Experiment of 11.7GHz PE at AWA DL. 2/27/2014. Some Background information( i ):. Some Background information(ii):. S21= [email protected]. S11= [email protected]. Some Background information(iii):. Some Background information(iv):. Where:. AWA DRIVE BEAM---19MeV. Structure. When:. - PowerPoint PPT Presentation
Popular Tags:
9
Experiment of 11.7GHz PE at AWA DL 2/27/2014
Transcript
Page 1: Experiment of 11.7GHz PE at AWA DL

Experiment of 11.7GHz PE at AWA DL

2/27/2014

Page 2: Experiment of 11.7GHz PE at AWA DL

Charge/bunch q(nC)

Bunch length z (mm)

RF power P (MW)

Peak surface field Es (MV/m)

Maximum energy loss of the bunch Eloss (MeV)

42 2.3 207 60 860 2.3 422 86 11.4

Some Background information(i):

Page 3: Experiment of 11.7GHz PE at AWA DL

Some Background information(ii):

S21= [email protected]

S11= [email protected]

Page 4: Experiment of 11.7GHz PE at AWA DL

Some Background information(iii):

Page 5: Experiment of 11.7GHz PE at AWA DL

Some Background information(iv):

Page 6: Experiment of 11.7GHz PE at AWA DL

AWA DRIVE BEAM---19MeVWhere:

Page 7: Experiment of 11.7GHz PE at AWA DL

Structure

Page 8: Experiment of 11.7GHz PE at AWA DL

When:

Task* Description Responsible Due Note

1 KL1/2 readiness Liu 4/30

2 LLRF readiness Jing 4/30 Linac phase measurement

3 Structure readiness Jing 3/10 Re-cleaning and assembling

4 Installation readiness Scott 4/15 HW for installation

5 Safety readiness Manoel 3/30 Approval for 19MeV DL

6 Vacuum readiness Eric 4/30

7 Beamline readiness Liu 4/30 PS, magnets, actuators, remote control

8 Diagnostics readiness John 4/30 Cameras, cables, scope

9 Laser readiness John 4/30 16/32 bunch train

10 High charge Eric 4/15 New cathode fabrication and installation

11 simulation John 3/15 19MeV to DUT

Proposed starting date of experiment: 5/1

Page 9: Experiment of 11.7GHz PE at AWA DL

Execution before the next meeting in around a week

1. 19MeV beam simulation---John/Dan

2. Structure assembling---Jing

3. Cleaning the rf load --- Sergey

4. Installation layout--- Scott (cross, pumping, ict location…)

5. Pump and leak check of diagnostic beamline--- Eric


Recommended