+ All Categories
Home > Documents > Evan Pyykkonen Portfolio

Evan Pyykkonen Portfolio

Date post: 22-Mar-2016
Category:
Upload: evan-pyykkonen
View: 219 times
Download: 0 times
Share this document with a friend
Description:
zeeeproductions.com
Popular Tags:
8
Isaac Muhovich
Transcript
Page 1: Evan Pyykkonen Portfolio

IsaacMuhovich

Page 2: Evan Pyykkonen Portfolio

I made this graphic for Rome Harris, owner This is a one minute video about a fictionalof Divine Cuts barber shop. I created this detective named Leeroy Jenkins. I madegraphic in illustrator after scanning a drawing this video for my digital media class. The of what he wanted the logo to look like. He video is a 60 second intro of what will bewas very satisfied with the logo and he’s a television show.

decided to make shirts and hats with it. The first scene is Leeroy Jenkins climbing of a sewer in pursuit of the criminal. The the second scene is the criminal flipping a fence trying to escape and the third scene fight scene that Leeroy Loses.

Page 3: Evan Pyykkonen Portfolio

I made this graphic for Rome Harris, owner This is a one minute video about a fictionalof Divine Cuts barber shop. I created this detective named Leeroy Jenkins. I madegraphic in illustrator after scanning a drawing this video for my digital media class. The of what he wanted the logo to look like. He video is a 60 second intro of what will bewas very satisfied with the logo and he’s a television show.

decided to make shirts and hats with it. The first scene is Leeroy Jenkins climbing of a sewer in pursuit of the criminal. The the second scene is the criminal flipping a fence trying to escape and the third scene fight scene that Leeroy Loses.

Page 4: Evan Pyykkonen Portfolio

This is a third video done for Divine cuts for another hair show at Arnellas Club Saint Paul Minnesota.Unfortunetely for us we had to incorporate the show differently than we

This is my website Zeeeproduction.com, the three E’s stand for Elevating Entertainment and Education. I have 5 other people that I’m planning on working with for future projects.

wanted to due to the camera man accidentally recorded in the lowest pixel aspect ratio as possible. However we made due with what we had and it turned out well.

My next client is a Christian rapper who’s name is Christopher but goes by the stage name Cmoe. One of his hit songs that was pub-lished to a popular Christian music collection is called You Know What It Is.

Page 5: Evan Pyykkonen Portfolio

This is a third video done for Divine cuts for another hair show at Arnellas Club Saint Paul Minnesota.Unfortunetely for us we had to incorporate the show differently than we

This is my website Zeeeproduction.com, the three E’s stand for Elevating Entertainment and Education. I have 5 other people that I’m planning on working with for future projects.

wanted to due to the camera man accidentally recorded in the lowest pixel aspect ratio as possible. However we made due with what we had and it turned out well.

My next client is a Christian rapper who’s name is Christopher but goes by the stage name Cmoe. One of his hit songs that was pub-lished to a popular Christian music collection is called You Know What It Is.

Page 6: Evan Pyykkonen Portfolio

The background of this picture is the very first

big video project I did. This was also for

Divine like the logo shown in the first page.

This was for a hair show at the holiday ex-

press ballroom in Bloomington Minnesota.

After our performance the crowd was com-

pletely silent. It’s moments like this that

remind me why I love digital media.

Project Challenge

Rani Engineer Solution

Project Background

In August 2007, southeastern Minnesota experienced devastating floods as a result of stationary warm front. Twenty-four hour rainfall totals of 15 to 18 inches were recorded in the Winona area. Compounding the problem was the topography, characterized by steep hills and bluffs and deep coulees, which gave steep gradients to the drainage and made streams highly erosive. As the rains far exceeded the absorption rate of 1.5 inches in six hours, flash floods rapidly overflowed the water courses and spread across the valley floors. bluffs gave way and several homes were completely washed away. The floods took out a bridge on Canadian Pacific’s Amtrak Empire Builder line which provides freight and passenger service between Chicago, St. Paul and points west. The washout left tracks suspended in air and train service halted. Canadian Pacific built a “shoofly track” around the damaged bridge in Minnesota City that opened within seven days, restoring Amtrak passenger service.

Rani Engineering provided survey support for the emergency construction. Professional services included:

Establishing existing alignment and proposed alignment

Construction staking, including elevations of bridge monuments and piers

site coordination with owner and contractor

Preparing field notes to document project activities

Providing 24/7 support to owner and contractor for the duration of the project

Owner: Canadian Pacific Railroad Client: DMJM Harris Contact: Sean Markey, PE [email protected] (215) 735-0832 Construction Cost: N/A Rani Fee: $11,500 Design: August 2007 Construction: August 2007

This is a template I created for Rani engineering

Page 7: Evan Pyykkonen Portfolio

The background of this picture is the very first

big video project I did. This was also for

Divine like the logo shown in the first page.

This was for a hair show at the holiday ex-

press ballroom in Bloomington Minnesota.

After our performance the crowd was com-

pletely silent. It’s moments like this that

remind me why I love digital media.

Project Challenge

Rani Engineer Solution

Project Background

In August 2007, southeastern Minnesota experienced devastating floods as a result of stationary warm front. Twenty-four hour rainfall totals of 15 to 18 inches were recorded in the Winona area. Compounding the problem was the topography, characterized by steep hills and bluffs and deep coulees, which gave steep gradients to the drainage and made streams highly erosive. As the rains far exceeded the absorption rate of 1.5 inches in six hours, flash floods rapidly overflowed the water courses and spread across the valley floors. bluffs gave way and several homes were completely washed away. The floods took out a bridge on Canadian Pacific’s Amtrak Empire Builder line which provides freight and passenger service between Chicago, St. Paul and points west. The washout left tracks suspended in air and train service halted. Canadian Pacific built a “shoofly track” around the damaged bridge in Minnesota City that opened within seven days, restoring Amtrak passenger service.

Rani Engineering provided survey support for the emergency construction. Professional services included:

Establishing existing alignment and proposed alignment

Construction staking, including elevations of bridge monuments and piers

site coordination with owner and contractor

Preparing field notes to document project activities

Providing 24/7 support to owner and contractor for the duration of the project

Owner: Canadian Pacific Railroad Client: DMJM Harris Contact: Sean Markey, PE [email protected] (215) 735-0832 Construction Cost: N/A Rani Fee: $11,500 Design: August 2007 Construction: August 2007

This is a template I created for Rani engineering

Page 8: Evan Pyykkonen Portfolio

ElevatingEntertainment &Education


Recommended