Block
Project
Structure
Electric
Plumbing
Contract #
Contractor
Homeland
Const. Co.
Homeland
Const. Co. /
Electrical
Solutions, Inc.
Homeland
Const. Co. /
Monkey
Wrench Plus,Inc.
H
Co
Ma
Estimated Cost, TY$M 94.1 22.7 17.5
L1 L2 L3 L4 L5 L6 L1 L2 L3 L4 L5 L6
1 House b b b1.1 Structure b
1.1.1 Basement/Foundation b1.1.1.1 Basement Hole b1.1.1.2 Basement Slab b1.1.1.3 Basement Walls b1.1.1.4 Basement Interior Framing b1.1.1.5 Integration, Assembly, Test, and Checkout b
1.1.2 Floor/Stairs b1.1.2.1 Floor b1.1.2.2 Stairs b
1.1.2.2.1 Stringers b1.1.2.2.2 Steps b
1.1.2.2.2.1 Tread b1.1.2.2.2.2 Riser b
1.1.2.2.3 Handrail Assembly b1.1.2.2.3.1 Railing b1 1 2 2 3 2 N l
WBS Element Code WBS
Block I
X00014-04-C-000
7/28/2019 ExamplePAM
2/45
1 1 2 2 3 2 N l
L1L2L3L4L5L6L1L2L3L4
1House1.1Structure
1.1.1Basement/Foundation1.1.1.1Basement Hole1.1.1.2Basement Slab
1.1.1.3Basement Walls1.1.1.4Basement Interior Framing1.1.1.5Integration, Assembly, Test, and Checkout
1.1.2Floor/Stairs1.1.2.1Floor1.1.2.2Stairs
1.1.2.2.1
1.1.2.2.21.1.2.2.2.1
1.1.2.2.2.21.1.2.2.3sembly
1.1.2.2.3.11.1.2.2.3.2
WBS Element CodeWBS
7/28/2019 ExamplePAM
3/45
1.1.12Walkway/Steps/Drive1.1.13Integration, Assembly, Test, and Checkout
1.2House Systems1.2.1Electrical Subsystems
1.2.1.1Meter box1.2.1.2Main Service Panel1.2.1.3Receptacles1.2.1.4Switches1.2.1.5Wiring1.2.1.6Integration, Assembly, Test, and Checkout
1.2.2Plumbing Subsystems1.2.3Gas Subsystem
1.2.3.1Gas Piping1.2.3.2Gas Meter
1.2.3.3Gas Furnace1.2.3.4Gas Stove1.2.3.5Integration, Assembly, Test, and Checkout
1.2.4HVAC Subsystem1.2.5Security Subsystem1.2.6Communications Subsystem
1.3Integration, Assembly, Test, and Checkout
1.4System Engineering/Program Management1.5System Test and Evaluation
1.5.1Development Test and Evaluation1.5.2Operational Test and Evaluation1.5.3Mock-ups1.5.4Test and Evaluation Support1.5.5Test Facilities
1.6Training1.6.1Equipment
1.6.2Services1.6.3Facilities
1.7Data
1.7.1Technical Publications
7/28/2019 ExamplePAM
4/45
L5L6
Stringers
StepsTread
RiserHandrail A
RailingNewels
7/28/2019 ExamplePAM
5/45
7/28/2019 ExamplePAM
6/45
7/28/2019 ExamplePAM
7/45
1.10
erational/Sitetivation (N/A)
al
1.10.3
Site Construction(N/A)
1.10.4
Site/Ship/VehicleConversion (N/A)
1.11
Industrial Facilities(N/A)
1.11.1
Construction/Conversion/Expansion
(N/A)
1.11.2
EquipmentAcquisition orModernization
(N/A)
1.11.3
Maintenance(Industrial Facilities)
(N/A)
1.12
Initial Spares andRepair Parts (N/A)
7/28/2019 ExamplePAM
8/45
7/28/2019 ExamplePAM
9/45
7/28/2019 ExamplePAM
10/45
7/28/2019 ExamplePAM
11/45
ta1.7.5
Data Depository
portt
1.9
Common SupportEquipment (N/A)
1.9.1
Test andMeasurement
Equipment (N/A)
1.9.2
Support andHandling Equipment
(N/A)
OpAc
1.10.1
System Assembly,
Installation andCheckout on Site
(N/A)
1.10.2
Contractor Technic
Support (N/A)
7/28/2019 ExamplePAM
12/45
7/28/2019 ExamplePAM
13/45
7/28/2019 ExamplePAM
14/45
7/28/2019 ExamplePAM
15/45
.6
ning
6.2
ices1.6.3
Facilities
1.7
Data
1.7.1
TechnicalPublications
1.7.2
Engineering Data1.7.3
Management Data1.7.4
Support D
1.8
Peculiar SupEquipme
7/28/2019 ExamplePAM
16/45
7/28/2019 ExamplePAM
17/45
7/28/2019 ExamplePAM
18/45
7/28/2019 ExamplePAM
19/45
1
House
1.5
System Test andEvaluation
1.5.2
perational Testnd Evaluation
1.5.3
Mock-ups1.5.4
Test and EvaluationSupport
1.5.5
Test Facilities
1
Trai
1.6.1
Equipment 1.Ser
7/28/2019 ExamplePAM
20/45
7/28/2019 ExamplePAM
21/45
7/28/2019 ExamplePAM
22/45
7/28/2019 ExamplePAM
23/45
1.2.3
Gas Subsystem1.2.4
HVAC Subsystem1.2.5
System Test andEvaluation
1.2.6
CommunicationsSubsystem
1.3
gration,ly, Test, andeckout
1.4
SystemEngineering/Progra
m Management
1.5.1
Development Testand Evaluation Oa
7/28/2019 ExamplePAM
24/45
1.2.3.3
Gas Furnace1.2.3.4
Gas Stove1.2.3.5
ntegration,Assembly, Test, and
Checkout
7/28/2019 ExamplePAM
25/45
7/28/2019 ExamplePAM
26/45
7/28/2019 ExamplePAM
27/45
1.2
House Systems
.2.1
ctricalystems
1.2.2
PlumbingSubsystems
InteAssemb
Ch
7/28/2019 ExamplePAM
28/45
7/28/2019 ExamplePAM
29/45
7/28/2019 ExamplePAM
30/45
7/28/2019 ExamplePAM
31/45
1.1.9
dows (GFE)1.1.10
Exterior Doors1.1.11
Deck (GFE)1.1.12
Walkway/Steps/Drive
1.1.13
Integration,Assembly, Test, and
Checkout1
EleSubs
7/28/2019 ExamplePAM
32/45
1.1.7.7Downspouts
1.1.7.8
Integration,Assembly, Test, and
Checkout1.2.1.1
Meter box 1.2.1.2Main Service Panel 1.2.1.3Receptacles
7/28/2019 ExamplePAM
33/45
7/28/2019 ExamplePAM
34/45
7/28/2019 ExamplePAM
35/45
1.1
Structure
1.1.5
Interior Doors1.1.6
Fireplace (N/A)1.1.7
Roof1.1.8
Exterior Walls Win
7/28/2019 ExamplePAM
36/45
1.1.2.2.3.4
Integration,Assembly, Test, and
Checkout
1.1.2.2.4
Integration,sembly, Test, and
Checkout
1.1.7.2Deck Sheathing 1.1.7.3Building Felt 1.1.7.4Roofing 1.1.7.5Metal Flashings 1.1.7.6Gutters
7/28/2019 ExamplePAM
37/45
7/28/2019 ExamplePAM
38/45
7/28/2019 ExamplePAM
39/45
1.1.2
Floor/Stairs1.1.3
Interior Walls1.1.4
Ceilings
7/28/2019 ExamplePAM
40/45
.4
Interiorng
1.1.1.5
Integration,Assembly, Test, and
Checkout1.1.2.1Floor 1.1.2.2Stairs
1.1.2.2.1
Stringers1.1.2.2.2
Steps
1.1.2.2.2.1
Tread1.1.2.2.2.2
Riser
1.1.2.2.3
Handrail Assembly
1.1.2.2.3.1
Railing1.1.2.2.3.2
Newels1.1.2.2.3.3
Balusters
A
1.1.2.3
Integration,Assembly, Test, and
Checkout
1.1.7.1Rafters
7/28/2019 ExamplePAM
41/45
7/28/2019 ExamplePAM
42/45
7/28/2019 ExamplePAM
43/45
1.1.1
Basement/Foundation
7/28/2019 ExamplePAM
44/45
1.1.1.1Basement Hole 1.1.1.2Basement Slab 1.1.1.3Basement Walls
1.1.1.
Basement IFrami