1 EVM-CR IPMDAR and Submit Workflow Update October 2020 Office of Acquisition Analytics and Policy 1 EVM‐CR Implementation of IPMDAR EVM‐CR Submitter Training ‐ October 2020 Ms. Jen Horner EVM‐CR Deputy Program Manager Tecolote Research, Inc.
Transcript

1

EVM-CR IPMDAR and Submit Workflow UpdateOctober 2020

Office of Acquisition Analytics and Policy 1

EVM‐CR Implementation of IPMDAR

EVM‐CR Submitter Training ‐ October 2020

Ms. Jen HornerEVM‐CR Deputy Program ManagerTecolote Research, Inc.

dkluzik
Cleared
dkluzik
Slides Only

2

EVM-CR IPMDAR and Submit Workflow UpdateOctober 2020

Office of Acquisition Analytics and Policy 2

EVM‐CR Reporting Requirements

Incremental Delivery

EVM‐CR Submit & Review

Tools

3

EVM-CR IPMDAR and Submit Workflow UpdateOctober 2020

Office of Acquisition Analytics and Policy 3

All UNCLASSIFIED ACAT I programs required to submit

All UNCLASSIFIED programs required to submit – regardless of ACAT designation

4

EVM-CR IPMDAR and Submit Workflow UpdateOctober 2020

Office of Acquisition Analytics and Policy 4

All programs required to submit to the EVM‐CR

Any contracts >$20M with EVM Reporting requirements must submit to the EVM-CR – independent of pathway

5

EVM-CR IPMDAR and Submit Workflow UpdateOctober 2020

Office of Acquisition Analytics and Policy 5

• The EVM-CR is a data repository managed by the EVM division of OUSD(A&S) AAP, the office of Acquisition, Analytics and Policy.

• The purpose of the EVM-CR is to establish a source of authoritative Earned Value Management (EVM) data for the Department and to provide prompt access for PMOs, Services, OSD, and DoD Components.

SUBMIT -INDUSTRYSUBMIT -INDUSTRY

• Monthly reports delivered direct from the supplier

REVIEW -GOVERNMENTREVIEW -GOVERNMENT

• Government PMO reviews and approves or rejects delivery

PUBLISHPUBLISH

• Published submissions are available to all approved DoD Analysts

IPMDAR doesn’t change this process

6

EVM-CR IPMDAR and Submit Workflow UpdateOctober 2020

Office of Acquisition Analytics and Policy 6

Reviewer

ACCESS EVM-CR via• External Certification Authority (ECA) certificate

• Certificates issued by major contractors Boeing, Northrup Grumman, Raytheon, and Lockheed Martin

Industry GovernmentSubmitter

RESPONSIBLE FORDelivery of reports

APPROPRIATE FORIndustry contractors

Industry ReviewerRESPONSIBLE FOROversight of reports delivered by all submitters from their organization

APPROPRIATE FORIndustry contractors

ACCESS EVM-CR via• Common Access Card (CAC)

• NDAs: Support contractors must obtain and submit NDAs in order to gain reviewer or analyst permissions

RESPONSIBLE FORReviewing, approving, and publishing reports

Managing submitters and reviewers assigned to efforts

APPROPRIATE FORProgram Office

AnalystALLOWED TOView and download published reports

APPROPRIATE FORDoD

Request Access

https://www.acq.osd.mil/evm/#/home

7

EVM-CR IPMDAR and Submit Workflow UpdateOctober 2020

Office of Acquisition Analytics and Policy 7

Separate (disconnected) deliverables CPR (Format 1‐4) is a printable report format (and EDI 839) IMS is a native tool format (or a printed image of a GANTT)

Reporting requirements aligned to capture cost/schedule data integrated Adopted UNCEFACT XML(1) Schema for all formats

• Formats 1‐4 mostly untouched (EDI839 to XML); plus printable reports• Introduced Format 6: XML snapshot of IMS (plus native)• Introduced (misunderstood) Format 7: Time‐phased Format 1

Corrects technical defects with cost/schedule integration JSON(1) encoding replaces XML

• Format 6 mostly untouched (replaced with IPMDAR SPD)• Replace Formats 1‐4, 7 with data more closely aligned to contractor EVMS (no 

requirement for printable reports) Reframed concept of VARs to facilitate conversation (what is needed by Govt)

(1) XML: eXtensible Markup Language; JSON: JavaScript Object Notation

8

EVM-CR IPMDAR and Submit Workflow UpdateOctober 2020

Office of Acquisition Analytics and Policy 8

IPMDAR IPMRCPD - Contract Performance Dataset (JSON)

Formats 1-4 & 7 XML (UN/CEFACT)

SPD - Schedule Performance Dataset Format 6 XML (UN/CEFACT)Native Schedule Native SchedulePerformance Narrative • Executive Summary• Variance Analysis

Format 5

***Not Required*** Formats 1-4 (Human Readable)

9

EVM-CR IPMDAR and Submit Workflow UpdateOctober 2020

Office of Acquisition Analytics and Policy 9

A program and contract performance overview contains:

• Top‐level PM cost and schedule forecast

• High‐level variance summary

• Undistributed budget (UB) and management reserve (MR) analysis

Compilation of write‐ups to describe the variances within a certain scope of the contract at the control account level.

10

EVM-CR IPMDAR and Submit Workflow UpdateOctober 2020

Office of Acquisition Analytics and Policy 10

12‐17 Days after the close of the contractors accounting period

Monthly submissions should be delivered to the EVM‐CR NLT 16 days after the close of the contractor accounting period.

11

EVM-CR IPMDAR and Submit Workflow UpdateOctober 2020

Office of Acquisition Analytics and Policy 11

12

EVM-CR IPMDAR and Submit Workflow UpdateOctober 2020

Office of Acquisition Analytics and Policy 12

Level of reporting (Work package, Control Account, WBS, etc.)  Units (dollars or hours, both)  Frequency (monthly, incremental, weekly, quarterly, annually, upon request) Variance Analysis Options (Government Identified Variances, Government Specified Variance Thresholds, Specific Number of Variances)  Tailoring out “formats” (e.g., Schedule Only deliverable) Eliminating Performance Narrative Report and using internally generated Contractor Explanations or performance reviews Eliminating Schedule Data set and receiving Native Format Schedule only 

Additional tailoring options discussed in the IPMDAR Implementation and Tailoring Guide; available on the EVM public website

13

EVM-CR IPMDAR and Submit Workflow UpdateOctober 2020

Office of Acquisition Analytics and Policy 13

IPMDAR DID is put on contract CDRLs created and sent to EVM‐CR Admins Admins establish reporting requirements EVM‐CR measures compliance against CDRL requirements (monthly reports sent to Services, Components and Industry corporate focal points).

Example: IPMDAR Default Reporting Requirements

14

EVM-CR IPMDAR and Submit Workflow UpdateOctober 2020

Office of Acquisition Analytics and Policy 14

Continue Existing Submissions• List of all submissions in the Open Status

Start New Submission on Effort• List includes all Contract Efforts assigned to you with active reporting requirements

Missing an Effort? Contact our Help Desk

[email protected]

15

EVM-CR IPMDAR and Submit Workflow UpdateOctober 2020

Office of Acquisition Analytics and Policy 15

16

EVM-CR IPMDAR and Submit Workflow UpdateOctober 2020

Office of Acquisition Analytics and Policy 16

1. Navigate to Upload Home, Submit tab2. Find Effort under Start new Submission on Effort3. Click Start Submission4. On Upload Submission page, select Submission Type

To begin a Submission on an assigned effort:

Reporting Requirements displayed will be based on:

1. Defined Reporting Stream (based on contract CDRL/DD-1423)2. The Submission Type selected

17

EVM-CR IPMDAR and Submit Workflow UpdateOctober 2020

Office of Acquisition Analytics and Policy 17

1. Choose the Upload link next to the requirement to browse for corresponding file2. Next, Upload file (Note: Electronic File types will be validated)3. Identify whether the file is Preliminary (e.g. quick look, draft or read ahead) or

Final Version4. Click Submit to finalize the upload

Standard Submission(all requirements identified in Submission Type are due same day)

18

EVM-CR IPMDAR and Submit Workflow UpdateOctober 2020

Office of Acquisition Analytics and Policy 18

Human Readable File types

The EVM-CR can identify machine readable IPMDAR and IPMR file types on it’s own. We will need your help when you are delivering a file that is of a Human Readable type, as shown here.

19

EVM-CR IPMDAR and Submit Workflow UpdateOctober 2020

Office of Acquisition Analytics and Policy 19

Reviewer and Submitter should verify data accuracy

Provides listing of all data checks and indicates if file passed or failed

Provides visual rendering of PMB data received since effort reporting started

20

EVM-CR IPMDAR and Submit Workflow UpdateOctober 2020

Office of Acquisition Analytics and Policy 20

Ready to Submit?The system will provide real time feedback as you upload required file types.

Once you have uploaded all requirements, it is time to Submit

21

EVM-CR IPMDAR and Submit Workflow UpdateOctober 2020

Office of Acquisition Analytics and Policy 21

• DUE Day 5: SPD and Native Schedule• DUE Day 10: CPD • DUE Day 13: Variance Analysis• DUE Day 16: Executive Summary

Notional Incremental Delivery Scenario

DAY 5• From the Reporting Requirements

grid, select SPD, Upload the SPD• Select Native Schedule, Upload

Native Schedule

DAY 10• From the Reporting Requirements

grid, select CPD, Upload the CPD

DAY 13• From the Reporting Requirements grid, select Variance Analysis, Upload the

Variance Analysis

DAY 16• From the Reporting Requirements grid, select Executive Summary, Upload the

Executive Summary• Review all files, when ready, Submit

22

EVM-CR IPMDAR and Submit Workflow UpdateOctober 2020

Office of Acquisition Analytics and Policy 22

Notes on Incremental Delivery

• PMO has immediate file access• Night time email notification sent to all Submitters and

Reviewers• Reviewers can Vote on whether to Accept, Conditionally

Accept or Reject a file.• Submitters can see Votes• Submission Comments allow for collaboration amongst all

users

23

EVM-CR IPMDAR and Submit Workflow UpdateOctober 2020

Office of Acquisition Analytics and Policy 23

Provides a tabular view of JSON tables and data

Provides data in Excel pivotable table

Generates a legacy IPMR UN/CEFACT file from data provided in the IPMDAR JSON

24

EVM-CR IPMDAR and Submit Workflow UpdateOctober 2020

Office of Acquisition Analytics and Policy 24

IPMDAR File Converter • Generates a legacy IPMR Cost –

UN/CEFACT file from the IPMDAR CPD JSON file

• Generates a legacy IPMR Format 6 file from the IPMDAR SPD JSON file

Web based toolRequires EVM-CR Account

Downloadable Tools• Validation Utilities check the file

against the DEI (Data Exchange Instructions)

• CPD and SPD • Conversion Utilities generate legacy

IPMR formats from IPMDAR files• CPD and SPD

Available on our public website and do not require an EVM-CR account to download

Many government networks block the download of an executable file.

25

EVM-CR IPMDAR and Submit Workflow UpdateOctober 2020

Office of Acquisition Analytics and Policy 25

https://www.acq.osd.mil/evm/#/policy‐guidance/ipmdar‐dei‐ffs

https://quicksearch.dla.mil/qsDocDetails.aspx?ident_number=278901

https://www.acq.osd.mil/evm/assets/docs/IPMDAR%20Implementation%20Guide%20‐%20May2020%20‐%20FINAL%20‐%20Signed%20and%20Dated.pdf

https://www.acq.osd.mil/evm/#/resources

26

EVM-CR IPMDAR and Submit Workflow UpdateOctober 2020

Office of Acquisition Analytics and Policy 26

JEN HORNEREVM-CR Deputy Program [email protected]

HELP DESK(253) 564-1979 [email protected]


Recommended