Exception to Development Standard – Minimum Lot Size (Clause 4.6 Orange LEP) Riverside Centre (North Bloomfield), Orange One to Two Lot Subdivision Final: Version 3.0, 2 October 2020 Prepared for: Housing & Property, Department of Planning, Industry and Environment
Transcript
Page 1: Exception to Development Standard Minimum Lot Size ......Exception to Development Standard – Minimum Lot Size Clause 4.6 Orange LEP) Riverside Centre (North Bloomfield), Orange One

Exception to Development Standard –

Minimum Lot Size

(Clause 4.6 Orange LEP)

Riverside Centre (North Bloomfield), Orange

One to Two Lot Subdivision

Final: Version 3.0, 2 October 2020

Prepared for: Housing & Property, Department of Planning, Industry and Environment

Page 2: Exception to Development Standard Minimum Lot Size ......Exception to Development Standard – Minimum Lot Size Clause 4.6 Orange LEP) Riverside Centre (North Bloomfield), Orange One

2

2 Clause 4.6 Variation Request - Riverside Centre, Orange

Disclaimer:

This document may only be used for the purpose for which it was commissioned.

Changes to available information, legislation and schedules are made on an

ongoing basis and readers should obtain up to date information. TBA Urban accepts

no liability or responsibility whatsoever for or in respect of any use of or reliance upon

this report and its supporting material by any third party. Information provided is not

intended to be a substitute for site specific assessment or legal advice in relation to

any matter. Unauthorised use of this report in any form is prohibited.

Document Control:

Project Reference Number: 2020 / 56

Version No. Date Document Status Completed by

V1.0 24/08/2020 Draft Patrick Waite

V1.1 24/08/2020 Draft Peer Reviewed Peter Mangels

V2.0 28/08/2020 FINAL – post client review Patrick Waite

V3.0 02/10/2020 Updated in response to

Council’s add info request

(28 Sep 2020)

Patrick Waite

Document Release:

Issuing

Version

Issued Date Issued Purpose Director Approval Signature

V1.1 24 Aug 2020 Draft for client

review Peter Mangels

V2.0 28 Aug 2020

Final Draft –

post client

review

Peter Mangels

V3.0 2 October Updated Final Peter Mangels

Page 3: Exception to Development Standard Minimum Lot Size ......Exception to Development Standard – Minimum Lot Size Clause 4.6 Orange LEP) Riverside Centre (North Bloomfield), Orange One

3

3 Clause 4.6 Variation Request - Riverside Centre, Orange

Contents

1. Summary ............................................................................................................................ 4

2. Summary ............................................................................................................................ 4

3. Site and Context .............................................................................................................. 4

4. Proposed development .................................................................................................. 6

5. Consideration of the Contravention of the Development Standard ....................... 7

6. Conclusion ...................................................................................................................... 14

Page 4: Exception to Development Standard Minimum Lot Size ......Exception to Development Standard – Minimum Lot Size Clause 4.6 Orange LEP) Riverside Centre (North Bloomfield), Orange One

4

4 Clause 4.6 Variation Request - Riverside Centre, Orange

1. Summary

This Clause 4.6 variation request has been prepared by TBA Urban in support of the

proposed one lot to two lot subdivision of the land at 1502 Forest Road, Orange

(subject site).

The request seeks to vary the Minimum Lot Size development standard prescribed for

part of the subject site under Clause 4.1 of the Orange Local Environmental Plan

2011 (OLEP 2011). The variation request is made pursuant to Clause 4.6 of the OLEP

2011.

The proposed subdivision seeks to rationalise the lot boundaries with the land use

zone boundaries as a means to facilitate future development.

2. Summary

The proposed development is as described in detail in the Statement of

Environmental Effects (SEE) prepared by TBA Urban. This variation request is to be

read in conjunction with the SEE.

The proposed subdivision seeks consent to subdivide the parent lot (Lot 1 in DP

1250343) which is 57.29 ha into two lots which will have site areas of 32.42 ha

(proposed lot 700) and 24.87 ha (proposed lot 701). The proposed configuration of

the proposed subdivision boundaries follows the existing land use zone boundaries

provided for by OLEP 2011.

The request to vary the Minimum Lot Size development standard is limited to an

isolated portion of land (subject portion) that is restricted to a 100 ha minimum lot

size despite the fact that the isolated portion is in-itself only ~10 ha in area.

The remaining area of the subject site is restricted to a minimum lot size of 1,000sqm,

or the land is not restricted to a minimum lot size development standard.

In this regard, this variation request is considered to be a matter of administration as

opposed to meritorious request.

The issue of the minimum lot size discrepancy is considered to be a short term issue

as the zoning of the local area is currently being reconsidered as part of the Orange

Health and Innovation Masterplan and will likely be rezoned in the near future.

3. Site and Context

Site Location

The subject site is located at 1502 Forest Road Orange NSW 2800, within the Riverside

Centre area of Bloomfield (North Bloomfield), and formally identified as Lot 1 DP

1250343. The site is approximately 3.6km south of the Orange City Centre and

Orange train station.

Page 5: Exception to Development Standard Minimum Lot Size ......Exception to Development Standard – Minimum Lot Size Clause 4.6 Orange LEP) Riverside Centre (North Bloomfield), Orange One

5

5 Clause 4.6 Variation Request - Riverside Centre, Orange

Site Details

The subject site (Lot 1 in DP 1250343) is 57.29ha is area, irregular in shape, and is

occupied by a range of medical, respite and treatment buildings.

The site is bound by Forest Road to the west, Huntley Road to the east, which

culminate to the north, and Bloomfield Road to the south.

The subject site is located within the Bloomfield Hospital precinct, which includes the

Orange Public Hospital, a mental Health Services Facility (Bloomfield South)

adjoining the hospital, and Riverside Centre (Bloomfield North), which most

previously was used as an Aging Disability and Home Care facility and closed in

2016. Refer to Figure 1.

Figure 1 - Site Map, showing proposed subdivision and notable use (source: Six Maps as adapted by

TBA Urban)

Land uses within the vicinity

The immediate land uses that adjoin Bloomfield include a golf course to the north

and south-east operated by the Orange Ex-Services Country Club, sports fields within

the centre of the precinct and additional fields north of the golf course at Sir Jack

Brabham Park.

A tertiary educational facility, which includes TAFE NSW, is located to the north-west,

and the Orange Agricultural Institute is located to the south-west.

Directly across the Forest Road from the public hospital is the newly constructed

Orange Private Hospital (1521 Forest Road), and further south is the Gosling Creek

aged care facility (1503 Forest Rd).

Page 6: Exception to Development Standard Minimum Lot Size ......Exception to Development Standard – Minimum Lot Size Clause 4.6 Orange LEP) Riverside Centre (North Bloomfield), Orange One

6

6 Clause 4.6 Variation Request - Riverside Centre, Orange

The Gosling Creek runs to the south of the site along Bloomfield Road.

4. Proposed development

The proposed development seeks consent for the subdivision of one lot to two lots,

to facilitate future development. Refer to Figure 2.

Lot 1 of DP 1250343 (site area of 57.29 ha) is proposed to be subdivided into:

- Proposed lot 700 which will have a site area of 32.42 ha, and

- Proposed lot 701 which will have a site area of 24.87 ha.

Figure 2 - Proposed subdivision layout (source: Survey of Proposed Subdivision Plan, Craig Jacques &

Assoc., Revision 6, 24/07/2020 as adapted by TBA Urban)

The configuration of the proposed subdivision will rationalise the subject lot

boundaries with the OLEP 2011 land use zoning boundaries. Refer to the Figure 5 for

diagrammatic representation.

Proposed Lot 701 will incorporate the north-eastern portion of R1 General Residential

zoned land, the south-eastern E2 Environmental Conservation zoned land and a

small portion of the E4 Environmental Living zoned land, and a fraction of the RE1

Public Recreation zoned and on the eastern boundary and RE2 Private Recreation

zoned land to the north to maintain lot access to Huntley Road, and Forest Road

respectively.

Page 7: Exception to Development Standard Minimum Lot Size ......Exception to Development Standard – Minimum Lot Size Clause 4.6 Orange LEP) Riverside Centre (North Bloomfield), Orange One

7

7 Clause 4.6 Variation Request - Riverside Centre, Orange

Proposed Lot 700 will incorporate a separate isolated portion of R1 General

Residential zoned land, and the majority of the E4 Environmental zoned land within

the precinct, and a vast portion of the SP2 Hospital zoned land.

The E2 Environmental Conservation zoned land is the subject of this variation request

and is later referred to as the subject portion.

Refer to Figure 3.

Figure 3 - Extract of land use zoning map, showing proposed subdivision (source: Orange Local

Environmental Plan 2011)

5. Consideration of the Contravention of the Development

Standard

Clause 4.6 provides a mechanism to enable the exercise of flexibility in applying

development standards under certain circumstances in order to achieve a better

outcome from the development.

Clause 4.6 also requires the concurrence of the Secretary to be obtained prior to the

granting of consent for development that contravenes a development standard.

The issue of the concurrence of the Secretary of the Department of Planning and

Environment is dealt with by Planning Circular PS 20–002 ‘Variations to development

standards’, dated 5 May 2020. This circular is a notice under 64(1) of the

Environmental Planning and Assessment Regulation 2000. A consent granted by a

consent authority that has assumed concurrence is as valid and effective as if

concurrence had been given.

The circular provides for assumed concurrence. Concurrence cannot be assumed

for a request for a variation to a numerical standard by more than 10 per cent if the

function is to be exercised by a delegate of the consent authority.

Page 8: Exception to Development Standard Minimum Lot Size ......Exception to Development Standard – Minimum Lot Size Clause 4.6 Orange LEP) Riverside Centre (North Bloomfield), Orange One

8

8 Clause 4.6 Variation Request - Riverside Centre, Orange

Consideration has been given to the following matters within this assessment:

• Varying development standards: A Guide, prepared by the Department of

Planning and Infrastructure dated August 2011.

• Relevant judgements issued by the Land and Environment Court.

Table 1: Consideration of proposed variation in form prescribed by the Department

of Planning, Industry and Environment’s ‘Application Form to vary a development

standard’.

Item Consideration / Comment

1 What is the name of the environmental planning instrument that applies

to the land?

Orange Local Environmental Plan 2011

2 What is the zoning of the land?

The land use zone to which proposed lot 701 relates includes:

• R1 General Residential

• E4 Environmental Living

• E2 Environmental Conservation

• RE1 Public Recreation – limited to portion of land required to

access Huntley Road

• RE2 Private Recreation – limited to portion of land required to

access Forest Road.

The land use zone to which proposed lot 700 relates includes:

• R1 General Residential

• E4 Environmental Living

• SP2 Infrastructure – Hospital

Refer to Figure 3 above.

3 What are the objectives of the zone?

R1 General Residential:

• To provide for the housing needs of the community.

• To provide for a variety of housing types and densities.

• To enable other land uses that provide facilities or services to meet the

day to day needs of residents.

• To ensure development is ordered in such a way as to maximise public

transport patronage and encourage walking and cycling in close

proximity to settlement.

• To ensure that development along the Southern Link Road has an

alternative access.

E4 Environmental Living:

• To provide for low-impact residential development in areas with special

ecological, scientific or aesthetic values.

• To ensure that residential development does not have an adverse effect

on those values.

Page 9: Exception to Development Standard Minimum Lot Size ......Exception to Development Standard – Minimum Lot Size Clause 4.6 Orange LEP) Riverside Centre (North Bloomfield), Orange One

9

9 Clause 4.6 Variation Request - Riverside Centre, Orange

• To provide for housing and complementary uses in an area with a

predominantly natural setting.

E2 Environmental Conservation:

• To protect, manage and restore areas of high ecological, scientific,

cultural or aesthetic values.

• To prevent development that could destroy, damage or otherwise have

an adverse effect on those values.

• To ensure development along the Southern Link Road has alternative

access.

RE1 Public Recreation:

• To enable land to be used for public open space or recreational

purposes.

• To provide a range of recreational settings and activities and

compatible land uses.

• To protect and enhance the natural environment for recreational

purposes.

• To ensure development is ordered in such a way as to maximise public

transport patronage and encourage walking and cycling in close

proximity to settlement.

• To ensure development along the Southern Link Road has alternative

access.

RE2 Private Recreation:

• To enable land to be used for private open space or recreational

purposes.

• To provide a range of recreational settings and activities and

compatible land uses.

• To protect and enhance the natural environment for recreational

purposes.

• To ensure development is ordered in such a way as to maximise public

transport patronage and encourage walking and cycling in close

proximity to settlement.

• To ensure development along the Southern Link Road has alternative

access.

SP2 Infrastructure:

• To provide for infrastructure and related uses.

• To prevent development that is not compatible with or that may detract

from the provision of infrastructure.

4 What is the development standard being varied?

Minimum subdivision lot size.

5 Under what clause is the development standard listed in the

environmental planning instrument?

Clause 4.1 (Minimum Lot Size).

6 What are the objectives of the development standard?

(a) to ensure that new subdivisions reflect existing lot sizes and patterns in the

surrounding locality,

Page 10: Exception to Development Standard Minimum Lot Size ......Exception to Development Standard – Minimum Lot Size Clause 4.6 Orange LEP) Riverside Centre (North Bloomfield), Orange One

10

10 Clause 4.6 Variation Request - Riverside Centre, Orange

(b) to ensure that lot sizes have a practical and efficient layout to meet

intended use,

(c) to ensure that lot sizes do not undermine the land’s capability to support

rural development,

(d) to prevent the fragmentation of rural lands,

(e) to provide for a range of lot sizes reflecting the ability of services

available to the area,

(f) (f) to encourage subdivision designs that promote a high level of

pedestrian and cyclist connectivity and accommodate public transport

vehicles.

7 What is the numeric value of the development standard in the

environmental planning instrument?

There are two Minimum Lot Size development standards that apply to the

subject site.

These are:

• 1,000sqm (U1) for the land zoned R1 (General Residential), E4

(Environmental Living), and

• 100 ha (AD) for the land zoned E2 (Environmental Conservation)

Refer to Figure 4.

Figure 4 - Extract of the minimum lot size zoning map, showing the proposed subdivision

(source: Orange Local Environmental Plan 2011)

Page 11: Exception to Development Standard Minimum Lot Size ......Exception to Development Standard – Minimum Lot Size Clause 4.6 Orange LEP) Riverside Centre (North Bloomfield), Orange One

11

11 Clause 4.6 Variation Request - Riverside Centre, Orange

8 What is proposed numeric value of the development standard in your

development application?

• Proposed lot 700 has a lot size area of 32.42 ha, and

• Proposed lot 701 has a lot size area of 24.87 ha.

Proposed Lot 700 complies with the applicable minimum lot size

development standards.

The portion of the land that is zoned E2 Environmental Conservation within

Proposed Lot 701 is restricted to a minimum lot size of 100 ha, despite being

only about 10 ha in site area itself.

9 What is the percentage variation (between your proposal and the

environmental planning instrument)?

• Percentage variation of Lot 701 to the 100 ha minimum lot size is

402.6%.

• Percentage variation of the isolated portion (~10 ha) restricted to 100

ha is 1000%.

• Percentage variation of existing parent lot (Lot 1 DP 1250343) to the

minimum lots size is 174.6%

It should be noted that compliance with this development standard is

impossible given the exiting portion of E2 Environmental Conservation

zoned land does not comply.

Accordingly, this considered to be an administrative variation request.

10 Clause 4.6(3)(a) Compliance with the development standard is

unreasonable or unnecessary in the circumstances of the case

Compliance with the building height development standard is

considered unnecessary and unreasonable in this circumstance as:

• The portion of land that is restricted to a minimum lot size of 100 ha is

only about 10 ha in area and inherently unable to comply with the

prescribed minimum lot size in and off itself, regardless of subdivision

configuration.

• There is no way to practically enforce a minimum lot size of 100 ha for

the subject portion of land given that the parent lot (Lot 1 DP

1250343) with a site area of ~57 ha already exhibits a non-

compliance with the subject minimum lot standard for this portion of

land (100 ha).

• The immediately adjoined R1 General Residential and E4

Environmental Living zoned land is afforded their own legal rights to

develop and use the land in accordance with the provisions of those

zones. In this regard, it would be unreasonable to enforce a 100 ha

minimum lot size beyond the subject portion of land.

• Despite the inherent non-compliance issue, the portion of the site that

is zoned E2 Environmental Conservation is still capable of achieving

the zone objectives:

• To protect, manage and restore areas of high ecological,

scientific, cultural or aesthetic values.

Page 12: Exception to Development Standard Minimum Lot Size ......Exception to Development Standard – Minimum Lot Size Clause 4.6 Orange LEP) Riverside Centre (North Bloomfield), Orange One

12

12 Clause 4.6 Variation Request - Riverside Centre, Orange

• To prevent development that could destroy, damage or otherwise

have an adverse effect on those values.

• To ensure development along the Southern Link Road has

alternative access.

Noting that this portion of land directly adjoins RE1 Public Recreation

zoned land to the south which is further connected to a large

contiguous expanse of land zoned E2 Environmental Conservation, it

is considered that this physical connection can assist in linking this

portion of land with the greater ecological network south of the site,

and thereby assisting with ‘restoring areas of high ecological value’.

• The zoning of the local and immediate area is being re-considered as

part of Council’s and the Department of Planning, Industry and

Environments proposal to create a Health and innovation Master

planned precinct which will leverage Orange Hospital as an anchor.

In this regard, the future of the minimum lot size standards is uncertain

for the local area and enforcing compliance for future integrity is

considered to be unreasonable and unnecessary.

11 Clause 4.6(3)(b) There are sufficient environmental planning grounds to

justify contravening the development standard.

It is submitted that the variation is well founded and is worthy of the

Council’s approval.

• The proposed subdivision will facilitate the alignment of lot boundaries

with the land use zoning boundaries which, in turn, will support the

achievement of orderly and economic land as guided by the

respective zone objectives.

• The proposal will support delivering on the intent of the strategic

planning which is being undertaken for the local area (Health and

Innovation Precinct).

• The variation will unlock land from a large landholding, which will

provide the opportunity to deliver land for business uses and

accommodation uses to support of key industry in the local area.

12 Is the development standard a performance based control?

Give details.

The development standard is a prescribed numerical standard and not a

performance based control.

(13) Clause 4.6(4)(a)(ii) Will the proposed development be in the public

interest because it is consistent with the objectives of the particular

standard and objectives for development within the zone in which the

development is proposed to be carried out?

Objectives of Clause 4.1 (Minimum Lot Size)

(a) to ensure that new subdivisions reflect existing lot sizes and patterns in

the surrounding locality,

Comment: The proposed subdivision reflects the land use zone

boundaries prescribed by the Orange Local Environmental Plan 2011.

(b) to ensure that lot sizes have a practical and efficient layout to meet

intended use,

Page 13: Exception to Development Standard Minimum Lot Size ......Exception to Development Standard – Minimum Lot Size Clause 4.6 Orange LEP) Riverside Centre (North Bloomfield), Orange One

13

13 Clause 4.6 Variation Request - Riverside Centre, Orange

Comment: Proposed subdivision lends itself well to future subdivisions

that will deliver on the specific land use zone objectives and

permitted uses.

(c) to ensure that lot sizes do not undermine the land’s capability to

support rural development,

Comment: The subject site does not include any rural development

zoned land.

Proposed lot sizes maintain significant land holding which will not

undermine the lands capability to achieve the respective zone

objectives.

(d) to prevent the fragmentation of rural lands,

Comment: The subject site does not include any rural development

zoned land.

(e) to provide for a range of lot sizes reflecting the ability of services

available to the area,

Comment: Proposal is for a facilitating subdivision, which will lend

future development in accordance with the land use zone

boundaries.

(f) to encourage subdivision designs that promote a high level of

pedestrian and cyclist connectivity and accommodate public

transport vehicles.

Comment: Proposal is for a facilitating subdivision. The proposal will

not preclude future development from promoting and delivering a

high level pedestrian and cyclist connectivity.

(14) Clause 4.6(5)(a) – Would non-compliance raise any matter of

significance for State or regional planning?

No. The proposed non-compliance is highly unique, and in its current

state, a non-compliance that can never be made to comply.

The proposed non-compliance is purely based on the specific

circumstances of the case and would not result in an unacceptable

precedent for the assessment of other development proposals.

(15) Clause 4.6(5)(b) – Is there a public benefit of maintaining the

development standard?

No. Strict compliance with the development standard would preclude

any appropriate subdivision opportunities for the subject portion of land

and by extension the subject site which would thwart the economic and

orderly use of the land.

(16) Clause 4.6(5)(c) – Are there any other matters required to be taken into

consideration by the Secretary before granting concurrence?

Matters relevant in the Planning Circular PS 20–002 ‘Variations to

development standards’, dated 5 May 2020, will need to be considered

by the Secretary.

(17) (6) Development consent must not be granted under this clause for a

subdivision of land in Zone RU1 Primary Production, Zone RU2 Rural

Landscape, Zone RU3 Forestry, Zone RU4 Primary Production Small Lots,

Zone RU6 Transition, Zone R5 Large Lot Residential, Zone E2 Environmental

Page 14: Exception to Development Standard Minimum Lot Size ......Exception to Development Standard – Minimum Lot Size Clause 4.6 Orange LEP) Riverside Centre (North Bloomfield), Orange One

14

14 Clause 4.6 Variation Request - Riverside Centre, Orange

Conservation, Zone E3 Environmental Management or Zone E4

Environmental Living if—

(a) the subdivision will result in 2 or more lots of less than the minimum

area specified for such lots by a development standard, or

(b) the subdivision will result in at least one lot that is less than 90% of

the minimum area specified for such a lot by a development

standard.

Note. When this Plan was made it did not include Zone RU2 Rural

Landscape, Zone RU3 Forestry, Zone RU4 Primary Production Small Lots or

Zone RU6 Transition.

The proposed development does not seek to subdivide land in Zone E2

(Environmental Conservation) zone.

In this regard, this subsection (6) of clause 4.6 is not considered to be

applicable to the site.

Furthermore, the intent of this clause is not considered to preclude

subdivision of land which adjoins land that is subject to the 100 ha

minimum lot size overlay.

6. Conclusion

Strict compliance with the minimum lot size development standard is unreasonable

and/or unnecessary in the circumstances of this case for the following reasons:

• The proposed non-compliance is highly unique resulting from an inherent

inconsistency in Orange Local Environmental Plan 2011, and in its current form

it is a non-compliance that can never be made to comply.

• Despite the non-compliance, the proposal is consistent with the objectives of

the minimum lot size standard.

• The proposal supports the intention of ongoing strategic planning for the local

area (Health and Innovation Precinct).

• Council’s support of the proposed variations will support the opportunity for

the economic and orderly development of the subject site.

• The variation to the development standard is supportable from environmental

planning grounds as it will not result in adverse environmental impacts.

Maintaining strict compliance with the development standard is not considered to

be in the public interest.

Based on the reasons outlined above, it is concluded that the request is well

founded and that the circumstances of the case warrant support for the

contravention of the development standard in this case.


Recommended