AECOM Oakland CA 11/15/2017 USER eli.popuch PATH C:\Users\eli.popuch\Documents\SFOBB\TakeHome_20170818\Maps\PierFooting_Compliance\ProjectVicinity.mxd
0 5 Miles
Project Site
EXHIBIT A - PROJECT VICINITY MAP San Francisco-Oakland Bay BridgeEast Span Seismic Safety Project
Santa Venetia
Fairfax San RafaelSan 101
Anselmo Ross
Kentfield
Larkspur
M a r i n C o u n t y Corte Madera
Mill Valley Tiburon
1 Sausalito
SanPablo
Richmond
Rodeo Hercules
Pinole 80
C o n t r a El Cerrito
Albany
Berkeley
123
24
C o s t a
Orinda
Martinez
C o u n t y
Lafayette
Moraga
ViH
neill
PleasantHill
4
242
Concord
Walnut Creek
680
Alamo
980 Piedmont
Danville
Alameda 260 Oakland 13
35
280 San Francisco
101 Daly City
Brisbane 82 Colma S a n
M a t e o C o u n t y South San Francisco
61 580 A l a m e d a C o u n t y 185
880
Castro Valley San
Leandro 238 San
Lorenzo Fairview 92
AECOM Oakland CA 11/15/2017 USER eli.popuch PATH C:\Users\eli.popuch\Documents\SFOBB\TakeHome_20170818\Maps\PierFooting_Compliance\SFOBB_Overview.mxd
0 1 Miles
Oakland Touchdown New East Span Treasure
Island
80 Original East Span
YerbaBuena Island
EXHIBIT B - SFOBB PROJECT AREASan Francisco-Oakland Bay BridgeEast Span Seismic Safety Project
AECOM Oakland CA 11/15/2017 USER eli.popuch PATH C:\Users\eli.popuch\Documents\SFOBB\TakeHome_20170818\Maps\PierFooting_Compliance\YerbaBuenaIsland_PierE2.mxd
New East Span
0 500 Feet
Yerba BuenaIsland
Pier E2
US CoastGuard Station
0 2Mi
TreasureIsland Oakland
Touchdown
Buena Yerba
80 Island 880
Map Location
San Francisco-Oakland Bay BridgeEast Span Seismic Safety Project
EXHIBIT C: PIER E2 PROJECT AREA
Oakland
Alameda
TO BE REMOVED
TO BE RETAINED
EXISTING CONDITIONS SCALE COMPARISON
175’
85’
55’
PIER 4 3
SITE CONDITIONS PIER 43 SCALE
120’
41’ 120’
10’ N G V D 29
PIER E 2
PROPOSED DEMOLITION PIER E2 SCALE
EXHIBIT D
BIKE ACCESS
VIEW OF BAY BRIDGE TRAIL LANDING
OAKLAND ROUTE-BIKE
TREASURE ISLAND-BIKE
EXHIBT E
BCDC
MHW LEGEND: DEDICATED PUBLIC ACCESS AREA
E
NEW DEDICATED PUBLIC ACCESS AREAS BY JURISDICTION
EXHIBIT F
INTERIM PLAN @ INSTALLATION RESTORATION SITE 11*
* APPROXIMATE LOCATION; REFER TO CALTRANS PLAN SET SHEET L-1 FOR BOUNDARIES
LEGEND: FORMER NAVY LANDFILL
PIER RETENTION:
40' 20' 0' 40' 120'
EXHIBIT G
2'-0
" TYP
.
6'-8
"
8'-0
" 8'
-9"
8'-0"
3'-0"
20'-0
"
R15'-0"
9'-0"
R15'-0"
R40
'-0"
YBI PARKING PLAN - INTERIM BUILD-OUT
7
SITE 11 BOUNDARY 10
3
4 5
12
6
2
8 1
9
LEGEND: 1 6’ WIDE POROUS CONCRETE SIDEWALK 2 6’ WIDE GRAVEL PATH 3 6’-8’ WIDE PERMEABLE HARD SURFACE PATH 4 8’ POROUS CONCRETE SIDEWALK 5 ADA PARKING 6 ADA DROP-OFF 7
8
SECURITY FENCE TEMPORARY FENCE
PIER RETENTION:
9 SWING GATE 15' 7.5' 0' 15' 30'
10 PARALLEL PARKING (13 SPACES) 11 BIKE PARKING EXHIBIT H 12 SECURITY BOLLARDS
11
YBI PARKING PLAN - FULL BUILD OUT CONCEPTUAL DESIGN
2
8
LEGEND:
1 6’-8’ WIDE SIDEWALK 2 24’ WIDE ENTRY ROAD 3 6’ WIDE PEDESTRIAN PATH 4 VEHICULAR PARKING 5 ADA PARKING 6 ADA VAN PARKING 7 ADA DROP-OFF 8 PLANTING AREA 9 WAYFINDING SIGNAGE
15
8
1
4
13
3
8
16
8
10 BENCH 11 TRASH/RECYCLING/COMPOST
RECEPTACLES 12 BIKE RACKS 13 BIOFILTRATION BASIN 14 SWING GATE 15 SECURITY FENCE 16 PROPERTY FENCE WITH
SECURITY SIGNAGE
7
8
9 10
11
12 5 6 5
14
PIER RETENTION:
15' 7.5' 0' 15' 30'
EXHIBIT I
YBI PIER PLAN-FULL BUILD-OUT
7
9
3 5
7 10
8
3 74
6 2
8
7
LEGEND:
1 12’ SHARED PATH/MAINTENANCE ROAD 2 SLOPED WALKWAY 3 SEAT STEPS
1 4 RE-PURPOSED STEEL AND WOOD COUNTER WITH BAR SEATING 5 BENCHES 6 COMMUNAL TABLE
11 7 INTERPRETIVE SIGNAGE 8 RAILINGS WITH INTEGRATED LIGHTING 9 PEDESTRIAN LIGHTING 10 TREE PIER RETENTION: 11 BIKE RACKS
15' 7.5' 0' 15' 30'
EXHIBIT J
VIEWS - YBI FINAL BUILD-OUT
EXHIBIT K
VIEWS - YBI FINAL BUILD-OUT
EXHIBIT L
VIEWS - YBI FINAL BUILD-OUT
EXHIBIT M
VIEWS - YBI FINAL BUILD-OUT
EXHIBIT N
BFE = BASE FLOOD ELEVATION (1% ANNUAL CHANCE) MHHW = MEAN HIGHER HIGH WATER MSL = MEAN SEA LEVEL SLR = SEA LEVEL RISE MLLW = MEAN LOWER LOW WATER
EXE
EX
DESIGN FOR SEA LEVEL RISE
EXHIBIT O
TYPICAL SECTION
� BRIDGE
�" = 1'-0"
LI
NE
@
CE
NT
ER
CIP
DE
CK
(Min)
CIP
DE
CK
RAILINGPEDESTRIAN
3 SPACES @ 5'-0" = 15'-0"
ADJACENT BOX BEAM4'-0" X 5'-0" PRECAST
PROFILE GRADE
A
TEXTURESTIFF BROOM
B C
5†
"
9'-6"9'-6"
Typ
8"
Typ
5�"
6�
"
Typ
6"
Typ
11"
7�
"
Typ
2'-0"
BOTH WAYS#5 @ 12
Typ3" FILLET,
TO SEAL JOINTSWHERE REQUIRED INSERT BACKER ROD
RAILINGPEDESTRIAN
� BRIDGE
DECKTOP OF BRIDGE
1" = 1'-0"
TYPICAL SECTION
#5 TOTAL 5
1'-0"
1'-7"
Typ
IN 9" DEEP HOLE,
DRILL AND BOND
#5 @ 12
Typ
6"
STRUCTURE DESIGN
DIVISION OF ENGINEERING SERVICES
S
TATE
OF CALIFOR
IAN
RE
EN
IG
NE
LANOSS IEFOR
P
E
D
RE
TS
IG
ER
No.
Exp.
CIVIL
0 1 2 3
DESIGN BRANCH
SHEET OF
STATE OF
CALIFORNIADEPARTMENT OF TRANSPORTATION
04-013584
DATE PLOTTED => 25-APR-2018
FILE => 34-0190z-k-typ_sect.dgn
TIME PLOTTED => 13:34
s134003USERNAME =>
BRIDGE No.
POST MILE
CONTRACT No.:EARLIER REVISION DATES
DISREGARD PRINTS BEARINGREVISION DATES
PROJECT NUMBER & PHASE:
UNIT:
REDUCED PLANS
IN INCHES FOR
ORIGINAL SCALE
CHECKED
CHECKED
CHECKED
DESIGN
BY
BY
BY
QUANTITIES
DETAILS
COUNTY ROUTETOTAL PROJECT
POST MILESNo.
SHEETSHEETSTOTAL
REGISTERED CIVIL ENGINEER DATE
PLANS APPROVAL DATE
COMPLETENESS OF SCANNED COPIES OF THIS PLAN SHEET.
SHALL NOT BE RESPONSIBLE FOR THE ACCURACY OR
THE STATE OF CALIFORNIA OR ITS OFFICERS OR AGENTS
Dist
(ENGLISH) (REVISION 3/17/2017)
STRUCTURES DESIGN DETAIL SHEET
YERBA BUENA ISLAND OBSERVATION DECK
8
10
Carlo Cancino
Randip Bains
3593
04 80
TYPICAL SECTION
0416000289, 1 12-18-17 02-22-18
RANDIP S BAINS
C64172
06-30-19
Kuldeep Charan
Kiewit / Mason Chris Traina
03-16-18 13
81SF, Ala0.9/1.48.0/8.3
03-23-18
R8.26
34-0190Z
1
Typƒ" DRIP GROOVE,
Typƒ" DRIP GROOVE,
-1% AND VARIES-1% AND VARIESTyp
2�
" Clr
Typ
2�
" Clr
B7-1
B7-1
-1% AND VARIES -1% AND VARIES
12"
4'-6�
"
For Pedestrian Railing Details, see "ROADWAY PLANS".
NOTE:
1
2
3
47R1
03-23-18
Kuldeep Charan
SHEET OF
MARK DATECIVIL
Exp.
No.
REGISTERED CIVIL ENGINEER:
REVISION(S) DESCRIPTION
DATE:
DES CHK DET
-
2
1
- - -
RB KC CC
RB KC CC
RB KC CC
-
04-18-18
04-18-18 Callout modified
Dimensions added and deleted
Note added
-
04-25-18
RANDIP S BAINS
C64172
06-30-19
CHANGE ORDER No.
3 04-18-18
EXHIBIT P
New East Span
0 500 Feet
Historic Key Building Pier E23 Historic Mole SubstationPier E22
Pier E21 Pier E20
Pier E19
Oakland Touchdown 0 2Mi
TreasureIsland Oakland
Touchdown
Buena Yerba
80 Island 880
Map Location
San Francisco-Oakland Bay BridgeEast Span Seismic Safety Project EXHIBIT Q: PIER E19 - E23 PROJECT AREA
Oakland
Alameda
E19 E20 E21 E22 E23
E23
EXISTING CONDITIONS
EXHIBIT R
BCDC
MHW
NEW DEDICATED PUBLIC ACCESS AREAS BY JURISDICTION
EXHIBIT S
OAKLAND PLAN - FINAL BUILD-OUT*
7 9 5
7 4
2 3 2 7 3 2
8 2
8 97 5 3 2 5 7
2 26
1 5 7
LEGEND: 6 FLEX SPACE
1 RE-PURPOSED STEEL AND CONCRETE COUNTER WITH BAR SEATING 7 TRIPLE STREAM WASTE RECEPTACLES 2 BENCHES 8 RAILINGS WITH INTEGRATED LIGHTING 3 BENCHES WITH BACKREST 9 PEDESTRIAN LIGHTING 4 PICNIC TABLE 10 BIKE RACKS 5 INTERPRETIVE SIGNAGE PANEL 11 REPURPOSED BAY STEEL BARRIER RAIL
*Final layout subject to change EXHIBIT T
OAKLAND PLAN - FINAL BUILD OUT*
11
8 7
8
11
LEGEND:
1 RE-PURPOSED STEEL AND CONCRETE COUNTER WITH BAR SEATING 2 BENCHES 3 BENCHES WITH BACKREST 4 PICNIC TABLE 5 INTERPRETIVE SIGNAGE PANEL
10
6 FLEX SPACE 7 TRIPLE STREAM WASTE RECEPTACLES 8 RAILINGS WITH INTEGRATED LIGHTING 9 PEDESTRIAN LIGHTING 10 BIKE RACKS 11 REPURPOSED BAY STEEL BARRIER RAIL
*Final layout subject to change EXHIBIT U
OAKLAND ACCESS
LEGEND: PROPOSED PEDESTRIAN AND BICYCLE SHARED ACCESS PATH PROPOSED CROSSWALK
EXHIBIT V
DESIGN FOR SEA LEVEL RISE
EXHIBIT W
VIEWS - OAKLAND - FINAL BUILD OUT
EXHIBIT X
VIEWS - OAKLAND - FINAL BUILD OUT
EXHIBIT Y
„" = 1'-0"
DECK
B
B
A
A
ELEVATION
Elev 4.8±
Elev 0.00
Elev 29.6±
„" = 1'-0"
PLAN
C
C
Elev 18.98 Elev 18.98
Elev 18.91Elev 18.91
2'-6"±
2'-6"±
SEE "DETAIL E"
-1%-1%0% 0%
0%
(FLAT) (FLAT)
0%
46'-0"
82'-8"±
20'-8"±
45'-0"
3'-0"
„" = 1'-0"
SECTION B-B
20'-8"±
� PIER
SEE "DETAIL C"
3'-0"
21'-6"
6"6"
1'-6"1'-0"
14'-1"±
15'-†"
18'-8"
„" = 1'-0"
SECTION A-A
20'-8"±
� PIER
SEE "DETAIL D"
2'-11"
1'-4"
6"
1'-0"
2"
1'-6"
1'-6"
1'-0"
3'-6"
13'-6†"
STRUCTURE DESIGN
DIVISION OF ENGINEERING SERVICES
S
TATE
OF CALIFOR
IAN
RE
EN
IG
NE
LANOSS IEFOR
P
E
D
RE
TS
IG
ER
No.
Exp.
CIVIL
0 1 2 3
DESIGN BRANCH
SHEET OF
STATE OF
CALIFORNIADEPARTMENT OF TRANSPORTATION
04-013584
DATE PLOTTED => 01-MAY-2018
FILE => 33-0762z-e-exist_pier_e21_det01.dgn
TIME PLOTTED => 14:29
s134003USERNAME =>
BRIDGE No.
POST MILE
CONTRACT No.:EARLIER REVISION DATES
DISREGARD PRINTS BEARINGREVISION DATES
PROJECT NUMBER & PHASE:
UNIT:
REDUCED PLANS
IN INCHES FOR
ORIGINAL SCALE
CHECKED
CHECKED
CHECKED
DESIGN
BY
BY
BY
QUANTITIES
DETAILS
COUNTY ROUTETOTAL PROJECT
POST MILESNo.
SHEETSHEETSTOTAL
REGISTERED CIVIL ENGINEER DATE
PLANS APPROVAL DATE
COMPLETENESS OF SCANNED COPIES OF THIS PLAN SHEET.
SHALL NOT BE RESPONSIBLE FOR THE ACCURACY OR
THE STATE OF CALIFORNIA OR ITS OFFICERS OR AGENTS
Dist
(ENGLISH) (REVISION 3/17/2017)
STRUCTURES DESIGN DETAIL SHEET
OAKLAND SHORE OBSERVATION DECK
8Carlo Cancino
Randip Bains
3593
0416000289, 1
DIMENSIONS BEFORE ORDERING OR FABRICATING ANY MATERIAL.
THE CONTRACTOR MUST VERIFY ALL CONTROLLING FIELD
NOTE:
LEGEND:
Indicates existing
02-09-18
RANDIP S BAINS
C64172
06-30-19
04 80
Kuldeep Charan
EXISTING PIER E21 DETAILS No. 1
6
PEDESTRIAN RAILING NOT SHOWN.
NOTE:
Kiewit / Mason Chris Traina
EXISTING PIER E21 DETAILS No. 3" sheet.2. For "DETAIL E" and "SECTION C-C", see
PIER E21 DETAILS No. 2" sheet.1. For "DETAIL C" and "DETAIL D", see "EXISTING
NOTES:
03-13-18 03-19-18 31
81SF, Ala0.9/1.48.0/8.3
03-23-18
33-0762Z
R0.96
3'-10"
2
1
1
56R1
3'-10"
1'-0"
1'-0"-0.25
%
1
03-23-18
Kuldeep Charan
� BRIDGE
@ � PIERElev 18.84
� BRIDGE
� PIER
2"
3
SHEET OF
MARK DATECIVIL
Exp.
No.
REGISTERED CIVIL ENGINEER:
REVISION(S) DESCRIPTION
DATE:
DES CHK DET
-
3
2
1
- - -
RB KC CC
RB KC CC
-
04-16-18
04-16-18 Design and details modified
Detail callout enlarged
-
05-01-18
RANDIP S BAINS
C64172
06-30-19
CHANGE ORDER No.
RB KC CC04-16-18 SECTION C-C cut modified
EXHIBIT Z