats

    Dilution

    M1 conveyor

    Stockpile

    VSD Pump

    Milling CircuitMilling Circuit

  • 7/30/2019 Evalucacin de molino de bolas

    6/26

    Milling CircuitMilling Circuit

    SAG Mill Ball Mill

    Cyclone Feed

    U/F

    O/F

    Mill Sump

    No.1 Cluster

    Linear Screen

    Fresh FeedDilution

    U/F U/FScats

    Dilution

    M1 conveyor

    Stockpile

    VSD Pump

    Sampling Points

  • 7/30/2019 Evalucacin de molino de bolas

    7/26

    Data to be collectedData to be collected

    Ball Mill inlet dilution water flow rate

    Ball Mill Power Consumption (kW)

    Cyclone pressures (kPa)

    Cyclone feed pump output (%)

    Cyclone feed density

    Cyclone feed flow rate (m3/h)

  • 7/30/2019 Evalucacin de molino de bolas

    8/26

    15%15%Ball Filling

    0.770.22Circulating ratio10.145.13Kwh/t +150 micron

    12.7030.28Kwh/t -75 micron

    66.0679.57P80 (micron)474679F80 (micron)

    0.330.26Mill discharge w/s

    75.0681.04% solids

    3.719.42Wi (kWh/t)

    18051970Power drawn (kW)

    150 mm

    Spigots

    100 mm

    Spigots

    Test ResultsTest Results

  • 7/30/2019 Evalucacin de molino de bolas

    9/26

    22%22%Ball Filling

    0.770.22Circulating ratio

    10.145.13Kwh/t +150 micron

    12.7030.28Kwh/t -75 micron

    66.0679.57P80 (micron)

    474679F80 (micron)

    0.330.26Mill discharge w/s

    72.0077.08% solids

    4.8911.16Wi (kWh/t)

    26402705Power drawn (kW)

    150 mm

    Spigots

    100 mm

    Spigots

    Test ResultsTest Results

  • 7/30/2019 Evalucacin de molino de bolas

    10/26

    Discharge Particle Distribution

    0

    20

    40

    60

    80

    100

    120

    10 100 1000 10000

    %P

    assing

    100 mm 150 mm

    Mill Discharge Size DistributionMill Discharge Size Distribution

  • 7/30/2019 Evalucacin de molino de bolas

    11/26

    Mill Discharge Vs % -75 Passing

    50

    55

    60

    65

    70

    75

    80

    85

    90

    70.00 72.00 74.00 76.00 78.00 80.00 82.00 84.00 86.00 88.00 90.00

    MIll Discharge % Solids

    %

    -75Passing

    100 mm 150 mm

    `

    Mill PerformanceMill Performance

  • 7/30/2019 Evalucacin de molino de bolas

    12/26

    Cyclone Perfomance Vs Predicted Tromp curve

    150 mm - sampling data

    0.00

    0.10

    0.20

    0.30

    0.40

    0.50

    0.60

    0.70

    0.80

    0.90

    1.00

    1 10 100 1000 10000 100000

    Particle Size, microns

    Partition

    facto

    r

    Simulation 150 mm

    Tromp Curves (2)Tromp Curves (2)

  • 7/30/2019 Evalucacin de molino de bolas

    13/26

    Cyclone Perfomance Vs Predicted Tromp curve

    100 mm - sampling data

    0.00

    0.10

    0.20

    0.30

    0.40

    0.50

    0.60

    0.70

    0.80

    0.90

    1.00

    1 10 100 1000 10000 100000

    Particle Size, microns

    Partition

    facto

    r

    Simulation 100 mm

    Tromp Curves (1)Tromp Curves (1)

  • 7/30/2019 Evalucacin de molino de bolas

    14/26

    55.746.745.3859.81Feed % Solids

    0.270.450.420.18Alpha Water

    1291029585D50 Corrected(um)

    526369550238Circulating load

    0.220.250.210.18Imperfection

    150 mm

    Spigots

    100 mm

    Spigots

    150 mm

    Spigots

    100 mm

    Spigots

    SimulationPlant data

    Cyclone Performance

    Cyclone performanceCyclone performance

  • 7/30/2019 Evalucacin de molino de bolas

    15/26

    379F80(micron)35.0Lift Angle, ()

    1.82Reduction Ratio15.0Balls Filling, %

    3.74Sp. Energy, KWH/ton35.0Charge Level, %

    74.0% Solids (by weight)3.99App. Density, ton/m3

    806.8Throughput, ton/hr72.0Speed, % Cr itical

    2068Mill Power, kW (Net)30.0Length, ft

    2298Mill Power, kW (Gross)16.0Diameter, ft

    BALL MILL PERFORMANCE

    Base Case ExampleRemarks :

    Grinding Circuit Mass Balance Estimator

    BALLBAL

    100 mmSample

    NMoly-Cop ToolsT M

    Mill performance SimulationMill performance Simulation

  • 7/30/2019 Evalucacin de molino de bolas

    16/26

    501F80(micron)35.0Lift Angle, ()

    1.19Reduction Ratio22.0Balls Filling, %

    0.39Sp. Energy, KWH/ton35.0Charge Level, %

    71.3% Solids (by weight)4.08App. Density, ton/m3

    7780Throughput, ton/hr72.0Speed, % Cr itical

    2702Mill Power, kW (Net)30.0Length, ft

    3002

    Mill Power, kW

    (Gross)16.0Diameter, ft

    BALL MILL PERFORMANCE

    Base Case ExampleRemarks :

    Grinding Circuit Mass Balance Estimator

    BALLBAL

    150 mm

    Sample

    NMoly-Cop ToolsT M

    Mill performance SimulationMill performance Simulation

  • 7/30/2019 Evalucacin de molino de bolas

    17/26

    Charge Volume vs x

    0

    0.05

    0.1

    0.15

    0.2

    0.25

    0.3

    0.35

    0.4

    0 200 400 600 800 1000 1200 1400 1600

    x (mm)

    Cha

    rgeVolume(%

    )

    Ball Mill

    First run

    Kw = 1987

    Second run

    Kw = 2300

    Charge Level EstimationCharge Level Estimation

  • 7/30/2019 Evalucacin de molino de bolas

    18/26

    Mill Power UtilizationMill Power Utilization

    %-75um (O/F) Vs Power draw (kWh/t)

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    Jul-04

    Jul-04

    A

    ug-04

    A

    ug-04

    A

    ug-04

    A

    ug-04

    S

    ep-04

    S

    ep-04

    S

    ep-04

    S

    ep-04

    O

    ct-04

    O

    ct-04

    O

    ct-04

    O

    ct-04

    O

    ct-04

    N

    ov-04

    N

    ov-04

    N

    ov-04

    N

    ov-04

    D

    ec-04

    D

    ec-04

    D

    ec-04

    D

    ec-04

    Jan-05

    Jan-05

    Jan-05

    Jan-05

    Jan-05

    %-

    75um

    0.00

    2.00

    4.00

    6.00

    8.00

    10.00

    12.00

    14.00

    16.00

    18.00

    20.00

    Power(kWh

    /t)

    %-75 um Pow er draw (kWh/t) Linear (Pow er draw (kWh/t))

  • 7/30/2019 Evalucacin de molino de bolas

    19/26

    50/80 mm ratio Ball Addition50/80 mm ratio Ball Addition

    Ineffective reduction of +150m fractionin Ball mill

    Simulation indicated larger dia ballrequired for coarser material

    Intent to mill both fractions

    80 mm added 50/50 ratio with 50 mm(Trial and Error)

  • 7/30/2019 Evalucacin de molino de bolas

    20/26

    Grind theoryGrind theory

    D is in t e g r a t e

    5 0 m m

    8 0 m m

    C o a r s eF i n e

    BallWearRate

    B a l l S iz e

    D is in t e g r a t e

    5 0 m m8 0 m m

    C o a r s eF in e

    BallWearRate

    1 0 0 9 0 8 0 7 0 6 0 5 0 4 0 3 0 2 0 1 0 0

  • 7/30/2019 Evalucacin de molino de bolas

    21/26

    Grind Vs ResidueGrind Vs Residue

    % +150 Um Vs Plant Residue

    0.0

    0.5

    1.0

    1.5

    2.0

    2.5

    3.0

    3.5

    4.0

    4.5

    5.0

    5.5

    6.0

    6.5

    7.0

    7.5

    8.0

    8.5

    9.0

    9.5

    10.0

    Jul-04

    Jul-04

    Aug-04

    Aug-04

    Aug-04

    Aug-04

    Sep-04

    Sep-04

    Sep-04

    Sep-04

    O

    ct-04

    O

    ct-04

    O

    ct-04

    O

    ct-04

    O

    ct-04

    Nov-04

    Nov-04

    Nov-04

    Nov-04

    Dec-04

    Dec-04

    Dec-04

    Dec-04

    Jan-05

    Jan-05

    Jan-05

    Jan-05

    Jan-05

    %

    +150

    um

    0.00

    0.05

    0.10

    0.15

    0.20

    0.25

    0.30

    0.35

    Residue

    (g/t)

    % +150um Residue (g/t) Linear (% +150um)

  • 7/30/2019 Evalucacin de molino de bolas

    22/26

    Tons milledTons milled

    TONS MILLED

    0

    50,000

    100,000

    150,000

    200,000

    250,000

    300,000

    Jun-0

    3

    Jul-0

    3

    Aug-03

    Sep-03

    Oct-0

    3

    Nov-0

    3

    Dec-0

    3

    Jan-0

    4

    Feb-0

    4

    Mar-0

    4

    Apr-04

    May-0

    4

    Jun-0

    4

    Jul-0

    4

    Aug-04

    Sep-04

    Oct-0

    4

    Nov-0

    4

    Dec-0

    4

    Jan-0

    5

    Feb-0

    5

    Mar-0

    5

    Apr-05

    Q4200

    4

    Q1200

    5

    Q2200

    5

    Q3200

    5

    YTD

    TON

    S

    Tons Milled Plan

  • 7/30/2019 Evalucacin de molino de bolas

    23/26

    RecoveryRecovery

    RECOVERY

    92

    94

    96

    98

    100

    Jun-03

    Jul-03

    Aug-03

    Sep-03

    O

    ct-03

    Nov-03

    Dec-03

    Jan-04

    Feb-04

    M

    ar-04

    Apr-04

    M

    ay-04

    Jun-04

    Jul-04

    Aug-04

    Sep-04

    O

    ct-04

    Nov-04

    Dec-04

    Jan-05

    Feb-05

    M

    ar-05

    Apr-05

    Q

    4

    2004

    Q

    1

    2005

    Q

    2

    2005

    Q

    3

    2005

    YTD

    %

    Recovery Plan

  • 7/30/2019 Evalucacin de molino de bolas

    24/26

    Feasibility StudyFeasibility Study

    1,477,046RThus profit @ 1.00 kg/t addition (Including make up)

    2,465,000RExtra revenue achieved

    85,000R/kgGold price

    29.00kgExtra Au extracted

    1,167.00kgGold Produced @ 96.4 % Recovery after make up

    1,138.00kgGold Produced @ 94 % Recovery before make up

    5.42g/tHead Grade

    888,529RSteel cost/month @ 1.00 kg/t

    99,425RCost of steel make up

    25tonsAmount of steel used for make up

    3977R/tSteel ball cost for make up

    3977R/tSteel ball cost

    223.417tons1.00Steel addition @ 1.0 kg/t223417tonsForecasted tons milled per month

    223417tonsCurrent tons milled

    MonthlyBase data

  • 7/30/2019 Evalucacin de molino de bolas

    25/26

    Maintain Optimum Mill Discharge

    Research Mill Feed Variation

    Investigate Liner Wear Screen failure

    due to over-charge

    Continue 50/80 mm steel ball blending

    Different ratio ( 100% 80 mm)

    RecommendationsRecommendations

  • 7/30/2019 Evalucacin de molino de bolas

    26/26

    Thank you


Recommended