28
Excellence in Infrastructure Development
Transcript
Page 1: Excellence in Infrastructure Development › Gorogang Profile.pdf · 28.05%, the company has effectively and proudly surged forward towards self-sustenance to maintain a healthy balance

Excellence in Infrastructure Development

Page 2: Excellence in Infrastructure Development › Gorogang Profile.pdf · 28.05%, the company has effectively and proudly surged forward towards self-sustenance to maintain a healthy balance

Excellence in Infrastructure Development

Reg No.: 2004/06/067203/23Tel: +2712 665 1306Fax: +2712 344 0545

www.gorogang.co.za

Page 3: Excellence in Infrastructure Development › Gorogang Profile.pdf · 28.05%, the company has effectively and proudly surged forward towards self-sustenance to maintain a healthy balance

3

CONTENTS

Gorogang Plant Hire At A Glance ..........

Business Plan..........

Our Strategic Objectives..........

Our Core Values..........

Financial Performance..........

Our Human Capital..........

Our Track Record..........

Water & Sanitation.........

Building Project..........

Roads and Stormwater..........

Plant Equipment..........

SHE Perspective..........

Quality..........

Transformation at Gorogang Plant..........

Social Investment at Gorogang..........

SABS ISO Certificate..........

Gallery..........

4

4

5

5

6

13

15

15

16

17

19

21

23

24

24

25

26

Page 4: Excellence in Infrastructure Development › Gorogang Profile.pdf · 28.05%, the company has effectively and proudly surged forward towards self-sustenance to maintain a healthy balance

Gorogang Plant Hire At A Glance

Created in 2001 and registered as a Property Development Company in 2004•

Ventured into Plant Hire business in 2004 and later ventured into Construction•

100% Black owned and level 2 contributor to the BBBEE•

CIDB Rating 9CE PE, 6GP PE•

SABS ISO 9001:2008 certified•

Plant Value: R 58 169 168.82•

Member of the Contractors Plant Hire Association (CPHA)•

National Footprint with projects in 5 provinces.•

Revenue of R 215 Million in the 2014 financial year•

35 x Interest cover•

OHSAS 18001 and ISO 14001 Management System in place•

Business Plan

Mission Statement

We are an output driven enterprise with a considerable amount of emphasis on quality, time and cost.

It is our intention to ensure that quality service will always be delivered to all our clients timeously and

in conformity with their specific needs, and in compliance with all relevant and applicable laws, taking

into account the Triple Bottom Line dimensions of people, planet and profits. It is this recognition of the

indivisibility of these dimensions that has always informed our decision-making process.

Vision Statement

Gorogang Plant Hire aims to become the most successful construction company providing the best

service to our customers whilst maximising profits.

4

Page 5: Excellence in Infrastructure Development › Gorogang Profile.pdf · 28.05%, the company has effectively and proudly surged forward towards self-sustenance to maintain a healthy balance

Business Plan Cont...

Our Strategic Objectives

Double our order book to R1 billion in 2014/15 financial year•

Improve our operating performance and efficiency•

Reinforce our Plant & Equipment Investment•

Expand our footprint into other Provinces•

Diversify Plant investment•

Continuously develop and enhance our talent pool•

Our Core Values

Gorogang Plant Hire adopts RAFT (Responsibility, Accountability, Fairness and Transparency) principles,

as cornerstone of corporate governance. In addition to these principles, our core values are stated as

follows:

Serve and cherish our customers•

Achieve equity and fairness in the workplace•

Maintain hard work, dedication and achievement of results•

Show respect for employees and their positive contribution to the business•

Display integrity founded on honesty and ethical behavior•

Attain the development of all employees•

Zero tolerance to safety, health, environmental and quality incidents•

Aspect What we mean

Aims to become the most successful construc-tion company

This shows the future that Gorogang Plant Hire wants to stimulate towards their prog-ress.

Providing the best service to our customersThis shows the core that Gorogang Plant Hire want to preserve in its journey of becoming the most successful construction company

Optimising profit

Optimising profit is also the core that needs to be preserved as it is important to ensure that whilst we envision the future, the present also need to be met

5

Page 6: Excellence in Infrastructure Development › Gorogang Profile.pdf · 28.05%, the company has effectively and proudly surged forward towards self-sustenance to maintain a healthy balance

Financial Performance

The current volatility of the global markets and their inherent risks necessitate perpetual monitoring of

an entity’s financial performance and continuous review of managerial decisions. In the same spirit of

managing the company’s resources and directing the company’s vision, Gorogang Plant Hire has always

taken prudent measures towards the achievement of financial stability and operational efficiency. The

results of the past three years have shown significant achievements underpinned by increased order

book and revenue growth.

Gross Profit Margin

The company has over the years displayed lucrative results with regard to its gross profit margins, as it

did in many other areas of quantitative and qualitative performance, reaching a high margin of 54% in

2013, against a reported industry median of around 20%. This has been due to the company’s effective

cost control measures and procurement policies that have translated to good, reliable and productive

relationships with all its service providers, and investors alike.

R 13 447 486 R 51 484 098 R 71 258 873 R 136 190 457

2012 R 2013 2014 Accumulative

GrossProfit

R 0

R 20,000,000

R 4,000,000

R 60,000,000

R 80,000,000

R 100,000,000

R 140,000,000

R 120,000,000

R 160,000,000

Gross Profit 2 per. Mov. Avg. (Gross Profit) 2 per. Mov. Avg. (Gross Profit)

Gross Profit - 2012 - 2014

6

Page 7: Excellence in Infrastructure Development › Gorogang Profile.pdf · 28.05%, the company has effectively and proudly surged forward towards self-sustenance to maintain a healthy balance

Financial Performance Cont...

As the pricing strategy is one of the key success factors in the construction industry since

any underpricing may result in failure to deliver on a project or lower margins, the upturn in the

profits of Gorogang Plant Hire clearly demonstrates the company’s ability to manage and maintain

its operational efficiency and monitor its costs on a constant basis.

Return on Equity (ROE)

The return on equity, as a measure of how successful an entity has used equity to attain its key financial

objectives, that is, to remain viable in the long run and to increase the wealth of its owners, has always

been very high and commendable for Gorogang Plant Hire. This means that Gorogang shareholders

are reaping far greater benefits than in comparable entities.

Return on Asset

As the total asset base of Gorogang Plant Hire continues to grow, year in, year out, so have the returns

generated by the effective employment of these assets. The company’s performance in this regard has

always shown impressive results, reaching a high of 44.19% in 2013. This is due to the management’s

vision to transform the company into a formidable force in the construction industry in the next few

years, and to book itself a place among other major industry players.

2010 2011 2012 2013 2014

5.2 10.827.4

95.3

215.65 Year Revenue

Year

Re

ven

ue

- M

illi

on

s

7

Page 8: Excellence in Infrastructure Development › Gorogang Profile.pdf · 28.05%, the company has effectively and proudly surged forward towards self-sustenance to maintain a healthy balance

Financial Performance Cont...

Capital Structure

Our capital form is structured in order to ensure lower cost funding for our expansion, primarily in plant

and equipment. We always intend to achieve optimal capital structure by having the right mix of capital

sources (debt and equity) that maximizes shareholder value while minimizing the cost of capital, which

gives the company more power to acquire more funding from other sources should a need arise.

Debt-Equity Ratio

The debt-equity ratio measures the percentage of total debt, both long-term and short-term, to the

equity of the entity, and Gorogang Plant Hire has made tremendous strides in improving its debt-equity

position during the past 3 years of operation. From a high ratio of 80.98% in 2012 to a fair figure of

28.05%, the company has effectively and proudly surged forward towards self-sustenance to maintain a

healthy balance of its equity and liabilities. Maintaining such a position will cushion the company in times

of rising interest rates and particularly during downturn in the industry.

60.00%

50.00%

40.00%

30.00%

20.00%

10.00%

0.00%2012 2013 2014

90.00%

80.00%

70.00%

Debt Equity Ratio

8

Page 9: Excellence in Infrastructure Development › Gorogang Profile.pdf · 28.05%, the company has effectively and proudly surged forward towards self-sustenance to maintain a healthy balance

Financial Performance Cont...

Interest Cover Ratio

The interest cover ratio measures the ability of an entity to meet its interest obligations from avail-

able profits, and is a measure of an entity’s solvency. Gorogang Plant Hire has done exceptionally well

in this respect in the past 3 years and steadfastly maintained a two digit ratio, ranging between 28.32%

and 39.14%. These attained ratios are impressively way above many other entities and they generously

create a comfort zone for our investors. This is attributed to the relentless efforts by Gorogang manage-

ment to generate more than adequate profits to sustain the company, even in turbulent times, as well

as sustain the livelihood of all its dedicated employees and all other related stakeholders., and to book itself a place among other major industry players.

Total Assets to Total Debt

This ratio indicates the number of times debt is covered by assets, and Gorogang Plant Hire has ex-

perienced continuous growth in its ratio during the past 3 years. From a ratio of 2.23 times in 2012,

it doubled to 4.57 in the 2014 financial year. As the higher the ratio means the lower the risk is for

investors and creditors, Gorogang Plant Hire has presented itself as a potential and trusted investment

vehicle and sustainable trading partner.

9

2012 2013 2014

Total Assets to Dept Ratio

Interest Cover Ratio

Interest Cover Ratio

2.3 3.23 4.57

Page 10: Excellence in Infrastructure Development › Gorogang Profile.pdf · 28.05%, the company has effectively and proudly surged forward towards self-sustenance to maintain a healthy balance

Financial Performance Cont...

Bidding

The tendering and bidding department of Gorogang Plant Hire always works tirelessly and diligently to

advance the vision and mission of the company. Its meticulous efforts and dedication have won the com-

pany numerous long-term valuable contracts over and above several other short and moderate-term

contracts. The results of the first quarter of 2014 are a self-testimony of the unwavering momentum of

the bidding team to maintain and augment the self-sustainability of the entity. More than three hundred

million worth of tenders were awarded to Gorogang Plant Hire in the first quarter of 2014 alone, as

shown in the graph below.

10

January 2014 February 2014 March 2014 April 2014

Gorogang Plant HireTenders Awarded: January 2014 - April 2014

Tenders Awarded

Te

nd

ers

Val

ue 140 000 000

120 000 000

100 000 000

80 000 000

60 000 000

40 000 000

20 000 000

0

200 000 000

180 000 000

160 000 000

Gorogang Plant Hire: Tenders Awarded during the period February 2014 to April 2014

Page 11: Excellence in Infrastructure Development › Gorogang Profile.pdf · 28.05%, the company has effectively and proudly surged forward towards self-sustenance to maintain a healthy balance

Financial Performance Cont...

This achievement, as depicted in the foregoing chart, expectedly reflects itself as an exquisite long-term

trend that is increasingly steering the company in an upward corporate trajectory.

Our order book has consistently grown in the midst of the global recession and credit crisis that hap-

pened during 2008/2009. Although the construction sector has been hardest hit, our robust business

relationship and experienced human capital continues to give us a competitive advantage and thereby

ensuring business sustainability. All our projects have been completed within time, cost, quality and safety

standards approved.

11

2002 2004 2006 2008 2010 2012 2014 20160

50

100

150

200

250

300

Order Book Trend Since 2003

350

400

Te

nd

er

Val

ue

- M

illi

on

s

Page 12: Excellence in Infrastructure Development › Gorogang Profile.pdf · 28.05%, the company has effectively and proudly surged forward towards self-sustenance to maintain a healthy balance

Financial Performance Cont...

The total value of tenders awarded to Gorogang Plant Hire has ballooned from a single digit value in

2003 to almost a billion rand by the first quarter of 2014. This trend is focussed to continue in this direc-

tion, and is expected to pass the billion rand mark in the third quarter of 2014.

131 6

217 5 12

70

7

110

240

402

894

5 Year Revenue

600

500

400

300

200

100

0

2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014Projected

Total

800

900

700

12

Page 13: Excellence in Infrastructure Development › Gorogang Profile.pdf · 28.05%, the company has effectively and proudly surged forward towards self-sustenance to maintain a healthy balance

Our Human Capital

Human Capital measures the economic value of an employee’s skills set. It is the stock of

competence, knowledge, personality attributes and ability to perform duties and responsibilities.

Gorogang Plant Hire prides itself in a team of qualified and hardworking employees, with the right

skills and knowledge that translate to practical efficiency and intellectual proficiency. In our restless

bid to deliver quality work and reach our full potential, the company always endeavours to recruit

qualified personnel, as we also invest in educating and training them even further. This investment in

our employees is dedicated to the empowerment of our staff and to ensure a continuous presence of

efficiency amongst our hard-working workforce.

Qualifications & Accreditations

The level of skill present among our workforce is well represented by the number of individuals with the

correct qualifications as illustrated in the graph below. This affirms the company’s efficiency and ability

to deliver with every project.

13

Key Personnel (Contracts Manger and Site Agents Only)

Qualifications & Accreditations

12

10

8

6

4

2

0

N Dip Eng B Tech Eng Pr Tech / Pr Tech Eng Masters

Qualifications and Accreditation

Hu

man

Cap

ital

Page 14: Excellence in Infrastructure Development › Gorogang Profile.pdf · 28.05%, the company has effectively and proudly surged forward towards self-sustenance to maintain a healthy balance

Our Human Capital Experience

Our high level of experience, as depicted below, contributes to the quality of our human capital. Our

employees are not just qualified but also highly experienced in the relevant and diverse fields of our

business.

14

120

100

80

60

40

20

0Roads and Stormwater Water and Reticulation Building Electrical and Mechanical

Key Personnel (Contracts Manger and Site Agents Only)

Acumulative Years of Experience

Field Of Service

Ye

ars

of

Ex

pe

rie

nce

Page 15: Excellence in Infrastructure Development › Gorogang Profile.pdf · 28.05%, the company has effectively and proudly surged forward towards self-sustenance to maintain a healthy balance

Our Track Record Cont...

Building ProjectBuilding Project

Our Track Record Cont...Our Track Record

Water & Sanitation Projects

Project Name Employer Project Value Status Reference

Construction of Houtriver Regional Scheme

Polokwane

MunicipalityR4,2 M Completed

Mr Rapetswa

015 290 2080

Tshishive, Mulodi, Mangaya Reticulation of water to RDP level – Phace 11

Vhembe District

MunicipalityR17,3 M Completed

A Gangashe015 960 2000

Mukumbani, Tshilapfene, Tshuhungululu, Radali, ngwenani, Mavhola, Gondeni and Lunungwi villages: Upgrading and Extension of Internal Reticulation Networks - Phase 3

Vhembe District

MunicipalityR24,3 M Completed

MT Maku-mule

015 360 2000

Construction of Jane Furse to Lobethal bulk water supply

Sekhukhune District

MunicipalityR55.8 M Current

M Machaba013 262 7536

Zaaiplaas Bulk Water Supply and Reticulation

Sekhukhune District

MunicipalityR19 M Completed

G Nkonyani

015 296 0005

Dzindi RL2, RL3, RL4 and RL6 Bulk Water Connection and Reticulation Network - Phase 3

Vhembe District

MunicipalityR10 M

CompletedN Mutele

071 302 6118

Xikundu Mhinga Bulk Water Supply Saselamane, Botsoleni, Maphope, Mabilingwe Bulk Pipeline and Storage

Vhembe District

MunicipalityR34 M Current

M Nemanane

015 960 200

Xhora Water Supply Scheme: Construction of Xhora off Channel Storage Dam

Amathole District

MunicipalityR195 M Current

N Bongoza

043 721 0136

Construction of Protea Park Bulk Outfall Sewer Pipeline

Westonaria Local

MunicipalityR11.9 M Current

T C Ndlovu

011 278 3000

15

Page 16: Excellence in Infrastructure Development › Gorogang Profile.pdf · 28.05%, the company has effectively and proudly surged forward towards self-sustenance to maintain a healthy balance

Project Name Employer Project Value Status Reference

Upgrading of Mmakau Sport FacilityBojanala Platinum

District MunicipalityR7.8 M Completed

S Maluleke014 590 4603

Construction of Damonsville SportsFacility

Madibeng Local Municipality

R4 M CompletedTakane

018 464 4482

Construction of a New Sports Complex in Jouberton

City of Matlosana R8.9 M CurrentE Motsemme018 487 8000

Restorations and Repairs at Moriting Primary SchoolInfrastructure Development

Gauteng province R8 M CurrentTLebudi

076 805 2109

Building Project

Our Track Record Cont...

16

Page 17: Excellence in Infrastructure Development › Gorogang Profile.pdf · 28.05%, the company has effectively and proudly surged forward towards self-sustenance to maintain a healthy balance

Our Track Record Cont...

Roads and Stormwater

Project Name Employer Project Value Status Reference

SPDC-2010-MOT-CIVIL (Provision of civil infrastructure)

Automotive Supplier Park ROSSLYN

R6.7 M CompletedW Maleka

012 564 5000

Upgrading of Malatane bridgeCapricorn District

MunicipalityR4,7 M Completed

T Muladzi

072 607 8925

Upgrading of Arterial Roads in Molepo Maja Chuene Cluster - Phase 2 (Paledi)

Polokwane Municipality

R 8.4 M CompletedP Meiring

015 296 8925

Maintenance of Road Mashatamohane (R37) to Bothashoek

Limpopo Dept. of Roads and Transport

R7.3 M CompletedA Matshimbe015 294 0989

Upgrading of Shakung Road –

Phase 2Madibeng Municipality R13 M Completed

O Bontsi

012 318 9100

Upgrading & Construction of Roads and Stormwater Infrastructure

Ekurhuleni Metropolitan Municipality

93 M CompletedD Sadiki

011 999 4536

Upgrading of Mercury Roads at N12 intersection: Jouberton

City of Matlosana R9.7 M CompletedNtlatleng

018 487 8023

Upgrading of Rankotea Road and Asso-ciated Stormwater System - Phase 1

Madibeng Local Munici-pality

R16 M CompletedM Juda

012 318 9100

Construction of Non-Motorised Trans-port Infrastructure (Bicycle Lanes) Mamelodi, Phatudi, Ledwaba Roads (Section A)

Gauteng Department of Roads and Transport

R4.1 M CompletedMr Lepheane082 370 2309

17

Page 18: Excellence in Infrastructure Development › Gorogang Profile.pdf · 28.05%, the company has effectively and proudly surged forward towards self-sustenance to maintain a healthy balance

Our Track Record Cont...

Roads and Stormwater

Project Name Employer Project Value Status Reference

Projects allocated to Gorogang Plant Hire for 2012/2013 Financial Year

Steve Tshwete Local Municipality

R2.8 M CompletedL Silolo

013 249 7350

Construction of streets, stormwater and sidewalks in Sebokeng Zone 7

Emfuleni Local Municipality

R6,9 M CurrentMorake Sefuthi082 512 6771

Supply and Delivery of Plant Hire and Equipment on an as and when required basis for a period of three (3) years

Merafong Local Munici-pality

R0.5 M CompletedN Moyo

018 788 9652

Upgrading and Construction of Roads and Stormwater Infrastructure in Ekurhuleni Region

Ekurhuleni Metropolitan municipality

R215 M CurrentS Xoloza

011 999 6568

Upgrading of Gravel roads to surfaced Roads including Stormwater Drainage

Johannesburg Roads Agency

R31.5 M CurrentG Sidinile

011 298 5000

Upgrading of Fafung to Rasai Road (Phase 1)

Madibeng Local Municipality

R9.9 M CompletedM Juta

012 318 9100

Upgrading of Rankotea (Road Phase 2)Madibeng Local

MunicipalityR5.5 M Completed

M Juta012 318 9100

Preventative Maintenance and Rehabilitation of Roads D2535 from Marble Hall

DRT-Limpopo R21 M CurrentS Makhalichi

015 291 5377

Preventative Maintenance and Rehabilitation of Roads R25

DRT-Limpopo R25.8 M CurrentS Makhalichi

015 291 5377

Re-gravelling and Maintenance Operation of Roads D781 in Pretoria

DRT-Gauteng R5 M CurrentM I Matji

011 355 7311

18

Page 19: Excellence in Infrastructure Development › Gorogang Profile.pdf · 28.05%, the company has effectively and proudly surged forward towards self-sustenance to maintain a healthy balance

Plant and Equipment Cont...

Discription Quantity Year of Manufacture Size Total

Cat Grader (140G) 1 1996 140G

7

Cat Grader (140G) 1 1998 140G

Cat Grader (140H) 1 2006 140H

Cat Grader (140H) 1 2009 140H

Cat Grader (140H) 1 2009 140H

Cat Grader (140K) 1 2012 140K

Cat Grader (140K) 1 2014 140K

Daewoo Excavator 220 1 2008 20Ton

7

Daewoo Excavator 225 1 2010 22.5Ton

Daewoo Excavator 225 1 2013 22.5Ton

Daewoo Excavator 225 1 2014 22.5Ton

Daewoo Excavator 255 1 2011 25Ton

Daewoo Excavator 300 1 2012 30Ton

Daewoo Excavator 300 1 2013 30Ton

Cat TLB 4X4 1 2004 4X4

4Bell TLB 4X4 1 2006 4X4

Cat TLB 4X4 1 2014 4X4

Cat TLB 4X4 1 2012 4X4

Plant and Equipment

19

Page 20: Excellence in Infrastructure Development › Gorogang Profile.pdf · 28.05%, the company has effectively and proudly surged forward towards self-sustenance to maintain a healthy balance

Discription Quantity Year of Manufacture Size Total

Merc Benz Water Tanker 1 2003 16000 L

6

Merc Benz Water Tanker 1 2004 16000 L

Merc Benz Water Tanker 1 2005 16000 L

Merc Benz Water Tanker 1 2006 16000 L

Merc Benz Water Tanker 1 2007 16000 L

Merc Benz Water Tanker 1 2009 16000 L

Tata Tipper 10m3 1 2008 10m³

21Tata Tipper 10m3 2 2011 10m³

Merc Benz Axor 2628 Tipper 8 2012 10m³

Merc Benz Axor 2628 Tipper 10 2014 10m³

Bomag Roller 216 1 2011 16Ton

5Bomag Roller smooth BW 212 1 2010 12Ton

Bomag Roller smooth 1 2007 19Ton

Hamm Smooth Roller 3412 1 2008 12Ton

Bomag Vipac 390 2 2012 390 HA

7Bomag Vipac 650 3 2013 73P2A HA

Bomag Vipac 750 1 2012 750 HA

Bomag Vipac 900 1 2010 900 HA

Plough 2 2009 2

Mercedes Benz 3550 lowbed 1 2013 3550 1

Mercedes Benz Atego 1517 1 2008 1517 1

Lowbed Trailer 1 2013 3 Axle2

End Tip Traler 1 2013 30m³

Diesel Bowser 4 2012 1500L7

Diesel Bowser 3 2014 1500L

Generator 1 2013 4.2 Kw 1

Water Pump 1 2013 75mm 1

Support Vehicles (Bakkies) 16 2011 - 2014 16

Pressure Testing Equipment 2 2013 2

Plant and Equipment Cont...

20

Page 21: Excellence in Infrastructure Development › Gorogang Profile.pdf · 28.05%, the company has effectively and proudly surged forward towards self-sustenance to maintain a healthy balance

Plant and Equipment Cont...

Our order book has shown rapid growth over the years and in ensuring the sustainability

of the company, we have hugely invested in the plant and equipment by ensuring that we make

strategic choices that maximize cash flows, even at the expense of lowering near term earnings.

These assets contribute substantially towards the future of the company. Our capital structure has

shown how our equity has been reinvested into the company with the help of debt capitalizing on our

excellent credit rating as a result of the credit worthiness of the company. Our retained earnings has

grown over the years fully supported by efficiency in working capital management.

SHE Perspective

“All accidents are preventable”.

Gorogang Plant Hire regards every single incident occurring at its sites as serious and takes whatever

step that is necessary and appropriate in law to prevent and, whenever they occur, mitigate their adverse

effects. The company has established a safety management system aimed at achieving zero percent inci-

dents. Every project site has a very effective safety file underpinned by the SHE Policy (attached here-

under) and adherence to all Occupational Health and Safety Act (Act 85 of 1993) and OHSAS 18001.

These are some of the activities we have performed and are still performing in our quest to achieving

a zero percent incidents:

24.2

43.3

94.7

8.79.35.5

3.7

70

80

90

100

50

60

30

40

10

20

02009 2010 2011 2012 2013 2014 Total

Plant has become a competitive edge in a highly competitive construction in-dustry - Our distinctive edge in this tight industrial competition.

Property, Plant and Equipment

21

Page 22: Excellence in Infrastructure Development › Gorogang Profile.pdf · 28.05%, the company has effectively and proudly surged forward towards self-sustenance to maintain a healthy balance

SHE Perspective Cont...

A health and safety risk management program is maintained which cultivate awareness of risks, and •

empowers employees to identity and take action to eliminate / minimize and control identified

risks.

All health and safety issues are executed according to legislation through daily, weekly monthly and •

annual inspections, meetings, reports and safe working procedures.

The SHE policy is reviewed annually based on the involvement of member and actual incident oc-•

currences.

The employees are adequately trained, supervised and provided with the means and equipment to •

assist them in performing their work in a safe health manner.

Compliance with safety and health legislation, project framework, as well with agreements and good •

international practice is encouraged, the demonstration of which, has placed us in the first position

when it comes to safety file development. We are now at 100% on the list of safety files that have

undergone evaluation. The reason to this assertion lies on the fact that out of the 15 safety files

evaluated over the last 3 months by our clients, none was rejected.

Any safety and health related issues brought to the company’s attention is investigated and followed •

up.

We communicate with interested parties on SHE issues as relevant, and ensure that employees per-•

form their duties in a responsible manner

We provide advice to managers and employees on SHE issues applicable to the organization•

We ensure that standards, procedures and operational controls conform to requirements•

We monitor and measure SHE performance in accordance with SHE requirements•

We report to management on the performance of SHE management system as a means to facilitate •

continual improvement in the management system.

Safety, Health and Environmental Policy

Policy Statement

Safety, health and protection of the environment will form an integral part of our planning and

decision making. We will manage our company, wherever we do business, in an ethical way

that strikes an appropriate and well-reasoned balance between economic, social and

environmental needs.

22

Page 23: Excellence in Infrastructure Development › Gorogang Profile.pdf · 28.05%, the company has effectively and proudly surged forward towards self-sustenance to maintain a healthy balance

We are committed to:

• Conducting our business with respect and care for people and the environment

• Continually improving our safety, health and environmental performance

• Complying as a minimum, with all applicable legal and other agreed requirements

We will achieve these by:

• Implementing safety, health, environmental management system

• Informing and appropriately training all employees on SHE matters

• Responding effectively to SHE emergencies involving our actives and products.

Quality

Gorogang Plant Hire undertakes to provide a quality, innovative and unparalleled service to all our

customers, striving always to be sensitive and responsive to their needs. Our continuous improve-

ment projects ensure that all customers are provided with a competitive service. (Please see our SABS

ISO9001:2008 Certificate below). We acknowledge that each employee is a valuable asset and com-

mitted to our growth and stability. We strive to provide standards of excellence that will support our

business strategy.

To achieve our Quality Policy the company has set the following key objectives:

Always meeting and exceeding our customer requirements,•

Maintaining a knowledgeable workforce. This is done by training and developing our people •

thereby improving our core competencies and their job satisfaction

Achieving zero percent quality incidents at the end of the project,•

Continuously improving our quality management system in line with changing customer needs. This •

is achieved by using feedback from customers to improve our quality and service.

Reducing warranty claims•

Reducing cost of failures•

All these objectives are underpinned by the drive to do things RIGHT THE FIRST TIME and thereby

minimizing delays, damages and improving customer satisfaction.

23

Page 24: Excellence in Infrastructure Development › Gorogang Profile.pdf · 28.05%, the company has effectively and proudly surged forward towards self-sustenance to maintain a healthy balance

Transformation at Gorogang Plant

Broad-Based Black Economic Empowerment (“BEE”) aims at substantially increasing black

participation at all levels in the economy. This strategic imperative tries to redress the imbalances

of the past by transferring more ownership, management and control of South Africa’s financial and

economic resources to the majority of its citizens. It also aims to ensure broader and meaningful

participation in the economy by black people.

Gorogang Plant Hire believes that BBBEE is a component of the broader transformation imperative in

our country. The company further believes that the starting point of our sustainable business is to un-

derstand the moment we are in, to understand the forces that shape the behaviour of our customers,

and to lead our employees toward using our resources to create sustainable value for those customers..

The following are key characteristics of our Empowerment Charter:

Greater representation at Ownership level•

Building a Talent Pipeline•

Enterprise Development, with a specific focus on the skills set in our economic sector and industry•

Impacting on the environment in which Gorogang Plant Hire operates, through focusing on the key •

skills our country needs to sustain transformation.

Social Investment at Gorogang

Gorogang Plant Hire is very aware of the wider socio-economic environment within which it operates,

and believes that corporate social investment is more than writing a cheque. It is about contributing to

changing the environment that Gorogang Plant Hire operates in and building future employees, clients

and suppliers.

Over the last year, Gorogang Plant Hire has been involved in several projects aimed at uplifting the

community. The company also donated money to various institutions and catered for the needs of

the poor, as well. We will continue to support projects in this financial coming year, and anticipate

spending 1.5% of NPAT on corporate social responsibility.

24 25

Page 25: Excellence in Infrastructure Development › Gorogang Profile.pdf · 28.05%, the company has effectively and proudly surged forward towards self-sustenance to maintain a healthy balance

24 25

Page 26: Excellence in Infrastructure Development › Gorogang Profile.pdf · 28.05%, the company has effectively and proudly surged forward towards self-sustenance to maintain a healthy balance

Gallery

Water and Sanitation Projects

Building Projects

Roads and Stormwater Projects

26 27

Page 27: Excellence in Infrastructure Development › Gorogang Profile.pdf · 28.05%, the company has effectively and proudly surged forward towards self-sustenance to maintain a healthy balance

Excellence in Infrastructure Development

Reg No.: 2004/06/067203/23Tel: +2712 665 1306Fax: +2712 344 0545

www.gorogang.co.za

26 27

Page 28: Excellence in Infrastructure Development › Gorogang Profile.pdf · 28.05%, the company has effectively and proudly surged forward towards self-sustenance to maintain a healthy balance

Excellence in Infrastructure Development

Head OfficeCambridge Office Park

5 Bauhinia StreetHighveld Technopark

Centurion

P.O Box 13645The Tramshed

0126

Tel: +2712 665 1306Fax: +2712 344 0545Cell: +2782 907 0250

Unit No.: 8125 Marshall Street

Polokwane0699

P.O Box 1120Bakone

0746

Tel: +2710 590 9502Fax: +2715 295 4304Cell: +2782 907 0250

1894 Blue Valley6 Edinburg Street

Midrand1685

P.O Box 115Noordwyk

1687

Fax: +2786 503 6615Cell: +2782 907 0250