May-19 Central Electricity Authority Executive Summary on Power Sector Government of India विय मंालय Ministry of Power के रीय विय ाधिकरण भारत सरकार File No.CEA-CH-14-11/4/2018-Coordination Division
Transcript

May-19

Central Electricity Authority

Executive Summary on Power Sector

Government of India

विदयत मतरालयMinistry of Power

कनदरीय विदयत पराधिकरण

भारत सरकार

File NoCEA-CH-14-1142018-Coordination Division

SN Section A - Highlights of Power Sector Page

1 Electricity Generation for May-2019 (BU) 1A amp 1B

2 Generating Capacity Addition for May-2019 (MW) 2

3 List of Projects Commissioned in May-2019 3

4 All India Installed Capacity (MW) Region-wise as on 31-05-19 3

5 All India Installed Capacity (MW) Sector-wise as on 31-05-19 4

6 Transmission Lines Added during May-2019 (Ckms) 5

7 Transformation Capacity Addition during May-2019 (MVA) 6

8 Power Supply Position (Energy amp Peak) in May-2019 7

9 Peak Shortage of Power Supply (MW) in Different Regions 8-9

10 All India PLF Sector-wise for May-2019 10

11 T amp D and AT amp C Losses ()

12 All India Village Electrification

13 Average cost of Power amp Average Realisation

14 All India Coal consumption for Power Generation (MT)

1 Capacity Addition Targets and Achievements in 12th Plan 12th Plan 2017-18 and 2018-19 12

2 Capacity Addition Targets amp Achievements during May-2019 13

3 Installed Capacity in various Regions including their shares 14-19

1 Programme and Achievements of Transmission Lines in May-2019

2 List of Transmission Lines CommissionedReady for commissioning during May-2019

1 Programme and Achievements of Sub-Stations in May-2019

2 List of Sub Stations commissionedready for commisssioning in May-2019

1 Electricity Generation (MU) Targets and Achievements for 2019-20 22

1 Power Supply Position (Provisional) for May-2019 23

2 Peak Demand and Peak Met (Provisional) for May-2019 24

3 Power Supply Position (Revised) for Apr-2019 25

4 Peak Demand and Peak Met (Revised) for Apr-2019 26

5 Notified Power cuts Restrictions on Industries during May-2019 27

6 Power Supply to Agricultural Sector during May-2019 28

1 Growth of Installed Capacity since 6th Plan 29

2 Growth of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since 2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in May-2019

1 Rate of sale of power for the year 2016-17 33-41

Section H - Rate of sale of power for the year 2016-17

Executive Summary for the Month of May-2019

32

11

20

21

31

Section B - Capacity Addition

Section C - Transmission Lines

Section D - Sub Stations

Section E - Electricity Generation

Section F - Power supply position

Contents

Section G - Growth of Power Sector

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1Electricity Generation (Conventional Sources) for May-2019 (BU) 1

2 Generating Capacity Addition for May-2019 (MW) 2

3 List of Projects Commissioned in May-2019 3

4 All India Installed Capacity (MW) Region-wise as on 31-05-19 3

5 All India Installed Capacity (MW) Sector-wise as on 31-05-19 4

6 Transmission Lines Added during May-2019 (Ckms) 5

7 Transformation Capacity Addition during May-2019 (MVA) 6

8 Power Supply Position (Energy amp Peak) in May-2019 7

9 Peak Shortage of Power Supply (MW) in Different Regions 8-9

10 All India PLF Sector-wise for May-2019 10

11 T amp D and AT amp C Losses ()

12 All India Village Electrification

13 Average cost of Power amp Average Realisation

14 All India Coal consumption for Power Generation (MT)

Section A - Highlights of Power Sector

11

File NoCEA-CH-14-1142018-Coordination Division

Achievement

May-19

Thermal 9866 182

Nuclear 365 1465

Hydro 1408 3184

Bhutan Import 035 1314

All India 11675 511

Type

Thermal

Nuclear

Hydro

Bhutan Import

All India

1A

25151

059034

690649

37921824

7672

Change wrt Apr-18 to May-18

Electricity Generation During Apr-18 to May-18 amp Apr-19 to May-19 (BU)

Apr-18 to May-18 Apr-19 to May-19

319

12983

5142260121496

11107

033

19332

6941

180

9689

18990

1 Electricity Generation for May-2019 (BU)

May-19

TypeAchievement

May-18

Targets Change of

Achievement

wrt May-2018

10357

031

3535

12042

1068

11107

11675

10800

10900

11000

11100

11200

11300

11400

11500

11600

11700

11800

BU

May-18 May-19

2149622601

000

5000

10000

15000

20000

25000

BU

Apr-18 to May-18 Apr-19 to May-19

File NoCEA-CH-14-1142018-Coordination Division

Generation from

Conventional

Sources

Generation

from

Renewable

Sources

Total Generation from

Conventional Sources

Generation from

Renewable SourcesTotal

Growth in

Conventional

Generation

Growth in

Renewable

Generation

Growth in

Total

Generation

(BU) (BU) (BU) (BU) (BU) (BU) () () ()

116746 12300 129046 111070 9256 120326 511 3289 725

Note Tentative

SlNo

Source-Wise All

India

Generation

from

Renewables Apr-2019 Apr-2018 Apr-19 to Apr-19 Apr-18 to Apr-18

1 Wind 3592220 3322740 3592220 3322740

2 Solar 4168670 3178880 4168670 3178880

3 Biomass 235010 255430 235010 255430

4 Bagasse 1201290 1263940 1201290 1263940

5 Small Hydro 518130 384140 518130 384140

6 Others 38770 38640 38770 38640

Total 9754090 8443770 9754090 8443770

Note 1) Data as received from SLDCElectricity Department of the respective states or from the electricity department

2) 25 MW Khopli-II project of NEEPCO located in Assam is considered under Small Hydro wef 01072018 Earlier it was considered under Hydro

3) Previous month generation has been taken as SLDC has not furnished generation data for the current month

Electricity Generation (Conventional and Renewable Sources)

May-2019 May-2018 Growth

1B

For the Month of Cummulative for the period

All India Generation From Renewables (All Figures are in MU)

File NoCEA-CH-14-1142018-Coordination Division

Achievement Targets Achievement

May-18

Thermal 0 660 0 NA

Hydro 110 0 0 000

Nuclear 0 0 0 NA

All India 110 660 0 000

Apr-18 to May-18 Apr-19 to May-19 Change wrt Previous Year

Thermal 69755 0 -1000

Hydro 110000 0 -1000

Nuclear 0000 0 NA

All India 179755 0 -1000

NA- Not Applicable

2

2 Generating Capacity Addition for May-2019 (MW)

Generating Capacity Addition during Apr-18 to May-18 amp Apr-19 to May-19

NA- Not Applicable

Achivement

wrt May-2018Type

May-19

1100

000

20

40

60

80

100

120

1May-18 May-19

0000

20000

40000

60000

80000

100000

120000

140000

160000

180000

200000

Apr-18 to May-18 Apr-19 to May-19

File NoCEA-CH-14-1142018-Coordination Division

1

2

3

Nuclear Hydro RES Grand TotalRegion Coal Lignite Gas Diesel Total

Northern 5036020 158000 578126 000 5772146 162000 1970777 1441143 9346066

Western 7280862 154000 1080649 000 8515511 184000 754750 2326226 11780487

Southern 4304202 314000 647366 56158 5321726 332000 1177483 3894034 10725243

Eastern 2746364 000 10000 000 2756364 000 494212 140300 3390876

North-East 77002 000 177581 3600 258183 000 142700 32429 433311

Islands 000 000 000 4005 4005 000 000 1773 5778

ALL INDIA 19444450 626000 2493722 63763 22627934 678000 4539922 7835904 35681760

Note Captive Genaration is not included in the total Captive Power capacity as on 31032017 RES as on 30042019 3

Thermal

Nuclear

3 List of Projects Commissioned During May-2019

4 All India Installed Capacity (MW) Region-wise as on 31-05-19

NIL

NIL

Thermal

NIL

Hydro

22627934

678000

4539922

7835904

35681760

51529

000

5000000

10000000

15000000

20000000

25000000

30000000

35000000

40000000

Thermal Nuclear Hydro RES Total Captive

Thermal Nuclear Hydro RES Total Captive

Total = 356817604

File NoCEA-CH-14-1142018-Coordination Division

Sector

Coal Lignite Gas Diesel Total

State 6407650 129000 711871 36393 7284913 000 2987880 234893 10507686

Private 7468800 183000 1058060 27370 8737230 000 339400 7437781 16514411

Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663

All India 19444450 626000 2493722 63763 22627934 678000 4539922 7835904 35681760

State 10507686

Private 16514411

Central 8659663

Electricity Generation (MU) Targets and Achievements for 2016-17

5 All India Installed Capacity (MW) Sector-wise as on 31-05-19

4

Grand TotalTHERMAL

Nuclear Hydro RES

RES as on 30042019

State 10507686 30

Private 16514411 46

Central 8659663 24

All India Installed Capacity(MW) (Sector-Wise)

File NoCEA-CH-14-1142018-Coordination Division

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 kV

220 KV

All India

5

0 0

6 Transmission Lines Added during May-2019 (Ckms)

May-18 May-19

0 0

0 0

0 0

623 474

720 503

1343 977

Transmission Lines Added duringApr-18 to May-18 ampApr-19 to May-19 (Ckms)

Apr-18 to May-18 Apr-19 to May-19

1201 904

2106 1451

0 0

242 53

663 494

1343

977

0

200

400

600

800

1000

1200

1400

1600

All India

Ckm

s

May-18 May-19

2106

1451

0

500

1000

1500

2000

2500

All India

Ckm

s

Apr-18 to May-18 Apr-19 to May-19

File NoCEA-CH-14-1142018-Coordination Division

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

6

7 Transformation Capacity Addition During May-2019 (MVA)

0

0

1390

1060

0 0

May-18 May-19

2450

0

1000

4145

2385

760

0 0

All India Transformation Capacity Addition during Apr-18 to May-18 amp Apr-19

to May-19 (MVA)

8745

0

1500

5180

2065

7920

4000

1575

2345

0

Apr-18 to May-18 Apr-19 to May-19

2450

4145

0

500

1000

1500

2000

2500

3000

3500

4000

4500

MV

A

May-18 May-19

7920 8745

0

74520

1

MV

A

Apr-18 to May-18 Apr-19 to May-19

File NoCEA-CH-14-1142018-Coordination Division

May-2018 May-2019 May-2018 May-2019 May-2018 May-2019

Northern 35206 37020 34664 36615 -15 -11

Western 35085 36658 35070 36658 00 00

Southern 27681 31232 27619 31213 -02 -01

Eastern 13210 13391 13063 13391 -11 00

North Eastern 1232 1416 1175 1323 -46 -66

All India 112414 119717 111591 119200 -07 -04

May-2018 May-2019 May-2018 May-2019 May-2018 May-2019

Northern 56546 60987 56243 60078 -05 -15

Western 53841 57113 52442 57093 -26 00

Southern 43234 47477 43234 47465 00 00

Eastern 21256 23558 21249 23558 00 00

North Eastern 2709 2758 2611 2674 -36 -31

All India 171973 183513 170765 182533 -07 -05

May-2019 Figures are Provisional

7

8 Power Supply Position (Energy amp Peak) in May-2019

Peak Demand Peak Met

Requirement Availability

Energy (MU)Region

Surplus(+)

Deficit (-) in

Surplus(+)

Deficit (-) in Region

Power (MW)

File NoCEA-CH-14-1142018-Coordination Division

Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand May-2018 0 0 0 0 589 0 0 172 0

May-2019 0 0 0 0 0 0 0 430 0

Chattisgarh Gujarat MP Maharashtra Daman amp Diu Dadar Nagar Goa

May-2018 11 1198 19 141 0 0 2

May-2019 0 0 14 8 0 1 0

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

May-2018 4 28 93 53 29 19 0

May-2019 0 0 0 81 62 11 0

8

9 Peak Shortage of Power Supply (MW) in Different Regions in May-2019

0 0 0 0 0 0 0

430

00 0 0 0

589

0 0

172

0

0

400

800

Ch

an

dig

ar

h Delh

i

Ha

rya

na

HP

Jamp

K

Pu

nja

b

Ra

jasth

an

UP

Utr

akhan

d

MW

Northern States (MW) May-2019 May-2018

0 0 14

8 0 1 011

1198

19 141

0 0 2

0

500

1000

1500

Ch

attis

gar

h

Guja

rat

MP

Mah

ara

shtr

a

Da

man amp

Diu

Da

dar

Na

gar G

oa

MW

Western States (MW) May-2019 May-2018

0 0 0

8162

11 0428

93

5329 19

00

100

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Southern State (MW) May-2019 May-2018

File NoCEA-CH-14-1142018-Coordination Division

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

May-2018 1 0 0 0 6 0 4

May-2019 0 0 0 0 0 0 4

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

May-2018 5 29 7 2 9 28 0

May-2019 2 80 2 4 2 2 1

9

0 0 0 0 0 0

4

1

0 0 0

6

0

4

0

2

4

6

8

Bih

ar

DV

C

Jha

rkh

an

d

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

NIs

land

MW

Eastern States (MW) May-2019 May-2018

2

80

2 4 2 2 15 7 2

9

28

0

0

20

40

60

80

100

Aru

na

cha

l

Assa

m

Ma

nip

ur

Me

gh

ala

ya

Miz

ora

m

Na

gala

nd

Trip

ura

MW

North-Eastern States (MW)

File NoCEA-CH-14-1142018-Coordination Division

Sector May-2018 May-2019

Central 7428 6845

State 6361 6095

Private Sector IPP 5625 6109

Private Sector UTL 6985 6458

ALL INDIA 6404 6324

Month PLF 2018 PLF 2019

Jan 6215 6054

Feb 6230 6051

March 6452 6340

April 6454 6471

May 6404 6324

For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment

10

PLF of Thermal Power Plants

(excluding gas based power plants)

All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise

10 All India Thermal PLF Sector-wise (Excluding Gas Based Power Plants) for May-2019

5800

6000

6200

6400

6600

Jan Feb March April May

Months

All India PLF Month-wise

PLF 2018 PLF 2019

7428

63615625

69856404

6845

60956109

64586324

000

1000

2000

3000

4000

5000

6000

7000

8000

Central State Private Sector IPP Private Sector UTL ALL INDIA

All India Thermal PLF

May-2018 May-2019

File NoCEA-CH-14-1142018-Coordination Division

2012-13 2013-14 2014-15 2015-16 2016-17 2017-18

TampD Losses 2304 2284 2277 2181 2142 2104

ATampC Losses 2548 2262 2572 2398 NA NA

Provisional

Note As per PFC for utilities selling directly to consumers NA- Not Available

Total Number of Villages

597464

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2013-14 4894

2014-15 5304

2015-16 5459

2016-17 5743

2017-18 6080

2018-19 6289

11

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality

as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a

Distribution Transformer may not be necessary)

14 All India Coal consumption for Power Generation (MT)

520

Average Revenue Realization(paiseunit)

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community

Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

11 T amp D and ATampC Losses ()

12 All India Village Electrification

Villiages Electrified (Nos)

10000All villages as per census 2011 has

been electrified on 28042018

Villages electrified

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12th Plan 2017-18 and 2018-19 12

2 Capacity Addition Targets amp Achievements during May-2019 and Apr-19 to May-19 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

File NoCEA-CH-14-1142018-Coordination Division

(i) CAPACITY ADDTION TARGETS AND ACHIEVEMENTS IN THE 12TH PLAN (Figures in MW)

SECTOR THERMAL HYDRO NUCLEAR TOTAL

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453

STATE 13922 22201 1608 2276 0 0 15530 24477

PRIVATE 43540 53661 3285 619 0 0 46825 54280

ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209

(ii) CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (Figures in MW)

Thermal Hydro Nuclear Total

Target Ach Target Ach Target Ach Target Ach

Central 4880 3170 800 390 500 0 6180 3560

State 3546 1760 300 200 0 0 3846 1960

Private 2940 3780 205 205 0 0 3145 3985

Total 11366 8710 1305 795 500 0 13171 9505

(iii) CAPACITY ADDITION ACHIEVEMENT FOR 2018-19 (Figures in MW)

Thermal Hydro Nuclear Total

Target Ach Target Ach Target Ach Target Ach

Central 2760 1960 710 110 0 0 3470 2070

State 4506 2850 130 30 0 0 4636 2880

Private 0 972 0 0 0 0 0 972

Total 7266 5782 840 140 0 0 8106 5922

12

1 Capacity Addtion Targets and Achievements in the 12th Plan 2017-18 and 2018-19

File NoCEA-CH-14-1142018-Coordination Division

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 6040 660 0 1160 0 -1160

State 425615 0 0 660 0 -660

Private 0 0 0 0 0 0

Total 1029615 660 0 1820 0 -1820

Central 600 0 0 0 0 0

State 21099 0 0 0 0 0

Private 379 0 0 0 0 0

Total 118999 0 0 0 0 0

Nuclear Central 700 0 0 0 0 0

Central 7340 660 0 1160 0 -1160

State 446714 0 0 660 0 -660

Private 379 0 0 0 0 0

Total 1218614 660 0 1820 0 -1820

Electricity Generation (MU) Targets and Achievements for 2016-17

13

2 Capacity Addition Targets Achievements During May-2019

Schemes Sector

Target 2019-20

Apr-19 to May-19May-19

Hydro

All India

Capacity Addition TargetsAchievements during the Month of May-2019

Thermal1

82

0

0 0

18

20

0 0 0 0

0

200

400

600

800

1000

1200

1400

1600

1800

2000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2019-20Target Achievement

0

100

200

300

400

500

600

700

Thermal Hydro Nuclear Total

660

0 0

660

0 0 00

MW

Target Achievement

File NoCEA-CH-14-1142018-Coordination Division

Coal Lignite Gas Diesel Total

State 1634400 25000 287920 000 1947320 000 869755 70056 2887131

Private 2168083 108000 55800 000 2331883 000 251400 1333187 3916470

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Sub Total 5036020 158000 578126 000 5772146 162000 1970777 1441143 9346066

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2204808 6245075

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Sub Total 7280862 154000 1080649 000 8515511 184000 754750 2326226 11780487

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3781156 5553186

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Sub Total 4304202 314000 647366 56158 5321726 332000 1177483 3894034 10725243

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111789 790389

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Sub Total 2746364 000 10000 000 2756364 000 494212 140300 3390876

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Sub Total 77002 000 177581 3600 258183 000 142700 32429 433311

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Sub Total 000 000 000 4005 4005 000 000 1773 5778

State 6407650 129000 711871 36393 7284913 000 2987880 234893 10507686

Private 7468800 183000 1058060 27370 8737230 000 339400 7437781 16514411

Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663

Total 19444450 626000 2493722 63763 22627934 678000 4539922 7835904 35681760

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30042019 is given below (in MW)

459415 3581588 2867921 7835904

A 0 MW

B May 2019 0 MW

C

May 2019 0 MW

D Net Capacity Added during May 2019 A-B-C 0 MW

Sector wise breakup of RES capacity as shown is provisional

RES

(MNRE)

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31052019)

(UTILITIES)

Region Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30042019

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

CapacityBM PowerCogen Waste to Energy

913150 13830

Capacity Added during May 2019

Capacity Retired during

Capacity removed due to change

from Conventional to RES during

Share of installed capacity of BBMB Stations is included in state sector of partner states

File NoCEA-CH-14-1142018-Coordination Division

Coal Lignite Gas Diesel Total

State 13500 000 180040 000 193540 000 000 000 193540

Private 86922 000 10800 000 97722 000 000 17889 115611

Central 311272 000 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 000 211541 000 623235 10283 72309 17889 723716

State 272000 000 15000 000 287000 000 110282 6930 404212

Private 408078 000 000 000 408078 000 20000 34512 462590

Central 129472 000 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 000 68561 000 878112 10094 196652 41942 1126799

State 000 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 000 99200 62668 161868

Central 18340 000 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 000 6201 000 24541 2895 291048 88329 406813

State 000 000 17500 000 17500 000 123000 13003 153503

Private 000 000 000 000 000 000 000 6483 6483

Central 50639 000 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 000 30407 000 81047 6798 232188 19486 339519

State 176000 000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 000 511550 000 28800 115462 655812

Central 85458 000 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244

State 626000 25000 60380 000 711380 000 109618 2385 823383

Private 280200 108000 000 000 388200 000 10400 751322 1149922

Central 95625 25000 22110 000 142735 55674 73901 34400 306710

Sub-Total 1001825 158000 82490 000 1242315 55674 193919 788107 2280015

State 546900 000 000 000 546900 000 72410 2510 621820

Private 871433 000 000 000 871433 000 84200 288760 1244393

Central 379639 000 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 000 54949 000 1852921 28948 336863 294270 2513002

State 000 000 000 000 000 000 125215 6787 132002

Private 9900 000 45000 000 54900 000 8800 52620 116320

Central 34324 000 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 000 51966 000 96190 3124 181569 59407 340290

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 3471 3471

Central 3815 000 1503 000 5317 801 10171 000 16289

Sub-Total 3815 000 1503 000 5317 801 10171 3471 19760

124953 000 29105 000 154058 23703 75145 000 252907

State 1634400 25000 287920 000 1947320 000 869755 70056 2887131

Private 2168083 108000 55800 000 2331883 000 251400 1333187 3916470

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Grand Total 5036020 158000 578126 000 5772146 162000 1970777 1441143 9346066

Jammu amp Kashmir

Punjab

Rajasthan

Uttar Pradesh

Uttarakhand

Chandigarh

Central - Unallocated

Total (Northern

Region)

HydroRES

(MNRE)

Delhi

Haryana

Himachal Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31052019)

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 005 005

Private 000 000 4800 000 4800 000 000 392 5192

Central 46959 000 1967 000 48926 2600 000 000 51526

Sub-Total 46959 000 6767 000 53726 2600 000 397 56723

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 1447 1447

Central 14141 000 4334 000 18475 700 000 000 19175

Sub-Total 14141 000 4334 000 18475 700 000 1447 20622

State 371000 104000 217782 000 692782 000 77200 6470 776452

Private 726567 50000 396000 000 1172567 000 000 841512 2014079

Central 324243 000 42400 000 366643 55900 000 24330 446873

Sub-Total 1421810 154000 656182 000 2231992 55900 77200 872312 3237404

State 540000 000 000 000 540000 000 170366 8396 718762

Private 617400 000 10000 000 627400 000 000 428040 1055440

Central 334238 000 25700 000 359938 27300 152000 30000 569238

Sub-Total 1491638 000 35700 000 1527338 27300 322366 466436 2343440

State 228000 000 000 000 228000 000 12000 1105 241105

Private 885000 000 000 000 885000 000 000 52430 937430

Central 211075 000 000 000 211075 4800 10000 000 225875

Sub-Total 1324075 000 000 000 1324075 4800 22000 53535 1404410

State 1017000 000 67200 000 1084200 000 285084 38813 1408097

Private 1245600 000 56800 000 1302400 000 48100 880441 2230941

Central 466780 000 227273 000 694053 69000 000 12300 775353

Sub-Total 2729380 000 351273 000 3080653 69000 333184 931553 4414390

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 546 546

Central 19560 000 6634 000 26194 900 000 000 27094

Sub-Total 19560 000 6634 000 26194 900 000 546 27640

233300 000 19759 000 253059 22800 000 000 275859

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2204808 6245075

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Grand Total 7280862 154000 1080649 000 8515511 184000 754750 2326226 11780487

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

ThermalNuclear Hydro

RES

(MNRE)

State Ownership Sector

Mode wise breakup

Grand Total

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 501000 000 23540 000 524540 000 167360 5618 697518

Private 387388 000 381318 3680 772386 000 000 743901 1516287

Central 154683 12773 000 000 167456 12727 000 25000 205183

Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 774519 2418988

State 558250 000 000 000 558250 000 247993 4122 810365

Private 83945 000 83182 000 167127 000 000 394315 561442

Central 180685 14927 000 000 195612 14873 000 1000 211485

Sub-Total 822880 14927 83182 000 920989 14873 247993 399437 1583292

State 502000 000 000 12792 514792 000 358660 19389 892841

Private 195850 000 000 2520 198370 000 000 1369720 1568090

Central 242780 40140 000 000 282920 69800 000 000 352720

Sub-Total 940630 40140 000 15312 996082 69800 358660 1389108 2813650

State 000 000 000 15996 15996 000 185650 17290 218936

Private 61500 000 17400 000 78900 000 000 19021 97921

Central 86142 28180 35958 000 150280 36200 000 5000 191480

Sub-Total 147642 28180 53358 15996 245176 36200 185650 41311 508337

State 432000 000 52408 000 484408 000 217820 12270 714498

Private 458767 25000 50310 21170 555247 000 000 1253885 1809132

Central 302532 136420 000 000 438952 144800 000 23190 606942

Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1289345 3130572

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 000 10000 000 000 10000 000 000 000 10000

Sub-Total 000 10000 000 000 10000 000 000 000 10000

State 000 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 000 314 314

Central 14080 10760 000 000 24840 8600 000 000 33440

Sub-Total 14080 10760 3250 000 28090 8600 000 314 37004

142600 35800 000 000 178400 45000 000 000 223400

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3781156 5553186

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Grand Total 4304202 314000 647366 56158 5321726 332000 1177483 3894034 10725243

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Andhra Pradesh

Telangana

Karnataka

Total (Southern

Region)

Tamil Nadu

NLC

Puducherry

Central - Unallocated

Kerala

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 7070 7070

Private 28100 000 000 000 28100 000 000 25545 53645

Central 384933 000 000 000 384933 000 11000 000 395932

Sub-Total 413033 000 000 000 413033 000 11000 32615 456647

State 42000 000 000 000 42000 000 13000 405 55405

Private 73000 000 000 000 73000 000 000 3647 76647

Central 39374 000 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 000 154374 000 19100 4052 177526

State 540000 000 10000 000 550000 000 98600 12195 660795

Private 243700 000 000 000 243700 000 000 35250 278950

Central 76077 000 000 000 76077 000 41000 000 117077

Sub-Total 859777 000 10000 000 869777 000 139600 47445 1056822

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 698504 000 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 000 698504 000 18620 000 717124

State 42000 000 000 000 42000 000 206192 2630 250822

Private 293900 000 000 000 293900 000 000 47346 341246

Central 163390 000 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 000 499290 000 215092 50976 765358

State 000 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 000 39900 001 39901

Central 8703 000 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 000 8703 000 82300 5212 96215

112683 000 000 000 112683 000 8501 000 121184

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111789 790389

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Grand Total 2746364 000 10000 000 2756364 000 494212 140300 3390876

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

Grand TotalThermalNuclear

RES

(MNRE)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

Total (Eastern

Region)

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

Central - Unallocated

HydroOwnership Sector

Mode wise breakup

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2650 5100

Central 40852 000 43556 000 84408 000 35708 2500 122616

Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038

State 000 000 000 000 000 000 000 10711 10711

Private 000 000 000 000 000 000 000 2939 2939

Central 3705 000 4682 000 8387 000 11655 000 20042

Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692

State 000 000 000 000 000 000 32200 3253 35453

Private 000 000 000 000 000 000 000 012 012

Central 4560 000 10969 000 15529 000 7227 000 22756

Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 5610 000 43695 000 49305 000 6849 500 56654

Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 344 344

Central 4710 000 7157 000 11867 000 9534 000 21401

Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 3210 000 4893 000 8103 000 5733 000 13836

Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 3105 000 4046 000 7151 000 9794 000 16945

Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642

11250 000 6362 000 17612 000 14000 000 31612

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 663 663

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1698 5703

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1773 5778

19

Andaman amp

Nicobar

Lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination Division

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during May-2019 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 31-05-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621

May19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 0 0 23 23 0 750 0 750 0 750 23 773

Achievement 0 0 0 0 0 0 0 0 0 0 0 0 0 474 0 474 0 503 0 503 0 977 0 977

Upto May-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 226 1176 0 1059 0 1059 637 2365 783 3785

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 494 0 494 0 904 0 904 53 1398 0 1451

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

Line

1 2 3 4 5 6

0

1 400 Barmer-Bhinmal line DC RVPNL 288

2 400 Jangaon - Tippapur DC TSTRANSCO 138

3 400 Kayathar - Thennampatty DC TANTRANSCO 48

4 220 Bareilly (400) - Pilibhit Ckt-II SC UPPTCL 39

5 220 Bhanjanagar - Aska DC OPTCL 57

6 220LILO of both Ckt of 220kV Mobha - Mangrol

line at 220kV Amod (Balanced portion)DC GETCO 46

7 220LILO of Gr Noida (400) - Noida Sec-148 line

at RC GreenDC UPPTCL 9

8 220 LILO of Hathras - Gokul at Mathura DC UPPTCL 120

9 220 Sohawal - Tanda DC UPPTCL 232

977

0

977

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During May-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 31-05-19

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during

May-201921(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 31-05-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716

May19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 0 1445 1000 2445 0 680 0 680 0 2125 1000 3125

Achievement 0 0 0 0 0 0 0 0 1000 0 0 1000 0 2385 0 2385 0 760 0 760 1000 3145 0 4145

Upto May-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 2445 3000 5445 0 1480 0 1480 3000 3925 6000 12925

Achievement 0 0 0 0 0 0 0 0 1500 0 0 1500 815 4365 0 5180 0 2065 0 2065 2315 6430 0 8745

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

As on 31-05-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1Bhadla SS (3x1500 3x500 MVA) (500 MVA ICTs- II

and III)400220 PGCIL 1000

Total of CENTRAL SECTOR 1000

2 Moradabad(Aug) (Additional TF) 400220 UPPTCL 240

3 Masauli Prayagraj (New) TF-III 400132 UPPTCL 200

4 Talaricheruvu Ss 400220 APTRANSCO 9455 Uravakonda (Aug) ICT-II 400220 APTRANSCO 5006 Jangaon ss (3x500) (ICT-I) 400220 TSTRANSCO 500

7 Chinhat Lucknow (Aug) TF-II (200-160) 220132 UPPTCL 408 Hathras (Aug)T-I(200-160) 220132 UPPTCL 409 Jaunpur (Aug) (Additional TF) 220132 UPPTCL 16010 Laukahi (Supaul new) 22013233 BSPTCL 32011 Sector- 95 Gurgaon 22033 HVPNL 10012 Alawalpur ss 22066 PSTCL 100

TOTAL STATE SECTOR 3145

GRAND TOTAL 4145

21(2)

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During May-2019

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2019-20 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination Division

Programme Achievement Ach Programme Achievement Ach

Central Sector 37545100 3290600 3141593 9547 6468500 6275642 9702

State Sector 37498600 3425800 3092392 9027 6748300 6066733 8990

PvtIPP Sector 37346200 3476700 3460217 9953 6713100 6652517 9910

PvtUTL Sector 1823100 164300 171799 10456 323600 337490 10429

Total 114213000 10357400 9866001 9526 20253500 19332382 9545

Central Sector 5661700 604200 619800 10258 990300 1104995 11158

State Sector 6680500 551500 652766 11836 1049700 1184387 11283

PvtIPP Sector 1206900 130200 121344 9320 187500 200643 10701

PvtUTL Sector 144100 12400 14009 11298 24700 25155 10184

Total 13693200 1298300 1407919 10844 2252200 2515180 11168

Central Sector 4472000 353500 365463 10338 720800 694195 9631

Total 4472000 353500 365463 10338 720800 694195 9631

Bhutan Import 621800 32500 35300 10862 50000 59270 11854

Central Sector 47678800 4248300 4126856 9714 8179600 8074832 9872

State Sector 44179100 3977300 3745158 9416 7798000 7251120 9299

Pvt Sector 40520300 3783600 3767369 9957 7248900 7215805 9954

Total 133000000 12041700 11674683 9695 23276500 22601027 9710

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Apr-19 Apr-18 Upto Apr-2019 Upto Apr-2018

975409 844377 975409 844377

22

Renewable Energy Generation

Achievement

May-2019

1 Electricity Generation (MU) Targets and Achievememts for 2019-20

All India Energy Generation During Apr-19 to May-19 (MU)

Target (2019-20)Apr-19 to May-19

Sector

Hydro

Thermal

Nuclear

202535

22522

7208

232765

193324

25152

6942

226010

0

50000

100000

150000

200000

250000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Energy Power Supply Position (Provisional) for May-2019 and during Apr-19 to May-19 23

2 Peak Power Supply Position (Provisional) for May-2019 and during Apr-19 to May-19 24

3 Energy Power Supply Position (Revised) for Apr-2019 and during Apr-19 to Apr-19 25

4 Peak Power Supply Position (Revised) for Apr-2019 and during Apr-19 to Apr-19 26

5 Notified Power cuts Restrictions on Industries during May-2019 27

6 Power Supply to Agricultural Sector during May-2019 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 154 154 0 00 271 271 0 00

दिलली Delhi 3366 3366 0 00 6065 6064 1 00

हरियजणज Haryana 4907 4907 0 00 8679 8679 0 00

दहमजचल परिश Himachal Pradesh 872 863 10 11 1654 1644 10 06

रमम कशमीि Jammu amp Kashmir 1760 1424 336 191 3364 2720 644 191

परजब Punjab 4769 4769 0 00 8475 8475 0 00

िजरसथजन Rajasthan 7120 7110 11 02 13313 13300 13 01

उतति परिश Uttar Pradesh 12742 12695 48 04 22897 22817 79 03

उततिजखड Uttarakhand 1329 1329 0 00 2449 2449 0 00

उततरी कषतर Northern Region 37020 36615 404 11 67166 66419 747 11

छततीसगढ़ Chhattisgarh 2794 2794 0 00 5765 5764 1 00

गरिजत Gujarat 11208 11208 0 00 21748 21748 0 00

मधय परिश Madhya Pradesh 6502 6502 0 00 12735 12735 0 00

महजिजषटर Maharashtra 14976 14976 0 00 29295 29294 0 00

िमन औि दिउ Daman amp Diu 222 222 0 00 443 443 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 1106 1106 0 00

गोवज Goa 404 404 0 00 801 801 0 00

पशचिमी कषतर Western Region 36658 36658 0 00 71893 71892 1 00

आनधर परिश Andhra Pradesh 6056 6048 7 01 11709 11702 7 01

तलगजनज Telangana 5318 5318 1 00 10772 10771 1 00

कनजाटक Karnataka 6702 6702 1 00 13569 13568 1 00

किल Kerala 2575 2566 9 03 4888 4878 10 02

तममल नजड Tamil Nadu 10309 10309 1 00 20031 20030 1 00

पडचिी Puducherry 271 271 1 03 517 516 1 01

लकष-दवीप Lakshadweep 4 4 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 31232 31213 19 01 61486 61465 21 00

बबहजि Bihar 3078 3078 0 00 5662 5659 3 01

िजमोिि घजटी ननगम DVC 1814 1814 0 00 3757 3755 2 01

झजिखणड Jharkhand 789 789 0 00 1505 1495 10 07

ओडडशज Odisha 2560 2560 0 00 5261 5261 0 00

पशशचम बगजल West Bengal 5115 5115 0 00 9920 9897 23 02

मसशककम Sikkim 36 36 0 00 78 78 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 58 54 4 67

परवी कषतर Eastern Region 13391 13391 0 00 26182 26144 38 01

अरणजचल परिश Arunachal Pradesh 64 64 0 06 127 126 1 06

असम Assam 819 738 81 99 1573 1434 139 88

मणणपि Manipur 73 72 1 07 135 134 2 12

मघजलय Meghalaya 167 159 8 50 336 318 18 55

ममज़ोिम Mizoram 55 55 0 07 100 99 1 08

नजगजलड Nagaland 65 64 1 08 124 123 1 08

बिपिज Tripura 173 170 2 14 292 288 4 13

उततर-परवी कषतर North-Eastern Region 1416 1323 93 66 2686 2521 165 62

समपणण भारत All India 119717 119200 517 04 229413 228441 972 04

Note Power Supply Position Report has been compiled based on the data furnished by State Utilities Electricity Departments

23

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 356 356 0 00 356 356 0 00

दिलली Delhi 6461 6461 0 00 6461 6461 0 00

हरियजणज Haryana 8874 8874 0 00 8874 8874 0 00

दहमजचल परिश Himachal Pradesh 1480 1480 0 00 1480 1480 0 00

रमम कशमीि Jammu amp Kashmir 2426 2426 0 00 2885 2426 459 159

परजब Punjab 8802 8802 0 00 8802 8802 0 00

िजरसथजन Rajasthan 11791 11791 0 00 11791 11791 0 00

उतति परिश Uttar Pradesh 22487 22057 430 19 22487 22057 430 19

उततिजखड Uttarakhand 2155 2155 0 00 2155 2155 0 00

उततरी कषतर Northern Region 60987 60078 909 15 60987 60078 909 15

छततीसगढ़ Chhattisgarh 4504 4504 0 00 4596 4574 22 05

गरिजत Gujarat 18094 18094 0 00 18094 18094 0 00

मधय परिश Madhya Pradesh 10145 10131 14 01 10145 10131 14 01

महजिजषटर Maharashtra 23621 23613 8 00 23621 23613 8 00

िमन औि दिउ Daman amp Diu 344 344 0 01 344 344 0 01

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 818 818 0 00

गोवज Goa 554 554 0 00 594 594 0 00

पशचिमी कषतर Western Region 57113 57093 20 00 57113 57093 20 00

आनधर परिश Andhra Pradesh 9854 9854 0 00 9854 9854 0 00

तलगजनज Telangana 8684 8684 0 00 10269 10202 67 07

कनजाटक Karnataka 12158 12158 0 00 12700 12688 12 01

किल Kerala 4286 4205 81 19 4316 4300 16 04

तममल नजड Tamil Nadu 15584 15522 62 04 15680 15659 21 01

पडचिी Puducherry 453 442 11 24 453 444 9 20

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 47477 47465 12 00 49218 49103 115 02

बबहजि Bihar 5481 5481 0 00 5481 5481 0 00

िजमोिि घजटी ननगम DVC 3048 3048 0 00 3048 3048 0 00

झजिखणड Jharkhand 1330 1330 0 00 1330 1330 0 00

ओडडशज Odisha 4736 4736 0 00 5142 5140 3 01

पशशचम बगजल West Bengal 9335 9335 0 00 9335 9335 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23558 23558 0 00 23558 23558 0 00

अरणजचल परिश Arunachal Pradesh 140 138 2 12 140 138 2 12

असम Assam 1753 1673 80 46 1910 1673 237 124

मणणपि Manipur 183 181 2 09 197 188 9 48

मघजलय Meghalaya 329 325 4 12 337 337 0 00

ममज़ोिम Mizoram 102 100 2 20 116 113 3 28

नजगजलड Nagaland 130 128 2 14 157 131 27 169

बिपिज Tripura 297 295 1 05 297 295 1 05

उततर-परवी कषतर North-Eastern Region 2758 2674 84 31 2848 2780 68 24

समपणण भारत All India 183513 182533 981 05 183513 182533 981 05

Note Power Supply Position Report has been compiled based on the data furnished by State Utilities Electricity Departments 24

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -मई2019 April2019 to May2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and supply

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateमई 2019 May2019

मजग की पनता म कमी Demand not Met

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 781 781 0 00 781 781 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3706 3706 0 00 3706 3706 0 00

िजरसथजन Rajasthan 6192 6190 2 00 6192 6190 2 00

उतति परिश Uttar Pradesh 10154 10123 32 03 10154 10123 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30147 29804 343 11 30147 29804 343 11

छततीसगढ़ Chhattisgarh 2972 2971 1 00 2972 2971 1 00

गरिजत Gujarat 10540 10540 0 00 10540 10540 0 00

मधय परिश Madhya Pradesh 6233 6233 0 00 6233 6233 0 00

महजिजषटर Maharashtra 14319 14319 0 00 14319 14319 0 00

िमन औि दिउ Daman amp Diu 221 221 0 00 221 221 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 554 554 0 00 554 554 0 00

गोवज Goa 397 397 0 00 397 397 0 00

पशचिमी कषतर Western Region 35235 35234 1 00 35235 35234 1 00

आनधर परिश Andhra Pradesh 5653 5653 0 00 5653 5653 0 00

तलगजनज Telangana 5453 5453 0 00 5453 5453 0 00

कनजाटक Karnataka 6867 6867 0 00 6867 6867 0 00

किल Kerala 2313 2312 2 01 2313 2312 2 01

तममल नजड Tamil Nadu 9721 9721 0 00 9721 9721 0 00

पडचिी Puducherry 246 246 0 00 246 246 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 30254 30252 2 00 30254 30252 2 00

बबहजि Bihar 2584 2581 3 01 2584 2581 3 01

िजमोिि घजटी ननगम DVC 1944 1942 2 01 1944 1942 2 01

झजिखणड Jharkhand 716 706 10 14 716 706 10 14

ओडडशज Odisha 2701 2701 0 00 2701 2701 0 00

पशशचम बगजल West Bengal 4805 4782 23 05 4805 4782 23 05

मसशककम Sikkim 42 42 0 00 42 42 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12792 12754 38 03 12792 12754 38 03

अरणजचल परिश Arunachal Pradesh 62 62 0 06 62 62 0 06

असम Assam 754 696 58 77 754 696 58 77

मणणपि Manipur 62 61 1 17 62 61 1 17

मघजलय Meghalaya 169 159 10 60 169 159 10 60

ममज़ोिम Mizoram 45 44 0 10 45 44 0 10

नजगजलड Nagaland 59 58 0 08 59 58 0 08

बिपिज Tripura 119 117 2 13 119 117 2 13

उततर-परवी कषतर North-Eastern Region 1270 1198 72 57 1270 1198 72 57

समपणण भारत All India 109696 109241 455 04 109696 109241 455 04

Note The revised data for March 2019 is not avaliable

Energy not Supplied Energy not Supplied

अपरल 2019 April2019 अपरल 2019 April2019 to April 2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2885 2308 577 200 2885 2308 577 200

परजब Punjab 7087 7087 0 00 7087 7087 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 47779 47210 569 12 47779 47210 569 12

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9179 9160 19 02 9179 9160 19 02

तलगजनज Telangana 10269 10202 67 07 10269 10202 67 07

कनजाटक Karnataka 12700 12688 12 01 12700 12688 12 01

किल Kerala 4316 4300 16 04 4316 4300 16 04

तममल नजड Tamil Nadu 15680 15659 21 01 15680 15659 21 01

पडचिी Puducherry 444 444 0 00 444 444 0 00

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49218 49103 115 02 49218 49103 115 02

बबहजि Bihar 5157 5155 2 00 5157 5155 2 00

िजमोिि घजटी ननगम DVC 3014 3014 0 00 3014 3014 0 00

झजिखणड Jharkhand 1326 1325 1 00 1326 1325 1 00

ओडडशज Odisha 5142 5140 3 01 5142 5140 3 01

पशशचम बगजल West Bengal 8745 8699 46 05 8745 8699 46 05

मसशककम Sikkim 98 98 0 00 98 98 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22415 22378 37 02 22415 22378 37 02

अरणजचल परिश Arunachal Pradesh 139 136 3 21 139 136 3 21

असम Assam 1910 1667 242 127 1910 1667 242 127

मणणपि Manipur 197 188 9 48 197 188 9 48

मघजलय Meghalaya 337 337 0 00 337 337 0 00

ममज़ोिम Mizoram 116 113 3 28 116 113 3 28

नजगजलड Nagaland 157 131 27 169 157 131 27 169

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177424 176810 613 03 177424 176810 613 03

Note The revised data for March 2019 is not avaliable 26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateअपरल 2019 April2019 अपरल 2019 April2019 to April 2019

File NoCEA-CH-14-1142018-Coordination Division

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

मई 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during May2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

N

o No

tified

Cuts

N

o No

tified

Cuts

File NoCEA-CH-14-1142018-Coordination Division

मई2019May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0910 hrsday 0811 - 910 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 403 hrsday 0347 - 403 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 2214 hrsday 2157 - 2214 hrsday

उततराखड Uttarakhand Data not received 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-957 hrs day

Three-Phase (Mixed) Supply - 2346 hrs day

Three-Phase Supply(Irrigation)- 0953 - 0957 hrs day Three-

Phase (Mixed) Supply - 2334 - 2346 hrs day

महजिजषटर Maharashtra Three-Phase Supply - 9 hrs day Three-Phase Supply - 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

मई 2019 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during May2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to May-2019 20070450 2493722 63763 22627934 678000 4539922 7835904 35681760

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 7835904 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

7835904

Total Installed Capacity 35687160 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-22 (Up to

Mar2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

Plan Period

2017-22 (Up to

May-19)

6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58732 21173 181240 11734 163456 1010 176200 158886 225204 30768 414858

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Progress of Transmission Sector in the Country up to May 2019

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on May19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

May 19)

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during May 2019

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 20525 925681234952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

SN Section A - Highlights of Power Sector Page

1 Electricity Generation for May-2019 (BU) 1A amp 1B

2 Generating Capacity Addition for May-2019 (MW) 2

3 List of Projects Commissioned in May-2019 3

4 All India Installed Capacity (MW) Region-wise as on 31-05-19 3

5 All India Installed Capacity (MW) Sector-wise as on 31-05-19 4

6 Transmission Lines Added during May-2019 (Ckms) 5

7 Transformation Capacity Addition during May-2019 (MVA) 6

8 Power Supply Position (Energy amp Peak) in May-2019 7

9 Peak Shortage of Power Supply (MW) in Different Regions 8-9

10 All India PLF Sector-wise for May-2019 10

11 T amp D and AT amp C Losses ()

12 All India Village Electrification

13 Average cost of Power amp Average Realisation

14 All India Coal consumption for Power Generation (MT)

1 Capacity Addition Targets and Achievements in 12th Plan 12th Plan 2017-18 and 2018-19 12

2 Capacity Addition Targets amp Achievements during May-2019 13

3 Installed Capacity in various Regions including their shares 14-19

1 Programme and Achievements of Transmission Lines in May-2019

2 List of Transmission Lines CommissionedReady for commissioning during May-2019

1 Programme and Achievements of Sub-Stations in May-2019

2 List of Sub Stations commissionedready for commisssioning in May-2019

1 Electricity Generation (MU) Targets and Achievements for 2019-20 22

1 Power Supply Position (Provisional) for May-2019 23

2 Peak Demand and Peak Met (Provisional) for May-2019 24

3 Power Supply Position (Revised) for Apr-2019 25

4 Peak Demand and Peak Met (Revised) for Apr-2019 26

5 Notified Power cuts Restrictions on Industries during May-2019 27

6 Power Supply to Agricultural Sector during May-2019 28

1 Growth of Installed Capacity since 6th Plan 29

2 Growth of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since 2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in May-2019

1 Rate of sale of power for the year 2016-17 33-41

Section H - Rate of sale of power for the year 2016-17

Executive Summary for the Month of May-2019

32

11

20

21

31

Section B - Capacity Addition

Section C - Transmission Lines

Section D - Sub Stations

Section E - Electricity Generation

Section F - Power supply position

Contents

Section G - Growth of Power Sector

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1Electricity Generation (Conventional Sources) for May-2019 (BU) 1

2 Generating Capacity Addition for May-2019 (MW) 2

3 List of Projects Commissioned in May-2019 3

4 All India Installed Capacity (MW) Region-wise as on 31-05-19 3

5 All India Installed Capacity (MW) Sector-wise as on 31-05-19 4

6 Transmission Lines Added during May-2019 (Ckms) 5

7 Transformation Capacity Addition during May-2019 (MVA) 6

8 Power Supply Position (Energy amp Peak) in May-2019 7

9 Peak Shortage of Power Supply (MW) in Different Regions 8-9

10 All India PLF Sector-wise for May-2019 10

11 T amp D and AT amp C Losses ()

12 All India Village Electrification

13 Average cost of Power amp Average Realisation

14 All India Coal consumption for Power Generation (MT)

Section A - Highlights of Power Sector

11

File NoCEA-CH-14-1142018-Coordination Division

Achievement

May-19

Thermal 9866 182

Nuclear 365 1465

Hydro 1408 3184

Bhutan Import 035 1314

All India 11675 511

Type

Thermal

Nuclear

Hydro

Bhutan Import

All India

1A

25151

059034

690649

37921824

7672

Change wrt Apr-18 to May-18

Electricity Generation During Apr-18 to May-18 amp Apr-19 to May-19 (BU)

Apr-18 to May-18 Apr-19 to May-19

319

12983

5142260121496

11107

033

19332

6941

180

9689

18990

1 Electricity Generation for May-2019 (BU)

May-19

TypeAchievement

May-18

Targets Change of

Achievement

wrt May-2018

10357

031

3535

12042

1068

11107

11675

10800

10900

11000

11100

11200

11300

11400

11500

11600

11700

11800

BU

May-18 May-19

2149622601

000

5000

10000

15000

20000

25000

BU

Apr-18 to May-18 Apr-19 to May-19

File NoCEA-CH-14-1142018-Coordination Division

Generation from

Conventional

Sources

Generation

from

Renewable

Sources

Total Generation from

Conventional Sources

Generation from

Renewable SourcesTotal

Growth in

Conventional

Generation

Growth in

Renewable

Generation

Growth in

Total

Generation

(BU) (BU) (BU) (BU) (BU) (BU) () () ()

116746 12300 129046 111070 9256 120326 511 3289 725

Note Tentative

SlNo

Source-Wise All

India

Generation

from

Renewables Apr-2019 Apr-2018 Apr-19 to Apr-19 Apr-18 to Apr-18

1 Wind 3592220 3322740 3592220 3322740

2 Solar 4168670 3178880 4168670 3178880

3 Biomass 235010 255430 235010 255430

4 Bagasse 1201290 1263940 1201290 1263940

5 Small Hydro 518130 384140 518130 384140

6 Others 38770 38640 38770 38640

Total 9754090 8443770 9754090 8443770

Note 1) Data as received from SLDCElectricity Department of the respective states or from the electricity department

2) 25 MW Khopli-II project of NEEPCO located in Assam is considered under Small Hydro wef 01072018 Earlier it was considered under Hydro

3) Previous month generation has been taken as SLDC has not furnished generation data for the current month

Electricity Generation (Conventional and Renewable Sources)

May-2019 May-2018 Growth

1B

For the Month of Cummulative for the period

All India Generation From Renewables (All Figures are in MU)

File NoCEA-CH-14-1142018-Coordination Division

Achievement Targets Achievement

May-18

Thermal 0 660 0 NA

Hydro 110 0 0 000

Nuclear 0 0 0 NA

All India 110 660 0 000

Apr-18 to May-18 Apr-19 to May-19 Change wrt Previous Year

Thermal 69755 0 -1000

Hydro 110000 0 -1000

Nuclear 0000 0 NA

All India 179755 0 -1000

NA- Not Applicable

2

2 Generating Capacity Addition for May-2019 (MW)

Generating Capacity Addition during Apr-18 to May-18 amp Apr-19 to May-19

NA- Not Applicable

Achivement

wrt May-2018Type

May-19

1100

000

20

40

60

80

100

120

1May-18 May-19

0000

20000

40000

60000

80000

100000

120000

140000

160000

180000

200000

Apr-18 to May-18 Apr-19 to May-19

File NoCEA-CH-14-1142018-Coordination Division

1

2

3

Nuclear Hydro RES Grand TotalRegion Coal Lignite Gas Diesel Total

Northern 5036020 158000 578126 000 5772146 162000 1970777 1441143 9346066

Western 7280862 154000 1080649 000 8515511 184000 754750 2326226 11780487

Southern 4304202 314000 647366 56158 5321726 332000 1177483 3894034 10725243

Eastern 2746364 000 10000 000 2756364 000 494212 140300 3390876

North-East 77002 000 177581 3600 258183 000 142700 32429 433311

Islands 000 000 000 4005 4005 000 000 1773 5778

ALL INDIA 19444450 626000 2493722 63763 22627934 678000 4539922 7835904 35681760

Note Captive Genaration is not included in the total Captive Power capacity as on 31032017 RES as on 30042019 3

Thermal

Nuclear

3 List of Projects Commissioned During May-2019

4 All India Installed Capacity (MW) Region-wise as on 31-05-19

NIL

NIL

Thermal

NIL

Hydro

22627934

678000

4539922

7835904

35681760

51529

000

5000000

10000000

15000000

20000000

25000000

30000000

35000000

40000000

Thermal Nuclear Hydro RES Total Captive

Thermal Nuclear Hydro RES Total Captive

Total = 356817604

File NoCEA-CH-14-1142018-Coordination Division

Sector

Coal Lignite Gas Diesel Total

State 6407650 129000 711871 36393 7284913 000 2987880 234893 10507686

Private 7468800 183000 1058060 27370 8737230 000 339400 7437781 16514411

Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663

All India 19444450 626000 2493722 63763 22627934 678000 4539922 7835904 35681760

State 10507686

Private 16514411

Central 8659663

Electricity Generation (MU) Targets and Achievements for 2016-17

5 All India Installed Capacity (MW) Sector-wise as on 31-05-19

4

Grand TotalTHERMAL

Nuclear Hydro RES

RES as on 30042019

State 10507686 30

Private 16514411 46

Central 8659663 24

All India Installed Capacity(MW) (Sector-Wise)

File NoCEA-CH-14-1142018-Coordination Division

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 kV

220 KV

All India

5

0 0

6 Transmission Lines Added during May-2019 (Ckms)

May-18 May-19

0 0

0 0

0 0

623 474

720 503

1343 977

Transmission Lines Added duringApr-18 to May-18 ampApr-19 to May-19 (Ckms)

Apr-18 to May-18 Apr-19 to May-19

1201 904

2106 1451

0 0

242 53

663 494

1343

977

0

200

400

600

800

1000

1200

1400

1600

All India

Ckm

s

May-18 May-19

2106

1451

0

500

1000

1500

2000

2500

All India

Ckm

s

Apr-18 to May-18 Apr-19 to May-19

File NoCEA-CH-14-1142018-Coordination Division

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

6

7 Transformation Capacity Addition During May-2019 (MVA)

0

0

1390

1060

0 0

May-18 May-19

2450

0

1000

4145

2385

760

0 0

All India Transformation Capacity Addition during Apr-18 to May-18 amp Apr-19

to May-19 (MVA)

8745

0

1500

5180

2065

7920

4000

1575

2345

0

Apr-18 to May-18 Apr-19 to May-19

2450

4145

0

500

1000

1500

2000

2500

3000

3500

4000

4500

MV

A

May-18 May-19

7920 8745

0

74520

1

MV

A

Apr-18 to May-18 Apr-19 to May-19

File NoCEA-CH-14-1142018-Coordination Division

May-2018 May-2019 May-2018 May-2019 May-2018 May-2019

Northern 35206 37020 34664 36615 -15 -11

Western 35085 36658 35070 36658 00 00

Southern 27681 31232 27619 31213 -02 -01

Eastern 13210 13391 13063 13391 -11 00

North Eastern 1232 1416 1175 1323 -46 -66

All India 112414 119717 111591 119200 -07 -04

May-2018 May-2019 May-2018 May-2019 May-2018 May-2019

Northern 56546 60987 56243 60078 -05 -15

Western 53841 57113 52442 57093 -26 00

Southern 43234 47477 43234 47465 00 00

Eastern 21256 23558 21249 23558 00 00

North Eastern 2709 2758 2611 2674 -36 -31

All India 171973 183513 170765 182533 -07 -05

May-2019 Figures are Provisional

7

8 Power Supply Position (Energy amp Peak) in May-2019

Peak Demand Peak Met

Requirement Availability

Energy (MU)Region

Surplus(+)

Deficit (-) in

Surplus(+)

Deficit (-) in Region

Power (MW)

File NoCEA-CH-14-1142018-Coordination Division

Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand May-2018 0 0 0 0 589 0 0 172 0

May-2019 0 0 0 0 0 0 0 430 0

Chattisgarh Gujarat MP Maharashtra Daman amp Diu Dadar Nagar Goa

May-2018 11 1198 19 141 0 0 2

May-2019 0 0 14 8 0 1 0

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

May-2018 4 28 93 53 29 19 0

May-2019 0 0 0 81 62 11 0

8

9 Peak Shortage of Power Supply (MW) in Different Regions in May-2019

0 0 0 0 0 0 0

430

00 0 0 0

589

0 0

172

0

0

400

800

Ch

an

dig

ar

h Delh

i

Ha

rya

na

HP

Jamp

K

Pu

nja

b

Ra

jasth

an

UP

Utr

akhan

d

MW

Northern States (MW) May-2019 May-2018

0 0 14

8 0 1 011

1198

19 141

0 0 2

0

500

1000

1500

Ch

attis

gar

h

Guja

rat

MP

Mah

ara

shtr

a

Da

man amp

Diu

Da

dar

Na

gar G

oa

MW

Western States (MW) May-2019 May-2018

0 0 0

8162

11 0428

93

5329 19

00

100

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Southern State (MW) May-2019 May-2018

File NoCEA-CH-14-1142018-Coordination Division

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

May-2018 1 0 0 0 6 0 4

May-2019 0 0 0 0 0 0 4

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

May-2018 5 29 7 2 9 28 0

May-2019 2 80 2 4 2 2 1

9

0 0 0 0 0 0

4

1

0 0 0

6

0

4

0

2

4

6

8

Bih

ar

DV

C

Jha

rkh

an

d

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

NIs

land

MW

Eastern States (MW) May-2019 May-2018

2

80

2 4 2 2 15 7 2

9

28

0

0

20

40

60

80

100

Aru

na

cha

l

Assa

m

Ma

nip

ur

Me

gh

ala

ya

Miz

ora

m

Na

gala

nd

Trip

ura

MW

North-Eastern States (MW)

File NoCEA-CH-14-1142018-Coordination Division

Sector May-2018 May-2019

Central 7428 6845

State 6361 6095

Private Sector IPP 5625 6109

Private Sector UTL 6985 6458

ALL INDIA 6404 6324

Month PLF 2018 PLF 2019

Jan 6215 6054

Feb 6230 6051

March 6452 6340

April 6454 6471

May 6404 6324

For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment

10

PLF of Thermal Power Plants

(excluding gas based power plants)

All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise

10 All India Thermal PLF Sector-wise (Excluding Gas Based Power Plants) for May-2019

5800

6000

6200

6400

6600

Jan Feb March April May

Months

All India PLF Month-wise

PLF 2018 PLF 2019

7428

63615625

69856404

6845

60956109

64586324

000

1000

2000

3000

4000

5000

6000

7000

8000

Central State Private Sector IPP Private Sector UTL ALL INDIA

All India Thermal PLF

May-2018 May-2019

File NoCEA-CH-14-1142018-Coordination Division

2012-13 2013-14 2014-15 2015-16 2016-17 2017-18

TampD Losses 2304 2284 2277 2181 2142 2104

ATampC Losses 2548 2262 2572 2398 NA NA

Provisional

Note As per PFC for utilities selling directly to consumers NA- Not Available

Total Number of Villages

597464

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2013-14 4894

2014-15 5304

2015-16 5459

2016-17 5743

2017-18 6080

2018-19 6289

11

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality

as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a

Distribution Transformer may not be necessary)

14 All India Coal consumption for Power Generation (MT)

520

Average Revenue Realization(paiseunit)

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community

Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

11 T amp D and ATampC Losses ()

12 All India Village Electrification

Villiages Electrified (Nos)

10000All villages as per census 2011 has

been electrified on 28042018

Villages electrified

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12th Plan 2017-18 and 2018-19 12

2 Capacity Addition Targets amp Achievements during May-2019 and Apr-19 to May-19 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

File NoCEA-CH-14-1142018-Coordination Division

(i) CAPACITY ADDTION TARGETS AND ACHIEVEMENTS IN THE 12TH PLAN (Figures in MW)

SECTOR THERMAL HYDRO NUCLEAR TOTAL

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453

STATE 13922 22201 1608 2276 0 0 15530 24477

PRIVATE 43540 53661 3285 619 0 0 46825 54280

ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209

(ii) CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (Figures in MW)

Thermal Hydro Nuclear Total

Target Ach Target Ach Target Ach Target Ach

Central 4880 3170 800 390 500 0 6180 3560

State 3546 1760 300 200 0 0 3846 1960

Private 2940 3780 205 205 0 0 3145 3985

Total 11366 8710 1305 795 500 0 13171 9505

(iii) CAPACITY ADDITION ACHIEVEMENT FOR 2018-19 (Figures in MW)

Thermal Hydro Nuclear Total

Target Ach Target Ach Target Ach Target Ach

Central 2760 1960 710 110 0 0 3470 2070

State 4506 2850 130 30 0 0 4636 2880

Private 0 972 0 0 0 0 0 972

Total 7266 5782 840 140 0 0 8106 5922

12

1 Capacity Addtion Targets and Achievements in the 12th Plan 2017-18 and 2018-19

File NoCEA-CH-14-1142018-Coordination Division

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 6040 660 0 1160 0 -1160

State 425615 0 0 660 0 -660

Private 0 0 0 0 0 0

Total 1029615 660 0 1820 0 -1820

Central 600 0 0 0 0 0

State 21099 0 0 0 0 0

Private 379 0 0 0 0 0

Total 118999 0 0 0 0 0

Nuclear Central 700 0 0 0 0 0

Central 7340 660 0 1160 0 -1160

State 446714 0 0 660 0 -660

Private 379 0 0 0 0 0

Total 1218614 660 0 1820 0 -1820

Electricity Generation (MU) Targets and Achievements for 2016-17

13

2 Capacity Addition Targets Achievements During May-2019

Schemes Sector

Target 2019-20

Apr-19 to May-19May-19

Hydro

All India

Capacity Addition TargetsAchievements during the Month of May-2019

Thermal1

82

0

0 0

18

20

0 0 0 0

0

200

400

600

800

1000

1200

1400

1600

1800

2000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2019-20Target Achievement

0

100

200

300

400

500

600

700

Thermal Hydro Nuclear Total

660

0 0

660

0 0 00

MW

Target Achievement

File NoCEA-CH-14-1142018-Coordination Division

Coal Lignite Gas Diesel Total

State 1634400 25000 287920 000 1947320 000 869755 70056 2887131

Private 2168083 108000 55800 000 2331883 000 251400 1333187 3916470

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Sub Total 5036020 158000 578126 000 5772146 162000 1970777 1441143 9346066

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2204808 6245075

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Sub Total 7280862 154000 1080649 000 8515511 184000 754750 2326226 11780487

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3781156 5553186

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Sub Total 4304202 314000 647366 56158 5321726 332000 1177483 3894034 10725243

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111789 790389

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Sub Total 2746364 000 10000 000 2756364 000 494212 140300 3390876

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Sub Total 77002 000 177581 3600 258183 000 142700 32429 433311

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Sub Total 000 000 000 4005 4005 000 000 1773 5778

State 6407650 129000 711871 36393 7284913 000 2987880 234893 10507686

Private 7468800 183000 1058060 27370 8737230 000 339400 7437781 16514411

Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663

Total 19444450 626000 2493722 63763 22627934 678000 4539922 7835904 35681760

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30042019 is given below (in MW)

459415 3581588 2867921 7835904

A 0 MW

B May 2019 0 MW

C

May 2019 0 MW

D Net Capacity Added during May 2019 A-B-C 0 MW

Sector wise breakup of RES capacity as shown is provisional

RES

(MNRE)

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31052019)

(UTILITIES)

Region Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30042019

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

CapacityBM PowerCogen Waste to Energy

913150 13830

Capacity Added during May 2019

Capacity Retired during

Capacity removed due to change

from Conventional to RES during

Share of installed capacity of BBMB Stations is included in state sector of partner states

File NoCEA-CH-14-1142018-Coordination Division

Coal Lignite Gas Diesel Total

State 13500 000 180040 000 193540 000 000 000 193540

Private 86922 000 10800 000 97722 000 000 17889 115611

Central 311272 000 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 000 211541 000 623235 10283 72309 17889 723716

State 272000 000 15000 000 287000 000 110282 6930 404212

Private 408078 000 000 000 408078 000 20000 34512 462590

Central 129472 000 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 000 68561 000 878112 10094 196652 41942 1126799

State 000 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 000 99200 62668 161868

Central 18340 000 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 000 6201 000 24541 2895 291048 88329 406813

State 000 000 17500 000 17500 000 123000 13003 153503

Private 000 000 000 000 000 000 000 6483 6483

Central 50639 000 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 000 30407 000 81047 6798 232188 19486 339519

State 176000 000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 000 511550 000 28800 115462 655812

Central 85458 000 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244

State 626000 25000 60380 000 711380 000 109618 2385 823383

Private 280200 108000 000 000 388200 000 10400 751322 1149922

Central 95625 25000 22110 000 142735 55674 73901 34400 306710

Sub-Total 1001825 158000 82490 000 1242315 55674 193919 788107 2280015

State 546900 000 000 000 546900 000 72410 2510 621820

Private 871433 000 000 000 871433 000 84200 288760 1244393

Central 379639 000 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 000 54949 000 1852921 28948 336863 294270 2513002

State 000 000 000 000 000 000 125215 6787 132002

Private 9900 000 45000 000 54900 000 8800 52620 116320

Central 34324 000 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 000 51966 000 96190 3124 181569 59407 340290

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 3471 3471

Central 3815 000 1503 000 5317 801 10171 000 16289

Sub-Total 3815 000 1503 000 5317 801 10171 3471 19760

124953 000 29105 000 154058 23703 75145 000 252907

State 1634400 25000 287920 000 1947320 000 869755 70056 2887131

Private 2168083 108000 55800 000 2331883 000 251400 1333187 3916470

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Grand Total 5036020 158000 578126 000 5772146 162000 1970777 1441143 9346066

Jammu amp Kashmir

Punjab

Rajasthan

Uttar Pradesh

Uttarakhand

Chandigarh

Central - Unallocated

Total (Northern

Region)

HydroRES

(MNRE)

Delhi

Haryana

Himachal Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31052019)

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 005 005

Private 000 000 4800 000 4800 000 000 392 5192

Central 46959 000 1967 000 48926 2600 000 000 51526

Sub-Total 46959 000 6767 000 53726 2600 000 397 56723

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 1447 1447

Central 14141 000 4334 000 18475 700 000 000 19175

Sub-Total 14141 000 4334 000 18475 700 000 1447 20622

State 371000 104000 217782 000 692782 000 77200 6470 776452

Private 726567 50000 396000 000 1172567 000 000 841512 2014079

Central 324243 000 42400 000 366643 55900 000 24330 446873

Sub-Total 1421810 154000 656182 000 2231992 55900 77200 872312 3237404

State 540000 000 000 000 540000 000 170366 8396 718762

Private 617400 000 10000 000 627400 000 000 428040 1055440

Central 334238 000 25700 000 359938 27300 152000 30000 569238

Sub-Total 1491638 000 35700 000 1527338 27300 322366 466436 2343440

State 228000 000 000 000 228000 000 12000 1105 241105

Private 885000 000 000 000 885000 000 000 52430 937430

Central 211075 000 000 000 211075 4800 10000 000 225875

Sub-Total 1324075 000 000 000 1324075 4800 22000 53535 1404410

State 1017000 000 67200 000 1084200 000 285084 38813 1408097

Private 1245600 000 56800 000 1302400 000 48100 880441 2230941

Central 466780 000 227273 000 694053 69000 000 12300 775353

Sub-Total 2729380 000 351273 000 3080653 69000 333184 931553 4414390

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 546 546

Central 19560 000 6634 000 26194 900 000 000 27094

Sub-Total 19560 000 6634 000 26194 900 000 546 27640

233300 000 19759 000 253059 22800 000 000 275859

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2204808 6245075

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Grand Total 7280862 154000 1080649 000 8515511 184000 754750 2326226 11780487

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

ThermalNuclear Hydro

RES

(MNRE)

State Ownership Sector

Mode wise breakup

Grand Total

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 501000 000 23540 000 524540 000 167360 5618 697518

Private 387388 000 381318 3680 772386 000 000 743901 1516287

Central 154683 12773 000 000 167456 12727 000 25000 205183

Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 774519 2418988

State 558250 000 000 000 558250 000 247993 4122 810365

Private 83945 000 83182 000 167127 000 000 394315 561442

Central 180685 14927 000 000 195612 14873 000 1000 211485

Sub-Total 822880 14927 83182 000 920989 14873 247993 399437 1583292

State 502000 000 000 12792 514792 000 358660 19389 892841

Private 195850 000 000 2520 198370 000 000 1369720 1568090

Central 242780 40140 000 000 282920 69800 000 000 352720

Sub-Total 940630 40140 000 15312 996082 69800 358660 1389108 2813650

State 000 000 000 15996 15996 000 185650 17290 218936

Private 61500 000 17400 000 78900 000 000 19021 97921

Central 86142 28180 35958 000 150280 36200 000 5000 191480

Sub-Total 147642 28180 53358 15996 245176 36200 185650 41311 508337

State 432000 000 52408 000 484408 000 217820 12270 714498

Private 458767 25000 50310 21170 555247 000 000 1253885 1809132

Central 302532 136420 000 000 438952 144800 000 23190 606942

Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1289345 3130572

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 000 10000 000 000 10000 000 000 000 10000

Sub-Total 000 10000 000 000 10000 000 000 000 10000

State 000 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 000 314 314

Central 14080 10760 000 000 24840 8600 000 000 33440

Sub-Total 14080 10760 3250 000 28090 8600 000 314 37004

142600 35800 000 000 178400 45000 000 000 223400

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3781156 5553186

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Grand Total 4304202 314000 647366 56158 5321726 332000 1177483 3894034 10725243

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Andhra Pradesh

Telangana

Karnataka

Total (Southern

Region)

Tamil Nadu

NLC

Puducherry

Central - Unallocated

Kerala

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 7070 7070

Private 28100 000 000 000 28100 000 000 25545 53645

Central 384933 000 000 000 384933 000 11000 000 395932

Sub-Total 413033 000 000 000 413033 000 11000 32615 456647

State 42000 000 000 000 42000 000 13000 405 55405

Private 73000 000 000 000 73000 000 000 3647 76647

Central 39374 000 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 000 154374 000 19100 4052 177526

State 540000 000 10000 000 550000 000 98600 12195 660795

Private 243700 000 000 000 243700 000 000 35250 278950

Central 76077 000 000 000 76077 000 41000 000 117077

Sub-Total 859777 000 10000 000 869777 000 139600 47445 1056822

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 698504 000 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 000 698504 000 18620 000 717124

State 42000 000 000 000 42000 000 206192 2630 250822

Private 293900 000 000 000 293900 000 000 47346 341246

Central 163390 000 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 000 499290 000 215092 50976 765358

State 000 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 000 39900 001 39901

Central 8703 000 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 000 8703 000 82300 5212 96215

112683 000 000 000 112683 000 8501 000 121184

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111789 790389

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Grand Total 2746364 000 10000 000 2756364 000 494212 140300 3390876

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

Grand TotalThermalNuclear

RES

(MNRE)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

Total (Eastern

Region)

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

Central - Unallocated

HydroOwnership Sector

Mode wise breakup

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2650 5100

Central 40852 000 43556 000 84408 000 35708 2500 122616

Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038

State 000 000 000 000 000 000 000 10711 10711

Private 000 000 000 000 000 000 000 2939 2939

Central 3705 000 4682 000 8387 000 11655 000 20042

Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692

State 000 000 000 000 000 000 32200 3253 35453

Private 000 000 000 000 000 000 000 012 012

Central 4560 000 10969 000 15529 000 7227 000 22756

Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 5610 000 43695 000 49305 000 6849 500 56654

Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 344 344

Central 4710 000 7157 000 11867 000 9534 000 21401

Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 3210 000 4893 000 8103 000 5733 000 13836

Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 3105 000 4046 000 7151 000 9794 000 16945

Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642

11250 000 6362 000 17612 000 14000 000 31612

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 663 663

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1698 5703

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1773 5778

19

Andaman amp

Nicobar

Lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination Division

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during May-2019 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 31-05-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621

May19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 0 0 23 23 0 750 0 750 0 750 23 773

Achievement 0 0 0 0 0 0 0 0 0 0 0 0 0 474 0 474 0 503 0 503 0 977 0 977

Upto May-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 226 1176 0 1059 0 1059 637 2365 783 3785

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 494 0 494 0 904 0 904 53 1398 0 1451

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

Line

1 2 3 4 5 6

0

1 400 Barmer-Bhinmal line DC RVPNL 288

2 400 Jangaon - Tippapur DC TSTRANSCO 138

3 400 Kayathar - Thennampatty DC TANTRANSCO 48

4 220 Bareilly (400) - Pilibhit Ckt-II SC UPPTCL 39

5 220 Bhanjanagar - Aska DC OPTCL 57

6 220LILO of both Ckt of 220kV Mobha - Mangrol

line at 220kV Amod (Balanced portion)DC GETCO 46

7 220LILO of Gr Noida (400) - Noida Sec-148 line

at RC GreenDC UPPTCL 9

8 220 LILO of Hathras - Gokul at Mathura DC UPPTCL 120

9 220 Sohawal - Tanda DC UPPTCL 232

977

0

977

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During May-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 31-05-19

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during

May-201921(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 31-05-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716

May19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 0 1445 1000 2445 0 680 0 680 0 2125 1000 3125

Achievement 0 0 0 0 0 0 0 0 1000 0 0 1000 0 2385 0 2385 0 760 0 760 1000 3145 0 4145

Upto May-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 2445 3000 5445 0 1480 0 1480 3000 3925 6000 12925

Achievement 0 0 0 0 0 0 0 0 1500 0 0 1500 815 4365 0 5180 0 2065 0 2065 2315 6430 0 8745

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

As on 31-05-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1Bhadla SS (3x1500 3x500 MVA) (500 MVA ICTs- II

and III)400220 PGCIL 1000

Total of CENTRAL SECTOR 1000

2 Moradabad(Aug) (Additional TF) 400220 UPPTCL 240

3 Masauli Prayagraj (New) TF-III 400132 UPPTCL 200

4 Talaricheruvu Ss 400220 APTRANSCO 9455 Uravakonda (Aug) ICT-II 400220 APTRANSCO 5006 Jangaon ss (3x500) (ICT-I) 400220 TSTRANSCO 500

7 Chinhat Lucknow (Aug) TF-II (200-160) 220132 UPPTCL 408 Hathras (Aug)T-I(200-160) 220132 UPPTCL 409 Jaunpur (Aug) (Additional TF) 220132 UPPTCL 16010 Laukahi (Supaul new) 22013233 BSPTCL 32011 Sector- 95 Gurgaon 22033 HVPNL 10012 Alawalpur ss 22066 PSTCL 100

TOTAL STATE SECTOR 3145

GRAND TOTAL 4145

21(2)

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During May-2019

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2019-20 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination Division

Programme Achievement Ach Programme Achievement Ach

Central Sector 37545100 3290600 3141593 9547 6468500 6275642 9702

State Sector 37498600 3425800 3092392 9027 6748300 6066733 8990

PvtIPP Sector 37346200 3476700 3460217 9953 6713100 6652517 9910

PvtUTL Sector 1823100 164300 171799 10456 323600 337490 10429

Total 114213000 10357400 9866001 9526 20253500 19332382 9545

Central Sector 5661700 604200 619800 10258 990300 1104995 11158

State Sector 6680500 551500 652766 11836 1049700 1184387 11283

PvtIPP Sector 1206900 130200 121344 9320 187500 200643 10701

PvtUTL Sector 144100 12400 14009 11298 24700 25155 10184

Total 13693200 1298300 1407919 10844 2252200 2515180 11168

Central Sector 4472000 353500 365463 10338 720800 694195 9631

Total 4472000 353500 365463 10338 720800 694195 9631

Bhutan Import 621800 32500 35300 10862 50000 59270 11854

Central Sector 47678800 4248300 4126856 9714 8179600 8074832 9872

State Sector 44179100 3977300 3745158 9416 7798000 7251120 9299

Pvt Sector 40520300 3783600 3767369 9957 7248900 7215805 9954

Total 133000000 12041700 11674683 9695 23276500 22601027 9710

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Apr-19 Apr-18 Upto Apr-2019 Upto Apr-2018

975409 844377 975409 844377

22

Renewable Energy Generation

Achievement

May-2019

1 Electricity Generation (MU) Targets and Achievememts for 2019-20

All India Energy Generation During Apr-19 to May-19 (MU)

Target (2019-20)Apr-19 to May-19

Sector

Hydro

Thermal

Nuclear

202535

22522

7208

232765

193324

25152

6942

226010

0

50000

100000

150000

200000

250000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Energy Power Supply Position (Provisional) for May-2019 and during Apr-19 to May-19 23

2 Peak Power Supply Position (Provisional) for May-2019 and during Apr-19 to May-19 24

3 Energy Power Supply Position (Revised) for Apr-2019 and during Apr-19 to Apr-19 25

4 Peak Power Supply Position (Revised) for Apr-2019 and during Apr-19 to Apr-19 26

5 Notified Power cuts Restrictions on Industries during May-2019 27

6 Power Supply to Agricultural Sector during May-2019 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 154 154 0 00 271 271 0 00

दिलली Delhi 3366 3366 0 00 6065 6064 1 00

हरियजणज Haryana 4907 4907 0 00 8679 8679 0 00

दहमजचल परिश Himachal Pradesh 872 863 10 11 1654 1644 10 06

रमम कशमीि Jammu amp Kashmir 1760 1424 336 191 3364 2720 644 191

परजब Punjab 4769 4769 0 00 8475 8475 0 00

िजरसथजन Rajasthan 7120 7110 11 02 13313 13300 13 01

उतति परिश Uttar Pradesh 12742 12695 48 04 22897 22817 79 03

उततिजखड Uttarakhand 1329 1329 0 00 2449 2449 0 00

उततरी कषतर Northern Region 37020 36615 404 11 67166 66419 747 11

छततीसगढ़ Chhattisgarh 2794 2794 0 00 5765 5764 1 00

गरिजत Gujarat 11208 11208 0 00 21748 21748 0 00

मधय परिश Madhya Pradesh 6502 6502 0 00 12735 12735 0 00

महजिजषटर Maharashtra 14976 14976 0 00 29295 29294 0 00

िमन औि दिउ Daman amp Diu 222 222 0 00 443 443 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 1106 1106 0 00

गोवज Goa 404 404 0 00 801 801 0 00

पशचिमी कषतर Western Region 36658 36658 0 00 71893 71892 1 00

आनधर परिश Andhra Pradesh 6056 6048 7 01 11709 11702 7 01

तलगजनज Telangana 5318 5318 1 00 10772 10771 1 00

कनजाटक Karnataka 6702 6702 1 00 13569 13568 1 00

किल Kerala 2575 2566 9 03 4888 4878 10 02

तममल नजड Tamil Nadu 10309 10309 1 00 20031 20030 1 00

पडचिी Puducherry 271 271 1 03 517 516 1 01

लकष-दवीप Lakshadweep 4 4 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 31232 31213 19 01 61486 61465 21 00

बबहजि Bihar 3078 3078 0 00 5662 5659 3 01

िजमोिि घजटी ननगम DVC 1814 1814 0 00 3757 3755 2 01

झजिखणड Jharkhand 789 789 0 00 1505 1495 10 07

ओडडशज Odisha 2560 2560 0 00 5261 5261 0 00

पशशचम बगजल West Bengal 5115 5115 0 00 9920 9897 23 02

मसशककम Sikkim 36 36 0 00 78 78 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 58 54 4 67

परवी कषतर Eastern Region 13391 13391 0 00 26182 26144 38 01

अरणजचल परिश Arunachal Pradesh 64 64 0 06 127 126 1 06

असम Assam 819 738 81 99 1573 1434 139 88

मणणपि Manipur 73 72 1 07 135 134 2 12

मघजलय Meghalaya 167 159 8 50 336 318 18 55

ममज़ोिम Mizoram 55 55 0 07 100 99 1 08

नजगजलड Nagaland 65 64 1 08 124 123 1 08

बिपिज Tripura 173 170 2 14 292 288 4 13

उततर-परवी कषतर North-Eastern Region 1416 1323 93 66 2686 2521 165 62

समपणण भारत All India 119717 119200 517 04 229413 228441 972 04

Note Power Supply Position Report has been compiled based on the data furnished by State Utilities Electricity Departments

23

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 356 356 0 00 356 356 0 00

दिलली Delhi 6461 6461 0 00 6461 6461 0 00

हरियजणज Haryana 8874 8874 0 00 8874 8874 0 00

दहमजचल परिश Himachal Pradesh 1480 1480 0 00 1480 1480 0 00

रमम कशमीि Jammu amp Kashmir 2426 2426 0 00 2885 2426 459 159

परजब Punjab 8802 8802 0 00 8802 8802 0 00

िजरसथजन Rajasthan 11791 11791 0 00 11791 11791 0 00

उतति परिश Uttar Pradesh 22487 22057 430 19 22487 22057 430 19

उततिजखड Uttarakhand 2155 2155 0 00 2155 2155 0 00

उततरी कषतर Northern Region 60987 60078 909 15 60987 60078 909 15

छततीसगढ़ Chhattisgarh 4504 4504 0 00 4596 4574 22 05

गरिजत Gujarat 18094 18094 0 00 18094 18094 0 00

मधय परिश Madhya Pradesh 10145 10131 14 01 10145 10131 14 01

महजिजषटर Maharashtra 23621 23613 8 00 23621 23613 8 00

िमन औि दिउ Daman amp Diu 344 344 0 01 344 344 0 01

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 818 818 0 00

गोवज Goa 554 554 0 00 594 594 0 00

पशचिमी कषतर Western Region 57113 57093 20 00 57113 57093 20 00

आनधर परिश Andhra Pradesh 9854 9854 0 00 9854 9854 0 00

तलगजनज Telangana 8684 8684 0 00 10269 10202 67 07

कनजाटक Karnataka 12158 12158 0 00 12700 12688 12 01

किल Kerala 4286 4205 81 19 4316 4300 16 04

तममल नजड Tamil Nadu 15584 15522 62 04 15680 15659 21 01

पडचिी Puducherry 453 442 11 24 453 444 9 20

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 47477 47465 12 00 49218 49103 115 02

बबहजि Bihar 5481 5481 0 00 5481 5481 0 00

िजमोिि घजटी ननगम DVC 3048 3048 0 00 3048 3048 0 00

झजिखणड Jharkhand 1330 1330 0 00 1330 1330 0 00

ओडडशज Odisha 4736 4736 0 00 5142 5140 3 01

पशशचम बगजल West Bengal 9335 9335 0 00 9335 9335 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23558 23558 0 00 23558 23558 0 00

अरणजचल परिश Arunachal Pradesh 140 138 2 12 140 138 2 12

असम Assam 1753 1673 80 46 1910 1673 237 124

मणणपि Manipur 183 181 2 09 197 188 9 48

मघजलय Meghalaya 329 325 4 12 337 337 0 00

ममज़ोिम Mizoram 102 100 2 20 116 113 3 28

नजगजलड Nagaland 130 128 2 14 157 131 27 169

बिपिज Tripura 297 295 1 05 297 295 1 05

उततर-परवी कषतर North-Eastern Region 2758 2674 84 31 2848 2780 68 24

समपणण भारत All India 183513 182533 981 05 183513 182533 981 05

Note Power Supply Position Report has been compiled based on the data furnished by State Utilities Electricity Departments 24

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -मई2019 April2019 to May2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and supply

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateमई 2019 May2019

मजग की पनता म कमी Demand not Met

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 781 781 0 00 781 781 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3706 3706 0 00 3706 3706 0 00

िजरसथजन Rajasthan 6192 6190 2 00 6192 6190 2 00

उतति परिश Uttar Pradesh 10154 10123 32 03 10154 10123 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30147 29804 343 11 30147 29804 343 11

छततीसगढ़ Chhattisgarh 2972 2971 1 00 2972 2971 1 00

गरिजत Gujarat 10540 10540 0 00 10540 10540 0 00

मधय परिश Madhya Pradesh 6233 6233 0 00 6233 6233 0 00

महजिजषटर Maharashtra 14319 14319 0 00 14319 14319 0 00

िमन औि दिउ Daman amp Diu 221 221 0 00 221 221 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 554 554 0 00 554 554 0 00

गोवज Goa 397 397 0 00 397 397 0 00

पशचिमी कषतर Western Region 35235 35234 1 00 35235 35234 1 00

आनधर परिश Andhra Pradesh 5653 5653 0 00 5653 5653 0 00

तलगजनज Telangana 5453 5453 0 00 5453 5453 0 00

कनजाटक Karnataka 6867 6867 0 00 6867 6867 0 00

किल Kerala 2313 2312 2 01 2313 2312 2 01

तममल नजड Tamil Nadu 9721 9721 0 00 9721 9721 0 00

पडचिी Puducherry 246 246 0 00 246 246 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 30254 30252 2 00 30254 30252 2 00

बबहजि Bihar 2584 2581 3 01 2584 2581 3 01

िजमोिि घजटी ननगम DVC 1944 1942 2 01 1944 1942 2 01

झजिखणड Jharkhand 716 706 10 14 716 706 10 14

ओडडशज Odisha 2701 2701 0 00 2701 2701 0 00

पशशचम बगजल West Bengal 4805 4782 23 05 4805 4782 23 05

मसशककम Sikkim 42 42 0 00 42 42 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12792 12754 38 03 12792 12754 38 03

अरणजचल परिश Arunachal Pradesh 62 62 0 06 62 62 0 06

असम Assam 754 696 58 77 754 696 58 77

मणणपि Manipur 62 61 1 17 62 61 1 17

मघजलय Meghalaya 169 159 10 60 169 159 10 60

ममज़ोिम Mizoram 45 44 0 10 45 44 0 10

नजगजलड Nagaland 59 58 0 08 59 58 0 08

बिपिज Tripura 119 117 2 13 119 117 2 13

उततर-परवी कषतर North-Eastern Region 1270 1198 72 57 1270 1198 72 57

समपणण भारत All India 109696 109241 455 04 109696 109241 455 04

Note The revised data for March 2019 is not avaliable

Energy not Supplied Energy not Supplied

अपरल 2019 April2019 अपरल 2019 April2019 to April 2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2885 2308 577 200 2885 2308 577 200

परजब Punjab 7087 7087 0 00 7087 7087 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 47779 47210 569 12 47779 47210 569 12

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9179 9160 19 02 9179 9160 19 02

तलगजनज Telangana 10269 10202 67 07 10269 10202 67 07

कनजाटक Karnataka 12700 12688 12 01 12700 12688 12 01

किल Kerala 4316 4300 16 04 4316 4300 16 04

तममल नजड Tamil Nadu 15680 15659 21 01 15680 15659 21 01

पडचिी Puducherry 444 444 0 00 444 444 0 00

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49218 49103 115 02 49218 49103 115 02

बबहजि Bihar 5157 5155 2 00 5157 5155 2 00

िजमोिि घजटी ननगम DVC 3014 3014 0 00 3014 3014 0 00

झजिखणड Jharkhand 1326 1325 1 00 1326 1325 1 00

ओडडशज Odisha 5142 5140 3 01 5142 5140 3 01

पशशचम बगजल West Bengal 8745 8699 46 05 8745 8699 46 05

मसशककम Sikkim 98 98 0 00 98 98 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22415 22378 37 02 22415 22378 37 02

अरणजचल परिश Arunachal Pradesh 139 136 3 21 139 136 3 21

असम Assam 1910 1667 242 127 1910 1667 242 127

मणणपि Manipur 197 188 9 48 197 188 9 48

मघजलय Meghalaya 337 337 0 00 337 337 0 00

ममज़ोिम Mizoram 116 113 3 28 116 113 3 28

नजगजलड Nagaland 157 131 27 169 157 131 27 169

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177424 176810 613 03 177424 176810 613 03

Note The revised data for March 2019 is not avaliable 26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateअपरल 2019 April2019 अपरल 2019 April2019 to April 2019

File NoCEA-CH-14-1142018-Coordination Division

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

मई 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during May2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

N

o No

tified

Cuts

N

o No

tified

Cuts

File NoCEA-CH-14-1142018-Coordination Division

मई2019May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0910 hrsday 0811 - 910 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 403 hrsday 0347 - 403 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 2214 hrsday 2157 - 2214 hrsday

उततराखड Uttarakhand Data not received 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-957 hrs day

Three-Phase (Mixed) Supply - 2346 hrs day

Three-Phase Supply(Irrigation)- 0953 - 0957 hrs day Three-

Phase (Mixed) Supply - 2334 - 2346 hrs day

महजिजषटर Maharashtra Three-Phase Supply - 9 hrs day Three-Phase Supply - 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

मई 2019 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during May2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to May-2019 20070450 2493722 63763 22627934 678000 4539922 7835904 35681760

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 7835904 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

7835904

Total Installed Capacity 35687160 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-22 (Up to

Mar2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

Plan Period

2017-22 (Up to

May-19)

6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58732 21173 181240 11734 163456 1010 176200 158886 225204 30768 414858

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Progress of Transmission Sector in the Country up to May 2019

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on May19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

May 19)

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during May 2019

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 20525 925681234952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1Electricity Generation (Conventional Sources) for May-2019 (BU) 1

2 Generating Capacity Addition for May-2019 (MW) 2

3 List of Projects Commissioned in May-2019 3

4 All India Installed Capacity (MW) Region-wise as on 31-05-19 3

5 All India Installed Capacity (MW) Sector-wise as on 31-05-19 4

6 Transmission Lines Added during May-2019 (Ckms) 5

7 Transformation Capacity Addition during May-2019 (MVA) 6

8 Power Supply Position (Energy amp Peak) in May-2019 7

9 Peak Shortage of Power Supply (MW) in Different Regions 8-9

10 All India PLF Sector-wise for May-2019 10

11 T amp D and AT amp C Losses ()

12 All India Village Electrification

13 Average cost of Power amp Average Realisation

14 All India Coal consumption for Power Generation (MT)

Section A - Highlights of Power Sector

11

File NoCEA-CH-14-1142018-Coordination Division

Achievement

May-19

Thermal 9866 182

Nuclear 365 1465

Hydro 1408 3184

Bhutan Import 035 1314

All India 11675 511

Type

Thermal

Nuclear

Hydro

Bhutan Import

All India

1A

25151

059034

690649

37921824

7672

Change wrt Apr-18 to May-18

Electricity Generation During Apr-18 to May-18 amp Apr-19 to May-19 (BU)

Apr-18 to May-18 Apr-19 to May-19

319

12983

5142260121496

11107

033

19332

6941

180

9689

18990

1 Electricity Generation for May-2019 (BU)

May-19

TypeAchievement

May-18

Targets Change of

Achievement

wrt May-2018

10357

031

3535

12042

1068

11107

11675

10800

10900

11000

11100

11200

11300

11400

11500

11600

11700

11800

BU

May-18 May-19

2149622601

000

5000

10000

15000

20000

25000

BU

Apr-18 to May-18 Apr-19 to May-19

File NoCEA-CH-14-1142018-Coordination Division

Generation from

Conventional

Sources

Generation

from

Renewable

Sources

Total Generation from

Conventional Sources

Generation from

Renewable SourcesTotal

Growth in

Conventional

Generation

Growth in

Renewable

Generation

Growth in

Total

Generation

(BU) (BU) (BU) (BU) (BU) (BU) () () ()

116746 12300 129046 111070 9256 120326 511 3289 725

Note Tentative

SlNo

Source-Wise All

India

Generation

from

Renewables Apr-2019 Apr-2018 Apr-19 to Apr-19 Apr-18 to Apr-18

1 Wind 3592220 3322740 3592220 3322740

2 Solar 4168670 3178880 4168670 3178880

3 Biomass 235010 255430 235010 255430

4 Bagasse 1201290 1263940 1201290 1263940

5 Small Hydro 518130 384140 518130 384140

6 Others 38770 38640 38770 38640

Total 9754090 8443770 9754090 8443770

Note 1) Data as received from SLDCElectricity Department of the respective states or from the electricity department

2) 25 MW Khopli-II project of NEEPCO located in Assam is considered under Small Hydro wef 01072018 Earlier it was considered under Hydro

3) Previous month generation has been taken as SLDC has not furnished generation data for the current month

Electricity Generation (Conventional and Renewable Sources)

May-2019 May-2018 Growth

1B

For the Month of Cummulative for the period

All India Generation From Renewables (All Figures are in MU)

File NoCEA-CH-14-1142018-Coordination Division

Achievement Targets Achievement

May-18

Thermal 0 660 0 NA

Hydro 110 0 0 000

Nuclear 0 0 0 NA

All India 110 660 0 000

Apr-18 to May-18 Apr-19 to May-19 Change wrt Previous Year

Thermal 69755 0 -1000

Hydro 110000 0 -1000

Nuclear 0000 0 NA

All India 179755 0 -1000

NA- Not Applicable

2

2 Generating Capacity Addition for May-2019 (MW)

Generating Capacity Addition during Apr-18 to May-18 amp Apr-19 to May-19

NA- Not Applicable

Achivement

wrt May-2018Type

May-19

1100

000

20

40

60

80

100

120

1May-18 May-19

0000

20000

40000

60000

80000

100000

120000

140000

160000

180000

200000

Apr-18 to May-18 Apr-19 to May-19

File NoCEA-CH-14-1142018-Coordination Division

1

2

3

Nuclear Hydro RES Grand TotalRegion Coal Lignite Gas Diesel Total

Northern 5036020 158000 578126 000 5772146 162000 1970777 1441143 9346066

Western 7280862 154000 1080649 000 8515511 184000 754750 2326226 11780487

Southern 4304202 314000 647366 56158 5321726 332000 1177483 3894034 10725243

Eastern 2746364 000 10000 000 2756364 000 494212 140300 3390876

North-East 77002 000 177581 3600 258183 000 142700 32429 433311

Islands 000 000 000 4005 4005 000 000 1773 5778

ALL INDIA 19444450 626000 2493722 63763 22627934 678000 4539922 7835904 35681760

Note Captive Genaration is not included in the total Captive Power capacity as on 31032017 RES as on 30042019 3

Thermal

Nuclear

3 List of Projects Commissioned During May-2019

4 All India Installed Capacity (MW) Region-wise as on 31-05-19

NIL

NIL

Thermal

NIL

Hydro

22627934

678000

4539922

7835904

35681760

51529

000

5000000

10000000

15000000

20000000

25000000

30000000

35000000

40000000

Thermal Nuclear Hydro RES Total Captive

Thermal Nuclear Hydro RES Total Captive

Total = 356817604

File NoCEA-CH-14-1142018-Coordination Division

Sector

Coal Lignite Gas Diesel Total

State 6407650 129000 711871 36393 7284913 000 2987880 234893 10507686

Private 7468800 183000 1058060 27370 8737230 000 339400 7437781 16514411

Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663

All India 19444450 626000 2493722 63763 22627934 678000 4539922 7835904 35681760

State 10507686

Private 16514411

Central 8659663

Electricity Generation (MU) Targets and Achievements for 2016-17

5 All India Installed Capacity (MW) Sector-wise as on 31-05-19

4

Grand TotalTHERMAL

Nuclear Hydro RES

RES as on 30042019

State 10507686 30

Private 16514411 46

Central 8659663 24

All India Installed Capacity(MW) (Sector-Wise)

File NoCEA-CH-14-1142018-Coordination Division

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 kV

220 KV

All India

5

0 0

6 Transmission Lines Added during May-2019 (Ckms)

May-18 May-19

0 0

0 0

0 0

623 474

720 503

1343 977

Transmission Lines Added duringApr-18 to May-18 ampApr-19 to May-19 (Ckms)

Apr-18 to May-18 Apr-19 to May-19

1201 904

2106 1451

0 0

242 53

663 494

1343

977

0

200

400

600

800

1000

1200

1400

1600

All India

Ckm

s

May-18 May-19

2106

1451

0

500

1000

1500

2000

2500

All India

Ckm

s

Apr-18 to May-18 Apr-19 to May-19

File NoCEA-CH-14-1142018-Coordination Division

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

6

7 Transformation Capacity Addition During May-2019 (MVA)

0

0

1390

1060

0 0

May-18 May-19

2450

0

1000

4145

2385

760

0 0

All India Transformation Capacity Addition during Apr-18 to May-18 amp Apr-19

to May-19 (MVA)

8745

0

1500

5180

2065

7920

4000

1575

2345

0

Apr-18 to May-18 Apr-19 to May-19

2450

4145

0

500

1000

1500

2000

2500

3000

3500

4000

4500

MV

A

May-18 May-19

7920 8745

0

74520

1

MV

A

Apr-18 to May-18 Apr-19 to May-19

File NoCEA-CH-14-1142018-Coordination Division

May-2018 May-2019 May-2018 May-2019 May-2018 May-2019

Northern 35206 37020 34664 36615 -15 -11

Western 35085 36658 35070 36658 00 00

Southern 27681 31232 27619 31213 -02 -01

Eastern 13210 13391 13063 13391 -11 00

North Eastern 1232 1416 1175 1323 -46 -66

All India 112414 119717 111591 119200 -07 -04

May-2018 May-2019 May-2018 May-2019 May-2018 May-2019

Northern 56546 60987 56243 60078 -05 -15

Western 53841 57113 52442 57093 -26 00

Southern 43234 47477 43234 47465 00 00

Eastern 21256 23558 21249 23558 00 00

North Eastern 2709 2758 2611 2674 -36 -31

All India 171973 183513 170765 182533 -07 -05

May-2019 Figures are Provisional

7

8 Power Supply Position (Energy amp Peak) in May-2019

Peak Demand Peak Met

Requirement Availability

Energy (MU)Region

Surplus(+)

Deficit (-) in

Surplus(+)

Deficit (-) in Region

Power (MW)

File NoCEA-CH-14-1142018-Coordination Division

Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand May-2018 0 0 0 0 589 0 0 172 0

May-2019 0 0 0 0 0 0 0 430 0

Chattisgarh Gujarat MP Maharashtra Daman amp Diu Dadar Nagar Goa

May-2018 11 1198 19 141 0 0 2

May-2019 0 0 14 8 0 1 0

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

May-2018 4 28 93 53 29 19 0

May-2019 0 0 0 81 62 11 0

8

9 Peak Shortage of Power Supply (MW) in Different Regions in May-2019

0 0 0 0 0 0 0

430

00 0 0 0

589

0 0

172

0

0

400

800

Ch

an

dig

ar

h Delh

i

Ha

rya

na

HP

Jamp

K

Pu

nja

b

Ra

jasth

an

UP

Utr

akhan

d

MW

Northern States (MW) May-2019 May-2018

0 0 14

8 0 1 011

1198

19 141

0 0 2

0

500

1000

1500

Ch

attis

gar

h

Guja

rat

MP

Mah

ara

shtr

a

Da

man amp

Diu

Da

dar

Na

gar G

oa

MW

Western States (MW) May-2019 May-2018

0 0 0

8162

11 0428

93

5329 19

00

100

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Southern State (MW) May-2019 May-2018

File NoCEA-CH-14-1142018-Coordination Division

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

May-2018 1 0 0 0 6 0 4

May-2019 0 0 0 0 0 0 4

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

May-2018 5 29 7 2 9 28 0

May-2019 2 80 2 4 2 2 1

9

0 0 0 0 0 0

4

1

0 0 0

6

0

4

0

2

4

6

8

Bih

ar

DV

C

Jha

rkh

an

d

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

NIs

land

MW

Eastern States (MW) May-2019 May-2018

2

80

2 4 2 2 15 7 2

9

28

0

0

20

40

60

80

100

Aru

na

cha

l

Assa

m

Ma

nip

ur

Me

gh

ala

ya

Miz

ora

m

Na

gala

nd

Trip

ura

MW

North-Eastern States (MW)

File NoCEA-CH-14-1142018-Coordination Division

Sector May-2018 May-2019

Central 7428 6845

State 6361 6095

Private Sector IPP 5625 6109

Private Sector UTL 6985 6458

ALL INDIA 6404 6324

Month PLF 2018 PLF 2019

Jan 6215 6054

Feb 6230 6051

March 6452 6340

April 6454 6471

May 6404 6324

For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment

10

PLF of Thermal Power Plants

(excluding gas based power plants)

All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise

10 All India Thermal PLF Sector-wise (Excluding Gas Based Power Plants) for May-2019

5800

6000

6200

6400

6600

Jan Feb March April May

Months

All India PLF Month-wise

PLF 2018 PLF 2019

7428

63615625

69856404

6845

60956109

64586324

000

1000

2000

3000

4000

5000

6000

7000

8000

Central State Private Sector IPP Private Sector UTL ALL INDIA

All India Thermal PLF

May-2018 May-2019

File NoCEA-CH-14-1142018-Coordination Division

2012-13 2013-14 2014-15 2015-16 2016-17 2017-18

TampD Losses 2304 2284 2277 2181 2142 2104

ATampC Losses 2548 2262 2572 2398 NA NA

Provisional

Note As per PFC for utilities selling directly to consumers NA- Not Available

Total Number of Villages

597464

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2013-14 4894

2014-15 5304

2015-16 5459

2016-17 5743

2017-18 6080

2018-19 6289

11

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality

as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a

Distribution Transformer may not be necessary)

14 All India Coal consumption for Power Generation (MT)

520

Average Revenue Realization(paiseunit)

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community

Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

11 T amp D and ATampC Losses ()

12 All India Village Electrification

Villiages Electrified (Nos)

10000All villages as per census 2011 has

been electrified on 28042018

Villages electrified

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12th Plan 2017-18 and 2018-19 12

2 Capacity Addition Targets amp Achievements during May-2019 and Apr-19 to May-19 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

File NoCEA-CH-14-1142018-Coordination Division

(i) CAPACITY ADDTION TARGETS AND ACHIEVEMENTS IN THE 12TH PLAN (Figures in MW)

SECTOR THERMAL HYDRO NUCLEAR TOTAL

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453

STATE 13922 22201 1608 2276 0 0 15530 24477

PRIVATE 43540 53661 3285 619 0 0 46825 54280

ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209

(ii) CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (Figures in MW)

Thermal Hydro Nuclear Total

Target Ach Target Ach Target Ach Target Ach

Central 4880 3170 800 390 500 0 6180 3560

State 3546 1760 300 200 0 0 3846 1960

Private 2940 3780 205 205 0 0 3145 3985

Total 11366 8710 1305 795 500 0 13171 9505

(iii) CAPACITY ADDITION ACHIEVEMENT FOR 2018-19 (Figures in MW)

Thermal Hydro Nuclear Total

Target Ach Target Ach Target Ach Target Ach

Central 2760 1960 710 110 0 0 3470 2070

State 4506 2850 130 30 0 0 4636 2880

Private 0 972 0 0 0 0 0 972

Total 7266 5782 840 140 0 0 8106 5922

12

1 Capacity Addtion Targets and Achievements in the 12th Plan 2017-18 and 2018-19

File NoCEA-CH-14-1142018-Coordination Division

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 6040 660 0 1160 0 -1160

State 425615 0 0 660 0 -660

Private 0 0 0 0 0 0

Total 1029615 660 0 1820 0 -1820

Central 600 0 0 0 0 0

State 21099 0 0 0 0 0

Private 379 0 0 0 0 0

Total 118999 0 0 0 0 0

Nuclear Central 700 0 0 0 0 0

Central 7340 660 0 1160 0 -1160

State 446714 0 0 660 0 -660

Private 379 0 0 0 0 0

Total 1218614 660 0 1820 0 -1820

Electricity Generation (MU) Targets and Achievements for 2016-17

13

2 Capacity Addition Targets Achievements During May-2019

Schemes Sector

Target 2019-20

Apr-19 to May-19May-19

Hydro

All India

Capacity Addition TargetsAchievements during the Month of May-2019

Thermal1

82

0

0 0

18

20

0 0 0 0

0

200

400

600

800

1000

1200

1400

1600

1800

2000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2019-20Target Achievement

0

100

200

300

400

500

600

700

Thermal Hydro Nuclear Total

660

0 0

660

0 0 00

MW

Target Achievement

File NoCEA-CH-14-1142018-Coordination Division

Coal Lignite Gas Diesel Total

State 1634400 25000 287920 000 1947320 000 869755 70056 2887131

Private 2168083 108000 55800 000 2331883 000 251400 1333187 3916470

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Sub Total 5036020 158000 578126 000 5772146 162000 1970777 1441143 9346066

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2204808 6245075

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Sub Total 7280862 154000 1080649 000 8515511 184000 754750 2326226 11780487

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3781156 5553186

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Sub Total 4304202 314000 647366 56158 5321726 332000 1177483 3894034 10725243

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111789 790389

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Sub Total 2746364 000 10000 000 2756364 000 494212 140300 3390876

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Sub Total 77002 000 177581 3600 258183 000 142700 32429 433311

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Sub Total 000 000 000 4005 4005 000 000 1773 5778

State 6407650 129000 711871 36393 7284913 000 2987880 234893 10507686

Private 7468800 183000 1058060 27370 8737230 000 339400 7437781 16514411

Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663

Total 19444450 626000 2493722 63763 22627934 678000 4539922 7835904 35681760

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30042019 is given below (in MW)

459415 3581588 2867921 7835904

A 0 MW

B May 2019 0 MW

C

May 2019 0 MW

D Net Capacity Added during May 2019 A-B-C 0 MW

Sector wise breakup of RES capacity as shown is provisional

RES

(MNRE)

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31052019)

(UTILITIES)

Region Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30042019

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

CapacityBM PowerCogen Waste to Energy

913150 13830

Capacity Added during May 2019

Capacity Retired during

Capacity removed due to change

from Conventional to RES during

Share of installed capacity of BBMB Stations is included in state sector of partner states

File NoCEA-CH-14-1142018-Coordination Division

Coal Lignite Gas Diesel Total

State 13500 000 180040 000 193540 000 000 000 193540

Private 86922 000 10800 000 97722 000 000 17889 115611

Central 311272 000 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 000 211541 000 623235 10283 72309 17889 723716

State 272000 000 15000 000 287000 000 110282 6930 404212

Private 408078 000 000 000 408078 000 20000 34512 462590

Central 129472 000 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 000 68561 000 878112 10094 196652 41942 1126799

State 000 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 000 99200 62668 161868

Central 18340 000 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 000 6201 000 24541 2895 291048 88329 406813

State 000 000 17500 000 17500 000 123000 13003 153503

Private 000 000 000 000 000 000 000 6483 6483

Central 50639 000 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 000 30407 000 81047 6798 232188 19486 339519

State 176000 000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 000 511550 000 28800 115462 655812

Central 85458 000 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244

State 626000 25000 60380 000 711380 000 109618 2385 823383

Private 280200 108000 000 000 388200 000 10400 751322 1149922

Central 95625 25000 22110 000 142735 55674 73901 34400 306710

Sub-Total 1001825 158000 82490 000 1242315 55674 193919 788107 2280015

State 546900 000 000 000 546900 000 72410 2510 621820

Private 871433 000 000 000 871433 000 84200 288760 1244393

Central 379639 000 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 000 54949 000 1852921 28948 336863 294270 2513002

State 000 000 000 000 000 000 125215 6787 132002

Private 9900 000 45000 000 54900 000 8800 52620 116320

Central 34324 000 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 000 51966 000 96190 3124 181569 59407 340290

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 3471 3471

Central 3815 000 1503 000 5317 801 10171 000 16289

Sub-Total 3815 000 1503 000 5317 801 10171 3471 19760

124953 000 29105 000 154058 23703 75145 000 252907

State 1634400 25000 287920 000 1947320 000 869755 70056 2887131

Private 2168083 108000 55800 000 2331883 000 251400 1333187 3916470

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Grand Total 5036020 158000 578126 000 5772146 162000 1970777 1441143 9346066

Jammu amp Kashmir

Punjab

Rajasthan

Uttar Pradesh

Uttarakhand

Chandigarh

Central - Unallocated

Total (Northern

Region)

HydroRES

(MNRE)

Delhi

Haryana

Himachal Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31052019)

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 005 005

Private 000 000 4800 000 4800 000 000 392 5192

Central 46959 000 1967 000 48926 2600 000 000 51526

Sub-Total 46959 000 6767 000 53726 2600 000 397 56723

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 1447 1447

Central 14141 000 4334 000 18475 700 000 000 19175

Sub-Total 14141 000 4334 000 18475 700 000 1447 20622

State 371000 104000 217782 000 692782 000 77200 6470 776452

Private 726567 50000 396000 000 1172567 000 000 841512 2014079

Central 324243 000 42400 000 366643 55900 000 24330 446873

Sub-Total 1421810 154000 656182 000 2231992 55900 77200 872312 3237404

State 540000 000 000 000 540000 000 170366 8396 718762

Private 617400 000 10000 000 627400 000 000 428040 1055440

Central 334238 000 25700 000 359938 27300 152000 30000 569238

Sub-Total 1491638 000 35700 000 1527338 27300 322366 466436 2343440

State 228000 000 000 000 228000 000 12000 1105 241105

Private 885000 000 000 000 885000 000 000 52430 937430

Central 211075 000 000 000 211075 4800 10000 000 225875

Sub-Total 1324075 000 000 000 1324075 4800 22000 53535 1404410

State 1017000 000 67200 000 1084200 000 285084 38813 1408097

Private 1245600 000 56800 000 1302400 000 48100 880441 2230941

Central 466780 000 227273 000 694053 69000 000 12300 775353

Sub-Total 2729380 000 351273 000 3080653 69000 333184 931553 4414390

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 546 546

Central 19560 000 6634 000 26194 900 000 000 27094

Sub-Total 19560 000 6634 000 26194 900 000 546 27640

233300 000 19759 000 253059 22800 000 000 275859

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2204808 6245075

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Grand Total 7280862 154000 1080649 000 8515511 184000 754750 2326226 11780487

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

ThermalNuclear Hydro

RES

(MNRE)

State Ownership Sector

Mode wise breakup

Grand Total

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 501000 000 23540 000 524540 000 167360 5618 697518

Private 387388 000 381318 3680 772386 000 000 743901 1516287

Central 154683 12773 000 000 167456 12727 000 25000 205183

Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 774519 2418988

State 558250 000 000 000 558250 000 247993 4122 810365

Private 83945 000 83182 000 167127 000 000 394315 561442

Central 180685 14927 000 000 195612 14873 000 1000 211485

Sub-Total 822880 14927 83182 000 920989 14873 247993 399437 1583292

State 502000 000 000 12792 514792 000 358660 19389 892841

Private 195850 000 000 2520 198370 000 000 1369720 1568090

Central 242780 40140 000 000 282920 69800 000 000 352720

Sub-Total 940630 40140 000 15312 996082 69800 358660 1389108 2813650

State 000 000 000 15996 15996 000 185650 17290 218936

Private 61500 000 17400 000 78900 000 000 19021 97921

Central 86142 28180 35958 000 150280 36200 000 5000 191480

Sub-Total 147642 28180 53358 15996 245176 36200 185650 41311 508337

State 432000 000 52408 000 484408 000 217820 12270 714498

Private 458767 25000 50310 21170 555247 000 000 1253885 1809132

Central 302532 136420 000 000 438952 144800 000 23190 606942

Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1289345 3130572

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 000 10000 000 000 10000 000 000 000 10000

Sub-Total 000 10000 000 000 10000 000 000 000 10000

State 000 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 000 314 314

Central 14080 10760 000 000 24840 8600 000 000 33440

Sub-Total 14080 10760 3250 000 28090 8600 000 314 37004

142600 35800 000 000 178400 45000 000 000 223400

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3781156 5553186

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Grand Total 4304202 314000 647366 56158 5321726 332000 1177483 3894034 10725243

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Andhra Pradesh

Telangana

Karnataka

Total (Southern

Region)

Tamil Nadu

NLC

Puducherry

Central - Unallocated

Kerala

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 7070 7070

Private 28100 000 000 000 28100 000 000 25545 53645

Central 384933 000 000 000 384933 000 11000 000 395932

Sub-Total 413033 000 000 000 413033 000 11000 32615 456647

State 42000 000 000 000 42000 000 13000 405 55405

Private 73000 000 000 000 73000 000 000 3647 76647

Central 39374 000 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 000 154374 000 19100 4052 177526

State 540000 000 10000 000 550000 000 98600 12195 660795

Private 243700 000 000 000 243700 000 000 35250 278950

Central 76077 000 000 000 76077 000 41000 000 117077

Sub-Total 859777 000 10000 000 869777 000 139600 47445 1056822

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 698504 000 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 000 698504 000 18620 000 717124

State 42000 000 000 000 42000 000 206192 2630 250822

Private 293900 000 000 000 293900 000 000 47346 341246

Central 163390 000 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 000 499290 000 215092 50976 765358

State 000 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 000 39900 001 39901

Central 8703 000 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 000 8703 000 82300 5212 96215

112683 000 000 000 112683 000 8501 000 121184

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111789 790389

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Grand Total 2746364 000 10000 000 2756364 000 494212 140300 3390876

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

Grand TotalThermalNuclear

RES

(MNRE)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

Total (Eastern

Region)

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

Central - Unallocated

HydroOwnership Sector

Mode wise breakup

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2650 5100

Central 40852 000 43556 000 84408 000 35708 2500 122616

Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038

State 000 000 000 000 000 000 000 10711 10711

Private 000 000 000 000 000 000 000 2939 2939

Central 3705 000 4682 000 8387 000 11655 000 20042

Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692

State 000 000 000 000 000 000 32200 3253 35453

Private 000 000 000 000 000 000 000 012 012

Central 4560 000 10969 000 15529 000 7227 000 22756

Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 5610 000 43695 000 49305 000 6849 500 56654

Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 344 344

Central 4710 000 7157 000 11867 000 9534 000 21401

Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 3210 000 4893 000 8103 000 5733 000 13836

Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 3105 000 4046 000 7151 000 9794 000 16945

Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642

11250 000 6362 000 17612 000 14000 000 31612

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 663 663

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1698 5703

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1773 5778

19

Andaman amp

Nicobar

Lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination Division

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during May-2019 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 31-05-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621

May19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 0 0 23 23 0 750 0 750 0 750 23 773

Achievement 0 0 0 0 0 0 0 0 0 0 0 0 0 474 0 474 0 503 0 503 0 977 0 977

Upto May-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 226 1176 0 1059 0 1059 637 2365 783 3785

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 494 0 494 0 904 0 904 53 1398 0 1451

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

Line

1 2 3 4 5 6

0

1 400 Barmer-Bhinmal line DC RVPNL 288

2 400 Jangaon - Tippapur DC TSTRANSCO 138

3 400 Kayathar - Thennampatty DC TANTRANSCO 48

4 220 Bareilly (400) - Pilibhit Ckt-II SC UPPTCL 39

5 220 Bhanjanagar - Aska DC OPTCL 57

6 220LILO of both Ckt of 220kV Mobha - Mangrol

line at 220kV Amod (Balanced portion)DC GETCO 46

7 220LILO of Gr Noida (400) - Noida Sec-148 line

at RC GreenDC UPPTCL 9

8 220 LILO of Hathras - Gokul at Mathura DC UPPTCL 120

9 220 Sohawal - Tanda DC UPPTCL 232

977

0

977

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During May-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 31-05-19

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during

May-201921(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 31-05-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716

May19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 0 1445 1000 2445 0 680 0 680 0 2125 1000 3125

Achievement 0 0 0 0 0 0 0 0 1000 0 0 1000 0 2385 0 2385 0 760 0 760 1000 3145 0 4145

Upto May-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 2445 3000 5445 0 1480 0 1480 3000 3925 6000 12925

Achievement 0 0 0 0 0 0 0 0 1500 0 0 1500 815 4365 0 5180 0 2065 0 2065 2315 6430 0 8745

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

As on 31-05-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1Bhadla SS (3x1500 3x500 MVA) (500 MVA ICTs- II

and III)400220 PGCIL 1000

Total of CENTRAL SECTOR 1000

2 Moradabad(Aug) (Additional TF) 400220 UPPTCL 240

3 Masauli Prayagraj (New) TF-III 400132 UPPTCL 200

4 Talaricheruvu Ss 400220 APTRANSCO 9455 Uravakonda (Aug) ICT-II 400220 APTRANSCO 5006 Jangaon ss (3x500) (ICT-I) 400220 TSTRANSCO 500

7 Chinhat Lucknow (Aug) TF-II (200-160) 220132 UPPTCL 408 Hathras (Aug)T-I(200-160) 220132 UPPTCL 409 Jaunpur (Aug) (Additional TF) 220132 UPPTCL 16010 Laukahi (Supaul new) 22013233 BSPTCL 32011 Sector- 95 Gurgaon 22033 HVPNL 10012 Alawalpur ss 22066 PSTCL 100

TOTAL STATE SECTOR 3145

GRAND TOTAL 4145

21(2)

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During May-2019

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2019-20 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination Division

Programme Achievement Ach Programme Achievement Ach

Central Sector 37545100 3290600 3141593 9547 6468500 6275642 9702

State Sector 37498600 3425800 3092392 9027 6748300 6066733 8990

PvtIPP Sector 37346200 3476700 3460217 9953 6713100 6652517 9910

PvtUTL Sector 1823100 164300 171799 10456 323600 337490 10429

Total 114213000 10357400 9866001 9526 20253500 19332382 9545

Central Sector 5661700 604200 619800 10258 990300 1104995 11158

State Sector 6680500 551500 652766 11836 1049700 1184387 11283

PvtIPP Sector 1206900 130200 121344 9320 187500 200643 10701

PvtUTL Sector 144100 12400 14009 11298 24700 25155 10184

Total 13693200 1298300 1407919 10844 2252200 2515180 11168

Central Sector 4472000 353500 365463 10338 720800 694195 9631

Total 4472000 353500 365463 10338 720800 694195 9631

Bhutan Import 621800 32500 35300 10862 50000 59270 11854

Central Sector 47678800 4248300 4126856 9714 8179600 8074832 9872

State Sector 44179100 3977300 3745158 9416 7798000 7251120 9299

Pvt Sector 40520300 3783600 3767369 9957 7248900 7215805 9954

Total 133000000 12041700 11674683 9695 23276500 22601027 9710

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Apr-19 Apr-18 Upto Apr-2019 Upto Apr-2018

975409 844377 975409 844377

22

Renewable Energy Generation

Achievement

May-2019

1 Electricity Generation (MU) Targets and Achievememts for 2019-20

All India Energy Generation During Apr-19 to May-19 (MU)

Target (2019-20)Apr-19 to May-19

Sector

Hydro

Thermal

Nuclear

202535

22522

7208

232765

193324

25152

6942

226010

0

50000

100000

150000

200000

250000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Energy Power Supply Position (Provisional) for May-2019 and during Apr-19 to May-19 23

2 Peak Power Supply Position (Provisional) for May-2019 and during Apr-19 to May-19 24

3 Energy Power Supply Position (Revised) for Apr-2019 and during Apr-19 to Apr-19 25

4 Peak Power Supply Position (Revised) for Apr-2019 and during Apr-19 to Apr-19 26

5 Notified Power cuts Restrictions on Industries during May-2019 27

6 Power Supply to Agricultural Sector during May-2019 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 154 154 0 00 271 271 0 00

दिलली Delhi 3366 3366 0 00 6065 6064 1 00

हरियजणज Haryana 4907 4907 0 00 8679 8679 0 00

दहमजचल परिश Himachal Pradesh 872 863 10 11 1654 1644 10 06

रमम कशमीि Jammu amp Kashmir 1760 1424 336 191 3364 2720 644 191

परजब Punjab 4769 4769 0 00 8475 8475 0 00

िजरसथजन Rajasthan 7120 7110 11 02 13313 13300 13 01

उतति परिश Uttar Pradesh 12742 12695 48 04 22897 22817 79 03

उततिजखड Uttarakhand 1329 1329 0 00 2449 2449 0 00

उततरी कषतर Northern Region 37020 36615 404 11 67166 66419 747 11

छततीसगढ़ Chhattisgarh 2794 2794 0 00 5765 5764 1 00

गरिजत Gujarat 11208 11208 0 00 21748 21748 0 00

मधय परिश Madhya Pradesh 6502 6502 0 00 12735 12735 0 00

महजिजषटर Maharashtra 14976 14976 0 00 29295 29294 0 00

िमन औि दिउ Daman amp Diu 222 222 0 00 443 443 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 1106 1106 0 00

गोवज Goa 404 404 0 00 801 801 0 00

पशचिमी कषतर Western Region 36658 36658 0 00 71893 71892 1 00

आनधर परिश Andhra Pradesh 6056 6048 7 01 11709 11702 7 01

तलगजनज Telangana 5318 5318 1 00 10772 10771 1 00

कनजाटक Karnataka 6702 6702 1 00 13569 13568 1 00

किल Kerala 2575 2566 9 03 4888 4878 10 02

तममल नजड Tamil Nadu 10309 10309 1 00 20031 20030 1 00

पडचिी Puducherry 271 271 1 03 517 516 1 01

लकष-दवीप Lakshadweep 4 4 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 31232 31213 19 01 61486 61465 21 00

बबहजि Bihar 3078 3078 0 00 5662 5659 3 01

िजमोिि घजटी ननगम DVC 1814 1814 0 00 3757 3755 2 01

झजिखणड Jharkhand 789 789 0 00 1505 1495 10 07

ओडडशज Odisha 2560 2560 0 00 5261 5261 0 00

पशशचम बगजल West Bengal 5115 5115 0 00 9920 9897 23 02

मसशककम Sikkim 36 36 0 00 78 78 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 58 54 4 67

परवी कषतर Eastern Region 13391 13391 0 00 26182 26144 38 01

अरणजचल परिश Arunachal Pradesh 64 64 0 06 127 126 1 06

असम Assam 819 738 81 99 1573 1434 139 88

मणणपि Manipur 73 72 1 07 135 134 2 12

मघजलय Meghalaya 167 159 8 50 336 318 18 55

ममज़ोिम Mizoram 55 55 0 07 100 99 1 08

नजगजलड Nagaland 65 64 1 08 124 123 1 08

बिपिज Tripura 173 170 2 14 292 288 4 13

उततर-परवी कषतर North-Eastern Region 1416 1323 93 66 2686 2521 165 62

समपणण भारत All India 119717 119200 517 04 229413 228441 972 04

Note Power Supply Position Report has been compiled based on the data furnished by State Utilities Electricity Departments

23

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 356 356 0 00 356 356 0 00

दिलली Delhi 6461 6461 0 00 6461 6461 0 00

हरियजणज Haryana 8874 8874 0 00 8874 8874 0 00

दहमजचल परिश Himachal Pradesh 1480 1480 0 00 1480 1480 0 00

रमम कशमीि Jammu amp Kashmir 2426 2426 0 00 2885 2426 459 159

परजब Punjab 8802 8802 0 00 8802 8802 0 00

िजरसथजन Rajasthan 11791 11791 0 00 11791 11791 0 00

उतति परिश Uttar Pradesh 22487 22057 430 19 22487 22057 430 19

उततिजखड Uttarakhand 2155 2155 0 00 2155 2155 0 00

उततरी कषतर Northern Region 60987 60078 909 15 60987 60078 909 15

छततीसगढ़ Chhattisgarh 4504 4504 0 00 4596 4574 22 05

गरिजत Gujarat 18094 18094 0 00 18094 18094 0 00

मधय परिश Madhya Pradesh 10145 10131 14 01 10145 10131 14 01

महजिजषटर Maharashtra 23621 23613 8 00 23621 23613 8 00

िमन औि दिउ Daman amp Diu 344 344 0 01 344 344 0 01

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 818 818 0 00

गोवज Goa 554 554 0 00 594 594 0 00

पशचिमी कषतर Western Region 57113 57093 20 00 57113 57093 20 00

आनधर परिश Andhra Pradesh 9854 9854 0 00 9854 9854 0 00

तलगजनज Telangana 8684 8684 0 00 10269 10202 67 07

कनजाटक Karnataka 12158 12158 0 00 12700 12688 12 01

किल Kerala 4286 4205 81 19 4316 4300 16 04

तममल नजड Tamil Nadu 15584 15522 62 04 15680 15659 21 01

पडचिी Puducherry 453 442 11 24 453 444 9 20

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 47477 47465 12 00 49218 49103 115 02

बबहजि Bihar 5481 5481 0 00 5481 5481 0 00

िजमोिि घजटी ननगम DVC 3048 3048 0 00 3048 3048 0 00

झजिखणड Jharkhand 1330 1330 0 00 1330 1330 0 00

ओडडशज Odisha 4736 4736 0 00 5142 5140 3 01

पशशचम बगजल West Bengal 9335 9335 0 00 9335 9335 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23558 23558 0 00 23558 23558 0 00

अरणजचल परिश Arunachal Pradesh 140 138 2 12 140 138 2 12

असम Assam 1753 1673 80 46 1910 1673 237 124

मणणपि Manipur 183 181 2 09 197 188 9 48

मघजलय Meghalaya 329 325 4 12 337 337 0 00

ममज़ोिम Mizoram 102 100 2 20 116 113 3 28

नजगजलड Nagaland 130 128 2 14 157 131 27 169

बिपिज Tripura 297 295 1 05 297 295 1 05

उततर-परवी कषतर North-Eastern Region 2758 2674 84 31 2848 2780 68 24

समपणण भारत All India 183513 182533 981 05 183513 182533 981 05

Note Power Supply Position Report has been compiled based on the data furnished by State Utilities Electricity Departments 24

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -मई2019 April2019 to May2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and supply

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateमई 2019 May2019

मजग की पनता म कमी Demand not Met

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 781 781 0 00 781 781 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3706 3706 0 00 3706 3706 0 00

िजरसथजन Rajasthan 6192 6190 2 00 6192 6190 2 00

उतति परिश Uttar Pradesh 10154 10123 32 03 10154 10123 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30147 29804 343 11 30147 29804 343 11

छततीसगढ़ Chhattisgarh 2972 2971 1 00 2972 2971 1 00

गरिजत Gujarat 10540 10540 0 00 10540 10540 0 00

मधय परिश Madhya Pradesh 6233 6233 0 00 6233 6233 0 00

महजिजषटर Maharashtra 14319 14319 0 00 14319 14319 0 00

िमन औि दिउ Daman amp Diu 221 221 0 00 221 221 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 554 554 0 00 554 554 0 00

गोवज Goa 397 397 0 00 397 397 0 00

पशचिमी कषतर Western Region 35235 35234 1 00 35235 35234 1 00

आनधर परिश Andhra Pradesh 5653 5653 0 00 5653 5653 0 00

तलगजनज Telangana 5453 5453 0 00 5453 5453 0 00

कनजाटक Karnataka 6867 6867 0 00 6867 6867 0 00

किल Kerala 2313 2312 2 01 2313 2312 2 01

तममल नजड Tamil Nadu 9721 9721 0 00 9721 9721 0 00

पडचिी Puducherry 246 246 0 00 246 246 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 30254 30252 2 00 30254 30252 2 00

बबहजि Bihar 2584 2581 3 01 2584 2581 3 01

िजमोिि घजटी ननगम DVC 1944 1942 2 01 1944 1942 2 01

झजिखणड Jharkhand 716 706 10 14 716 706 10 14

ओडडशज Odisha 2701 2701 0 00 2701 2701 0 00

पशशचम बगजल West Bengal 4805 4782 23 05 4805 4782 23 05

मसशककम Sikkim 42 42 0 00 42 42 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12792 12754 38 03 12792 12754 38 03

अरणजचल परिश Arunachal Pradesh 62 62 0 06 62 62 0 06

असम Assam 754 696 58 77 754 696 58 77

मणणपि Manipur 62 61 1 17 62 61 1 17

मघजलय Meghalaya 169 159 10 60 169 159 10 60

ममज़ोिम Mizoram 45 44 0 10 45 44 0 10

नजगजलड Nagaland 59 58 0 08 59 58 0 08

बिपिज Tripura 119 117 2 13 119 117 2 13

उततर-परवी कषतर North-Eastern Region 1270 1198 72 57 1270 1198 72 57

समपणण भारत All India 109696 109241 455 04 109696 109241 455 04

Note The revised data for March 2019 is not avaliable

Energy not Supplied Energy not Supplied

अपरल 2019 April2019 अपरल 2019 April2019 to April 2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2885 2308 577 200 2885 2308 577 200

परजब Punjab 7087 7087 0 00 7087 7087 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 47779 47210 569 12 47779 47210 569 12

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9179 9160 19 02 9179 9160 19 02

तलगजनज Telangana 10269 10202 67 07 10269 10202 67 07

कनजाटक Karnataka 12700 12688 12 01 12700 12688 12 01

किल Kerala 4316 4300 16 04 4316 4300 16 04

तममल नजड Tamil Nadu 15680 15659 21 01 15680 15659 21 01

पडचिी Puducherry 444 444 0 00 444 444 0 00

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49218 49103 115 02 49218 49103 115 02

बबहजि Bihar 5157 5155 2 00 5157 5155 2 00

िजमोिि घजटी ननगम DVC 3014 3014 0 00 3014 3014 0 00

झजिखणड Jharkhand 1326 1325 1 00 1326 1325 1 00

ओडडशज Odisha 5142 5140 3 01 5142 5140 3 01

पशशचम बगजल West Bengal 8745 8699 46 05 8745 8699 46 05

मसशककम Sikkim 98 98 0 00 98 98 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22415 22378 37 02 22415 22378 37 02

अरणजचल परिश Arunachal Pradesh 139 136 3 21 139 136 3 21

असम Assam 1910 1667 242 127 1910 1667 242 127

मणणपि Manipur 197 188 9 48 197 188 9 48

मघजलय Meghalaya 337 337 0 00 337 337 0 00

ममज़ोिम Mizoram 116 113 3 28 116 113 3 28

नजगजलड Nagaland 157 131 27 169 157 131 27 169

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177424 176810 613 03 177424 176810 613 03

Note The revised data for March 2019 is not avaliable 26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateअपरल 2019 April2019 अपरल 2019 April2019 to April 2019

File NoCEA-CH-14-1142018-Coordination Division

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

मई 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during May2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

N

o No

tified

Cuts

N

o No

tified

Cuts

File NoCEA-CH-14-1142018-Coordination Division

मई2019May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0910 hrsday 0811 - 910 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 403 hrsday 0347 - 403 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 2214 hrsday 2157 - 2214 hrsday

उततराखड Uttarakhand Data not received 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-957 hrs day

Three-Phase (Mixed) Supply - 2346 hrs day

Three-Phase Supply(Irrigation)- 0953 - 0957 hrs day Three-

Phase (Mixed) Supply - 2334 - 2346 hrs day

महजिजषटर Maharashtra Three-Phase Supply - 9 hrs day Three-Phase Supply - 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

मई 2019 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during May2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to May-2019 20070450 2493722 63763 22627934 678000 4539922 7835904 35681760

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 7835904 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

7835904

Total Installed Capacity 35687160 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-22 (Up to

Mar2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

Plan Period

2017-22 (Up to

May-19)

6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58732 21173 181240 11734 163456 1010 176200 158886 225204 30768 414858

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Progress of Transmission Sector in the Country up to May 2019

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on May19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

May 19)

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during May 2019

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 20525 925681234952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Achievement

May-19

Thermal 9866 182

Nuclear 365 1465

Hydro 1408 3184

Bhutan Import 035 1314

All India 11675 511

Type

Thermal

Nuclear

Hydro

Bhutan Import

All India

1A

25151

059034

690649

37921824

7672

Change wrt Apr-18 to May-18

Electricity Generation During Apr-18 to May-18 amp Apr-19 to May-19 (BU)

Apr-18 to May-18 Apr-19 to May-19

319

12983

5142260121496

11107

033

19332

6941

180

9689

18990

1 Electricity Generation for May-2019 (BU)

May-19

TypeAchievement

May-18

Targets Change of

Achievement

wrt May-2018

10357

031

3535

12042

1068

11107

11675

10800

10900

11000

11100

11200

11300

11400

11500

11600

11700

11800

BU

May-18 May-19

2149622601

000

5000

10000

15000

20000

25000

BU

Apr-18 to May-18 Apr-19 to May-19

File NoCEA-CH-14-1142018-Coordination Division

Generation from

Conventional

Sources

Generation

from

Renewable

Sources

Total Generation from

Conventional Sources

Generation from

Renewable SourcesTotal

Growth in

Conventional

Generation

Growth in

Renewable

Generation

Growth in

Total

Generation

(BU) (BU) (BU) (BU) (BU) (BU) () () ()

116746 12300 129046 111070 9256 120326 511 3289 725

Note Tentative

SlNo

Source-Wise All

India

Generation

from

Renewables Apr-2019 Apr-2018 Apr-19 to Apr-19 Apr-18 to Apr-18

1 Wind 3592220 3322740 3592220 3322740

2 Solar 4168670 3178880 4168670 3178880

3 Biomass 235010 255430 235010 255430

4 Bagasse 1201290 1263940 1201290 1263940

5 Small Hydro 518130 384140 518130 384140

6 Others 38770 38640 38770 38640

Total 9754090 8443770 9754090 8443770

Note 1) Data as received from SLDCElectricity Department of the respective states or from the electricity department

2) 25 MW Khopli-II project of NEEPCO located in Assam is considered under Small Hydro wef 01072018 Earlier it was considered under Hydro

3) Previous month generation has been taken as SLDC has not furnished generation data for the current month

Electricity Generation (Conventional and Renewable Sources)

May-2019 May-2018 Growth

1B

For the Month of Cummulative for the period

All India Generation From Renewables (All Figures are in MU)

File NoCEA-CH-14-1142018-Coordination Division

Achievement Targets Achievement

May-18

Thermal 0 660 0 NA

Hydro 110 0 0 000

Nuclear 0 0 0 NA

All India 110 660 0 000

Apr-18 to May-18 Apr-19 to May-19 Change wrt Previous Year

Thermal 69755 0 -1000

Hydro 110000 0 -1000

Nuclear 0000 0 NA

All India 179755 0 -1000

NA- Not Applicable

2

2 Generating Capacity Addition for May-2019 (MW)

Generating Capacity Addition during Apr-18 to May-18 amp Apr-19 to May-19

NA- Not Applicable

Achivement

wrt May-2018Type

May-19

1100

000

20

40

60

80

100

120

1May-18 May-19

0000

20000

40000

60000

80000

100000

120000

140000

160000

180000

200000

Apr-18 to May-18 Apr-19 to May-19

File NoCEA-CH-14-1142018-Coordination Division

1

2

3

Nuclear Hydro RES Grand TotalRegion Coal Lignite Gas Diesel Total

Northern 5036020 158000 578126 000 5772146 162000 1970777 1441143 9346066

Western 7280862 154000 1080649 000 8515511 184000 754750 2326226 11780487

Southern 4304202 314000 647366 56158 5321726 332000 1177483 3894034 10725243

Eastern 2746364 000 10000 000 2756364 000 494212 140300 3390876

North-East 77002 000 177581 3600 258183 000 142700 32429 433311

Islands 000 000 000 4005 4005 000 000 1773 5778

ALL INDIA 19444450 626000 2493722 63763 22627934 678000 4539922 7835904 35681760

Note Captive Genaration is not included in the total Captive Power capacity as on 31032017 RES as on 30042019 3

Thermal

Nuclear

3 List of Projects Commissioned During May-2019

4 All India Installed Capacity (MW) Region-wise as on 31-05-19

NIL

NIL

Thermal

NIL

Hydro

22627934

678000

4539922

7835904

35681760

51529

000

5000000

10000000

15000000

20000000

25000000

30000000

35000000

40000000

Thermal Nuclear Hydro RES Total Captive

Thermal Nuclear Hydro RES Total Captive

Total = 356817604

File NoCEA-CH-14-1142018-Coordination Division

Sector

Coal Lignite Gas Diesel Total

State 6407650 129000 711871 36393 7284913 000 2987880 234893 10507686

Private 7468800 183000 1058060 27370 8737230 000 339400 7437781 16514411

Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663

All India 19444450 626000 2493722 63763 22627934 678000 4539922 7835904 35681760

State 10507686

Private 16514411

Central 8659663

Electricity Generation (MU) Targets and Achievements for 2016-17

5 All India Installed Capacity (MW) Sector-wise as on 31-05-19

4

Grand TotalTHERMAL

Nuclear Hydro RES

RES as on 30042019

State 10507686 30

Private 16514411 46

Central 8659663 24

All India Installed Capacity(MW) (Sector-Wise)

File NoCEA-CH-14-1142018-Coordination Division

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 kV

220 KV

All India

5

0 0

6 Transmission Lines Added during May-2019 (Ckms)

May-18 May-19

0 0

0 0

0 0

623 474

720 503

1343 977

Transmission Lines Added duringApr-18 to May-18 ampApr-19 to May-19 (Ckms)

Apr-18 to May-18 Apr-19 to May-19

1201 904

2106 1451

0 0

242 53

663 494

1343

977

0

200

400

600

800

1000

1200

1400

1600

All India

Ckm

s

May-18 May-19

2106

1451

0

500

1000

1500

2000

2500

All India

Ckm

s

Apr-18 to May-18 Apr-19 to May-19

File NoCEA-CH-14-1142018-Coordination Division

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

6

7 Transformation Capacity Addition During May-2019 (MVA)

0

0

1390

1060

0 0

May-18 May-19

2450

0

1000

4145

2385

760

0 0

All India Transformation Capacity Addition during Apr-18 to May-18 amp Apr-19

to May-19 (MVA)

8745

0

1500

5180

2065

7920

4000

1575

2345

0

Apr-18 to May-18 Apr-19 to May-19

2450

4145

0

500

1000

1500

2000

2500

3000

3500

4000

4500

MV

A

May-18 May-19

7920 8745

0

74520

1

MV

A

Apr-18 to May-18 Apr-19 to May-19

File NoCEA-CH-14-1142018-Coordination Division

May-2018 May-2019 May-2018 May-2019 May-2018 May-2019

Northern 35206 37020 34664 36615 -15 -11

Western 35085 36658 35070 36658 00 00

Southern 27681 31232 27619 31213 -02 -01

Eastern 13210 13391 13063 13391 -11 00

North Eastern 1232 1416 1175 1323 -46 -66

All India 112414 119717 111591 119200 -07 -04

May-2018 May-2019 May-2018 May-2019 May-2018 May-2019

Northern 56546 60987 56243 60078 -05 -15

Western 53841 57113 52442 57093 -26 00

Southern 43234 47477 43234 47465 00 00

Eastern 21256 23558 21249 23558 00 00

North Eastern 2709 2758 2611 2674 -36 -31

All India 171973 183513 170765 182533 -07 -05

May-2019 Figures are Provisional

7

8 Power Supply Position (Energy amp Peak) in May-2019

Peak Demand Peak Met

Requirement Availability

Energy (MU)Region

Surplus(+)

Deficit (-) in

Surplus(+)

Deficit (-) in Region

Power (MW)

File NoCEA-CH-14-1142018-Coordination Division

Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand May-2018 0 0 0 0 589 0 0 172 0

May-2019 0 0 0 0 0 0 0 430 0

Chattisgarh Gujarat MP Maharashtra Daman amp Diu Dadar Nagar Goa

May-2018 11 1198 19 141 0 0 2

May-2019 0 0 14 8 0 1 0

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

May-2018 4 28 93 53 29 19 0

May-2019 0 0 0 81 62 11 0

8

9 Peak Shortage of Power Supply (MW) in Different Regions in May-2019

0 0 0 0 0 0 0

430

00 0 0 0

589

0 0

172

0

0

400

800

Ch

an

dig

ar

h Delh

i

Ha

rya

na

HP

Jamp

K

Pu

nja

b

Ra

jasth

an

UP

Utr

akhan

d

MW

Northern States (MW) May-2019 May-2018

0 0 14

8 0 1 011

1198

19 141

0 0 2

0

500

1000

1500

Ch

attis

gar

h

Guja

rat

MP

Mah

ara

shtr

a

Da

man amp

Diu

Da

dar

Na

gar G

oa

MW

Western States (MW) May-2019 May-2018

0 0 0

8162

11 0428

93

5329 19

00

100

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Southern State (MW) May-2019 May-2018

File NoCEA-CH-14-1142018-Coordination Division

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

May-2018 1 0 0 0 6 0 4

May-2019 0 0 0 0 0 0 4

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

May-2018 5 29 7 2 9 28 0

May-2019 2 80 2 4 2 2 1

9

0 0 0 0 0 0

4

1

0 0 0

6

0

4

0

2

4

6

8

Bih

ar

DV

C

Jha

rkh

an

d

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

NIs

land

MW

Eastern States (MW) May-2019 May-2018

2

80

2 4 2 2 15 7 2

9

28

0

0

20

40

60

80

100

Aru

na

cha

l

Assa

m

Ma

nip

ur

Me

gh

ala

ya

Miz

ora

m

Na

gala

nd

Trip

ura

MW

North-Eastern States (MW)

File NoCEA-CH-14-1142018-Coordination Division

Sector May-2018 May-2019

Central 7428 6845

State 6361 6095

Private Sector IPP 5625 6109

Private Sector UTL 6985 6458

ALL INDIA 6404 6324

Month PLF 2018 PLF 2019

Jan 6215 6054

Feb 6230 6051

March 6452 6340

April 6454 6471

May 6404 6324

For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment

10

PLF of Thermal Power Plants

(excluding gas based power plants)

All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise

10 All India Thermal PLF Sector-wise (Excluding Gas Based Power Plants) for May-2019

5800

6000

6200

6400

6600

Jan Feb March April May

Months

All India PLF Month-wise

PLF 2018 PLF 2019

7428

63615625

69856404

6845

60956109

64586324

000

1000

2000

3000

4000

5000

6000

7000

8000

Central State Private Sector IPP Private Sector UTL ALL INDIA

All India Thermal PLF

May-2018 May-2019

File NoCEA-CH-14-1142018-Coordination Division

2012-13 2013-14 2014-15 2015-16 2016-17 2017-18

TampD Losses 2304 2284 2277 2181 2142 2104

ATampC Losses 2548 2262 2572 2398 NA NA

Provisional

Note As per PFC for utilities selling directly to consumers NA- Not Available

Total Number of Villages

597464

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2013-14 4894

2014-15 5304

2015-16 5459

2016-17 5743

2017-18 6080

2018-19 6289

11

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality

as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a

Distribution Transformer may not be necessary)

14 All India Coal consumption for Power Generation (MT)

520

Average Revenue Realization(paiseunit)

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community

Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

11 T amp D and ATampC Losses ()

12 All India Village Electrification

Villiages Electrified (Nos)

10000All villages as per census 2011 has

been electrified on 28042018

Villages electrified

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12th Plan 2017-18 and 2018-19 12

2 Capacity Addition Targets amp Achievements during May-2019 and Apr-19 to May-19 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

File NoCEA-CH-14-1142018-Coordination Division

(i) CAPACITY ADDTION TARGETS AND ACHIEVEMENTS IN THE 12TH PLAN (Figures in MW)

SECTOR THERMAL HYDRO NUCLEAR TOTAL

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453

STATE 13922 22201 1608 2276 0 0 15530 24477

PRIVATE 43540 53661 3285 619 0 0 46825 54280

ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209

(ii) CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (Figures in MW)

Thermal Hydro Nuclear Total

Target Ach Target Ach Target Ach Target Ach

Central 4880 3170 800 390 500 0 6180 3560

State 3546 1760 300 200 0 0 3846 1960

Private 2940 3780 205 205 0 0 3145 3985

Total 11366 8710 1305 795 500 0 13171 9505

(iii) CAPACITY ADDITION ACHIEVEMENT FOR 2018-19 (Figures in MW)

Thermal Hydro Nuclear Total

Target Ach Target Ach Target Ach Target Ach

Central 2760 1960 710 110 0 0 3470 2070

State 4506 2850 130 30 0 0 4636 2880

Private 0 972 0 0 0 0 0 972

Total 7266 5782 840 140 0 0 8106 5922

12

1 Capacity Addtion Targets and Achievements in the 12th Plan 2017-18 and 2018-19

File NoCEA-CH-14-1142018-Coordination Division

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 6040 660 0 1160 0 -1160

State 425615 0 0 660 0 -660

Private 0 0 0 0 0 0

Total 1029615 660 0 1820 0 -1820

Central 600 0 0 0 0 0

State 21099 0 0 0 0 0

Private 379 0 0 0 0 0

Total 118999 0 0 0 0 0

Nuclear Central 700 0 0 0 0 0

Central 7340 660 0 1160 0 -1160

State 446714 0 0 660 0 -660

Private 379 0 0 0 0 0

Total 1218614 660 0 1820 0 -1820

Electricity Generation (MU) Targets and Achievements for 2016-17

13

2 Capacity Addition Targets Achievements During May-2019

Schemes Sector

Target 2019-20

Apr-19 to May-19May-19

Hydro

All India

Capacity Addition TargetsAchievements during the Month of May-2019

Thermal1

82

0

0 0

18

20

0 0 0 0

0

200

400

600

800

1000

1200

1400

1600

1800

2000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2019-20Target Achievement

0

100

200

300

400

500

600

700

Thermal Hydro Nuclear Total

660

0 0

660

0 0 00

MW

Target Achievement

File NoCEA-CH-14-1142018-Coordination Division

Coal Lignite Gas Diesel Total

State 1634400 25000 287920 000 1947320 000 869755 70056 2887131

Private 2168083 108000 55800 000 2331883 000 251400 1333187 3916470

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Sub Total 5036020 158000 578126 000 5772146 162000 1970777 1441143 9346066

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2204808 6245075

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Sub Total 7280862 154000 1080649 000 8515511 184000 754750 2326226 11780487

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3781156 5553186

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Sub Total 4304202 314000 647366 56158 5321726 332000 1177483 3894034 10725243

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111789 790389

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Sub Total 2746364 000 10000 000 2756364 000 494212 140300 3390876

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Sub Total 77002 000 177581 3600 258183 000 142700 32429 433311

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Sub Total 000 000 000 4005 4005 000 000 1773 5778

State 6407650 129000 711871 36393 7284913 000 2987880 234893 10507686

Private 7468800 183000 1058060 27370 8737230 000 339400 7437781 16514411

Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663

Total 19444450 626000 2493722 63763 22627934 678000 4539922 7835904 35681760

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30042019 is given below (in MW)

459415 3581588 2867921 7835904

A 0 MW

B May 2019 0 MW

C

May 2019 0 MW

D Net Capacity Added during May 2019 A-B-C 0 MW

Sector wise breakup of RES capacity as shown is provisional

RES

(MNRE)

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31052019)

(UTILITIES)

Region Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30042019

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

CapacityBM PowerCogen Waste to Energy

913150 13830

Capacity Added during May 2019

Capacity Retired during

Capacity removed due to change

from Conventional to RES during

Share of installed capacity of BBMB Stations is included in state sector of partner states

File NoCEA-CH-14-1142018-Coordination Division

Coal Lignite Gas Diesel Total

State 13500 000 180040 000 193540 000 000 000 193540

Private 86922 000 10800 000 97722 000 000 17889 115611

Central 311272 000 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 000 211541 000 623235 10283 72309 17889 723716

State 272000 000 15000 000 287000 000 110282 6930 404212

Private 408078 000 000 000 408078 000 20000 34512 462590

Central 129472 000 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 000 68561 000 878112 10094 196652 41942 1126799

State 000 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 000 99200 62668 161868

Central 18340 000 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 000 6201 000 24541 2895 291048 88329 406813

State 000 000 17500 000 17500 000 123000 13003 153503

Private 000 000 000 000 000 000 000 6483 6483

Central 50639 000 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 000 30407 000 81047 6798 232188 19486 339519

State 176000 000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 000 511550 000 28800 115462 655812

Central 85458 000 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244

State 626000 25000 60380 000 711380 000 109618 2385 823383

Private 280200 108000 000 000 388200 000 10400 751322 1149922

Central 95625 25000 22110 000 142735 55674 73901 34400 306710

Sub-Total 1001825 158000 82490 000 1242315 55674 193919 788107 2280015

State 546900 000 000 000 546900 000 72410 2510 621820

Private 871433 000 000 000 871433 000 84200 288760 1244393

Central 379639 000 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 000 54949 000 1852921 28948 336863 294270 2513002

State 000 000 000 000 000 000 125215 6787 132002

Private 9900 000 45000 000 54900 000 8800 52620 116320

Central 34324 000 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 000 51966 000 96190 3124 181569 59407 340290

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 3471 3471

Central 3815 000 1503 000 5317 801 10171 000 16289

Sub-Total 3815 000 1503 000 5317 801 10171 3471 19760

124953 000 29105 000 154058 23703 75145 000 252907

State 1634400 25000 287920 000 1947320 000 869755 70056 2887131

Private 2168083 108000 55800 000 2331883 000 251400 1333187 3916470

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Grand Total 5036020 158000 578126 000 5772146 162000 1970777 1441143 9346066

Jammu amp Kashmir

Punjab

Rajasthan

Uttar Pradesh

Uttarakhand

Chandigarh

Central - Unallocated

Total (Northern

Region)

HydroRES

(MNRE)

Delhi

Haryana

Himachal Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31052019)

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 005 005

Private 000 000 4800 000 4800 000 000 392 5192

Central 46959 000 1967 000 48926 2600 000 000 51526

Sub-Total 46959 000 6767 000 53726 2600 000 397 56723

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 1447 1447

Central 14141 000 4334 000 18475 700 000 000 19175

Sub-Total 14141 000 4334 000 18475 700 000 1447 20622

State 371000 104000 217782 000 692782 000 77200 6470 776452

Private 726567 50000 396000 000 1172567 000 000 841512 2014079

Central 324243 000 42400 000 366643 55900 000 24330 446873

Sub-Total 1421810 154000 656182 000 2231992 55900 77200 872312 3237404

State 540000 000 000 000 540000 000 170366 8396 718762

Private 617400 000 10000 000 627400 000 000 428040 1055440

Central 334238 000 25700 000 359938 27300 152000 30000 569238

Sub-Total 1491638 000 35700 000 1527338 27300 322366 466436 2343440

State 228000 000 000 000 228000 000 12000 1105 241105

Private 885000 000 000 000 885000 000 000 52430 937430

Central 211075 000 000 000 211075 4800 10000 000 225875

Sub-Total 1324075 000 000 000 1324075 4800 22000 53535 1404410

State 1017000 000 67200 000 1084200 000 285084 38813 1408097

Private 1245600 000 56800 000 1302400 000 48100 880441 2230941

Central 466780 000 227273 000 694053 69000 000 12300 775353

Sub-Total 2729380 000 351273 000 3080653 69000 333184 931553 4414390

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 546 546

Central 19560 000 6634 000 26194 900 000 000 27094

Sub-Total 19560 000 6634 000 26194 900 000 546 27640

233300 000 19759 000 253059 22800 000 000 275859

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2204808 6245075

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Grand Total 7280862 154000 1080649 000 8515511 184000 754750 2326226 11780487

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

ThermalNuclear Hydro

RES

(MNRE)

State Ownership Sector

Mode wise breakup

Grand Total

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 501000 000 23540 000 524540 000 167360 5618 697518

Private 387388 000 381318 3680 772386 000 000 743901 1516287

Central 154683 12773 000 000 167456 12727 000 25000 205183

Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 774519 2418988

State 558250 000 000 000 558250 000 247993 4122 810365

Private 83945 000 83182 000 167127 000 000 394315 561442

Central 180685 14927 000 000 195612 14873 000 1000 211485

Sub-Total 822880 14927 83182 000 920989 14873 247993 399437 1583292

State 502000 000 000 12792 514792 000 358660 19389 892841

Private 195850 000 000 2520 198370 000 000 1369720 1568090

Central 242780 40140 000 000 282920 69800 000 000 352720

Sub-Total 940630 40140 000 15312 996082 69800 358660 1389108 2813650

State 000 000 000 15996 15996 000 185650 17290 218936

Private 61500 000 17400 000 78900 000 000 19021 97921

Central 86142 28180 35958 000 150280 36200 000 5000 191480

Sub-Total 147642 28180 53358 15996 245176 36200 185650 41311 508337

State 432000 000 52408 000 484408 000 217820 12270 714498

Private 458767 25000 50310 21170 555247 000 000 1253885 1809132

Central 302532 136420 000 000 438952 144800 000 23190 606942

Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1289345 3130572

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 000 10000 000 000 10000 000 000 000 10000

Sub-Total 000 10000 000 000 10000 000 000 000 10000

State 000 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 000 314 314

Central 14080 10760 000 000 24840 8600 000 000 33440

Sub-Total 14080 10760 3250 000 28090 8600 000 314 37004

142600 35800 000 000 178400 45000 000 000 223400

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3781156 5553186

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Grand Total 4304202 314000 647366 56158 5321726 332000 1177483 3894034 10725243

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Andhra Pradesh

Telangana

Karnataka

Total (Southern

Region)

Tamil Nadu

NLC

Puducherry

Central - Unallocated

Kerala

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 7070 7070

Private 28100 000 000 000 28100 000 000 25545 53645

Central 384933 000 000 000 384933 000 11000 000 395932

Sub-Total 413033 000 000 000 413033 000 11000 32615 456647

State 42000 000 000 000 42000 000 13000 405 55405

Private 73000 000 000 000 73000 000 000 3647 76647

Central 39374 000 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 000 154374 000 19100 4052 177526

State 540000 000 10000 000 550000 000 98600 12195 660795

Private 243700 000 000 000 243700 000 000 35250 278950

Central 76077 000 000 000 76077 000 41000 000 117077

Sub-Total 859777 000 10000 000 869777 000 139600 47445 1056822

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 698504 000 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 000 698504 000 18620 000 717124

State 42000 000 000 000 42000 000 206192 2630 250822

Private 293900 000 000 000 293900 000 000 47346 341246

Central 163390 000 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 000 499290 000 215092 50976 765358

State 000 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 000 39900 001 39901

Central 8703 000 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 000 8703 000 82300 5212 96215

112683 000 000 000 112683 000 8501 000 121184

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111789 790389

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Grand Total 2746364 000 10000 000 2756364 000 494212 140300 3390876

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

Grand TotalThermalNuclear

RES

(MNRE)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

Total (Eastern

Region)

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

Central - Unallocated

HydroOwnership Sector

Mode wise breakup

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2650 5100

Central 40852 000 43556 000 84408 000 35708 2500 122616

Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038

State 000 000 000 000 000 000 000 10711 10711

Private 000 000 000 000 000 000 000 2939 2939

Central 3705 000 4682 000 8387 000 11655 000 20042

Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692

State 000 000 000 000 000 000 32200 3253 35453

Private 000 000 000 000 000 000 000 012 012

Central 4560 000 10969 000 15529 000 7227 000 22756

Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 5610 000 43695 000 49305 000 6849 500 56654

Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 344 344

Central 4710 000 7157 000 11867 000 9534 000 21401

Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 3210 000 4893 000 8103 000 5733 000 13836

Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 3105 000 4046 000 7151 000 9794 000 16945

Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642

11250 000 6362 000 17612 000 14000 000 31612

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 663 663

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1698 5703

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1773 5778

19

Andaman amp

Nicobar

Lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination Division

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during May-2019 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 31-05-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621

May19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 0 0 23 23 0 750 0 750 0 750 23 773

Achievement 0 0 0 0 0 0 0 0 0 0 0 0 0 474 0 474 0 503 0 503 0 977 0 977

Upto May-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 226 1176 0 1059 0 1059 637 2365 783 3785

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 494 0 494 0 904 0 904 53 1398 0 1451

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

Line

1 2 3 4 5 6

0

1 400 Barmer-Bhinmal line DC RVPNL 288

2 400 Jangaon - Tippapur DC TSTRANSCO 138

3 400 Kayathar - Thennampatty DC TANTRANSCO 48

4 220 Bareilly (400) - Pilibhit Ckt-II SC UPPTCL 39

5 220 Bhanjanagar - Aska DC OPTCL 57

6 220LILO of both Ckt of 220kV Mobha - Mangrol

line at 220kV Amod (Balanced portion)DC GETCO 46

7 220LILO of Gr Noida (400) - Noida Sec-148 line

at RC GreenDC UPPTCL 9

8 220 LILO of Hathras - Gokul at Mathura DC UPPTCL 120

9 220 Sohawal - Tanda DC UPPTCL 232

977

0

977

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During May-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 31-05-19

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during

May-201921(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 31-05-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716

May19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 0 1445 1000 2445 0 680 0 680 0 2125 1000 3125

Achievement 0 0 0 0 0 0 0 0 1000 0 0 1000 0 2385 0 2385 0 760 0 760 1000 3145 0 4145

Upto May-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 2445 3000 5445 0 1480 0 1480 3000 3925 6000 12925

Achievement 0 0 0 0 0 0 0 0 1500 0 0 1500 815 4365 0 5180 0 2065 0 2065 2315 6430 0 8745

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

As on 31-05-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1Bhadla SS (3x1500 3x500 MVA) (500 MVA ICTs- II

and III)400220 PGCIL 1000

Total of CENTRAL SECTOR 1000

2 Moradabad(Aug) (Additional TF) 400220 UPPTCL 240

3 Masauli Prayagraj (New) TF-III 400132 UPPTCL 200

4 Talaricheruvu Ss 400220 APTRANSCO 9455 Uravakonda (Aug) ICT-II 400220 APTRANSCO 5006 Jangaon ss (3x500) (ICT-I) 400220 TSTRANSCO 500

7 Chinhat Lucknow (Aug) TF-II (200-160) 220132 UPPTCL 408 Hathras (Aug)T-I(200-160) 220132 UPPTCL 409 Jaunpur (Aug) (Additional TF) 220132 UPPTCL 16010 Laukahi (Supaul new) 22013233 BSPTCL 32011 Sector- 95 Gurgaon 22033 HVPNL 10012 Alawalpur ss 22066 PSTCL 100

TOTAL STATE SECTOR 3145

GRAND TOTAL 4145

21(2)

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During May-2019

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2019-20 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination Division

Programme Achievement Ach Programme Achievement Ach

Central Sector 37545100 3290600 3141593 9547 6468500 6275642 9702

State Sector 37498600 3425800 3092392 9027 6748300 6066733 8990

PvtIPP Sector 37346200 3476700 3460217 9953 6713100 6652517 9910

PvtUTL Sector 1823100 164300 171799 10456 323600 337490 10429

Total 114213000 10357400 9866001 9526 20253500 19332382 9545

Central Sector 5661700 604200 619800 10258 990300 1104995 11158

State Sector 6680500 551500 652766 11836 1049700 1184387 11283

PvtIPP Sector 1206900 130200 121344 9320 187500 200643 10701

PvtUTL Sector 144100 12400 14009 11298 24700 25155 10184

Total 13693200 1298300 1407919 10844 2252200 2515180 11168

Central Sector 4472000 353500 365463 10338 720800 694195 9631

Total 4472000 353500 365463 10338 720800 694195 9631

Bhutan Import 621800 32500 35300 10862 50000 59270 11854

Central Sector 47678800 4248300 4126856 9714 8179600 8074832 9872

State Sector 44179100 3977300 3745158 9416 7798000 7251120 9299

Pvt Sector 40520300 3783600 3767369 9957 7248900 7215805 9954

Total 133000000 12041700 11674683 9695 23276500 22601027 9710

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Apr-19 Apr-18 Upto Apr-2019 Upto Apr-2018

975409 844377 975409 844377

22

Renewable Energy Generation

Achievement

May-2019

1 Electricity Generation (MU) Targets and Achievememts for 2019-20

All India Energy Generation During Apr-19 to May-19 (MU)

Target (2019-20)Apr-19 to May-19

Sector

Hydro

Thermal

Nuclear

202535

22522

7208

232765

193324

25152

6942

226010

0

50000

100000

150000

200000

250000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Energy Power Supply Position (Provisional) for May-2019 and during Apr-19 to May-19 23

2 Peak Power Supply Position (Provisional) for May-2019 and during Apr-19 to May-19 24

3 Energy Power Supply Position (Revised) for Apr-2019 and during Apr-19 to Apr-19 25

4 Peak Power Supply Position (Revised) for Apr-2019 and during Apr-19 to Apr-19 26

5 Notified Power cuts Restrictions on Industries during May-2019 27

6 Power Supply to Agricultural Sector during May-2019 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 154 154 0 00 271 271 0 00

दिलली Delhi 3366 3366 0 00 6065 6064 1 00

हरियजणज Haryana 4907 4907 0 00 8679 8679 0 00

दहमजचल परिश Himachal Pradesh 872 863 10 11 1654 1644 10 06

रमम कशमीि Jammu amp Kashmir 1760 1424 336 191 3364 2720 644 191

परजब Punjab 4769 4769 0 00 8475 8475 0 00

िजरसथजन Rajasthan 7120 7110 11 02 13313 13300 13 01

उतति परिश Uttar Pradesh 12742 12695 48 04 22897 22817 79 03

उततिजखड Uttarakhand 1329 1329 0 00 2449 2449 0 00

उततरी कषतर Northern Region 37020 36615 404 11 67166 66419 747 11

छततीसगढ़ Chhattisgarh 2794 2794 0 00 5765 5764 1 00

गरिजत Gujarat 11208 11208 0 00 21748 21748 0 00

मधय परिश Madhya Pradesh 6502 6502 0 00 12735 12735 0 00

महजिजषटर Maharashtra 14976 14976 0 00 29295 29294 0 00

िमन औि दिउ Daman amp Diu 222 222 0 00 443 443 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 1106 1106 0 00

गोवज Goa 404 404 0 00 801 801 0 00

पशचिमी कषतर Western Region 36658 36658 0 00 71893 71892 1 00

आनधर परिश Andhra Pradesh 6056 6048 7 01 11709 11702 7 01

तलगजनज Telangana 5318 5318 1 00 10772 10771 1 00

कनजाटक Karnataka 6702 6702 1 00 13569 13568 1 00

किल Kerala 2575 2566 9 03 4888 4878 10 02

तममल नजड Tamil Nadu 10309 10309 1 00 20031 20030 1 00

पडचिी Puducherry 271 271 1 03 517 516 1 01

लकष-दवीप Lakshadweep 4 4 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 31232 31213 19 01 61486 61465 21 00

बबहजि Bihar 3078 3078 0 00 5662 5659 3 01

िजमोिि घजटी ननगम DVC 1814 1814 0 00 3757 3755 2 01

झजिखणड Jharkhand 789 789 0 00 1505 1495 10 07

ओडडशज Odisha 2560 2560 0 00 5261 5261 0 00

पशशचम बगजल West Bengal 5115 5115 0 00 9920 9897 23 02

मसशककम Sikkim 36 36 0 00 78 78 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 58 54 4 67

परवी कषतर Eastern Region 13391 13391 0 00 26182 26144 38 01

अरणजचल परिश Arunachal Pradesh 64 64 0 06 127 126 1 06

असम Assam 819 738 81 99 1573 1434 139 88

मणणपि Manipur 73 72 1 07 135 134 2 12

मघजलय Meghalaya 167 159 8 50 336 318 18 55

ममज़ोिम Mizoram 55 55 0 07 100 99 1 08

नजगजलड Nagaland 65 64 1 08 124 123 1 08

बिपिज Tripura 173 170 2 14 292 288 4 13

उततर-परवी कषतर North-Eastern Region 1416 1323 93 66 2686 2521 165 62

समपणण भारत All India 119717 119200 517 04 229413 228441 972 04

Note Power Supply Position Report has been compiled based on the data furnished by State Utilities Electricity Departments

23

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 356 356 0 00 356 356 0 00

दिलली Delhi 6461 6461 0 00 6461 6461 0 00

हरियजणज Haryana 8874 8874 0 00 8874 8874 0 00

दहमजचल परिश Himachal Pradesh 1480 1480 0 00 1480 1480 0 00

रमम कशमीि Jammu amp Kashmir 2426 2426 0 00 2885 2426 459 159

परजब Punjab 8802 8802 0 00 8802 8802 0 00

िजरसथजन Rajasthan 11791 11791 0 00 11791 11791 0 00

उतति परिश Uttar Pradesh 22487 22057 430 19 22487 22057 430 19

उततिजखड Uttarakhand 2155 2155 0 00 2155 2155 0 00

उततरी कषतर Northern Region 60987 60078 909 15 60987 60078 909 15

छततीसगढ़ Chhattisgarh 4504 4504 0 00 4596 4574 22 05

गरिजत Gujarat 18094 18094 0 00 18094 18094 0 00

मधय परिश Madhya Pradesh 10145 10131 14 01 10145 10131 14 01

महजिजषटर Maharashtra 23621 23613 8 00 23621 23613 8 00

िमन औि दिउ Daman amp Diu 344 344 0 01 344 344 0 01

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 818 818 0 00

गोवज Goa 554 554 0 00 594 594 0 00

पशचिमी कषतर Western Region 57113 57093 20 00 57113 57093 20 00

आनधर परिश Andhra Pradesh 9854 9854 0 00 9854 9854 0 00

तलगजनज Telangana 8684 8684 0 00 10269 10202 67 07

कनजाटक Karnataka 12158 12158 0 00 12700 12688 12 01

किल Kerala 4286 4205 81 19 4316 4300 16 04

तममल नजड Tamil Nadu 15584 15522 62 04 15680 15659 21 01

पडचिी Puducherry 453 442 11 24 453 444 9 20

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 47477 47465 12 00 49218 49103 115 02

बबहजि Bihar 5481 5481 0 00 5481 5481 0 00

िजमोिि घजटी ननगम DVC 3048 3048 0 00 3048 3048 0 00

झजिखणड Jharkhand 1330 1330 0 00 1330 1330 0 00

ओडडशज Odisha 4736 4736 0 00 5142 5140 3 01

पशशचम बगजल West Bengal 9335 9335 0 00 9335 9335 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23558 23558 0 00 23558 23558 0 00

अरणजचल परिश Arunachal Pradesh 140 138 2 12 140 138 2 12

असम Assam 1753 1673 80 46 1910 1673 237 124

मणणपि Manipur 183 181 2 09 197 188 9 48

मघजलय Meghalaya 329 325 4 12 337 337 0 00

ममज़ोिम Mizoram 102 100 2 20 116 113 3 28

नजगजलड Nagaland 130 128 2 14 157 131 27 169

बिपिज Tripura 297 295 1 05 297 295 1 05

उततर-परवी कषतर North-Eastern Region 2758 2674 84 31 2848 2780 68 24

समपणण भारत All India 183513 182533 981 05 183513 182533 981 05

Note Power Supply Position Report has been compiled based on the data furnished by State Utilities Electricity Departments 24

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -मई2019 April2019 to May2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and supply

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateमई 2019 May2019

मजग की पनता म कमी Demand not Met

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 781 781 0 00 781 781 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3706 3706 0 00 3706 3706 0 00

िजरसथजन Rajasthan 6192 6190 2 00 6192 6190 2 00

उतति परिश Uttar Pradesh 10154 10123 32 03 10154 10123 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30147 29804 343 11 30147 29804 343 11

छततीसगढ़ Chhattisgarh 2972 2971 1 00 2972 2971 1 00

गरिजत Gujarat 10540 10540 0 00 10540 10540 0 00

मधय परिश Madhya Pradesh 6233 6233 0 00 6233 6233 0 00

महजिजषटर Maharashtra 14319 14319 0 00 14319 14319 0 00

िमन औि दिउ Daman amp Diu 221 221 0 00 221 221 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 554 554 0 00 554 554 0 00

गोवज Goa 397 397 0 00 397 397 0 00

पशचिमी कषतर Western Region 35235 35234 1 00 35235 35234 1 00

आनधर परिश Andhra Pradesh 5653 5653 0 00 5653 5653 0 00

तलगजनज Telangana 5453 5453 0 00 5453 5453 0 00

कनजाटक Karnataka 6867 6867 0 00 6867 6867 0 00

किल Kerala 2313 2312 2 01 2313 2312 2 01

तममल नजड Tamil Nadu 9721 9721 0 00 9721 9721 0 00

पडचिी Puducherry 246 246 0 00 246 246 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 30254 30252 2 00 30254 30252 2 00

बबहजि Bihar 2584 2581 3 01 2584 2581 3 01

िजमोिि घजटी ननगम DVC 1944 1942 2 01 1944 1942 2 01

झजिखणड Jharkhand 716 706 10 14 716 706 10 14

ओडडशज Odisha 2701 2701 0 00 2701 2701 0 00

पशशचम बगजल West Bengal 4805 4782 23 05 4805 4782 23 05

मसशककम Sikkim 42 42 0 00 42 42 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12792 12754 38 03 12792 12754 38 03

अरणजचल परिश Arunachal Pradesh 62 62 0 06 62 62 0 06

असम Assam 754 696 58 77 754 696 58 77

मणणपि Manipur 62 61 1 17 62 61 1 17

मघजलय Meghalaya 169 159 10 60 169 159 10 60

ममज़ोिम Mizoram 45 44 0 10 45 44 0 10

नजगजलड Nagaland 59 58 0 08 59 58 0 08

बिपिज Tripura 119 117 2 13 119 117 2 13

उततर-परवी कषतर North-Eastern Region 1270 1198 72 57 1270 1198 72 57

समपणण भारत All India 109696 109241 455 04 109696 109241 455 04

Note The revised data for March 2019 is not avaliable

Energy not Supplied Energy not Supplied

अपरल 2019 April2019 अपरल 2019 April2019 to April 2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2885 2308 577 200 2885 2308 577 200

परजब Punjab 7087 7087 0 00 7087 7087 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 47779 47210 569 12 47779 47210 569 12

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9179 9160 19 02 9179 9160 19 02

तलगजनज Telangana 10269 10202 67 07 10269 10202 67 07

कनजाटक Karnataka 12700 12688 12 01 12700 12688 12 01

किल Kerala 4316 4300 16 04 4316 4300 16 04

तममल नजड Tamil Nadu 15680 15659 21 01 15680 15659 21 01

पडचिी Puducherry 444 444 0 00 444 444 0 00

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49218 49103 115 02 49218 49103 115 02

बबहजि Bihar 5157 5155 2 00 5157 5155 2 00

िजमोिि घजटी ननगम DVC 3014 3014 0 00 3014 3014 0 00

झजिखणड Jharkhand 1326 1325 1 00 1326 1325 1 00

ओडडशज Odisha 5142 5140 3 01 5142 5140 3 01

पशशचम बगजल West Bengal 8745 8699 46 05 8745 8699 46 05

मसशककम Sikkim 98 98 0 00 98 98 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22415 22378 37 02 22415 22378 37 02

अरणजचल परिश Arunachal Pradesh 139 136 3 21 139 136 3 21

असम Assam 1910 1667 242 127 1910 1667 242 127

मणणपि Manipur 197 188 9 48 197 188 9 48

मघजलय Meghalaya 337 337 0 00 337 337 0 00

ममज़ोिम Mizoram 116 113 3 28 116 113 3 28

नजगजलड Nagaland 157 131 27 169 157 131 27 169

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177424 176810 613 03 177424 176810 613 03

Note The revised data for March 2019 is not avaliable 26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateअपरल 2019 April2019 अपरल 2019 April2019 to April 2019

File NoCEA-CH-14-1142018-Coordination Division

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

मई 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during May2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

N

o No

tified

Cuts

N

o No

tified

Cuts

File NoCEA-CH-14-1142018-Coordination Division

मई2019May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0910 hrsday 0811 - 910 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 403 hrsday 0347 - 403 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 2214 hrsday 2157 - 2214 hrsday

उततराखड Uttarakhand Data not received 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-957 hrs day

Three-Phase (Mixed) Supply - 2346 hrs day

Three-Phase Supply(Irrigation)- 0953 - 0957 hrs day Three-

Phase (Mixed) Supply - 2334 - 2346 hrs day

महजिजषटर Maharashtra Three-Phase Supply - 9 hrs day Three-Phase Supply - 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

मई 2019 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during May2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to May-2019 20070450 2493722 63763 22627934 678000 4539922 7835904 35681760

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 7835904 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

7835904

Total Installed Capacity 35687160 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-22 (Up to

Mar2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

Plan Period

2017-22 (Up to

May-19)

6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58732 21173 181240 11734 163456 1010 176200 158886 225204 30768 414858

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Progress of Transmission Sector in the Country up to May 2019

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on May19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

May 19)

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during May 2019

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 20525 925681234952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Generation from

Conventional

Sources

Generation

from

Renewable

Sources

Total Generation from

Conventional Sources

Generation from

Renewable SourcesTotal

Growth in

Conventional

Generation

Growth in

Renewable

Generation

Growth in

Total

Generation

(BU) (BU) (BU) (BU) (BU) (BU) () () ()

116746 12300 129046 111070 9256 120326 511 3289 725

Note Tentative

SlNo

Source-Wise All

India

Generation

from

Renewables Apr-2019 Apr-2018 Apr-19 to Apr-19 Apr-18 to Apr-18

1 Wind 3592220 3322740 3592220 3322740

2 Solar 4168670 3178880 4168670 3178880

3 Biomass 235010 255430 235010 255430

4 Bagasse 1201290 1263940 1201290 1263940

5 Small Hydro 518130 384140 518130 384140

6 Others 38770 38640 38770 38640

Total 9754090 8443770 9754090 8443770

Note 1) Data as received from SLDCElectricity Department of the respective states or from the electricity department

2) 25 MW Khopli-II project of NEEPCO located in Assam is considered under Small Hydro wef 01072018 Earlier it was considered under Hydro

3) Previous month generation has been taken as SLDC has not furnished generation data for the current month

Electricity Generation (Conventional and Renewable Sources)

May-2019 May-2018 Growth

1B

For the Month of Cummulative for the period

All India Generation From Renewables (All Figures are in MU)

File NoCEA-CH-14-1142018-Coordination Division

Achievement Targets Achievement

May-18

Thermal 0 660 0 NA

Hydro 110 0 0 000

Nuclear 0 0 0 NA

All India 110 660 0 000

Apr-18 to May-18 Apr-19 to May-19 Change wrt Previous Year

Thermal 69755 0 -1000

Hydro 110000 0 -1000

Nuclear 0000 0 NA

All India 179755 0 -1000

NA- Not Applicable

2

2 Generating Capacity Addition for May-2019 (MW)

Generating Capacity Addition during Apr-18 to May-18 amp Apr-19 to May-19

NA- Not Applicable

Achivement

wrt May-2018Type

May-19

1100

000

20

40

60

80

100

120

1May-18 May-19

0000

20000

40000

60000

80000

100000

120000

140000

160000

180000

200000

Apr-18 to May-18 Apr-19 to May-19

File NoCEA-CH-14-1142018-Coordination Division

1

2

3

Nuclear Hydro RES Grand TotalRegion Coal Lignite Gas Diesel Total

Northern 5036020 158000 578126 000 5772146 162000 1970777 1441143 9346066

Western 7280862 154000 1080649 000 8515511 184000 754750 2326226 11780487

Southern 4304202 314000 647366 56158 5321726 332000 1177483 3894034 10725243

Eastern 2746364 000 10000 000 2756364 000 494212 140300 3390876

North-East 77002 000 177581 3600 258183 000 142700 32429 433311

Islands 000 000 000 4005 4005 000 000 1773 5778

ALL INDIA 19444450 626000 2493722 63763 22627934 678000 4539922 7835904 35681760

Note Captive Genaration is not included in the total Captive Power capacity as on 31032017 RES as on 30042019 3

Thermal

Nuclear

3 List of Projects Commissioned During May-2019

4 All India Installed Capacity (MW) Region-wise as on 31-05-19

NIL

NIL

Thermal

NIL

Hydro

22627934

678000

4539922

7835904

35681760

51529

000

5000000

10000000

15000000

20000000

25000000

30000000

35000000

40000000

Thermal Nuclear Hydro RES Total Captive

Thermal Nuclear Hydro RES Total Captive

Total = 356817604

File NoCEA-CH-14-1142018-Coordination Division

Sector

Coal Lignite Gas Diesel Total

State 6407650 129000 711871 36393 7284913 000 2987880 234893 10507686

Private 7468800 183000 1058060 27370 8737230 000 339400 7437781 16514411

Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663

All India 19444450 626000 2493722 63763 22627934 678000 4539922 7835904 35681760

State 10507686

Private 16514411

Central 8659663

Electricity Generation (MU) Targets and Achievements for 2016-17

5 All India Installed Capacity (MW) Sector-wise as on 31-05-19

4

Grand TotalTHERMAL

Nuclear Hydro RES

RES as on 30042019

State 10507686 30

Private 16514411 46

Central 8659663 24

All India Installed Capacity(MW) (Sector-Wise)

File NoCEA-CH-14-1142018-Coordination Division

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 kV

220 KV

All India

5

0 0

6 Transmission Lines Added during May-2019 (Ckms)

May-18 May-19

0 0

0 0

0 0

623 474

720 503

1343 977

Transmission Lines Added duringApr-18 to May-18 ampApr-19 to May-19 (Ckms)

Apr-18 to May-18 Apr-19 to May-19

1201 904

2106 1451

0 0

242 53

663 494

1343

977

0

200

400

600

800

1000

1200

1400

1600

All India

Ckm

s

May-18 May-19

2106

1451

0

500

1000

1500

2000

2500

All India

Ckm

s

Apr-18 to May-18 Apr-19 to May-19

File NoCEA-CH-14-1142018-Coordination Division

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

6

7 Transformation Capacity Addition During May-2019 (MVA)

0

0

1390

1060

0 0

May-18 May-19

2450

0

1000

4145

2385

760

0 0

All India Transformation Capacity Addition during Apr-18 to May-18 amp Apr-19

to May-19 (MVA)

8745

0

1500

5180

2065

7920

4000

1575

2345

0

Apr-18 to May-18 Apr-19 to May-19

2450

4145

0

500

1000

1500

2000

2500

3000

3500

4000

4500

MV

A

May-18 May-19

7920 8745

0

74520

1

MV

A

Apr-18 to May-18 Apr-19 to May-19

File NoCEA-CH-14-1142018-Coordination Division

May-2018 May-2019 May-2018 May-2019 May-2018 May-2019

Northern 35206 37020 34664 36615 -15 -11

Western 35085 36658 35070 36658 00 00

Southern 27681 31232 27619 31213 -02 -01

Eastern 13210 13391 13063 13391 -11 00

North Eastern 1232 1416 1175 1323 -46 -66

All India 112414 119717 111591 119200 -07 -04

May-2018 May-2019 May-2018 May-2019 May-2018 May-2019

Northern 56546 60987 56243 60078 -05 -15

Western 53841 57113 52442 57093 -26 00

Southern 43234 47477 43234 47465 00 00

Eastern 21256 23558 21249 23558 00 00

North Eastern 2709 2758 2611 2674 -36 -31

All India 171973 183513 170765 182533 -07 -05

May-2019 Figures are Provisional

7

8 Power Supply Position (Energy amp Peak) in May-2019

Peak Demand Peak Met

Requirement Availability

Energy (MU)Region

Surplus(+)

Deficit (-) in

Surplus(+)

Deficit (-) in Region

Power (MW)

File NoCEA-CH-14-1142018-Coordination Division

Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand May-2018 0 0 0 0 589 0 0 172 0

May-2019 0 0 0 0 0 0 0 430 0

Chattisgarh Gujarat MP Maharashtra Daman amp Diu Dadar Nagar Goa

May-2018 11 1198 19 141 0 0 2

May-2019 0 0 14 8 0 1 0

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

May-2018 4 28 93 53 29 19 0

May-2019 0 0 0 81 62 11 0

8

9 Peak Shortage of Power Supply (MW) in Different Regions in May-2019

0 0 0 0 0 0 0

430

00 0 0 0

589

0 0

172

0

0

400

800

Ch

an

dig

ar

h Delh

i

Ha

rya

na

HP

Jamp

K

Pu

nja

b

Ra

jasth

an

UP

Utr

akhan

d

MW

Northern States (MW) May-2019 May-2018

0 0 14

8 0 1 011

1198

19 141

0 0 2

0

500

1000

1500

Ch

attis

gar

h

Guja

rat

MP

Mah

ara

shtr

a

Da

man amp

Diu

Da

dar

Na

gar G

oa

MW

Western States (MW) May-2019 May-2018

0 0 0

8162

11 0428

93

5329 19

00

100

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Southern State (MW) May-2019 May-2018

File NoCEA-CH-14-1142018-Coordination Division

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

May-2018 1 0 0 0 6 0 4

May-2019 0 0 0 0 0 0 4

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

May-2018 5 29 7 2 9 28 0

May-2019 2 80 2 4 2 2 1

9

0 0 0 0 0 0

4

1

0 0 0

6

0

4

0

2

4

6

8

Bih

ar

DV

C

Jha

rkh

an

d

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

NIs

land

MW

Eastern States (MW) May-2019 May-2018

2

80

2 4 2 2 15 7 2

9

28

0

0

20

40

60

80

100

Aru

na

cha

l

Assa

m

Ma

nip

ur

Me

gh

ala

ya

Miz

ora

m

Na

gala

nd

Trip

ura

MW

North-Eastern States (MW)

File NoCEA-CH-14-1142018-Coordination Division

Sector May-2018 May-2019

Central 7428 6845

State 6361 6095

Private Sector IPP 5625 6109

Private Sector UTL 6985 6458

ALL INDIA 6404 6324

Month PLF 2018 PLF 2019

Jan 6215 6054

Feb 6230 6051

March 6452 6340

April 6454 6471

May 6404 6324

For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment

10

PLF of Thermal Power Plants

(excluding gas based power plants)

All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise

10 All India Thermal PLF Sector-wise (Excluding Gas Based Power Plants) for May-2019

5800

6000

6200

6400

6600

Jan Feb March April May

Months

All India PLF Month-wise

PLF 2018 PLF 2019

7428

63615625

69856404

6845

60956109

64586324

000

1000

2000

3000

4000

5000

6000

7000

8000

Central State Private Sector IPP Private Sector UTL ALL INDIA

All India Thermal PLF

May-2018 May-2019

File NoCEA-CH-14-1142018-Coordination Division

2012-13 2013-14 2014-15 2015-16 2016-17 2017-18

TampD Losses 2304 2284 2277 2181 2142 2104

ATampC Losses 2548 2262 2572 2398 NA NA

Provisional

Note As per PFC for utilities selling directly to consumers NA- Not Available

Total Number of Villages

597464

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2013-14 4894

2014-15 5304

2015-16 5459

2016-17 5743

2017-18 6080

2018-19 6289

11

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality

as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a

Distribution Transformer may not be necessary)

14 All India Coal consumption for Power Generation (MT)

520

Average Revenue Realization(paiseunit)

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community

Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

11 T amp D and ATampC Losses ()

12 All India Village Electrification

Villiages Electrified (Nos)

10000All villages as per census 2011 has

been electrified on 28042018

Villages electrified

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12th Plan 2017-18 and 2018-19 12

2 Capacity Addition Targets amp Achievements during May-2019 and Apr-19 to May-19 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

File NoCEA-CH-14-1142018-Coordination Division

(i) CAPACITY ADDTION TARGETS AND ACHIEVEMENTS IN THE 12TH PLAN (Figures in MW)

SECTOR THERMAL HYDRO NUCLEAR TOTAL

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453

STATE 13922 22201 1608 2276 0 0 15530 24477

PRIVATE 43540 53661 3285 619 0 0 46825 54280

ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209

(ii) CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (Figures in MW)

Thermal Hydro Nuclear Total

Target Ach Target Ach Target Ach Target Ach

Central 4880 3170 800 390 500 0 6180 3560

State 3546 1760 300 200 0 0 3846 1960

Private 2940 3780 205 205 0 0 3145 3985

Total 11366 8710 1305 795 500 0 13171 9505

(iii) CAPACITY ADDITION ACHIEVEMENT FOR 2018-19 (Figures in MW)

Thermal Hydro Nuclear Total

Target Ach Target Ach Target Ach Target Ach

Central 2760 1960 710 110 0 0 3470 2070

State 4506 2850 130 30 0 0 4636 2880

Private 0 972 0 0 0 0 0 972

Total 7266 5782 840 140 0 0 8106 5922

12

1 Capacity Addtion Targets and Achievements in the 12th Plan 2017-18 and 2018-19

File NoCEA-CH-14-1142018-Coordination Division

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 6040 660 0 1160 0 -1160

State 425615 0 0 660 0 -660

Private 0 0 0 0 0 0

Total 1029615 660 0 1820 0 -1820

Central 600 0 0 0 0 0

State 21099 0 0 0 0 0

Private 379 0 0 0 0 0

Total 118999 0 0 0 0 0

Nuclear Central 700 0 0 0 0 0

Central 7340 660 0 1160 0 -1160

State 446714 0 0 660 0 -660

Private 379 0 0 0 0 0

Total 1218614 660 0 1820 0 -1820

Electricity Generation (MU) Targets and Achievements for 2016-17

13

2 Capacity Addition Targets Achievements During May-2019

Schemes Sector

Target 2019-20

Apr-19 to May-19May-19

Hydro

All India

Capacity Addition TargetsAchievements during the Month of May-2019

Thermal1

82

0

0 0

18

20

0 0 0 0

0

200

400

600

800

1000

1200

1400

1600

1800

2000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2019-20Target Achievement

0

100

200

300

400

500

600

700

Thermal Hydro Nuclear Total

660

0 0

660

0 0 00

MW

Target Achievement

File NoCEA-CH-14-1142018-Coordination Division

Coal Lignite Gas Diesel Total

State 1634400 25000 287920 000 1947320 000 869755 70056 2887131

Private 2168083 108000 55800 000 2331883 000 251400 1333187 3916470

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Sub Total 5036020 158000 578126 000 5772146 162000 1970777 1441143 9346066

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2204808 6245075

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Sub Total 7280862 154000 1080649 000 8515511 184000 754750 2326226 11780487

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3781156 5553186

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Sub Total 4304202 314000 647366 56158 5321726 332000 1177483 3894034 10725243

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111789 790389

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Sub Total 2746364 000 10000 000 2756364 000 494212 140300 3390876

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Sub Total 77002 000 177581 3600 258183 000 142700 32429 433311

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Sub Total 000 000 000 4005 4005 000 000 1773 5778

State 6407650 129000 711871 36393 7284913 000 2987880 234893 10507686

Private 7468800 183000 1058060 27370 8737230 000 339400 7437781 16514411

Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663

Total 19444450 626000 2493722 63763 22627934 678000 4539922 7835904 35681760

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30042019 is given below (in MW)

459415 3581588 2867921 7835904

A 0 MW

B May 2019 0 MW

C

May 2019 0 MW

D Net Capacity Added during May 2019 A-B-C 0 MW

Sector wise breakup of RES capacity as shown is provisional

RES

(MNRE)

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31052019)

(UTILITIES)

Region Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30042019

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

CapacityBM PowerCogen Waste to Energy

913150 13830

Capacity Added during May 2019

Capacity Retired during

Capacity removed due to change

from Conventional to RES during

Share of installed capacity of BBMB Stations is included in state sector of partner states

File NoCEA-CH-14-1142018-Coordination Division

Coal Lignite Gas Diesel Total

State 13500 000 180040 000 193540 000 000 000 193540

Private 86922 000 10800 000 97722 000 000 17889 115611

Central 311272 000 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 000 211541 000 623235 10283 72309 17889 723716

State 272000 000 15000 000 287000 000 110282 6930 404212

Private 408078 000 000 000 408078 000 20000 34512 462590

Central 129472 000 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 000 68561 000 878112 10094 196652 41942 1126799

State 000 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 000 99200 62668 161868

Central 18340 000 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 000 6201 000 24541 2895 291048 88329 406813

State 000 000 17500 000 17500 000 123000 13003 153503

Private 000 000 000 000 000 000 000 6483 6483

Central 50639 000 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 000 30407 000 81047 6798 232188 19486 339519

State 176000 000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 000 511550 000 28800 115462 655812

Central 85458 000 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244

State 626000 25000 60380 000 711380 000 109618 2385 823383

Private 280200 108000 000 000 388200 000 10400 751322 1149922

Central 95625 25000 22110 000 142735 55674 73901 34400 306710

Sub-Total 1001825 158000 82490 000 1242315 55674 193919 788107 2280015

State 546900 000 000 000 546900 000 72410 2510 621820

Private 871433 000 000 000 871433 000 84200 288760 1244393

Central 379639 000 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 000 54949 000 1852921 28948 336863 294270 2513002

State 000 000 000 000 000 000 125215 6787 132002

Private 9900 000 45000 000 54900 000 8800 52620 116320

Central 34324 000 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 000 51966 000 96190 3124 181569 59407 340290

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 3471 3471

Central 3815 000 1503 000 5317 801 10171 000 16289

Sub-Total 3815 000 1503 000 5317 801 10171 3471 19760

124953 000 29105 000 154058 23703 75145 000 252907

State 1634400 25000 287920 000 1947320 000 869755 70056 2887131

Private 2168083 108000 55800 000 2331883 000 251400 1333187 3916470

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Grand Total 5036020 158000 578126 000 5772146 162000 1970777 1441143 9346066

Jammu amp Kashmir

Punjab

Rajasthan

Uttar Pradesh

Uttarakhand

Chandigarh

Central - Unallocated

Total (Northern

Region)

HydroRES

(MNRE)

Delhi

Haryana

Himachal Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31052019)

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 005 005

Private 000 000 4800 000 4800 000 000 392 5192

Central 46959 000 1967 000 48926 2600 000 000 51526

Sub-Total 46959 000 6767 000 53726 2600 000 397 56723

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 1447 1447

Central 14141 000 4334 000 18475 700 000 000 19175

Sub-Total 14141 000 4334 000 18475 700 000 1447 20622

State 371000 104000 217782 000 692782 000 77200 6470 776452

Private 726567 50000 396000 000 1172567 000 000 841512 2014079

Central 324243 000 42400 000 366643 55900 000 24330 446873

Sub-Total 1421810 154000 656182 000 2231992 55900 77200 872312 3237404

State 540000 000 000 000 540000 000 170366 8396 718762

Private 617400 000 10000 000 627400 000 000 428040 1055440

Central 334238 000 25700 000 359938 27300 152000 30000 569238

Sub-Total 1491638 000 35700 000 1527338 27300 322366 466436 2343440

State 228000 000 000 000 228000 000 12000 1105 241105

Private 885000 000 000 000 885000 000 000 52430 937430

Central 211075 000 000 000 211075 4800 10000 000 225875

Sub-Total 1324075 000 000 000 1324075 4800 22000 53535 1404410

State 1017000 000 67200 000 1084200 000 285084 38813 1408097

Private 1245600 000 56800 000 1302400 000 48100 880441 2230941

Central 466780 000 227273 000 694053 69000 000 12300 775353

Sub-Total 2729380 000 351273 000 3080653 69000 333184 931553 4414390

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 546 546

Central 19560 000 6634 000 26194 900 000 000 27094

Sub-Total 19560 000 6634 000 26194 900 000 546 27640

233300 000 19759 000 253059 22800 000 000 275859

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2204808 6245075

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Grand Total 7280862 154000 1080649 000 8515511 184000 754750 2326226 11780487

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

ThermalNuclear Hydro

RES

(MNRE)

State Ownership Sector

Mode wise breakup

Grand Total

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 501000 000 23540 000 524540 000 167360 5618 697518

Private 387388 000 381318 3680 772386 000 000 743901 1516287

Central 154683 12773 000 000 167456 12727 000 25000 205183

Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 774519 2418988

State 558250 000 000 000 558250 000 247993 4122 810365

Private 83945 000 83182 000 167127 000 000 394315 561442

Central 180685 14927 000 000 195612 14873 000 1000 211485

Sub-Total 822880 14927 83182 000 920989 14873 247993 399437 1583292

State 502000 000 000 12792 514792 000 358660 19389 892841

Private 195850 000 000 2520 198370 000 000 1369720 1568090

Central 242780 40140 000 000 282920 69800 000 000 352720

Sub-Total 940630 40140 000 15312 996082 69800 358660 1389108 2813650

State 000 000 000 15996 15996 000 185650 17290 218936

Private 61500 000 17400 000 78900 000 000 19021 97921

Central 86142 28180 35958 000 150280 36200 000 5000 191480

Sub-Total 147642 28180 53358 15996 245176 36200 185650 41311 508337

State 432000 000 52408 000 484408 000 217820 12270 714498

Private 458767 25000 50310 21170 555247 000 000 1253885 1809132

Central 302532 136420 000 000 438952 144800 000 23190 606942

Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1289345 3130572

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 000 10000 000 000 10000 000 000 000 10000

Sub-Total 000 10000 000 000 10000 000 000 000 10000

State 000 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 000 314 314

Central 14080 10760 000 000 24840 8600 000 000 33440

Sub-Total 14080 10760 3250 000 28090 8600 000 314 37004

142600 35800 000 000 178400 45000 000 000 223400

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3781156 5553186

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Grand Total 4304202 314000 647366 56158 5321726 332000 1177483 3894034 10725243

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Andhra Pradesh

Telangana

Karnataka

Total (Southern

Region)

Tamil Nadu

NLC

Puducherry

Central - Unallocated

Kerala

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 7070 7070

Private 28100 000 000 000 28100 000 000 25545 53645

Central 384933 000 000 000 384933 000 11000 000 395932

Sub-Total 413033 000 000 000 413033 000 11000 32615 456647

State 42000 000 000 000 42000 000 13000 405 55405

Private 73000 000 000 000 73000 000 000 3647 76647

Central 39374 000 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 000 154374 000 19100 4052 177526

State 540000 000 10000 000 550000 000 98600 12195 660795

Private 243700 000 000 000 243700 000 000 35250 278950

Central 76077 000 000 000 76077 000 41000 000 117077

Sub-Total 859777 000 10000 000 869777 000 139600 47445 1056822

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 698504 000 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 000 698504 000 18620 000 717124

State 42000 000 000 000 42000 000 206192 2630 250822

Private 293900 000 000 000 293900 000 000 47346 341246

Central 163390 000 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 000 499290 000 215092 50976 765358

State 000 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 000 39900 001 39901

Central 8703 000 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 000 8703 000 82300 5212 96215

112683 000 000 000 112683 000 8501 000 121184

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111789 790389

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Grand Total 2746364 000 10000 000 2756364 000 494212 140300 3390876

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

Grand TotalThermalNuclear

RES

(MNRE)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

Total (Eastern

Region)

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

Central - Unallocated

HydroOwnership Sector

Mode wise breakup

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2650 5100

Central 40852 000 43556 000 84408 000 35708 2500 122616

Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038

State 000 000 000 000 000 000 000 10711 10711

Private 000 000 000 000 000 000 000 2939 2939

Central 3705 000 4682 000 8387 000 11655 000 20042

Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692

State 000 000 000 000 000 000 32200 3253 35453

Private 000 000 000 000 000 000 000 012 012

Central 4560 000 10969 000 15529 000 7227 000 22756

Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 5610 000 43695 000 49305 000 6849 500 56654

Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 344 344

Central 4710 000 7157 000 11867 000 9534 000 21401

Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 3210 000 4893 000 8103 000 5733 000 13836

Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 3105 000 4046 000 7151 000 9794 000 16945

Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642

11250 000 6362 000 17612 000 14000 000 31612

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 663 663

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1698 5703

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1773 5778

19

Andaman amp

Nicobar

Lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination Division

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during May-2019 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 31-05-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621

May19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 0 0 23 23 0 750 0 750 0 750 23 773

Achievement 0 0 0 0 0 0 0 0 0 0 0 0 0 474 0 474 0 503 0 503 0 977 0 977

Upto May-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 226 1176 0 1059 0 1059 637 2365 783 3785

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 494 0 494 0 904 0 904 53 1398 0 1451

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

Line

1 2 3 4 5 6

0

1 400 Barmer-Bhinmal line DC RVPNL 288

2 400 Jangaon - Tippapur DC TSTRANSCO 138

3 400 Kayathar - Thennampatty DC TANTRANSCO 48

4 220 Bareilly (400) - Pilibhit Ckt-II SC UPPTCL 39

5 220 Bhanjanagar - Aska DC OPTCL 57

6 220LILO of both Ckt of 220kV Mobha - Mangrol

line at 220kV Amod (Balanced portion)DC GETCO 46

7 220LILO of Gr Noida (400) - Noida Sec-148 line

at RC GreenDC UPPTCL 9

8 220 LILO of Hathras - Gokul at Mathura DC UPPTCL 120

9 220 Sohawal - Tanda DC UPPTCL 232

977

0

977

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During May-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 31-05-19

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during

May-201921(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 31-05-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716

May19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 0 1445 1000 2445 0 680 0 680 0 2125 1000 3125

Achievement 0 0 0 0 0 0 0 0 1000 0 0 1000 0 2385 0 2385 0 760 0 760 1000 3145 0 4145

Upto May-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 2445 3000 5445 0 1480 0 1480 3000 3925 6000 12925

Achievement 0 0 0 0 0 0 0 0 1500 0 0 1500 815 4365 0 5180 0 2065 0 2065 2315 6430 0 8745

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

As on 31-05-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1Bhadla SS (3x1500 3x500 MVA) (500 MVA ICTs- II

and III)400220 PGCIL 1000

Total of CENTRAL SECTOR 1000

2 Moradabad(Aug) (Additional TF) 400220 UPPTCL 240

3 Masauli Prayagraj (New) TF-III 400132 UPPTCL 200

4 Talaricheruvu Ss 400220 APTRANSCO 9455 Uravakonda (Aug) ICT-II 400220 APTRANSCO 5006 Jangaon ss (3x500) (ICT-I) 400220 TSTRANSCO 500

7 Chinhat Lucknow (Aug) TF-II (200-160) 220132 UPPTCL 408 Hathras (Aug)T-I(200-160) 220132 UPPTCL 409 Jaunpur (Aug) (Additional TF) 220132 UPPTCL 16010 Laukahi (Supaul new) 22013233 BSPTCL 32011 Sector- 95 Gurgaon 22033 HVPNL 10012 Alawalpur ss 22066 PSTCL 100

TOTAL STATE SECTOR 3145

GRAND TOTAL 4145

21(2)

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During May-2019

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2019-20 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination Division

Programme Achievement Ach Programme Achievement Ach

Central Sector 37545100 3290600 3141593 9547 6468500 6275642 9702

State Sector 37498600 3425800 3092392 9027 6748300 6066733 8990

PvtIPP Sector 37346200 3476700 3460217 9953 6713100 6652517 9910

PvtUTL Sector 1823100 164300 171799 10456 323600 337490 10429

Total 114213000 10357400 9866001 9526 20253500 19332382 9545

Central Sector 5661700 604200 619800 10258 990300 1104995 11158

State Sector 6680500 551500 652766 11836 1049700 1184387 11283

PvtIPP Sector 1206900 130200 121344 9320 187500 200643 10701

PvtUTL Sector 144100 12400 14009 11298 24700 25155 10184

Total 13693200 1298300 1407919 10844 2252200 2515180 11168

Central Sector 4472000 353500 365463 10338 720800 694195 9631

Total 4472000 353500 365463 10338 720800 694195 9631

Bhutan Import 621800 32500 35300 10862 50000 59270 11854

Central Sector 47678800 4248300 4126856 9714 8179600 8074832 9872

State Sector 44179100 3977300 3745158 9416 7798000 7251120 9299

Pvt Sector 40520300 3783600 3767369 9957 7248900 7215805 9954

Total 133000000 12041700 11674683 9695 23276500 22601027 9710

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Apr-19 Apr-18 Upto Apr-2019 Upto Apr-2018

975409 844377 975409 844377

22

Renewable Energy Generation

Achievement

May-2019

1 Electricity Generation (MU) Targets and Achievememts for 2019-20

All India Energy Generation During Apr-19 to May-19 (MU)

Target (2019-20)Apr-19 to May-19

Sector

Hydro

Thermal

Nuclear

202535

22522

7208

232765

193324

25152

6942

226010

0

50000

100000

150000

200000

250000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Energy Power Supply Position (Provisional) for May-2019 and during Apr-19 to May-19 23

2 Peak Power Supply Position (Provisional) for May-2019 and during Apr-19 to May-19 24

3 Energy Power Supply Position (Revised) for Apr-2019 and during Apr-19 to Apr-19 25

4 Peak Power Supply Position (Revised) for Apr-2019 and during Apr-19 to Apr-19 26

5 Notified Power cuts Restrictions on Industries during May-2019 27

6 Power Supply to Agricultural Sector during May-2019 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 154 154 0 00 271 271 0 00

दिलली Delhi 3366 3366 0 00 6065 6064 1 00

हरियजणज Haryana 4907 4907 0 00 8679 8679 0 00

दहमजचल परिश Himachal Pradesh 872 863 10 11 1654 1644 10 06

रमम कशमीि Jammu amp Kashmir 1760 1424 336 191 3364 2720 644 191

परजब Punjab 4769 4769 0 00 8475 8475 0 00

िजरसथजन Rajasthan 7120 7110 11 02 13313 13300 13 01

उतति परिश Uttar Pradesh 12742 12695 48 04 22897 22817 79 03

उततिजखड Uttarakhand 1329 1329 0 00 2449 2449 0 00

उततरी कषतर Northern Region 37020 36615 404 11 67166 66419 747 11

छततीसगढ़ Chhattisgarh 2794 2794 0 00 5765 5764 1 00

गरिजत Gujarat 11208 11208 0 00 21748 21748 0 00

मधय परिश Madhya Pradesh 6502 6502 0 00 12735 12735 0 00

महजिजषटर Maharashtra 14976 14976 0 00 29295 29294 0 00

िमन औि दिउ Daman amp Diu 222 222 0 00 443 443 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 1106 1106 0 00

गोवज Goa 404 404 0 00 801 801 0 00

पशचिमी कषतर Western Region 36658 36658 0 00 71893 71892 1 00

आनधर परिश Andhra Pradesh 6056 6048 7 01 11709 11702 7 01

तलगजनज Telangana 5318 5318 1 00 10772 10771 1 00

कनजाटक Karnataka 6702 6702 1 00 13569 13568 1 00

किल Kerala 2575 2566 9 03 4888 4878 10 02

तममल नजड Tamil Nadu 10309 10309 1 00 20031 20030 1 00

पडचिी Puducherry 271 271 1 03 517 516 1 01

लकष-दवीप Lakshadweep 4 4 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 31232 31213 19 01 61486 61465 21 00

बबहजि Bihar 3078 3078 0 00 5662 5659 3 01

िजमोिि घजटी ननगम DVC 1814 1814 0 00 3757 3755 2 01

झजिखणड Jharkhand 789 789 0 00 1505 1495 10 07

ओडडशज Odisha 2560 2560 0 00 5261 5261 0 00

पशशचम बगजल West Bengal 5115 5115 0 00 9920 9897 23 02

मसशककम Sikkim 36 36 0 00 78 78 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 58 54 4 67

परवी कषतर Eastern Region 13391 13391 0 00 26182 26144 38 01

अरणजचल परिश Arunachal Pradesh 64 64 0 06 127 126 1 06

असम Assam 819 738 81 99 1573 1434 139 88

मणणपि Manipur 73 72 1 07 135 134 2 12

मघजलय Meghalaya 167 159 8 50 336 318 18 55

ममज़ोिम Mizoram 55 55 0 07 100 99 1 08

नजगजलड Nagaland 65 64 1 08 124 123 1 08

बिपिज Tripura 173 170 2 14 292 288 4 13

उततर-परवी कषतर North-Eastern Region 1416 1323 93 66 2686 2521 165 62

समपणण भारत All India 119717 119200 517 04 229413 228441 972 04

Note Power Supply Position Report has been compiled based on the data furnished by State Utilities Electricity Departments

23

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 356 356 0 00 356 356 0 00

दिलली Delhi 6461 6461 0 00 6461 6461 0 00

हरियजणज Haryana 8874 8874 0 00 8874 8874 0 00

दहमजचल परिश Himachal Pradesh 1480 1480 0 00 1480 1480 0 00

रमम कशमीि Jammu amp Kashmir 2426 2426 0 00 2885 2426 459 159

परजब Punjab 8802 8802 0 00 8802 8802 0 00

िजरसथजन Rajasthan 11791 11791 0 00 11791 11791 0 00

उतति परिश Uttar Pradesh 22487 22057 430 19 22487 22057 430 19

उततिजखड Uttarakhand 2155 2155 0 00 2155 2155 0 00

उततरी कषतर Northern Region 60987 60078 909 15 60987 60078 909 15

छततीसगढ़ Chhattisgarh 4504 4504 0 00 4596 4574 22 05

गरिजत Gujarat 18094 18094 0 00 18094 18094 0 00

मधय परिश Madhya Pradesh 10145 10131 14 01 10145 10131 14 01

महजिजषटर Maharashtra 23621 23613 8 00 23621 23613 8 00

िमन औि दिउ Daman amp Diu 344 344 0 01 344 344 0 01

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 818 818 0 00

गोवज Goa 554 554 0 00 594 594 0 00

पशचिमी कषतर Western Region 57113 57093 20 00 57113 57093 20 00

आनधर परिश Andhra Pradesh 9854 9854 0 00 9854 9854 0 00

तलगजनज Telangana 8684 8684 0 00 10269 10202 67 07

कनजाटक Karnataka 12158 12158 0 00 12700 12688 12 01

किल Kerala 4286 4205 81 19 4316 4300 16 04

तममल नजड Tamil Nadu 15584 15522 62 04 15680 15659 21 01

पडचिी Puducherry 453 442 11 24 453 444 9 20

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 47477 47465 12 00 49218 49103 115 02

बबहजि Bihar 5481 5481 0 00 5481 5481 0 00

िजमोिि घजटी ननगम DVC 3048 3048 0 00 3048 3048 0 00

झजिखणड Jharkhand 1330 1330 0 00 1330 1330 0 00

ओडडशज Odisha 4736 4736 0 00 5142 5140 3 01

पशशचम बगजल West Bengal 9335 9335 0 00 9335 9335 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23558 23558 0 00 23558 23558 0 00

अरणजचल परिश Arunachal Pradesh 140 138 2 12 140 138 2 12

असम Assam 1753 1673 80 46 1910 1673 237 124

मणणपि Manipur 183 181 2 09 197 188 9 48

मघजलय Meghalaya 329 325 4 12 337 337 0 00

ममज़ोिम Mizoram 102 100 2 20 116 113 3 28

नजगजलड Nagaland 130 128 2 14 157 131 27 169

बिपिज Tripura 297 295 1 05 297 295 1 05

उततर-परवी कषतर North-Eastern Region 2758 2674 84 31 2848 2780 68 24

समपणण भारत All India 183513 182533 981 05 183513 182533 981 05

Note Power Supply Position Report has been compiled based on the data furnished by State Utilities Electricity Departments 24

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -मई2019 April2019 to May2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and supply

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateमई 2019 May2019

मजग की पनता म कमी Demand not Met

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 781 781 0 00 781 781 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3706 3706 0 00 3706 3706 0 00

िजरसथजन Rajasthan 6192 6190 2 00 6192 6190 2 00

उतति परिश Uttar Pradesh 10154 10123 32 03 10154 10123 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30147 29804 343 11 30147 29804 343 11

छततीसगढ़ Chhattisgarh 2972 2971 1 00 2972 2971 1 00

गरिजत Gujarat 10540 10540 0 00 10540 10540 0 00

मधय परिश Madhya Pradesh 6233 6233 0 00 6233 6233 0 00

महजिजषटर Maharashtra 14319 14319 0 00 14319 14319 0 00

िमन औि दिउ Daman amp Diu 221 221 0 00 221 221 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 554 554 0 00 554 554 0 00

गोवज Goa 397 397 0 00 397 397 0 00

पशचिमी कषतर Western Region 35235 35234 1 00 35235 35234 1 00

आनधर परिश Andhra Pradesh 5653 5653 0 00 5653 5653 0 00

तलगजनज Telangana 5453 5453 0 00 5453 5453 0 00

कनजाटक Karnataka 6867 6867 0 00 6867 6867 0 00

किल Kerala 2313 2312 2 01 2313 2312 2 01

तममल नजड Tamil Nadu 9721 9721 0 00 9721 9721 0 00

पडचिी Puducherry 246 246 0 00 246 246 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 30254 30252 2 00 30254 30252 2 00

बबहजि Bihar 2584 2581 3 01 2584 2581 3 01

िजमोिि घजटी ननगम DVC 1944 1942 2 01 1944 1942 2 01

झजिखणड Jharkhand 716 706 10 14 716 706 10 14

ओडडशज Odisha 2701 2701 0 00 2701 2701 0 00

पशशचम बगजल West Bengal 4805 4782 23 05 4805 4782 23 05

मसशककम Sikkim 42 42 0 00 42 42 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12792 12754 38 03 12792 12754 38 03

अरणजचल परिश Arunachal Pradesh 62 62 0 06 62 62 0 06

असम Assam 754 696 58 77 754 696 58 77

मणणपि Manipur 62 61 1 17 62 61 1 17

मघजलय Meghalaya 169 159 10 60 169 159 10 60

ममज़ोिम Mizoram 45 44 0 10 45 44 0 10

नजगजलड Nagaland 59 58 0 08 59 58 0 08

बिपिज Tripura 119 117 2 13 119 117 2 13

उततर-परवी कषतर North-Eastern Region 1270 1198 72 57 1270 1198 72 57

समपणण भारत All India 109696 109241 455 04 109696 109241 455 04

Note The revised data for March 2019 is not avaliable

Energy not Supplied Energy not Supplied

अपरल 2019 April2019 अपरल 2019 April2019 to April 2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2885 2308 577 200 2885 2308 577 200

परजब Punjab 7087 7087 0 00 7087 7087 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 47779 47210 569 12 47779 47210 569 12

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9179 9160 19 02 9179 9160 19 02

तलगजनज Telangana 10269 10202 67 07 10269 10202 67 07

कनजाटक Karnataka 12700 12688 12 01 12700 12688 12 01

किल Kerala 4316 4300 16 04 4316 4300 16 04

तममल नजड Tamil Nadu 15680 15659 21 01 15680 15659 21 01

पडचिी Puducherry 444 444 0 00 444 444 0 00

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49218 49103 115 02 49218 49103 115 02

बबहजि Bihar 5157 5155 2 00 5157 5155 2 00

िजमोिि घजटी ननगम DVC 3014 3014 0 00 3014 3014 0 00

झजिखणड Jharkhand 1326 1325 1 00 1326 1325 1 00

ओडडशज Odisha 5142 5140 3 01 5142 5140 3 01

पशशचम बगजल West Bengal 8745 8699 46 05 8745 8699 46 05

मसशककम Sikkim 98 98 0 00 98 98 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22415 22378 37 02 22415 22378 37 02

अरणजचल परिश Arunachal Pradesh 139 136 3 21 139 136 3 21

असम Assam 1910 1667 242 127 1910 1667 242 127

मणणपि Manipur 197 188 9 48 197 188 9 48

मघजलय Meghalaya 337 337 0 00 337 337 0 00

ममज़ोिम Mizoram 116 113 3 28 116 113 3 28

नजगजलड Nagaland 157 131 27 169 157 131 27 169

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177424 176810 613 03 177424 176810 613 03

Note The revised data for March 2019 is not avaliable 26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateअपरल 2019 April2019 अपरल 2019 April2019 to April 2019

File NoCEA-CH-14-1142018-Coordination Division

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

मई 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during May2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

N

o No

tified

Cuts

N

o No

tified

Cuts

File NoCEA-CH-14-1142018-Coordination Division

मई2019May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0910 hrsday 0811 - 910 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 403 hrsday 0347 - 403 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 2214 hrsday 2157 - 2214 hrsday

उततराखड Uttarakhand Data not received 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-957 hrs day

Three-Phase (Mixed) Supply - 2346 hrs day

Three-Phase Supply(Irrigation)- 0953 - 0957 hrs day Three-

Phase (Mixed) Supply - 2334 - 2346 hrs day

महजिजषटर Maharashtra Three-Phase Supply - 9 hrs day Three-Phase Supply - 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

मई 2019 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during May2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to May-2019 20070450 2493722 63763 22627934 678000 4539922 7835904 35681760

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 7835904 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

7835904

Total Installed Capacity 35687160 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-22 (Up to

Mar2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

Plan Period

2017-22 (Up to

May-19)

6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58732 21173 181240 11734 163456 1010 176200 158886 225204 30768 414858

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Progress of Transmission Sector in the Country up to May 2019

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on May19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

May 19)

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during May 2019

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 20525 925681234952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Achievement Targets Achievement

May-18

Thermal 0 660 0 NA

Hydro 110 0 0 000

Nuclear 0 0 0 NA

All India 110 660 0 000

Apr-18 to May-18 Apr-19 to May-19 Change wrt Previous Year

Thermal 69755 0 -1000

Hydro 110000 0 -1000

Nuclear 0000 0 NA

All India 179755 0 -1000

NA- Not Applicable

2

2 Generating Capacity Addition for May-2019 (MW)

Generating Capacity Addition during Apr-18 to May-18 amp Apr-19 to May-19

NA- Not Applicable

Achivement

wrt May-2018Type

May-19

1100

000

20

40

60

80

100

120

1May-18 May-19

0000

20000

40000

60000

80000

100000

120000

140000

160000

180000

200000

Apr-18 to May-18 Apr-19 to May-19

File NoCEA-CH-14-1142018-Coordination Division

1

2

3

Nuclear Hydro RES Grand TotalRegion Coal Lignite Gas Diesel Total

Northern 5036020 158000 578126 000 5772146 162000 1970777 1441143 9346066

Western 7280862 154000 1080649 000 8515511 184000 754750 2326226 11780487

Southern 4304202 314000 647366 56158 5321726 332000 1177483 3894034 10725243

Eastern 2746364 000 10000 000 2756364 000 494212 140300 3390876

North-East 77002 000 177581 3600 258183 000 142700 32429 433311

Islands 000 000 000 4005 4005 000 000 1773 5778

ALL INDIA 19444450 626000 2493722 63763 22627934 678000 4539922 7835904 35681760

Note Captive Genaration is not included in the total Captive Power capacity as on 31032017 RES as on 30042019 3

Thermal

Nuclear

3 List of Projects Commissioned During May-2019

4 All India Installed Capacity (MW) Region-wise as on 31-05-19

NIL

NIL

Thermal

NIL

Hydro

22627934

678000

4539922

7835904

35681760

51529

000

5000000

10000000

15000000

20000000

25000000

30000000

35000000

40000000

Thermal Nuclear Hydro RES Total Captive

Thermal Nuclear Hydro RES Total Captive

Total = 356817604

File NoCEA-CH-14-1142018-Coordination Division

Sector

Coal Lignite Gas Diesel Total

State 6407650 129000 711871 36393 7284913 000 2987880 234893 10507686

Private 7468800 183000 1058060 27370 8737230 000 339400 7437781 16514411

Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663

All India 19444450 626000 2493722 63763 22627934 678000 4539922 7835904 35681760

State 10507686

Private 16514411

Central 8659663

Electricity Generation (MU) Targets and Achievements for 2016-17

5 All India Installed Capacity (MW) Sector-wise as on 31-05-19

4

Grand TotalTHERMAL

Nuclear Hydro RES

RES as on 30042019

State 10507686 30

Private 16514411 46

Central 8659663 24

All India Installed Capacity(MW) (Sector-Wise)

File NoCEA-CH-14-1142018-Coordination Division

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 kV

220 KV

All India

5

0 0

6 Transmission Lines Added during May-2019 (Ckms)

May-18 May-19

0 0

0 0

0 0

623 474

720 503

1343 977

Transmission Lines Added duringApr-18 to May-18 ampApr-19 to May-19 (Ckms)

Apr-18 to May-18 Apr-19 to May-19

1201 904

2106 1451

0 0

242 53

663 494

1343

977

0

200

400

600

800

1000

1200

1400

1600

All India

Ckm

s

May-18 May-19

2106

1451

0

500

1000

1500

2000

2500

All India

Ckm

s

Apr-18 to May-18 Apr-19 to May-19

File NoCEA-CH-14-1142018-Coordination Division

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

6

7 Transformation Capacity Addition During May-2019 (MVA)

0

0

1390

1060

0 0

May-18 May-19

2450

0

1000

4145

2385

760

0 0

All India Transformation Capacity Addition during Apr-18 to May-18 amp Apr-19

to May-19 (MVA)

8745

0

1500

5180

2065

7920

4000

1575

2345

0

Apr-18 to May-18 Apr-19 to May-19

2450

4145

0

500

1000

1500

2000

2500

3000

3500

4000

4500

MV

A

May-18 May-19

7920 8745

0

74520

1

MV

A

Apr-18 to May-18 Apr-19 to May-19

File NoCEA-CH-14-1142018-Coordination Division

May-2018 May-2019 May-2018 May-2019 May-2018 May-2019

Northern 35206 37020 34664 36615 -15 -11

Western 35085 36658 35070 36658 00 00

Southern 27681 31232 27619 31213 -02 -01

Eastern 13210 13391 13063 13391 -11 00

North Eastern 1232 1416 1175 1323 -46 -66

All India 112414 119717 111591 119200 -07 -04

May-2018 May-2019 May-2018 May-2019 May-2018 May-2019

Northern 56546 60987 56243 60078 -05 -15

Western 53841 57113 52442 57093 -26 00

Southern 43234 47477 43234 47465 00 00

Eastern 21256 23558 21249 23558 00 00

North Eastern 2709 2758 2611 2674 -36 -31

All India 171973 183513 170765 182533 -07 -05

May-2019 Figures are Provisional

7

8 Power Supply Position (Energy amp Peak) in May-2019

Peak Demand Peak Met

Requirement Availability

Energy (MU)Region

Surplus(+)

Deficit (-) in

Surplus(+)

Deficit (-) in Region

Power (MW)

File NoCEA-CH-14-1142018-Coordination Division

Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand May-2018 0 0 0 0 589 0 0 172 0

May-2019 0 0 0 0 0 0 0 430 0

Chattisgarh Gujarat MP Maharashtra Daman amp Diu Dadar Nagar Goa

May-2018 11 1198 19 141 0 0 2

May-2019 0 0 14 8 0 1 0

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

May-2018 4 28 93 53 29 19 0

May-2019 0 0 0 81 62 11 0

8

9 Peak Shortage of Power Supply (MW) in Different Regions in May-2019

0 0 0 0 0 0 0

430

00 0 0 0

589

0 0

172

0

0

400

800

Ch

an

dig

ar

h Delh

i

Ha

rya

na

HP

Jamp

K

Pu

nja

b

Ra

jasth

an

UP

Utr

akhan

d

MW

Northern States (MW) May-2019 May-2018

0 0 14

8 0 1 011

1198

19 141

0 0 2

0

500

1000

1500

Ch

attis

gar

h

Guja

rat

MP

Mah

ara

shtr

a

Da

man amp

Diu

Da

dar

Na

gar G

oa

MW

Western States (MW) May-2019 May-2018

0 0 0

8162

11 0428

93

5329 19

00

100

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Southern State (MW) May-2019 May-2018

File NoCEA-CH-14-1142018-Coordination Division

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

May-2018 1 0 0 0 6 0 4

May-2019 0 0 0 0 0 0 4

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

May-2018 5 29 7 2 9 28 0

May-2019 2 80 2 4 2 2 1

9

0 0 0 0 0 0

4

1

0 0 0

6

0

4

0

2

4

6

8

Bih

ar

DV

C

Jha

rkh

an

d

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

NIs

land

MW

Eastern States (MW) May-2019 May-2018

2

80

2 4 2 2 15 7 2

9

28

0

0

20

40

60

80

100

Aru

na

cha

l

Assa

m

Ma

nip

ur

Me

gh

ala

ya

Miz

ora

m

Na

gala

nd

Trip

ura

MW

North-Eastern States (MW)

File NoCEA-CH-14-1142018-Coordination Division

Sector May-2018 May-2019

Central 7428 6845

State 6361 6095

Private Sector IPP 5625 6109

Private Sector UTL 6985 6458

ALL INDIA 6404 6324

Month PLF 2018 PLF 2019

Jan 6215 6054

Feb 6230 6051

March 6452 6340

April 6454 6471

May 6404 6324

For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment

10

PLF of Thermal Power Plants

(excluding gas based power plants)

All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise

10 All India Thermal PLF Sector-wise (Excluding Gas Based Power Plants) for May-2019

5800

6000

6200

6400

6600

Jan Feb March April May

Months

All India PLF Month-wise

PLF 2018 PLF 2019

7428

63615625

69856404

6845

60956109

64586324

000

1000

2000

3000

4000

5000

6000

7000

8000

Central State Private Sector IPP Private Sector UTL ALL INDIA

All India Thermal PLF

May-2018 May-2019

File NoCEA-CH-14-1142018-Coordination Division

2012-13 2013-14 2014-15 2015-16 2016-17 2017-18

TampD Losses 2304 2284 2277 2181 2142 2104

ATampC Losses 2548 2262 2572 2398 NA NA

Provisional

Note As per PFC for utilities selling directly to consumers NA- Not Available

Total Number of Villages

597464

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2013-14 4894

2014-15 5304

2015-16 5459

2016-17 5743

2017-18 6080

2018-19 6289

11

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality

as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a

Distribution Transformer may not be necessary)

14 All India Coal consumption for Power Generation (MT)

520

Average Revenue Realization(paiseunit)

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community

Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

11 T amp D and ATampC Losses ()

12 All India Village Electrification

Villiages Electrified (Nos)

10000All villages as per census 2011 has

been electrified on 28042018

Villages electrified

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12th Plan 2017-18 and 2018-19 12

2 Capacity Addition Targets amp Achievements during May-2019 and Apr-19 to May-19 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

File NoCEA-CH-14-1142018-Coordination Division

(i) CAPACITY ADDTION TARGETS AND ACHIEVEMENTS IN THE 12TH PLAN (Figures in MW)

SECTOR THERMAL HYDRO NUCLEAR TOTAL

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453

STATE 13922 22201 1608 2276 0 0 15530 24477

PRIVATE 43540 53661 3285 619 0 0 46825 54280

ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209

(ii) CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (Figures in MW)

Thermal Hydro Nuclear Total

Target Ach Target Ach Target Ach Target Ach

Central 4880 3170 800 390 500 0 6180 3560

State 3546 1760 300 200 0 0 3846 1960

Private 2940 3780 205 205 0 0 3145 3985

Total 11366 8710 1305 795 500 0 13171 9505

(iii) CAPACITY ADDITION ACHIEVEMENT FOR 2018-19 (Figures in MW)

Thermal Hydro Nuclear Total

Target Ach Target Ach Target Ach Target Ach

Central 2760 1960 710 110 0 0 3470 2070

State 4506 2850 130 30 0 0 4636 2880

Private 0 972 0 0 0 0 0 972

Total 7266 5782 840 140 0 0 8106 5922

12

1 Capacity Addtion Targets and Achievements in the 12th Plan 2017-18 and 2018-19

File NoCEA-CH-14-1142018-Coordination Division

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 6040 660 0 1160 0 -1160

State 425615 0 0 660 0 -660

Private 0 0 0 0 0 0

Total 1029615 660 0 1820 0 -1820

Central 600 0 0 0 0 0

State 21099 0 0 0 0 0

Private 379 0 0 0 0 0

Total 118999 0 0 0 0 0

Nuclear Central 700 0 0 0 0 0

Central 7340 660 0 1160 0 -1160

State 446714 0 0 660 0 -660

Private 379 0 0 0 0 0

Total 1218614 660 0 1820 0 -1820

Electricity Generation (MU) Targets and Achievements for 2016-17

13

2 Capacity Addition Targets Achievements During May-2019

Schemes Sector

Target 2019-20

Apr-19 to May-19May-19

Hydro

All India

Capacity Addition TargetsAchievements during the Month of May-2019

Thermal1

82

0

0 0

18

20

0 0 0 0

0

200

400

600

800

1000

1200

1400

1600

1800

2000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2019-20Target Achievement

0

100

200

300

400

500

600

700

Thermal Hydro Nuclear Total

660

0 0

660

0 0 00

MW

Target Achievement

File NoCEA-CH-14-1142018-Coordination Division

Coal Lignite Gas Diesel Total

State 1634400 25000 287920 000 1947320 000 869755 70056 2887131

Private 2168083 108000 55800 000 2331883 000 251400 1333187 3916470

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Sub Total 5036020 158000 578126 000 5772146 162000 1970777 1441143 9346066

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2204808 6245075

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Sub Total 7280862 154000 1080649 000 8515511 184000 754750 2326226 11780487

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3781156 5553186

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Sub Total 4304202 314000 647366 56158 5321726 332000 1177483 3894034 10725243

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111789 790389

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Sub Total 2746364 000 10000 000 2756364 000 494212 140300 3390876

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Sub Total 77002 000 177581 3600 258183 000 142700 32429 433311

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Sub Total 000 000 000 4005 4005 000 000 1773 5778

State 6407650 129000 711871 36393 7284913 000 2987880 234893 10507686

Private 7468800 183000 1058060 27370 8737230 000 339400 7437781 16514411

Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663

Total 19444450 626000 2493722 63763 22627934 678000 4539922 7835904 35681760

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30042019 is given below (in MW)

459415 3581588 2867921 7835904

A 0 MW

B May 2019 0 MW

C

May 2019 0 MW

D Net Capacity Added during May 2019 A-B-C 0 MW

Sector wise breakup of RES capacity as shown is provisional

RES

(MNRE)

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31052019)

(UTILITIES)

Region Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30042019

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

CapacityBM PowerCogen Waste to Energy

913150 13830

Capacity Added during May 2019

Capacity Retired during

Capacity removed due to change

from Conventional to RES during

Share of installed capacity of BBMB Stations is included in state sector of partner states

File NoCEA-CH-14-1142018-Coordination Division

Coal Lignite Gas Diesel Total

State 13500 000 180040 000 193540 000 000 000 193540

Private 86922 000 10800 000 97722 000 000 17889 115611

Central 311272 000 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 000 211541 000 623235 10283 72309 17889 723716

State 272000 000 15000 000 287000 000 110282 6930 404212

Private 408078 000 000 000 408078 000 20000 34512 462590

Central 129472 000 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 000 68561 000 878112 10094 196652 41942 1126799

State 000 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 000 99200 62668 161868

Central 18340 000 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 000 6201 000 24541 2895 291048 88329 406813

State 000 000 17500 000 17500 000 123000 13003 153503

Private 000 000 000 000 000 000 000 6483 6483

Central 50639 000 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 000 30407 000 81047 6798 232188 19486 339519

State 176000 000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 000 511550 000 28800 115462 655812

Central 85458 000 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244

State 626000 25000 60380 000 711380 000 109618 2385 823383

Private 280200 108000 000 000 388200 000 10400 751322 1149922

Central 95625 25000 22110 000 142735 55674 73901 34400 306710

Sub-Total 1001825 158000 82490 000 1242315 55674 193919 788107 2280015

State 546900 000 000 000 546900 000 72410 2510 621820

Private 871433 000 000 000 871433 000 84200 288760 1244393

Central 379639 000 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 000 54949 000 1852921 28948 336863 294270 2513002

State 000 000 000 000 000 000 125215 6787 132002

Private 9900 000 45000 000 54900 000 8800 52620 116320

Central 34324 000 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 000 51966 000 96190 3124 181569 59407 340290

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 3471 3471

Central 3815 000 1503 000 5317 801 10171 000 16289

Sub-Total 3815 000 1503 000 5317 801 10171 3471 19760

124953 000 29105 000 154058 23703 75145 000 252907

State 1634400 25000 287920 000 1947320 000 869755 70056 2887131

Private 2168083 108000 55800 000 2331883 000 251400 1333187 3916470

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Grand Total 5036020 158000 578126 000 5772146 162000 1970777 1441143 9346066

Jammu amp Kashmir

Punjab

Rajasthan

Uttar Pradesh

Uttarakhand

Chandigarh

Central - Unallocated

Total (Northern

Region)

HydroRES

(MNRE)

Delhi

Haryana

Himachal Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31052019)

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 005 005

Private 000 000 4800 000 4800 000 000 392 5192

Central 46959 000 1967 000 48926 2600 000 000 51526

Sub-Total 46959 000 6767 000 53726 2600 000 397 56723

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 1447 1447

Central 14141 000 4334 000 18475 700 000 000 19175

Sub-Total 14141 000 4334 000 18475 700 000 1447 20622

State 371000 104000 217782 000 692782 000 77200 6470 776452

Private 726567 50000 396000 000 1172567 000 000 841512 2014079

Central 324243 000 42400 000 366643 55900 000 24330 446873

Sub-Total 1421810 154000 656182 000 2231992 55900 77200 872312 3237404

State 540000 000 000 000 540000 000 170366 8396 718762

Private 617400 000 10000 000 627400 000 000 428040 1055440

Central 334238 000 25700 000 359938 27300 152000 30000 569238

Sub-Total 1491638 000 35700 000 1527338 27300 322366 466436 2343440

State 228000 000 000 000 228000 000 12000 1105 241105

Private 885000 000 000 000 885000 000 000 52430 937430

Central 211075 000 000 000 211075 4800 10000 000 225875

Sub-Total 1324075 000 000 000 1324075 4800 22000 53535 1404410

State 1017000 000 67200 000 1084200 000 285084 38813 1408097

Private 1245600 000 56800 000 1302400 000 48100 880441 2230941

Central 466780 000 227273 000 694053 69000 000 12300 775353

Sub-Total 2729380 000 351273 000 3080653 69000 333184 931553 4414390

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 546 546

Central 19560 000 6634 000 26194 900 000 000 27094

Sub-Total 19560 000 6634 000 26194 900 000 546 27640

233300 000 19759 000 253059 22800 000 000 275859

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2204808 6245075

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Grand Total 7280862 154000 1080649 000 8515511 184000 754750 2326226 11780487

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

ThermalNuclear Hydro

RES

(MNRE)

State Ownership Sector

Mode wise breakup

Grand Total

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 501000 000 23540 000 524540 000 167360 5618 697518

Private 387388 000 381318 3680 772386 000 000 743901 1516287

Central 154683 12773 000 000 167456 12727 000 25000 205183

Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 774519 2418988

State 558250 000 000 000 558250 000 247993 4122 810365

Private 83945 000 83182 000 167127 000 000 394315 561442

Central 180685 14927 000 000 195612 14873 000 1000 211485

Sub-Total 822880 14927 83182 000 920989 14873 247993 399437 1583292

State 502000 000 000 12792 514792 000 358660 19389 892841

Private 195850 000 000 2520 198370 000 000 1369720 1568090

Central 242780 40140 000 000 282920 69800 000 000 352720

Sub-Total 940630 40140 000 15312 996082 69800 358660 1389108 2813650

State 000 000 000 15996 15996 000 185650 17290 218936

Private 61500 000 17400 000 78900 000 000 19021 97921

Central 86142 28180 35958 000 150280 36200 000 5000 191480

Sub-Total 147642 28180 53358 15996 245176 36200 185650 41311 508337

State 432000 000 52408 000 484408 000 217820 12270 714498

Private 458767 25000 50310 21170 555247 000 000 1253885 1809132

Central 302532 136420 000 000 438952 144800 000 23190 606942

Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1289345 3130572

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 000 10000 000 000 10000 000 000 000 10000

Sub-Total 000 10000 000 000 10000 000 000 000 10000

State 000 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 000 314 314

Central 14080 10760 000 000 24840 8600 000 000 33440

Sub-Total 14080 10760 3250 000 28090 8600 000 314 37004

142600 35800 000 000 178400 45000 000 000 223400

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3781156 5553186

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Grand Total 4304202 314000 647366 56158 5321726 332000 1177483 3894034 10725243

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Andhra Pradesh

Telangana

Karnataka

Total (Southern

Region)

Tamil Nadu

NLC

Puducherry

Central - Unallocated

Kerala

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 7070 7070

Private 28100 000 000 000 28100 000 000 25545 53645

Central 384933 000 000 000 384933 000 11000 000 395932

Sub-Total 413033 000 000 000 413033 000 11000 32615 456647

State 42000 000 000 000 42000 000 13000 405 55405

Private 73000 000 000 000 73000 000 000 3647 76647

Central 39374 000 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 000 154374 000 19100 4052 177526

State 540000 000 10000 000 550000 000 98600 12195 660795

Private 243700 000 000 000 243700 000 000 35250 278950

Central 76077 000 000 000 76077 000 41000 000 117077

Sub-Total 859777 000 10000 000 869777 000 139600 47445 1056822

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 698504 000 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 000 698504 000 18620 000 717124

State 42000 000 000 000 42000 000 206192 2630 250822

Private 293900 000 000 000 293900 000 000 47346 341246

Central 163390 000 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 000 499290 000 215092 50976 765358

State 000 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 000 39900 001 39901

Central 8703 000 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 000 8703 000 82300 5212 96215

112683 000 000 000 112683 000 8501 000 121184

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111789 790389

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Grand Total 2746364 000 10000 000 2756364 000 494212 140300 3390876

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

Grand TotalThermalNuclear

RES

(MNRE)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

Total (Eastern

Region)

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

Central - Unallocated

HydroOwnership Sector

Mode wise breakup

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2650 5100

Central 40852 000 43556 000 84408 000 35708 2500 122616

Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038

State 000 000 000 000 000 000 000 10711 10711

Private 000 000 000 000 000 000 000 2939 2939

Central 3705 000 4682 000 8387 000 11655 000 20042

Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692

State 000 000 000 000 000 000 32200 3253 35453

Private 000 000 000 000 000 000 000 012 012

Central 4560 000 10969 000 15529 000 7227 000 22756

Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 5610 000 43695 000 49305 000 6849 500 56654

Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 344 344

Central 4710 000 7157 000 11867 000 9534 000 21401

Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 3210 000 4893 000 8103 000 5733 000 13836

Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 3105 000 4046 000 7151 000 9794 000 16945

Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642

11250 000 6362 000 17612 000 14000 000 31612

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 663 663

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1698 5703

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1773 5778

19

Andaman amp

Nicobar

Lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination Division

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during May-2019 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 31-05-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621

May19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 0 0 23 23 0 750 0 750 0 750 23 773

Achievement 0 0 0 0 0 0 0 0 0 0 0 0 0 474 0 474 0 503 0 503 0 977 0 977

Upto May-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 226 1176 0 1059 0 1059 637 2365 783 3785

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 494 0 494 0 904 0 904 53 1398 0 1451

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

Line

1 2 3 4 5 6

0

1 400 Barmer-Bhinmal line DC RVPNL 288

2 400 Jangaon - Tippapur DC TSTRANSCO 138

3 400 Kayathar - Thennampatty DC TANTRANSCO 48

4 220 Bareilly (400) - Pilibhit Ckt-II SC UPPTCL 39

5 220 Bhanjanagar - Aska DC OPTCL 57

6 220LILO of both Ckt of 220kV Mobha - Mangrol

line at 220kV Amod (Balanced portion)DC GETCO 46

7 220LILO of Gr Noida (400) - Noida Sec-148 line

at RC GreenDC UPPTCL 9

8 220 LILO of Hathras - Gokul at Mathura DC UPPTCL 120

9 220 Sohawal - Tanda DC UPPTCL 232

977

0

977

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During May-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 31-05-19

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during

May-201921(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 31-05-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716

May19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 0 1445 1000 2445 0 680 0 680 0 2125 1000 3125

Achievement 0 0 0 0 0 0 0 0 1000 0 0 1000 0 2385 0 2385 0 760 0 760 1000 3145 0 4145

Upto May-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 2445 3000 5445 0 1480 0 1480 3000 3925 6000 12925

Achievement 0 0 0 0 0 0 0 0 1500 0 0 1500 815 4365 0 5180 0 2065 0 2065 2315 6430 0 8745

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

As on 31-05-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1Bhadla SS (3x1500 3x500 MVA) (500 MVA ICTs- II

and III)400220 PGCIL 1000

Total of CENTRAL SECTOR 1000

2 Moradabad(Aug) (Additional TF) 400220 UPPTCL 240

3 Masauli Prayagraj (New) TF-III 400132 UPPTCL 200

4 Talaricheruvu Ss 400220 APTRANSCO 9455 Uravakonda (Aug) ICT-II 400220 APTRANSCO 5006 Jangaon ss (3x500) (ICT-I) 400220 TSTRANSCO 500

7 Chinhat Lucknow (Aug) TF-II (200-160) 220132 UPPTCL 408 Hathras (Aug)T-I(200-160) 220132 UPPTCL 409 Jaunpur (Aug) (Additional TF) 220132 UPPTCL 16010 Laukahi (Supaul new) 22013233 BSPTCL 32011 Sector- 95 Gurgaon 22033 HVPNL 10012 Alawalpur ss 22066 PSTCL 100

TOTAL STATE SECTOR 3145

GRAND TOTAL 4145

21(2)

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During May-2019

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2019-20 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination Division

Programme Achievement Ach Programme Achievement Ach

Central Sector 37545100 3290600 3141593 9547 6468500 6275642 9702

State Sector 37498600 3425800 3092392 9027 6748300 6066733 8990

PvtIPP Sector 37346200 3476700 3460217 9953 6713100 6652517 9910

PvtUTL Sector 1823100 164300 171799 10456 323600 337490 10429

Total 114213000 10357400 9866001 9526 20253500 19332382 9545

Central Sector 5661700 604200 619800 10258 990300 1104995 11158

State Sector 6680500 551500 652766 11836 1049700 1184387 11283

PvtIPP Sector 1206900 130200 121344 9320 187500 200643 10701

PvtUTL Sector 144100 12400 14009 11298 24700 25155 10184

Total 13693200 1298300 1407919 10844 2252200 2515180 11168

Central Sector 4472000 353500 365463 10338 720800 694195 9631

Total 4472000 353500 365463 10338 720800 694195 9631

Bhutan Import 621800 32500 35300 10862 50000 59270 11854

Central Sector 47678800 4248300 4126856 9714 8179600 8074832 9872

State Sector 44179100 3977300 3745158 9416 7798000 7251120 9299

Pvt Sector 40520300 3783600 3767369 9957 7248900 7215805 9954

Total 133000000 12041700 11674683 9695 23276500 22601027 9710

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Apr-19 Apr-18 Upto Apr-2019 Upto Apr-2018

975409 844377 975409 844377

22

Renewable Energy Generation

Achievement

May-2019

1 Electricity Generation (MU) Targets and Achievememts for 2019-20

All India Energy Generation During Apr-19 to May-19 (MU)

Target (2019-20)Apr-19 to May-19

Sector

Hydro

Thermal

Nuclear

202535

22522

7208

232765

193324

25152

6942

226010

0

50000

100000

150000

200000

250000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Energy Power Supply Position (Provisional) for May-2019 and during Apr-19 to May-19 23

2 Peak Power Supply Position (Provisional) for May-2019 and during Apr-19 to May-19 24

3 Energy Power Supply Position (Revised) for Apr-2019 and during Apr-19 to Apr-19 25

4 Peak Power Supply Position (Revised) for Apr-2019 and during Apr-19 to Apr-19 26

5 Notified Power cuts Restrictions on Industries during May-2019 27

6 Power Supply to Agricultural Sector during May-2019 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 154 154 0 00 271 271 0 00

दिलली Delhi 3366 3366 0 00 6065 6064 1 00

हरियजणज Haryana 4907 4907 0 00 8679 8679 0 00

दहमजचल परिश Himachal Pradesh 872 863 10 11 1654 1644 10 06

रमम कशमीि Jammu amp Kashmir 1760 1424 336 191 3364 2720 644 191

परजब Punjab 4769 4769 0 00 8475 8475 0 00

िजरसथजन Rajasthan 7120 7110 11 02 13313 13300 13 01

उतति परिश Uttar Pradesh 12742 12695 48 04 22897 22817 79 03

उततिजखड Uttarakhand 1329 1329 0 00 2449 2449 0 00

उततरी कषतर Northern Region 37020 36615 404 11 67166 66419 747 11

छततीसगढ़ Chhattisgarh 2794 2794 0 00 5765 5764 1 00

गरिजत Gujarat 11208 11208 0 00 21748 21748 0 00

मधय परिश Madhya Pradesh 6502 6502 0 00 12735 12735 0 00

महजिजषटर Maharashtra 14976 14976 0 00 29295 29294 0 00

िमन औि दिउ Daman amp Diu 222 222 0 00 443 443 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 1106 1106 0 00

गोवज Goa 404 404 0 00 801 801 0 00

पशचिमी कषतर Western Region 36658 36658 0 00 71893 71892 1 00

आनधर परिश Andhra Pradesh 6056 6048 7 01 11709 11702 7 01

तलगजनज Telangana 5318 5318 1 00 10772 10771 1 00

कनजाटक Karnataka 6702 6702 1 00 13569 13568 1 00

किल Kerala 2575 2566 9 03 4888 4878 10 02

तममल नजड Tamil Nadu 10309 10309 1 00 20031 20030 1 00

पडचिी Puducherry 271 271 1 03 517 516 1 01

लकष-दवीप Lakshadweep 4 4 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 31232 31213 19 01 61486 61465 21 00

बबहजि Bihar 3078 3078 0 00 5662 5659 3 01

िजमोिि घजटी ननगम DVC 1814 1814 0 00 3757 3755 2 01

झजिखणड Jharkhand 789 789 0 00 1505 1495 10 07

ओडडशज Odisha 2560 2560 0 00 5261 5261 0 00

पशशचम बगजल West Bengal 5115 5115 0 00 9920 9897 23 02

मसशककम Sikkim 36 36 0 00 78 78 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 58 54 4 67

परवी कषतर Eastern Region 13391 13391 0 00 26182 26144 38 01

अरणजचल परिश Arunachal Pradesh 64 64 0 06 127 126 1 06

असम Assam 819 738 81 99 1573 1434 139 88

मणणपि Manipur 73 72 1 07 135 134 2 12

मघजलय Meghalaya 167 159 8 50 336 318 18 55

ममज़ोिम Mizoram 55 55 0 07 100 99 1 08

नजगजलड Nagaland 65 64 1 08 124 123 1 08

बिपिज Tripura 173 170 2 14 292 288 4 13

उततर-परवी कषतर North-Eastern Region 1416 1323 93 66 2686 2521 165 62

समपणण भारत All India 119717 119200 517 04 229413 228441 972 04

Note Power Supply Position Report has been compiled based on the data furnished by State Utilities Electricity Departments

23

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 356 356 0 00 356 356 0 00

दिलली Delhi 6461 6461 0 00 6461 6461 0 00

हरियजणज Haryana 8874 8874 0 00 8874 8874 0 00

दहमजचल परिश Himachal Pradesh 1480 1480 0 00 1480 1480 0 00

रमम कशमीि Jammu amp Kashmir 2426 2426 0 00 2885 2426 459 159

परजब Punjab 8802 8802 0 00 8802 8802 0 00

िजरसथजन Rajasthan 11791 11791 0 00 11791 11791 0 00

उतति परिश Uttar Pradesh 22487 22057 430 19 22487 22057 430 19

उततिजखड Uttarakhand 2155 2155 0 00 2155 2155 0 00

उततरी कषतर Northern Region 60987 60078 909 15 60987 60078 909 15

छततीसगढ़ Chhattisgarh 4504 4504 0 00 4596 4574 22 05

गरिजत Gujarat 18094 18094 0 00 18094 18094 0 00

मधय परिश Madhya Pradesh 10145 10131 14 01 10145 10131 14 01

महजिजषटर Maharashtra 23621 23613 8 00 23621 23613 8 00

िमन औि दिउ Daman amp Diu 344 344 0 01 344 344 0 01

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 818 818 0 00

गोवज Goa 554 554 0 00 594 594 0 00

पशचिमी कषतर Western Region 57113 57093 20 00 57113 57093 20 00

आनधर परिश Andhra Pradesh 9854 9854 0 00 9854 9854 0 00

तलगजनज Telangana 8684 8684 0 00 10269 10202 67 07

कनजाटक Karnataka 12158 12158 0 00 12700 12688 12 01

किल Kerala 4286 4205 81 19 4316 4300 16 04

तममल नजड Tamil Nadu 15584 15522 62 04 15680 15659 21 01

पडचिी Puducherry 453 442 11 24 453 444 9 20

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 47477 47465 12 00 49218 49103 115 02

बबहजि Bihar 5481 5481 0 00 5481 5481 0 00

िजमोिि घजटी ननगम DVC 3048 3048 0 00 3048 3048 0 00

झजिखणड Jharkhand 1330 1330 0 00 1330 1330 0 00

ओडडशज Odisha 4736 4736 0 00 5142 5140 3 01

पशशचम बगजल West Bengal 9335 9335 0 00 9335 9335 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23558 23558 0 00 23558 23558 0 00

अरणजचल परिश Arunachal Pradesh 140 138 2 12 140 138 2 12

असम Assam 1753 1673 80 46 1910 1673 237 124

मणणपि Manipur 183 181 2 09 197 188 9 48

मघजलय Meghalaya 329 325 4 12 337 337 0 00

ममज़ोिम Mizoram 102 100 2 20 116 113 3 28

नजगजलड Nagaland 130 128 2 14 157 131 27 169

बिपिज Tripura 297 295 1 05 297 295 1 05

उततर-परवी कषतर North-Eastern Region 2758 2674 84 31 2848 2780 68 24

समपणण भारत All India 183513 182533 981 05 183513 182533 981 05

Note Power Supply Position Report has been compiled based on the data furnished by State Utilities Electricity Departments 24

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -मई2019 April2019 to May2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and supply

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateमई 2019 May2019

मजग की पनता म कमी Demand not Met

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 781 781 0 00 781 781 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3706 3706 0 00 3706 3706 0 00

िजरसथजन Rajasthan 6192 6190 2 00 6192 6190 2 00

उतति परिश Uttar Pradesh 10154 10123 32 03 10154 10123 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30147 29804 343 11 30147 29804 343 11

छततीसगढ़ Chhattisgarh 2972 2971 1 00 2972 2971 1 00

गरिजत Gujarat 10540 10540 0 00 10540 10540 0 00

मधय परिश Madhya Pradesh 6233 6233 0 00 6233 6233 0 00

महजिजषटर Maharashtra 14319 14319 0 00 14319 14319 0 00

िमन औि दिउ Daman amp Diu 221 221 0 00 221 221 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 554 554 0 00 554 554 0 00

गोवज Goa 397 397 0 00 397 397 0 00

पशचिमी कषतर Western Region 35235 35234 1 00 35235 35234 1 00

आनधर परिश Andhra Pradesh 5653 5653 0 00 5653 5653 0 00

तलगजनज Telangana 5453 5453 0 00 5453 5453 0 00

कनजाटक Karnataka 6867 6867 0 00 6867 6867 0 00

किल Kerala 2313 2312 2 01 2313 2312 2 01

तममल नजड Tamil Nadu 9721 9721 0 00 9721 9721 0 00

पडचिी Puducherry 246 246 0 00 246 246 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 30254 30252 2 00 30254 30252 2 00

बबहजि Bihar 2584 2581 3 01 2584 2581 3 01

िजमोिि घजटी ननगम DVC 1944 1942 2 01 1944 1942 2 01

झजिखणड Jharkhand 716 706 10 14 716 706 10 14

ओडडशज Odisha 2701 2701 0 00 2701 2701 0 00

पशशचम बगजल West Bengal 4805 4782 23 05 4805 4782 23 05

मसशककम Sikkim 42 42 0 00 42 42 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12792 12754 38 03 12792 12754 38 03

अरणजचल परिश Arunachal Pradesh 62 62 0 06 62 62 0 06

असम Assam 754 696 58 77 754 696 58 77

मणणपि Manipur 62 61 1 17 62 61 1 17

मघजलय Meghalaya 169 159 10 60 169 159 10 60

ममज़ोिम Mizoram 45 44 0 10 45 44 0 10

नजगजलड Nagaland 59 58 0 08 59 58 0 08

बिपिज Tripura 119 117 2 13 119 117 2 13

उततर-परवी कषतर North-Eastern Region 1270 1198 72 57 1270 1198 72 57

समपणण भारत All India 109696 109241 455 04 109696 109241 455 04

Note The revised data for March 2019 is not avaliable

Energy not Supplied Energy not Supplied

अपरल 2019 April2019 अपरल 2019 April2019 to April 2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2885 2308 577 200 2885 2308 577 200

परजब Punjab 7087 7087 0 00 7087 7087 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 47779 47210 569 12 47779 47210 569 12

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9179 9160 19 02 9179 9160 19 02

तलगजनज Telangana 10269 10202 67 07 10269 10202 67 07

कनजाटक Karnataka 12700 12688 12 01 12700 12688 12 01

किल Kerala 4316 4300 16 04 4316 4300 16 04

तममल नजड Tamil Nadu 15680 15659 21 01 15680 15659 21 01

पडचिी Puducherry 444 444 0 00 444 444 0 00

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49218 49103 115 02 49218 49103 115 02

बबहजि Bihar 5157 5155 2 00 5157 5155 2 00

िजमोिि घजटी ननगम DVC 3014 3014 0 00 3014 3014 0 00

झजिखणड Jharkhand 1326 1325 1 00 1326 1325 1 00

ओडडशज Odisha 5142 5140 3 01 5142 5140 3 01

पशशचम बगजल West Bengal 8745 8699 46 05 8745 8699 46 05

मसशककम Sikkim 98 98 0 00 98 98 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22415 22378 37 02 22415 22378 37 02

अरणजचल परिश Arunachal Pradesh 139 136 3 21 139 136 3 21

असम Assam 1910 1667 242 127 1910 1667 242 127

मणणपि Manipur 197 188 9 48 197 188 9 48

मघजलय Meghalaya 337 337 0 00 337 337 0 00

ममज़ोिम Mizoram 116 113 3 28 116 113 3 28

नजगजलड Nagaland 157 131 27 169 157 131 27 169

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177424 176810 613 03 177424 176810 613 03

Note The revised data for March 2019 is not avaliable 26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateअपरल 2019 April2019 अपरल 2019 April2019 to April 2019

File NoCEA-CH-14-1142018-Coordination Division

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

मई 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during May2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

N

o No

tified

Cuts

N

o No

tified

Cuts

File NoCEA-CH-14-1142018-Coordination Division

मई2019May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0910 hrsday 0811 - 910 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 403 hrsday 0347 - 403 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 2214 hrsday 2157 - 2214 hrsday

उततराखड Uttarakhand Data not received 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-957 hrs day

Three-Phase (Mixed) Supply - 2346 hrs day

Three-Phase Supply(Irrigation)- 0953 - 0957 hrs day Three-

Phase (Mixed) Supply - 2334 - 2346 hrs day

महजिजषटर Maharashtra Three-Phase Supply - 9 hrs day Three-Phase Supply - 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

मई 2019 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during May2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to May-2019 20070450 2493722 63763 22627934 678000 4539922 7835904 35681760

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 7835904 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

7835904

Total Installed Capacity 35687160 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-22 (Up to

Mar2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

Plan Period

2017-22 (Up to

May-19)

6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58732 21173 181240 11734 163456 1010 176200 158886 225204 30768 414858

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Progress of Transmission Sector in the Country up to May 2019

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on May19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

May 19)

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during May 2019

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 20525 925681234952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

1

2

3

Nuclear Hydro RES Grand TotalRegion Coal Lignite Gas Diesel Total

Northern 5036020 158000 578126 000 5772146 162000 1970777 1441143 9346066

Western 7280862 154000 1080649 000 8515511 184000 754750 2326226 11780487

Southern 4304202 314000 647366 56158 5321726 332000 1177483 3894034 10725243

Eastern 2746364 000 10000 000 2756364 000 494212 140300 3390876

North-East 77002 000 177581 3600 258183 000 142700 32429 433311

Islands 000 000 000 4005 4005 000 000 1773 5778

ALL INDIA 19444450 626000 2493722 63763 22627934 678000 4539922 7835904 35681760

Note Captive Genaration is not included in the total Captive Power capacity as on 31032017 RES as on 30042019 3

Thermal

Nuclear

3 List of Projects Commissioned During May-2019

4 All India Installed Capacity (MW) Region-wise as on 31-05-19

NIL

NIL

Thermal

NIL

Hydro

22627934

678000

4539922

7835904

35681760

51529

000

5000000

10000000

15000000

20000000

25000000

30000000

35000000

40000000

Thermal Nuclear Hydro RES Total Captive

Thermal Nuclear Hydro RES Total Captive

Total = 356817604

File NoCEA-CH-14-1142018-Coordination Division

Sector

Coal Lignite Gas Diesel Total

State 6407650 129000 711871 36393 7284913 000 2987880 234893 10507686

Private 7468800 183000 1058060 27370 8737230 000 339400 7437781 16514411

Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663

All India 19444450 626000 2493722 63763 22627934 678000 4539922 7835904 35681760

State 10507686

Private 16514411

Central 8659663

Electricity Generation (MU) Targets and Achievements for 2016-17

5 All India Installed Capacity (MW) Sector-wise as on 31-05-19

4

Grand TotalTHERMAL

Nuclear Hydro RES

RES as on 30042019

State 10507686 30

Private 16514411 46

Central 8659663 24

All India Installed Capacity(MW) (Sector-Wise)

File NoCEA-CH-14-1142018-Coordination Division

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 kV

220 KV

All India

5

0 0

6 Transmission Lines Added during May-2019 (Ckms)

May-18 May-19

0 0

0 0

0 0

623 474

720 503

1343 977

Transmission Lines Added duringApr-18 to May-18 ampApr-19 to May-19 (Ckms)

Apr-18 to May-18 Apr-19 to May-19

1201 904

2106 1451

0 0

242 53

663 494

1343

977

0

200

400

600

800

1000

1200

1400

1600

All India

Ckm

s

May-18 May-19

2106

1451

0

500

1000

1500

2000

2500

All India

Ckm

s

Apr-18 to May-18 Apr-19 to May-19

File NoCEA-CH-14-1142018-Coordination Division

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

6

7 Transformation Capacity Addition During May-2019 (MVA)

0

0

1390

1060

0 0

May-18 May-19

2450

0

1000

4145

2385

760

0 0

All India Transformation Capacity Addition during Apr-18 to May-18 amp Apr-19

to May-19 (MVA)

8745

0

1500

5180

2065

7920

4000

1575

2345

0

Apr-18 to May-18 Apr-19 to May-19

2450

4145

0

500

1000

1500

2000

2500

3000

3500

4000

4500

MV

A

May-18 May-19

7920 8745

0

74520

1

MV

A

Apr-18 to May-18 Apr-19 to May-19

File NoCEA-CH-14-1142018-Coordination Division

May-2018 May-2019 May-2018 May-2019 May-2018 May-2019

Northern 35206 37020 34664 36615 -15 -11

Western 35085 36658 35070 36658 00 00

Southern 27681 31232 27619 31213 -02 -01

Eastern 13210 13391 13063 13391 -11 00

North Eastern 1232 1416 1175 1323 -46 -66

All India 112414 119717 111591 119200 -07 -04

May-2018 May-2019 May-2018 May-2019 May-2018 May-2019

Northern 56546 60987 56243 60078 -05 -15

Western 53841 57113 52442 57093 -26 00

Southern 43234 47477 43234 47465 00 00

Eastern 21256 23558 21249 23558 00 00

North Eastern 2709 2758 2611 2674 -36 -31

All India 171973 183513 170765 182533 -07 -05

May-2019 Figures are Provisional

7

8 Power Supply Position (Energy amp Peak) in May-2019

Peak Demand Peak Met

Requirement Availability

Energy (MU)Region

Surplus(+)

Deficit (-) in

Surplus(+)

Deficit (-) in Region

Power (MW)

File NoCEA-CH-14-1142018-Coordination Division

Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand May-2018 0 0 0 0 589 0 0 172 0

May-2019 0 0 0 0 0 0 0 430 0

Chattisgarh Gujarat MP Maharashtra Daman amp Diu Dadar Nagar Goa

May-2018 11 1198 19 141 0 0 2

May-2019 0 0 14 8 0 1 0

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

May-2018 4 28 93 53 29 19 0

May-2019 0 0 0 81 62 11 0

8

9 Peak Shortage of Power Supply (MW) in Different Regions in May-2019

0 0 0 0 0 0 0

430

00 0 0 0

589

0 0

172

0

0

400

800

Ch

an

dig

ar

h Delh

i

Ha

rya

na

HP

Jamp

K

Pu

nja

b

Ra

jasth

an

UP

Utr

akhan

d

MW

Northern States (MW) May-2019 May-2018

0 0 14

8 0 1 011

1198

19 141

0 0 2

0

500

1000

1500

Ch

attis

gar

h

Guja

rat

MP

Mah

ara

shtr

a

Da

man amp

Diu

Da

dar

Na

gar G

oa

MW

Western States (MW) May-2019 May-2018

0 0 0

8162

11 0428

93

5329 19

00

100

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Southern State (MW) May-2019 May-2018

File NoCEA-CH-14-1142018-Coordination Division

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

May-2018 1 0 0 0 6 0 4

May-2019 0 0 0 0 0 0 4

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

May-2018 5 29 7 2 9 28 0

May-2019 2 80 2 4 2 2 1

9

0 0 0 0 0 0

4

1

0 0 0

6

0

4

0

2

4

6

8

Bih

ar

DV

C

Jha

rkh

an

d

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

NIs

land

MW

Eastern States (MW) May-2019 May-2018

2

80

2 4 2 2 15 7 2

9

28

0

0

20

40

60

80

100

Aru

na

cha

l

Assa

m

Ma

nip

ur

Me

gh

ala

ya

Miz

ora

m

Na

gala

nd

Trip

ura

MW

North-Eastern States (MW)

File NoCEA-CH-14-1142018-Coordination Division

Sector May-2018 May-2019

Central 7428 6845

State 6361 6095

Private Sector IPP 5625 6109

Private Sector UTL 6985 6458

ALL INDIA 6404 6324

Month PLF 2018 PLF 2019

Jan 6215 6054

Feb 6230 6051

March 6452 6340

April 6454 6471

May 6404 6324

For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment

10

PLF of Thermal Power Plants

(excluding gas based power plants)

All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise

10 All India Thermal PLF Sector-wise (Excluding Gas Based Power Plants) for May-2019

5800

6000

6200

6400

6600

Jan Feb March April May

Months

All India PLF Month-wise

PLF 2018 PLF 2019

7428

63615625

69856404

6845

60956109

64586324

000

1000

2000

3000

4000

5000

6000

7000

8000

Central State Private Sector IPP Private Sector UTL ALL INDIA

All India Thermal PLF

May-2018 May-2019

File NoCEA-CH-14-1142018-Coordination Division

2012-13 2013-14 2014-15 2015-16 2016-17 2017-18

TampD Losses 2304 2284 2277 2181 2142 2104

ATampC Losses 2548 2262 2572 2398 NA NA

Provisional

Note As per PFC for utilities selling directly to consumers NA- Not Available

Total Number of Villages

597464

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2013-14 4894

2014-15 5304

2015-16 5459

2016-17 5743

2017-18 6080

2018-19 6289

11

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality

as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a

Distribution Transformer may not be necessary)

14 All India Coal consumption for Power Generation (MT)

520

Average Revenue Realization(paiseunit)

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community

Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

11 T amp D and ATampC Losses ()

12 All India Village Electrification

Villiages Electrified (Nos)

10000All villages as per census 2011 has

been electrified on 28042018

Villages electrified

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12th Plan 2017-18 and 2018-19 12

2 Capacity Addition Targets amp Achievements during May-2019 and Apr-19 to May-19 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

File NoCEA-CH-14-1142018-Coordination Division

(i) CAPACITY ADDTION TARGETS AND ACHIEVEMENTS IN THE 12TH PLAN (Figures in MW)

SECTOR THERMAL HYDRO NUCLEAR TOTAL

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453

STATE 13922 22201 1608 2276 0 0 15530 24477

PRIVATE 43540 53661 3285 619 0 0 46825 54280

ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209

(ii) CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (Figures in MW)

Thermal Hydro Nuclear Total

Target Ach Target Ach Target Ach Target Ach

Central 4880 3170 800 390 500 0 6180 3560

State 3546 1760 300 200 0 0 3846 1960

Private 2940 3780 205 205 0 0 3145 3985

Total 11366 8710 1305 795 500 0 13171 9505

(iii) CAPACITY ADDITION ACHIEVEMENT FOR 2018-19 (Figures in MW)

Thermal Hydro Nuclear Total

Target Ach Target Ach Target Ach Target Ach

Central 2760 1960 710 110 0 0 3470 2070

State 4506 2850 130 30 0 0 4636 2880

Private 0 972 0 0 0 0 0 972

Total 7266 5782 840 140 0 0 8106 5922

12

1 Capacity Addtion Targets and Achievements in the 12th Plan 2017-18 and 2018-19

File NoCEA-CH-14-1142018-Coordination Division

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 6040 660 0 1160 0 -1160

State 425615 0 0 660 0 -660

Private 0 0 0 0 0 0

Total 1029615 660 0 1820 0 -1820

Central 600 0 0 0 0 0

State 21099 0 0 0 0 0

Private 379 0 0 0 0 0

Total 118999 0 0 0 0 0

Nuclear Central 700 0 0 0 0 0

Central 7340 660 0 1160 0 -1160

State 446714 0 0 660 0 -660

Private 379 0 0 0 0 0

Total 1218614 660 0 1820 0 -1820

Electricity Generation (MU) Targets and Achievements for 2016-17

13

2 Capacity Addition Targets Achievements During May-2019

Schemes Sector

Target 2019-20

Apr-19 to May-19May-19

Hydro

All India

Capacity Addition TargetsAchievements during the Month of May-2019

Thermal1

82

0

0 0

18

20

0 0 0 0

0

200

400

600

800

1000

1200

1400

1600

1800

2000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2019-20Target Achievement

0

100

200

300

400

500

600

700

Thermal Hydro Nuclear Total

660

0 0

660

0 0 00

MW

Target Achievement

File NoCEA-CH-14-1142018-Coordination Division

Coal Lignite Gas Diesel Total

State 1634400 25000 287920 000 1947320 000 869755 70056 2887131

Private 2168083 108000 55800 000 2331883 000 251400 1333187 3916470

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Sub Total 5036020 158000 578126 000 5772146 162000 1970777 1441143 9346066

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2204808 6245075

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Sub Total 7280862 154000 1080649 000 8515511 184000 754750 2326226 11780487

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3781156 5553186

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Sub Total 4304202 314000 647366 56158 5321726 332000 1177483 3894034 10725243

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111789 790389

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Sub Total 2746364 000 10000 000 2756364 000 494212 140300 3390876

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Sub Total 77002 000 177581 3600 258183 000 142700 32429 433311

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Sub Total 000 000 000 4005 4005 000 000 1773 5778

State 6407650 129000 711871 36393 7284913 000 2987880 234893 10507686

Private 7468800 183000 1058060 27370 8737230 000 339400 7437781 16514411

Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663

Total 19444450 626000 2493722 63763 22627934 678000 4539922 7835904 35681760

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30042019 is given below (in MW)

459415 3581588 2867921 7835904

A 0 MW

B May 2019 0 MW

C

May 2019 0 MW

D Net Capacity Added during May 2019 A-B-C 0 MW

Sector wise breakup of RES capacity as shown is provisional

RES

(MNRE)

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31052019)

(UTILITIES)

Region Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30042019

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

CapacityBM PowerCogen Waste to Energy

913150 13830

Capacity Added during May 2019

Capacity Retired during

Capacity removed due to change

from Conventional to RES during

Share of installed capacity of BBMB Stations is included in state sector of partner states

File NoCEA-CH-14-1142018-Coordination Division

Coal Lignite Gas Diesel Total

State 13500 000 180040 000 193540 000 000 000 193540

Private 86922 000 10800 000 97722 000 000 17889 115611

Central 311272 000 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 000 211541 000 623235 10283 72309 17889 723716

State 272000 000 15000 000 287000 000 110282 6930 404212

Private 408078 000 000 000 408078 000 20000 34512 462590

Central 129472 000 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 000 68561 000 878112 10094 196652 41942 1126799

State 000 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 000 99200 62668 161868

Central 18340 000 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 000 6201 000 24541 2895 291048 88329 406813

State 000 000 17500 000 17500 000 123000 13003 153503

Private 000 000 000 000 000 000 000 6483 6483

Central 50639 000 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 000 30407 000 81047 6798 232188 19486 339519

State 176000 000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 000 511550 000 28800 115462 655812

Central 85458 000 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244

State 626000 25000 60380 000 711380 000 109618 2385 823383

Private 280200 108000 000 000 388200 000 10400 751322 1149922

Central 95625 25000 22110 000 142735 55674 73901 34400 306710

Sub-Total 1001825 158000 82490 000 1242315 55674 193919 788107 2280015

State 546900 000 000 000 546900 000 72410 2510 621820

Private 871433 000 000 000 871433 000 84200 288760 1244393

Central 379639 000 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 000 54949 000 1852921 28948 336863 294270 2513002

State 000 000 000 000 000 000 125215 6787 132002

Private 9900 000 45000 000 54900 000 8800 52620 116320

Central 34324 000 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 000 51966 000 96190 3124 181569 59407 340290

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 3471 3471

Central 3815 000 1503 000 5317 801 10171 000 16289

Sub-Total 3815 000 1503 000 5317 801 10171 3471 19760

124953 000 29105 000 154058 23703 75145 000 252907

State 1634400 25000 287920 000 1947320 000 869755 70056 2887131

Private 2168083 108000 55800 000 2331883 000 251400 1333187 3916470

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Grand Total 5036020 158000 578126 000 5772146 162000 1970777 1441143 9346066

Jammu amp Kashmir

Punjab

Rajasthan

Uttar Pradesh

Uttarakhand

Chandigarh

Central - Unallocated

Total (Northern

Region)

HydroRES

(MNRE)

Delhi

Haryana

Himachal Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31052019)

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 005 005

Private 000 000 4800 000 4800 000 000 392 5192

Central 46959 000 1967 000 48926 2600 000 000 51526

Sub-Total 46959 000 6767 000 53726 2600 000 397 56723

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 1447 1447

Central 14141 000 4334 000 18475 700 000 000 19175

Sub-Total 14141 000 4334 000 18475 700 000 1447 20622

State 371000 104000 217782 000 692782 000 77200 6470 776452

Private 726567 50000 396000 000 1172567 000 000 841512 2014079

Central 324243 000 42400 000 366643 55900 000 24330 446873

Sub-Total 1421810 154000 656182 000 2231992 55900 77200 872312 3237404

State 540000 000 000 000 540000 000 170366 8396 718762

Private 617400 000 10000 000 627400 000 000 428040 1055440

Central 334238 000 25700 000 359938 27300 152000 30000 569238

Sub-Total 1491638 000 35700 000 1527338 27300 322366 466436 2343440

State 228000 000 000 000 228000 000 12000 1105 241105

Private 885000 000 000 000 885000 000 000 52430 937430

Central 211075 000 000 000 211075 4800 10000 000 225875

Sub-Total 1324075 000 000 000 1324075 4800 22000 53535 1404410

State 1017000 000 67200 000 1084200 000 285084 38813 1408097

Private 1245600 000 56800 000 1302400 000 48100 880441 2230941

Central 466780 000 227273 000 694053 69000 000 12300 775353

Sub-Total 2729380 000 351273 000 3080653 69000 333184 931553 4414390

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 546 546

Central 19560 000 6634 000 26194 900 000 000 27094

Sub-Total 19560 000 6634 000 26194 900 000 546 27640

233300 000 19759 000 253059 22800 000 000 275859

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2204808 6245075

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Grand Total 7280862 154000 1080649 000 8515511 184000 754750 2326226 11780487

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

ThermalNuclear Hydro

RES

(MNRE)

State Ownership Sector

Mode wise breakup

Grand Total

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 501000 000 23540 000 524540 000 167360 5618 697518

Private 387388 000 381318 3680 772386 000 000 743901 1516287

Central 154683 12773 000 000 167456 12727 000 25000 205183

Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 774519 2418988

State 558250 000 000 000 558250 000 247993 4122 810365

Private 83945 000 83182 000 167127 000 000 394315 561442

Central 180685 14927 000 000 195612 14873 000 1000 211485

Sub-Total 822880 14927 83182 000 920989 14873 247993 399437 1583292

State 502000 000 000 12792 514792 000 358660 19389 892841

Private 195850 000 000 2520 198370 000 000 1369720 1568090

Central 242780 40140 000 000 282920 69800 000 000 352720

Sub-Total 940630 40140 000 15312 996082 69800 358660 1389108 2813650

State 000 000 000 15996 15996 000 185650 17290 218936

Private 61500 000 17400 000 78900 000 000 19021 97921

Central 86142 28180 35958 000 150280 36200 000 5000 191480

Sub-Total 147642 28180 53358 15996 245176 36200 185650 41311 508337

State 432000 000 52408 000 484408 000 217820 12270 714498

Private 458767 25000 50310 21170 555247 000 000 1253885 1809132

Central 302532 136420 000 000 438952 144800 000 23190 606942

Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1289345 3130572

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 000 10000 000 000 10000 000 000 000 10000

Sub-Total 000 10000 000 000 10000 000 000 000 10000

State 000 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 000 314 314

Central 14080 10760 000 000 24840 8600 000 000 33440

Sub-Total 14080 10760 3250 000 28090 8600 000 314 37004

142600 35800 000 000 178400 45000 000 000 223400

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3781156 5553186

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Grand Total 4304202 314000 647366 56158 5321726 332000 1177483 3894034 10725243

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Andhra Pradesh

Telangana

Karnataka

Total (Southern

Region)

Tamil Nadu

NLC

Puducherry

Central - Unallocated

Kerala

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 7070 7070

Private 28100 000 000 000 28100 000 000 25545 53645

Central 384933 000 000 000 384933 000 11000 000 395932

Sub-Total 413033 000 000 000 413033 000 11000 32615 456647

State 42000 000 000 000 42000 000 13000 405 55405

Private 73000 000 000 000 73000 000 000 3647 76647

Central 39374 000 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 000 154374 000 19100 4052 177526

State 540000 000 10000 000 550000 000 98600 12195 660795

Private 243700 000 000 000 243700 000 000 35250 278950

Central 76077 000 000 000 76077 000 41000 000 117077

Sub-Total 859777 000 10000 000 869777 000 139600 47445 1056822

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 698504 000 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 000 698504 000 18620 000 717124

State 42000 000 000 000 42000 000 206192 2630 250822

Private 293900 000 000 000 293900 000 000 47346 341246

Central 163390 000 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 000 499290 000 215092 50976 765358

State 000 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 000 39900 001 39901

Central 8703 000 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 000 8703 000 82300 5212 96215

112683 000 000 000 112683 000 8501 000 121184

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111789 790389

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Grand Total 2746364 000 10000 000 2756364 000 494212 140300 3390876

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

Grand TotalThermalNuclear

RES

(MNRE)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

Total (Eastern

Region)

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

Central - Unallocated

HydroOwnership Sector

Mode wise breakup

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2650 5100

Central 40852 000 43556 000 84408 000 35708 2500 122616

Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038

State 000 000 000 000 000 000 000 10711 10711

Private 000 000 000 000 000 000 000 2939 2939

Central 3705 000 4682 000 8387 000 11655 000 20042

Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692

State 000 000 000 000 000 000 32200 3253 35453

Private 000 000 000 000 000 000 000 012 012

Central 4560 000 10969 000 15529 000 7227 000 22756

Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 5610 000 43695 000 49305 000 6849 500 56654

Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 344 344

Central 4710 000 7157 000 11867 000 9534 000 21401

Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 3210 000 4893 000 8103 000 5733 000 13836

Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 3105 000 4046 000 7151 000 9794 000 16945

Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642

11250 000 6362 000 17612 000 14000 000 31612

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 663 663

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1698 5703

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1773 5778

19

Andaman amp

Nicobar

Lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination Division

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during May-2019 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 31-05-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621

May19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 0 0 23 23 0 750 0 750 0 750 23 773

Achievement 0 0 0 0 0 0 0 0 0 0 0 0 0 474 0 474 0 503 0 503 0 977 0 977

Upto May-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 226 1176 0 1059 0 1059 637 2365 783 3785

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 494 0 494 0 904 0 904 53 1398 0 1451

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

Line

1 2 3 4 5 6

0

1 400 Barmer-Bhinmal line DC RVPNL 288

2 400 Jangaon - Tippapur DC TSTRANSCO 138

3 400 Kayathar - Thennampatty DC TANTRANSCO 48

4 220 Bareilly (400) - Pilibhit Ckt-II SC UPPTCL 39

5 220 Bhanjanagar - Aska DC OPTCL 57

6 220LILO of both Ckt of 220kV Mobha - Mangrol

line at 220kV Amod (Balanced portion)DC GETCO 46

7 220LILO of Gr Noida (400) - Noida Sec-148 line

at RC GreenDC UPPTCL 9

8 220 LILO of Hathras - Gokul at Mathura DC UPPTCL 120

9 220 Sohawal - Tanda DC UPPTCL 232

977

0

977

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During May-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 31-05-19

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during

May-201921(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 31-05-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716

May19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 0 1445 1000 2445 0 680 0 680 0 2125 1000 3125

Achievement 0 0 0 0 0 0 0 0 1000 0 0 1000 0 2385 0 2385 0 760 0 760 1000 3145 0 4145

Upto May-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 2445 3000 5445 0 1480 0 1480 3000 3925 6000 12925

Achievement 0 0 0 0 0 0 0 0 1500 0 0 1500 815 4365 0 5180 0 2065 0 2065 2315 6430 0 8745

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

As on 31-05-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1Bhadla SS (3x1500 3x500 MVA) (500 MVA ICTs- II

and III)400220 PGCIL 1000

Total of CENTRAL SECTOR 1000

2 Moradabad(Aug) (Additional TF) 400220 UPPTCL 240

3 Masauli Prayagraj (New) TF-III 400132 UPPTCL 200

4 Talaricheruvu Ss 400220 APTRANSCO 9455 Uravakonda (Aug) ICT-II 400220 APTRANSCO 5006 Jangaon ss (3x500) (ICT-I) 400220 TSTRANSCO 500

7 Chinhat Lucknow (Aug) TF-II (200-160) 220132 UPPTCL 408 Hathras (Aug)T-I(200-160) 220132 UPPTCL 409 Jaunpur (Aug) (Additional TF) 220132 UPPTCL 16010 Laukahi (Supaul new) 22013233 BSPTCL 32011 Sector- 95 Gurgaon 22033 HVPNL 10012 Alawalpur ss 22066 PSTCL 100

TOTAL STATE SECTOR 3145

GRAND TOTAL 4145

21(2)

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During May-2019

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2019-20 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination Division

Programme Achievement Ach Programme Achievement Ach

Central Sector 37545100 3290600 3141593 9547 6468500 6275642 9702

State Sector 37498600 3425800 3092392 9027 6748300 6066733 8990

PvtIPP Sector 37346200 3476700 3460217 9953 6713100 6652517 9910

PvtUTL Sector 1823100 164300 171799 10456 323600 337490 10429

Total 114213000 10357400 9866001 9526 20253500 19332382 9545

Central Sector 5661700 604200 619800 10258 990300 1104995 11158

State Sector 6680500 551500 652766 11836 1049700 1184387 11283

PvtIPP Sector 1206900 130200 121344 9320 187500 200643 10701

PvtUTL Sector 144100 12400 14009 11298 24700 25155 10184

Total 13693200 1298300 1407919 10844 2252200 2515180 11168

Central Sector 4472000 353500 365463 10338 720800 694195 9631

Total 4472000 353500 365463 10338 720800 694195 9631

Bhutan Import 621800 32500 35300 10862 50000 59270 11854

Central Sector 47678800 4248300 4126856 9714 8179600 8074832 9872

State Sector 44179100 3977300 3745158 9416 7798000 7251120 9299

Pvt Sector 40520300 3783600 3767369 9957 7248900 7215805 9954

Total 133000000 12041700 11674683 9695 23276500 22601027 9710

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Apr-19 Apr-18 Upto Apr-2019 Upto Apr-2018

975409 844377 975409 844377

22

Renewable Energy Generation

Achievement

May-2019

1 Electricity Generation (MU) Targets and Achievememts for 2019-20

All India Energy Generation During Apr-19 to May-19 (MU)

Target (2019-20)Apr-19 to May-19

Sector

Hydro

Thermal

Nuclear

202535

22522

7208

232765

193324

25152

6942

226010

0

50000

100000

150000

200000

250000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Energy Power Supply Position (Provisional) for May-2019 and during Apr-19 to May-19 23

2 Peak Power Supply Position (Provisional) for May-2019 and during Apr-19 to May-19 24

3 Energy Power Supply Position (Revised) for Apr-2019 and during Apr-19 to Apr-19 25

4 Peak Power Supply Position (Revised) for Apr-2019 and during Apr-19 to Apr-19 26

5 Notified Power cuts Restrictions on Industries during May-2019 27

6 Power Supply to Agricultural Sector during May-2019 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 154 154 0 00 271 271 0 00

दिलली Delhi 3366 3366 0 00 6065 6064 1 00

हरियजणज Haryana 4907 4907 0 00 8679 8679 0 00

दहमजचल परिश Himachal Pradesh 872 863 10 11 1654 1644 10 06

रमम कशमीि Jammu amp Kashmir 1760 1424 336 191 3364 2720 644 191

परजब Punjab 4769 4769 0 00 8475 8475 0 00

िजरसथजन Rajasthan 7120 7110 11 02 13313 13300 13 01

उतति परिश Uttar Pradesh 12742 12695 48 04 22897 22817 79 03

उततिजखड Uttarakhand 1329 1329 0 00 2449 2449 0 00

उततरी कषतर Northern Region 37020 36615 404 11 67166 66419 747 11

छततीसगढ़ Chhattisgarh 2794 2794 0 00 5765 5764 1 00

गरिजत Gujarat 11208 11208 0 00 21748 21748 0 00

मधय परिश Madhya Pradesh 6502 6502 0 00 12735 12735 0 00

महजिजषटर Maharashtra 14976 14976 0 00 29295 29294 0 00

िमन औि दिउ Daman amp Diu 222 222 0 00 443 443 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 1106 1106 0 00

गोवज Goa 404 404 0 00 801 801 0 00

पशचिमी कषतर Western Region 36658 36658 0 00 71893 71892 1 00

आनधर परिश Andhra Pradesh 6056 6048 7 01 11709 11702 7 01

तलगजनज Telangana 5318 5318 1 00 10772 10771 1 00

कनजाटक Karnataka 6702 6702 1 00 13569 13568 1 00

किल Kerala 2575 2566 9 03 4888 4878 10 02

तममल नजड Tamil Nadu 10309 10309 1 00 20031 20030 1 00

पडचिी Puducherry 271 271 1 03 517 516 1 01

लकष-दवीप Lakshadweep 4 4 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 31232 31213 19 01 61486 61465 21 00

बबहजि Bihar 3078 3078 0 00 5662 5659 3 01

िजमोिि घजटी ननगम DVC 1814 1814 0 00 3757 3755 2 01

झजिखणड Jharkhand 789 789 0 00 1505 1495 10 07

ओडडशज Odisha 2560 2560 0 00 5261 5261 0 00

पशशचम बगजल West Bengal 5115 5115 0 00 9920 9897 23 02

मसशककम Sikkim 36 36 0 00 78 78 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 58 54 4 67

परवी कषतर Eastern Region 13391 13391 0 00 26182 26144 38 01

अरणजचल परिश Arunachal Pradesh 64 64 0 06 127 126 1 06

असम Assam 819 738 81 99 1573 1434 139 88

मणणपि Manipur 73 72 1 07 135 134 2 12

मघजलय Meghalaya 167 159 8 50 336 318 18 55

ममज़ोिम Mizoram 55 55 0 07 100 99 1 08

नजगजलड Nagaland 65 64 1 08 124 123 1 08

बिपिज Tripura 173 170 2 14 292 288 4 13

उततर-परवी कषतर North-Eastern Region 1416 1323 93 66 2686 2521 165 62

समपणण भारत All India 119717 119200 517 04 229413 228441 972 04

Note Power Supply Position Report has been compiled based on the data furnished by State Utilities Electricity Departments

23

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 356 356 0 00 356 356 0 00

दिलली Delhi 6461 6461 0 00 6461 6461 0 00

हरियजणज Haryana 8874 8874 0 00 8874 8874 0 00

दहमजचल परिश Himachal Pradesh 1480 1480 0 00 1480 1480 0 00

रमम कशमीि Jammu amp Kashmir 2426 2426 0 00 2885 2426 459 159

परजब Punjab 8802 8802 0 00 8802 8802 0 00

िजरसथजन Rajasthan 11791 11791 0 00 11791 11791 0 00

उतति परिश Uttar Pradesh 22487 22057 430 19 22487 22057 430 19

उततिजखड Uttarakhand 2155 2155 0 00 2155 2155 0 00

उततरी कषतर Northern Region 60987 60078 909 15 60987 60078 909 15

छततीसगढ़ Chhattisgarh 4504 4504 0 00 4596 4574 22 05

गरिजत Gujarat 18094 18094 0 00 18094 18094 0 00

मधय परिश Madhya Pradesh 10145 10131 14 01 10145 10131 14 01

महजिजषटर Maharashtra 23621 23613 8 00 23621 23613 8 00

िमन औि दिउ Daman amp Diu 344 344 0 01 344 344 0 01

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 818 818 0 00

गोवज Goa 554 554 0 00 594 594 0 00

पशचिमी कषतर Western Region 57113 57093 20 00 57113 57093 20 00

आनधर परिश Andhra Pradesh 9854 9854 0 00 9854 9854 0 00

तलगजनज Telangana 8684 8684 0 00 10269 10202 67 07

कनजाटक Karnataka 12158 12158 0 00 12700 12688 12 01

किल Kerala 4286 4205 81 19 4316 4300 16 04

तममल नजड Tamil Nadu 15584 15522 62 04 15680 15659 21 01

पडचिी Puducherry 453 442 11 24 453 444 9 20

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 47477 47465 12 00 49218 49103 115 02

बबहजि Bihar 5481 5481 0 00 5481 5481 0 00

िजमोिि घजटी ननगम DVC 3048 3048 0 00 3048 3048 0 00

झजिखणड Jharkhand 1330 1330 0 00 1330 1330 0 00

ओडडशज Odisha 4736 4736 0 00 5142 5140 3 01

पशशचम बगजल West Bengal 9335 9335 0 00 9335 9335 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23558 23558 0 00 23558 23558 0 00

अरणजचल परिश Arunachal Pradesh 140 138 2 12 140 138 2 12

असम Assam 1753 1673 80 46 1910 1673 237 124

मणणपि Manipur 183 181 2 09 197 188 9 48

मघजलय Meghalaya 329 325 4 12 337 337 0 00

ममज़ोिम Mizoram 102 100 2 20 116 113 3 28

नजगजलड Nagaland 130 128 2 14 157 131 27 169

बिपिज Tripura 297 295 1 05 297 295 1 05

उततर-परवी कषतर North-Eastern Region 2758 2674 84 31 2848 2780 68 24

समपणण भारत All India 183513 182533 981 05 183513 182533 981 05

Note Power Supply Position Report has been compiled based on the data furnished by State Utilities Electricity Departments 24

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -मई2019 April2019 to May2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and supply

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateमई 2019 May2019

मजग की पनता म कमी Demand not Met

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 781 781 0 00 781 781 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3706 3706 0 00 3706 3706 0 00

िजरसथजन Rajasthan 6192 6190 2 00 6192 6190 2 00

उतति परिश Uttar Pradesh 10154 10123 32 03 10154 10123 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30147 29804 343 11 30147 29804 343 11

छततीसगढ़ Chhattisgarh 2972 2971 1 00 2972 2971 1 00

गरिजत Gujarat 10540 10540 0 00 10540 10540 0 00

मधय परिश Madhya Pradesh 6233 6233 0 00 6233 6233 0 00

महजिजषटर Maharashtra 14319 14319 0 00 14319 14319 0 00

िमन औि दिउ Daman amp Diu 221 221 0 00 221 221 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 554 554 0 00 554 554 0 00

गोवज Goa 397 397 0 00 397 397 0 00

पशचिमी कषतर Western Region 35235 35234 1 00 35235 35234 1 00

आनधर परिश Andhra Pradesh 5653 5653 0 00 5653 5653 0 00

तलगजनज Telangana 5453 5453 0 00 5453 5453 0 00

कनजाटक Karnataka 6867 6867 0 00 6867 6867 0 00

किल Kerala 2313 2312 2 01 2313 2312 2 01

तममल नजड Tamil Nadu 9721 9721 0 00 9721 9721 0 00

पडचिी Puducherry 246 246 0 00 246 246 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 30254 30252 2 00 30254 30252 2 00

बबहजि Bihar 2584 2581 3 01 2584 2581 3 01

िजमोिि घजटी ननगम DVC 1944 1942 2 01 1944 1942 2 01

झजिखणड Jharkhand 716 706 10 14 716 706 10 14

ओडडशज Odisha 2701 2701 0 00 2701 2701 0 00

पशशचम बगजल West Bengal 4805 4782 23 05 4805 4782 23 05

मसशककम Sikkim 42 42 0 00 42 42 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12792 12754 38 03 12792 12754 38 03

अरणजचल परिश Arunachal Pradesh 62 62 0 06 62 62 0 06

असम Assam 754 696 58 77 754 696 58 77

मणणपि Manipur 62 61 1 17 62 61 1 17

मघजलय Meghalaya 169 159 10 60 169 159 10 60

ममज़ोिम Mizoram 45 44 0 10 45 44 0 10

नजगजलड Nagaland 59 58 0 08 59 58 0 08

बिपिज Tripura 119 117 2 13 119 117 2 13

उततर-परवी कषतर North-Eastern Region 1270 1198 72 57 1270 1198 72 57

समपणण भारत All India 109696 109241 455 04 109696 109241 455 04

Note The revised data for March 2019 is not avaliable

Energy not Supplied Energy not Supplied

अपरल 2019 April2019 अपरल 2019 April2019 to April 2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2885 2308 577 200 2885 2308 577 200

परजब Punjab 7087 7087 0 00 7087 7087 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 47779 47210 569 12 47779 47210 569 12

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9179 9160 19 02 9179 9160 19 02

तलगजनज Telangana 10269 10202 67 07 10269 10202 67 07

कनजाटक Karnataka 12700 12688 12 01 12700 12688 12 01

किल Kerala 4316 4300 16 04 4316 4300 16 04

तममल नजड Tamil Nadu 15680 15659 21 01 15680 15659 21 01

पडचिी Puducherry 444 444 0 00 444 444 0 00

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49218 49103 115 02 49218 49103 115 02

बबहजि Bihar 5157 5155 2 00 5157 5155 2 00

िजमोिि घजटी ननगम DVC 3014 3014 0 00 3014 3014 0 00

झजिखणड Jharkhand 1326 1325 1 00 1326 1325 1 00

ओडडशज Odisha 5142 5140 3 01 5142 5140 3 01

पशशचम बगजल West Bengal 8745 8699 46 05 8745 8699 46 05

मसशककम Sikkim 98 98 0 00 98 98 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22415 22378 37 02 22415 22378 37 02

अरणजचल परिश Arunachal Pradesh 139 136 3 21 139 136 3 21

असम Assam 1910 1667 242 127 1910 1667 242 127

मणणपि Manipur 197 188 9 48 197 188 9 48

मघजलय Meghalaya 337 337 0 00 337 337 0 00

ममज़ोिम Mizoram 116 113 3 28 116 113 3 28

नजगजलड Nagaland 157 131 27 169 157 131 27 169

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177424 176810 613 03 177424 176810 613 03

Note The revised data for March 2019 is not avaliable 26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateअपरल 2019 April2019 अपरल 2019 April2019 to April 2019

File NoCEA-CH-14-1142018-Coordination Division

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

मई 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during May2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

N

o No

tified

Cuts

N

o No

tified

Cuts

File NoCEA-CH-14-1142018-Coordination Division

मई2019May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0910 hrsday 0811 - 910 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 403 hrsday 0347 - 403 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 2214 hrsday 2157 - 2214 hrsday

उततराखड Uttarakhand Data not received 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-957 hrs day

Three-Phase (Mixed) Supply - 2346 hrs day

Three-Phase Supply(Irrigation)- 0953 - 0957 hrs day Three-

Phase (Mixed) Supply - 2334 - 2346 hrs day

महजिजषटर Maharashtra Three-Phase Supply - 9 hrs day Three-Phase Supply - 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

मई 2019 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during May2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to May-2019 20070450 2493722 63763 22627934 678000 4539922 7835904 35681760

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 7835904 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

7835904

Total Installed Capacity 35687160 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-22 (Up to

Mar2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

Plan Period

2017-22 (Up to

May-19)

6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58732 21173 181240 11734 163456 1010 176200 158886 225204 30768 414858

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Progress of Transmission Sector in the Country up to May 2019

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on May19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

May 19)

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during May 2019

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 20525 925681234952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Sector

Coal Lignite Gas Diesel Total

State 6407650 129000 711871 36393 7284913 000 2987880 234893 10507686

Private 7468800 183000 1058060 27370 8737230 000 339400 7437781 16514411

Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663

All India 19444450 626000 2493722 63763 22627934 678000 4539922 7835904 35681760

State 10507686

Private 16514411

Central 8659663

Electricity Generation (MU) Targets and Achievements for 2016-17

5 All India Installed Capacity (MW) Sector-wise as on 31-05-19

4

Grand TotalTHERMAL

Nuclear Hydro RES

RES as on 30042019

State 10507686 30

Private 16514411 46

Central 8659663 24

All India Installed Capacity(MW) (Sector-Wise)

File NoCEA-CH-14-1142018-Coordination Division

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 kV

220 KV

All India

5

0 0

6 Transmission Lines Added during May-2019 (Ckms)

May-18 May-19

0 0

0 0

0 0

623 474

720 503

1343 977

Transmission Lines Added duringApr-18 to May-18 ampApr-19 to May-19 (Ckms)

Apr-18 to May-18 Apr-19 to May-19

1201 904

2106 1451

0 0

242 53

663 494

1343

977

0

200

400

600

800

1000

1200

1400

1600

All India

Ckm

s

May-18 May-19

2106

1451

0

500

1000

1500

2000

2500

All India

Ckm

s

Apr-18 to May-18 Apr-19 to May-19

File NoCEA-CH-14-1142018-Coordination Division

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

6

7 Transformation Capacity Addition During May-2019 (MVA)

0

0

1390

1060

0 0

May-18 May-19

2450

0

1000

4145

2385

760

0 0

All India Transformation Capacity Addition during Apr-18 to May-18 amp Apr-19

to May-19 (MVA)

8745

0

1500

5180

2065

7920

4000

1575

2345

0

Apr-18 to May-18 Apr-19 to May-19

2450

4145

0

500

1000

1500

2000

2500

3000

3500

4000

4500

MV

A

May-18 May-19

7920 8745

0

74520

1

MV

A

Apr-18 to May-18 Apr-19 to May-19

File NoCEA-CH-14-1142018-Coordination Division

May-2018 May-2019 May-2018 May-2019 May-2018 May-2019

Northern 35206 37020 34664 36615 -15 -11

Western 35085 36658 35070 36658 00 00

Southern 27681 31232 27619 31213 -02 -01

Eastern 13210 13391 13063 13391 -11 00

North Eastern 1232 1416 1175 1323 -46 -66

All India 112414 119717 111591 119200 -07 -04

May-2018 May-2019 May-2018 May-2019 May-2018 May-2019

Northern 56546 60987 56243 60078 -05 -15

Western 53841 57113 52442 57093 -26 00

Southern 43234 47477 43234 47465 00 00

Eastern 21256 23558 21249 23558 00 00

North Eastern 2709 2758 2611 2674 -36 -31

All India 171973 183513 170765 182533 -07 -05

May-2019 Figures are Provisional

7

8 Power Supply Position (Energy amp Peak) in May-2019

Peak Demand Peak Met

Requirement Availability

Energy (MU)Region

Surplus(+)

Deficit (-) in

Surplus(+)

Deficit (-) in Region

Power (MW)

File NoCEA-CH-14-1142018-Coordination Division

Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand May-2018 0 0 0 0 589 0 0 172 0

May-2019 0 0 0 0 0 0 0 430 0

Chattisgarh Gujarat MP Maharashtra Daman amp Diu Dadar Nagar Goa

May-2018 11 1198 19 141 0 0 2

May-2019 0 0 14 8 0 1 0

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

May-2018 4 28 93 53 29 19 0

May-2019 0 0 0 81 62 11 0

8

9 Peak Shortage of Power Supply (MW) in Different Regions in May-2019

0 0 0 0 0 0 0

430

00 0 0 0

589

0 0

172

0

0

400

800

Ch

an

dig

ar

h Delh

i

Ha

rya

na

HP

Jamp

K

Pu

nja

b

Ra

jasth

an

UP

Utr

akhan

d

MW

Northern States (MW) May-2019 May-2018

0 0 14

8 0 1 011

1198

19 141

0 0 2

0

500

1000

1500

Ch

attis

gar

h

Guja

rat

MP

Mah

ara

shtr

a

Da

man amp

Diu

Da

dar

Na

gar G

oa

MW

Western States (MW) May-2019 May-2018

0 0 0

8162

11 0428

93

5329 19

00

100

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Southern State (MW) May-2019 May-2018

File NoCEA-CH-14-1142018-Coordination Division

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

May-2018 1 0 0 0 6 0 4

May-2019 0 0 0 0 0 0 4

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

May-2018 5 29 7 2 9 28 0

May-2019 2 80 2 4 2 2 1

9

0 0 0 0 0 0

4

1

0 0 0

6

0

4

0

2

4

6

8

Bih

ar

DV

C

Jha

rkh

an

d

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

NIs

land

MW

Eastern States (MW) May-2019 May-2018

2

80

2 4 2 2 15 7 2

9

28

0

0

20

40

60

80

100

Aru

na

cha

l

Assa

m

Ma

nip

ur

Me

gh

ala

ya

Miz

ora

m

Na

gala

nd

Trip

ura

MW

North-Eastern States (MW)

File NoCEA-CH-14-1142018-Coordination Division

Sector May-2018 May-2019

Central 7428 6845

State 6361 6095

Private Sector IPP 5625 6109

Private Sector UTL 6985 6458

ALL INDIA 6404 6324

Month PLF 2018 PLF 2019

Jan 6215 6054

Feb 6230 6051

March 6452 6340

April 6454 6471

May 6404 6324

For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment

10

PLF of Thermal Power Plants

(excluding gas based power plants)

All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise

10 All India Thermal PLF Sector-wise (Excluding Gas Based Power Plants) for May-2019

5800

6000

6200

6400

6600

Jan Feb March April May

Months

All India PLF Month-wise

PLF 2018 PLF 2019

7428

63615625

69856404

6845

60956109

64586324

000

1000

2000

3000

4000

5000

6000

7000

8000

Central State Private Sector IPP Private Sector UTL ALL INDIA

All India Thermal PLF

May-2018 May-2019

File NoCEA-CH-14-1142018-Coordination Division

2012-13 2013-14 2014-15 2015-16 2016-17 2017-18

TampD Losses 2304 2284 2277 2181 2142 2104

ATampC Losses 2548 2262 2572 2398 NA NA

Provisional

Note As per PFC for utilities selling directly to consumers NA- Not Available

Total Number of Villages

597464

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2013-14 4894

2014-15 5304

2015-16 5459

2016-17 5743

2017-18 6080

2018-19 6289

11

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality

as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a

Distribution Transformer may not be necessary)

14 All India Coal consumption for Power Generation (MT)

520

Average Revenue Realization(paiseunit)

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community

Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

11 T amp D and ATampC Losses ()

12 All India Village Electrification

Villiages Electrified (Nos)

10000All villages as per census 2011 has

been electrified on 28042018

Villages electrified

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12th Plan 2017-18 and 2018-19 12

2 Capacity Addition Targets amp Achievements during May-2019 and Apr-19 to May-19 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

File NoCEA-CH-14-1142018-Coordination Division

(i) CAPACITY ADDTION TARGETS AND ACHIEVEMENTS IN THE 12TH PLAN (Figures in MW)

SECTOR THERMAL HYDRO NUCLEAR TOTAL

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453

STATE 13922 22201 1608 2276 0 0 15530 24477

PRIVATE 43540 53661 3285 619 0 0 46825 54280

ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209

(ii) CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (Figures in MW)

Thermal Hydro Nuclear Total

Target Ach Target Ach Target Ach Target Ach

Central 4880 3170 800 390 500 0 6180 3560

State 3546 1760 300 200 0 0 3846 1960

Private 2940 3780 205 205 0 0 3145 3985

Total 11366 8710 1305 795 500 0 13171 9505

(iii) CAPACITY ADDITION ACHIEVEMENT FOR 2018-19 (Figures in MW)

Thermal Hydro Nuclear Total

Target Ach Target Ach Target Ach Target Ach

Central 2760 1960 710 110 0 0 3470 2070

State 4506 2850 130 30 0 0 4636 2880

Private 0 972 0 0 0 0 0 972

Total 7266 5782 840 140 0 0 8106 5922

12

1 Capacity Addtion Targets and Achievements in the 12th Plan 2017-18 and 2018-19

File NoCEA-CH-14-1142018-Coordination Division

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 6040 660 0 1160 0 -1160

State 425615 0 0 660 0 -660

Private 0 0 0 0 0 0

Total 1029615 660 0 1820 0 -1820

Central 600 0 0 0 0 0

State 21099 0 0 0 0 0

Private 379 0 0 0 0 0

Total 118999 0 0 0 0 0

Nuclear Central 700 0 0 0 0 0

Central 7340 660 0 1160 0 -1160

State 446714 0 0 660 0 -660

Private 379 0 0 0 0 0

Total 1218614 660 0 1820 0 -1820

Electricity Generation (MU) Targets and Achievements for 2016-17

13

2 Capacity Addition Targets Achievements During May-2019

Schemes Sector

Target 2019-20

Apr-19 to May-19May-19

Hydro

All India

Capacity Addition TargetsAchievements during the Month of May-2019

Thermal1

82

0

0 0

18

20

0 0 0 0

0

200

400

600

800

1000

1200

1400

1600

1800

2000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2019-20Target Achievement

0

100

200

300

400

500

600

700

Thermal Hydro Nuclear Total

660

0 0

660

0 0 00

MW

Target Achievement

File NoCEA-CH-14-1142018-Coordination Division

Coal Lignite Gas Diesel Total

State 1634400 25000 287920 000 1947320 000 869755 70056 2887131

Private 2168083 108000 55800 000 2331883 000 251400 1333187 3916470

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Sub Total 5036020 158000 578126 000 5772146 162000 1970777 1441143 9346066

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2204808 6245075

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Sub Total 7280862 154000 1080649 000 8515511 184000 754750 2326226 11780487

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3781156 5553186

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Sub Total 4304202 314000 647366 56158 5321726 332000 1177483 3894034 10725243

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111789 790389

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Sub Total 2746364 000 10000 000 2756364 000 494212 140300 3390876

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Sub Total 77002 000 177581 3600 258183 000 142700 32429 433311

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Sub Total 000 000 000 4005 4005 000 000 1773 5778

State 6407650 129000 711871 36393 7284913 000 2987880 234893 10507686

Private 7468800 183000 1058060 27370 8737230 000 339400 7437781 16514411

Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663

Total 19444450 626000 2493722 63763 22627934 678000 4539922 7835904 35681760

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30042019 is given below (in MW)

459415 3581588 2867921 7835904

A 0 MW

B May 2019 0 MW

C

May 2019 0 MW

D Net Capacity Added during May 2019 A-B-C 0 MW

Sector wise breakup of RES capacity as shown is provisional

RES

(MNRE)

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31052019)

(UTILITIES)

Region Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30042019

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

CapacityBM PowerCogen Waste to Energy

913150 13830

Capacity Added during May 2019

Capacity Retired during

Capacity removed due to change

from Conventional to RES during

Share of installed capacity of BBMB Stations is included in state sector of partner states

File NoCEA-CH-14-1142018-Coordination Division

Coal Lignite Gas Diesel Total

State 13500 000 180040 000 193540 000 000 000 193540

Private 86922 000 10800 000 97722 000 000 17889 115611

Central 311272 000 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 000 211541 000 623235 10283 72309 17889 723716

State 272000 000 15000 000 287000 000 110282 6930 404212

Private 408078 000 000 000 408078 000 20000 34512 462590

Central 129472 000 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 000 68561 000 878112 10094 196652 41942 1126799

State 000 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 000 99200 62668 161868

Central 18340 000 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 000 6201 000 24541 2895 291048 88329 406813

State 000 000 17500 000 17500 000 123000 13003 153503

Private 000 000 000 000 000 000 000 6483 6483

Central 50639 000 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 000 30407 000 81047 6798 232188 19486 339519

State 176000 000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 000 511550 000 28800 115462 655812

Central 85458 000 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244

State 626000 25000 60380 000 711380 000 109618 2385 823383

Private 280200 108000 000 000 388200 000 10400 751322 1149922

Central 95625 25000 22110 000 142735 55674 73901 34400 306710

Sub-Total 1001825 158000 82490 000 1242315 55674 193919 788107 2280015

State 546900 000 000 000 546900 000 72410 2510 621820

Private 871433 000 000 000 871433 000 84200 288760 1244393

Central 379639 000 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 000 54949 000 1852921 28948 336863 294270 2513002

State 000 000 000 000 000 000 125215 6787 132002

Private 9900 000 45000 000 54900 000 8800 52620 116320

Central 34324 000 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 000 51966 000 96190 3124 181569 59407 340290

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 3471 3471

Central 3815 000 1503 000 5317 801 10171 000 16289

Sub-Total 3815 000 1503 000 5317 801 10171 3471 19760

124953 000 29105 000 154058 23703 75145 000 252907

State 1634400 25000 287920 000 1947320 000 869755 70056 2887131

Private 2168083 108000 55800 000 2331883 000 251400 1333187 3916470

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Grand Total 5036020 158000 578126 000 5772146 162000 1970777 1441143 9346066

Jammu amp Kashmir

Punjab

Rajasthan

Uttar Pradesh

Uttarakhand

Chandigarh

Central - Unallocated

Total (Northern

Region)

HydroRES

(MNRE)

Delhi

Haryana

Himachal Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31052019)

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 005 005

Private 000 000 4800 000 4800 000 000 392 5192

Central 46959 000 1967 000 48926 2600 000 000 51526

Sub-Total 46959 000 6767 000 53726 2600 000 397 56723

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 1447 1447

Central 14141 000 4334 000 18475 700 000 000 19175

Sub-Total 14141 000 4334 000 18475 700 000 1447 20622

State 371000 104000 217782 000 692782 000 77200 6470 776452

Private 726567 50000 396000 000 1172567 000 000 841512 2014079

Central 324243 000 42400 000 366643 55900 000 24330 446873

Sub-Total 1421810 154000 656182 000 2231992 55900 77200 872312 3237404

State 540000 000 000 000 540000 000 170366 8396 718762

Private 617400 000 10000 000 627400 000 000 428040 1055440

Central 334238 000 25700 000 359938 27300 152000 30000 569238

Sub-Total 1491638 000 35700 000 1527338 27300 322366 466436 2343440

State 228000 000 000 000 228000 000 12000 1105 241105

Private 885000 000 000 000 885000 000 000 52430 937430

Central 211075 000 000 000 211075 4800 10000 000 225875

Sub-Total 1324075 000 000 000 1324075 4800 22000 53535 1404410

State 1017000 000 67200 000 1084200 000 285084 38813 1408097

Private 1245600 000 56800 000 1302400 000 48100 880441 2230941

Central 466780 000 227273 000 694053 69000 000 12300 775353

Sub-Total 2729380 000 351273 000 3080653 69000 333184 931553 4414390

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 546 546

Central 19560 000 6634 000 26194 900 000 000 27094

Sub-Total 19560 000 6634 000 26194 900 000 546 27640

233300 000 19759 000 253059 22800 000 000 275859

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2204808 6245075

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Grand Total 7280862 154000 1080649 000 8515511 184000 754750 2326226 11780487

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

ThermalNuclear Hydro

RES

(MNRE)

State Ownership Sector

Mode wise breakup

Grand Total

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 501000 000 23540 000 524540 000 167360 5618 697518

Private 387388 000 381318 3680 772386 000 000 743901 1516287

Central 154683 12773 000 000 167456 12727 000 25000 205183

Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 774519 2418988

State 558250 000 000 000 558250 000 247993 4122 810365

Private 83945 000 83182 000 167127 000 000 394315 561442

Central 180685 14927 000 000 195612 14873 000 1000 211485

Sub-Total 822880 14927 83182 000 920989 14873 247993 399437 1583292

State 502000 000 000 12792 514792 000 358660 19389 892841

Private 195850 000 000 2520 198370 000 000 1369720 1568090

Central 242780 40140 000 000 282920 69800 000 000 352720

Sub-Total 940630 40140 000 15312 996082 69800 358660 1389108 2813650

State 000 000 000 15996 15996 000 185650 17290 218936

Private 61500 000 17400 000 78900 000 000 19021 97921

Central 86142 28180 35958 000 150280 36200 000 5000 191480

Sub-Total 147642 28180 53358 15996 245176 36200 185650 41311 508337

State 432000 000 52408 000 484408 000 217820 12270 714498

Private 458767 25000 50310 21170 555247 000 000 1253885 1809132

Central 302532 136420 000 000 438952 144800 000 23190 606942

Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1289345 3130572

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 000 10000 000 000 10000 000 000 000 10000

Sub-Total 000 10000 000 000 10000 000 000 000 10000

State 000 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 000 314 314

Central 14080 10760 000 000 24840 8600 000 000 33440

Sub-Total 14080 10760 3250 000 28090 8600 000 314 37004

142600 35800 000 000 178400 45000 000 000 223400

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3781156 5553186

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Grand Total 4304202 314000 647366 56158 5321726 332000 1177483 3894034 10725243

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Andhra Pradesh

Telangana

Karnataka

Total (Southern

Region)

Tamil Nadu

NLC

Puducherry

Central - Unallocated

Kerala

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 7070 7070

Private 28100 000 000 000 28100 000 000 25545 53645

Central 384933 000 000 000 384933 000 11000 000 395932

Sub-Total 413033 000 000 000 413033 000 11000 32615 456647

State 42000 000 000 000 42000 000 13000 405 55405

Private 73000 000 000 000 73000 000 000 3647 76647

Central 39374 000 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 000 154374 000 19100 4052 177526

State 540000 000 10000 000 550000 000 98600 12195 660795

Private 243700 000 000 000 243700 000 000 35250 278950

Central 76077 000 000 000 76077 000 41000 000 117077

Sub-Total 859777 000 10000 000 869777 000 139600 47445 1056822

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 698504 000 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 000 698504 000 18620 000 717124

State 42000 000 000 000 42000 000 206192 2630 250822

Private 293900 000 000 000 293900 000 000 47346 341246

Central 163390 000 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 000 499290 000 215092 50976 765358

State 000 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 000 39900 001 39901

Central 8703 000 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 000 8703 000 82300 5212 96215

112683 000 000 000 112683 000 8501 000 121184

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111789 790389

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Grand Total 2746364 000 10000 000 2756364 000 494212 140300 3390876

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

Grand TotalThermalNuclear

RES

(MNRE)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

Total (Eastern

Region)

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

Central - Unallocated

HydroOwnership Sector

Mode wise breakup

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2650 5100

Central 40852 000 43556 000 84408 000 35708 2500 122616

Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038

State 000 000 000 000 000 000 000 10711 10711

Private 000 000 000 000 000 000 000 2939 2939

Central 3705 000 4682 000 8387 000 11655 000 20042

Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692

State 000 000 000 000 000 000 32200 3253 35453

Private 000 000 000 000 000 000 000 012 012

Central 4560 000 10969 000 15529 000 7227 000 22756

Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 5610 000 43695 000 49305 000 6849 500 56654

Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 344 344

Central 4710 000 7157 000 11867 000 9534 000 21401

Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 3210 000 4893 000 8103 000 5733 000 13836

Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 3105 000 4046 000 7151 000 9794 000 16945

Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642

11250 000 6362 000 17612 000 14000 000 31612

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 663 663

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1698 5703

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1773 5778

19

Andaman amp

Nicobar

Lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination Division

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during May-2019 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 31-05-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621

May19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 0 0 23 23 0 750 0 750 0 750 23 773

Achievement 0 0 0 0 0 0 0 0 0 0 0 0 0 474 0 474 0 503 0 503 0 977 0 977

Upto May-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 226 1176 0 1059 0 1059 637 2365 783 3785

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 494 0 494 0 904 0 904 53 1398 0 1451

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

Line

1 2 3 4 5 6

0

1 400 Barmer-Bhinmal line DC RVPNL 288

2 400 Jangaon - Tippapur DC TSTRANSCO 138

3 400 Kayathar - Thennampatty DC TANTRANSCO 48

4 220 Bareilly (400) - Pilibhit Ckt-II SC UPPTCL 39

5 220 Bhanjanagar - Aska DC OPTCL 57

6 220LILO of both Ckt of 220kV Mobha - Mangrol

line at 220kV Amod (Balanced portion)DC GETCO 46

7 220LILO of Gr Noida (400) - Noida Sec-148 line

at RC GreenDC UPPTCL 9

8 220 LILO of Hathras - Gokul at Mathura DC UPPTCL 120

9 220 Sohawal - Tanda DC UPPTCL 232

977

0

977

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During May-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 31-05-19

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during

May-201921(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 31-05-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716

May19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 0 1445 1000 2445 0 680 0 680 0 2125 1000 3125

Achievement 0 0 0 0 0 0 0 0 1000 0 0 1000 0 2385 0 2385 0 760 0 760 1000 3145 0 4145

Upto May-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 2445 3000 5445 0 1480 0 1480 3000 3925 6000 12925

Achievement 0 0 0 0 0 0 0 0 1500 0 0 1500 815 4365 0 5180 0 2065 0 2065 2315 6430 0 8745

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

As on 31-05-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1Bhadla SS (3x1500 3x500 MVA) (500 MVA ICTs- II

and III)400220 PGCIL 1000

Total of CENTRAL SECTOR 1000

2 Moradabad(Aug) (Additional TF) 400220 UPPTCL 240

3 Masauli Prayagraj (New) TF-III 400132 UPPTCL 200

4 Talaricheruvu Ss 400220 APTRANSCO 9455 Uravakonda (Aug) ICT-II 400220 APTRANSCO 5006 Jangaon ss (3x500) (ICT-I) 400220 TSTRANSCO 500

7 Chinhat Lucknow (Aug) TF-II (200-160) 220132 UPPTCL 408 Hathras (Aug)T-I(200-160) 220132 UPPTCL 409 Jaunpur (Aug) (Additional TF) 220132 UPPTCL 16010 Laukahi (Supaul new) 22013233 BSPTCL 32011 Sector- 95 Gurgaon 22033 HVPNL 10012 Alawalpur ss 22066 PSTCL 100

TOTAL STATE SECTOR 3145

GRAND TOTAL 4145

21(2)

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During May-2019

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2019-20 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination Division

Programme Achievement Ach Programme Achievement Ach

Central Sector 37545100 3290600 3141593 9547 6468500 6275642 9702

State Sector 37498600 3425800 3092392 9027 6748300 6066733 8990

PvtIPP Sector 37346200 3476700 3460217 9953 6713100 6652517 9910

PvtUTL Sector 1823100 164300 171799 10456 323600 337490 10429

Total 114213000 10357400 9866001 9526 20253500 19332382 9545

Central Sector 5661700 604200 619800 10258 990300 1104995 11158

State Sector 6680500 551500 652766 11836 1049700 1184387 11283

PvtIPP Sector 1206900 130200 121344 9320 187500 200643 10701

PvtUTL Sector 144100 12400 14009 11298 24700 25155 10184

Total 13693200 1298300 1407919 10844 2252200 2515180 11168

Central Sector 4472000 353500 365463 10338 720800 694195 9631

Total 4472000 353500 365463 10338 720800 694195 9631

Bhutan Import 621800 32500 35300 10862 50000 59270 11854

Central Sector 47678800 4248300 4126856 9714 8179600 8074832 9872

State Sector 44179100 3977300 3745158 9416 7798000 7251120 9299

Pvt Sector 40520300 3783600 3767369 9957 7248900 7215805 9954

Total 133000000 12041700 11674683 9695 23276500 22601027 9710

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Apr-19 Apr-18 Upto Apr-2019 Upto Apr-2018

975409 844377 975409 844377

22

Renewable Energy Generation

Achievement

May-2019

1 Electricity Generation (MU) Targets and Achievememts for 2019-20

All India Energy Generation During Apr-19 to May-19 (MU)

Target (2019-20)Apr-19 to May-19

Sector

Hydro

Thermal

Nuclear

202535

22522

7208

232765

193324

25152

6942

226010

0

50000

100000

150000

200000

250000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Energy Power Supply Position (Provisional) for May-2019 and during Apr-19 to May-19 23

2 Peak Power Supply Position (Provisional) for May-2019 and during Apr-19 to May-19 24

3 Energy Power Supply Position (Revised) for Apr-2019 and during Apr-19 to Apr-19 25

4 Peak Power Supply Position (Revised) for Apr-2019 and during Apr-19 to Apr-19 26

5 Notified Power cuts Restrictions on Industries during May-2019 27

6 Power Supply to Agricultural Sector during May-2019 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 154 154 0 00 271 271 0 00

दिलली Delhi 3366 3366 0 00 6065 6064 1 00

हरियजणज Haryana 4907 4907 0 00 8679 8679 0 00

दहमजचल परिश Himachal Pradesh 872 863 10 11 1654 1644 10 06

रमम कशमीि Jammu amp Kashmir 1760 1424 336 191 3364 2720 644 191

परजब Punjab 4769 4769 0 00 8475 8475 0 00

िजरसथजन Rajasthan 7120 7110 11 02 13313 13300 13 01

उतति परिश Uttar Pradesh 12742 12695 48 04 22897 22817 79 03

उततिजखड Uttarakhand 1329 1329 0 00 2449 2449 0 00

उततरी कषतर Northern Region 37020 36615 404 11 67166 66419 747 11

छततीसगढ़ Chhattisgarh 2794 2794 0 00 5765 5764 1 00

गरिजत Gujarat 11208 11208 0 00 21748 21748 0 00

मधय परिश Madhya Pradesh 6502 6502 0 00 12735 12735 0 00

महजिजषटर Maharashtra 14976 14976 0 00 29295 29294 0 00

िमन औि दिउ Daman amp Diu 222 222 0 00 443 443 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 1106 1106 0 00

गोवज Goa 404 404 0 00 801 801 0 00

पशचिमी कषतर Western Region 36658 36658 0 00 71893 71892 1 00

आनधर परिश Andhra Pradesh 6056 6048 7 01 11709 11702 7 01

तलगजनज Telangana 5318 5318 1 00 10772 10771 1 00

कनजाटक Karnataka 6702 6702 1 00 13569 13568 1 00

किल Kerala 2575 2566 9 03 4888 4878 10 02

तममल नजड Tamil Nadu 10309 10309 1 00 20031 20030 1 00

पडचिी Puducherry 271 271 1 03 517 516 1 01

लकष-दवीप Lakshadweep 4 4 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 31232 31213 19 01 61486 61465 21 00

बबहजि Bihar 3078 3078 0 00 5662 5659 3 01

िजमोिि घजटी ननगम DVC 1814 1814 0 00 3757 3755 2 01

झजिखणड Jharkhand 789 789 0 00 1505 1495 10 07

ओडडशज Odisha 2560 2560 0 00 5261 5261 0 00

पशशचम बगजल West Bengal 5115 5115 0 00 9920 9897 23 02

मसशककम Sikkim 36 36 0 00 78 78 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 58 54 4 67

परवी कषतर Eastern Region 13391 13391 0 00 26182 26144 38 01

अरणजचल परिश Arunachal Pradesh 64 64 0 06 127 126 1 06

असम Assam 819 738 81 99 1573 1434 139 88

मणणपि Manipur 73 72 1 07 135 134 2 12

मघजलय Meghalaya 167 159 8 50 336 318 18 55

ममज़ोिम Mizoram 55 55 0 07 100 99 1 08

नजगजलड Nagaland 65 64 1 08 124 123 1 08

बिपिज Tripura 173 170 2 14 292 288 4 13

उततर-परवी कषतर North-Eastern Region 1416 1323 93 66 2686 2521 165 62

समपणण भारत All India 119717 119200 517 04 229413 228441 972 04

Note Power Supply Position Report has been compiled based on the data furnished by State Utilities Electricity Departments

23

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 356 356 0 00 356 356 0 00

दिलली Delhi 6461 6461 0 00 6461 6461 0 00

हरियजणज Haryana 8874 8874 0 00 8874 8874 0 00

दहमजचल परिश Himachal Pradesh 1480 1480 0 00 1480 1480 0 00

रमम कशमीि Jammu amp Kashmir 2426 2426 0 00 2885 2426 459 159

परजब Punjab 8802 8802 0 00 8802 8802 0 00

िजरसथजन Rajasthan 11791 11791 0 00 11791 11791 0 00

उतति परिश Uttar Pradesh 22487 22057 430 19 22487 22057 430 19

उततिजखड Uttarakhand 2155 2155 0 00 2155 2155 0 00

उततरी कषतर Northern Region 60987 60078 909 15 60987 60078 909 15

छततीसगढ़ Chhattisgarh 4504 4504 0 00 4596 4574 22 05

गरिजत Gujarat 18094 18094 0 00 18094 18094 0 00

मधय परिश Madhya Pradesh 10145 10131 14 01 10145 10131 14 01

महजिजषटर Maharashtra 23621 23613 8 00 23621 23613 8 00

िमन औि दिउ Daman amp Diu 344 344 0 01 344 344 0 01

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 818 818 0 00

गोवज Goa 554 554 0 00 594 594 0 00

पशचिमी कषतर Western Region 57113 57093 20 00 57113 57093 20 00

आनधर परिश Andhra Pradesh 9854 9854 0 00 9854 9854 0 00

तलगजनज Telangana 8684 8684 0 00 10269 10202 67 07

कनजाटक Karnataka 12158 12158 0 00 12700 12688 12 01

किल Kerala 4286 4205 81 19 4316 4300 16 04

तममल नजड Tamil Nadu 15584 15522 62 04 15680 15659 21 01

पडचिी Puducherry 453 442 11 24 453 444 9 20

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 47477 47465 12 00 49218 49103 115 02

बबहजि Bihar 5481 5481 0 00 5481 5481 0 00

िजमोिि घजटी ननगम DVC 3048 3048 0 00 3048 3048 0 00

झजिखणड Jharkhand 1330 1330 0 00 1330 1330 0 00

ओडडशज Odisha 4736 4736 0 00 5142 5140 3 01

पशशचम बगजल West Bengal 9335 9335 0 00 9335 9335 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23558 23558 0 00 23558 23558 0 00

अरणजचल परिश Arunachal Pradesh 140 138 2 12 140 138 2 12

असम Assam 1753 1673 80 46 1910 1673 237 124

मणणपि Manipur 183 181 2 09 197 188 9 48

मघजलय Meghalaya 329 325 4 12 337 337 0 00

ममज़ोिम Mizoram 102 100 2 20 116 113 3 28

नजगजलड Nagaland 130 128 2 14 157 131 27 169

बिपिज Tripura 297 295 1 05 297 295 1 05

उततर-परवी कषतर North-Eastern Region 2758 2674 84 31 2848 2780 68 24

समपणण भारत All India 183513 182533 981 05 183513 182533 981 05

Note Power Supply Position Report has been compiled based on the data furnished by State Utilities Electricity Departments 24

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -मई2019 April2019 to May2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and supply

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateमई 2019 May2019

मजग की पनता म कमी Demand not Met

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 781 781 0 00 781 781 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3706 3706 0 00 3706 3706 0 00

िजरसथजन Rajasthan 6192 6190 2 00 6192 6190 2 00

उतति परिश Uttar Pradesh 10154 10123 32 03 10154 10123 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30147 29804 343 11 30147 29804 343 11

छततीसगढ़ Chhattisgarh 2972 2971 1 00 2972 2971 1 00

गरिजत Gujarat 10540 10540 0 00 10540 10540 0 00

मधय परिश Madhya Pradesh 6233 6233 0 00 6233 6233 0 00

महजिजषटर Maharashtra 14319 14319 0 00 14319 14319 0 00

िमन औि दिउ Daman amp Diu 221 221 0 00 221 221 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 554 554 0 00 554 554 0 00

गोवज Goa 397 397 0 00 397 397 0 00

पशचिमी कषतर Western Region 35235 35234 1 00 35235 35234 1 00

आनधर परिश Andhra Pradesh 5653 5653 0 00 5653 5653 0 00

तलगजनज Telangana 5453 5453 0 00 5453 5453 0 00

कनजाटक Karnataka 6867 6867 0 00 6867 6867 0 00

किल Kerala 2313 2312 2 01 2313 2312 2 01

तममल नजड Tamil Nadu 9721 9721 0 00 9721 9721 0 00

पडचिी Puducherry 246 246 0 00 246 246 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 30254 30252 2 00 30254 30252 2 00

बबहजि Bihar 2584 2581 3 01 2584 2581 3 01

िजमोिि घजटी ननगम DVC 1944 1942 2 01 1944 1942 2 01

झजिखणड Jharkhand 716 706 10 14 716 706 10 14

ओडडशज Odisha 2701 2701 0 00 2701 2701 0 00

पशशचम बगजल West Bengal 4805 4782 23 05 4805 4782 23 05

मसशककम Sikkim 42 42 0 00 42 42 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12792 12754 38 03 12792 12754 38 03

अरणजचल परिश Arunachal Pradesh 62 62 0 06 62 62 0 06

असम Assam 754 696 58 77 754 696 58 77

मणणपि Manipur 62 61 1 17 62 61 1 17

मघजलय Meghalaya 169 159 10 60 169 159 10 60

ममज़ोिम Mizoram 45 44 0 10 45 44 0 10

नजगजलड Nagaland 59 58 0 08 59 58 0 08

बिपिज Tripura 119 117 2 13 119 117 2 13

उततर-परवी कषतर North-Eastern Region 1270 1198 72 57 1270 1198 72 57

समपणण भारत All India 109696 109241 455 04 109696 109241 455 04

Note The revised data for March 2019 is not avaliable

Energy not Supplied Energy not Supplied

अपरल 2019 April2019 अपरल 2019 April2019 to April 2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2885 2308 577 200 2885 2308 577 200

परजब Punjab 7087 7087 0 00 7087 7087 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 47779 47210 569 12 47779 47210 569 12

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9179 9160 19 02 9179 9160 19 02

तलगजनज Telangana 10269 10202 67 07 10269 10202 67 07

कनजाटक Karnataka 12700 12688 12 01 12700 12688 12 01

किल Kerala 4316 4300 16 04 4316 4300 16 04

तममल नजड Tamil Nadu 15680 15659 21 01 15680 15659 21 01

पडचिी Puducherry 444 444 0 00 444 444 0 00

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49218 49103 115 02 49218 49103 115 02

बबहजि Bihar 5157 5155 2 00 5157 5155 2 00

िजमोिि घजटी ननगम DVC 3014 3014 0 00 3014 3014 0 00

झजिखणड Jharkhand 1326 1325 1 00 1326 1325 1 00

ओडडशज Odisha 5142 5140 3 01 5142 5140 3 01

पशशचम बगजल West Bengal 8745 8699 46 05 8745 8699 46 05

मसशककम Sikkim 98 98 0 00 98 98 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22415 22378 37 02 22415 22378 37 02

अरणजचल परिश Arunachal Pradesh 139 136 3 21 139 136 3 21

असम Assam 1910 1667 242 127 1910 1667 242 127

मणणपि Manipur 197 188 9 48 197 188 9 48

मघजलय Meghalaya 337 337 0 00 337 337 0 00

ममज़ोिम Mizoram 116 113 3 28 116 113 3 28

नजगजलड Nagaland 157 131 27 169 157 131 27 169

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177424 176810 613 03 177424 176810 613 03

Note The revised data for March 2019 is not avaliable 26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateअपरल 2019 April2019 अपरल 2019 April2019 to April 2019

File NoCEA-CH-14-1142018-Coordination Division

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

मई 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during May2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

N

o No

tified

Cuts

N

o No

tified

Cuts

File NoCEA-CH-14-1142018-Coordination Division

मई2019May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0910 hrsday 0811 - 910 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 403 hrsday 0347 - 403 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 2214 hrsday 2157 - 2214 hrsday

उततराखड Uttarakhand Data not received 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-957 hrs day

Three-Phase (Mixed) Supply - 2346 hrs day

Three-Phase Supply(Irrigation)- 0953 - 0957 hrs day Three-

Phase (Mixed) Supply - 2334 - 2346 hrs day

महजिजषटर Maharashtra Three-Phase Supply - 9 hrs day Three-Phase Supply - 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

मई 2019 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during May2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to May-2019 20070450 2493722 63763 22627934 678000 4539922 7835904 35681760

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 7835904 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

7835904

Total Installed Capacity 35687160 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-22 (Up to

Mar2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

Plan Period

2017-22 (Up to

May-19)

6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58732 21173 181240 11734 163456 1010 176200 158886 225204 30768 414858

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Progress of Transmission Sector in the Country up to May 2019

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on May19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

May 19)

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during May 2019

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 20525 925681234952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 kV

220 KV

All India

5

0 0

6 Transmission Lines Added during May-2019 (Ckms)

May-18 May-19

0 0

0 0

0 0

623 474

720 503

1343 977

Transmission Lines Added duringApr-18 to May-18 ampApr-19 to May-19 (Ckms)

Apr-18 to May-18 Apr-19 to May-19

1201 904

2106 1451

0 0

242 53

663 494

1343

977

0

200

400

600

800

1000

1200

1400

1600

All India

Ckm

s

May-18 May-19

2106

1451

0

500

1000

1500

2000

2500

All India

Ckm

s

Apr-18 to May-18 Apr-19 to May-19

File NoCEA-CH-14-1142018-Coordination Division

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

6

7 Transformation Capacity Addition During May-2019 (MVA)

0

0

1390

1060

0 0

May-18 May-19

2450

0

1000

4145

2385

760

0 0

All India Transformation Capacity Addition during Apr-18 to May-18 amp Apr-19

to May-19 (MVA)

8745

0

1500

5180

2065

7920

4000

1575

2345

0

Apr-18 to May-18 Apr-19 to May-19

2450

4145

0

500

1000

1500

2000

2500

3000

3500

4000

4500

MV

A

May-18 May-19

7920 8745

0

74520

1

MV

A

Apr-18 to May-18 Apr-19 to May-19

File NoCEA-CH-14-1142018-Coordination Division

May-2018 May-2019 May-2018 May-2019 May-2018 May-2019

Northern 35206 37020 34664 36615 -15 -11

Western 35085 36658 35070 36658 00 00

Southern 27681 31232 27619 31213 -02 -01

Eastern 13210 13391 13063 13391 -11 00

North Eastern 1232 1416 1175 1323 -46 -66

All India 112414 119717 111591 119200 -07 -04

May-2018 May-2019 May-2018 May-2019 May-2018 May-2019

Northern 56546 60987 56243 60078 -05 -15

Western 53841 57113 52442 57093 -26 00

Southern 43234 47477 43234 47465 00 00

Eastern 21256 23558 21249 23558 00 00

North Eastern 2709 2758 2611 2674 -36 -31

All India 171973 183513 170765 182533 -07 -05

May-2019 Figures are Provisional

7

8 Power Supply Position (Energy amp Peak) in May-2019

Peak Demand Peak Met

Requirement Availability

Energy (MU)Region

Surplus(+)

Deficit (-) in

Surplus(+)

Deficit (-) in Region

Power (MW)

File NoCEA-CH-14-1142018-Coordination Division

Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand May-2018 0 0 0 0 589 0 0 172 0

May-2019 0 0 0 0 0 0 0 430 0

Chattisgarh Gujarat MP Maharashtra Daman amp Diu Dadar Nagar Goa

May-2018 11 1198 19 141 0 0 2

May-2019 0 0 14 8 0 1 0

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

May-2018 4 28 93 53 29 19 0

May-2019 0 0 0 81 62 11 0

8

9 Peak Shortage of Power Supply (MW) in Different Regions in May-2019

0 0 0 0 0 0 0

430

00 0 0 0

589

0 0

172

0

0

400

800

Ch

an

dig

ar

h Delh

i

Ha

rya

na

HP

Jamp

K

Pu

nja

b

Ra

jasth

an

UP

Utr

akhan

d

MW

Northern States (MW) May-2019 May-2018

0 0 14

8 0 1 011

1198

19 141

0 0 2

0

500

1000

1500

Ch

attis

gar

h

Guja

rat

MP

Mah

ara

shtr

a

Da

man amp

Diu

Da

dar

Na

gar G

oa

MW

Western States (MW) May-2019 May-2018

0 0 0

8162

11 0428

93

5329 19

00

100

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Southern State (MW) May-2019 May-2018

File NoCEA-CH-14-1142018-Coordination Division

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

May-2018 1 0 0 0 6 0 4

May-2019 0 0 0 0 0 0 4

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

May-2018 5 29 7 2 9 28 0

May-2019 2 80 2 4 2 2 1

9

0 0 0 0 0 0

4

1

0 0 0

6

0

4

0

2

4

6

8

Bih

ar

DV

C

Jha

rkh

an

d

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

NIs

land

MW

Eastern States (MW) May-2019 May-2018

2

80

2 4 2 2 15 7 2

9

28

0

0

20

40

60

80

100

Aru

na

cha

l

Assa

m

Ma

nip

ur

Me

gh

ala

ya

Miz

ora

m

Na

gala

nd

Trip

ura

MW

North-Eastern States (MW)

File NoCEA-CH-14-1142018-Coordination Division

Sector May-2018 May-2019

Central 7428 6845

State 6361 6095

Private Sector IPP 5625 6109

Private Sector UTL 6985 6458

ALL INDIA 6404 6324

Month PLF 2018 PLF 2019

Jan 6215 6054

Feb 6230 6051

March 6452 6340

April 6454 6471

May 6404 6324

For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment

10

PLF of Thermal Power Plants

(excluding gas based power plants)

All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise

10 All India Thermal PLF Sector-wise (Excluding Gas Based Power Plants) for May-2019

5800

6000

6200

6400

6600

Jan Feb March April May

Months

All India PLF Month-wise

PLF 2018 PLF 2019

7428

63615625

69856404

6845

60956109

64586324

000

1000

2000

3000

4000

5000

6000

7000

8000

Central State Private Sector IPP Private Sector UTL ALL INDIA

All India Thermal PLF

May-2018 May-2019

File NoCEA-CH-14-1142018-Coordination Division

2012-13 2013-14 2014-15 2015-16 2016-17 2017-18

TampD Losses 2304 2284 2277 2181 2142 2104

ATampC Losses 2548 2262 2572 2398 NA NA

Provisional

Note As per PFC for utilities selling directly to consumers NA- Not Available

Total Number of Villages

597464

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2013-14 4894

2014-15 5304

2015-16 5459

2016-17 5743

2017-18 6080

2018-19 6289

11

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality

as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a

Distribution Transformer may not be necessary)

14 All India Coal consumption for Power Generation (MT)

520

Average Revenue Realization(paiseunit)

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community

Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

11 T amp D and ATampC Losses ()

12 All India Village Electrification

Villiages Electrified (Nos)

10000All villages as per census 2011 has

been electrified on 28042018

Villages electrified

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12th Plan 2017-18 and 2018-19 12

2 Capacity Addition Targets amp Achievements during May-2019 and Apr-19 to May-19 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

File NoCEA-CH-14-1142018-Coordination Division

(i) CAPACITY ADDTION TARGETS AND ACHIEVEMENTS IN THE 12TH PLAN (Figures in MW)

SECTOR THERMAL HYDRO NUCLEAR TOTAL

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453

STATE 13922 22201 1608 2276 0 0 15530 24477

PRIVATE 43540 53661 3285 619 0 0 46825 54280

ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209

(ii) CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (Figures in MW)

Thermal Hydro Nuclear Total

Target Ach Target Ach Target Ach Target Ach

Central 4880 3170 800 390 500 0 6180 3560

State 3546 1760 300 200 0 0 3846 1960

Private 2940 3780 205 205 0 0 3145 3985

Total 11366 8710 1305 795 500 0 13171 9505

(iii) CAPACITY ADDITION ACHIEVEMENT FOR 2018-19 (Figures in MW)

Thermal Hydro Nuclear Total

Target Ach Target Ach Target Ach Target Ach

Central 2760 1960 710 110 0 0 3470 2070

State 4506 2850 130 30 0 0 4636 2880

Private 0 972 0 0 0 0 0 972

Total 7266 5782 840 140 0 0 8106 5922

12

1 Capacity Addtion Targets and Achievements in the 12th Plan 2017-18 and 2018-19

File NoCEA-CH-14-1142018-Coordination Division

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 6040 660 0 1160 0 -1160

State 425615 0 0 660 0 -660

Private 0 0 0 0 0 0

Total 1029615 660 0 1820 0 -1820

Central 600 0 0 0 0 0

State 21099 0 0 0 0 0

Private 379 0 0 0 0 0

Total 118999 0 0 0 0 0

Nuclear Central 700 0 0 0 0 0

Central 7340 660 0 1160 0 -1160

State 446714 0 0 660 0 -660

Private 379 0 0 0 0 0

Total 1218614 660 0 1820 0 -1820

Electricity Generation (MU) Targets and Achievements for 2016-17

13

2 Capacity Addition Targets Achievements During May-2019

Schemes Sector

Target 2019-20

Apr-19 to May-19May-19

Hydro

All India

Capacity Addition TargetsAchievements during the Month of May-2019

Thermal1

82

0

0 0

18

20

0 0 0 0

0

200

400

600

800

1000

1200

1400

1600

1800

2000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2019-20Target Achievement

0

100

200

300

400

500

600

700

Thermal Hydro Nuclear Total

660

0 0

660

0 0 00

MW

Target Achievement

File NoCEA-CH-14-1142018-Coordination Division

Coal Lignite Gas Diesel Total

State 1634400 25000 287920 000 1947320 000 869755 70056 2887131

Private 2168083 108000 55800 000 2331883 000 251400 1333187 3916470

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Sub Total 5036020 158000 578126 000 5772146 162000 1970777 1441143 9346066

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2204808 6245075

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Sub Total 7280862 154000 1080649 000 8515511 184000 754750 2326226 11780487

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3781156 5553186

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Sub Total 4304202 314000 647366 56158 5321726 332000 1177483 3894034 10725243

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111789 790389

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Sub Total 2746364 000 10000 000 2756364 000 494212 140300 3390876

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Sub Total 77002 000 177581 3600 258183 000 142700 32429 433311

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Sub Total 000 000 000 4005 4005 000 000 1773 5778

State 6407650 129000 711871 36393 7284913 000 2987880 234893 10507686

Private 7468800 183000 1058060 27370 8737230 000 339400 7437781 16514411

Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663

Total 19444450 626000 2493722 63763 22627934 678000 4539922 7835904 35681760

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30042019 is given below (in MW)

459415 3581588 2867921 7835904

A 0 MW

B May 2019 0 MW

C

May 2019 0 MW

D Net Capacity Added during May 2019 A-B-C 0 MW

Sector wise breakup of RES capacity as shown is provisional

RES

(MNRE)

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31052019)

(UTILITIES)

Region Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30042019

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

CapacityBM PowerCogen Waste to Energy

913150 13830

Capacity Added during May 2019

Capacity Retired during

Capacity removed due to change

from Conventional to RES during

Share of installed capacity of BBMB Stations is included in state sector of partner states

File NoCEA-CH-14-1142018-Coordination Division

Coal Lignite Gas Diesel Total

State 13500 000 180040 000 193540 000 000 000 193540

Private 86922 000 10800 000 97722 000 000 17889 115611

Central 311272 000 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 000 211541 000 623235 10283 72309 17889 723716

State 272000 000 15000 000 287000 000 110282 6930 404212

Private 408078 000 000 000 408078 000 20000 34512 462590

Central 129472 000 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 000 68561 000 878112 10094 196652 41942 1126799

State 000 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 000 99200 62668 161868

Central 18340 000 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 000 6201 000 24541 2895 291048 88329 406813

State 000 000 17500 000 17500 000 123000 13003 153503

Private 000 000 000 000 000 000 000 6483 6483

Central 50639 000 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 000 30407 000 81047 6798 232188 19486 339519

State 176000 000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 000 511550 000 28800 115462 655812

Central 85458 000 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244

State 626000 25000 60380 000 711380 000 109618 2385 823383

Private 280200 108000 000 000 388200 000 10400 751322 1149922

Central 95625 25000 22110 000 142735 55674 73901 34400 306710

Sub-Total 1001825 158000 82490 000 1242315 55674 193919 788107 2280015

State 546900 000 000 000 546900 000 72410 2510 621820

Private 871433 000 000 000 871433 000 84200 288760 1244393

Central 379639 000 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 000 54949 000 1852921 28948 336863 294270 2513002

State 000 000 000 000 000 000 125215 6787 132002

Private 9900 000 45000 000 54900 000 8800 52620 116320

Central 34324 000 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 000 51966 000 96190 3124 181569 59407 340290

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 3471 3471

Central 3815 000 1503 000 5317 801 10171 000 16289

Sub-Total 3815 000 1503 000 5317 801 10171 3471 19760

124953 000 29105 000 154058 23703 75145 000 252907

State 1634400 25000 287920 000 1947320 000 869755 70056 2887131

Private 2168083 108000 55800 000 2331883 000 251400 1333187 3916470

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Grand Total 5036020 158000 578126 000 5772146 162000 1970777 1441143 9346066

Jammu amp Kashmir

Punjab

Rajasthan

Uttar Pradesh

Uttarakhand

Chandigarh

Central - Unallocated

Total (Northern

Region)

HydroRES

(MNRE)

Delhi

Haryana

Himachal Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31052019)

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 005 005

Private 000 000 4800 000 4800 000 000 392 5192

Central 46959 000 1967 000 48926 2600 000 000 51526

Sub-Total 46959 000 6767 000 53726 2600 000 397 56723

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 1447 1447

Central 14141 000 4334 000 18475 700 000 000 19175

Sub-Total 14141 000 4334 000 18475 700 000 1447 20622

State 371000 104000 217782 000 692782 000 77200 6470 776452

Private 726567 50000 396000 000 1172567 000 000 841512 2014079

Central 324243 000 42400 000 366643 55900 000 24330 446873

Sub-Total 1421810 154000 656182 000 2231992 55900 77200 872312 3237404

State 540000 000 000 000 540000 000 170366 8396 718762

Private 617400 000 10000 000 627400 000 000 428040 1055440

Central 334238 000 25700 000 359938 27300 152000 30000 569238

Sub-Total 1491638 000 35700 000 1527338 27300 322366 466436 2343440

State 228000 000 000 000 228000 000 12000 1105 241105

Private 885000 000 000 000 885000 000 000 52430 937430

Central 211075 000 000 000 211075 4800 10000 000 225875

Sub-Total 1324075 000 000 000 1324075 4800 22000 53535 1404410

State 1017000 000 67200 000 1084200 000 285084 38813 1408097

Private 1245600 000 56800 000 1302400 000 48100 880441 2230941

Central 466780 000 227273 000 694053 69000 000 12300 775353

Sub-Total 2729380 000 351273 000 3080653 69000 333184 931553 4414390

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 546 546

Central 19560 000 6634 000 26194 900 000 000 27094

Sub-Total 19560 000 6634 000 26194 900 000 546 27640

233300 000 19759 000 253059 22800 000 000 275859

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2204808 6245075

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Grand Total 7280862 154000 1080649 000 8515511 184000 754750 2326226 11780487

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

ThermalNuclear Hydro

RES

(MNRE)

State Ownership Sector

Mode wise breakup

Grand Total

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 501000 000 23540 000 524540 000 167360 5618 697518

Private 387388 000 381318 3680 772386 000 000 743901 1516287

Central 154683 12773 000 000 167456 12727 000 25000 205183

Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 774519 2418988

State 558250 000 000 000 558250 000 247993 4122 810365

Private 83945 000 83182 000 167127 000 000 394315 561442

Central 180685 14927 000 000 195612 14873 000 1000 211485

Sub-Total 822880 14927 83182 000 920989 14873 247993 399437 1583292

State 502000 000 000 12792 514792 000 358660 19389 892841

Private 195850 000 000 2520 198370 000 000 1369720 1568090

Central 242780 40140 000 000 282920 69800 000 000 352720

Sub-Total 940630 40140 000 15312 996082 69800 358660 1389108 2813650

State 000 000 000 15996 15996 000 185650 17290 218936

Private 61500 000 17400 000 78900 000 000 19021 97921

Central 86142 28180 35958 000 150280 36200 000 5000 191480

Sub-Total 147642 28180 53358 15996 245176 36200 185650 41311 508337

State 432000 000 52408 000 484408 000 217820 12270 714498

Private 458767 25000 50310 21170 555247 000 000 1253885 1809132

Central 302532 136420 000 000 438952 144800 000 23190 606942

Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1289345 3130572

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 000 10000 000 000 10000 000 000 000 10000

Sub-Total 000 10000 000 000 10000 000 000 000 10000

State 000 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 000 314 314

Central 14080 10760 000 000 24840 8600 000 000 33440

Sub-Total 14080 10760 3250 000 28090 8600 000 314 37004

142600 35800 000 000 178400 45000 000 000 223400

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3781156 5553186

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Grand Total 4304202 314000 647366 56158 5321726 332000 1177483 3894034 10725243

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Andhra Pradesh

Telangana

Karnataka

Total (Southern

Region)

Tamil Nadu

NLC

Puducherry

Central - Unallocated

Kerala

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 7070 7070

Private 28100 000 000 000 28100 000 000 25545 53645

Central 384933 000 000 000 384933 000 11000 000 395932

Sub-Total 413033 000 000 000 413033 000 11000 32615 456647

State 42000 000 000 000 42000 000 13000 405 55405

Private 73000 000 000 000 73000 000 000 3647 76647

Central 39374 000 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 000 154374 000 19100 4052 177526

State 540000 000 10000 000 550000 000 98600 12195 660795

Private 243700 000 000 000 243700 000 000 35250 278950

Central 76077 000 000 000 76077 000 41000 000 117077

Sub-Total 859777 000 10000 000 869777 000 139600 47445 1056822

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 698504 000 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 000 698504 000 18620 000 717124

State 42000 000 000 000 42000 000 206192 2630 250822

Private 293900 000 000 000 293900 000 000 47346 341246

Central 163390 000 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 000 499290 000 215092 50976 765358

State 000 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 000 39900 001 39901

Central 8703 000 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 000 8703 000 82300 5212 96215

112683 000 000 000 112683 000 8501 000 121184

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111789 790389

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Grand Total 2746364 000 10000 000 2756364 000 494212 140300 3390876

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

Grand TotalThermalNuclear

RES

(MNRE)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

Total (Eastern

Region)

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

Central - Unallocated

HydroOwnership Sector

Mode wise breakup

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2650 5100

Central 40852 000 43556 000 84408 000 35708 2500 122616

Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038

State 000 000 000 000 000 000 000 10711 10711

Private 000 000 000 000 000 000 000 2939 2939

Central 3705 000 4682 000 8387 000 11655 000 20042

Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692

State 000 000 000 000 000 000 32200 3253 35453

Private 000 000 000 000 000 000 000 012 012

Central 4560 000 10969 000 15529 000 7227 000 22756

Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 5610 000 43695 000 49305 000 6849 500 56654

Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 344 344

Central 4710 000 7157 000 11867 000 9534 000 21401

Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 3210 000 4893 000 8103 000 5733 000 13836

Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 3105 000 4046 000 7151 000 9794 000 16945

Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642

11250 000 6362 000 17612 000 14000 000 31612

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 663 663

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1698 5703

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1773 5778

19

Andaman amp

Nicobar

Lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination Division

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during May-2019 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 31-05-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621

May19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 0 0 23 23 0 750 0 750 0 750 23 773

Achievement 0 0 0 0 0 0 0 0 0 0 0 0 0 474 0 474 0 503 0 503 0 977 0 977

Upto May-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 226 1176 0 1059 0 1059 637 2365 783 3785

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 494 0 494 0 904 0 904 53 1398 0 1451

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

Line

1 2 3 4 5 6

0

1 400 Barmer-Bhinmal line DC RVPNL 288

2 400 Jangaon - Tippapur DC TSTRANSCO 138

3 400 Kayathar - Thennampatty DC TANTRANSCO 48

4 220 Bareilly (400) - Pilibhit Ckt-II SC UPPTCL 39

5 220 Bhanjanagar - Aska DC OPTCL 57

6 220LILO of both Ckt of 220kV Mobha - Mangrol

line at 220kV Amod (Balanced portion)DC GETCO 46

7 220LILO of Gr Noida (400) - Noida Sec-148 line

at RC GreenDC UPPTCL 9

8 220 LILO of Hathras - Gokul at Mathura DC UPPTCL 120

9 220 Sohawal - Tanda DC UPPTCL 232

977

0

977

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During May-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 31-05-19

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during

May-201921(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 31-05-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716

May19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 0 1445 1000 2445 0 680 0 680 0 2125 1000 3125

Achievement 0 0 0 0 0 0 0 0 1000 0 0 1000 0 2385 0 2385 0 760 0 760 1000 3145 0 4145

Upto May-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 2445 3000 5445 0 1480 0 1480 3000 3925 6000 12925

Achievement 0 0 0 0 0 0 0 0 1500 0 0 1500 815 4365 0 5180 0 2065 0 2065 2315 6430 0 8745

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

As on 31-05-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1Bhadla SS (3x1500 3x500 MVA) (500 MVA ICTs- II

and III)400220 PGCIL 1000

Total of CENTRAL SECTOR 1000

2 Moradabad(Aug) (Additional TF) 400220 UPPTCL 240

3 Masauli Prayagraj (New) TF-III 400132 UPPTCL 200

4 Talaricheruvu Ss 400220 APTRANSCO 9455 Uravakonda (Aug) ICT-II 400220 APTRANSCO 5006 Jangaon ss (3x500) (ICT-I) 400220 TSTRANSCO 500

7 Chinhat Lucknow (Aug) TF-II (200-160) 220132 UPPTCL 408 Hathras (Aug)T-I(200-160) 220132 UPPTCL 409 Jaunpur (Aug) (Additional TF) 220132 UPPTCL 16010 Laukahi (Supaul new) 22013233 BSPTCL 32011 Sector- 95 Gurgaon 22033 HVPNL 10012 Alawalpur ss 22066 PSTCL 100

TOTAL STATE SECTOR 3145

GRAND TOTAL 4145

21(2)

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During May-2019

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2019-20 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination Division

Programme Achievement Ach Programme Achievement Ach

Central Sector 37545100 3290600 3141593 9547 6468500 6275642 9702

State Sector 37498600 3425800 3092392 9027 6748300 6066733 8990

PvtIPP Sector 37346200 3476700 3460217 9953 6713100 6652517 9910

PvtUTL Sector 1823100 164300 171799 10456 323600 337490 10429

Total 114213000 10357400 9866001 9526 20253500 19332382 9545

Central Sector 5661700 604200 619800 10258 990300 1104995 11158

State Sector 6680500 551500 652766 11836 1049700 1184387 11283

PvtIPP Sector 1206900 130200 121344 9320 187500 200643 10701

PvtUTL Sector 144100 12400 14009 11298 24700 25155 10184

Total 13693200 1298300 1407919 10844 2252200 2515180 11168

Central Sector 4472000 353500 365463 10338 720800 694195 9631

Total 4472000 353500 365463 10338 720800 694195 9631

Bhutan Import 621800 32500 35300 10862 50000 59270 11854

Central Sector 47678800 4248300 4126856 9714 8179600 8074832 9872

State Sector 44179100 3977300 3745158 9416 7798000 7251120 9299

Pvt Sector 40520300 3783600 3767369 9957 7248900 7215805 9954

Total 133000000 12041700 11674683 9695 23276500 22601027 9710

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Apr-19 Apr-18 Upto Apr-2019 Upto Apr-2018

975409 844377 975409 844377

22

Renewable Energy Generation

Achievement

May-2019

1 Electricity Generation (MU) Targets and Achievememts for 2019-20

All India Energy Generation During Apr-19 to May-19 (MU)

Target (2019-20)Apr-19 to May-19

Sector

Hydro

Thermal

Nuclear

202535

22522

7208

232765

193324

25152

6942

226010

0

50000

100000

150000

200000

250000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Energy Power Supply Position (Provisional) for May-2019 and during Apr-19 to May-19 23

2 Peak Power Supply Position (Provisional) for May-2019 and during Apr-19 to May-19 24

3 Energy Power Supply Position (Revised) for Apr-2019 and during Apr-19 to Apr-19 25

4 Peak Power Supply Position (Revised) for Apr-2019 and during Apr-19 to Apr-19 26

5 Notified Power cuts Restrictions on Industries during May-2019 27

6 Power Supply to Agricultural Sector during May-2019 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 154 154 0 00 271 271 0 00

दिलली Delhi 3366 3366 0 00 6065 6064 1 00

हरियजणज Haryana 4907 4907 0 00 8679 8679 0 00

दहमजचल परिश Himachal Pradesh 872 863 10 11 1654 1644 10 06

रमम कशमीि Jammu amp Kashmir 1760 1424 336 191 3364 2720 644 191

परजब Punjab 4769 4769 0 00 8475 8475 0 00

िजरसथजन Rajasthan 7120 7110 11 02 13313 13300 13 01

उतति परिश Uttar Pradesh 12742 12695 48 04 22897 22817 79 03

उततिजखड Uttarakhand 1329 1329 0 00 2449 2449 0 00

उततरी कषतर Northern Region 37020 36615 404 11 67166 66419 747 11

छततीसगढ़ Chhattisgarh 2794 2794 0 00 5765 5764 1 00

गरिजत Gujarat 11208 11208 0 00 21748 21748 0 00

मधय परिश Madhya Pradesh 6502 6502 0 00 12735 12735 0 00

महजिजषटर Maharashtra 14976 14976 0 00 29295 29294 0 00

िमन औि दिउ Daman amp Diu 222 222 0 00 443 443 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 1106 1106 0 00

गोवज Goa 404 404 0 00 801 801 0 00

पशचिमी कषतर Western Region 36658 36658 0 00 71893 71892 1 00

आनधर परिश Andhra Pradesh 6056 6048 7 01 11709 11702 7 01

तलगजनज Telangana 5318 5318 1 00 10772 10771 1 00

कनजाटक Karnataka 6702 6702 1 00 13569 13568 1 00

किल Kerala 2575 2566 9 03 4888 4878 10 02

तममल नजड Tamil Nadu 10309 10309 1 00 20031 20030 1 00

पडचिी Puducherry 271 271 1 03 517 516 1 01

लकष-दवीप Lakshadweep 4 4 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 31232 31213 19 01 61486 61465 21 00

बबहजि Bihar 3078 3078 0 00 5662 5659 3 01

िजमोिि घजटी ननगम DVC 1814 1814 0 00 3757 3755 2 01

झजिखणड Jharkhand 789 789 0 00 1505 1495 10 07

ओडडशज Odisha 2560 2560 0 00 5261 5261 0 00

पशशचम बगजल West Bengal 5115 5115 0 00 9920 9897 23 02

मसशककम Sikkim 36 36 0 00 78 78 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 58 54 4 67

परवी कषतर Eastern Region 13391 13391 0 00 26182 26144 38 01

अरणजचल परिश Arunachal Pradesh 64 64 0 06 127 126 1 06

असम Assam 819 738 81 99 1573 1434 139 88

मणणपि Manipur 73 72 1 07 135 134 2 12

मघजलय Meghalaya 167 159 8 50 336 318 18 55

ममज़ोिम Mizoram 55 55 0 07 100 99 1 08

नजगजलड Nagaland 65 64 1 08 124 123 1 08

बिपिज Tripura 173 170 2 14 292 288 4 13

उततर-परवी कषतर North-Eastern Region 1416 1323 93 66 2686 2521 165 62

समपणण भारत All India 119717 119200 517 04 229413 228441 972 04

Note Power Supply Position Report has been compiled based on the data furnished by State Utilities Electricity Departments

23

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 356 356 0 00 356 356 0 00

दिलली Delhi 6461 6461 0 00 6461 6461 0 00

हरियजणज Haryana 8874 8874 0 00 8874 8874 0 00

दहमजचल परिश Himachal Pradesh 1480 1480 0 00 1480 1480 0 00

रमम कशमीि Jammu amp Kashmir 2426 2426 0 00 2885 2426 459 159

परजब Punjab 8802 8802 0 00 8802 8802 0 00

िजरसथजन Rajasthan 11791 11791 0 00 11791 11791 0 00

उतति परिश Uttar Pradesh 22487 22057 430 19 22487 22057 430 19

उततिजखड Uttarakhand 2155 2155 0 00 2155 2155 0 00

उततरी कषतर Northern Region 60987 60078 909 15 60987 60078 909 15

छततीसगढ़ Chhattisgarh 4504 4504 0 00 4596 4574 22 05

गरिजत Gujarat 18094 18094 0 00 18094 18094 0 00

मधय परिश Madhya Pradesh 10145 10131 14 01 10145 10131 14 01

महजिजषटर Maharashtra 23621 23613 8 00 23621 23613 8 00

िमन औि दिउ Daman amp Diu 344 344 0 01 344 344 0 01

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 818 818 0 00

गोवज Goa 554 554 0 00 594 594 0 00

पशचिमी कषतर Western Region 57113 57093 20 00 57113 57093 20 00

आनधर परिश Andhra Pradesh 9854 9854 0 00 9854 9854 0 00

तलगजनज Telangana 8684 8684 0 00 10269 10202 67 07

कनजाटक Karnataka 12158 12158 0 00 12700 12688 12 01

किल Kerala 4286 4205 81 19 4316 4300 16 04

तममल नजड Tamil Nadu 15584 15522 62 04 15680 15659 21 01

पडचिी Puducherry 453 442 11 24 453 444 9 20

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 47477 47465 12 00 49218 49103 115 02

बबहजि Bihar 5481 5481 0 00 5481 5481 0 00

िजमोिि घजटी ननगम DVC 3048 3048 0 00 3048 3048 0 00

झजिखणड Jharkhand 1330 1330 0 00 1330 1330 0 00

ओडडशज Odisha 4736 4736 0 00 5142 5140 3 01

पशशचम बगजल West Bengal 9335 9335 0 00 9335 9335 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23558 23558 0 00 23558 23558 0 00

अरणजचल परिश Arunachal Pradesh 140 138 2 12 140 138 2 12

असम Assam 1753 1673 80 46 1910 1673 237 124

मणणपि Manipur 183 181 2 09 197 188 9 48

मघजलय Meghalaya 329 325 4 12 337 337 0 00

ममज़ोिम Mizoram 102 100 2 20 116 113 3 28

नजगजलड Nagaland 130 128 2 14 157 131 27 169

बिपिज Tripura 297 295 1 05 297 295 1 05

उततर-परवी कषतर North-Eastern Region 2758 2674 84 31 2848 2780 68 24

समपणण भारत All India 183513 182533 981 05 183513 182533 981 05

Note Power Supply Position Report has been compiled based on the data furnished by State Utilities Electricity Departments 24

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -मई2019 April2019 to May2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and supply

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateमई 2019 May2019

मजग की पनता म कमी Demand not Met

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 781 781 0 00 781 781 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3706 3706 0 00 3706 3706 0 00

िजरसथजन Rajasthan 6192 6190 2 00 6192 6190 2 00

उतति परिश Uttar Pradesh 10154 10123 32 03 10154 10123 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30147 29804 343 11 30147 29804 343 11

छततीसगढ़ Chhattisgarh 2972 2971 1 00 2972 2971 1 00

गरिजत Gujarat 10540 10540 0 00 10540 10540 0 00

मधय परिश Madhya Pradesh 6233 6233 0 00 6233 6233 0 00

महजिजषटर Maharashtra 14319 14319 0 00 14319 14319 0 00

िमन औि दिउ Daman amp Diu 221 221 0 00 221 221 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 554 554 0 00 554 554 0 00

गोवज Goa 397 397 0 00 397 397 0 00

पशचिमी कषतर Western Region 35235 35234 1 00 35235 35234 1 00

आनधर परिश Andhra Pradesh 5653 5653 0 00 5653 5653 0 00

तलगजनज Telangana 5453 5453 0 00 5453 5453 0 00

कनजाटक Karnataka 6867 6867 0 00 6867 6867 0 00

किल Kerala 2313 2312 2 01 2313 2312 2 01

तममल नजड Tamil Nadu 9721 9721 0 00 9721 9721 0 00

पडचिी Puducherry 246 246 0 00 246 246 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 30254 30252 2 00 30254 30252 2 00

बबहजि Bihar 2584 2581 3 01 2584 2581 3 01

िजमोिि घजटी ननगम DVC 1944 1942 2 01 1944 1942 2 01

झजिखणड Jharkhand 716 706 10 14 716 706 10 14

ओडडशज Odisha 2701 2701 0 00 2701 2701 0 00

पशशचम बगजल West Bengal 4805 4782 23 05 4805 4782 23 05

मसशककम Sikkim 42 42 0 00 42 42 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12792 12754 38 03 12792 12754 38 03

अरणजचल परिश Arunachal Pradesh 62 62 0 06 62 62 0 06

असम Assam 754 696 58 77 754 696 58 77

मणणपि Manipur 62 61 1 17 62 61 1 17

मघजलय Meghalaya 169 159 10 60 169 159 10 60

ममज़ोिम Mizoram 45 44 0 10 45 44 0 10

नजगजलड Nagaland 59 58 0 08 59 58 0 08

बिपिज Tripura 119 117 2 13 119 117 2 13

उततर-परवी कषतर North-Eastern Region 1270 1198 72 57 1270 1198 72 57

समपणण भारत All India 109696 109241 455 04 109696 109241 455 04

Note The revised data for March 2019 is not avaliable

Energy not Supplied Energy not Supplied

अपरल 2019 April2019 अपरल 2019 April2019 to April 2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2885 2308 577 200 2885 2308 577 200

परजब Punjab 7087 7087 0 00 7087 7087 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 47779 47210 569 12 47779 47210 569 12

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9179 9160 19 02 9179 9160 19 02

तलगजनज Telangana 10269 10202 67 07 10269 10202 67 07

कनजाटक Karnataka 12700 12688 12 01 12700 12688 12 01

किल Kerala 4316 4300 16 04 4316 4300 16 04

तममल नजड Tamil Nadu 15680 15659 21 01 15680 15659 21 01

पडचिी Puducherry 444 444 0 00 444 444 0 00

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49218 49103 115 02 49218 49103 115 02

बबहजि Bihar 5157 5155 2 00 5157 5155 2 00

िजमोिि घजटी ननगम DVC 3014 3014 0 00 3014 3014 0 00

झजिखणड Jharkhand 1326 1325 1 00 1326 1325 1 00

ओडडशज Odisha 5142 5140 3 01 5142 5140 3 01

पशशचम बगजल West Bengal 8745 8699 46 05 8745 8699 46 05

मसशककम Sikkim 98 98 0 00 98 98 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22415 22378 37 02 22415 22378 37 02

अरणजचल परिश Arunachal Pradesh 139 136 3 21 139 136 3 21

असम Assam 1910 1667 242 127 1910 1667 242 127

मणणपि Manipur 197 188 9 48 197 188 9 48

मघजलय Meghalaya 337 337 0 00 337 337 0 00

ममज़ोिम Mizoram 116 113 3 28 116 113 3 28

नजगजलड Nagaland 157 131 27 169 157 131 27 169

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177424 176810 613 03 177424 176810 613 03

Note The revised data for March 2019 is not avaliable 26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateअपरल 2019 April2019 अपरल 2019 April2019 to April 2019

File NoCEA-CH-14-1142018-Coordination Division

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

मई 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during May2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

N

o No

tified

Cuts

N

o No

tified

Cuts

File NoCEA-CH-14-1142018-Coordination Division

मई2019May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0910 hrsday 0811 - 910 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 403 hrsday 0347 - 403 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 2214 hrsday 2157 - 2214 hrsday

उततराखड Uttarakhand Data not received 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-957 hrs day

Three-Phase (Mixed) Supply - 2346 hrs day

Three-Phase Supply(Irrigation)- 0953 - 0957 hrs day Three-

Phase (Mixed) Supply - 2334 - 2346 hrs day

महजिजषटर Maharashtra Three-Phase Supply - 9 hrs day Three-Phase Supply - 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

मई 2019 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during May2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to May-2019 20070450 2493722 63763 22627934 678000 4539922 7835904 35681760

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 7835904 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

7835904

Total Installed Capacity 35687160 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-22 (Up to

Mar2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

Plan Period

2017-22 (Up to

May-19)

6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58732 21173 181240 11734 163456 1010 176200 158886 225204 30768 414858

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Progress of Transmission Sector in the Country up to May 2019

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on May19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

May 19)

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during May 2019

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 20525 925681234952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

6

7 Transformation Capacity Addition During May-2019 (MVA)

0

0

1390

1060

0 0

May-18 May-19

2450

0

1000

4145

2385

760

0 0

All India Transformation Capacity Addition during Apr-18 to May-18 amp Apr-19

to May-19 (MVA)

8745

0

1500

5180

2065

7920

4000

1575

2345

0

Apr-18 to May-18 Apr-19 to May-19

2450

4145

0

500

1000

1500

2000

2500

3000

3500

4000

4500

MV

A

May-18 May-19

7920 8745

0

74520

1

MV

A

Apr-18 to May-18 Apr-19 to May-19

File NoCEA-CH-14-1142018-Coordination Division

May-2018 May-2019 May-2018 May-2019 May-2018 May-2019

Northern 35206 37020 34664 36615 -15 -11

Western 35085 36658 35070 36658 00 00

Southern 27681 31232 27619 31213 -02 -01

Eastern 13210 13391 13063 13391 -11 00

North Eastern 1232 1416 1175 1323 -46 -66

All India 112414 119717 111591 119200 -07 -04

May-2018 May-2019 May-2018 May-2019 May-2018 May-2019

Northern 56546 60987 56243 60078 -05 -15

Western 53841 57113 52442 57093 -26 00

Southern 43234 47477 43234 47465 00 00

Eastern 21256 23558 21249 23558 00 00

North Eastern 2709 2758 2611 2674 -36 -31

All India 171973 183513 170765 182533 -07 -05

May-2019 Figures are Provisional

7

8 Power Supply Position (Energy amp Peak) in May-2019

Peak Demand Peak Met

Requirement Availability

Energy (MU)Region

Surplus(+)

Deficit (-) in

Surplus(+)

Deficit (-) in Region

Power (MW)

File NoCEA-CH-14-1142018-Coordination Division

Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand May-2018 0 0 0 0 589 0 0 172 0

May-2019 0 0 0 0 0 0 0 430 0

Chattisgarh Gujarat MP Maharashtra Daman amp Diu Dadar Nagar Goa

May-2018 11 1198 19 141 0 0 2

May-2019 0 0 14 8 0 1 0

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

May-2018 4 28 93 53 29 19 0

May-2019 0 0 0 81 62 11 0

8

9 Peak Shortage of Power Supply (MW) in Different Regions in May-2019

0 0 0 0 0 0 0

430

00 0 0 0

589

0 0

172

0

0

400

800

Ch

an

dig

ar

h Delh

i

Ha

rya

na

HP

Jamp

K

Pu

nja

b

Ra

jasth

an

UP

Utr

akhan

d

MW

Northern States (MW) May-2019 May-2018

0 0 14

8 0 1 011

1198

19 141

0 0 2

0

500

1000

1500

Ch

attis

gar

h

Guja

rat

MP

Mah

ara

shtr

a

Da

man amp

Diu

Da

dar

Na

gar G

oa

MW

Western States (MW) May-2019 May-2018

0 0 0

8162

11 0428

93

5329 19

00

100

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Southern State (MW) May-2019 May-2018

File NoCEA-CH-14-1142018-Coordination Division

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

May-2018 1 0 0 0 6 0 4

May-2019 0 0 0 0 0 0 4

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

May-2018 5 29 7 2 9 28 0

May-2019 2 80 2 4 2 2 1

9

0 0 0 0 0 0

4

1

0 0 0

6

0

4

0

2

4

6

8

Bih

ar

DV

C

Jha

rkh

an

d

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

NIs

land

MW

Eastern States (MW) May-2019 May-2018

2

80

2 4 2 2 15 7 2

9

28

0

0

20

40

60

80

100

Aru

na

cha

l

Assa

m

Ma

nip

ur

Me

gh

ala

ya

Miz

ora

m

Na

gala

nd

Trip

ura

MW

North-Eastern States (MW)

File NoCEA-CH-14-1142018-Coordination Division

Sector May-2018 May-2019

Central 7428 6845

State 6361 6095

Private Sector IPP 5625 6109

Private Sector UTL 6985 6458

ALL INDIA 6404 6324

Month PLF 2018 PLF 2019

Jan 6215 6054

Feb 6230 6051

March 6452 6340

April 6454 6471

May 6404 6324

For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment

10

PLF of Thermal Power Plants

(excluding gas based power plants)

All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise

10 All India Thermal PLF Sector-wise (Excluding Gas Based Power Plants) for May-2019

5800

6000

6200

6400

6600

Jan Feb March April May

Months

All India PLF Month-wise

PLF 2018 PLF 2019

7428

63615625

69856404

6845

60956109

64586324

000

1000

2000

3000

4000

5000

6000

7000

8000

Central State Private Sector IPP Private Sector UTL ALL INDIA

All India Thermal PLF

May-2018 May-2019

File NoCEA-CH-14-1142018-Coordination Division

2012-13 2013-14 2014-15 2015-16 2016-17 2017-18

TampD Losses 2304 2284 2277 2181 2142 2104

ATampC Losses 2548 2262 2572 2398 NA NA

Provisional

Note As per PFC for utilities selling directly to consumers NA- Not Available

Total Number of Villages

597464

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2013-14 4894

2014-15 5304

2015-16 5459

2016-17 5743

2017-18 6080

2018-19 6289

11

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality

as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a

Distribution Transformer may not be necessary)

14 All India Coal consumption for Power Generation (MT)

520

Average Revenue Realization(paiseunit)

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community

Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

11 T amp D and ATampC Losses ()

12 All India Village Electrification

Villiages Electrified (Nos)

10000All villages as per census 2011 has

been electrified on 28042018

Villages electrified

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12th Plan 2017-18 and 2018-19 12

2 Capacity Addition Targets amp Achievements during May-2019 and Apr-19 to May-19 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

File NoCEA-CH-14-1142018-Coordination Division

(i) CAPACITY ADDTION TARGETS AND ACHIEVEMENTS IN THE 12TH PLAN (Figures in MW)

SECTOR THERMAL HYDRO NUCLEAR TOTAL

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453

STATE 13922 22201 1608 2276 0 0 15530 24477

PRIVATE 43540 53661 3285 619 0 0 46825 54280

ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209

(ii) CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (Figures in MW)

Thermal Hydro Nuclear Total

Target Ach Target Ach Target Ach Target Ach

Central 4880 3170 800 390 500 0 6180 3560

State 3546 1760 300 200 0 0 3846 1960

Private 2940 3780 205 205 0 0 3145 3985

Total 11366 8710 1305 795 500 0 13171 9505

(iii) CAPACITY ADDITION ACHIEVEMENT FOR 2018-19 (Figures in MW)

Thermal Hydro Nuclear Total

Target Ach Target Ach Target Ach Target Ach

Central 2760 1960 710 110 0 0 3470 2070

State 4506 2850 130 30 0 0 4636 2880

Private 0 972 0 0 0 0 0 972

Total 7266 5782 840 140 0 0 8106 5922

12

1 Capacity Addtion Targets and Achievements in the 12th Plan 2017-18 and 2018-19

File NoCEA-CH-14-1142018-Coordination Division

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 6040 660 0 1160 0 -1160

State 425615 0 0 660 0 -660

Private 0 0 0 0 0 0

Total 1029615 660 0 1820 0 -1820

Central 600 0 0 0 0 0

State 21099 0 0 0 0 0

Private 379 0 0 0 0 0

Total 118999 0 0 0 0 0

Nuclear Central 700 0 0 0 0 0

Central 7340 660 0 1160 0 -1160

State 446714 0 0 660 0 -660

Private 379 0 0 0 0 0

Total 1218614 660 0 1820 0 -1820

Electricity Generation (MU) Targets and Achievements for 2016-17

13

2 Capacity Addition Targets Achievements During May-2019

Schemes Sector

Target 2019-20

Apr-19 to May-19May-19

Hydro

All India

Capacity Addition TargetsAchievements during the Month of May-2019

Thermal1

82

0

0 0

18

20

0 0 0 0

0

200

400

600

800

1000

1200

1400

1600

1800

2000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2019-20Target Achievement

0

100

200

300

400

500

600

700

Thermal Hydro Nuclear Total

660

0 0

660

0 0 00

MW

Target Achievement

File NoCEA-CH-14-1142018-Coordination Division

Coal Lignite Gas Diesel Total

State 1634400 25000 287920 000 1947320 000 869755 70056 2887131

Private 2168083 108000 55800 000 2331883 000 251400 1333187 3916470

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Sub Total 5036020 158000 578126 000 5772146 162000 1970777 1441143 9346066

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2204808 6245075

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Sub Total 7280862 154000 1080649 000 8515511 184000 754750 2326226 11780487

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3781156 5553186

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Sub Total 4304202 314000 647366 56158 5321726 332000 1177483 3894034 10725243

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111789 790389

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Sub Total 2746364 000 10000 000 2756364 000 494212 140300 3390876

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Sub Total 77002 000 177581 3600 258183 000 142700 32429 433311

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Sub Total 000 000 000 4005 4005 000 000 1773 5778

State 6407650 129000 711871 36393 7284913 000 2987880 234893 10507686

Private 7468800 183000 1058060 27370 8737230 000 339400 7437781 16514411

Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663

Total 19444450 626000 2493722 63763 22627934 678000 4539922 7835904 35681760

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30042019 is given below (in MW)

459415 3581588 2867921 7835904

A 0 MW

B May 2019 0 MW

C

May 2019 0 MW

D Net Capacity Added during May 2019 A-B-C 0 MW

Sector wise breakup of RES capacity as shown is provisional

RES

(MNRE)

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31052019)

(UTILITIES)

Region Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30042019

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

CapacityBM PowerCogen Waste to Energy

913150 13830

Capacity Added during May 2019

Capacity Retired during

Capacity removed due to change

from Conventional to RES during

Share of installed capacity of BBMB Stations is included in state sector of partner states

File NoCEA-CH-14-1142018-Coordination Division

Coal Lignite Gas Diesel Total

State 13500 000 180040 000 193540 000 000 000 193540

Private 86922 000 10800 000 97722 000 000 17889 115611

Central 311272 000 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 000 211541 000 623235 10283 72309 17889 723716

State 272000 000 15000 000 287000 000 110282 6930 404212

Private 408078 000 000 000 408078 000 20000 34512 462590

Central 129472 000 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 000 68561 000 878112 10094 196652 41942 1126799

State 000 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 000 99200 62668 161868

Central 18340 000 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 000 6201 000 24541 2895 291048 88329 406813

State 000 000 17500 000 17500 000 123000 13003 153503

Private 000 000 000 000 000 000 000 6483 6483

Central 50639 000 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 000 30407 000 81047 6798 232188 19486 339519

State 176000 000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 000 511550 000 28800 115462 655812

Central 85458 000 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244

State 626000 25000 60380 000 711380 000 109618 2385 823383

Private 280200 108000 000 000 388200 000 10400 751322 1149922

Central 95625 25000 22110 000 142735 55674 73901 34400 306710

Sub-Total 1001825 158000 82490 000 1242315 55674 193919 788107 2280015

State 546900 000 000 000 546900 000 72410 2510 621820

Private 871433 000 000 000 871433 000 84200 288760 1244393

Central 379639 000 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 000 54949 000 1852921 28948 336863 294270 2513002

State 000 000 000 000 000 000 125215 6787 132002

Private 9900 000 45000 000 54900 000 8800 52620 116320

Central 34324 000 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 000 51966 000 96190 3124 181569 59407 340290

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 3471 3471

Central 3815 000 1503 000 5317 801 10171 000 16289

Sub-Total 3815 000 1503 000 5317 801 10171 3471 19760

124953 000 29105 000 154058 23703 75145 000 252907

State 1634400 25000 287920 000 1947320 000 869755 70056 2887131

Private 2168083 108000 55800 000 2331883 000 251400 1333187 3916470

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Grand Total 5036020 158000 578126 000 5772146 162000 1970777 1441143 9346066

Jammu amp Kashmir

Punjab

Rajasthan

Uttar Pradesh

Uttarakhand

Chandigarh

Central - Unallocated

Total (Northern

Region)

HydroRES

(MNRE)

Delhi

Haryana

Himachal Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31052019)

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 005 005

Private 000 000 4800 000 4800 000 000 392 5192

Central 46959 000 1967 000 48926 2600 000 000 51526

Sub-Total 46959 000 6767 000 53726 2600 000 397 56723

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 1447 1447

Central 14141 000 4334 000 18475 700 000 000 19175

Sub-Total 14141 000 4334 000 18475 700 000 1447 20622

State 371000 104000 217782 000 692782 000 77200 6470 776452

Private 726567 50000 396000 000 1172567 000 000 841512 2014079

Central 324243 000 42400 000 366643 55900 000 24330 446873

Sub-Total 1421810 154000 656182 000 2231992 55900 77200 872312 3237404

State 540000 000 000 000 540000 000 170366 8396 718762

Private 617400 000 10000 000 627400 000 000 428040 1055440

Central 334238 000 25700 000 359938 27300 152000 30000 569238

Sub-Total 1491638 000 35700 000 1527338 27300 322366 466436 2343440

State 228000 000 000 000 228000 000 12000 1105 241105

Private 885000 000 000 000 885000 000 000 52430 937430

Central 211075 000 000 000 211075 4800 10000 000 225875

Sub-Total 1324075 000 000 000 1324075 4800 22000 53535 1404410

State 1017000 000 67200 000 1084200 000 285084 38813 1408097

Private 1245600 000 56800 000 1302400 000 48100 880441 2230941

Central 466780 000 227273 000 694053 69000 000 12300 775353

Sub-Total 2729380 000 351273 000 3080653 69000 333184 931553 4414390

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 546 546

Central 19560 000 6634 000 26194 900 000 000 27094

Sub-Total 19560 000 6634 000 26194 900 000 546 27640

233300 000 19759 000 253059 22800 000 000 275859

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2204808 6245075

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Grand Total 7280862 154000 1080649 000 8515511 184000 754750 2326226 11780487

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

ThermalNuclear Hydro

RES

(MNRE)

State Ownership Sector

Mode wise breakup

Grand Total

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 501000 000 23540 000 524540 000 167360 5618 697518

Private 387388 000 381318 3680 772386 000 000 743901 1516287

Central 154683 12773 000 000 167456 12727 000 25000 205183

Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 774519 2418988

State 558250 000 000 000 558250 000 247993 4122 810365

Private 83945 000 83182 000 167127 000 000 394315 561442

Central 180685 14927 000 000 195612 14873 000 1000 211485

Sub-Total 822880 14927 83182 000 920989 14873 247993 399437 1583292

State 502000 000 000 12792 514792 000 358660 19389 892841

Private 195850 000 000 2520 198370 000 000 1369720 1568090

Central 242780 40140 000 000 282920 69800 000 000 352720

Sub-Total 940630 40140 000 15312 996082 69800 358660 1389108 2813650

State 000 000 000 15996 15996 000 185650 17290 218936

Private 61500 000 17400 000 78900 000 000 19021 97921

Central 86142 28180 35958 000 150280 36200 000 5000 191480

Sub-Total 147642 28180 53358 15996 245176 36200 185650 41311 508337

State 432000 000 52408 000 484408 000 217820 12270 714498

Private 458767 25000 50310 21170 555247 000 000 1253885 1809132

Central 302532 136420 000 000 438952 144800 000 23190 606942

Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1289345 3130572

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 000 10000 000 000 10000 000 000 000 10000

Sub-Total 000 10000 000 000 10000 000 000 000 10000

State 000 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 000 314 314

Central 14080 10760 000 000 24840 8600 000 000 33440

Sub-Total 14080 10760 3250 000 28090 8600 000 314 37004

142600 35800 000 000 178400 45000 000 000 223400

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3781156 5553186

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Grand Total 4304202 314000 647366 56158 5321726 332000 1177483 3894034 10725243

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Andhra Pradesh

Telangana

Karnataka

Total (Southern

Region)

Tamil Nadu

NLC

Puducherry

Central - Unallocated

Kerala

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 7070 7070

Private 28100 000 000 000 28100 000 000 25545 53645

Central 384933 000 000 000 384933 000 11000 000 395932

Sub-Total 413033 000 000 000 413033 000 11000 32615 456647

State 42000 000 000 000 42000 000 13000 405 55405

Private 73000 000 000 000 73000 000 000 3647 76647

Central 39374 000 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 000 154374 000 19100 4052 177526

State 540000 000 10000 000 550000 000 98600 12195 660795

Private 243700 000 000 000 243700 000 000 35250 278950

Central 76077 000 000 000 76077 000 41000 000 117077

Sub-Total 859777 000 10000 000 869777 000 139600 47445 1056822

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 698504 000 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 000 698504 000 18620 000 717124

State 42000 000 000 000 42000 000 206192 2630 250822

Private 293900 000 000 000 293900 000 000 47346 341246

Central 163390 000 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 000 499290 000 215092 50976 765358

State 000 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 000 39900 001 39901

Central 8703 000 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 000 8703 000 82300 5212 96215

112683 000 000 000 112683 000 8501 000 121184

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111789 790389

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Grand Total 2746364 000 10000 000 2756364 000 494212 140300 3390876

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

Grand TotalThermalNuclear

RES

(MNRE)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

Total (Eastern

Region)

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

Central - Unallocated

HydroOwnership Sector

Mode wise breakup

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2650 5100

Central 40852 000 43556 000 84408 000 35708 2500 122616

Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038

State 000 000 000 000 000 000 000 10711 10711

Private 000 000 000 000 000 000 000 2939 2939

Central 3705 000 4682 000 8387 000 11655 000 20042

Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692

State 000 000 000 000 000 000 32200 3253 35453

Private 000 000 000 000 000 000 000 012 012

Central 4560 000 10969 000 15529 000 7227 000 22756

Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 5610 000 43695 000 49305 000 6849 500 56654

Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 344 344

Central 4710 000 7157 000 11867 000 9534 000 21401

Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 3210 000 4893 000 8103 000 5733 000 13836

Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 3105 000 4046 000 7151 000 9794 000 16945

Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642

11250 000 6362 000 17612 000 14000 000 31612

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 663 663

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1698 5703

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1773 5778

19

Andaman amp

Nicobar

Lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination Division

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during May-2019 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 31-05-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621

May19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 0 0 23 23 0 750 0 750 0 750 23 773

Achievement 0 0 0 0 0 0 0 0 0 0 0 0 0 474 0 474 0 503 0 503 0 977 0 977

Upto May-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 226 1176 0 1059 0 1059 637 2365 783 3785

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 494 0 494 0 904 0 904 53 1398 0 1451

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

Line

1 2 3 4 5 6

0

1 400 Barmer-Bhinmal line DC RVPNL 288

2 400 Jangaon - Tippapur DC TSTRANSCO 138

3 400 Kayathar - Thennampatty DC TANTRANSCO 48

4 220 Bareilly (400) - Pilibhit Ckt-II SC UPPTCL 39

5 220 Bhanjanagar - Aska DC OPTCL 57

6 220LILO of both Ckt of 220kV Mobha - Mangrol

line at 220kV Amod (Balanced portion)DC GETCO 46

7 220LILO of Gr Noida (400) - Noida Sec-148 line

at RC GreenDC UPPTCL 9

8 220 LILO of Hathras - Gokul at Mathura DC UPPTCL 120

9 220 Sohawal - Tanda DC UPPTCL 232

977

0

977

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During May-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 31-05-19

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during

May-201921(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 31-05-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716

May19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 0 1445 1000 2445 0 680 0 680 0 2125 1000 3125

Achievement 0 0 0 0 0 0 0 0 1000 0 0 1000 0 2385 0 2385 0 760 0 760 1000 3145 0 4145

Upto May-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 2445 3000 5445 0 1480 0 1480 3000 3925 6000 12925

Achievement 0 0 0 0 0 0 0 0 1500 0 0 1500 815 4365 0 5180 0 2065 0 2065 2315 6430 0 8745

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

As on 31-05-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1Bhadla SS (3x1500 3x500 MVA) (500 MVA ICTs- II

and III)400220 PGCIL 1000

Total of CENTRAL SECTOR 1000

2 Moradabad(Aug) (Additional TF) 400220 UPPTCL 240

3 Masauli Prayagraj (New) TF-III 400132 UPPTCL 200

4 Talaricheruvu Ss 400220 APTRANSCO 9455 Uravakonda (Aug) ICT-II 400220 APTRANSCO 5006 Jangaon ss (3x500) (ICT-I) 400220 TSTRANSCO 500

7 Chinhat Lucknow (Aug) TF-II (200-160) 220132 UPPTCL 408 Hathras (Aug)T-I(200-160) 220132 UPPTCL 409 Jaunpur (Aug) (Additional TF) 220132 UPPTCL 16010 Laukahi (Supaul new) 22013233 BSPTCL 32011 Sector- 95 Gurgaon 22033 HVPNL 10012 Alawalpur ss 22066 PSTCL 100

TOTAL STATE SECTOR 3145

GRAND TOTAL 4145

21(2)

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During May-2019

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2019-20 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination Division

Programme Achievement Ach Programme Achievement Ach

Central Sector 37545100 3290600 3141593 9547 6468500 6275642 9702

State Sector 37498600 3425800 3092392 9027 6748300 6066733 8990

PvtIPP Sector 37346200 3476700 3460217 9953 6713100 6652517 9910

PvtUTL Sector 1823100 164300 171799 10456 323600 337490 10429

Total 114213000 10357400 9866001 9526 20253500 19332382 9545

Central Sector 5661700 604200 619800 10258 990300 1104995 11158

State Sector 6680500 551500 652766 11836 1049700 1184387 11283

PvtIPP Sector 1206900 130200 121344 9320 187500 200643 10701

PvtUTL Sector 144100 12400 14009 11298 24700 25155 10184

Total 13693200 1298300 1407919 10844 2252200 2515180 11168

Central Sector 4472000 353500 365463 10338 720800 694195 9631

Total 4472000 353500 365463 10338 720800 694195 9631

Bhutan Import 621800 32500 35300 10862 50000 59270 11854

Central Sector 47678800 4248300 4126856 9714 8179600 8074832 9872

State Sector 44179100 3977300 3745158 9416 7798000 7251120 9299

Pvt Sector 40520300 3783600 3767369 9957 7248900 7215805 9954

Total 133000000 12041700 11674683 9695 23276500 22601027 9710

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Apr-19 Apr-18 Upto Apr-2019 Upto Apr-2018

975409 844377 975409 844377

22

Renewable Energy Generation

Achievement

May-2019

1 Electricity Generation (MU) Targets and Achievememts for 2019-20

All India Energy Generation During Apr-19 to May-19 (MU)

Target (2019-20)Apr-19 to May-19

Sector

Hydro

Thermal

Nuclear

202535

22522

7208

232765

193324

25152

6942

226010

0

50000

100000

150000

200000

250000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Energy Power Supply Position (Provisional) for May-2019 and during Apr-19 to May-19 23

2 Peak Power Supply Position (Provisional) for May-2019 and during Apr-19 to May-19 24

3 Energy Power Supply Position (Revised) for Apr-2019 and during Apr-19 to Apr-19 25

4 Peak Power Supply Position (Revised) for Apr-2019 and during Apr-19 to Apr-19 26

5 Notified Power cuts Restrictions on Industries during May-2019 27

6 Power Supply to Agricultural Sector during May-2019 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 154 154 0 00 271 271 0 00

दिलली Delhi 3366 3366 0 00 6065 6064 1 00

हरियजणज Haryana 4907 4907 0 00 8679 8679 0 00

दहमजचल परिश Himachal Pradesh 872 863 10 11 1654 1644 10 06

रमम कशमीि Jammu amp Kashmir 1760 1424 336 191 3364 2720 644 191

परजब Punjab 4769 4769 0 00 8475 8475 0 00

िजरसथजन Rajasthan 7120 7110 11 02 13313 13300 13 01

उतति परिश Uttar Pradesh 12742 12695 48 04 22897 22817 79 03

उततिजखड Uttarakhand 1329 1329 0 00 2449 2449 0 00

उततरी कषतर Northern Region 37020 36615 404 11 67166 66419 747 11

छततीसगढ़ Chhattisgarh 2794 2794 0 00 5765 5764 1 00

गरिजत Gujarat 11208 11208 0 00 21748 21748 0 00

मधय परिश Madhya Pradesh 6502 6502 0 00 12735 12735 0 00

महजिजषटर Maharashtra 14976 14976 0 00 29295 29294 0 00

िमन औि दिउ Daman amp Diu 222 222 0 00 443 443 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 1106 1106 0 00

गोवज Goa 404 404 0 00 801 801 0 00

पशचिमी कषतर Western Region 36658 36658 0 00 71893 71892 1 00

आनधर परिश Andhra Pradesh 6056 6048 7 01 11709 11702 7 01

तलगजनज Telangana 5318 5318 1 00 10772 10771 1 00

कनजाटक Karnataka 6702 6702 1 00 13569 13568 1 00

किल Kerala 2575 2566 9 03 4888 4878 10 02

तममल नजड Tamil Nadu 10309 10309 1 00 20031 20030 1 00

पडचिी Puducherry 271 271 1 03 517 516 1 01

लकष-दवीप Lakshadweep 4 4 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 31232 31213 19 01 61486 61465 21 00

बबहजि Bihar 3078 3078 0 00 5662 5659 3 01

िजमोिि घजटी ननगम DVC 1814 1814 0 00 3757 3755 2 01

झजिखणड Jharkhand 789 789 0 00 1505 1495 10 07

ओडडशज Odisha 2560 2560 0 00 5261 5261 0 00

पशशचम बगजल West Bengal 5115 5115 0 00 9920 9897 23 02

मसशककम Sikkim 36 36 0 00 78 78 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 58 54 4 67

परवी कषतर Eastern Region 13391 13391 0 00 26182 26144 38 01

अरणजचल परिश Arunachal Pradesh 64 64 0 06 127 126 1 06

असम Assam 819 738 81 99 1573 1434 139 88

मणणपि Manipur 73 72 1 07 135 134 2 12

मघजलय Meghalaya 167 159 8 50 336 318 18 55

ममज़ोिम Mizoram 55 55 0 07 100 99 1 08

नजगजलड Nagaland 65 64 1 08 124 123 1 08

बिपिज Tripura 173 170 2 14 292 288 4 13

उततर-परवी कषतर North-Eastern Region 1416 1323 93 66 2686 2521 165 62

समपणण भारत All India 119717 119200 517 04 229413 228441 972 04

Note Power Supply Position Report has been compiled based on the data furnished by State Utilities Electricity Departments

23

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 356 356 0 00 356 356 0 00

दिलली Delhi 6461 6461 0 00 6461 6461 0 00

हरियजणज Haryana 8874 8874 0 00 8874 8874 0 00

दहमजचल परिश Himachal Pradesh 1480 1480 0 00 1480 1480 0 00

रमम कशमीि Jammu amp Kashmir 2426 2426 0 00 2885 2426 459 159

परजब Punjab 8802 8802 0 00 8802 8802 0 00

िजरसथजन Rajasthan 11791 11791 0 00 11791 11791 0 00

उतति परिश Uttar Pradesh 22487 22057 430 19 22487 22057 430 19

उततिजखड Uttarakhand 2155 2155 0 00 2155 2155 0 00

उततरी कषतर Northern Region 60987 60078 909 15 60987 60078 909 15

छततीसगढ़ Chhattisgarh 4504 4504 0 00 4596 4574 22 05

गरिजत Gujarat 18094 18094 0 00 18094 18094 0 00

मधय परिश Madhya Pradesh 10145 10131 14 01 10145 10131 14 01

महजिजषटर Maharashtra 23621 23613 8 00 23621 23613 8 00

िमन औि दिउ Daman amp Diu 344 344 0 01 344 344 0 01

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 818 818 0 00

गोवज Goa 554 554 0 00 594 594 0 00

पशचिमी कषतर Western Region 57113 57093 20 00 57113 57093 20 00

आनधर परिश Andhra Pradesh 9854 9854 0 00 9854 9854 0 00

तलगजनज Telangana 8684 8684 0 00 10269 10202 67 07

कनजाटक Karnataka 12158 12158 0 00 12700 12688 12 01

किल Kerala 4286 4205 81 19 4316 4300 16 04

तममल नजड Tamil Nadu 15584 15522 62 04 15680 15659 21 01

पडचिी Puducherry 453 442 11 24 453 444 9 20

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 47477 47465 12 00 49218 49103 115 02

बबहजि Bihar 5481 5481 0 00 5481 5481 0 00

िजमोिि घजटी ननगम DVC 3048 3048 0 00 3048 3048 0 00

झजिखणड Jharkhand 1330 1330 0 00 1330 1330 0 00

ओडडशज Odisha 4736 4736 0 00 5142 5140 3 01

पशशचम बगजल West Bengal 9335 9335 0 00 9335 9335 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23558 23558 0 00 23558 23558 0 00

अरणजचल परिश Arunachal Pradesh 140 138 2 12 140 138 2 12

असम Assam 1753 1673 80 46 1910 1673 237 124

मणणपि Manipur 183 181 2 09 197 188 9 48

मघजलय Meghalaya 329 325 4 12 337 337 0 00

ममज़ोिम Mizoram 102 100 2 20 116 113 3 28

नजगजलड Nagaland 130 128 2 14 157 131 27 169

बिपिज Tripura 297 295 1 05 297 295 1 05

उततर-परवी कषतर North-Eastern Region 2758 2674 84 31 2848 2780 68 24

समपणण भारत All India 183513 182533 981 05 183513 182533 981 05

Note Power Supply Position Report has been compiled based on the data furnished by State Utilities Electricity Departments 24

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -मई2019 April2019 to May2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and supply

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateमई 2019 May2019

मजग की पनता म कमी Demand not Met

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 781 781 0 00 781 781 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3706 3706 0 00 3706 3706 0 00

िजरसथजन Rajasthan 6192 6190 2 00 6192 6190 2 00

उतति परिश Uttar Pradesh 10154 10123 32 03 10154 10123 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30147 29804 343 11 30147 29804 343 11

छततीसगढ़ Chhattisgarh 2972 2971 1 00 2972 2971 1 00

गरिजत Gujarat 10540 10540 0 00 10540 10540 0 00

मधय परिश Madhya Pradesh 6233 6233 0 00 6233 6233 0 00

महजिजषटर Maharashtra 14319 14319 0 00 14319 14319 0 00

िमन औि दिउ Daman amp Diu 221 221 0 00 221 221 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 554 554 0 00 554 554 0 00

गोवज Goa 397 397 0 00 397 397 0 00

पशचिमी कषतर Western Region 35235 35234 1 00 35235 35234 1 00

आनधर परिश Andhra Pradesh 5653 5653 0 00 5653 5653 0 00

तलगजनज Telangana 5453 5453 0 00 5453 5453 0 00

कनजाटक Karnataka 6867 6867 0 00 6867 6867 0 00

किल Kerala 2313 2312 2 01 2313 2312 2 01

तममल नजड Tamil Nadu 9721 9721 0 00 9721 9721 0 00

पडचिी Puducherry 246 246 0 00 246 246 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 30254 30252 2 00 30254 30252 2 00

बबहजि Bihar 2584 2581 3 01 2584 2581 3 01

िजमोिि घजटी ननगम DVC 1944 1942 2 01 1944 1942 2 01

झजिखणड Jharkhand 716 706 10 14 716 706 10 14

ओडडशज Odisha 2701 2701 0 00 2701 2701 0 00

पशशचम बगजल West Bengal 4805 4782 23 05 4805 4782 23 05

मसशककम Sikkim 42 42 0 00 42 42 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12792 12754 38 03 12792 12754 38 03

अरणजचल परिश Arunachal Pradesh 62 62 0 06 62 62 0 06

असम Assam 754 696 58 77 754 696 58 77

मणणपि Manipur 62 61 1 17 62 61 1 17

मघजलय Meghalaya 169 159 10 60 169 159 10 60

ममज़ोिम Mizoram 45 44 0 10 45 44 0 10

नजगजलड Nagaland 59 58 0 08 59 58 0 08

बिपिज Tripura 119 117 2 13 119 117 2 13

उततर-परवी कषतर North-Eastern Region 1270 1198 72 57 1270 1198 72 57

समपणण भारत All India 109696 109241 455 04 109696 109241 455 04

Note The revised data for March 2019 is not avaliable

Energy not Supplied Energy not Supplied

अपरल 2019 April2019 अपरल 2019 April2019 to April 2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2885 2308 577 200 2885 2308 577 200

परजब Punjab 7087 7087 0 00 7087 7087 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 47779 47210 569 12 47779 47210 569 12

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9179 9160 19 02 9179 9160 19 02

तलगजनज Telangana 10269 10202 67 07 10269 10202 67 07

कनजाटक Karnataka 12700 12688 12 01 12700 12688 12 01

किल Kerala 4316 4300 16 04 4316 4300 16 04

तममल नजड Tamil Nadu 15680 15659 21 01 15680 15659 21 01

पडचिी Puducherry 444 444 0 00 444 444 0 00

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49218 49103 115 02 49218 49103 115 02

बबहजि Bihar 5157 5155 2 00 5157 5155 2 00

िजमोिि घजटी ननगम DVC 3014 3014 0 00 3014 3014 0 00

झजिखणड Jharkhand 1326 1325 1 00 1326 1325 1 00

ओडडशज Odisha 5142 5140 3 01 5142 5140 3 01

पशशचम बगजल West Bengal 8745 8699 46 05 8745 8699 46 05

मसशककम Sikkim 98 98 0 00 98 98 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22415 22378 37 02 22415 22378 37 02

अरणजचल परिश Arunachal Pradesh 139 136 3 21 139 136 3 21

असम Assam 1910 1667 242 127 1910 1667 242 127

मणणपि Manipur 197 188 9 48 197 188 9 48

मघजलय Meghalaya 337 337 0 00 337 337 0 00

ममज़ोिम Mizoram 116 113 3 28 116 113 3 28

नजगजलड Nagaland 157 131 27 169 157 131 27 169

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177424 176810 613 03 177424 176810 613 03

Note The revised data for March 2019 is not avaliable 26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateअपरल 2019 April2019 अपरल 2019 April2019 to April 2019

File NoCEA-CH-14-1142018-Coordination Division

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

मई 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during May2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

N

o No

tified

Cuts

N

o No

tified

Cuts

File NoCEA-CH-14-1142018-Coordination Division

मई2019May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0910 hrsday 0811 - 910 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 403 hrsday 0347 - 403 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 2214 hrsday 2157 - 2214 hrsday

उततराखड Uttarakhand Data not received 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-957 hrs day

Three-Phase (Mixed) Supply - 2346 hrs day

Three-Phase Supply(Irrigation)- 0953 - 0957 hrs day Three-

Phase (Mixed) Supply - 2334 - 2346 hrs day

महजिजषटर Maharashtra Three-Phase Supply - 9 hrs day Three-Phase Supply - 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

मई 2019 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during May2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to May-2019 20070450 2493722 63763 22627934 678000 4539922 7835904 35681760

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 7835904 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

7835904

Total Installed Capacity 35687160 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-22 (Up to

Mar2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

Plan Period

2017-22 (Up to

May-19)

6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58732 21173 181240 11734 163456 1010 176200 158886 225204 30768 414858

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Progress of Transmission Sector in the Country up to May 2019

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on May19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

May 19)

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during May 2019

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 20525 925681234952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

May-2018 May-2019 May-2018 May-2019 May-2018 May-2019

Northern 35206 37020 34664 36615 -15 -11

Western 35085 36658 35070 36658 00 00

Southern 27681 31232 27619 31213 -02 -01

Eastern 13210 13391 13063 13391 -11 00

North Eastern 1232 1416 1175 1323 -46 -66

All India 112414 119717 111591 119200 -07 -04

May-2018 May-2019 May-2018 May-2019 May-2018 May-2019

Northern 56546 60987 56243 60078 -05 -15

Western 53841 57113 52442 57093 -26 00

Southern 43234 47477 43234 47465 00 00

Eastern 21256 23558 21249 23558 00 00

North Eastern 2709 2758 2611 2674 -36 -31

All India 171973 183513 170765 182533 -07 -05

May-2019 Figures are Provisional

7

8 Power Supply Position (Energy amp Peak) in May-2019

Peak Demand Peak Met

Requirement Availability

Energy (MU)Region

Surplus(+)

Deficit (-) in

Surplus(+)

Deficit (-) in Region

Power (MW)

File NoCEA-CH-14-1142018-Coordination Division

Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand May-2018 0 0 0 0 589 0 0 172 0

May-2019 0 0 0 0 0 0 0 430 0

Chattisgarh Gujarat MP Maharashtra Daman amp Diu Dadar Nagar Goa

May-2018 11 1198 19 141 0 0 2

May-2019 0 0 14 8 0 1 0

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

May-2018 4 28 93 53 29 19 0

May-2019 0 0 0 81 62 11 0

8

9 Peak Shortage of Power Supply (MW) in Different Regions in May-2019

0 0 0 0 0 0 0

430

00 0 0 0

589

0 0

172

0

0

400

800

Ch

an

dig

ar

h Delh

i

Ha

rya

na

HP

Jamp

K

Pu

nja

b

Ra

jasth

an

UP

Utr

akhan

d

MW

Northern States (MW) May-2019 May-2018

0 0 14

8 0 1 011

1198

19 141

0 0 2

0

500

1000

1500

Ch

attis

gar

h

Guja

rat

MP

Mah

ara

shtr

a

Da

man amp

Diu

Da

dar

Na

gar G

oa

MW

Western States (MW) May-2019 May-2018

0 0 0

8162

11 0428

93

5329 19

00

100

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Southern State (MW) May-2019 May-2018

File NoCEA-CH-14-1142018-Coordination Division

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

May-2018 1 0 0 0 6 0 4

May-2019 0 0 0 0 0 0 4

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

May-2018 5 29 7 2 9 28 0

May-2019 2 80 2 4 2 2 1

9

0 0 0 0 0 0

4

1

0 0 0

6

0

4

0

2

4

6

8

Bih

ar

DV

C

Jha

rkh

an

d

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

NIs

land

MW

Eastern States (MW) May-2019 May-2018

2

80

2 4 2 2 15 7 2

9

28

0

0

20

40

60

80

100

Aru

na

cha

l

Assa

m

Ma

nip

ur

Me

gh

ala

ya

Miz

ora

m

Na

gala

nd

Trip

ura

MW

North-Eastern States (MW)

File NoCEA-CH-14-1142018-Coordination Division

Sector May-2018 May-2019

Central 7428 6845

State 6361 6095

Private Sector IPP 5625 6109

Private Sector UTL 6985 6458

ALL INDIA 6404 6324

Month PLF 2018 PLF 2019

Jan 6215 6054

Feb 6230 6051

March 6452 6340

April 6454 6471

May 6404 6324

For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment

10

PLF of Thermal Power Plants

(excluding gas based power plants)

All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise

10 All India Thermal PLF Sector-wise (Excluding Gas Based Power Plants) for May-2019

5800

6000

6200

6400

6600

Jan Feb March April May

Months

All India PLF Month-wise

PLF 2018 PLF 2019

7428

63615625

69856404

6845

60956109

64586324

000

1000

2000

3000

4000

5000

6000

7000

8000

Central State Private Sector IPP Private Sector UTL ALL INDIA

All India Thermal PLF

May-2018 May-2019

File NoCEA-CH-14-1142018-Coordination Division

2012-13 2013-14 2014-15 2015-16 2016-17 2017-18

TampD Losses 2304 2284 2277 2181 2142 2104

ATampC Losses 2548 2262 2572 2398 NA NA

Provisional

Note As per PFC for utilities selling directly to consumers NA- Not Available

Total Number of Villages

597464

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2013-14 4894

2014-15 5304

2015-16 5459

2016-17 5743

2017-18 6080

2018-19 6289

11

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality

as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a

Distribution Transformer may not be necessary)

14 All India Coal consumption for Power Generation (MT)

520

Average Revenue Realization(paiseunit)

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community

Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

11 T amp D and ATampC Losses ()

12 All India Village Electrification

Villiages Electrified (Nos)

10000All villages as per census 2011 has

been electrified on 28042018

Villages electrified

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12th Plan 2017-18 and 2018-19 12

2 Capacity Addition Targets amp Achievements during May-2019 and Apr-19 to May-19 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

File NoCEA-CH-14-1142018-Coordination Division

(i) CAPACITY ADDTION TARGETS AND ACHIEVEMENTS IN THE 12TH PLAN (Figures in MW)

SECTOR THERMAL HYDRO NUCLEAR TOTAL

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453

STATE 13922 22201 1608 2276 0 0 15530 24477

PRIVATE 43540 53661 3285 619 0 0 46825 54280

ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209

(ii) CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (Figures in MW)

Thermal Hydro Nuclear Total

Target Ach Target Ach Target Ach Target Ach

Central 4880 3170 800 390 500 0 6180 3560

State 3546 1760 300 200 0 0 3846 1960

Private 2940 3780 205 205 0 0 3145 3985

Total 11366 8710 1305 795 500 0 13171 9505

(iii) CAPACITY ADDITION ACHIEVEMENT FOR 2018-19 (Figures in MW)

Thermal Hydro Nuclear Total

Target Ach Target Ach Target Ach Target Ach

Central 2760 1960 710 110 0 0 3470 2070

State 4506 2850 130 30 0 0 4636 2880

Private 0 972 0 0 0 0 0 972

Total 7266 5782 840 140 0 0 8106 5922

12

1 Capacity Addtion Targets and Achievements in the 12th Plan 2017-18 and 2018-19

File NoCEA-CH-14-1142018-Coordination Division

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 6040 660 0 1160 0 -1160

State 425615 0 0 660 0 -660

Private 0 0 0 0 0 0

Total 1029615 660 0 1820 0 -1820

Central 600 0 0 0 0 0

State 21099 0 0 0 0 0

Private 379 0 0 0 0 0

Total 118999 0 0 0 0 0

Nuclear Central 700 0 0 0 0 0

Central 7340 660 0 1160 0 -1160

State 446714 0 0 660 0 -660

Private 379 0 0 0 0 0

Total 1218614 660 0 1820 0 -1820

Electricity Generation (MU) Targets and Achievements for 2016-17

13

2 Capacity Addition Targets Achievements During May-2019

Schemes Sector

Target 2019-20

Apr-19 to May-19May-19

Hydro

All India

Capacity Addition TargetsAchievements during the Month of May-2019

Thermal1

82

0

0 0

18

20

0 0 0 0

0

200

400

600

800

1000

1200

1400

1600

1800

2000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2019-20Target Achievement

0

100

200

300

400

500

600

700

Thermal Hydro Nuclear Total

660

0 0

660

0 0 00

MW

Target Achievement

File NoCEA-CH-14-1142018-Coordination Division

Coal Lignite Gas Diesel Total

State 1634400 25000 287920 000 1947320 000 869755 70056 2887131

Private 2168083 108000 55800 000 2331883 000 251400 1333187 3916470

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Sub Total 5036020 158000 578126 000 5772146 162000 1970777 1441143 9346066

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2204808 6245075

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Sub Total 7280862 154000 1080649 000 8515511 184000 754750 2326226 11780487

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3781156 5553186

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Sub Total 4304202 314000 647366 56158 5321726 332000 1177483 3894034 10725243

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111789 790389

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Sub Total 2746364 000 10000 000 2756364 000 494212 140300 3390876

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Sub Total 77002 000 177581 3600 258183 000 142700 32429 433311

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Sub Total 000 000 000 4005 4005 000 000 1773 5778

State 6407650 129000 711871 36393 7284913 000 2987880 234893 10507686

Private 7468800 183000 1058060 27370 8737230 000 339400 7437781 16514411

Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663

Total 19444450 626000 2493722 63763 22627934 678000 4539922 7835904 35681760

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30042019 is given below (in MW)

459415 3581588 2867921 7835904

A 0 MW

B May 2019 0 MW

C

May 2019 0 MW

D Net Capacity Added during May 2019 A-B-C 0 MW

Sector wise breakup of RES capacity as shown is provisional

RES

(MNRE)

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31052019)

(UTILITIES)

Region Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30042019

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

CapacityBM PowerCogen Waste to Energy

913150 13830

Capacity Added during May 2019

Capacity Retired during

Capacity removed due to change

from Conventional to RES during

Share of installed capacity of BBMB Stations is included in state sector of partner states

File NoCEA-CH-14-1142018-Coordination Division

Coal Lignite Gas Diesel Total

State 13500 000 180040 000 193540 000 000 000 193540

Private 86922 000 10800 000 97722 000 000 17889 115611

Central 311272 000 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 000 211541 000 623235 10283 72309 17889 723716

State 272000 000 15000 000 287000 000 110282 6930 404212

Private 408078 000 000 000 408078 000 20000 34512 462590

Central 129472 000 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 000 68561 000 878112 10094 196652 41942 1126799

State 000 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 000 99200 62668 161868

Central 18340 000 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 000 6201 000 24541 2895 291048 88329 406813

State 000 000 17500 000 17500 000 123000 13003 153503

Private 000 000 000 000 000 000 000 6483 6483

Central 50639 000 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 000 30407 000 81047 6798 232188 19486 339519

State 176000 000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 000 511550 000 28800 115462 655812

Central 85458 000 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244

State 626000 25000 60380 000 711380 000 109618 2385 823383

Private 280200 108000 000 000 388200 000 10400 751322 1149922

Central 95625 25000 22110 000 142735 55674 73901 34400 306710

Sub-Total 1001825 158000 82490 000 1242315 55674 193919 788107 2280015

State 546900 000 000 000 546900 000 72410 2510 621820

Private 871433 000 000 000 871433 000 84200 288760 1244393

Central 379639 000 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 000 54949 000 1852921 28948 336863 294270 2513002

State 000 000 000 000 000 000 125215 6787 132002

Private 9900 000 45000 000 54900 000 8800 52620 116320

Central 34324 000 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 000 51966 000 96190 3124 181569 59407 340290

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 3471 3471

Central 3815 000 1503 000 5317 801 10171 000 16289

Sub-Total 3815 000 1503 000 5317 801 10171 3471 19760

124953 000 29105 000 154058 23703 75145 000 252907

State 1634400 25000 287920 000 1947320 000 869755 70056 2887131

Private 2168083 108000 55800 000 2331883 000 251400 1333187 3916470

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Grand Total 5036020 158000 578126 000 5772146 162000 1970777 1441143 9346066

Jammu amp Kashmir

Punjab

Rajasthan

Uttar Pradesh

Uttarakhand

Chandigarh

Central - Unallocated

Total (Northern

Region)

HydroRES

(MNRE)

Delhi

Haryana

Himachal Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31052019)

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 005 005

Private 000 000 4800 000 4800 000 000 392 5192

Central 46959 000 1967 000 48926 2600 000 000 51526

Sub-Total 46959 000 6767 000 53726 2600 000 397 56723

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 1447 1447

Central 14141 000 4334 000 18475 700 000 000 19175

Sub-Total 14141 000 4334 000 18475 700 000 1447 20622

State 371000 104000 217782 000 692782 000 77200 6470 776452

Private 726567 50000 396000 000 1172567 000 000 841512 2014079

Central 324243 000 42400 000 366643 55900 000 24330 446873

Sub-Total 1421810 154000 656182 000 2231992 55900 77200 872312 3237404

State 540000 000 000 000 540000 000 170366 8396 718762

Private 617400 000 10000 000 627400 000 000 428040 1055440

Central 334238 000 25700 000 359938 27300 152000 30000 569238

Sub-Total 1491638 000 35700 000 1527338 27300 322366 466436 2343440

State 228000 000 000 000 228000 000 12000 1105 241105

Private 885000 000 000 000 885000 000 000 52430 937430

Central 211075 000 000 000 211075 4800 10000 000 225875

Sub-Total 1324075 000 000 000 1324075 4800 22000 53535 1404410

State 1017000 000 67200 000 1084200 000 285084 38813 1408097

Private 1245600 000 56800 000 1302400 000 48100 880441 2230941

Central 466780 000 227273 000 694053 69000 000 12300 775353

Sub-Total 2729380 000 351273 000 3080653 69000 333184 931553 4414390

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 546 546

Central 19560 000 6634 000 26194 900 000 000 27094

Sub-Total 19560 000 6634 000 26194 900 000 546 27640

233300 000 19759 000 253059 22800 000 000 275859

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2204808 6245075

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Grand Total 7280862 154000 1080649 000 8515511 184000 754750 2326226 11780487

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

ThermalNuclear Hydro

RES

(MNRE)

State Ownership Sector

Mode wise breakup

Grand Total

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 501000 000 23540 000 524540 000 167360 5618 697518

Private 387388 000 381318 3680 772386 000 000 743901 1516287

Central 154683 12773 000 000 167456 12727 000 25000 205183

Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 774519 2418988

State 558250 000 000 000 558250 000 247993 4122 810365

Private 83945 000 83182 000 167127 000 000 394315 561442

Central 180685 14927 000 000 195612 14873 000 1000 211485

Sub-Total 822880 14927 83182 000 920989 14873 247993 399437 1583292

State 502000 000 000 12792 514792 000 358660 19389 892841

Private 195850 000 000 2520 198370 000 000 1369720 1568090

Central 242780 40140 000 000 282920 69800 000 000 352720

Sub-Total 940630 40140 000 15312 996082 69800 358660 1389108 2813650

State 000 000 000 15996 15996 000 185650 17290 218936

Private 61500 000 17400 000 78900 000 000 19021 97921

Central 86142 28180 35958 000 150280 36200 000 5000 191480

Sub-Total 147642 28180 53358 15996 245176 36200 185650 41311 508337

State 432000 000 52408 000 484408 000 217820 12270 714498

Private 458767 25000 50310 21170 555247 000 000 1253885 1809132

Central 302532 136420 000 000 438952 144800 000 23190 606942

Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1289345 3130572

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 000 10000 000 000 10000 000 000 000 10000

Sub-Total 000 10000 000 000 10000 000 000 000 10000

State 000 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 000 314 314

Central 14080 10760 000 000 24840 8600 000 000 33440

Sub-Total 14080 10760 3250 000 28090 8600 000 314 37004

142600 35800 000 000 178400 45000 000 000 223400

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3781156 5553186

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Grand Total 4304202 314000 647366 56158 5321726 332000 1177483 3894034 10725243

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Andhra Pradesh

Telangana

Karnataka

Total (Southern

Region)

Tamil Nadu

NLC

Puducherry

Central - Unallocated

Kerala

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 7070 7070

Private 28100 000 000 000 28100 000 000 25545 53645

Central 384933 000 000 000 384933 000 11000 000 395932

Sub-Total 413033 000 000 000 413033 000 11000 32615 456647

State 42000 000 000 000 42000 000 13000 405 55405

Private 73000 000 000 000 73000 000 000 3647 76647

Central 39374 000 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 000 154374 000 19100 4052 177526

State 540000 000 10000 000 550000 000 98600 12195 660795

Private 243700 000 000 000 243700 000 000 35250 278950

Central 76077 000 000 000 76077 000 41000 000 117077

Sub-Total 859777 000 10000 000 869777 000 139600 47445 1056822

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 698504 000 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 000 698504 000 18620 000 717124

State 42000 000 000 000 42000 000 206192 2630 250822

Private 293900 000 000 000 293900 000 000 47346 341246

Central 163390 000 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 000 499290 000 215092 50976 765358

State 000 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 000 39900 001 39901

Central 8703 000 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 000 8703 000 82300 5212 96215

112683 000 000 000 112683 000 8501 000 121184

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111789 790389

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Grand Total 2746364 000 10000 000 2756364 000 494212 140300 3390876

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

Grand TotalThermalNuclear

RES

(MNRE)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

Total (Eastern

Region)

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

Central - Unallocated

HydroOwnership Sector

Mode wise breakup

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2650 5100

Central 40852 000 43556 000 84408 000 35708 2500 122616

Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038

State 000 000 000 000 000 000 000 10711 10711

Private 000 000 000 000 000 000 000 2939 2939

Central 3705 000 4682 000 8387 000 11655 000 20042

Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692

State 000 000 000 000 000 000 32200 3253 35453

Private 000 000 000 000 000 000 000 012 012

Central 4560 000 10969 000 15529 000 7227 000 22756

Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 5610 000 43695 000 49305 000 6849 500 56654

Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 344 344

Central 4710 000 7157 000 11867 000 9534 000 21401

Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 3210 000 4893 000 8103 000 5733 000 13836

Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 3105 000 4046 000 7151 000 9794 000 16945

Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642

11250 000 6362 000 17612 000 14000 000 31612

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 663 663

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1698 5703

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1773 5778

19

Andaman amp

Nicobar

Lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination Division

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during May-2019 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 31-05-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621

May19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 0 0 23 23 0 750 0 750 0 750 23 773

Achievement 0 0 0 0 0 0 0 0 0 0 0 0 0 474 0 474 0 503 0 503 0 977 0 977

Upto May-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 226 1176 0 1059 0 1059 637 2365 783 3785

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 494 0 494 0 904 0 904 53 1398 0 1451

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

Line

1 2 3 4 5 6

0

1 400 Barmer-Bhinmal line DC RVPNL 288

2 400 Jangaon - Tippapur DC TSTRANSCO 138

3 400 Kayathar - Thennampatty DC TANTRANSCO 48

4 220 Bareilly (400) - Pilibhit Ckt-II SC UPPTCL 39

5 220 Bhanjanagar - Aska DC OPTCL 57

6 220LILO of both Ckt of 220kV Mobha - Mangrol

line at 220kV Amod (Balanced portion)DC GETCO 46

7 220LILO of Gr Noida (400) - Noida Sec-148 line

at RC GreenDC UPPTCL 9

8 220 LILO of Hathras - Gokul at Mathura DC UPPTCL 120

9 220 Sohawal - Tanda DC UPPTCL 232

977

0

977

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During May-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 31-05-19

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during

May-201921(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 31-05-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716

May19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 0 1445 1000 2445 0 680 0 680 0 2125 1000 3125

Achievement 0 0 0 0 0 0 0 0 1000 0 0 1000 0 2385 0 2385 0 760 0 760 1000 3145 0 4145

Upto May-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 2445 3000 5445 0 1480 0 1480 3000 3925 6000 12925

Achievement 0 0 0 0 0 0 0 0 1500 0 0 1500 815 4365 0 5180 0 2065 0 2065 2315 6430 0 8745

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

As on 31-05-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1Bhadla SS (3x1500 3x500 MVA) (500 MVA ICTs- II

and III)400220 PGCIL 1000

Total of CENTRAL SECTOR 1000

2 Moradabad(Aug) (Additional TF) 400220 UPPTCL 240

3 Masauli Prayagraj (New) TF-III 400132 UPPTCL 200

4 Talaricheruvu Ss 400220 APTRANSCO 9455 Uravakonda (Aug) ICT-II 400220 APTRANSCO 5006 Jangaon ss (3x500) (ICT-I) 400220 TSTRANSCO 500

7 Chinhat Lucknow (Aug) TF-II (200-160) 220132 UPPTCL 408 Hathras (Aug)T-I(200-160) 220132 UPPTCL 409 Jaunpur (Aug) (Additional TF) 220132 UPPTCL 16010 Laukahi (Supaul new) 22013233 BSPTCL 32011 Sector- 95 Gurgaon 22033 HVPNL 10012 Alawalpur ss 22066 PSTCL 100

TOTAL STATE SECTOR 3145

GRAND TOTAL 4145

21(2)

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During May-2019

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2019-20 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination Division

Programme Achievement Ach Programme Achievement Ach

Central Sector 37545100 3290600 3141593 9547 6468500 6275642 9702

State Sector 37498600 3425800 3092392 9027 6748300 6066733 8990

PvtIPP Sector 37346200 3476700 3460217 9953 6713100 6652517 9910

PvtUTL Sector 1823100 164300 171799 10456 323600 337490 10429

Total 114213000 10357400 9866001 9526 20253500 19332382 9545

Central Sector 5661700 604200 619800 10258 990300 1104995 11158

State Sector 6680500 551500 652766 11836 1049700 1184387 11283

PvtIPP Sector 1206900 130200 121344 9320 187500 200643 10701

PvtUTL Sector 144100 12400 14009 11298 24700 25155 10184

Total 13693200 1298300 1407919 10844 2252200 2515180 11168

Central Sector 4472000 353500 365463 10338 720800 694195 9631

Total 4472000 353500 365463 10338 720800 694195 9631

Bhutan Import 621800 32500 35300 10862 50000 59270 11854

Central Sector 47678800 4248300 4126856 9714 8179600 8074832 9872

State Sector 44179100 3977300 3745158 9416 7798000 7251120 9299

Pvt Sector 40520300 3783600 3767369 9957 7248900 7215805 9954

Total 133000000 12041700 11674683 9695 23276500 22601027 9710

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Apr-19 Apr-18 Upto Apr-2019 Upto Apr-2018

975409 844377 975409 844377

22

Renewable Energy Generation

Achievement

May-2019

1 Electricity Generation (MU) Targets and Achievememts for 2019-20

All India Energy Generation During Apr-19 to May-19 (MU)

Target (2019-20)Apr-19 to May-19

Sector

Hydro

Thermal

Nuclear

202535

22522

7208

232765

193324

25152

6942

226010

0

50000

100000

150000

200000

250000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Energy Power Supply Position (Provisional) for May-2019 and during Apr-19 to May-19 23

2 Peak Power Supply Position (Provisional) for May-2019 and during Apr-19 to May-19 24

3 Energy Power Supply Position (Revised) for Apr-2019 and during Apr-19 to Apr-19 25

4 Peak Power Supply Position (Revised) for Apr-2019 and during Apr-19 to Apr-19 26

5 Notified Power cuts Restrictions on Industries during May-2019 27

6 Power Supply to Agricultural Sector during May-2019 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 154 154 0 00 271 271 0 00

दिलली Delhi 3366 3366 0 00 6065 6064 1 00

हरियजणज Haryana 4907 4907 0 00 8679 8679 0 00

दहमजचल परिश Himachal Pradesh 872 863 10 11 1654 1644 10 06

रमम कशमीि Jammu amp Kashmir 1760 1424 336 191 3364 2720 644 191

परजब Punjab 4769 4769 0 00 8475 8475 0 00

िजरसथजन Rajasthan 7120 7110 11 02 13313 13300 13 01

उतति परिश Uttar Pradesh 12742 12695 48 04 22897 22817 79 03

उततिजखड Uttarakhand 1329 1329 0 00 2449 2449 0 00

उततरी कषतर Northern Region 37020 36615 404 11 67166 66419 747 11

छततीसगढ़ Chhattisgarh 2794 2794 0 00 5765 5764 1 00

गरिजत Gujarat 11208 11208 0 00 21748 21748 0 00

मधय परिश Madhya Pradesh 6502 6502 0 00 12735 12735 0 00

महजिजषटर Maharashtra 14976 14976 0 00 29295 29294 0 00

िमन औि दिउ Daman amp Diu 222 222 0 00 443 443 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 1106 1106 0 00

गोवज Goa 404 404 0 00 801 801 0 00

पशचिमी कषतर Western Region 36658 36658 0 00 71893 71892 1 00

आनधर परिश Andhra Pradesh 6056 6048 7 01 11709 11702 7 01

तलगजनज Telangana 5318 5318 1 00 10772 10771 1 00

कनजाटक Karnataka 6702 6702 1 00 13569 13568 1 00

किल Kerala 2575 2566 9 03 4888 4878 10 02

तममल नजड Tamil Nadu 10309 10309 1 00 20031 20030 1 00

पडचिी Puducherry 271 271 1 03 517 516 1 01

लकष-दवीप Lakshadweep 4 4 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 31232 31213 19 01 61486 61465 21 00

बबहजि Bihar 3078 3078 0 00 5662 5659 3 01

िजमोिि घजटी ननगम DVC 1814 1814 0 00 3757 3755 2 01

झजिखणड Jharkhand 789 789 0 00 1505 1495 10 07

ओडडशज Odisha 2560 2560 0 00 5261 5261 0 00

पशशचम बगजल West Bengal 5115 5115 0 00 9920 9897 23 02

मसशककम Sikkim 36 36 0 00 78 78 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 58 54 4 67

परवी कषतर Eastern Region 13391 13391 0 00 26182 26144 38 01

अरणजचल परिश Arunachal Pradesh 64 64 0 06 127 126 1 06

असम Assam 819 738 81 99 1573 1434 139 88

मणणपि Manipur 73 72 1 07 135 134 2 12

मघजलय Meghalaya 167 159 8 50 336 318 18 55

ममज़ोिम Mizoram 55 55 0 07 100 99 1 08

नजगजलड Nagaland 65 64 1 08 124 123 1 08

बिपिज Tripura 173 170 2 14 292 288 4 13

उततर-परवी कषतर North-Eastern Region 1416 1323 93 66 2686 2521 165 62

समपणण भारत All India 119717 119200 517 04 229413 228441 972 04

Note Power Supply Position Report has been compiled based on the data furnished by State Utilities Electricity Departments

23

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 356 356 0 00 356 356 0 00

दिलली Delhi 6461 6461 0 00 6461 6461 0 00

हरियजणज Haryana 8874 8874 0 00 8874 8874 0 00

दहमजचल परिश Himachal Pradesh 1480 1480 0 00 1480 1480 0 00

रमम कशमीि Jammu amp Kashmir 2426 2426 0 00 2885 2426 459 159

परजब Punjab 8802 8802 0 00 8802 8802 0 00

िजरसथजन Rajasthan 11791 11791 0 00 11791 11791 0 00

उतति परिश Uttar Pradesh 22487 22057 430 19 22487 22057 430 19

उततिजखड Uttarakhand 2155 2155 0 00 2155 2155 0 00

उततरी कषतर Northern Region 60987 60078 909 15 60987 60078 909 15

छततीसगढ़ Chhattisgarh 4504 4504 0 00 4596 4574 22 05

गरिजत Gujarat 18094 18094 0 00 18094 18094 0 00

मधय परिश Madhya Pradesh 10145 10131 14 01 10145 10131 14 01

महजिजषटर Maharashtra 23621 23613 8 00 23621 23613 8 00

िमन औि दिउ Daman amp Diu 344 344 0 01 344 344 0 01

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 818 818 0 00

गोवज Goa 554 554 0 00 594 594 0 00

पशचिमी कषतर Western Region 57113 57093 20 00 57113 57093 20 00

आनधर परिश Andhra Pradesh 9854 9854 0 00 9854 9854 0 00

तलगजनज Telangana 8684 8684 0 00 10269 10202 67 07

कनजाटक Karnataka 12158 12158 0 00 12700 12688 12 01

किल Kerala 4286 4205 81 19 4316 4300 16 04

तममल नजड Tamil Nadu 15584 15522 62 04 15680 15659 21 01

पडचिी Puducherry 453 442 11 24 453 444 9 20

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 47477 47465 12 00 49218 49103 115 02

बबहजि Bihar 5481 5481 0 00 5481 5481 0 00

िजमोिि घजटी ननगम DVC 3048 3048 0 00 3048 3048 0 00

झजिखणड Jharkhand 1330 1330 0 00 1330 1330 0 00

ओडडशज Odisha 4736 4736 0 00 5142 5140 3 01

पशशचम बगजल West Bengal 9335 9335 0 00 9335 9335 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23558 23558 0 00 23558 23558 0 00

अरणजचल परिश Arunachal Pradesh 140 138 2 12 140 138 2 12

असम Assam 1753 1673 80 46 1910 1673 237 124

मणणपि Manipur 183 181 2 09 197 188 9 48

मघजलय Meghalaya 329 325 4 12 337 337 0 00

ममज़ोिम Mizoram 102 100 2 20 116 113 3 28

नजगजलड Nagaland 130 128 2 14 157 131 27 169

बिपिज Tripura 297 295 1 05 297 295 1 05

उततर-परवी कषतर North-Eastern Region 2758 2674 84 31 2848 2780 68 24

समपणण भारत All India 183513 182533 981 05 183513 182533 981 05

Note Power Supply Position Report has been compiled based on the data furnished by State Utilities Electricity Departments 24

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -मई2019 April2019 to May2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and supply

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateमई 2019 May2019

मजग की पनता म कमी Demand not Met

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 781 781 0 00 781 781 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3706 3706 0 00 3706 3706 0 00

िजरसथजन Rajasthan 6192 6190 2 00 6192 6190 2 00

उतति परिश Uttar Pradesh 10154 10123 32 03 10154 10123 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30147 29804 343 11 30147 29804 343 11

छततीसगढ़ Chhattisgarh 2972 2971 1 00 2972 2971 1 00

गरिजत Gujarat 10540 10540 0 00 10540 10540 0 00

मधय परिश Madhya Pradesh 6233 6233 0 00 6233 6233 0 00

महजिजषटर Maharashtra 14319 14319 0 00 14319 14319 0 00

िमन औि दिउ Daman amp Diu 221 221 0 00 221 221 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 554 554 0 00 554 554 0 00

गोवज Goa 397 397 0 00 397 397 0 00

पशचिमी कषतर Western Region 35235 35234 1 00 35235 35234 1 00

आनधर परिश Andhra Pradesh 5653 5653 0 00 5653 5653 0 00

तलगजनज Telangana 5453 5453 0 00 5453 5453 0 00

कनजाटक Karnataka 6867 6867 0 00 6867 6867 0 00

किल Kerala 2313 2312 2 01 2313 2312 2 01

तममल नजड Tamil Nadu 9721 9721 0 00 9721 9721 0 00

पडचिी Puducherry 246 246 0 00 246 246 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 30254 30252 2 00 30254 30252 2 00

बबहजि Bihar 2584 2581 3 01 2584 2581 3 01

िजमोिि घजटी ननगम DVC 1944 1942 2 01 1944 1942 2 01

झजिखणड Jharkhand 716 706 10 14 716 706 10 14

ओडडशज Odisha 2701 2701 0 00 2701 2701 0 00

पशशचम बगजल West Bengal 4805 4782 23 05 4805 4782 23 05

मसशककम Sikkim 42 42 0 00 42 42 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12792 12754 38 03 12792 12754 38 03

अरणजचल परिश Arunachal Pradesh 62 62 0 06 62 62 0 06

असम Assam 754 696 58 77 754 696 58 77

मणणपि Manipur 62 61 1 17 62 61 1 17

मघजलय Meghalaya 169 159 10 60 169 159 10 60

ममज़ोिम Mizoram 45 44 0 10 45 44 0 10

नजगजलड Nagaland 59 58 0 08 59 58 0 08

बिपिज Tripura 119 117 2 13 119 117 2 13

उततर-परवी कषतर North-Eastern Region 1270 1198 72 57 1270 1198 72 57

समपणण भारत All India 109696 109241 455 04 109696 109241 455 04

Note The revised data for March 2019 is not avaliable

Energy not Supplied Energy not Supplied

अपरल 2019 April2019 अपरल 2019 April2019 to April 2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2885 2308 577 200 2885 2308 577 200

परजब Punjab 7087 7087 0 00 7087 7087 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 47779 47210 569 12 47779 47210 569 12

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9179 9160 19 02 9179 9160 19 02

तलगजनज Telangana 10269 10202 67 07 10269 10202 67 07

कनजाटक Karnataka 12700 12688 12 01 12700 12688 12 01

किल Kerala 4316 4300 16 04 4316 4300 16 04

तममल नजड Tamil Nadu 15680 15659 21 01 15680 15659 21 01

पडचिी Puducherry 444 444 0 00 444 444 0 00

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49218 49103 115 02 49218 49103 115 02

बबहजि Bihar 5157 5155 2 00 5157 5155 2 00

िजमोिि घजटी ननगम DVC 3014 3014 0 00 3014 3014 0 00

झजिखणड Jharkhand 1326 1325 1 00 1326 1325 1 00

ओडडशज Odisha 5142 5140 3 01 5142 5140 3 01

पशशचम बगजल West Bengal 8745 8699 46 05 8745 8699 46 05

मसशककम Sikkim 98 98 0 00 98 98 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22415 22378 37 02 22415 22378 37 02

अरणजचल परिश Arunachal Pradesh 139 136 3 21 139 136 3 21

असम Assam 1910 1667 242 127 1910 1667 242 127

मणणपि Manipur 197 188 9 48 197 188 9 48

मघजलय Meghalaya 337 337 0 00 337 337 0 00

ममज़ोिम Mizoram 116 113 3 28 116 113 3 28

नजगजलड Nagaland 157 131 27 169 157 131 27 169

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177424 176810 613 03 177424 176810 613 03

Note The revised data for March 2019 is not avaliable 26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateअपरल 2019 April2019 अपरल 2019 April2019 to April 2019

File NoCEA-CH-14-1142018-Coordination Division

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

मई 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during May2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

N

o No

tified

Cuts

N

o No

tified

Cuts

File NoCEA-CH-14-1142018-Coordination Division

मई2019May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0910 hrsday 0811 - 910 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 403 hrsday 0347 - 403 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 2214 hrsday 2157 - 2214 hrsday

उततराखड Uttarakhand Data not received 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-957 hrs day

Three-Phase (Mixed) Supply - 2346 hrs day

Three-Phase Supply(Irrigation)- 0953 - 0957 hrs day Three-

Phase (Mixed) Supply - 2334 - 2346 hrs day

महजिजषटर Maharashtra Three-Phase Supply - 9 hrs day Three-Phase Supply - 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

मई 2019 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during May2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to May-2019 20070450 2493722 63763 22627934 678000 4539922 7835904 35681760

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 7835904 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

7835904

Total Installed Capacity 35687160 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-22 (Up to

Mar2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

Plan Period

2017-22 (Up to

May-19)

6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58732 21173 181240 11734 163456 1010 176200 158886 225204 30768 414858

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Progress of Transmission Sector in the Country up to May 2019

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on May19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

May 19)

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during May 2019

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 20525 925681234952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand May-2018 0 0 0 0 589 0 0 172 0

May-2019 0 0 0 0 0 0 0 430 0

Chattisgarh Gujarat MP Maharashtra Daman amp Diu Dadar Nagar Goa

May-2018 11 1198 19 141 0 0 2

May-2019 0 0 14 8 0 1 0

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

May-2018 4 28 93 53 29 19 0

May-2019 0 0 0 81 62 11 0

8

9 Peak Shortage of Power Supply (MW) in Different Regions in May-2019

0 0 0 0 0 0 0

430

00 0 0 0

589

0 0

172

0

0

400

800

Ch

an

dig

ar

h Delh

i

Ha

rya

na

HP

Jamp

K

Pu

nja

b

Ra

jasth

an

UP

Utr

akhan

d

MW

Northern States (MW) May-2019 May-2018

0 0 14

8 0 1 011

1198

19 141

0 0 2

0

500

1000

1500

Ch

attis

gar

h

Guja

rat

MP

Mah

ara

shtr

a

Da

man amp

Diu

Da

dar

Na

gar G

oa

MW

Western States (MW) May-2019 May-2018

0 0 0

8162

11 0428

93

5329 19

00

100

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Southern State (MW) May-2019 May-2018

File NoCEA-CH-14-1142018-Coordination Division

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

May-2018 1 0 0 0 6 0 4

May-2019 0 0 0 0 0 0 4

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

May-2018 5 29 7 2 9 28 0

May-2019 2 80 2 4 2 2 1

9

0 0 0 0 0 0

4

1

0 0 0

6

0

4

0

2

4

6

8

Bih

ar

DV

C

Jha

rkh

an

d

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

NIs

land

MW

Eastern States (MW) May-2019 May-2018

2

80

2 4 2 2 15 7 2

9

28

0

0

20

40

60

80

100

Aru

na

cha

l

Assa

m

Ma

nip

ur

Me

gh

ala

ya

Miz

ora

m

Na

gala

nd

Trip

ura

MW

North-Eastern States (MW)

File NoCEA-CH-14-1142018-Coordination Division

Sector May-2018 May-2019

Central 7428 6845

State 6361 6095

Private Sector IPP 5625 6109

Private Sector UTL 6985 6458

ALL INDIA 6404 6324

Month PLF 2018 PLF 2019

Jan 6215 6054

Feb 6230 6051

March 6452 6340

April 6454 6471

May 6404 6324

For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment

10

PLF of Thermal Power Plants

(excluding gas based power plants)

All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise

10 All India Thermal PLF Sector-wise (Excluding Gas Based Power Plants) for May-2019

5800

6000

6200

6400

6600

Jan Feb March April May

Months

All India PLF Month-wise

PLF 2018 PLF 2019

7428

63615625

69856404

6845

60956109

64586324

000

1000

2000

3000

4000

5000

6000

7000

8000

Central State Private Sector IPP Private Sector UTL ALL INDIA

All India Thermal PLF

May-2018 May-2019

File NoCEA-CH-14-1142018-Coordination Division

2012-13 2013-14 2014-15 2015-16 2016-17 2017-18

TampD Losses 2304 2284 2277 2181 2142 2104

ATampC Losses 2548 2262 2572 2398 NA NA

Provisional

Note As per PFC for utilities selling directly to consumers NA- Not Available

Total Number of Villages

597464

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2013-14 4894

2014-15 5304

2015-16 5459

2016-17 5743

2017-18 6080

2018-19 6289

11

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality

as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a

Distribution Transformer may not be necessary)

14 All India Coal consumption for Power Generation (MT)

520

Average Revenue Realization(paiseunit)

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community

Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

11 T amp D and ATampC Losses ()

12 All India Village Electrification

Villiages Electrified (Nos)

10000All villages as per census 2011 has

been electrified on 28042018

Villages electrified

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12th Plan 2017-18 and 2018-19 12

2 Capacity Addition Targets amp Achievements during May-2019 and Apr-19 to May-19 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

File NoCEA-CH-14-1142018-Coordination Division

(i) CAPACITY ADDTION TARGETS AND ACHIEVEMENTS IN THE 12TH PLAN (Figures in MW)

SECTOR THERMAL HYDRO NUCLEAR TOTAL

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453

STATE 13922 22201 1608 2276 0 0 15530 24477

PRIVATE 43540 53661 3285 619 0 0 46825 54280

ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209

(ii) CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (Figures in MW)

Thermal Hydro Nuclear Total

Target Ach Target Ach Target Ach Target Ach

Central 4880 3170 800 390 500 0 6180 3560

State 3546 1760 300 200 0 0 3846 1960

Private 2940 3780 205 205 0 0 3145 3985

Total 11366 8710 1305 795 500 0 13171 9505

(iii) CAPACITY ADDITION ACHIEVEMENT FOR 2018-19 (Figures in MW)

Thermal Hydro Nuclear Total

Target Ach Target Ach Target Ach Target Ach

Central 2760 1960 710 110 0 0 3470 2070

State 4506 2850 130 30 0 0 4636 2880

Private 0 972 0 0 0 0 0 972

Total 7266 5782 840 140 0 0 8106 5922

12

1 Capacity Addtion Targets and Achievements in the 12th Plan 2017-18 and 2018-19

File NoCEA-CH-14-1142018-Coordination Division

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 6040 660 0 1160 0 -1160

State 425615 0 0 660 0 -660

Private 0 0 0 0 0 0

Total 1029615 660 0 1820 0 -1820

Central 600 0 0 0 0 0

State 21099 0 0 0 0 0

Private 379 0 0 0 0 0

Total 118999 0 0 0 0 0

Nuclear Central 700 0 0 0 0 0

Central 7340 660 0 1160 0 -1160

State 446714 0 0 660 0 -660

Private 379 0 0 0 0 0

Total 1218614 660 0 1820 0 -1820

Electricity Generation (MU) Targets and Achievements for 2016-17

13

2 Capacity Addition Targets Achievements During May-2019

Schemes Sector

Target 2019-20

Apr-19 to May-19May-19

Hydro

All India

Capacity Addition TargetsAchievements during the Month of May-2019

Thermal1

82

0

0 0

18

20

0 0 0 0

0

200

400

600

800

1000

1200

1400

1600

1800

2000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2019-20Target Achievement

0

100

200

300

400

500

600

700

Thermal Hydro Nuclear Total

660

0 0

660

0 0 00

MW

Target Achievement

File NoCEA-CH-14-1142018-Coordination Division

Coal Lignite Gas Diesel Total

State 1634400 25000 287920 000 1947320 000 869755 70056 2887131

Private 2168083 108000 55800 000 2331883 000 251400 1333187 3916470

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Sub Total 5036020 158000 578126 000 5772146 162000 1970777 1441143 9346066

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2204808 6245075

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Sub Total 7280862 154000 1080649 000 8515511 184000 754750 2326226 11780487

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3781156 5553186

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Sub Total 4304202 314000 647366 56158 5321726 332000 1177483 3894034 10725243

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111789 790389

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Sub Total 2746364 000 10000 000 2756364 000 494212 140300 3390876

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Sub Total 77002 000 177581 3600 258183 000 142700 32429 433311

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Sub Total 000 000 000 4005 4005 000 000 1773 5778

State 6407650 129000 711871 36393 7284913 000 2987880 234893 10507686

Private 7468800 183000 1058060 27370 8737230 000 339400 7437781 16514411

Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663

Total 19444450 626000 2493722 63763 22627934 678000 4539922 7835904 35681760

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30042019 is given below (in MW)

459415 3581588 2867921 7835904

A 0 MW

B May 2019 0 MW

C

May 2019 0 MW

D Net Capacity Added during May 2019 A-B-C 0 MW

Sector wise breakup of RES capacity as shown is provisional

RES

(MNRE)

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31052019)

(UTILITIES)

Region Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30042019

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

CapacityBM PowerCogen Waste to Energy

913150 13830

Capacity Added during May 2019

Capacity Retired during

Capacity removed due to change

from Conventional to RES during

Share of installed capacity of BBMB Stations is included in state sector of partner states

File NoCEA-CH-14-1142018-Coordination Division

Coal Lignite Gas Diesel Total

State 13500 000 180040 000 193540 000 000 000 193540

Private 86922 000 10800 000 97722 000 000 17889 115611

Central 311272 000 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 000 211541 000 623235 10283 72309 17889 723716

State 272000 000 15000 000 287000 000 110282 6930 404212

Private 408078 000 000 000 408078 000 20000 34512 462590

Central 129472 000 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 000 68561 000 878112 10094 196652 41942 1126799

State 000 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 000 99200 62668 161868

Central 18340 000 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 000 6201 000 24541 2895 291048 88329 406813

State 000 000 17500 000 17500 000 123000 13003 153503

Private 000 000 000 000 000 000 000 6483 6483

Central 50639 000 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 000 30407 000 81047 6798 232188 19486 339519

State 176000 000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 000 511550 000 28800 115462 655812

Central 85458 000 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244

State 626000 25000 60380 000 711380 000 109618 2385 823383

Private 280200 108000 000 000 388200 000 10400 751322 1149922

Central 95625 25000 22110 000 142735 55674 73901 34400 306710

Sub-Total 1001825 158000 82490 000 1242315 55674 193919 788107 2280015

State 546900 000 000 000 546900 000 72410 2510 621820

Private 871433 000 000 000 871433 000 84200 288760 1244393

Central 379639 000 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 000 54949 000 1852921 28948 336863 294270 2513002

State 000 000 000 000 000 000 125215 6787 132002

Private 9900 000 45000 000 54900 000 8800 52620 116320

Central 34324 000 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 000 51966 000 96190 3124 181569 59407 340290

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 3471 3471

Central 3815 000 1503 000 5317 801 10171 000 16289

Sub-Total 3815 000 1503 000 5317 801 10171 3471 19760

124953 000 29105 000 154058 23703 75145 000 252907

State 1634400 25000 287920 000 1947320 000 869755 70056 2887131

Private 2168083 108000 55800 000 2331883 000 251400 1333187 3916470

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Grand Total 5036020 158000 578126 000 5772146 162000 1970777 1441143 9346066

Jammu amp Kashmir

Punjab

Rajasthan

Uttar Pradesh

Uttarakhand

Chandigarh

Central - Unallocated

Total (Northern

Region)

HydroRES

(MNRE)

Delhi

Haryana

Himachal Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31052019)

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 005 005

Private 000 000 4800 000 4800 000 000 392 5192

Central 46959 000 1967 000 48926 2600 000 000 51526

Sub-Total 46959 000 6767 000 53726 2600 000 397 56723

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 1447 1447

Central 14141 000 4334 000 18475 700 000 000 19175

Sub-Total 14141 000 4334 000 18475 700 000 1447 20622

State 371000 104000 217782 000 692782 000 77200 6470 776452

Private 726567 50000 396000 000 1172567 000 000 841512 2014079

Central 324243 000 42400 000 366643 55900 000 24330 446873

Sub-Total 1421810 154000 656182 000 2231992 55900 77200 872312 3237404

State 540000 000 000 000 540000 000 170366 8396 718762

Private 617400 000 10000 000 627400 000 000 428040 1055440

Central 334238 000 25700 000 359938 27300 152000 30000 569238

Sub-Total 1491638 000 35700 000 1527338 27300 322366 466436 2343440

State 228000 000 000 000 228000 000 12000 1105 241105

Private 885000 000 000 000 885000 000 000 52430 937430

Central 211075 000 000 000 211075 4800 10000 000 225875

Sub-Total 1324075 000 000 000 1324075 4800 22000 53535 1404410

State 1017000 000 67200 000 1084200 000 285084 38813 1408097

Private 1245600 000 56800 000 1302400 000 48100 880441 2230941

Central 466780 000 227273 000 694053 69000 000 12300 775353

Sub-Total 2729380 000 351273 000 3080653 69000 333184 931553 4414390

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 546 546

Central 19560 000 6634 000 26194 900 000 000 27094

Sub-Total 19560 000 6634 000 26194 900 000 546 27640

233300 000 19759 000 253059 22800 000 000 275859

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2204808 6245075

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Grand Total 7280862 154000 1080649 000 8515511 184000 754750 2326226 11780487

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

ThermalNuclear Hydro

RES

(MNRE)

State Ownership Sector

Mode wise breakup

Grand Total

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 501000 000 23540 000 524540 000 167360 5618 697518

Private 387388 000 381318 3680 772386 000 000 743901 1516287

Central 154683 12773 000 000 167456 12727 000 25000 205183

Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 774519 2418988

State 558250 000 000 000 558250 000 247993 4122 810365

Private 83945 000 83182 000 167127 000 000 394315 561442

Central 180685 14927 000 000 195612 14873 000 1000 211485

Sub-Total 822880 14927 83182 000 920989 14873 247993 399437 1583292

State 502000 000 000 12792 514792 000 358660 19389 892841

Private 195850 000 000 2520 198370 000 000 1369720 1568090

Central 242780 40140 000 000 282920 69800 000 000 352720

Sub-Total 940630 40140 000 15312 996082 69800 358660 1389108 2813650

State 000 000 000 15996 15996 000 185650 17290 218936

Private 61500 000 17400 000 78900 000 000 19021 97921

Central 86142 28180 35958 000 150280 36200 000 5000 191480

Sub-Total 147642 28180 53358 15996 245176 36200 185650 41311 508337

State 432000 000 52408 000 484408 000 217820 12270 714498

Private 458767 25000 50310 21170 555247 000 000 1253885 1809132

Central 302532 136420 000 000 438952 144800 000 23190 606942

Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1289345 3130572

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 000 10000 000 000 10000 000 000 000 10000

Sub-Total 000 10000 000 000 10000 000 000 000 10000

State 000 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 000 314 314

Central 14080 10760 000 000 24840 8600 000 000 33440

Sub-Total 14080 10760 3250 000 28090 8600 000 314 37004

142600 35800 000 000 178400 45000 000 000 223400

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3781156 5553186

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Grand Total 4304202 314000 647366 56158 5321726 332000 1177483 3894034 10725243

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Andhra Pradesh

Telangana

Karnataka

Total (Southern

Region)

Tamil Nadu

NLC

Puducherry

Central - Unallocated

Kerala

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 7070 7070

Private 28100 000 000 000 28100 000 000 25545 53645

Central 384933 000 000 000 384933 000 11000 000 395932

Sub-Total 413033 000 000 000 413033 000 11000 32615 456647

State 42000 000 000 000 42000 000 13000 405 55405

Private 73000 000 000 000 73000 000 000 3647 76647

Central 39374 000 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 000 154374 000 19100 4052 177526

State 540000 000 10000 000 550000 000 98600 12195 660795

Private 243700 000 000 000 243700 000 000 35250 278950

Central 76077 000 000 000 76077 000 41000 000 117077

Sub-Total 859777 000 10000 000 869777 000 139600 47445 1056822

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 698504 000 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 000 698504 000 18620 000 717124

State 42000 000 000 000 42000 000 206192 2630 250822

Private 293900 000 000 000 293900 000 000 47346 341246

Central 163390 000 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 000 499290 000 215092 50976 765358

State 000 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 000 39900 001 39901

Central 8703 000 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 000 8703 000 82300 5212 96215

112683 000 000 000 112683 000 8501 000 121184

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111789 790389

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Grand Total 2746364 000 10000 000 2756364 000 494212 140300 3390876

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

Grand TotalThermalNuclear

RES

(MNRE)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

Total (Eastern

Region)

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

Central - Unallocated

HydroOwnership Sector

Mode wise breakup

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2650 5100

Central 40852 000 43556 000 84408 000 35708 2500 122616

Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038

State 000 000 000 000 000 000 000 10711 10711

Private 000 000 000 000 000 000 000 2939 2939

Central 3705 000 4682 000 8387 000 11655 000 20042

Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692

State 000 000 000 000 000 000 32200 3253 35453

Private 000 000 000 000 000 000 000 012 012

Central 4560 000 10969 000 15529 000 7227 000 22756

Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 5610 000 43695 000 49305 000 6849 500 56654

Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 344 344

Central 4710 000 7157 000 11867 000 9534 000 21401

Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 3210 000 4893 000 8103 000 5733 000 13836

Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 3105 000 4046 000 7151 000 9794 000 16945

Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642

11250 000 6362 000 17612 000 14000 000 31612

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 663 663

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1698 5703

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1773 5778

19

Andaman amp

Nicobar

Lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination Division

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during May-2019 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 31-05-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621

May19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 0 0 23 23 0 750 0 750 0 750 23 773

Achievement 0 0 0 0 0 0 0 0 0 0 0 0 0 474 0 474 0 503 0 503 0 977 0 977

Upto May-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 226 1176 0 1059 0 1059 637 2365 783 3785

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 494 0 494 0 904 0 904 53 1398 0 1451

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

Line

1 2 3 4 5 6

0

1 400 Barmer-Bhinmal line DC RVPNL 288

2 400 Jangaon - Tippapur DC TSTRANSCO 138

3 400 Kayathar - Thennampatty DC TANTRANSCO 48

4 220 Bareilly (400) - Pilibhit Ckt-II SC UPPTCL 39

5 220 Bhanjanagar - Aska DC OPTCL 57

6 220LILO of both Ckt of 220kV Mobha - Mangrol

line at 220kV Amod (Balanced portion)DC GETCO 46

7 220LILO of Gr Noida (400) - Noida Sec-148 line

at RC GreenDC UPPTCL 9

8 220 LILO of Hathras - Gokul at Mathura DC UPPTCL 120

9 220 Sohawal - Tanda DC UPPTCL 232

977

0

977

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During May-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 31-05-19

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during

May-201921(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 31-05-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716

May19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 0 1445 1000 2445 0 680 0 680 0 2125 1000 3125

Achievement 0 0 0 0 0 0 0 0 1000 0 0 1000 0 2385 0 2385 0 760 0 760 1000 3145 0 4145

Upto May-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 2445 3000 5445 0 1480 0 1480 3000 3925 6000 12925

Achievement 0 0 0 0 0 0 0 0 1500 0 0 1500 815 4365 0 5180 0 2065 0 2065 2315 6430 0 8745

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

As on 31-05-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1Bhadla SS (3x1500 3x500 MVA) (500 MVA ICTs- II

and III)400220 PGCIL 1000

Total of CENTRAL SECTOR 1000

2 Moradabad(Aug) (Additional TF) 400220 UPPTCL 240

3 Masauli Prayagraj (New) TF-III 400132 UPPTCL 200

4 Talaricheruvu Ss 400220 APTRANSCO 9455 Uravakonda (Aug) ICT-II 400220 APTRANSCO 5006 Jangaon ss (3x500) (ICT-I) 400220 TSTRANSCO 500

7 Chinhat Lucknow (Aug) TF-II (200-160) 220132 UPPTCL 408 Hathras (Aug)T-I(200-160) 220132 UPPTCL 409 Jaunpur (Aug) (Additional TF) 220132 UPPTCL 16010 Laukahi (Supaul new) 22013233 BSPTCL 32011 Sector- 95 Gurgaon 22033 HVPNL 10012 Alawalpur ss 22066 PSTCL 100

TOTAL STATE SECTOR 3145

GRAND TOTAL 4145

21(2)

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During May-2019

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2019-20 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination Division

Programme Achievement Ach Programme Achievement Ach

Central Sector 37545100 3290600 3141593 9547 6468500 6275642 9702

State Sector 37498600 3425800 3092392 9027 6748300 6066733 8990

PvtIPP Sector 37346200 3476700 3460217 9953 6713100 6652517 9910

PvtUTL Sector 1823100 164300 171799 10456 323600 337490 10429

Total 114213000 10357400 9866001 9526 20253500 19332382 9545

Central Sector 5661700 604200 619800 10258 990300 1104995 11158

State Sector 6680500 551500 652766 11836 1049700 1184387 11283

PvtIPP Sector 1206900 130200 121344 9320 187500 200643 10701

PvtUTL Sector 144100 12400 14009 11298 24700 25155 10184

Total 13693200 1298300 1407919 10844 2252200 2515180 11168

Central Sector 4472000 353500 365463 10338 720800 694195 9631

Total 4472000 353500 365463 10338 720800 694195 9631

Bhutan Import 621800 32500 35300 10862 50000 59270 11854

Central Sector 47678800 4248300 4126856 9714 8179600 8074832 9872

State Sector 44179100 3977300 3745158 9416 7798000 7251120 9299

Pvt Sector 40520300 3783600 3767369 9957 7248900 7215805 9954

Total 133000000 12041700 11674683 9695 23276500 22601027 9710

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Apr-19 Apr-18 Upto Apr-2019 Upto Apr-2018

975409 844377 975409 844377

22

Renewable Energy Generation

Achievement

May-2019

1 Electricity Generation (MU) Targets and Achievememts for 2019-20

All India Energy Generation During Apr-19 to May-19 (MU)

Target (2019-20)Apr-19 to May-19

Sector

Hydro

Thermal

Nuclear

202535

22522

7208

232765

193324

25152

6942

226010

0

50000

100000

150000

200000

250000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Energy Power Supply Position (Provisional) for May-2019 and during Apr-19 to May-19 23

2 Peak Power Supply Position (Provisional) for May-2019 and during Apr-19 to May-19 24

3 Energy Power Supply Position (Revised) for Apr-2019 and during Apr-19 to Apr-19 25

4 Peak Power Supply Position (Revised) for Apr-2019 and during Apr-19 to Apr-19 26

5 Notified Power cuts Restrictions on Industries during May-2019 27

6 Power Supply to Agricultural Sector during May-2019 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 154 154 0 00 271 271 0 00

दिलली Delhi 3366 3366 0 00 6065 6064 1 00

हरियजणज Haryana 4907 4907 0 00 8679 8679 0 00

दहमजचल परिश Himachal Pradesh 872 863 10 11 1654 1644 10 06

रमम कशमीि Jammu amp Kashmir 1760 1424 336 191 3364 2720 644 191

परजब Punjab 4769 4769 0 00 8475 8475 0 00

िजरसथजन Rajasthan 7120 7110 11 02 13313 13300 13 01

उतति परिश Uttar Pradesh 12742 12695 48 04 22897 22817 79 03

उततिजखड Uttarakhand 1329 1329 0 00 2449 2449 0 00

उततरी कषतर Northern Region 37020 36615 404 11 67166 66419 747 11

छततीसगढ़ Chhattisgarh 2794 2794 0 00 5765 5764 1 00

गरिजत Gujarat 11208 11208 0 00 21748 21748 0 00

मधय परिश Madhya Pradesh 6502 6502 0 00 12735 12735 0 00

महजिजषटर Maharashtra 14976 14976 0 00 29295 29294 0 00

िमन औि दिउ Daman amp Diu 222 222 0 00 443 443 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 1106 1106 0 00

गोवज Goa 404 404 0 00 801 801 0 00

पशचिमी कषतर Western Region 36658 36658 0 00 71893 71892 1 00

आनधर परिश Andhra Pradesh 6056 6048 7 01 11709 11702 7 01

तलगजनज Telangana 5318 5318 1 00 10772 10771 1 00

कनजाटक Karnataka 6702 6702 1 00 13569 13568 1 00

किल Kerala 2575 2566 9 03 4888 4878 10 02

तममल नजड Tamil Nadu 10309 10309 1 00 20031 20030 1 00

पडचिी Puducherry 271 271 1 03 517 516 1 01

लकष-दवीप Lakshadweep 4 4 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 31232 31213 19 01 61486 61465 21 00

बबहजि Bihar 3078 3078 0 00 5662 5659 3 01

िजमोिि घजटी ननगम DVC 1814 1814 0 00 3757 3755 2 01

झजिखणड Jharkhand 789 789 0 00 1505 1495 10 07

ओडडशज Odisha 2560 2560 0 00 5261 5261 0 00

पशशचम बगजल West Bengal 5115 5115 0 00 9920 9897 23 02

मसशककम Sikkim 36 36 0 00 78 78 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 58 54 4 67

परवी कषतर Eastern Region 13391 13391 0 00 26182 26144 38 01

अरणजचल परिश Arunachal Pradesh 64 64 0 06 127 126 1 06

असम Assam 819 738 81 99 1573 1434 139 88

मणणपि Manipur 73 72 1 07 135 134 2 12

मघजलय Meghalaya 167 159 8 50 336 318 18 55

ममज़ोिम Mizoram 55 55 0 07 100 99 1 08

नजगजलड Nagaland 65 64 1 08 124 123 1 08

बिपिज Tripura 173 170 2 14 292 288 4 13

उततर-परवी कषतर North-Eastern Region 1416 1323 93 66 2686 2521 165 62

समपणण भारत All India 119717 119200 517 04 229413 228441 972 04

Note Power Supply Position Report has been compiled based on the data furnished by State Utilities Electricity Departments

23

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 356 356 0 00 356 356 0 00

दिलली Delhi 6461 6461 0 00 6461 6461 0 00

हरियजणज Haryana 8874 8874 0 00 8874 8874 0 00

दहमजचल परिश Himachal Pradesh 1480 1480 0 00 1480 1480 0 00

रमम कशमीि Jammu amp Kashmir 2426 2426 0 00 2885 2426 459 159

परजब Punjab 8802 8802 0 00 8802 8802 0 00

िजरसथजन Rajasthan 11791 11791 0 00 11791 11791 0 00

उतति परिश Uttar Pradesh 22487 22057 430 19 22487 22057 430 19

उततिजखड Uttarakhand 2155 2155 0 00 2155 2155 0 00

उततरी कषतर Northern Region 60987 60078 909 15 60987 60078 909 15

छततीसगढ़ Chhattisgarh 4504 4504 0 00 4596 4574 22 05

गरिजत Gujarat 18094 18094 0 00 18094 18094 0 00

मधय परिश Madhya Pradesh 10145 10131 14 01 10145 10131 14 01

महजिजषटर Maharashtra 23621 23613 8 00 23621 23613 8 00

िमन औि दिउ Daman amp Diu 344 344 0 01 344 344 0 01

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 818 818 0 00

गोवज Goa 554 554 0 00 594 594 0 00

पशचिमी कषतर Western Region 57113 57093 20 00 57113 57093 20 00

आनधर परिश Andhra Pradesh 9854 9854 0 00 9854 9854 0 00

तलगजनज Telangana 8684 8684 0 00 10269 10202 67 07

कनजाटक Karnataka 12158 12158 0 00 12700 12688 12 01

किल Kerala 4286 4205 81 19 4316 4300 16 04

तममल नजड Tamil Nadu 15584 15522 62 04 15680 15659 21 01

पडचिी Puducherry 453 442 11 24 453 444 9 20

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 47477 47465 12 00 49218 49103 115 02

बबहजि Bihar 5481 5481 0 00 5481 5481 0 00

िजमोिि घजटी ननगम DVC 3048 3048 0 00 3048 3048 0 00

झजिखणड Jharkhand 1330 1330 0 00 1330 1330 0 00

ओडडशज Odisha 4736 4736 0 00 5142 5140 3 01

पशशचम बगजल West Bengal 9335 9335 0 00 9335 9335 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23558 23558 0 00 23558 23558 0 00

अरणजचल परिश Arunachal Pradesh 140 138 2 12 140 138 2 12

असम Assam 1753 1673 80 46 1910 1673 237 124

मणणपि Manipur 183 181 2 09 197 188 9 48

मघजलय Meghalaya 329 325 4 12 337 337 0 00

ममज़ोिम Mizoram 102 100 2 20 116 113 3 28

नजगजलड Nagaland 130 128 2 14 157 131 27 169

बिपिज Tripura 297 295 1 05 297 295 1 05

उततर-परवी कषतर North-Eastern Region 2758 2674 84 31 2848 2780 68 24

समपणण भारत All India 183513 182533 981 05 183513 182533 981 05

Note Power Supply Position Report has been compiled based on the data furnished by State Utilities Electricity Departments 24

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -मई2019 April2019 to May2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and supply

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateमई 2019 May2019

मजग की पनता म कमी Demand not Met

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 781 781 0 00 781 781 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3706 3706 0 00 3706 3706 0 00

िजरसथजन Rajasthan 6192 6190 2 00 6192 6190 2 00

उतति परिश Uttar Pradesh 10154 10123 32 03 10154 10123 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30147 29804 343 11 30147 29804 343 11

छततीसगढ़ Chhattisgarh 2972 2971 1 00 2972 2971 1 00

गरिजत Gujarat 10540 10540 0 00 10540 10540 0 00

मधय परिश Madhya Pradesh 6233 6233 0 00 6233 6233 0 00

महजिजषटर Maharashtra 14319 14319 0 00 14319 14319 0 00

िमन औि दिउ Daman amp Diu 221 221 0 00 221 221 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 554 554 0 00 554 554 0 00

गोवज Goa 397 397 0 00 397 397 0 00

पशचिमी कषतर Western Region 35235 35234 1 00 35235 35234 1 00

आनधर परिश Andhra Pradesh 5653 5653 0 00 5653 5653 0 00

तलगजनज Telangana 5453 5453 0 00 5453 5453 0 00

कनजाटक Karnataka 6867 6867 0 00 6867 6867 0 00

किल Kerala 2313 2312 2 01 2313 2312 2 01

तममल नजड Tamil Nadu 9721 9721 0 00 9721 9721 0 00

पडचिी Puducherry 246 246 0 00 246 246 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 30254 30252 2 00 30254 30252 2 00

बबहजि Bihar 2584 2581 3 01 2584 2581 3 01

िजमोिि घजटी ननगम DVC 1944 1942 2 01 1944 1942 2 01

झजिखणड Jharkhand 716 706 10 14 716 706 10 14

ओडडशज Odisha 2701 2701 0 00 2701 2701 0 00

पशशचम बगजल West Bengal 4805 4782 23 05 4805 4782 23 05

मसशककम Sikkim 42 42 0 00 42 42 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12792 12754 38 03 12792 12754 38 03

अरणजचल परिश Arunachal Pradesh 62 62 0 06 62 62 0 06

असम Assam 754 696 58 77 754 696 58 77

मणणपि Manipur 62 61 1 17 62 61 1 17

मघजलय Meghalaya 169 159 10 60 169 159 10 60

ममज़ोिम Mizoram 45 44 0 10 45 44 0 10

नजगजलड Nagaland 59 58 0 08 59 58 0 08

बिपिज Tripura 119 117 2 13 119 117 2 13

उततर-परवी कषतर North-Eastern Region 1270 1198 72 57 1270 1198 72 57

समपणण भारत All India 109696 109241 455 04 109696 109241 455 04

Note The revised data for March 2019 is not avaliable

Energy not Supplied Energy not Supplied

अपरल 2019 April2019 अपरल 2019 April2019 to April 2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2885 2308 577 200 2885 2308 577 200

परजब Punjab 7087 7087 0 00 7087 7087 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 47779 47210 569 12 47779 47210 569 12

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9179 9160 19 02 9179 9160 19 02

तलगजनज Telangana 10269 10202 67 07 10269 10202 67 07

कनजाटक Karnataka 12700 12688 12 01 12700 12688 12 01

किल Kerala 4316 4300 16 04 4316 4300 16 04

तममल नजड Tamil Nadu 15680 15659 21 01 15680 15659 21 01

पडचिी Puducherry 444 444 0 00 444 444 0 00

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49218 49103 115 02 49218 49103 115 02

बबहजि Bihar 5157 5155 2 00 5157 5155 2 00

िजमोिि घजटी ननगम DVC 3014 3014 0 00 3014 3014 0 00

झजिखणड Jharkhand 1326 1325 1 00 1326 1325 1 00

ओडडशज Odisha 5142 5140 3 01 5142 5140 3 01

पशशचम बगजल West Bengal 8745 8699 46 05 8745 8699 46 05

मसशककम Sikkim 98 98 0 00 98 98 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22415 22378 37 02 22415 22378 37 02

अरणजचल परिश Arunachal Pradesh 139 136 3 21 139 136 3 21

असम Assam 1910 1667 242 127 1910 1667 242 127

मणणपि Manipur 197 188 9 48 197 188 9 48

मघजलय Meghalaya 337 337 0 00 337 337 0 00

ममज़ोिम Mizoram 116 113 3 28 116 113 3 28

नजगजलड Nagaland 157 131 27 169 157 131 27 169

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177424 176810 613 03 177424 176810 613 03

Note The revised data for March 2019 is not avaliable 26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateअपरल 2019 April2019 अपरल 2019 April2019 to April 2019

File NoCEA-CH-14-1142018-Coordination Division

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

मई 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during May2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

N

o No

tified

Cuts

N

o No

tified

Cuts

File NoCEA-CH-14-1142018-Coordination Division

मई2019May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0910 hrsday 0811 - 910 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 403 hrsday 0347 - 403 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 2214 hrsday 2157 - 2214 hrsday

उततराखड Uttarakhand Data not received 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-957 hrs day

Three-Phase (Mixed) Supply - 2346 hrs day

Three-Phase Supply(Irrigation)- 0953 - 0957 hrs day Three-

Phase (Mixed) Supply - 2334 - 2346 hrs day

महजिजषटर Maharashtra Three-Phase Supply - 9 hrs day Three-Phase Supply - 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

मई 2019 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during May2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to May-2019 20070450 2493722 63763 22627934 678000 4539922 7835904 35681760

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 7835904 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

7835904

Total Installed Capacity 35687160 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-22 (Up to

Mar2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

Plan Period

2017-22 (Up to

May-19)

6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58732 21173 181240 11734 163456 1010 176200 158886 225204 30768 414858

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Progress of Transmission Sector in the Country up to May 2019

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on May19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

May 19)

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during May 2019

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 20525 925681234952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

May-2018 1 0 0 0 6 0 4

May-2019 0 0 0 0 0 0 4

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

May-2018 5 29 7 2 9 28 0

May-2019 2 80 2 4 2 2 1

9

0 0 0 0 0 0

4

1

0 0 0

6

0

4

0

2

4

6

8

Bih

ar

DV

C

Jha

rkh

an

d

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

NIs

land

MW

Eastern States (MW) May-2019 May-2018

2

80

2 4 2 2 15 7 2

9

28

0

0

20

40

60

80

100

Aru

na

cha

l

Assa

m

Ma

nip

ur

Me

gh

ala

ya

Miz

ora

m

Na

gala

nd

Trip

ura

MW

North-Eastern States (MW)

File NoCEA-CH-14-1142018-Coordination Division

Sector May-2018 May-2019

Central 7428 6845

State 6361 6095

Private Sector IPP 5625 6109

Private Sector UTL 6985 6458

ALL INDIA 6404 6324

Month PLF 2018 PLF 2019

Jan 6215 6054

Feb 6230 6051

March 6452 6340

April 6454 6471

May 6404 6324

For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment

10

PLF of Thermal Power Plants

(excluding gas based power plants)

All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise

10 All India Thermal PLF Sector-wise (Excluding Gas Based Power Plants) for May-2019

5800

6000

6200

6400

6600

Jan Feb March April May

Months

All India PLF Month-wise

PLF 2018 PLF 2019

7428

63615625

69856404

6845

60956109

64586324

000

1000

2000

3000

4000

5000

6000

7000

8000

Central State Private Sector IPP Private Sector UTL ALL INDIA

All India Thermal PLF

May-2018 May-2019

File NoCEA-CH-14-1142018-Coordination Division

2012-13 2013-14 2014-15 2015-16 2016-17 2017-18

TampD Losses 2304 2284 2277 2181 2142 2104

ATampC Losses 2548 2262 2572 2398 NA NA

Provisional

Note As per PFC for utilities selling directly to consumers NA- Not Available

Total Number of Villages

597464

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2013-14 4894

2014-15 5304

2015-16 5459

2016-17 5743

2017-18 6080

2018-19 6289

11

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality

as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a

Distribution Transformer may not be necessary)

14 All India Coal consumption for Power Generation (MT)

520

Average Revenue Realization(paiseunit)

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community

Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

11 T amp D and ATampC Losses ()

12 All India Village Electrification

Villiages Electrified (Nos)

10000All villages as per census 2011 has

been electrified on 28042018

Villages electrified

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12th Plan 2017-18 and 2018-19 12

2 Capacity Addition Targets amp Achievements during May-2019 and Apr-19 to May-19 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

File NoCEA-CH-14-1142018-Coordination Division

(i) CAPACITY ADDTION TARGETS AND ACHIEVEMENTS IN THE 12TH PLAN (Figures in MW)

SECTOR THERMAL HYDRO NUCLEAR TOTAL

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453

STATE 13922 22201 1608 2276 0 0 15530 24477

PRIVATE 43540 53661 3285 619 0 0 46825 54280

ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209

(ii) CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (Figures in MW)

Thermal Hydro Nuclear Total

Target Ach Target Ach Target Ach Target Ach

Central 4880 3170 800 390 500 0 6180 3560

State 3546 1760 300 200 0 0 3846 1960

Private 2940 3780 205 205 0 0 3145 3985

Total 11366 8710 1305 795 500 0 13171 9505

(iii) CAPACITY ADDITION ACHIEVEMENT FOR 2018-19 (Figures in MW)

Thermal Hydro Nuclear Total

Target Ach Target Ach Target Ach Target Ach

Central 2760 1960 710 110 0 0 3470 2070

State 4506 2850 130 30 0 0 4636 2880

Private 0 972 0 0 0 0 0 972

Total 7266 5782 840 140 0 0 8106 5922

12

1 Capacity Addtion Targets and Achievements in the 12th Plan 2017-18 and 2018-19

File NoCEA-CH-14-1142018-Coordination Division

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 6040 660 0 1160 0 -1160

State 425615 0 0 660 0 -660

Private 0 0 0 0 0 0

Total 1029615 660 0 1820 0 -1820

Central 600 0 0 0 0 0

State 21099 0 0 0 0 0

Private 379 0 0 0 0 0

Total 118999 0 0 0 0 0

Nuclear Central 700 0 0 0 0 0

Central 7340 660 0 1160 0 -1160

State 446714 0 0 660 0 -660

Private 379 0 0 0 0 0

Total 1218614 660 0 1820 0 -1820

Electricity Generation (MU) Targets and Achievements for 2016-17

13

2 Capacity Addition Targets Achievements During May-2019

Schemes Sector

Target 2019-20

Apr-19 to May-19May-19

Hydro

All India

Capacity Addition TargetsAchievements during the Month of May-2019

Thermal1

82

0

0 0

18

20

0 0 0 0

0

200

400

600

800

1000

1200

1400

1600

1800

2000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2019-20Target Achievement

0

100

200

300

400

500

600

700

Thermal Hydro Nuclear Total

660

0 0

660

0 0 00

MW

Target Achievement

File NoCEA-CH-14-1142018-Coordination Division

Coal Lignite Gas Diesel Total

State 1634400 25000 287920 000 1947320 000 869755 70056 2887131

Private 2168083 108000 55800 000 2331883 000 251400 1333187 3916470

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Sub Total 5036020 158000 578126 000 5772146 162000 1970777 1441143 9346066

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2204808 6245075

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Sub Total 7280862 154000 1080649 000 8515511 184000 754750 2326226 11780487

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3781156 5553186

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Sub Total 4304202 314000 647366 56158 5321726 332000 1177483 3894034 10725243

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111789 790389

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Sub Total 2746364 000 10000 000 2756364 000 494212 140300 3390876

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Sub Total 77002 000 177581 3600 258183 000 142700 32429 433311

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Sub Total 000 000 000 4005 4005 000 000 1773 5778

State 6407650 129000 711871 36393 7284913 000 2987880 234893 10507686

Private 7468800 183000 1058060 27370 8737230 000 339400 7437781 16514411

Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663

Total 19444450 626000 2493722 63763 22627934 678000 4539922 7835904 35681760

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30042019 is given below (in MW)

459415 3581588 2867921 7835904

A 0 MW

B May 2019 0 MW

C

May 2019 0 MW

D Net Capacity Added during May 2019 A-B-C 0 MW

Sector wise breakup of RES capacity as shown is provisional

RES

(MNRE)

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31052019)

(UTILITIES)

Region Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30042019

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

CapacityBM PowerCogen Waste to Energy

913150 13830

Capacity Added during May 2019

Capacity Retired during

Capacity removed due to change

from Conventional to RES during

Share of installed capacity of BBMB Stations is included in state sector of partner states

File NoCEA-CH-14-1142018-Coordination Division

Coal Lignite Gas Diesel Total

State 13500 000 180040 000 193540 000 000 000 193540

Private 86922 000 10800 000 97722 000 000 17889 115611

Central 311272 000 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 000 211541 000 623235 10283 72309 17889 723716

State 272000 000 15000 000 287000 000 110282 6930 404212

Private 408078 000 000 000 408078 000 20000 34512 462590

Central 129472 000 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 000 68561 000 878112 10094 196652 41942 1126799

State 000 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 000 99200 62668 161868

Central 18340 000 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 000 6201 000 24541 2895 291048 88329 406813

State 000 000 17500 000 17500 000 123000 13003 153503

Private 000 000 000 000 000 000 000 6483 6483

Central 50639 000 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 000 30407 000 81047 6798 232188 19486 339519

State 176000 000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 000 511550 000 28800 115462 655812

Central 85458 000 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244

State 626000 25000 60380 000 711380 000 109618 2385 823383

Private 280200 108000 000 000 388200 000 10400 751322 1149922

Central 95625 25000 22110 000 142735 55674 73901 34400 306710

Sub-Total 1001825 158000 82490 000 1242315 55674 193919 788107 2280015

State 546900 000 000 000 546900 000 72410 2510 621820

Private 871433 000 000 000 871433 000 84200 288760 1244393

Central 379639 000 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 000 54949 000 1852921 28948 336863 294270 2513002

State 000 000 000 000 000 000 125215 6787 132002

Private 9900 000 45000 000 54900 000 8800 52620 116320

Central 34324 000 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 000 51966 000 96190 3124 181569 59407 340290

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 3471 3471

Central 3815 000 1503 000 5317 801 10171 000 16289

Sub-Total 3815 000 1503 000 5317 801 10171 3471 19760

124953 000 29105 000 154058 23703 75145 000 252907

State 1634400 25000 287920 000 1947320 000 869755 70056 2887131

Private 2168083 108000 55800 000 2331883 000 251400 1333187 3916470

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Grand Total 5036020 158000 578126 000 5772146 162000 1970777 1441143 9346066

Jammu amp Kashmir

Punjab

Rajasthan

Uttar Pradesh

Uttarakhand

Chandigarh

Central - Unallocated

Total (Northern

Region)

HydroRES

(MNRE)

Delhi

Haryana

Himachal Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31052019)

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 005 005

Private 000 000 4800 000 4800 000 000 392 5192

Central 46959 000 1967 000 48926 2600 000 000 51526

Sub-Total 46959 000 6767 000 53726 2600 000 397 56723

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 1447 1447

Central 14141 000 4334 000 18475 700 000 000 19175

Sub-Total 14141 000 4334 000 18475 700 000 1447 20622

State 371000 104000 217782 000 692782 000 77200 6470 776452

Private 726567 50000 396000 000 1172567 000 000 841512 2014079

Central 324243 000 42400 000 366643 55900 000 24330 446873

Sub-Total 1421810 154000 656182 000 2231992 55900 77200 872312 3237404

State 540000 000 000 000 540000 000 170366 8396 718762

Private 617400 000 10000 000 627400 000 000 428040 1055440

Central 334238 000 25700 000 359938 27300 152000 30000 569238

Sub-Total 1491638 000 35700 000 1527338 27300 322366 466436 2343440

State 228000 000 000 000 228000 000 12000 1105 241105

Private 885000 000 000 000 885000 000 000 52430 937430

Central 211075 000 000 000 211075 4800 10000 000 225875

Sub-Total 1324075 000 000 000 1324075 4800 22000 53535 1404410

State 1017000 000 67200 000 1084200 000 285084 38813 1408097

Private 1245600 000 56800 000 1302400 000 48100 880441 2230941

Central 466780 000 227273 000 694053 69000 000 12300 775353

Sub-Total 2729380 000 351273 000 3080653 69000 333184 931553 4414390

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 546 546

Central 19560 000 6634 000 26194 900 000 000 27094

Sub-Total 19560 000 6634 000 26194 900 000 546 27640

233300 000 19759 000 253059 22800 000 000 275859

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2204808 6245075

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Grand Total 7280862 154000 1080649 000 8515511 184000 754750 2326226 11780487

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

ThermalNuclear Hydro

RES

(MNRE)

State Ownership Sector

Mode wise breakup

Grand Total

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 501000 000 23540 000 524540 000 167360 5618 697518

Private 387388 000 381318 3680 772386 000 000 743901 1516287

Central 154683 12773 000 000 167456 12727 000 25000 205183

Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 774519 2418988

State 558250 000 000 000 558250 000 247993 4122 810365

Private 83945 000 83182 000 167127 000 000 394315 561442

Central 180685 14927 000 000 195612 14873 000 1000 211485

Sub-Total 822880 14927 83182 000 920989 14873 247993 399437 1583292

State 502000 000 000 12792 514792 000 358660 19389 892841

Private 195850 000 000 2520 198370 000 000 1369720 1568090

Central 242780 40140 000 000 282920 69800 000 000 352720

Sub-Total 940630 40140 000 15312 996082 69800 358660 1389108 2813650

State 000 000 000 15996 15996 000 185650 17290 218936

Private 61500 000 17400 000 78900 000 000 19021 97921

Central 86142 28180 35958 000 150280 36200 000 5000 191480

Sub-Total 147642 28180 53358 15996 245176 36200 185650 41311 508337

State 432000 000 52408 000 484408 000 217820 12270 714498

Private 458767 25000 50310 21170 555247 000 000 1253885 1809132

Central 302532 136420 000 000 438952 144800 000 23190 606942

Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1289345 3130572

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 000 10000 000 000 10000 000 000 000 10000

Sub-Total 000 10000 000 000 10000 000 000 000 10000

State 000 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 000 314 314

Central 14080 10760 000 000 24840 8600 000 000 33440

Sub-Total 14080 10760 3250 000 28090 8600 000 314 37004

142600 35800 000 000 178400 45000 000 000 223400

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3781156 5553186

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Grand Total 4304202 314000 647366 56158 5321726 332000 1177483 3894034 10725243

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Andhra Pradesh

Telangana

Karnataka

Total (Southern

Region)

Tamil Nadu

NLC

Puducherry

Central - Unallocated

Kerala

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 7070 7070

Private 28100 000 000 000 28100 000 000 25545 53645

Central 384933 000 000 000 384933 000 11000 000 395932

Sub-Total 413033 000 000 000 413033 000 11000 32615 456647

State 42000 000 000 000 42000 000 13000 405 55405

Private 73000 000 000 000 73000 000 000 3647 76647

Central 39374 000 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 000 154374 000 19100 4052 177526

State 540000 000 10000 000 550000 000 98600 12195 660795

Private 243700 000 000 000 243700 000 000 35250 278950

Central 76077 000 000 000 76077 000 41000 000 117077

Sub-Total 859777 000 10000 000 869777 000 139600 47445 1056822

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 698504 000 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 000 698504 000 18620 000 717124

State 42000 000 000 000 42000 000 206192 2630 250822

Private 293900 000 000 000 293900 000 000 47346 341246

Central 163390 000 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 000 499290 000 215092 50976 765358

State 000 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 000 39900 001 39901

Central 8703 000 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 000 8703 000 82300 5212 96215

112683 000 000 000 112683 000 8501 000 121184

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111789 790389

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Grand Total 2746364 000 10000 000 2756364 000 494212 140300 3390876

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

Grand TotalThermalNuclear

RES

(MNRE)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

Total (Eastern

Region)

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

Central - Unallocated

HydroOwnership Sector

Mode wise breakup

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2650 5100

Central 40852 000 43556 000 84408 000 35708 2500 122616

Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038

State 000 000 000 000 000 000 000 10711 10711

Private 000 000 000 000 000 000 000 2939 2939

Central 3705 000 4682 000 8387 000 11655 000 20042

Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692

State 000 000 000 000 000 000 32200 3253 35453

Private 000 000 000 000 000 000 000 012 012

Central 4560 000 10969 000 15529 000 7227 000 22756

Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 5610 000 43695 000 49305 000 6849 500 56654

Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 344 344

Central 4710 000 7157 000 11867 000 9534 000 21401

Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 3210 000 4893 000 8103 000 5733 000 13836

Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 3105 000 4046 000 7151 000 9794 000 16945

Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642

11250 000 6362 000 17612 000 14000 000 31612

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 663 663

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1698 5703

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1773 5778

19

Andaman amp

Nicobar

Lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination Division

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during May-2019 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 31-05-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621

May19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 0 0 23 23 0 750 0 750 0 750 23 773

Achievement 0 0 0 0 0 0 0 0 0 0 0 0 0 474 0 474 0 503 0 503 0 977 0 977

Upto May-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 226 1176 0 1059 0 1059 637 2365 783 3785

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 494 0 494 0 904 0 904 53 1398 0 1451

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

Line

1 2 3 4 5 6

0

1 400 Barmer-Bhinmal line DC RVPNL 288

2 400 Jangaon - Tippapur DC TSTRANSCO 138

3 400 Kayathar - Thennampatty DC TANTRANSCO 48

4 220 Bareilly (400) - Pilibhit Ckt-II SC UPPTCL 39

5 220 Bhanjanagar - Aska DC OPTCL 57

6 220LILO of both Ckt of 220kV Mobha - Mangrol

line at 220kV Amod (Balanced portion)DC GETCO 46

7 220LILO of Gr Noida (400) - Noida Sec-148 line

at RC GreenDC UPPTCL 9

8 220 LILO of Hathras - Gokul at Mathura DC UPPTCL 120

9 220 Sohawal - Tanda DC UPPTCL 232

977

0

977

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During May-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 31-05-19

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during

May-201921(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 31-05-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716

May19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 0 1445 1000 2445 0 680 0 680 0 2125 1000 3125

Achievement 0 0 0 0 0 0 0 0 1000 0 0 1000 0 2385 0 2385 0 760 0 760 1000 3145 0 4145

Upto May-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 2445 3000 5445 0 1480 0 1480 3000 3925 6000 12925

Achievement 0 0 0 0 0 0 0 0 1500 0 0 1500 815 4365 0 5180 0 2065 0 2065 2315 6430 0 8745

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

As on 31-05-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1Bhadla SS (3x1500 3x500 MVA) (500 MVA ICTs- II

and III)400220 PGCIL 1000

Total of CENTRAL SECTOR 1000

2 Moradabad(Aug) (Additional TF) 400220 UPPTCL 240

3 Masauli Prayagraj (New) TF-III 400132 UPPTCL 200

4 Talaricheruvu Ss 400220 APTRANSCO 9455 Uravakonda (Aug) ICT-II 400220 APTRANSCO 5006 Jangaon ss (3x500) (ICT-I) 400220 TSTRANSCO 500

7 Chinhat Lucknow (Aug) TF-II (200-160) 220132 UPPTCL 408 Hathras (Aug)T-I(200-160) 220132 UPPTCL 409 Jaunpur (Aug) (Additional TF) 220132 UPPTCL 16010 Laukahi (Supaul new) 22013233 BSPTCL 32011 Sector- 95 Gurgaon 22033 HVPNL 10012 Alawalpur ss 22066 PSTCL 100

TOTAL STATE SECTOR 3145

GRAND TOTAL 4145

21(2)

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During May-2019

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2019-20 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination Division

Programme Achievement Ach Programme Achievement Ach

Central Sector 37545100 3290600 3141593 9547 6468500 6275642 9702

State Sector 37498600 3425800 3092392 9027 6748300 6066733 8990

PvtIPP Sector 37346200 3476700 3460217 9953 6713100 6652517 9910

PvtUTL Sector 1823100 164300 171799 10456 323600 337490 10429

Total 114213000 10357400 9866001 9526 20253500 19332382 9545

Central Sector 5661700 604200 619800 10258 990300 1104995 11158

State Sector 6680500 551500 652766 11836 1049700 1184387 11283

PvtIPP Sector 1206900 130200 121344 9320 187500 200643 10701

PvtUTL Sector 144100 12400 14009 11298 24700 25155 10184

Total 13693200 1298300 1407919 10844 2252200 2515180 11168

Central Sector 4472000 353500 365463 10338 720800 694195 9631

Total 4472000 353500 365463 10338 720800 694195 9631

Bhutan Import 621800 32500 35300 10862 50000 59270 11854

Central Sector 47678800 4248300 4126856 9714 8179600 8074832 9872

State Sector 44179100 3977300 3745158 9416 7798000 7251120 9299

Pvt Sector 40520300 3783600 3767369 9957 7248900 7215805 9954

Total 133000000 12041700 11674683 9695 23276500 22601027 9710

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Apr-19 Apr-18 Upto Apr-2019 Upto Apr-2018

975409 844377 975409 844377

22

Renewable Energy Generation

Achievement

May-2019

1 Electricity Generation (MU) Targets and Achievememts for 2019-20

All India Energy Generation During Apr-19 to May-19 (MU)

Target (2019-20)Apr-19 to May-19

Sector

Hydro

Thermal

Nuclear

202535

22522

7208

232765

193324

25152

6942

226010

0

50000

100000

150000

200000

250000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Energy Power Supply Position (Provisional) for May-2019 and during Apr-19 to May-19 23

2 Peak Power Supply Position (Provisional) for May-2019 and during Apr-19 to May-19 24

3 Energy Power Supply Position (Revised) for Apr-2019 and during Apr-19 to Apr-19 25

4 Peak Power Supply Position (Revised) for Apr-2019 and during Apr-19 to Apr-19 26

5 Notified Power cuts Restrictions on Industries during May-2019 27

6 Power Supply to Agricultural Sector during May-2019 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 154 154 0 00 271 271 0 00

दिलली Delhi 3366 3366 0 00 6065 6064 1 00

हरियजणज Haryana 4907 4907 0 00 8679 8679 0 00

दहमजचल परिश Himachal Pradesh 872 863 10 11 1654 1644 10 06

रमम कशमीि Jammu amp Kashmir 1760 1424 336 191 3364 2720 644 191

परजब Punjab 4769 4769 0 00 8475 8475 0 00

िजरसथजन Rajasthan 7120 7110 11 02 13313 13300 13 01

उतति परिश Uttar Pradesh 12742 12695 48 04 22897 22817 79 03

उततिजखड Uttarakhand 1329 1329 0 00 2449 2449 0 00

उततरी कषतर Northern Region 37020 36615 404 11 67166 66419 747 11

छततीसगढ़ Chhattisgarh 2794 2794 0 00 5765 5764 1 00

गरिजत Gujarat 11208 11208 0 00 21748 21748 0 00

मधय परिश Madhya Pradesh 6502 6502 0 00 12735 12735 0 00

महजिजषटर Maharashtra 14976 14976 0 00 29295 29294 0 00

िमन औि दिउ Daman amp Diu 222 222 0 00 443 443 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 1106 1106 0 00

गोवज Goa 404 404 0 00 801 801 0 00

पशचिमी कषतर Western Region 36658 36658 0 00 71893 71892 1 00

आनधर परिश Andhra Pradesh 6056 6048 7 01 11709 11702 7 01

तलगजनज Telangana 5318 5318 1 00 10772 10771 1 00

कनजाटक Karnataka 6702 6702 1 00 13569 13568 1 00

किल Kerala 2575 2566 9 03 4888 4878 10 02

तममल नजड Tamil Nadu 10309 10309 1 00 20031 20030 1 00

पडचिी Puducherry 271 271 1 03 517 516 1 01

लकष-दवीप Lakshadweep 4 4 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 31232 31213 19 01 61486 61465 21 00

बबहजि Bihar 3078 3078 0 00 5662 5659 3 01

िजमोिि घजटी ननगम DVC 1814 1814 0 00 3757 3755 2 01

झजिखणड Jharkhand 789 789 0 00 1505 1495 10 07

ओडडशज Odisha 2560 2560 0 00 5261 5261 0 00

पशशचम बगजल West Bengal 5115 5115 0 00 9920 9897 23 02

मसशककम Sikkim 36 36 0 00 78 78 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 58 54 4 67

परवी कषतर Eastern Region 13391 13391 0 00 26182 26144 38 01

अरणजचल परिश Arunachal Pradesh 64 64 0 06 127 126 1 06

असम Assam 819 738 81 99 1573 1434 139 88

मणणपि Manipur 73 72 1 07 135 134 2 12

मघजलय Meghalaya 167 159 8 50 336 318 18 55

ममज़ोिम Mizoram 55 55 0 07 100 99 1 08

नजगजलड Nagaland 65 64 1 08 124 123 1 08

बिपिज Tripura 173 170 2 14 292 288 4 13

उततर-परवी कषतर North-Eastern Region 1416 1323 93 66 2686 2521 165 62

समपणण भारत All India 119717 119200 517 04 229413 228441 972 04

Note Power Supply Position Report has been compiled based on the data furnished by State Utilities Electricity Departments

23

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 356 356 0 00 356 356 0 00

दिलली Delhi 6461 6461 0 00 6461 6461 0 00

हरियजणज Haryana 8874 8874 0 00 8874 8874 0 00

दहमजचल परिश Himachal Pradesh 1480 1480 0 00 1480 1480 0 00

रमम कशमीि Jammu amp Kashmir 2426 2426 0 00 2885 2426 459 159

परजब Punjab 8802 8802 0 00 8802 8802 0 00

िजरसथजन Rajasthan 11791 11791 0 00 11791 11791 0 00

उतति परिश Uttar Pradesh 22487 22057 430 19 22487 22057 430 19

उततिजखड Uttarakhand 2155 2155 0 00 2155 2155 0 00

उततरी कषतर Northern Region 60987 60078 909 15 60987 60078 909 15

छततीसगढ़ Chhattisgarh 4504 4504 0 00 4596 4574 22 05

गरिजत Gujarat 18094 18094 0 00 18094 18094 0 00

मधय परिश Madhya Pradesh 10145 10131 14 01 10145 10131 14 01

महजिजषटर Maharashtra 23621 23613 8 00 23621 23613 8 00

िमन औि दिउ Daman amp Diu 344 344 0 01 344 344 0 01

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 818 818 0 00

गोवज Goa 554 554 0 00 594 594 0 00

पशचिमी कषतर Western Region 57113 57093 20 00 57113 57093 20 00

आनधर परिश Andhra Pradesh 9854 9854 0 00 9854 9854 0 00

तलगजनज Telangana 8684 8684 0 00 10269 10202 67 07

कनजाटक Karnataka 12158 12158 0 00 12700 12688 12 01

किल Kerala 4286 4205 81 19 4316 4300 16 04

तममल नजड Tamil Nadu 15584 15522 62 04 15680 15659 21 01

पडचिी Puducherry 453 442 11 24 453 444 9 20

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 47477 47465 12 00 49218 49103 115 02

बबहजि Bihar 5481 5481 0 00 5481 5481 0 00

िजमोिि घजटी ननगम DVC 3048 3048 0 00 3048 3048 0 00

झजिखणड Jharkhand 1330 1330 0 00 1330 1330 0 00

ओडडशज Odisha 4736 4736 0 00 5142 5140 3 01

पशशचम बगजल West Bengal 9335 9335 0 00 9335 9335 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23558 23558 0 00 23558 23558 0 00

अरणजचल परिश Arunachal Pradesh 140 138 2 12 140 138 2 12

असम Assam 1753 1673 80 46 1910 1673 237 124

मणणपि Manipur 183 181 2 09 197 188 9 48

मघजलय Meghalaya 329 325 4 12 337 337 0 00

ममज़ोिम Mizoram 102 100 2 20 116 113 3 28

नजगजलड Nagaland 130 128 2 14 157 131 27 169

बिपिज Tripura 297 295 1 05 297 295 1 05

उततर-परवी कषतर North-Eastern Region 2758 2674 84 31 2848 2780 68 24

समपणण भारत All India 183513 182533 981 05 183513 182533 981 05

Note Power Supply Position Report has been compiled based on the data furnished by State Utilities Electricity Departments 24

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -मई2019 April2019 to May2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and supply

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateमई 2019 May2019

मजग की पनता म कमी Demand not Met

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 781 781 0 00 781 781 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3706 3706 0 00 3706 3706 0 00

िजरसथजन Rajasthan 6192 6190 2 00 6192 6190 2 00

उतति परिश Uttar Pradesh 10154 10123 32 03 10154 10123 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30147 29804 343 11 30147 29804 343 11

छततीसगढ़ Chhattisgarh 2972 2971 1 00 2972 2971 1 00

गरिजत Gujarat 10540 10540 0 00 10540 10540 0 00

मधय परिश Madhya Pradesh 6233 6233 0 00 6233 6233 0 00

महजिजषटर Maharashtra 14319 14319 0 00 14319 14319 0 00

िमन औि दिउ Daman amp Diu 221 221 0 00 221 221 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 554 554 0 00 554 554 0 00

गोवज Goa 397 397 0 00 397 397 0 00

पशचिमी कषतर Western Region 35235 35234 1 00 35235 35234 1 00

आनधर परिश Andhra Pradesh 5653 5653 0 00 5653 5653 0 00

तलगजनज Telangana 5453 5453 0 00 5453 5453 0 00

कनजाटक Karnataka 6867 6867 0 00 6867 6867 0 00

किल Kerala 2313 2312 2 01 2313 2312 2 01

तममल नजड Tamil Nadu 9721 9721 0 00 9721 9721 0 00

पडचिी Puducherry 246 246 0 00 246 246 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 30254 30252 2 00 30254 30252 2 00

बबहजि Bihar 2584 2581 3 01 2584 2581 3 01

िजमोिि घजटी ननगम DVC 1944 1942 2 01 1944 1942 2 01

झजिखणड Jharkhand 716 706 10 14 716 706 10 14

ओडडशज Odisha 2701 2701 0 00 2701 2701 0 00

पशशचम बगजल West Bengal 4805 4782 23 05 4805 4782 23 05

मसशककम Sikkim 42 42 0 00 42 42 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12792 12754 38 03 12792 12754 38 03

अरणजचल परिश Arunachal Pradesh 62 62 0 06 62 62 0 06

असम Assam 754 696 58 77 754 696 58 77

मणणपि Manipur 62 61 1 17 62 61 1 17

मघजलय Meghalaya 169 159 10 60 169 159 10 60

ममज़ोिम Mizoram 45 44 0 10 45 44 0 10

नजगजलड Nagaland 59 58 0 08 59 58 0 08

बिपिज Tripura 119 117 2 13 119 117 2 13

उततर-परवी कषतर North-Eastern Region 1270 1198 72 57 1270 1198 72 57

समपणण भारत All India 109696 109241 455 04 109696 109241 455 04

Note The revised data for March 2019 is not avaliable

Energy not Supplied Energy not Supplied

अपरल 2019 April2019 अपरल 2019 April2019 to April 2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2885 2308 577 200 2885 2308 577 200

परजब Punjab 7087 7087 0 00 7087 7087 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 47779 47210 569 12 47779 47210 569 12

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9179 9160 19 02 9179 9160 19 02

तलगजनज Telangana 10269 10202 67 07 10269 10202 67 07

कनजाटक Karnataka 12700 12688 12 01 12700 12688 12 01

किल Kerala 4316 4300 16 04 4316 4300 16 04

तममल नजड Tamil Nadu 15680 15659 21 01 15680 15659 21 01

पडचिी Puducherry 444 444 0 00 444 444 0 00

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49218 49103 115 02 49218 49103 115 02

बबहजि Bihar 5157 5155 2 00 5157 5155 2 00

िजमोिि घजटी ननगम DVC 3014 3014 0 00 3014 3014 0 00

झजिखणड Jharkhand 1326 1325 1 00 1326 1325 1 00

ओडडशज Odisha 5142 5140 3 01 5142 5140 3 01

पशशचम बगजल West Bengal 8745 8699 46 05 8745 8699 46 05

मसशककम Sikkim 98 98 0 00 98 98 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22415 22378 37 02 22415 22378 37 02

अरणजचल परिश Arunachal Pradesh 139 136 3 21 139 136 3 21

असम Assam 1910 1667 242 127 1910 1667 242 127

मणणपि Manipur 197 188 9 48 197 188 9 48

मघजलय Meghalaya 337 337 0 00 337 337 0 00

ममज़ोिम Mizoram 116 113 3 28 116 113 3 28

नजगजलड Nagaland 157 131 27 169 157 131 27 169

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177424 176810 613 03 177424 176810 613 03

Note The revised data for March 2019 is not avaliable 26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateअपरल 2019 April2019 अपरल 2019 April2019 to April 2019

File NoCEA-CH-14-1142018-Coordination Division

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

मई 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during May2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

N

o No

tified

Cuts

N

o No

tified

Cuts

File NoCEA-CH-14-1142018-Coordination Division

मई2019May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0910 hrsday 0811 - 910 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 403 hrsday 0347 - 403 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 2214 hrsday 2157 - 2214 hrsday

उततराखड Uttarakhand Data not received 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-957 hrs day

Three-Phase (Mixed) Supply - 2346 hrs day

Three-Phase Supply(Irrigation)- 0953 - 0957 hrs day Three-

Phase (Mixed) Supply - 2334 - 2346 hrs day

महजिजषटर Maharashtra Three-Phase Supply - 9 hrs day Three-Phase Supply - 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

मई 2019 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during May2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to May-2019 20070450 2493722 63763 22627934 678000 4539922 7835904 35681760

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 7835904 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

7835904

Total Installed Capacity 35687160 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-22 (Up to

Mar2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

Plan Period

2017-22 (Up to

May-19)

6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58732 21173 181240 11734 163456 1010 176200 158886 225204 30768 414858

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Progress of Transmission Sector in the Country up to May 2019

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on May19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

May 19)

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during May 2019

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 20525 925681234952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Sector May-2018 May-2019

Central 7428 6845

State 6361 6095

Private Sector IPP 5625 6109

Private Sector UTL 6985 6458

ALL INDIA 6404 6324

Month PLF 2018 PLF 2019

Jan 6215 6054

Feb 6230 6051

March 6452 6340

April 6454 6471

May 6404 6324

For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment

10

PLF of Thermal Power Plants

(excluding gas based power plants)

All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise

10 All India Thermal PLF Sector-wise (Excluding Gas Based Power Plants) for May-2019

5800

6000

6200

6400

6600

Jan Feb March April May

Months

All India PLF Month-wise

PLF 2018 PLF 2019

7428

63615625

69856404

6845

60956109

64586324

000

1000

2000

3000

4000

5000

6000

7000

8000

Central State Private Sector IPP Private Sector UTL ALL INDIA

All India Thermal PLF

May-2018 May-2019

File NoCEA-CH-14-1142018-Coordination Division

2012-13 2013-14 2014-15 2015-16 2016-17 2017-18

TampD Losses 2304 2284 2277 2181 2142 2104

ATampC Losses 2548 2262 2572 2398 NA NA

Provisional

Note As per PFC for utilities selling directly to consumers NA- Not Available

Total Number of Villages

597464

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2013-14 4894

2014-15 5304

2015-16 5459

2016-17 5743

2017-18 6080

2018-19 6289

11

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality

as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a

Distribution Transformer may not be necessary)

14 All India Coal consumption for Power Generation (MT)

520

Average Revenue Realization(paiseunit)

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community

Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

11 T amp D and ATampC Losses ()

12 All India Village Electrification

Villiages Electrified (Nos)

10000All villages as per census 2011 has

been electrified on 28042018

Villages electrified

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12th Plan 2017-18 and 2018-19 12

2 Capacity Addition Targets amp Achievements during May-2019 and Apr-19 to May-19 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

File NoCEA-CH-14-1142018-Coordination Division

(i) CAPACITY ADDTION TARGETS AND ACHIEVEMENTS IN THE 12TH PLAN (Figures in MW)

SECTOR THERMAL HYDRO NUCLEAR TOTAL

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453

STATE 13922 22201 1608 2276 0 0 15530 24477

PRIVATE 43540 53661 3285 619 0 0 46825 54280

ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209

(ii) CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (Figures in MW)

Thermal Hydro Nuclear Total

Target Ach Target Ach Target Ach Target Ach

Central 4880 3170 800 390 500 0 6180 3560

State 3546 1760 300 200 0 0 3846 1960

Private 2940 3780 205 205 0 0 3145 3985

Total 11366 8710 1305 795 500 0 13171 9505

(iii) CAPACITY ADDITION ACHIEVEMENT FOR 2018-19 (Figures in MW)

Thermal Hydro Nuclear Total

Target Ach Target Ach Target Ach Target Ach

Central 2760 1960 710 110 0 0 3470 2070

State 4506 2850 130 30 0 0 4636 2880

Private 0 972 0 0 0 0 0 972

Total 7266 5782 840 140 0 0 8106 5922

12

1 Capacity Addtion Targets and Achievements in the 12th Plan 2017-18 and 2018-19

File NoCEA-CH-14-1142018-Coordination Division

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 6040 660 0 1160 0 -1160

State 425615 0 0 660 0 -660

Private 0 0 0 0 0 0

Total 1029615 660 0 1820 0 -1820

Central 600 0 0 0 0 0

State 21099 0 0 0 0 0

Private 379 0 0 0 0 0

Total 118999 0 0 0 0 0

Nuclear Central 700 0 0 0 0 0

Central 7340 660 0 1160 0 -1160

State 446714 0 0 660 0 -660

Private 379 0 0 0 0 0

Total 1218614 660 0 1820 0 -1820

Electricity Generation (MU) Targets and Achievements for 2016-17

13

2 Capacity Addition Targets Achievements During May-2019

Schemes Sector

Target 2019-20

Apr-19 to May-19May-19

Hydro

All India

Capacity Addition TargetsAchievements during the Month of May-2019

Thermal1

82

0

0 0

18

20

0 0 0 0

0

200

400

600

800

1000

1200

1400

1600

1800

2000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2019-20Target Achievement

0

100

200

300

400

500

600

700

Thermal Hydro Nuclear Total

660

0 0

660

0 0 00

MW

Target Achievement

File NoCEA-CH-14-1142018-Coordination Division

Coal Lignite Gas Diesel Total

State 1634400 25000 287920 000 1947320 000 869755 70056 2887131

Private 2168083 108000 55800 000 2331883 000 251400 1333187 3916470

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Sub Total 5036020 158000 578126 000 5772146 162000 1970777 1441143 9346066

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2204808 6245075

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Sub Total 7280862 154000 1080649 000 8515511 184000 754750 2326226 11780487

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3781156 5553186

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Sub Total 4304202 314000 647366 56158 5321726 332000 1177483 3894034 10725243

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111789 790389

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Sub Total 2746364 000 10000 000 2756364 000 494212 140300 3390876

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Sub Total 77002 000 177581 3600 258183 000 142700 32429 433311

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Sub Total 000 000 000 4005 4005 000 000 1773 5778

State 6407650 129000 711871 36393 7284913 000 2987880 234893 10507686

Private 7468800 183000 1058060 27370 8737230 000 339400 7437781 16514411

Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663

Total 19444450 626000 2493722 63763 22627934 678000 4539922 7835904 35681760

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30042019 is given below (in MW)

459415 3581588 2867921 7835904

A 0 MW

B May 2019 0 MW

C

May 2019 0 MW

D Net Capacity Added during May 2019 A-B-C 0 MW

Sector wise breakup of RES capacity as shown is provisional

RES

(MNRE)

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31052019)

(UTILITIES)

Region Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30042019

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

CapacityBM PowerCogen Waste to Energy

913150 13830

Capacity Added during May 2019

Capacity Retired during

Capacity removed due to change

from Conventional to RES during

Share of installed capacity of BBMB Stations is included in state sector of partner states

File NoCEA-CH-14-1142018-Coordination Division

Coal Lignite Gas Diesel Total

State 13500 000 180040 000 193540 000 000 000 193540

Private 86922 000 10800 000 97722 000 000 17889 115611

Central 311272 000 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 000 211541 000 623235 10283 72309 17889 723716

State 272000 000 15000 000 287000 000 110282 6930 404212

Private 408078 000 000 000 408078 000 20000 34512 462590

Central 129472 000 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 000 68561 000 878112 10094 196652 41942 1126799

State 000 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 000 99200 62668 161868

Central 18340 000 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 000 6201 000 24541 2895 291048 88329 406813

State 000 000 17500 000 17500 000 123000 13003 153503

Private 000 000 000 000 000 000 000 6483 6483

Central 50639 000 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 000 30407 000 81047 6798 232188 19486 339519

State 176000 000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 000 511550 000 28800 115462 655812

Central 85458 000 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244

State 626000 25000 60380 000 711380 000 109618 2385 823383

Private 280200 108000 000 000 388200 000 10400 751322 1149922

Central 95625 25000 22110 000 142735 55674 73901 34400 306710

Sub-Total 1001825 158000 82490 000 1242315 55674 193919 788107 2280015

State 546900 000 000 000 546900 000 72410 2510 621820

Private 871433 000 000 000 871433 000 84200 288760 1244393

Central 379639 000 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 000 54949 000 1852921 28948 336863 294270 2513002

State 000 000 000 000 000 000 125215 6787 132002

Private 9900 000 45000 000 54900 000 8800 52620 116320

Central 34324 000 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 000 51966 000 96190 3124 181569 59407 340290

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 3471 3471

Central 3815 000 1503 000 5317 801 10171 000 16289

Sub-Total 3815 000 1503 000 5317 801 10171 3471 19760

124953 000 29105 000 154058 23703 75145 000 252907

State 1634400 25000 287920 000 1947320 000 869755 70056 2887131

Private 2168083 108000 55800 000 2331883 000 251400 1333187 3916470

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Grand Total 5036020 158000 578126 000 5772146 162000 1970777 1441143 9346066

Jammu amp Kashmir

Punjab

Rajasthan

Uttar Pradesh

Uttarakhand

Chandigarh

Central - Unallocated

Total (Northern

Region)

HydroRES

(MNRE)

Delhi

Haryana

Himachal Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31052019)

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 005 005

Private 000 000 4800 000 4800 000 000 392 5192

Central 46959 000 1967 000 48926 2600 000 000 51526

Sub-Total 46959 000 6767 000 53726 2600 000 397 56723

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 1447 1447

Central 14141 000 4334 000 18475 700 000 000 19175

Sub-Total 14141 000 4334 000 18475 700 000 1447 20622

State 371000 104000 217782 000 692782 000 77200 6470 776452

Private 726567 50000 396000 000 1172567 000 000 841512 2014079

Central 324243 000 42400 000 366643 55900 000 24330 446873

Sub-Total 1421810 154000 656182 000 2231992 55900 77200 872312 3237404

State 540000 000 000 000 540000 000 170366 8396 718762

Private 617400 000 10000 000 627400 000 000 428040 1055440

Central 334238 000 25700 000 359938 27300 152000 30000 569238

Sub-Total 1491638 000 35700 000 1527338 27300 322366 466436 2343440

State 228000 000 000 000 228000 000 12000 1105 241105

Private 885000 000 000 000 885000 000 000 52430 937430

Central 211075 000 000 000 211075 4800 10000 000 225875

Sub-Total 1324075 000 000 000 1324075 4800 22000 53535 1404410

State 1017000 000 67200 000 1084200 000 285084 38813 1408097

Private 1245600 000 56800 000 1302400 000 48100 880441 2230941

Central 466780 000 227273 000 694053 69000 000 12300 775353

Sub-Total 2729380 000 351273 000 3080653 69000 333184 931553 4414390

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 546 546

Central 19560 000 6634 000 26194 900 000 000 27094

Sub-Total 19560 000 6634 000 26194 900 000 546 27640

233300 000 19759 000 253059 22800 000 000 275859

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2204808 6245075

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Grand Total 7280862 154000 1080649 000 8515511 184000 754750 2326226 11780487

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

ThermalNuclear Hydro

RES

(MNRE)

State Ownership Sector

Mode wise breakup

Grand Total

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 501000 000 23540 000 524540 000 167360 5618 697518

Private 387388 000 381318 3680 772386 000 000 743901 1516287

Central 154683 12773 000 000 167456 12727 000 25000 205183

Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 774519 2418988

State 558250 000 000 000 558250 000 247993 4122 810365

Private 83945 000 83182 000 167127 000 000 394315 561442

Central 180685 14927 000 000 195612 14873 000 1000 211485

Sub-Total 822880 14927 83182 000 920989 14873 247993 399437 1583292

State 502000 000 000 12792 514792 000 358660 19389 892841

Private 195850 000 000 2520 198370 000 000 1369720 1568090

Central 242780 40140 000 000 282920 69800 000 000 352720

Sub-Total 940630 40140 000 15312 996082 69800 358660 1389108 2813650

State 000 000 000 15996 15996 000 185650 17290 218936

Private 61500 000 17400 000 78900 000 000 19021 97921

Central 86142 28180 35958 000 150280 36200 000 5000 191480

Sub-Total 147642 28180 53358 15996 245176 36200 185650 41311 508337

State 432000 000 52408 000 484408 000 217820 12270 714498

Private 458767 25000 50310 21170 555247 000 000 1253885 1809132

Central 302532 136420 000 000 438952 144800 000 23190 606942

Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1289345 3130572

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 000 10000 000 000 10000 000 000 000 10000

Sub-Total 000 10000 000 000 10000 000 000 000 10000

State 000 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 000 314 314

Central 14080 10760 000 000 24840 8600 000 000 33440

Sub-Total 14080 10760 3250 000 28090 8600 000 314 37004

142600 35800 000 000 178400 45000 000 000 223400

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3781156 5553186

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Grand Total 4304202 314000 647366 56158 5321726 332000 1177483 3894034 10725243

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Andhra Pradesh

Telangana

Karnataka

Total (Southern

Region)

Tamil Nadu

NLC

Puducherry

Central - Unallocated

Kerala

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 7070 7070

Private 28100 000 000 000 28100 000 000 25545 53645

Central 384933 000 000 000 384933 000 11000 000 395932

Sub-Total 413033 000 000 000 413033 000 11000 32615 456647

State 42000 000 000 000 42000 000 13000 405 55405

Private 73000 000 000 000 73000 000 000 3647 76647

Central 39374 000 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 000 154374 000 19100 4052 177526

State 540000 000 10000 000 550000 000 98600 12195 660795

Private 243700 000 000 000 243700 000 000 35250 278950

Central 76077 000 000 000 76077 000 41000 000 117077

Sub-Total 859777 000 10000 000 869777 000 139600 47445 1056822

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 698504 000 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 000 698504 000 18620 000 717124

State 42000 000 000 000 42000 000 206192 2630 250822

Private 293900 000 000 000 293900 000 000 47346 341246

Central 163390 000 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 000 499290 000 215092 50976 765358

State 000 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 000 39900 001 39901

Central 8703 000 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 000 8703 000 82300 5212 96215

112683 000 000 000 112683 000 8501 000 121184

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111789 790389

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Grand Total 2746364 000 10000 000 2756364 000 494212 140300 3390876

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

Grand TotalThermalNuclear

RES

(MNRE)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

Total (Eastern

Region)

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

Central - Unallocated

HydroOwnership Sector

Mode wise breakup

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2650 5100

Central 40852 000 43556 000 84408 000 35708 2500 122616

Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038

State 000 000 000 000 000 000 000 10711 10711

Private 000 000 000 000 000 000 000 2939 2939

Central 3705 000 4682 000 8387 000 11655 000 20042

Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692

State 000 000 000 000 000 000 32200 3253 35453

Private 000 000 000 000 000 000 000 012 012

Central 4560 000 10969 000 15529 000 7227 000 22756

Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 5610 000 43695 000 49305 000 6849 500 56654

Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 344 344

Central 4710 000 7157 000 11867 000 9534 000 21401

Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 3210 000 4893 000 8103 000 5733 000 13836

Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 3105 000 4046 000 7151 000 9794 000 16945

Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642

11250 000 6362 000 17612 000 14000 000 31612

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 663 663

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1698 5703

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1773 5778

19

Andaman amp

Nicobar

Lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination Division

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during May-2019 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 31-05-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621

May19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 0 0 23 23 0 750 0 750 0 750 23 773

Achievement 0 0 0 0 0 0 0 0 0 0 0 0 0 474 0 474 0 503 0 503 0 977 0 977

Upto May-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 226 1176 0 1059 0 1059 637 2365 783 3785

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 494 0 494 0 904 0 904 53 1398 0 1451

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

Line

1 2 3 4 5 6

0

1 400 Barmer-Bhinmal line DC RVPNL 288

2 400 Jangaon - Tippapur DC TSTRANSCO 138

3 400 Kayathar - Thennampatty DC TANTRANSCO 48

4 220 Bareilly (400) - Pilibhit Ckt-II SC UPPTCL 39

5 220 Bhanjanagar - Aska DC OPTCL 57

6 220LILO of both Ckt of 220kV Mobha - Mangrol

line at 220kV Amod (Balanced portion)DC GETCO 46

7 220LILO of Gr Noida (400) - Noida Sec-148 line

at RC GreenDC UPPTCL 9

8 220 LILO of Hathras - Gokul at Mathura DC UPPTCL 120

9 220 Sohawal - Tanda DC UPPTCL 232

977

0

977

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During May-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 31-05-19

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during

May-201921(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 31-05-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716

May19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 0 1445 1000 2445 0 680 0 680 0 2125 1000 3125

Achievement 0 0 0 0 0 0 0 0 1000 0 0 1000 0 2385 0 2385 0 760 0 760 1000 3145 0 4145

Upto May-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 2445 3000 5445 0 1480 0 1480 3000 3925 6000 12925

Achievement 0 0 0 0 0 0 0 0 1500 0 0 1500 815 4365 0 5180 0 2065 0 2065 2315 6430 0 8745

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

As on 31-05-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1Bhadla SS (3x1500 3x500 MVA) (500 MVA ICTs- II

and III)400220 PGCIL 1000

Total of CENTRAL SECTOR 1000

2 Moradabad(Aug) (Additional TF) 400220 UPPTCL 240

3 Masauli Prayagraj (New) TF-III 400132 UPPTCL 200

4 Talaricheruvu Ss 400220 APTRANSCO 9455 Uravakonda (Aug) ICT-II 400220 APTRANSCO 5006 Jangaon ss (3x500) (ICT-I) 400220 TSTRANSCO 500

7 Chinhat Lucknow (Aug) TF-II (200-160) 220132 UPPTCL 408 Hathras (Aug)T-I(200-160) 220132 UPPTCL 409 Jaunpur (Aug) (Additional TF) 220132 UPPTCL 16010 Laukahi (Supaul new) 22013233 BSPTCL 32011 Sector- 95 Gurgaon 22033 HVPNL 10012 Alawalpur ss 22066 PSTCL 100

TOTAL STATE SECTOR 3145

GRAND TOTAL 4145

21(2)

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During May-2019

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2019-20 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination Division

Programme Achievement Ach Programme Achievement Ach

Central Sector 37545100 3290600 3141593 9547 6468500 6275642 9702

State Sector 37498600 3425800 3092392 9027 6748300 6066733 8990

PvtIPP Sector 37346200 3476700 3460217 9953 6713100 6652517 9910

PvtUTL Sector 1823100 164300 171799 10456 323600 337490 10429

Total 114213000 10357400 9866001 9526 20253500 19332382 9545

Central Sector 5661700 604200 619800 10258 990300 1104995 11158

State Sector 6680500 551500 652766 11836 1049700 1184387 11283

PvtIPP Sector 1206900 130200 121344 9320 187500 200643 10701

PvtUTL Sector 144100 12400 14009 11298 24700 25155 10184

Total 13693200 1298300 1407919 10844 2252200 2515180 11168

Central Sector 4472000 353500 365463 10338 720800 694195 9631

Total 4472000 353500 365463 10338 720800 694195 9631

Bhutan Import 621800 32500 35300 10862 50000 59270 11854

Central Sector 47678800 4248300 4126856 9714 8179600 8074832 9872

State Sector 44179100 3977300 3745158 9416 7798000 7251120 9299

Pvt Sector 40520300 3783600 3767369 9957 7248900 7215805 9954

Total 133000000 12041700 11674683 9695 23276500 22601027 9710

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Apr-19 Apr-18 Upto Apr-2019 Upto Apr-2018

975409 844377 975409 844377

22

Renewable Energy Generation

Achievement

May-2019

1 Electricity Generation (MU) Targets and Achievememts for 2019-20

All India Energy Generation During Apr-19 to May-19 (MU)

Target (2019-20)Apr-19 to May-19

Sector

Hydro

Thermal

Nuclear

202535

22522

7208

232765

193324

25152

6942

226010

0

50000

100000

150000

200000

250000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Energy Power Supply Position (Provisional) for May-2019 and during Apr-19 to May-19 23

2 Peak Power Supply Position (Provisional) for May-2019 and during Apr-19 to May-19 24

3 Energy Power Supply Position (Revised) for Apr-2019 and during Apr-19 to Apr-19 25

4 Peak Power Supply Position (Revised) for Apr-2019 and during Apr-19 to Apr-19 26

5 Notified Power cuts Restrictions on Industries during May-2019 27

6 Power Supply to Agricultural Sector during May-2019 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 154 154 0 00 271 271 0 00

दिलली Delhi 3366 3366 0 00 6065 6064 1 00

हरियजणज Haryana 4907 4907 0 00 8679 8679 0 00

दहमजचल परिश Himachal Pradesh 872 863 10 11 1654 1644 10 06

रमम कशमीि Jammu amp Kashmir 1760 1424 336 191 3364 2720 644 191

परजब Punjab 4769 4769 0 00 8475 8475 0 00

िजरसथजन Rajasthan 7120 7110 11 02 13313 13300 13 01

उतति परिश Uttar Pradesh 12742 12695 48 04 22897 22817 79 03

उततिजखड Uttarakhand 1329 1329 0 00 2449 2449 0 00

उततरी कषतर Northern Region 37020 36615 404 11 67166 66419 747 11

छततीसगढ़ Chhattisgarh 2794 2794 0 00 5765 5764 1 00

गरिजत Gujarat 11208 11208 0 00 21748 21748 0 00

मधय परिश Madhya Pradesh 6502 6502 0 00 12735 12735 0 00

महजिजषटर Maharashtra 14976 14976 0 00 29295 29294 0 00

िमन औि दिउ Daman amp Diu 222 222 0 00 443 443 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 1106 1106 0 00

गोवज Goa 404 404 0 00 801 801 0 00

पशचिमी कषतर Western Region 36658 36658 0 00 71893 71892 1 00

आनधर परिश Andhra Pradesh 6056 6048 7 01 11709 11702 7 01

तलगजनज Telangana 5318 5318 1 00 10772 10771 1 00

कनजाटक Karnataka 6702 6702 1 00 13569 13568 1 00

किल Kerala 2575 2566 9 03 4888 4878 10 02

तममल नजड Tamil Nadu 10309 10309 1 00 20031 20030 1 00

पडचिी Puducherry 271 271 1 03 517 516 1 01

लकष-दवीप Lakshadweep 4 4 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 31232 31213 19 01 61486 61465 21 00

बबहजि Bihar 3078 3078 0 00 5662 5659 3 01

िजमोिि घजटी ननगम DVC 1814 1814 0 00 3757 3755 2 01

झजिखणड Jharkhand 789 789 0 00 1505 1495 10 07

ओडडशज Odisha 2560 2560 0 00 5261 5261 0 00

पशशचम बगजल West Bengal 5115 5115 0 00 9920 9897 23 02

मसशककम Sikkim 36 36 0 00 78 78 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 58 54 4 67

परवी कषतर Eastern Region 13391 13391 0 00 26182 26144 38 01

अरणजचल परिश Arunachal Pradesh 64 64 0 06 127 126 1 06

असम Assam 819 738 81 99 1573 1434 139 88

मणणपि Manipur 73 72 1 07 135 134 2 12

मघजलय Meghalaya 167 159 8 50 336 318 18 55

ममज़ोिम Mizoram 55 55 0 07 100 99 1 08

नजगजलड Nagaland 65 64 1 08 124 123 1 08

बिपिज Tripura 173 170 2 14 292 288 4 13

उततर-परवी कषतर North-Eastern Region 1416 1323 93 66 2686 2521 165 62

समपणण भारत All India 119717 119200 517 04 229413 228441 972 04

Note Power Supply Position Report has been compiled based on the data furnished by State Utilities Electricity Departments

23

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 356 356 0 00 356 356 0 00

दिलली Delhi 6461 6461 0 00 6461 6461 0 00

हरियजणज Haryana 8874 8874 0 00 8874 8874 0 00

दहमजचल परिश Himachal Pradesh 1480 1480 0 00 1480 1480 0 00

रमम कशमीि Jammu amp Kashmir 2426 2426 0 00 2885 2426 459 159

परजब Punjab 8802 8802 0 00 8802 8802 0 00

िजरसथजन Rajasthan 11791 11791 0 00 11791 11791 0 00

उतति परिश Uttar Pradesh 22487 22057 430 19 22487 22057 430 19

उततिजखड Uttarakhand 2155 2155 0 00 2155 2155 0 00

उततरी कषतर Northern Region 60987 60078 909 15 60987 60078 909 15

छततीसगढ़ Chhattisgarh 4504 4504 0 00 4596 4574 22 05

गरिजत Gujarat 18094 18094 0 00 18094 18094 0 00

मधय परिश Madhya Pradesh 10145 10131 14 01 10145 10131 14 01

महजिजषटर Maharashtra 23621 23613 8 00 23621 23613 8 00

िमन औि दिउ Daman amp Diu 344 344 0 01 344 344 0 01

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 818 818 0 00

गोवज Goa 554 554 0 00 594 594 0 00

पशचिमी कषतर Western Region 57113 57093 20 00 57113 57093 20 00

आनधर परिश Andhra Pradesh 9854 9854 0 00 9854 9854 0 00

तलगजनज Telangana 8684 8684 0 00 10269 10202 67 07

कनजाटक Karnataka 12158 12158 0 00 12700 12688 12 01

किल Kerala 4286 4205 81 19 4316 4300 16 04

तममल नजड Tamil Nadu 15584 15522 62 04 15680 15659 21 01

पडचिी Puducherry 453 442 11 24 453 444 9 20

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 47477 47465 12 00 49218 49103 115 02

बबहजि Bihar 5481 5481 0 00 5481 5481 0 00

िजमोिि घजटी ननगम DVC 3048 3048 0 00 3048 3048 0 00

झजिखणड Jharkhand 1330 1330 0 00 1330 1330 0 00

ओडडशज Odisha 4736 4736 0 00 5142 5140 3 01

पशशचम बगजल West Bengal 9335 9335 0 00 9335 9335 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23558 23558 0 00 23558 23558 0 00

अरणजचल परिश Arunachal Pradesh 140 138 2 12 140 138 2 12

असम Assam 1753 1673 80 46 1910 1673 237 124

मणणपि Manipur 183 181 2 09 197 188 9 48

मघजलय Meghalaya 329 325 4 12 337 337 0 00

ममज़ोिम Mizoram 102 100 2 20 116 113 3 28

नजगजलड Nagaland 130 128 2 14 157 131 27 169

बिपिज Tripura 297 295 1 05 297 295 1 05

उततर-परवी कषतर North-Eastern Region 2758 2674 84 31 2848 2780 68 24

समपणण भारत All India 183513 182533 981 05 183513 182533 981 05

Note Power Supply Position Report has been compiled based on the data furnished by State Utilities Electricity Departments 24

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -मई2019 April2019 to May2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and supply

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateमई 2019 May2019

मजग की पनता म कमी Demand not Met

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 781 781 0 00 781 781 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3706 3706 0 00 3706 3706 0 00

िजरसथजन Rajasthan 6192 6190 2 00 6192 6190 2 00

उतति परिश Uttar Pradesh 10154 10123 32 03 10154 10123 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30147 29804 343 11 30147 29804 343 11

छततीसगढ़ Chhattisgarh 2972 2971 1 00 2972 2971 1 00

गरिजत Gujarat 10540 10540 0 00 10540 10540 0 00

मधय परिश Madhya Pradesh 6233 6233 0 00 6233 6233 0 00

महजिजषटर Maharashtra 14319 14319 0 00 14319 14319 0 00

िमन औि दिउ Daman amp Diu 221 221 0 00 221 221 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 554 554 0 00 554 554 0 00

गोवज Goa 397 397 0 00 397 397 0 00

पशचिमी कषतर Western Region 35235 35234 1 00 35235 35234 1 00

आनधर परिश Andhra Pradesh 5653 5653 0 00 5653 5653 0 00

तलगजनज Telangana 5453 5453 0 00 5453 5453 0 00

कनजाटक Karnataka 6867 6867 0 00 6867 6867 0 00

किल Kerala 2313 2312 2 01 2313 2312 2 01

तममल नजड Tamil Nadu 9721 9721 0 00 9721 9721 0 00

पडचिी Puducherry 246 246 0 00 246 246 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 30254 30252 2 00 30254 30252 2 00

बबहजि Bihar 2584 2581 3 01 2584 2581 3 01

िजमोिि घजटी ननगम DVC 1944 1942 2 01 1944 1942 2 01

झजिखणड Jharkhand 716 706 10 14 716 706 10 14

ओडडशज Odisha 2701 2701 0 00 2701 2701 0 00

पशशचम बगजल West Bengal 4805 4782 23 05 4805 4782 23 05

मसशककम Sikkim 42 42 0 00 42 42 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12792 12754 38 03 12792 12754 38 03

अरणजचल परिश Arunachal Pradesh 62 62 0 06 62 62 0 06

असम Assam 754 696 58 77 754 696 58 77

मणणपि Manipur 62 61 1 17 62 61 1 17

मघजलय Meghalaya 169 159 10 60 169 159 10 60

ममज़ोिम Mizoram 45 44 0 10 45 44 0 10

नजगजलड Nagaland 59 58 0 08 59 58 0 08

बिपिज Tripura 119 117 2 13 119 117 2 13

उततर-परवी कषतर North-Eastern Region 1270 1198 72 57 1270 1198 72 57

समपणण भारत All India 109696 109241 455 04 109696 109241 455 04

Note The revised data for March 2019 is not avaliable

Energy not Supplied Energy not Supplied

अपरल 2019 April2019 अपरल 2019 April2019 to April 2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2885 2308 577 200 2885 2308 577 200

परजब Punjab 7087 7087 0 00 7087 7087 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 47779 47210 569 12 47779 47210 569 12

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9179 9160 19 02 9179 9160 19 02

तलगजनज Telangana 10269 10202 67 07 10269 10202 67 07

कनजाटक Karnataka 12700 12688 12 01 12700 12688 12 01

किल Kerala 4316 4300 16 04 4316 4300 16 04

तममल नजड Tamil Nadu 15680 15659 21 01 15680 15659 21 01

पडचिी Puducherry 444 444 0 00 444 444 0 00

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49218 49103 115 02 49218 49103 115 02

बबहजि Bihar 5157 5155 2 00 5157 5155 2 00

िजमोिि घजटी ननगम DVC 3014 3014 0 00 3014 3014 0 00

झजिखणड Jharkhand 1326 1325 1 00 1326 1325 1 00

ओडडशज Odisha 5142 5140 3 01 5142 5140 3 01

पशशचम बगजल West Bengal 8745 8699 46 05 8745 8699 46 05

मसशककम Sikkim 98 98 0 00 98 98 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22415 22378 37 02 22415 22378 37 02

अरणजचल परिश Arunachal Pradesh 139 136 3 21 139 136 3 21

असम Assam 1910 1667 242 127 1910 1667 242 127

मणणपि Manipur 197 188 9 48 197 188 9 48

मघजलय Meghalaya 337 337 0 00 337 337 0 00

ममज़ोिम Mizoram 116 113 3 28 116 113 3 28

नजगजलड Nagaland 157 131 27 169 157 131 27 169

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177424 176810 613 03 177424 176810 613 03

Note The revised data for March 2019 is not avaliable 26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateअपरल 2019 April2019 अपरल 2019 April2019 to April 2019

File NoCEA-CH-14-1142018-Coordination Division

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

मई 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during May2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

N

o No

tified

Cuts

N

o No

tified

Cuts

File NoCEA-CH-14-1142018-Coordination Division

मई2019May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0910 hrsday 0811 - 910 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 403 hrsday 0347 - 403 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 2214 hrsday 2157 - 2214 hrsday

उततराखड Uttarakhand Data not received 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-957 hrs day

Three-Phase (Mixed) Supply - 2346 hrs day

Three-Phase Supply(Irrigation)- 0953 - 0957 hrs day Three-

Phase (Mixed) Supply - 2334 - 2346 hrs day

महजिजषटर Maharashtra Three-Phase Supply - 9 hrs day Three-Phase Supply - 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

मई 2019 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during May2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to May-2019 20070450 2493722 63763 22627934 678000 4539922 7835904 35681760

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 7835904 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

7835904

Total Installed Capacity 35687160 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-22 (Up to

Mar2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

Plan Period

2017-22 (Up to

May-19)

6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58732 21173 181240 11734 163456 1010 176200 158886 225204 30768 414858

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Progress of Transmission Sector in the Country up to May 2019

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on May19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

May 19)

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during May 2019

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 20525 925681234952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

2012-13 2013-14 2014-15 2015-16 2016-17 2017-18

TampD Losses 2304 2284 2277 2181 2142 2104

ATampC Losses 2548 2262 2572 2398 NA NA

Provisional

Note As per PFC for utilities selling directly to consumers NA- Not Available

Total Number of Villages

597464

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2013-14 4894

2014-15 5304

2015-16 5459

2016-17 5743

2017-18 6080

2018-19 6289

11

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality

as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a

Distribution Transformer may not be necessary)

14 All India Coal consumption for Power Generation (MT)

520

Average Revenue Realization(paiseunit)

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community

Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

11 T amp D and ATampC Losses ()

12 All India Village Electrification

Villiages Electrified (Nos)

10000All villages as per census 2011 has

been electrified on 28042018

Villages electrified

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12th Plan 2017-18 and 2018-19 12

2 Capacity Addition Targets amp Achievements during May-2019 and Apr-19 to May-19 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

File NoCEA-CH-14-1142018-Coordination Division

(i) CAPACITY ADDTION TARGETS AND ACHIEVEMENTS IN THE 12TH PLAN (Figures in MW)

SECTOR THERMAL HYDRO NUCLEAR TOTAL

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453

STATE 13922 22201 1608 2276 0 0 15530 24477

PRIVATE 43540 53661 3285 619 0 0 46825 54280

ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209

(ii) CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (Figures in MW)

Thermal Hydro Nuclear Total

Target Ach Target Ach Target Ach Target Ach

Central 4880 3170 800 390 500 0 6180 3560

State 3546 1760 300 200 0 0 3846 1960

Private 2940 3780 205 205 0 0 3145 3985

Total 11366 8710 1305 795 500 0 13171 9505

(iii) CAPACITY ADDITION ACHIEVEMENT FOR 2018-19 (Figures in MW)

Thermal Hydro Nuclear Total

Target Ach Target Ach Target Ach Target Ach

Central 2760 1960 710 110 0 0 3470 2070

State 4506 2850 130 30 0 0 4636 2880

Private 0 972 0 0 0 0 0 972

Total 7266 5782 840 140 0 0 8106 5922

12

1 Capacity Addtion Targets and Achievements in the 12th Plan 2017-18 and 2018-19

File NoCEA-CH-14-1142018-Coordination Division

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 6040 660 0 1160 0 -1160

State 425615 0 0 660 0 -660

Private 0 0 0 0 0 0

Total 1029615 660 0 1820 0 -1820

Central 600 0 0 0 0 0

State 21099 0 0 0 0 0

Private 379 0 0 0 0 0

Total 118999 0 0 0 0 0

Nuclear Central 700 0 0 0 0 0

Central 7340 660 0 1160 0 -1160

State 446714 0 0 660 0 -660

Private 379 0 0 0 0 0

Total 1218614 660 0 1820 0 -1820

Electricity Generation (MU) Targets and Achievements for 2016-17

13

2 Capacity Addition Targets Achievements During May-2019

Schemes Sector

Target 2019-20

Apr-19 to May-19May-19

Hydro

All India

Capacity Addition TargetsAchievements during the Month of May-2019

Thermal1

82

0

0 0

18

20

0 0 0 0

0

200

400

600

800

1000

1200

1400

1600

1800

2000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2019-20Target Achievement

0

100

200

300

400

500

600

700

Thermal Hydro Nuclear Total

660

0 0

660

0 0 00

MW

Target Achievement

File NoCEA-CH-14-1142018-Coordination Division

Coal Lignite Gas Diesel Total

State 1634400 25000 287920 000 1947320 000 869755 70056 2887131

Private 2168083 108000 55800 000 2331883 000 251400 1333187 3916470

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Sub Total 5036020 158000 578126 000 5772146 162000 1970777 1441143 9346066

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2204808 6245075

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Sub Total 7280862 154000 1080649 000 8515511 184000 754750 2326226 11780487

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3781156 5553186

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Sub Total 4304202 314000 647366 56158 5321726 332000 1177483 3894034 10725243

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111789 790389

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Sub Total 2746364 000 10000 000 2756364 000 494212 140300 3390876

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Sub Total 77002 000 177581 3600 258183 000 142700 32429 433311

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Sub Total 000 000 000 4005 4005 000 000 1773 5778

State 6407650 129000 711871 36393 7284913 000 2987880 234893 10507686

Private 7468800 183000 1058060 27370 8737230 000 339400 7437781 16514411

Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663

Total 19444450 626000 2493722 63763 22627934 678000 4539922 7835904 35681760

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30042019 is given below (in MW)

459415 3581588 2867921 7835904

A 0 MW

B May 2019 0 MW

C

May 2019 0 MW

D Net Capacity Added during May 2019 A-B-C 0 MW

Sector wise breakup of RES capacity as shown is provisional

RES

(MNRE)

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31052019)

(UTILITIES)

Region Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30042019

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

CapacityBM PowerCogen Waste to Energy

913150 13830

Capacity Added during May 2019

Capacity Retired during

Capacity removed due to change

from Conventional to RES during

Share of installed capacity of BBMB Stations is included in state sector of partner states

File NoCEA-CH-14-1142018-Coordination Division

Coal Lignite Gas Diesel Total

State 13500 000 180040 000 193540 000 000 000 193540

Private 86922 000 10800 000 97722 000 000 17889 115611

Central 311272 000 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 000 211541 000 623235 10283 72309 17889 723716

State 272000 000 15000 000 287000 000 110282 6930 404212

Private 408078 000 000 000 408078 000 20000 34512 462590

Central 129472 000 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 000 68561 000 878112 10094 196652 41942 1126799

State 000 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 000 99200 62668 161868

Central 18340 000 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 000 6201 000 24541 2895 291048 88329 406813

State 000 000 17500 000 17500 000 123000 13003 153503

Private 000 000 000 000 000 000 000 6483 6483

Central 50639 000 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 000 30407 000 81047 6798 232188 19486 339519

State 176000 000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 000 511550 000 28800 115462 655812

Central 85458 000 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244

State 626000 25000 60380 000 711380 000 109618 2385 823383

Private 280200 108000 000 000 388200 000 10400 751322 1149922

Central 95625 25000 22110 000 142735 55674 73901 34400 306710

Sub-Total 1001825 158000 82490 000 1242315 55674 193919 788107 2280015

State 546900 000 000 000 546900 000 72410 2510 621820

Private 871433 000 000 000 871433 000 84200 288760 1244393

Central 379639 000 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 000 54949 000 1852921 28948 336863 294270 2513002

State 000 000 000 000 000 000 125215 6787 132002

Private 9900 000 45000 000 54900 000 8800 52620 116320

Central 34324 000 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 000 51966 000 96190 3124 181569 59407 340290

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 3471 3471

Central 3815 000 1503 000 5317 801 10171 000 16289

Sub-Total 3815 000 1503 000 5317 801 10171 3471 19760

124953 000 29105 000 154058 23703 75145 000 252907

State 1634400 25000 287920 000 1947320 000 869755 70056 2887131

Private 2168083 108000 55800 000 2331883 000 251400 1333187 3916470

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Grand Total 5036020 158000 578126 000 5772146 162000 1970777 1441143 9346066

Jammu amp Kashmir

Punjab

Rajasthan

Uttar Pradesh

Uttarakhand

Chandigarh

Central - Unallocated

Total (Northern

Region)

HydroRES

(MNRE)

Delhi

Haryana

Himachal Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31052019)

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 005 005

Private 000 000 4800 000 4800 000 000 392 5192

Central 46959 000 1967 000 48926 2600 000 000 51526

Sub-Total 46959 000 6767 000 53726 2600 000 397 56723

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 1447 1447

Central 14141 000 4334 000 18475 700 000 000 19175

Sub-Total 14141 000 4334 000 18475 700 000 1447 20622

State 371000 104000 217782 000 692782 000 77200 6470 776452

Private 726567 50000 396000 000 1172567 000 000 841512 2014079

Central 324243 000 42400 000 366643 55900 000 24330 446873

Sub-Total 1421810 154000 656182 000 2231992 55900 77200 872312 3237404

State 540000 000 000 000 540000 000 170366 8396 718762

Private 617400 000 10000 000 627400 000 000 428040 1055440

Central 334238 000 25700 000 359938 27300 152000 30000 569238

Sub-Total 1491638 000 35700 000 1527338 27300 322366 466436 2343440

State 228000 000 000 000 228000 000 12000 1105 241105

Private 885000 000 000 000 885000 000 000 52430 937430

Central 211075 000 000 000 211075 4800 10000 000 225875

Sub-Total 1324075 000 000 000 1324075 4800 22000 53535 1404410

State 1017000 000 67200 000 1084200 000 285084 38813 1408097

Private 1245600 000 56800 000 1302400 000 48100 880441 2230941

Central 466780 000 227273 000 694053 69000 000 12300 775353

Sub-Total 2729380 000 351273 000 3080653 69000 333184 931553 4414390

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 546 546

Central 19560 000 6634 000 26194 900 000 000 27094

Sub-Total 19560 000 6634 000 26194 900 000 546 27640

233300 000 19759 000 253059 22800 000 000 275859

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2204808 6245075

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Grand Total 7280862 154000 1080649 000 8515511 184000 754750 2326226 11780487

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

ThermalNuclear Hydro

RES

(MNRE)

State Ownership Sector

Mode wise breakup

Grand Total

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 501000 000 23540 000 524540 000 167360 5618 697518

Private 387388 000 381318 3680 772386 000 000 743901 1516287

Central 154683 12773 000 000 167456 12727 000 25000 205183

Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 774519 2418988

State 558250 000 000 000 558250 000 247993 4122 810365

Private 83945 000 83182 000 167127 000 000 394315 561442

Central 180685 14927 000 000 195612 14873 000 1000 211485

Sub-Total 822880 14927 83182 000 920989 14873 247993 399437 1583292

State 502000 000 000 12792 514792 000 358660 19389 892841

Private 195850 000 000 2520 198370 000 000 1369720 1568090

Central 242780 40140 000 000 282920 69800 000 000 352720

Sub-Total 940630 40140 000 15312 996082 69800 358660 1389108 2813650

State 000 000 000 15996 15996 000 185650 17290 218936

Private 61500 000 17400 000 78900 000 000 19021 97921

Central 86142 28180 35958 000 150280 36200 000 5000 191480

Sub-Total 147642 28180 53358 15996 245176 36200 185650 41311 508337

State 432000 000 52408 000 484408 000 217820 12270 714498

Private 458767 25000 50310 21170 555247 000 000 1253885 1809132

Central 302532 136420 000 000 438952 144800 000 23190 606942

Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1289345 3130572

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 000 10000 000 000 10000 000 000 000 10000

Sub-Total 000 10000 000 000 10000 000 000 000 10000

State 000 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 000 314 314

Central 14080 10760 000 000 24840 8600 000 000 33440

Sub-Total 14080 10760 3250 000 28090 8600 000 314 37004

142600 35800 000 000 178400 45000 000 000 223400

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3781156 5553186

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Grand Total 4304202 314000 647366 56158 5321726 332000 1177483 3894034 10725243

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Andhra Pradesh

Telangana

Karnataka

Total (Southern

Region)

Tamil Nadu

NLC

Puducherry

Central - Unallocated

Kerala

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 7070 7070

Private 28100 000 000 000 28100 000 000 25545 53645

Central 384933 000 000 000 384933 000 11000 000 395932

Sub-Total 413033 000 000 000 413033 000 11000 32615 456647

State 42000 000 000 000 42000 000 13000 405 55405

Private 73000 000 000 000 73000 000 000 3647 76647

Central 39374 000 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 000 154374 000 19100 4052 177526

State 540000 000 10000 000 550000 000 98600 12195 660795

Private 243700 000 000 000 243700 000 000 35250 278950

Central 76077 000 000 000 76077 000 41000 000 117077

Sub-Total 859777 000 10000 000 869777 000 139600 47445 1056822

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 698504 000 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 000 698504 000 18620 000 717124

State 42000 000 000 000 42000 000 206192 2630 250822

Private 293900 000 000 000 293900 000 000 47346 341246

Central 163390 000 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 000 499290 000 215092 50976 765358

State 000 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 000 39900 001 39901

Central 8703 000 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 000 8703 000 82300 5212 96215

112683 000 000 000 112683 000 8501 000 121184

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111789 790389

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Grand Total 2746364 000 10000 000 2756364 000 494212 140300 3390876

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

Grand TotalThermalNuclear

RES

(MNRE)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

Total (Eastern

Region)

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

Central - Unallocated

HydroOwnership Sector

Mode wise breakup

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2650 5100

Central 40852 000 43556 000 84408 000 35708 2500 122616

Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038

State 000 000 000 000 000 000 000 10711 10711

Private 000 000 000 000 000 000 000 2939 2939

Central 3705 000 4682 000 8387 000 11655 000 20042

Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692

State 000 000 000 000 000 000 32200 3253 35453

Private 000 000 000 000 000 000 000 012 012

Central 4560 000 10969 000 15529 000 7227 000 22756

Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 5610 000 43695 000 49305 000 6849 500 56654

Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 344 344

Central 4710 000 7157 000 11867 000 9534 000 21401

Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 3210 000 4893 000 8103 000 5733 000 13836

Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 3105 000 4046 000 7151 000 9794 000 16945

Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642

11250 000 6362 000 17612 000 14000 000 31612

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 663 663

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1698 5703

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1773 5778

19

Andaman amp

Nicobar

Lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination Division

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during May-2019 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 31-05-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621

May19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 0 0 23 23 0 750 0 750 0 750 23 773

Achievement 0 0 0 0 0 0 0 0 0 0 0 0 0 474 0 474 0 503 0 503 0 977 0 977

Upto May-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 226 1176 0 1059 0 1059 637 2365 783 3785

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 494 0 494 0 904 0 904 53 1398 0 1451

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

Line

1 2 3 4 5 6

0

1 400 Barmer-Bhinmal line DC RVPNL 288

2 400 Jangaon - Tippapur DC TSTRANSCO 138

3 400 Kayathar - Thennampatty DC TANTRANSCO 48

4 220 Bareilly (400) - Pilibhit Ckt-II SC UPPTCL 39

5 220 Bhanjanagar - Aska DC OPTCL 57

6 220LILO of both Ckt of 220kV Mobha - Mangrol

line at 220kV Amod (Balanced portion)DC GETCO 46

7 220LILO of Gr Noida (400) - Noida Sec-148 line

at RC GreenDC UPPTCL 9

8 220 LILO of Hathras - Gokul at Mathura DC UPPTCL 120

9 220 Sohawal - Tanda DC UPPTCL 232

977

0

977

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During May-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 31-05-19

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during

May-201921(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 31-05-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716

May19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 0 1445 1000 2445 0 680 0 680 0 2125 1000 3125

Achievement 0 0 0 0 0 0 0 0 1000 0 0 1000 0 2385 0 2385 0 760 0 760 1000 3145 0 4145

Upto May-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 2445 3000 5445 0 1480 0 1480 3000 3925 6000 12925

Achievement 0 0 0 0 0 0 0 0 1500 0 0 1500 815 4365 0 5180 0 2065 0 2065 2315 6430 0 8745

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

As on 31-05-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1Bhadla SS (3x1500 3x500 MVA) (500 MVA ICTs- II

and III)400220 PGCIL 1000

Total of CENTRAL SECTOR 1000

2 Moradabad(Aug) (Additional TF) 400220 UPPTCL 240

3 Masauli Prayagraj (New) TF-III 400132 UPPTCL 200

4 Talaricheruvu Ss 400220 APTRANSCO 9455 Uravakonda (Aug) ICT-II 400220 APTRANSCO 5006 Jangaon ss (3x500) (ICT-I) 400220 TSTRANSCO 500

7 Chinhat Lucknow (Aug) TF-II (200-160) 220132 UPPTCL 408 Hathras (Aug)T-I(200-160) 220132 UPPTCL 409 Jaunpur (Aug) (Additional TF) 220132 UPPTCL 16010 Laukahi (Supaul new) 22013233 BSPTCL 32011 Sector- 95 Gurgaon 22033 HVPNL 10012 Alawalpur ss 22066 PSTCL 100

TOTAL STATE SECTOR 3145

GRAND TOTAL 4145

21(2)

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During May-2019

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2019-20 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination Division

Programme Achievement Ach Programme Achievement Ach

Central Sector 37545100 3290600 3141593 9547 6468500 6275642 9702

State Sector 37498600 3425800 3092392 9027 6748300 6066733 8990

PvtIPP Sector 37346200 3476700 3460217 9953 6713100 6652517 9910

PvtUTL Sector 1823100 164300 171799 10456 323600 337490 10429

Total 114213000 10357400 9866001 9526 20253500 19332382 9545

Central Sector 5661700 604200 619800 10258 990300 1104995 11158

State Sector 6680500 551500 652766 11836 1049700 1184387 11283

PvtIPP Sector 1206900 130200 121344 9320 187500 200643 10701

PvtUTL Sector 144100 12400 14009 11298 24700 25155 10184

Total 13693200 1298300 1407919 10844 2252200 2515180 11168

Central Sector 4472000 353500 365463 10338 720800 694195 9631

Total 4472000 353500 365463 10338 720800 694195 9631

Bhutan Import 621800 32500 35300 10862 50000 59270 11854

Central Sector 47678800 4248300 4126856 9714 8179600 8074832 9872

State Sector 44179100 3977300 3745158 9416 7798000 7251120 9299

Pvt Sector 40520300 3783600 3767369 9957 7248900 7215805 9954

Total 133000000 12041700 11674683 9695 23276500 22601027 9710

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Apr-19 Apr-18 Upto Apr-2019 Upto Apr-2018

975409 844377 975409 844377

22

Renewable Energy Generation

Achievement

May-2019

1 Electricity Generation (MU) Targets and Achievememts for 2019-20

All India Energy Generation During Apr-19 to May-19 (MU)

Target (2019-20)Apr-19 to May-19

Sector

Hydro

Thermal

Nuclear

202535

22522

7208

232765

193324

25152

6942

226010

0

50000

100000

150000

200000

250000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Energy Power Supply Position (Provisional) for May-2019 and during Apr-19 to May-19 23

2 Peak Power Supply Position (Provisional) for May-2019 and during Apr-19 to May-19 24

3 Energy Power Supply Position (Revised) for Apr-2019 and during Apr-19 to Apr-19 25

4 Peak Power Supply Position (Revised) for Apr-2019 and during Apr-19 to Apr-19 26

5 Notified Power cuts Restrictions on Industries during May-2019 27

6 Power Supply to Agricultural Sector during May-2019 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 154 154 0 00 271 271 0 00

दिलली Delhi 3366 3366 0 00 6065 6064 1 00

हरियजणज Haryana 4907 4907 0 00 8679 8679 0 00

दहमजचल परिश Himachal Pradesh 872 863 10 11 1654 1644 10 06

रमम कशमीि Jammu amp Kashmir 1760 1424 336 191 3364 2720 644 191

परजब Punjab 4769 4769 0 00 8475 8475 0 00

िजरसथजन Rajasthan 7120 7110 11 02 13313 13300 13 01

उतति परिश Uttar Pradesh 12742 12695 48 04 22897 22817 79 03

उततिजखड Uttarakhand 1329 1329 0 00 2449 2449 0 00

उततरी कषतर Northern Region 37020 36615 404 11 67166 66419 747 11

छततीसगढ़ Chhattisgarh 2794 2794 0 00 5765 5764 1 00

गरिजत Gujarat 11208 11208 0 00 21748 21748 0 00

मधय परिश Madhya Pradesh 6502 6502 0 00 12735 12735 0 00

महजिजषटर Maharashtra 14976 14976 0 00 29295 29294 0 00

िमन औि दिउ Daman amp Diu 222 222 0 00 443 443 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 1106 1106 0 00

गोवज Goa 404 404 0 00 801 801 0 00

पशचिमी कषतर Western Region 36658 36658 0 00 71893 71892 1 00

आनधर परिश Andhra Pradesh 6056 6048 7 01 11709 11702 7 01

तलगजनज Telangana 5318 5318 1 00 10772 10771 1 00

कनजाटक Karnataka 6702 6702 1 00 13569 13568 1 00

किल Kerala 2575 2566 9 03 4888 4878 10 02

तममल नजड Tamil Nadu 10309 10309 1 00 20031 20030 1 00

पडचिी Puducherry 271 271 1 03 517 516 1 01

लकष-दवीप Lakshadweep 4 4 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 31232 31213 19 01 61486 61465 21 00

बबहजि Bihar 3078 3078 0 00 5662 5659 3 01

िजमोिि घजटी ननगम DVC 1814 1814 0 00 3757 3755 2 01

झजिखणड Jharkhand 789 789 0 00 1505 1495 10 07

ओडडशज Odisha 2560 2560 0 00 5261 5261 0 00

पशशचम बगजल West Bengal 5115 5115 0 00 9920 9897 23 02

मसशककम Sikkim 36 36 0 00 78 78 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 58 54 4 67

परवी कषतर Eastern Region 13391 13391 0 00 26182 26144 38 01

अरणजचल परिश Arunachal Pradesh 64 64 0 06 127 126 1 06

असम Assam 819 738 81 99 1573 1434 139 88

मणणपि Manipur 73 72 1 07 135 134 2 12

मघजलय Meghalaya 167 159 8 50 336 318 18 55

ममज़ोिम Mizoram 55 55 0 07 100 99 1 08

नजगजलड Nagaland 65 64 1 08 124 123 1 08

बिपिज Tripura 173 170 2 14 292 288 4 13

उततर-परवी कषतर North-Eastern Region 1416 1323 93 66 2686 2521 165 62

समपणण भारत All India 119717 119200 517 04 229413 228441 972 04

Note Power Supply Position Report has been compiled based on the data furnished by State Utilities Electricity Departments

23

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 356 356 0 00 356 356 0 00

दिलली Delhi 6461 6461 0 00 6461 6461 0 00

हरियजणज Haryana 8874 8874 0 00 8874 8874 0 00

दहमजचल परिश Himachal Pradesh 1480 1480 0 00 1480 1480 0 00

रमम कशमीि Jammu amp Kashmir 2426 2426 0 00 2885 2426 459 159

परजब Punjab 8802 8802 0 00 8802 8802 0 00

िजरसथजन Rajasthan 11791 11791 0 00 11791 11791 0 00

उतति परिश Uttar Pradesh 22487 22057 430 19 22487 22057 430 19

उततिजखड Uttarakhand 2155 2155 0 00 2155 2155 0 00

उततरी कषतर Northern Region 60987 60078 909 15 60987 60078 909 15

छततीसगढ़ Chhattisgarh 4504 4504 0 00 4596 4574 22 05

गरिजत Gujarat 18094 18094 0 00 18094 18094 0 00

मधय परिश Madhya Pradesh 10145 10131 14 01 10145 10131 14 01

महजिजषटर Maharashtra 23621 23613 8 00 23621 23613 8 00

िमन औि दिउ Daman amp Diu 344 344 0 01 344 344 0 01

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 818 818 0 00

गोवज Goa 554 554 0 00 594 594 0 00

पशचिमी कषतर Western Region 57113 57093 20 00 57113 57093 20 00

आनधर परिश Andhra Pradesh 9854 9854 0 00 9854 9854 0 00

तलगजनज Telangana 8684 8684 0 00 10269 10202 67 07

कनजाटक Karnataka 12158 12158 0 00 12700 12688 12 01

किल Kerala 4286 4205 81 19 4316 4300 16 04

तममल नजड Tamil Nadu 15584 15522 62 04 15680 15659 21 01

पडचिी Puducherry 453 442 11 24 453 444 9 20

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 47477 47465 12 00 49218 49103 115 02

बबहजि Bihar 5481 5481 0 00 5481 5481 0 00

िजमोिि घजटी ननगम DVC 3048 3048 0 00 3048 3048 0 00

झजिखणड Jharkhand 1330 1330 0 00 1330 1330 0 00

ओडडशज Odisha 4736 4736 0 00 5142 5140 3 01

पशशचम बगजल West Bengal 9335 9335 0 00 9335 9335 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23558 23558 0 00 23558 23558 0 00

अरणजचल परिश Arunachal Pradesh 140 138 2 12 140 138 2 12

असम Assam 1753 1673 80 46 1910 1673 237 124

मणणपि Manipur 183 181 2 09 197 188 9 48

मघजलय Meghalaya 329 325 4 12 337 337 0 00

ममज़ोिम Mizoram 102 100 2 20 116 113 3 28

नजगजलड Nagaland 130 128 2 14 157 131 27 169

बिपिज Tripura 297 295 1 05 297 295 1 05

उततर-परवी कषतर North-Eastern Region 2758 2674 84 31 2848 2780 68 24

समपणण भारत All India 183513 182533 981 05 183513 182533 981 05

Note Power Supply Position Report has been compiled based on the data furnished by State Utilities Electricity Departments 24

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -मई2019 April2019 to May2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and supply

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateमई 2019 May2019

मजग की पनता म कमी Demand not Met

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 781 781 0 00 781 781 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3706 3706 0 00 3706 3706 0 00

िजरसथजन Rajasthan 6192 6190 2 00 6192 6190 2 00

उतति परिश Uttar Pradesh 10154 10123 32 03 10154 10123 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30147 29804 343 11 30147 29804 343 11

छततीसगढ़ Chhattisgarh 2972 2971 1 00 2972 2971 1 00

गरिजत Gujarat 10540 10540 0 00 10540 10540 0 00

मधय परिश Madhya Pradesh 6233 6233 0 00 6233 6233 0 00

महजिजषटर Maharashtra 14319 14319 0 00 14319 14319 0 00

िमन औि दिउ Daman amp Diu 221 221 0 00 221 221 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 554 554 0 00 554 554 0 00

गोवज Goa 397 397 0 00 397 397 0 00

पशचिमी कषतर Western Region 35235 35234 1 00 35235 35234 1 00

आनधर परिश Andhra Pradesh 5653 5653 0 00 5653 5653 0 00

तलगजनज Telangana 5453 5453 0 00 5453 5453 0 00

कनजाटक Karnataka 6867 6867 0 00 6867 6867 0 00

किल Kerala 2313 2312 2 01 2313 2312 2 01

तममल नजड Tamil Nadu 9721 9721 0 00 9721 9721 0 00

पडचिी Puducherry 246 246 0 00 246 246 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 30254 30252 2 00 30254 30252 2 00

बबहजि Bihar 2584 2581 3 01 2584 2581 3 01

िजमोिि घजटी ननगम DVC 1944 1942 2 01 1944 1942 2 01

झजिखणड Jharkhand 716 706 10 14 716 706 10 14

ओडडशज Odisha 2701 2701 0 00 2701 2701 0 00

पशशचम बगजल West Bengal 4805 4782 23 05 4805 4782 23 05

मसशककम Sikkim 42 42 0 00 42 42 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12792 12754 38 03 12792 12754 38 03

अरणजचल परिश Arunachal Pradesh 62 62 0 06 62 62 0 06

असम Assam 754 696 58 77 754 696 58 77

मणणपि Manipur 62 61 1 17 62 61 1 17

मघजलय Meghalaya 169 159 10 60 169 159 10 60

ममज़ोिम Mizoram 45 44 0 10 45 44 0 10

नजगजलड Nagaland 59 58 0 08 59 58 0 08

बिपिज Tripura 119 117 2 13 119 117 2 13

उततर-परवी कषतर North-Eastern Region 1270 1198 72 57 1270 1198 72 57

समपणण भारत All India 109696 109241 455 04 109696 109241 455 04

Note The revised data for March 2019 is not avaliable

Energy not Supplied Energy not Supplied

अपरल 2019 April2019 अपरल 2019 April2019 to April 2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2885 2308 577 200 2885 2308 577 200

परजब Punjab 7087 7087 0 00 7087 7087 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 47779 47210 569 12 47779 47210 569 12

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9179 9160 19 02 9179 9160 19 02

तलगजनज Telangana 10269 10202 67 07 10269 10202 67 07

कनजाटक Karnataka 12700 12688 12 01 12700 12688 12 01

किल Kerala 4316 4300 16 04 4316 4300 16 04

तममल नजड Tamil Nadu 15680 15659 21 01 15680 15659 21 01

पडचिी Puducherry 444 444 0 00 444 444 0 00

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49218 49103 115 02 49218 49103 115 02

बबहजि Bihar 5157 5155 2 00 5157 5155 2 00

िजमोिि घजटी ननगम DVC 3014 3014 0 00 3014 3014 0 00

झजिखणड Jharkhand 1326 1325 1 00 1326 1325 1 00

ओडडशज Odisha 5142 5140 3 01 5142 5140 3 01

पशशचम बगजल West Bengal 8745 8699 46 05 8745 8699 46 05

मसशककम Sikkim 98 98 0 00 98 98 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22415 22378 37 02 22415 22378 37 02

अरणजचल परिश Arunachal Pradesh 139 136 3 21 139 136 3 21

असम Assam 1910 1667 242 127 1910 1667 242 127

मणणपि Manipur 197 188 9 48 197 188 9 48

मघजलय Meghalaya 337 337 0 00 337 337 0 00

ममज़ोिम Mizoram 116 113 3 28 116 113 3 28

नजगजलड Nagaland 157 131 27 169 157 131 27 169

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177424 176810 613 03 177424 176810 613 03

Note The revised data for March 2019 is not avaliable 26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateअपरल 2019 April2019 अपरल 2019 April2019 to April 2019

File NoCEA-CH-14-1142018-Coordination Division

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

मई 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during May2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

N

o No

tified

Cuts

N

o No

tified

Cuts

File NoCEA-CH-14-1142018-Coordination Division

मई2019May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0910 hrsday 0811 - 910 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 403 hrsday 0347 - 403 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 2214 hrsday 2157 - 2214 hrsday

उततराखड Uttarakhand Data not received 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-957 hrs day

Three-Phase (Mixed) Supply - 2346 hrs day

Three-Phase Supply(Irrigation)- 0953 - 0957 hrs day Three-

Phase (Mixed) Supply - 2334 - 2346 hrs day

महजिजषटर Maharashtra Three-Phase Supply - 9 hrs day Three-Phase Supply - 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

मई 2019 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during May2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to May-2019 20070450 2493722 63763 22627934 678000 4539922 7835904 35681760

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 7835904 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

7835904

Total Installed Capacity 35687160 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-22 (Up to

Mar2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

Plan Period

2017-22 (Up to

May-19)

6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58732 21173 181240 11734 163456 1010 176200 158886 225204 30768 414858

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Progress of Transmission Sector in the Country up to May 2019

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on May19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

May 19)

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during May 2019

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 20525 925681234952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12th Plan 2017-18 and 2018-19 12

2 Capacity Addition Targets amp Achievements during May-2019 and Apr-19 to May-19 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

File NoCEA-CH-14-1142018-Coordination Division

(i) CAPACITY ADDTION TARGETS AND ACHIEVEMENTS IN THE 12TH PLAN (Figures in MW)

SECTOR THERMAL HYDRO NUCLEAR TOTAL

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453

STATE 13922 22201 1608 2276 0 0 15530 24477

PRIVATE 43540 53661 3285 619 0 0 46825 54280

ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209

(ii) CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (Figures in MW)

Thermal Hydro Nuclear Total

Target Ach Target Ach Target Ach Target Ach

Central 4880 3170 800 390 500 0 6180 3560

State 3546 1760 300 200 0 0 3846 1960

Private 2940 3780 205 205 0 0 3145 3985

Total 11366 8710 1305 795 500 0 13171 9505

(iii) CAPACITY ADDITION ACHIEVEMENT FOR 2018-19 (Figures in MW)

Thermal Hydro Nuclear Total

Target Ach Target Ach Target Ach Target Ach

Central 2760 1960 710 110 0 0 3470 2070

State 4506 2850 130 30 0 0 4636 2880

Private 0 972 0 0 0 0 0 972

Total 7266 5782 840 140 0 0 8106 5922

12

1 Capacity Addtion Targets and Achievements in the 12th Plan 2017-18 and 2018-19

File NoCEA-CH-14-1142018-Coordination Division

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 6040 660 0 1160 0 -1160

State 425615 0 0 660 0 -660

Private 0 0 0 0 0 0

Total 1029615 660 0 1820 0 -1820

Central 600 0 0 0 0 0

State 21099 0 0 0 0 0

Private 379 0 0 0 0 0

Total 118999 0 0 0 0 0

Nuclear Central 700 0 0 0 0 0

Central 7340 660 0 1160 0 -1160

State 446714 0 0 660 0 -660

Private 379 0 0 0 0 0

Total 1218614 660 0 1820 0 -1820

Electricity Generation (MU) Targets and Achievements for 2016-17

13

2 Capacity Addition Targets Achievements During May-2019

Schemes Sector

Target 2019-20

Apr-19 to May-19May-19

Hydro

All India

Capacity Addition TargetsAchievements during the Month of May-2019

Thermal1

82

0

0 0

18

20

0 0 0 0

0

200

400

600

800

1000

1200

1400

1600

1800

2000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2019-20Target Achievement

0

100

200

300

400

500

600

700

Thermal Hydro Nuclear Total

660

0 0

660

0 0 00

MW

Target Achievement

File NoCEA-CH-14-1142018-Coordination Division

Coal Lignite Gas Diesel Total

State 1634400 25000 287920 000 1947320 000 869755 70056 2887131

Private 2168083 108000 55800 000 2331883 000 251400 1333187 3916470

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Sub Total 5036020 158000 578126 000 5772146 162000 1970777 1441143 9346066

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2204808 6245075

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Sub Total 7280862 154000 1080649 000 8515511 184000 754750 2326226 11780487

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3781156 5553186

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Sub Total 4304202 314000 647366 56158 5321726 332000 1177483 3894034 10725243

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111789 790389

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Sub Total 2746364 000 10000 000 2756364 000 494212 140300 3390876

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Sub Total 77002 000 177581 3600 258183 000 142700 32429 433311

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Sub Total 000 000 000 4005 4005 000 000 1773 5778

State 6407650 129000 711871 36393 7284913 000 2987880 234893 10507686

Private 7468800 183000 1058060 27370 8737230 000 339400 7437781 16514411

Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663

Total 19444450 626000 2493722 63763 22627934 678000 4539922 7835904 35681760

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30042019 is given below (in MW)

459415 3581588 2867921 7835904

A 0 MW

B May 2019 0 MW

C

May 2019 0 MW

D Net Capacity Added during May 2019 A-B-C 0 MW

Sector wise breakup of RES capacity as shown is provisional

RES

(MNRE)

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31052019)

(UTILITIES)

Region Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30042019

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

CapacityBM PowerCogen Waste to Energy

913150 13830

Capacity Added during May 2019

Capacity Retired during

Capacity removed due to change

from Conventional to RES during

Share of installed capacity of BBMB Stations is included in state sector of partner states

File NoCEA-CH-14-1142018-Coordination Division

Coal Lignite Gas Diesel Total

State 13500 000 180040 000 193540 000 000 000 193540

Private 86922 000 10800 000 97722 000 000 17889 115611

Central 311272 000 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 000 211541 000 623235 10283 72309 17889 723716

State 272000 000 15000 000 287000 000 110282 6930 404212

Private 408078 000 000 000 408078 000 20000 34512 462590

Central 129472 000 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 000 68561 000 878112 10094 196652 41942 1126799

State 000 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 000 99200 62668 161868

Central 18340 000 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 000 6201 000 24541 2895 291048 88329 406813

State 000 000 17500 000 17500 000 123000 13003 153503

Private 000 000 000 000 000 000 000 6483 6483

Central 50639 000 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 000 30407 000 81047 6798 232188 19486 339519

State 176000 000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 000 511550 000 28800 115462 655812

Central 85458 000 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244

State 626000 25000 60380 000 711380 000 109618 2385 823383

Private 280200 108000 000 000 388200 000 10400 751322 1149922

Central 95625 25000 22110 000 142735 55674 73901 34400 306710

Sub-Total 1001825 158000 82490 000 1242315 55674 193919 788107 2280015

State 546900 000 000 000 546900 000 72410 2510 621820

Private 871433 000 000 000 871433 000 84200 288760 1244393

Central 379639 000 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 000 54949 000 1852921 28948 336863 294270 2513002

State 000 000 000 000 000 000 125215 6787 132002

Private 9900 000 45000 000 54900 000 8800 52620 116320

Central 34324 000 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 000 51966 000 96190 3124 181569 59407 340290

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 3471 3471

Central 3815 000 1503 000 5317 801 10171 000 16289

Sub-Total 3815 000 1503 000 5317 801 10171 3471 19760

124953 000 29105 000 154058 23703 75145 000 252907

State 1634400 25000 287920 000 1947320 000 869755 70056 2887131

Private 2168083 108000 55800 000 2331883 000 251400 1333187 3916470

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Grand Total 5036020 158000 578126 000 5772146 162000 1970777 1441143 9346066

Jammu amp Kashmir

Punjab

Rajasthan

Uttar Pradesh

Uttarakhand

Chandigarh

Central - Unallocated

Total (Northern

Region)

HydroRES

(MNRE)

Delhi

Haryana

Himachal Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31052019)

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 005 005

Private 000 000 4800 000 4800 000 000 392 5192

Central 46959 000 1967 000 48926 2600 000 000 51526

Sub-Total 46959 000 6767 000 53726 2600 000 397 56723

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 1447 1447

Central 14141 000 4334 000 18475 700 000 000 19175

Sub-Total 14141 000 4334 000 18475 700 000 1447 20622

State 371000 104000 217782 000 692782 000 77200 6470 776452

Private 726567 50000 396000 000 1172567 000 000 841512 2014079

Central 324243 000 42400 000 366643 55900 000 24330 446873

Sub-Total 1421810 154000 656182 000 2231992 55900 77200 872312 3237404

State 540000 000 000 000 540000 000 170366 8396 718762

Private 617400 000 10000 000 627400 000 000 428040 1055440

Central 334238 000 25700 000 359938 27300 152000 30000 569238

Sub-Total 1491638 000 35700 000 1527338 27300 322366 466436 2343440

State 228000 000 000 000 228000 000 12000 1105 241105

Private 885000 000 000 000 885000 000 000 52430 937430

Central 211075 000 000 000 211075 4800 10000 000 225875

Sub-Total 1324075 000 000 000 1324075 4800 22000 53535 1404410

State 1017000 000 67200 000 1084200 000 285084 38813 1408097

Private 1245600 000 56800 000 1302400 000 48100 880441 2230941

Central 466780 000 227273 000 694053 69000 000 12300 775353

Sub-Total 2729380 000 351273 000 3080653 69000 333184 931553 4414390

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 546 546

Central 19560 000 6634 000 26194 900 000 000 27094

Sub-Total 19560 000 6634 000 26194 900 000 546 27640

233300 000 19759 000 253059 22800 000 000 275859

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2204808 6245075

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Grand Total 7280862 154000 1080649 000 8515511 184000 754750 2326226 11780487

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

ThermalNuclear Hydro

RES

(MNRE)

State Ownership Sector

Mode wise breakup

Grand Total

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 501000 000 23540 000 524540 000 167360 5618 697518

Private 387388 000 381318 3680 772386 000 000 743901 1516287

Central 154683 12773 000 000 167456 12727 000 25000 205183

Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 774519 2418988

State 558250 000 000 000 558250 000 247993 4122 810365

Private 83945 000 83182 000 167127 000 000 394315 561442

Central 180685 14927 000 000 195612 14873 000 1000 211485

Sub-Total 822880 14927 83182 000 920989 14873 247993 399437 1583292

State 502000 000 000 12792 514792 000 358660 19389 892841

Private 195850 000 000 2520 198370 000 000 1369720 1568090

Central 242780 40140 000 000 282920 69800 000 000 352720

Sub-Total 940630 40140 000 15312 996082 69800 358660 1389108 2813650

State 000 000 000 15996 15996 000 185650 17290 218936

Private 61500 000 17400 000 78900 000 000 19021 97921

Central 86142 28180 35958 000 150280 36200 000 5000 191480

Sub-Total 147642 28180 53358 15996 245176 36200 185650 41311 508337

State 432000 000 52408 000 484408 000 217820 12270 714498

Private 458767 25000 50310 21170 555247 000 000 1253885 1809132

Central 302532 136420 000 000 438952 144800 000 23190 606942

Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1289345 3130572

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 000 10000 000 000 10000 000 000 000 10000

Sub-Total 000 10000 000 000 10000 000 000 000 10000

State 000 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 000 314 314

Central 14080 10760 000 000 24840 8600 000 000 33440

Sub-Total 14080 10760 3250 000 28090 8600 000 314 37004

142600 35800 000 000 178400 45000 000 000 223400

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3781156 5553186

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Grand Total 4304202 314000 647366 56158 5321726 332000 1177483 3894034 10725243

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Andhra Pradesh

Telangana

Karnataka

Total (Southern

Region)

Tamil Nadu

NLC

Puducherry

Central - Unallocated

Kerala

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 7070 7070

Private 28100 000 000 000 28100 000 000 25545 53645

Central 384933 000 000 000 384933 000 11000 000 395932

Sub-Total 413033 000 000 000 413033 000 11000 32615 456647

State 42000 000 000 000 42000 000 13000 405 55405

Private 73000 000 000 000 73000 000 000 3647 76647

Central 39374 000 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 000 154374 000 19100 4052 177526

State 540000 000 10000 000 550000 000 98600 12195 660795

Private 243700 000 000 000 243700 000 000 35250 278950

Central 76077 000 000 000 76077 000 41000 000 117077

Sub-Total 859777 000 10000 000 869777 000 139600 47445 1056822

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 698504 000 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 000 698504 000 18620 000 717124

State 42000 000 000 000 42000 000 206192 2630 250822

Private 293900 000 000 000 293900 000 000 47346 341246

Central 163390 000 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 000 499290 000 215092 50976 765358

State 000 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 000 39900 001 39901

Central 8703 000 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 000 8703 000 82300 5212 96215

112683 000 000 000 112683 000 8501 000 121184

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111789 790389

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Grand Total 2746364 000 10000 000 2756364 000 494212 140300 3390876

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

Grand TotalThermalNuclear

RES

(MNRE)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

Total (Eastern

Region)

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

Central - Unallocated

HydroOwnership Sector

Mode wise breakup

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2650 5100

Central 40852 000 43556 000 84408 000 35708 2500 122616

Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038

State 000 000 000 000 000 000 000 10711 10711

Private 000 000 000 000 000 000 000 2939 2939

Central 3705 000 4682 000 8387 000 11655 000 20042

Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692

State 000 000 000 000 000 000 32200 3253 35453

Private 000 000 000 000 000 000 000 012 012

Central 4560 000 10969 000 15529 000 7227 000 22756

Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 5610 000 43695 000 49305 000 6849 500 56654

Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 344 344

Central 4710 000 7157 000 11867 000 9534 000 21401

Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 3210 000 4893 000 8103 000 5733 000 13836

Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 3105 000 4046 000 7151 000 9794 000 16945

Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642

11250 000 6362 000 17612 000 14000 000 31612

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 663 663

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1698 5703

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1773 5778

19

Andaman amp

Nicobar

Lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination Division

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during May-2019 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 31-05-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621

May19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 0 0 23 23 0 750 0 750 0 750 23 773

Achievement 0 0 0 0 0 0 0 0 0 0 0 0 0 474 0 474 0 503 0 503 0 977 0 977

Upto May-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 226 1176 0 1059 0 1059 637 2365 783 3785

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 494 0 494 0 904 0 904 53 1398 0 1451

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

Line

1 2 3 4 5 6

0

1 400 Barmer-Bhinmal line DC RVPNL 288

2 400 Jangaon - Tippapur DC TSTRANSCO 138

3 400 Kayathar - Thennampatty DC TANTRANSCO 48

4 220 Bareilly (400) - Pilibhit Ckt-II SC UPPTCL 39

5 220 Bhanjanagar - Aska DC OPTCL 57

6 220LILO of both Ckt of 220kV Mobha - Mangrol

line at 220kV Amod (Balanced portion)DC GETCO 46

7 220LILO of Gr Noida (400) - Noida Sec-148 line

at RC GreenDC UPPTCL 9

8 220 LILO of Hathras - Gokul at Mathura DC UPPTCL 120

9 220 Sohawal - Tanda DC UPPTCL 232

977

0

977

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During May-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 31-05-19

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during

May-201921(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 31-05-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716

May19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 0 1445 1000 2445 0 680 0 680 0 2125 1000 3125

Achievement 0 0 0 0 0 0 0 0 1000 0 0 1000 0 2385 0 2385 0 760 0 760 1000 3145 0 4145

Upto May-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 2445 3000 5445 0 1480 0 1480 3000 3925 6000 12925

Achievement 0 0 0 0 0 0 0 0 1500 0 0 1500 815 4365 0 5180 0 2065 0 2065 2315 6430 0 8745

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

As on 31-05-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1Bhadla SS (3x1500 3x500 MVA) (500 MVA ICTs- II

and III)400220 PGCIL 1000

Total of CENTRAL SECTOR 1000

2 Moradabad(Aug) (Additional TF) 400220 UPPTCL 240

3 Masauli Prayagraj (New) TF-III 400132 UPPTCL 200

4 Talaricheruvu Ss 400220 APTRANSCO 9455 Uravakonda (Aug) ICT-II 400220 APTRANSCO 5006 Jangaon ss (3x500) (ICT-I) 400220 TSTRANSCO 500

7 Chinhat Lucknow (Aug) TF-II (200-160) 220132 UPPTCL 408 Hathras (Aug)T-I(200-160) 220132 UPPTCL 409 Jaunpur (Aug) (Additional TF) 220132 UPPTCL 16010 Laukahi (Supaul new) 22013233 BSPTCL 32011 Sector- 95 Gurgaon 22033 HVPNL 10012 Alawalpur ss 22066 PSTCL 100

TOTAL STATE SECTOR 3145

GRAND TOTAL 4145

21(2)

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During May-2019

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2019-20 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination Division

Programme Achievement Ach Programme Achievement Ach

Central Sector 37545100 3290600 3141593 9547 6468500 6275642 9702

State Sector 37498600 3425800 3092392 9027 6748300 6066733 8990

PvtIPP Sector 37346200 3476700 3460217 9953 6713100 6652517 9910

PvtUTL Sector 1823100 164300 171799 10456 323600 337490 10429

Total 114213000 10357400 9866001 9526 20253500 19332382 9545

Central Sector 5661700 604200 619800 10258 990300 1104995 11158

State Sector 6680500 551500 652766 11836 1049700 1184387 11283

PvtIPP Sector 1206900 130200 121344 9320 187500 200643 10701

PvtUTL Sector 144100 12400 14009 11298 24700 25155 10184

Total 13693200 1298300 1407919 10844 2252200 2515180 11168

Central Sector 4472000 353500 365463 10338 720800 694195 9631

Total 4472000 353500 365463 10338 720800 694195 9631

Bhutan Import 621800 32500 35300 10862 50000 59270 11854

Central Sector 47678800 4248300 4126856 9714 8179600 8074832 9872

State Sector 44179100 3977300 3745158 9416 7798000 7251120 9299

Pvt Sector 40520300 3783600 3767369 9957 7248900 7215805 9954

Total 133000000 12041700 11674683 9695 23276500 22601027 9710

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Apr-19 Apr-18 Upto Apr-2019 Upto Apr-2018

975409 844377 975409 844377

22

Renewable Energy Generation

Achievement

May-2019

1 Electricity Generation (MU) Targets and Achievememts for 2019-20

All India Energy Generation During Apr-19 to May-19 (MU)

Target (2019-20)Apr-19 to May-19

Sector

Hydro

Thermal

Nuclear

202535

22522

7208

232765

193324

25152

6942

226010

0

50000

100000

150000

200000

250000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Energy Power Supply Position (Provisional) for May-2019 and during Apr-19 to May-19 23

2 Peak Power Supply Position (Provisional) for May-2019 and during Apr-19 to May-19 24

3 Energy Power Supply Position (Revised) for Apr-2019 and during Apr-19 to Apr-19 25

4 Peak Power Supply Position (Revised) for Apr-2019 and during Apr-19 to Apr-19 26

5 Notified Power cuts Restrictions on Industries during May-2019 27

6 Power Supply to Agricultural Sector during May-2019 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 154 154 0 00 271 271 0 00

दिलली Delhi 3366 3366 0 00 6065 6064 1 00

हरियजणज Haryana 4907 4907 0 00 8679 8679 0 00

दहमजचल परिश Himachal Pradesh 872 863 10 11 1654 1644 10 06

रमम कशमीि Jammu amp Kashmir 1760 1424 336 191 3364 2720 644 191

परजब Punjab 4769 4769 0 00 8475 8475 0 00

िजरसथजन Rajasthan 7120 7110 11 02 13313 13300 13 01

उतति परिश Uttar Pradesh 12742 12695 48 04 22897 22817 79 03

उततिजखड Uttarakhand 1329 1329 0 00 2449 2449 0 00

उततरी कषतर Northern Region 37020 36615 404 11 67166 66419 747 11

छततीसगढ़ Chhattisgarh 2794 2794 0 00 5765 5764 1 00

गरिजत Gujarat 11208 11208 0 00 21748 21748 0 00

मधय परिश Madhya Pradesh 6502 6502 0 00 12735 12735 0 00

महजिजषटर Maharashtra 14976 14976 0 00 29295 29294 0 00

िमन औि दिउ Daman amp Diu 222 222 0 00 443 443 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 1106 1106 0 00

गोवज Goa 404 404 0 00 801 801 0 00

पशचिमी कषतर Western Region 36658 36658 0 00 71893 71892 1 00

आनधर परिश Andhra Pradesh 6056 6048 7 01 11709 11702 7 01

तलगजनज Telangana 5318 5318 1 00 10772 10771 1 00

कनजाटक Karnataka 6702 6702 1 00 13569 13568 1 00

किल Kerala 2575 2566 9 03 4888 4878 10 02

तममल नजड Tamil Nadu 10309 10309 1 00 20031 20030 1 00

पडचिी Puducherry 271 271 1 03 517 516 1 01

लकष-दवीप Lakshadweep 4 4 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 31232 31213 19 01 61486 61465 21 00

बबहजि Bihar 3078 3078 0 00 5662 5659 3 01

िजमोिि घजटी ननगम DVC 1814 1814 0 00 3757 3755 2 01

झजिखणड Jharkhand 789 789 0 00 1505 1495 10 07

ओडडशज Odisha 2560 2560 0 00 5261 5261 0 00

पशशचम बगजल West Bengal 5115 5115 0 00 9920 9897 23 02

मसशककम Sikkim 36 36 0 00 78 78 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 58 54 4 67

परवी कषतर Eastern Region 13391 13391 0 00 26182 26144 38 01

अरणजचल परिश Arunachal Pradesh 64 64 0 06 127 126 1 06

असम Assam 819 738 81 99 1573 1434 139 88

मणणपि Manipur 73 72 1 07 135 134 2 12

मघजलय Meghalaya 167 159 8 50 336 318 18 55

ममज़ोिम Mizoram 55 55 0 07 100 99 1 08

नजगजलड Nagaland 65 64 1 08 124 123 1 08

बिपिज Tripura 173 170 2 14 292 288 4 13

उततर-परवी कषतर North-Eastern Region 1416 1323 93 66 2686 2521 165 62

समपणण भारत All India 119717 119200 517 04 229413 228441 972 04

Note Power Supply Position Report has been compiled based on the data furnished by State Utilities Electricity Departments

23

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 356 356 0 00 356 356 0 00

दिलली Delhi 6461 6461 0 00 6461 6461 0 00

हरियजणज Haryana 8874 8874 0 00 8874 8874 0 00

दहमजचल परिश Himachal Pradesh 1480 1480 0 00 1480 1480 0 00

रमम कशमीि Jammu amp Kashmir 2426 2426 0 00 2885 2426 459 159

परजब Punjab 8802 8802 0 00 8802 8802 0 00

िजरसथजन Rajasthan 11791 11791 0 00 11791 11791 0 00

उतति परिश Uttar Pradesh 22487 22057 430 19 22487 22057 430 19

उततिजखड Uttarakhand 2155 2155 0 00 2155 2155 0 00

उततरी कषतर Northern Region 60987 60078 909 15 60987 60078 909 15

छततीसगढ़ Chhattisgarh 4504 4504 0 00 4596 4574 22 05

गरिजत Gujarat 18094 18094 0 00 18094 18094 0 00

मधय परिश Madhya Pradesh 10145 10131 14 01 10145 10131 14 01

महजिजषटर Maharashtra 23621 23613 8 00 23621 23613 8 00

िमन औि दिउ Daman amp Diu 344 344 0 01 344 344 0 01

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 818 818 0 00

गोवज Goa 554 554 0 00 594 594 0 00

पशचिमी कषतर Western Region 57113 57093 20 00 57113 57093 20 00

आनधर परिश Andhra Pradesh 9854 9854 0 00 9854 9854 0 00

तलगजनज Telangana 8684 8684 0 00 10269 10202 67 07

कनजाटक Karnataka 12158 12158 0 00 12700 12688 12 01

किल Kerala 4286 4205 81 19 4316 4300 16 04

तममल नजड Tamil Nadu 15584 15522 62 04 15680 15659 21 01

पडचिी Puducherry 453 442 11 24 453 444 9 20

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 47477 47465 12 00 49218 49103 115 02

बबहजि Bihar 5481 5481 0 00 5481 5481 0 00

िजमोिि घजटी ननगम DVC 3048 3048 0 00 3048 3048 0 00

झजिखणड Jharkhand 1330 1330 0 00 1330 1330 0 00

ओडडशज Odisha 4736 4736 0 00 5142 5140 3 01

पशशचम बगजल West Bengal 9335 9335 0 00 9335 9335 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23558 23558 0 00 23558 23558 0 00

अरणजचल परिश Arunachal Pradesh 140 138 2 12 140 138 2 12

असम Assam 1753 1673 80 46 1910 1673 237 124

मणणपि Manipur 183 181 2 09 197 188 9 48

मघजलय Meghalaya 329 325 4 12 337 337 0 00

ममज़ोिम Mizoram 102 100 2 20 116 113 3 28

नजगजलड Nagaland 130 128 2 14 157 131 27 169

बिपिज Tripura 297 295 1 05 297 295 1 05

उततर-परवी कषतर North-Eastern Region 2758 2674 84 31 2848 2780 68 24

समपणण भारत All India 183513 182533 981 05 183513 182533 981 05

Note Power Supply Position Report has been compiled based on the data furnished by State Utilities Electricity Departments 24

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -मई2019 April2019 to May2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and supply

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateमई 2019 May2019

मजग की पनता म कमी Demand not Met

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 781 781 0 00 781 781 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3706 3706 0 00 3706 3706 0 00

िजरसथजन Rajasthan 6192 6190 2 00 6192 6190 2 00

उतति परिश Uttar Pradesh 10154 10123 32 03 10154 10123 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30147 29804 343 11 30147 29804 343 11

छततीसगढ़ Chhattisgarh 2972 2971 1 00 2972 2971 1 00

गरिजत Gujarat 10540 10540 0 00 10540 10540 0 00

मधय परिश Madhya Pradesh 6233 6233 0 00 6233 6233 0 00

महजिजषटर Maharashtra 14319 14319 0 00 14319 14319 0 00

िमन औि दिउ Daman amp Diu 221 221 0 00 221 221 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 554 554 0 00 554 554 0 00

गोवज Goa 397 397 0 00 397 397 0 00

पशचिमी कषतर Western Region 35235 35234 1 00 35235 35234 1 00

आनधर परिश Andhra Pradesh 5653 5653 0 00 5653 5653 0 00

तलगजनज Telangana 5453 5453 0 00 5453 5453 0 00

कनजाटक Karnataka 6867 6867 0 00 6867 6867 0 00

किल Kerala 2313 2312 2 01 2313 2312 2 01

तममल नजड Tamil Nadu 9721 9721 0 00 9721 9721 0 00

पडचिी Puducherry 246 246 0 00 246 246 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 30254 30252 2 00 30254 30252 2 00

बबहजि Bihar 2584 2581 3 01 2584 2581 3 01

िजमोिि घजटी ननगम DVC 1944 1942 2 01 1944 1942 2 01

झजिखणड Jharkhand 716 706 10 14 716 706 10 14

ओडडशज Odisha 2701 2701 0 00 2701 2701 0 00

पशशचम बगजल West Bengal 4805 4782 23 05 4805 4782 23 05

मसशककम Sikkim 42 42 0 00 42 42 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12792 12754 38 03 12792 12754 38 03

अरणजचल परिश Arunachal Pradesh 62 62 0 06 62 62 0 06

असम Assam 754 696 58 77 754 696 58 77

मणणपि Manipur 62 61 1 17 62 61 1 17

मघजलय Meghalaya 169 159 10 60 169 159 10 60

ममज़ोिम Mizoram 45 44 0 10 45 44 0 10

नजगजलड Nagaland 59 58 0 08 59 58 0 08

बिपिज Tripura 119 117 2 13 119 117 2 13

उततर-परवी कषतर North-Eastern Region 1270 1198 72 57 1270 1198 72 57

समपणण भारत All India 109696 109241 455 04 109696 109241 455 04

Note The revised data for March 2019 is not avaliable

Energy not Supplied Energy not Supplied

अपरल 2019 April2019 अपरल 2019 April2019 to April 2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2885 2308 577 200 2885 2308 577 200

परजब Punjab 7087 7087 0 00 7087 7087 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 47779 47210 569 12 47779 47210 569 12

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9179 9160 19 02 9179 9160 19 02

तलगजनज Telangana 10269 10202 67 07 10269 10202 67 07

कनजाटक Karnataka 12700 12688 12 01 12700 12688 12 01

किल Kerala 4316 4300 16 04 4316 4300 16 04

तममल नजड Tamil Nadu 15680 15659 21 01 15680 15659 21 01

पडचिी Puducherry 444 444 0 00 444 444 0 00

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49218 49103 115 02 49218 49103 115 02

बबहजि Bihar 5157 5155 2 00 5157 5155 2 00

िजमोिि घजटी ननगम DVC 3014 3014 0 00 3014 3014 0 00

झजिखणड Jharkhand 1326 1325 1 00 1326 1325 1 00

ओडडशज Odisha 5142 5140 3 01 5142 5140 3 01

पशशचम बगजल West Bengal 8745 8699 46 05 8745 8699 46 05

मसशककम Sikkim 98 98 0 00 98 98 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22415 22378 37 02 22415 22378 37 02

अरणजचल परिश Arunachal Pradesh 139 136 3 21 139 136 3 21

असम Assam 1910 1667 242 127 1910 1667 242 127

मणणपि Manipur 197 188 9 48 197 188 9 48

मघजलय Meghalaya 337 337 0 00 337 337 0 00

ममज़ोिम Mizoram 116 113 3 28 116 113 3 28

नजगजलड Nagaland 157 131 27 169 157 131 27 169

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177424 176810 613 03 177424 176810 613 03

Note The revised data for March 2019 is not avaliable 26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateअपरल 2019 April2019 अपरल 2019 April2019 to April 2019

File NoCEA-CH-14-1142018-Coordination Division

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

मई 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during May2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

N

o No

tified

Cuts

N

o No

tified

Cuts

File NoCEA-CH-14-1142018-Coordination Division

मई2019May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0910 hrsday 0811 - 910 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 403 hrsday 0347 - 403 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 2214 hrsday 2157 - 2214 hrsday

उततराखड Uttarakhand Data not received 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-957 hrs day

Three-Phase (Mixed) Supply - 2346 hrs day

Three-Phase Supply(Irrigation)- 0953 - 0957 hrs day Three-

Phase (Mixed) Supply - 2334 - 2346 hrs day

महजिजषटर Maharashtra Three-Phase Supply - 9 hrs day Three-Phase Supply - 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

मई 2019 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during May2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to May-2019 20070450 2493722 63763 22627934 678000 4539922 7835904 35681760

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 7835904 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

7835904

Total Installed Capacity 35687160 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-22 (Up to

Mar2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

Plan Period

2017-22 (Up to

May-19)

6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58732 21173 181240 11734 163456 1010 176200 158886 225204 30768 414858

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Progress of Transmission Sector in the Country up to May 2019

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on May19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

May 19)

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during May 2019

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 20525 925681234952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

(i) CAPACITY ADDTION TARGETS AND ACHIEVEMENTS IN THE 12TH PLAN (Figures in MW)

SECTOR THERMAL HYDRO NUCLEAR TOTAL

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453

STATE 13922 22201 1608 2276 0 0 15530 24477

PRIVATE 43540 53661 3285 619 0 0 46825 54280

ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209

(ii) CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (Figures in MW)

Thermal Hydro Nuclear Total

Target Ach Target Ach Target Ach Target Ach

Central 4880 3170 800 390 500 0 6180 3560

State 3546 1760 300 200 0 0 3846 1960

Private 2940 3780 205 205 0 0 3145 3985

Total 11366 8710 1305 795 500 0 13171 9505

(iii) CAPACITY ADDITION ACHIEVEMENT FOR 2018-19 (Figures in MW)

Thermal Hydro Nuclear Total

Target Ach Target Ach Target Ach Target Ach

Central 2760 1960 710 110 0 0 3470 2070

State 4506 2850 130 30 0 0 4636 2880

Private 0 972 0 0 0 0 0 972

Total 7266 5782 840 140 0 0 8106 5922

12

1 Capacity Addtion Targets and Achievements in the 12th Plan 2017-18 and 2018-19

File NoCEA-CH-14-1142018-Coordination Division

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 6040 660 0 1160 0 -1160

State 425615 0 0 660 0 -660

Private 0 0 0 0 0 0

Total 1029615 660 0 1820 0 -1820

Central 600 0 0 0 0 0

State 21099 0 0 0 0 0

Private 379 0 0 0 0 0

Total 118999 0 0 0 0 0

Nuclear Central 700 0 0 0 0 0

Central 7340 660 0 1160 0 -1160

State 446714 0 0 660 0 -660

Private 379 0 0 0 0 0

Total 1218614 660 0 1820 0 -1820

Electricity Generation (MU) Targets and Achievements for 2016-17

13

2 Capacity Addition Targets Achievements During May-2019

Schemes Sector

Target 2019-20

Apr-19 to May-19May-19

Hydro

All India

Capacity Addition TargetsAchievements during the Month of May-2019

Thermal1

82

0

0 0

18

20

0 0 0 0

0

200

400

600

800

1000

1200

1400

1600

1800

2000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2019-20Target Achievement

0

100

200

300

400

500

600

700

Thermal Hydro Nuclear Total

660

0 0

660

0 0 00

MW

Target Achievement

File NoCEA-CH-14-1142018-Coordination Division

Coal Lignite Gas Diesel Total

State 1634400 25000 287920 000 1947320 000 869755 70056 2887131

Private 2168083 108000 55800 000 2331883 000 251400 1333187 3916470

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Sub Total 5036020 158000 578126 000 5772146 162000 1970777 1441143 9346066

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2204808 6245075

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Sub Total 7280862 154000 1080649 000 8515511 184000 754750 2326226 11780487

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3781156 5553186

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Sub Total 4304202 314000 647366 56158 5321726 332000 1177483 3894034 10725243

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111789 790389

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Sub Total 2746364 000 10000 000 2756364 000 494212 140300 3390876

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Sub Total 77002 000 177581 3600 258183 000 142700 32429 433311

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Sub Total 000 000 000 4005 4005 000 000 1773 5778

State 6407650 129000 711871 36393 7284913 000 2987880 234893 10507686

Private 7468800 183000 1058060 27370 8737230 000 339400 7437781 16514411

Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663

Total 19444450 626000 2493722 63763 22627934 678000 4539922 7835904 35681760

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30042019 is given below (in MW)

459415 3581588 2867921 7835904

A 0 MW

B May 2019 0 MW

C

May 2019 0 MW

D Net Capacity Added during May 2019 A-B-C 0 MW

Sector wise breakup of RES capacity as shown is provisional

RES

(MNRE)

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31052019)

(UTILITIES)

Region Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30042019

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

CapacityBM PowerCogen Waste to Energy

913150 13830

Capacity Added during May 2019

Capacity Retired during

Capacity removed due to change

from Conventional to RES during

Share of installed capacity of BBMB Stations is included in state sector of partner states

File NoCEA-CH-14-1142018-Coordination Division

Coal Lignite Gas Diesel Total

State 13500 000 180040 000 193540 000 000 000 193540

Private 86922 000 10800 000 97722 000 000 17889 115611

Central 311272 000 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 000 211541 000 623235 10283 72309 17889 723716

State 272000 000 15000 000 287000 000 110282 6930 404212

Private 408078 000 000 000 408078 000 20000 34512 462590

Central 129472 000 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 000 68561 000 878112 10094 196652 41942 1126799

State 000 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 000 99200 62668 161868

Central 18340 000 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 000 6201 000 24541 2895 291048 88329 406813

State 000 000 17500 000 17500 000 123000 13003 153503

Private 000 000 000 000 000 000 000 6483 6483

Central 50639 000 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 000 30407 000 81047 6798 232188 19486 339519

State 176000 000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 000 511550 000 28800 115462 655812

Central 85458 000 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244

State 626000 25000 60380 000 711380 000 109618 2385 823383

Private 280200 108000 000 000 388200 000 10400 751322 1149922

Central 95625 25000 22110 000 142735 55674 73901 34400 306710

Sub-Total 1001825 158000 82490 000 1242315 55674 193919 788107 2280015

State 546900 000 000 000 546900 000 72410 2510 621820

Private 871433 000 000 000 871433 000 84200 288760 1244393

Central 379639 000 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 000 54949 000 1852921 28948 336863 294270 2513002

State 000 000 000 000 000 000 125215 6787 132002

Private 9900 000 45000 000 54900 000 8800 52620 116320

Central 34324 000 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 000 51966 000 96190 3124 181569 59407 340290

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 3471 3471

Central 3815 000 1503 000 5317 801 10171 000 16289

Sub-Total 3815 000 1503 000 5317 801 10171 3471 19760

124953 000 29105 000 154058 23703 75145 000 252907

State 1634400 25000 287920 000 1947320 000 869755 70056 2887131

Private 2168083 108000 55800 000 2331883 000 251400 1333187 3916470

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Grand Total 5036020 158000 578126 000 5772146 162000 1970777 1441143 9346066

Jammu amp Kashmir

Punjab

Rajasthan

Uttar Pradesh

Uttarakhand

Chandigarh

Central - Unallocated

Total (Northern

Region)

HydroRES

(MNRE)

Delhi

Haryana

Himachal Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31052019)

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 005 005

Private 000 000 4800 000 4800 000 000 392 5192

Central 46959 000 1967 000 48926 2600 000 000 51526

Sub-Total 46959 000 6767 000 53726 2600 000 397 56723

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 1447 1447

Central 14141 000 4334 000 18475 700 000 000 19175

Sub-Total 14141 000 4334 000 18475 700 000 1447 20622

State 371000 104000 217782 000 692782 000 77200 6470 776452

Private 726567 50000 396000 000 1172567 000 000 841512 2014079

Central 324243 000 42400 000 366643 55900 000 24330 446873

Sub-Total 1421810 154000 656182 000 2231992 55900 77200 872312 3237404

State 540000 000 000 000 540000 000 170366 8396 718762

Private 617400 000 10000 000 627400 000 000 428040 1055440

Central 334238 000 25700 000 359938 27300 152000 30000 569238

Sub-Total 1491638 000 35700 000 1527338 27300 322366 466436 2343440

State 228000 000 000 000 228000 000 12000 1105 241105

Private 885000 000 000 000 885000 000 000 52430 937430

Central 211075 000 000 000 211075 4800 10000 000 225875

Sub-Total 1324075 000 000 000 1324075 4800 22000 53535 1404410

State 1017000 000 67200 000 1084200 000 285084 38813 1408097

Private 1245600 000 56800 000 1302400 000 48100 880441 2230941

Central 466780 000 227273 000 694053 69000 000 12300 775353

Sub-Total 2729380 000 351273 000 3080653 69000 333184 931553 4414390

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 546 546

Central 19560 000 6634 000 26194 900 000 000 27094

Sub-Total 19560 000 6634 000 26194 900 000 546 27640

233300 000 19759 000 253059 22800 000 000 275859

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2204808 6245075

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Grand Total 7280862 154000 1080649 000 8515511 184000 754750 2326226 11780487

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

ThermalNuclear Hydro

RES

(MNRE)

State Ownership Sector

Mode wise breakup

Grand Total

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 501000 000 23540 000 524540 000 167360 5618 697518

Private 387388 000 381318 3680 772386 000 000 743901 1516287

Central 154683 12773 000 000 167456 12727 000 25000 205183

Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 774519 2418988

State 558250 000 000 000 558250 000 247993 4122 810365

Private 83945 000 83182 000 167127 000 000 394315 561442

Central 180685 14927 000 000 195612 14873 000 1000 211485

Sub-Total 822880 14927 83182 000 920989 14873 247993 399437 1583292

State 502000 000 000 12792 514792 000 358660 19389 892841

Private 195850 000 000 2520 198370 000 000 1369720 1568090

Central 242780 40140 000 000 282920 69800 000 000 352720

Sub-Total 940630 40140 000 15312 996082 69800 358660 1389108 2813650

State 000 000 000 15996 15996 000 185650 17290 218936

Private 61500 000 17400 000 78900 000 000 19021 97921

Central 86142 28180 35958 000 150280 36200 000 5000 191480

Sub-Total 147642 28180 53358 15996 245176 36200 185650 41311 508337

State 432000 000 52408 000 484408 000 217820 12270 714498

Private 458767 25000 50310 21170 555247 000 000 1253885 1809132

Central 302532 136420 000 000 438952 144800 000 23190 606942

Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1289345 3130572

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 000 10000 000 000 10000 000 000 000 10000

Sub-Total 000 10000 000 000 10000 000 000 000 10000

State 000 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 000 314 314

Central 14080 10760 000 000 24840 8600 000 000 33440

Sub-Total 14080 10760 3250 000 28090 8600 000 314 37004

142600 35800 000 000 178400 45000 000 000 223400

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3781156 5553186

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Grand Total 4304202 314000 647366 56158 5321726 332000 1177483 3894034 10725243

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Andhra Pradesh

Telangana

Karnataka

Total (Southern

Region)

Tamil Nadu

NLC

Puducherry

Central - Unallocated

Kerala

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 7070 7070

Private 28100 000 000 000 28100 000 000 25545 53645

Central 384933 000 000 000 384933 000 11000 000 395932

Sub-Total 413033 000 000 000 413033 000 11000 32615 456647

State 42000 000 000 000 42000 000 13000 405 55405

Private 73000 000 000 000 73000 000 000 3647 76647

Central 39374 000 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 000 154374 000 19100 4052 177526

State 540000 000 10000 000 550000 000 98600 12195 660795

Private 243700 000 000 000 243700 000 000 35250 278950

Central 76077 000 000 000 76077 000 41000 000 117077

Sub-Total 859777 000 10000 000 869777 000 139600 47445 1056822

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 698504 000 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 000 698504 000 18620 000 717124

State 42000 000 000 000 42000 000 206192 2630 250822

Private 293900 000 000 000 293900 000 000 47346 341246

Central 163390 000 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 000 499290 000 215092 50976 765358

State 000 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 000 39900 001 39901

Central 8703 000 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 000 8703 000 82300 5212 96215

112683 000 000 000 112683 000 8501 000 121184

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111789 790389

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Grand Total 2746364 000 10000 000 2756364 000 494212 140300 3390876

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

Grand TotalThermalNuclear

RES

(MNRE)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

Total (Eastern

Region)

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

Central - Unallocated

HydroOwnership Sector

Mode wise breakup

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2650 5100

Central 40852 000 43556 000 84408 000 35708 2500 122616

Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038

State 000 000 000 000 000 000 000 10711 10711

Private 000 000 000 000 000 000 000 2939 2939

Central 3705 000 4682 000 8387 000 11655 000 20042

Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692

State 000 000 000 000 000 000 32200 3253 35453

Private 000 000 000 000 000 000 000 012 012

Central 4560 000 10969 000 15529 000 7227 000 22756

Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 5610 000 43695 000 49305 000 6849 500 56654

Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 344 344

Central 4710 000 7157 000 11867 000 9534 000 21401

Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 3210 000 4893 000 8103 000 5733 000 13836

Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 3105 000 4046 000 7151 000 9794 000 16945

Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642

11250 000 6362 000 17612 000 14000 000 31612

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 663 663

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1698 5703

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1773 5778

19

Andaman amp

Nicobar

Lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination Division

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during May-2019 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 31-05-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621

May19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 0 0 23 23 0 750 0 750 0 750 23 773

Achievement 0 0 0 0 0 0 0 0 0 0 0 0 0 474 0 474 0 503 0 503 0 977 0 977

Upto May-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 226 1176 0 1059 0 1059 637 2365 783 3785

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 494 0 494 0 904 0 904 53 1398 0 1451

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

Line

1 2 3 4 5 6

0

1 400 Barmer-Bhinmal line DC RVPNL 288

2 400 Jangaon - Tippapur DC TSTRANSCO 138

3 400 Kayathar - Thennampatty DC TANTRANSCO 48

4 220 Bareilly (400) - Pilibhit Ckt-II SC UPPTCL 39

5 220 Bhanjanagar - Aska DC OPTCL 57

6 220LILO of both Ckt of 220kV Mobha - Mangrol

line at 220kV Amod (Balanced portion)DC GETCO 46

7 220LILO of Gr Noida (400) - Noida Sec-148 line

at RC GreenDC UPPTCL 9

8 220 LILO of Hathras - Gokul at Mathura DC UPPTCL 120

9 220 Sohawal - Tanda DC UPPTCL 232

977

0

977

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During May-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 31-05-19

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during

May-201921(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 31-05-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716

May19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 0 1445 1000 2445 0 680 0 680 0 2125 1000 3125

Achievement 0 0 0 0 0 0 0 0 1000 0 0 1000 0 2385 0 2385 0 760 0 760 1000 3145 0 4145

Upto May-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 2445 3000 5445 0 1480 0 1480 3000 3925 6000 12925

Achievement 0 0 0 0 0 0 0 0 1500 0 0 1500 815 4365 0 5180 0 2065 0 2065 2315 6430 0 8745

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

As on 31-05-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1Bhadla SS (3x1500 3x500 MVA) (500 MVA ICTs- II

and III)400220 PGCIL 1000

Total of CENTRAL SECTOR 1000

2 Moradabad(Aug) (Additional TF) 400220 UPPTCL 240

3 Masauli Prayagraj (New) TF-III 400132 UPPTCL 200

4 Talaricheruvu Ss 400220 APTRANSCO 9455 Uravakonda (Aug) ICT-II 400220 APTRANSCO 5006 Jangaon ss (3x500) (ICT-I) 400220 TSTRANSCO 500

7 Chinhat Lucknow (Aug) TF-II (200-160) 220132 UPPTCL 408 Hathras (Aug)T-I(200-160) 220132 UPPTCL 409 Jaunpur (Aug) (Additional TF) 220132 UPPTCL 16010 Laukahi (Supaul new) 22013233 BSPTCL 32011 Sector- 95 Gurgaon 22033 HVPNL 10012 Alawalpur ss 22066 PSTCL 100

TOTAL STATE SECTOR 3145

GRAND TOTAL 4145

21(2)

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During May-2019

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2019-20 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination Division

Programme Achievement Ach Programme Achievement Ach

Central Sector 37545100 3290600 3141593 9547 6468500 6275642 9702

State Sector 37498600 3425800 3092392 9027 6748300 6066733 8990

PvtIPP Sector 37346200 3476700 3460217 9953 6713100 6652517 9910

PvtUTL Sector 1823100 164300 171799 10456 323600 337490 10429

Total 114213000 10357400 9866001 9526 20253500 19332382 9545

Central Sector 5661700 604200 619800 10258 990300 1104995 11158

State Sector 6680500 551500 652766 11836 1049700 1184387 11283

PvtIPP Sector 1206900 130200 121344 9320 187500 200643 10701

PvtUTL Sector 144100 12400 14009 11298 24700 25155 10184

Total 13693200 1298300 1407919 10844 2252200 2515180 11168

Central Sector 4472000 353500 365463 10338 720800 694195 9631

Total 4472000 353500 365463 10338 720800 694195 9631

Bhutan Import 621800 32500 35300 10862 50000 59270 11854

Central Sector 47678800 4248300 4126856 9714 8179600 8074832 9872

State Sector 44179100 3977300 3745158 9416 7798000 7251120 9299

Pvt Sector 40520300 3783600 3767369 9957 7248900 7215805 9954

Total 133000000 12041700 11674683 9695 23276500 22601027 9710

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Apr-19 Apr-18 Upto Apr-2019 Upto Apr-2018

975409 844377 975409 844377

22

Renewable Energy Generation

Achievement

May-2019

1 Electricity Generation (MU) Targets and Achievememts for 2019-20

All India Energy Generation During Apr-19 to May-19 (MU)

Target (2019-20)Apr-19 to May-19

Sector

Hydro

Thermal

Nuclear

202535

22522

7208

232765

193324

25152

6942

226010

0

50000

100000

150000

200000

250000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Energy Power Supply Position (Provisional) for May-2019 and during Apr-19 to May-19 23

2 Peak Power Supply Position (Provisional) for May-2019 and during Apr-19 to May-19 24

3 Energy Power Supply Position (Revised) for Apr-2019 and during Apr-19 to Apr-19 25

4 Peak Power Supply Position (Revised) for Apr-2019 and during Apr-19 to Apr-19 26

5 Notified Power cuts Restrictions on Industries during May-2019 27

6 Power Supply to Agricultural Sector during May-2019 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 154 154 0 00 271 271 0 00

दिलली Delhi 3366 3366 0 00 6065 6064 1 00

हरियजणज Haryana 4907 4907 0 00 8679 8679 0 00

दहमजचल परिश Himachal Pradesh 872 863 10 11 1654 1644 10 06

रमम कशमीि Jammu amp Kashmir 1760 1424 336 191 3364 2720 644 191

परजब Punjab 4769 4769 0 00 8475 8475 0 00

िजरसथजन Rajasthan 7120 7110 11 02 13313 13300 13 01

उतति परिश Uttar Pradesh 12742 12695 48 04 22897 22817 79 03

उततिजखड Uttarakhand 1329 1329 0 00 2449 2449 0 00

उततरी कषतर Northern Region 37020 36615 404 11 67166 66419 747 11

छततीसगढ़ Chhattisgarh 2794 2794 0 00 5765 5764 1 00

गरिजत Gujarat 11208 11208 0 00 21748 21748 0 00

मधय परिश Madhya Pradesh 6502 6502 0 00 12735 12735 0 00

महजिजषटर Maharashtra 14976 14976 0 00 29295 29294 0 00

िमन औि दिउ Daman amp Diu 222 222 0 00 443 443 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 1106 1106 0 00

गोवज Goa 404 404 0 00 801 801 0 00

पशचिमी कषतर Western Region 36658 36658 0 00 71893 71892 1 00

आनधर परिश Andhra Pradesh 6056 6048 7 01 11709 11702 7 01

तलगजनज Telangana 5318 5318 1 00 10772 10771 1 00

कनजाटक Karnataka 6702 6702 1 00 13569 13568 1 00

किल Kerala 2575 2566 9 03 4888 4878 10 02

तममल नजड Tamil Nadu 10309 10309 1 00 20031 20030 1 00

पडचिी Puducherry 271 271 1 03 517 516 1 01

लकष-दवीप Lakshadweep 4 4 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 31232 31213 19 01 61486 61465 21 00

बबहजि Bihar 3078 3078 0 00 5662 5659 3 01

िजमोिि घजटी ननगम DVC 1814 1814 0 00 3757 3755 2 01

झजिखणड Jharkhand 789 789 0 00 1505 1495 10 07

ओडडशज Odisha 2560 2560 0 00 5261 5261 0 00

पशशचम बगजल West Bengal 5115 5115 0 00 9920 9897 23 02

मसशककम Sikkim 36 36 0 00 78 78 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 58 54 4 67

परवी कषतर Eastern Region 13391 13391 0 00 26182 26144 38 01

अरणजचल परिश Arunachal Pradesh 64 64 0 06 127 126 1 06

असम Assam 819 738 81 99 1573 1434 139 88

मणणपि Manipur 73 72 1 07 135 134 2 12

मघजलय Meghalaya 167 159 8 50 336 318 18 55

ममज़ोिम Mizoram 55 55 0 07 100 99 1 08

नजगजलड Nagaland 65 64 1 08 124 123 1 08

बिपिज Tripura 173 170 2 14 292 288 4 13

उततर-परवी कषतर North-Eastern Region 1416 1323 93 66 2686 2521 165 62

समपणण भारत All India 119717 119200 517 04 229413 228441 972 04

Note Power Supply Position Report has been compiled based on the data furnished by State Utilities Electricity Departments

23

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 356 356 0 00 356 356 0 00

दिलली Delhi 6461 6461 0 00 6461 6461 0 00

हरियजणज Haryana 8874 8874 0 00 8874 8874 0 00

दहमजचल परिश Himachal Pradesh 1480 1480 0 00 1480 1480 0 00

रमम कशमीि Jammu amp Kashmir 2426 2426 0 00 2885 2426 459 159

परजब Punjab 8802 8802 0 00 8802 8802 0 00

िजरसथजन Rajasthan 11791 11791 0 00 11791 11791 0 00

उतति परिश Uttar Pradesh 22487 22057 430 19 22487 22057 430 19

उततिजखड Uttarakhand 2155 2155 0 00 2155 2155 0 00

उततरी कषतर Northern Region 60987 60078 909 15 60987 60078 909 15

छततीसगढ़ Chhattisgarh 4504 4504 0 00 4596 4574 22 05

गरिजत Gujarat 18094 18094 0 00 18094 18094 0 00

मधय परिश Madhya Pradesh 10145 10131 14 01 10145 10131 14 01

महजिजषटर Maharashtra 23621 23613 8 00 23621 23613 8 00

िमन औि दिउ Daman amp Diu 344 344 0 01 344 344 0 01

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 818 818 0 00

गोवज Goa 554 554 0 00 594 594 0 00

पशचिमी कषतर Western Region 57113 57093 20 00 57113 57093 20 00

आनधर परिश Andhra Pradesh 9854 9854 0 00 9854 9854 0 00

तलगजनज Telangana 8684 8684 0 00 10269 10202 67 07

कनजाटक Karnataka 12158 12158 0 00 12700 12688 12 01

किल Kerala 4286 4205 81 19 4316 4300 16 04

तममल नजड Tamil Nadu 15584 15522 62 04 15680 15659 21 01

पडचिी Puducherry 453 442 11 24 453 444 9 20

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 47477 47465 12 00 49218 49103 115 02

बबहजि Bihar 5481 5481 0 00 5481 5481 0 00

िजमोिि घजटी ननगम DVC 3048 3048 0 00 3048 3048 0 00

झजिखणड Jharkhand 1330 1330 0 00 1330 1330 0 00

ओडडशज Odisha 4736 4736 0 00 5142 5140 3 01

पशशचम बगजल West Bengal 9335 9335 0 00 9335 9335 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23558 23558 0 00 23558 23558 0 00

अरणजचल परिश Arunachal Pradesh 140 138 2 12 140 138 2 12

असम Assam 1753 1673 80 46 1910 1673 237 124

मणणपि Manipur 183 181 2 09 197 188 9 48

मघजलय Meghalaya 329 325 4 12 337 337 0 00

ममज़ोिम Mizoram 102 100 2 20 116 113 3 28

नजगजलड Nagaland 130 128 2 14 157 131 27 169

बिपिज Tripura 297 295 1 05 297 295 1 05

उततर-परवी कषतर North-Eastern Region 2758 2674 84 31 2848 2780 68 24

समपणण भारत All India 183513 182533 981 05 183513 182533 981 05

Note Power Supply Position Report has been compiled based on the data furnished by State Utilities Electricity Departments 24

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -मई2019 April2019 to May2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and supply

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateमई 2019 May2019

मजग की पनता म कमी Demand not Met

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 781 781 0 00 781 781 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3706 3706 0 00 3706 3706 0 00

िजरसथजन Rajasthan 6192 6190 2 00 6192 6190 2 00

उतति परिश Uttar Pradesh 10154 10123 32 03 10154 10123 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30147 29804 343 11 30147 29804 343 11

छततीसगढ़ Chhattisgarh 2972 2971 1 00 2972 2971 1 00

गरिजत Gujarat 10540 10540 0 00 10540 10540 0 00

मधय परिश Madhya Pradesh 6233 6233 0 00 6233 6233 0 00

महजिजषटर Maharashtra 14319 14319 0 00 14319 14319 0 00

िमन औि दिउ Daman amp Diu 221 221 0 00 221 221 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 554 554 0 00 554 554 0 00

गोवज Goa 397 397 0 00 397 397 0 00

पशचिमी कषतर Western Region 35235 35234 1 00 35235 35234 1 00

आनधर परिश Andhra Pradesh 5653 5653 0 00 5653 5653 0 00

तलगजनज Telangana 5453 5453 0 00 5453 5453 0 00

कनजाटक Karnataka 6867 6867 0 00 6867 6867 0 00

किल Kerala 2313 2312 2 01 2313 2312 2 01

तममल नजड Tamil Nadu 9721 9721 0 00 9721 9721 0 00

पडचिी Puducherry 246 246 0 00 246 246 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 30254 30252 2 00 30254 30252 2 00

बबहजि Bihar 2584 2581 3 01 2584 2581 3 01

िजमोिि घजटी ननगम DVC 1944 1942 2 01 1944 1942 2 01

झजिखणड Jharkhand 716 706 10 14 716 706 10 14

ओडडशज Odisha 2701 2701 0 00 2701 2701 0 00

पशशचम बगजल West Bengal 4805 4782 23 05 4805 4782 23 05

मसशककम Sikkim 42 42 0 00 42 42 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12792 12754 38 03 12792 12754 38 03

अरणजचल परिश Arunachal Pradesh 62 62 0 06 62 62 0 06

असम Assam 754 696 58 77 754 696 58 77

मणणपि Manipur 62 61 1 17 62 61 1 17

मघजलय Meghalaya 169 159 10 60 169 159 10 60

ममज़ोिम Mizoram 45 44 0 10 45 44 0 10

नजगजलड Nagaland 59 58 0 08 59 58 0 08

बिपिज Tripura 119 117 2 13 119 117 2 13

उततर-परवी कषतर North-Eastern Region 1270 1198 72 57 1270 1198 72 57

समपणण भारत All India 109696 109241 455 04 109696 109241 455 04

Note The revised data for March 2019 is not avaliable

Energy not Supplied Energy not Supplied

अपरल 2019 April2019 अपरल 2019 April2019 to April 2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2885 2308 577 200 2885 2308 577 200

परजब Punjab 7087 7087 0 00 7087 7087 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 47779 47210 569 12 47779 47210 569 12

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9179 9160 19 02 9179 9160 19 02

तलगजनज Telangana 10269 10202 67 07 10269 10202 67 07

कनजाटक Karnataka 12700 12688 12 01 12700 12688 12 01

किल Kerala 4316 4300 16 04 4316 4300 16 04

तममल नजड Tamil Nadu 15680 15659 21 01 15680 15659 21 01

पडचिी Puducherry 444 444 0 00 444 444 0 00

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49218 49103 115 02 49218 49103 115 02

बबहजि Bihar 5157 5155 2 00 5157 5155 2 00

िजमोिि घजटी ननगम DVC 3014 3014 0 00 3014 3014 0 00

झजिखणड Jharkhand 1326 1325 1 00 1326 1325 1 00

ओडडशज Odisha 5142 5140 3 01 5142 5140 3 01

पशशचम बगजल West Bengal 8745 8699 46 05 8745 8699 46 05

मसशककम Sikkim 98 98 0 00 98 98 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22415 22378 37 02 22415 22378 37 02

अरणजचल परिश Arunachal Pradesh 139 136 3 21 139 136 3 21

असम Assam 1910 1667 242 127 1910 1667 242 127

मणणपि Manipur 197 188 9 48 197 188 9 48

मघजलय Meghalaya 337 337 0 00 337 337 0 00

ममज़ोिम Mizoram 116 113 3 28 116 113 3 28

नजगजलड Nagaland 157 131 27 169 157 131 27 169

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177424 176810 613 03 177424 176810 613 03

Note The revised data for March 2019 is not avaliable 26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateअपरल 2019 April2019 अपरल 2019 April2019 to April 2019

File NoCEA-CH-14-1142018-Coordination Division

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

मई 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during May2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

N

o No

tified

Cuts

N

o No

tified

Cuts

File NoCEA-CH-14-1142018-Coordination Division

मई2019May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0910 hrsday 0811 - 910 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 403 hrsday 0347 - 403 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 2214 hrsday 2157 - 2214 hrsday

उततराखड Uttarakhand Data not received 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-957 hrs day

Three-Phase (Mixed) Supply - 2346 hrs day

Three-Phase Supply(Irrigation)- 0953 - 0957 hrs day Three-

Phase (Mixed) Supply - 2334 - 2346 hrs day

महजिजषटर Maharashtra Three-Phase Supply - 9 hrs day Three-Phase Supply - 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

मई 2019 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during May2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to May-2019 20070450 2493722 63763 22627934 678000 4539922 7835904 35681760

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 7835904 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

7835904

Total Installed Capacity 35687160 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-22 (Up to

Mar2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

Plan Period

2017-22 (Up to

May-19)

6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58732 21173 181240 11734 163456 1010 176200 158886 225204 30768 414858

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Progress of Transmission Sector in the Country up to May 2019

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on May19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

May 19)

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during May 2019

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 20525 925681234952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 6040 660 0 1160 0 -1160

State 425615 0 0 660 0 -660

Private 0 0 0 0 0 0

Total 1029615 660 0 1820 0 -1820

Central 600 0 0 0 0 0

State 21099 0 0 0 0 0

Private 379 0 0 0 0 0

Total 118999 0 0 0 0 0

Nuclear Central 700 0 0 0 0 0

Central 7340 660 0 1160 0 -1160

State 446714 0 0 660 0 -660

Private 379 0 0 0 0 0

Total 1218614 660 0 1820 0 -1820

Electricity Generation (MU) Targets and Achievements for 2016-17

13

2 Capacity Addition Targets Achievements During May-2019

Schemes Sector

Target 2019-20

Apr-19 to May-19May-19

Hydro

All India

Capacity Addition TargetsAchievements during the Month of May-2019

Thermal1

82

0

0 0

18

20

0 0 0 0

0

200

400

600

800

1000

1200

1400

1600

1800

2000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2019-20Target Achievement

0

100

200

300

400

500

600

700

Thermal Hydro Nuclear Total

660

0 0

660

0 0 00

MW

Target Achievement

File NoCEA-CH-14-1142018-Coordination Division

Coal Lignite Gas Diesel Total

State 1634400 25000 287920 000 1947320 000 869755 70056 2887131

Private 2168083 108000 55800 000 2331883 000 251400 1333187 3916470

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Sub Total 5036020 158000 578126 000 5772146 162000 1970777 1441143 9346066

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2204808 6245075

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Sub Total 7280862 154000 1080649 000 8515511 184000 754750 2326226 11780487

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3781156 5553186

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Sub Total 4304202 314000 647366 56158 5321726 332000 1177483 3894034 10725243

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111789 790389

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Sub Total 2746364 000 10000 000 2756364 000 494212 140300 3390876

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Sub Total 77002 000 177581 3600 258183 000 142700 32429 433311

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Sub Total 000 000 000 4005 4005 000 000 1773 5778

State 6407650 129000 711871 36393 7284913 000 2987880 234893 10507686

Private 7468800 183000 1058060 27370 8737230 000 339400 7437781 16514411

Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663

Total 19444450 626000 2493722 63763 22627934 678000 4539922 7835904 35681760

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30042019 is given below (in MW)

459415 3581588 2867921 7835904

A 0 MW

B May 2019 0 MW

C

May 2019 0 MW

D Net Capacity Added during May 2019 A-B-C 0 MW

Sector wise breakup of RES capacity as shown is provisional

RES

(MNRE)

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31052019)

(UTILITIES)

Region Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30042019

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

CapacityBM PowerCogen Waste to Energy

913150 13830

Capacity Added during May 2019

Capacity Retired during

Capacity removed due to change

from Conventional to RES during

Share of installed capacity of BBMB Stations is included in state sector of partner states

File NoCEA-CH-14-1142018-Coordination Division

Coal Lignite Gas Diesel Total

State 13500 000 180040 000 193540 000 000 000 193540

Private 86922 000 10800 000 97722 000 000 17889 115611

Central 311272 000 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 000 211541 000 623235 10283 72309 17889 723716

State 272000 000 15000 000 287000 000 110282 6930 404212

Private 408078 000 000 000 408078 000 20000 34512 462590

Central 129472 000 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 000 68561 000 878112 10094 196652 41942 1126799

State 000 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 000 99200 62668 161868

Central 18340 000 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 000 6201 000 24541 2895 291048 88329 406813

State 000 000 17500 000 17500 000 123000 13003 153503

Private 000 000 000 000 000 000 000 6483 6483

Central 50639 000 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 000 30407 000 81047 6798 232188 19486 339519

State 176000 000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 000 511550 000 28800 115462 655812

Central 85458 000 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244

State 626000 25000 60380 000 711380 000 109618 2385 823383

Private 280200 108000 000 000 388200 000 10400 751322 1149922

Central 95625 25000 22110 000 142735 55674 73901 34400 306710

Sub-Total 1001825 158000 82490 000 1242315 55674 193919 788107 2280015

State 546900 000 000 000 546900 000 72410 2510 621820

Private 871433 000 000 000 871433 000 84200 288760 1244393

Central 379639 000 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 000 54949 000 1852921 28948 336863 294270 2513002

State 000 000 000 000 000 000 125215 6787 132002

Private 9900 000 45000 000 54900 000 8800 52620 116320

Central 34324 000 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 000 51966 000 96190 3124 181569 59407 340290

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 3471 3471

Central 3815 000 1503 000 5317 801 10171 000 16289

Sub-Total 3815 000 1503 000 5317 801 10171 3471 19760

124953 000 29105 000 154058 23703 75145 000 252907

State 1634400 25000 287920 000 1947320 000 869755 70056 2887131

Private 2168083 108000 55800 000 2331883 000 251400 1333187 3916470

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Grand Total 5036020 158000 578126 000 5772146 162000 1970777 1441143 9346066

Jammu amp Kashmir

Punjab

Rajasthan

Uttar Pradesh

Uttarakhand

Chandigarh

Central - Unallocated

Total (Northern

Region)

HydroRES

(MNRE)

Delhi

Haryana

Himachal Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31052019)

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 005 005

Private 000 000 4800 000 4800 000 000 392 5192

Central 46959 000 1967 000 48926 2600 000 000 51526

Sub-Total 46959 000 6767 000 53726 2600 000 397 56723

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 1447 1447

Central 14141 000 4334 000 18475 700 000 000 19175

Sub-Total 14141 000 4334 000 18475 700 000 1447 20622

State 371000 104000 217782 000 692782 000 77200 6470 776452

Private 726567 50000 396000 000 1172567 000 000 841512 2014079

Central 324243 000 42400 000 366643 55900 000 24330 446873

Sub-Total 1421810 154000 656182 000 2231992 55900 77200 872312 3237404

State 540000 000 000 000 540000 000 170366 8396 718762

Private 617400 000 10000 000 627400 000 000 428040 1055440

Central 334238 000 25700 000 359938 27300 152000 30000 569238

Sub-Total 1491638 000 35700 000 1527338 27300 322366 466436 2343440

State 228000 000 000 000 228000 000 12000 1105 241105

Private 885000 000 000 000 885000 000 000 52430 937430

Central 211075 000 000 000 211075 4800 10000 000 225875

Sub-Total 1324075 000 000 000 1324075 4800 22000 53535 1404410

State 1017000 000 67200 000 1084200 000 285084 38813 1408097

Private 1245600 000 56800 000 1302400 000 48100 880441 2230941

Central 466780 000 227273 000 694053 69000 000 12300 775353

Sub-Total 2729380 000 351273 000 3080653 69000 333184 931553 4414390

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 546 546

Central 19560 000 6634 000 26194 900 000 000 27094

Sub-Total 19560 000 6634 000 26194 900 000 546 27640

233300 000 19759 000 253059 22800 000 000 275859

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2204808 6245075

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Grand Total 7280862 154000 1080649 000 8515511 184000 754750 2326226 11780487

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

ThermalNuclear Hydro

RES

(MNRE)

State Ownership Sector

Mode wise breakup

Grand Total

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 501000 000 23540 000 524540 000 167360 5618 697518

Private 387388 000 381318 3680 772386 000 000 743901 1516287

Central 154683 12773 000 000 167456 12727 000 25000 205183

Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 774519 2418988

State 558250 000 000 000 558250 000 247993 4122 810365

Private 83945 000 83182 000 167127 000 000 394315 561442

Central 180685 14927 000 000 195612 14873 000 1000 211485

Sub-Total 822880 14927 83182 000 920989 14873 247993 399437 1583292

State 502000 000 000 12792 514792 000 358660 19389 892841

Private 195850 000 000 2520 198370 000 000 1369720 1568090

Central 242780 40140 000 000 282920 69800 000 000 352720

Sub-Total 940630 40140 000 15312 996082 69800 358660 1389108 2813650

State 000 000 000 15996 15996 000 185650 17290 218936

Private 61500 000 17400 000 78900 000 000 19021 97921

Central 86142 28180 35958 000 150280 36200 000 5000 191480

Sub-Total 147642 28180 53358 15996 245176 36200 185650 41311 508337

State 432000 000 52408 000 484408 000 217820 12270 714498

Private 458767 25000 50310 21170 555247 000 000 1253885 1809132

Central 302532 136420 000 000 438952 144800 000 23190 606942

Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1289345 3130572

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 000 10000 000 000 10000 000 000 000 10000

Sub-Total 000 10000 000 000 10000 000 000 000 10000

State 000 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 000 314 314

Central 14080 10760 000 000 24840 8600 000 000 33440

Sub-Total 14080 10760 3250 000 28090 8600 000 314 37004

142600 35800 000 000 178400 45000 000 000 223400

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3781156 5553186

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Grand Total 4304202 314000 647366 56158 5321726 332000 1177483 3894034 10725243

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Andhra Pradesh

Telangana

Karnataka

Total (Southern

Region)

Tamil Nadu

NLC

Puducherry

Central - Unallocated

Kerala

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 7070 7070

Private 28100 000 000 000 28100 000 000 25545 53645

Central 384933 000 000 000 384933 000 11000 000 395932

Sub-Total 413033 000 000 000 413033 000 11000 32615 456647

State 42000 000 000 000 42000 000 13000 405 55405

Private 73000 000 000 000 73000 000 000 3647 76647

Central 39374 000 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 000 154374 000 19100 4052 177526

State 540000 000 10000 000 550000 000 98600 12195 660795

Private 243700 000 000 000 243700 000 000 35250 278950

Central 76077 000 000 000 76077 000 41000 000 117077

Sub-Total 859777 000 10000 000 869777 000 139600 47445 1056822

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 698504 000 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 000 698504 000 18620 000 717124

State 42000 000 000 000 42000 000 206192 2630 250822

Private 293900 000 000 000 293900 000 000 47346 341246

Central 163390 000 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 000 499290 000 215092 50976 765358

State 000 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 000 39900 001 39901

Central 8703 000 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 000 8703 000 82300 5212 96215

112683 000 000 000 112683 000 8501 000 121184

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111789 790389

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Grand Total 2746364 000 10000 000 2756364 000 494212 140300 3390876

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

Grand TotalThermalNuclear

RES

(MNRE)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

Total (Eastern

Region)

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

Central - Unallocated

HydroOwnership Sector

Mode wise breakup

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2650 5100

Central 40852 000 43556 000 84408 000 35708 2500 122616

Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038

State 000 000 000 000 000 000 000 10711 10711

Private 000 000 000 000 000 000 000 2939 2939

Central 3705 000 4682 000 8387 000 11655 000 20042

Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692

State 000 000 000 000 000 000 32200 3253 35453

Private 000 000 000 000 000 000 000 012 012

Central 4560 000 10969 000 15529 000 7227 000 22756

Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 5610 000 43695 000 49305 000 6849 500 56654

Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 344 344

Central 4710 000 7157 000 11867 000 9534 000 21401

Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 3210 000 4893 000 8103 000 5733 000 13836

Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 3105 000 4046 000 7151 000 9794 000 16945

Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642

11250 000 6362 000 17612 000 14000 000 31612

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 663 663

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1698 5703

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1773 5778

19

Andaman amp

Nicobar

Lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination Division

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during May-2019 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 31-05-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621

May19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 0 0 23 23 0 750 0 750 0 750 23 773

Achievement 0 0 0 0 0 0 0 0 0 0 0 0 0 474 0 474 0 503 0 503 0 977 0 977

Upto May-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 226 1176 0 1059 0 1059 637 2365 783 3785

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 494 0 494 0 904 0 904 53 1398 0 1451

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

Line

1 2 3 4 5 6

0

1 400 Barmer-Bhinmal line DC RVPNL 288

2 400 Jangaon - Tippapur DC TSTRANSCO 138

3 400 Kayathar - Thennampatty DC TANTRANSCO 48

4 220 Bareilly (400) - Pilibhit Ckt-II SC UPPTCL 39

5 220 Bhanjanagar - Aska DC OPTCL 57

6 220LILO of both Ckt of 220kV Mobha - Mangrol

line at 220kV Amod (Balanced portion)DC GETCO 46

7 220LILO of Gr Noida (400) - Noida Sec-148 line

at RC GreenDC UPPTCL 9

8 220 LILO of Hathras - Gokul at Mathura DC UPPTCL 120

9 220 Sohawal - Tanda DC UPPTCL 232

977

0

977

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During May-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 31-05-19

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during

May-201921(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 31-05-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716

May19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 0 1445 1000 2445 0 680 0 680 0 2125 1000 3125

Achievement 0 0 0 0 0 0 0 0 1000 0 0 1000 0 2385 0 2385 0 760 0 760 1000 3145 0 4145

Upto May-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 2445 3000 5445 0 1480 0 1480 3000 3925 6000 12925

Achievement 0 0 0 0 0 0 0 0 1500 0 0 1500 815 4365 0 5180 0 2065 0 2065 2315 6430 0 8745

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

As on 31-05-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1Bhadla SS (3x1500 3x500 MVA) (500 MVA ICTs- II

and III)400220 PGCIL 1000

Total of CENTRAL SECTOR 1000

2 Moradabad(Aug) (Additional TF) 400220 UPPTCL 240

3 Masauli Prayagraj (New) TF-III 400132 UPPTCL 200

4 Talaricheruvu Ss 400220 APTRANSCO 9455 Uravakonda (Aug) ICT-II 400220 APTRANSCO 5006 Jangaon ss (3x500) (ICT-I) 400220 TSTRANSCO 500

7 Chinhat Lucknow (Aug) TF-II (200-160) 220132 UPPTCL 408 Hathras (Aug)T-I(200-160) 220132 UPPTCL 409 Jaunpur (Aug) (Additional TF) 220132 UPPTCL 16010 Laukahi (Supaul new) 22013233 BSPTCL 32011 Sector- 95 Gurgaon 22033 HVPNL 10012 Alawalpur ss 22066 PSTCL 100

TOTAL STATE SECTOR 3145

GRAND TOTAL 4145

21(2)

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During May-2019

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2019-20 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination Division

Programme Achievement Ach Programme Achievement Ach

Central Sector 37545100 3290600 3141593 9547 6468500 6275642 9702

State Sector 37498600 3425800 3092392 9027 6748300 6066733 8990

PvtIPP Sector 37346200 3476700 3460217 9953 6713100 6652517 9910

PvtUTL Sector 1823100 164300 171799 10456 323600 337490 10429

Total 114213000 10357400 9866001 9526 20253500 19332382 9545

Central Sector 5661700 604200 619800 10258 990300 1104995 11158

State Sector 6680500 551500 652766 11836 1049700 1184387 11283

PvtIPP Sector 1206900 130200 121344 9320 187500 200643 10701

PvtUTL Sector 144100 12400 14009 11298 24700 25155 10184

Total 13693200 1298300 1407919 10844 2252200 2515180 11168

Central Sector 4472000 353500 365463 10338 720800 694195 9631

Total 4472000 353500 365463 10338 720800 694195 9631

Bhutan Import 621800 32500 35300 10862 50000 59270 11854

Central Sector 47678800 4248300 4126856 9714 8179600 8074832 9872

State Sector 44179100 3977300 3745158 9416 7798000 7251120 9299

Pvt Sector 40520300 3783600 3767369 9957 7248900 7215805 9954

Total 133000000 12041700 11674683 9695 23276500 22601027 9710

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Apr-19 Apr-18 Upto Apr-2019 Upto Apr-2018

975409 844377 975409 844377

22

Renewable Energy Generation

Achievement

May-2019

1 Electricity Generation (MU) Targets and Achievememts for 2019-20

All India Energy Generation During Apr-19 to May-19 (MU)

Target (2019-20)Apr-19 to May-19

Sector

Hydro

Thermal

Nuclear

202535

22522

7208

232765

193324

25152

6942

226010

0

50000

100000

150000

200000

250000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Energy Power Supply Position (Provisional) for May-2019 and during Apr-19 to May-19 23

2 Peak Power Supply Position (Provisional) for May-2019 and during Apr-19 to May-19 24

3 Energy Power Supply Position (Revised) for Apr-2019 and during Apr-19 to Apr-19 25

4 Peak Power Supply Position (Revised) for Apr-2019 and during Apr-19 to Apr-19 26

5 Notified Power cuts Restrictions on Industries during May-2019 27

6 Power Supply to Agricultural Sector during May-2019 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 154 154 0 00 271 271 0 00

दिलली Delhi 3366 3366 0 00 6065 6064 1 00

हरियजणज Haryana 4907 4907 0 00 8679 8679 0 00

दहमजचल परिश Himachal Pradesh 872 863 10 11 1654 1644 10 06

रमम कशमीि Jammu amp Kashmir 1760 1424 336 191 3364 2720 644 191

परजब Punjab 4769 4769 0 00 8475 8475 0 00

िजरसथजन Rajasthan 7120 7110 11 02 13313 13300 13 01

उतति परिश Uttar Pradesh 12742 12695 48 04 22897 22817 79 03

उततिजखड Uttarakhand 1329 1329 0 00 2449 2449 0 00

उततरी कषतर Northern Region 37020 36615 404 11 67166 66419 747 11

छततीसगढ़ Chhattisgarh 2794 2794 0 00 5765 5764 1 00

गरिजत Gujarat 11208 11208 0 00 21748 21748 0 00

मधय परिश Madhya Pradesh 6502 6502 0 00 12735 12735 0 00

महजिजषटर Maharashtra 14976 14976 0 00 29295 29294 0 00

िमन औि दिउ Daman amp Diu 222 222 0 00 443 443 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 1106 1106 0 00

गोवज Goa 404 404 0 00 801 801 0 00

पशचिमी कषतर Western Region 36658 36658 0 00 71893 71892 1 00

आनधर परिश Andhra Pradesh 6056 6048 7 01 11709 11702 7 01

तलगजनज Telangana 5318 5318 1 00 10772 10771 1 00

कनजाटक Karnataka 6702 6702 1 00 13569 13568 1 00

किल Kerala 2575 2566 9 03 4888 4878 10 02

तममल नजड Tamil Nadu 10309 10309 1 00 20031 20030 1 00

पडचिी Puducherry 271 271 1 03 517 516 1 01

लकष-दवीप Lakshadweep 4 4 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 31232 31213 19 01 61486 61465 21 00

बबहजि Bihar 3078 3078 0 00 5662 5659 3 01

िजमोिि घजटी ननगम DVC 1814 1814 0 00 3757 3755 2 01

झजिखणड Jharkhand 789 789 0 00 1505 1495 10 07

ओडडशज Odisha 2560 2560 0 00 5261 5261 0 00

पशशचम बगजल West Bengal 5115 5115 0 00 9920 9897 23 02

मसशककम Sikkim 36 36 0 00 78 78 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 58 54 4 67

परवी कषतर Eastern Region 13391 13391 0 00 26182 26144 38 01

अरणजचल परिश Arunachal Pradesh 64 64 0 06 127 126 1 06

असम Assam 819 738 81 99 1573 1434 139 88

मणणपि Manipur 73 72 1 07 135 134 2 12

मघजलय Meghalaya 167 159 8 50 336 318 18 55

ममज़ोिम Mizoram 55 55 0 07 100 99 1 08

नजगजलड Nagaland 65 64 1 08 124 123 1 08

बिपिज Tripura 173 170 2 14 292 288 4 13

उततर-परवी कषतर North-Eastern Region 1416 1323 93 66 2686 2521 165 62

समपणण भारत All India 119717 119200 517 04 229413 228441 972 04

Note Power Supply Position Report has been compiled based on the data furnished by State Utilities Electricity Departments

23

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 356 356 0 00 356 356 0 00

दिलली Delhi 6461 6461 0 00 6461 6461 0 00

हरियजणज Haryana 8874 8874 0 00 8874 8874 0 00

दहमजचल परिश Himachal Pradesh 1480 1480 0 00 1480 1480 0 00

रमम कशमीि Jammu amp Kashmir 2426 2426 0 00 2885 2426 459 159

परजब Punjab 8802 8802 0 00 8802 8802 0 00

िजरसथजन Rajasthan 11791 11791 0 00 11791 11791 0 00

उतति परिश Uttar Pradesh 22487 22057 430 19 22487 22057 430 19

उततिजखड Uttarakhand 2155 2155 0 00 2155 2155 0 00

उततरी कषतर Northern Region 60987 60078 909 15 60987 60078 909 15

छततीसगढ़ Chhattisgarh 4504 4504 0 00 4596 4574 22 05

गरिजत Gujarat 18094 18094 0 00 18094 18094 0 00

मधय परिश Madhya Pradesh 10145 10131 14 01 10145 10131 14 01

महजिजषटर Maharashtra 23621 23613 8 00 23621 23613 8 00

िमन औि दिउ Daman amp Diu 344 344 0 01 344 344 0 01

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 818 818 0 00

गोवज Goa 554 554 0 00 594 594 0 00

पशचिमी कषतर Western Region 57113 57093 20 00 57113 57093 20 00

आनधर परिश Andhra Pradesh 9854 9854 0 00 9854 9854 0 00

तलगजनज Telangana 8684 8684 0 00 10269 10202 67 07

कनजाटक Karnataka 12158 12158 0 00 12700 12688 12 01

किल Kerala 4286 4205 81 19 4316 4300 16 04

तममल नजड Tamil Nadu 15584 15522 62 04 15680 15659 21 01

पडचिी Puducherry 453 442 11 24 453 444 9 20

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 47477 47465 12 00 49218 49103 115 02

बबहजि Bihar 5481 5481 0 00 5481 5481 0 00

िजमोिि घजटी ननगम DVC 3048 3048 0 00 3048 3048 0 00

झजिखणड Jharkhand 1330 1330 0 00 1330 1330 0 00

ओडडशज Odisha 4736 4736 0 00 5142 5140 3 01

पशशचम बगजल West Bengal 9335 9335 0 00 9335 9335 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23558 23558 0 00 23558 23558 0 00

अरणजचल परिश Arunachal Pradesh 140 138 2 12 140 138 2 12

असम Assam 1753 1673 80 46 1910 1673 237 124

मणणपि Manipur 183 181 2 09 197 188 9 48

मघजलय Meghalaya 329 325 4 12 337 337 0 00

ममज़ोिम Mizoram 102 100 2 20 116 113 3 28

नजगजलड Nagaland 130 128 2 14 157 131 27 169

बिपिज Tripura 297 295 1 05 297 295 1 05

उततर-परवी कषतर North-Eastern Region 2758 2674 84 31 2848 2780 68 24

समपणण भारत All India 183513 182533 981 05 183513 182533 981 05

Note Power Supply Position Report has been compiled based on the data furnished by State Utilities Electricity Departments 24

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -मई2019 April2019 to May2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and supply

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateमई 2019 May2019

मजग की पनता म कमी Demand not Met

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 781 781 0 00 781 781 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3706 3706 0 00 3706 3706 0 00

िजरसथजन Rajasthan 6192 6190 2 00 6192 6190 2 00

उतति परिश Uttar Pradesh 10154 10123 32 03 10154 10123 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30147 29804 343 11 30147 29804 343 11

छततीसगढ़ Chhattisgarh 2972 2971 1 00 2972 2971 1 00

गरिजत Gujarat 10540 10540 0 00 10540 10540 0 00

मधय परिश Madhya Pradesh 6233 6233 0 00 6233 6233 0 00

महजिजषटर Maharashtra 14319 14319 0 00 14319 14319 0 00

िमन औि दिउ Daman amp Diu 221 221 0 00 221 221 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 554 554 0 00 554 554 0 00

गोवज Goa 397 397 0 00 397 397 0 00

पशचिमी कषतर Western Region 35235 35234 1 00 35235 35234 1 00

आनधर परिश Andhra Pradesh 5653 5653 0 00 5653 5653 0 00

तलगजनज Telangana 5453 5453 0 00 5453 5453 0 00

कनजाटक Karnataka 6867 6867 0 00 6867 6867 0 00

किल Kerala 2313 2312 2 01 2313 2312 2 01

तममल नजड Tamil Nadu 9721 9721 0 00 9721 9721 0 00

पडचिी Puducherry 246 246 0 00 246 246 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 30254 30252 2 00 30254 30252 2 00

बबहजि Bihar 2584 2581 3 01 2584 2581 3 01

िजमोिि घजटी ननगम DVC 1944 1942 2 01 1944 1942 2 01

झजिखणड Jharkhand 716 706 10 14 716 706 10 14

ओडडशज Odisha 2701 2701 0 00 2701 2701 0 00

पशशचम बगजल West Bengal 4805 4782 23 05 4805 4782 23 05

मसशककम Sikkim 42 42 0 00 42 42 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12792 12754 38 03 12792 12754 38 03

अरणजचल परिश Arunachal Pradesh 62 62 0 06 62 62 0 06

असम Assam 754 696 58 77 754 696 58 77

मणणपि Manipur 62 61 1 17 62 61 1 17

मघजलय Meghalaya 169 159 10 60 169 159 10 60

ममज़ोिम Mizoram 45 44 0 10 45 44 0 10

नजगजलड Nagaland 59 58 0 08 59 58 0 08

बिपिज Tripura 119 117 2 13 119 117 2 13

उततर-परवी कषतर North-Eastern Region 1270 1198 72 57 1270 1198 72 57

समपणण भारत All India 109696 109241 455 04 109696 109241 455 04

Note The revised data for March 2019 is not avaliable

Energy not Supplied Energy not Supplied

अपरल 2019 April2019 अपरल 2019 April2019 to April 2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2885 2308 577 200 2885 2308 577 200

परजब Punjab 7087 7087 0 00 7087 7087 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 47779 47210 569 12 47779 47210 569 12

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9179 9160 19 02 9179 9160 19 02

तलगजनज Telangana 10269 10202 67 07 10269 10202 67 07

कनजाटक Karnataka 12700 12688 12 01 12700 12688 12 01

किल Kerala 4316 4300 16 04 4316 4300 16 04

तममल नजड Tamil Nadu 15680 15659 21 01 15680 15659 21 01

पडचिी Puducherry 444 444 0 00 444 444 0 00

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49218 49103 115 02 49218 49103 115 02

बबहजि Bihar 5157 5155 2 00 5157 5155 2 00

िजमोिि घजटी ननगम DVC 3014 3014 0 00 3014 3014 0 00

झजिखणड Jharkhand 1326 1325 1 00 1326 1325 1 00

ओडडशज Odisha 5142 5140 3 01 5142 5140 3 01

पशशचम बगजल West Bengal 8745 8699 46 05 8745 8699 46 05

मसशककम Sikkim 98 98 0 00 98 98 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22415 22378 37 02 22415 22378 37 02

अरणजचल परिश Arunachal Pradesh 139 136 3 21 139 136 3 21

असम Assam 1910 1667 242 127 1910 1667 242 127

मणणपि Manipur 197 188 9 48 197 188 9 48

मघजलय Meghalaya 337 337 0 00 337 337 0 00

ममज़ोिम Mizoram 116 113 3 28 116 113 3 28

नजगजलड Nagaland 157 131 27 169 157 131 27 169

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177424 176810 613 03 177424 176810 613 03

Note The revised data for March 2019 is not avaliable 26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateअपरल 2019 April2019 अपरल 2019 April2019 to April 2019

File NoCEA-CH-14-1142018-Coordination Division

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

मई 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during May2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

N

o No

tified

Cuts

N

o No

tified

Cuts

File NoCEA-CH-14-1142018-Coordination Division

मई2019May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0910 hrsday 0811 - 910 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 403 hrsday 0347 - 403 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 2214 hrsday 2157 - 2214 hrsday

उततराखड Uttarakhand Data not received 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-957 hrs day

Three-Phase (Mixed) Supply - 2346 hrs day

Three-Phase Supply(Irrigation)- 0953 - 0957 hrs day Three-

Phase (Mixed) Supply - 2334 - 2346 hrs day

महजिजषटर Maharashtra Three-Phase Supply - 9 hrs day Three-Phase Supply - 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

मई 2019 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during May2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to May-2019 20070450 2493722 63763 22627934 678000 4539922 7835904 35681760

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 7835904 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

7835904

Total Installed Capacity 35687160 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-22 (Up to

Mar2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

Plan Period

2017-22 (Up to

May-19)

6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58732 21173 181240 11734 163456 1010 176200 158886 225204 30768 414858

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Progress of Transmission Sector in the Country up to May 2019

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on May19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

May 19)

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during May 2019

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 20525 925681234952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Coal Lignite Gas Diesel Total

State 1634400 25000 287920 000 1947320 000 869755 70056 2887131

Private 2168083 108000 55800 000 2331883 000 251400 1333187 3916470

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Sub Total 5036020 158000 578126 000 5772146 162000 1970777 1441143 9346066

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2204808 6245075

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Sub Total 7280862 154000 1080649 000 8515511 184000 754750 2326226 11780487

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3781156 5553186

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Sub Total 4304202 314000 647366 56158 5321726 332000 1177483 3894034 10725243

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111789 790389

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Sub Total 2746364 000 10000 000 2756364 000 494212 140300 3390876

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Sub Total 77002 000 177581 3600 258183 000 142700 32429 433311

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Sub Total 000 000 000 4005 4005 000 000 1773 5778

State 6407650 129000 711871 36393 7284913 000 2987880 234893 10507686

Private 7468800 183000 1058060 27370 8737230 000 339400 7437781 16514411

Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663

Total 19444450 626000 2493722 63763 22627934 678000 4539922 7835904 35681760

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30042019 is given below (in MW)

459415 3581588 2867921 7835904

A 0 MW

B May 2019 0 MW

C

May 2019 0 MW

D Net Capacity Added during May 2019 A-B-C 0 MW

Sector wise breakup of RES capacity as shown is provisional

RES

(MNRE)

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31052019)

(UTILITIES)

Region Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30042019

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

CapacityBM PowerCogen Waste to Energy

913150 13830

Capacity Added during May 2019

Capacity Retired during

Capacity removed due to change

from Conventional to RES during

Share of installed capacity of BBMB Stations is included in state sector of partner states

File NoCEA-CH-14-1142018-Coordination Division

Coal Lignite Gas Diesel Total

State 13500 000 180040 000 193540 000 000 000 193540

Private 86922 000 10800 000 97722 000 000 17889 115611

Central 311272 000 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 000 211541 000 623235 10283 72309 17889 723716

State 272000 000 15000 000 287000 000 110282 6930 404212

Private 408078 000 000 000 408078 000 20000 34512 462590

Central 129472 000 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 000 68561 000 878112 10094 196652 41942 1126799

State 000 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 000 99200 62668 161868

Central 18340 000 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 000 6201 000 24541 2895 291048 88329 406813

State 000 000 17500 000 17500 000 123000 13003 153503

Private 000 000 000 000 000 000 000 6483 6483

Central 50639 000 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 000 30407 000 81047 6798 232188 19486 339519

State 176000 000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 000 511550 000 28800 115462 655812

Central 85458 000 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244

State 626000 25000 60380 000 711380 000 109618 2385 823383

Private 280200 108000 000 000 388200 000 10400 751322 1149922

Central 95625 25000 22110 000 142735 55674 73901 34400 306710

Sub-Total 1001825 158000 82490 000 1242315 55674 193919 788107 2280015

State 546900 000 000 000 546900 000 72410 2510 621820

Private 871433 000 000 000 871433 000 84200 288760 1244393

Central 379639 000 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 000 54949 000 1852921 28948 336863 294270 2513002

State 000 000 000 000 000 000 125215 6787 132002

Private 9900 000 45000 000 54900 000 8800 52620 116320

Central 34324 000 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 000 51966 000 96190 3124 181569 59407 340290

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 3471 3471

Central 3815 000 1503 000 5317 801 10171 000 16289

Sub-Total 3815 000 1503 000 5317 801 10171 3471 19760

124953 000 29105 000 154058 23703 75145 000 252907

State 1634400 25000 287920 000 1947320 000 869755 70056 2887131

Private 2168083 108000 55800 000 2331883 000 251400 1333187 3916470

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Grand Total 5036020 158000 578126 000 5772146 162000 1970777 1441143 9346066

Jammu amp Kashmir

Punjab

Rajasthan

Uttar Pradesh

Uttarakhand

Chandigarh

Central - Unallocated

Total (Northern

Region)

HydroRES

(MNRE)

Delhi

Haryana

Himachal Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31052019)

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 005 005

Private 000 000 4800 000 4800 000 000 392 5192

Central 46959 000 1967 000 48926 2600 000 000 51526

Sub-Total 46959 000 6767 000 53726 2600 000 397 56723

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 1447 1447

Central 14141 000 4334 000 18475 700 000 000 19175

Sub-Total 14141 000 4334 000 18475 700 000 1447 20622

State 371000 104000 217782 000 692782 000 77200 6470 776452

Private 726567 50000 396000 000 1172567 000 000 841512 2014079

Central 324243 000 42400 000 366643 55900 000 24330 446873

Sub-Total 1421810 154000 656182 000 2231992 55900 77200 872312 3237404

State 540000 000 000 000 540000 000 170366 8396 718762

Private 617400 000 10000 000 627400 000 000 428040 1055440

Central 334238 000 25700 000 359938 27300 152000 30000 569238

Sub-Total 1491638 000 35700 000 1527338 27300 322366 466436 2343440

State 228000 000 000 000 228000 000 12000 1105 241105

Private 885000 000 000 000 885000 000 000 52430 937430

Central 211075 000 000 000 211075 4800 10000 000 225875

Sub-Total 1324075 000 000 000 1324075 4800 22000 53535 1404410

State 1017000 000 67200 000 1084200 000 285084 38813 1408097

Private 1245600 000 56800 000 1302400 000 48100 880441 2230941

Central 466780 000 227273 000 694053 69000 000 12300 775353

Sub-Total 2729380 000 351273 000 3080653 69000 333184 931553 4414390

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 546 546

Central 19560 000 6634 000 26194 900 000 000 27094

Sub-Total 19560 000 6634 000 26194 900 000 546 27640

233300 000 19759 000 253059 22800 000 000 275859

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2204808 6245075

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Grand Total 7280862 154000 1080649 000 8515511 184000 754750 2326226 11780487

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

ThermalNuclear Hydro

RES

(MNRE)

State Ownership Sector

Mode wise breakup

Grand Total

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 501000 000 23540 000 524540 000 167360 5618 697518

Private 387388 000 381318 3680 772386 000 000 743901 1516287

Central 154683 12773 000 000 167456 12727 000 25000 205183

Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 774519 2418988

State 558250 000 000 000 558250 000 247993 4122 810365

Private 83945 000 83182 000 167127 000 000 394315 561442

Central 180685 14927 000 000 195612 14873 000 1000 211485

Sub-Total 822880 14927 83182 000 920989 14873 247993 399437 1583292

State 502000 000 000 12792 514792 000 358660 19389 892841

Private 195850 000 000 2520 198370 000 000 1369720 1568090

Central 242780 40140 000 000 282920 69800 000 000 352720

Sub-Total 940630 40140 000 15312 996082 69800 358660 1389108 2813650

State 000 000 000 15996 15996 000 185650 17290 218936

Private 61500 000 17400 000 78900 000 000 19021 97921

Central 86142 28180 35958 000 150280 36200 000 5000 191480

Sub-Total 147642 28180 53358 15996 245176 36200 185650 41311 508337

State 432000 000 52408 000 484408 000 217820 12270 714498

Private 458767 25000 50310 21170 555247 000 000 1253885 1809132

Central 302532 136420 000 000 438952 144800 000 23190 606942

Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1289345 3130572

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 000 10000 000 000 10000 000 000 000 10000

Sub-Total 000 10000 000 000 10000 000 000 000 10000

State 000 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 000 314 314

Central 14080 10760 000 000 24840 8600 000 000 33440

Sub-Total 14080 10760 3250 000 28090 8600 000 314 37004

142600 35800 000 000 178400 45000 000 000 223400

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3781156 5553186

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Grand Total 4304202 314000 647366 56158 5321726 332000 1177483 3894034 10725243

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Andhra Pradesh

Telangana

Karnataka

Total (Southern

Region)

Tamil Nadu

NLC

Puducherry

Central - Unallocated

Kerala

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 7070 7070

Private 28100 000 000 000 28100 000 000 25545 53645

Central 384933 000 000 000 384933 000 11000 000 395932

Sub-Total 413033 000 000 000 413033 000 11000 32615 456647

State 42000 000 000 000 42000 000 13000 405 55405

Private 73000 000 000 000 73000 000 000 3647 76647

Central 39374 000 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 000 154374 000 19100 4052 177526

State 540000 000 10000 000 550000 000 98600 12195 660795

Private 243700 000 000 000 243700 000 000 35250 278950

Central 76077 000 000 000 76077 000 41000 000 117077

Sub-Total 859777 000 10000 000 869777 000 139600 47445 1056822

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 698504 000 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 000 698504 000 18620 000 717124

State 42000 000 000 000 42000 000 206192 2630 250822

Private 293900 000 000 000 293900 000 000 47346 341246

Central 163390 000 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 000 499290 000 215092 50976 765358

State 000 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 000 39900 001 39901

Central 8703 000 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 000 8703 000 82300 5212 96215

112683 000 000 000 112683 000 8501 000 121184

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111789 790389

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Grand Total 2746364 000 10000 000 2756364 000 494212 140300 3390876

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

Grand TotalThermalNuclear

RES

(MNRE)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

Total (Eastern

Region)

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

Central - Unallocated

HydroOwnership Sector

Mode wise breakup

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2650 5100

Central 40852 000 43556 000 84408 000 35708 2500 122616

Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038

State 000 000 000 000 000 000 000 10711 10711

Private 000 000 000 000 000 000 000 2939 2939

Central 3705 000 4682 000 8387 000 11655 000 20042

Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692

State 000 000 000 000 000 000 32200 3253 35453

Private 000 000 000 000 000 000 000 012 012

Central 4560 000 10969 000 15529 000 7227 000 22756

Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 5610 000 43695 000 49305 000 6849 500 56654

Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 344 344

Central 4710 000 7157 000 11867 000 9534 000 21401

Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 3210 000 4893 000 8103 000 5733 000 13836

Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 3105 000 4046 000 7151 000 9794 000 16945

Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642

11250 000 6362 000 17612 000 14000 000 31612

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 663 663

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1698 5703

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1773 5778

19

Andaman amp

Nicobar

Lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination Division

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during May-2019 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 31-05-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621

May19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 0 0 23 23 0 750 0 750 0 750 23 773

Achievement 0 0 0 0 0 0 0 0 0 0 0 0 0 474 0 474 0 503 0 503 0 977 0 977

Upto May-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 226 1176 0 1059 0 1059 637 2365 783 3785

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 494 0 494 0 904 0 904 53 1398 0 1451

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

Line

1 2 3 4 5 6

0

1 400 Barmer-Bhinmal line DC RVPNL 288

2 400 Jangaon - Tippapur DC TSTRANSCO 138

3 400 Kayathar - Thennampatty DC TANTRANSCO 48

4 220 Bareilly (400) - Pilibhit Ckt-II SC UPPTCL 39

5 220 Bhanjanagar - Aska DC OPTCL 57

6 220LILO of both Ckt of 220kV Mobha - Mangrol

line at 220kV Amod (Balanced portion)DC GETCO 46

7 220LILO of Gr Noida (400) - Noida Sec-148 line

at RC GreenDC UPPTCL 9

8 220 LILO of Hathras - Gokul at Mathura DC UPPTCL 120

9 220 Sohawal - Tanda DC UPPTCL 232

977

0

977

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During May-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 31-05-19

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during

May-201921(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 31-05-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716

May19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 0 1445 1000 2445 0 680 0 680 0 2125 1000 3125

Achievement 0 0 0 0 0 0 0 0 1000 0 0 1000 0 2385 0 2385 0 760 0 760 1000 3145 0 4145

Upto May-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 2445 3000 5445 0 1480 0 1480 3000 3925 6000 12925

Achievement 0 0 0 0 0 0 0 0 1500 0 0 1500 815 4365 0 5180 0 2065 0 2065 2315 6430 0 8745

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

As on 31-05-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1Bhadla SS (3x1500 3x500 MVA) (500 MVA ICTs- II

and III)400220 PGCIL 1000

Total of CENTRAL SECTOR 1000

2 Moradabad(Aug) (Additional TF) 400220 UPPTCL 240

3 Masauli Prayagraj (New) TF-III 400132 UPPTCL 200

4 Talaricheruvu Ss 400220 APTRANSCO 9455 Uravakonda (Aug) ICT-II 400220 APTRANSCO 5006 Jangaon ss (3x500) (ICT-I) 400220 TSTRANSCO 500

7 Chinhat Lucknow (Aug) TF-II (200-160) 220132 UPPTCL 408 Hathras (Aug)T-I(200-160) 220132 UPPTCL 409 Jaunpur (Aug) (Additional TF) 220132 UPPTCL 16010 Laukahi (Supaul new) 22013233 BSPTCL 32011 Sector- 95 Gurgaon 22033 HVPNL 10012 Alawalpur ss 22066 PSTCL 100

TOTAL STATE SECTOR 3145

GRAND TOTAL 4145

21(2)

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During May-2019

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2019-20 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination Division

Programme Achievement Ach Programme Achievement Ach

Central Sector 37545100 3290600 3141593 9547 6468500 6275642 9702

State Sector 37498600 3425800 3092392 9027 6748300 6066733 8990

PvtIPP Sector 37346200 3476700 3460217 9953 6713100 6652517 9910

PvtUTL Sector 1823100 164300 171799 10456 323600 337490 10429

Total 114213000 10357400 9866001 9526 20253500 19332382 9545

Central Sector 5661700 604200 619800 10258 990300 1104995 11158

State Sector 6680500 551500 652766 11836 1049700 1184387 11283

PvtIPP Sector 1206900 130200 121344 9320 187500 200643 10701

PvtUTL Sector 144100 12400 14009 11298 24700 25155 10184

Total 13693200 1298300 1407919 10844 2252200 2515180 11168

Central Sector 4472000 353500 365463 10338 720800 694195 9631

Total 4472000 353500 365463 10338 720800 694195 9631

Bhutan Import 621800 32500 35300 10862 50000 59270 11854

Central Sector 47678800 4248300 4126856 9714 8179600 8074832 9872

State Sector 44179100 3977300 3745158 9416 7798000 7251120 9299

Pvt Sector 40520300 3783600 3767369 9957 7248900 7215805 9954

Total 133000000 12041700 11674683 9695 23276500 22601027 9710

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Apr-19 Apr-18 Upto Apr-2019 Upto Apr-2018

975409 844377 975409 844377

22

Renewable Energy Generation

Achievement

May-2019

1 Electricity Generation (MU) Targets and Achievememts for 2019-20

All India Energy Generation During Apr-19 to May-19 (MU)

Target (2019-20)Apr-19 to May-19

Sector

Hydro

Thermal

Nuclear

202535

22522

7208

232765

193324

25152

6942

226010

0

50000

100000

150000

200000

250000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Energy Power Supply Position (Provisional) for May-2019 and during Apr-19 to May-19 23

2 Peak Power Supply Position (Provisional) for May-2019 and during Apr-19 to May-19 24

3 Energy Power Supply Position (Revised) for Apr-2019 and during Apr-19 to Apr-19 25

4 Peak Power Supply Position (Revised) for Apr-2019 and during Apr-19 to Apr-19 26

5 Notified Power cuts Restrictions on Industries during May-2019 27

6 Power Supply to Agricultural Sector during May-2019 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 154 154 0 00 271 271 0 00

दिलली Delhi 3366 3366 0 00 6065 6064 1 00

हरियजणज Haryana 4907 4907 0 00 8679 8679 0 00

दहमजचल परिश Himachal Pradesh 872 863 10 11 1654 1644 10 06

रमम कशमीि Jammu amp Kashmir 1760 1424 336 191 3364 2720 644 191

परजब Punjab 4769 4769 0 00 8475 8475 0 00

िजरसथजन Rajasthan 7120 7110 11 02 13313 13300 13 01

उतति परिश Uttar Pradesh 12742 12695 48 04 22897 22817 79 03

उततिजखड Uttarakhand 1329 1329 0 00 2449 2449 0 00

उततरी कषतर Northern Region 37020 36615 404 11 67166 66419 747 11

छततीसगढ़ Chhattisgarh 2794 2794 0 00 5765 5764 1 00

गरिजत Gujarat 11208 11208 0 00 21748 21748 0 00

मधय परिश Madhya Pradesh 6502 6502 0 00 12735 12735 0 00

महजिजषटर Maharashtra 14976 14976 0 00 29295 29294 0 00

िमन औि दिउ Daman amp Diu 222 222 0 00 443 443 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 1106 1106 0 00

गोवज Goa 404 404 0 00 801 801 0 00

पशचिमी कषतर Western Region 36658 36658 0 00 71893 71892 1 00

आनधर परिश Andhra Pradesh 6056 6048 7 01 11709 11702 7 01

तलगजनज Telangana 5318 5318 1 00 10772 10771 1 00

कनजाटक Karnataka 6702 6702 1 00 13569 13568 1 00

किल Kerala 2575 2566 9 03 4888 4878 10 02

तममल नजड Tamil Nadu 10309 10309 1 00 20031 20030 1 00

पडचिी Puducherry 271 271 1 03 517 516 1 01

लकष-दवीप Lakshadweep 4 4 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 31232 31213 19 01 61486 61465 21 00

बबहजि Bihar 3078 3078 0 00 5662 5659 3 01

िजमोिि घजटी ननगम DVC 1814 1814 0 00 3757 3755 2 01

झजिखणड Jharkhand 789 789 0 00 1505 1495 10 07

ओडडशज Odisha 2560 2560 0 00 5261 5261 0 00

पशशचम बगजल West Bengal 5115 5115 0 00 9920 9897 23 02

मसशककम Sikkim 36 36 0 00 78 78 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 58 54 4 67

परवी कषतर Eastern Region 13391 13391 0 00 26182 26144 38 01

अरणजचल परिश Arunachal Pradesh 64 64 0 06 127 126 1 06

असम Assam 819 738 81 99 1573 1434 139 88

मणणपि Manipur 73 72 1 07 135 134 2 12

मघजलय Meghalaya 167 159 8 50 336 318 18 55

ममज़ोिम Mizoram 55 55 0 07 100 99 1 08

नजगजलड Nagaland 65 64 1 08 124 123 1 08

बिपिज Tripura 173 170 2 14 292 288 4 13

उततर-परवी कषतर North-Eastern Region 1416 1323 93 66 2686 2521 165 62

समपणण भारत All India 119717 119200 517 04 229413 228441 972 04

Note Power Supply Position Report has been compiled based on the data furnished by State Utilities Electricity Departments

23

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 356 356 0 00 356 356 0 00

दिलली Delhi 6461 6461 0 00 6461 6461 0 00

हरियजणज Haryana 8874 8874 0 00 8874 8874 0 00

दहमजचल परिश Himachal Pradesh 1480 1480 0 00 1480 1480 0 00

रमम कशमीि Jammu amp Kashmir 2426 2426 0 00 2885 2426 459 159

परजब Punjab 8802 8802 0 00 8802 8802 0 00

िजरसथजन Rajasthan 11791 11791 0 00 11791 11791 0 00

उतति परिश Uttar Pradesh 22487 22057 430 19 22487 22057 430 19

उततिजखड Uttarakhand 2155 2155 0 00 2155 2155 0 00

उततरी कषतर Northern Region 60987 60078 909 15 60987 60078 909 15

छततीसगढ़ Chhattisgarh 4504 4504 0 00 4596 4574 22 05

गरिजत Gujarat 18094 18094 0 00 18094 18094 0 00

मधय परिश Madhya Pradesh 10145 10131 14 01 10145 10131 14 01

महजिजषटर Maharashtra 23621 23613 8 00 23621 23613 8 00

िमन औि दिउ Daman amp Diu 344 344 0 01 344 344 0 01

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 818 818 0 00

गोवज Goa 554 554 0 00 594 594 0 00

पशचिमी कषतर Western Region 57113 57093 20 00 57113 57093 20 00

आनधर परिश Andhra Pradesh 9854 9854 0 00 9854 9854 0 00

तलगजनज Telangana 8684 8684 0 00 10269 10202 67 07

कनजाटक Karnataka 12158 12158 0 00 12700 12688 12 01

किल Kerala 4286 4205 81 19 4316 4300 16 04

तममल नजड Tamil Nadu 15584 15522 62 04 15680 15659 21 01

पडचिी Puducherry 453 442 11 24 453 444 9 20

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 47477 47465 12 00 49218 49103 115 02

बबहजि Bihar 5481 5481 0 00 5481 5481 0 00

िजमोिि घजटी ननगम DVC 3048 3048 0 00 3048 3048 0 00

झजिखणड Jharkhand 1330 1330 0 00 1330 1330 0 00

ओडडशज Odisha 4736 4736 0 00 5142 5140 3 01

पशशचम बगजल West Bengal 9335 9335 0 00 9335 9335 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23558 23558 0 00 23558 23558 0 00

अरणजचल परिश Arunachal Pradesh 140 138 2 12 140 138 2 12

असम Assam 1753 1673 80 46 1910 1673 237 124

मणणपि Manipur 183 181 2 09 197 188 9 48

मघजलय Meghalaya 329 325 4 12 337 337 0 00

ममज़ोिम Mizoram 102 100 2 20 116 113 3 28

नजगजलड Nagaland 130 128 2 14 157 131 27 169

बिपिज Tripura 297 295 1 05 297 295 1 05

उततर-परवी कषतर North-Eastern Region 2758 2674 84 31 2848 2780 68 24

समपणण भारत All India 183513 182533 981 05 183513 182533 981 05

Note Power Supply Position Report has been compiled based on the data furnished by State Utilities Electricity Departments 24

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -मई2019 April2019 to May2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and supply

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateमई 2019 May2019

मजग की पनता म कमी Demand not Met

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 781 781 0 00 781 781 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3706 3706 0 00 3706 3706 0 00

िजरसथजन Rajasthan 6192 6190 2 00 6192 6190 2 00

उतति परिश Uttar Pradesh 10154 10123 32 03 10154 10123 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30147 29804 343 11 30147 29804 343 11

छततीसगढ़ Chhattisgarh 2972 2971 1 00 2972 2971 1 00

गरिजत Gujarat 10540 10540 0 00 10540 10540 0 00

मधय परिश Madhya Pradesh 6233 6233 0 00 6233 6233 0 00

महजिजषटर Maharashtra 14319 14319 0 00 14319 14319 0 00

िमन औि दिउ Daman amp Diu 221 221 0 00 221 221 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 554 554 0 00 554 554 0 00

गोवज Goa 397 397 0 00 397 397 0 00

पशचिमी कषतर Western Region 35235 35234 1 00 35235 35234 1 00

आनधर परिश Andhra Pradesh 5653 5653 0 00 5653 5653 0 00

तलगजनज Telangana 5453 5453 0 00 5453 5453 0 00

कनजाटक Karnataka 6867 6867 0 00 6867 6867 0 00

किल Kerala 2313 2312 2 01 2313 2312 2 01

तममल नजड Tamil Nadu 9721 9721 0 00 9721 9721 0 00

पडचिी Puducherry 246 246 0 00 246 246 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 30254 30252 2 00 30254 30252 2 00

बबहजि Bihar 2584 2581 3 01 2584 2581 3 01

िजमोिि घजटी ननगम DVC 1944 1942 2 01 1944 1942 2 01

झजिखणड Jharkhand 716 706 10 14 716 706 10 14

ओडडशज Odisha 2701 2701 0 00 2701 2701 0 00

पशशचम बगजल West Bengal 4805 4782 23 05 4805 4782 23 05

मसशककम Sikkim 42 42 0 00 42 42 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12792 12754 38 03 12792 12754 38 03

अरणजचल परिश Arunachal Pradesh 62 62 0 06 62 62 0 06

असम Assam 754 696 58 77 754 696 58 77

मणणपि Manipur 62 61 1 17 62 61 1 17

मघजलय Meghalaya 169 159 10 60 169 159 10 60

ममज़ोिम Mizoram 45 44 0 10 45 44 0 10

नजगजलड Nagaland 59 58 0 08 59 58 0 08

बिपिज Tripura 119 117 2 13 119 117 2 13

उततर-परवी कषतर North-Eastern Region 1270 1198 72 57 1270 1198 72 57

समपणण भारत All India 109696 109241 455 04 109696 109241 455 04

Note The revised data for March 2019 is not avaliable

Energy not Supplied Energy not Supplied

अपरल 2019 April2019 अपरल 2019 April2019 to April 2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2885 2308 577 200 2885 2308 577 200

परजब Punjab 7087 7087 0 00 7087 7087 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 47779 47210 569 12 47779 47210 569 12

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9179 9160 19 02 9179 9160 19 02

तलगजनज Telangana 10269 10202 67 07 10269 10202 67 07

कनजाटक Karnataka 12700 12688 12 01 12700 12688 12 01

किल Kerala 4316 4300 16 04 4316 4300 16 04

तममल नजड Tamil Nadu 15680 15659 21 01 15680 15659 21 01

पडचिी Puducherry 444 444 0 00 444 444 0 00

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49218 49103 115 02 49218 49103 115 02

बबहजि Bihar 5157 5155 2 00 5157 5155 2 00

िजमोिि घजटी ननगम DVC 3014 3014 0 00 3014 3014 0 00

झजिखणड Jharkhand 1326 1325 1 00 1326 1325 1 00

ओडडशज Odisha 5142 5140 3 01 5142 5140 3 01

पशशचम बगजल West Bengal 8745 8699 46 05 8745 8699 46 05

मसशककम Sikkim 98 98 0 00 98 98 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22415 22378 37 02 22415 22378 37 02

अरणजचल परिश Arunachal Pradesh 139 136 3 21 139 136 3 21

असम Assam 1910 1667 242 127 1910 1667 242 127

मणणपि Manipur 197 188 9 48 197 188 9 48

मघजलय Meghalaya 337 337 0 00 337 337 0 00

ममज़ोिम Mizoram 116 113 3 28 116 113 3 28

नजगजलड Nagaland 157 131 27 169 157 131 27 169

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177424 176810 613 03 177424 176810 613 03

Note The revised data for March 2019 is not avaliable 26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateअपरल 2019 April2019 अपरल 2019 April2019 to April 2019

File NoCEA-CH-14-1142018-Coordination Division

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

मई 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during May2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

N

o No

tified

Cuts

N

o No

tified

Cuts

File NoCEA-CH-14-1142018-Coordination Division

मई2019May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0910 hrsday 0811 - 910 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 403 hrsday 0347 - 403 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 2214 hrsday 2157 - 2214 hrsday

उततराखड Uttarakhand Data not received 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-957 hrs day

Three-Phase (Mixed) Supply - 2346 hrs day

Three-Phase Supply(Irrigation)- 0953 - 0957 hrs day Three-

Phase (Mixed) Supply - 2334 - 2346 hrs day

महजिजषटर Maharashtra Three-Phase Supply - 9 hrs day Three-Phase Supply - 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

मई 2019 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during May2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to May-2019 20070450 2493722 63763 22627934 678000 4539922 7835904 35681760

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 7835904 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

7835904

Total Installed Capacity 35687160 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-22 (Up to

Mar2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

Plan Period

2017-22 (Up to

May-19)

6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58732 21173 181240 11734 163456 1010 176200 158886 225204 30768 414858

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Progress of Transmission Sector in the Country up to May 2019

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on May19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

May 19)

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during May 2019

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 20525 925681234952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Coal Lignite Gas Diesel Total

State 13500 000 180040 000 193540 000 000 000 193540

Private 86922 000 10800 000 97722 000 000 17889 115611

Central 311272 000 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 000 211541 000 623235 10283 72309 17889 723716

State 272000 000 15000 000 287000 000 110282 6930 404212

Private 408078 000 000 000 408078 000 20000 34512 462590

Central 129472 000 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 000 68561 000 878112 10094 196652 41942 1126799

State 000 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 000 99200 62668 161868

Central 18340 000 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 000 6201 000 24541 2895 291048 88329 406813

State 000 000 17500 000 17500 000 123000 13003 153503

Private 000 000 000 000 000 000 000 6483 6483

Central 50639 000 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 000 30407 000 81047 6798 232188 19486 339519

State 176000 000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 000 511550 000 28800 115462 655812

Central 85458 000 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244

State 626000 25000 60380 000 711380 000 109618 2385 823383

Private 280200 108000 000 000 388200 000 10400 751322 1149922

Central 95625 25000 22110 000 142735 55674 73901 34400 306710

Sub-Total 1001825 158000 82490 000 1242315 55674 193919 788107 2280015

State 546900 000 000 000 546900 000 72410 2510 621820

Private 871433 000 000 000 871433 000 84200 288760 1244393

Central 379639 000 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 000 54949 000 1852921 28948 336863 294270 2513002

State 000 000 000 000 000 000 125215 6787 132002

Private 9900 000 45000 000 54900 000 8800 52620 116320

Central 34324 000 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 000 51966 000 96190 3124 181569 59407 340290

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 3471 3471

Central 3815 000 1503 000 5317 801 10171 000 16289

Sub-Total 3815 000 1503 000 5317 801 10171 3471 19760

124953 000 29105 000 154058 23703 75145 000 252907

State 1634400 25000 287920 000 1947320 000 869755 70056 2887131

Private 2168083 108000 55800 000 2331883 000 251400 1333187 3916470

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Grand Total 5036020 158000 578126 000 5772146 162000 1970777 1441143 9346066

Jammu amp Kashmir

Punjab

Rajasthan

Uttar Pradesh

Uttarakhand

Chandigarh

Central - Unallocated

Total (Northern

Region)

HydroRES

(MNRE)

Delhi

Haryana

Himachal Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31052019)

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 005 005

Private 000 000 4800 000 4800 000 000 392 5192

Central 46959 000 1967 000 48926 2600 000 000 51526

Sub-Total 46959 000 6767 000 53726 2600 000 397 56723

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 1447 1447

Central 14141 000 4334 000 18475 700 000 000 19175

Sub-Total 14141 000 4334 000 18475 700 000 1447 20622

State 371000 104000 217782 000 692782 000 77200 6470 776452

Private 726567 50000 396000 000 1172567 000 000 841512 2014079

Central 324243 000 42400 000 366643 55900 000 24330 446873

Sub-Total 1421810 154000 656182 000 2231992 55900 77200 872312 3237404

State 540000 000 000 000 540000 000 170366 8396 718762

Private 617400 000 10000 000 627400 000 000 428040 1055440

Central 334238 000 25700 000 359938 27300 152000 30000 569238

Sub-Total 1491638 000 35700 000 1527338 27300 322366 466436 2343440

State 228000 000 000 000 228000 000 12000 1105 241105

Private 885000 000 000 000 885000 000 000 52430 937430

Central 211075 000 000 000 211075 4800 10000 000 225875

Sub-Total 1324075 000 000 000 1324075 4800 22000 53535 1404410

State 1017000 000 67200 000 1084200 000 285084 38813 1408097

Private 1245600 000 56800 000 1302400 000 48100 880441 2230941

Central 466780 000 227273 000 694053 69000 000 12300 775353

Sub-Total 2729380 000 351273 000 3080653 69000 333184 931553 4414390

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 546 546

Central 19560 000 6634 000 26194 900 000 000 27094

Sub-Total 19560 000 6634 000 26194 900 000 546 27640

233300 000 19759 000 253059 22800 000 000 275859

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2204808 6245075

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Grand Total 7280862 154000 1080649 000 8515511 184000 754750 2326226 11780487

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

ThermalNuclear Hydro

RES

(MNRE)

State Ownership Sector

Mode wise breakup

Grand Total

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 501000 000 23540 000 524540 000 167360 5618 697518

Private 387388 000 381318 3680 772386 000 000 743901 1516287

Central 154683 12773 000 000 167456 12727 000 25000 205183

Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 774519 2418988

State 558250 000 000 000 558250 000 247993 4122 810365

Private 83945 000 83182 000 167127 000 000 394315 561442

Central 180685 14927 000 000 195612 14873 000 1000 211485

Sub-Total 822880 14927 83182 000 920989 14873 247993 399437 1583292

State 502000 000 000 12792 514792 000 358660 19389 892841

Private 195850 000 000 2520 198370 000 000 1369720 1568090

Central 242780 40140 000 000 282920 69800 000 000 352720

Sub-Total 940630 40140 000 15312 996082 69800 358660 1389108 2813650

State 000 000 000 15996 15996 000 185650 17290 218936

Private 61500 000 17400 000 78900 000 000 19021 97921

Central 86142 28180 35958 000 150280 36200 000 5000 191480

Sub-Total 147642 28180 53358 15996 245176 36200 185650 41311 508337

State 432000 000 52408 000 484408 000 217820 12270 714498

Private 458767 25000 50310 21170 555247 000 000 1253885 1809132

Central 302532 136420 000 000 438952 144800 000 23190 606942

Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1289345 3130572

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 000 10000 000 000 10000 000 000 000 10000

Sub-Total 000 10000 000 000 10000 000 000 000 10000

State 000 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 000 314 314

Central 14080 10760 000 000 24840 8600 000 000 33440

Sub-Total 14080 10760 3250 000 28090 8600 000 314 37004

142600 35800 000 000 178400 45000 000 000 223400

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3781156 5553186

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Grand Total 4304202 314000 647366 56158 5321726 332000 1177483 3894034 10725243

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Andhra Pradesh

Telangana

Karnataka

Total (Southern

Region)

Tamil Nadu

NLC

Puducherry

Central - Unallocated

Kerala

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 7070 7070

Private 28100 000 000 000 28100 000 000 25545 53645

Central 384933 000 000 000 384933 000 11000 000 395932

Sub-Total 413033 000 000 000 413033 000 11000 32615 456647

State 42000 000 000 000 42000 000 13000 405 55405

Private 73000 000 000 000 73000 000 000 3647 76647

Central 39374 000 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 000 154374 000 19100 4052 177526

State 540000 000 10000 000 550000 000 98600 12195 660795

Private 243700 000 000 000 243700 000 000 35250 278950

Central 76077 000 000 000 76077 000 41000 000 117077

Sub-Total 859777 000 10000 000 869777 000 139600 47445 1056822

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 698504 000 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 000 698504 000 18620 000 717124

State 42000 000 000 000 42000 000 206192 2630 250822

Private 293900 000 000 000 293900 000 000 47346 341246

Central 163390 000 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 000 499290 000 215092 50976 765358

State 000 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 000 39900 001 39901

Central 8703 000 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 000 8703 000 82300 5212 96215

112683 000 000 000 112683 000 8501 000 121184

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111789 790389

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Grand Total 2746364 000 10000 000 2756364 000 494212 140300 3390876

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

Grand TotalThermalNuclear

RES

(MNRE)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

Total (Eastern

Region)

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

Central - Unallocated

HydroOwnership Sector

Mode wise breakup

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2650 5100

Central 40852 000 43556 000 84408 000 35708 2500 122616

Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038

State 000 000 000 000 000 000 000 10711 10711

Private 000 000 000 000 000 000 000 2939 2939

Central 3705 000 4682 000 8387 000 11655 000 20042

Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692

State 000 000 000 000 000 000 32200 3253 35453

Private 000 000 000 000 000 000 000 012 012

Central 4560 000 10969 000 15529 000 7227 000 22756

Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 5610 000 43695 000 49305 000 6849 500 56654

Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 344 344

Central 4710 000 7157 000 11867 000 9534 000 21401

Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 3210 000 4893 000 8103 000 5733 000 13836

Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 3105 000 4046 000 7151 000 9794 000 16945

Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642

11250 000 6362 000 17612 000 14000 000 31612

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 663 663

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1698 5703

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1773 5778

19

Andaman amp

Nicobar

Lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination Division

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during May-2019 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 31-05-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621

May19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 0 0 23 23 0 750 0 750 0 750 23 773

Achievement 0 0 0 0 0 0 0 0 0 0 0 0 0 474 0 474 0 503 0 503 0 977 0 977

Upto May-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 226 1176 0 1059 0 1059 637 2365 783 3785

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 494 0 494 0 904 0 904 53 1398 0 1451

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

Line

1 2 3 4 5 6

0

1 400 Barmer-Bhinmal line DC RVPNL 288

2 400 Jangaon - Tippapur DC TSTRANSCO 138

3 400 Kayathar - Thennampatty DC TANTRANSCO 48

4 220 Bareilly (400) - Pilibhit Ckt-II SC UPPTCL 39

5 220 Bhanjanagar - Aska DC OPTCL 57

6 220LILO of both Ckt of 220kV Mobha - Mangrol

line at 220kV Amod (Balanced portion)DC GETCO 46

7 220LILO of Gr Noida (400) - Noida Sec-148 line

at RC GreenDC UPPTCL 9

8 220 LILO of Hathras - Gokul at Mathura DC UPPTCL 120

9 220 Sohawal - Tanda DC UPPTCL 232

977

0

977

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During May-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 31-05-19

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during

May-201921(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 31-05-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716

May19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 0 1445 1000 2445 0 680 0 680 0 2125 1000 3125

Achievement 0 0 0 0 0 0 0 0 1000 0 0 1000 0 2385 0 2385 0 760 0 760 1000 3145 0 4145

Upto May-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 2445 3000 5445 0 1480 0 1480 3000 3925 6000 12925

Achievement 0 0 0 0 0 0 0 0 1500 0 0 1500 815 4365 0 5180 0 2065 0 2065 2315 6430 0 8745

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

As on 31-05-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1Bhadla SS (3x1500 3x500 MVA) (500 MVA ICTs- II

and III)400220 PGCIL 1000

Total of CENTRAL SECTOR 1000

2 Moradabad(Aug) (Additional TF) 400220 UPPTCL 240

3 Masauli Prayagraj (New) TF-III 400132 UPPTCL 200

4 Talaricheruvu Ss 400220 APTRANSCO 9455 Uravakonda (Aug) ICT-II 400220 APTRANSCO 5006 Jangaon ss (3x500) (ICT-I) 400220 TSTRANSCO 500

7 Chinhat Lucknow (Aug) TF-II (200-160) 220132 UPPTCL 408 Hathras (Aug)T-I(200-160) 220132 UPPTCL 409 Jaunpur (Aug) (Additional TF) 220132 UPPTCL 16010 Laukahi (Supaul new) 22013233 BSPTCL 32011 Sector- 95 Gurgaon 22033 HVPNL 10012 Alawalpur ss 22066 PSTCL 100

TOTAL STATE SECTOR 3145

GRAND TOTAL 4145

21(2)

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During May-2019

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2019-20 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination Division

Programme Achievement Ach Programme Achievement Ach

Central Sector 37545100 3290600 3141593 9547 6468500 6275642 9702

State Sector 37498600 3425800 3092392 9027 6748300 6066733 8990

PvtIPP Sector 37346200 3476700 3460217 9953 6713100 6652517 9910

PvtUTL Sector 1823100 164300 171799 10456 323600 337490 10429

Total 114213000 10357400 9866001 9526 20253500 19332382 9545

Central Sector 5661700 604200 619800 10258 990300 1104995 11158

State Sector 6680500 551500 652766 11836 1049700 1184387 11283

PvtIPP Sector 1206900 130200 121344 9320 187500 200643 10701

PvtUTL Sector 144100 12400 14009 11298 24700 25155 10184

Total 13693200 1298300 1407919 10844 2252200 2515180 11168

Central Sector 4472000 353500 365463 10338 720800 694195 9631

Total 4472000 353500 365463 10338 720800 694195 9631

Bhutan Import 621800 32500 35300 10862 50000 59270 11854

Central Sector 47678800 4248300 4126856 9714 8179600 8074832 9872

State Sector 44179100 3977300 3745158 9416 7798000 7251120 9299

Pvt Sector 40520300 3783600 3767369 9957 7248900 7215805 9954

Total 133000000 12041700 11674683 9695 23276500 22601027 9710

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Apr-19 Apr-18 Upto Apr-2019 Upto Apr-2018

975409 844377 975409 844377

22

Renewable Energy Generation

Achievement

May-2019

1 Electricity Generation (MU) Targets and Achievememts for 2019-20

All India Energy Generation During Apr-19 to May-19 (MU)

Target (2019-20)Apr-19 to May-19

Sector

Hydro

Thermal

Nuclear

202535

22522

7208

232765

193324

25152

6942

226010

0

50000

100000

150000

200000

250000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Energy Power Supply Position (Provisional) for May-2019 and during Apr-19 to May-19 23

2 Peak Power Supply Position (Provisional) for May-2019 and during Apr-19 to May-19 24

3 Energy Power Supply Position (Revised) for Apr-2019 and during Apr-19 to Apr-19 25

4 Peak Power Supply Position (Revised) for Apr-2019 and during Apr-19 to Apr-19 26

5 Notified Power cuts Restrictions on Industries during May-2019 27

6 Power Supply to Agricultural Sector during May-2019 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 154 154 0 00 271 271 0 00

दिलली Delhi 3366 3366 0 00 6065 6064 1 00

हरियजणज Haryana 4907 4907 0 00 8679 8679 0 00

दहमजचल परिश Himachal Pradesh 872 863 10 11 1654 1644 10 06

रमम कशमीि Jammu amp Kashmir 1760 1424 336 191 3364 2720 644 191

परजब Punjab 4769 4769 0 00 8475 8475 0 00

िजरसथजन Rajasthan 7120 7110 11 02 13313 13300 13 01

उतति परिश Uttar Pradesh 12742 12695 48 04 22897 22817 79 03

उततिजखड Uttarakhand 1329 1329 0 00 2449 2449 0 00

उततरी कषतर Northern Region 37020 36615 404 11 67166 66419 747 11

छततीसगढ़ Chhattisgarh 2794 2794 0 00 5765 5764 1 00

गरिजत Gujarat 11208 11208 0 00 21748 21748 0 00

मधय परिश Madhya Pradesh 6502 6502 0 00 12735 12735 0 00

महजिजषटर Maharashtra 14976 14976 0 00 29295 29294 0 00

िमन औि दिउ Daman amp Diu 222 222 0 00 443 443 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 1106 1106 0 00

गोवज Goa 404 404 0 00 801 801 0 00

पशचिमी कषतर Western Region 36658 36658 0 00 71893 71892 1 00

आनधर परिश Andhra Pradesh 6056 6048 7 01 11709 11702 7 01

तलगजनज Telangana 5318 5318 1 00 10772 10771 1 00

कनजाटक Karnataka 6702 6702 1 00 13569 13568 1 00

किल Kerala 2575 2566 9 03 4888 4878 10 02

तममल नजड Tamil Nadu 10309 10309 1 00 20031 20030 1 00

पडचिी Puducherry 271 271 1 03 517 516 1 01

लकष-दवीप Lakshadweep 4 4 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 31232 31213 19 01 61486 61465 21 00

बबहजि Bihar 3078 3078 0 00 5662 5659 3 01

िजमोिि घजटी ननगम DVC 1814 1814 0 00 3757 3755 2 01

झजिखणड Jharkhand 789 789 0 00 1505 1495 10 07

ओडडशज Odisha 2560 2560 0 00 5261 5261 0 00

पशशचम बगजल West Bengal 5115 5115 0 00 9920 9897 23 02

मसशककम Sikkim 36 36 0 00 78 78 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 58 54 4 67

परवी कषतर Eastern Region 13391 13391 0 00 26182 26144 38 01

अरणजचल परिश Arunachal Pradesh 64 64 0 06 127 126 1 06

असम Assam 819 738 81 99 1573 1434 139 88

मणणपि Manipur 73 72 1 07 135 134 2 12

मघजलय Meghalaya 167 159 8 50 336 318 18 55

ममज़ोिम Mizoram 55 55 0 07 100 99 1 08

नजगजलड Nagaland 65 64 1 08 124 123 1 08

बिपिज Tripura 173 170 2 14 292 288 4 13

उततर-परवी कषतर North-Eastern Region 1416 1323 93 66 2686 2521 165 62

समपणण भारत All India 119717 119200 517 04 229413 228441 972 04

Note Power Supply Position Report has been compiled based on the data furnished by State Utilities Electricity Departments

23

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 356 356 0 00 356 356 0 00

दिलली Delhi 6461 6461 0 00 6461 6461 0 00

हरियजणज Haryana 8874 8874 0 00 8874 8874 0 00

दहमजचल परिश Himachal Pradesh 1480 1480 0 00 1480 1480 0 00

रमम कशमीि Jammu amp Kashmir 2426 2426 0 00 2885 2426 459 159

परजब Punjab 8802 8802 0 00 8802 8802 0 00

िजरसथजन Rajasthan 11791 11791 0 00 11791 11791 0 00

उतति परिश Uttar Pradesh 22487 22057 430 19 22487 22057 430 19

उततिजखड Uttarakhand 2155 2155 0 00 2155 2155 0 00

उततरी कषतर Northern Region 60987 60078 909 15 60987 60078 909 15

छततीसगढ़ Chhattisgarh 4504 4504 0 00 4596 4574 22 05

गरिजत Gujarat 18094 18094 0 00 18094 18094 0 00

मधय परिश Madhya Pradesh 10145 10131 14 01 10145 10131 14 01

महजिजषटर Maharashtra 23621 23613 8 00 23621 23613 8 00

िमन औि दिउ Daman amp Diu 344 344 0 01 344 344 0 01

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 818 818 0 00

गोवज Goa 554 554 0 00 594 594 0 00

पशचिमी कषतर Western Region 57113 57093 20 00 57113 57093 20 00

आनधर परिश Andhra Pradesh 9854 9854 0 00 9854 9854 0 00

तलगजनज Telangana 8684 8684 0 00 10269 10202 67 07

कनजाटक Karnataka 12158 12158 0 00 12700 12688 12 01

किल Kerala 4286 4205 81 19 4316 4300 16 04

तममल नजड Tamil Nadu 15584 15522 62 04 15680 15659 21 01

पडचिी Puducherry 453 442 11 24 453 444 9 20

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 47477 47465 12 00 49218 49103 115 02

बबहजि Bihar 5481 5481 0 00 5481 5481 0 00

िजमोिि घजटी ननगम DVC 3048 3048 0 00 3048 3048 0 00

झजिखणड Jharkhand 1330 1330 0 00 1330 1330 0 00

ओडडशज Odisha 4736 4736 0 00 5142 5140 3 01

पशशचम बगजल West Bengal 9335 9335 0 00 9335 9335 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23558 23558 0 00 23558 23558 0 00

अरणजचल परिश Arunachal Pradesh 140 138 2 12 140 138 2 12

असम Assam 1753 1673 80 46 1910 1673 237 124

मणणपि Manipur 183 181 2 09 197 188 9 48

मघजलय Meghalaya 329 325 4 12 337 337 0 00

ममज़ोिम Mizoram 102 100 2 20 116 113 3 28

नजगजलड Nagaland 130 128 2 14 157 131 27 169

बिपिज Tripura 297 295 1 05 297 295 1 05

उततर-परवी कषतर North-Eastern Region 2758 2674 84 31 2848 2780 68 24

समपणण भारत All India 183513 182533 981 05 183513 182533 981 05

Note Power Supply Position Report has been compiled based on the data furnished by State Utilities Electricity Departments 24

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -मई2019 April2019 to May2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and supply

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateमई 2019 May2019

मजग की पनता म कमी Demand not Met

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 781 781 0 00 781 781 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3706 3706 0 00 3706 3706 0 00

िजरसथजन Rajasthan 6192 6190 2 00 6192 6190 2 00

उतति परिश Uttar Pradesh 10154 10123 32 03 10154 10123 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30147 29804 343 11 30147 29804 343 11

छततीसगढ़ Chhattisgarh 2972 2971 1 00 2972 2971 1 00

गरिजत Gujarat 10540 10540 0 00 10540 10540 0 00

मधय परिश Madhya Pradesh 6233 6233 0 00 6233 6233 0 00

महजिजषटर Maharashtra 14319 14319 0 00 14319 14319 0 00

िमन औि दिउ Daman amp Diu 221 221 0 00 221 221 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 554 554 0 00 554 554 0 00

गोवज Goa 397 397 0 00 397 397 0 00

पशचिमी कषतर Western Region 35235 35234 1 00 35235 35234 1 00

आनधर परिश Andhra Pradesh 5653 5653 0 00 5653 5653 0 00

तलगजनज Telangana 5453 5453 0 00 5453 5453 0 00

कनजाटक Karnataka 6867 6867 0 00 6867 6867 0 00

किल Kerala 2313 2312 2 01 2313 2312 2 01

तममल नजड Tamil Nadu 9721 9721 0 00 9721 9721 0 00

पडचिी Puducherry 246 246 0 00 246 246 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 30254 30252 2 00 30254 30252 2 00

बबहजि Bihar 2584 2581 3 01 2584 2581 3 01

िजमोिि घजटी ननगम DVC 1944 1942 2 01 1944 1942 2 01

झजिखणड Jharkhand 716 706 10 14 716 706 10 14

ओडडशज Odisha 2701 2701 0 00 2701 2701 0 00

पशशचम बगजल West Bengal 4805 4782 23 05 4805 4782 23 05

मसशककम Sikkim 42 42 0 00 42 42 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12792 12754 38 03 12792 12754 38 03

अरणजचल परिश Arunachal Pradesh 62 62 0 06 62 62 0 06

असम Assam 754 696 58 77 754 696 58 77

मणणपि Manipur 62 61 1 17 62 61 1 17

मघजलय Meghalaya 169 159 10 60 169 159 10 60

ममज़ोिम Mizoram 45 44 0 10 45 44 0 10

नजगजलड Nagaland 59 58 0 08 59 58 0 08

बिपिज Tripura 119 117 2 13 119 117 2 13

उततर-परवी कषतर North-Eastern Region 1270 1198 72 57 1270 1198 72 57

समपणण भारत All India 109696 109241 455 04 109696 109241 455 04

Note The revised data for March 2019 is not avaliable

Energy not Supplied Energy not Supplied

अपरल 2019 April2019 अपरल 2019 April2019 to April 2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2885 2308 577 200 2885 2308 577 200

परजब Punjab 7087 7087 0 00 7087 7087 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 47779 47210 569 12 47779 47210 569 12

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9179 9160 19 02 9179 9160 19 02

तलगजनज Telangana 10269 10202 67 07 10269 10202 67 07

कनजाटक Karnataka 12700 12688 12 01 12700 12688 12 01

किल Kerala 4316 4300 16 04 4316 4300 16 04

तममल नजड Tamil Nadu 15680 15659 21 01 15680 15659 21 01

पडचिी Puducherry 444 444 0 00 444 444 0 00

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49218 49103 115 02 49218 49103 115 02

बबहजि Bihar 5157 5155 2 00 5157 5155 2 00

िजमोिि घजटी ननगम DVC 3014 3014 0 00 3014 3014 0 00

झजिखणड Jharkhand 1326 1325 1 00 1326 1325 1 00

ओडडशज Odisha 5142 5140 3 01 5142 5140 3 01

पशशचम बगजल West Bengal 8745 8699 46 05 8745 8699 46 05

मसशककम Sikkim 98 98 0 00 98 98 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22415 22378 37 02 22415 22378 37 02

अरणजचल परिश Arunachal Pradesh 139 136 3 21 139 136 3 21

असम Assam 1910 1667 242 127 1910 1667 242 127

मणणपि Manipur 197 188 9 48 197 188 9 48

मघजलय Meghalaya 337 337 0 00 337 337 0 00

ममज़ोिम Mizoram 116 113 3 28 116 113 3 28

नजगजलड Nagaland 157 131 27 169 157 131 27 169

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177424 176810 613 03 177424 176810 613 03

Note The revised data for March 2019 is not avaliable 26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateअपरल 2019 April2019 अपरल 2019 April2019 to April 2019

File NoCEA-CH-14-1142018-Coordination Division

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

मई 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during May2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

N

o No

tified

Cuts

N

o No

tified

Cuts

File NoCEA-CH-14-1142018-Coordination Division

मई2019May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0910 hrsday 0811 - 910 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 403 hrsday 0347 - 403 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 2214 hrsday 2157 - 2214 hrsday

उततराखड Uttarakhand Data not received 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-957 hrs day

Three-Phase (Mixed) Supply - 2346 hrs day

Three-Phase Supply(Irrigation)- 0953 - 0957 hrs day Three-

Phase (Mixed) Supply - 2334 - 2346 hrs day

महजिजषटर Maharashtra Three-Phase Supply - 9 hrs day Three-Phase Supply - 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

मई 2019 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during May2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to May-2019 20070450 2493722 63763 22627934 678000 4539922 7835904 35681760

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 7835904 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

7835904

Total Installed Capacity 35687160 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-22 (Up to

Mar2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

Plan Period

2017-22 (Up to

May-19)

6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58732 21173 181240 11734 163456 1010 176200 158886 225204 30768 414858

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Progress of Transmission Sector in the Country up to May 2019

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on May19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

May 19)

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during May 2019

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 20525 925681234952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 005 005

Private 000 000 4800 000 4800 000 000 392 5192

Central 46959 000 1967 000 48926 2600 000 000 51526

Sub-Total 46959 000 6767 000 53726 2600 000 397 56723

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 1447 1447

Central 14141 000 4334 000 18475 700 000 000 19175

Sub-Total 14141 000 4334 000 18475 700 000 1447 20622

State 371000 104000 217782 000 692782 000 77200 6470 776452

Private 726567 50000 396000 000 1172567 000 000 841512 2014079

Central 324243 000 42400 000 366643 55900 000 24330 446873

Sub-Total 1421810 154000 656182 000 2231992 55900 77200 872312 3237404

State 540000 000 000 000 540000 000 170366 8396 718762

Private 617400 000 10000 000 627400 000 000 428040 1055440

Central 334238 000 25700 000 359938 27300 152000 30000 569238

Sub-Total 1491638 000 35700 000 1527338 27300 322366 466436 2343440

State 228000 000 000 000 228000 000 12000 1105 241105

Private 885000 000 000 000 885000 000 000 52430 937430

Central 211075 000 000 000 211075 4800 10000 000 225875

Sub-Total 1324075 000 000 000 1324075 4800 22000 53535 1404410

State 1017000 000 67200 000 1084200 000 285084 38813 1408097

Private 1245600 000 56800 000 1302400 000 48100 880441 2230941

Central 466780 000 227273 000 694053 69000 000 12300 775353

Sub-Total 2729380 000 351273 000 3080653 69000 333184 931553 4414390

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 546 546

Central 19560 000 6634 000 26194 900 000 000 27094

Sub-Total 19560 000 6634 000 26194 900 000 546 27640

233300 000 19759 000 253059 22800 000 000 275859

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2204808 6245075

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Grand Total 7280862 154000 1080649 000 8515511 184000 754750 2326226 11780487

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

ThermalNuclear Hydro

RES

(MNRE)

State Ownership Sector

Mode wise breakup

Grand Total

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 501000 000 23540 000 524540 000 167360 5618 697518

Private 387388 000 381318 3680 772386 000 000 743901 1516287

Central 154683 12773 000 000 167456 12727 000 25000 205183

Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 774519 2418988

State 558250 000 000 000 558250 000 247993 4122 810365

Private 83945 000 83182 000 167127 000 000 394315 561442

Central 180685 14927 000 000 195612 14873 000 1000 211485

Sub-Total 822880 14927 83182 000 920989 14873 247993 399437 1583292

State 502000 000 000 12792 514792 000 358660 19389 892841

Private 195850 000 000 2520 198370 000 000 1369720 1568090

Central 242780 40140 000 000 282920 69800 000 000 352720

Sub-Total 940630 40140 000 15312 996082 69800 358660 1389108 2813650

State 000 000 000 15996 15996 000 185650 17290 218936

Private 61500 000 17400 000 78900 000 000 19021 97921

Central 86142 28180 35958 000 150280 36200 000 5000 191480

Sub-Total 147642 28180 53358 15996 245176 36200 185650 41311 508337

State 432000 000 52408 000 484408 000 217820 12270 714498

Private 458767 25000 50310 21170 555247 000 000 1253885 1809132

Central 302532 136420 000 000 438952 144800 000 23190 606942

Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1289345 3130572

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 000 10000 000 000 10000 000 000 000 10000

Sub-Total 000 10000 000 000 10000 000 000 000 10000

State 000 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 000 314 314

Central 14080 10760 000 000 24840 8600 000 000 33440

Sub-Total 14080 10760 3250 000 28090 8600 000 314 37004

142600 35800 000 000 178400 45000 000 000 223400

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3781156 5553186

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Grand Total 4304202 314000 647366 56158 5321726 332000 1177483 3894034 10725243

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Andhra Pradesh

Telangana

Karnataka

Total (Southern

Region)

Tamil Nadu

NLC

Puducherry

Central - Unallocated

Kerala

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 7070 7070

Private 28100 000 000 000 28100 000 000 25545 53645

Central 384933 000 000 000 384933 000 11000 000 395932

Sub-Total 413033 000 000 000 413033 000 11000 32615 456647

State 42000 000 000 000 42000 000 13000 405 55405

Private 73000 000 000 000 73000 000 000 3647 76647

Central 39374 000 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 000 154374 000 19100 4052 177526

State 540000 000 10000 000 550000 000 98600 12195 660795

Private 243700 000 000 000 243700 000 000 35250 278950

Central 76077 000 000 000 76077 000 41000 000 117077

Sub-Total 859777 000 10000 000 869777 000 139600 47445 1056822

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 698504 000 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 000 698504 000 18620 000 717124

State 42000 000 000 000 42000 000 206192 2630 250822

Private 293900 000 000 000 293900 000 000 47346 341246

Central 163390 000 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 000 499290 000 215092 50976 765358

State 000 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 000 39900 001 39901

Central 8703 000 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 000 8703 000 82300 5212 96215

112683 000 000 000 112683 000 8501 000 121184

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111789 790389

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Grand Total 2746364 000 10000 000 2756364 000 494212 140300 3390876

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

Grand TotalThermalNuclear

RES

(MNRE)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

Total (Eastern

Region)

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

Central - Unallocated

HydroOwnership Sector

Mode wise breakup

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2650 5100

Central 40852 000 43556 000 84408 000 35708 2500 122616

Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038

State 000 000 000 000 000 000 000 10711 10711

Private 000 000 000 000 000 000 000 2939 2939

Central 3705 000 4682 000 8387 000 11655 000 20042

Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692

State 000 000 000 000 000 000 32200 3253 35453

Private 000 000 000 000 000 000 000 012 012

Central 4560 000 10969 000 15529 000 7227 000 22756

Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 5610 000 43695 000 49305 000 6849 500 56654

Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 344 344

Central 4710 000 7157 000 11867 000 9534 000 21401

Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 3210 000 4893 000 8103 000 5733 000 13836

Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 3105 000 4046 000 7151 000 9794 000 16945

Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642

11250 000 6362 000 17612 000 14000 000 31612

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 663 663

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1698 5703

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1773 5778

19

Andaman amp

Nicobar

Lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination Division

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during May-2019 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 31-05-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621

May19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 0 0 23 23 0 750 0 750 0 750 23 773

Achievement 0 0 0 0 0 0 0 0 0 0 0 0 0 474 0 474 0 503 0 503 0 977 0 977

Upto May-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 226 1176 0 1059 0 1059 637 2365 783 3785

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 494 0 494 0 904 0 904 53 1398 0 1451

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

Line

1 2 3 4 5 6

0

1 400 Barmer-Bhinmal line DC RVPNL 288

2 400 Jangaon - Tippapur DC TSTRANSCO 138

3 400 Kayathar - Thennampatty DC TANTRANSCO 48

4 220 Bareilly (400) - Pilibhit Ckt-II SC UPPTCL 39

5 220 Bhanjanagar - Aska DC OPTCL 57

6 220LILO of both Ckt of 220kV Mobha - Mangrol

line at 220kV Amod (Balanced portion)DC GETCO 46

7 220LILO of Gr Noida (400) - Noida Sec-148 line

at RC GreenDC UPPTCL 9

8 220 LILO of Hathras - Gokul at Mathura DC UPPTCL 120

9 220 Sohawal - Tanda DC UPPTCL 232

977

0

977

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During May-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 31-05-19

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during

May-201921(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 31-05-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716

May19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 0 1445 1000 2445 0 680 0 680 0 2125 1000 3125

Achievement 0 0 0 0 0 0 0 0 1000 0 0 1000 0 2385 0 2385 0 760 0 760 1000 3145 0 4145

Upto May-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 2445 3000 5445 0 1480 0 1480 3000 3925 6000 12925

Achievement 0 0 0 0 0 0 0 0 1500 0 0 1500 815 4365 0 5180 0 2065 0 2065 2315 6430 0 8745

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

As on 31-05-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1Bhadla SS (3x1500 3x500 MVA) (500 MVA ICTs- II

and III)400220 PGCIL 1000

Total of CENTRAL SECTOR 1000

2 Moradabad(Aug) (Additional TF) 400220 UPPTCL 240

3 Masauli Prayagraj (New) TF-III 400132 UPPTCL 200

4 Talaricheruvu Ss 400220 APTRANSCO 9455 Uravakonda (Aug) ICT-II 400220 APTRANSCO 5006 Jangaon ss (3x500) (ICT-I) 400220 TSTRANSCO 500

7 Chinhat Lucknow (Aug) TF-II (200-160) 220132 UPPTCL 408 Hathras (Aug)T-I(200-160) 220132 UPPTCL 409 Jaunpur (Aug) (Additional TF) 220132 UPPTCL 16010 Laukahi (Supaul new) 22013233 BSPTCL 32011 Sector- 95 Gurgaon 22033 HVPNL 10012 Alawalpur ss 22066 PSTCL 100

TOTAL STATE SECTOR 3145

GRAND TOTAL 4145

21(2)

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During May-2019

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2019-20 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination Division

Programme Achievement Ach Programme Achievement Ach

Central Sector 37545100 3290600 3141593 9547 6468500 6275642 9702

State Sector 37498600 3425800 3092392 9027 6748300 6066733 8990

PvtIPP Sector 37346200 3476700 3460217 9953 6713100 6652517 9910

PvtUTL Sector 1823100 164300 171799 10456 323600 337490 10429

Total 114213000 10357400 9866001 9526 20253500 19332382 9545

Central Sector 5661700 604200 619800 10258 990300 1104995 11158

State Sector 6680500 551500 652766 11836 1049700 1184387 11283

PvtIPP Sector 1206900 130200 121344 9320 187500 200643 10701

PvtUTL Sector 144100 12400 14009 11298 24700 25155 10184

Total 13693200 1298300 1407919 10844 2252200 2515180 11168

Central Sector 4472000 353500 365463 10338 720800 694195 9631

Total 4472000 353500 365463 10338 720800 694195 9631

Bhutan Import 621800 32500 35300 10862 50000 59270 11854

Central Sector 47678800 4248300 4126856 9714 8179600 8074832 9872

State Sector 44179100 3977300 3745158 9416 7798000 7251120 9299

Pvt Sector 40520300 3783600 3767369 9957 7248900 7215805 9954

Total 133000000 12041700 11674683 9695 23276500 22601027 9710

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Apr-19 Apr-18 Upto Apr-2019 Upto Apr-2018

975409 844377 975409 844377

22

Renewable Energy Generation

Achievement

May-2019

1 Electricity Generation (MU) Targets and Achievememts for 2019-20

All India Energy Generation During Apr-19 to May-19 (MU)

Target (2019-20)Apr-19 to May-19

Sector

Hydro

Thermal

Nuclear

202535

22522

7208

232765

193324

25152

6942

226010

0

50000

100000

150000

200000

250000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Energy Power Supply Position (Provisional) for May-2019 and during Apr-19 to May-19 23

2 Peak Power Supply Position (Provisional) for May-2019 and during Apr-19 to May-19 24

3 Energy Power Supply Position (Revised) for Apr-2019 and during Apr-19 to Apr-19 25

4 Peak Power Supply Position (Revised) for Apr-2019 and during Apr-19 to Apr-19 26

5 Notified Power cuts Restrictions on Industries during May-2019 27

6 Power Supply to Agricultural Sector during May-2019 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 154 154 0 00 271 271 0 00

दिलली Delhi 3366 3366 0 00 6065 6064 1 00

हरियजणज Haryana 4907 4907 0 00 8679 8679 0 00

दहमजचल परिश Himachal Pradesh 872 863 10 11 1654 1644 10 06

रमम कशमीि Jammu amp Kashmir 1760 1424 336 191 3364 2720 644 191

परजब Punjab 4769 4769 0 00 8475 8475 0 00

िजरसथजन Rajasthan 7120 7110 11 02 13313 13300 13 01

उतति परिश Uttar Pradesh 12742 12695 48 04 22897 22817 79 03

उततिजखड Uttarakhand 1329 1329 0 00 2449 2449 0 00

उततरी कषतर Northern Region 37020 36615 404 11 67166 66419 747 11

छततीसगढ़ Chhattisgarh 2794 2794 0 00 5765 5764 1 00

गरिजत Gujarat 11208 11208 0 00 21748 21748 0 00

मधय परिश Madhya Pradesh 6502 6502 0 00 12735 12735 0 00

महजिजषटर Maharashtra 14976 14976 0 00 29295 29294 0 00

िमन औि दिउ Daman amp Diu 222 222 0 00 443 443 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 1106 1106 0 00

गोवज Goa 404 404 0 00 801 801 0 00

पशचिमी कषतर Western Region 36658 36658 0 00 71893 71892 1 00

आनधर परिश Andhra Pradesh 6056 6048 7 01 11709 11702 7 01

तलगजनज Telangana 5318 5318 1 00 10772 10771 1 00

कनजाटक Karnataka 6702 6702 1 00 13569 13568 1 00

किल Kerala 2575 2566 9 03 4888 4878 10 02

तममल नजड Tamil Nadu 10309 10309 1 00 20031 20030 1 00

पडचिी Puducherry 271 271 1 03 517 516 1 01

लकष-दवीप Lakshadweep 4 4 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 31232 31213 19 01 61486 61465 21 00

बबहजि Bihar 3078 3078 0 00 5662 5659 3 01

िजमोिि घजटी ननगम DVC 1814 1814 0 00 3757 3755 2 01

झजिखणड Jharkhand 789 789 0 00 1505 1495 10 07

ओडडशज Odisha 2560 2560 0 00 5261 5261 0 00

पशशचम बगजल West Bengal 5115 5115 0 00 9920 9897 23 02

मसशककम Sikkim 36 36 0 00 78 78 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 58 54 4 67

परवी कषतर Eastern Region 13391 13391 0 00 26182 26144 38 01

अरणजचल परिश Arunachal Pradesh 64 64 0 06 127 126 1 06

असम Assam 819 738 81 99 1573 1434 139 88

मणणपि Manipur 73 72 1 07 135 134 2 12

मघजलय Meghalaya 167 159 8 50 336 318 18 55

ममज़ोिम Mizoram 55 55 0 07 100 99 1 08

नजगजलड Nagaland 65 64 1 08 124 123 1 08

बिपिज Tripura 173 170 2 14 292 288 4 13

उततर-परवी कषतर North-Eastern Region 1416 1323 93 66 2686 2521 165 62

समपणण भारत All India 119717 119200 517 04 229413 228441 972 04

Note Power Supply Position Report has been compiled based on the data furnished by State Utilities Electricity Departments

23

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 356 356 0 00 356 356 0 00

दिलली Delhi 6461 6461 0 00 6461 6461 0 00

हरियजणज Haryana 8874 8874 0 00 8874 8874 0 00

दहमजचल परिश Himachal Pradesh 1480 1480 0 00 1480 1480 0 00

रमम कशमीि Jammu amp Kashmir 2426 2426 0 00 2885 2426 459 159

परजब Punjab 8802 8802 0 00 8802 8802 0 00

िजरसथजन Rajasthan 11791 11791 0 00 11791 11791 0 00

उतति परिश Uttar Pradesh 22487 22057 430 19 22487 22057 430 19

उततिजखड Uttarakhand 2155 2155 0 00 2155 2155 0 00

उततरी कषतर Northern Region 60987 60078 909 15 60987 60078 909 15

छततीसगढ़ Chhattisgarh 4504 4504 0 00 4596 4574 22 05

गरिजत Gujarat 18094 18094 0 00 18094 18094 0 00

मधय परिश Madhya Pradesh 10145 10131 14 01 10145 10131 14 01

महजिजषटर Maharashtra 23621 23613 8 00 23621 23613 8 00

िमन औि दिउ Daman amp Diu 344 344 0 01 344 344 0 01

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 818 818 0 00

गोवज Goa 554 554 0 00 594 594 0 00

पशचिमी कषतर Western Region 57113 57093 20 00 57113 57093 20 00

आनधर परिश Andhra Pradesh 9854 9854 0 00 9854 9854 0 00

तलगजनज Telangana 8684 8684 0 00 10269 10202 67 07

कनजाटक Karnataka 12158 12158 0 00 12700 12688 12 01

किल Kerala 4286 4205 81 19 4316 4300 16 04

तममल नजड Tamil Nadu 15584 15522 62 04 15680 15659 21 01

पडचिी Puducherry 453 442 11 24 453 444 9 20

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 47477 47465 12 00 49218 49103 115 02

बबहजि Bihar 5481 5481 0 00 5481 5481 0 00

िजमोिि घजटी ननगम DVC 3048 3048 0 00 3048 3048 0 00

झजिखणड Jharkhand 1330 1330 0 00 1330 1330 0 00

ओडडशज Odisha 4736 4736 0 00 5142 5140 3 01

पशशचम बगजल West Bengal 9335 9335 0 00 9335 9335 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23558 23558 0 00 23558 23558 0 00

अरणजचल परिश Arunachal Pradesh 140 138 2 12 140 138 2 12

असम Assam 1753 1673 80 46 1910 1673 237 124

मणणपि Manipur 183 181 2 09 197 188 9 48

मघजलय Meghalaya 329 325 4 12 337 337 0 00

ममज़ोिम Mizoram 102 100 2 20 116 113 3 28

नजगजलड Nagaland 130 128 2 14 157 131 27 169

बिपिज Tripura 297 295 1 05 297 295 1 05

उततर-परवी कषतर North-Eastern Region 2758 2674 84 31 2848 2780 68 24

समपणण भारत All India 183513 182533 981 05 183513 182533 981 05

Note Power Supply Position Report has been compiled based on the data furnished by State Utilities Electricity Departments 24

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -मई2019 April2019 to May2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and supply

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateमई 2019 May2019

मजग की पनता म कमी Demand not Met

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 781 781 0 00 781 781 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3706 3706 0 00 3706 3706 0 00

िजरसथजन Rajasthan 6192 6190 2 00 6192 6190 2 00

उतति परिश Uttar Pradesh 10154 10123 32 03 10154 10123 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30147 29804 343 11 30147 29804 343 11

छततीसगढ़ Chhattisgarh 2972 2971 1 00 2972 2971 1 00

गरिजत Gujarat 10540 10540 0 00 10540 10540 0 00

मधय परिश Madhya Pradesh 6233 6233 0 00 6233 6233 0 00

महजिजषटर Maharashtra 14319 14319 0 00 14319 14319 0 00

िमन औि दिउ Daman amp Diu 221 221 0 00 221 221 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 554 554 0 00 554 554 0 00

गोवज Goa 397 397 0 00 397 397 0 00

पशचिमी कषतर Western Region 35235 35234 1 00 35235 35234 1 00

आनधर परिश Andhra Pradesh 5653 5653 0 00 5653 5653 0 00

तलगजनज Telangana 5453 5453 0 00 5453 5453 0 00

कनजाटक Karnataka 6867 6867 0 00 6867 6867 0 00

किल Kerala 2313 2312 2 01 2313 2312 2 01

तममल नजड Tamil Nadu 9721 9721 0 00 9721 9721 0 00

पडचिी Puducherry 246 246 0 00 246 246 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 30254 30252 2 00 30254 30252 2 00

बबहजि Bihar 2584 2581 3 01 2584 2581 3 01

िजमोिि घजटी ननगम DVC 1944 1942 2 01 1944 1942 2 01

झजिखणड Jharkhand 716 706 10 14 716 706 10 14

ओडडशज Odisha 2701 2701 0 00 2701 2701 0 00

पशशचम बगजल West Bengal 4805 4782 23 05 4805 4782 23 05

मसशककम Sikkim 42 42 0 00 42 42 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12792 12754 38 03 12792 12754 38 03

अरणजचल परिश Arunachal Pradesh 62 62 0 06 62 62 0 06

असम Assam 754 696 58 77 754 696 58 77

मणणपि Manipur 62 61 1 17 62 61 1 17

मघजलय Meghalaya 169 159 10 60 169 159 10 60

ममज़ोिम Mizoram 45 44 0 10 45 44 0 10

नजगजलड Nagaland 59 58 0 08 59 58 0 08

बिपिज Tripura 119 117 2 13 119 117 2 13

उततर-परवी कषतर North-Eastern Region 1270 1198 72 57 1270 1198 72 57

समपणण भारत All India 109696 109241 455 04 109696 109241 455 04

Note The revised data for March 2019 is not avaliable

Energy not Supplied Energy not Supplied

अपरल 2019 April2019 अपरल 2019 April2019 to April 2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2885 2308 577 200 2885 2308 577 200

परजब Punjab 7087 7087 0 00 7087 7087 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 47779 47210 569 12 47779 47210 569 12

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9179 9160 19 02 9179 9160 19 02

तलगजनज Telangana 10269 10202 67 07 10269 10202 67 07

कनजाटक Karnataka 12700 12688 12 01 12700 12688 12 01

किल Kerala 4316 4300 16 04 4316 4300 16 04

तममल नजड Tamil Nadu 15680 15659 21 01 15680 15659 21 01

पडचिी Puducherry 444 444 0 00 444 444 0 00

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49218 49103 115 02 49218 49103 115 02

बबहजि Bihar 5157 5155 2 00 5157 5155 2 00

िजमोिि घजटी ननगम DVC 3014 3014 0 00 3014 3014 0 00

झजिखणड Jharkhand 1326 1325 1 00 1326 1325 1 00

ओडडशज Odisha 5142 5140 3 01 5142 5140 3 01

पशशचम बगजल West Bengal 8745 8699 46 05 8745 8699 46 05

मसशककम Sikkim 98 98 0 00 98 98 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22415 22378 37 02 22415 22378 37 02

अरणजचल परिश Arunachal Pradesh 139 136 3 21 139 136 3 21

असम Assam 1910 1667 242 127 1910 1667 242 127

मणणपि Manipur 197 188 9 48 197 188 9 48

मघजलय Meghalaya 337 337 0 00 337 337 0 00

ममज़ोिम Mizoram 116 113 3 28 116 113 3 28

नजगजलड Nagaland 157 131 27 169 157 131 27 169

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177424 176810 613 03 177424 176810 613 03

Note The revised data for March 2019 is not avaliable 26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateअपरल 2019 April2019 अपरल 2019 April2019 to April 2019

File NoCEA-CH-14-1142018-Coordination Division

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

मई 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during May2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

N

o No

tified

Cuts

N

o No

tified

Cuts

File NoCEA-CH-14-1142018-Coordination Division

मई2019May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0910 hrsday 0811 - 910 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 403 hrsday 0347 - 403 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 2214 hrsday 2157 - 2214 hrsday

उततराखड Uttarakhand Data not received 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-957 hrs day

Three-Phase (Mixed) Supply - 2346 hrs day

Three-Phase Supply(Irrigation)- 0953 - 0957 hrs day Three-

Phase (Mixed) Supply - 2334 - 2346 hrs day

महजिजषटर Maharashtra Three-Phase Supply - 9 hrs day Three-Phase Supply - 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

मई 2019 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during May2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to May-2019 20070450 2493722 63763 22627934 678000 4539922 7835904 35681760

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 7835904 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

7835904

Total Installed Capacity 35687160 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-22 (Up to

Mar2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

Plan Period

2017-22 (Up to

May-19)

6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58732 21173 181240 11734 163456 1010 176200 158886 225204 30768 414858

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Progress of Transmission Sector in the Country up to May 2019

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on May19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

May 19)

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during May 2019

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 20525 925681234952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 501000 000 23540 000 524540 000 167360 5618 697518

Private 387388 000 381318 3680 772386 000 000 743901 1516287

Central 154683 12773 000 000 167456 12727 000 25000 205183

Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 774519 2418988

State 558250 000 000 000 558250 000 247993 4122 810365

Private 83945 000 83182 000 167127 000 000 394315 561442

Central 180685 14927 000 000 195612 14873 000 1000 211485

Sub-Total 822880 14927 83182 000 920989 14873 247993 399437 1583292

State 502000 000 000 12792 514792 000 358660 19389 892841

Private 195850 000 000 2520 198370 000 000 1369720 1568090

Central 242780 40140 000 000 282920 69800 000 000 352720

Sub-Total 940630 40140 000 15312 996082 69800 358660 1389108 2813650

State 000 000 000 15996 15996 000 185650 17290 218936

Private 61500 000 17400 000 78900 000 000 19021 97921

Central 86142 28180 35958 000 150280 36200 000 5000 191480

Sub-Total 147642 28180 53358 15996 245176 36200 185650 41311 508337

State 432000 000 52408 000 484408 000 217820 12270 714498

Private 458767 25000 50310 21170 555247 000 000 1253885 1809132

Central 302532 136420 000 000 438952 144800 000 23190 606942

Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1289345 3130572

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 000 10000 000 000 10000 000 000 000 10000

Sub-Total 000 10000 000 000 10000 000 000 000 10000

State 000 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 000 314 314

Central 14080 10760 000 000 24840 8600 000 000 33440

Sub-Total 14080 10760 3250 000 28090 8600 000 314 37004

142600 35800 000 000 178400 45000 000 000 223400

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3781156 5553186

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Grand Total 4304202 314000 647366 56158 5321726 332000 1177483 3894034 10725243

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Andhra Pradesh

Telangana

Karnataka

Total (Southern

Region)

Tamil Nadu

NLC

Puducherry

Central - Unallocated

Kerala

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 7070 7070

Private 28100 000 000 000 28100 000 000 25545 53645

Central 384933 000 000 000 384933 000 11000 000 395932

Sub-Total 413033 000 000 000 413033 000 11000 32615 456647

State 42000 000 000 000 42000 000 13000 405 55405

Private 73000 000 000 000 73000 000 000 3647 76647

Central 39374 000 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 000 154374 000 19100 4052 177526

State 540000 000 10000 000 550000 000 98600 12195 660795

Private 243700 000 000 000 243700 000 000 35250 278950

Central 76077 000 000 000 76077 000 41000 000 117077

Sub-Total 859777 000 10000 000 869777 000 139600 47445 1056822

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 698504 000 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 000 698504 000 18620 000 717124

State 42000 000 000 000 42000 000 206192 2630 250822

Private 293900 000 000 000 293900 000 000 47346 341246

Central 163390 000 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 000 499290 000 215092 50976 765358

State 000 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 000 39900 001 39901

Central 8703 000 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 000 8703 000 82300 5212 96215

112683 000 000 000 112683 000 8501 000 121184

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111789 790389

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Grand Total 2746364 000 10000 000 2756364 000 494212 140300 3390876

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

Grand TotalThermalNuclear

RES

(MNRE)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

Total (Eastern

Region)

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

Central - Unallocated

HydroOwnership Sector

Mode wise breakup

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2650 5100

Central 40852 000 43556 000 84408 000 35708 2500 122616

Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038

State 000 000 000 000 000 000 000 10711 10711

Private 000 000 000 000 000 000 000 2939 2939

Central 3705 000 4682 000 8387 000 11655 000 20042

Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692

State 000 000 000 000 000 000 32200 3253 35453

Private 000 000 000 000 000 000 000 012 012

Central 4560 000 10969 000 15529 000 7227 000 22756

Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 5610 000 43695 000 49305 000 6849 500 56654

Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 344 344

Central 4710 000 7157 000 11867 000 9534 000 21401

Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 3210 000 4893 000 8103 000 5733 000 13836

Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 3105 000 4046 000 7151 000 9794 000 16945

Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642

11250 000 6362 000 17612 000 14000 000 31612

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 663 663

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1698 5703

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1773 5778

19

Andaman amp

Nicobar

Lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination Division

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during May-2019 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 31-05-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621

May19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 0 0 23 23 0 750 0 750 0 750 23 773

Achievement 0 0 0 0 0 0 0 0 0 0 0 0 0 474 0 474 0 503 0 503 0 977 0 977

Upto May-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 226 1176 0 1059 0 1059 637 2365 783 3785

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 494 0 494 0 904 0 904 53 1398 0 1451

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

Line

1 2 3 4 5 6

0

1 400 Barmer-Bhinmal line DC RVPNL 288

2 400 Jangaon - Tippapur DC TSTRANSCO 138

3 400 Kayathar - Thennampatty DC TANTRANSCO 48

4 220 Bareilly (400) - Pilibhit Ckt-II SC UPPTCL 39

5 220 Bhanjanagar - Aska DC OPTCL 57

6 220LILO of both Ckt of 220kV Mobha - Mangrol

line at 220kV Amod (Balanced portion)DC GETCO 46

7 220LILO of Gr Noida (400) - Noida Sec-148 line

at RC GreenDC UPPTCL 9

8 220 LILO of Hathras - Gokul at Mathura DC UPPTCL 120

9 220 Sohawal - Tanda DC UPPTCL 232

977

0

977

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During May-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 31-05-19

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during

May-201921(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 31-05-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716

May19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 0 1445 1000 2445 0 680 0 680 0 2125 1000 3125

Achievement 0 0 0 0 0 0 0 0 1000 0 0 1000 0 2385 0 2385 0 760 0 760 1000 3145 0 4145

Upto May-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 2445 3000 5445 0 1480 0 1480 3000 3925 6000 12925

Achievement 0 0 0 0 0 0 0 0 1500 0 0 1500 815 4365 0 5180 0 2065 0 2065 2315 6430 0 8745

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

As on 31-05-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1Bhadla SS (3x1500 3x500 MVA) (500 MVA ICTs- II

and III)400220 PGCIL 1000

Total of CENTRAL SECTOR 1000

2 Moradabad(Aug) (Additional TF) 400220 UPPTCL 240

3 Masauli Prayagraj (New) TF-III 400132 UPPTCL 200

4 Talaricheruvu Ss 400220 APTRANSCO 9455 Uravakonda (Aug) ICT-II 400220 APTRANSCO 5006 Jangaon ss (3x500) (ICT-I) 400220 TSTRANSCO 500

7 Chinhat Lucknow (Aug) TF-II (200-160) 220132 UPPTCL 408 Hathras (Aug)T-I(200-160) 220132 UPPTCL 409 Jaunpur (Aug) (Additional TF) 220132 UPPTCL 16010 Laukahi (Supaul new) 22013233 BSPTCL 32011 Sector- 95 Gurgaon 22033 HVPNL 10012 Alawalpur ss 22066 PSTCL 100

TOTAL STATE SECTOR 3145

GRAND TOTAL 4145

21(2)

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During May-2019

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2019-20 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination Division

Programme Achievement Ach Programme Achievement Ach

Central Sector 37545100 3290600 3141593 9547 6468500 6275642 9702

State Sector 37498600 3425800 3092392 9027 6748300 6066733 8990

PvtIPP Sector 37346200 3476700 3460217 9953 6713100 6652517 9910

PvtUTL Sector 1823100 164300 171799 10456 323600 337490 10429

Total 114213000 10357400 9866001 9526 20253500 19332382 9545

Central Sector 5661700 604200 619800 10258 990300 1104995 11158

State Sector 6680500 551500 652766 11836 1049700 1184387 11283

PvtIPP Sector 1206900 130200 121344 9320 187500 200643 10701

PvtUTL Sector 144100 12400 14009 11298 24700 25155 10184

Total 13693200 1298300 1407919 10844 2252200 2515180 11168

Central Sector 4472000 353500 365463 10338 720800 694195 9631

Total 4472000 353500 365463 10338 720800 694195 9631

Bhutan Import 621800 32500 35300 10862 50000 59270 11854

Central Sector 47678800 4248300 4126856 9714 8179600 8074832 9872

State Sector 44179100 3977300 3745158 9416 7798000 7251120 9299

Pvt Sector 40520300 3783600 3767369 9957 7248900 7215805 9954

Total 133000000 12041700 11674683 9695 23276500 22601027 9710

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Apr-19 Apr-18 Upto Apr-2019 Upto Apr-2018

975409 844377 975409 844377

22

Renewable Energy Generation

Achievement

May-2019

1 Electricity Generation (MU) Targets and Achievememts for 2019-20

All India Energy Generation During Apr-19 to May-19 (MU)

Target (2019-20)Apr-19 to May-19

Sector

Hydro

Thermal

Nuclear

202535

22522

7208

232765

193324

25152

6942

226010

0

50000

100000

150000

200000

250000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Energy Power Supply Position (Provisional) for May-2019 and during Apr-19 to May-19 23

2 Peak Power Supply Position (Provisional) for May-2019 and during Apr-19 to May-19 24

3 Energy Power Supply Position (Revised) for Apr-2019 and during Apr-19 to Apr-19 25

4 Peak Power Supply Position (Revised) for Apr-2019 and during Apr-19 to Apr-19 26

5 Notified Power cuts Restrictions on Industries during May-2019 27

6 Power Supply to Agricultural Sector during May-2019 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 154 154 0 00 271 271 0 00

दिलली Delhi 3366 3366 0 00 6065 6064 1 00

हरियजणज Haryana 4907 4907 0 00 8679 8679 0 00

दहमजचल परिश Himachal Pradesh 872 863 10 11 1654 1644 10 06

रमम कशमीि Jammu amp Kashmir 1760 1424 336 191 3364 2720 644 191

परजब Punjab 4769 4769 0 00 8475 8475 0 00

िजरसथजन Rajasthan 7120 7110 11 02 13313 13300 13 01

उतति परिश Uttar Pradesh 12742 12695 48 04 22897 22817 79 03

उततिजखड Uttarakhand 1329 1329 0 00 2449 2449 0 00

उततरी कषतर Northern Region 37020 36615 404 11 67166 66419 747 11

छततीसगढ़ Chhattisgarh 2794 2794 0 00 5765 5764 1 00

गरिजत Gujarat 11208 11208 0 00 21748 21748 0 00

मधय परिश Madhya Pradesh 6502 6502 0 00 12735 12735 0 00

महजिजषटर Maharashtra 14976 14976 0 00 29295 29294 0 00

िमन औि दिउ Daman amp Diu 222 222 0 00 443 443 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 1106 1106 0 00

गोवज Goa 404 404 0 00 801 801 0 00

पशचिमी कषतर Western Region 36658 36658 0 00 71893 71892 1 00

आनधर परिश Andhra Pradesh 6056 6048 7 01 11709 11702 7 01

तलगजनज Telangana 5318 5318 1 00 10772 10771 1 00

कनजाटक Karnataka 6702 6702 1 00 13569 13568 1 00

किल Kerala 2575 2566 9 03 4888 4878 10 02

तममल नजड Tamil Nadu 10309 10309 1 00 20031 20030 1 00

पडचिी Puducherry 271 271 1 03 517 516 1 01

लकष-दवीप Lakshadweep 4 4 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 31232 31213 19 01 61486 61465 21 00

बबहजि Bihar 3078 3078 0 00 5662 5659 3 01

िजमोिि घजटी ननगम DVC 1814 1814 0 00 3757 3755 2 01

झजिखणड Jharkhand 789 789 0 00 1505 1495 10 07

ओडडशज Odisha 2560 2560 0 00 5261 5261 0 00

पशशचम बगजल West Bengal 5115 5115 0 00 9920 9897 23 02

मसशककम Sikkim 36 36 0 00 78 78 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 58 54 4 67

परवी कषतर Eastern Region 13391 13391 0 00 26182 26144 38 01

अरणजचल परिश Arunachal Pradesh 64 64 0 06 127 126 1 06

असम Assam 819 738 81 99 1573 1434 139 88

मणणपि Manipur 73 72 1 07 135 134 2 12

मघजलय Meghalaya 167 159 8 50 336 318 18 55

ममज़ोिम Mizoram 55 55 0 07 100 99 1 08

नजगजलड Nagaland 65 64 1 08 124 123 1 08

बिपिज Tripura 173 170 2 14 292 288 4 13

उततर-परवी कषतर North-Eastern Region 1416 1323 93 66 2686 2521 165 62

समपणण भारत All India 119717 119200 517 04 229413 228441 972 04

Note Power Supply Position Report has been compiled based on the data furnished by State Utilities Electricity Departments

23

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 356 356 0 00 356 356 0 00

दिलली Delhi 6461 6461 0 00 6461 6461 0 00

हरियजणज Haryana 8874 8874 0 00 8874 8874 0 00

दहमजचल परिश Himachal Pradesh 1480 1480 0 00 1480 1480 0 00

रमम कशमीि Jammu amp Kashmir 2426 2426 0 00 2885 2426 459 159

परजब Punjab 8802 8802 0 00 8802 8802 0 00

िजरसथजन Rajasthan 11791 11791 0 00 11791 11791 0 00

उतति परिश Uttar Pradesh 22487 22057 430 19 22487 22057 430 19

उततिजखड Uttarakhand 2155 2155 0 00 2155 2155 0 00

उततरी कषतर Northern Region 60987 60078 909 15 60987 60078 909 15

छततीसगढ़ Chhattisgarh 4504 4504 0 00 4596 4574 22 05

गरिजत Gujarat 18094 18094 0 00 18094 18094 0 00

मधय परिश Madhya Pradesh 10145 10131 14 01 10145 10131 14 01

महजिजषटर Maharashtra 23621 23613 8 00 23621 23613 8 00

िमन औि दिउ Daman amp Diu 344 344 0 01 344 344 0 01

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 818 818 0 00

गोवज Goa 554 554 0 00 594 594 0 00

पशचिमी कषतर Western Region 57113 57093 20 00 57113 57093 20 00

आनधर परिश Andhra Pradesh 9854 9854 0 00 9854 9854 0 00

तलगजनज Telangana 8684 8684 0 00 10269 10202 67 07

कनजाटक Karnataka 12158 12158 0 00 12700 12688 12 01

किल Kerala 4286 4205 81 19 4316 4300 16 04

तममल नजड Tamil Nadu 15584 15522 62 04 15680 15659 21 01

पडचिी Puducherry 453 442 11 24 453 444 9 20

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 47477 47465 12 00 49218 49103 115 02

बबहजि Bihar 5481 5481 0 00 5481 5481 0 00

िजमोिि घजटी ननगम DVC 3048 3048 0 00 3048 3048 0 00

झजिखणड Jharkhand 1330 1330 0 00 1330 1330 0 00

ओडडशज Odisha 4736 4736 0 00 5142 5140 3 01

पशशचम बगजल West Bengal 9335 9335 0 00 9335 9335 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23558 23558 0 00 23558 23558 0 00

अरणजचल परिश Arunachal Pradesh 140 138 2 12 140 138 2 12

असम Assam 1753 1673 80 46 1910 1673 237 124

मणणपि Manipur 183 181 2 09 197 188 9 48

मघजलय Meghalaya 329 325 4 12 337 337 0 00

ममज़ोिम Mizoram 102 100 2 20 116 113 3 28

नजगजलड Nagaland 130 128 2 14 157 131 27 169

बिपिज Tripura 297 295 1 05 297 295 1 05

उततर-परवी कषतर North-Eastern Region 2758 2674 84 31 2848 2780 68 24

समपणण भारत All India 183513 182533 981 05 183513 182533 981 05

Note Power Supply Position Report has been compiled based on the data furnished by State Utilities Electricity Departments 24

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -मई2019 April2019 to May2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and supply

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateमई 2019 May2019

मजग की पनता म कमी Demand not Met

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 781 781 0 00 781 781 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3706 3706 0 00 3706 3706 0 00

िजरसथजन Rajasthan 6192 6190 2 00 6192 6190 2 00

उतति परिश Uttar Pradesh 10154 10123 32 03 10154 10123 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30147 29804 343 11 30147 29804 343 11

छततीसगढ़ Chhattisgarh 2972 2971 1 00 2972 2971 1 00

गरिजत Gujarat 10540 10540 0 00 10540 10540 0 00

मधय परिश Madhya Pradesh 6233 6233 0 00 6233 6233 0 00

महजिजषटर Maharashtra 14319 14319 0 00 14319 14319 0 00

िमन औि दिउ Daman amp Diu 221 221 0 00 221 221 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 554 554 0 00 554 554 0 00

गोवज Goa 397 397 0 00 397 397 0 00

पशचिमी कषतर Western Region 35235 35234 1 00 35235 35234 1 00

आनधर परिश Andhra Pradesh 5653 5653 0 00 5653 5653 0 00

तलगजनज Telangana 5453 5453 0 00 5453 5453 0 00

कनजाटक Karnataka 6867 6867 0 00 6867 6867 0 00

किल Kerala 2313 2312 2 01 2313 2312 2 01

तममल नजड Tamil Nadu 9721 9721 0 00 9721 9721 0 00

पडचिी Puducherry 246 246 0 00 246 246 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 30254 30252 2 00 30254 30252 2 00

बबहजि Bihar 2584 2581 3 01 2584 2581 3 01

िजमोिि घजटी ननगम DVC 1944 1942 2 01 1944 1942 2 01

झजिखणड Jharkhand 716 706 10 14 716 706 10 14

ओडडशज Odisha 2701 2701 0 00 2701 2701 0 00

पशशचम बगजल West Bengal 4805 4782 23 05 4805 4782 23 05

मसशककम Sikkim 42 42 0 00 42 42 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12792 12754 38 03 12792 12754 38 03

अरणजचल परिश Arunachal Pradesh 62 62 0 06 62 62 0 06

असम Assam 754 696 58 77 754 696 58 77

मणणपि Manipur 62 61 1 17 62 61 1 17

मघजलय Meghalaya 169 159 10 60 169 159 10 60

ममज़ोिम Mizoram 45 44 0 10 45 44 0 10

नजगजलड Nagaland 59 58 0 08 59 58 0 08

बिपिज Tripura 119 117 2 13 119 117 2 13

उततर-परवी कषतर North-Eastern Region 1270 1198 72 57 1270 1198 72 57

समपणण भारत All India 109696 109241 455 04 109696 109241 455 04

Note The revised data for March 2019 is not avaliable

Energy not Supplied Energy not Supplied

अपरल 2019 April2019 अपरल 2019 April2019 to April 2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2885 2308 577 200 2885 2308 577 200

परजब Punjab 7087 7087 0 00 7087 7087 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 47779 47210 569 12 47779 47210 569 12

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9179 9160 19 02 9179 9160 19 02

तलगजनज Telangana 10269 10202 67 07 10269 10202 67 07

कनजाटक Karnataka 12700 12688 12 01 12700 12688 12 01

किल Kerala 4316 4300 16 04 4316 4300 16 04

तममल नजड Tamil Nadu 15680 15659 21 01 15680 15659 21 01

पडचिी Puducherry 444 444 0 00 444 444 0 00

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49218 49103 115 02 49218 49103 115 02

बबहजि Bihar 5157 5155 2 00 5157 5155 2 00

िजमोिि घजटी ननगम DVC 3014 3014 0 00 3014 3014 0 00

झजिखणड Jharkhand 1326 1325 1 00 1326 1325 1 00

ओडडशज Odisha 5142 5140 3 01 5142 5140 3 01

पशशचम बगजल West Bengal 8745 8699 46 05 8745 8699 46 05

मसशककम Sikkim 98 98 0 00 98 98 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22415 22378 37 02 22415 22378 37 02

अरणजचल परिश Arunachal Pradesh 139 136 3 21 139 136 3 21

असम Assam 1910 1667 242 127 1910 1667 242 127

मणणपि Manipur 197 188 9 48 197 188 9 48

मघजलय Meghalaya 337 337 0 00 337 337 0 00

ममज़ोिम Mizoram 116 113 3 28 116 113 3 28

नजगजलड Nagaland 157 131 27 169 157 131 27 169

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177424 176810 613 03 177424 176810 613 03

Note The revised data for March 2019 is not avaliable 26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateअपरल 2019 April2019 अपरल 2019 April2019 to April 2019

File NoCEA-CH-14-1142018-Coordination Division

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

मई 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during May2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

N

o No

tified

Cuts

N

o No

tified

Cuts

File NoCEA-CH-14-1142018-Coordination Division

मई2019May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0910 hrsday 0811 - 910 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 403 hrsday 0347 - 403 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 2214 hrsday 2157 - 2214 hrsday

उततराखड Uttarakhand Data not received 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-957 hrs day

Three-Phase (Mixed) Supply - 2346 hrs day

Three-Phase Supply(Irrigation)- 0953 - 0957 hrs day Three-

Phase (Mixed) Supply - 2334 - 2346 hrs day

महजिजषटर Maharashtra Three-Phase Supply - 9 hrs day Three-Phase Supply - 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

मई 2019 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during May2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to May-2019 20070450 2493722 63763 22627934 678000 4539922 7835904 35681760

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 7835904 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

7835904

Total Installed Capacity 35687160 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-22 (Up to

Mar2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

Plan Period

2017-22 (Up to

May-19)

6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58732 21173 181240 11734 163456 1010 176200 158886 225204 30768 414858

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Progress of Transmission Sector in the Country up to May 2019

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on May19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

May 19)

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during May 2019

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 20525 925681234952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 7070 7070

Private 28100 000 000 000 28100 000 000 25545 53645

Central 384933 000 000 000 384933 000 11000 000 395932

Sub-Total 413033 000 000 000 413033 000 11000 32615 456647

State 42000 000 000 000 42000 000 13000 405 55405

Private 73000 000 000 000 73000 000 000 3647 76647

Central 39374 000 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 000 154374 000 19100 4052 177526

State 540000 000 10000 000 550000 000 98600 12195 660795

Private 243700 000 000 000 243700 000 000 35250 278950

Central 76077 000 000 000 76077 000 41000 000 117077

Sub-Total 859777 000 10000 000 869777 000 139600 47445 1056822

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 698504 000 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 000 698504 000 18620 000 717124

State 42000 000 000 000 42000 000 206192 2630 250822

Private 293900 000 000 000 293900 000 000 47346 341246

Central 163390 000 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 000 499290 000 215092 50976 765358

State 000 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 000 39900 001 39901

Central 8703 000 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 000 8703 000 82300 5212 96215

112683 000 000 000 112683 000 8501 000 121184

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111789 790389

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Grand Total 2746364 000 10000 000 2756364 000 494212 140300 3390876

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

Grand TotalThermalNuclear

RES

(MNRE)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

Total (Eastern

Region)

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

Central - Unallocated

HydroOwnership Sector

Mode wise breakup

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2650 5100

Central 40852 000 43556 000 84408 000 35708 2500 122616

Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038

State 000 000 000 000 000 000 000 10711 10711

Private 000 000 000 000 000 000 000 2939 2939

Central 3705 000 4682 000 8387 000 11655 000 20042

Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692

State 000 000 000 000 000 000 32200 3253 35453

Private 000 000 000 000 000 000 000 012 012

Central 4560 000 10969 000 15529 000 7227 000 22756

Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 5610 000 43695 000 49305 000 6849 500 56654

Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 344 344

Central 4710 000 7157 000 11867 000 9534 000 21401

Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 3210 000 4893 000 8103 000 5733 000 13836

Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 3105 000 4046 000 7151 000 9794 000 16945

Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642

11250 000 6362 000 17612 000 14000 000 31612

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 663 663

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1698 5703

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1773 5778

19

Andaman amp

Nicobar

Lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination Division

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during May-2019 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 31-05-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621

May19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 0 0 23 23 0 750 0 750 0 750 23 773

Achievement 0 0 0 0 0 0 0 0 0 0 0 0 0 474 0 474 0 503 0 503 0 977 0 977

Upto May-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 226 1176 0 1059 0 1059 637 2365 783 3785

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 494 0 494 0 904 0 904 53 1398 0 1451

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

Line

1 2 3 4 5 6

0

1 400 Barmer-Bhinmal line DC RVPNL 288

2 400 Jangaon - Tippapur DC TSTRANSCO 138

3 400 Kayathar - Thennampatty DC TANTRANSCO 48

4 220 Bareilly (400) - Pilibhit Ckt-II SC UPPTCL 39

5 220 Bhanjanagar - Aska DC OPTCL 57

6 220LILO of both Ckt of 220kV Mobha - Mangrol

line at 220kV Amod (Balanced portion)DC GETCO 46

7 220LILO of Gr Noida (400) - Noida Sec-148 line

at RC GreenDC UPPTCL 9

8 220 LILO of Hathras - Gokul at Mathura DC UPPTCL 120

9 220 Sohawal - Tanda DC UPPTCL 232

977

0

977

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During May-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 31-05-19

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during

May-201921(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 31-05-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716

May19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 0 1445 1000 2445 0 680 0 680 0 2125 1000 3125

Achievement 0 0 0 0 0 0 0 0 1000 0 0 1000 0 2385 0 2385 0 760 0 760 1000 3145 0 4145

Upto May-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 2445 3000 5445 0 1480 0 1480 3000 3925 6000 12925

Achievement 0 0 0 0 0 0 0 0 1500 0 0 1500 815 4365 0 5180 0 2065 0 2065 2315 6430 0 8745

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

As on 31-05-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1Bhadla SS (3x1500 3x500 MVA) (500 MVA ICTs- II

and III)400220 PGCIL 1000

Total of CENTRAL SECTOR 1000

2 Moradabad(Aug) (Additional TF) 400220 UPPTCL 240

3 Masauli Prayagraj (New) TF-III 400132 UPPTCL 200

4 Talaricheruvu Ss 400220 APTRANSCO 9455 Uravakonda (Aug) ICT-II 400220 APTRANSCO 5006 Jangaon ss (3x500) (ICT-I) 400220 TSTRANSCO 500

7 Chinhat Lucknow (Aug) TF-II (200-160) 220132 UPPTCL 408 Hathras (Aug)T-I(200-160) 220132 UPPTCL 409 Jaunpur (Aug) (Additional TF) 220132 UPPTCL 16010 Laukahi (Supaul new) 22013233 BSPTCL 32011 Sector- 95 Gurgaon 22033 HVPNL 10012 Alawalpur ss 22066 PSTCL 100

TOTAL STATE SECTOR 3145

GRAND TOTAL 4145

21(2)

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During May-2019

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2019-20 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination Division

Programme Achievement Ach Programme Achievement Ach

Central Sector 37545100 3290600 3141593 9547 6468500 6275642 9702

State Sector 37498600 3425800 3092392 9027 6748300 6066733 8990

PvtIPP Sector 37346200 3476700 3460217 9953 6713100 6652517 9910

PvtUTL Sector 1823100 164300 171799 10456 323600 337490 10429

Total 114213000 10357400 9866001 9526 20253500 19332382 9545

Central Sector 5661700 604200 619800 10258 990300 1104995 11158

State Sector 6680500 551500 652766 11836 1049700 1184387 11283

PvtIPP Sector 1206900 130200 121344 9320 187500 200643 10701

PvtUTL Sector 144100 12400 14009 11298 24700 25155 10184

Total 13693200 1298300 1407919 10844 2252200 2515180 11168

Central Sector 4472000 353500 365463 10338 720800 694195 9631

Total 4472000 353500 365463 10338 720800 694195 9631

Bhutan Import 621800 32500 35300 10862 50000 59270 11854

Central Sector 47678800 4248300 4126856 9714 8179600 8074832 9872

State Sector 44179100 3977300 3745158 9416 7798000 7251120 9299

Pvt Sector 40520300 3783600 3767369 9957 7248900 7215805 9954

Total 133000000 12041700 11674683 9695 23276500 22601027 9710

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Apr-19 Apr-18 Upto Apr-2019 Upto Apr-2018

975409 844377 975409 844377

22

Renewable Energy Generation

Achievement

May-2019

1 Electricity Generation (MU) Targets and Achievememts for 2019-20

All India Energy Generation During Apr-19 to May-19 (MU)

Target (2019-20)Apr-19 to May-19

Sector

Hydro

Thermal

Nuclear

202535

22522

7208

232765

193324

25152

6942

226010

0

50000

100000

150000

200000

250000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Energy Power Supply Position (Provisional) for May-2019 and during Apr-19 to May-19 23

2 Peak Power Supply Position (Provisional) for May-2019 and during Apr-19 to May-19 24

3 Energy Power Supply Position (Revised) for Apr-2019 and during Apr-19 to Apr-19 25

4 Peak Power Supply Position (Revised) for Apr-2019 and during Apr-19 to Apr-19 26

5 Notified Power cuts Restrictions on Industries during May-2019 27

6 Power Supply to Agricultural Sector during May-2019 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 154 154 0 00 271 271 0 00

दिलली Delhi 3366 3366 0 00 6065 6064 1 00

हरियजणज Haryana 4907 4907 0 00 8679 8679 0 00

दहमजचल परिश Himachal Pradesh 872 863 10 11 1654 1644 10 06

रमम कशमीि Jammu amp Kashmir 1760 1424 336 191 3364 2720 644 191

परजब Punjab 4769 4769 0 00 8475 8475 0 00

िजरसथजन Rajasthan 7120 7110 11 02 13313 13300 13 01

उतति परिश Uttar Pradesh 12742 12695 48 04 22897 22817 79 03

उततिजखड Uttarakhand 1329 1329 0 00 2449 2449 0 00

उततरी कषतर Northern Region 37020 36615 404 11 67166 66419 747 11

छततीसगढ़ Chhattisgarh 2794 2794 0 00 5765 5764 1 00

गरिजत Gujarat 11208 11208 0 00 21748 21748 0 00

मधय परिश Madhya Pradesh 6502 6502 0 00 12735 12735 0 00

महजिजषटर Maharashtra 14976 14976 0 00 29295 29294 0 00

िमन औि दिउ Daman amp Diu 222 222 0 00 443 443 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 1106 1106 0 00

गोवज Goa 404 404 0 00 801 801 0 00

पशचिमी कषतर Western Region 36658 36658 0 00 71893 71892 1 00

आनधर परिश Andhra Pradesh 6056 6048 7 01 11709 11702 7 01

तलगजनज Telangana 5318 5318 1 00 10772 10771 1 00

कनजाटक Karnataka 6702 6702 1 00 13569 13568 1 00

किल Kerala 2575 2566 9 03 4888 4878 10 02

तममल नजड Tamil Nadu 10309 10309 1 00 20031 20030 1 00

पडचिी Puducherry 271 271 1 03 517 516 1 01

लकष-दवीप Lakshadweep 4 4 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 31232 31213 19 01 61486 61465 21 00

बबहजि Bihar 3078 3078 0 00 5662 5659 3 01

िजमोिि घजटी ननगम DVC 1814 1814 0 00 3757 3755 2 01

झजिखणड Jharkhand 789 789 0 00 1505 1495 10 07

ओडडशज Odisha 2560 2560 0 00 5261 5261 0 00

पशशचम बगजल West Bengal 5115 5115 0 00 9920 9897 23 02

मसशककम Sikkim 36 36 0 00 78 78 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 58 54 4 67

परवी कषतर Eastern Region 13391 13391 0 00 26182 26144 38 01

अरणजचल परिश Arunachal Pradesh 64 64 0 06 127 126 1 06

असम Assam 819 738 81 99 1573 1434 139 88

मणणपि Manipur 73 72 1 07 135 134 2 12

मघजलय Meghalaya 167 159 8 50 336 318 18 55

ममज़ोिम Mizoram 55 55 0 07 100 99 1 08

नजगजलड Nagaland 65 64 1 08 124 123 1 08

बिपिज Tripura 173 170 2 14 292 288 4 13

उततर-परवी कषतर North-Eastern Region 1416 1323 93 66 2686 2521 165 62

समपणण भारत All India 119717 119200 517 04 229413 228441 972 04

Note Power Supply Position Report has been compiled based on the data furnished by State Utilities Electricity Departments

23

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 356 356 0 00 356 356 0 00

दिलली Delhi 6461 6461 0 00 6461 6461 0 00

हरियजणज Haryana 8874 8874 0 00 8874 8874 0 00

दहमजचल परिश Himachal Pradesh 1480 1480 0 00 1480 1480 0 00

रमम कशमीि Jammu amp Kashmir 2426 2426 0 00 2885 2426 459 159

परजब Punjab 8802 8802 0 00 8802 8802 0 00

िजरसथजन Rajasthan 11791 11791 0 00 11791 11791 0 00

उतति परिश Uttar Pradesh 22487 22057 430 19 22487 22057 430 19

उततिजखड Uttarakhand 2155 2155 0 00 2155 2155 0 00

उततरी कषतर Northern Region 60987 60078 909 15 60987 60078 909 15

छततीसगढ़ Chhattisgarh 4504 4504 0 00 4596 4574 22 05

गरिजत Gujarat 18094 18094 0 00 18094 18094 0 00

मधय परिश Madhya Pradesh 10145 10131 14 01 10145 10131 14 01

महजिजषटर Maharashtra 23621 23613 8 00 23621 23613 8 00

िमन औि दिउ Daman amp Diu 344 344 0 01 344 344 0 01

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 818 818 0 00

गोवज Goa 554 554 0 00 594 594 0 00

पशचिमी कषतर Western Region 57113 57093 20 00 57113 57093 20 00

आनधर परिश Andhra Pradesh 9854 9854 0 00 9854 9854 0 00

तलगजनज Telangana 8684 8684 0 00 10269 10202 67 07

कनजाटक Karnataka 12158 12158 0 00 12700 12688 12 01

किल Kerala 4286 4205 81 19 4316 4300 16 04

तममल नजड Tamil Nadu 15584 15522 62 04 15680 15659 21 01

पडचिी Puducherry 453 442 11 24 453 444 9 20

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 47477 47465 12 00 49218 49103 115 02

बबहजि Bihar 5481 5481 0 00 5481 5481 0 00

िजमोिि घजटी ननगम DVC 3048 3048 0 00 3048 3048 0 00

झजिखणड Jharkhand 1330 1330 0 00 1330 1330 0 00

ओडडशज Odisha 4736 4736 0 00 5142 5140 3 01

पशशचम बगजल West Bengal 9335 9335 0 00 9335 9335 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23558 23558 0 00 23558 23558 0 00

अरणजचल परिश Arunachal Pradesh 140 138 2 12 140 138 2 12

असम Assam 1753 1673 80 46 1910 1673 237 124

मणणपि Manipur 183 181 2 09 197 188 9 48

मघजलय Meghalaya 329 325 4 12 337 337 0 00

ममज़ोिम Mizoram 102 100 2 20 116 113 3 28

नजगजलड Nagaland 130 128 2 14 157 131 27 169

बिपिज Tripura 297 295 1 05 297 295 1 05

उततर-परवी कषतर North-Eastern Region 2758 2674 84 31 2848 2780 68 24

समपणण भारत All India 183513 182533 981 05 183513 182533 981 05

Note Power Supply Position Report has been compiled based on the data furnished by State Utilities Electricity Departments 24

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -मई2019 April2019 to May2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and supply

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateमई 2019 May2019

मजग की पनता म कमी Demand not Met

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 781 781 0 00 781 781 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3706 3706 0 00 3706 3706 0 00

िजरसथजन Rajasthan 6192 6190 2 00 6192 6190 2 00

उतति परिश Uttar Pradesh 10154 10123 32 03 10154 10123 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30147 29804 343 11 30147 29804 343 11

छततीसगढ़ Chhattisgarh 2972 2971 1 00 2972 2971 1 00

गरिजत Gujarat 10540 10540 0 00 10540 10540 0 00

मधय परिश Madhya Pradesh 6233 6233 0 00 6233 6233 0 00

महजिजषटर Maharashtra 14319 14319 0 00 14319 14319 0 00

िमन औि दिउ Daman amp Diu 221 221 0 00 221 221 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 554 554 0 00 554 554 0 00

गोवज Goa 397 397 0 00 397 397 0 00

पशचिमी कषतर Western Region 35235 35234 1 00 35235 35234 1 00

आनधर परिश Andhra Pradesh 5653 5653 0 00 5653 5653 0 00

तलगजनज Telangana 5453 5453 0 00 5453 5453 0 00

कनजाटक Karnataka 6867 6867 0 00 6867 6867 0 00

किल Kerala 2313 2312 2 01 2313 2312 2 01

तममल नजड Tamil Nadu 9721 9721 0 00 9721 9721 0 00

पडचिी Puducherry 246 246 0 00 246 246 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 30254 30252 2 00 30254 30252 2 00

बबहजि Bihar 2584 2581 3 01 2584 2581 3 01

िजमोिि घजटी ननगम DVC 1944 1942 2 01 1944 1942 2 01

झजिखणड Jharkhand 716 706 10 14 716 706 10 14

ओडडशज Odisha 2701 2701 0 00 2701 2701 0 00

पशशचम बगजल West Bengal 4805 4782 23 05 4805 4782 23 05

मसशककम Sikkim 42 42 0 00 42 42 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12792 12754 38 03 12792 12754 38 03

अरणजचल परिश Arunachal Pradesh 62 62 0 06 62 62 0 06

असम Assam 754 696 58 77 754 696 58 77

मणणपि Manipur 62 61 1 17 62 61 1 17

मघजलय Meghalaya 169 159 10 60 169 159 10 60

ममज़ोिम Mizoram 45 44 0 10 45 44 0 10

नजगजलड Nagaland 59 58 0 08 59 58 0 08

बिपिज Tripura 119 117 2 13 119 117 2 13

उततर-परवी कषतर North-Eastern Region 1270 1198 72 57 1270 1198 72 57

समपणण भारत All India 109696 109241 455 04 109696 109241 455 04

Note The revised data for March 2019 is not avaliable

Energy not Supplied Energy not Supplied

अपरल 2019 April2019 अपरल 2019 April2019 to April 2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2885 2308 577 200 2885 2308 577 200

परजब Punjab 7087 7087 0 00 7087 7087 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 47779 47210 569 12 47779 47210 569 12

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9179 9160 19 02 9179 9160 19 02

तलगजनज Telangana 10269 10202 67 07 10269 10202 67 07

कनजाटक Karnataka 12700 12688 12 01 12700 12688 12 01

किल Kerala 4316 4300 16 04 4316 4300 16 04

तममल नजड Tamil Nadu 15680 15659 21 01 15680 15659 21 01

पडचिी Puducherry 444 444 0 00 444 444 0 00

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49218 49103 115 02 49218 49103 115 02

बबहजि Bihar 5157 5155 2 00 5157 5155 2 00

िजमोिि घजटी ननगम DVC 3014 3014 0 00 3014 3014 0 00

झजिखणड Jharkhand 1326 1325 1 00 1326 1325 1 00

ओडडशज Odisha 5142 5140 3 01 5142 5140 3 01

पशशचम बगजल West Bengal 8745 8699 46 05 8745 8699 46 05

मसशककम Sikkim 98 98 0 00 98 98 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22415 22378 37 02 22415 22378 37 02

अरणजचल परिश Arunachal Pradesh 139 136 3 21 139 136 3 21

असम Assam 1910 1667 242 127 1910 1667 242 127

मणणपि Manipur 197 188 9 48 197 188 9 48

मघजलय Meghalaya 337 337 0 00 337 337 0 00

ममज़ोिम Mizoram 116 113 3 28 116 113 3 28

नजगजलड Nagaland 157 131 27 169 157 131 27 169

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177424 176810 613 03 177424 176810 613 03

Note The revised data for March 2019 is not avaliable 26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateअपरल 2019 April2019 अपरल 2019 April2019 to April 2019

File NoCEA-CH-14-1142018-Coordination Division

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

मई 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during May2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

N

o No

tified

Cuts

N

o No

tified

Cuts

File NoCEA-CH-14-1142018-Coordination Division

मई2019May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0910 hrsday 0811 - 910 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 403 hrsday 0347 - 403 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 2214 hrsday 2157 - 2214 hrsday

उततराखड Uttarakhand Data not received 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-957 hrs day

Three-Phase (Mixed) Supply - 2346 hrs day

Three-Phase Supply(Irrigation)- 0953 - 0957 hrs day Three-

Phase (Mixed) Supply - 2334 - 2346 hrs day

महजिजषटर Maharashtra Three-Phase Supply - 9 hrs day Three-Phase Supply - 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

मई 2019 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during May2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to May-2019 20070450 2493722 63763 22627934 678000 4539922 7835904 35681760

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 7835904 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

7835904

Total Installed Capacity 35687160 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-22 (Up to

Mar2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

Plan Period

2017-22 (Up to

May-19)

6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58732 21173 181240 11734 163456 1010 176200 158886 225204 30768 414858

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Progress of Transmission Sector in the Country up to May 2019

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on May19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

May 19)

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during May 2019

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 20525 925681234952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2650 5100

Central 40852 000 43556 000 84408 000 35708 2500 122616

Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038

State 000 000 000 000 000 000 000 10711 10711

Private 000 000 000 000 000 000 000 2939 2939

Central 3705 000 4682 000 8387 000 11655 000 20042

Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692

State 000 000 000 000 000 000 32200 3253 35453

Private 000 000 000 000 000 000 000 012 012

Central 4560 000 10969 000 15529 000 7227 000 22756

Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 5610 000 43695 000 49305 000 6849 500 56654

Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 344 344

Central 4710 000 7157 000 11867 000 9534 000 21401

Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 3210 000 4893 000 8103 000 5733 000 13836

Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 3105 000 4046 000 7151 000 9794 000 16945

Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642

11250 000 6362 000 17612 000 14000 000 31612

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 663 663

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1698 5703

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1773 5778

19

Andaman amp

Nicobar

Lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination Division

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during May-2019 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 31-05-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621

May19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 0 0 23 23 0 750 0 750 0 750 23 773

Achievement 0 0 0 0 0 0 0 0 0 0 0 0 0 474 0 474 0 503 0 503 0 977 0 977

Upto May-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 226 1176 0 1059 0 1059 637 2365 783 3785

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 494 0 494 0 904 0 904 53 1398 0 1451

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

Line

1 2 3 4 5 6

0

1 400 Barmer-Bhinmal line DC RVPNL 288

2 400 Jangaon - Tippapur DC TSTRANSCO 138

3 400 Kayathar - Thennampatty DC TANTRANSCO 48

4 220 Bareilly (400) - Pilibhit Ckt-II SC UPPTCL 39

5 220 Bhanjanagar - Aska DC OPTCL 57

6 220LILO of both Ckt of 220kV Mobha - Mangrol

line at 220kV Amod (Balanced portion)DC GETCO 46

7 220LILO of Gr Noida (400) - Noida Sec-148 line

at RC GreenDC UPPTCL 9

8 220 LILO of Hathras - Gokul at Mathura DC UPPTCL 120

9 220 Sohawal - Tanda DC UPPTCL 232

977

0

977

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During May-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 31-05-19

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during

May-201921(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 31-05-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716

May19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 0 1445 1000 2445 0 680 0 680 0 2125 1000 3125

Achievement 0 0 0 0 0 0 0 0 1000 0 0 1000 0 2385 0 2385 0 760 0 760 1000 3145 0 4145

Upto May-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 2445 3000 5445 0 1480 0 1480 3000 3925 6000 12925

Achievement 0 0 0 0 0 0 0 0 1500 0 0 1500 815 4365 0 5180 0 2065 0 2065 2315 6430 0 8745

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

As on 31-05-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1Bhadla SS (3x1500 3x500 MVA) (500 MVA ICTs- II

and III)400220 PGCIL 1000

Total of CENTRAL SECTOR 1000

2 Moradabad(Aug) (Additional TF) 400220 UPPTCL 240

3 Masauli Prayagraj (New) TF-III 400132 UPPTCL 200

4 Talaricheruvu Ss 400220 APTRANSCO 9455 Uravakonda (Aug) ICT-II 400220 APTRANSCO 5006 Jangaon ss (3x500) (ICT-I) 400220 TSTRANSCO 500

7 Chinhat Lucknow (Aug) TF-II (200-160) 220132 UPPTCL 408 Hathras (Aug)T-I(200-160) 220132 UPPTCL 409 Jaunpur (Aug) (Additional TF) 220132 UPPTCL 16010 Laukahi (Supaul new) 22013233 BSPTCL 32011 Sector- 95 Gurgaon 22033 HVPNL 10012 Alawalpur ss 22066 PSTCL 100

TOTAL STATE SECTOR 3145

GRAND TOTAL 4145

21(2)

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During May-2019

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2019-20 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination Division

Programme Achievement Ach Programme Achievement Ach

Central Sector 37545100 3290600 3141593 9547 6468500 6275642 9702

State Sector 37498600 3425800 3092392 9027 6748300 6066733 8990

PvtIPP Sector 37346200 3476700 3460217 9953 6713100 6652517 9910

PvtUTL Sector 1823100 164300 171799 10456 323600 337490 10429

Total 114213000 10357400 9866001 9526 20253500 19332382 9545

Central Sector 5661700 604200 619800 10258 990300 1104995 11158

State Sector 6680500 551500 652766 11836 1049700 1184387 11283

PvtIPP Sector 1206900 130200 121344 9320 187500 200643 10701

PvtUTL Sector 144100 12400 14009 11298 24700 25155 10184

Total 13693200 1298300 1407919 10844 2252200 2515180 11168

Central Sector 4472000 353500 365463 10338 720800 694195 9631

Total 4472000 353500 365463 10338 720800 694195 9631

Bhutan Import 621800 32500 35300 10862 50000 59270 11854

Central Sector 47678800 4248300 4126856 9714 8179600 8074832 9872

State Sector 44179100 3977300 3745158 9416 7798000 7251120 9299

Pvt Sector 40520300 3783600 3767369 9957 7248900 7215805 9954

Total 133000000 12041700 11674683 9695 23276500 22601027 9710

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Apr-19 Apr-18 Upto Apr-2019 Upto Apr-2018

975409 844377 975409 844377

22

Renewable Energy Generation

Achievement

May-2019

1 Electricity Generation (MU) Targets and Achievememts for 2019-20

All India Energy Generation During Apr-19 to May-19 (MU)

Target (2019-20)Apr-19 to May-19

Sector

Hydro

Thermal

Nuclear

202535

22522

7208

232765

193324

25152

6942

226010

0

50000

100000

150000

200000

250000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Energy Power Supply Position (Provisional) for May-2019 and during Apr-19 to May-19 23

2 Peak Power Supply Position (Provisional) for May-2019 and during Apr-19 to May-19 24

3 Energy Power Supply Position (Revised) for Apr-2019 and during Apr-19 to Apr-19 25

4 Peak Power Supply Position (Revised) for Apr-2019 and during Apr-19 to Apr-19 26

5 Notified Power cuts Restrictions on Industries during May-2019 27

6 Power Supply to Agricultural Sector during May-2019 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 154 154 0 00 271 271 0 00

दिलली Delhi 3366 3366 0 00 6065 6064 1 00

हरियजणज Haryana 4907 4907 0 00 8679 8679 0 00

दहमजचल परिश Himachal Pradesh 872 863 10 11 1654 1644 10 06

रमम कशमीि Jammu amp Kashmir 1760 1424 336 191 3364 2720 644 191

परजब Punjab 4769 4769 0 00 8475 8475 0 00

िजरसथजन Rajasthan 7120 7110 11 02 13313 13300 13 01

उतति परिश Uttar Pradesh 12742 12695 48 04 22897 22817 79 03

उततिजखड Uttarakhand 1329 1329 0 00 2449 2449 0 00

उततरी कषतर Northern Region 37020 36615 404 11 67166 66419 747 11

छततीसगढ़ Chhattisgarh 2794 2794 0 00 5765 5764 1 00

गरिजत Gujarat 11208 11208 0 00 21748 21748 0 00

मधय परिश Madhya Pradesh 6502 6502 0 00 12735 12735 0 00

महजिजषटर Maharashtra 14976 14976 0 00 29295 29294 0 00

िमन औि दिउ Daman amp Diu 222 222 0 00 443 443 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 1106 1106 0 00

गोवज Goa 404 404 0 00 801 801 0 00

पशचिमी कषतर Western Region 36658 36658 0 00 71893 71892 1 00

आनधर परिश Andhra Pradesh 6056 6048 7 01 11709 11702 7 01

तलगजनज Telangana 5318 5318 1 00 10772 10771 1 00

कनजाटक Karnataka 6702 6702 1 00 13569 13568 1 00

किल Kerala 2575 2566 9 03 4888 4878 10 02

तममल नजड Tamil Nadu 10309 10309 1 00 20031 20030 1 00

पडचिी Puducherry 271 271 1 03 517 516 1 01

लकष-दवीप Lakshadweep 4 4 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 31232 31213 19 01 61486 61465 21 00

बबहजि Bihar 3078 3078 0 00 5662 5659 3 01

िजमोिि घजटी ननगम DVC 1814 1814 0 00 3757 3755 2 01

झजिखणड Jharkhand 789 789 0 00 1505 1495 10 07

ओडडशज Odisha 2560 2560 0 00 5261 5261 0 00

पशशचम बगजल West Bengal 5115 5115 0 00 9920 9897 23 02

मसशककम Sikkim 36 36 0 00 78 78 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 58 54 4 67

परवी कषतर Eastern Region 13391 13391 0 00 26182 26144 38 01

अरणजचल परिश Arunachal Pradesh 64 64 0 06 127 126 1 06

असम Assam 819 738 81 99 1573 1434 139 88

मणणपि Manipur 73 72 1 07 135 134 2 12

मघजलय Meghalaya 167 159 8 50 336 318 18 55

ममज़ोिम Mizoram 55 55 0 07 100 99 1 08

नजगजलड Nagaland 65 64 1 08 124 123 1 08

बिपिज Tripura 173 170 2 14 292 288 4 13

उततर-परवी कषतर North-Eastern Region 1416 1323 93 66 2686 2521 165 62

समपणण भारत All India 119717 119200 517 04 229413 228441 972 04

Note Power Supply Position Report has been compiled based on the data furnished by State Utilities Electricity Departments

23

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 356 356 0 00 356 356 0 00

दिलली Delhi 6461 6461 0 00 6461 6461 0 00

हरियजणज Haryana 8874 8874 0 00 8874 8874 0 00

दहमजचल परिश Himachal Pradesh 1480 1480 0 00 1480 1480 0 00

रमम कशमीि Jammu amp Kashmir 2426 2426 0 00 2885 2426 459 159

परजब Punjab 8802 8802 0 00 8802 8802 0 00

िजरसथजन Rajasthan 11791 11791 0 00 11791 11791 0 00

उतति परिश Uttar Pradesh 22487 22057 430 19 22487 22057 430 19

उततिजखड Uttarakhand 2155 2155 0 00 2155 2155 0 00

उततरी कषतर Northern Region 60987 60078 909 15 60987 60078 909 15

छततीसगढ़ Chhattisgarh 4504 4504 0 00 4596 4574 22 05

गरिजत Gujarat 18094 18094 0 00 18094 18094 0 00

मधय परिश Madhya Pradesh 10145 10131 14 01 10145 10131 14 01

महजिजषटर Maharashtra 23621 23613 8 00 23621 23613 8 00

िमन औि दिउ Daman amp Diu 344 344 0 01 344 344 0 01

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 818 818 0 00

गोवज Goa 554 554 0 00 594 594 0 00

पशचिमी कषतर Western Region 57113 57093 20 00 57113 57093 20 00

आनधर परिश Andhra Pradesh 9854 9854 0 00 9854 9854 0 00

तलगजनज Telangana 8684 8684 0 00 10269 10202 67 07

कनजाटक Karnataka 12158 12158 0 00 12700 12688 12 01

किल Kerala 4286 4205 81 19 4316 4300 16 04

तममल नजड Tamil Nadu 15584 15522 62 04 15680 15659 21 01

पडचिी Puducherry 453 442 11 24 453 444 9 20

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 47477 47465 12 00 49218 49103 115 02

बबहजि Bihar 5481 5481 0 00 5481 5481 0 00

िजमोिि घजटी ननगम DVC 3048 3048 0 00 3048 3048 0 00

झजिखणड Jharkhand 1330 1330 0 00 1330 1330 0 00

ओडडशज Odisha 4736 4736 0 00 5142 5140 3 01

पशशचम बगजल West Bengal 9335 9335 0 00 9335 9335 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23558 23558 0 00 23558 23558 0 00

अरणजचल परिश Arunachal Pradesh 140 138 2 12 140 138 2 12

असम Assam 1753 1673 80 46 1910 1673 237 124

मणणपि Manipur 183 181 2 09 197 188 9 48

मघजलय Meghalaya 329 325 4 12 337 337 0 00

ममज़ोिम Mizoram 102 100 2 20 116 113 3 28

नजगजलड Nagaland 130 128 2 14 157 131 27 169

बिपिज Tripura 297 295 1 05 297 295 1 05

उततर-परवी कषतर North-Eastern Region 2758 2674 84 31 2848 2780 68 24

समपणण भारत All India 183513 182533 981 05 183513 182533 981 05

Note Power Supply Position Report has been compiled based on the data furnished by State Utilities Electricity Departments 24

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -मई2019 April2019 to May2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and supply

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateमई 2019 May2019

मजग की पनता म कमी Demand not Met

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 781 781 0 00 781 781 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3706 3706 0 00 3706 3706 0 00

िजरसथजन Rajasthan 6192 6190 2 00 6192 6190 2 00

उतति परिश Uttar Pradesh 10154 10123 32 03 10154 10123 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30147 29804 343 11 30147 29804 343 11

छततीसगढ़ Chhattisgarh 2972 2971 1 00 2972 2971 1 00

गरिजत Gujarat 10540 10540 0 00 10540 10540 0 00

मधय परिश Madhya Pradesh 6233 6233 0 00 6233 6233 0 00

महजिजषटर Maharashtra 14319 14319 0 00 14319 14319 0 00

िमन औि दिउ Daman amp Diu 221 221 0 00 221 221 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 554 554 0 00 554 554 0 00

गोवज Goa 397 397 0 00 397 397 0 00

पशचिमी कषतर Western Region 35235 35234 1 00 35235 35234 1 00

आनधर परिश Andhra Pradesh 5653 5653 0 00 5653 5653 0 00

तलगजनज Telangana 5453 5453 0 00 5453 5453 0 00

कनजाटक Karnataka 6867 6867 0 00 6867 6867 0 00

किल Kerala 2313 2312 2 01 2313 2312 2 01

तममल नजड Tamil Nadu 9721 9721 0 00 9721 9721 0 00

पडचिी Puducherry 246 246 0 00 246 246 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 30254 30252 2 00 30254 30252 2 00

बबहजि Bihar 2584 2581 3 01 2584 2581 3 01

िजमोिि घजटी ननगम DVC 1944 1942 2 01 1944 1942 2 01

झजिखणड Jharkhand 716 706 10 14 716 706 10 14

ओडडशज Odisha 2701 2701 0 00 2701 2701 0 00

पशशचम बगजल West Bengal 4805 4782 23 05 4805 4782 23 05

मसशककम Sikkim 42 42 0 00 42 42 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12792 12754 38 03 12792 12754 38 03

अरणजचल परिश Arunachal Pradesh 62 62 0 06 62 62 0 06

असम Assam 754 696 58 77 754 696 58 77

मणणपि Manipur 62 61 1 17 62 61 1 17

मघजलय Meghalaya 169 159 10 60 169 159 10 60

ममज़ोिम Mizoram 45 44 0 10 45 44 0 10

नजगजलड Nagaland 59 58 0 08 59 58 0 08

बिपिज Tripura 119 117 2 13 119 117 2 13

उततर-परवी कषतर North-Eastern Region 1270 1198 72 57 1270 1198 72 57

समपणण भारत All India 109696 109241 455 04 109696 109241 455 04

Note The revised data for March 2019 is not avaliable

Energy not Supplied Energy not Supplied

अपरल 2019 April2019 अपरल 2019 April2019 to April 2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2885 2308 577 200 2885 2308 577 200

परजब Punjab 7087 7087 0 00 7087 7087 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 47779 47210 569 12 47779 47210 569 12

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9179 9160 19 02 9179 9160 19 02

तलगजनज Telangana 10269 10202 67 07 10269 10202 67 07

कनजाटक Karnataka 12700 12688 12 01 12700 12688 12 01

किल Kerala 4316 4300 16 04 4316 4300 16 04

तममल नजड Tamil Nadu 15680 15659 21 01 15680 15659 21 01

पडचिी Puducherry 444 444 0 00 444 444 0 00

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49218 49103 115 02 49218 49103 115 02

बबहजि Bihar 5157 5155 2 00 5157 5155 2 00

िजमोिि घजटी ननगम DVC 3014 3014 0 00 3014 3014 0 00

झजिखणड Jharkhand 1326 1325 1 00 1326 1325 1 00

ओडडशज Odisha 5142 5140 3 01 5142 5140 3 01

पशशचम बगजल West Bengal 8745 8699 46 05 8745 8699 46 05

मसशककम Sikkim 98 98 0 00 98 98 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22415 22378 37 02 22415 22378 37 02

अरणजचल परिश Arunachal Pradesh 139 136 3 21 139 136 3 21

असम Assam 1910 1667 242 127 1910 1667 242 127

मणणपि Manipur 197 188 9 48 197 188 9 48

मघजलय Meghalaya 337 337 0 00 337 337 0 00

ममज़ोिम Mizoram 116 113 3 28 116 113 3 28

नजगजलड Nagaland 157 131 27 169 157 131 27 169

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177424 176810 613 03 177424 176810 613 03

Note The revised data for March 2019 is not avaliable 26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateअपरल 2019 April2019 अपरल 2019 April2019 to April 2019

File NoCEA-CH-14-1142018-Coordination Division

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

मई 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during May2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

N

o No

tified

Cuts

N

o No

tified

Cuts

File NoCEA-CH-14-1142018-Coordination Division

मई2019May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0910 hrsday 0811 - 910 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 403 hrsday 0347 - 403 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 2214 hrsday 2157 - 2214 hrsday

उततराखड Uttarakhand Data not received 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-957 hrs day

Three-Phase (Mixed) Supply - 2346 hrs day

Three-Phase Supply(Irrigation)- 0953 - 0957 hrs day Three-

Phase (Mixed) Supply - 2334 - 2346 hrs day

महजिजषटर Maharashtra Three-Phase Supply - 9 hrs day Three-Phase Supply - 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

मई 2019 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during May2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to May-2019 20070450 2493722 63763 22627934 678000 4539922 7835904 35681760

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 7835904 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

7835904

Total Installed Capacity 35687160 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-22 (Up to

Mar2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

Plan Period

2017-22 (Up to

May-19)

6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58732 21173 181240 11734 163456 1010 176200 158886 225204 30768 414858

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Progress of Transmission Sector in the Country up to May 2019

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on May19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

May 19)

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during May 2019

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 20525 925681234952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

(As on 31052019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 663 663

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1698 5703

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1773 5778

19

Andaman amp

Nicobar

Lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination Division

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during May-2019 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 31-05-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621

May19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 0 0 23 23 0 750 0 750 0 750 23 773

Achievement 0 0 0 0 0 0 0 0 0 0 0 0 0 474 0 474 0 503 0 503 0 977 0 977

Upto May-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 226 1176 0 1059 0 1059 637 2365 783 3785

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 494 0 494 0 904 0 904 53 1398 0 1451

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

Line

1 2 3 4 5 6

0

1 400 Barmer-Bhinmal line DC RVPNL 288

2 400 Jangaon - Tippapur DC TSTRANSCO 138

3 400 Kayathar - Thennampatty DC TANTRANSCO 48

4 220 Bareilly (400) - Pilibhit Ckt-II SC UPPTCL 39

5 220 Bhanjanagar - Aska DC OPTCL 57

6 220LILO of both Ckt of 220kV Mobha - Mangrol

line at 220kV Amod (Balanced portion)DC GETCO 46

7 220LILO of Gr Noida (400) - Noida Sec-148 line

at RC GreenDC UPPTCL 9

8 220 LILO of Hathras - Gokul at Mathura DC UPPTCL 120

9 220 Sohawal - Tanda DC UPPTCL 232

977

0

977

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During May-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 31-05-19

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during

May-201921(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 31-05-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716

May19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 0 1445 1000 2445 0 680 0 680 0 2125 1000 3125

Achievement 0 0 0 0 0 0 0 0 1000 0 0 1000 0 2385 0 2385 0 760 0 760 1000 3145 0 4145

Upto May-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 2445 3000 5445 0 1480 0 1480 3000 3925 6000 12925

Achievement 0 0 0 0 0 0 0 0 1500 0 0 1500 815 4365 0 5180 0 2065 0 2065 2315 6430 0 8745

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

As on 31-05-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1Bhadla SS (3x1500 3x500 MVA) (500 MVA ICTs- II

and III)400220 PGCIL 1000

Total of CENTRAL SECTOR 1000

2 Moradabad(Aug) (Additional TF) 400220 UPPTCL 240

3 Masauli Prayagraj (New) TF-III 400132 UPPTCL 200

4 Talaricheruvu Ss 400220 APTRANSCO 9455 Uravakonda (Aug) ICT-II 400220 APTRANSCO 5006 Jangaon ss (3x500) (ICT-I) 400220 TSTRANSCO 500

7 Chinhat Lucknow (Aug) TF-II (200-160) 220132 UPPTCL 408 Hathras (Aug)T-I(200-160) 220132 UPPTCL 409 Jaunpur (Aug) (Additional TF) 220132 UPPTCL 16010 Laukahi (Supaul new) 22013233 BSPTCL 32011 Sector- 95 Gurgaon 22033 HVPNL 10012 Alawalpur ss 22066 PSTCL 100

TOTAL STATE SECTOR 3145

GRAND TOTAL 4145

21(2)

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During May-2019

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2019-20 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination Division

Programme Achievement Ach Programme Achievement Ach

Central Sector 37545100 3290600 3141593 9547 6468500 6275642 9702

State Sector 37498600 3425800 3092392 9027 6748300 6066733 8990

PvtIPP Sector 37346200 3476700 3460217 9953 6713100 6652517 9910

PvtUTL Sector 1823100 164300 171799 10456 323600 337490 10429

Total 114213000 10357400 9866001 9526 20253500 19332382 9545

Central Sector 5661700 604200 619800 10258 990300 1104995 11158

State Sector 6680500 551500 652766 11836 1049700 1184387 11283

PvtIPP Sector 1206900 130200 121344 9320 187500 200643 10701

PvtUTL Sector 144100 12400 14009 11298 24700 25155 10184

Total 13693200 1298300 1407919 10844 2252200 2515180 11168

Central Sector 4472000 353500 365463 10338 720800 694195 9631

Total 4472000 353500 365463 10338 720800 694195 9631

Bhutan Import 621800 32500 35300 10862 50000 59270 11854

Central Sector 47678800 4248300 4126856 9714 8179600 8074832 9872

State Sector 44179100 3977300 3745158 9416 7798000 7251120 9299

Pvt Sector 40520300 3783600 3767369 9957 7248900 7215805 9954

Total 133000000 12041700 11674683 9695 23276500 22601027 9710

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Apr-19 Apr-18 Upto Apr-2019 Upto Apr-2018

975409 844377 975409 844377

22

Renewable Energy Generation

Achievement

May-2019

1 Electricity Generation (MU) Targets and Achievememts for 2019-20

All India Energy Generation During Apr-19 to May-19 (MU)

Target (2019-20)Apr-19 to May-19

Sector

Hydro

Thermal

Nuclear

202535

22522

7208

232765

193324

25152

6942

226010

0

50000

100000

150000

200000

250000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Energy Power Supply Position (Provisional) for May-2019 and during Apr-19 to May-19 23

2 Peak Power Supply Position (Provisional) for May-2019 and during Apr-19 to May-19 24

3 Energy Power Supply Position (Revised) for Apr-2019 and during Apr-19 to Apr-19 25

4 Peak Power Supply Position (Revised) for Apr-2019 and during Apr-19 to Apr-19 26

5 Notified Power cuts Restrictions on Industries during May-2019 27

6 Power Supply to Agricultural Sector during May-2019 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 154 154 0 00 271 271 0 00

दिलली Delhi 3366 3366 0 00 6065 6064 1 00

हरियजणज Haryana 4907 4907 0 00 8679 8679 0 00

दहमजचल परिश Himachal Pradesh 872 863 10 11 1654 1644 10 06

रमम कशमीि Jammu amp Kashmir 1760 1424 336 191 3364 2720 644 191

परजब Punjab 4769 4769 0 00 8475 8475 0 00

िजरसथजन Rajasthan 7120 7110 11 02 13313 13300 13 01

उतति परिश Uttar Pradesh 12742 12695 48 04 22897 22817 79 03

उततिजखड Uttarakhand 1329 1329 0 00 2449 2449 0 00

उततरी कषतर Northern Region 37020 36615 404 11 67166 66419 747 11

छततीसगढ़ Chhattisgarh 2794 2794 0 00 5765 5764 1 00

गरिजत Gujarat 11208 11208 0 00 21748 21748 0 00

मधय परिश Madhya Pradesh 6502 6502 0 00 12735 12735 0 00

महजिजषटर Maharashtra 14976 14976 0 00 29295 29294 0 00

िमन औि दिउ Daman amp Diu 222 222 0 00 443 443 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 1106 1106 0 00

गोवज Goa 404 404 0 00 801 801 0 00

पशचिमी कषतर Western Region 36658 36658 0 00 71893 71892 1 00

आनधर परिश Andhra Pradesh 6056 6048 7 01 11709 11702 7 01

तलगजनज Telangana 5318 5318 1 00 10772 10771 1 00

कनजाटक Karnataka 6702 6702 1 00 13569 13568 1 00

किल Kerala 2575 2566 9 03 4888 4878 10 02

तममल नजड Tamil Nadu 10309 10309 1 00 20031 20030 1 00

पडचिी Puducherry 271 271 1 03 517 516 1 01

लकष-दवीप Lakshadweep 4 4 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 31232 31213 19 01 61486 61465 21 00

बबहजि Bihar 3078 3078 0 00 5662 5659 3 01

िजमोिि घजटी ननगम DVC 1814 1814 0 00 3757 3755 2 01

झजिखणड Jharkhand 789 789 0 00 1505 1495 10 07

ओडडशज Odisha 2560 2560 0 00 5261 5261 0 00

पशशचम बगजल West Bengal 5115 5115 0 00 9920 9897 23 02

मसशककम Sikkim 36 36 0 00 78 78 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 58 54 4 67

परवी कषतर Eastern Region 13391 13391 0 00 26182 26144 38 01

अरणजचल परिश Arunachal Pradesh 64 64 0 06 127 126 1 06

असम Assam 819 738 81 99 1573 1434 139 88

मणणपि Manipur 73 72 1 07 135 134 2 12

मघजलय Meghalaya 167 159 8 50 336 318 18 55

ममज़ोिम Mizoram 55 55 0 07 100 99 1 08

नजगजलड Nagaland 65 64 1 08 124 123 1 08

बिपिज Tripura 173 170 2 14 292 288 4 13

उततर-परवी कषतर North-Eastern Region 1416 1323 93 66 2686 2521 165 62

समपणण भारत All India 119717 119200 517 04 229413 228441 972 04

Note Power Supply Position Report has been compiled based on the data furnished by State Utilities Electricity Departments

23

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 356 356 0 00 356 356 0 00

दिलली Delhi 6461 6461 0 00 6461 6461 0 00

हरियजणज Haryana 8874 8874 0 00 8874 8874 0 00

दहमजचल परिश Himachal Pradesh 1480 1480 0 00 1480 1480 0 00

रमम कशमीि Jammu amp Kashmir 2426 2426 0 00 2885 2426 459 159

परजब Punjab 8802 8802 0 00 8802 8802 0 00

िजरसथजन Rajasthan 11791 11791 0 00 11791 11791 0 00

उतति परिश Uttar Pradesh 22487 22057 430 19 22487 22057 430 19

उततिजखड Uttarakhand 2155 2155 0 00 2155 2155 0 00

उततरी कषतर Northern Region 60987 60078 909 15 60987 60078 909 15

छततीसगढ़ Chhattisgarh 4504 4504 0 00 4596 4574 22 05

गरिजत Gujarat 18094 18094 0 00 18094 18094 0 00

मधय परिश Madhya Pradesh 10145 10131 14 01 10145 10131 14 01

महजिजषटर Maharashtra 23621 23613 8 00 23621 23613 8 00

िमन औि दिउ Daman amp Diu 344 344 0 01 344 344 0 01

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 818 818 0 00

गोवज Goa 554 554 0 00 594 594 0 00

पशचिमी कषतर Western Region 57113 57093 20 00 57113 57093 20 00

आनधर परिश Andhra Pradesh 9854 9854 0 00 9854 9854 0 00

तलगजनज Telangana 8684 8684 0 00 10269 10202 67 07

कनजाटक Karnataka 12158 12158 0 00 12700 12688 12 01

किल Kerala 4286 4205 81 19 4316 4300 16 04

तममल नजड Tamil Nadu 15584 15522 62 04 15680 15659 21 01

पडचिी Puducherry 453 442 11 24 453 444 9 20

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 47477 47465 12 00 49218 49103 115 02

बबहजि Bihar 5481 5481 0 00 5481 5481 0 00

िजमोिि घजटी ननगम DVC 3048 3048 0 00 3048 3048 0 00

झजिखणड Jharkhand 1330 1330 0 00 1330 1330 0 00

ओडडशज Odisha 4736 4736 0 00 5142 5140 3 01

पशशचम बगजल West Bengal 9335 9335 0 00 9335 9335 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23558 23558 0 00 23558 23558 0 00

अरणजचल परिश Arunachal Pradesh 140 138 2 12 140 138 2 12

असम Assam 1753 1673 80 46 1910 1673 237 124

मणणपि Manipur 183 181 2 09 197 188 9 48

मघजलय Meghalaya 329 325 4 12 337 337 0 00

ममज़ोिम Mizoram 102 100 2 20 116 113 3 28

नजगजलड Nagaland 130 128 2 14 157 131 27 169

बिपिज Tripura 297 295 1 05 297 295 1 05

उततर-परवी कषतर North-Eastern Region 2758 2674 84 31 2848 2780 68 24

समपणण भारत All India 183513 182533 981 05 183513 182533 981 05

Note Power Supply Position Report has been compiled based on the data furnished by State Utilities Electricity Departments 24

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -मई2019 April2019 to May2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and supply

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateमई 2019 May2019

मजग की पनता म कमी Demand not Met

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 781 781 0 00 781 781 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3706 3706 0 00 3706 3706 0 00

िजरसथजन Rajasthan 6192 6190 2 00 6192 6190 2 00

उतति परिश Uttar Pradesh 10154 10123 32 03 10154 10123 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30147 29804 343 11 30147 29804 343 11

छततीसगढ़ Chhattisgarh 2972 2971 1 00 2972 2971 1 00

गरिजत Gujarat 10540 10540 0 00 10540 10540 0 00

मधय परिश Madhya Pradesh 6233 6233 0 00 6233 6233 0 00

महजिजषटर Maharashtra 14319 14319 0 00 14319 14319 0 00

िमन औि दिउ Daman amp Diu 221 221 0 00 221 221 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 554 554 0 00 554 554 0 00

गोवज Goa 397 397 0 00 397 397 0 00

पशचिमी कषतर Western Region 35235 35234 1 00 35235 35234 1 00

आनधर परिश Andhra Pradesh 5653 5653 0 00 5653 5653 0 00

तलगजनज Telangana 5453 5453 0 00 5453 5453 0 00

कनजाटक Karnataka 6867 6867 0 00 6867 6867 0 00

किल Kerala 2313 2312 2 01 2313 2312 2 01

तममल नजड Tamil Nadu 9721 9721 0 00 9721 9721 0 00

पडचिी Puducherry 246 246 0 00 246 246 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 30254 30252 2 00 30254 30252 2 00

बबहजि Bihar 2584 2581 3 01 2584 2581 3 01

िजमोिि घजटी ननगम DVC 1944 1942 2 01 1944 1942 2 01

झजिखणड Jharkhand 716 706 10 14 716 706 10 14

ओडडशज Odisha 2701 2701 0 00 2701 2701 0 00

पशशचम बगजल West Bengal 4805 4782 23 05 4805 4782 23 05

मसशककम Sikkim 42 42 0 00 42 42 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12792 12754 38 03 12792 12754 38 03

अरणजचल परिश Arunachal Pradesh 62 62 0 06 62 62 0 06

असम Assam 754 696 58 77 754 696 58 77

मणणपि Manipur 62 61 1 17 62 61 1 17

मघजलय Meghalaya 169 159 10 60 169 159 10 60

ममज़ोिम Mizoram 45 44 0 10 45 44 0 10

नजगजलड Nagaland 59 58 0 08 59 58 0 08

बिपिज Tripura 119 117 2 13 119 117 2 13

उततर-परवी कषतर North-Eastern Region 1270 1198 72 57 1270 1198 72 57

समपणण भारत All India 109696 109241 455 04 109696 109241 455 04

Note The revised data for March 2019 is not avaliable

Energy not Supplied Energy not Supplied

अपरल 2019 April2019 अपरल 2019 April2019 to April 2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2885 2308 577 200 2885 2308 577 200

परजब Punjab 7087 7087 0 00 7087 7087 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 47779 47210 569 12 47779 47210 569 12

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9179 9160 19 02 9179 9160 19 02

तलगजनज Telangana 10269 10202 67 07 10269 10202 67 07

कनजाटक Karnataka 12700 12688 12 01 12700 12688 12 01

किल Kerala 4316 4300 16 04 4316 4300 16 04

तममल नजड Tamil Nadu 15680 15659 21 01 15680 15659 21 01

पडचिी Puducherry 444 444 0 00 444 444 0 00

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49218 49103 115 02 49218 49103 115 02

बबहजि Bihar 5157 5155 2 00 5157 5155 2 00

िजमोिि घजटी ननगम DVC 3014 3014 0 00 3014 3014 0 00

झजिखणड Jharkhand 1326 1325 1 00 1326 1325 1 00

ओडडशज Odisha 5142 5140 3 01 5142 5140 3 01

पशशचम बगजल West Bengal 8745 8699 46 05 8745 8699 46 05

मसशककम Sikkim 98 98 0 00 98 98 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22415 22378 37 02 22415 22378 37 02

अरणजचल परिश Arunachal Pradesh 139 136 3 21 139 136 3 21

असम Assam 1910 1667 242 127 1910 1667 242 127

मणणपि Manipur 197 188 9 48 197 188 9 48

मघजलय Meghalaya 337 337 0 00 337 337 0 00

ममज़ोिम Mizoram 116 113 3 28 116 113 3 28

नजगजलड Nagaland 157 131 27 169 157 131 27 169

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177424 176810 613 03 177424 176810 613 03

Note The revised data for March 2019 is not avaliable 26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateअपरल 2019 April2019 अपरल 2019 April2019 to April 2019

File NoCEA-CH-14-1142018-Coordination Division

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

मई 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during May2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

N

o No

tified

Cuts

N

o No

tified

Cuts

File NoCEA-CH-14-1142018-Coordination Division

मई2019May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0910 hrsday 0811 - 910 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 403 hrsday 0347 - 403 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 2214 hrsday 2157 - 2214 hrsday

उततराखड Uttarakhand Data not received 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-957 hrs day

Three-Phase (Mixed) Supply - 2346 hrs day

Three-Phase Supply(Irrigation)- 0953 - 0957 hrs day Three-

Phase (Mixed) Supply - 2334 - 2346 hrs day

महजिजषटर Maharashtra Three-Phase Supply - 9 hrs day Three-Phase Supply - 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

मई 2019 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during May2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to May-2019 20070450 2493722 63763 22627934 678000 4539922 7835904 35681760

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 7835904 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

7835904

Total Installed Capacity 35687160 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-22 (Up to

Mar2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

Plan Period

2017-22 (Up to

May-19)

6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58732 21173 181240 11734 163456 1010 176200 158886 225204 30768 414858

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Progress of Transmission Sector in the Country up to May 2019

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on May19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

May 19)

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during May 2019

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 20525 925681234952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during May-2019 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 31-05-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621

May19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 0 0 23 23 0 750 0 750 0 750 23 773

Achievement 0 0 0 0 0 0 0 0 0 0 0 0 0 474 0 474 0 503 0 503 0 977 0 977

Upto May-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 226 1176 0 1059 0 1059 637 2365 783 3785

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 494 0 494 0 904 0 904 53 1398 0 1451

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

Line

1 2 3 4 5 6

0

1 400 Barmer-Bhinmal line DC RVPNL 288

2 400 Jangaon - Tippapur DC TSTRANSCO 138

3 400 Kayathar - Thennampatty DC TANTRANSCO 48

4 220 Bareilly (400) - Pilibhit Ckt-II SC UPPTCL 39

5 220 Bhanjanagar - Aska DC OPTCL 57

6 220LILO of both Ckt of 220kV Mobha - Mangrol

line at 220kV Amod (Balanced portion)DC GETCO 46

7 220LILO of Gr Noida (400) - Noida Sec-148 line

at RC GreenDC UPPTCL 9

8 220 LILO of Hathras - Gokul at Mathura DC UPPTCL 120

9 220 Sohawal - Tanda DC UPPTCL 232

977

0

977

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During May-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 31-05-19

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during

May-201921(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 31-05-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716

May19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 0 1445 1000 2445 0 680 0 680 0 2125 1000 3125

Achievement 0 0 0 0 0 0 0 0 1000 0 0 1000 0 2385 0 2385 0 760 0 760 1000 3145 0 4145

Upto May-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 2445 3000 5445 0 1480 0 1480 3000 3925 6000 12925

Achievement 0 0 0 0 0 0 0 0 1500 0 0 1500 815 4365 0 5180 0 2065 0 2065 2315 6430 0 8745

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

As on 31-05-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1Bhadla SS (3x1500 3x500 MVA) (500 MVA ICTs- II

and III)400220 PGCIL 1000

Total of CENTRAL SECTOR 1000

2 Moradabad(Aug) (Additional TF) 400220 UPPTCL 240

3 Masauli Prayagraj (New) TF-III 400132 UPPTCL 200

4 Talaricheruvu Ss 400220 APTRANSCO 9455 Uravakonda (Aug) ICT-II 400220 APTRANSCO 5006 Jangaon ss (3x500) (ICT-I) 400220 TSTRANSCO 500

7 Chinhat Lucknow (Aug) TF-II (200-160) 220132 UPPTCL 408 Hathras (Aug)T-I(200-160) 220132 UPPTCL 409 Jaunpur (Aug) (Additional TF) 220132 UPPTCL 16010 Laukahi (Supaul new) 22013233 BSPTCL 32011 Sector- 95 Gurgaon 22033 HVPNL 10012 Alawalpur ss 22066 PSTCL 100

TOTAL STATE SECTOR 3145

GRAND TOTAL 4145

21(2)

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During May-2019

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2019-20 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination Division

Programme Achievement Ach Programme Achievement Ach

Central Sector 37545100 3290600 3141593 9547 6468500 6275642 9702

State Sector 37498600 3425800 3092392 9027 6748300 6066733 8990

PvtIPP Sector 37346200 3476700 3460217 9953 6713100 6652517 9910

PvtUTL Sector 1823100 164300 171799 10456 323600 337490 10429

Total 114213000 10357400 9866001 9526 20253500 19332382 9545

Central Sector 5661700 604200 619800 10258 990300 1104995 11158

State Sector 6680500 551500 652766 11836 1049700 1184387 11283

PvtIPP Sector 1206900 130200 121344 9320 187500 200643 10701

PvtUTL Sector 144100 12400 14009 11298 24700 25155 10184

Total 13693200 1298300 1407919 10844 2252200 2515180 11168

Central Sector 4472000 353500 365463 10338 720800 694195 9631

Total 4472000 353500 365463 10338 720800 694195 9631

Bhutan Import 621800 32500 35300 10862 50000 59270 11854

Central Sector 47678800 4248300 4126856 9714 8179600 8074832 9872

State Sector 44179100 3977300 3745158 9416 7798000 7251120 9299

Pvt Sector 40520300 3783600 3767369 9957 7248900 7215805 9954

Total 133000000 12041700 11674683 9695 23276500 22601027 9710

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Apr-19 Apr-18 Upto Apr-2019 Upto Apr-2018

975409 844377 975409 844377

22

Renewable Energy Generation

Achievement

May-2019

1 Electricity Generation (MU) Targets and Achievememts for 2019-20

All India Energy Generation During Apr-19 to May-19 (MU)

Target (2019-20)Apr-19 to May-19

Sector

Hydro

Thermal

Nuclear

202535

22522

7208

232765

193324

25152

6942

226010

0

50000

100000

150000

200000

250000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Energy Power Supply Position (Provisional) for May-2019 and during Apr-19 to May-19 23

2 Peak Power Supply Position (Provisional) for May-2019 and during Apr-19 to May-19 24

3 Energy Power Supply Position (Revised) for Apr-2019 and during Apr-19 to Apr-19 25

4 Peak Power Supply Position (Revised) for Apr-2019 and during Apr-19 to Apr-19 26

5 Notified Power cuts Restrictions on Industries during May-2019 27

6 Power Supply to Agricultural Sector during May-2019 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 154 154 0 00 271 271 0 00

दिलली Delhi 3366 3366 0 00 6065 6064 1 00

हरियजणज Haryana 4907 4907 0 00 8679 8679 0 00

दहमजचल परिश Himachal Pradesh 872 863 10 11 1654 1644 10 06

रमम कशमीि Jammu amp Kashmir 1760 1424 336 191 3364 2720 644 191

परजब Punjab 4769 4769 0 00 8475 8475 0 00

िजरसथजन Rajasthan 7120 7110 11 02 13313 13300 13 01

उतति परिश Uttar Pradesh 12742 12695 48 04 22897 22817 79 03

उततिजखड Uttarakhand 1329 1329 0 00 2449 2449 0 00

उततरी कषतर Northern Region 37020 36615 404 11 67166 66419 747 11

छततीसगढ़ Chhattisgarh 2794 2794 0 00 5765 5764 1 00

गरिजत Gujarat 11208 11208 0 00 21748 21748 0 00

मधय परिश Madhya Pradesh 6502 6502 0 00 12735 12735 0 00

महजिजषटर Maharashtra 14976 14976 0 00 29295 29294 0 00

िमन औि दिउ Daman amp Diu 222 222 0 00 443 443 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 1106 1106 0 00

गोवज Goa 404 404 0 00 801 801 0 00

पशचिमी कषतर Western Region 36658 36658 0 00 71893 71892 1 00

आनधर परिश Andhra Pradesh 6056 6048 7 01 11709 11702 7 01

तलगजनज Telangana 5318 5318 1 00 10772 10771 1 00

कनजाटक Karnataka 6702 6702 1 00 13569 13568 1 00

किल Kerala 2575 2566 9 03 4888 4878 10 02

तममल नजड Tamil Nadu 10309 10309 1 00 20031 20030 1 00

पडचिी Puducherry 271 271 1 03 517 516 1 01

लकष-दवीप Lakshadweep 4 4 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 31232 31213 19 01 61486 61465 21 00

बबहजि Bihar 3078 3078 0 00 5662 5659 3 01

िजमोिि घजटी ननगम DVC 1814 1814 0 00 3757 3755 2 01

झजिखणड Jharkhand 789 789 0 00 1505 1495 10 07

ओडडशज Odisha 2560 2560 0 00 5261 5261 0 00

पशशचम बगजल West Bengal 5115 5115 0 00 9920 9897 23 02

मसशककम Sikkim 36 36 0 00 78 78 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 58 54 4 67

परवी कषतर Eastern Region 13391 13391 0 00 26182 26144 38 01

अरणजचल परिश Arunachal Pradesh 64 64 0 06 127 126 1 06

असम Assam 819 738 81 99 1573 1434 139 88

मणणपि Manipur 73 72 1 07 135 134 2 12

मघजलय Meghalaya 167 159 8 50 336 318 18 55

ममज़ोिम Mizoram 55 55 0 07 100 99 1 08

नजगजलड Nagaland 65 64 1 08 124 123 1 08

बिपिज Tripura 173 170 2 14 292 288 4 13

उततर-परवी कषतर North-Eastern Region 1416 1323 93 66 2686 2521 165 62

समपणण भारत All India 119717 119200 517 04 229413 228441 972 04

Note Power Supply Position Report has been compiled based on the data furnished by State Utilities Electricity Departments

23

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 356 356 0 00 356 356 0 00

दिलली Delhi 6461 6461 0 00 6461 6461 0 00

हरियजणज Haryana 8874 8874 0 00 8874 8874 0 00

दहमजचल परिश Himachal Pradesh 1480 1480 0 00 1480 1480 0 00

रमम कशमीि Jammu amp Kashmir 2426 2426 0 00 2885 2426 459 159

परजब Punjab 8802 8802 0 00 8802 8802 0 00

िजरसथजन Rajasthan 11791 11791 0 00 11791 11791 0 00

उतति परिश Uttar Pradesh 22487 22057 430 19 22487 22057 430 19

उततिजखड Uttarakhand 2155 2155 0 00 2155 2155 0 00

उततरी कषतर Northern Region 60987 60078 909 15 60987 60078 909 15

छततीसगढ़ Chhattisgarh 4504 4504 0 00 4596 4574 22 05

गरिजत Gujarat 18094 18094 0 00 18094 18094 0 00

मधय परिश Madhya Pradesh 10145 10131 14 01 10145 10131 14 01

महजिजषटर Maharashtra 23621 23613 8 00 23621 23613 8 00

िमन औि दिउ Daman amp Diu 344 344 0 01 344 344 0 01

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 818 818 0 00

गोवज Goa 554 554 0 00 594 594 0 00

पशचिमी कषतर Western Region 57113 57093 20 00 57113 57093 20 00

आनधर परिश Andhra Pradesh 9854 9854 0 00 9854 9854 0 00

तलगजनज Telangana 8684 8684 0 00 10269 10202 67 07

कनजाटक Karnataka 12158 12158 0 00 12700 12688 12 01

किल Kerala 4286 4205 81 19 4316 4300 16 04

तममल नजड Tamil Nadu 15584 15522 62 04 15680 15659 21 01

पडचिी Puducherry 453 442 11 24 453 444 9 20

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 47477 47465 12 00 49218 49103 115 02

बबहजि Bihar 5481 5481 0 00 5481 5481 0 00

िजमोिि घजटी ननगम DVC 3048 3048 0 00 3048 3048 0 00

झजिखणड Jharkhand 1330 1330 0 00 1330 1330 0 00

ओडडशज Odisha 4736 4736 0 00 5142 5140 3 01

पशशचम बगजल West Bengal 9335 9335 0 00 9335 9335 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23558 23558 0 00 23558 23558 0 00

अरणजचल परिश Arunachal Pradesh 140 138 2 12 140 138 2 12

असम Assam 1753 1673 80 46 1910 1673 237 124

मणणपि Manipur 183 181 2 09 197 188 9 48

मघजलय Meghalaya 329 325 4 12 337 337 0 00

ममज़ोिम Mizoram 102 100 2 20 116 113 3 28

नजगजलड Nagaland 130 128 2 14 157 131 27 169

बिपिज Tripura 297 295 1 05 297 295 1 05

उततर-परवी कषतर North-Eastern Region 2758 2674 84 31 2848 2780 68 24

समपणण भारत All India 183513 182533 981 05 183513 182533 981 05

Note Power Supply Position Report has been compiled based on the data furnished by State Utilities Electricity Departments 24

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -मई2019 April2019 to May2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and supply

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateमई 2019 May2019

मजग की पनता म कमी Demand not Met

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 781 781 0 00 781 781 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3706 3706 0 00 3706 3706 0 00

िजरसथजन Rajasthan 6192 6190 2 00 6192 6190 2 00

उतति परिश Uttar Pradesh 10154 10123 32 03 10154 10123 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30147 29804 343 11 30147 29804 343 11

छततीसगढ़ Chhattisgarh 2972 2971 1 00 2972 2971 1 00

गरिजत Gujarat 10540 10540 0 00 10540 10540 0 00

मधय परिश Madhya Pradesh 6233 6233 0 00 6233 6233 0 00

महजिजषटर Maharashtra 14319 14319 0 00 14319 14319 0 00

िमन औि दिउ Daman amp Diu 221 221 0 00 221 221 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 554 554 0 00 554 554 0 00

गोवज Goa 397 397 0 00 397 397 0 00

पशचिमी कषतर Western Region 35235 35234 1 00 35235 35234 1 00

आनधर परिश Andhra Pradesh 5653 5653 0 00 5653 5653 0 00

तलगजनज Telangana 5453 5453 0 00 5453 5453 0 00

कनजाटक Karnataka 6867 6867 0 00 6867 6867 0 00

किल Kerala 2313 2312 2 01 2313 2312 2 01

तममल नजड Tamil Nadu 9721 9721 0 00 9721 9721 0 00

पडचिी Puducherry 246 246 0 00 246 246 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 30254 30252 2 00 30254 30252 2 00

बबहजि Bihar 2584 2581 3 01 2584 2581 3 01

िजमोिि घजटी ननगम DVC 1944 1942 2 01 1944 1942 2 01

झजिखणड Jharkhand 716 706 10 14 716 706 10 14

ओडडशज Odisha 2701 2701 0 00 2701 2701 0 00

पशशचम बगजल West Bengal 4805 4782 23 05 4805 4782 23 05

मसशककम Sikkim 42 42 0 00 42 42 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12792 12754 38 03 12792 12754 38 03

अरणजचल परिश Arunachal Pradesh 62 62 0 06 62 62 0 06

असम Assam 754 696 58 77 754 696 58 77

मणणपि Manipur 62 61 1 17 62 61 1 17

मघजलय Meghalaya 169 159 10 60 169 159 10 60

ममज़ोिम Mizoram 45 44 0 10 45 44 0 10

नजगजलड Nagaland 59 58 0 08 59 58 0 08

बिपिज Tripura 119 117 2 13 119 117 2 13

उततर-परवी कषतर North-Eastern Region 1270 1198 72 57 1270 1198 72 57

समपणण भारत All India 109696 109241 455 04 109696 109241 455 04

Note The revised data for March 2019 is not avaliable

Energy not Supplied Energy not Supplied

अपरल 2019 April2019 अपरल 2019 April2019 to April 2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2885 2308 577 200 2885 2308 577 200

परजब Punjab 7087 7087 0 00 7087 7087 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 47779 47210 569 12 47779 47210 569 12

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9179 9160 19 02 9179 9160 19 02

तलगजनज Telangana 10269 10202 67 07 10269 10202 67 07

कनजाटक Karnataka 12700 12688 12 01 12700 12688 12 01

किल Kerala 4316 4300 16 04 4316 4300 16 04

तममल नजड Tamil Nadu 15680 15659 21 01 15680 15659 21 01

पडचिी Puducherry 444 444 0 00 444 444 0 00

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49218 49103 115 02 49218 49103 115 02

बबहजि Bihar 5157 5155 2 00 5157 5155 2 00

िजमोिि घजटी ननगम DVC 3014 3014 0 00 3014 3014 0 00

झजिखणड Jharkhand 1326 1325 1 00 1326 1325 1 00

ओडडशज Odisha 5142 5140 3 01 5142 5140 3 01

पशशचम बगजल West Bengal 8745 8699 46 05 8745 8699 46 05

मसशककम Sikkim 98 98 0 00 98 98 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22415 22378 37 02 22415 22378 37 02

अरणजचल परिश Arunachal Pradesh 139 136 3 21 139 136 3 21

असम Assam 1910 1667 242 127 1910 1667 242 127

मणणपि Manipur 197 188 9 48 197 188 9 48

मघजलय Meghalaya 337 337 0 00 337 337 0 00

ममज़ोिम Mizoram 116 113 3 28 116 113 3 28

नजगजलड Nagaland 157 131 27 169 157 131 27 169

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177424 176810 613 03 177424 176810 613 03

Note The revised data for March 2019 is not avaliable 26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateअपरल 2019 April2019 अपरल 2019 April2019 to April 2019

File NoCEA-CH-14-1142018-Coordination Division

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

मई 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during May2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

N

o No

tified

Cuts

N

o No

tified

Cuts

File NoCEA-CH-14-1142018-Coordination Division

मई2019May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0910 hrsday 0811 - 910 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 403 hrsday 0347 - 403 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 2214 hrsday 2157 - 2214 hrsday

उततराखड Uttarakhand Data not received 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-957 hrs day

Three-Phase (Mixed) Supply - 2346 hrs day

Three-Phase Supply(Irrigation)- 0953 - 0957 hrs day Three-

Phase (Mixed) Supply - 2334 - 2346 hrs day

महजिजषटर Maharashtra Three-Phase Supply - 9 hrs day Three-Phase Supply - 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

मई 2019 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during May2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to May-2019 20070450 2493722 63763 22627934 678000 4539922 7835904 35681760

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 7835904 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

7835904

Total Installed Capacity 35687160 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-22 (Up to

Mar2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

Plan Period

2017-22 (Up to

May-19)

6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58732 21173 181240 11734 163456 1010 176200 158886 225204 30768 414858

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Progress of Transmission Sector in the Country up to May 2019

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on May19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

May 19)

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during May 2019

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 20525 925681234952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 31-05-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621

May19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 0 0 23 23 0 750 0 750 0 750 23 773

Achievement 0 0 0 0 0 0 0 0 0 0 0 0 0 474 0 474 0 503 0 503 0 977 0 977

Upto May-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 226 1176 0 1059 0 1059 637 2365 783 3785

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 494 0 494 0 904 0 904 53 1398 0 1451

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

Line

1 2 3 4 5 6

0

1 400 Barmer-Bhinmal line DC RVPNL 288

2 400 Jangaon - Tippapur DC TSTRANSCO 138

3 400 Kayathar - Thennampatty DC TANTRANSCO 48

4 220 Bareilly (400) - Pilibhit Ckt-II SC UPPTCL 39

5 220 Bhanjanagar - Aska DC OPTCL 57

6 220LILO of both Ckt of 220kV Mobha - Mangrol

line at 220kV Amod (Balanced portion)DC GETCO 46

7 220LILO of Gr Noida (400) - Noida Sec-148 line

at RC GreenDC UPPTCL 9

8 220 LILO of Hathras - Gokul at Mathura DC UPPTCL 120

9 220 Sohawal - Tanda DC UPPTCL 232

977

0

977

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During May-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 31-05-19

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during

May-201921(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 31-05-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716

May19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 0 1445 1000 2445 0 680 0 680 0 2125 1000 3125

Achievement 0 0 0 0 0 0 0 0 1000 0 0 1000 0 2385 0 2385 0 760 0 760 1000 3145 0 4145

Upto May-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 2445 3000 5445 0 1480 0 1480 3000 3925 6000 12925

Achievement 0 0 0 0 0 0 0 0 1500 0 0 1500 815 4365 0 5180 0 2065 0 2065 2315 6430 0 8745

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

As on 31-05-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1Bhadla SS (3x1500 3x500 MVA) (500 MVA ICTs- II

and III)400220 PGCIL 1000

Total of CENTRAL SECTOR 1000

2 Moradabad(Aug) (Additional TF) 400220 UPPTCL 240

3 Masauli Prayagraj (New) TF-III 400132 UPPTCL 200

4 Talaricheruvu Ss 400220 APTRANSCO 9455 Uravakonda (Aug) ICT-II 400220 APTRANSCO 5006 Jangaon ss (3x500) (ICT-I) 400220 TSTRANSCO 500

7 Chinhat Lucknow (Aug) TF-II (200-160) 220132 UPPTCL 408 Hathras (Aug)T-I(200-160) 220132 UPPTCL 409 Jaunpur (Aug) (Additional TF) 220132 UPPTCL 16010 Laukahi (Supaul new) 22013233 BSPTCL 32011 Sector- 95 Gurgaon 22033 HVPNL 10012 Alawalpur ss 22066 PSTCL 100

TOTAL STATE SECTOR 3145

GRAND TOTAL 4145

21(2)

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During May-2019

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2019-20 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination Division

Programme Achievement Ach Programme Achievement Ach

Central Sector 37545100 3290600 3141593 9547 6468500 6275642 9702

State Sector 37498600 3425800 3092392 9027 6748300 6066733 8990

PvtIPP Sector 37346200 3476700 3460217 9953 6713100 6652517 9910

PvtUTL Sector 1823100 164300 171799 10456 323600 337490 10429

Total 114213000 10357400 9866001 9526 20253500 19332382 9545

Central Sector 5661700 604200 619800 10258 990300 1104995 11158

State Sector 6680500 551500 652766 11836 1049700 1184387 11283

PvtIPP Sector 1206900 130200 121344 9320 187500 200643 10701

PvtUTL Sector 144100 12400 14009 11298 24700 25155 10184

Total 13693200 1298300 1407919 10844 2252200 2515180 11168

Central Sector 4472000 353500 365463 10338 720800 694195 9631

Total 4472000 353500 365463 10338 720800 694195 9631

Bhutan Import 621800 32500 35300 10862 50000 59270 11854

Central Sector 47678800 4248300 4126856 9714 8179600 8074832 9872

State Sector 44179100 3977300 3745158 9416 7798000 7251120 9299

Pvt Sector 40520300 3783600 3767369 9957 7248900 7215805 9954

Total 133000000 12041700 11674683 9695 23276500 22601027 9710

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Apr-19 Apr-18 Upto Apr-2019 Upto Apr-2018

975409 844377 975409 844377

22

Renewable Energy Generation

Achievement

May-2019

1 Electricity Generation (MU) Targets and Achievememts for 2019-20

All India Energy Generation During Apr-19 to May-19 (MU)

Target (2019-20)Apr-19 to May-19

Sector

Hydro

Thermal

Nuclear

202535

22522

7208

232765

193324

25152

6942

226010

0

50000

100000

150000

200000

250000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Energy Power Supply Position (Provisional) for May-2019 and during Apr-19 to May-19 23

2 Peak Power Supply Position (Provisional) for May-2019 and during Apr-19 to May-19 24

3 Energy Power Supply Position (Revised) for Apr-2019 and during Apr-19 to Apr-19 25

4 Peak Power Supply Position (Revised) for Apr-2019 and during Apr-19 to Apr-19 26

5 Notified Power cuts Restrictions on Industries during May-2019 27

6 Power Supply to Agricultural Sector during May-2019 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 154 154 0 00 271 271 0 00

दिलली Delhi 3366 3366 0 00 6065 6064 1 00

हरियजणज Haryana 4907 4907 0 00 8679 8679 0 00

दहमजचल परिश Himachal Pradesh 872 863 10 11 1654 1644 10 06

रमम कशमीि Jammu amp Kashmir 1760 1424 336 191 3364 2720 644 191

परजब Punjab 4769 4769 0 00 8475 8475 0 00

िजरसथजन Rajasthan 7120 7110 11 02 13313 13300 13 01

उतति परिश Uttar Pradesh 12742 12695 48 04 22897 22817 79 03

उततिजखड Uttarakhand 1329 1329 0 00 2449 2449 0 00

उततरी कषतर Northern Region 37020 36615 404 11 67166 66419 747 11

छततीसगढ़ Chhattisgarh 2794 2794 0 00 5765 5764 1 00

गरिजत Gujarat 11208 11208 0 00 21748 21748 0 00

मधय परिश Madhya Pradesh 6502 6502 0 00 12735 12735 0 00

महजिजषटर Maharashtra 14976 14976 0 00 29295 29294 0 00

िमन औि दिउ Daman amp Diu 222 222 0 00 443 443 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 1106 1106 0 00

गोवज Goa 404 404 0 00 801 801 0 00

पशचिमी कषतर Western Region 36658 36658 0 00 71893 71892 1 00

आनधर परिश Andhra Pradesh 6056 6048 7 01 11709 11702 7 01

तलगजनज Telangana 5318 5318 1 00 10772 10771 1 00

कनजाटक Karnataka 6702 6702 1 00 13569 13568 1 00

किल Kerala 2575 2566 9 03 4888 4878 10 02

तममल नजड Tamil Nadu 10309 10309 1 00 20031 20030 1 00

पडचिी Puducherry 271 271 1 03 517 516 1 01

लकष-दवीप Lakshadweep 4 4 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 31232 31213 19 01 61486 61465 21 00

बबहजि Bihar 3078 3078 0 00 5662 5659 3 01

िजमोिि घजटी ननगम DVC 1814 1814 0 00 3757 3755 2 01

झजिखणड Jharkhand 789 789 0 00 1505 1495 10 07

ओडडशज Odisha 2560 2560 0 00 5261 5261 0 00

पशशचम बगजल West Bengal 5115 5115 0 00 9920 9897 23 02

मसशककम Sikkim 36 36 0 00 78 78 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 58 54 4 67

परवी कषतर Eastern Region 13391 13391 0 00 26182 26144 38 01

अरणजचल परिश Arunachal Pradesh 64 64 0 06 127 126 1 06

असम Assam 819 738 81 99 1573 1434 139 88

मणणपि Manipur 73 72 1 07 135 134 2 12

मघजलय Meghalaya 167 159 8 50 336 318 18 55

ममज़ोिम Mizoram 55 55 0 07 100 99 1 08

नजगजलड Nagaland 65 64 1 08 124 123 1 08

बिपिज Tripura 173 170 2 14 292 288 4 13

उततर-परवी कषतर North-Eastern Region 1416 1323 93 66 2686 2521 165 62

समपणण भारत All India 119717 119200 517 04 229413 228441 972 04

Note Power Supply Position Report has been compiled based on the data furnished by State Utilities Electricity Departments

23

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 356 356 0 00 356 356 0 00

दिलली Delhi 6461 6461 0 00 6461 6461 0 00

हरियजणज Haryana 8874 8874 0 00 8874 8874 0 00

दहमजचल परिश Himachal Pradesh 1480 1480 0 00 1480 1480 0 00

रमम कशमीि Jammu amp Kashmir 2426 2426 0 00 2885 2426 459 159

परजब Punjab 8802 8802 0 00 8802 8802 0 00

िजरसथजन Rajasthan 11791 11791 0 00 11791 11791 0 00

उतति परिश Uttar Pradesh 22487 22057 430 19 22487 22057 430 19

उततिजखड Uttarakhand 2155 2155 0 00 2155 2155 0 00

उततरी कषतर Northern Region 60987 60078 909 15 60987 60078 909 15

छततीसगढ़ Chhattisgarh 4504 4504 0 00 4596 4574 22 05

गरिजत Gujarat 18094 18094 0 00 18094 18094 0 00

मधय परिश Madhya Pradesh 10145 10131 14 01 10145 10131 14 01

महजिजषटर Maharashtra 23621 23613 8 00 23621 23613 8 00

िमन औि दिउ Daman amp Diu 344 344 0 01 344 344 0 01

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 818 818 0 00

गोवज Goa 554 554 0 00 594 594 0 00

पशचिमी कषतर Western Region 57113 57093 20 00 57113 57093 20 00

आनधर परिश Andhra Pradesh 9854 9854 0 00 9854 9854 0 00

तलगजनज Telangana 8684 8684 0 00 10269 10202 67 07

कनजाटक Karnataka 12158 12158 0 00 12700 12688 12 01

किल Kerala 4286 4205 81 19 4316 4300 16 04

तममल नजड Tamil Nadu 15584 15522 62 04 15680 15659 21 01

पडचिी Puducherry 453 442 11 24 453 444 9 20

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 47477 47465 12 00 49218 49103 115 02

बबहजि Bihar 5481 5481 0 00 5481 5481 0 00

िजमोिि घजटी ननगम DVC 3048 3048 0 00 3048 3048 0 00

झजिखणड Jharkhand 1330 1330 0 00 1330 1330 0 00

ओडडशज Odisha 4736 4736 0 00 5142 5140 3 01

पशशचम बगजल West Bengal 9335 9335 0 00 9335 9335 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23558 23558 0 00 23558 23558 0 00

अरणजचल परिश Arunachal Pradesh 140 138 2 12 140 138 2 12

असम Assam 1753 1673 80 46 1910 1673 237 124

मणणपि Manipur 183 181 2 09 197 188 9 48

मघजलय Meghalaya 329 325 4 12 337 337 0 00

ममज़ोिम Mizoram 102 100 2 20 116 113 3 28

नजगजलड Nagaland 130 128 2 14 157 131 27 169

बिपिज Tripura 297 295 1 05 297 295 1 05

उततर-परवी कषतर North-Eastern Region 2758 2674 84 31 2848 2780 68 24

समपणण भारत All India 183513 182533 981 05 183513 182533 981 05

Note Power Supply Position Report has been compiled based on the data furnished by State Utilities Electricity Departments 24

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -मई2019 April2019 to May2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and supply

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateमई 2019 May2019

मजग की पनता म कमी Demand not Met

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 781 781 0 00 781 781 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3706 3706 0 00 3706 3706 0 00

िजरसथजन Rajasthan 6192 6190 2 00 6192 6190 2 00

उतति परिश Uttar Pradesh 10154 10123 32 03 10154 10123 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30147 29804 343 11 30147 29804 343 11

छततीसगढ़ Chhattisgarh 2972 2971 1 00 2972 2971 1 00

गरिजत Gujarat 10540 10540 0 00 10540 10540 0 00

मधय परिश Madhya Pradesh 6233 6233 0 00 6233 6233 0 00

महजिजषटर Maharashtra 14319 14319 0 00 14319 14319 0 00

िमन औि दिउ Daman amp Diu 221 221 0 00 221 221 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 554 554 0 00 554 554 0 00

गोवज Goa 397 397 0 00 397 397 0 00

पशचिमी कषतर Western Region 35235 35234 1 00 35235 35234 1 00

आनधर परिश Andhra Pradesh 5653 5653 0 00 5653 5653 0 00

तलगजनज Telangana 5453 5453 0 00 5453 5453 0 00

कनजाटक Karnataka 6867 6867 0 00 6867 6867 0 00

किल Kerala 2313 2312 2 01 2313 2312 2 01

तममल नजड Tamil Nadu 9721 9721 0 00 9721 9721 0 00

पडचिी Puducherry 246 246 0 00 246 246 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 30254 30252 2 00 30254 30252 2 00

बबहजि Bihar 2584 2581 3 01 2584 2581 3 01

िजमोिि घजटी ननगम DVC 1944 1942 2 01 1944 1942 2 01

झजिखणड Jharkhand 716 706 10 14 716 706 10 14

ओडडशज Odisha 2701 2701 0 00 2701 2701 0 00

पशशचम बगजल West Bengal 4805 4782 23 05 4805 4782 23 05

मसशककम Sikkim 42 42 0 00 42 42 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12792 12754 38 03 12792 12754 38 03

अरणजचल परिश Arunachal Pradesh 62 62 0 06 62 62 0 06

असम Assam 754 696 58 77 754 696 58 77

मणणपि Manipur 62 61 1 17 62 61 1 17

मघजलय Meghalaya 169 159 10 60 169 159 10 60

ममज़ोिम Mizoram 45 44 0 10 45 44 0 10

नजगजलड Nagaland 59 58 0 08 59 58 0 08

बिपिज Tripura 119 117 2 13 119 117 2 13

उततर-परवी कषतर North-Eastern Region 1270 1198 72 57 1270 1198 72 57

समपणण भारत All India 109696 109241 455 04 109696 109241 455 04

Note The revised data for March 2019 is not avaliable

Energy not Supplied Energy not Supplied

अपरल 2019 April2019 अपरल 2019 April2019 to April 2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2885 2308 577 200 2885 2308 577 200

परजब Punjab 7087 7087 0 00 7087 7087 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 47779 47210 569 12 47779 47210 569 12

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9179 9160 19 02 9179 9160 19 02

तलगजनज Telangana 10269 10202 67 07 10269 10202 67 07

कनजाटक Karnataka 12700 12688 12 01 12700 12688 12 01

किल Kerala 4316 4300 16 04 4316 4300 16 04

तममल नजड Tamil Nadu 15680 15659 21 01 15680 15659 21 01

पडचिी Puducherry 444 444 0 00 444 444 0 00

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49218 49103 115 02 49218 49103 115 02

बबहजि Bihar 5157 5155 2 00 5157 5155 2 00

िजमोिि घजटी ननगम DVC 3014 3014 0 00 3014 3014 0 00

झजिखणड Jharkhand 1326 1325 1 00 1326 1325 1 00

ओडडशज Odisha 5142 5140 3 01 5142 5140 3 01

पशशचम बगजल West Bengal 8745 8699 46 05 8745 8699 46 05

मसशककम Sikkim 98 98 0 00 98 98 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22415 22378 37 02 22415 22378 37 02

अरणजचल परिश Arunachal Pradesh 139 136 3 21 139 136 3 21

असम Assam 1910 1667 242 127 1910 1667 242 127

मणणपि Manipur 197 188 9 48 197 188 9 48

मघजलय Meghalaya 337 337 0 00 337 337 0 00

ममज़ोिम Mizoram 116 113 3 28 116 113 3 28

नजगजलड Nagaland 157 131 27 169 157 131 27 169

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177424 176810 613 03 177424 176810 613 03

Note The revised data for March 2019 is not avaliable 26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateअपरल 2019 April2019 अपरल 2019 April2019 to April 2019

File NoCEA-CH-14-1142018-Coordination Division

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

मई 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during May2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

N

o No

tified

Cuts

N

o No

tified

Cuts

File NoCEA-CH-14-1142018-Coordination Division

मई2019May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0910 hrsday 0811 - 910 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 403 hrsday 0347 - 403 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 2214 hrsday 2157 - 2214 hrsday

उततराखड Uttarakhand Data not received 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-957 hrs day

Three-Phase (Mixed) Supply - 2346 hrs day

Three-Phase Supply(Irrigation)- 0953 - 0957 hrs day Three-

Phase (Mixed) Supply - 2334 - 2346 hrs day

महजिजषटर Maharashtra Three-Phase Supply - 9 hrs day Three-Phase Supply - 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

मई 2019 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during May2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to May-2019 20070450 2493722 63763 22627934 678000 4539922 7835904 35681760

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 7835904 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

7835904

Total Installed Capacity 35687160 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-22 (Up to

Mar2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

Plan Period

2017-22 (Up to

May-19)

6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58732 21173 181240 11734 163456 1010 176200 158886 225204 30768 414858

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Progress of Transmission Sector in the Country up to May 2019

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on May19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

May 19)

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during May 2019

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 20525 925681234952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Line

1 2 3 4 5 6

0

1 400 Barmer-Bhinmal line DC RVPNL 288

2 400 Jangaon - Tippapur DC TSTRANSCO 138

3 400 Kayathar - Thennampatty DC TANTRANSCO 48

4 220 Bareilly (400) - Pilibhit Ckt-II SC UPPTCL 39

5 220 Bhanjanagar - Aska DC OPTCL 57

6 220LILO of both Ckt of 220kV Mobha - Mangrol

line at 220kV Amod (Balanced portion)DC GETCO 46

7 220LILO of Gr Noida (400) - Noida Sec-148 line

at RC GreenDC UPPTCL 9

8 220 LILO of Hathras - Gokul at Mathura DC UPPTCL 120

9 220 Sohawal - Tanda DC UPPTCL 232

977

0

977

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During May-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 31-05-19

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during

May-201921(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 31-05-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716

May19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 0 1445 1000 2445 0 680 0 680 0 2125 1000 3125

Achievement 0 0 0 0 0 0 0 0 1000 0 0 1000 0 2385 0 2385 0 760 0 760 1000 3145 0 4145

Upto May-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 2445 3000 5445 0 1480 0 1480 3000 3925 6000 12925

Achievement 0 0 0 0 0 0 0 0 1500 0 0 1500 815 4365 0 5180 0 2065 0 2065 2315 6430 0 8745

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

As on 31-05-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1Bhadla SS (3x1500 3x500 MVA) (500 MVA ICTs- II

and III)400220 PGCIL 1000

Total of CENTRAL SECTOR 1000

2 Moradabad(Aug) (Additional TF) 400220 UPPTCL 240

3 Masauli Prayagraj (New) TF-III 400132 UPPTCL 200

4 Talaricheruvu Ss 400220 APTRANSCO 9455 Uravakonda (Aug) ICT-II 400220 APTRANSCO 5006 Jangaon ss (3x500) (ICT-I) 400220 TSTRANSCO 500

7 Chinhat Lucknow (Aug) TF-II (200-160) 220132 UPPTCL 408 Hathras (Aug)T-I(200-160) 220132 UPPTCL 409 Jaunpur (Aug) (Additional TF) 220132 UPPTCL 16010 Laukahi (Supaul new) 22013233 BSPTCL 32011 Sector- 95 Gurgaon 22033 HVPNL 10012 Alawalpur ss 22066 PSTCL 100

TOTAL STATE SECTOR 3145

GRAND TOTAL 4145

21(2)

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During May-2019

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2019-20 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination Division

Programme Achievement Ach Programme Achievement Ach

Central Sector 37545100 3290600 3141593 9547 6468500 6275642 9702

State Sector 37498600 3425800 3092392 9027 6748300 6066733 8990

PvtIPP Sector 37346200 3476700 3460217 9953 6713100 6652517 9910

PvtUTL Sector 1823100 164300 171799 10456 323600 337490 10429

Total 114213000 10357400 9866001 9526 20253500 19332382 9545

Central Sector 5661700 604200 619800 10258 990300 1104995 11158

State Sector 6680500 551500 652766 11836 1049700 1184387 11283

PvtIPP Sector 1206900 130200 121344 9320 187500 200643 10701

PvtUTL Sector 144100 12400 14009 11298 24700 25155 10184

Total 13693200 1298300 1407919 10844 2252200 2515180 11168

Central Sector 4472000 353500 365463 10338 720800 694195 9631

Total 4472000 353500 365463 10338 720800 694195 9631

Bhutan Import 621800 32500 35300 10862 50000 59270 11854

Central Sector 47678800 4248300 4126856 9714 8179600 8074832 9872

State Sector 44179100 3977300 3745158 9416 7798000 7251120 9299

Pvt Sector 40520300 3783600 3767369 9957 7248900 7215805 9954

Total 133000000 12041700 11674683 9695 23276500 22601027 9710

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Apr-19 Apr-18 Upto Apr-2019 Upto Apr-2018

975409 844377 975409 844377

22

Renewable Energy Generation

Achievement

May-2019

1 Electricity Generation (MU) Targets and Achievememts for 2019-20

All India Energy Generation During Apr-19 to May-19 (MU)

Target (2019-20)Apr-19 to May-19

Sector

Hydro

Thermal

Nuclear

202535

22522

7208

232765

193324

25152

6942

226010

0

50000

100000

150000

200000

250000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Energy Power Supply Position (Provisional) for May-2019 and during Apr-19 to May-19 23

2 Peak Power Supply Position (Provisional) for May-2019 and during Apr-19 to May-19 24

3 Energy Power Supply Position (Revised) for Apr-2019 and during Apr-19 to Apr-19 25

4 Peak Power Supply Position (Revised) for Apr-2019 and during Apr-19 to Apr-19 26

5 Notified Power cuts Restrictions on Industries during May-2019 27

6 Power Supply to Agricultural Sector during May-2019 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 154 154 0 00 271 271 0 00

दिलली Delhi 3366 3366 0 00 6065 6064 1 00

हरियजणज Haryana 4907 4907 0 00 8679 8679 0 00

दहमजचल परिश Himachal Pradesh 872 863 10 11 1654 1644 10 06

रमम कशमीि Jammu amp Kashmir 1760 1424 336 191 3364 2720 644 191

परजब Punjab 4769 4769 0 00 8475 8475 0 00

िजरसथजन Rajasthan 7120 7110 11 02 13313 13300 13 01

उतति परिश Uttar Pradesh 12742 12695 48 04 22897 22817 79 03

उततिजखड Uttarakhand 1329 1329 0 00 2449 2449 0 00

उततरी कषतर Northern Region 37020 36615 404 11 67166 66419 747 11

छततीसगढ़ Chhattisgarh 2794 2794 0 00 5765 5764 1 00

गरिजत Gujarat 11208 11208 0 00 21748 21748 0 00

मधय परिश Madhya Pradesh 6502 6502 0 00 12735 12735 0 00

महजिजषटर Maharashtra 14976 14976 0 00 29295 29294 0 00

िमन औि दिउ Daman amp Diu 222 222 0 00 443 443 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 1106 1106 0 00

गोवज Goa 404 404 0 00 801 801 0 00

पशचिमी कषतर Western Region 36658 36658 0 00 71893 71892 1 00

आनधर परिश Andhra Pradesh 6056 6048 7 01 11709 11702 7 01

तलगजनज Telangana 5318 5318 1 00 10772 10771 1 00

कनजाटक Karnataka 6702 6702 1 00 13569 13568 1 00

किल Kerala 2575 2566 9 03 4888 4878 10 02

तममल नजड Tamil Nadu 10309 10309 1 00 20031 20030 1 00

पडचिी Puducherry 271 271 1 03 517 516 1 01

लकष-दवीप Lakshadweep 4 4 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 31232 31213 19 01 61486 61465 21 00

बबहजि Bihar 3078 3078 0 00 5662 5659 3 01

िजमोिि घजटी ननगम DVC 1814 1814 0 00 3757 3755 2 01

झजिखणड Jharkhand 789 789 0 00 1505 1495 10 07

ओडडशज Odisha 2560 2560 0 00 5261 5261 0 00

पशशचम बगजल West Bengal 5115 5115 0 00 9920 9897 23 02

मसशककम Sikkim 36 36 0 00 78 78 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 58 54 4 67

परवी कषतर Eastern Region 13391 13391 0 00 26182 26144 38 01

अरणजचल परिश Arunachal Pradesh 64 64 0 06 127 126 1 06

असम Assam 819 738 81 99 1573 1434 139 88

मणणपि Manipur 73 72 1 07 135 134 2 12

मघजलय Meghalaya 167 159 8 50 336 318 18 55

ममज़ोिम Mizoram 55 55 0 07 100 99 1 08

नजगजलड Nagaland 65 64 1 08 124 123 1 08

बिपिज Tripura 173 170 2 14 292 288 4 13

उततर-परवी कषतर North-Eastern Region 1416 1323 93 66 2686 2521 165 62

समपणण भारत All India 119717 119200 517 04 229413 228441 972 04

Note Power Supply Position Report has been compiled based on the data furnished by State Utilities Electricity Departments

23

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 356 356 0 00 356 356 0 00

दिलली Delhi 6461 6461 0 00 6461 6461 0 00

हरियजणज Haryana 8874 8874 0 00 8874 8874 0 00

दहमजचल परिश Himachal Pradesh 1480 1480 0 00 1480 1480 0 00

रमम कशमीि Jammu amp Kashmir 2426 2426 0 00 2885 2426 459 159

परजब Punjab 8802 8802 0 00 8802 8802 0 00

िजरसथजन Rajasthan 11791 11791 0 00 11791 11791 0 00

उतति परिश Uttar Pradesh 22487 22057 430 19 22487 22057 430 19

उततिजखड Uttarakhand 2155 2155 0 00 2155 2155 0 00

उततरी कषतर Northern Region 60987 60078 909 15 60987 60078 909 15

छततीसगढ़ Chhattisgarh 4504 4504 0 00 4596 4574 22 05

गरिजत Gujarat 18094 18094 0 00 18094 18094 0 00

मधय परिश Madhya Pradesh 10145 10131 14 01 10145 10131 14 01

महजिजषटर Maharashtra 23621 23613 8 00 23621 23613 8 00

िमन औि दिउ Daman amp Diu 344 344 0 01 344 344 0 01

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 818 818 0 00

गोवज Goa 554 554 0 00 594 594 0 00

पशचिमी कषतर Western Region 57113 57093 20 00 57113 57093 20 00

आनधर परिश Andhra Pradesh 9854 9854 0 00 9854 9854 0 00

तलगजनज Telangana 8684 8684 0 00 10269 10202 67 07

कनजाटक Karnataka 12158 12158 0 00 12700 12688 12 01

किल Kerala 4286 4205 81 19 4316 4300 16 04

तममल नजड Tamil Nadu 15584 15522 62 04 15680 15659 21 01

पडचिी Puducherry 453 442 11 24 453 444 9 20

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 47477 47465 12 00 49218 49103 115 02

बबहजि Bihar 5481 5481 0 00 5481 5481 0 00

िजमोिि घजटी ननगम DVC 3048 3048 0 00 3048 3048 0 00

झजिखणड Jharkhand 1330 1330 0 00 1330 1330 0 00

ओडडशज Odisha 4736 4736 0 00 5142 5140 3 01

पशशचम बगजल West Bengal 9335 9335 0 00 9335 9335 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23558 23558 0 00 23558 23558 0 00

अरणजचल परिश Arunachal Pradesh 140 138 2 12 140 138 2 12

असम Assam 1753 1673 80 46 1910 1673 237 124

मणणपि Manipur 183 181 2 09 197 188 9 48

मघजलय Meghalaya 329 325 4 12 337 337 0 00

ममज़ोिम Mizoram 102 100 2 20 116 113 3 28

नजगजलड Nagaland 130 128 2 14 157 131 27 169

बिपिज Tripura 297 295 1 05 297 295 1 05

उततर-परवी कषतर North-Eastern Region 2758 2674 84 31 2848 2780 68 24

समपणण भारत All India 183513 182533 981 05 183513 182533 981 05

Note Power Supply Position Report has been compiled based on the data furnished by State Utilities Electricity Departments 24

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -मई2019 April2019 to May2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and supply

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateमई 2019 May2019

मजग की पनता म कमी Demand not Met

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 781 781 0 00 781 781 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3706 3706 0 00 3706 3706 0 00

िजरसथजन Rajasthan 6192 6190 2 00 6192 6190 2 00

उतति परिश Uttar Pradesh 10154 10123 32 03 10154 10123 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30147 29804 343 11 30147 29804 343 11

छततीसगढ़ Chhattisgarh 2972 2971 1 00 2972 2971 1 00

गरिजत Gujarat 10540 10540 0 00 10540 10540 0 00

मधय परिश Madhya Pradesh 6233 6233 0 00 6233 6233 0 00

महजिजषटर Maharashtra 14319 14319 0 00 14319 14319 0 00

िमन औि दिउ Daman amp Diu 221 221 0 00 221 221 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 554 554 0 00 554 554 0 00

गोवज Goa 397 397 0 00 397 397 0 00

पशचिमी कषतर Western Region 35235 35234 1 00 35235 35234 1 00

आनधर परिश Andhra Pradesh 5653 5653 0 00 5653 5653 0 00

तलगजनज Telangana 5453 5453 0 00 5453 5453 0 00

कनजाटक Karnataka 6867 6867 0 00 6867 6867 0 00

किल Kerala 2313 2312 2 01 2313 2312 2 01

तममल नजड Tamil Nadu 9721 9721 0 00 9721 9721 0 00

पडचिी Puducherry 246 246 0 00 246 246 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 30254 30252 2 00 30254 30252 2 00

बबहजि Bihar 2584 2581 3 01 2584 2581 3 01

िजमोिि घजटी ननगम DVC 1944 1942 2 01 1944 1942 2 01

झजिखणड Jharkhand 716 706 10 14 716 706 10 14

ओडडशज Odisha 2701 2701 0 00 2701 2701 0 00

पशशचम बगजल West Bengal 4805 4782 23 05 4805 4782 23 05

मसशककम Sikkim 42 42 0 00 42 42 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12792 12754 38 03 12792 12754 38 03

अरणजचल परिश Arunachal Pradesh 62 62 0 06 62 62 0 06

असम Assam 754 696 58 77 754 696 58 77

मणणपि Manipur 62 61 1 17 62 61 1 17

मघजलय Meghalaya 169 159 10 60 169 159 10 60

ममज़ोिम Mizoram 45 44 0 10 45 44 0 10

नजगजलड Nagaland 59 58 0 08 59 58 0 08

बिपिज Tripura 119 117 2 13 119 117 2 13

उततर-परवी कषतर North-Eastern Region 1270 1198 72 57 1270 1198 72 57

समपणण भारत All India 109696 109241 455 04 109696 109241 455 04

Note The revised data for March 2019 is not avaliable

Energy not Supplied Energy not Supplied

अपरल 2019 April2019 अपरल 2019 April2019 to April 2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2885 2308 577 200 2885 2308 577 200

परजब Punjab 7087 7087 0 00 7087 7087 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 47779 47210 569 12 47779 47210 569 12

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9179 9160 19 02 9179 9160 19 02

तलगजनज Telangana 10269 10202 67 07 10269 10202 67 07

कनजाटक Karnataka 12700 12688 12 01 12700 12688 12 01

किल Kerala 4316 4300 16 04 4316 4300 16 04

तममल नजड Tamil Nadu 15680 15659 21 01 15680 15659 21 01

पडचिी Puducherry 444 444 0 00 444 444 0 00

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49218 49103 115 02 49218 49103 115 02

बबहजि Bihar 5157 5155 2 00 5157 5155 2 00

िजमोिि घजटी ननगम DVC 3014 3014 0 00 3014 3014 0 00

झजिखणड Jharkhand 1326 1325 1 00 1326 1325 1 00

ओडडशज Odisha 5142 5140 3 01 5142 5140 3 01

पशशचम बगजल West Bengal 8745 8699 46 05 8745 8699 46 05

मसशककम Sikkim 98 98 0 00 98 98 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22415 22378 37 02 22415 22378 37 02

अरणजचल परिश Arunachal Pradesh 139 136 3 21 139 136 3 21

असम Assam 1910 1667 242 127 1910 1667 242 127

मणणपि Manipur 197 188 9 48 197 188 9 48

मघजलय Meghalaya 337 337 0 00 337 337 0 00

ममज़ोिम Mizoram 116 113 3 28 116 113 3 28

नजगजलड Nagaland 157 131 27 169 157 131 27 169

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177424 176810 613 03 177424 176810 613 03

Note The revised data for March 2019 is not avaliable 26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateअपरल 2019 April2019 अपरल 2019 April2019 to April 2019

File NoCEA-CH-14-1142018-Coordination Division

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

मई 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during May2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

N

o No

tified

Cuts

N

o No

tified

Cuts

File NoCEA-CH-14-1142018-Coordination Division

मई2019May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0910 hrsday 0811 - 910 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 403 hrsday 0347 - 403 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 2214 hrsday 2157 - 2214 hrsday

उततराखड Uttarakhand Data not received 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-957 hrs day

Three-Phase (Mixed) Supply - 2346 hrs day

Three-Phase Supply(Irrigation)- 0953 - 0957 hrs day Three-

Phase (Mixed) Supply - 2334 - 2346 hrs day

महजिजषटर Maharashtra Three-Phase Supply - 9 hrs day Three-Phase Supply - 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

मई 2019 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during May2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to May-2019 20070450 2493722 63763 22627934 678000 4539922 7835904 35681760

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 7835904 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

7835904

Total Installed Capacity 35687160 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-22 (Up to

Mar2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

Plan Period

2017-22 (Up to

May-19)

6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58732 21173 181240 11734 163456 1010 176200 158886 225204 30768 414858

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Progress of Transmission Sector in the Country up to May 2019

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on May19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

May 19)

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during May 2019

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 20525 925681234952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during

May-201921(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 31-05-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716

May19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 0 1445 1000 2445 0 680 0 680 0 2125 1000 3125

Achievement 0 0 0 0 0 0 0 0 1000 0 0 1000 0 2385 0 2385 0 760 0 760 1000 3145 0 4145

Upto May-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 2445 3000 5445 0 1480 0 1480 3000 3925 6000 12925

Achievement 0 0 0 0 0 0 0 0 1500 0 0 1500 815 4365 0 5180 0 2065 0 2065 2315 6430 0 8745

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

As on 31-05-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1Bhadla SS (3x1500 3x500 MVA) (500 MVA ICTs- II

and III)400220 PGCIL 1000

Total of CENTRAL SECTOR 1000

2 Moradabad(Aug) (Additional TF) 400220 UPPTCL 240

3 Masauli Prayagraj (New) TF-III 400132 UPPTCL 200

4 Talaricheruvu Ss 400220 APTRANSCO 9455 Uravakonda (Aug) ICT-II 400220 APTRANSCO 5006 Jangaon ss (3x500) (ICT-I) 400220 TSTRANSCO 500

7 Chinhat Lucknow (Aug) TF-II (200-160) 220132 UPPTCL 408 Hathras (Aug)T-I(200-160) 220132 UPPTCL 409 Jaunpur (Aug) (Additional TF) 220132 UPPTCL 16010 Laukahi (Supaul new) 22013233 BSPTCL 32011 Sector- 95 Gurgaon 22033 HVPNL 10012 Alawalpur ss 22066 PSTCL 100

TOTAL STATE SECTOR 3145

GRAND TOTAL 4145

21(2)

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During May-2019

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2019-20 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination Division

Programme Achievement Ach Programme Achievement Ach

Central Sector 37545100 3290600 3141593 9547 6468500 6275642 9702

State Sector 37498600 3425800 3092392 9027 6748300 6066733 8990

PvtIPP Sector 37346200 3476700 3460217 9953 6713100 6652517 9910

PvtUTL Sector 1823100 164300 171799 10456 323600 337490 10429

Total 114213000 10357400 9866001 9526 20253500 19332382 9545

Central Sector 5661700 604200 619800 10258 990300 1104995 11158

State Sector 6680500 551500 652766 11836 1049700 1184387 11283

PvtIPP Sector 1206900 130200 121344 9320 187500 200643 10701

PvtUTL Sector 144100 12400 14009 11298 24700 25155 10184

Total 13693200 1298300 1407919 10844 2252200 2515180 11168

Central Sector 4472000 353500 365463 10338 720800 694195 9631

Total 4472000 353500 365463 10338 720800 694195 9631

Bhutan Import 621800 32500 35300 10862 50000 59270 11854

Central Sector 47678800 4248300 4126856 9714 8179600 8074832 9872

State Sector 44179100 3977300 3745158 9416 7798000 7251120 9299

Pvt Sector 40520300 3783600 3767369 9957 7248900 7215805 9954

Total 133000000 12041700 11674683 9695 23276500 22601027 9710

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Apr-19 Apr-18 Upto Apr-2019 Upto Apr-2018

975409 844377 975409 844377

22

Renewable Energy Generation

Achievement

May-2019

1 Electricity Generation (MU) Targets and Achievememts for 2019-20

All India Energy Generation During Apr-19 to May-19 (MU)

Target (2019-20)Apr-19 to May-19

Sector

Hydro

Thermal

Nuclear

202535

22522

7208

232765

193324

25152

6942

226010

0

50000

100000

150000

200000

250000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Energy Power Supply Position (Provisional) for May-2019 and during Apr-19 to May-19 23

2 Peak Power Supply Position (Provisional) for May-2019 and during Apr-19 to May-19 24

3 Energy Power Supply Position (Revised) for Apr-2019 and during Apr-19 to Apr-19 25

4 Peak Power Supply Position (Revised) for Apr-2019 and during Apr-19 to Apr-19 26

5 Notified Power cuts Restrictions on Industries during May-2019 27

6 Power Supply to Agricultural Sector during May-2019 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 154 154 0 00 271 271 0 00

दिलली Delhi 3366 3366 0 00 6065 6064 1 00

हरियजणज Haryana 4907 4907 0 00 8679 8679 0 00

दहमजचल परिश Himachal Pradesh 872 863 10 11 1654 1644 10 06

रमम कशमीि Jammu amp Kashmir 1760 1424 336 191 3364 2720 644 191

परजब Punjab 4769 4769 0 00 8475 8475 0 00

िजरसथजन Rajasthan 7120 7110 11 02 13313 13300 13 01

उतति परिश Uttar Pradesh 12742 12695 48 04 22897 22817 79 03

उततिजखड Uttarakhand 1329 1329 0 00 2449 2449 0 00

उततरी कषतर Northern Region 37020 36615 404 11 67166 66419 747 11

छततीसगढ़ Chhattisgarh 2794 2794 0 00 5765 5764 1 00

गरिजत Gujarat 11208 11208 0 00 21748 21748 0 00

मधय परिश Madhya Pradesh 6502 6502 0 00 12735 12735 0 00

महजिजषटर Maharashtra 14976 14976 0 00 29295 29294 0 00

िमन औि दिउ Daman amp Diu 222 222 0 00 443 443 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 1106 1106 0 00

गोवज Goa 404 404 0 00 801 801 0 00

पशचिमी कषतर Western Region 36658 36658 0 00 71893 71892 1 00

आनधर परिश Andhra Pradesh 6056 6048 7 01 11709 11702 7 01

तलगजनज Telangana 5318 5318 1 00 10772 10771 1 00

कनजाटक Karnataka 6702 6702 1 00 13569 13568 1 00

किल Kerala 2575 2566 9 03 4888 4878 10 02

तममल नजड Tamil Nadu 10309 10309 1 00 20031 20030 1 00

पडचिी Puducherry 271 271 1 03 517 516 1 01

लकष-दवीप Lakshadweep 4 4 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 31232 31213 19 01 61486 61465 21 00

बबहजि Bihar 3078 3078 0 00 5662 5659 3 01

िजमोिि घजटी ननगम DVC 1814 1814 0 00 3757 3755 2 01

झजिखणड Jharkhand 789 789 0 00 1505 1495 10 07

ओडडशज Odisha 2560 2560 0 00 5261 5261 0 00

पशशचम बगजल West Bengal 5115 5115 0 00 9920 9897 23 02

मसशककम Sikkim 36 36 0 00 78 78 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 58 54 4 67

परवी कषतर Eastern Region 13391 13391 0 00 26182 26144 38 01

अरणजचल परिश Arunachal Pradesh 64 64 0 06 127 126 1 06

असम Assam 819 738 81 99 1573 1434 139 88

मणणपि Manipur 73 72 1 07 135 134 2 12

मघजलय Meghalaya 167 159 8 50 336 318 18 55

ममज़ोिम Mizoram 55 55 0 07 100 99 1 08

नजगजलड Nagaland 65 64 1 08 124 123 1 08

बिपिज Tripura 173 170 2 14 292 288 4 13

उततर-परवी कषतर North-Eastern Region 1416 1323 93 66 2686 2521 165 62

समपणण भारत All India 119717 119200 517 04 229413 228441 972 04

Note Power Supply Position Report has been compiled based on the data furnished by State Utilities Electricity Departments

23

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 356 356 0 00 356 356 0 00

दिलली Delhi 6461 6461 0 00 6461 6461 0 00

हरियजणज Haryana 8874 8874 0 00 8874 8874 0 00

दहमजचल परिश Himachal Pradesh 1480 1480 0 00 1480 1480 0 00

रमम कशमीि Jammu amp Kashmir 2426 2426 0 00 2885 2426 459 159

परजब Punjab 8802 8802 0 00 8802 8802 0 00

िजरसथजन Rajasthan 11791 11791 0 00 11791 11791 0 00

उतति परिश Uttar Pradesh 22487 22057 430 19 22487 22057 430 19

उततिजखड Uttarakhand 2155 2155 0 00 2155 2155 0 00

उततरी कषतर Northern Region 60987 60078 909 15 60987 60078 909 15

छततीसगढ़ Chhattisgarh 4504 4504 0 00 4596 4574 22 05

गरिजत Gujarat 18094 18094 0 00 18094 18094 0 00

मधय परिश Madhya Pradesh 10145 10131 14 01 10145 10131 14 01

महजिजषटर Maharashtra 23621 23613 8 00 23621 23613 8 00

िमन औि दिउ Daman amp Diu 344 344 0 01 344 344 0 01

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 818 818 0 00

गोवज Goa 554 554 0 00 594 594 0 00

पशचिमी कषतर Western Region 57113 57093 20 00 57113 57093 20 00

आनधर परिश Andhra Pradesh 9854 9854 0 00 9854 9854 0 00

तलगजनज Telangana 8684 8684 0 00 10269 10202 67 07

कनजाटक Karnataka 12158 12158 0 00 12700 12688 12 01

किल Kerala 4286 4205 81 19 4316 4300 16 04

तममल नजड Tamil Nadu 15584 15522 62 04 15680 15659 21 01

पडचिी Puducherry 453 442 11 24 453 444 9 20

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 47477 47465 12 00 49218 49103 115 02

बबहजि Bihar 5481 5481 0 00 5481 5481 0 00

िजमोिि घजटी ननगम DVC 3048 3048 0 00 3048 3048 0 00

झजिखणड Jharkhand 1330 1330 0 00 1330 1330 0 00

ओडडशज Odisha 4736 4736 0 00 5142 5140 3 01

पशशचम बगजल West Bengal 9335 9335 0 00 9335 9335 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23558 23558 0 00 23558 23558 0 00

अरणजचल परिश Arunachal Pradesh 140 138 2 12 140 138 2 12

असम Assam 1753 1673 80 46 1910 1673 237 124

मणणपि Manipur 183 181 2 09 197 188 9 48

मघजलय Meghalaya 329 325 4 12 337 337 0 00

ममज़ोिम Mizoram 102 100 2 20 116 113 3 28

नजगजलड Nagaland 130 128 2 14 157 131 27 169

बिपिज Tripura 297 295 1 05 297 295 1 05

उततर-परवी कषतर North-Eastern Region 2758 2674 84 31 2848 2780 68 24

समपणण भारत All India 183513 182533 981 05 183513 182533 981 05

Note Power Supply Position Report has been compiled based on the data furnished by State Utilities Electricity Departments 24

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -मई2019 April2019 to May2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and supply

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateमई 2019 May2019

मजग की पनता म कमी Demand not Met

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 781 781 0 00 781 781 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3706 3706 0 00 3706 3706 0 00

िजरसथजन Rajasthan 6192 6190 2 00 6192 6190 2 00

उतति परिश Uttar Pradesh 10154 10123 32 03 10154 10123 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30147 29804 343 11 30147 29804 343 11

छततीसगढ़ Chhattisgarh 2972 2971 1 00 2972 2971 1 00

गरिजत Gujarat 10540 10540 0 00 10540 10540 0 00

मधय परिश Madhya Pradesh 6233 6233 0 00 6233 6233 0 00

महजिजषटर Maharashtra 14319 14319 0 00 14319 14319 0 00

िमन औि दिउ Daman amp Diu 221 221 0 00 221 221 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 554 554 0 00 554 554 0 00

गोवज Goa 397 397 0 00 397 397 0 00

पशचिमी कषतर Western Region 35235 35234 1 00 35235 35234 1 00

आनधर परिश Andhra Pradesh 5653 5653 0 00 5653 5653 0 00

तलगजनज Telangana 5453 5453 0 00 5453 5453 0 00

कनजाटक Karnataka 6867 6867 0 00 6867 6867 0 00

किल Kerala 2313 2312 2 01 2313 2312 2 01

तममल नजड Tamil Nadu 9721 9721 0 00 9721 9721 0 00

पडचिी Puducherry 246 246 0 00 246 246 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 30254 30252 2 00 30254 30252 2 00

बबहजि Bihar 2584 2581 3 01 2584 2581 3 01

िजमोिि घजटी ननगम DVC 1944 1942 2 01 1944 1942 2 01

झजिखणड Jharkhand 716 706 10 14 716 706 10 14

ओडडशज Odisha 2701 2701 0 00 2701 2701 0 00

पशशचम बगजल West Bengal 4805 4782 23 05 4805 4782 23 05

मसशककम Sikkim 42 42 0 00 42 42 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12792 12754 38 03 12792 12754 38 03

अरणजचल परिश Arunachal Pradesh 62 62 0 06 62 62 0 06

असम Assam 754 696 58 77 754 696 58 77

मणणपि Manipur 62 61 1 17 62 61 1 17

मघजलय Meghalaya 169 159 10 60 169 159 10 60

ममज़ोिम Mizoram 45 44 0 10 45 44 0 10

नजगजलड Nagaland 59 58 0 08 59 58 0 08

बिपिज Tripura 119 117 2 13 119 117 2 13

उततर-परवी कषतर North-Eastern Region 1270 1198 72 57 1270 1198 72 57

समपणण भारत All India 109696 109241 455 04 109696 109241 455 04

Note The revised data for March 2019 is not avaliable

Energy not Supplied Energy not Supplied

अपरल 2019 April2019 अपरल 2019 April2019 to April 2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2885 2308 577 200 2885 2308 577 200

परजब Punjab 7087 7087 0 00 7087 7087 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 47779 47210 569 12 47779 47210 569 12

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9179 9160 19 02 9179 9160 19 02

तलगजनज Telangana 10269 10202 67 07 10269 10202 67 07

कनजाटक Karnataka 12700 12688 12 01 12700 12688 12 01

किल Kerala 4316 4300 16 04 4316 4300 16 04

तममल नजड Tamil Nadu 15680 15659 21 01 15680 15659 21 01

पडचिी Puducherry 444 444 0 00 444 444 0 00

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49218 49103 115 02 49218 49103 115 02

बबहजि Bihar 5157 5155 2 00 5157 5155 2 00

िजमोिि घजटी ननगम DVC 3014 3014 0 00 3014 3014 0 00

झजिखणड Jharkhand 1326 1325 1 00 1326 1325 1 00

ओडडशज Odisha 5142 5140 3 01 5142 5140 3 01

पशशचम बगजल West Bengal 8745 8699 46 05 8745 8699 46 05

मसशककम Sikkim 98 98 0 00 98 98 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22415 22378 37 02 22415 22378 37 02

अरणजचल परिश Arunachal Pradesh 139 136 3 21 139 136 3 21

असम Assam 1910 1667 242 127 1910 1667 242 127

मणणपि Manipur 197 188 9 48 197 188 9 48

मघजलय Meghalaya 337 337 0 00 337 337 0 00

ममज़ोिम Mizoram 116 113 3 28 116 113 3 28

नजगजलड Nagaland 157 131 27 169 157 131 27 169

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177424 176810 613 03 177424 176810 613 03

Note The revised data for March 2019 is not avaliable 26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateअपरल 2019 April2019 अपरल 2019 April2019 to April 2019

File NoCEA-CH-14-1142018-Coordination Division

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

मई 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during May2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

N

o No

tified

Cuts

N

o No

tified

Cuts

File NoCEA-CH-14-1142018-Coordination Division

मई2019May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0910 hrsday 0811 - 910 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 403 hrsday 0347 - 403 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 2214 hrsday 2157 - 2214 hrsday

उततराखड Uttarakhand Data not received 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-957 hrs day

Three-Phase (Mixed) Supply - 2346 hrs day

Three-Phase Supply(Irrigation)- 0953 - 0957 hrs day Three-

Phase (Mixed) Supply - 2334 - 2346 hrs day

महजिजषटर Maharashtra Three-Phase Supply - 9 hrs day Three-Phase Supply - 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

मई 2019 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during May2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to May-2019 20070450 2493722 63763 22627934 678000 4539922 7835904 35681760

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 7835904 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

7835904

Total Installed Capacity 35687160 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-22 (Up to

Mar2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

Plan Period

2017-22 (Up to

May-19)

6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58732 21173 181240 11734 163456 1010 176200 158886 225204 30768 414858

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Progress of Transmission Sector in the Country up to May 2019

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on May19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

May 19)

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during May 2019

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 20525 925681234952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 31-05-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716

May19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 0 1445 1000 2445 0 680 0 680 0 2125 1000 3125

Achievement 0 0 0 0 0 0 0 0 1000 0 0 1000 0 2385 0 2385 0 760 0 760 1000 3145 0 4145

Upto May-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 2445 3000 5445 0 1480 0 1480 3000 3925 6000 12925

Achievement 0 0 0 0 0 0 0 0 1500 0 0 1500 815 4365 0 5180 0 2065 0 2065 2315 6430 0 8745

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

As on 31-05-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1Bhadla SS (3x1500 3x500 MVA) (500 MVA ICTs- II

and III)400220 PGCIL 1000

Total of CENTRAL SECTOR 1000

2 Moradabad(Aug) (Additional TF) 400220 UPPTCL 240

3 Masauli Prayagraj (New) TF-III 400132 UPPTCL 200

4 Talaricheruvu Ss 400220 APTRANSCO 9455 Uravakonda (Aug) ICT-II 400220 APTRANSCO 5006 Jangaon ss (3x500) (ICT-I) 400220 TSTRANSCO 500

7 Chinhat Lucknow (Aug) TF-II (200-160) 220132 UPPTCL 408 Hathras (Aug)T-I(200-160) 220132 UPPTCL 409 Jaunpur (Aug) (Additional TF) 220132 UPPTCL 16010 Laukahi (Supaul new) 22013233 BSPTCL 32011 Sector- 95 Gurgaon 22033 HVPNL 10012 Alawalpur ss 22066 PSTCL 100

TOTAL STATE SECTOR 3145

GRAND TOTAL 4145

21(2)

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During May-2019

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2019-20 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination Division

Programme Achievement Ach Programme Achievement Ach

Central Sector 37545100 3290600 3141593 9547 6468500 6275642 9702

State Sector 37498600 3425800 3092392 9027 6748300 6066733 8990

PvtIPP Sector 37346200 3476700 3460217 9953 6713100 6652517 9910

PvtUTL Sector 1823100 164300 171799 10456 323600 337490 10429

Total 114213000 10357400 9866001 9526 20253500 19332382 9545

Central Sector 5661700 604200 619800 10258 990300 1104995 11158

State Sector 6680500 551500 652766 11836 1049700 1184387 11283

PvtIPP Sector 1206900 130200 121344 9320 187500 200643 10701

PvtUTL Sector 144100 12400 14009 11298 24700 25155 10184

Total 13693200 1298300 1407919 10844 2252200 2515180 11168

Central Sector 4472000 353500 365463 10338 720800 694195 9631

Total 4472000 353500 365463 10338 720800 694195 9631

Bhutan Import 621800 32500 35300 10862 50000 59270 11854

Central Sector 47678800 4248300 4126856 9714 8179600 8074832 9872

State Sector 44179100 3977300 3745158 9416 7798000 7251120 9299

Pvt Sector 40520300 3783600 3767369 9957 7248900 7215805 9954

Total 133000000 12041700 11674683 9695 23276500 22601027 9710

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Apr-19 Apr-18 Upto Apr-2019 Upto Apr-2018

975409 844377 975409 844377

22

Renewable Energy Generation

Achievement

May-2019

1 Electricity Generation (MU) Targets and Achievememts for 2019-20

All India Energy Generation During Apr-19 to May-19 (MU)

Target (2019-20)Apr-19 to May-19

Sector

Hydro

Thermal

Nuclear

202535

22522

7208

232765

193324

25152

6942

226010

0

50000

100000

150000

200000

250000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Energy Power Supply Position (Provisional) for May-2019 and during Apr-19 to May-19 23

2 Peak Power Supply Position (Provisional) for May-2019 and during Apr-19 to May-19 24

3 Energy Power Supply Position (Revised) for Apr-2019 and during Apr-19 to Apr-19 25

4 Peak Power Supply Position (Revised) for Apr-2019 and during Apr-19 to Apr-19 26

5 Notified Power cuts Restrictions on Industries during May-2019 27

6 Power Supply to Agricultural Sector during May-2019 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 154 154 0 00 271 271 0 00

दिलली Delhi 3366 3366 0 00 6065 6064 1 00

हरियजणज Haryana 4907 4907 0 00 8679 8679 0 00

दहमजचल परिश Himachal Pradesh 872 863 10 11 1654 1644 10 06

रमम कशमीि Jammu amp Kashmir 1760 1424 336 191 3364 2720 644 191

परजब Punjab 4769 4769 0 00 8475 8475 0 00

िजरसथजन Rajasthan 7120 7110 11 02 13313 13300 13 01

उतति परिश Uttar Pradesh 12742 12695 48 04 22897 22817 79 03

उततिजखड Uttarakhand 1329 1329 0 00 2449 2449 0 00

उततरी कषतर Northern Region 37020 36615 404 11 67166 66419 747 11

छततीसगढ़ Chhattisgarh 2794 2794 0 00 5765 5764 1 00

गरिजत Gujarat 11208 11208 0 00 21748 21748 0 00

मधय परिश Madhya Pradesh 6502 6502 0 00 12735 12735 0 00

महजिजषटर Maharashtra 14976 14976 0 00 29295 29294 0 00

िमन औि दिउ Daman amp Diu 222 222 0 00 443 443 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 1106 1106 0 00

गोवज Goa 404 404 0 00 801 801 0 00

पशचिमी कषतर Western Region 36658 36658 0 00 71893 71892 1 00

आनधर परिश Andhra Pradesh 6056 6048 7 01 11709 11702 7 01

तलगजनज Telangana 5318 5318 1 00 10772 10771 1 00

कनजाटक Karnataka 6702 6702 1 00 13569 13568 1 00

किल Kerala 2575 2566 9 03 4888 4878 10 02

तममल नजड Tamil Nadu 10309 10309 1 00 20031 20030 1 00

पडचिी Puducherry 271 271 1 03 517 516 1 01

लकष-दवीप Lakshadweep 4 4 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 31232 31213 19 01 61486 61465 21 00

बबहजि Bihar 3078 3078 0 00 5662 5659 3 01

िजमोिि घजटी ननगम DVC 1814 1814 0 00 3757 3755 2 01

झजिखणड Jharkhand 789 789 0 00 1505 1495 10 07

ओडडशज Odisha 2560 2560 0 00 5261 5261 0 00

पशशचम बगजल West Bengal 5115 5115 0 00 9920 9897 23 02

मसशककम Sikkim 36 36 0 00 78 78 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 58 54 4 67

परवी कषतर Eastern Region 13391 13391 0 00 26182 26144 38 01

अरणजचल परिश Arunachal Pradesh 64 64 0 06 127 126 1 06

असम Assam 819 738 81 99 1573 1434 139 88

मणणपि Manipur 73 72 1 07 135 134 2 12

मघजलय Meghalaya 167 159 8 50 336 318 18 55

ममज़ोिम Mizoram 55 55 0 07 100 99 1 08

नजगजलड Nagaland 65 64 1 08 124 123 1 08

बिपिज Tripura 173 170 2 14 292 288 4 13

उततर-परवी कषतर North-Eastern Region 1416 1323 93 66 2686 2521 165 62

समपणण भारत All India 119717 119200 517 04 229413 228441 972 04

Note Power Supply Position Report has been compiled based on the data furnished by State Utilities Electricity Departments

23

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 356 356 0 00 356 356 0 00

दिलली Delhi 6461 6461 0 00 6461 6461 0 00

हरियजणज Haryana 8874 8874 0 00 8874 8874 0 00

दहमजचल परिश Himachal Pradesh 1480 1480 0 00 1480 1480 0 00

रमम कशमीि Jammu amp Kashmir 2426 2426 0 00 2885 2426 459 159

परजब Punjab 8802 8802 0 00 8802 8802 0 00

िजरसथजन Rajasthan 11791 11791 0 00 11791 11791 0 00

उतति परिश Uttar Pradesh 22487 22057 430 19 22487 22057 430 19

उततिजखड Uttarakhand 2155 2155 0 00 2155 2155 0 00

उततरी कषतर Northern Region 60987 60078 909 15 60987 60078 909 15

छततीसगढ़ Chhattisgarh 4504 4504 0 00 4596 4574 22 05

गरिजत Gujarat 18094 18094 0 00 18094 18094 0 00

मधय परिश Madhya Pradesh 10145 10131 14 01 10145 10131 14 01

महजिजषटर Maharashtra 23621 23613 8 00 23621 23613 8 00

िमन औि दिउ Daman amp Diu 344 344 0 01 344 344 0 01

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 818 818 0 00

गोवज Goa 554 554 0 00 594 594 0 00

पशचिमी कषतर Western Region 57113 57093 20 00 57113 57093 20 00

आनधर परिश Andhra Pradesh 9854 9854 0 00 9854 9854 0 00

तलगजनज Telangana 8684 8684 0 00 10269 10202 67 07

कनजाटक Karnataka 12158 12158 0 00 12700 12688 12 01

किल Kerala 4286 4205 81 19 4316 4300 16 04

तममल नजड Tamil Nadu 15584 15522 62 04 15680 15659 21 01

पडचिी Puducherry 453 442 11 24 453 444 9 20

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 47477 47465 12 00 49218 49103 115 02

बबहजि Bihar 5481 5481 0 00 5481 5481 0 00

िजमोिि घजटी ननगम DVC 3048 3048 0 00 3048 3048 0 00

झजिखणड Jharkhand 1330 1330 0 00 1330 1330 0 00

ओडडशज Odisha 4736 4736 0 00 5142 5140 3 01

पशशचम बगजल West Bengal 9335 9335 0 00 9335 9335 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23558 23558 0 00 23558 23558 0 00

अरणजचल परिश Arunachal Pradesh 140 138 2 12 140 138 2 12

असम Assam 1753 1673 80 46 1910 1673 237 124

मणणपि Manipur 183 181 2 09 197 188 9 48

मघजलय Meghalaya 329 325 4 12 337 337 0 00

ममज़ोिम Mizoram 102 100 2 20 116 113 3 28

नजगजलड Nagaland 130 128 2 14 157 131 27 169

बिपिज Tripura 297 295 1 05 297 295 1 05

उततर-परवी कषतर North-Eastern Region 2758 2674 84 31 2848 2780 68 24

समपणण भारत All India 183513 182533 981 05 183513 182533 981 05

Note Power Supply Position Report has been compiled based on the data furnished by State Utilities Electricity Departments 24

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -मई2019 April2019 to May2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and supply

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateमई 2019 May2019

मजग की पनता म कमी Demand not Met

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 781 781 0 00 781 781 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3706 3706 0 00 3706 3706 0 00

िजरसथजन Rajasthan 6192 6190 2 00 6192 6190 2 00

उतति परिश Uttar Pradesh 10154 10123 32 03 10154 10123 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30147 29804 343 11 30147 29804 343 11

छततीसगढ़ Chhattisgarh 2972 2971 1 00 2972 2971 1 00

गरिजत Gujarat 10540 10540 0 00 10540 10540 0 00

मधय परिश Madhya Pradesh 6233 6233 0 00 6233 6233 0 00

महजिजषटर Maharashtra 14319 14319 0 00 14319 14319 0 00

िमन औि दिउ Daman amp Diu 221 221 0 00 221 221 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 554 554 0 00 554 554 0 00

गोवज Goa 397 397 0 00 397 397 0 00

पशचिमी कषतर Western Region 35235 35234 1 00 35235 35234 1 00

आनधर परिश Andhra Pradesh 5653 5653 0 00 5653 5653 0 00

तलगजनज Telangana 5453 5453 0 00 5453 5453 0 00

कनजाटक Karnataka 6867 6867 0 00 6867 6867 0 00

किल Kerala 2313 2312 2 01 2313 2312 2 01

तममल नजड Tamil Nadu 9721 9721 0 00 9721 9721 0 00

पडचिी Puducherry 246 246 0 00 246 246 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 30254 30252 2 00 30254 30252 2 00

बबहजि Bihar 2584 2581 3 01 2584 2581 3 01

िजमोिि घजटी ननगम DVC 1944 1942 2 01 1944 1942 2 01

झजिखणड Jharkhand 716 706 10 14 716 706 10 14

ओडडशज Odisha 2701 2701 0 00 2701 2701 0 00

पशशचम बगजल West Bengal 4805 4782 23 05 4805 4782 23 05

मसशककम Sikkim 42 42 0 00 42 42 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12792 12754 38 03 12792 12754 38 03

अरणजचल परिश Arunachal Pradesh 62 62 0 06 62 62 0 06

असम Assam 754 696 58 77 754 696 58 77

मणणपि Manipur 62 61 1 17 62 61 1 17

मघजलय Meghalaya 169 159 10 60 169 159 10 60

ममज़ोिम Mizoram 45 44 0 10 45 44 0 10

नजगजलड Nagaland 59 58 0 08 59 58 0 08

बिपिज Tripura 119 117 2 13 119 117 2 13

उततर-परवी कषतर North-Eastern Region 1270 1198 72 57 1270 1198 72 57

समपणण भारत All India 109696 109241 455 04 109696 109241 455 04

Note The revised data for March 2019 is not avaliable

Energy not Supplied Energy not Supplied

अपरल 2019 April2019 अपरल 2019 April2019 to April 2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2885 2308 577 200 2885 2308 577 200

परजब Punjab 7087 7087 0 00 7087 7087 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 47779 47210 569 12 47779 47210 569 12

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9179 9160 19 02 9179 9160 19 02

तलगजनज Telangana 10269 10202 67 07 10269 10202 67 07

कनजाटक Karnataka 12700 12688 12 01 12700 12688 12 01

किल Kerala 4316 4300 16 04 4316 4300 16 04

तममल नजड Tamil Nadu 15680 15659 21 01 15680 15659 21 01

पडचिी Puducherry 444 444 0 00 444 444 0 00

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49218 49103 115 02 49218 49103 115 02

बबहजि Bihar 5157 5155 2 00 5157 5155 2 00

िजमोिि घजटी ननगम DVC 3014 3014 0 00 3014 3014 0 00

झजिखणड Jharkhand 1326 1325 1 00 1326 1325 1 00

ओडडशज Odisha 5142 5140 3 01 5142 5140 3 01

पशशचम बगजल West Bengal 8745 8699 46 05 8745 8699 46 05

मसशककम Sikkim 98 98 0 00 98 98 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22415 22378 37 02 22415 22378 37 02

अरणजचल परिश Arunachal Pradesh 139 136 3 21 139 136 3 21

असम Assam 1910 1667 242 127 1910 1667 242 127

मणणपि Manipur 197 188 9 48 197 188 9 48

मघजलय Meghalaya 337 337 0 00 337 337 0 00

ममज़ोिम Mizoram 116 113 3 28 116 113 3 28

नजगजलड Nagaland 157 131 27 169 157 131 27 169

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177424 176810 613 03 177424 176810 613 03

Note The revised data for March 2019 is not avaliable 26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateअपरल 2019 April2019 अपरल 2019 April2019 to April 2019

File NoCEA-CH-14-1142018-Coordination Division

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

मई 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during May2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

N

o No

tified

Cuts

N

o No

tified

Cuts

File NoCEA-CH-14-1142018-Coordination Division

मई2019May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0910 hrsday 0811 - 910 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 403 hrsday 0347 - 403 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 2214 hrsday 2157 - 2214 hrsday

उततराखड Uttarakhand Data not received 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-957 hrs day

Three-Phase (Mixed) Supply - 2346 hrs day

Three-Phase Supply(Irrigation)- 0953 - 0957 hrs day Three-

Phase (Mixed) Supply - 2334 - 2346 hrs day

महजिजषटर Maharashtra Three-Phase Supply - 9 hrs day Three-Phase Supply - 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

मई 2019 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during May2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to May-2019 20070450 2493722 63763 22627934 678000 4539922 7835904 35681760

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 7835904 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

7835904

Total Installed Capacity 35687160 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-22 (Up to

Mar2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

Plan Period

2017-22 (Up to

May-19)

6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58732 21173 181240 11734 163456 1010 176200 158886 225204 30768 414858

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Progress of Transmission Sector in the Country up to May 2019

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on May19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

May 19)

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during May 2019

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 20525 925681234952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

As on 31-05-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1Bhadla SS (3x1500 3x500 MVA) (500 MVA ICTs- II

and III)400220 PGCIL 1000

Total of CENTRAL SECTOR 1000

2 Moradabad(Aug) (Additional TF) 400220 UPPTCL 240

3 Masauli Prayagraj (New) TF-III 400132 UPPTCL 200

4 Talaricheruvu Ss 400220 APTRANSCO 9455 Uravakonda (Aug) ICT-II 400220 APTRANSCO 5006 Jangaon ss (3x500) (ICT-I) 400220 TSTRANSCO 500

7 Chinhat Lucknow (Aug) TF-II (200-160) 220132 UPPTCL 408 Hathras (Aug)T-I(200-160) 220132 UPPTCL 409 Jaunpur (Aug) (Additional TF) 220132 UPPTCL 16010 Laukahi (Supaul new) 22013233 BSPTCL 32011 Sector- 95 Gurgaon 22033 HVPNL 10012 Alawalpur ss 22066 PSTCL 100

TOTAL STATE SECTOR 3145

GRAND TOTAL 4145

21(2)

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During May-2019

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2019-20 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination Division

Programme Achievement Ach Programme Achievement Ach

Central Sector 37545100 3290600 3141593 9547 6468500 6275642 9702

State Sector 37498600 3425800 3092392 9027 6748300 6066733 8990

PvtIPP Sector 37346200 3476700 3460217 9953 6713100 6652517 9910

PvtUTL Sector 1823100 164300 171799 10456 323600 337490 10429

Total 114213000 10357400 9866001 9526 20253500 19332382 9545

Central Sector 5661700 604200 619800 10258 990300 1104995 11158

State Sector 6680500 551500 652766 11836 1049700 1184387 11283

PvtIPP Sector 1206900 130200 121344 9320 187500 200643 10701

PvtUTL Sector 144100 12400 14009 11298 24700 25155 10184

Total 13693200 1298300 1407919 10844 2252200 2515180 11168

Central Sector 4472000 353500 365463 10338 720800 694195 9631

Total 4472000 353500 365463 10338 720800 694195 9631

Bhutan Import 621800 32500 35300 10862 50000 59270 11854

Central Sector 47678800 4248300 4126856 9714 8179600 8074832 9872

State Sector 44179100 3977300 3745158 9416 7798000 7251120 9299

Pvt Sector 40520300 3783600 3767369 9957 7248900 7215805 9954

Total 133000000 12041700 11674683 9695 23276500 22601027 9710

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Apr-19 Apr-18 Upto Apr-2019 Upto Apr-2018

975409 844377 975409 844377

22

Renewable Energy Generation

Achievement

May-2019

1 Electricity Generation (MU) Targets and Achievememts for 2019-20

All India Energy Generation During Apr-19 to May-19 (MU)

Target (2019-20)Apr-19 to May-19

Sector

Hydro

Thermal

Nuclear

202535

22522

7208

232765

193324

25152

6942

226010

0

50000

100000

150000

200000

250000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Energy Power Supply Position (Provisional) for May-2019 and during Apr-19 to May-19 23

2 Peak Power Supply Position (Provisional) for May-2019 and during Apr-19 to May-19 24

3 Energy Power Supply Position (Revised) for Apr-2019 and during Apr-19 to Apr-19 25

4 Peak Power Supply Position (Revised) for Apr-2019 and during Apr-19 to Apr-19 26

5 Notified Power cuts Restrictions on Industries during May-2019 27

6 Power Supply to Agricultural Sector during May-2019 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 154 154 0 00 271 271 0 00

दिलली Delhi 3366 3366 0 00 6065 6064 1 00

हरियजणज Haryana 4907 4907 0 00 8679 8679 0 00

दहमजचल परिश Himachal Pradesh 872 863 10 11 1654 1644 10 06

रमम कशमीि Jammu amp Kashmir 1760 1424 336 191 3364 2720 644 191

परजब Punjab 4769 4769 0 00 8475 8475 0 00

िजरसथजन Rajasthan 7120 7110 11 02 13313 13300 13 01

उतति परिश Uttar Pradesh 12742 12695 48 04 22897 22817 79 03

उततिजखड Uttarakhand 1329 1329 0 00 2449 2449 0 00

उततरी कषतर Northern Region 37020 36615 404 11 67166 66419 747 11

छततीसगढ़ Chhattisgarh 2794 2794 0 00 5765 5764 1 00

गरिजत Gujarat 11208 11208 0 00 21748 21748 0 00

मधय परिश Madhya Pradesh 6502 6502 0 00 12735 12735 0 00

महजिजषटर Maharashtra 14976 14976 0 00 29295 29294 0 00

िमन औि दिउ Daman amp Diu 222 222 0 00 443 443 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 1106 1106 0 00

गोवज Goa 404 404 0 00 801 801 0 00

पशचिमी कषतर Western Region 36658 36658 0 00 71893 71892 1 00

आनधर परिश Andhra Pradesh 6056 6048 7 01 11709 11702 7 01

तलगजनज Telangana 5318 5318 1 00 10772 10771 1 00

कनजाटक Karnataka 6702 6702 1 00 13569 13568 1 00

किल Kerala 2575 2566 9 03 4888 4878 10 02

तममल नजड Tamil Nadu 10309 10309 1 00 20031 20030 1 00

पडचिी Puducherry 271 271 1 03 517 516 1 01

लकष-दवीप Lakshadweep 4 4 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 31232 31213 19 01 61486 61465 21 00

बबहजि Bihar 3078 3078 0 00 5662 5659 3 01

िजमोिि घजटी ननगम DVC 1814 1814 0 00 3757 3755 2 01

झजिखणड Jharkhand 789 789 0 00 1505 1495 10 07

ओडडशज Odisha 2560 2560 0 00 5261 5261 0 00

पशशचम बगजल West Bengal 5115 5115 0 00 9920 9897 23 02

मसशककम Sikkim 36 36 0 00 78 78 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 58 54 4 67

परवी कषतर Eastern Region 13391 13391 0 00 26182 26144 38 01

अरणजचल परिश Arunachal Pradesh 64 64 0 06 127 126 1 06

असम Assam 819 738 81 99 1573 1434 139 88

मणणपि Manipur 73 72 1 07 135 134 2 12

मघजलय Meghalaya 167 159 8 50 336 318 18 55

ममज़ोिम Mizoram 55 55 0 07 100 99 1 08

नजगजलड Nagaland 65 64 1 08 124 123 1 08

बिपिज Tripura 173 170 2 14 292 288 4 13

उततर-परवी कषतर North-Eastern Region 1416 1323 93 66 2686 2521 165 62

समपणण भारत All India 119717 119200 517 04 229413 228441 972 04

Note Power Supply Position Report has been compiled based on the data furnished by State Utilities Electricity Departments

23

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 356 356 0 00 356 356 0 00

दिलली Delhi 6461 6461 0 00 6461 6461 0 00

हरियजणज Haryana 8874 8874 0 00 8874 8874 0 00

दहमजचल परिश Himachal Pradesh 1480 1480 0 00 1480 1480 0 00

रमम कशमीि Jammu amp Kashmir 2426 2426 0 00 2885 2426 459 159

परजब Punjab 8802 8802 0 00 8802 8802 0 00

िजरसथजन Rajasthan 11791 11791 0 00 11791 11791 0 00

उतति परिश Uttar Pradesh 22487 22057 430 19 22487 22057 430 19

उततिजखड Uttarakhand 2155 2155 0 00 2155 2155 0 00

उततरी कषतर Northern Region 60987 60078 909 15 60987 60078 909 15

छततीसगढ़ Chhattisgarh 4504 4504 0 00 4596 4574 22 05

गरिजत Gujarat 18094 18094 0 00 18094 18094 0 00

मधय परिश Madhya Pradesh 10145 10131 14 01 10145 10131 14 01

महजिजषटर Maharashtra 23621 23613 8 00 23621 23613 8 00

िमन औि दिउ Daman amp Diu 344 344 0 01 344 344 0 01

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 818 818 0 00

गोवज Goa 554 554 0 00 594 594 0 00

पशचिमी कषतर Western Region 57113 57093 20 00 57113 57093 20 00

आनधर परिश Andhra Pradesh 9854 9854 0 00 9854 9854 0 00

तलगजनज Telangana 8684 8684 0 00 10269 10202 67 07

कनजाटक Karnataka 12158 12158 0 00 12700 12688 12 01

किल Kerala 4286 4205 81 19 4316 4300 16 04

तममल नजड Tamil Nadu 15584 15522 62 04 15680 15659 21 01

पडचिी Puducherry 453 442 11 24 453 444 9 20

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 47477 47465 12 00 49218 49103 115 02

बबहजि Bihar 5481 5481 0 00 5481 5481 0 00

िजमोिि घजटी ननगम DVC 3048 3048 0 00 3048 3048 0 00

झजिखणड Jharkhand 1330 1330 0 00 1330 1330 0 00

ओडडशज Odisha 4736 4736 0 00 5142 5140 3 01

पशशचम बगजल West Bengal 9335 9335 0 00 9335 9335 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23558 23558 0 00 23558 23558 0 00

अरणजचल परिश Arunachal Pradesh 140 138 2 12 140 138 2 12

असम Assam 1753 1673 80 46 1910 1673 237 124

मणणपि Manipur 183 181 2 09 197 188 9 48

मघजलय Meghalaya 329 325 4 12 337 337 0 00

ममज़ोिम Mizoram 102 100 2 20 116 113 3 28

नजगजलड Nagaland 130 128 2 14 157 131 27 169

बिपिज Tripura 297 295 1 05 297 295 1 05

उततर-परवी कषतर North-Eastern Region 2758 2674 84 31 2848 2780 68 24

समपणण भारत All India 183513 182533 981 05 183513 182533 981 05

Note Power Supply Position Report has been compiled based on the data furnished by State Utilities Electricity Departments 24

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -मई2019 April2019 to May2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and supply

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateमई 2019 May2019

मजग की पनता म कमी Demand not Met

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 781 781 0 00 781 781 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3706 3706 0 00 3706 3706 0 00

िजरसथजन Rajasthan 6192 6190 2 00 6192 6190 2 00

उतति परिश Uttar Pradesh 10154 10123 32 03 10154 10123 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30147 29804 343 11 30147 29804 343 11

छततीसगढ़ Chhattisgarh 2972 2971 1 00 2972 2971 1 00

गरिजत Gujarat 10540 10540 0 00 10540 10540 0 00

मधय परिश Madhya Pradesh 6233 6233 0 00 6233 6233 0 00

महजिजषटर Maharashtra 14319 14319 0 00 14319 14319 0 00

िमन औि दिउ Daman amp Diu 221 221 0 00 221 221 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 554 554 0 00 554 554 0 00

गोवज Goa 397 397 0 00 397 397 0 00

पशचिमी कषतर Western Region 35235 35234 1 00 35235 35234 1 00

आनधर परिश Andhra Pradesh 5653 5653 0 00 5653 5653 0 00

तलगजनज Telangana 5453 5453 0 00 5453 5453 0 00

कनजाटक Karnataka 6867 6867 0 00 6867 6867 0 00

किल Kerala 2313 2312 2 01 2313 2312 2 01

तममल नजड Tamil Nadu 9721 9721 0 00 9721 9721 0 00

पडचिी Puducherry 246 246 0 00 246 246 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 30254 30252 2 00 30254 30252 2 00

बबहजि Bihar 2584 2581 3 01 2584 2581 3 01

िजमोिि घजटी ननगम DVC 1944 1942 2 01 1944 1942 2 01

झजिखणड Jharkhand 716 706 10 14 716 706 10 14

ओडडशज Odisha 2701 2701 0 00 2701 2701 0 00

पशशचम बगजल West Bengal 4805 4782 23 05 4805 4782 23 05

मसशककम Sikkim 42 42 0 00 42 42 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12792 12754 38 03 12792 12754 38 03

अरणजचल परिश Arunachal Pradesh 62 62 0 06 62 62 0 06

असम Assam 754 696 58 77 754 696 58 77

मणणपि Manipur 62 61 1 17 62 61 1 17

मघजलय Meghalaya 169 159 10 60 169 159 10 60

ममज़ोिम Mizoram 45 44 0 10 45 44 0 10

नजगजलड Nagaland 59 58 0 08 59 58 0 08

बिपिज Tripura 119 117 2 13 119 117 2 13

उततर-परवी कषतर North-Eastern Region 1270 1198 72 57 1270 1198 72 57

समपणण भारत All India 109696 109241 455 04 109696 109241 455 04

Note The revised data for March 2019 is not avaliable

Energy not Supplied Energy not Supplied

अपरल 2019 April2019 अपरल 2019 April2019 to April 2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2885 2308 577 200 2885 2308 577 200

परजब Punjab 7087 7087 0 00 7087 7087 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 47779 47210 569 12 47779 47210 569 12

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9179 9160 19 02 9179 9160 19 02

तलगजनज Telangana 10269 10202 67 07 10269 10202 67 07

कनजाटक Karnataka 12700 12688 12 01 12700 12688 12 01

किल Kerala 4316 4300 16 04 4316 4300 16 04

तममल नजड Tamil Nadu 15680 15659 21 01 15680 15659 21 01

पडचिी Puducherry 444 444 0 00 444 444 0 00

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49218 49103 115 02 49218 49103 115 02

बबहजि Bihar 5157 5155 2 00 5157 5155 2 00

िजमोिि घजटी ननगम DVC 3014 3014 0 00 3014 3014 0 00

झजिखणड Jharkhand 1326 1325 1 00 1326 1325 1 00

ओडडशज Odisha 5142 5140 3 01 5142 5140 3 01

पशशचम बगजल West Bengal 8745 8699 46 05 8745 8699 46 05

मसशककम Sikkim 98 98 0 00 98 98 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22415 22378 37 02 22415 22378 37 02

अरणजचल परिश Arunachal Pradesh 139 136 3 21 139 136 3 21

असम Assam 1910 1667 242 127 1910 1667 242 127

मणणपि Manipur 197 188 9 48 197 188 9 48

मघजलय Meghalaya 337 337 0 00 337 337 0 00

ममज़ोिम Mizoram 116 113 3 28 116 113 3 28

नजगजलड Nagaland 157 131 27 169 157 131 27 169

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177424 176810 613 03 177424 176810 613 03

Note The revised data for March 2019 is not avaliable 26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateअपरल 2019 April2019 अपरल 2019 April2019 to April 2019

File NoCEA-CH-14-1142018-Coordination Division

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

मई 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during May2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

N

o No

tified

Cuts

N

o No

tified

Cuts

File NoCEA-CH-14-1142018-Coordination Division

मई2019May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0910 hrsday 0811 - 910 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 403 hrsday 0347 - 403 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 2214 hrsday 2157 - 2214 hrsday

उततराखड Uttarakhand Data not received 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-957 hrs day

Three-Phase (Mixed) Supply - 2346 hrs day

Three-Phase Supply(Irrigation)- 0953 - 0957 hrs day Three-

Phase (Mixed) Supply - 2334 - 2346 hrs day

महजिजषटर Maharashtra Three-Phase Supply - 9 hrs day Three-Phase Supply - 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

मई 2019 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during May2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to May-2019 20070450 2493722 63763 22627934 678000 4539922 7835904 35681760

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 7835904 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

7835904

Total Installed Capacity 35687160 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-22 (Up to

Mar2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

Plan Period

2017-22 (Up to

May-19)

6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58732 21173 181240 11734 163456 1010 176200 158886 225204 30768 414858

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Progress of Transmission Sector in the Country up to May 2019

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on May19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

May 19)

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during May 2019

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 20525 925681234952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2019-20 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination Division

Programme Achievement Ach Programme Achievement Ach

Central Sector 37545100 3290600 3141593 9547 6468500 6275642 9702

State Sector 37498600 3425800 3092392 9027 6748300 6066733 8990

PvtIPP Sector 37346200 3476700 3460217 9953 6713100 6652517 9910

PvtUTL Sector 1823100 164300 171799 10456 323600 337490 10429

Total 114213000 10357400 9866001 9526 20253500 19332382 9545

Central Sector 5661700 604200 619800 10258 990300 1104995 11158

State Sector 6680500 551500 652766 11836 1049700 1184387 11283

PvtIPP Sector 1206900 130200 121344 9320 187500 200643 10701

PvtUTL Sector 144100 12400 14009 11298 24700 25155 10184

Total 13693200 1298300 1407919 10844 2252200 2515180 11168

Central Sector 4472000 353500 365463 10338 720800 694195 9631

Total 4472000 353500 365463 10338 720800 694195 9631

Bhutan Import 621800 32500 35300 10862 50000 59270 11854

Central Sector 47678800 4248300 4126856 9714 8179600 8074832 9872

State Sector 44179100 3977300 3745158 9416 7798000 7251120 9299

Pvt Sector 40520300 3783600 3767369 9957 7248900 7215805 9954

Total 133000000 12041700 11674683 9695 23276500 22601027 9710

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Apr-19 Apr-18 Upto Apr-2019 Upto Apr-2018

975409 844377 975409 844377

22

Renewable Energy Generation

Achievement

May-2019

1 Electricity Generation (MU) Targets and Achievememts for 2019-20

All India Energy Generation During Apr-19 to May-19 (MU)

Target (2019-20)Apr-19 to May-19

Sector

Hydro

Thermal

Nuclear

202535

22522

7208

232765

193324

25152

6942

226010

0

50000

100000

150000

200000

250000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Energy Power Supply Position (Provisional) for May-2019 and during Apr-19 to May-19 23

2 Peak Power Supply Position (Provisional) for May-2019 and during Apr-19 to May-19 24

3 Energy Power Supply Position (Revised) for Apr-2019 and during Apr-19 to Apr-19 25

4 Peak Power Supply Position (Revised) for Apr-2019 and during Apr-19 to Apr-19 26

5 Notified Power cuts Restrictions on Industries during May-2019 27

6 Power Supply to Agricultural Sector during May-2019 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 154 154 0 00 271 271 0 00

दिलली Delhi 3366 3366 0 00 6065 6064 1 00

हरियजणज Haryana 4907 4907 0 00 8679 8679 0 00

दहमजचल परिश Himachal Pradesh 872 863 10 11 1654 1644 10 06

रमम कशमीि Jammu amp Kashmir 1760 1424 336 191 3364 2720 644 191

परजब Punjab 4769 4769 0 00 8475 8475 0 00

िजरसथजन Rajasthan 7120 7110 11 02 13313 13300 13 01

उतति परिश Uttar Pradesh 12742 12695 48 04 22897 22817 79 03

उततिजखड Uttarakhand 1329 1329 0 00 2449 2449 0 00

उततरी कषतर Northern Region 37020 36615 404 11 67166 66419 747 11

छततीसगढ़ Chhattisgarh 2794 2794 0 00 5765 5764 1 00

गरिजत Gujarat 11208 11208 0 00 21748 21748 0 00

मधय परिश Madhya Pradesh 6502 6502 0 00 12735 12735 0 00

महजिजषटर Maharashtra 14976 14976 0 00 29295 29294 0 00

िमन औि दिउ Daman amp Diu 222 222 0 00 443 443 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 1106 1106 0 00

गोवज Goa 404 404 0 00 801 801 0 00

पशचिमी कषतर Western Region 36658 36658 0 00 71893 71892 1 00

आनधर परिश Andhra Pradesh 6056 6048 7 01 11709 11702 7 01

तलगजनज Telangana 5318 5318 1 00 10772 10771 1 00

कनजाटक Karnataka 6702 6702 1 00 13569 13568 1 00

किल Kerala 2575 2566 9 03 4888 4878 10 02

तममल नजड Tamil Nadu 10309 10309 1 00 20031 20030 1 00

पडचिी Puducherry 271 271 1 03 517 516 1 01

लकष-दवीप Lakshadweep 4 4 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 31232 31213 19 01 61486 61465 21 00

बबहजि Bihar 3078 3078 0 00 5662 5659 3 01

िजमोिि घजटी ननगम DVC 1814 1814 0 00 3757 3755 2 01

झजिखणड Jharkhand 789 789 0 00 1505 1495 10 07

ओडडशज Odisha 2560 2560 0 00 5261 5261 0 00

पशशचम बगजल West Bengal 5115 5115 0 00 9920 9897 23 02

मसशककम Sikkim 36 36 0 00 78 78 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 58 54 4 67

परवी कषतर Eastern Region 13391 13391 0 00 26182 26144 38 01

अरणजचल परिश Arunachal Pradesh 64 64 0 06 127 126 1 06

असम Assam 819 738 81 99 1573 1434 139 88

मणणपि Manipur 73 72 1 07 135 134 2 12

मघजलय Meghalaya 167 159 8 50 336 318 18 55

ममज़ोिम Mizoram 55 55 0 07 100 99 1 08

नजगजलड Nagaland 65 64 1 08 124 123 1 08

बिपिज Tripura 173 170 2 14 292 288 4 13

उततर-परवी कषतर North-Eastern Region 1416 1323 93 66 2686 2521 165 62

समपणण भारत All India 119717 119200 517 04 229413 228441 972 04

Note Power Supply Position Report has been compiled based on the data furnished by State Utilities Electricity Departments

23

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 356 356 0 00 356 356 0 00

दिलली Delhi 6461 6461 0 00 6461 6461 0 00

हरियजणज Haryana 8874 8874 0 00 8874 8874 0 00

दहमजचल परिश Himachal Pradesh 1480 1480 0 00 1480 1480 0 00

रमम कशमीि Jammu amp Kashmir 2426 2426 0 00 2885 2426 459 159

परजब Punjab 8802 8802 0 00 8802 8802 0 00

िजरसथजन Rajasthan 11791 11791 0 00 11791 11791 0 00

उतति परिश Uttar Pradesh 22487 22057 430 19 22487 22057 430 19

उततिजखड Uttarakhand 2155 2155 0 00 2155 2155 0 00

उततरी कषतर Northern Region 60987 60078 909 15 60987 60078 909 15

छततीसगढ़ Chhattisgarh 4504 4504 0 00 4596 4574 22 05

गरिजत Gujarat 18094 18094 0 00 18094 18094 0 00

मधय परिश Madhya Pradesh 10145 10131 14 01 10145 10131 14 01

महजिजषटर Maharashtra 23621 23613 8 00 23621 23613 8 00

िमन औि दिउ Daman amp Diu 344 344 0 01 344 344 0 01

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 818 818 0 00

गोवज Goa 554 554 0 00 594 594 0 00

पशचिमी कषतर Western Region 57113 57093 20 00 57113 57093 20 00

आनधर परिश Andhra Pradesh 9854 9854 0 00 9854 9854 0 00

तलगजनज Telangana 8684 8684 0 00 10269 10202 67 07

कनजाटक Karnataka 12158 12158 0 00 12700 12688 12 01

किल Kerala 4286 4205 81 19 4316 4300 16 04

तममल नजड Tamil Nadu 15584 15522 62 04 15680 15659 21 01

पडचिी Puducherry 453 442 11 24 453 444 9 20

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 47477 47465 12 00 49218 49103 115 02

बबहजि Bihar 5481 5481 0 00 5481 5481 0 00

िजमोिि घजटी ननगम DVC 3048 3048 0 00 3048 3048 0 00

झजिखणड Jharkhand 1330 1330 0 00 1330 1330 0 00

ओडडशज Odisha 4736 4736 0 00 5142 5140 3 01

पशशचम बगजल West Bengal 9335 9335 0 00 9335 9335 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23558 23558 0 00 23558 23558 0 00

अरणजचल परिश Arunachal Pradesh 140 138 2 12 140 138 2 12

असम Assam 1753 1673 80 46 1910 1673 237 124

मणणपि Manipur 183 181 2 09 197 188 9 48

मघजलय Meghalaya 329 325 4 12 337 337 0 00

ममज़ोिम Mizoram 102 100 2 20 116 113 3 28

नजगजलड Nagaland 130 128 2 14 157 131 27 169

बिपिज Tripura 297 295 1 05 297 295 1 05

उततर-परवी कषतर North-Eastern Region 2758 2674 84 31 2848 2780 68 24

समपणण भारत All India 183513 182533 981 05 183513 182533 981 05

Note Power Supply Position Report has been compiled based on the data furnished by State Utilities Electricity Departments 24

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -मई2019 April2019 to May2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and supply

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateमई 2019 May2019

मजग की पनता म कमी Demand not Met

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 781 781 0 00 781 781 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3706 3706 0 00 3706 3706 0 00

िजरसथजन Rajasthan 6192 6190 2 00 6192 6190 2 00

उतति परिश Uttar Pradesh 10154 10123 32 03 10154 10123 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30147 29804 343 11 30147 29804 343 11

छततीसगढ़ Chhattisgarh 2972 2971 1 00 2972 2971 1 00

गरिजत Gujarat 10540 10540 0 00 10540 10540 0 00

मधय परिश Madhya Pradesh 6233 6233 0 00 6233 6233 0 00

महजिजषटर Maharashtra 14319 14319 0 00 14319 14319 0 00

िमन औि दिउ Daman amp Diu 221 221 0 00 221 221 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 554 554 0 00 554 554 0 00

गोवज Goa 397 397 0 00 397 397 0 00

पशचिमी कषतर Western Region 35235 35234 1 00 35235 35234 1 00

आनधर परिश Andhra Pradesh 5653 5653 0 00 5653 5653 0 00

तलगजनज Telangana 5453 5453 0 00 5453 5453 0 00

कनजाटक Karnataka 6867 6867 0 00 6867 6867 0 00

किल Kerala 2313 2312 2 01 2313 2312 2 01

तममल नजड Tamil Nadu 9721 9721 0 00 9721 9721 0 00

पडचिी Puducherry 246 246 0 00 246 246 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 30254 30252 2 00 30254 30252 2 00

बबहजि Bihar 2584 2581 3 01 2584 2581 3 01

िजमोिि घजटी ननगम DVC 1944 1942 2 01 1944 1942 2 01

झजिखणड Jharkhand 716 706 10 14 716 706 10 14

ओडडशज Odisha 2701 2701 0 00 2701 2701 0 00

पशशचम बगजल West Bengal 4805 4782 23 05 4805 4782 23 05

मसशककम Sikkim 42 42 0 00 42 42 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12792 12754 38 03 12792 12754 38 03

अरणजचल परिश Arunachal Pradesh 62 62 0 06 62 62 0 06

असम Assam 754 696 58 77 754 696 58 77

मणणपि Manipur 62 61 1 17 62 61 1 17

मघजलय Meghalaya 169 159 10 60 169 159 10 60

ममज़ोिम Mizoram 45 44 0 10 45 44 0 10

नजगजलड Nagaland 59 58 0 08 59 58 0 08

बिपिज Tripura 119 117 2 13 119 117 2 13

उततर-परवी कषतर North-Eastern Region 1270 1198 72 57 1270 1198 72 57

समपणण भारत All India 109696 109241 455 04 109696 109241 455 04

Note The revised data for March 2019 is not avaliable

Energy not Supplied Energy not Supplied

अपरल 2019 April2019 अपरल 2019 April2019 to April 2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2885 2308 577 200 2885 2308 577 200

परजब Punjab 7087 7087 0 00 7087 7087 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 47779 47210 569 12 47779 47210 569 12

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9179 9160 19 02 9179 9160 19 02

तलगजनज Telangana 10269 10202 67 07 10269 10202 67 07

कनजाटक Karnataka 12700 12688 12 01 12700 12688 12 01

किल Kerala 4316 4300 16 04 4316 4300 16 04

तममल नजड Tamil Nadu 15680 15659 21 01 15680 15659 21 01

पडचिी Puducherry 444 444 0 00 444 444 0 00

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49218 49103 115 02 49218 49103 115 02

बबहजि Bihar 5157 5155 2 00 5157 5155 2 00

िजमोिि घजटी ननगम DVC 3014 3014 0 00 3014 3014 0 00

झजिखणड Jharkhand 1326 1325 1 00 1326 1325 1 00

ओडडशज Odisha 5142 5140 3 01 5142 5140 3 01

पशशचम बगजल West Bengal 8745 8699 46 05 8745 8699 46 05

मसशककम Sikkim 98 98 0 00 98 98 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22415 22378 37 02 22415 22378 37 02

अरणजचल परिश Arunachal Pradesh 139 136 3 21 139 136 3 21

असम Assam 1910 1667 242 127 1910 1667 242 127

मणणपि Manipur 197 188 9 48 197 188 9 48

मघजलय Meghalaya 337 337 0 00 337 337 0 00

ममज़ोिम Mizoram 116 113 3 28 116 113 3 28

नजगजलड Nagaland 157 131 27 169 157 131 27 169

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177424 176810 613 03 177424 176810 613 03

Note The revised data for March 2019 is not avaliable 26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateअपरल 2019 April2019 अपरल 2019 April2019 to April 2019

File NoCEA-CH-14-1142018-Coordination Division

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

मई 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during May2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

N

o No

tified

Cuts

N

o No

tified

Cuts

File NoCEA-CH-14-1142018-Coordination Division

मई2019May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0910 hrsday 0811 - 910 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 403 hrsday 0347 - 403 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 2214 hrsday 2157 - 2214 hrsday

उततराखड Uttarakhand Data not received 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-957 hrs day

Three-Phase (Mixed) Supply - 2346 hrs day

Three-Phase Supply(Irrigation)- 0953 - 0957 hrs day Three-

Phase (Mixed) Supply - 2334 - 2346 hrs day

महजिजषटर Maharashtra Three-Phase Supply - 9 hrs day Three-Phase Supply - 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

मई 2019 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during May2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to May-2019 20070450 2493722 63763 22627934 678000 4539922 7835904 35681760

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 7835904 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

7835904

Total Installed Capacity 35687160 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-22 (Up to

Mar2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

Plan Period

2017-22 (Up to

May-19)

6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58732 21173 181240 11734 163456 1010 176200 158886 225204 30768 414858

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Progress of Transmission Sector in the Country up to May 2019

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on May19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

May 19)

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during May 2019

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 20525 925681234952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Programme Achievement Ach Programme Achievement Ach

Central Sector 37545100 3290600 3141593 9547 6468500 6275642 9702

State Sector 37498600 3425800 3092392 9027 6748300 6066733 8990

PvtIPP Sector 37346200 3476700 3460217 9953 6713100 6652517 9910

PvtUTL Sector 1823100 164300 171799 10456 323600 337490 10429

Total 114213000 10357400 9866001 9526 20253500 19332382 9545

Central Sector 5661700 604200 619800 10258 990300 1104995 11158

State Sector 6680500 551500 652766 11836 1049700 1184387 11283

PvtIPP Sector 1206900 130200 121344 9320 187500 200643 10701

PvtUTL Sector 144100 12400 14009 11298 24700 25155 10184

Total 13693200 1298300 1407919 10844 2252200 2515180 11168

Central Sector 4472000 353500 365463 10338 720800 694195 9631

Total 4472000 353500 365463 10338 720800 694195 9631

Bhutan Import 621800 32500 35300 10862 50000 59270 11854

Central Sector 47678800 4248300 4126856 9714 8179600 8074832 9872

State Sector 44179100 3977300 3745158 9416 7798000 7251120 9299

Pvt Sector 40520300 3783600 3767369 9957 7248900 7215805 9954

Total 133000000 12041700 11674683 9695 23276500 22601027 9710

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Apr-19 Apr-18 Upto Apr-2019 Upto Apr-2018

975409 844377 975409 844377

22

Renewable Energy Generation

Achievement

May-2019

1 Electricity Generation (MU) Targets and Achievememts for 2019-20

All India Energy Generation During Apr-19 to May-19 (MU)

Target (2019-20)Apr-19 to May-19

Sector

Hydro

Thermal

Nuclear

202535

22522

7208

232765

193324

25152

6942

226010

0

50000

100000

150000

200000

250000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Energy Power Supply Position (Provisional) for May-2019 and during Apr-19 to May-19 23

2 Peak Power Supply Position (Provisional) for May-2019 and during Apr-19 to May-19 24

3 Energy Power Supply Position (Revised) for Apr-2019 and during Apr-19 to Apr-19 25

4 Peak Power Supply Position (Revised) for Apr-2019 and during Apr-19 to Apr-19 26

5 Notified Power cuts Restrictions on Industries during May-2019 27

6 Power Supply to Agricultural Sector during May-2019 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 154 154 0 00 271 271 0 00

दिलली Delhi 3366 3366 0 00 6065 6064 1 00

हरियजणज Haryana 4907 4907 0 00 8679 8679 0 00

दहमजचल परिश Himachal Pradesh 872 863 10 11 1654 1644 10 06

रमम कशमीि Jammu amp Kashmir 1760 1424 336 191 3364 2720 644 191

परजब Punjab 4769 4769 0 00 8475 8475 0 00

िजरसथजन Rajasthan 7120 7110 11 02 13313 13300 13 01

उतति परिश Uttar Pradesh 12742 12695 48 04 22897 22817 79 03

उततिजखड Uttarakhand 1329 1329 0 00 2449 2449 0 00

उततरी कषतर Northern Region 37020 36615 404 11 67166 66419 747 11

छततीसगढ़ Chhattisgarh 2794 2794 0 00 5765 5764 1 00

गरिजत Gujarat 11208 11208 0 00 21748 21748 0 00

मधय परिश Madhya Pradesh 6502 6502 0 00 12735 12735 0 00

महजिजषटर Maharashtra 14976 14976 0 00 29295 29294 0 00

िमन औि दिउ Daman amp Diu 222 222 0 00 443 443 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 1106 1106 0 00

गोवज Goa 404 404 0 00 801 801 0 00

पशचिमी कषतर Western Region 36658 36658 0 00 71893 71892 1 00

आनधर परिश Andhra Pradesh 6056 6048 7 01 11709 11702 7 01

तलगजनज Telangana 5318 5318 1 00 10772 10771 1 00

कनजाटक Karnataka 6702 6702 1 00 13569 13568 1 00

किल Kerala 2575 2566 9 03 4888 4878 10 02

तममल नजड Tamil Nadu 10309 10309 1 00 20031 20030 1 00

पडचिी Puducherry 271 271 1 03 517 516 1 01

लकष-दवीप Lakshadweep 4 4 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 31232 31213 19 01 61486 61465 21 00

बबहजि Bihar 3078 3078 0 00 5662 5659 3 01

िजमोिि घजटी ननगम DVC 1814 1814 0 00 3757 3755 2 01

झजिखणड Jharkhand 789 789 0 00 1505 1495 10 07

ओडडशज Odisha 2560 2560 0 00 5261 5261 0 00

पशशचम बगजल West Bengal 5115 5115 0 00 9920 9897 23 02

मसशककम Sikkim 36 36 0 00 78 78 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 58 54 4 67

परवी कषतर Eastern Region 13391 13391 0 00 26182 26144 38 01

अरणजचल परिश Arunachal Pradesh 64 64 0 06 127 126 1 06

असम Assam 819 738 81 99 1573 1434 139 88

मणणपि Manipur 73 72 1 07 135 134 2 12

मघजलय Meghalaya 167 159 8 50 336 318 18 55

ममज़ोिम Mizoram 55 55 0 07 100 99 1 08

नजगजलड Nagaland 65 64 1 08 124 123 1 08

बिपिज Tripura 173 170 2 14 292 288 4 13

उततर-परवी कषतर North-Eastern Region 1416 1323 93 66 2686 2521 165 62

समपणण भारत All India 119717 119200 517 04 229413 228441 972 04

Note Power Supply Position Report has been compiled based on the data furnished by State Utilities Electricity Departments

23

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 356 356 0 00 356 356 0 00

दिलली Delhi 6461 6461 0 00 6461 6461 0 00

हरियजणज Haryana 8874 8874 0 00 8874 8874 0 00

दहमजचल परिश Himachal Pradesh 1480 1480 0 00 1480 1480 0 00

रमम कशमीि Jammu amp Kashmir 2426 2426 0 00 2885 2426 459 159

परजब Punjab 8802 8802 0 00 8802 8802 0 00

िजरसथजन Rajasthan 11791 11791 0 00 11791 11791 0 00

उतति परिश Uttar Pradesh 22487 22057 430 19 22487 22057 430 19

उततिजखड Uttarakhand 2155 2155 0 00 2155 2155 0 00

उततरी कषतर Northern Region 60987 60078 909 15 60987 60078 909 15

छततीसगढ़ Chhattisgarh 4504 4504 0 00 4596 4574 22 05

गरिजत Gujarat 18094 18094 0 00 18094 18094 0 00

मधय परिश Madhya Pradesh 10145 10131 14 01 10145 10131 14 01

महजिजषटर Maharashtra 23621 23613 8 00 23621 23613 8 00

िमन औि दिउ Daman amp Diu 344 344 0 01 344 344 0 01

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 818 818 0 00

गोवज Goa 554 554 0 00 594 594 0 00

पशचिमी कषतर Western Region 57113 57093 20 00 57113 57093 20 00

आनधर परिश Andhra Pradesh 9854 9854 0 00 9854 9854 0 00

तलगजनज Telangana 8684 8684 0 00 10269 10202 67 07

कनजाटक Karnataka 12158 12158 0 00 12700 12688 12 01

किल Kerala 4286 4205 81 19 4316 4300 16 04

तममल नजड Tamil Nadu 15584 15522 62 04 15680 15659 21 01

पडचिी Puducherry 453 442 11 24 453 444 9 20

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 47477 47465 12 00 49218 49103 115 02

बबहजि Bihar 5481 5481 0 00 5481 5481 0 00

िजमोिि घजटी ननगम DVC 3048 3048 0 00 3048 3048 0 00

झजिखणड Jharkhand 1330 1330 0 00 1330 1330 0 00

ओडडशज Odisha 4736 4736 0 00 5142 5140 3 01

पशशचम बगजल West Bengal 9335 9335 0 00 9335 9335 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23558 23558 0 00 23558 23558 0 00

अरणजचल परिश Arunachal Pradesh 140 138 2 12 140 138 2 12

असम Assam 1753 1673 80 46 1910 1673 237 124

मणणपि Manipur 183 181 2 09 197 188 9 48

मघजलय Meghalaya 329 325 4 12 337 337 0 00

ममज़ोिम Mizoram 102 100 2 20 116 113 3 28

नजगजलड Nagaland 130 128 2 14 157 131 27 169

बिपिज Tripura 297 295 1 05 297 295 1 05

उततर-परवी कषतर North-Eastern Region 2758 2674 84 31 2848 2780 68 24

समपणण भारत All India 183513 182533 981 05 183513 182533 981 05

Note Power Supply Position Report has been compiled based on the data furnished by State Utilities Electricity Departments 24

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -मई2019 April2019 to May2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and supply

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateमई 2019 May2019

मजग की पनता म कमी Demand not Met

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 781 781 0 00 781 781 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3706 3706 0 00 3706 3706 0 00

िजरसथजन Rajasthan 6192 6190 2 00 6192 6190 2 00

उतति परिश Uttar Pradesh 10154 10123 32 03 10154 10123 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30147 29804 343 11 30147 29804 343 11

छततीसगढ़ Chhattisgarh 2972 2971 1 00 2972 2971 1 00

गरिजत Gujarat 10540 10540 0 00 10540 10540 0 00

मधय परिश Madhya Pradesh 6233 6233 0 00 6233 6233 0 00

महजिजषटर Maharashtra 14319 14319 0 00 14319 14319 0 00

िमन औि दिउ Daman amp Diu 221 221 0 00 221 221 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 554 554 0 00 554 554 0 00

गोवज Goa 397 397 0 00 397 397 0 00

पशचिमी कषतर Western Region 35235 35234 1 00 35235 35234 1 00

आनधर परिश Andhra Pradesh 5653 5653 0 00 5653 5653 0 00

तलगजनज Telangana 5453 5453 0 00 5453 5453 0 00

कनजाटक Karnataka 6867 6867 0 00 6867 6867 0 00

किल Kerala 2313 2312 2 01 2313 2312 2 01

तममल नजड Tamil Nadu 9721 9721 0 00 9721 9721 0 00

पडचिी Puducherry 246 246 0 00 246 246 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 30254 30252 2 00 30254 30252 2 00

बबहजि Bihar 2584 2581 3 01 2584 2581 3 01

िजमोिि घजटी ननगम DVC 1944 1942 2 01 1944 1942 2 01

झजिखणड Jharkhand 716 706 10 14 716 706 10 14

ओडडशज Odisha 2701 2701 0 00 2701 2701 0 00

पशशचम बगजल West Bengal 4805 4782 23 05 4805 4782 23 05

मसशककम Sikkim 42 42 0 00 42 42 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12792 12754 38 03 12792 12754 38 03

अरणजचल परिश Arunachal Pradesh 62 62 0 06 62 62 0 06

असम Assam 754 696 58 77 754 696 58 77

मणणपि Manipur 62 61 1 17 62 61 1 17

मघजलय Meghalaya 169 159 10 60 169 159 10 60

ममज़ोिम Mizoram 45 44 0 10 45 44 0 10

नजगजलड Nagaland 59 58 0 08 59 58 0 08

बिपिज Tripura 119 117 2 13 119 117 2 13

उततर-परवी कषतर North-Eastern Region 1270 1198 72 57 1270 1198 72 57

समपणण भारत All India 109696 109241 455 04 109696 109241 455 04

Note The revised data for March 2019 is not avaliable

Energy not Supplied Energy not Supplied

अपरल 2019 April2019 अपरल 2019 April2019 to April 2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2885 2308 577 200 2885 2308 577 200

परजब Punjab 7087 7087 0 00 7087 7087 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 47779 47210 569 12 47779 47210 569 12

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9179 9160 19 02 9179 9160 19 02

तलगजनज Telangana 10269 10202 67 07 10269 10202 67 07

कनजाटक Karnataka 12700 12688 12 01 12700 12688 12 01

किल Kerala 4316 4300 16 04 4316 4300 16 04

तममल नजड Tamil Nadu 15680 15659 21 01 15680 15659 21 01

पडचिी Puducherry 444 444 0 00 444 444 0 00

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49218 49103 115 02 49218 49103 115 02

बबहजि Bihar 5157 5155 2 00 5157 5155 2 00

िजमोिि घजटी ननगम DVC 3014 3014 0 00 3014 3014 0 00

झजिखणड Jharkhand 1326 1325 1 00 1326 1325 1 00

ओडडशज Odisha 5142 5140 3 01 5142 5140 3 01

पशशचम बगजल West Bengal 8745 8699 46 05 8745 8699 46 05

मसशककम Sikkim 98 98 0 00 98 98 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22415 22378 37 02 22415 22378 37 02

अरणजचल परिश Arunachal Pradesh 139 136 3 21 139 136 3 21

असम Assam 1910 1667 242 127 1910 1667 242 127

मणणपि Manipur 197 188 9 48 197 188 9 48

मघजलय Meghalaya 337 337 0 00 337 337 0 00

ममज़ोिम Mizoram 116 113 3 28 116 113 3 28

नजगजलड Nagaland 157 131 27 169 157 131 27 169

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177424 176810 613 03 177424 176810 613 03

Note The revised data for March 2019 is not avaliable 26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateअपरल 2019 April2019 अपरल 2019 April2019 to April 2019

File NoCEA-CH-14-1142018-Coordination Division

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

मई 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during May2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

N

o No

tified

Cuts

N

o No

tified

Cuts

File NoCEA-CH-14-1142018-Coordination Division

मई2019May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0910 hrsday 0811 - 910 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 403 hrsday 0347 - 403 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 2214 hrsday 2157 - 2214 hrsday

उततराखड Uttarakhand Data not received 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-957 hrs day

Three-Phase (Mixed) Supply - 2346 hrs day

Three-Phase Supply(Irrigation)- 0953 - 0957 hrs day Three-

Phase (Mixed) Supply - 2334 - 2346 hrs day

महजिजषटर Maharashtra Three-Phase Supply - 9 hrs day Three-Phase Supply - 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

मई 2019 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during May2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to May-2019 20070450 2493722 63763 22627934 678000 4539922 7835904 35681760

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 7835904 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

7835904

Total Installed Capacity 35687160 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-22 (Up to

Mar2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

Plan Period

2017-22 (Up to

May-19)

6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58732 21173 181240 11734 163456 1010 176200 158886 225204 30768 414858

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Progress of Transmission Sector in the Country up to May 2019

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on May19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

May 19)

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during May 2019

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 20525 925681234952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Energy Power Supply Position (Provisional) for May-2019 and during Apr-19 to May-19 23

2 Peak Power Supply Position (Provisional) for May-2019 and during Apr-19 to May-19 24

3 Energy Power Supply Position (Revised) for Apr-2019 and during Apr-19 to Apr-19 25

4 Peak Power Supply Position (Revised) for Apr-2019 and during Apr-19 to Apr-19 26

5 Notified Power cuts Restrictions on Industries during May-2019 27

6 Power Supply to Agricultural Sector during May-2019 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 154 154 0 00 271 271 0 00

दिलली Delhi 3366 3366 0 00 6065 6064 1 00

हरियजणज Haryana 4907 4907 0 00 8679 8679 0 00

दहमजचल परिश Himachal Pradesh 872 863 10 11 1654 1644 10 06

रमम कशमीि Jammu amp Kashmir 1760 1424 336 191 3364 2720 644 191

परजब Punjab 4769 4769 0 00 8475 8475 0 00

िजरसथजन Rajasthan 7120 7110 11 02 13313 13300 13 01

उतति परिश Uttar Pradesh 12742 12695 48 04 22897 22817 79 03

उततिजखड Uttarakhand 1329 1329 0 00 2449 2449 0 00

उततरी कषतर Northern Region 37020 36615 404 11 67166 66419 747 11

छततीसगढ़ Chhattisgarh 2794 2794 0 00 5765 5764 1 00

गरिजत Gujarat 11208 11208 0 00 21748 21748 0 00

मधय परिश Madhya Pradesh 6502 6502 0 00 12735 12735 0 00

महजिजषटर Maharashtra 14976 14976 0 00 29295 29294 0 00

िमन औि दिउ Daman amp Diu 222 222 0 00 443 443 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 1106 1106 0 00

गोवज Goa 404 404 0 00 801 801 0 00

पशचिमी कषतर Western Region 36658 36658 0 00 71893 71892 1 00

आनधर परिश Andhra Pradesh 6056 6048 7 01 11709 11702 7 01

तलगजनज Telangana 5318 5318 1 00 10772 10771 1 00

कनजाटक Karnataka 6702 6702 1 00 13569 13568 1 00

किल Kerala 2575 2566 9 03 4888 4878 10 02

तममल नजड Tamil Nadu 10309 10309 1 00 20031 20030 1 00

पडचिी Puducherry 271 271 1 03 517 516 1 01

लकष-दवीप Lakshadweep 4 4 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 31232 31213 19 01 61486 61465 21 00

बबहजि Bihar 3078 3078 0 00 5662 5659 3 01

िजमोिि घजटी ननगम DVC 1814 1814 0 00 3757 3755 2 01

झजिखणड Jharkhand 789 789 0 00 1505 1495 10 07

ओडडशज Odisha 2560 2560 0 00 5261 5261 0 00

पशशचम बगजल West Bengal 5115 5115 0 00 9920 9897 23 02

मसशककम Sikkim 36 36 0 00 78 78 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 58 54 4 67

परवी कषतर Eastern Region 13391 13391 0 00 26182 26144 38 01

अरणजचल परिश Arunachal Pradesh 64 64 0 06 127 126 1 06

असम Assam 819 738 81 99 1573 1434 139 88

मणणपि Manipur 73 72 1 07 135 134 2 12

मघजलय Meghalaya 167 159 8 50 336 318 18 55

ममज़ोिम Mizoram 55 55 0 07 100 99 1 08

नजगजलड Nagaland 65 64 1 08 124 123 1 08

बिपिज Tripura 173 170 2 14 292 288 4 13

उततर-परवी कषतर North-Eastern Region 1416 1323 93 66 2686 2521 165 62

समपणण भारत All India 119717 119200 517 04 229413 228441 972 04

Note Power Supply Position Report has been compiled based on the data furnished by State Utilities Electricity Departments

23

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 356 356 0 00 356 356 0 00

दिलली Delhi 6461 6461 0 00 6461 6461 0 00

हरियजणज Haryana 8874 8874 0 00 8874 8874 0 00

दहमजचल परिश Himachal Pradesh 1480 1480 0 00 1480 1480 0 00

रमम कशमीि Jammu amp Kashmir 2426 2426 0 00 2885 2426 459 159

परजब Punjab 8802 8802 0 00 8802 8802 0 00

िजरसथजन Rajasthan 11791 11791 0 00 11791 11791 0 00

उतति परिश Uttar Pradesh 22487 22057 430 19 22487 22057 430 19

उततिजखड Uttarakhand 2155 2155 0 00 2155 2155 0 00

उततरी कषतर Northern Region 60987 60078 909 15 60987 60078 909 15

छततीसगढ़ Chhattisgarh 4504 4504 0 00 4596 4574 22 05

गरिजत Gujarat 18094 18094 0 00 18094 18094 0 00

मधय परिश Madhya Pradesh 10145 10131 14 01 10145 10131 14 01

महजिजषटर Maharashtra 23621 23613 8 00 23621 23613 8 00

िमन औि दिउ Daman amp Diu 344 344 0 01 344 344 0 01

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 818 818 0 00

गोवज Goa 554 554 0 00 594 594 0 00

पशचिमी कषतर Western Region 57113 57093 20 00 57113 57093 20 00

आनधर परिश Andhra Pradesh 9854 9854 0 00 9854 9854 0 00

तलगजनज Telangana 8684 8684 0 00 10269 10202 67 07

कनजाटक Karnataka 12158 12158 0 00 12700 12688 12 01

किल Kerala 4286 4205 81 19 4316 4300 16 04

तममल नजड Tamil Nadu 15584 15522 62 04 15680 15659 21 01

पडचिी Puducherry 453 442 11 24 453 444 9 20

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 47477 47465 12 00 49218 49103 115 02

बबहजि Bihar 5481 5481 0 00 5481 5481 0 00

िजमोिि घजटी ननगम DVC 3048 3048 0 00 3048 3048 0 00

झजिखणड Jharkhand 1330 1330 0 00 1330 1330 0 00

ओडडशज Odisha 4736 4736 0 00 5142 5140 3 01

पशशचम बगजल West Bengal 9335 9335 0 00 9335 9335 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23558 23558 0 00 23558 23558 0 00

अरणजचल परिश Arunachal Pradesh 140 138 2 12 140 138 2 12

असम Assam 1753 1673 80 46 1910 1673 237 124

मणणपि Manipur 183 181 2 09 197 188 9 48

मघजलय Meghalaya 329 325 4 12 337 337 0 00

ममज़ोिम Mizoram 102 100 2 20 116 113 3 28

नजगजलड Nagaland 130 128 2 14 157 131 27 169

बिपिज Tripura 297 295 1 05 297 295 1 05

उततर-परवी कषतर North-Eastern Region 2758 2674 84 31 2848 2780 68 24

समपणण भारत All India 183513 182533 981 05 183513 182533 981 05

Note Power Supply Position Report has been compiled based on the data furnished by State Utilities Electricity Departments 24

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -मई2019 April2019 to May2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and supply

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateमई 2019 May2019

मजग की पनता म कमी Demand not Met

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 781 781 0 00 781 781 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3706 3706 0 00 3706 3706 0 00

िजरसथजन Rajasthan 6192 6190 2 00 6192 6190 2 00

उतति परिश Uttar Pradesh 10154 10123 32 03 10154 10123 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30147 29804 343 11 30147 29804 343 11

छततीसगढ़ Chhattisgarh 2972 2971 1 00 2972 2971 1 00

गरिजत Gujarat 10540 10540 0 00 10540 10540 0 00

मधय परिश Madhya Pradesh 6233 6233 0 00 6233 6233 0 00

महजिजषटर Maharashtra 14319 14319 0 00 14319 14319 0 00

िमन औि दिउ Daman amp Diu 221 221 0 00 221 221 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 554 554 0 00 554 554 0 00

गोवज Goa 397 397 0 00 397 397 0 00

पशचिमी कषतर Western Region 35235 35234 1 00 35235 35234 1 00

आनधर परिश Andhra Pradesh 5653 5653 0 00 5653 5653 0 00

तलगजनज Telangana 5453 5453 0 00 5453 5453 0 00

कनजाटक Karnataka 6867 6867 0 00 6867 6867 0 00

किल Kerala 2313 2312 2 01 2313 2312 2 01

तममल नजड Tamil Nadu 9721 9721 0 00 9721 9721 0 00

पडचिी Puducherry 246 246 0 00 246 246 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 30254 30252 2 00 30254 30252 2 00

बबहजि Bihar 2584 2581 3 01 2584 2581 3 01

िजमोिि घजटी ननगम DVC 1944 1942 2 01 1944 1942 2 01

झजिखणड Jharkhand 716 706 10 14 716 706 10 14

ओडडशज Odisha 2701 2701 0 00 2701 2701 0 00

पशशचम बगजल West Bengal 4805 4782 23 05 4805 4782 23 05

मसशककम Sikkim 42 42 0 00 42 42 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12792 12754 38 03 12792 12754 38 03

अरणजचल परिश Arunachal Pradesh 62 62 0 06 62 62 0 06

असम Assam 754 696 58 77 754 696 58 77

मणणपि Manipur 62 61 1 17 62 61 1 17

मघजलय Meghalaya 169 159 10 60 169 159 10 60

ममज़ोिम Mizoram 45 44 0 10 45 44 0 10

नजगजलड Nagaland 59 58 0 08 59 58 0 08

बिपिज Tripura 119 117 2 13 119 117 2 13

उततर-परवी कषतर North-Eastern Region 1270 1198 72 57 1270 1198 72 57

समपणण भारत All India 109696 109241 455 04 109696 109241 455 04

Note The revised data for March 2019 is not avaliable

Energy not Supplied Energy not Supplied

अपरल 2019 April2019 अपरल 2019 April2019 to April 2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2885 2308 577 200 2885 2308 577 200

परजब Punjab 7087 7087 0 00 7087 7087 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 47779 47210 569 12 47779 47210 569 12

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9179 9160 19 02 9179 9160 19 02

तलगजनज Telangana 10269 10202 67 07 10269 10202 67 07

कनजाटक Karnataka 12700 12688 12 01 12700 12688 12 01

किल Kerala 4316 4300 16 04 4316 4300 16 04

तममल नजड Tamil Nadu 15680 15659 21 01 15680 15659 21 01

पडचिी Puducherry 444 444 0 00 444 444 0 00

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49218 49103 115 02 49218 49103 115 02

बबहजि Bihar 5157 5155 2 00 5157 5155 2 00

िजमोिि घजटी ननगम DVC 3014 3014 0 00 3014 3014 0 00

झजिखणड Jharkhand 1326 1325 1 00 1326 1325 1 00

ओडडशज Odisha 5142 5140 3 01 5142 5140 3 01

पशशचम बगजल West Bengal 8745 8699 46 05 8745 8699 46 05

मसशककम Sikkim 98 98 0 00 98 98 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22415 22378 37 02 22415 22378 37 02

अरणजचल परिश Arunachal Pradesh 139 136 3 21 139 136 3 21

असम Assam 1910 1667 242 127 1910 1667 242 127

मणणपि Manipur 197 188 9 48 197 188 9 48

मघजलय Meghalaya 337 337 0 00 337 337 0 00

ममज़ोिम Mizoram 116 113 3 28 116 113 3 28

नजगजलड Nagaland 157 131 27 169 157 131 27 169

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177424 176810 613 03 177424 176810 613 03

Note The revised data for March 2019 is not avaliable 26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateअपरल 2019 April2019 अपरल 2019 April2019 to April 2019

File NoCEA-CH-14-1142018-Coordination Division

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

मई 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during May2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

N

o No

tified

Cuts

N

o No

tified

Cuts

File NoCEA-CH-14-1142018-Coordination Division

मई2019May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0910 hrsday 0811 - 910 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 403 hrsday 0347 - 403 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 2214 hrsday 2157 - 2214 hrsday

उततराखड Uttarakhand Data not received 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-957 hrs day

Three-Phase (Mixed) Supply - 2346 hrs day

Three-Phase Supply(Irrigation)- 0953 - 0957 hrs day Three-

Phase (Mixed) Supply - 2334 - 2346 hrs day

महजिजषटर Maharashtra Three-Phase Supply - 9 hrs day Three-Phase Supply - 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

मई 2019 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during May2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to May-2019 20070450 2493722 63763 22627934 678000 4539922 7835904 35681760

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 7835904 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

7835904

Total Installed Capacity 35687160 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-22 (Up to

Mar2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

Plan Period

2017-22 (Up to

May-19)

6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58732 21173 181240 11734 163456 1010 176200 158886 225204 30768 414858

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Progress of Transmission Sector in the Country up to May 2019

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on May19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

May 19)

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during May 2019

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 20525 925681234952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 154 154 0 00 271 271 0 00

दिलली Delhi 3366 3366 0 00 6065 6064 1 00

हरियजणज Haryana 4907 4907 0 00 8679 8679 0 00

दहमजचल परिश Himachal Pradesh 872 863 10 11 1654 1644 10 06

रमम कशमीि Jammu amp Kashmir 1760 1424 336 191 3364 2720 644 191

परजब Punjab 4769 4769 0 00 8475 8475 0 00

िजरसथजन Rajasthan 7120 7110 11 02 13313 13300 13 01

उतति परिश Uttar Pradesh 12742 12695 48 04 22897 22817 79 03

उततिजखड Uttarakhand 1329 1329 0 00 2449 2449 0 00

उततरी कषतर Northern Region 37020 36615 404 11 67166 66419 747 11

छततीसगढ़ Chhattisgarh 2794 2794 0 00 5765 5764 1 00

गरिजत Gujarat 11208 11208 0 00 21748 21748 0 00

मधय परिश Madhya Pradesh 6502 6502 0 00 12735 12735 0 00

महजिजषटर Maharashtra 14976 14976 0 00 29295 29294 0 00

िमन औि दिउ Daman amp Diu 222 222 0 00 443 443 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 1106 1106 0 00

गोवज Goa 404 404 0 00 801 801 0 00

पशचिमी कषतर Western Region 36658 36658 0 00 71893 71892 1 00

आनधर परिश Andhra Pradesh 6056 6048 7 01 11709 11702 7 01

तलगजनज Telangana 5318 5318 1 00 10772 10771 1 00

कनजाटक Karnataka 6702 6702 1 00 13569 13568 1 00

किल Kerala 2575 2566 9 03 4888 4878 10 02

तममल नजड Tamil Nadu 10309 10309 1 00 20031 20030 1 00

पडचिी Puducherry 271 271 1 03 517 516 1 01

लकष-दवीप Lakshadweep 4 4 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 31232 31213 19 01 61486 61465 21 00

बबहजि Bihar 3078 3078 0 00 5662 5659 3 01

िजमोिि घजटी ननगम DVC 1814 1814 0 00 3757 3755 2 01

झजिखणड Jharkhand 789 789 0 00 1505 1495 10 07

ओडडशज Odisha 2560 2560 0 00 5261 5261 0 00

पशशचम बगजल West Bengal 5115 5115 0 00 9920 9897 23 02

मसशककम Sikkim 36 36 0 00 78 78 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 58 54 4 67

परवी कषतर Eastern Region 13391 13391 0 00 26182 26144 38 01

अरणजचल परिश Arunachal Pradesh 64 64 0 06 127 126 1 06

असम Assam 819 738 81 99 1573 1434 139 88

मणणपि Manipur 73 72 1 07 135 134 2 12

मघजलय Meghalaya 167 159 8 50 336 318 18 55

ममज़ोिम Mizoram 55 55 0 07 100 99 1 08

नजगजलड Nagaland 65 64 1 08 124 123 1 08

बिपिज Tripura 173 170 2 14 292 288 4 13

उततर-परवी कषतर North-Eastern Region 1416 1323 93 66 2686 2521 165 62

समपणण भारत All India 119717 119200 517 04 229413 228441 972 04

Note Power Supply Position Report has been compiled based on the data furnished by State Utilities Electricity Departments

23

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and energy supplied

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 356 356 0 00 356 356 0 00

दिलली Delhi 6461 6461 0 00 6461 6461 0 00

हरियजणज Haryana 8874 8874 0 00 8874 8874 0 00

दहमजचल परिश Himachal Pradesh 1480 1480 0 00 1480 1480 0 00

रमम कशमीि Jammu amp Kashmir 2426 2426 0 00 2885 2426 459 159

परजब Punjab 8802 8802 0 00 8802 8802 0 00

िजरसथजन Rajasthan 11791 11791 0 00 11791 11791 0 00

उतति परिश Uttar Pradesh 22487 22057 430 19 22487 22057 430 19

उततिजखड Uttarakhand 2155 2155 0 00 2155 2155 0 00

उततरी कषतर Northern Region 60987 60078 909 15 60987 60078 909 15

छततीसगढ़ Chhattisgarh 4504 4504 0 00 4596 4574 22 05

गरिजत Gujarat 18094 18094 0 00 18094 18094 0 00

मधय परिश Madhya Pradesh 10145 10131 14 01 10145 10131 14 01

महजिजषटर Maharashtra 23621 23613 8 00 23621 23613 8 00

िमन औि दिउ Daman amp Diu 344 344 0 01 344 344 0 01

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 818 818 0 00

गोवज Goa 554 554 0 00 594 594 0 00

पशचिमी कषतर Western Region 57113 57093 20 00 57113 57093 20 00

आनधर परिश Andhra Pradesh 9854 9854 0 00 9854 9854 0 00

तलगजनज Telangana 8684 8684 0 00 10269 10202 67 07

कनजाटक Karnataka 12158 12158 0 00 12700 12688 12 01

किल Kerala 4286 4205 81 19 4316 4300 16 04

तममल नजड Tamil Nadu 15584 15522 62 04 15680 15659 21 01

पडचिी Puducherry 453 442 11 24 453 444 9 20

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 47477 47465 12 00 49218 49103 115 02

बबहजि Bihar 5481 5481 0 00 5481 5481 0 00

िजमोिि घजटी ननगम DVC 3048 3048 0 00 3048 3048 0 00

झजिखणड Jharkhand 1330 1330 0 00 1330 1330 0 00

ओडडशज Odisha 4736 4736 0 00 5142 5140 3 01

पशशचम बगजल West Bengal 9335 9335 0 00 9335 9335 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23558 23558 0 00 23558 23558 0 00

अरणजचल परिश Arunachal Pradesh 140 138 2 12 140 138 2 12

असम Assam 1753 1673 80 46 1910 1673 237 124

मणणपि Manipur 183 181 2 09 197 188 9 48

मघजलय Meghalaya 329 325 4 12 337 337 0 00

ममज़ोिम Mizoram 102 100 2 20 116 113 3 28

नजगजलड Nagaland 130 128 2 14 157 131 27 169

बिपिज Tripura 297 295 1 05 297 295 1 05

उततर-परवी कषतर North-Eastern Region 2758 2674 84 31 2848 2780 68 24

समपणण भारत All India 183513 182533 981 05 183513 182533 981 05

Note Power Supply Position Report has been compiled based on the data furnished by State Utilities Electricity Departments 24

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -मई2019 April2019 to May2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and supply

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateमई 2019 May2019

मजग की पनता म कमी Demand not Met

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 781 781 0 00 781 781 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3706 3706 0 00 3706 3706 0 00

िजरसथजन Rajasthan 6192 6190 2 00 6192 6190 2 00

उतति परिश Uttar Pradesh 10154 10123 32 03 10154 10123 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30147 29804 343 11 30147 29804 343 11

छततीसगढ़ Chhattisgarh 2972 2971 1 00 2972 2971 1 00

गरिजत Gujarat 10540 10540 0 00 10540 10540 0 00

मधय परिश Madhya Pradesh 6233 6233 0 00 6233 6233 0 00

महजिजषटर Maharashtra 14319 14319 0 00 14319 14319 0 00

िमन औि दिउ Daman amp Diu 221 221 0 00 221 221 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 554 554 0 00 554 554 0 00

गोवज Goa 397 397 0 00 397 397 0 00

पशचिमी कषतर Western Region 35235 35234 1 00 35235 35234 1 00

आनधर परिश Andhra Pradesh 5653 5653 0 00 5653 5653 0 00

तलगजनज Telangana 5453 5453 0 00 5453 5453 0 00

कनजाटक Karnataka 6867 6867 0 00 6867 6867 0 00

किल Kerala 2313 2312 2 01 2313 2312 2 01

तममल नजड Tamil Nadu 9721 9721 0 00 9721 9721 0 00

पडचिी Puducherry 246 246 0 00 246 246 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 30254 30252 2 00 30254 30252 2 00

बबहजि Bihar 2584 2581 3 01 2584 2581 3 01

िजमोिि घजटी ननगम DVC 1944 1942 2 01 1944 1942 2 01

झजिखणड Jharkhand 716 706 10 14 716 706 10 14

ओडडशज Odisha 2701 2701 0 00 2701 2701 0 00

पशशचम बगजल West Bengal 4805 4782 23 05 4805 4782 23 05

मसशककम Sikkim 42 42 0 00 42 42 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12792 12754 38 03 12792 12754 38 03

अरणजचल परिश Arunachal Pradesh 62 62 0 06 62 62 0 06

असम Assam 754 696 58 77 754 696 58 77

मणणपि Manipur 62 61 1 17 62 61 1 17

मघजलय Meghalaya 169 159 10 60 169 159 10 60

ममज़ोिम Mizoram 45 44 0 10 45 44 0 10

नजगजलड Nagaland 59 58 0 08 59 58 0 08

बिपिज Tripura 119 117 2 13 119 117 2 13

उततर-परवी कषतर North-Eastern Region 1270 1198 72 57 1270 1198 72 57

समपणण भारत All India 109696 109241 455 04 109696 109241 455 04

Note The revised data for March 2019 is not avaliable

Energy not Supplied Energy not Supplied

अपरल 2019 April2019 अपरल 2019 April2019 to April 2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2885 2308 577 200 2885 2308 577 200

परजब Punjab 7087 7087 0 00 7087 7087 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 47779 47210 569 12 47779 47210 569 12

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9179 9160 19 02 9179 9160 19 02

तलगजनज Telangana 10269 10202 67 07 10269 10202 67 07

कनजाटक Karnataka 12700 12688 12 01 12700 12688 12 01

किल Kerala 4316 4300 16 04 4316 4300 16 04

तममल नजड Tamil Nadu 15680 15659 21 01 15680 15659 21 01

पडचिी Puducherry 444 444 0 00 444 444 0 00

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49218 49103 115 02 49218 49103 115 02

बबहजि Bihar 5157 5155 2 00 5157 5155 2 00

िजमोिि घजटी ननगम DVC 3014 3014 0 00 3014 3014 0 00

झजिखणड Jharkhand 1326 1325 1 00 1326 1325 1 00

ओडडशज Odisha 5142 5140 3 01 5142 5140 3 01

पशशचम बगजल West Bengal 8745 8699 46 05 8745 8699 46 05

मसशककम Sikkim 98 98 0 00 98 98 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22415 22378 37 02 22415 22378 37 02

अरणजचल परिश Arunachal Pradesh 139 136 3 21 139 136 3 21

असम Assam 1910 1667 242 127 1910 1667 242 127

मणणपि Manipur 197 188 9 48 197 188 9 48

मघजलय Meghalaya 337 337 0 00 337 337 0 00

ममज़ोिम Mizoram 116 113 3 28 116 113 3 28

नजगजलड Nagaland 157 131 27 169 157 131 27 169

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177424 176810 613 03 177424 176810 613 03

Note The revised data for March 2019 is not avaliable 26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateअपरल 2019 April2019 अपरल 2019 April2019 to April 2019

File NoCEA-CH-14-1142018-Coordination Division

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

मई 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during May2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

N

o No

tified

Cuts

N

o No

tified

Cuts

File NoCEA-CH-14-1142018-Coordination Division

मई2019May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0910 hrsday 0811 - 910 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 403 hrsday 0347 - 403 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 2214 hrsday 2157 - 2214 hrsday

उततराखड Uttarakhand Data not received 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-957 hrs day

Three-Phase (Mixed) Supply - 2346 hrs day

Three-Phase Supply(Irrigation)- 0953 - 0957 hrs day Three-

Phase (Mixed) Supply - 2334 - 2346 hrs day

महजिजषटर Maharashtra Three-Phase Supply - 9 hrs day Three-Phase Supply - 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

मई 2019 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during May2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to May-2019 20070450 2493722 63763 22627934 678000 4539922 7835904 35681760

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 7835904 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

7835904

Total Installed Capacity 35687160 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-22 (Up to

Mar2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

Plan Period

2017-22 (Up to

May-19)

6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58732 21173 181240 11734 163456 1010 176200 158886 225204 30768 414858

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Progress of Transmission Sector in the Country up to May 2019

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on May19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

May 19)

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during May 2019

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 20525 925681234952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 356 356 0 00 356 356 0 00

दिलली Delhi 6461 6461 0 00 6461 6461 0 00

हरियजणज Haryana 8874 8874 0 00 8874 8874 0 00

दहमजचल परिश Himachal Pradesh 1480 1480 0 00 1480 1480 0 00

रमम कशमीि Jammu amp Kashmir 2426 2426 0 00 2885 2426 459 159

परजब Punjab 8802 8802 0 00 8802 8802 0 00

िजरसथजन Rajasthan 11791 11791 0 00 11791 11791 0 00

उतति परिश Uttar Pradesh 22487 22057 430 19 22487 22057 430 19

उततिजखड Uttarakhand 2155 2155 0 00 2155 2155 0 00

उततरी कषतर Northern Region 60987 60078 909 15 60987 60078 909 15

छततीसगढ़ Chhattisgarh 4504 4504 0 00 4596 4574 22 05

गरिजत Gujarat 18094 18094 0 00 18094 18094 0 00

मधय परिश Madhya Pradesh 10145 10131 14 01 10145 10131 14 01

महजिजषटर Maharashtra 23621 23613 8 00 23621 23613 8 00

िमन औि दिउ Daman amp Diu 344 344 0 01 344 344 0 01

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 818 818 0 00

गोवज Goa 554 554 0 00 594 594 0 00

पशचिमी कषतर Western Region 57113 57093 20 00 57113 57093 20 00

आनधर परिश Andhra Pradesh 9854 9854 0 00 9854 9854 0 00

तलगजनज Telangana 8684 8684 0 00 10269 10202 67 07

कनजाटक Karnataka 12158 12158 0 00 12700 12688 12 01

किल Kerala 4286 4205 81 19 4316 4300 16 04

तममल नजड Tamil Nadu 15584 15522 62 04 15680 15659 21 01

पडचिी Puducherry 453 442 11 24 453 444 9 20

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 47477 47465 12 00 49218 49103 115 02

बबहजि Bihar 5481 5481 0 00 5481 5481 0 00

िजमोिि घजटी ननगम DVC 3048 3048 0 00 3048 3048 0 00

झजिखणड Jharkhand 1330 1330 0 00 1330 1330 0 00

ओडडशज Odisha 4736 4736 0 00 5142 5140 3 01

पशशचम बगजल West Bengal 9335 9335 0 00 9335 9335 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23558 23558 0 00 23558 23558 0 00

अरणजचल परिश Arunachal Pradesh 140 138 2 12 140 138 2 12

असम Assam 1753 1673 80 46 1910 1673 237 124

मणणपि Manipur 183 181 2 09 197 188 9 48

मघजलय Meghalaya 329 325 4 12 337 337 0 00

ममज़ोिम Mizoram 102 100 2 20 116 113 3 28

नजगजलड Nagaland 130 128 2 14 157 131 27 169

बिपिज Tripura 297 295 1 05 297 295 1 05

उततर-परवी कषतर North-Eastern Region 2758 2674 84 31 2848 2780 68 24

समपणण भारत All India 183513 182533 981 05 183513 182533 981 05

Note Power Supply Position Report has been compiled based on the data furnished by State Utilities Electricity Departments 24

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -मई2019 April2019 to May2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and supply

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateमई 2019 May2019

मजग की पनता म कमी Demand not Met

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 781 781 0 00 781 781 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3706 3706 0 00 3706 3706 0 00

िजरसथजन Rajasthan 6192 6190 2 00 6192 6190 2 00

उतति परिश Uttar Pradesh 10154 10123 32 03 10154 10123 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30147 29804 343 11 30147 29804 343 11

छततीसगढ़ Chhattisgarh 2972 2971 1 00 2972 2971 1 00

गरिजत Gujarat 10540 10540 0 00 10540 10540 0 00

मधय परिश Madhya Pradesh 6233 6233 0 00 6233 6233 0 00

महजिजषटर Maharashtra 14319 14319 0 00 14319 14319 0 00

िमन औि दिउ Daman amp Diu 221 221 0 00 221 221 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 554 554 0 00 554 554 0 00

गोवज Goa 397 397 0 00 397 397 0 00

पशचिमी कषतर Western Region 35235 35234 1 00 35235 35234 1 00

आनधर परिश Andhra Pradesh 5653 5653 0 00 5653 5653 0 00

तलगजनज Telangana 5453 5453 0 00 5453 5453 0 00

कनजाटक Karnataka 6867 6867 0 00 6867 6867 0 00

किल Kerala 2313 2312 2 01 2313 2312 2 01

तममल नजड Tamil Nadu 9721 9721 0 00 9721 9721 0 00

पडचिी Puducherry 246 246 0 00 246 246 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 30254 30252 2 00 30254 30252 2 00

बबहजि Bihar 2584 2581 3 01 2584 2581 3 01

िजमोिि घजटी ननगम DVC 1944 1942 2 01 1944 1942 2 01

झजिखणड Jharkhand 716 706 10 14 716 706 10 14

ओडडशज Odisha 2701 2701 0 00 2701 2701 0 00

पशशचम बगजल West Bengal 4805 4782 23 05 4805 4782 23 05

मसशककम Sikkim 42 42 0 00 42 42 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12792 12754 38 03 12792 12754 38 03

अरणजचल परिश Arunachal Pradesh 62 62 0 06 62 62 0 06

असम Assam 754 696 58 77 754 696 58 77

मणणपि Manipur 62 61 1 17 62 61 1 17

मघजलय Meghalaya 169 159 10 60 169 159 10 60

ममज़ोिम Mizoram 45 44 0 10 45 44 0 10

नजगजलड Nagaland 59 58 0 08 59 58 0 08

बिपिज Tripura 119 117 2 13 119 117 2 13

उततर-परवी कषतर North-Eastern Region 1270 1198 72 57 1270 1198 72 57

समपणण भारत All India 109696 109241 455 04 109696 109241 455 04

Note The revised data for March 2019 is not avaliable

Energy not Supplied Energy not Supplied

अपरल 2019 April2019 अपरल 2019 April2019 to April 2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2885 2308 577 200 2885 2308 577 200

परजब Punjab 7087 7087 0 00 7087 7087 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 47779 47210 569 12 47779 47210 569 12

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9179 9160 19 02 9179 9160 19 02

तलगजनज Telangana 10269 10202 67 07 10269 10202 67 07

कनजाटक Karnataka 12700 12688 12 01 12700 12688 12 01

किल Kerala 4316 4300 16 04 4316 4300 16 04

तममल नजड Tamil Nadu 15680 15659 21 01 15680 15659 21 01

पडचिी Puducherry 444 444 0 00 444 444 0 00

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49218 49103 115 02 49218 49103 115 02

बबहजि Bihar 5157 5155 2 00 5157 5155 2 00

िजमोिि घजटी ननगम DVC 3014 3014 0 00 3014 3014 0 00

झजिखणड Jharkhand 1326 1325 1 00 1326 1325 1 00

ओडडशज Odisha 5142 5140 3 01 5142 5140 3 01

पशशचम बगजल West Bengal 8745 8699 46 05 8745 8699 46 05

मसशककम Sikkim 98 98 0 00 98 98 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22415 22378 37 02 22415 22378 37 02

अरणजचल परिश Arunachal Pradesh 139 136 3 21 139 136 3 21

असम Assam 1910 1667 242 127 1910 1667 242 127

मणणपि Manipur 197 188 9 48 197 188 9 48

मघजलय Meghalaya 337 337 0 00 337 337 0 00

ममज़ोिम Mizoram 116 113 3 28 116 113 3 28

नजगजलड Nagaland 157 131 27 169 157 131 27 169

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177424 176810 613 03 177424 176810 613 03

Note The revised data for March 2019 is not avaliable 26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateअपरल 2019 April2019 अपरल 2019 April2019 to April 2019

File NoCEA-CH-14-1142018-Coordination Division

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

मई 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during May2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

N

o No

tified

Cuts

N

o No

tified

Cuts

File NoCEA-CH-14-1142018-Coordination Division

मई2019May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0910 hrsday 0811 - 910 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 403 hrsday 0347 - 403 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 2214 hrsday 2157 - 2214 hrsday

उततराखड Uttarakhand Data not received 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-957 hrs day

Three-Phase (Mixed) Supply - 2346 hrs day

Three-Phase Supply(Irrigation)- 0953 - 0957 hrs day Three-

Phase (Mixed) Supply - 2334 - 2346 hrs day

महजिजषटर Maharashtra Three-Phase Supply - 9 hrs day Three-Phase Supply - 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

मई 2019 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during May2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to May-2019 20070450 2493722 63763 22627934 678000 4539922 7835904 35681760

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 7835904 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

7835904

Total Installed Capacity 35687160 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-22 (Up to

Mar2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

Plan Period

2017-22 (Up to

May-19)

6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58732 21173 181240 11734 163456 1010 176200 158886 225204 30768 414858

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Progress of Transmission Sector in the Country up to May 2019

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on May19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

May 19)

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during May 2019

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 20525 925681234952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 781 781 0 00 781 781 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3706 3706 0 00 3706 3706 0 00

िजरसथजन Rajasthan 6192 6190 2 00 6192 6190 2 00

उतति परिश Uttar Pradesh 10154 10123 32 03 10154 10123 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30147 29804 343 11 30147 29804 343 11

छततीसगढ़ Chhattisgarh 2972 2971 1 00 2972 2971 1 00

गरिजत Gujarat 10540 10540 0 00 10540 10540 0 00

मधय परिश Madhya Pradesh 6233 6233 0 00 6233 6233 0 00

महजिजषटर Maharashtra 14319 14319 0 00 14319 14319 0 00

िमन औि दिउ Daman amp Diu 221 221 0 00 221 221 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 554 554 0 00 554 554 0 00

गोवज Goa 397 397 0 00 397 397 0 00

पशचिमी कषतर Western Region 35235 35234 1 00 35235 35234 1 00

आनधर परिश Andhra Pradesh 5653 5653 0 00 5653 5653 0 00

तलगजनज Telangana 5453 5453 0 00 5453 5453 0 00

कनजाटक Karnataka 6867 6867 0 00 6867 6867 0 00

किल Kerala 2313 2312 2 01 2313 2312 2 01

तममल नजड Tamil Nadu 9721 9721 0 00 9721 9721 0 00

पडचिी Puducherry 246 246 0 00 246 246 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 30254 30252 2 00 30254 30252 2 00

बबहजि Bihar 2584 2581 3 01 2584 2581 3 01

िजमोिि घजटी ननगम DVC 1944 1942 2 01 1944 1942 2 01

झजिखणड Jharkhand 716 706 10 14 716 706 10 14

ओडडशज Odisha 2701 2701 0 00 2701 2701 0 00

पशशचम बगजल West Bengal 4805 4782 23 05 4805 4782 23 05

मसशककम Sikkim 42 42 0 00 42 42 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12792 12754 38 03 12792 12754 38 03

अरणजचल परिश Arunachal Pradesh 62 62 0 06 62 62 0 06

असम Assam 754 696 58 77 754 696 58 77

मणणपि Manipur 62 61 1 17 62 61 1 17

मघजलय Meghalaya 169 159 10 60 169 159 10 60

ममज़ोिम Mizoram 45 44 0 10 45 44 0 10

नजगजलड Nagaland 59 58 0 08 59 58 0 08

बिपिज Tripura 119 117 2 13 119 117 2 13

उततर-परवी कषतर North-Eastern Region 1270 1198 72 57 1270 1198 72 57

समपणण भारत All India 109696 109241 455 04 109696 109241 455 04

Note The revised data for March 2019 is not avaliable

Energy not Supplied Energy not Supplied

अपरल 2019 April2019 अपरल 2019 April2019 to April 2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2885 2308 577 200 2885 2308 577 200

परजब Punjab 7087 7087 0 00 7087 7087 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 47779 47210 569 12 47779 47210 569 12

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9179 9160 19 02 9179 9160 19 02

तलगजनज Telangana 10269 10202 67 07 10269 10202 67 07

कनजाटक Karnataka 12700 12688 12 01 12700 12688 12 01

किल Kerala 4316 4300 16 04 4316 4300 16 04

तममल नजड Tamil Nadu 15680 15659 21 01 15680 15659 21 01

पडचिी Puducherry 444 444 0 00 444 444 0 00

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49218 49103 115 02 49218 49103 115 02

बबहजि Bihar 5157 5155 2 00 5157 5155 2 00

िजमोिि घजटी ननगम DVC 3014 3014 0 00 3014 3014 0 00

झजिखणड Jharkhand 1326 1325 1 00 1326 1325 1 00

ओडडशज Odisha 5142 5140 3 01 5142 5140 3 01

पशशचम बगजल West Bengal 8745 8699 46 05 8745 8699 46 05

मसशककम Sikkim 98 98 0 00 98 98 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22415 22378 37 02 22415 22378 37 02

अरणजचल परिश Arunachal Pradesh 139 136 3 21 139 136 3 21

असम Assam 1910 1667 242 127 1910 1667 242 127

मणणपि Manipur 197 188 9 48 197 188 9 48

मघजलय Meghalaya 337 337 0 00 337 337 0 00

ममज़ोिम Mizoram 116 113 3 28 116 113 3 28

नजगजलड Nagaland 157 131 27 169 157 131 27 169

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177424 176810 613 03 177424 176810 613 03

Note The revised data for March 2019 is not avaliable 26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateअपरल 2019 April2019 अपरल 2019 April2019 to April 2019

File NoCEA-CH-14-1142018-Coordination Division

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

मई 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during May2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

N

o No

tified

Cuts

N

o No

tified

Cuts

File NoCEA-CH-14-1142018-Coordination Division

मई2019May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0910 hrsday 0811 - 910 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 403 hrsday 0347 - 403 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 2214 hrsday 2157 - 2214 hrsday

उततराखड Uttarakhand Data not received 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-957 hrs day

Three-Phase (Mixed) Supply - 2346 hrs day

Three-Phase Supply(Irrigation)- 0953 - 0957 hrs day Three-

Phase (Mixed) Supply - 2334 - 2346 hrs day

महजिजषटर Maharashtra Three-Phase Supply - 9 hrs day Three-Phase Supply - 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

मई 2019 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during May2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to May-2019 20070450 2493722 63763 22627934 678000 4539922 7835904 35681760

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 7835904 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

7835904

Total Installed Capacity 35687160 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-22 (Up to

Mar2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

Plan Period

2017-22 (Up to

May-19)

6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58732 21173 181240 11734 163456 1010 176200 158886 225204 30768 414858

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Progress of Transmission Sector in the Country up to May 2019

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on May19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

May 19)

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during May 2019

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 20525 925681234952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2885 2308 577 200 2885 2308 577 200

परजब Punjab 7087 7087 0 00 7087 7087 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 47779 47210 569 12 47779 47210 569 12

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9179 9160 19 02 9179 9160 19 02

तलगजनज Telangana 10269 10202 67 07 10269 10202 67 07

कनजाटक Karnataka 12700 12688 12 01 12700 12688 12 01

किल Kerala 4316 4300 16 04 4316 4300 16 04

तममल नजड Tamil Nadu 15680 15659 21 01 15680 15659 21 01

पडचिी Puducherry 444 444 0 00 444 444 0 00

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49218 49103 115 02 49218 49103 115 02

बबहजि Bihar 5157 5155 2 00 5157 5155 2 00

िजमोिि घजटी ननगम DVC 3014 3014 0 00 3014 3014 0 00

झजिखणड Jharkhand 1326 1325 1 00 1326 1325 1 00

ओडडशज Odisha 5142 5140 3 01 5142 5140 3 01

पशशचम बगजल West Bengal 8745 8699 46 05 8745 8699 46 05

मसशककम Sikkim 98 98 0 00 98 98 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22415 22378 37 02 22415 22378 37 02

अरणजचल परिश Arunachal Pradesh 139 136 3 21 139 136 3 21

असम Assam 1910 1667 242 127 1910 1667 242 127

मणणपि Manipur 197 188 9 48 197 188 9 48

मघजलय Meghalaya 337 337 0 00 337 337 0 00

ममज़ोिम Mizoram 116 113 3 28 116 113 3 28

नजगजलड Nagaland 157 131 27 169 157 131 27 169

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177424 176810 613 03 177424 176810 613 03

Note The revised data for March 2019 is not avaliable 26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateअपरल 2019 April2019 अपरल 2019 April2019 to April 2019

File NoCEA-CH-14-1142018-Coordination Division

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

मई 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during May2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

N

o No

tified

Cuts

N

o No

tified

Cuts

File NoCEA-CH-14-1142018-Coordination Division

मई2019May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0910 hrsday 0811 - 910 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 403 hrsday 0347 - 403 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 2214 hrsday 2157 - 2214 hrsday

उततराखड Uttarakhand Data not received 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-957 hrs day

Three-Phase (Mixed) Supply - 2346 hrs day

Three-Phase Supply(Irrigation)- 0953 - 0957 hrs day Three-

Phase (Mixed) Supply - 2334 - 2346 hrs day

महजिजषटर Maharashtra Three-Phase Supply - 9 hrs day Three-Phase Supply - 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

मई 2019 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during May2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to May-2019 20070450 2493722 63763 22627934 678000 4539922 7835904 35681760

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 7835904 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

7835904

Total Installed Capacity 35687160 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-22 (Up to

Mar2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

Plan Period

2017-22 (Up to

May-19)

6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58732 21173 181240 11734 163456 1010 176200 158886 225204 30768 414858

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Progress of Transmission Sector in the Country up to May 2019

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on May19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

May 19)

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during May 2019

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 20525 925681234952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

मई 2019 May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

मई 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during May2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

N

o No

tified

Cuts

N

o No

tified

Cuts

File NoCEA-CH-14-1142018-Coordination Division

मई2019May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0910 hrsday 0811 - 910 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 403 hrsday 0347 - 403 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 2214 hrsday 2157 - 2214 hrsday

उततराखड Uttarakhand Data not received 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-957 hrs day

Three-Phase (Mixed) Supply - 2346 hrs day

Three-Phase Supply(Irrigation)- 0953 - 0957 hrs day Three-

Phase (Mixed) Supply - 2334 - 2346 hrs day

महजिजषटर Maharashtra Three-Phase Supply - 9 hrs day Three-Phase Supply - 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

मई 2019 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during May2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to May-2019 20070450 2493722 63763 22627934 678000 4539922 7835904 35681760

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 7835904 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

7835904

Total Installed Capacity 35687160 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-22 (Up to

Mar2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

Plan Period

2017-22 (Up to

May-19)

6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58732 21173 181240 11734 163456 1010 176200 158886 225204 30768 414858

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Progress of Transmission Sector in the Country up to May 2019

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on May19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

May 19)

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during May 2019

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 20525 925681234952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

मई2019May2019 अपरल2019 -मई2019 April2019 to May2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0910 hrsday 0811 - 910 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 403 hrsday 0347 - 403 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 2214 hrsday 2157 - 2214 hrsday

उततराखड Uttarakhand Data not received 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-957 hrs day

Three-Phase (Mixed) Supply - 2346 hrs day

Three-Phase Supply(Irrigation)- 0953 - 0957 hrs day Three-

Phase (Mixed) Supply - 2334 - 2346 hrs day

महजिजषटर Maharashtra Three-Phase Supply - 9 hrs day Three-Phase Supply - 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

मई 2019 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during May2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to May-2019 20070450 2493722 63763 22627934 678000 4539922 7835904 35681760

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 7835904 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

7835904

Total Installed Capacity 35687160 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-22 (Up to

Mar2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

Plan Period

2017-22 (Up to

May-19)

6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58732 21173 181240 11734 163456 1010 176200 158886 225204 30768 414858

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Progress of Transmission Sector in the Country up to May 2019

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on May19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

May 19)

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during May 2019

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 20525 925681234952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to May-2019 20070450 2493722 63763 22627934 678000 4539922 7835904 35681760

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 7835904 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

7835904

Total Installed Capacity 35687160 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-22 (Up to

Mar2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

Plan Period

2017-22 (Up to

May-19)

6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58732 21173 181240 11734 163456 1010 176200 158886 225204 30768 414858

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Progress of Transmission Sector in the Country up to May 2019

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on May19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

May 19)

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during May 2019

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 20525 925681234952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to May-2019 20070450 2493722 63763 22627934 678000 4539922 7835904 35681760

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 7835904 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

7835904

Total Installed Capacity 35687160 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-22 (Up to

Mar2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

Plan Period

2017-22 (Up to

May-19)

6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58732 21173 181240 11734 163456 1010 176200 158886 225204 30768 414858

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Progress of Transmission Sector in the Country up to May 2019

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on May19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

May 19)

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during May 2019

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 20525 925681234952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-22 (Up to

Mar2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

Plan Period

2017-22 (Up to

May-19)

6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58732 21173 181240 11734 163456 1010 176200 158886 225204 30768 414858

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Progress of Transmission Sector in the Country up to May 2019

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on May19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

May 19)

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during May 2019

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 20525 925681234952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during May 2019

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 20525 925681234952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during May 2019

7 Status of Hydro Schemes Cleared by the CEA in May-2019

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 20525 925681234952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 20525 925681234952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 20525 925681234952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 20525 925681234952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 20525 925681234952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 20525 925681234952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 20525 925681234952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 20525 925681234952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 20525 925681234952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 20525 925681234952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii)

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division