EXPLANATION OF BOREHOLE LOG This form describes some of the information provided on the borehole logs, which is based primarily on examination of the recovered samples, and the results of the field and laboratory tests. Additional description of the soil/rock encountered is given in the accompanying geotechnical report. GENERAL INFORMATION Project details, borehole number, location coordinates and type of drilling equipment used are given at the top of the borehole log. SOIL LITHOLOGY Elevation and Depth This column gives the elevation and depth of inferred geologic layers. The elevation is referred to the datum shown in the Description column. Lithology Plot This column presents a graphic depiction of the soil and rock stratigraphy encountered within the borehole. Description This column gives a description of the soil stratums, based on visual and tactile examination of the samples augmented with field and laboratory test results. Each stratum is described according to the Modified Unified Soil Classification System. The compactness condition of cohesionless soils (SPT) and the consistency of cohesive soils (undrained shear strength) are defined as follows (Ref. Canadian Foundation Engineering Manual):
Soil Sampling Sample types are abbreviated as follows:
SS Split Spoon TW Thin Wall Open (Pushed) RC Rock Core
AS Auger Sample TP Thin Wall Piston (Pushed) WS Washed Sample
Additional information provided in this section includes sample numbering, sample recovery and numerical testing results. Field and Laboratory Testing Results of field testing (e.g., SPT, pocket penetrometer, and vane testing) and laboratory testing (e.g., natural moisture content, and limits) executed on the recovered samples are plotted in this section. Instrumentation Installation Instrumentation installations (monitoring wells, piezometers, inclinometers, etc.) are plotted in this section. Water levels, if measured during fieldwork, are also plotted. These water levels may or may not be representative of the static groundwater level depending on the nature of soil stratum where the piezometer tips are located, the time elapsed from installation to reading and other applicable factors. Comments This column is used to describe non-standard situations or notes of interest.
Consistency of Undrained Shear Strength
Cohesive Soils kPa psf
Very soft 0 to 12 0 to 250
Soft 12 to 25 250 to 500
Firm 25 to 50 500 to 1000
Stiff 50 to 100 1000 to 2000
Very stiff 100 to 200 2000 to 4000
Hard Over 200 Over 4000
Compactness of
Cohesionless
Soils
SPT N-Value
Very loose 0 to 4
Loose 4 to 10
Compact 10 to 30
Dense 30 to 50
Very Dense > 50
GROUP SYMBOL
GW
GP
GM
GC
SW
SP
SM
SC
WL < 50 ML
WL > 50 MH
WL < 30 CL
30 < WL < 50 CI
WL > 50 CH
WL < 50 OL
WL > 50 OH
Pt
FRACTION
PASSING RETAINED PERCENT DESCRIPTOR
76 mm 19 mm
FINE 19 mm 4.75 mm
COARSE 4.75 mm 2.00 mm
MEDIUM 2.00 mm 425 µm
FINE 425 µm 75 µm
75 µm
DEFINING RANGES OF
PERCENTAGE BY WEIGHT OF
MINOR COMPONENTS
U.S STANDARD SIEVE SIZE
35-50
20-35
10-20
1-10
SOIL COMPONENTS
MODIFIED * UNIFIED CLASSIFICATION SYSTEM FOR SOILS
*The soil of each stratum is described using the Unified Soil Classification System (Technical Memorandum 36-357
prepared by Waterways Experiment Station, Vicksburg, Mississippi, Corps of Engineers, U.S Army. Vol. 1
March 1953.) modified slightly so that an inorganic clay of "medium plasticity" is recognized.
MAJOR DIVISION TYPICAL DESCRIPTION LABORATORY CLASSIFICATION CRITERIA
CLA
YS
AB
OV
E "
A"
LIN
E
NE
GLIG
IBLE
OR
GA
NIC
CO
NT
EN
T
OR
GA
NIC
SLIT
S &
CLA
YS
BE
LO
W "
A"
LIN
E
CO
AR
SE
GR
AIN
ED
SO
ILS
(M
OR
E T
HA
N H
ALF
BY
WE
IGH
T
LA
RG
ER
TH
AN
75µ
m)
GR
AV
ELS
MO
RE
TH
AN
HA
LF
TH
E C
OA
RS
E F
RA
CT
ION
LA
RG
ER
TH
AN
4.7
5m
m
CLEAN
GRAVELS
(TRACE OR NO
FINES)
WELL GRADED GRAVELS, GRAVEL-SAND MIXTURES, LITTLE OR NO FINES
SA
ND
S M
OR
E T
HA
N H
ALF
TH
E
CO
AR
SE
FR
AC
TIO
N S
MA
LLE
R
TH
AN
4.7
5m
m
CLEAN SANDS
(TRACE OR NO
FINES)
WELL GRADED SANDS, GRAVELLY SANDS, LITTLE OR NO FINES
Cu= D60>4; CC= (D30)2
= 1 to 3
D10 D10 X D60
POORLY GRADED GRAVELS, GRAVEL-SAND
MIXTURES, LITTLE OR NO FINESNOT MEETING ABOVE REQUIREMENTS
DIRTY GRAVELS
(WITH SOME OR
MORE FINES)
SILTY GRAVELS, GRAVEL-SAND- SILT MIXTURES ATTERBERG LIMITS BELOW "A" LINE OR P.I MORE THAN 4
CLAYEY GRAVELS, GRAVEL-SAND-CLAY MIXTURES ATTERBERG LIMITS BELOW "A" LINE OR P.I MORE THAN 7
Cu= D60 >6; CC= (D30)2
= 1 to 3
D10 D10 X D60
POORLY GRADED GRAVELS, GRAVEL- SAND MIXTURES, LITTLE OR NO FINES NOT MEETING ABOVE REQUIREMENTS
DIRTY SANDS
(WITH SOME OR
MORE FINES)
SILTY SANDS, SAND-SILT MIXTURES ATTERBERG LIMITS BELOW "A" LINE OR P.I MORE THAN 4
CLAYEY SANDS, SAND-CLAY MIXTURES ATTERBERG LIMITS BELOW "A" LINE OR P.I MORE THAN 7
WHENEVER THE NATURE OF THE FINES CONTENT HAS NOT
BEEN DETERMINED, IT IS DESIGNATED BY THE LETTER "F",
E.G SF IS A MIXTURE OF SAND WITH SILT OR CLAYORGANIC CLAYS OF HIGH PLASTICITY
HIGH ORGANIC SOILS PEAT AND OTHER HIGHLY ORGANIC SOILSSTRONG COLOUR OR ODOUR, AND OFTEN FIBROUS
TEXTURE
FIN
E-G
RA
INE
D S
OIL
S (
MO
RE
TH
AN
HA
LF
BY
WE
IGH
T S
MA
LLE
R T
HA
N
75µ
m)
INORGANIC SILTS AND VERY FINE SANDS, ROCK FLOUR, SILTY SANDS OF
SLIGHT PLASTICITY
CLASSIFICATION IS BASED UPON PLASTICITY CHART
(SEE BELOW)
INORGANIC SILTS, MICACEOUS OR DIATOMACEOUS, FINE SANDY OR SILTY
SOILS
SIL
TS
BE
LO
W "
A"
LIN
E
NE
GLIG
IBLE
OR
GA
NIC
CO
NT
EN
T
INORGANIC CLAYS OF LOW PLASTICITY, GRAVELLY, SANDY OR SILTY CLAYS,
LEAN CLAYS
INORGANIC CLAYS OF MEDIUM PLASTICITY, SILTY CLAYS
INORGANIC CLAYS OF HIGH PLASTICITY, FAT CLAYS
ORGANIC SILTS AND ORGANIC SILTY CLAYS OF LOW PLASTICITY
Amec Foster Wheeler Environment & Infrastructure
104 Crockford Boulevard
Scarborough, Ontario, M1R 3C3
Canada
Tel. No.: (416) 751-6565
amecfw.com
GR
AV
EL COARSE
SA
ND
FINES (SILT OR CLAY BASED ON
PLASTICITY)
ROUNDED OR SUBROUNDED: COBBLES 76 mm TO 200 mm
BOULDERS > 200 mm
OVERSIZED MATERIAL
AND
Y/EY
SOME
TRACE
NOT ROUNDED:
ROCK FRAGMENTS > 76 mm
ROCKS > 0.76 CUBIC METRE IN
VOLUME
Note 1: Soils are classified and described according to their engineering properties
and behaviour.
Note 2: The modifying adjectives used to define the actual or estimated percentage
range by weight of minor components are consistent with the Canadian Foundation
Engineering Manual.
WL = 30
WL = 50
CH
CL CI MH
OL OH
CL-ML ML
0
10
20
30
40
50
60
0 10 20 30 40 50 60 70 80 90 100
Pla
sti
cit
y I
nd
ex
, I P
Liquid Limit, WL
Plasticity Chart for Soil Passing 425 Micron Sieve
'A' LineIP = 0.73 (WL - 20)
83
67
100
30
101.0
99.9
99.4
0.1
1.2
1.7
50
25 /100mm
45
25 /100mm
Auger refusal.borehole was moved 4 times within 1m radius and auger refusal wasencountered at 1.2 m depth
On October 19, 2017, test pit wasconducted to 1.2 m and followed withSPT
Auger refusal
1
2
3
4
5
SS
SS
SS
SS
GB
about 100 mm TOPSOIL
brown to greySandy Silt FILL
clay pockets and rock fragmentsmoist
greyWEATHERED SHALE
Georgian Bay FormationHighly weathered
End of Borehole
Project Client:
Project Name:
Project Location:
Drilling Machine:
Drilling Method:
Drilling Location:Project Number: Proposed Bridge A
Reviewed by:Compiled by:Logged by:
TT163003.9000
SN
Date Started:
Minute ManProposed Bridges A to F, Highland Sewershed Trunk SewerRehabilitation
Revision No.:
29 Sep 17
CH2M HILL Canada Limited
Ivan Franko Ukrainian Home to the Hydro Corridor (SouthMimico Site), Toronto, ON
2, 20/12/17LJSN
Date Completed: 19 Oct 17
100 mm Solid Stem Auger and Test Pit
SOIL SAMPLING
Sam
ple
Type
Sam
ple
Num
ber
LITHOLOGY PROFILE FIELD TESTING
Recovery
(%
)
Litholo
gy P
lot
LAB TESTING
COMMENTS&
GRAIN SIZEDISTRIBUTION
(%)
SP
T 'N
' / R
QD
(%
)
Geodetic Ground Surface Elevation: 101.1 m
DCPT
* Undrained Shear Strength (kPa)
(m)
(m)
EL
EV
AT
IONDESCRIPTION
20 40 60 80
Intact
INS
TR
UM
EN
TA
TIO
NIN
ST
ALLA
TIO
N
Remould
PenetrationTesting
SPT PPT
DE
PT
H RemouldIntact
Nilcon Vane*MTO Vane*
Soil Vapour Reading
W WL
TOV (ppm)
100 200 300 400
2 4 6 8
COV (ppm)
COV (LEL) TOV (LEL)
PlasticCLSISAGR
Liquid
WP
20 40 60 80
Amec Foster WheelerEnvironment & Infrastructure
50 Vogell RoadRichmond Hill, Ontario, L4B 3K6CanadaTel. No.: (905) 403-5014amecfw.com
Scale: 1 : 26Borehole details as presented, do not constitute a thorough understanding of all potential conditions present and require interpretative assistance froma qualified Geotechnical Engineer. Also, borehole information should be read in conjunction with the geotechnical report for which it wascommissioned and the accompanying'Explanation of Borehole Log'.
101
100
RECORD OF BOREHOLE No. BH 17-1
Page: 1 of 1
1
7
5
8
8
7
100 mm
25
100 mm
25
Groundwater encountered on completion of drilling on 19/10/2017 at a depth of: dry. Cave in depth after removal of augers: 0.0 m.
83
100
100
100
100
15 47 36
100.0
98.2
97.7
97.4
0.2
2.1
2.6
2.9
2
29
25 /150mm
25 /100mm
25 /100mm
25 /130mm
Auger Refusal.
1
2
3
4
5
SS
SS
SS
SS
SS
about 225 mm TOPSOIL
brownSandy Silt FILL
trace to some clay, with rock fragmentsmoist
greySILTY CLAY
some sand, trace gravelhard
greyWEATHERED SHALE
Georgian Bay FormationHighly weathered
End of Borehole
Project Client:
Project Name:
Project Location:
Drilling Machine:
Drilling Method:
Drilling Location:Project Number: Proposed Bridge B
Reviewed by:Compiled by:Logged by:
TT163003.9000
SN
Date Started:
Minute ManProposed Bridges A to F, Highland Sewershed Trunk SewerRehabilitation
Revision No.:
29 Sep 17
CH2M HILL Canada Limited
Ivan Franko Ukrainian Home to the Hydro Corridor (SouthMimico Site), Toronto, ON
2, 20/12/17LJSN
Date Completed: 29 Sep 17
100 mm Solid Stem Auger
SOIL SAMPLING
Sam
ple
Type
Sam
ple
Num
ber
LITHOLOGY PROFILE FIELD TESTING
Recovery
(%
)
Litholo
gy P
lot
LAB TESTING
COMMENTS&
GRAIN SIZEDISTRIBUTION
(%)
SP
T 'N
' / R
QD
(%
)
Geodetic Ground Surface Elevation: 100.3 m
DCPT
* Undrained Shear Strength (kPa)
(m)
(m)
EL
EV
AT
IONDESCRIPTION
20 40 60 80
Intact
INS
TR
UM
EN
TA
TIO
NIN
ST
ALLA
TIO
N
Remould
PenetrationTesting
SPT PPT
DE
PT
H RemouldIntact
Nilcon Vane*MTO Vane*
Soil Vapour Reading
W WL
TOV (ppm)
100 200 300 400
2 4 6 8
COV (ppm)
COV (LEL) TOV (LEL)
PlasticCLSISAGR
Liquid
WP
20 40 60 80
Amec Foster WheelerEnvironment & Infrastructure
50 Vogell RoadRichmond Hill, Ontario, L4B 3K6CanadaTel. No.: (905) 403-5014amecfw.com
Scale: 1 : 26Borehole details as presented, do not constitute a thorough understanding of all potential conditions present and require interpretative assistance froma qualified Geotechnical Engineer. Also, borehole information should be read in conjunction with the geotechnical report for which it wascommissioned and the accompanying'Explanation of Borehole Log'.
100
99
98
RECORD OF BOREHOLE No. BH 17-2
Page: 1 of 1
1
2
12
6
4
6
9
150 mm
25
100 mm
25
100 mm
25
130 mm
25
Groundwater encountered on completion of drilling on 29/09/2017 at a depth of: dry. Cave in depth after removal of augers: 0.6 m.
58
67
100
100
100
18 48 34
99.2
98.0
97.6
97.4
0.1
1.3
1.7
1.9
0
10
25 /150mm
25 /150mm
25 /100mm
25 /80mm
Auger refusal. Borehole was movedwithin 1 m radius and auger refusalwas encountered at 0.9 m depthOn October 12, 2017, anotherborehole was augered down to 0.9 mand followed with SPT.
Auger refusal
1
2
3
4
5
SS
SS
SS
SS
SS
about 100 mm TOPSOIL
brownSandy Silt FILL
trace to some clay, trace gravel, with rockfragments, trace rootlets
moist
hit rock fragment
with wood pieces
greySILTY CLAYsome sand
hard
greyWEATHERED SHALE
Georgian Bay FormationHighly weathered
End of Borehole
Project Client:
Project Name:
Project Location:
Drilling Machine:
Drilling Method:
Drilling Location:Project Number: Proposed Bridge B
Reviewed by:Compiled by:Logged by:
TT163003.9000
SN
Date Started:
Minute ManProposed Bridges A to F, Highland Sewershed Trunk SewerRehabilitation
Revision No.:
10 Oct 17
CH2M HILL Canada Limited
Ivan Franko Ukrainian Home to the Hydro Corridor (SouthMimico Site), Toronto, ON
2, 20/12/17LJSN
Date Completed: 12 Oct 17
100 mm Solid Stem Auger
SOIL SAMPLING
Sam
ple
Type
Sam
ple
Num
ber
LITHOLOGY PROFILE FIELD TESTING
Recovery
(%
)
Litholo
gy P
lot
LAB TESTING
COMMENTS&
GRAIN SIZEDISTRIBUTION
(%)
SP
T 'N
' / R
QD
(%
)
Geodetic Ground Surface Elevation: 99.3 m
DCPT
* Undrained Shear Strength (kPa)
(m)
(m)
EL
EV
AT
IONDESCRIPTION
20 40 60 80
Intact
INS
TR
UM
EN
TA
TIO
NIN
ST
ALLA
TIO
N
Remould
PenetrationTesting
SPT PPT
DE
PT
H RemouldIntact
Nilcon Vane*MTO Vane*
Soil Vapour Reading
W WL
TOV (ppm)
100 200 300 400
2 4 6 8
COV (ppm)
COV (LEL) TOV (LEL)
PlasticCLSISAGR
Liquid
WP
20 40 60 80
Amec Foster WheelerEnvironment & Infrastructure
50 Vogell RoadRichmond Hill, Ontario, L4B 3K6CanadaTel. No.: (905) 403-5014amecfw.com
Scale: 1 : 26Borehole details as presented, do not constitute a thorough understanding of all potential conditions present and require interpretative assistance froma qualified Geotechnical Engineer. Also, borehole information should be read in conjunction with the geotechnical report for which it wascommissioned and the accompanying'Explanation of Borehole Log'.
99
98
RECORD OF BOREHOLE No. BH 17-3
Page: 1 of 1
1
8
9
7
8
9
150 mm
25
150 mm
25
100 mm
25
80 mm
25
Groundwater encountered on completion of drilling on 12/10/2017 at a depth of: dry. Cave in depth after removal of augers: 0.0 m.
67
100
22
33
33
96.8
95.7
95.4
0.9
2.0
2.3
30
25 /80mm
50
25 /150mm
25 /80mm
Hand dig to 0.5 m deep to clearpavement material
Auger refusal, borehole was moved10 times with 1.5 m radius and augerrefusal was encountered at 0.5 mdepthOn Oct. 12, 2017, another boreholewas augered down to 0.5 m andfollowed with SPT, auger refusal wasencountered at 1.1 m depth
On October 19, 2017, test pit wasconducted to 1.1 m depth andfollowed with SPT
Auger refusal
1
2
3
4
5
6
GB
SS
SS
SS
SS
SS
brownSandy Gravel FILL
trace rootletsmoist
brownSandy Silt FILL
some gravel, with rootletslightly oxidized
moist
greyWEATHERED SHALE
Georgian Bay FormationHighly weathered
End of Borehole
Project Client:
Project Name:
Project Location:
Drilling Machine:
Drilling Method:
Drilling Location:Project Number: Proposed Bridge C
Reviewed by:Compiled by:Logged by:
TT163003.9000
SN
Date Started:
Minute ManProposed Bridges A to F, Highland Sewershed Trunk SewerRehabilitation
Revision No.:
6 Oct 17
CH2M HILL Canada Limited
Ivan Franko Ukrainian Home to the Hydro Corridor (SouthMimico Site), Toronto, ON
2, 20/12/17LJSN
Date Completed: 19 Oct 17
100 mm Solid Stem Auger and Test Pit
SOIL SAMPLING
Sam
ple
Type
Sam
ple
Num
ber
LITHOLOGY PROFILE FIELD TESTING
Recovery
(%
)
Litholo
gy P
lot
LAB TESTING
COMMENTS&
GRAIN SIZEDISTRIBUTION
(%)
SP
T 'N
' / R
QD
(%
)
Geodetic Ground Surface Elevation: 97.7 m
DCPT
* Undrained Shear Strength (kPa)
(m)
(m)
EL
EV
AT
IONDESCRIPTION
20 40 60 80
Intact
INS
TR
UM
EN
TA
TIO
NIN
ST
ALLA
TIO
N
Remould
PenetrationTesting
SPT PPT
DE
PT
H RemouldIntact
Nilcon Vane*MTO Vane*
Soil Vapour Reading
W WL
TOV (ppm)
100 200 300 400
2 4 6 8
COV (ppm)
COV (LEL) TOV (LEL)
PlasticCLSISAGR
Liquid
WP
20 40 60 80
Amec Foster WheelerEnvironment & Infrastructure
50 Vogell RoadRichmond Hill, Ontario, L4B 3K6CanadaTel. No.: (905) 403-5014amecfw.com
Scale: 1 : 26Borehole details as presented, do not constitute a thorough understanding of all potential conditions present and require interpretative assistance froma qualified Geotechnical Engineer. Also, borehole information should be read in conjunction with the geotechnical report for which it wascommissioned and the accompanying'Explanation of Borehole Log'.
97
96
RECORD OF BOREHOLE No. BH 17-4
Page: 1 of 1
1
2
3
6
6
6
5
6
80 mm
25
150 mm
25
80 mm
25
Groundwater encountered on completion of drilling on 19/10/2017 at a depth of: dry. Cave in depth after removal of augers: 0.0 m.
100
83
100
100
95.0
94.2
93.9
0.6
1.4
1.7
25 /50mm
26
50 /50mm50 /
100mm
6 October 2017Hand dig to 0.5 m to removepavement material
Auger Refusal.
1
2
3
4
5
GB
SS
SS
SS
SS
brownSandy Gravel FILL
trace rootlets, trace rock fragmentsmoist
brown to greySandy Silt FILL
trace clay, trace gravelmoist
--------wet
greyWEATHERED SHALE
Georgian Bay FormationHighly weathered
End of Borehole
Project Client:
Project Name:
Project Location:
Drilling Machine:
Drilling Method:
Drilling Location:Project Number: Proposed Bridge D
Reviewed by:Compiled by:Logged by:
TT163003.9000
SN
Date Started:
Minute ManProposed Bridges A to F, Highland Sewershed Trunk SewerRehabilitation
Revision No.:
6 Oct 17
CH2M HILL Canada Limited
Ivan Franko Ukrainian Home to the Hydro Corridor (SouthMimico Site), Toronto, ON
2, 20/12/17LJSN
Date Completed: 6 Oct 17
100 mm Solid Stem Auger and Test Pit
SOIL SAMPLING
Sam
ple
Type
Sam
ple
Num
ber
LITHOLOGY PROFILE FIELD TESTING
Recovery
(%
)
Litholo
gy P
lot
LAB TESTING
COMMENTS&
GRAIN SIZEDISTRIBUTION
(%)
SP
T 'N
' / R
QD
(%
)
Geodetic Ground Surface Elevation: 95.6 m
DCPT
* Undrained Shear Strength (kPa)
(m)
(m)
EL
EV
AT
IONDESCRIPTION
20 40 60 80
Intact
INS
TR
UM
EN
TA
TIO
NIN
ST
ALLA
TIO
N
Remould
PenetrationTesting
SPT PPT
DE
PT
H RemouldIntact
Nilcon Vane*MTO Vane*
Soil Vapour Reading
W WL
TOV (ppm)
100 200 300 400
2 4 6 8
COV (ppm)
COV (LEL) TOV (LEL)
PlasticCLSISAGR
Liquid
WP
20 40 60 80
Amec Foster WheelerEnvironment & Infrastructure
50 Vogell RoadRichmond Hill, Ontario, L4B 3K6CanadaTel. No.: (905) 403-5014amecfw.com
Scale: 1 : 26Borehole details as presented, do not constitute a thorough understanding of all potential conditions present and require interpretative assistance froma qualified Geotechnical Engineer. Also, borehole information should be read in conjunction with the geotechnical report for which it wascommissioned and the accompanying'Explanation of Borehole Log'.
95
94
RECORD OF BOREHOLE No. BH 17-5
Page: 1 of 1
1
4
7
12
13
8
50 mm
25
50 mm
50
100 mm
50
Groundwater encountered on completion of drilling on 06/10/2017 at a depth of: 0.9 m. Cave in depth after removal of augers: 1.6 m.
25
78
44
100
100
100
100
92.4
91.5
87.9
0.3
1.2
4.7
16
16
50 /80mm
50 /100mm
50 /80mm
50 /50mm
50 /30mm Auger Refusal.
1
2
3
4
5
6
7
SS
SS
SS
SS
SS
SS
SS
brownSandy Gravel FILL
trace rootlets
mottledSandy Silt FILL
trace clay, trace gravel, trace rootlets & organicmattermoist
greyWEATHERED SHALE
Georgian Bay FormationHighly weathered
End of Borehole
Project Client:
Project Name:
Project Location:
Drilling Machine:
Drilling Method:
Drilling Location:Project Number: Proposed Bridge E
Reviewed by:Compiled by:Logged by:
TT163003.9000
SN
Date Started:
Track Mounted DrillProposed Bridges A to F, Highland Sewershed Trunk SewerRehabilitation
Revision No.:
5 Oct 17
CH2M HILL Canada Limited
Ivan Franko Ukrainian Home to the Hydro Corridor (SouthMimico Site), Toronto, ON
2, 20/12/17LJSN
Date Completed: 13 Oct 17
150 mm Solid Stem Auger
SOIL SAMPLING
Sam
ple
Type
Sam
ple
Num
ber
LITHOLOGY PROFILE FIELD TESTING
Recovery
(%
)
Litholo
gy P
lot
LAB TESTING
COMMENTS&
GRAIN SIZEDISTRIBUTION
(%)
SP
T 'N
' / R
QD
(%
)
Geodetic Ground Surface Elevation: 92.7 m
DCPT
* Undrained Shear Strength (kPa)
(m)
(m)
EL
EV
AT
IONDESCRIPTION
20 40 60 80
Intact
INS
TR
UM
EN
TA
TIO
NIN
ST
ALLA
TIO
N
Remould
PenetrationTesting
SPT PPT
DE
PT
H RemouldIntact
Nilcon Vane*MTO Vane*
Soil Vapour Reading
W WL
TOV (ppm)
100 200 300 400
2 4 6 8
COV (ppm)
COV (LEL) TOV (LEL)
PlasticCLSISAGR
Liquid
WP
20 40 60 80
Amec Foster WheelerEnvironment & Infrastructure
50 Vogell RoadRichmond Hill, Ontario, L4B 3K6CanadaTel. No.: (905) 403-5014amecfw.com
Scale: 1 : 26Borehole details as presented, do not constitute a thorough understanding of all potential conditions present and require interpretative assistance froma qualified Geotechnical Engineer. Also, borehole information should be read in conjunction with the geotechnical report for which it wascommissioned and the accompanying'Explanation of Borehole Log'.
92
91
90
89
88
RECORD OF BOREHOLE No. BH 17-6
Page: 1 of 1
1
2
3
4
4
11
4
6
7
5
9
80 mm
50
100 mm
50
80 mm
50
50 mm
50
30 mm
50
Groundwater encountered on completion of drilling on 13/10/2017 at a depth of: 4.6 m. Cave in depth after removal of augers: 4.6 m.
67
79
100
100
22 50 25
93.5
92.6
91.7
91.5
0.2
1.1
2.0
2.2
3
31
34
25 /100mm
50 /50mm
Auger Refusal.
1
2
3
4
5
AS
SS
SS
SS
SS
about 150 mm TOPSOIL
brown to greySandy Silt FILL
trace to some clay, trace gravel,with rock fragments, trace rootlets
moist
brown to greySILTY CLAY
sandy, trace gravelhard
greyWEATHERED SHALE
Georgian Bay FormationHighly weathered
End of Borehole
Project Client:
Project Name:
Project Location:
Drilling Machine:
Drilling Method:
Drilling Location:Project Number: Proposed Bridge E
Reviewed by:Compiled by:Logged by:
TT163003.9000
SN
Date Started:
Minute ManProposed Bridges A to F, Highland Sewershed Trunk SewerRehabilitation
Revision No.:
5 Oct 17
CH2M HILL Canada Limited
Ivan Franko Ukrainian Home to the Hydro Corridor (SouthMimico Site), Toronto, ON
2, 20/12/17LJSN
Date Completed: 5 Oct 17
100 mm Solid Stem Auger
SOIL SAMPLING
Sam
ple
Type
Sam
ple
Num
ber
LITHOLOGY PROFILE FIELD TESTING
Recovery
(%
)
Litholo
gy P
lot
LAB TESTING
COMMENTS&
GRAIN SIZEDISTRIBUTION
(%)
SP
T 'N
' / R
QD
(%
)
Geodetic Ground Surface Elevation: 93.7 m
DCPT
* Undrained Shear Strength (kPa)
(m)
(m)
EL
EV
AT
IONDESCRIPTION
20 40 60 80
Intact
INS
TR
UM
EN
TA
TIO
NIN
ST
ALLA
TIO
N
Remould
PenetrationTesting
SPT PPT
DE
PT
H RemouldIntact
Nilcon Vane*MTO Vane*
Soil Vapour Reading
W WL
TOV (ppm)
100 200 300 400
2 4 6 8
COV (ppm)
COV (LEL) TOV (LEL)
PlasticCLSISAGR
Liquid
WP
20 40 60 80
Amec Foster WheelerEnvironment & Infrastructure
50 Vogell RoadRichmond Hill, Ontario, L4B 3K6CanadaTel. No.: (905) 403-5014amecfw.com
Scale: 1 : 26Borehole details as presented, do not constitute a thorough understanding of all potential conditions present and require interpretative assistance froma qualified Geotechnical Engineer. Also, borehole information should be read in conjunction with the geotechnical report for which it wascommissioned and the accompanying'Explanation of Borehole Log'.
93
92
RECORD OF BOREHOLE No. BH 17-7
Page: 1 of 1
1
2
13
7
6
4
8
7
100 mm
25
50 mm
50
Groundwater encountered on completion of drilling on 05/10/2017 at a depth of: dry. Cave in depth after removal of augers: 0.0 m.
67
60
50
83
100
100
10 59 30
92.2
90.9
90.0
89.8
0.2
1.4
2.4
2.6
1
15
25 /100mm
25 /100mm
48
25 /50mm
25 /50mm
Auger Refusal.
1
2
3
4
5
6
SS
SS
SS
SS
SS
SS
about 150 mm TOPSOIL
brownSandy Silt FILL
trace to some clay, occasional graveltrace rootlets
moist
hit rock fragment
brown to greySILTY CLAY
trace to some sand, trace gravel, with shalepieceshard
greyWEATHERED SHALE
Georgian Bay FormationHIghly weathered
End of Borehole
Project Client:
Project Name:
Project Location:
Drilling Machine:
Drilling Method:
Drilling Location:Project Number: Proposed Bridge F
Reviewed by:Compiled by:Logged by:
TT163003.9000
SN
Date Started:
Minute ManProposed Bridges A to F, Highland Sewershed Trunk SewerRehabilitation
Revision No.:
5 Oct 17
CH2M HILL Canada Limited
Ivan Franko Ukrainian Home to the Hydro Corridor (SouthMimico Site), Toronto, ON
2, 20/12/17LJSN
Date Completed: 5 Oct 17
100 mm Solid Stem Auger
SOIL SAMPLING
Sam
ple
Type
Sam
ple
Num
ber
LITHOLOGY PROFILE FIELD TESTING
Recovery
(%
)
Litholo
gy P
lot
LAB TESTING
COMMENTS&
GRAIN SIZEDISTRIBUTION
(%)
SP
T 'N
' / R
QD
(%
)
Geodetic Ground Surface Elevation: 92.4 m
DCPT
* Undrained Shear Strength (kPa)
(m)
(m)
EL
EV
AT
IONDESCRIPTION
20 40 60 80
Intact
INS
TR
UM
EN
TA
TIO
NIN
ST
ALLA
TIO
N
Remould
PenetrationTesting
SPT PPT
DE
PT
H RemouldIntact
Nilcon Vane*MTO Vane*
Soil Vapour Reading
W WL
TOV (ppm)
100 200 300 400
2 4 6 8
COV (ppm)
COV (LEL) TOV (LEL)
PlasticCLSISAGR
Liquid
WP
20 40 60 80
Amec Foster WheelerEnvironment & Infrastructure
50 Vogell RoadRichmond Hill, Ontario, L4B 3K6CanadaTel. No.: (905) 403-5014amecfw.com
Scale: 1 : 26Borehole details as presented, do not constitute a thorough understanding of all potential conditions present and require interpretative assistance froma qualified Geotechnical Engineer. Also, borehole information should be read in conjunction with the geotechnical report for which it wascommissioned and the accompanying'Explanation of Borehole Log'.
92
91
90
RECORD OF BOREHOLE No. BH 17-8
Page: 1 of 1
1
2
15
7
7
7
9
6
100 mm
25
100 mm
25
50 mm
25
50 mm
25
Groundwater encountered on completion of drilling on 05/10/2017 at a depth of: dry. Cave in depth after removal of augers: 0.0 m.
APPENDICES
APPENDIX A
Record of Boreholes BH 4 to BH 8
(Amec Foster Wheeler Reference No. TT163003)
about 100 mm TOPSOILgreyish brown
Silty Clay / Clayey Silt FILLtrace sand, trace gravel
with rootlets and organics
with shale fragments
greyWEATHERED SHALE
End of Borehole Borehole was terminated due to auger refual.
Monitoring Well Installation Details:(50 mm Dia.)
Protective Flushmount Cover Installed Bentonite: 0.0 - 1.2 m Sand Filter: 1.2- 1.5 m Screen: 1.5 - 3.0 m Sand Filter: 3.0 - 3.1 m
42
42
29
64
100
92.5
90.1
89.5
0.1
2.5
3.1
1
2
3
4
5
SS
SS
SS
SS
SS
4
8
10
50/13
50/5
Drilling Method:Project Client:
Project Name:
Project Location:
Drilling Machine: Reviewed by:
Revision No.:Date Started:
Highland Sewershed Trunk Sewer Rehabilitation
AH
DA
31/03/2016 31/03/2016
CH2M HILL Canada Limited Compiled by: 150 mm Solid Stem Augers
Queensway and Royal York Road Vicinity (South MimicoSite), Toronto, ON
SOIL SAMPLING
Sam
ple
Typ
e
Sam
ple
Num
ber
LITHOLOGY PROFILE FIELD TESTING
Rec
over
y (%
)
SP
T 'N
' Val
ue
Lith
olog
y P
lot
LAB TESTINGCOMMENTS
&GRAIN SIZE
DISTRIBUTION(%)
SPT PPT
DE
PT
H RemouldIntact
Nilcon Vane*MTO Vane*
Geodetic Ground Surface Elevation: 92.6 m
DCPT
* Undrained Shear Strength (kPa)
(m)
(m)
EL
EV
AT
IONDESCRIPTION
20 40 60 80
Intact
INS
TR
UM
EN
TA
TIO
NIN
ST
ALL
AT
ION
Remould
PenetrationTesting
PlasticCL
COV parts per million (ppm)200 400 600 800
SISAGRLiquid
WP
20 40 60 80
2 4 6 8 10 12
Soil Vapour Reading
W WL
Rinse pH Values
TOV parts per million (ppm)
Logged by:Project Number: Drilling Location: East side of Mimico Creek (E621117,N4832118)
RECORD OF BOREHOLE No. BH 4
Page: 1 of 1
JW
Scale: 1 : 42Borehole details as presented, do not constitute a thorough understanding of all potential conditions present and require interpretative assistance froma qualified Geotechnical Engineer. Also, borehole information should be read in conjunction with the geotechnical report for which it wascommissioned and the accompanying'Explanation of Borehole Log'.
TT163003
92
91
90
1
2
3
27
18
13
13
6
13
50
5
50
Groundwater depth observed on 10/04/2016 at a depth of: 0.0 m.
No freestanding groundwater measured in open borehole on completion of drilling.
Track Mounted Drill
Date Completed: 0, 16/06/16
104 Crockford BoulevardScarborough, OntarioCanada M1R 3C3Tel +1(416) 751-6565
Amec Foster WheelerEnvironment & Infrastructure
amecfw.com
brownClayey Silt FILL
trace sand, trace gravel, trace cobbleswith rootles
moist
brownSANDY SILT
trace clay, trace gravel and cobbleswith shale pieces
loosemoist
greyWEATHERED SHALE
End of Borehole Borehole was terminated due to auger refusal.
Monitoring Well Installation Details:(50 mm Dia.)
Protective Flushmount Cover Installed Bentonite: 0.0 - 1.8 m Sand Filter: 1.8 - 2.1 m Screen: 2.1 - 5.2 m
33
75
100
100
100
100
91.6
90.8
87.1
0.7
1.4
5.2
Hard augering from 4.6 m to 5.2 mdepth
1
2
3
4
5
6
7
SS
SS
SS
SS
SS
SS
SS
8
8
50/10
50/13
50/15
50/1
50/0
Drilling Method:Project Client:
Project Name:
Project Location:
Drilling Machine: Reviewed by:
Revision No.:Date Started:
Highland Sewershed Trunk Sewer Rehabilitation
AH
DA
10/03/2016 10/03/2016
CH2M HILL Canada Limited Compiled by: 150 mm Solid Stem Augers
Queensway and Royal York Road Vicinity (South MimicoSite), Toronto, ON
SOIL SAMPLING
Sam
ple
Typ
e
Sam
ple
Num
ber
LITHOLOGY PROFILE FIELD TESTING
Rec
over
y (%
)
SP
T 'N
' Val
ue
Lith
olog
y P
lot
LAB TESTINGCOMMENTS
&GRAIN SIZE
DISTRIBUTION(%)
SPT PPT
DE
PT
H RemouldIntact
Nilcon Vane*MTO Vane*
Geodetic Ground Surface Elevation: 92.2 m
DCPT
* Undrained Shear Strength (kPa)
(m)
(m)
EL
EV
AT
IONDESCRIPTION
20 40 60 80
Intact
INS
TR
UM
EN
TA
TIO
NIN
ST
ALL
AT
ION
Remould
PenetrationTesting
PlasticCL
COV parts per million (ppm)200 400 600 800
SISAGRLiquid
WP
20 40 60 80
2 4 6 8 10 12
Soil Vapour Reading
W WL
Rinse pH Values
TOV parts per million (ppm)
Logged by:Project Number: Drilling Location: North Side of Mimico Creek (E621019,N4832303)
RECORD OF BOREHOLE No. BH 5
Page: 1 of 1
DU
Scale: 1 : 42Borehole details as presented, do not constitute a thorough understanding of all potential conditions present and require interpretative assistance froma qualified Geotechnical Engineer. Also, borehole information should be read in conjunction with the geotechnical report for which it wascommissioned and the accompanying'Explanation of Borehole Log'.
TT163003
92
91
90
89
88
1
2
3
4
5
11
12
4
5
5
5
23
10
50
13
50
15
50
1
50
0
50
Groundwater depth observed on 10/04/2016 at a depth of: 1.1 m.
Groundwater depth on completion of drilling on 10/03/2016 at a depth of: 2.7 m.
Track Mounted Drill
Date Completed: 0, 16/06/16
104 Crockford BoulevardScarborough, OntarioCanada M1R 3C3Tel +1(416) 751-6565
Amec Foster WheelerEnvironment & Infrastructure
amecfw.com
about 150 mm TOPSOIL
dark brownSilty Clay / Clayey Silt FILL
trace sand, with shale fragmentswith rootlets and organics
greyWEATHERED SHALE
End of Borehole Borehole was terminated due to auger refusal.
Monitoring Well Installation Details:(50 mm Dia.)
Screen: 0 - 1.5 m Sand Filter: 1.5 - 1.6 m
29
38
100
98.0
96.7
96.6
0.2
1.4
1.6
1
2
3
SS
SS
SS
11
7
50/15
Drilling Method:Project Client:
Project Name:
Project Location:
Drilling Machine: Reviewed by:
Revision No.:Date Started:
Highland Sewershed Trunk Sewer Rehabilitation
AH
DA
01/04/2016 01/04/2016
CH2M HILL Canada Limited Compiled by: 100 mm Solid Stem Augers
Queensway and Royal York Road Vicinity (South MimicoSite), Toronto, ON
SOIL SAMPLING
Sam
ple
Typ
e
Sam
ple
Num
ber
LITHOLOGY PROFILE FIELD TESTING
Rec
over
y (%
)
SP
T 'N
' Val
ue
Lith
olog
y P
lot
LAB TESTINGCOMMENTS
&GRAIN SIZE
DISTRIBUTION(%)
SPT PPT
DE
PT
H RemouldIntact
Nilcon Vane*MTO Vane*
Geodetic Ground Surface Elevation: 98.2 m
DCPT
* Undrained Shear Strength (kPa)
(m)
(m)
EL
EV
AT
IONDESCRIPTION
20 40 60 80
Intact
INS
TR
UM
EN
TA
TIO
NIN
ST
ALL
AT
ION
Remould
PenetrationTesting
PlasticCL
COV parts per million (ppm)200 400 600 800
SISAGRLiquid
WP
20 40 60 80
2 4 6 8 10 12
Soil Vapour Reading
W WL
Rinse pH Values
TOV parts per million (ppm)
Logged by:Project Number: Drilling Location: East side of Mimico Creek (E620768,N4832486)
RECORD OF BOREHOLE No. BH 6
Page: 1 of 1
JW
Scale: 1 : 42Borehole details as presented, do not constitute a thorough understanding of all potential conditions present and require interpretative assistance froma qualified Geotechnical Engineer. Also, borehole information should be read in conjunction with the geotechnical report for which it wascommissioned and the accompanying'Explanation of Borehole Log'.
TT163003
98
97
1
13
27
715
50
Groundwater depth observed on 10/04/2016 at a depth of: 1.2 m.
Groundwater depth on completion of drilling on 01/04/2016 at a depth of: 1.5 m.
Minute Man
Date Completed: 0, 16/06/16
104 Crockford BoulevardScarborough, OntarioCanada M1R 3C3Tel +1(416) 751-6565
Amec Foster WheelerEnvironment & Infrastructure
amecfw.com
about 100 mm TOPSOILdark brown
Clayey Silt FILLsome sand, trace gravel
with rootles
brown to greySANDY SILT
trace clay, trace gravel and cobblesdensemoist
greyish brownSILTY CLAY
trace sand, with shale fragmentshardgrey
WEATHERED SHALE
End of Borehole End of Borehole.
Monitoring Well Installation Details:(50 mm Dia.)
Concrete: 0 - 0.3 m Bentonite: 0.3 - 3.4 m Sand Filter: 3.4 - 3.8 m Screen: 3.8 - 6.9 m
75
83
100
100
100
100
101.5
100.9
100.2
99.8
94.7
0.1
0.7
1.4
1.8
6.9
Hard augering from 4.6 m to 6.9 mdepth.
1
2
3
4
5
6
7
8
SS
SS
SS
SS
SS
SS
SS
SS
2
32
50/13
50/13
50/13
50/5
50/0
50/0
Drilling Method:Project Client:
Project Name:
Project Location:
Drilling Machine: Reviewed by:
Revision No.:Date Started:
Highland Sewershed Trunk Sewer Rehabilitation
AH
DA
10/03/2016 10/03/2016
CH2M HILL Canada Limited Compiled by: 150 mm Solid Stem Augers
Queensway and Royal York Road Vicinity (South MimicoSite), Toronto, ON
SOIL SAMPLING
Sam
ple
Typ
e
Sam
ple
Num
ber
LITHOLOGY PROFILE FIELD TESTING
Rec
over
y (%
)
SP
T 'N
' Val
ue
Lith
olog
y P
lot
LAB TESTINGCOMMENTS
&GRAIN SIZE
DISTRIBUTION(%)
SPT PPT
DE
PT
H RemouldIntact
Nilcon Vane*MTO Vane*
Geodetic Ground Surface Elevation: 101.6 m
DCPT
* Undrained Shear Strength (kPa)
(m)
(m)
EL
EV
AT
IONDESCRIPTION
20 40 60 80
Intact
INS
TR
UM
EN
TA
TIO
NIN
ST
ALL
AT
ION
Remould
PenetrationTesting
PlasticCL
COV parts per million (ppm)200 400 600 800
SISAGRLiquid
WP
20 40 60 80
2 4 6 8 10 12
Soil Vapour Reading
W WL
Rinse pH Values
TOV parts per million (ppm)
Logged by:Project Number: Drilling Location: North side of Mimico Creek (E620572,N4832750)
RECORD OF BOREHOLE No. BH 7
Page: 1 of 1
DU
Scale: 1 : 42Borehole details as presented, do not constitute a thorough understanding of all potential conditions present and require interpretative assistance froma qualified Geotechnical Engineer. Also, borehole information should be read in conjunction with the geotechnical report for which it wascommissioned and the accompanying'Explanation of Borehole Log'.
TT163003
101
100
99
98
97
96
95
1
2
3
4
5
6
22
9
10
8
5
4
3
3
13
50
13
50
13
50
5
50
0
50
0
50
Groundwater depth observed on 10/04/2016 at a depth of: 2.9 m.
Groundwater depth on completion of drilling on 10/03/2016 at a depth of: 5.5 m.
Track Mounted Drill
Date Completed: 0, 16/06/16
104 Crockford BoulevardScarborough, OntarioCanada M1R 3C3Tel +1(416) 751-6565
Amec Foster WheelerEnvironment & Infrastructure
amecfw.com
about 200 mm TOPSOIL
brownSand / Silty Sand FILL
with rootlets and organicsmoist
brownSANDY SILT
trace clay, trace gravelcompact
moistgrey
WEATHERED SHALE
End of Borehole End of Borehole.
Monitoring Well Installation Details:(50 mm Dia.)
Concrete: 0 - 0.3 m Bentonite: 0.3 - 3.2 m Sand Filter: 3.2 - 3.8 m Screen: 3.8 - 6.9 m
50
42
100
100
100
100
101.4
100.4
100.2
94.8
0.2
1.2
1.4
6.9
Hard augering from 3.0 m to 4.6 mdepth
1
2
3
4
5
6
7
8
SS
SS
SS
SS
SS
SS
SS
SS
7
27
50/10
50/10
50/10
50/3
50/0
50/0
Drilling Method:Project Client:
Project Name:
Project Location:
Drilling Machine: Reviewed by:
Revision No.:Date Started:
Highland Sewershed Trunk Sewer Rehabilitation
AH
DA
10/03/2016 10/03/2016
CH2M HILL Canada Limited Compiled by: 150 mm Solid Stem Augers
Queensway and Royal York Road Vicinity (South MimicoSite), Toronto, ON
SOIL SAMPLING
Sam
ple
Typ
e
Sam
ple
Num
ber
LITHOLOGY PROFILE FIELD TESTING
Rec
over
y (%
)
SP
T 'N
' Val
ue
Lith
olog
y P
lot
LAB TESTINGCOMMENTS
&GRAIN SIZE
DISTRIBUTION(%)
SPT PPT
DE
PT
H RemouldIntact
Nilcon Vane*MTO Vane*
Geodetic Ground Surface Elevation: 101.7 m
DCPT
* Undrained Shear Strength (kPa)
(m)
(m)
EL
EV
AT
IONDESCRIPTION
20 40 60 80
Intact
INS
TR
UM
EN
TA
TIO
NIN
ST
ALL
AT
ION
Remould
PenetrationTesting
PlasticCL
COV parts per million (ppm)200 400 600 800
SISAGRLiquid
WP
20 40 60 80
2 4 6 8 10 12
Soil Vapour Reading
W WL
Rinse pH Values
TOV parts per million (ppm)
Logged by:Project Number: Drilling Location: Reid Manor Park (E620477, N4832765)
RECORD OF BOREHOLE No. BH 8
Page: 1 of 1
DU
Scale: 1 : 42Borehole details as presented, do not constitute a thorough understanding of all potential conditions present and require interpretative assistance froma qualified Geotechnical Engineer. Also, borehole information should be read in conjunction with the geotechnical report for which it wascommissioned and the accompanying'Explanation of Borehole Log'.
TT163003
101
100
99
98
97
96
95
1
2
3
4
5
6
30
41
14
10
6
5
13
15
10
50
10
50
10
50
3
50
0
50
0
50
Groundwater depth observed on 10/04/2016 at a depth of: 2.2 m.
Groundwater depth on completion of drilling on 10/03/2016 at a depth of: 3.7 m.
Track Mounted Drill
Date Completed: 0, 16/06/16
104 Crockford BoulevardScarborough, OntarioCanada M1R 3C3
Tel +1(416) 751-6565
Amec Foster WheelerEnvironment & Infrastructure
amecfw.com
APPENDIX B
Soil Laboratory Test Results
0
10
20
30
40
50
60
70
80
90
100
COBBLESIZE
COARSE MEDIUM FINE
3/8"
U.S.S. Sieve size, meshes/inch
3 10 16 301/2"
SAND
SILT and CLAY
FINE GRAINED
Size of openings, inches
6" 41/4"
1 0.1 0.01 0.001 0.0001100
40 50 60 1004" 2004
FINE
GRAVEL
COARSE
11/2" 1" 3/3" 8
PE
RC
EN
T F
INE
R T
HA
N
GRAIN SIZE, mm
100 10
GRAIN SIZE DISTRIBUTION
ELEVATION (m)
98.097.892.190.8
DEPTH (m)
2.31.51.51.5
SAMPLE
4444
BOREHOLE
BH 17-2BH 17-3BH 17-7BH 17-8
SYMBOL
Date November 2017 Prep'd
Chkd.Project TT163003.9000
Proposed Bridges A to F, Highland Sewershed Trunk SewerRehabilitation
Silt and Clay
AM
EC
FW
GR
AD
AT
ION
CU
RV
E T
T16
300
3.90
00.
GP
J A
ME
C S
CA
RB
OR
OU
GH
LO
G 2
009.
GD
T
07/1
1/17
FIGURE No. B1
0
10
20
30
40
50
60
0 10 20 30 40 50 60 70 80
CICL MH
OHOL
ML
CL
CL-ML
ML
'A' LIN
E
CH
WL=50
WL=30
LIQUID LIMIT (LL)
PLA
ST
ICIT
Y IN
DE
X (
PI)
PI = 0.73 (L
L-20)
ATTERBERG LIMIT TEST RESULTS
SYMBOL PI
19181418
PL
19171921
LL
38353339
ELEVATION (m)
98.097.892.190.8
SAMPLE
4444
DEPTH (m)
2.31.51.51.5
BOREHOLE
BH 17-2BH 17-3BH 17-7BH 17-8
Date November 2017 Prep'd
Chkd.Project TT163003.9000
Proposed Bridges A to F, Highland Sewershed Trunk SewerRehabilitation
FIGURE No. A2
Silt and Clay
AM
EC
FW
AT
TE
RB
ER
G L
IMIT
S T
T16
300
3.90
00.
GP
J A
ME
C S
CA
RB
OR
OU
GH
LO
G 2
009
.GD
T
07/1
1/17
APPENDIX C
CH2M Drawings
CONSULTANTS
INFRASTRUCTURE
LINEAR UNDERGROUND
DIRECTOR,
JOHN P. KELLY, P. ENG
MANAGEMENT
WATER INFRASTRUCTURE
DIRECTOR,
GRAHAM HARDING, P. ENG.
DISTRIBUTION AND COLLECTION
DIRECTOR,
BILL SHEA, P. ENG
1:100
1
1:100
2
CROSS SECTION OF BRIDGE
CROSS SECTION OF BRIDGE
EROSION CONTROL BLANKET DETAILS TYP.
POSITIVE SEWER CHAINAGE
POSITIVE SEWER CHAINAGE
POSITIVE SEWER CHAINAGE
SECTION AT CREEK CROSSING "A"
SECTION AT CREEK CROSSING "B"
Engineering & Construction Services
DATE INITIALREVISIONSNo. SIGNEDDIGITAL INFORMATION
DESIGN DRAWN CHECKED
NUMBER
DRAWINGSCALE SHEET
CONTRACT No.
DATE
1AS NOTED
17ECS-LU-01TT
C40
SFKMJ GMH
1058-16-02-56AUG, 2016 ISSUED FOR 30% REVIEW
ISSUED FOR 75% REVIEWDEC, 20162
ISSUED FOR 90% REVIEWMAR, 20173
ISSUED FOR 100% REVIEWSEP, 20174
11.
12.
13.
1.
CONSTRUCTION SEQUENCE:
2.
3.
4.
5.
BACKFILL RAMP.
INSTALL BEARING AND BRIDGE.
INSTALL SOIL ANCHORS.
BACKFILL TO TOP OF BEARING SEAT.
CONSTRUCT FOOTING.
INSTALL SEDIMENTATION AND EROSION CONTROL MEASURES.
6.
1.
TRCA SEEDING MIX.
BACKFILL WITH NATIVE MATERIAL AND SEED WITH
AND DEMOLISH ABUTMENTS TO A DEPTH OF 600mm,
AFTER CONSTRUCTION, REMOVE BRIDGE, EXCAVATE
RESTORATION NOTES:NOTES:
1.
2.
3.
LICENSED IN THE PROVINCE OF ONTARIO.
STAMPED BY TWO PROFESSIONAL ENGINEERS
ABUTMENTS AND SOIL ANCHORS, SIGNED AND
OF THE TEMPORARY BRIDGE, INCLUDING
CONTRACTOR TO PROVIDE SHOP DRAWINGS
CL-625-ONT LOADING, COMPLETE WITH BEARINGS.
PANEL BRIDGE OR EQUIVALENT DESIGNED FOR
THE TEMPORARY BRIDGE SHALL BE AN ACROW
AND DIMENSIONS BASED ON FIELD CONDITIONS.
CONTRACTOR TO CONFIRM CROSSING LENGTH 4.
5.
7.
8.
9.
CONTRACTOR'S SOLE RESPONSIBILITY.
THE TRCA APPROVAL WITH ANY DELAY BEING THE
CONTRACTOR WILL BE RESPONSIBLE FOR OBTAINING
TEMPORARY BRIDGE ARRANGEMENT, THE
IF THE CONTRACTOR CHOOSES AN ALTERNATIVE
BACKFILL WITH NATIVE MATERIAL.
EXCAVATED MATERIALS SHALL BE STORED ON-SITE.
WITHIN 15M OF THE EMBANKMENTS.
NO STOCKPILING OF MATERIALS SHALL BE PERMITTED
TEMPORARY CREEK CROSSING
FOR CONSTRUCTION VEHICLES AND BYPASS PIPING (1)
SOUTH MIMICO STS REHABILITATION
SLIDING OR FURTHER EROSION OF THE EMBANKMENTS.
SEDIMENT CONTROL MEASURES STAY IN PLACE WITHOUT
CONTRACTOR TO ENSURE THAT THE EROSION AND
TO TRCA APPROVAL).
EACH CREEK CROSSING AND BANK (LOCATION SUBJECT
CONTRACTOR SHALL DRILL ADDITIONAL BOREHOLES FOR
FOOTPRINT.
COMPLETELY REMOVED WITHIN THE ABUTMENT
OR LOOSENED/SOFTENED MATERIALS MUST BE
EXISTING TOPSOIL FILL MATERIALS, ORGANIC SILT
TO 100% SPMDD.
200mm LOOSE LIFTS AND UNIFORMLY COMPACTED
GRANULAR 'A' PAD SHALL BE PLACED IN MAXIMUM
FAILURE.
SURROUNDING AREA INCLUDING EMBANKMENT
WORKS DO NOT ADVERSELY IMPACT THE
PRECAUTIONS TO ENSURE THAT THE EXCAVATION
THE CONTRACTOR SHALL TAKE ALL NECESSARY
BE ABOVE 2 YEAR FLOOD ELEVATION.
CONTRACTOR SHALL DESIGN BRIDGE SOFFIT TO
BY THE CONTRACTOR.
THE TEMPORARY BRIDGE WILL BE CORRECTED
DESIGN FLOOD IS 2 YEARS. ANY DAMAGE TO
FLOOD EVENTS. THE RETURN PERIOD OF THE
TEMPORARY BRIDGE INCLUDING DURING
RESPONSIBILITY FOR THE INTEGRITY OF THE
THE CONTRACTOR SHALL ASSUME ALL
6.
10.
SEPTEMBER, 2017
GRANULAR 'A' PAD
STAPLE OVERLAPS
FABRICATED RAMP OR OTHER
PROPOSED 400mm GRAVEL STAGING AREA
TEMPORARY ABUTMENT
SILT SOXX UNDER TEMPORARY BRIDGE
EROSION CONTROL BLANKET
SILT SOXX UNDER TEMPORARY BRIDGE
MANUFACTURERS SPECIFICATIONS
STAPLING PATTERNS AS PER MINIMUM 150mm OVERLAP
ANCHOR IN 150mm DEEP TRENCH
MINIMUM 300mm OVERLAP
STAPLE OVERLAPS
AND BURY END IN 150mm DEEP TRENCH
BRING MATERIAL TO A LEVEL AREA, IF POSSIBLE,
PROPOSED 400mm GRAVEL STAGING AREA
SLOPE GRADE TO MATCH EXISTING
3.5m MIN. 3.5m MIN.
BRIDGE SOFFIT EL. 102.01 APPROX.
2 YEAR FLOOD LINE EL. 101.18 APPROX.
2 LAYERS OF GEOTEXTILE FABRIC, TERRAFIX 270R
2 LAYERS OF GEOTEXTILE FABRIC, TERRAFIX 270R
APPROX. 21.4m
WIDTH OF CREEK
BRIDGE DECK EL. 102.73
PROPOSED 400mm GRAVEL STAGING AREA
TEMPORARY ABUTMENT
SILT SOXX UNDER TEMPORARY BRIDGE
EROSION CONTROL BLANKET
SILT SOXX UNDER TEMPORARY BRIDGE
PROPOSED 400mm GRAVEL STAGING AREA
3.5m MIN. 3.5m MIN.
BRIDGE SOFFIT EL. 100.48 APPROX.
2 YEAR FLOOD LINE EL. 99.03 APPROX.
2 LAYERS OF GEOTEXTILE FABRIC, TERRAFIX 270R
APPROX. 49.0m
WIDTH OF CREEK
GRANULAR 'A' PAD
SLOPE GRADE TO MATCH EXISTING
TERRAFIX 270R
2 LAYERS OF GEOTEXTILE FABRIC
COMPACTED FILL
COMPACTED FILL
OF CREEK CROSSING
EXISTING GROUND AT CENTRELINE
OF CREEK CROSSING
EXISTING GROUND AT CENTRELINE
EROSION CONTROL BLANKET (SEE DETAIL ON C40)
EROSION CONTROL BLANKET (SEE DETAIL ON C40)
RIVER ROCK BEDDING
(APPROXIMATE)
MIMICO CREEK WATER SURFACE
(APPROXIMATE)
MIMICO CREEK WATER SURFACE
EL. VARIES
BRIDGE DECK
SEE SECTION DETAILS
BRIDGE DECK EL. VARIES
4.2m APPROX.
3.0m MIN.
COMPARTMENT
TRAFFIC
ACROW, MABEY PANEL BRIDGE OR EQUIVALENT WITH OPEN TRUSS SYSTEM
ACROW, MABEY PANEL BRIDGE OR EQUIVALENT WITH OPEN TRUSS SYSTEM
WITH OPEN TRUSS SYSTEM
OR EQUIVALENT BRIDGE
ACROW, MABEY PANEL
BYPASS COMPARTMENT
3.15m APPROX.
WITH OPEN TRUSS SYSTEM
BRIDGE OR EQUIVALENT
ACROW PANEL
COMPARTMENT
BYPASS PIPING
COMPARTMENT
PROTECTION
ACROW PANEL BRIDGE OR EQUIVALENT WITH OPEN TRUSS SYSTEM
CONSULTANTS
INFRASTRUCTURE
LINEAR UNDERGROUND
DIRECTOR,
JOHN P. KELLY, P. ENG
MANAGEMENT
WATER INFRASTRUCTURE
DIRECTOR,
GRAHAM HARDING, P. ENG.
DISTRIBUTION AND COLLECTION
DIRECTOR,
BILL SHEA, P. ENG
CROSS SECTION OF BRIDGE
CROSS SECTION OF BRIDGE
1:100
1
1:100
2
CROSS SECTION OF BRIDGE
POSITIVE SEWER CHAINAGE
POSITIVE SEWER CHAINAGE
SECTION AT CREEK CROSSING "C"
SECTION AT CREEK CROSSING "D"
Engineering & Construction Services
DATE INITIALREVISIONSNo. SIGNEDDIGITAL INFORMATION
DESIGN DRAWN CHECKED
NUMBER
DRAWINGSCALE SHEET
CONTRACT No.
DATE
1AS NOTED
17ECS-LU-01TT
C41
SFKMJ GMH
1058-16-02-57AUG, 2016 ISSUED FOR 30% REVIEW
ISSUED FOR 75% REVIEWDEC, 20162
ISSUED FOR 90% REVIEWMAR, 20173
ISSUED FOR 100% REVIEWSEP, 20174
1.
CONSTRUCTION SEQUENCE:
2.
3.
4.
5.
BACKFILL RAMP.
INSTALL BEARING AND BRIDGE.
INSTALL SOIL ANCHORS.
BACKFILL TO TOP OF BEARING SEAT.
CONSTRUCT FOOTING.
INSTALL SEDIMENTATION AND EROSION CONTROL MEASURES.
6.
1.
TRCA SEEDING MIX.
BACKFILL WITH NATIVE MATERIAL AND SEED WITH
AND DEMOLISH ABUTMENTS TO A DEPTH OF 600mm,
AFTER CONSTRUCTION, REMOVE BRIDGE, EXCAVATE
RESTORATION NOTES:
TEMPORARY CREEK CROSSING
FOR CONSTRUCTION VEHICLES AND BYPASS PIPING (2)
SOUTH MIMICO STS REHABILITATION
11.
12.
13.
NOTES:
1.
2.
3.
LICENSED IN THE PROVINCE OF ONTARIO.
STAMPED BY TWO PROFESSIONAL ENGINEERS
ABUTMENTS AND SOIL ANCHORS, SIGNED AND
OF THE TEMPORARY BRIDGE, INCLUDING
CONTRACTOR TO PROVIDE SHOP DRAWINGS
CL-625-ONT LOADING, COMPLETE WITH BEARINGS.
PANEL BRIDGE OR EQUIVALENT DESIGNED FOR
THE TEMPORARY BRIDGE SHALL BE AN ACROW
AND DIMENSIONS BASED ON FIELD CONDITIONS.
CONTRACTOR TO CONFIRM CROSSING LENGTH 4.
5.
7.
8.
9.
CONTRACTOR'S SOLE RESPONSIBILITY.
THE TRCA APPROVAL WITH ANY DELAY BEING THE
CONTRACTOR WILL BE RESPONSIBLE FOR OBTAINING
TEMPORARY BRIDGE ARRANGEMENT, THE
IF THE CONTRACTOR CHOOSES AN ALTERNATIVE
BACKFILL WITH NATIVE MATERIAL.
EXCAVATED MATERIALS SHALL BE STORED ON-SITE.
WITHIN 15M OF THE EMBANKMENTS.
NO STOCKPILING OF MATERIALS SHALL BE PERMITTED
SLIDING OR FURTHER EROSION OF THE EMBANKMENTS.
SEDIMENT CONTROL MEASURES STAY IN PLACE WITHOUT
CONTRACTOR TO ENSURE THAT THE EROSION AND
TO TRCA APPROVAL).
EACH CREEK CROSSING AND BANK (LOCATION SUBJECT
CONTRACTOR SHALL DRILL ADDITIONAL BOREHOLES FOR
FOOTPRINT.
COMPLETELY REMOVED WITHIN THE ABUTMENT
OR LOOSENED/SOFTENED MATERIALS MUST BE
EXISTING TOPSOIL FILL MATERIALS, ORGANIC SILT
TO 100% SPMDD.
200mm LOOSE LIFTS AND UNIFORMLY COMPACTED
GRANULAR 'A' PAD SHALL BE PLACED IN MAXIMUM
FAILURE.
SURROUNDING AREA INCLUDING EMBANKMENT
WORKS DO NOT ADVERSELY IMPACT THE
PRECAUTIONS TO ENSURE THAT THE EXCAVATION
THE CONTRACTOR SHALL TAKE ALL NECESSARY
BE ABOVE 2 YEAR FLOOD ELEVATION.
CONTRACTOR SHALL DESIGN BRIDGE SOFFIT TO
BY THE CONTRACTOR.
THE TEMPORARY BRIDGE WILL BE CORRECTED
DESIGN FLOOD IS 2 YEARS. ANY DAMAGE TO
FLOOD EVENTS. THE RETURN PERIOD OF THE
TEMPORARY BRIDGE INCLUDING DURING
RESPONSIBILITY FOR THE INTEGRITY OF THE
THE CONTRACTOR SHALL ASSUME ALL
6.
10.
SEPTEMBER, 2017
SEE SECTION DETAILS
BRIDGE DECK EL. VARIES
4.2m APPROX.
3.0m MIN.
COMPARTMENT
TRAFFIC
WITH OPEN TRUSS SYSTEM
BRIDGE OR EQUIVALENT
ACROW PANEL
COMPARTMENT
BYPASS PIPING
COMPARTMENT
PROTECTION
SEE SECTION DETAILS
BRIDGE DECK EL. VARIES
4.2m APPROX.
3.0m MIN.
COMPARTMENT
TRAFFIC
WITH OPEN TRUSS SYSTEM
BRIDGE OR EQUIVALENT
ACROW PANEL
COMPARTMENT
BYPASS PIPING
COMPARTMENT
PROTECTION
FABRICATED RAMP OR OTHER
PROPOSED 400mm GRAVEL STAGING AREA
TEMPORARY ABUTMENT
SILT SOXX UNDER TEMPORARY BRIDGE
EROSION CONTROL BLANKET
SILT SOXX UNDER TEMPORARY BRIDGE
PROPOSED 400mm GRAVEL STAGING AREA
SLOPE GRADE TO MATCH EXISTING
3.5m MIN. 3.5m MIN.
BRIDGE SOFFIT EL. 98.79 APPROX.
2 YEAR FLOOD LINE EL. 97.49 APPROX.
2 LAYERS OF GEOTEXTILE FABRIC, TERRAFIX 270R
APPROX. 21.6m
WIDTH OF CREEK
BRIDGE DECK EL. 99.51
GRANULAR 'A' PAD
TERRAFIX 270R
2 LAYERS OF GEOTEXTILE FABRIC
COMPACTED FILL
OF CREEK CROSSING
EXISTING GROUND AT CENTRELINE
3.5m MIN.3.5m MIN.
APPROX. 32.5m
WIDTH OF CREEK
EROSION CONTROL BLANKET
SILT SOXX UNDER TEMPORARY BRIDGE
GRANULAR 'A' PAD
TERRAFIX 270R
2 LAYERS OF GEOTEXTILE FABRIC
PROPOSED 400mm GRAVEL STAGING AREA
SLOPE GRADE TO MATCH EXISTING
SILT SOXX UNDER TEMPORARY BRIDGE
COMPACTED FILL
OF CREEK CROSSING
EXISTING GROUND AT CENTRELINE
BRIDGE DECK EL. 98.23
FABRICATED RAMP OR OTHER
PROPOSED 400mm GRAVEL STAGING AREA
TEMPORARY ABUTMENT
2 LAYERS OF GEOTEXTILE FABRIC, TERRAFIX 270R
BRIDGE SOFFIT EL. 97.51 APPROX.
2 YEAR FLOOD LINE EL. 95.94 APPROX.
STONE RETAINING WALL
EROSION CONTROL BLANKET (SEE DETAIL ON C40)
EROSION CONTROL BLANKET (SEE DETAIL ON C40)
(APPROXIMATE)
MIMICO CREEK WATER SURFACE
(APPROXIMATE)
MIMICO CREEK WATER SURFACE
ACROW PANEL BRIDGE OR EQUIVALENT WITH OPEN TRUSS SYSTEM
ACROW PANEL BRIDGE OR EQUIVALENT WITH OPEN TRUSS SYSTEM
ACROW PANEL BRIDGE OR EQUIVALENT WITH OPEN TRUSS SYSTEM
CONSULTANTS
INFRASTRUCTURE
LINEAR UNDERGROUND
DIRECTOR,
JOHN P. KELLY, P. ENG
MANAGEMENT
WATER INFRASTRUCTURE
DIRECTOR,
GRAHAM HARDING, P. ENG.
DISTRIBUTION AND COLLECTION
DIRECTOR,
BILL SHEA, P. ENG
CROSS SECTION OF BRIDGE
CROSS SECTION OF BRIDGE
1:100
1
1:100
2
POSITIVE SEWER CHAINAGE
POSITIVE SEWER CHAINAGE
SECTION AT CREEK CROSSING "E"
SECTION AT CREEK CROSSING "F"
Engineering & Construction Services
DATE INITIALREVISIONSNo. SIGNEDDIGITAL INFORMATION
DESIGN DRAWN CHECKED
NUMBER
DRAWINGSCALE SHEET
CONTRACT No.
DATE
1AS NOTED
17ECS-LU-01TTSFKMJ GMH
1058-16-02-58AUG, 2016 ISSUED FOR 30% REVIEW
ISSUED FOR 75% REVIEWDEC, 20162
ISSUED FOR 90% REVIEWMAR, 20173
ISSUED FOR 100% REVIEWSEP, 20174
1.
CONSTRUCTION SEQUENCE:
2.
3.
4.
5.
BACKFILL RAMP.
INSTALL BEARING AND BRIDGE.
INSTALL SOIL ANCHORS.
BACKFILL TO TOP OF BEARING SEAT.
CONSTRUCT FOOTING.
INSTALL SEDIMENTATION AND EROSION CONTROL MEASURES.
6.
1.
TRCA SEEDING MIX.
BACKFILL WITH NATIVE MATERIAL AND SEED WITH
AND DEMOLISH ABUTMENTS TO A DEPTH OF 600mm,
AFTER CONSTRUCTION, REMOVE BRIDGE, EXCAVATE
RESTORATION NOTES:
TEMPORARY CREEK CROSSING
FOR CONSTRUCTION VEHICLES AND BYPASS PIPING (3)
C42
SOUTH MIMICO STS REHABILITATION
11.
12.
13.
NOTES:
1.
2.
3.
LICENSED IN THE PROVINCE OF ONTARIO.
STAMPED BY TWO PROFESSIONAL ENGINEERS
ABUTMENTS AND SOIL ANCHORS, SIGNED AND
OF THE TEMPORARY BRIDGE, INCLUDING
CONTRACTOR TO PROVIDE SHOP DRAWINGS
CL-625-ONT LOADING, COMPLETE WITH BEARINGS.
PANEL BRIDGE OR EQUIVALENT DESIGNED FOR
THE TEMPORARY BRIDGE SHALL BE AN ACROW
AND DIMENSIONS BASED ON FIELD CONDITIONS.
CONTRACTOR TO CONFIRM CROSSING LENGTH 4.
5.
7.
8.
9.
CONTRACTOR'S SOLE RESPONSIBILITY.
THE TRCA APPROVAL WITH ANY DELAY BEING THE
CONTRACTOR WILL BE RESPONSIBLE FOR OBTAINING
TEMPORARY BRIDGE ARRANGEMENT, THE
IF THE CONTRACTOR CHOOSES AN ALTERNATIVE
BACKFILL WITH NATIVE MATERIAL.
EXCAVATED MATERIALS SHALL BE STORED ON-SITE.
WITHIN 15M OF THE EMBANKMENTS.
NO STOCKPILING OF MATERIALS SHALL BE PERMITTED
SLIDING OR FURTHER EROSION OF THE EMBANKMENTS.
SEDIMENT CONTROL MEASURES STAY IN PLACE WITHOUT
CONTRACTOR TO ENSURE THAT THE EROSION AND
TO TRCA APPROVAL).
EACH CREEK CROSSING AND BANK (LOCATION SUBJECT
CONTRACTOR SHALL DRILL ADDITIONAL BOREHOLES FOR
FOOTPRINT.
COMPLETELY REMOVED WITHIN THE ABUTMENT
OR LOOSENED/SOFTENED MATERIALS MUST BE
EXISTING TOPSOIL FILL MATERIALS, ORGANIC SILT
TO 100% SPMDD.
200mm LOOSE LIFTS AND UNIFORMLY COMPACTED
GRANULAR 'A' PAD SHALL BE PLACED IN MAXIMUM
FAILURE.
SURROUNDING AREA INCLUDING EMBANKMENT
WORKS DO NOT ADVERSELY IMPACT THE
PRECAUTIONS TO ENSURE THAT THE EXCAVATION
THE CONTRACTOR SHALL TAKE ALL NECESSARY
BE ABOVE 2 YEAR FLOOD ELEVATION.
CONTRACTOR SHALL DESIGN BRIDGE SOFFIT TO
BY THE CONTRACTOR.
THE TEMPORARY BRIDGE WILL BE CORRECTED
DESIGN FLOOD IS 2 YEARS. ANY DAMAGE TO
FLOOD EVENTS. THE RETURN PERIOD OF THE
TEMPORARY BRIDGE INCLUDING DURING
RESPONSIBILITY FOR THE INTEGRITY OF THE
THE CONTRACTOR SHALL ASSUME ALL
6.
10.
SEPTEMBER, 2017
SEE SECTION DETAILS
BRIDGE DECK EL. VARIES
4.2m APPROX.
3.0m MIN.
COMPARTMENT
TRAFFIC
WITH OPEN TRUSS SYSTEM
BRIDGE OR EQUIVALENT
ACROW PANEL
COMPARTMENT
BYPASS PIPING
COMPARTMENT
PROTECTION
SEE SECTION DETAILS
BRIDGE DECK EL. VARIES
4.2m APPROX.
3.0m MIN.
COMPARTMENT
TRAFFIC
WITH OPEN TRUSS SYSTEM
BRIDGE OR EQUIVALENT
ACROW PANEL
COMPARTMENT
BYPASS PIPING
COMPARTMENT
PROTECTION
FABRICATED RAMP OR OTHER
PROPOSED 400mm GRAVEL STAGING AREA
3.5m MIN.3.5m MIN.
APPROX. 30.3m
WIDTH OF CREEK
BRIDGE SOFFIT EL. 94.72 APPROX.
2 YEAR FLOOD LINE EL. 93.02 APPROX.
PROPOSED 400mm GRAVEL STAGING AREA
SLOPE GRADE TO MATCH EXISTING
BRIDGE DECK EL. 95.44
EROSION CONTROL BLANKET
SILT SOXX UNDER TEMPORARY BRIDGE
GRANULAR 'A' PAD
TERRAFIX 270R
2 LAYERS OF GEOTEXTILE FABRIC
SILT SOXX UNDER TEMPORARY BRIDGE
COMPACTED FILL
OF CREEK CROSSING
EXISTING GROUND AT CENTRELINE
TEMPORARY ABUTMENT
2 LAYERS OF GEOTEXTILE FABRIC, TERRAFIX 270R
3.5m MIN. 3.5m MIN.APPROX. 30.0m
WIDTH OF CREEK
BRIDGE SOFFIT EL. 91.91 APPROX.
2 YEAR FLOOD LINE EL. 90.30 APPROX.
PROPOSED 400mm GRAVEL STAGING AREA
SLOPE GRADE TO MATCH EXISTING
FABRICATED RAMP OR OTHER
PROPOSED 400mm GRAVEL STAGING AREA
BRIDGE DECK EL. 92.64
EROSION CONTROL BLANKET
SILT SOXX UNDER TEMPORARY BRIDGE
GRANULAR 'A' PAD
TERRAFIX 270R
2 LAYERS OF GEOTEXTILE FABRIC
SILT SOXX UNDER TEMPORARY BRIDGE
COMPACTED FILL
OF CREEK CROSSING
EXISTING GROUND AT CENTRELINE
TEMPORARY ABUTMENT
2 LAYERS OF GEOTEXTILE FABRIC, TERRAFIX 270R
EROSION CONTROL BLANKET (SEE DETAIL ON C40)
EROSION CONTROL BLANKET (SEE DETAIL ON C40)
ARMOUR STONE
(APPROXIMATE)
MIMICO CREEK WATER SURFACE
(APPROXIMATE)
MIMICO CREEK WATER SURFACE
RIVER ROCK BEDDING
ACROW PANEL BRIDGE OR EQUIVALENT WITH OPEN TRUSS SYSTEM
ACROW PANEL BRIDGE OR EQUIVALENT WITH OPEN TRUSS SYSTEM
APPENDIX D
Photographs
Photograph No. 1: Bridge A – Profile
Photograph No. 2: Bridge A – Right Bank
Photograph No. 3: Bridge A – Left Bank
Photograph No. 4: Bridge B – Profile and Left Bank
Photograph No. 5: Bridge B – Right Bank
Photograph No. 6: Bridge C – Profile
Photograph No. 7: Bridge C – Right Bank
Photograph No. 8: Bridge C – Left Bank
Photograph No. 9: Bridge D – Right Bank
Photograph No. 10: Bridge D – Left Bank
Photograph No. 11: Bridge E – Profile
Photograph No. 12: Bridge E – Profile
Photograph No. 13: Bridge F – Profile and Right Bank
Photograph No. 14: Bridge F –Left Bank