EWB-MAP Water Tank ProjectConstruction Progress
June 5-12, 2012
Map of Las Delicias Water System
DOWNHILL
260 Homes Served by Tanque 3
33 Homes Served
by Tanque 2291 Homes Served by Tanque 1
DOWNHILL
Map of current Las Delicias Water System from ADESCO with approx house locations indicated
117 Homes Served by Tanque 3
33 Homes Served
by Tanque 2
154 Homes Served by Tanque 1
Proposed Water Distribution System
280 Homes Served by New Tank
DOWNHILL
Map of Current Water System (section relevant for EWB-MAP modifications)
RED lines – supply lines to tank (uphill by pump)BLUE lines – distributions lines by gravity
DOWNHILL
New 17,000 gallon tank Exisiting
11,000 gallon tank
Proposed update to Water System (section relevant for EWB-MAP modifications)
RED lines – supply lines to tank (uphill by pump)BLUE lines – distributions lines by gravity
NEW
SUP
PLY
LINE
1
NEW DISTRIBUTION LINE 2c
NEW DISTRIBUTION
LINE 2a
NEW
DI
STRI
BUTI
ON
LINE
2bNEW TANK
A
B
C
D
E
F
DOWNHILL
1. Tank Construction2. Pipe connections3. Pipeline Plans4. Distribution of Work
DAY 1 – June 5, 2012
Photos
Day 2 – Wednesday June 6, 9 AM
Day 2 – 3 PM
Day 2 – 3 PMDaniel Rivera
(Engineer from Rotary)
Miguel Delgado (driver/handyman)
from FIAT)
Miguel Martinez(Supervisor)
Holman (driver from
FIAT)
Sergio (LD ADESCO member)
Mario (LD resident)
Day 3 – Thursday June 7, 9 AM
Day 4 – Friday June 10, 11 AM
Day 5 – Saturday June 9, noon
Day 6 – June 11: noon
Day 7 – June 12 noon
Day 7 – 4 PM – ‘mesita’ complete
Schedule for Completion of Tank
1. Wed June 13: start laying rocks/sand for base of foundation
2. Thur June 14: continue laying rocks/sand for base of foundation
3. Fri June 15 – Tue June 19: cut/tie rebar and prepare form for foundation
4. Wed June 20: pour foundation5. Rain could delay these tasks
Photos
Ordered tubing and fittings from local supply store in San Salvador
Proposed update to Water System (section relevant for EWB-MAP modifications)
RED lines – supply lines to tank (uphill by pump)BLUE lines – distributions lines by gravity
NEW
SUP
PLY
LINE
1
NEW DISTRIBUTION LINE 2c
NEW DISTRIBUTION
LINE 2a
NEW
DI
STRI
BUTI
ON
LINE
2bNEW TANK
A
B
C
D
E
F
DOWNHILL
1. Tank Construction2. Pipe connections3. Pipeline Plans4. Distribution of Work
Proposed update to Water System (section relevant for EWB-MAP modifications)
RED lines – supply lines to tank (uphill by pump)BLUE lines – distributions lines by gravity
NEW
SUP
PLY
LINE
1
NEW DISTRIBUTION LINE 2c
NEW
DI
STRI
BUTI
ON
LINE
2bNEW TANK
A
B
C
D
E
F
DOWNHILL
Photos along Pipeline PathArea of Connection to Tubo Madre
NEW
SUP
PLY
LINE
1
NEW
DI
STRI
BUTI
ON
LINE
2b
NEW TANK
A
B
C
D
Photos along Pipeline Path(location of valve box?)
NEW
SUP
PLY
LINE
1
NEW
DI
STRI
BUTI
ON
LINE
2b
NEW TANK
A
B
C
D
Photos along Pipeline Path(location of valve box?)
NEW
SUP
PLY
LINE
1
NEW
DI
STRI
BUTI
ON
LINE
2b
NEW TANK
A
B
C
D
Photos along Pipeline Path
NEW
SUP
PLY
LINE
1
NEW
DI
STRI
BUTI
ON
LINE
2b
NEW TANK
A
B
C
D
Photos along Pipeline Path
NEW
SUP
PLY
LINE
1
NEW
DI
STRI
BUTI
ON
LINE
2b
NEW TANK
A
B
C
D
Photos along Pipeline Path
NEW
SUP
PLY
LINE
1
NEW
DI
STRI
BUTI
ON
LINE
2b
NEW TANK
A
B
C
D
Photos along Pipeline Path
NEW
SUP
PLY
LINE
1
NEW
DI
STRI
BUTI
ON
LINE
2b
NEW TANK
A
B
C
D
Photos along Pipeline Path
NEW
SUP
PLY
LINE
1
NEW
DI
STRI
BUTI
ON
LINE
2b
NEW TANK
A
B
C
D
Photos along Pipeline Path
NEW
SUP
PLY
LINE
1
NEW
DI
STRI
BUTI
ON
LINE
2b
NEW TANK
A
B
C
D
Photos along Pipeline Path
NEW
SUP
PLY
LINE
1
NEW
DI
STRI
BUTI
ON
LINE
2b
NEW TANK
A
B
C
D
Meeting with Mayor to discuss installation of pipeline
• Alcalde (Mayor) Ingeniero Romeo Jose Barillas ([email protected], 2331-3001)
• Travelled to Alcaldia (Mayor’s office) with Alfredo Torres (member of LD ADESCO) on Tuesday June 12, 2012)
• Got on waiting list at 8:30 & met with Mayor at 10:45• Requested help digging trench and installing PVC tubing. Alfredo had official letter
from ADESCO• Mayor knew about project (had been contacted by Ana Maria de Keene – honorary
consul of El Salvador in Philadelphia) and agreed to help with everything including supplying the 4” (supply) and 2” (distribution) pipes.
• Questions from mayor:– Is 160 PSI PVC acceptable?– Do you want cemented PVC or rapid connection?– Will send an engineer to evaluate poject.
• Other questions (from RAC)– Location of valve boxes, air bleeds, T’s, cleanouts– Should prepare detailed plan to send to mayor ASAP
Distribution of Work• EWB-MAP
– Overall project management and communication between parties– Updating design verifying that work meets design specs.– Long term planning
• FIAT (Sister Gloria)– Purchase of last minute supplies, order trucks of materials, submission of receipts to
Rotary for reimbursement. Storage of supplies.– Organizing volunteers, hiring one mason
• Las Delicias ADESCO– Organizing community labor (each house volunteers 1 day or pays $6 for another
person to do the work)– Ensuring secure storage of supplies– Communication with Alcaldia
• Daniel Rivera (Rotary San Salvador)– Purchase of supplies (1 week notice): rebar, concrete– Payment of supervisor and mason (hire one mason)– Local project management and oversight of supervisor (Miguel Martinez)
• Alcaldia San Juan Opico– Installation of two lines (4” supply and 2” distribution) of tubing in the same trench
between Calle Principal and Tanks.
Project Expenses (Thru June 11)
TOTALS--> 1,812.70$ 1,543$ 120$ -$ 150$ -$ 1,812.70$ Date Expense Item Amt Qty Total Paid by Detail FIAT CRSS MAP LD Team Total2
1-Jun photocopies 4.70$ 1 4.70$ FIAT for CRSS 5$ 4.70$ 4-Jun tools 196.50$ 1 196.50$ FIAT for CRSS 197$ 196.50$ 6-Jun Rocks (trucks ~6m^3) 145.00$ 2 290.00$ FIAT for CRSS 290$ 290.00$ 7-Jun Arena (sand trucks ~6 m^3) 70.00$ 2 140.00$ FIAT for CRSS 140$ 140.00$ 8-Jun Tierra Blanca (trucks ~6m^3) 70.00$ 2 140.00$ FIAT for CRSS 140$ 140.00$ 9-Jun Cement (bags 42.5 kg) 8.26$ 40 330.50$ FIAT for CRSS 331$ 330.50$ 9-Jun Transportation of materials 40.00$ 1 40.00$ FIAT for CRSS 40$ 40.00$
11-Jun Pipe for tank connections 331.00$ 1 331.00$ FIAT for CRSS 331$ 331.00$
11-JunSupervisor (Miguel) paid daily 6 days/wk 20.00$ 6 120.00$ CRSS 120$ 120.00$
11-Jun Laborers (from LD) paid daily 6.00$ 25 150.00$ LD 150$ 150.00$ 11-Jun Tierra Blanca (trucks ~6m^3) 70.00$ 1 70.00$ FIAT for CRSS 70$ 70.00$
Contacts
• FIAT guest house: 2-226-7610• Miguel Delgado (FIAT driver/helper) cell: 7-
570-8675• Rene (LD President): 7-458-4150• Miguel Martinez (Supervisor on work site): 7-
465-0654• Alcalde (Mayor) Ingeniero Romeo Jose Barillas
([email protected], 2-331-3001)