ExxonMobil BBS web tool Version June 2011
Transcript
Page 1: ExxonMobil BBS web tool Version June 2011. What has changed Alert Observations – Project number – Observation time – Unannounced Observations – Field.

ExxonMobil BBS web tool Version June 2011

Page 2: ExxonMobil BBS web tool Version June 2011. What has changed Alert Observations – Project number – Observation time – Unannounced Observations – Field.

What has changed• Alert Observations

– Project number– Observation time– Unannounced Observations– Field verification and validation process

• Reports– Selection criteria– Stewardship reports for AO Validated, active users, AO’s and Questionable items

• AO DTR– Layout– Job description added as quality criteria

• Near miss – Layout– Actual versus planned closing date– OIMS system reference (ExxonMobil only)

• JSA DTR– Button added on 1st level

Page 3: ExxonMobil BBS web tool Version June 2011. What has changed Alert Observations – Project number – Observation time – Unannounced Observations – Field.

What has changed – Alert Observations

• Project #: – Field added to cluster AO’s per project – Convention• the apro number is to be used for Coteba/Artelia projects• TBD for ABB programs

Page 4: ExxonMobil BBS web tool Version June 2011. What has changed Alert Observations – Project number – Observation time – Unannounced Observations – Field.

What has changed – Alert Observations

• Time: – Time plus AM/PM indication changed into 24 Hrs

clock– Convention• HH:MM format to be used

Page 5: ExxonMobil BBS web tool Version June 2011. What has changed Alert Observations – Project number – Observation time – Unannounced Observations – Field.

What has changed – Alert Observations• Unannounced AO: – Field ( Yes/No) added to indicate if the AO was

announced or not• Unannounced means that the observer appears on site

without giving a heads up or pre-notice to the persons observed

– One should strive to maximize the number of unannounced visits

Page 6: ExxonMobil BBS web tool Version June 2011. What has changed Alert Observations – Project number – Observation time – Unannounced Observations – Field.

What has changed – Alert Observations• Description of Task & Background Information /

Work Conditions: – Importance of this field is raised and it is added on

the AO DTR template as a separate item

Page 7: ExxonMobil BBS web tool Version June 2011. What has changed Alert Observations – Project number – Observation time – Unannounced Observations – Field.

What has changed – Alert Observations• Questionable Item #: – Field protected from direct input– QI are picked up by the system from Page 2 of the AO

• Signature field has been eliminated

Page 8: ExxonMobil BBS web tool Version June 2011. What has changed Alert Observations – Project number – Observation time – Unannounced Observations – Field.

What has changed – Alert Observations• Field verification and validation:– In the field follow up and Quality review of the

recommendation that were implemented to confirm: • Effectiveness and Sustainability over time

– Should be performed 1-3 months after the confirmed implementation date

Field Verification and Validation

new

Page 9: ExxonMobil BBS web tool Version June 2011. What has changed Alert Observations – Project number – Observation time – Unannounced Observations – Field.

What has changed – Alert Observation DTR• Page 2 Positive comments / Questionable items – Split into 2 sections

• Page 1 Job description – Added

new

Split

Page 10: ExxonMobil BBS web tool Version June 2011. What has changed Alert Observations – Project number – Observation time – Unannounced Observations – Field.

What has changed – Alert Observation DTR• Field Verification and Validation process– No longer obsolete

new

Split

Page 11: ExxonMobil BBS web tool Version June 2011. What has changed Alert Observations – Project number – Observation time – Unannounced Observations – Field.

What has changed - Reports

new

Page 12: ExxonMobil BBS web tool Version June 2011. What has changed Alert Observations – Project number – Observation time – Unannounced Observations – Field.

What has changed - Reports

• AO Count Report - Vendors working for >1 OSP – Selection of AO’s is now based on the OSP selected in

the AO form when completing the AO – In the past the selection was based on default OSP,

resulting in incorrect counts • Test vendor has performed 124 AO’s for work ordered by

OSP 1 and 6 for work ordered by OSP 2

Test Vendor

Test Vendor

Test Vendor OSP1 selected

Test Vendor OSP2 selected

Page 13: ExxonMobil BBS web tool Version June 2011. What has changed Alert Observations – Project number – Observation time – Unannounced Observations – Field.

What has changed - Reports

• LPO Validated– Stewardship report to monitor the completion of the

field verification and validation (V&V)• Verification and validation takes place 1-3 months after the

implementation • Report is general indicator if verification is still required • The AO list gives detail which AO’s need V&V

Page 14: ExxonMobil BBS web tool Version June 2011. What has changed Alert Observations – Project number – Observation time – Unannounced Observations – Field.

What has changed - Reports

• LPO Validated – continued • The AO list gives detail which AO’s need V&V• Vendors can order by clicking on the “Field Validation

completed? “ column in the header

Page 15: ExxonMobil BBS web tool Version June 2011. What has changed Alert Observations – Project number – Observation time – Unannounced Observations – Field.

What has changed - Reports

• Questionable items per month and YTD– Stewardship report to monitor quality of AO process

and indirect also the application of the deeper dive tools

Test Vendor

Test Vendor

Page 16: ExxonMobil BBS web tool Version June 2011. What has changed Alert Observations – Project number – Observation time – Unannounced Observations – Field.

What has changed - Reports

• Active users – Stewardship report to manage the User Base– Every vendor should have at least one user that has

admin rights, if not, contact ABB or Coteba/Artelia • enables that user to create new users and to change the

status to inactive of users that are not longer participating

Page 17: ExxonMobil BBS web tool Version June 2011. What has changed Alert Observations – Project number – Observation time – Unannounced Observations – Field.

What has changed – JSA DTR

• “Add Default JSA DTR” button– Button added on first JSA DTR level to open blank JSA

DTR template

new

Page 18: ExxonMobil BBS web tool Version June 2011. What has changed Alert Observations – Project number – Observation time – Unannounced Observations – Field.

What has changed – Near Miss• New layout of the Near miss / hazard

identification form – more logical flow

Page 19: ExxonMobil BBS web tool Version June 2011. What has changed Alert Observations – Project number – Observation time – Unannounced Observations – Field.

What has changed – Near Miss• Added reference to OIMS system (ExxonMobil only)• Added “Actual Completion Date” versus “Expected

Completion Date”