exyte-hargreaves.net 1 Exyte Hargreaves Limited Excellence in HVAC Engineering Solutions
Transcript
Page 1: Excellence in HVAC Engineering Solutions - Exyte Hargreaves · 2019-10-22 · installation of HVAC systems at Dungeness Power Station Hargreaves begins work on Sizewell B, the UK‘s

exyte-hargreaves.net 1

Exyte Hargreaves Limited

Excellence in HVAC Engineering Solutions

Page 2: Excellence in HVAC Engineering Solutions - Exyte Hargreaves · 2019-10-22 · installation of HVAC systems at Dungeness Power Station Hargreaves begins work on Sizewell B, the UK‘s

2

Our Heritage

Welcome to Exyte Hargreaves

1872 1957 1968 1989

Business founded in Bury by Henry Hargreaves, becoming Henry Hargreaves & Sons in 1890

Beginning of a significant period in Hargreaves history as it is

acquired by Senior Engineering Group Limited

Hargreaves enter the nuclear industry, with the manufacture and installation of HVAC systems at Dungeness Power Station

Hargreaves begins work on Sizewell B, the UK‘s only

pressurised water reactor power station

M+W Group purchase Hargreaves from the Senior Group. Hargreaves

begins a new chapter after 55 years with Senior Group

1991

Henry Hargreaves & Sons Ltd becomes Senior Construction Services Ltd, reflecting its broader offering of HVAC products and services

A leading European mechanical HVAC engineering and manufacturing business operating across all high integrity and complex building sectors

Page 3: Excellence in HVAC Engineering Solutions - Exyte Hargreaves · 2019-10-22 · installation of HVAC systems at Dungeness Power Station Hargreaves begins work on Sizewell B, the UK‘s

exyte-hargreaves.net 3

Welcome to Exyte Hargreaves

I’m proud to lead the company through one of the most exciting periods in its 146-year history. Faced with the opportunity of growing from a national service provider to global innovator, Exyte Hargreaves has developed into a company that stands at the forefront of engineering.

Over the past year we’ve strengthened our team, creating a robust management structure and improving streams of communication. We’ve also welcomed industry-renowned engineers to the team and have introduced a new research and development department to ensure that we continue

to lead our sector into the latest engineering developments. While we acknowledge the fantastic achievements of our past, we look forward as a management team, focusing on a successful future.

We have a skilled workforce who are focused on quality, not just in the manufacture of products but in the service offered to clients. From concept to completion, we have a culture of health and

safety, quality, excellence and continuous development.

Our approach is to serve our customers by building long lasting relationships. I invite you to get in touch and see how we can create an engineering partnership guaranteed for success.

Andy SneydManaging Director Exyte Hargreaves

Designing Engineering Excellence

20162012

M+W Group purchase Hargreaves from the Senior Group. Hargreaves

begins a new chapter after 55 years with Senior Group

Hargreaves completes ground-breaking work for Novarka on the Chernobyl New Safe Containment Project in Ukraine

20182017

Hargreaves rebranded to MW Hargreaves to comprehensively

realign the market activities of the M+W Group and high

integrity sectors

M+W become Exyte and MW Hargreaves become Exyte Hargreaves, the choice partner for engineered HVAC solutions in high integrity construction and engineering sectors

2019

Hargreaves undergoing business transformation and a foundation

project is launched for future growth in providing single source HVAC solutions

across an international footprint

Henry Hargreaves & Sons Ltd becomes Senior Construction Services Ltd, reflecting its broader offering of HVAC products and services

A leading European mechanical HVAC engineering and manufacturing business operating across all high integrity and complex building sectors

Page 4: Excellence in HVAC Engineering Solutions - Exyte Hargreaves · 2019-10-22 · installation of HVAC systems at Dungeness Power Station Hargreaves begins work on Sizewell B, the UK‘s

4

Safety - A Cornerstone of our CultureA key is an important symbol, the means of unlocking but also securing something. Our ten keys are crucial to securing a safer environment, as derived from the sectors we work in. But we see them as the benchmark in all that we do.

Keys to Safety

Leaders demonstrate a commitment to safety in their decisions & behaviours

Leadership Safety Values & Actions

10

Decisions that support or affect nuclear safety are systematic, rigorous & thorough

Decision Making

Opportunities to learn about waysto ensure safety are sought out & implemented

Continuous Learning

Trust & respect permeate the organisation.

Respectful Work Environment

Communications maintain a focus on safety

Effective Communications

A safety-conscious work environment (SCWE) is maintained where personnel feel

free to raise safety concerns without fear of reprisal.

Environment for Raising Concerns Individuals avoid complacency & continuously challenge existing conditions & activities

in order to identify discrepancies that might result in error.

Questioning Attitude

Exyte Hargreaves

Page 5: Excellence in HVAC Engineering Solutions - Exyte Hargreaves · 2019-10-22 · installation of HVAC systems at Dungeness Power Station Hargreaves begins work on Sizewell B, the UK‘s

exyte-hargreaves.net 5

Safety - A Cornerstone of our CultureA key is an important symbol, the means of unlocking but also securing something. Our ten keys are crucial to securing a safer environment, as derived from the sectors we work in. But we see them as the benchmark in all that we do.

5

Decisions that support or affect nuclear safety are systematic, rigorous & thorough

Decision Making

The process of planning & controlling workactivities is implemented so that safety is maintained.

Work Processes

Issues potentially impacting safety are promptly identified, fully evaluated, promptly

addressed & corrected depending upon their significance

Problem Identification & Resolution

Trust & respect permeate the organisation.

Respectful Work Environment

All individuals take personal responsibility for safety

Personal Accountability

Communications maintain a focus on safety

Effective Communications

Individuals avoid complacency & continuously challenge existing conditions & activities

in order to identify discrepancies that might result in error.

Questioning Attitude

Page 6: Excellence in HVAC Engineering Solutions - Exyte Hargreaves · 2019-10-22 · installation of HVAC systems at Dungeness Power Station Hargreaves begins work on Sizewell B, the UK‘s

6

Our Approach

Exyte Hargreaves

1. Initial concept, feasibility, design

and lifetime evaluation 2. Proposals and pricing

Being involved as early as possible in a project is critical to its success. Exyte Hargreaves provides a full cradle to grave service working with customers to ensure that all expectations are met and any unforeseen obstacles during the project, are overcome.

Scope of ServicesOur seven step process is adhered to regardless of the scale of a project, and enables us to guarantee that our own rigorous standards are always met.

5. Factory testing and inspection 6.Site construction

management

Our 3 Business PillarsWe carry out our activities in three distinct ways, which we call our Business Pillars. These are:

Manufacturing

• HVAC product for external sale• Product for EDO

Engineering Delivery Organisation

• EDO to external market• EDO to Exyte EMEA

Management Consultancy

• High integrity engineering and management

Page 7: Excellence in HVAC Engineering Solutions - Exyte Hargreaves · 2019-10-22 · installation of HVAC systems at Dungeness Power Station Hargreaves begins work on Sizewell B, the UK‘s

exyte-hargreaves.net 7

3.Full mechanical system design 4.Manufacture and

assembly

Being involved as early as possible in a project is critical to its success. Exyte Hargreaves provides a full cradle to grave service working with customers to ensure that all expectations are met and any unforeseen obstacles during the project, are overcome.

Scope of ServicesOur seven step process is adhered to regardless of the scale of a project, and enables us to guarantee that our own rigorous standards are always met.

7.Test, inspection and commissioning

Our 3 Business PillarsWe carry out our activities in three distinct ways, which we call our Business Pillars. These are:

Management Consultancy

• High integrity engineering and management

Page 8: Excellence in HVAC Engineering Solutions - Exyte Hargreaves · 2019-10-22 · installation of HVAC systems at Dungeness Power Station Hargreaves begins work on Sizewell B, the UK‘s

8

Our 50 years of experience in this challenging sector, enables us to use it as the benchmark for all we do. Our long standing involvement in the sector has enabled to develop close ties with its key organisations.

Clean room environments are a critical part of the production toolkit for the world‘s creators of our modern advanced technology. We can provide tailor made turnkey solutions for these highly controlled applications.

Our Markets

Advanced Technology Facilities (ATF)Thermal Energy Plants

Exyte Hargreaves

Our experience of working in high integrity, controlled environment sectors makes Exyte Hargreaves an ideal partner for defence sector projects, however complex the requirements.

Defence

Page 9: Excellence in HVAC Engineering Solutions - Exyte Hargreaves · 2019-10-22 · installation of HVAC systems at Dungeness Power Station Hargreaves begins work on Sizewell B, the UK‘s

exyte-hargreaves.net 9

Life Sciences & Chemicals (LSC)Partnering our parent company Exyte, we can tailor solutions for global players as well as innovative start-ups in Pharma & Biotech, Food & Nutrition, Consumer Care and Specialty Chemicals.

The volume and speed of data traversing the modern world, demands the most sophisticated facilities to meet our connectivity needs. Our expertise in controlled environment solutions makes us the ideal partner.

Data Centres (DTC)

Page 10: Excellence in HVAC Engineering Solutions - Exyte Hargreaves · 2019-10-22 · installation of HVAC systems at Dungeness Power Station Hargreaves begins work on Sizewell B, the UK‘s

10

Exyte Hargreaves

Investing in our PeopleSafety & Compliance

Exyte Hargreaves operates an Occupational Health and Safety Management System which is third party certified against the requirements of BS OHSAS 18001, the primary aim being to prevent injury and ill-health, whilst demonstrating compliance with all relevant legislation and other requirements relating to safety matters to which we subscribe.

In addition we take a proactive approach in relation to our impact on the environment. We actively practice recycling within both our office, factory and on-site workspaces, operate a cycle to work scheme and invite staff to submit suggestions and comments through our Observation Box initiative

Mental health and wellbeing is high on the agenda of the construction and civil engineering industries. As with many businesses operating in these sectors, we strive to raise awareness in both our staff and the external stakeholders with which we work.

SHEQ VisionExyte Hargreaves is committed to overseeing an incident-free and injury-free environment through the prevention of injuries, occupational ill health, pollution and operational losses to ensure the safe delivery of our Target Zero and Beyond program.

SHEQ MissionPeople and Environment is our core value applied through all operations to maintain robust global standards.

SHEQ CommitmentThe Executive Committee for Exyte Group is responsible for establishing the company’s SHEQ policy, monitoring the company’s performance through regular leadership reviews and striving for continuous improvement strategies.

SHEQ Commitment

Page 11: Excellence in HVAC Engineering Solutions - Exyte Hargreaves · 2019-10-22 · installation of HVAC systems at Dungeness Power Station Hargreaves begins work on Sizewell B, the UK‘s

exyte-hargreaves.net 11

Investing in our People

Succession planning has always been a key part of our Engineering Young Talent Programme which Hargreaves started in 2012.

Part of this programme is introducing engineering to students from Year 5 (Primary) through to Year 11 (school leavers).

We do this by hosting Open Days, providing week long work experience programmes and delivering projects at several local schools which work towards an annual Inter schools Finals event at the Museum of Science & industry in Manchester.

Engineering Youth Talent Programme

At Exyte-Hargreaves we recognise the importance of identifying and developing talented individuals, not just in their current roles but toward future leadership roles.

Now in its second year our Executive Talent Programme (ETP) is a purpose designed programme focussed on our Leadership Behaviours including enhanced self awareness, communication skills, resilience and well-being, leading change and developing coaching and mentoring skills. Key to the success of ETP is the coaching and mentoring support that each delegate receives throughout the programme helping to drive and embed their learning.

Feedback confirms that our future leaders are better equipped to meet today’s and tomorrow’s challenges both within the organisation and in the markets in which we operate.

Executive Talent Programme

Page 12: Excellence in HVAC Engineering Solutions - Exyte Hargreaves · 2019-10-22 · installation of HVAC systems at Dungeness Power Station Hargreaves begins work on Sizewell B, the UK‘s

12

Exyte Hargreaves provides a differentiated capability to deliver our projects utilising offsite manufactured engineered products and components, engineered through the design & engineering process of Design for Manufacturing and Assembly (DfMA). Our in-house manufacturing capability enables us to optimise our solutions throughout early engagement and collaborative working with clients and design & delivery teams. We are in a unique position to deliver our strategic intent to support all of our projects utilising offsite manufactured products/components.

Exyte Hargreaves is recognised for its quality workmanship and commitment to customers. This has been achieved through constantly delivering and exceeding on its promises while displaying openness, integrity, passion and pride in all projects. With more than 80 people based at our production facility in Bury, boasting exceptional skills and leading technical expertise, Exyte Hargreaves maintains a strong workforce with the unique capacity to support nationwide projects, wherever and whenever the need arises.

At the earliest opportunity in projects, our team look to support project bid & delivery teams in identifying areas of the services that could benefit from being manufactured & completed away from the site. Our aim is to improve the delivery of the services installation in all projects, offering benefits to our client, our business & workforce.

Exyte Hargreaves

Investing in our Future

Off-Site Manufacture

Energy centres / plant rooms Plant / equipment modules Vertical distribution modules Horizontal distribution modules Terminal distribution modules

Page 13: Excellence in HVAC Engineering Solutions - Exyte Hargreaves · 2019-10-22 · installation of HVAC systems at Dungeness Power Station Hargreaves begins work on Sizewell B, the UK‘s

exyte-hargreaves.net 13

Investing in our Future

Product Design & DevelopmentAn essential component in ensuring that Exyte Hargreaves continue to drive to be industry leaders in design and manufacture of HVAC systems. Having Product Design & Development capabilities has allowed Exyte Hargreaves to develop a wide range of products using a methodical and structured process to deliver key deliverables from concept to delivery.

But research & development within the business is not only limited to New Product Development. It also extends to the manufacturing process, enabling new methods to be developed and tested by means of physical or digital twin allowing minimum disruption to operations with maximum efficiencies.

Page 14: Excellence in HVAC Engineering Solutions - Exyte Hargreaves · 2019-10-22 · installation of HVAC systems at Dungeness Power Station Hargreaves begins work on Sizewell B, the UK‘s

14

Case Studies

Exyte Hargreaves

Value: £9.9 million

Established as a response to the deteriorating sarcophagus hastily built to contain the aftermath of the world‘s worst nuclear accident, Novarka is a collaboration of two global construction giants backed by 27 nations.

Our contribution to the construction of the world‘s largest movable land-based structure, covering the remains of reactor 4, is a complete seismically tolerant HVAC package for the main arch and associated support facilities.

Novarka (Chernobyl) Safe Containment Arch

Value: £20 million

Manufacture and installation of specialist HVAC including transition pieces averaging 4m high, the highest being 6.3m, as well as 25 ventilation systems across 9 shafts. Innovation of fabrication design required to meet the logistical challenges of the shafts and transition pieces in confined environments.

Crossrail is arguably the most ambitious transport infrastructure project the nation’s capital has seen this century.

Exyte Hargreaves were contracted to design, manufacture, deliver and install 25 individual ventilation systems, with 54 transitions, across five separate sites on the Crossrail network, Canary Wharf, Woolwich, Bond Street, Paddington and Stepney Green. Because of the physical restrictions placed on any construction or civil engineering project in the centre of London and coupled with the very tight space constraints of the Crossrail sites themselves,

Exyte Hargreaves completed its contracted work in early 2019. On the back of its work on the Crossrail C610 project, Exyte Hargreaves was awarded Contractor of the Year at the 2018 BESA North West Awards.

C610 CrossrailLondon

Case Studies

Page 15: Excellence in HVAC Engineering Solutions - Exyte Hargreaves · 2019-10-22 · installation of HVAC systems at Dungeness Power Station Hargreaves begins work on Sizewell B, the UK‘s

exyte-hargreaves.net 15

Value: £2.4 million

Provide the infrastructure for fresh air supply into the building, and acid and solvent extract for the lab. Manufactured and installed a mixture of spiral ductwork and stainless steel ductwork as well as supplying acid extract Teflon-coated ductwork to address the specific needs of the project.

Designed, manufactured and built a flat pack plenum on site for the facility’s third floor plant room to overcome space and access restrictions and complete within 18 months.

Manchester GrapheneInstitute

Value: £16 million

The Separation Area Ventilation (SAV) project invol-ved the replacement of legacy ventilation systems, the re-routing of exhaust ductwork and the creation of new filters and a discharge stack.

The project involved the fabrication, installation and commissioning of 2,500 individual components total-ling 3,000m in length.

SAVSellafield

Page 16: Excellence in HVAC Engineering Solutions - Exyte Hargreaves · 2019-10-22 · installation of HVAC systems at Dungeness Power Station Hargreaves begins work on Sizewell B, the UK‘s

16

Value: £2.4 million

PR&D Facility - Pharmaceutical Research Facility comprising fume cupboard laboratories and supporting plantroom, office, welfare and meeting room facilities.

Supply and Installation of Koolduct, DW144 type ductwork all shapes and sizes. Small amount of PVC ductwork. Modularisation philosophy adopted throughout the laboratories. Also supplied dampers, attenuators, fabric air socks and grilles and some minor fans.

Astra ZenecaPR & D Facility

Value: £21 million

BEPPS (Box Encapsulation Plant Product Store) and DIF (Direct Import Facility) are key projects for Sellafield, which when complete will facilitate the processing of intermediate level waste for above ground storage.

The project encompasses design, manufacture, installation, management of the supply chain and associated works in relation to ventilation systems over 10,000m2 in size.

BEPPS DIF, Sellafield

Exyte Hargreaves

Case Studies

Page 17: Excellence in HVAC Engineering Solutions - Exyte Hargreaves · 2019-10-22 · installation of HVAC systems at Dungeness Power Station Hargreaves begins work on Sizewell B, the UK‘s

exyte-hargreaves.net 17

High Standard is our Only StandardAccreditations

Awards

MembershipsBESA

BECBC

ISO14001We are committed to planned, proactive mitigation of our impact on the environment.

NSQ-100Quality systems compliant with nuclear standard NSQ-100

• Contractor of the Year 2018• Employer Training Initiative of the Year 2017,

2018• Employer Recruitment Initiative of the Year

2017

North West Region Awards

RoSPA 2018 Gold Award

ECIA

EEF

NIA

NSAN

LRQA

TWI

FIRAS

Nuclear Institute

Nuclear South West

ADCAS

ISO9001We operate to the internationally recognised quality management system standard to ensure we meet the needs of our customers and stakeholders.

Diversity Impact AwardWINNER

RoSPA 2019 Gold Medal(5 consecutive Gold Awards)

ISO18001We maintain an Occupational Health and Safety Management System which is third party certified.

Page 18: Excellence in HVAC Engineering Solutions - Exyte Hargreaves · 2019-10-22 · installation of HVAC systems at Dungeness Power Station Hargreaves begins work on Sizewell B, the UK‘s

18

Exyte Hargreaves

Exyte Group at a Glance

Exyte is a global leader in design, engineering and construction delivering high-tech facilities, plants and factories. With a history of more than 100 years, we have developed a special expertise in controlled and regulated environments.

We serve the most technically demanding clients in growth markets such as semiconductors, life sciences, and data centers. Our business is organized in three strategic segments – Advanced Technology Facilities, Life Sciences & Chemicals and Data Centers. In addition to this certain Regional Specific Business activities are conducted.

We serve the most technically demanding clients across the full spectrum of services from consulting and design to managing turnkey solutions. Operating in more than 20 countries, Exyte is uniquely positioned to support clients locally and globally.

In 2017, Exyte generated sales of 2.4 billion euros, up from 2.1 billion euros in 2016 on a like-for-like basis, with over 4,800 highly experienced and motivated employees.

Exyte emerged from a re-grouping of the German-based M+W Group in 2018. Visit us on our website to explore more: www.exyte.net

Bringing the future of technology to life

Advanced Technology Facilities Life Sciences & Chemicals Data Center

Semiconductor

Flat Panel Display

Photovoltaics

Batteries

Pharmaceuticals & Biotechnology

Food & Nutrition

Consumer Care

Specialty Chemicals

Cloud Computing

Enterprise

Co-Location

High Performance Computing

History of 100+ years

Special expertise in controlled

and regulated environments

Serving the most technically

demanding clients

Full spectrum of services from consulting and design to managing turnkey solutions

Client centric operations in 20+ countries

Commitment to Safety:

“Incident Free Workplace” (IFW)

Sales of €2.4bn (2017)

4.800 + highly experienced and

motivated employees

Page 19: Excellence in HVAC Engineering Solutions - Exyte Hargreaves · 2019-10-22 · installation of HVAC systems at Dungeness Power Station Hargreaves begins work on Sizewell B, the UK‘s

exyte-hargreaves.net 19

Exyte Corporate

• Exyte AG• Exyte Management GmbH

Exyte AMER

• Exyte Americas Holding, Inc.• Exyte U.S., Inc.• Total Facility Solutions, Inc.• Exyte Energy, Inc.• Exyte Gilbane JV

Exyte EMEA

• Exyte Europe Holding GmbH• Exyte Central Europe GmbH• Exyte Rus, LLC• Exyte France SAS• Exyte Northern Europe Ltd.• Exyte Hargreaves Ltd.• Exyte Israel Engineering Ltd.• Exyte UK Ltd.

Exyte APAC

• Exyte Asia Pacific Holding Ltd.• Exyte Singapore Pte. Ltd.• Exyte Trading (Singapore) Pte. Ltd.• Exyte Malaysia Sdn. Bhd.• Exyte China Co. Ltd.• Exyte Trading China Co. Ltd.• Exyte Taiwan Co., Ltd.• Exyte Japan Ltd.• Exyte Vietnam Co., Ltd.• Exyte Services (Singapore) Pte. Ltd• Exyte Services (Malaysia) Sdn. Bhd.

Exyte Tech

• Exyte Technology GmbH (Germany)• Exyte Technology Co. Ltd. (China)• Exyte Technology CZ s.r.o. (Czech

Republic)• Exyte Technology Gebaude GmbH & Co.

KG (Germany)

Page 20: Excellence in HVAC Engineering Solutions - Exyte Hargreaves · 2019-10-22 · installation of HVAC systems at Dungeness Power Station Hargreaves begins work on Sizewell B, the UK‘s

20 exyte-hargreaves.net

Exyte Group

Exyte Hargreaves LimitedHargreaves HouseLord StreetBuryLancashireBL9 0RG, UKPhone:+44 (0)161 764 [email protected]

Exyte GroupLoewentorbogen 9B70376 StuttgartGermanyPhone:+49 711 [email protected]

Global Footprint

02/2

019


Recommended