Issue Amendment Date Drawn Chk'd
C
1. DO NOT SCALE FROM DRAWINGS. USE WRITTEN DIMENSIONS ONLY.2. BUILDER TO CHECK & VERIFY ALL DIMENSIONS & LEVELS PRIOR TO COMMENCEMENT OF WORK.3. IT IS THE OWNERS RESPONSIBILITY TO ENSURE THAT THE ENGINEER HAS INVESTIGATED SUBSOIL CONDITIONS & DESIGNED ALL STRUCTURAL ELEMENTS TO SUIT.4. THE DESIGN & DETAILS CONTAINED ON THIS DRAWING IS SUPPLIED IN CONFIDENCE & IS NOT TO BE USED FOR ANY OTHER PURPOSE, EXCEPT THAT AUTHORISED BY DEANGELIS TAYLOR AND ASSOCIATES
Drawing No.
A401Amend't
ANo. of sheets
Job No.
16015Drawn:MP.MS
CC
Scale:
As shown @ B1
Project:
Dwg Name:
Address:
Nominated ArchitectsCAD File: #File Path
Project North:
NSW Architects Registration Board No.Daniel Donai 9068, Glorio DeAngelis 3808, Steve Taylor 7414COPYRIGHT 2016 - DE ANGELIS TAYLOR + ASSOCIATES PTY LTD
AMENITIES BUILDINGLOT 100 DP.1107591, LOT 8 DP.1132349, LOT 1 DP.829852NARELLAN SPORTS HUB , NARELLAN , NSW , 2567SECTIONS
JUL 16
Date:
Client:de angelis taylor + associates88 bathurst street liverpool nsw 2170 australia
po box 68 l i verpool bc nsw 1 8 7 1
t: 6 1 2 9 6 0 1 1 0 1 1 f : 6 1 2 9 8 2 1 2 2 1 3
w: www.dta.net.au e: [email protected]
architects
A TENDER ISSUE 27-06-16 CC,MP,MS DD
457 2 16 3
4A602
6A603
70.193
3,80
02,
743
307
279
471
1,17
0
BASEMENT LEVEL - RL 68.040
GROUND FLOOR LEVEL - RL 71.840
CEILING LEVEL - RL 74.583
U/S OF RAFTER - RL 74.890
U/S OF RAFTER ON GRID 2 - RL 75.640
RIDGE LEVEL - RL 76.810
U/S OF RAFTER ON GRID 2 - 75.640
RIDGE LEVEL - 76.487
847
TOP OF BEAM ON GRID 4 - RL 75.169
Gutter anddownpipe to Hyd.
eng's detail
Galvanised steel slidinggate. Paint finish
Stainless steelwall projection
Concrete slab andfootings to struct.
eng's detail
Skylight to spec.
Metal roofsheeting on steelstructure
Finishedground level
Balustradeand handrailto detail
Capping to detail
Handrail todetail
Metal wallcladding to
finishes schedule
Galvanised steel column &concrete base to struct. eng's detail
Stainless steelwall projection
D02
RS4 RS8
MS
FBFB
MS
CR2CR1
FHR
Metal soffit lining, install tomanufactures details.
7 5 4 2 16 3
1A602
2A602
1A6035
A603
3,80
02,
743
307
279
471
BASEMENT LEVEL - RL 68.040
GROUND FLOOR LEVEL - RL 71.840
CEILING LEVEL - RL 74.583
U/S OF RAFTER - RL 74.890
U/S OF RAFTER ON GRID 2 - RL 75.640
TOP OF BEAM ON GRID 4 - RL 75.169
5.00°
2.50°
Galvanised steel column &concrete base to struct. eng's
detail
Existing groundlevel showndotted
Concrete slaband footings tostruct. eng'sdetail
Skylight to spec.
Metal roofsheeting on steelstructure
Finishedgroundlevel
Suspendedconcrete slab tostruct. eng'sdetail
Balustradeandhandrail todetail
Capping to detail
Gutter anddownpipe to Hyd.eng's detail
Conc. block retainingwall to struct. eng's
detail
Suspendedplasterboardceiling, paintfinish
Atlantis drainagecell & pipe drain
Atlantis drainagecell & pipe drain
D10 W08
D32
NETBALLCOMPETITION
CONTROL
NETBALL STORE
HALLWAY NETBALLADMINISTRATION ATHLETICS
MEETING ROOM
Compacted fill tostructural eng's detail
WET
WA
LLC
HA
MB
ER
WET
WA
LLC
HA
MB
ER
Metal soffit lining, install tomanufactures details.
7 5 4 2 16 3
2A601
3A601
3,80
02,
743
307
279
1,64
1
BASEMENT LEVEL - RL 68.040
GROUND FLOOR LEVEL - RL 71.840
CEILING LEVEL - RL 74.583
U/S OF RAFTER - RL 74.890
RIDGE LEVEL - RL 76.810
TOP OF BEAM ON GRID 4 - RL 75.169
5.00°
Galvanised steel column &concrete base to struct. eng's
detail
Existing groundlevel shown
dotted
Concrete slab andfootings to struct.eng's detail
Metal roofsheeting onsteel structure
Finished groundlevel
Skylight tospec.
Balustrade to detail
Conc. block wall tostruct. eng's detail
Gutter anddownpipe to Hyd.eng's detail
Conc. block wall tostruct. eng's detail Suspended conc.
slab to struct.eng's detail
Conc. beam to struct.eng's detail
Raked plasterboardceiling, paint finish
Galv. steel gatepowdercoat finish
Atlantis drainagecell & pipe drain
plasterboardlined bulkhead
plasterboardlined bulkhead
D29
D06
NETBALLCLUB ROOM
ATHLETIC STORE
WET
WA
LLC
HA
MB
ER
Compacted fill tostructural eng's detail
CDB
CDBCB
4 5 71 2 3 6
3,80
02,
743
307
750
1,17
0
BASEMENT LEVEL - RL 68.040
GROUND FLOOR LEVEL - RL 71.840
CEILING LEVEL - RL 74.583
U/S OF RAFTER - RL 74.890
U/S OF RAFTER ON GRID 2 - RL 75.640
RIDGE LEVEL - RL 76.810
5.00°
2.50°
Galvanised steel column &concrete base to struct. eng'sdetail
Concrete slaband footings tostruct. eng'sdetail
Metal roofsheeting on steelstructure
ML2
Building behind
Finished groundlevel
Balustrade to detail
Skylight tospec.
Gutter anddownpipe to Hyd.eng's detail
W08
D06
CR3 CR3
CR4
CR2
FHR
Metal soffit lining, install tomanufactures details.
Capping to detail
Indicative sign shown,toilet signage to be as
specified
7 5 4 2 16 3
10A604
7A603
3,80
02,
743
307
279
1,64
1
BASEMENT LEVEL - RL 68.040
GROUND FLOOR LEVEL - RL 71.840
CEILING LEVEL - RL 74.583
U/S OF RAFTER - RL 74.890
RIDGE LEVEL - RL 76.810
TOP OF BEAM ON GRID 4 - RL 75.169
5.00°
Galvanised steel column & concretebase to struct. eng's detail
Concrete slaband footings tostruct. eng'sdetail
Skylight to spec. Metal roofsheeting on steelstructure
Steel structure
Metal wall cladding tofinishes schedule
Wash troughto detail
Gutter anddownpipe to Hyd.eng's detail
Finished groundlevel
GB
CR3 CR3
FC
FB FB
CTCT
CR1
Metal soffit lining, install tomanufactures details.
Capping to detail
Indicative sign shown,toilet signage to be as
specified
7 5 4 2 16 3
1A601
3,80
02,
743
307
279
1,64
1
BASEMENT LEVEL - RL 68.040
GROUND FLOOR LEVEL - RL 71.840
CEILING LEVEL - RL 74.583
U/S OF RAFTER - RL 74.890
RIDGE LEVEL - RL 76.810
TOP OF BEAM ON GRID 4 - RL 75.169
5.00°
Galvanised steel column &concrete base to struct. eng's detail
Concrete slaband footings tostruct. eng'sdetail
Skylight to spec.Metal roofsheeting on steelstructure
Galvanized steelcolumn
Finishedgroundlevel
ML2
Gutters anddownpipes tohyd. eng's detail
MALE TOILETSFEMALE TOILETS EDB
Metal soffit lining, install tomanufactures details.
Capping to detail
LEGENDABC ABRASIVE BLASTED CONCRETEB-1 WALL HUNG BASINB-2 WALL HUNG BASIN - DISABLE COMPLIANTBFC BROOM FINISHED CONCRETEBCS BABY CHANGE STATIONCAP CEILING ACCESS PANELCH CLOTHES HOOKCR1 CEMENT RENDERED FINISH COLOUR 1CR2 CEMENT RENDERED FINISH COLOUR 2CR3 CEMENT RENDERED FINISH COLOUR 3CR4 CEMENT RENDERED FINISH COLOUR 4CS CLEANERS SHELFCT CERAMIC TILESCT-1 CERAMIC TILES COLOUR 1CT-2 CERAMIC TILES COLOUR 2CT-3 CERAMIC TILES COLOUR 3CT-4 CERAMIC TILES COLOUR 4CT-5 CERAMIC TILES COLOUR 5CT-6 CERAMIC TILES COLOUR 6C/W COMPLETE WITHDP DOWNPIPE - PFCDPS DOWNPIPE & SPREADER - COLORBOND.EAC EXPOSED AGGREGATE CONCRETEEDB ELECT. DISTRIBUTION BOARD, REFER TO ELECT. DOCUMENTSF FRIDGE BY OTHERSFG FIXED GLASSFHR FIRE HOSE REEL REFER TO HYDRAULUC ENGINEERS DETAILSFW FLOOR WASTEGD GRATED DRAINGPO-S SINGLE GENERAL PURPOSE OUTLETGPO-D DOUBLE GENERAL PURPOSE OUTLETGR GRAB RAILHC HONED CONCRETEHD HAND DRYERHWU HOT WATER UNITHYD HYDRANT REFER TO HYDRAULUC ENGINEERS DETAILSLF LAMINATED BENCH TOP & CUPBOARDSM1 MIRRORM2 MIRROR - DISABLE COMPLIANTMBS MOP & BROOM SHELFML1 METAL LOUVRES TYPE 1ML2 METAL LOUVRES TYPE 2MW MICROWAVE OVENNS-CT NON-SLIP CERAMIC TILEPB PLASTERBOARD LININGPTD PAPER TOWEL DISPENSERSCR SHOWER CURTAIN RAILSC COLUMN TO STRUCTURAL ENGINEERS DETAILSSD SOAP DISPENSERSH WALL SHELFSK-1 KITCHENETTE SINKSK-2 CLEANER SINKSK-3 CANTEEN SINKSMR SHEET METAL ROOFSTF STEEL TROWEL FINISHED CONCRETETGSI TACTILE INDICATORTP TOILET PARTITIONSTPH TOILET PAPER HOLDERTS-1 TAP SET - BBQ, CANTEEN, BABY CHANGETS-2 TAP SET - DISABLE COMPLIANTTS-3 TAP SET - WASHTROUGH,PARENT/CHILDTS-4 TAP SET - CLEANERSTS-5 TAP SET - CANTEEN/BBQ SINKTS-6 TAP SET - SHOWER DISABLESTS-7 TAP SET - SHOWER FEMALEV VINYLVTY VANITY UNITWC-1 TOILET PAN / SUITEWC-2 TOILET PAN / SUIT DISABLE COMPLIANTWC-3 CHILD TOILET PAN / SUITEWT WASH TROUGHWU-1 WALL HUNG URINAL
AL1 Aluminium framed glazed windows & doors - powdercoat finishAL2 Aluminium framed solid core doorsBAL Galvanised steel balustradeCB Concrete block wallCDB Concrete designer block wallCR1 Cement render - paint finish - colour 1CR2 Cement render - paint finish - colour 2CR3 Cement render - paint finish - colour 3CR4 Cement render - paint finish - colour 4DP PVC down pipe - paint finishFB Face brickGB Glazed brickFC Fibre cement, set joints, paint finishHR Handrail - stainless steelML1 Metal louvres - powdercoat finishML2 Metal louvres - powdercoat finishMS Metal wall claddingRS Roller shutterSC Steel column - galvanised finishSG Galvanised steel silding gate - powdercoat finishSL Metal soffit liningSM Exposed structural members - galvanised finish with timber infillSMR Sheet metal roofWP Wall projection - stainless steel
EXTERNAL FINISHES SCHEDULE
6 SECTION 61:1005 SECTION 5
1:100
4 SECTION 41:1003 SECTION 3
1:100
2 SECTION 21:1001 SECTION 1
1:100
B
B TENDER ISSUE 05-07-16 MP DD
C
C 13-07-16 CC,MP DDTENDER ISSUE