from design to reality ATOMENERGOPROEKT State Corporation “Rosatom” Enterprise
Experience in Life Cycle Management of
Design Knowledge
JSC “Atomenergoproekt”
12% of electricity in Russia is generated at nuclear power plants that
were designed by JCS «Atomenergoproekt»
The company employs about 4500 engineering , management and
construction personnel
The company owns about 700 units of heavy construction equipment
The revenue in 2013 year ~ 1 bln. Dollars.
VISION A full scope engineering company that provides high quality and
efficiency of industrial design and construction
MISSION Contribute to the growth of the Russian industrial potential and
wealthfare of the society through the use of advanced technologies and
development of energy and industrial infrastructure
2
Main activities
JSC «Atomenergoproekt» - is the engineering company, General Designer of
nuclear power plants in Russia, Eastern Europe and CIS countries.
Full scope of works and services in the area of NPP construction, including:
siting;
development of pre-design, design and working documentation;
3D-designing for construction;
engineering surveys;
environmental monitoring;
NPP life extension;
designer supervision during NPP construction and follow-up during operation;
radiation, nuclear and environmental safety substantiation;
organization and development of construction and erection works, equipment and
materials procurement, including development of the required documentation;
NPP commissioning activities and handover to operation;
NPP decommissioning
3
Nuclear Power Plant Design
Atomenergoproekt has designed most of the NPPs in Russia, CIS
and Eastern Europe.
JSC Atomenergoproekt is the General Designer of Kurskaya, Smolenskaya, Balakovskaya, Bilibinskaya and Novovoronezhskaya NPPs, nuclear plants in Belene (Bulgaria), Bushehr (Iran), Kudankulam (India), and Akkuyu (Turkey). The Company’s design was used to build the Kozloduy NPP in Bulgaria,the Temelin NPP in the Czech Republic and Zaporizhskaya NPP in Ukraine. In 2012 the JSC Atomenergoproekt was assigned as General Designer to the Smolenskaya NPP-2.
Specialists of the JSC Atomenergoproekt have designed about 120 designs for nuclear power units. The JSC Atomenergoproekt participates in support of existing units built on the Company's projects.
4 4
5
Atomenergoproekt– modern engineering company
R&D Construction
Project
management
Supply
management
Design
Decommissioning Maintenance
supervision
Engineering
survey
5
High safety and security level
Competitive price
Serial manufacturing
Modern technologies, integrated
information model Short terms of
construction
General Designer of VVER-TOI project
6
VVER-TOI
Unique integrated information environment
has been created for the development and
verification of project decisions
NPP information model that meets all the
parameters specified in the design requirements
and ready for replication has been developed
Verification of the received design has been
performed, the achieved planned targets have
been confirmed by calculation
Requirements management
and data verification
Cost management
Procurement and
supply
management
Construction
management Planning and terms
management
Engineering
management
Design process
management
7
NPP information model: benefits
The implementation of NPP information model has the following major
advantages:
data transfer ensuring at all stages of NPP life cycle avoiding data loss or
data re-entry
Improvement of project documentation quality by means of chart and
layout arrangements
Implementation of changes managing system in the process of unit design
and construction
Implementation of the deviations managing system from the project
arrangements at the stage of unit construction
Design and construction terms reduction
Financial resources and workforce reduction
engineering and construction processes optimization
8
9
WEB-PORTAL
Designing Engineering Construction
Mechanical CADD/CAE
PLM
Plant Design CADD/CAE
cPLM
MS МТО
Changes and deviations managing system
Main sources
Installation managing system
Project management system
Technical information
managing system
Maintenance managing system
Safety and security
managing system ERP System
NPP management system Operation
Integrated information environment for data management
during NPP life cycle
9
Engineering data managing system – main basis
of NPP information model
WEB-Portal
ISO 15926
P&ID flowcharts
Electrical, control and testing instrumentation
Project catalogs Reactor unit
module
3D designing
Engineering data management
Supply management External systems
10
Use of NPP unit 3D-model for the issue of
working documentation
Development of technological
charts SmartPlant P&ID
Integrated 3D project model creation
SmartPlant 3D
Development of electrical charts
SmartPlant Electrical
Project catalogs SPRD
Technological & electrical elements`
charts catalog
Correlation of the
technological schemes
and objects in the 3D
model
Working documentation retrieval
from 3D model
11
Room Management in SmartPlant Enterprise modules
SmartPlant Foundation SmartPlant 3D
SmartPlant P&ID, SPEl, SPI
12
Architectural and construction part specification on the
basis of SmartPlant 3D and Tekla Structures integration
SmartPlant 3D.
Creating of 3D model of the construction elements of the building
Data transfer
Tekla Structures.
Engineering structures reinforcement
13
Engineering and designing systems integration
14
Project construction organization in the modern
information environment
4D model of the Project, uniting the 3D unit model with the
chart of the second level is developed
The modeling of especially complicated execution plan
works was carried out: construction of the foundation, the
underground part of the reactor building, the reactor pit
and fuel storage pool, inside and outside protection cover
of the reactor part
There are the possibility to carry out main
construction and erection works using the main lifting
devices by means of the developed unique simulator
Detailed 4D model of construction organization plan is
used as initial input data for Multi D modeling of
construction and erection works
15
Operation Decommissioning
Increasing the quality of the project
Reducing time and cost for engineering
Improving the layout arrangements
Collisions management with announce of
all project participants
Providing competitiveness of the project in
the world market
Construction Designing
Advantages of NPP information model
implementation at all stages of NPP life cycle
16
Developing and optimizing of work
execution plan beforehand
Managing procurements and delivery,
carrying out tender procedures in
accordance with the project requirements
Implementing the concept of information
model construction
Operation Decommissioning Construction Designing
Improving the opportunity of construction
and erection works industrialization
Advantages of NPP information model
implementation at all stages of NPP life cycle
17
Centralized accumulation of all operation
features
Efficient teaching of new staff
Significant reduction of human factor
negative effect over the exploitation
process, increasing the efficiency of operational staff.
Decommissioning Construction Designing
18
Operation
Advantages of NPP information model
implementation at all stages of NPP life cycle
18
Reduction of time and financial
expenditures connected with
decommissioning
Operation Decommissioning Construction Designing
Increasing the integral economic
efficiency of NPP unit
Advantages of NPP information model
implementation at all stages of NPP life cycle
19
THANKS FOR YOUR ATTENTION!
Dmitry V. Silaev
Head of Intellectual property Department
JSС «Atomenergoproekt»
W. +7 (495) 633-5050 (ext. 4823)
М. +7 (926) 228-0225
E-mail: [email protected]
http://www.aep.ru