How We Permitted the Extreme Makeover: 1 Extreme Makeover: Floodplain Edition “Project 616”
Transcript
Page 1: Extreme Makeover: Floodplain Edition · Expect the Unexpected •• Annexation delayed due to passing of CM Silcox -- October 24, 2008.October 24, 2008. •• November 4, 2008 Council

How We Permitted the

Extreme Makeover:

11

Extreme Makeover:

Floodplain Edition“Project 616”

Page 2: Extreme Makeover: Floodplain Edition · Expect the Unexpected •• Annexation delayed due to passing of CM Silcox -- October 24, 2008.October 24, 2008. •• November 4, 2008 Council

Quick StartQuick Start

•• Meetings with EMHE staff @ County Meetings with EMHE staff @ County offices in early October 2008, “2 or 3 offices in early October 2008, “2 or 3 sites being considered, so tell us if you sites being considered, so tell us if you want this to be in your city”.want this to be in your city”.

••

22

want this to be in your city”.want this to be in your city”.•• City / County staff and management City / County staff and management

buybuy--in required in required –– no fees or expenses.no fees or expenses.•• Site selected; City regulations would Site selected; City regulations would

govern due to pending annexation govern due to pending annexation scheduled for the week prior to start of scheduled for the week prior to start of construction.construction.

Page 3: Extreme Makeover: Floodplain Edition · Expect the Unexpected •• Annexation delayed due to passing of CM Silcox -- October 24, 2008.October 24, 2008. •• November 4, 2008 Council

Logistics of the Project & SiteLogistics of the Project & Site

–– Floodplain Floodplain –– Zone A downstream of studied section.Zone A downstream of studied section.

–– Sanitary sewer extension to replace septic system on Sanitary sewer extension to replace septic system on site .site .

–– City annexing area from County City annexing area from County -- What rules and What rules and

33

–– City annexing area from County City annexing area from County -- What rules and What rules and regulations apply? regulations apply?

–– What permits are required? FDP, Building, etc.What permits are required? FDP, Building, etc.

–– Timing? DoorTiming? Door--knock 12/8/2008, finished 12/15/2008.knock 12/8/2008, finished 12/15/2008.

–– Secrecy Secrecy –– owner can’t find out beforehand for owner can’t find out beforehand for tax/finance purposes.tax/finance purposes.

Page 4: Extreme Makeover: Floodplain Edition · Expect the Unexpected •• Annexation delayed due to passing of CM Silcox -- October 24, 2008.October 24, 2008. •• November 4, 2008 Council

Where to Start?Where to Start?

•• Structure is located in the floodplain.Structure is located in the floodplain.

•• New construction or substantial New construction or substantial improvements must be permitted [improvements must be permitted [ 60.3 60.3 (a)(1)] and must be reasonably safe from (a)(1)] and must be reasonably safe from

44

(a)(1)] and must be reasonably safe from (a)(1)] and must be reasonably safe from flooding [flooding [ 60.3 (a)(3)].60.3 (a)(3)].

•• Establish BFE to determine MFF.Establish BFE to determine MFF.

•• Check for impacts to adjacent structures Check for impacts to adjacent structures [[ 65.12 (a)(5)].65.12 (a)(5)].

Page 5: Extreme Makeover: Floodplain Edition · Expect the Unexpected •• Annexation delayed due to passing of CM Silcox -- October 24, 2008.October 24, 2008. •• November 4, 2008 Council

Floodplain & City LimitsFloodplain & City Limits

55

Page 6: Extreme Makeover: Floodplain Edition · Expect the Unexpected •• Annexation delayed due to passing of CM Silcox -- October 24, 2008.October 24, 2008. •• November 4, 2008 Council

Big Picture FloodplainBig Picture Floodplain

66

Page 7: Extreme Makeover: Floodplain Edition · Expect the Unexpected •• Annexation delayed due to passing of CM Silcox -- October 24, 2008.October 24, 2008. •• November 4, 2008 Council

HECHEC--RAS Cross SectionRAS Cross Section

77

Page 8: Extreme Makeover: Floodplain Edition · Expect the Unexpected •• Annexation delayed due to passing of CM Silcox -- October 24, 2008.October 24, 2008. •• November 4, 2008 Council

Expect the UnexpectedExpect the Unexpected

•• Annexation delayed due to passing of CM Silcox Annexation delayed due to passing of CM Silcox -- October 24, 2008.October 24, 2008.

•• November 4, 2008 Council meeting canceled.November 4, 2008 Council meeting canceled.

•• All CC Agenda items pushed at least one week All CC Agenda items pushed at least one week --

88

•• All CC Agenda items pushed at least one week All CC Agenda items pushed at least one week --first public meeting for annexation 12/2/2008, first public meeting for annexation 12/2/2008, 2nd 12/9/2008, officially annexed 1/6/2009.2nd 12/9/2008, officially annexed 1/6/2009.

•• Regulation flipped back to County Regulation flipped back to County –– FDP, FDP, building permits, driveway culverts, etc.building permits, driveway culverts, etc.

Page 9: Extreme Makeover: Floodplain Edition · Expect the Unexpected •• Annexation delayed due to passing of CM Silcox -- October 24, 2008.October 24, 2008. •• November 4, 2008 Council

The Show Must Go OnThe Show Must Go On

•• Work with landscapers & graders to match Work with landscapers & graders to match the modelthe model

•• Swales in side yardsSwales in side yards

99

•• Swales in side yardsSwales in side yards

•• Fence openingsFence openings

•• Driveway culvertsDriveway culverts

Page 10: Extreme Makeover: Floodplain Edition · Expect the Unexpected •• Annexation delayed due to passing of CM Silcox -- October 24, 2008.October 24, 2008. •• November 4, 2008 Council

Site InspectionsSite Inspections

•• Very fast progress, little time to correct.Very fast progress, little time to correct.

•• Found finish floor needed to be raised.Found finish floor needed to be raised.

•• Small trees planted in swales.Small trees planted in swales.

••

1010

•• Small trees planted in swales.Small trees planted in swales.

•• Fences needed open space below.Fences needed open space below.

•• AsAs--built, finish floor is slightly lower than built, finish floor is slightly lower than City requirement, but higher than County City requirement, but higher than County requirement.requirement.

•• Reasonably safe from flooding.Reasonably safe from flooding.

Page 11: Extreme Makeover: Floodplain Edition · Expect the Unexpected •• Annexation delayed due to passing of CM Silcox -- October 24, 2008.October 24, 2008. •• November 4, 2008 Council

Foundation & Pad ProfileFoundation & Pad Profile

1111

Page 12: Extreme Makeover: Floodplain Edition · Expect the Unexpected •• Annexation delayed due to passing of CM Silcox -- October 24, 2008.October 24, 2008. •• November 4, 2008 Council

Final Lot SurveyFinal Lot Survey

1212

Page 13: Extreme Makeover: Floodplain Edition · Expect the Unexpected •• Annexation delayed due to passing of CM Silcox -- October 24, 2008.October 24, 2008. •• November 4, 2008 Council

Construction PhotosConstruction Photos

1313

Page 14: Extreme Makeover: Floodplain Edition · Expect the Unexpected •• Annexation delayed due to passing of CM Silcox -- October 24, 2008.October 24, 2008. •• November 4, 2008 Council

Construction PhotosConstruction Photos

1414

Page 15: Extreme Makeover: Floodplain Edition · Expect the Unexpected •• Annexation delayed due to passing of CM Silcox -- October 24, 2008.October 24, 2008. •• November 4, 2008 Council

Construction PhotosConstruction Photos

1515

Page 16: Extreme Makeover: Floodplain Edition · Expect the Unexpected •• Annexation delayed due to passing of CM Silcox -- October 24, 2008.October 24, 2008. •• November 4, 2008 Council

Construction PhotosConstruction Photos

1616

Page 17: Extreme Makeover: Floodplain Edition · Expect the Unexpected •• Annexation delayed due to passing of CM Silcox -- October 24, 2008.October 24, 2008. •• November 4, 2008 Council

Construction PhotosConstruction Photos

1717

Page 18: Extreme Makeover: Floodplain Edition · Expect the Unexpected •• Annexation delayed due to passing of CM Silcox -- October 24, 2008.October 24, 2008. •• November 4, 2008 Council

And now it’s time for:And now it’s time for:

The Reality CheckThe Reality Check

1818

The Reality CheckThe Reality Check