1 Evolving Conceptual Site Models Evolving Conceptual Site Models ( ( CSMs CSMs ) in Real ) in Real - - time for Cost Effective time for Cost Effective Projects Projects Kira P. Lynch, M.S. Kira P. Lynch, M.S. US Army Corps Seattle District US Army Corps Seattle District Seattle, WA 98134 Seattle, WA 98134 206 206 - - 764 764 - - 6918 6918 [email protected] [email protected] National Site Assessment Symposium National Site Assessment Symposium San Diego, June 28, 2004 San Diego, June 28, 2004
Transcript

1

Evolving Conceptual Site Models Evolving Conceptual Site Models ((CSMsCSMs) in Real) in Real--time for Cost Effective time for Cost Effective

ProjectsProjects

Kira P. Lynch, M.S.Kira P. Lynch, M.S.US Army Corps Seattle DistrictUS Army Corps Seattle District

Seattle, WA 98134Seattle, WA 98134206206--764764--69186918

[email protected]@usace.army.milNational Site Assessment SymposiumNational Site Assessment Symposium

San Diego, June 28, 2004San Diego, June 28, 2004

2

The Term “Conceptual Site Model”The Term “Conceptual Site Model”

This term has a number of different (but This term has a number of different (but related) environmental meanings:related) environmental meanings:–– preliminary stage in creating a computer or preliminary stage in creating a computer or

physical modelphysical model–– focused risk assessment or geologic evaluationfocused risk assessment or geologic evaluation–– an integration of all relevant information an integration of all relevant information

assembled for the purposes of investigating or assembled for the purposes of investigating or remediatingremediating a sitea site

This workshop focuses on the latter This workshop focuses on the latter definitiondefinition

3

The Data ProblemThe Data Problem

Where are you going Where are you going to sample?to sample?

How many samples How many samples are you going to take?are you going to take?

Can you get a Can you get a representative representative sample?sample?

When will I have When will I have enough data?enough data?

How to Manage Uncertainty

4

CSMsCSMs Are Critical!!Are Critical!!

Whether or not openly articulated, a CSM is the basis of all Whether or not openly articulated, a CSM is the basis of all site decisionsite decision--making. Many unacknowledged making. Many unacknowledged CSMsCSMs are are based on unjustified assumptions of homogeneity, leading to based on unjustified assumptions of homogeneity, leading to the generation of nonthe generation of non--representative data.representative data.

Working without a CSM is like working blindWorking without a CSM is like working blind--folded & folded & handcuffed!handcuffed!

Preliminary Preliminary CSM predicts CSM predicts contaminant contaminant distributionsdistributions Data confirms or Data confirms or

modifies predictions as modifies predictions as CSM gradually maturesCSM gradually matures

Mature CSM is Mature CSM is basis of decisions basis of decisions about exposure about exposure risk & risk mgt risk & risk mgt

strategiesstrategies

Prediction guides Prediction guides development of SAPdevelopment of SAP

5

Where Does Uncertainty Lie??Where Does Uncertainty Lie??

Reuse Plans, Goals, Outcomes

Decisions:• Exposure risk?• Cleanup goals• Data (type, quality)• Tolerable uncertainty

Approaches to:•Assessment•Investigation•Cleanup Design, Implementation•Closeout, Long-Term Operations and Maintenance

Tools for:•Sampling, Analysis, Interpretation•Cleanup/Remediation

ContainmentCleanupControls

•Monitoring, Maintenance

Impact

Determine

+

CSM

…or here…which means no foundation for agreement here

Lack of clarity here

…means lack of clarity here

6

Preliminary CSMPreliminary CSM

Highlights Highlights PhysicalPhysical Features of SiteFeatures of Site–– ManMan--made Structures / Historically Disturbed Areas / made Structures / Historically Disturbed Areas /

Accumulation PointsAccumulation Points

–– Actual Site Data or Professional ConjectureActual Site Data or Professional Conjecture»» Contaminants of Concern Contaminants of Concern

»» Release MechanismsRelease Mechanisms

Incorporates knownIncorporates known Societal Societal ConsiderationsConsiderations–– Future Land Use / Community GoalsFuture Land Use / Community Goals

–– Potential Exposure PathwaysPotential Exposure Pathways

–– Risk Management ScenariosRisk Management Scenarios

7

Additional Data to Build the Additional Data to Build the Preliminary CSMPreliminary CSM

Related information:Related information:–– other nearby contaminated sites other nearby contaminated sites –– regulatory regulatory

agenciesagencies

–– state geological surveysstate geological surveys

–– research by academic institutionsresearch by academic institutions

Professional judgment:Professional judgment:–– scientific knowledgescientific knowledge

–– conjectureconjecture

8

Site DataSite Data

ChemicalChemical

HydrogeologicalHydrogeological

BiologicalBiological

GeochemicalGeochemical

HydrologyHydrology

Preferential pathsPreferential paths

Historical activitiesHistorical activities

Source areasSource areas

Land useLand use

ReceptorsReceptors

Exposure pathwaysExposure pathways

Community plansCommunity plans

9

CSM PresentationCSM Presentation

TextText

22--Dimensional images:Dimensional images:–– Geologic crossGeologic cross--sectionssections

–– Contaminant transport areal viewsContaminant transport areal views

33--Dimensional imagesDimensional images

Flow chartsFlow charts

10

How Might a CSM Appear?How Might a CSM Appear?

Text?

3-d Physical Model?

Computer Model?

Receptor Flow Chart?

2-d Cross Section?

How can we organizethis information?

11

Other PossibilitiesOther Possibilities

12

Manufacturing Plant: Manufacturing Plant: The CSM Exploits Existing KnowledgeThe CSM Exploits Existing Knowledge

What areas are expected to be contaminated? What areas are expected to be ~clean?

13

Example of Macro Population SegregationExample of Macro Population SegregationWenatchee site: 3 distinct soil decisionWenatchee site: 3 distinct soil decision--driven pop’sdriven pop’s–– Compliant soil (remain on site)Compliant soil (remain on site)–– MildMild--mod nonmod non--compliant soil (landfill)compliant soil (landfill)–– Severely contaminated soil (incinerate)Severely contaminated soil (incinerate)

If unable to segregate populations, If unable to segregate populations, incinerate total volume: ~ $1.2 million (708 tons soil)incinerate total volume: ~ $1.2 million (708 tons soil)

Actual cost to clean closure using Triad = $589KActual cost to clean closure using Triad = $589K–– 56 tons incinerated 56 tons incinerated –– 334 tons 334 tons landfilledlandfilled

Cost if segregation done correctly, but using a Cost if segregation done correctly, but using a traditional site mgt approach ~ $1.2 milliontraditional site mgt approach ~ $1.2 million

14

Example of Micro (WithinExample of Micro (Within--Sample) Sample) PopulationsPopulations

1,970Less than 200-mesh (<0.07 mm)

836Between 50- and 200-mesh (0.3 - 0.07 mm)

165Between 10- and 50-mesh (2 - 0.3 mm)

108Between 4- and 10-mesh (5 - 2 mm)

50Between 4-mesh and 3/8” (5 - 9 mm)

10Greater than 3/8” (~10 mm)

Pb Conc. for the fraction by AA (mg/kg)

Soil Grain Size Std Sieve Mesh Size (mm diameter)

Adapted from ITRC (2003 ); http://www.itrcweb.org/SMART-1.pdf

15

How to Manage Uncertainty? How to Manage Uncertainty?

The The Evolving Conceptual Site ModelEvolving Conceptual Site Model–– By processing the data each day, andBy processing the data each day, and–– Presenting the updates to the Technical Team, Presenting the updates to the Technical Team,

andand–– Allowing everyone to questions its assumptions Allowing everyone to questions its assumptions

……–– The dynamic work plan allows you to address The dynamic work plan allows you to address

these questions these questions -- the next day.the next day.–– So you don’t leave the field until the CSM is So you don’t leave the field until the CSM is

fully vetted.fully vetted.

16

Dynamic Work Strategy Must Dynamic Work Strategy Must Include:Include:

Definition of decision process Definition of decision process –– stay stay focused on the ultimate goalfocused on the ultimate goal

Provide framework for CSM to be tested Provide framework for CSM to be tested and sufficiently evolved in the field to the and sufficiently evolved in the field to the desired level of decision confidencedesired level of decision confidence

Data management at time scales for Data management at time scales for decisionsdecisions

Communication proceduresCommunication procedures

17

Decision Rules and StrategiesDecision Rules and Strategies

Real time decisions based on data produced by field Real time decisions based on data produced by field measurement technologies is a major difference between measurement technologies is a major difference between Triad projects and traditional approachesTriad projects and traditional approaches

Decision rules/strategies allow project participants to feel Decision rules/strategies allow project participants to feel confident that DQOs will be met and that decision uncertainty confident that DQOs will be met and that decision uncertainty is managedis managed

Decision rules/strategies reflect anticipated contingencies Decision rules/strategies reflect anticipated contingencies based on the initial CSM and allow evolution of the CSM based on the initial CSM and allow evolution of the CSM during project executionduring project execution

Decision rules/strategies assign authority for various levels ofDecision rules/strategies assign authority for various levels ofdecisions to field technical staff, project core technical staffdecisions to field technical staff, project core technical staffand project decision teamand project decision team

Decision Rules and StrategiesDecision Rules and Strategies

19

Decision Rules and StrategiesDecision Rules and Strategies

gg DWS must attempt to anticipate a wide variety of problems,DWS must attempt to anticipate a wide variety of problems,challenges and site conditions (uncertainties)challenges and site conditions (uncertainties)

gg Decisions must be allowed to change tools when necessary Decisions must be allowed to change tools when necessary

20

gg Field measurement technologies produce large volumes of dataField measurement technologies produce large volumes of data

gg Project QA program must insure decision quality data on theProject QA program must insure decision quality data on thetime scale(s) required by project decisionstime scale(s) required by project decisions

gg Large volumes of data can pose a challenge to conventionalLarge volumes of data can pose a challenge to conventionalmethods used to visualize and communicate data to projectmethods used to visualize and communicate data to projectteam members on time scales requiredteam members on time scales required

gg Similar to decision rules, SOPs for data management and Similar to decision rules, SOPs for data management and communications ensure responsibilities of project staff arecommunications ensure responsibilities of project staff areclearly understoodclearly understood

Data Management and Communications Data Management and Communications

21

Daily Report FormatDaily Report Format

Contents determined based on needs of the Contents determined based on needs of the teamteamTypical contentsTypical contents–– Identification of technical staff on site/weather Identification of technical staff on site/weather –– Work completedWork completed–– Decisions madeDecisions made–– Data verification summaryData verification summary–– Changes to CSM summarizedChanges to CSM summarized–– Recommendations for next days workRecommendations for next days work

On site Decision team meeting are beneficial when feasibleOn site Decision team meeting are beneficial when feasible

Data Management and Communications Data Management and Communications

23

gg 3D visualization can be a very important tool to communicate 3D visualization can be a very important tool to communicate CSM changes when high density data sets are being collecteCSM changes when high density data sets are being collectedd

gg Cell telephones, wireless modems, land telephone lines are alCell telephones, wireless modems, land telephone lines are all usefull usefulfor communicating in realfor communicating in real--time with off site project stake holderstime with off site project stake holders

Data Management and Communications Data Management and Communications

WebWeb--Sharing Data to Link DecisionSharing Data to Link Decision--Makers Who Are Not in the FieldMakers Who Are Not in the Field

Existing InformationExisting Information•• Base mapsBase maps•• Geology Geology •• Boring samplesBoring samples•• ……..……..

Decision makers, stakeholders, ..Decision makers, stakeholders, ..

Rapid field data Rapid field data acquisitionacquisition

Results on Results on WebWeb

Slide adapted from Argonne, 2002

Data Management and Communications Data Management and Communications

25

26

eRoom Main PageeRoom Main Page

27

eRoom Sample PageeRoom Sample Page

28

29

Sonic DrillingSonic Drilling

30

Completed Push InformationCompleted Push InformationCone Resistance

(Qc)

Sleeve Friction

(fs)

31

Spectral LogSpectral Log

99SE37 (56.0’-57.0’)

Spectral Plot - 99SE37 (56.37')

0

200

400

600

800

1000

1200

1400

1600

1800

300 350 400 450 500 550 600 650 700

Wavelength (nm)

Inte

nsit

y (c

ount

s)

Field TRPH Results

Mod EPA 418.1

6,836 mg/kg

32

Data Management and CommunicationsData Management and Communications

33

Data Management and CommunicationsData Management and Communications

34

3D Optimization via Web3D Optimization via Web--cast cast –– well well datadata

• Do we know the source?

• How many other possible sources do we have?

• What is the extent vertically AND horizontally?

• Where should we place our wells?

35

High Definition Mapping High Definition Mapping –– MIP dataMIP data

36

MidMid--range extentrange extent

37

Full extent of MIP responseFull extent of MIP response

38

Soil conductivity resultsSoil conductivity results

39

Data Review and Usability EvaluationData Review and Usability Evaluation

TRS Preliminary Data ReviewDate: 11/20/2003Data Batch: FPA 111603Sample Handling/Preservation HCL AcceptableHolding time: 9-11 days AcceptableCOC AcceptableSensitivity 2 ug/L Acceptable for untreated GW Calibration LCS Acceptable ("LCS" is daily Continuing Cal Check)Lab Blank ND AcceptableSurrogates >80% Acceptable

Matrix Spike Not PerformedLab Precision <10% RPD AcceptableField Blanks ND Acceptable Trip BlankData Completeness AcceptableSensibility Acceptable

General Commens

Mike Webb 11/20/2003Reviewer Date

Not qualified - Analyst indicated there were essentially no spurious peaks or interferences. Future data sets will have MS/MSD and duplicates.

These data are usable for the intended purpose.E-flagged result is accepted with qualification. Future samples exceeding the calibration range will be diluted.

40

gg Triad projects differ significantly from conventional projectTriad projects differ significantly from conventional project ininhow regulators are involved in planning and executionhow regulators are involved in planning and execution

gg Triad projects often employ new and innovative technologiesTriad projects often employ new and innovative technologiesin addition to the new Triad approachin addition to the new Triad approach

gg Most successful Triad projects have regulator involvementMost successful Triad projects have regulator involvementearly and oftenearly and often

gg Regulators should be true stakeholders in project successRegulators should be true stakeholders in project success

gg The members of the project decision team, including the regulThe members of the project decision team, including the regulatorsatorsmust trust each othermust trust each other

Regulatory InvolvementRegulatory Involvement

41

gg As true stakeholders, regulators take risks and are invested As true stakeholders, regulators take risks and are invested ininproject success or failureproject success or failure

gg The relationship is a partnership and not adversarial:The relationship is a partnership and not adversarial:turn the turn the rectangular table to a round tablerectangular table to a round table

Regulatory InvolvementRegulatory Involvement

42

CSM SummaryCSM Summary

Develop iteratively, be openDevelop iteratively, be open--mindedminded

Complexity commensurate with required Complexity commensurate with required decisions and available datadecisions and available data

Involve all team members Involve all team members –– balance with balance with model evolutionmodel evolution

Utilize CSM to develop strategies for Utilize CSM to develop strategies for uncertainty managementuncertainty management

43

Decision Rule SummaryDecision Rule Summary

Facilitate evolution of the CSMFacilitate evolution of the CSMMany scenarios should be consideredMany scenarios should be consideredAssign authority for decisionsAssign authority for decisionsComplex projects consider preComplex projects consider pre--mobilization mobilization decision logic testdecision logic testPlan to encounter and resolve site Plan to encounter and resolve site uncertainty during field work uncertainty during field work

44

BenefitsBenefits

CommunicationCommunication

Force integrated data interpretationForce integrated data interpretation

Evaluate potential scenariosEvaluate potential scenarios

Make better decisionsMake better decisions

Most importantly Most importantly –– to achieve successful to achieve successful and cost effective environmental restorationand cost effective environmental restoration

45

ReferencesReferences

American Society for Testing and Materials (ASTM) International,American Society for Testing and Materials (ASTM) International,1995. 1995. Standard Guide for Developing Conceptual Site Models for Standard Guide for Developing Conceptual Site Models for Contaminated Sites.Contaminated Sites. West Conshohocken, PAWest Conshohocken, PA

American Society for Testing and Materials (ASTM) International,American Society for Testing and Materials (ASTM) International,1998. 1998. Standard Guide for Site Characterization for Environmental Standard Guide for Site Characterization for Environmental Purposes with Emphasis on Soil, Rock, the Vadose Zone and GroundPurposes with Emphasis on Soil, Rock, the Vadose Zone and GroundWaterWater. West Conshohocken, PA. West Conshohocken, PA

American Society for Testing and Materials (ASTM) International,American Society for Testing and Materials (ASTM) International,2002. Standard Guide for Conceptualization and Characterization2002. Standard Guide for Conceptualization and Characterization of of GroundGround--Water Systems. West Conshohocken, PA.Water Systems. West Conshohocken, PA.

46

References (cont.)References (cont.)

Call, B.A. 2003. “The Use of Conceptual Site Models in HazardoCall, B.A. 2003. “The Use of Conceptual Site Models in Hazardous us and Toxic Waste Investigations.” In and Toxic Waste Investigations.” In Proceedings NEMC 2003 Proceedings NEMC 2003 -- 1919thth

Annual National Environmental Monitoring ConferenceAnnual National Environmental Monitoring Conference, pp. 293 , pp. 293 --297. Crystal City, Virginia. July. Available at 297. Crystal City, Virginia. July. Available at www.www.nemcnemc.us.us (also (also available on Workshop CD).available on Workshop CD).LeGrandLeGrand, Harry E. and Lars Rosen, 2000. “Systematic Makings of , Harry E. and Lars Rosen, 2000. “Systematic Makings of Early Stage Hydrogeologic Conceptual Models.” Early Stage Hydrogeologic Conceptual Models.” Ground WaterGround Water. . 3838(6): 887(6): 887--893.893.UddameriUddameri, , VenkiVenki, 2003. “Models: Know Your Type.” , 2003. “Models: Know Your Type.” Soil Sediment Soil Sediment and Waterand Water. September.. September.U.S. Army Corps of Engineers (USACE), 1998. U.S. Army Corps of Engineers (USACE), 1998. Technical Project Technical Project Planning (TPP) ProcessPlanning (TPP) Process. Engineer Manual EM 200. Engineer Manual EM 200--11--2. August 31. 2. August 31. Available online at Available online at http://www.http://www.usaceusace.army.mil/.army.mil/inetinet//usaceusace--docs/engdocs/eng--manuals/manuals/emem..htmhtm

47

References (cont.)References (cont.)

U.S. Army Corps of Engineers (USACE), 2003. U.S. Army Corps of Engineers (USACE), 2003. Conceptual Site Conceptual Site Models for Ordnance and Explosives (OE) and Hazardous, Toxic, anModels for Ordnance and Explosives (OE) and Hazardous, Toxic, and d Radioactive Waste (HTRW) ProjectsRadioactive Waste (HTRW) Projects. Engineer Manual EM 1110. Engineer Manual EM 1110--11--1200. February 3. Available online at 1200. February 3. Available online at http://www.http://www.usaceusace.army.mil/.army.mil/inetinet//usaceusace--docs/engdocs/eng--manuals/manuals/emem..htmhtm

U.S. Environmental Protection Agency (US EPA), 1989. U.S. Environmental Protection Agency (US EPA), 1989. Risk Risk Assessment Guidance for Superfund, Volume 1: Human Health Assessment Guidance for Superfund, Volume 1: Human Health Evaluation Manual, Part A, Interim FinalEvaluation Manual, Part A, Interim Final. EPA/540/1. EPA/540/1--89/002.89/002.

U.S. Environmental Protection Agency (USEPA), 2001. U.S. Environmental Protection Agency (USEPA), 2001. Improving Improving Sampling, Analysis, and Data Management for Site Investigation aSampling, Analysis, and Data Management for Site Investigation and nd Cleanup (Fact Sheet)Cleanup (Fact Sheet). EPA. EPA--542542--FF--0101--030a. April. pp. 1030a. April. pp. 1--2. 2. Available online at Available online at http://cluin.org/download/char/542http://cluin.org/download/char/542--ff--0101--030a.pdf030a.pdf